ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Size: px
Start display at page:

Download "ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)"

Transcription

1 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) # PROPOSAL:$21.36 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ This project involves the construction of a township road and storm water management facilities around the Fulton County Medical Center. The township road will start at an existing access roadway that extends to T-516 (Peach Orchard Road). The roadway will continue around the medical center facilities and will end at the intersection of SR 1004 (Lincoln Way West). Also, part of the project will be the addition of a right turn lane from SR 1004 onto the township road and other miscellaneous construction, as indicated on the approved drawings included in the bid package in FULTON COUNTY, TODD TOWNSHIP. This project is located just west of McConnellsburg Borough and east of the intersection of T-516 (Peach Orchard Road) and SR 1004 (Lincoln Way West). SULLIVAN COUNTY SR 154(084) # PROPOSAL:$21.36 PLANS:$ X18:$ X36:$93.60 Ex St:$ x18:$ x36:$11.70 Bridge rehabilitation including removal of existing timber bridge deck, replacement of steel I-beam fascia beam of structure over Elk Creek, removal of portion of existing bridge, rehabilitation of a single span steel thru truss bridge over Little Loyalsock Creek, base and wearing courses, guide rail, pavement markings, reinforced soil slope, temporary support and protection system, and other related work as indicated on approved drawings for STATE ROUTE 154, SECTION 084, from approximately 2.41 miles west of the intersection with State Route 4008 at Segment 0290 Offset 1552 to approximately 0.07 mile north of the intersection with State Route 4001 at Segment 0300 Offset 0000 in ELKLAND TOWNSHIP, SULLIVAN COUNTY and for STATE ROUTE 87, SECTION 135, from approximately 0.03 mile east of the intersection with State Route 154 at Segment 0270 Offset 0000 to approximately 1.44 miles southwest of the intersection with State Route 4011 at Segment 0280 Offset 0065 in FORKSVILLE BOROUGH, SULLIVAN COUNTY. ERIE COUNTY SR 90(CMB) # PROPOSAL:$13.20 PLANS 8.5x11:$1.32 The description and location of the project is as follows: For the Installation of Cable Median Barrier and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0090, SECTION CMB, in ERIE COUNTY, NORTH EAST, GREENFIELD & HARBORCREEK TOWNSHIP from segment 0330 offset 1462 to segment 0454 offset CRAWFORD COUNTY SR 408(182) #98601 PROPOSAL:$17.40 PLANS 8.5x11:$4.20 For the construction or improvement of a certain section of STATE HIGHWAYS in CRAWFORD COUNTY, BLOOMFIELD, STEUBEN, AND TROY TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 0408 SECTION 182. This project being situated as follows, SR approximately 182 feet south of the intersection with SR at Segment 0170 Offset 0184 then north to approximately 184 feet north of the intersection with SR at Segment 0310 Offset SR From Approximately 100 feet west from the intersection with SR at Segment 0320 Offset 3286 then east and south to approximately 145 feet west of the intersection with SR at Segment 0400 Offset For the bituminous milling and overlay with Warm Mix Superpave Asphalt Mixture Designs 22' to 24' in width, also for drainage, ADA curb ramps, guide rail, and pavement markings all within a project length of 9.58 miles as indicated on the approved drawings. BERKS COUNTY SR 0000(---) # PROPOSAL:$13.44 This is a two year Maintenance Contract for the repair and/or replacement of accident damaged guide rail, metal median barrier, end treatments, and right-of-way fencing. This is also for the updating of low cost tort liability reduction sites as directed, on various STATE ROUTES in various MUNICIPALITIES in BERKS, LEHIGH AND NORTHAMPTON COUNTIES, Commonwealth of Pennsylvania. 1

