STAFF S REQUEST ANALYSIS AND RECOMMENDATION 10SN0114. Virginia Electric & Power Company c/o Dominion Resources, Inc.

Size: px
Start display at page:

Download "STAFF S REQUEST ANALYSIS AND RECOMMENDATION 10SN0114. Virginia Electric & Power Company c/o Dominion Resources, Inc."

Transcription

1 January 19, 2010 CPC SFF S QUS NLYSIS N COMMNION 10SN0114 Virginia lectric & Power Company c/o ominion esources, Inc. Bermuda Magisterial istrict Coxendale and Old Stage oads QUS: ezoning from Light Industrial (I-1) to Heavy Industrial () of acres with Conditional Use to permit an electric power generation plant and disposal facility for fossil fuel combustion products on the entire acre tract. POPOS LN US: n electric power generation plant, commonly known as the Chesterfield Power Station, is currently operated on a portion of the request property. Initially developed in the 1940 s as a by-right use, this facility has expanded with three (3) conditional use approvals. he applicant seeks to consolidate all properties related to the station under one (1) set of zoning guidelines, thereby permitting flexibility to accommodate various power plant uses throughout the property. In addition, the development of a Fossil Fuel Combustion Products (FFCPs) disposal facility is proposed north of the existing station. his long-term management facility would accommodate FFCPs generated both on-site and from other ominion power plants, as well as permit reclamation of this material for reuse or use in other products, as limited by the proffered conditions. ecommend approval for the following reasons: COMMNION. he proposed zoning and land uses conform to the Consolidated astern rea Plan which suggests the property is appropriate for industrial use. B. he proffered conditions ensure land use compatibility between the proposed landfill and existing and anticipated area industrial development. Providing a FIS CHOIC community through excellence in public service

2 C. xisting County Ordinances and proffered conditions together with the requirements of the Virginia epartment of nvironmental Quality (Q) and the U.S. nvironmental Protection gency (P) relative to the siting, design, construction, operation and closure of solid waste management facilities, further ensure that landfilling operations are conducted in a manner that is compatible with area development and do not have an adverse impact on public health, safety and environment. (NO: CONIIONS MY B IMPOS O H POPY OWN(S) MY POFF CONIIONS.) POFF CONIIONS Virginia lectric and Power Company (the Owner ) in this zoning case, pursuant to Section of the Code of Virginia (1950 as amended) and the Zoning Ordinance of Chesterfield County, for itself and its successors or assigns, proffers that the development of the property known as Chesterfield County ax Identification Numbers , , , , , , and (the Property ) under consideration will be developed according to the following conditions if, and only if, the rezoning request for and the conditional use permits (CU) are granted. In the event the request is denied or approved with conditions not agreed to by the Owner, the proffers shall immediately be null and void and of no further force or effect. If the zoning is granted, these proffers will supersede all proffers and conditions now existing on the Property. xhibit he plan titled ominion, Chesterfield Power Station, FFCP Management Facility, djacent Parcel Map, prepared by Golder ssociates, dated 11/4/09. xhibit B he plan titled Facility Phasing Plan, ominion Chesterfield Power Station, prepared by Golder ssociates, evision 2 dated 12/9/09. xhibit C he plan titled Buffer Plan, ominion Chesterfield Power Station, revision 2, prepared by Golder ssociates, dated 10/26/ Uses. Uses permitted on the Property shall be:. ny use permitted in the Heavy Industrial () istrict. B. lectric power generation plant. C. Management facility for fossil fuel combustion products ( FFCPs ), as that term is defined by the Virginia epartment of nvironmental Quality ( Q ). For purposes of this condition, the term FFCPs shall include fly ash; bottom ash; gypsum; rock, pyrites and tramp iron; waste coal and coal fines; ground wood; waste lime and limestone; cenospheres; bead blast residue; stabilized solids from the Plant Waste Water reatment Plant; 2 10SN0114-JN19-CPC-P

3 stabilized solids from Waste reatment Ponds; filter press solids; and waste solid refractory.. Ponds or other storage facilities for FFCPs.. Haul road or other manners of transport of FFCPs. F. eclamation of FFCPs. G. ny accessory uses associated with any of the uses listed above. (P) 2. Construction and Phasing of FFCP Facility.. he FFCP management facility (the Management Facility ), generally shown on xhibit as proposed FFCP limits of disturbance shall be developed as an industrial waste disposal facility, subject to Virginia epartment of nvironmental Quality ( Q ) regulations. Notwithstanding the general nature of the proposed FFCP limits of disturbance shown on xhibit, the actual area of disturbance for the Management Facility (exclusive of the Haul oad as described in Proffer 4) shall not exceed ninety-two (92) acres. B. he Management Facility shall be constructed in four phases. he first phase of development (Phase 1) shall begin at the eastern section of the Management Facility and proceed in a westerly direction generally as shown on xhibit B. he lined areas for each phase, exclusive of required stormwater and sediment basins, access roads, and perimeter roads, shall be limited to an acreage range as follows: i. Phase 1: between 12.0 acres and 15.0 acres. ii. iii. iv. Phase 2: between 14.0 acres and 17.0 acres. Phase 3: between 15.0 acres and 18.0 acres. Phase 4: between 20.0 acres and 23.0 acres. he Owner shall submit a phasing plan that shows the exact size and dimensions of each phase (the Phasing Plan ), which plan shall be submitted for approval with the site plan for the first phase of development for the Management Facility and shall also be submitted to the County irector of General Services (or his or her designee), to confirm compliance with the dimensional requirements of this Proffer 2. he Phasing Plan shall include an estimated time schedule for development of each phase. If the Owner decides to change the size and/or dimensions of any phase after approval of the original Phasing Plan, the Owner shall be 3 10SN0114-JN19-CPC-P

4 required to resubmit for approval an amended Phasing Plan to the Planning epartment and the County irector of General Services (or his or her designee) to confirm compliance with the dimensional requirements of this Proffer 2. C. Stockpiling of soil shall be permitted within each operational phase of the Management Facility and shall be shown with more detail as part of the site plan. Further, during the development of Phases 1, 2 and 3, stockpiling of soil shall be permitted in the area as generally shown on xhibit B as the Soil Stockpile rea. he Soil Stockpile rea shall be subject to the following limitations during the development of Phases 1, 2 and 3, only: i. he area of disturbance for the Soil Stockpile rea (exclusive of the access road to the Soil Stockpile rea and any temporary sediment basins required for the Soil Stockpile rea) shall not exceed 3.0 acres. ii. iii. he height of any soil stockpile located in the Soil Stockpile rea shall not exceed fifty (50) feet above existing grade for the Soil Stockpile rea. he limits of disturbance for the Soil Stockpile rea shall be located at least three hundred (300) feet away from James iver Industrial Park (defined in Proffer 13) during development of Phases 1, 2 and 3.. he maximum height of each phase (as measured from mean sea level, or MSL ), shall be as follows: i. Phase 1: 140 feet MSL. ii. iii. iv. Phase 2: 195 feet MSL. Phase 3: 225 feet MSL. Phase 4: 275 feet MSL. (GS) 3. Off-Site FFCPs. FFCPs managed on the Property shall be limited to FFCPs generated by (i) the Chesterfield Power Station (the Station ) and (ii) Off-Site Stations (as defined in subsection B below), but from no other sources. he management of FFCPs from Off-Site Stations shall be limited as follows:. uring the operational life of the Management Facility (up to the time of closure of the Management Facility), the total amount of FFCPs received into the Management Facility that are generated by Off-Site Stations shall 4 10SN0114-JN19-CPC-P

