COMMENTARY ON THE ENVIRONMENTAL ASSESSMENT PARKWAY CENTER SHOPPING MALL URBAN DEVELOPMENT ACTION GRANT CITY OF PITTSBURGH, PENNSYLVANIA

Size: px
Start display at page:

Download "COMMENTARY ON THE ENVIRONMENTAL ASSESSMENT PARKWAY CENTER SHOPPING MALL URBAN DEVELOPMENT ACTION GRANT CITY OF PITTSBURGH, PENNSYLVANIA"

Transcription

1 A. INTRODUCTION COMMENTARY ON THE ENVIRONMENTAL ASSESSMENT PARKWAY CENTER SHOPPING MALL URBAN DEVELOPMENT ACTION GRANT CITY OF PITTSBURGH, PENNSYLVANIA The Environmental Assessment for the Parkway Center Shopping Mall, dated November, 1980 is very comprehensive in several subjects. Conflicting and erroneous statements are made in several sections of the Assessment and analyses on other issues are obvious by their absence. We note that the comments tend to be provincial in nature and lack accuracy on subjects outside of the City limits. The Assessment does not include the plans or sketches for most on-site and off-site improvements which would be invaluable in evaluating the narrative discussions. Also, many of the exhibits conflict with each other as to the location or alignment of existing and proposed facilities. The second paragraph on page 1 mentions alternatives to the project that are evaluated. Little of such analysis is presented, but only justification for the preconceived project. As critiqued by David E. Wooster and Associates, all of the effects of the project were not evaluated. Planning for this Mall appears to be reactionary rather than visionary. B. TRAFFIC COMMENTS In the last paragraph on page 7, the forty-eight foot long turn lane from Greentree Road northbound onto Parkway Center Drive South is mentioned as an additional traffic improvement. Such a short decelleration lane will have no effect other than providing an enlarged curb radius return.

2 No consideration is given to the effects of the Parkway Center Inn driveway to the indoor garage and the main entrance which are in close proximity to Greentree Road. These driveways are shown on Exhibit 3, but omitted on the GAI Consultants' Figure 3. On page 17, the Penn-Lincoln Parkway (1-279) is stated as extending from the Fort Pitt Bridge to 1-79, and also that it interchanges with U.S. 22/30 and PA 60 which are many miles west of Discussion about Greentree Road on page 18 identifies the road as PA 60. All maps and physical signing designate the road as PA 121. The proposed Westwood Village is mentioned on page 24 as being partly within Green Tree Borough. The Borough Zoning Map, attached as Exhibit 4, indicates this development in the Borough. The outlined area includes a row of very good private dwellings along Elmdale Drive as well as a cemetery. A proposed plan for this development was never presented to Green Tree Borough for official reviews, rezoning or other approvals. GAI Consultants considered only the City portion in their traffic studies. When this question was raised at a work session with the City and their consultant, it was clearly stated that they could not include the Borough portion of the development in their projected traffic volumes as the Borough portion was not properly zoned and no Borough approvals had been given. The beginning of construction in 1981 is extremely optimistic. A proposed West Pointe development is mentioned on page 25. This high density development is proposed for an area north of McKinney Lane in the City with the only access being to Greentree Road. The potential effects of such a major development can be ascertained with some reasonable accuracy at this time and factored into the extensive Mall analyses. It should not be deferred until such time as the project becomes viable. Improvements

3 contemplated for the proposed Mall will greatly enhance the viability of this development as well as other lands in the immediate vicinity. The discussion of Generated Traffic Volumes on page 27 is in conflict with previous statements: 1. The Warrior Hills (Westwood Village) is totally within the City of Pittsburgh. 2. The West Pointe development could become viable by the design year of The two office buildings having a combined floor area of 100,000 square feet appears to be an additional item not previously studied. The GAI study mentions one additional office building (see Table 2 of their report). 4. Still unmentioned and not evaluated are the two office buildings in Parkway Center within the Borough that have received preliminary approval via the plan of subdivision along Parkway Center Drive North. The Plan of Subdivision was approved by Green Tree Borough on February 26, 1979 and is recorded in the Recorder of Deeds Office of Allegheny County on March 9, 1979 in Plan Book Volume 108, page 198. McKinney Lane within the City is a very narrow and poorly maintained roadway. The Environmental Assessment does not indicate that any improvements will be made to this road which is only a few feet away from the proposed Mall structure. Exhibit 3 indicates that some trees may be planted to hide it. This road is also mentioned as being the access to the proposed West Pointe development. Discussion of the Mitigating Measures on pages 30 to 33 inclusive do not mention that many of the items, as traffic control devices, are the exclusive responsibility of the Borough of Green Tree, albeit State and County permits are necessary.