2 SCHUYLKILL COUNTY SR 0000(---) # PROPOSAL:$12.12 This is a two year Maintenance Contract for the repair and/or replacement of accident damaged guide rail, metal median barrier, end treatments, and right-of-way fencing, also for the updating of low cost tort liability reduction sites as directed, on VARIOUS STATE ROUTES in VARIOUS MUNICIPALITIES in CARBON, MONROE AND SCHUYLKILL COUNTIES, Commonwealth of Pennsylvania. DAUPHIN COUNTY SR 22(080) # PROPOSAL:$15.60 PLANS:$ X18:$ X36:$58.50 This is a pavement preservation project that includes bituminous overlay, accelerated concrete pavement patching, pavement reconstruction, drainage updates, signing, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0022, SECTION 080, in DAUPHIN COUNTY, MIDDLE PAXTON & SUSQUEHANNA TOWNSHIPS and DAUPHIN BOROUGH, from west of PA 325 at Segment 0080/0081 Offset 2471/2137 to east of PA 225 at Segment 0174 Offset 2550 eastbound and to east of PA 39 at Segment 0261 Offset 1052 westbound, for an overall project length of 8.50 miles. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated April 27, 2018 MONTGOMERY COUNTY SR 0000(APM) # PROPOSAL:$10.92 The description and location of the project is as follows: Furnishing and Installation of snow plowable raised pavement markers having one/two way holder with reflector of the type indicated, at various site locations on Highways and Ramps in Bucks, Chester, Delaware, Montgomery and Philadelphia counties in Various CITY/BOROUGH/TOWNSHIP/MUNICIPALITY. BEDFORD COUNTY SR 0000(---) # PROPOSAL:$9.96 The description and location of the project is as follows: and end treatments that have been damaged by traffic accidents along VARIOUS STATE ROUTES in BEDFORD, BLAIR, CAMBRIA, FULTON, HUNTINGDON & SOMERSET COUNTIES, Commonwealth of Pennsylvania. FULTON COUNTY SR 30(009) # PROPOSAL:$16.20 PLANS:$ X18:$ X36:$58.10 X-SEC:$ X18:$ X36:$54.60 This project is for the resurfacing of approximately miles of bituminous roadway and includes drainage, guiderail & pavement markings and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0030, SECTION 009, in FULTON COUNTY, AYR & TODD TOWNSHIPS at the approximate location: SR 0030, Segment 0400, Offset 0504 to Segment 0450, Offset

3 FULTON COUNTY SR 522(015) #92619 PROPOSAL:$28.32 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$28.80 This project is for the resurfacing of approximately miles of bituminous roadway on SR 0522 in Fulton County and includes mill and overlay, shoulder widening and cross slope modification, drainage & guide rail upgrades, sidewalks including design and construction of ADA ramps and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0522, SECTION 015, in FULTON COUNTY, AYR TOWNSHIP, MCCONNELLSBURG BOROUGH at the approximate location: Station to Station Segment 0290, Offset 1570 to Segment 0410, Offset 0485 LEBANON COUNTY SR 1003(022) # PROPOSAL:$24.12 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$50.70 Ex St:$ x18:$ x36:$7.80 This is a Design Build Project. Work will consist of the complete replacement of the old structure over the Little Swatara Creek with two 11' lanes and a 8' wide shoulder on the northbound side and a 6' wide shoulder on the southbound side. Roadway work includes an overlay, full depth approach construction, new guiderail, minor drainage work, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 1003, SECTION 022, in LEBANON COUNTY, SWATARA TOWNSHIP and JONESTOWN BOROUGH, from Segment 0120 Offset 0465 to Segment 0120 Offset 1260, for an overall project length of linear feet (0.129 mile). BUCKS COUNTY SR 4021(099) # PROPOSAL:$16.32 The milling and resurfacing with bituminous material, general maintenance of various state roadways in Bucks County, Engineering District 6-0, Commonwealth of Pennsylvania. VENANGO COUNTY SR 38(B02) #90028 PROPOSAL:$17.16 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$27.30 For the construction of a certain sections of STATE HIGHWAY in VENANGO COUNTY, RICHLAND TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0038, SECTION B02. This project situated as follows, From approximately 0.2 mile north of the intersection with SR at Segment 0100 Offset 1455 (Station ) then north to approximately 0.6 mile south of the intersection with SR at Segment 0110 Offset 0268 (Station ). For the construction of a Precast Reinforced Concrete Box Culvert over Richey Run having an overall span length of 12'-0", Also for construction of bridge structure removal, new roadway approaches using Superpave Asphalt Mixture Designs, guiderail, drainage, paved shoulders, signs, pavement markings and other miscellaneous work all within a project length of feet (0.069 mile) as indicated on the approved drawings. SOMERSET COUNTY SR 2017(003) # PROPOSAL:$14.28 PLANS:$ X18:$ X36:$23.40 This project is to preform Full Depth Reclamation of approximately 8.35 miles of bituminous roadway on SR 2017 as indicated on the approved drawings included in the bid package for STATE ROUTE 2017, SECTION 003, in SOMERSET COUNTY, NORTHAMPTON & ALLEGHENY TOWNSHIPS at the approximate location. Segment 0120, Offset 0000 to Segment 0290, Offset