5 not exceed 122,500 tons per any consecutive twelve month period. In the event of an emergency, additional FFCPs from Off-Site Stations may be brought to the Management Facility to the extent such is necessary to address the emergency situation. Prior to accepting FFCPs in an emergency, the Owner shall obtain approval to exceed 122,500 ton limit from the County irector of General Services (or his or her designee) to confirm the fact that an emergency situation exists. B. he term Off-Site Stations shall include the Southampton Power Station (located in Franklin, Virginia), the James iver Cogeneration Station (located in Hopewell, Virginia), each of which is owned and/or operated by the Owner, but no other facilities. he term Off-Site Stations may be expanded to include other power generating stations that are owned and/or operated by the Owner, provided that the addition of other such facilities to the definition of Off-Site Stations shall be first reviewed and confirmed by the County irector of General Services (or his or her designee) to ensure that the amount of FFCPs being received from such other facilities, together with any other Off-Site Stations, will not exceed the 122,500 ton limit described in 3.. above. In seeking such confirmation, the Owner shall provide to the County irector of General Services (or his or her designee) estimates of the amount of FFCPs that are planned to be transported from such other facilities that are to be added to the definition of Off-Site Stations. Further, should the Owner permanently discontinue the transport of FFCPs from a designated Off- Site Station, the Owner shall notify the County irector of General Services (or his or her designee) so that such facility can be removed from the list of designated Off-Site Stations. C. he Owner shall maintain records of the weight (in tons) of all FFCPs received into the Management Facility from Off-Site Stations, and the Owner shall make such records available for inspection by the County irector of General Services (or his or her designee) to insure compliance with this condition. On or before pril 1st of each calendar year, the Owner shall submit copies of such records for the prior calendar year to the County irector of General Services (or his or her designee).. o assist in mitigating impacts on public roads caused by the hauling of FFCPs from Off-Site Stations to the Management Facility, the Owner shall pay to the County the amount of ON dollar and no/100 cents ($1.00) per ton (subject to adjustment as provided herein) of FFCPs transported into the Management Facility from Off-Site Stations by trucks or other over the road vehicles (the Off-Site FFCP Cash Proffer ). he Off-Site FFCP Cash Proffer shall be paid to the County on or before each June 30th following the pril 1st report submitted pursuant to subsection 3.C. above. he Off-Site FFCP Cash Proffer shall be paid for the first year of operation of the Management Facility and, thereafter, shall be 5 10SN0114-JN19-CPC-P

6 adjusted upward by any increase in the Marshall and Swift Building Cost Index between July 1st of the first year of operation of the Management Facility and July 1 of the fiscal year in which the payment is made. he Owner s obligation to pay the Off-Site FFCP Cash Proffer shall cease when the Owner permanently discontinues placing FFCPs in the Management Facility and commences the process of closure for the Management Facility as required by the Virginia epartment of nvironmental Quality or other state or federal agency having authority over the Management Facility at the time of such closure. (GS) 4. Haul oad. private road shall be constructed on the Property for the conveyance of FFCPs to the Management Facility. he general location of the proposed haul road ( Haul oad ) is shown on xhibit.. he Owner will convey the FFCPs to the Management Facility by truck using the Haul oad or by some other means (e.g., a mechanical conveyance), or by a combination of the two. If FFCPs generated by the Station are transported by truck, such trucks shall not be permitted to travel on any adjacent public roads to transport FFCPs to the Management Facility except where necessary to cross the public road generally as shown on xhibit. FFCPs received from Off-Site Stations may be hauled by truck on public roads but must access the Haul oad by using existing entrances to the Property or by using an entrance approved as part of the site plan approval for the Management Facility or the Haul oad. B. he portions of the Haul oad constructed by the Owner shall be paved with asphalt, concrete, or other hard-surface material, but no curb and gutter shall be required. C. he exact location of the Haul oad, including the exact location of the public road crossing, shall be approved at the time of site plan review. he public road crossing shall be constructed pursuant to all permits issued by the Virginia epartment of ransportation ( VO ) for such road crossing. (NO: he Owner anticipates that the VO-require improvements to the public road for the road crossing may include, but not be limited to, strengthening the public road where the Haul oad crosses such public road so as to avoid damage to such public roads by heavy trucks and other equipment crossing that road.). fter completion of the public road crossing, the Owner shall be responsible for any future repairs to the public road crossing that may be necessary because of any damage caused by, or normal wear and tear from, the transport of FFCPs by truck or other, similar, vehicles across the 6 10SN0114-JN19-CPC-P

7 road crossing, as determined by the County irector of General Services (or his or her designee). (GS) 5. Public Facility Proffer. o assist in mitigating impacts of the Management Facility on items included in the capital improvements program, the Owner shall pay to the County the amount of ON HUN HOUSN and no/100 dollars $100, per year (the Public Facility Cash Proffer ), as described herein. he Public Facility Cash Proffer shall be paid on the anniversary of the date of approval for the site plan for the first phase of development for the Management Facility, and each anniversary thereafter as provided herein. he Public Facility Cash Proffer shall be adjusted upward annually by any increase in the Marshall and Swift Building Cost Index between July 1st of the first year of operation of the Management Facility and July 1 of the fiscal year in which the payment is made if paid. he Owner s obligation to pay the Public Facility Cash Proffer shall cease when the Owner permanently discontinues placing FFCPs in the Management Facility and commences the process of closure for the Management Facility as required by the Virginia epartment of nvironmental Quality or other state or federal agency having authority over the Management Facility at the time of such closure. (GS) 6. Spill esponse Plan. he Owner shall prepare and maintain spill response plans to address spills of substances in accordance with applicable state and federal regulations. he Owner shall provide the County irector of General Services (or his or her designee) with access to copies of those spill response plans. ccess to copies of the spill response plans shall be provided either by sending electronic copies of the plans to the County or by uploading copies of those plans to an internet-based library (e.g., an ftp site ). Updates and amendments to any spill response plans either shall be forwarded to the County irector of General Services (or his or her designee) or uploaded to the internet-based library. (GS) 7. Fugitive ust Management.. t the time of site plan submittal for the Management Facility, the Owner shall provide to the County Planning epartment and the County irector of General Services (or his or her designee) copies of applicable sections of all permits from state and/or federal authorities that include requirements for the management of fugitive dust related to operation of the Management Facility. If those permits do not include such requirements for fugitive dust management, the Owner shall submit to the County Planning epartment and the County irector of General Services (or his or her designee) a plan for the control of fugitive dust related to operation of the Management Facility (the ust Control Plan ). t a minimum (unless as otherwise provided below), the permit(s) or the ust Control Plan shall include the following methods of fugitive dust management: 7 10SN0114-JN19-CPC-P