4 C. GENERAL COMMENTS The "Utilities and Public Services" section on page 25 states that all utilities are available in the immediate area is not substantiated. UDAG funds are to be used by the developer for on-site waterlines, sanitary sewers and storm sewers, as well as provide better water service and fire hydrants for residents of McKinney Lane in the City. No mention is made of the existing 18" Western Pennsylvania Water Company transmission line parallel to the Penn-Lincoln Parkway which may need protective treatment or relocation to accommodate the large fill required for the proposed Parkway Ramps. This tract is, and will be commonly identified as Green Tree, so that the Borough will generally receive first calls for police, fire and other emergency services. The "Community Facilities" statement on page 26 does not mention Suella Park, the Borough library or available amenities which will aid in identifying the Mall with Green Tree Borough. The " Population" and "Socioeconomics" comments on pages 26,27 and elsewhere should be amplified with available 1980 data. In these rapidly changing times, the 1960 and 1970 data is ancient history. Discussion of the "Ground Stability/Landfill Site" on page 42 is incomplete. It is known that the Pittsburgh Coal seam, which is less than 150 feet below the finished grade of the Mall site, was mined out and was also the scene of mine fires in the 1930's. Their statement on the cause of the landslide onto Greentree Road at Hamburg Street appears to be derived from a casual observation rather than from an investigation and is incorrect. No discussion or comment is noted on Storm Water Management. Storm water run-off has already been increased because of the landfill and will be further increased by construction of buildings and parking lots. Certainly,

5 the proposed off-site culvert construction will eliminate one existing off-site problem. The total development and culvert improvement will accellerate the volume and flow rate of water to the West End which now experiences flooding. In the last paragraph on page 14, mention is made of flood control and sanitary sewer work which is to be completed in 1981 and Assurances must be obtained that these projects are funded and can be completed in the next two years as stated. D. SANITARY SEWERS The brief discussion of Sanitary Sewage on page 35 mentions the insignificant additional flows into the Saw Mill Run interceptor where plans have been developed to construct a relief sewer. Exhibit 2 indicates the location of this sewer in relation to the site. However, no discussion ensues on the location, condition or capacity of the sewers between the site and the interceptor sewer. There are no sanitary sewers in McKinney Lane within the City of Pittsburgh. The existing Borough sewer system consists of a Sanitary Sewer beginning at a point about 350 feet west of the City line on Parkway Center Drive North (McKinney Lane) flowing westwardly to Greentree Road, thence along Greentree Road northwardly to the City line where it discharges into the City combined sewer which flows northwardly to the Saw Mill Run sewer in the West End. The Borough sewer on Parkway Center Drive North was designed to carry gravity flows from development abutting the street. It is on a very flat grade and may be inadequate to receive pumped flows from another watershed.

