1 Contents Executive Summary 1 1 Project Background 6 Page 1.1 Project Overview Hotel Concept Justification of the Project Foreign Currency Earnings Tourism Developments in Mauritius Econony Employment Creation Potential Legal, Institutional and Regulatory Framework Environmental Protection Act The Planning and Development Act The National Development Strategy - April The Grand Port-Savanne DCA Outline Planning Scheme Road Traffic Act Maurice Ile Durable Project (MID) SSR International Airport Safeguarding Sustainable Development Vision Implementation Schedule 12 2 Project Brief, Promoter and Professional Services Brief Description of the Project The Promoter The Hotel Management - Minor International The Promoter s Representative Professional Services Project Manager Architect and Master Planning Services Quantity Surveying Landscape Engineer Engineering Services Land Surveying The Flora and Fauna Specialist Cultural Heritage Survey Ecological and Environmental Management Plan 16 3 The Project Description The Project Site Site Location 17

2 3.1.2 Site Ownership Site Boundaries Site Topography Site Occupancy The Le Chaland Resort Hotel The Room Accommodation The Central Facilities The Beach Restaurant The Day Spa Light Structures on Existing Plinths Back of House Remote Services Back of House M&E Compound Le Chaland Resort Hotel Footprint Height above Ground Setbacks Hotel Access Driveway and Parking Spaces Project Utilities and Infrastructure Requirements Potable Water Electricity Supply Wastewater Collection, Treatment & Disposal Storm Water Collection and Disposal Solid Waste Management Telecommunication Ancillary Works Relocation of the MTE and NCG Facilities Construction of NCG Guard Post Construction of a new Public Access Road La Cambuse Public Beach Extension and Upgrading Realignment of the 22kV CEB Transmission Line Re-routing of Potable Water Supply to Public Beach Realignment of Telecommunication Lines Preservation of Sand Dune 36 4 Natural Environment of Site Overview Climatic Environment Rainfall Air Temperature Free Surface Evaporation Wind Relative Humidity Sunshine Hours Sea Temperature 42

3 4.3 Local Air Quality Fire Risks Site Acoustic Environment Site Noise Aircraft Noise Local Noise Regulations Site Geomorphology Site Geology Site Pedology Soil type Sand Dune Formation Surface Hydrology and Hydrogeology Regional Surface Hydrology Hydrogeology Fauna and Flora Site Fauna Site Flora Marine Environment Tidal and Long-term Water Levels Environmentally Sensitive Areas (ESA) The Blue Bay Marine Park Coastal Sand Dune Mare-aux-Songes Archeological Site 52 5 The Built Environment Demography Existing Regional Settlements and Population Regional Industrial and Tourism Activity Agriculture Poultry Farming Tourism SSR International Airport Synergy between Le Chaland Resort Hotel and Plaisance AeroVille Project Public Amenities Social Infrastructure Public Beaches Road Infrastructure Public Services and Utilities Domestic Water Supply Electricity Supply Telecommunications Sewerage 57

4 5.8.5 Solid Waste Disposal 58 6 Environmental Management Plan Introduction Demolition and Site Clearance The Demolition of Existing Building and Site clearance Phase Removal of Floral Species within the footprint of new buildings Modification of Site Geomorphology Generation of Biological Wastes Impacts at Construction Phase Generation of Solid Wastes Generation of Biological Pollution by Contractor Staff on Site Spillage of Hydrocarbon Exhaust Gases Dust Emissions Generation of Noise from Site Equipment and Traffic Construction of New Access Road Impacts on Sand Dune Cultural Heritage Impact Assessment Stormwater Management Impacts at Operation Stage Generation of Solid Wastes Generation of Biological Pollution Risks of Hydrocarbon spillage at Stand-by Power storage tanks Atmospheric pollution by Stand-by Plant stack gases Noise from Stand-by Plant and Electro-Mechanical Equipment Increased demand on Public Utilities Socio-Economic Impacts At Conceptual Stage At Construction Stage At Operation Phase 83 7 The Environmental Monitoring Plan The Environmental Monitoring Plan EMP at Construction Phase EMP at Operation Phase 86 8 Conclusion 93 Appendices