8 i. Periodic watering of unpaved roadways, as needed, that serve the Management Facility. ii. iii. iv. Periodic watering and/or sweeping, as needed, of paved roadways. Maintain appropriate speed limits on paved and unpaved roadways. Maintain adequate moisture content needed for compaction of the FFCPs stored in the Management Facility. v. Periodic watering of the areas where FFCPs are prepared for transport to the Management Facility and periodic watering of the areas where FFCPs are placed in the Management Facility, as needed. vi. vii. viii. ix. Construction methods including tarps, geotextiles, soil cover, chemical dust control agents and other, similar, methods may be used as an alternative to watering. he process for cleaning any spills of FFCPs on the Haul oad and any adjoining public roads. Periodic covering of FFCPs placed in the Management Facility with soil, tarps, geotextiles, chemical dust control agents and other, similar methods. Methods for the management of fugitive dust from soil stored in any soil stockpiles, which methods may include, but are not limited to, soil stabilization through hydro-seeding and other, similar methods. B. egardless of the requirements contained in any state or federal permits related to dust management for the Management Facility, no more than ten (10) acres of the working area where FFCPs are placed in the Management Facility shall be open at any one time. Material placed in the working area will be tracked in daily with a bulldozer or similar earth moving equipment. Once the material reaches the appropriate moisture content for compaction, that material will be compacted with a mechanical roller. C. If, at any time during the operational life of the Management Facility, any state or federal permits that regulate fugitive dust management for the Management Facility are amended, the Owner shall submit those amended permits to the County Planning epartment and the County irector of General Services (or his or her designee). If, at any time during the operational life of the Management Facility, any state or federal permits 8 10SN0114-JN19-CPC-P

9 8. Buffers. that regulate dust management for the Management Facility delete all requirements for fugitive dust management for the Management Facility or makes such requirements less stringent than prior requirements, the Owner shall submit for approval a ust Control Plan to the County irector of General Services (or his or her designee). (GS). variable width buffer along the northern boundary of the parcel identified as ax I shall be maintained as provided herein (the Northern Buffer ). he Northern Buffer and its dimensions shall be as shown on the attached xhibit C (the Buffer Plan ). xcept for those areas where the Northern Buffer is shown on the Buffer Plan as greater than one hundred fifty (150) feet in width, the minimum width of the Northern Buffer shall be one hundred and fifty (150) feet. he Northern Buffer shall be inclusive of the existing power lines, gravel roads, various easements, and the substation. he existing vegetation within the Northern Buffer that is south of the 100 foot wide transmission corridor in the Northern Buffer (the Northern Vegetative Buffer ) shall be retained unless removal is required (i) for maintenance of and access to the existing substation within the Northern Buffer, (ii) to provide generally perpendicular crossings of the Northern Vegetative Buffer for access to the existing transmission line right of way within the Northern Buffer, (iii) to provide for generally perpendicular crossings of the Northern Vegetative Buffer to accommodate utilities, (iv) to allow for archaeological investigations on the Property, and (v) as may otherwise be required by subsection B below. he removal of vegetation within the Northern Vegetative Buffer to provide access to the existing transmission line right of way and substation, to accommodate utilities that cross the Northern Vegetative Buffer, and to allow for archaeological investigations on the Property shall be permitted as shown on the approved site plan, provided that such removal involves the least amount of disturbance of the Northern Vegetative Buffer as reasonably possible and, in the case of archaeological investigations, the area of buffer disturbance is restored with additional plantings, all as approved as part of the site plan. B. In areas where the Northern Vegetative Buffer is only fifty (50) feet in width, the Owner shall enhance that buffer area by installing additional plantings, as provided herein. t the time of site plan submittal, the Owner shall submit for approval a landscape plan for enhancement of this portion of the Northern Vegetative Buffer. he landscape plan shall be designed to provide an appropriate composition of plantings (e.g., evergreen trees, deciduous trees, and overstory (tall-growing) and understory (eye-level) plantings) that will enhance the screening quality of the Northern Vegetative Buffer. Further, the landscape plan shall include shall include a time-table for installing such plants so that newly installed 9 10SN0114-JN19-CPC-P

10 plants can grow to adequate maturity prior to land disturbing activity adjacent to the Northern Vegetative Buffer. ll plantings required by the approved landscape plan shall be installed pursuant to the approved timetable. (NO: he purpose of this condition is to help establish additional plantings that will help protect existing vegetation to wind throw when adjacent trees are removed and the preserved trees are exposed to wind.) C. 100 foot wide buffer along the western boundary of the parcel identified as ax I (the Western Buffer ) shall be maintained as shown on the Buffer Plan. he Western Buffer shall be inclusive of the existing power lines, gravel roads, various easements, and the substation. he existing vegetation within the Western Buffer shall be retained unless removal is required (i) for maintenance of and access to the existing substation, (ii) to provide generally perpendicular crossings of the Western Buffer for access to the existing transmission line right of way within the Western Buffer, (iii) to provide for generally perpendicular crossings of the Western Buffer to accommodate utilities, and (iv) to allow for archaeological investigations on the Property. he removal of vegetation within the Western Buffer to provide access to the existing transmission line right of way and substation, to accommodate utilities that cross the Western Buffer, and to allow for archaeological investigations on the Property shall be permitted as shown on the approved site plan, provided that such removal involves the least amount of disturbance of the Western Buffer as reasonably possible and, in the case of archaeological investigations, the area of buffer disturbance is restored with additional plantings, all as approved as part of the site plan. (P) 9. Contributions for Construction of rails. t the time of site plan approval for the Haul oad or the Management Facility (whichever first occurs), the Owner shall pay to the County the amount of $150, to be used for the acquisition of easements for and/or construction of public pedestrian trails by the County, which trails shall be part of the County s parks and recreation infrastructure. (P) 10. Public Water and Wastewater.. he public water and wastewater systems shall be required only for domestic use, except for construction offices. B. No use of public water shall be required for industrial processes or plant operations. (U) 10 10SN0114-JN19-CPC-P

11 11. nvironmental ngineering.. With the exception of timbering which has been approved by the Virginia State epartment of Forestry for the purpose of removing dead or diseased trees, there shall be no timbering until a land disturbance permit has been obtained from the nvironmental ngineering epartment and the approved devices have been installed. imbering of the site shall be phased in accordance with the construction phasing as set forth in Proffer 2. B. Super silt fence shall be used at the toe of the slope during construction and fill along Proctor s Creek and the James iver. () 12. Cultural esources.. he Owner will give notice to the County Planning epartment upon submission of the Joint Permit pplication (JP) for the Management Facility. Phase 1 Cultural esources Identification Survey prepared by a person or persons who meet(s) the Secretary of the Interior s Professional Qualification Standards for rcheology and Historic Preservation will be performed as part of the JP process. Cultural resources identified during the Phase I study will undergo a Phase II significance evaluation study in accordance with the provisions of Section 106 of the National Historic Preservation ct of 1966, as amended, and it s implementing regulations 36 CF Part 800 Protection of Historic Properties. Copies of the results of the Phase I and Phase II studies and any subsequent reports will be submitted to the Planning epartment. B. house commonly known as Spring Hill is located on the parcel identified as GPIN nytime prior to the relocation or demolition of such house, the County Parks and ecreation epartment (or its designee) and the County Planning epartment shall have the right to enter the Property to examine and catalogue such house, subject to the Owner s reasonable safety procedures for approaching and/or entering such structure. (P) 13. Committee. Prior to the commencement of construction for the Management Facility, the Owner shall form a committee consisting of representatives from the Owner, at least one representative of the properties identified as ax I , and (collectively, James iver Industrial Park ) and the County irector of General Services (or his or her designee) (the Committee ). he Committee shall meet annually (and more often if approved by the Committee) until the Owner discontinues the placement of FFCPs in the Management Facility. he purpose of the Committee will be to maintain open dialogue between the Owner, the County irector of General Services (or his or 11 10SN0114-JN19-CPC-P