6 The natural gravity flow of sewage from the Mall site would be toward Little Saw Mill Run as indicated by the "Offsite Sewer Improvement" on Exhibit 2. A sewer in this location would better serve the Mall and other development in the area without an irreversable committment to use of energy for pumping purposes. The estimate of sanitary sewage flow from the site of 40,000 gallons per day from this mall site appears reasonable. However, the normal design practice is to run off the flows from commercial and business users during the period of their operation. Hence, the 40,000 gallons per day would result in a flow rate of 120,000 gallons per day. Sewage pumping stations are designed for intermittent operation and for surge flows. Hence, the pumping would be at the rate of about 300,000 gallons per day (200 gpm). A pumping station with this capacity is not an insignificant item of cost. The Saw Mill Run Combined Sewer Study (Green Engineering Co., 1974) as prepared for the Pennsylvania Department of Environmental Resources, the Pennsylvania Department of Transportation and the County of Allegheny presents data on the Greentree Road Sewer. This report recommends corrective work be done on the City and Borough portions of this sewer. It is doubtful if Green Engineering considered this proposed pumped flow in their analysis of the Greentree Road Sewer System. Concern about sewage disposal was stated to the Pittsburgh City Council on September 25, 1979 (see page 50). We also raised this question with the City Planning Department at a work session on July 28, 1980, but the issue was not mentioned in the GAI Consultants' report on the progress meeting. As of December 8, 1980 a Planning Module has not been submitted to the Allegheny County Health Department as agent for Department of Environmental Resources, to obtain approval of their sewage disposal proposal. The Borough has not been contacted for permission to connect and utilize a Borough sewer.

7 This major environmental problem of sewage disposal must be given analysis similar to that given to the air quality and noise issues.

INTRODUCTION AND WATERSHED DESCRIPTION. On May 16, 1967, Pennsylvania voters approved a $500 million

INTRODUCTION AND WATERSHED DESCRIPTION. On May 16, 1967, Pennsylvania voters approved a $500 million INTRODUCTION AND WATERSHED DESCRIPTION On May 16, 1967, Pennsylvania voters approved a $500 million environmental bond issue. A major portion of this program is to be expended for the elimination of stream

More information

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted: 6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major

More information

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS CEE BS, Fulltime (3 positions) Posted 1/30/2017 COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS SUFFOLK COUNTY IS AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER

More information

CHAPTER 70 PUBLIC WORKS DEPARTMENT DEVELOPMENT STANDARDS ARTICLE 70 BASIC PROVISIONS

CHAPTER 70 PUBLIC WORKS DEPARTMENT DEVELOPMENT STANDARDS ARTICLE 70 BASIC PROVISIONS CHAPTER 70 PUBLIC WORKS DEPARTMENT DEVELOPMENT STANDARDS ARTICLE 70 BASIC PROVISIONS 70.010 - PURPOSE The purpose of this chapter is to establish standards for the design and development of sites in order

More information

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1300 CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1301 SECTION 13.01 STATEMENT OF PURPOSE To provide for manufactured home park development, of long-term duration of stay, in

More information

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change) Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three

More information

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November, HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November, 18 2016 1 VICINITY MAP Site Data Land Use Statistics o Proposed Developed Site 55 acres 22.8% o Flood Plain 6 acres 2.4% o Open Space 100.6 acres

More information

Engineer s Report Infrastructure Improvements

Engineer s Report Infrastructure Improvements Gulfstream Polo Community Development District Engineer s Report Infrastructure Improvements Prepared for: Gulfstream Polo Community Development District Board of Supervisors Palm Beach County, Florida

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

APPENDIX A. 2. That the road allowances included in this draft plan shall be shown and dedicated as public highways.

APPENDIX A. 2. That the road allowances included in this draft plan shall be shown and dedicated as public highways. APPENDIX A FILE NO: 04-T-2008-01 The City of Cornwall s conditions and amendments to final plan approval for registration of subdivision File No. 04-T-2008-01 are as follows: NO. CONDITIONS 1. That this

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

WESTERN ENGINEERING CONSULTANTS, Inc LLC

WESTERN ENGINEERING CONSULTANTS, Inc LLC WESTERN ENGINEERING CONSULTANTS, Inc LLC 127 S. Denver Avenue, Ft. Lupton CO 80621 2501 Mill St. Brush, CO 80723 Ph. 303-913-7341, Fax 720-294-1330 Email: firstname.lastname@westerneci.com August 24, 2017

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

DEVELOPMENTS OF REGIONAL IMPACT

DEVELOPMENTS OF REGIONAL IMPACT DEVELOPMENTS OF REGIONAL IMPACT Regional Review Notification Northeast Georgia Regional Commission 305 Research Drive, Athens, Georgia www.negrc.org The project described below has been submitted to this