5 Appendix A Letter of Intent - Ministry of Housing and Lands Appendix B CJ - Certificate of Incorporation Appendix C EIA Licence for the Construction of a Beach Resort at La Cambuse ENV/12/1456 December 2009 Appendix D Correspondences with Authorities Appendix E Correspondences with OMNICANE & MOISE Appendix F Architect Drawings Appendix G Ecological Impact Report Appendix H Waste Water Treatment Plant Appendix I Wind Roses at Plaisance

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

New Mauritius Hotels Limited Resort Hotel at Les Salines, Rivière Noire Environmental Impact Assessment

New Mauritius Hotels Limited Resort Hotel at Les Salines, Rivière Noire Environmental Impact Assessment Resort Hotel at Les Salines, Rivière Noire Beachcomber/EIA/01 Issue 21 December 2017 This report takes into account the particular instructions and requirements of our client. It is not intended for and

More information

FOR. Mer (MOST) (E.I.A)

FOR. Mer (MOST) (E.I.A) PROPOSED OIL FARM of 250000 MT CAPACITY AT MER ROUGE Mer FOR Rouge Oil Storage Terminal (MOST) ENVIRONMENTAL IMPACT ASSESSMENT REPORT (E.I.A) December 2014 TABLE OF CONTENTS Title Page (i) Table of Contents

More information

TABLE OF CONTENTS. Title Page Table of Contents List of Tables

TABLE OF CONTENTS. Title Page Table of Contents List of Tables TABLE OF CONTENTS Title Page Table of Contents List of Tables ii List of Plates List of Annexes i Executie Summary ii Chapter 1. Introduction & Methods of Assessment of Impact 1 1.1 The Promoter 1 1.2

More information

TABLE OF CONTENTS. 3.1 Project Justification Project Description 21

TABLE OF CONTENTS. 3.1 Project Justification Project Description 21 TABLE OF CONTENTS Title Page Table of Contents (ii) List of Tables (iv) List of Plates (v) List of Annexes (vi) Executive Summary (vii) Chapter 1. Introduction & Methods of Assessment of Impact 1 1.1 The

More information

LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776]

LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776] LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776] 1. Notwithstanding all the other permits and clearances

More information

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS BAIE DU TOMBEAU SITE CONTENTS

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS BAIE DU TOMBEAU SITE CONTENTS COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS BAIE DU TOMBEAU SITE CONTENTS Chapter Description Page EXECUTIVE SUMMARY 1 INTRODUCTION 1-1 1.1 General 1-1 1.1.1 Need for EIA 1-1

More information

DESIGN SHEET Wastewater Treatment Plant. Mauritius. Design Sheet. Wastewater Treatment Plant. Revised 08 October Ministry of Housing and Lands

DESIGN SHEET Wastewater Treatment Plant. Mauritius. Design Sheet. Wastewater Treatment Plant. Revised 08 October Ministry of Housing and Lands Mauritius Design Sheet Wastewater Treatment Plant Revised 08 October 2014 Ministry of Housing and Lands Design Sheet Wastewater Treatment plant Ministry of Housing and Lands Contents: Page 1.0 Introduction

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS Chapter Description Page EXECUTIVE SUMMARY 1 INTRODUCTION 1-1 1.1

More information

Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius

Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius CONTENTS Chapter Description Page 1 NON-TECHNICAL SUMMARY 17 1 INTRODUCTION 18 2 PROPOSED PROJECT IN FORT GEORGE 18 3 METHODOLOGY

More information

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY DECEMBER 2013 EXECUTIVE SUMMARY 1. PROJECT BACKGROUND

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014. EXECUTIVE SUMMARY E1 Introduction The proponent is SOLAR FIELD LTD, a consortium between 1. Dhamma Energy, a company based in Spain, specialised in photovoltaic projects 2. Harel Mallac & Co. Ltd, a company

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

19. INTERACTION OF IMPACTS

19. INTERACTION OF IMPACTS 19. INTERACTION OF IMPACTS 19.1 INTRODUCTION In addition to the requirement to describe the likely significant effects of the proposed development on the different elements of the environment, it is also

More information

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10 22 NETWORK UTILITIES 22.1 ISSUES 3 22.2 OBJECTIVES 4 22.3 POLICIES 4 22.4 RULES 6 22.5 PERFORMANCE STANDARDS 10 Whanganui District Plan (15 January 2018) Chapter 22 Network Utilities 22-1 22 NETWORK UTILITIES