12 Location: her designee), and the owners in James iver Industrial Park regarding operational issues for the Management Facility. (GS) 14. Inspections. Subject to the Owner s safety and security requirements, the County irector of General Services (or his or her designee) shall be permitted regular access to the Management Facility so as to monitor for compliance with these proffers. GNL INFOMION North and south lines of Coxendale oad, east of its intersection with Old Stage oad, and the southwest corner of Old Stage and Coxendale oads. ax Is ; ; ; ; ; ; and xisting Zoning: Size: I-1 and with Conditional Use acres xisting Land Use: Industrial and vacant djacent Zoning and Land Use: North - ; Industrial or vacant South - I-1, and ; Public/semi-public (Henricus Park) or vacant ast - Henrico County West - I-2, and ; Industrial, public/semi-public (sewage treatment plant) or vacant Public Water System: UILIIS here is an existing twelve (12) inch water line extending along Coxendale oad, approximately 1000 feet south of this site. he existing station is connected to the public water system. he applicant has proffered to use the public water system for domestic purposes. (Proffered Condition 10) 12 10SN0114-JN19-CPC-P

13 Public Wastewater System: here is an existing forty-two (42) inch wastewater trunk line extending along Proctors Creek, adjacent to the southern boundary of this site. he fifty-four (54) inch Kingsland Creek wastewater trunk line extends from north to south across the eastern portion of this site, and a fifteen (15) inch wastewater trunk line extends along a portion of the northern boundary of this site. he applicant has proffered to use the public wastewater system for domestic purposes (Proffered Condition 10). he applicant has also proposed to use an industrial waste transportation road that will intersect with the fifty-four (54) inch effluent lines from the Proctors Creek Wastewater reatment Plant. Care should be taken during the construction of this road to avoid damaging these lines. rainage and rosion: NVIONMNL he subject property is bordered by the James iver to the north and bisected by Proctors Creek. he majority of the site drains to the James iver, with a small portion draining to Proctors Creek. here are currently no known on- or off-site drainage or erosion problems and none are anticipated after development. he property is wooded and, as such, should not be timbered without first obtaining a land disturbance permit from the epartment of nvironmental ngineering. his will ensure that adequate erosion control measures are in place prior to any land disturbance. (Proffered Condition 11.a). o minimize the amount of soil exposed to the weather at any one time, the project should be designed with distinct phases. (Proffered Condition 2) Stockpiled FFCPs are subject to wind erosion. s such, a dust suppression plan must be on file and implemented at all times. (Proffered Condition 7) Water Quality: Both the James iver and Proctors Creek are perennial streams and, as such, are subject to 100 foot conservation buffers as part of the esource Protection rea (P) within which uses are very limited. he Ps on both the James iver and Proctors Creek are very wide due to the vast amount of wetlands with a large percentage of the property located adjacent to these sensitive areas. Given the close proximity of the adjacent wetlands and the nature of the project, super silt fence should be used adjacent to these sensitive areas. (Proffered Condition 11.b) 13 10SN0114-JN19-CPC-P

14 GNL SVICS Siting and Operation of the Facility ny individual or company wishing to establish and operate a waste disposal or management facility in Chesterfield County must comply with an application and approval process set forth in the Chesterfield County Municipal Code. Siting requirements for such a facility are set forth in rticle VII and the approval of waste material and management are set forth in rticle VIII. he specific application requirements for rticle VII and rticle VIII are set forth in Section (Form of pplication for Siting pproval), and Section (Form of pplication for pproval), respectively. In ugust 2009, ominion Virginia Power (Owner and pplicant) submitted two (2) separate sets of documents to meet the requirements of the code in their process to gain approval for a FFCP Management Facility. he Chesterfield County General Services epartment (General Services) is the process owner of this siting approval process. n environmental engineering consultant (Faulkner and Flynn) was retained by General Services to assist in the analysis of the submission to verify that all necessary components to the application were submitted and that the application requirements were met by the submission. his analysis is designed to provide the county with much of the information that will be required by the Virginia epartment of nvironmental Quality (VQ) in the Part and Part B application process administered by VQ that leads to an approved Waste Management Operations Permit that the Owner must have to construct and operate such a waste facility within the Commonwealth of Virginia. his information enables county staff to perform a review of the proposed operations, as well as an analysis of the location and general design of the facility in order to make determinations on the potential impacts of such a facility on the county and its citizens and businesses. his review process conducted by the county and its consultant is neither intended nor represented as a comprehensive technical review of the science and engineering of the design and operation of the waste management facility, but rather it provides the county with a preview of the facility and assistance in measuring the impacts the facility may have on the county. he technical review of the science and engineering of the facility is conducted by VQ in the Part and Part B application process required for permitting and licensing of the facility as provided by the regulatory authority granted VQ through both state and federal regulations. ll of the potential county concerns have been adequately addressed in the two parallel submissions in combination with the proffered conditions of this case, as discussed in the Management Facility for Fossil Fuel Combustion Products section of this report SN0114-JN19-CPC-P

15 PUBLIC FCILIIS Fire Service: he utch Gap Fire Station, Company Number 14, and Bensley Bermuda Volunteer escue Squad currently provide fire protection and emergency medical service (MS). his request will have a minimal impact on Fire and MS. ccess and required water flow requirements will be evaluated in the Site Plan approval process. Parks and ecreation: he Public Facilities Plan identifies the need for three (3) regional, seven (7) community and twenty-nine (29) neighborhood parks by In addition, there is currently a shortage of community and neighborhood park acreage in the county. he Plan identifies a need for 354 acres of regional park space; 252 acres of community park space; and 199 acres of neighborhood park space by 2020; the need for linear parks; resource basedspecial purpose parks [historical, cultural and environmental]; and recreational facilities. he Plan also identifies the need for water access and trails along the James and ppomattox ivers and their major tributaries, Swift and Falling Creeks. Co-location of neighborhood and community athletic parks with middle and elementary schools is desired. Specific Plan needs associated with this request include trails, water access and linear and resource based parks. Proffered Condition 9 commits to a cash contribution in the amount of $150,000 to the County for the purpose of trail easement/property acquisition and trail construction. his proffer addresses Plan impacts for new trails and linear parks. County epartment of ransportation: ypical traffic generation information is not available for the proposed use of electric power generation plant and disposal facility. ue to a through truck restriction on part of Coxendale oad, traffic generated by this facility will be initially distributed along West Hundred oad (oute 10) and Old Stage oad, which had 2009 traffic counts of 49,612 and 4,653 vehicles per day, respectively. Currently, there are no limitations on the amount of FFCPs that can be exported from or delivered to the Management Facility. ccording to the applicants representatives, on average, there are approximately thirty (30) to forty (40) trucks per day that deliver FFCPs to the Management Facility. In allowing a comparable amount of FFCPs to be delivered, the applicant has proffered to limit FFCPs into the Management Facility to 122,500 tons per twelve-month period (Proffered Condition 3). s with the current use, this request will allow the applicant to continue to have the ability to haul FFCPs from the Management Facility without restrictions. herefore, this request will have similar traffic impact as the current power generation and disposal facility SN0114-JN19-CPC-P