4 BERKS COUNTY SR 176(POC) # PROPOSAL:$20.40 PLANS 8.5x11:$1.68 SR176 (4 lanes of traffic and shoulders), SR222 ( 3 lanes of traffic and shoulders):base repair, Micro surfacing, milling, replace all pavement markings, replace rumble strips, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 176/222, SECTION POC, in BERKS COUNTY, CUMRU AND ROBESON/MAXXTAWNY TOWNSHIP. SR176 segment 35 offset 1498 to segment 95 offset 0240, and segment 40 offset 0183 to segment 94 offset 1708, include SR9402 and SR9404. SR222 segment 620 offset 0000 to segment 680 offset 3631, and segment 611 offset 2169 to segment 611 offset All work is within the existing ROW. WAYNE COUNTY SR 652(IMP) # PROPOSAL:$13.80 PLANS 8.5x11:$1.20 This project is for the construction of full depth bituminous shoulders, milled shoulder rumble strips and line painting as indicated on the approved drawings included in the bid package for STATE ROUTE 652, SECTION IMP, in WAYNE COUNTY, for an overall length of 21,000 linear feet (3.98 miles). BERKS COUNTY SR 222(0) # PROPOSAL:$27.72 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ Bridge repairs on SR 222 in Wyomissing Hills, including but not limited to structural steel repairs, concrete deck repairs, concrete substructure repairs, bearing repairs, joint repairs, zone painting, median barrier, along with other miscellaneous construction as indicated on the attached details included in the Bid Package. ALLEGHENY COUNTY SR 376(A64) # PROPOSAL:$31.68 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ The description and location of the project is as follows: For the milling and resurfacing, concrete pavement rehabilitation, drainage, guide rail, signing and pavement marking, bridge preservation, and other miscellaneous construction, all within a length of 34,228 linear feet (6.49 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0376 SECTION A64 (Penn Lincoln Parkway), in ALLEGHENY COUNTY, CITY OF PITTSBURGH, SWISSVALE AND EDGEWOOD BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 175 feet west of the north end of the Fort Pitt Bridge at Segment 0694/0695 Offset 1505/1472 (Station / ) to the dual structures over SR 8010 Ramp B at Segment 0764/0765 Offset 0121/0100 (Station ). ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated April 23, 2018 DELAWARE COUNTY SR 7023(186) #47993 PROPOSAL:$25.32 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$27.30 Ex St:$ x18:$ x36:$15.60 The description and location of the project is as follows: This project is the replacement of the West Seventh Street Bridge over Chester Cresk and other miscellaneous construction, all as indicated on the drawings approved November 13, 2017 for STATE ROUTE 7023, SECTION 186, in DELAWARE COUNTY, CITY of CHESTER from approximately Penn Street to Sproul Street. The new bridge is a single span composite steel multi-girder bridge with a total length of 148 feet 0 inches. Bituminous paving is included on the approaches. 4