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

Chapter 9 SUMMARY AND CONCLUSION

Chapter 9 SUMMARY AND CONCLUSION Chapter 9 SUMMARY AND CONCLUSION The potential environmental impacts and socio-economic issues associated with the construction and operation of the dye house at La Tour Koenig have been assessed in this

More information

4. Agency (or Institution) Responsible for Implementing the Project

4. Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study 1. Full Title of the Project Urban Transport Policy and System Development Master Plan for the ity of Dar es Salaam 2. Type of Study Master Plan 3. ategorisation and Its Reason

More information

Rural Production Environment (RPE)

Rural Production Environment (RPE) 1 RPE.1 Rural Production Environment (RPE) RPE.1.1 Description & Expectations The Rural Production Environment (RPE) encompasses a large area of the Whangarei District. The Environment hosts a wide range

More information

74 Subdivision Rules - Business 1, 2, 3, 4, Town Basin, Marsden Point Port, Port Nikau and Airport Environments

74 Subdivision Rules - Business 1, 2, 3, 4, Town Basin, Marsden Point Port, Port Nikau and Airport Environments 74 Subdivision Rules - Business 1, 2, 3, 4, Town Basin, Marsden Point Port, Port Nikau and Airport 74.1 Introduction This chapter contains subdivision rules for the Business 1, 2, 3, 4, Town Basin, Marsden

More information

A. TABLE OF CONTENTS ENVIRONMENTAL IMPACT STATEMENT

A. TABLE OF CONTENTS ENVIRONMENTAL IMPACT STATEMENT A. TABLE OF CONTENTS TABLE OF CONTENTS PAGE ii TABLE OF CONTENTS FOLDER 1 OF 14 List of Abbreviations... Tab B Glossary of Terms... Tab C Summary of changes to Queensland Government Departments... Tab

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Final Environmental Impact Assessment Report

Final Environmental Impact Assessment Report NON-TECHNICAL SUMMARY... I 1 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 PROJECT IMPLEMENTATION SCHEDULE... 2 1.3 COST ESTIMATE... 2 1.4 KEY LEGISLATIVE, REGULATORY AND INSTITUTIONAL FRAMEWORK... 2 1.4.1

More information

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement TABLE OF CONTENTS 1 INTRODUCTION 1-1 1.1 PROJECT OVERVIEW 1-1 1.1.1 Purpose of this Report 1-1 1.1.2 Project Summary 1-1 1.1.3 Land Tenure, Development Application Area, Tenements and Zoning 1-7 1.1.4

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

Environmental Impact Statement. Avoca Tank Project

Environmental Impact Statement. Avoca Tank Project ABN 88 100 095 494 Environmental Impact Statement for the Avoca Tank Project Prepared by: R.W. CORKERY & CO. PTY. LIMITED July 2014 This page has intentionally been left blank ABN 88 100 095 494 Environmental

More information

Development of Wind Energy in Lithuania. Vitalijus Auglys Ministry of Environment of Lithuania

Development of Wind Energy in Lithuania. Vitalijus Auglys Ministry of Environment of Lithuania Development of Wind Energy in Lithuania Vitalijus Auglys Ministry of Environment of Lithuania Demand of Renewable Energy Following the commitments to the EU, LT has to increase the total amount of energy

More information

Part 8 Natural hazards

Part 8 Natural hazards Part 8 Natural hazards Contents Page 8.1 Introduction... 3 8.2 Resource management issue... 3 8.3 Objectives and policies... 3 8.4 Resource management strategy... 5 8.5 Rules - restricted discretionary

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2

More information

NETWORK UTILITIES. Chapter 17. Network Utilities

NETWORK UTILITIES. Chapter 17. Network Utilities Chapter 17 Network Utilities PROPOSEDDRAFT ŌPŌTIKI DISTRICT PLAN 2016 17. NETWORK UTILITIES 17.1 RESOURCE MANAGEMENT ISSUES 1. Regionally significant infrastructure and network utilities are physical resources

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

6 IDENTIFICATION AND PREDICTION OF IMPACTS

6 IDENTIFICATION AND PREDICTION OF IMPACTS 6 IDENTIFICATION AND PREDICTION OF IMPACTS 6.1 General The actual and potential environmental impacts due to the proposed development by Mauritius Molasses Company Limited in the setting up of an oil storage

More information

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps.