16 s previously stated, the applicant has proffered to limit transport of FFCPs into the Management Facility to 122,500 tons per twelve-month period. he applicant has also proffered to contribute cash in the amount of $1.00 per ton of FFCPs transported into the Management Facility. his cash contribution will be used to assist in mitigating the impacts on the public roads (Proffered Condition 3). his cash proffer alone certainly will not cover the cost of all of the road improvements needed in this area. project to widen oute 10 from Interstate 95 to Ware Bottom Spring oad is planned to be under construction in he project will include the Old Stage oad intersection, including the bridges over the CSX railroad tracks. he project should take about one and a half years to complete. Virginia epartment of ransportation: VO has no comment on this case. ppropriate comments will be made at the time construction plans are submitted for review, including a durable crossing of Coxendale oad with appropriate entrances. CONOMIC VLOPMN he epartment of conomic evelopment supports this request and continues to resolve final proffered language with the applicant and area property owners regarding northern boundary buffer provisions. Comprehensive Plan: LN US Lies within the boundaries of the Consolidated astern rea Plan which suggests the property is appropriate for industrial use. rea evelopment rends: Properties to the north are zoned Heavy Industrial () and are developed as the James iver Industrial Park. Properties to the south are zoned Light and Heavy Industrial (I-1 and ) or gricultural () and are occupied by Henricus Park or are vacant. he James iver and County of Henrico border the eastern boundary. he CSX railroad along with General and Heavy Industrial I-2 and ) and gricultural () properties border the western boundary. It is anticipated that moderate to heavy industrial development will continue both within the immediate area as well as north along the CSX ailroad to the James iver consistent with the recommendations of the Plan SN0114-JN19-CPC-P

17 Zoning History: Site esign: he ominion Virginia Power Chesterfield Power Station has existed on a portion of the request property for a number of years. t the time this facility was initially constructed, electric power generation facilities were permitted by-right in industrial districts. Subsequent to the initial construction of the station, the Zoning Ordinance was amended to require a Conditional Use for electric power generation facilities in Heavy Industrial () istricts. On February 28, 1990, the Board of Supervisors, upon a favorable recommendation by the Planning Commission, approved a rezoning from Heavy Industrial (M-3) to Heavy Industrial () of 2.3 acres with Conditional Use to permit two (2) electric generating units at the existing electric power generation facility. (Case 89SN0412) On November 28, 1990, the Board of Supervisors, upon a favorable recommendation by the Planning Commission, approved a rezoning from Heavy Industrial (M-3) to Heavy Industrial () of 19.5 acres with Conditional Use to permit expansion of an existing substation located at the Chesterfield Power Station. (Case 90SN0283) On pril 24, 1991, the Board of Supervisors, upon a favorable recommendation by the Planning Commission, approved a rezoning from Heavy Industrial (M-3) to Heavy Industrial () of acres with Conditional Use to bring the existing power station facilities into conformance with new ordinance requirements and to permit expansion of plant facilities and replacement of existing power generating units. (Case 90SN0307) he request property lies within an merging Growth istrict rea. New development, including landfilling operations, must conform to the development standards of the Zoning Ordinance for industrial development in merging Growth reas which address access, parking, landscaping, architectural treatment, setbacks, signs, buffers, utilities and screening of dumpsters and loading areas. Use xceptions: lectric Power Generation Plant xhibit depicts the existing station complex. pproval of this request would permit future expansion of plant facilities within the limits of the subject property as well as redevelopment and/or replacement of existing plant facilities. (Proffered Condition 1) 17 10SN0114-JN19-CPC-P

18 Management Facility for Fossil Fuel Combustion Products (FFCPs) Overview: Fossil fuel combustion products (FFCPs) are currently processed and stored on-site, southeast of the existing station, where they are stored and dewatered in one pond (west pond), prior to final storage (east pond). With the ultimate closure of the east pond, a long-term management facility for the FFCPs is proposed northwest of the station, as noted in xhibit (Proffered Condition 1). hese FFCP s would be conveyed to the management facility using a private haul road or mechanical conveyance through the power station property, also noted on xhibit (Proffered Condition 4). s proffered, the actual area of disturbance for this facility, exclusive of access, would not exceed ninety-two (92) acres (Proffered Condition 2.). evelopment of this facility would be phased from east to west, as noted in xhibit B, so as to minimize impacts on the adjoining property to the north (James iver Industrial Park) (Proffered Condition 2.B). ach phasing plan would be submitted for approval by the irector of General Services to confirm compliance with the dimensional requirements of Proffered Condition 2.B. Likewise, limitations on the location and height of soil stockpiling during the operational phases of the facility (Proffered Condition 2.C) as well as the maximum height of each phase (Proffered Condition 2.) have also been addressed. Proffered Condition 1 defines the materials that will be allowed by VQ to be disposed in the facility. Staff is satisfied that the proffer restricts the materials to those that are relatively inert and would be unlikely to create contamination issues with ground water or surface water. Off-Site FFCPs: Proffered Condition 3 limits the amount of FFCPs generated off-site that may be delivered to this facility at 122,500 tons annually which is close to the volume that the facility is currently accepting. his proffer also limits the FFCPs brought to this facility to those generated by ominion Virginia Power. he owner would maintain records of the precise tonnage of off-site waste brought into the facility and would annually pay the county $1.00 per ton to assist in mitigating transportation impacts caused by the vehicular traffic associated with this operation. Public Facility Impacts: Proffered Condition 5 provides the county an annual payment of $100,000 to be used within the Capital Improvement Program to address any impacts that the facility may cause the County SN0114-JN19-CPC-P

19 Spill esponse Plan and Fugitive ust Management: Inspections: Committee: Buffers: Cultural esources: Proffered Condition 6 provides access to spill response plans, which meet all applicable state and federal regulations, to the irector of General Services or his/her designee. ll updates to such plans will also be made available. Proffered Condition 7 identifies specific issues that will be addressed in a Fugitive ust Management Plan as required by the regulatory agencies with jurisdiction over this facility. If such a plan is not required by the regulatory agencies, the owner will create a plan to be approved by the irector of General Services or his/her designee. his proffer also limits the open working area of the facility to ten (10) acres at any time. Proffered Condition 14 provides for access by county staff to inspect the facility for compliance with the proffered conditions and all applicable regulations. In an effort to maintain communications regarding the operation of the facility and associated impacts, Proffered Condition13 establishes a committee consisting of the applicant, county staff and a representative of the James iver Industrial Park. he Zoning Ordinance does not require the provision of buffers between industrial districts. In an effort to minimize impacts of the FFCP management facility upon the adjacent James iver Industrial Park, xhibit C in combination with Proffered Condition 8 would require the provision of buffer, a minimum of 150 feet in width, adjacent to the northern boundary of the request property. s written, with the inclusion of an existing transmission line right of way, various easements, a gravel road and a substation, the resulting vegetative portion of the buffer would be reduced to a minimum of fifty (50) feet in width. Proffered Condition 8 also requires the provision of a 100 foot wide buffer, inclusive of existing encumbrances, along the western boundary of the FFCP management facility property adjacent to the rail line. Proffered Condition 12 requires a Cultural esource Identification Survey to determine areas of any historical significance on the property and associated implementation for documentation and/or protection. Preliminary research indicates the location of a historical resource known as the Spring Hill house. Staff has been advised by the applicant that this 19 10SN0114-JN19-CPC-P