5 CUMBERLAND COUNTY SR 83(083) # PROPOSAL:$18.36 PLANS:$ X18:$ X36:$ This project consists of concrete patching, replacing center median barrier, milling & resurfacing, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0083, SECTION 083, in CUMBERLAND COUNTY, LOWER ALLEN TOWNSHIP and NEW CUMBERLAND & LEMOYNE BOROUGHS, from the Yellow Breeches Creek at the York County line Segment 0396/0397 Offset 0186/0186 to the Susquehanna River at Segment 0420/0421 Offset 0052/0076, for an overall project length of 6, linear feet (1.30 miles). WESTMORELAND COUNTY SR 31(000) #76084 PROPOSAL:$17.40 PLANS:$ X18:$ X36:$70.20 Ex St:$ x18:$ x36:$7.80 The description and location of the project is as follows. This is a Bridge Rehabilitation project for the structure on SR M a Reinforced Concrete Tee-Beam bridge carrying SR 31 over Brush Run. This project is the removal of the existing asphalt and placement of a membrane and new overlay, replacement of existing barrier, minor substructure work and other miscellaneous construction, as indicated on the approved structure drawings S-37855, as indicated on the approved drawings included in the bid package for STATE ROUTE 0031 SECTION 09M, in WESTMORELAND COUNTY MT. PLEASANT TOWNSHIP from approximately segment 0310 offset 1251 to approximately segment 0310 offset WASHINGTON COUNTY SR 1002(0) #98344 PROPOSAL:$17.28 PLANS:$ X18:$ X36:$ Paving West McMurray Road and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1002, SECTION 03R, in WASHINGTON COUNTY PETERS TOWNSHIP from SR 19 at segment 0050 offset 0000 to the Washington/Allegheny county line at segment 0130 offset LEHIGH COUNTY SR 0000(---) # PROPOSAL:$10.80 This project is a Districtwide bi-annual maintenance contract for the installation of major guide signs and other miscellaneous construction on VARIOUS STATE ROUTES in VARIOUS MUNICIPALITIES in BERKS, CARBON, LEHIGH, MONROE, NORTHAMPTON, AND SCHUYLKILL COUNTIES. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION ASSOCIATED PENNSYLVANIA CONSTRUCTORS NORTHUMBERLAND COUNTY SR 61(125) #99183 PROPOSAL:$26.16 PLANS:$ X18:$ X36:$42.90 Milling and resurfacing of existing roadway, including flexible base replacement, Superpave Asphalt Mixture scratch and wearing courses, pavement markings, design and construction of ADA curb ramps, and other miscellaneous construction within a length of 6, linear feet (1.20 mile) as indicated on approved drawings for STATE ROUTE 61, SECTION 125 from approximately 0.25 mile west of the intersection with State Route 4009 at Segment 0500 Offset 1292 to approximately 0.10 mile east of the intersection with State Route 4004 at Segment 0500 Offset 0768 in the CITY OF SUNBURY and UPPER AUGUSTA TOWNSHIP, NORTHUMBERLAND COUNTY. 5

6 MERCER COUNTY SR 58(STU) # PROPOSAL:$18.72 PLANS:$ X18:$ X36:$78.00 The description and location of the project is as follows: For the Design Build of Highway Lighting. Also for the construction of Cement Concrete Sidewalk, Plain Cement Concrete Curb, Curb Ramps, landscaping improvements, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for SOUTH DIAMOND STREET STREETSCAPE, in MERCER COUNTY, MERCER BOROUGH from segment 0550 offset 0016 to segment 0550 offset LYCOMING COUNTY SR 0000(---) # PROPOSAL:$7.92 PLANS:$ X18:$ X36:$85.80 For the furnishing and application of white and yellow waterborne pavement markings along various state highways within Engineering District 3-0, various municipalities, Commonwealth of Pennsylvania, as indicated on the approved drawings included in the Bid Package. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 6