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps. Chapter 34 MAIN RURAL ZONE RULES INTRODUCTION This Chapter contains rules managing land uses in the. The boundaries of this zone are shown on the Planning Maps. All rules apply throughout the unless otherwise

More information

Draft Code of Construction Practice

Draft Code of Construction Practice Draft Code of Construction Practice This factsheet outlines how it is expected the nominated undertaker will manage the effects of the construction of the Proposed Scheme on communities and the environment

More information

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to

More information

SABI Code of Practice for On-farm Irrigation Design

SABI Code of Practice for On-farm Irrigation Design SABI Code of Practice for On-farm Irrigation Design This code was developed to provide guidelines for irrigators and those servicing irrigators on developing a new irrigation system or upgrading an existing

More information

S e c t i o n S u b d i vision

S e c t i o n S u b d i vision S e c t i o n 2. 6 - S u b d i vision Subdivision is a process of defining and redefining land parcel boundaries and can provide a framework for future land use and development. Integrated, well planned

More information

N O N - T E C H N I C A L S U M M A R Y

N O N - T E C H N I C A L S U M M A R Y PROPOSED LUBE OIL BLENDING PLANT AT MAURITIUS FREEPORT DEVELOPMENT ZONE, MER ROUGE, PORT LOUIS N O N - T E C H N I C A L S U M M A R Y Project Promoter The project proponent, Sivoko Lubes Ltd, is a private

More information

RPE.3.4. Rural Production Environment. Index. RPE.1.1 Description and Expectations

RPE.3.4. Rural Production Environment. Index. RPE.1.1 Description and Expectations RPE.1 Index RPE.1 RPE.1.1 RPE.1.2 RPE.1.3 RPE.1.4 RPE.2 RPE.2.1 RPE.2.2 RPE.2.3 RPE.3 Landuse Description and Expectations Objectives Policies Guidance Note Eligibility Rules Notification Rules Discretionary

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT PURPOSE OF THIS DOCUMENT The purpose of this Background Information

More information

SCHEDULE 4 TO CLAUSE THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ4. GOULBURN VALLEY HARNESS AND GREYHOUND RACING PRECINCT

SCHEDULE 4 TO CLAUSE THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ4. GOULBURN VALLEY HARNESS AND GREYHOUND RACING PRECINCT --/--/--- Proposed C199 SCHEDULE 4 TO CLAUSE 37.01 THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ4. GOULBURN VALLEY HARNESS AND GREYHOUND RACING PRECINCT Purpose General To facilitate use,

More information

20.2 Issue 1 - Protecting the amenity within Business Zones and in areas adjoining Business Zones.

20.2 Issue 1 - Protecting the amenity within Business Zones and in areas adjoining Business Zones. 20. Business Zones 20.1 Introduction Kaikoura township is the principal commercial and service centre of the District, containing a wide range of retail outlets, offices, mixed industry, travellers accommodation,

More information

2. PROJECT DESCRIPTION

2. PROJECT DESCRIPTION 4 2. PROJECT DESCRIPTION 2.1. PROJECT LOCATION AND DESIGN The proposed Project is located in the southwest of the SRR International Airport at Plaine Magnien, District of Grand Port - Savanne, Figure 2-1.

More information

BAY OF ISLANDS PLANNING LIMITED 2 Totara Place, Kerikeri PO Box 795

BAY OF ISLANDS PLANNING LIMITED 2 Totara Place, Kerikeri PO Box 795 Far North District Council John Butler Centre Kerikeri Road Kerikeri Attention Ms Louise Wilson 30 May 2018 Dear Louise, BAY OF ISLANDS PLANNING LIMITED 2 Totara Place, Kerikeri PO Box 795 Kerikeri Phone

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

LIST OF CONDITIONS FOR PROPOSED HOTEL PROJECT AT LES SALINES, RIVIERE NOIRE BY NEW MAURITIUS HOTELS LTD [ENV/DOE/EIA/1767]