More information

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe: November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg,

More information

1 April 8, 2015 Public Hearing

1 April 8, 2015 Public Hearing 1 April 8, 2015 Public Hearing APPLICANT: PROPERTY OWNER: CONTE ACQUISITIONS, LLC STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Craft Brewery) ADDRESS / DESCRIPTION: 1805 Laskin Road, Suite

More information

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of

More information

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES CHAPTER 8: OTHER UTILITIES Sections Page # 8.0 INTRODUCTION 4 8.1 GENERAL 4 8.1.1 Act 287: PA OneCall 4 8.2 LOCATION 4 8.3 TRENCHING AND BACKFILL STANDARDS 4 8.4 EASEMENTS 6 8.5 PETROLEUM AND NATURAL GAS

More information

a. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###)

a. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###) CITY OF OXNARD ENGINEERING DIVISION REQUIRED FORMAT AND CONTENTS HYDROLOGIC AND HYDRAULIC DRAINAGE REPORTS This report will provide a basis for design of the drainage system for the subject project. The

More information

KEYSTONE EMPLOYMENT AND ECONOMIC PLAN STUDY

KEYSTONE EMPLOYMENT AND ECONOMIC PLAN STUDY SUPPLEMENTAL NARRATIVE For the KEYSTONE EMPLOYMENT AND ECONOMIC PLAN STUDY Borough of Pottstown & West Pottsgrove Township Montgomery County, PA Prepared for: Pottstown Area Industrial Authority 152 East

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

LICK RUN WATERSHED MASTER PLAN. Community Design Workshop #1 August 11, 2011

LICK RUN WATERSHED MASTER PLAN. Community Design Workshop #1 August 11, 2011 LICK RUN WATERSHED MASTER PLAN Community Design Workshop #1 August 11, 2011 Overview What s the Challenge? Combined Sewer Overflows (CSOs) Impacts on our Communities What s the Solution? Consent Decree

More information

Standard Performance Attributes for Transportation Projects

Standard Performance Attributes for Transportation Projects Standard s for Transportation Projects Mainline Operations Local Operations Maintainability Construction Impacts Environmental Impacts Project Schedule An assessment of traffic operations and safety on

More information

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J DRAINAGE STUDY PHASE 2 REPORT FOR: HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: HORRY COUNTY STORMWATER DEPARTMENT APRIL 07, 2016 Prepared by: Savannah, GA Charleston, SC Myrtle Beach, SC Brunswick, GA

More information

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6" minus)

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6 minus) L. Road Construction All roads shall be a minimum of 200' in length and shall comply with all applicable provisions of this ordinance. No building permit shall be issued for a property until the road constituting

More information

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan A. In accordance with Local Government Code Section 232.007, an Infrastructure Development Plan (IDP) is required for all manufactured home rental communities, as defined in Section A 1.0 E of these regulations,

More information

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007: LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates

More information

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Project Name: Project Location: Date Submitted: TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Last Revised January 31, 2014 Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( )

More information

SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS

SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS 2.1. General Requirements Sanitary sewers are to be provided solely for the removal of sanitary waste. Under no circumstances shall any roof drains,

More information

ARTICLE 700 LARGE SCALE DEVELOPMENTS

ARTICLE 700 LARGE SCALE DEVELOPMENTS ARTICLE 700 LARGE SCALE DEVELOPMENTS SEC. 700.1 APPLICABILITY A development plan shall be submitted to the Bentonville Planning Commission for all developments or building construction regardless of zone

More information

Questions from Heritage Hunt Grounds Committee Received on 7/7/16

Questions from Heritage Hunt Grounds Committee Received on 7/7/16 Questions from Heritage Hunt Grounds Committee Received on 7/7/16 1. What specific areas are going to be dug up? Portions of the northeast side of the property will require some level of disturbance for