20 structure is in very poor condition. s such, staff has requested access to the property to examine and catalogue this structure prior to its demolition, as addressed in this proffer. CONCLUSION he proposed zoning conforms to the Plan. Further, as proffered, the proposed land uses are compatible with existing and anticipated area industrial development. County Ordinances and proffered guidelines in combination with state and federal regulations ensure that the proposed landfilling operations will not have an adverse impact on the public health, safety and environment. Given these considerations, approval of this request is recommended SN0114-JN19-CPC-P

21 L IS P C O LL L N U SS LL Legend CH HNICO COUNY IV J N I-2 SI -7 B Y B O OK PK WY Commercial IN V esidential CS X ON S BU M IN IS V V O L N B LV V O S O V L V N V V O O MI L N N L MO OK O G L VIN I-1 C CO V C N B NH IL L B LV I S V C IN CH S I-9 5 P -15 G N G N C G N G N G C I OL C I G N S I C N S I H P W Y LIB SU N S V C V BL V N C FU L C H Y W Y LN LI L W S N I N LL OM V F IL S SO N W OO ON L BL C G N C-2 G S IN SB KIN H C IG G N G N WY IV L VIL L O N B U G L N OW IL C-2 H Y B M C LIV PO L S VI L PL NS H OG LN NS W O L SC IM S H W C I N GL I MU B NS L N erial photos taken in 2007 HU N L B W L N V SO KIN G S C I H C G N L C L L L ON C LU S B Y Y LO MO S C W C N L I S G VIL IN G S PL C I V LIV LY U P H O I M Y LN P K S SY HO ON V C OW S I M S NS B Y N ZL C S IV S M N SC IM S H W L OW C-2 LIV PO OL L N PO IN O S F I WY WO G O W Y C N M N S LV SO KB PL O N G OV O SB W S Y C I W IV B I S V IS N S V IS N F IN V I C B LV J M S LS B I G C S G N I C S PL WY IV S B N C I S C N S L N S S S G L SC IM S H W C I-2 I-2 I-1 N I-2 B Y P K S B I-2 S C N C IV S B M CO X N L C Y N IV OV N LN C G K IS N LY I K FeetI-2 C-3 H B OU S YL N JOH SP IN G W B O OM W C L S UN H IL G LL IG JOL L Y P L JO Y LN MH-1 I-1 2,400 Z L NU W I PL N S W I B Y CH 0 B 1,200 / C-3 L N LN N N W I G 2,400 WHI OK FM N PS SW IF -15 IN V C-5 Z IN V I BL IH F S N IG H IN L I-1 O C LU C LU B G C C ILL K H UN B LN C OY C-3 SO U H VIL C-3 IN GS OC MO C I I G SP C-3 10SN0114 C-5 C.U. I-1 OC-3 IN GS PL Y WOO S I G V -15 I-1 C LU B U -7 V M N O -15 K C-3 K P O N P W G OV C US MI L C OF F G S N I PO IN S SP IL U F W S IC L L Y NS P LN IL -9 C-5 C F W W H N H OG C I COXNL I-2 C U V P U LN S S FO PL Y P U V O P WO L IL S P N OS BO -15 L M H W L F I V H IL L S I N LN WIL ON W FL Y L C P S I H N IC U SP K O K K C LIF L V IS N NOMNL C -15 Y WIL ON C SH V OO LS O MIN Y Y GB SH I GL OL B U SU L IN C-3-7 C S IN OL B N BU VIS IO L OK C-5 S M N L N SU O C N WO X N S G O Y C Y F C-5 BU PL -7 L COXN LM P I BLLM W MY S Streams V -7 OO OL M 5 IV S L B O V I-9 PIN H U S S S P C YS OL M J M IN I-1 N I-1 M IL S W V I OL F Office NS LN Industrial G SS Y M HO X P JN COU -7 W ON gricultural S G MH-1 ZONING C O I-2 M V IN C OS SB L S S N BU G V C-5-7 N WIL M U H U N

22 10SN0114-1

23 10SN0114-2

24 10SN0114-3

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 08SN0280. Miles & Wells Partnership and Burgess & Niple, Inc

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 08SN0280. Miles & Wells Partnership and Burgess & Niple, Inc ugust 19, 2008 CPC September 24, 2008 BS SFF S REQUES NLYSIS N RECOMMENION 08SN0280 Miles & Wells Partnership and Burgess & Niple, Inc Bermuda Magisterial istrict Ecoff Elementary, Salem Middle and Bird

More information

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 12SN0152. Sustainability Park, LLC. Bermuda Magisterial District North Enon Church Road

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 12SN0152. Sustainability Park, LLC. Bermuda Magisterial District North Enon Church Road SE GE: Jane Peterson ecember 12, 2011 P P Time emaining: 100 days STFF S EQUEST LYSIS EOENTION 12SN0152 Sustainability Park, LL Bermuda agisterial istrict 13101 North Enon hurch oad EQUEST: onditional

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket10-13-2015part3-1Nsm 10.19. SMALL SCALE SAND AND GRAVEL EXTRACTION. 10.19.1. Applicability. This section applies to any mineral

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 14SN0546. Harish Shrimanker. Clover Hill Magisterial District Hull Street Road

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 14SN0546. Harish Shrimanker. Clover Hill Magisterial District Hull Street Road ASE MANAGE: obert lay January 21, 2014 P January 22, 2014 BS BS ime emaining: 365 days SAFF S EQUES ANAYSIS AND EOMMENDAION 14SN0546 Harish Shrimanker lover Hill Magisterial District 13732 Hull Street

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

MOBILE HOME DISTRICT OR "MH" DISTRICT AND MOBILE HOMES EXCLUSIVE OF MOBILE HOME DISTRICTS (Ord.No )

MOBILE HOME DISTRICT OR MH DISTRICT AND MOBILE HOMES EXCLUSIVE OF MOBILE HOME DISTRICTS (Ord.No ) Page 1 of 6 SECTION 27 MOBILE HOME DISTRICT OR "MH" DISTRICT AND MOBILE HOMES EXCLUSIVE OF MOBILE HOME DISTRICTS (Ord.No.315-450) A. GENERAL DESCRIPTION: The purpose of this Zoning District is to provide

More information

Re: Erosion Control Report and Drawings Requirements Accompanying Document

Re: Erosion Control Report and Drawings Requirements Accompanying Document Re: Erosion Control Report and Drawings Requirements Accompanying Document This document was created to help engineers and other design staff to better understand, meet and exceed the erosion control requirements

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

Larimer County Land Use Code Section 5.8: Rural Land Use Process

Larimer County Land Use Code Section 5.8: Rural Land Use Process Larimer County Land Use Code Section 5.8: Rural Land Use Process 5.8.6 PRINCIPLES D. Development Standards 3. Engineering Standards and Guidelines for Roads and Drainage The following Standards and Guidelines

More information

Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red.

Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red. Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red. Index Sec. 10-23. Solar Energy Systems Article 9. Use Matrix

More information

181 State Road 415, New Smyrna Beach. Railey Harding & Allen, P.A. Barcelo Developments, Inc. Scott Ashley, AICP, Planning Manager

181 State Road 415, New Smyrna Beach. Railey Harding & Allen, P.A. Barcelo Developments, Inc. Scott Ashley, AICP, Planning Manager GROWTH AND RESOURCE MANAGEMENT DEPARTMENT PLANNING AND DEVELOPMENT SERVICES DIVISION CURRENT PLANNING ACTIVITY 123 W. Indiana Avenue, Room 202, DeLand, FL 32720 (386) 943-7059 PUBLIC HEARING: CASE NO:

More information

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS Section 1201 Applicability For the purpose of this Article, recreation vehicles and recreational vehicle

More information

ADDENDUM 14SN0590. Bermuda Magisterial District 4100 Bermuda Hundred Road. Rezoning from Agricultural (A) to Heavy Industrial (I-3) on 26.

ADDENDUM 14SN0590. Bermuda Magisterial District 4100 Bermuda Hundred Road. Rezoning from Agricultural (A) to Heavy Industrial (I-3) on 26. CSE MNGER: Darla Orr ugust 27, 2014 BS BOS Time Remaining: 365 days DDENDUM 14SN0590 Virginia Electric and Power Company, ttn: Real Estate nd Philip Morris US Inc., c/o ltria Client Services, ttn: Charles

More information

INTENSIVE LIVESTOCK, DAIRY, POULTRY FACILITIES

INTENSIVE LIVESTOCK, DAIRY, POULTRY FACILITIES PAGE 23: 1 ARTICLE 23 INTENSIVE LIVESTOCK, DAIRY, POULTRY FACILITIES 3-510 INTENT It is the intent of this Article to preserve the agricultural character of King and Queen County, to protect the health,

More information

New Administration Building

New Administration Building New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

CASE NUMBER: 15SN0618 (Amended) APPLICANT: Plantation Haven LLC

CASE NUMBER: 15SN0618 (Amended) APPLICANT: Plantation Haven LLC CASE NUMBER: 15SN0618 (Amended) APPLICANT: Plantation Haven LLC STAFF S ANALYSIS AND RECOMMENDATION CHESTERFIELD COUNTY, VIRGINIA Magisterial District: BERMUDA Board of Supervisors (BOS) Public Hearing

More information

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted: 6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major

More information

ARTICLE 5 RESIDENTIAL MANUFACTURED HOME DISTRICT. Description and Purpose CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE

ARTICLE 5 RESIDENTIAL MANUFACTURED HOME DISTRICT. Description and Purpose CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE ARTICLE RESIDENTIAL MANUFACTURED HOME DISTRICT This Article was reviewed and approved by the Michigan Department of Consumer and Industry Services, Corporation and Securities Bureau, Manufactured Home

More information

TOWN OF HOLLIS, NEW HAMPSHIRE

TOWN OF HOLLIS, NEW HAMPSHIRE TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08) APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall

More information

CHAPTER 725. Solar Farms.

CHAPTER 725. Solar Farms. CHAPTER 725 Solar Farms. The following provisions shall apply to all solar farms in Carroll County, IL. A Solar Farm is defined as a power station using photovoltaic modules and inverters for utility electricity

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1300 CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1301 SECTION 13.01 STATEMENT OF PURPOSE To provide for manufactured home park development, of long-term duration of stay, in

More information

ATTACHMENT A PROPOSED TEXT CHANGE FOR CHAPTER ASPHALT PLANT SUP OF THE THURSTON COUNTY CODE

ATTACHMENT A PROPOSED TEXT CHANGE FOR CHAPTER ASPHALT PLANT SUP OF THE THURSTON COUNTY CODE TTHMENT POPOSED TEXT HNGE FO HPTE 0.4 SPHT PNT SUP OF THE THUSTON OUNTY ODE The Thurston ounty ode is hereby amended to read as follows: Deleted Text: Strikethrough Proposed hanges: Underlined Staff omments:

More information

LAND DISTURBANCE PLAN AND IMPLEMENTATION REQUIREMENTS

LAND DISTURBANCE PLAN AND IMPLEMENTATION REQUIREMENTS For any site that disturbs land through excavation, embankment or grading activities, as defined by the city s Land Disturbance Ordinance, the owner shall, at minimum, conform to the provisions of these

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES ST. LOUIS

More information

Annual CCR Fugitive Dust Control Report

Annual CCR Fugitive Dust Control Report Annual CCR Fugitive Dust Control Report Mill Creek Generating Station Louisville Gas & Electric Company Jefferson County, Kentucky December 2017 Annual CCR Fugitive Dust Control Report Mill Creek Generating

More information

Hodgson Road. Randolph Road Variable Public Right of Way VICINITY MAP NOT TO SCALE. 50' Public Right of Way

Hodgson Road. Randolph Road Variable Public Right of Way VICINITY MAP NOT TO SCALE. 50' Public Right of Way Site Development Data: MPV Properties Development Standards 07/18/18 Rezoning Petition No. 2018-061 --Acreage: ± 2.192 acres --Tax Parcel #: portion of 185-033-01 --Existing Zoning: R-3 --Proposed Zoning:

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY CULVERTS, ROAD BORES, USE OF HEAVY EQUIPMENT AND UTILITY LINES WITHIN GRAYSON COUNTY ROAD

More information

Joe Rust Company

Joe Rust Company FOR SALE MANUFACTURED HOME DEVELOPMENT LAND Waxahachie, Texas LOCATION: The subject property is located approximately onequarter mile southwest of the intersection of I-35E and FM 66 in the Waxahachie

More information

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN Clover Power Station Coal Combustion Residual Management Submitted To: Clover Power Station S.R. 92 Clover, VA 24534 Submitted By: Golder Associates

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

CASE NUMBER: 18PD0228 APPLICANT: Chesterfield County Public Schools

CASE NUMBER: 18PD0228 APPLICANT: Chesterfield County Public Schools CASE NUMBER: 18PD0228 APPLICANT: Chesterfield County Public Schools STAFF S ANALYSIS AND RECOMMENDATION Planning Commission (CPC) Public Hearing Date: JULY 17, 2018 CPC Time Remaining: 60 DAYS Applicant

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

914. "I-1", LIGHT INDUSTRIAL DISTRICT

914. I-1, LIGHT INDUSTRIAL DISTRICT 914. "I-1", LIGHT INDUSTRIAL DISTRICT 914.010. PURPOSE. The purpose of the "I-1", Light Industrial District is to provide for the establishment of warehousing and light or limited industrial development

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

STAFF REPORT. About percent depending on how much is added in the outdoor storage area (max allowed where storm sewer exists is 90 percent).