LIST OF CONDITIONS FOR PROPOSED HOTEL PROJECT AT LES SALINES, RIVIERE NOIRE BY NEW MAURITIUS HOTELS LTD [ENV/DOE/EIA/1767] LIST OF CONDITIONS FOR PROPOSED HOTEL PROJECT AT LES SALINES, RIVIERE NOIRE BY NEW MAURITIUS HOTELS LTD [ENV/DOE/EIA/1767] 1. Notwithstanding all the other permits and clearances from the relevant authorities,

More information

The Case of the Strategic Environmental Assessment of the Tourism Sector in Honduras

The Case of the Strategic Environmental Assessment of the Tourism Sector in Honduras The Case of the Strategic Environmental Assessment of the Tourism Sector in Honduras Juan David Quintero The World Bank Background The government of Honduras in the process of developing and implementing

More information

Environmental Planning and Assessment Act 1979

Environmental Planning and Assessment Act 1979 New South Wales State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) Amendment 2010 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor,

More information

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS TERMS OF REFERENCE ELECTRICAL TRANSMISSION LINES & SUBSTATIONS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to development projects involving the construction

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Chapter 8 Natural Resources

Chapter 8 Natural Resources Chapter 8 Natural Resources 127-134 8.1 Introduction 8.2 Extractives Industry 8.3 Forestry 8.4 Fishing / Aquaculture 8.1 Introduction Kerry has a number of naturally occurring resources that contribute

More information

Proposed Blackhillock Substation Expansion. Public Exhibition

Proposed Blackhillock Substation Expansion. Public Exhibition Proposed Blackhillock Substation Expansion Public Exhibition 9 February 2012 Blackhillock Substation Expansion: Pre Application Consultation The proposals are for the redevelopment of the existing substation

More information

General A. General A.1 Activities Not Specifically Provided For A.2 Temporary Activities... 3

General A. General A.1 Activities Not Specifically Provided For A.2 Temporary Activities... 3 Section Contents General... 2 4A. General... 2 4A.1 Activities Not Specifically Provided For... 2 4A.2 Temporary Activities... 3 4A.3 Activities on the Surface of Water... 6 4A.4 Status of Roads... 7 4A.5

More information

SCIENCE FOR RESILIENCE SCIENCE AS CRITICAL TO JAMAICA S RESILIENCE BUILDING STRATEGY

SCIENCE FOR RESILIENCE SCIENCE AS CRITICAL TO JAMAICA S RESILIENCE BUILDING STRATEGY SCIENCE FOR RESILIENCE SCIENCE AS CRITICAL TO JAMAICA S RESILIENCE BUILDING STRATEGY The premise... Extreme climate sensitivity which translates into pervasive vulnerability Size, location and topography

More information

Appendix 3 The World Bank s New Operational Manual

Appendix 3 The World Bank s New Operational Manual Appendix 3 The World Bank s New Operational Manual Appendix 4 Environmental Consideration in JICA Outline of Environmental Consideration in JICA 1Introduction Various studies

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

TERMS OF REFERENCE (TOR) FOR THE PROPOSED RESIDENTIAL APARTMENTS LOCATEDON PLOT L.R NO.

TERMS OF REFERENCE (TOR) FOR THE PROPOSED RESIDENTIAL APARTMENTS LOCATEDON PLOT L.R NO. TERMS OF REFERENCE (TOR) FOR THE PROPOSED RESIDENTIAL APARTMENTS LOCATEDON PLOT L.R NO. 1/95 ALONG ARGWINGS KODHEK ROAD, IN HURLINGHAM, NAIROBI CITY COUNTY. PROPONENT DOUBLE WIN COMPANY LIMITED P.O. BOX

More information

Victorian Desalination Project

Victorian Desalination Project Victorian Desalination Project D&C Utilities Environmental Management Plan Attachment D List of Technical Reports and Documents (Environmental) DOCUMENT NUMBER TDV 0 EV AT 0012.D 03 ATTACHMENT D LIST OF

More information

NETWORK UTILITIES. Chapter 17. Network Utilities PROPOSED ŌPŌTIKI DISTRICT PLAN DECISIONS VERSION MAY

NETWORK UTILITIES. Chapter 17. Network Utilities PROPOSED ŌPŌTIKI DISTRICT PLAN DECISIONS VERSION MAY Chapter 17 Network Utilities PROPOSED ŌPŌTIKI DISTRICT PLAN 2016 - DECISIONS VERSION MAY 2018 338 17. NETWORK UTILITIES 17.1 RESOURCE MANAGEMENT ISSUES 1. Regionally significant infrastructure and network