More information

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement

More information

OFFICIAL MUNICIPALITY OF MURRYSVILLE, WESTMORELAND COUNTY, PENNSYLVANIA ORDINANCE NO. -16

OFFICIAL MUNICIPALITY OF MURRYSVILLE, WESTMORELAND COUNTY, PENNSYLVANIA ORDINANCE NO. -16 OFFICIAL MUNICIPALITY OF MURRYSVILLE, WESTMORELAND COUNTY, PENNSYLVANIA ORDINANCE NO. -16 AN ORDINANCE OF THE MUNICIPALITY OF MURRYSVILLE AMENDING CHAPTER 201, SECTIONS 54, 71, 101 AND 141 OF THE MUNICIPAL

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

3.12 LAND USE AND PLANNING

3.12 LAND USE AND PLANNING 3.12 LAND USE AND PLANNING 3.12.1 INTRODUCTION This section describes the existing land uses in the project vicinity that could be affected by implementation of the Proposed Action and the alternatives.

More information

Agenda Item #4 Attachment C Page 1 of 6

Agenda Item #4 Attachment C Page 1 of 6 PLAN OF SERVICE LA CANADA SUBDIVION ANNEXATION TO THE EL DORADO IRRIGATION DISTRICT, Page 1 of 6 LAFCO PROJECT N 2010-02> Z08-0001/ PD08-0003/ TM08-1463 EI Dorado County Project Name: Project Assessor

More information

3 February 12, 2014 Public Hearing

3 February 12, 2014 Public Hearing 3 February 12, 2014 Public Hearing APPLICANT AND OWNER: STAFF PLANNER: Kristine Gay REQUEST: Conditional Use Permit (Home Occupation) ADDRESS / DESCRIPTION: 2173 Old Pungo Ferry Road GPIN: 23094353090000

More information

1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL

1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL 1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL 1006.01 GENERAL STANDARDS A. The location, design, installation, and maintenance of all utility

More information

Title 15 BUILDINGS AND CONSTRUCTION

Title 15 BUILDINGS AND CONSTRUCTION Title 15 BUILDINGS AND CONSTRUCTION Chapters: 15.04 International Codes Adopted 15.08 Building Permits 15.12 Movement of Buildings Chapter 15.04 INTERNATIONAL CODE COMMISSION CODES Sections: 15.04.010

More information

B. ALL RESIDENTIAL ALTERNATIVE

B. ALL RESIDENTIAL ALTERNATIVE The All Residential Alternative would include the development of residential units across the Project Site and Add Area. The All Residential Alternative would include replacement of existing uses at the

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

3 PROJECT DESCRIPTION

3 PROJECT DESCRIPTION 3.1 PROJECT OVERVIEW 3 PROJECT DESCRIPTION The Rocklin 60 project (proposed project) includes the subdivision of 56.9 acres of land, construction of 179 single-family, detached dwelling units, and installation

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

Chapter 9 Sanitary Sewers

Chapter 9 Sanitary Sewers Chapter 9 Sanitary Sewers I:\AD\030\U30\U30009.docx 4-8-16 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow 9-1 9.4 Facility Design

More information

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH) City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk

More information

ARTICLE 12 PUBLIC IMPROVEMENTS

ARTICLE 12 PUBLIC IMPROVEMENTS ARTICLE 12 PUBLIC IMPROVEMENTS 12.000 Overview. This article contains the City s standards for public improvements that relate to the development process. The following is a list of the main headings in

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

ENGINEERING DEPARTMENT UPDATE

ENGINEERING DEPARTMENT UPDATE To: Date: Public Works Committee Safety & Public Properties Committee Month ending July 31, 2018 RESIDENTIAL & COMMERCIAL REVIEWS AND PERMITTING A. Summary of Permits Type July Submitted 2018 YTD Submitted

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

SUBDIVISION DESIGN GUIDELINES WREN CREEK PHASE II-A STONEBRIDGE RANCH

SUBDIVISION DESIGN GUIDELINES WREN CREEK PHASE II-A STONEBRIDGE RANCH -- -...-----...--.. - ~--- --- -- - -- -- -=-.::==- :.. :'". - SUBDIVISION DESIGN GUIDELINES FOR WREN CREEK PHASE II-A at STONEBRIDGE RANCH SUBDIVISION DESIGN GUIDELINES FOR WREN CREEK PHASE II-A These