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated April 13, 2018 ALLEGHENY COUNTY SR 376(A65) #110880 PROPOSAL:$15.96 PLANS 8.5x11:$2.04 The description and location of the project is as follows: For the milling, resurfacing, pavement marking,

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated March 20, 2017 ALLEGHENY COUNTY SR 3088(05) #106380 PROPOSAL:$23.40 PLANS:$11.88 12X18:$14.58 24X36:$210.60 EXSTRUCT:$3.08 12X18:$3.78 24X36:$54.60 The description and location of the project is

More information

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Update January 3, 2018 GREENE COUNTY - SR 221(J10) #105392 PROPOSAL:$11.76 PLANS:$4.18 12X18:$5.13 24X36:$47.10 The description and location of the project is as follows:

More information

Straight Line Diagram. Cameron 12. January 2018

Straight Line Diagram. Cameron 12. January 2018 Straight Line Diagram Cameron 12 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Blueprint for One of the Nation s Largest SCM Maintenance Programs

Blueprint for One of the Nation s Largest SCM Maintenance Programs Blueprint for One of the Nation s Largest SCM Maintenance Programs PA Department of Transportation Hydrologic & Hydraulic Studies Waterway Permitting Stormwater Design & Permitting Technical Course Development

More information

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17)

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17) AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PREPARED BY: BUREAU OF MAINTENANCE AND OPERATIONS ASSET MANAGEMENT DIVISION P.O. Box 3437 HARRISBURG, PENNSYLVANIA 17105-3437

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management DOCUMENT NUMBER: ***-****-*** EFFECTIVE DATE: Month DD, YYYY DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management TITLE: Addressing Spills and Releases from Oil & Gas Wells and Related

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( ) Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 4.8 Beech Ridge Road Underpass Repairs York $410,000

More information

General Permit WMGR116. Beneficial Use of Alternative Fuels for Circulating and Bubbling Fluidized Bed Boilers and Pulverized Coal-fired Boilers

General Permit WMGR116. Beneficial Use of Alternative Fuels for Circulating and Bubbling Fluidized Bed Boilers and Pulverized Coal-fired Boilers General Permit WMGR116 Beneficial Use of Alternative Fuels for Circulating and Bubbling Fluidized Bed Boilers and Pulverized Coal-fired Boilers Department of Environmental Protection Bureau of Waste Management

More information

Act 101 Section 902 Grants Round 53 Summary

Act 101 Section 902 Grants Round 53 Summary APPLICANT PROJECT REQUESTED AWARDED Comments SOUTHEAST REGION 1 Bristol Township Curbside Recycling $90,585 $90,585 Bucks County Prorgam 2 Chester County Office Building & Community $46,490 $43,439 Item

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

Biosolids Quality. Enhancement Plan. For more information, visit keyword: Biosolids.

Biosolids Quality. Enhancement Plan. For more information, visit  keyword: Biosolids. Biosolids Quality Enhancement Plan For more information, visit www.dep.state.pa.us, keyword: Biosolids. Biosolids Quality Enhancement Plan INTRODUCTION The beneficial use of biosolids has become a growing

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

Transportation Subcommittee Meeting July 18, 2014

Transportation Subcommittee Meeting July 18, 2014 Transportation Subcommittee Meeting July 18, 2014 Action Requested Recommend for Planning and Programming Committee approval in August 2014 and placement on the Board of Directors agenda for October 2014.