More information

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION 4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION This section provides an overview of legislation, guidelines and information documents that have informed the scope and content of this report and the approach

More information

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis & Prepared By: JANUARY, 2014 Executive Summary Two expansion alternatives were

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full title of the Project Project for Updating Dakar Urbanization Master Plan by

More information

RURAL CONSERVATION ZONE

RURAL CONSERVATION ZONE Chapter 37 RURAL CONSERVATION ZONE INTRODUCTION This Chapter contains rules managing land uses in the. The boundaries of this zone are shown on the Planning Maps. All rules apply throughout the unless

More information

Legislative environment

Legislative environment 4 Legislative environment Development at Brisbane Airport is governed by a range of Australian and Queensland Government legislative requirements. 4.1 Master Planning This 2014 Master Plan sets out the

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

13 Section 32 Summary for the Residential Chapter

13 Section 32 Summary for the Residential Chapter 13 Section 32 Summary for the Residential Chapter The purpose of this section is to present a summary of the evaluation of the objectives, policies and methods of the Residential Zone Chapter of the Proposed

More information

Division 19 Limited Development (Constrained) Zone: Assessment Criteria and Assessment Tables

Division 19 Limited Development (Constrained) Zone: Assessment Criteria and Assessment Tables Division 19 Limited Development (Constrained) Zone: Assessment Criteria and Assessment Tables 4.19.1 Limited Development (Constrained) Zone The provisions in this division relate to the Limited Development

More information

Appendix 3.1 Sample Scoping Letter, Newspaper Advertisement and Summary of Responses

Appendix 3.1 Sample Scoping Letter, Newspaper Advertisement and Summary of Responses Environmental Impact Statement Appendices for Laois-Kilkenny Reinforcement Project Appendix 3.1 Sample Scoping Letter, Newspaper Advertisement and Summary of Responses SAMPLE SCOPING LETTER Dear Sir/Madam,

More information

73 Subdivision Rules - Countryside and Coastal Countryside Environments

73 Subdivision Rules - Countryside and Coastal Countryside Environments 73 Subdivision Rules - Countryside and Coastal Countryside Environments 73.1 Introduction This section contains subdivision rules for the Countryside and Coastal Countryside Environments. Additional subdivision

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

Sectoral Guideline No3 February 2014

Sectoral Guideline No3 February 2014 Sectoral Guideline No3 February 2014 Ministry of Environment and Sustainable Development Guideline on the Content of an Environmental Impact Assessment report for Development under the Integrated Resort

More information

S e c t i o n B i o d i ve r s i t y

S e c t i o n B i o d i ve r s i t y S e c t i o n 2. 2 - B i o d i ve r s i t y The District has a wealth of ecosystems which support indigenous vegetation and habitats of indigenous fauna. Many of these ecosystems are the remnants of the

More information

Revitalization Plan and EIR Board of Supervisors Hearing January 31, 2006

Revitalization Plan and EIR Board of Supervisors Hearing January 31, 2006 Dana Point Harbor Revitalization Plan and EIR Board of Supervisors Hearing January 31, 2006 Existing Conditions 2 3 4 Dana Point Harbor Drive Golden Lantern Proposed Commercial Core Plan (PA 1 & 2) 5 Environmental

More information

Understanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks

Understanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks Understanding the State Planning Policy July 2017 Changes to state statements, policies and assessment benchmarks This fact sheet outlines the key policy changes to the state statements, policies and assessment

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

(1) Site Suitability PURPOSE

(1) Site Suitability PURPOSE 3.3 Code for Development and Use of Rural Service Industries PURPOSE This purpose of this code is to encourage the development and use of suitable rural service industries on rural, industrial or suitable

More information

Lisbon Metro expansion and environmental follow-up

Lisbon Metro expansion and environmental follow-up Lisbon Metro expansion and environmental follow-up COURSE: IMPACTES AMBIENTAIS / ENVIRONMENTAL IMPACTS Ana Cerdeira Lisbon, 13 April 2015 Outline 1. Definition of Environmental Follow-up 2. Environmental