More information

APPENDIX B THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION

APPENDIX B THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION APPENDIX B DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION FOR FISCAL YEAR 2017 DESCRIPTION OF THE AUTHORITY S WATER AND SEWER SYSTEM The existing water distribution system

More information

ZONING AMENDMENT, PUD & PLANNING APPROAVAL STAFF REPORT Date: May 4, 2006

ZONING AMENDMENT, PUD & PLANNING APPROAVAL STAFF REPORT Date: May 4, 2006 # 7, 8, & 9 Case ZON2006-00256, ZON2006-00815, & SUB2006-00816 ZONING AMENDMENT, PUD & PLANNING APPROAVAL STAFF REPORT Date: May 4, 2006 NAME SUBDIVISION NAME LOCATION David Hickman Auto Shredding Subdivision

More information

Little Hunting Creek Community Meeting Mt. Vernon High School 12/11/2018

Little Hunting Creek Community Meeting Mt. Vernon High School 12/11/2018 Start 7:15 PM Approximately 27 people in attendance. Little Hunting Creek Community Meeting Mt. Vernon High School 12/11/2018 Tom Grala, Meredith Raetz went through a presentation of the results of the

More information

Phase 2 Exposition Metro Line Project

Phase 2 Exposition Metro Line Project Phase 2 Exposition Metro Line Project Monthly Project Status Report April 2013 TABLE OF CONTENTS PHASE 2 EXPO LINE PROJECT STATUS TABLE OF CONTENTS... 2 Phase 2 Exposition Metro Line Construction Authority

More information

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL CPC-2014-3808-GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL Pursuant to Los Angeles Municipal Code Section 12.32 G, the T Tentative Classification shall

More information

APPENDIX B. WSSC Design Criteria for Water Distribution Systems

APPENDIX B. WSSC Design Criteria for Water Distribution Systems a. System Requirements ) Pressure Requirements APPENDIX B WSSC Design Criteria for Water Distribution Systems a) The water distribution system shall have adequate capacity to supply domestic demand to

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) 1 OLD LEAKE S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA PUBLIC OFFICIALS MEETING MAY 11, 2016 AGENDA I. INTRODUCTIONS V. CURRENT PROJECT STATUS VI. PROJECT SCHEDULE VII. UPCOMING ACTIVITIES VOPEN DISCUSSION & QUESTIONS IX. ACTION ITEMS 1 A. Bridge Lighting

More information

Q. CONSTRUCTION IMPACTS

Q. CONSTRUCTION IMPACTS Q. CONSTRUCTION IMPACTS 1. Construction Plan As noted on Exhibit 3Q-1, Overall Phasing Plan and SWPPP Notes, construction of the Proposed Project is anticipated to include five phases. The entire construction

More information

Noise Abatement Guidelines. Regional Official Plan Guidelines

Noise Abatement Guidelines. Regional Official Plan Guidelines Noise Abatement Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document for land use planning. It contains policies

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS 4-101. FIRE DISTRICTS. The following described area is the city fire district: beginning at a point at the southwest corner of Lot 1, Block 11, Original

More information

Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara

Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara Applicant Property Owner Sarrow One, LLC Public Hearing December 14, 2016 City Council Election District Princess Anne Agenda Item 13 Request Conditional Use Permit (Automobile Repair Garage) Staff Planner

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS November 25, 2013 Table of Contents Cuyahoga County Engineer's

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

2003 PRELIMINARY ENGINEERING STUDY JUNE 2006

2003 PRELIMINARY ENGINEERING STUDY JUNE 2006 167 TH STREET PFLUMM ROAD TO METCALF AVENUE 159 th STREET & PFLUMM ROAD INTERSECTION PFLUMM ROAD 159 TH STREET TO 175 TH STREET QUIVIRA ROAD 159 TH STREET TO 167 TH STREET SWITZER ROAD 159 TH STREET TO

More information

Project: Developer/Designer: Reviewer:

Project: Developer/Designer: Reviewer: City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;

More information

CITY OF LEBANON CITY WIDE DRAINAGE EVALUATION EXECUTIVE SUMMARY

CITY OF LEBANON CITY WIDE DRAINAGE EVALUATION EXECUTIVE SUMMARY CITY OF LEBANON CITY WIDE DRAINAGE EVALUATION EXECUTIVE SUMMARY Introduction Neel-Schaffer performed an engineering evaluation of drainage issues and flooding concerns within the City of Lebanon (City)

More information

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report APPENDIX B Excerpts from the October 2002 Interstate 83 and PA Route 921 The objective for the SR 921 interchange site was to study alternatives for construction of a new interchange. There are no short-term

More information

HAMLET OF ROUND HILL AREA STRUCTURE PLAN

HAMLET OF ROUND HILL AREA STRUCTURE PLAN HAMLET OF ROUND HILL AREA STRUCTURE PLAN With Amendment December 11, 2012 to Map 4 Land Use Concept Map Prepared by: Austrom Consulting Ltd. Area Structure Plan, Page 1 of 21 Table of Contents TABLE OF

More information

DRAFT Foothills District Framework Plan PRELIMINARY District-Wide Cost Summary July 11, 2011

DRAFT Foothills District Framework Plan PRELIMINARY District-Wide Cost Summary July 11, 2011 DRAFT Foothills District Framework Plan PRELIMINARY DistrictWide Cost Summary July 11, 2011 USES FOOTHILLS DISTRICT 10 POTENTIAL SOURCES North District B Avenue East of Foothills $ 4,052,453 TIF, LID,

More information

19 January 13, 2010 Public Hearing APPLICANT: GARY C. KIMNACH C/O BEACH AUTO

19 January 13, 2010 Public Hearing APPLICANT: GARY C. KIMNACH C/O BEACH AUTO 19 January 13, 2010 Public Hearing APPLICANT: GARY C. KIMNACH C/O BEACH AUTO PROPERTY OWNERS: WIILAIM D. FRIERSON, GRACE A. FRIERSON, DONALD S. CLARKE, PRICE M. CLARKE, CITY OF VIRGINIA BEACH STAFF PLANNER:

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

ORDINANCE NO ARTICLE II: DEFINITIONS: HEIGHT OF BUILDING will be replaced in its entirety with the following:

ORDINANCE NO ARTICLE II: DEFINITIONS: HEIGHT OF BUILDING will be replaced in its entirety with the following: ORDINANCE NO. 912 AN ORDINANCE OF THE BOROUGH OF OCEANPORT, COUNTY OF MONMOUTH AND STATE OF NEW JERSEY AMENDING CHAPTER 390 OF THE CODE OF THE BOROUGH OF OCEANPORT, ENTITLED ZONING ARTICLE II: DEFINITIONS:

More information

CITY OF WINDSOR Municipal Performance Measurement Program (MPMP) 2011 RESULTS 1.1 GENERAL GOVERNMENT - EFFICIENCY 3.7% 4.7%

CITY OF WINDSOR Municipal Performance Measurement Program (MPMP) 2011 RESULTS 1.1 GENERAL GOVERNMENT - EFFICIENCY 3.7% 4.7% Local Government 1.1 a) Operating costs for governance and corporate management as a percentage of total municipal operating costs. 1.1 b) Total costs for governance and corporate management as a percentage

More information

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by

More information

Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director

Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director DATE: April 26, 2016 TO: FROM: Ron Davis, Interim City Manager Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director SUBJECT: Modification of two

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

ARTICLE II ZONING USES

ARTICLE II ZONING USES ARTICLE II ZONING USES Section 7 PLANNED RESIDENTIAL DEVELOPMENT ZONE 7.01 Purpose 1 7.01.01 A Planned Residence Development zone is a medium density residential district which allows a mixture of various

More information

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT / PROJECT INFORMATION: PARCEL INFO: APPLICANT S INFO: Public Works/Engineering 595 SILVER LACE BLVD, FERNLEY, NV 89408 (775)-784-9910 ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT APPLICATIONS,