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

STANDARD CONDITIONS GENERAL PERMIT WMGM042

STANDARD CONDITIONS GENERAL PERMIT WMGM042 STANDARD CONDITIONS GENERAL PERMIT WMGM042 A. Authorization: This general permit authorizes the processing (mixing or blending) of (i) animal manure, (ii) grease trap waste (collected from restaurants,

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

General Permit WMGR025 Residual and Municipal Waste Composting

General Permit WMGR025 Residual and Municipal Waste Composting Department of Environmental Protection Bureau of Waste Management Division of Municipal and Residual Waste February, 9 2008 A. Description: This general permit authorizes the composting and beneficial

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

COUNTY ROAD ASSOCIATION OF MICHIGAN

COUNTY ROAD ASSOCIATION OF MICHIGAN COUNTY ROAD ASSOCIATION OF MICHIGAN 417 SEYMOUR SUITE ONE - LANSING, MI 48933 TELEPHONE 517.482.1189 - FAX 517.482.1253 Talking Points- HB 5305 Mandatory Competitive Bidding Summary: House Bill 5305, introduced

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

GENERAL PERMIT WMGR125 BENEFICIAL USE OF DRY FGD WASTE AND COAL ASH

GENERAL PERMIT WMGR125 BENEFICIAL USE OF DRY FGD WASTE AND COAL ASH A. Description. This general permit authorizes the processing and beneficial use of dry flue gas desulfurization waste (FGD waste) and coal ash from coal-fired power plants for reclamation of coal mine

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

APPLICANT PROJECT REQUESTED RECOMMENDED COMMENTS

APPLICANT PROJECT REQUESTED RECOMMENDED COMMENTS Act 101, Section 902 Recycling Development and Implementation Grant Applications SOUTHEAST REGION 1 Bristol Township Curbside Recycling & $199,109 $116,957 ineligible item requested Educational s 2 Lower

More information

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 CBD Improvements Agenda Meeting Agenda Introduction Scope of Improvements Time frames for improvements May vary

More information

SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES

SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES Bureau of Environmental Cleanup and Brownfields Division of Storage Tanks November 1, 2016 2630-BK-DEP4699 11/2016 An Equal

More information

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS BRIDGE PREVENTIVE MAINTENANCE STRATEGY Approved January 3, 2007 BLANK Purpose To maximize the non-deficient service life of local bridges in the Erie-Niagara region, members of the Greater Buffalo-Niagara

More information

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s) G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings 01/04/1994 04/01/1994 TOS/TO For use with Pavement Marking items.

More information

REHABILITATION PACKAGE 4-a

REHABILITATION PACKAGE 4-a 4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

2 State Profile. Pennsylvania 2018 State Hazard Mitigation Plan 7

2 State Profile. Pennsylvania 2018 State Hazard Mitigation Plan 7 Pennsylvania 2018 State Hazard Mitigation Plan 7 2. State Profile Geography and Environment The Commonwealth of Pennsylvania consists of approximately 46,058 square miles, 44,820 square miles of which

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200 GRADING 219.101 Light Duty Straw

More information

Pattullo Bridge Replacement Project. Cost Report

Pattullo Bridge Replacement Project. Cost Report Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 23, Alexander Road to Maple Lake Road DBNUM: 11424 / UPC: 114240 Initiated from the Pavement Management System, this project will resurface within the project limits. ADA upgrades and guiderail repair

More information

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE Approved : Procedure No: 210-003(SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting Julie Ray, Deputy Director Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

Engineering District 5-0

Engineering District 5-0 Engineering District 5-0 Executive Staff Michael W. Rebert, PE District Executive Christopher Kufro, PE Assistant District Executive (Design) Alfred A. Picca, PE Assistant District Executive (Construction)

More information

An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1

An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1 An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1 Executive Summary Steven Deller, Mark Stephenson and Chuck Nicholson 2 To assess the contribution of dairy to the Pennsylvania