More information

TRANSPORT and INFRASTRUCTURE

TRANSPORT and INFRASTRUCTURE The Resource Management Act allows district and regional plans and policy statements to enable people and communities to provide for their economic, cultural and social well being (that is part of the

More information

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES Project Category Project Proponent Location Expansion of Lucknow Airport in Respect of Construction of New Integrated Terminal Building at Amausi, Lucknow, Uttar Pradesh. A [7 (a): Development of an Airport]

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS

More information

UTE.1 Urban Transition Environment

UTE.1 Urban Transition Environment UTE.1 Urban Transition Environment Index UTE.1 Urban Transition Environment UTE.1.1 UTE.1.2 UTE.1.3 UTE.1.4 UTE.2 Land Use Description and Expectations Eligibility Rules Information Requirements Objectives

More information

Appendix A Schedule of Amendments to the EIAR

Appendix A Schedule of Amendments to the EIAR Appendix A Schedule of Amendments to the EIAR EIAR Chapter Page Number Changes Made to the Original EIS Submitted Chapter 1 Introduction Update of all references from EIS to EIAR Update of references to

More information

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices Crossrail Environmental Statement Volume 9c Appendices Westbourne Park Bus Garage Extension Environmental Statement Volume 2 Appendices 9c If you would like information about Crossrail in your language,

More information

Volume 2. Dundonnell Wind Farm EES. April Annex A - Annex Z DELWP Exhibition. This pages is intentionally blank

Volume 2. Dundonnell Wind Farm EES. April Annex A - Annex Z DELWP Exhibition. This pages is intentionally blank Trustpower Australia (NZ) Ltd Volume 2 Annex A - Annex Z Dundonnell Wind Farm EES April 2015 0107773 DELWP Exhibition This pages is intentionally blank Annex Annex A - Annex B - Annex C - Annex D - Annex

More information

33.02 INDUSTRIAL 2 ZONE. Shown on the planning scheme map as IN2Z. Purpose

33.02 INDUSTRIAL 2 ZONE. Shown on the planning scheme map as IN2Z. Purpose 33.02 INDUSTRIAL 2 ZONE Shown on the planning scheme map as IN2Z. Purpose To implement the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement

More information

PROJECT INFORMATION QUESTIONNAIRE PLANNING DIVISION 214 SOUTH C STREET, OXNARD, CA (805) FAX: (805)

PROJECT INFORMATION QUESTIONNAIRE PLANNING DIVISION 214 SOUTH C STREET, OXNARD, CA (805) FAX: (805) PROJECT INFORMATION QUESTIONNAIRE PLANNING DIVISION 214 SOUTH C STREET, OXNARD, CA 93030 (805) 385-7858 FAX: (805) 385-7417 General Information PROJECT INFORMATION QUESTIONNAIRE 1. Applicant (name, address,

More information

P R O P O S E D H O T E L P R O J E C T A T B E L O M B R E

P R O P O S E D H O T E L P R O J E C T A T B E L O M B R E P R O P O S E D H O T E L P R O J E C T A T B E L O M B R E Project Promoter NON-TECHNICAL SUMMARY The project proponent, KPMM (Mauritius) Ltd is a local extension of the KPMM Group based in South Africa

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

Appendix 9 - Engineering Performance Standards

Appendix 9 - Engineering Performance Standards Appendix 9 - Engineering Performance Standards A9.1 Introduction A9.1.1 This Appendix contains standards that apply to the subdivision of land. It is referred to in the Subdivision Rules for the Living,

More information

KEY PRINCIPLES FOR TOURISM DEVELOPMENT

KEY PRINCIPLES FOR TOURISM DEVELOPMENT KEY PRINCIPLES FOR TOURISM DEVELOPMENT Tourism is one of the world s largest industries and one that heavily depends on the natural resource base. Attractive coastal landscapes such as sandy beaches, dune

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Arawak Cay Port. New port facility at Arawak Cay. Client: Arawak Port Development Ltd. Services Provided. Benefits to Customer

Arawak Cay Port. New port facility at Arawak Cay.  Client: Arawak Port Development Ltd. Services Provided. Benefits to Customer Arawak Cay Port New port facility at Arawak Cay Client: Arawak Port Development Ltd. Design management of surfacing materials Asphalt and concrete design Consideration of local environment and ensuring

More information