More information

Traffic Impact Analysis (TIA) POLICY

Traffic Impact Analysis (TIA) POLICY Ascension Parish Planning Commission Traffic Impact Analysis (TIA) POLICY This policy establishes requirements for studies that provide information on traffic projected to be generated by all proposed

More information

Chapter 4. Capital Facilities and Utilities Report

Chapter 4. Capital Facilities and Utilities Report Chapter 4 Capital Facilities and Utilities Report Capital Facilities and Utilities in the R-1 Area City of Woodinville Prepared January 2007 Revised February 2007 Revised September 2007 Revised October

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

Bestall Collaborative Limited Planning Environment Construction Management Development

Bestall Collaborative Limited Planning Environment Construction Management Development November 17 2015 Ms. Leah Dawson, AICP, Senior Planner City Development Department City of Thornton 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: Case No. Z 2015-012 - River Valley Village

More information

Table Related Arlington County Standards, Specification and Policies

Table Related Arlington County Standards, Specification and Policies 2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements

More information

Information for File # MVP MHK

Information for File # MVP MHK Information for File # MVP-017-04353-K Applicant: Corps Contact: Town of Brookfield Marie Kopka Address: 50 N. Sunnyslope Road, Suite 96, Brookfield, WI 53005 E-Mail: Phone: (651) 90-5733 Primary County:

More information

65 East Project (P18-045) Addendum to an Environmental Impact Report

65 East Project (P18-045) Addendum to an Environmental Impact Report 65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of

More information

HISTORIC PROPERTY SURVEY REPORT

HISTORIC PROPERTY SURVEY REPORT 1. UNDERTAKING DESCRIPTION AND LOCATION District County Route Post Miles Unit E-FIS Project Number Phase District Federal Project. Number. County (Prefix, Agency Code, Project No.) Location 04 SC BRLO-5937(124)

More information

APPENDIX D INDEX, REFERENCES AND BIBLIOGRAPHY

APPENDIX D INDEX, REFERENCES AND BIBLIOGRAPHY APPENDIX D INDEX, REFERENCES AND BIBLIOGRAPHY TABLE OF CONTENTS PAGE # INDEX... D-3 REFERENCES... D-7 BIBLIOGRAPHY... D-9 Appendix D - 1 (This page has intentionally been left blank) Appendix D - 2 INDEX

More information

SECTION 400 WATER SUPPLY SYSTEMS

SECTION 400 WATER SUPPLY SYSTEMS SECTION 400 WATER SUPPLY SYSTEMS Page 401.00 WATER SUPPLY SYSTEMS - GENERAL POLICY AND REQUIREMENTS 401.01 General Policy...................................... 400-1 401.02 Reference Manuals..................................

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

ORDER ADOPTING MINIMUM INFRASTRUCTURE STANDARDS FOR MANUFACTURED HOME RENTAL COMMUNITIES IN GRAYSON COUNTY, TEXAS PREAMBLE

ORDER ADOPTING MINIMUM INFRASTRUCTURE STANDARDS FOR MANUFACTURED HOME RENTAL COMMUNITIES IN GRAYSON COUNTY, TEXAS PREAMBLE ORDER ADOPTING MINIMUM INFRASTRUCTURE STANDARDS FOR MANUFACTURED HOME RENTAL COMMUNITIES IN GRAYSON COUNTY, TEXAS PREAMBLE WHEREAS, the Legislature has enacted legislation, codified as Local Government

More information

Chapter 1 INTRODUCTION

Chapter 1 INTRODUCTION Chapter 1 Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 1.1 Introduction... 1 1.2 Preconstruction Division... 1 1.2.1 Regional Production Groups... 2 1.2.2 Preconstruction

More information

SECTION 9.0 Effects Found Not To Be Significant

SECTION 9.0 Effects Found Not To Be Significant SECTION 9.0 Effects Found Not To Be Significant 9.0 EFFECTS FOUND NOT TO BE SIGNIFICANT The City of Santa Clarita conducted an Initial Study in April 2006 to determine significant effects of the proposed

More information