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

2017 Highway Safety Improvement Program Call

2017 Highway Safety Improvement Program Call 2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public

More information

JOINT PERMIT APPLICATION INSTRUCTIONS FOR A PENNSYLVANIA WATER OBSTRUCTION AND ENCROACHMENT PERMIT APPLICATION AND A

JOINT PERMIT APPLICATION INSTRUCTIONS FOR A PENNSYLVANIA WATER OBSTRUCTION AND ENCROACHMENT PERMIT APPLICATION AND A COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION JOINT PERMIT APPLICATION INSTRUCTIONS FOR A PENNSYLVANIA WATER OBSTRUCTION AND ENCROACHMENT PERMIT APPLICATION AND A U.S. ARMY CORPS

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

Scenarios. The following slides will present you with several Scenarios & Questions that address pollution prevention and good housekeeping.

Scenarios. The following slides will present you with several Scenarios & Questions that address pollution prevention and good housekeeping. Scenarios The following slides will present you with several Scenarios & Questions that address pollution prevention and good housekeeping. Questions will be asked to help further your understanding of

More information

Maryland Transportation Authority (MDTA)

Maryland Transportation Authority (MDTA) Maryland Transportation Authority (MDTA) I-95 Major Deck and Superstructure Rehabilitation South of the Fort McHenry Tunnel Northeast Bridge Preservation Partnership Conference September 20, 2016 David

More information

CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL

CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL Notices 181004 Late CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL FOR IMPROVING VARIOUS SECTIONS IN CUYAHOGA COUNTY, OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVING TREES

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

extent feasible. Per the and low constructability,

extent feasible. Per the and low constructability, RELEVANT PUBLIC PROJECTS AND REFERENCES TranTech is proud of its accomplishments in structural engineering. Our staff members have provided design servicess to numerous public agencies on very successful

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Engineering Sales Tax Projects Bridges $ 43.4 m (27) Roads (Resurfacing) $ 77.6 m (121) Roads (Restriping) $

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Metals Data. for. Pennsylvania Soils

Metals Data. for. Pennsylvania Soils Metals Data for Pennsylvania Soils by Edward J. Ciolkosz, Richard C. Stehouwer, and Mary Kay Amistadi Agronomy Series Number 140 Agronomy Department The Pennsylvania State University University Park, PA

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

Brad Hall Midstream & Marketing

Brad Hall Midstream & Marketing Brad Hall Midstream & Marketing October 17, 2012 Overview Lines of Business Marketing Generation Midstream Natural Gas >100 Bcf > 30,000 locations 33 LDCs Power > 2 MM MWhrs > 10,000 locations 19 EDCs

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

Highway Performance Monitoring System Quality Review

Highway Performance Monitoring System Quality Review 2017 Highway Performance Monitoring System Quality Review 0 Bureau of Planning and Research Transportation Planning Division 10/13/2017 TABLE OF CONTENTS INTRODUCTION... 2 EXECUTIVE SUMMARY... 3 2017 HPMS

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

CHAPTER 11 PAVEMENT TYPE DETERMINATION

CHAPTER 11 PAVEMENT TYPE DETERMINATION CHAPTER 11 PAVEMENT TYPE DETERMINATION 11.1 PAVEMENT TYPE SELECTION FACTORS A highway system designation shall not determine the choice of pavement type. The following factors should be considered when

More information

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT

More information

PENNSYLVANIA WEEKLY FALL FOLIAGE REPORT

PENNSYLVANIA WEEKLY FALL FOLIAGE REPORT Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry PENNSYLVANIA WEEKLY FALL FOLIAGE REPORT October 26 November 1, 2017 Autumn color in the commonwealth is still good to excellent

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION...

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION... Materials Division Page 1 TABLE OF CONTENTS EXECUTIVE SUMMARY...2 I. INTRODUCTION...4 II. Purpose...4 What is LCCA?...4 History of LCCA in VDOT...4 ECONOMIC ANALYSIS COMPONENTS...6 Analysis Period...6

More information

Full Depth Pavement Reclamation

Full Depth Pavement Reclamation Full Depth Pavement Reclamation Delaware County, Ohio Chris Bauserman, PE, PS April 28, 2015 Background Population has increased from 55,000 in 1989 to approximately 200,000 Explosive growth in residential,

More information

B313-1 HOT MIX ASPHALT OPSS.PROV 313

B313-1 HOT MIX ASPHALT OPSS.PROV 313 B313-1 OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013 Maintenance, Construction & Secondary Roads Terry Gibson, PE Chief Engineer February 20, 2013 State versus local responsibility Division structure Allocations Flexibility in funding Implications of not

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking

More information

Chapter URBAN & RURAL FREEWAY DESIGN

Chapter URBAN & RURAL FREEWAY DESIGN Chapter 5 URBAN & RURAL FREEWAY DESIGN 5.1 INTRODUCTION This chapter provides standards and guidance for urban and rural freeways on new construction/reconstruction projects. The chapter also provides

More information

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer Overview of Maintenance and Construction Programs Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer March 3, 2015 Overview Maintenance and Construction State v.

More information

February Page 1

February Page 1 February 2017 - Page 1 CHAPTER 1 LOCATED ON. This section is revised as shown in the highlight below The description of the project location should reflect the beginning and ending location of the project.

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Re: PW Appendix 3 - Part 8

Re: PW Appendix 3 - Part 8 Demolish S/W DVP ramp, FGE WBL (including Logan Ramp), Don River bridge WB, and existing LSB WBL Construct new S/W DVP ramp, FGE WBL ramp, Don River bridge WB, and remaining portion of LSB WB roadwork.

More information

BID ITEM WORKBOOK COSTARS-34 Theater (Auditorium) Furniture, Fixtures, Audio/Visual Equipment and Musical Instruments BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-34 Theater (Auditorium) Furniture, Fixtures, Audio/Visual Equipment and Musical Instruments BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NA: D/B/A NA, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: VENDOR NUMBER: PA Legislative House District Number 50 Allegheny River Blvd. Verona, PA

More information

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 SHRP2 SOLUTONS Innovative Bridge Designs for Rapid Renewal Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 VIJAYKUMAR THAKER, PE HARDEV DAVÉ INTRODUCTION VIJAYKUMAR THAKER, PE EXECUTIVE MANAGER

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer Life Cycle Cost Analysis Considerations in Pavement Type Selection in Red Deer and Construction Challenges Bozena Czarnecki, Ph.D., P.Eng., Principal Specialist, Engineering Practice, Tetra Tech Canada

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) South Inlet Transportation Improvement Project DBNUM: 09361 / UPC: 093610 The Casino Redevelopment Authority (CRDA) has identified certain road improvements to be performed in Atlantic City on certain

More information

ESTIMATE OF QUANTITIES

ESTIMATE OF QUANTITIES ESTIMATE QUANTITIES STATE S.D. SHEET NO. TOTAL SHEETS 2 12 SPECIFICATIONS TEMPORARY PAVEMENT MARKING, Continued STATE S.D. SHEET NO. TOTAL SHEETS 3 12 South Dakota Standard Specifications for Roads and

More information

Implementing a Pavement Management System PASER Based City of Omaha, NE

Implementing a Pavement Management System PASER Based City of Omaha, NE Implementing a Pavement Management System PASER Based City of Omaha, NE Introductions JESS HASTINGS, PE Project Manager 10 Years of Experience TIM O BRYAN, PE Senior Project Manager 30 Years of Experience

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Project/Plan Authorization and Approval Authority SPECIFIC SUBJECT:

More information

Pavement Preservation: When, Where, and How?

Pavement Preservation: When, Where, and How? movingforward winter 2017 A quarterly review of news and information about Pennsylvania local roads. Pavement Preservation: When, Where, and How? by Jennifer A. Albert, Ph.D., P.E., Federal Highway Administration

More information