STAFF REPORT. About percent depending on how much is added in the outdoor storage area (max allowed where storm sewer exists is 90 percent). STAFF REPORT Application: Conditional use permit for the operation of a light repair (small engine repair) business with retail sales and outdoor storage in a fenced area. Applicant: Matthew L Rezac Property

More information

CASE NUMBER: 17SN0500 APPLICANTS: Marjorie S. Elliott and Michael B. Elliott

CASE NUMBER: 17SN0500 APPLICANTS: Marjorie S. Elliott and Michael B. Elliott CASE NUMBER: 17SN0500 APPLICANTS: Marjorie S. Elliott and Michael B. Elliott CHESTERFIELD COUNTY, VIRGINIA STAFF S ANALYSIS Magisterial District: MIDLOTHIAN AND 1730 Olde Coalmine Road RECOMMENDATION Planning

More information

Section 1 Non-Conforming Structures and Uses Allowed to Continue. 12

Section 1 Non-Conforming Structures and Uses Allowed to Continue. 12 CHAPTER 3 NONCONFORMITIES Section 1 Non-Conforming Structures and Uses Allowed to Continue. 12 Section 2 Discontinuance 12 Section 3 Change of Use... 12 Section 4 Residential Alterations 12 Section 5 Restoration..

More information

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 09SN0136 EOR, LLC.

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 09SN0136 EOR, LLC. January 20, 2009 P February 25, 2009 BS STFF S REQUEST NLYSIS ND REOMMENDTION 09SN0136 EOR, LL. Bermuda Magisterial District South of arver Heights Drive and South halkley Road Intersection REQUEST: Rezoning

More information

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 NAME LOCATION MAWSS Shelton Beach Road East side of Shelton Beach Road Extension, 2/10± mile North of Moffett Road CITY

More information

A. Each Contractor shall comply with the requirements outlined in these documents.

A. Each Contractor shall comply with the requirements outlined in these documents. Section 000700 Stormwater Management Plan for Aurora Public Schools PART 1 GENERAL 1.0 DESCRIPTION A. Each Contractor shall comply with the requirements outlined in these documents. PART 2 PRODUCTS Not

More information

CASE NUMBER: 15SN0613 APPLICANT: Verizon Wireless

CASE NUMBER: 15SN0613 APPLICANT: Verizon Wireless STAFF S ANALYSIS AND RECOMMENDATION Planning Commission (CPC) Public Hearing Date: FEBRUARY 17, 2015 CPC Time Remaining: 100 DAYS Applicant s Agent: JAMES W. THEOBALD (804-771-9513) Applicant s Contact:

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report County of Sonoma Agenda Item Summary Report Agenda Item Number: 55 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Supervisors

More information

ZONING AMENDMENT, PUD & PLANNING APPROAVAL STAFF REPORT Date: May 4, 2006

ZONING AMENDMENT, PUD & PLANNING APPROAVAL STAFF REPORT Date: May 4, 2006 # 7, 8, & 9 Case ZON2006-00256, ZON2006-00815, & SUB2006-00816 ZONING AMENDMENT, PUD & PLANNING APPROAVAL STAFF REPORT Date: May 4, 2006 NAME SUBDIVISION NAME LOCATION David Hickman Auto Shredding Subdivision

More information

13PR0171. Asheville Beaux Catcher Vass, LLC (Big Lots and Shops) Applicant requests site plan and architectural approval.

13PR0171. Asheville Beaux Catcher Vass, LLC (Big Lots and Shops) Applicant requests site plan and architectural approval. SE MNGER: Jeff Lamson March 19, 2013 P P Time Remaining: 100 days STFF S REQUEST NLYSIS ND REOMMENDTION 13PR0171 sheville Beaux atcher ass, LL (Big Lots and Shops) Bermuda Magisterial District Lying approximately

More information

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED PROJECT 000P-151 US HWY 12 DAY COUNTY Construction of New Field Approach PCN i4g8 Sheet 1 of 11 ENVIRONMENTAL COMMITMENTS An Environmental

More information

Ledges East Master Owners Association. Architectural Guidelines for the Community-Wide Areas

Ledges East Master Owners Association. Architectural Guidelines for the Community-Wide Areas Ledges East Master Owners Association Architectural Guidelines All improvements proposed or required to be constructed in Community-Wide Areas (whether located in Commercial Areas or Residential Areas)

More information

Texas Commission on Environmental Quality

Texas Commission on Environmental Quality Texas Commission on Environmental Quality Permit For Municipal Solid Waste (MSW) Management Facility Issued under provisions of Texas Health and Safety Code Chapter 361 MSW Permit No.: 2383 Name of Site

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 Project Address: (305) 593-6700 Permit Number: National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control

More information

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Mill Creek Generating Station Louisville Gas & Electric Company Jefferson County, Kentucky October 2015 CCR Fugitive Dust Control Plan - Mill Creek Generating Station Page

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

Charter Township of Garfield Grand Traverse County

Charter Township of Garfield Grand Traverse County Charter Township of Garfield Grand Traverse County 3848 VETERANS DRIVE TRAVERSE CITY, MICHIGAN 49684 PH: (231) 941-1620 FAX: (231) 941-1588 SPECIAL USE PERMIT APPLICATION APPLICANT INFORMATION Name: Address:

More information

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN NRG BRANDYWINE COAL ASH MANAGEMENT SITE Prepared for NRG MD Ash Management LLC 25100 Chalk Point Road Aquasco, MD. 20608 September 28, 2015 12420 Milestone

More information

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

(1) The proposed commercial solar energy generation facility is either

(1) The proposed commercial solar energy generation facility is either (2) The design and siting of these facilities shall avoid the placement of turbines on or immediately adjacent to the upwind side of ridge crests; (3) The design may include other design features to minimize

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL

More information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan The Application for an Earth Moving Permit / Dust Control Plan Is At the End of This Guidance Section 1 Applicant

More information

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 13SN0140. Sarah Phuong Tran. Clover Hill Magisterial District 9930 Hull Street Road

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 13SN0140. Sarah Phuong Tran. Clover Hill Magisterial District 9930 Hull Street Road E MNGER: Jane Peterson ecember 10, 2012 P January 23, 2013 B B Time Remaining: 365 days TFF REQUET NLYI N REOMMENTION 13N0140 arah Phuong Tran lover Hill Magisterial istrict 9930 Hull treet Road REQUET:

More information

Written Closure Plan. Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016 Written Closure Plan Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure

More information

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA This report was prepared to present development information (Utility availability, Development Regulations, Flood Plain information,

More information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan The Application for an Earth Moving Permit / Dust Control Plan Is At the End of This Guidance Section 1 Applicant

More information

Asbestos Dust Mitigation Plan (ADMP) Application

Asbestos Dust Mitigation Plan (ADMP) Application El Dorado County Air Quality Management District (AQMD) 330 Fair Lane, Placerville, CA 95667 Phone: 530-621-7501 / Fax: 530-295-2774 www.edcgov.us/airqualitymanagement Asbestos Dust Mitigation Plan (ADMP)

More information

Q. CONSTRUCTION IMPACTS

Q. CONSTRUCTION IMPACTS Q. CONSTRUCTION IMPACTS 1. Construction Plan As noted on Exhibit 3Q-1, Overall Phasing Plan and SWPPP Notes, construction of the Proposed Project is anticipated to include five phases. The entire construction

More information

DUST CONTROL MEASURES

DUST CONTROL MEASURES The City of Rancho Cucamonga exhibits an extreme concern for its citizens regarding dust control. Our city has several windy days each year. Air pollution remains a significant health concern in many parts

More information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan The Application for an Earth Moving Permit / Dust Control Plan Is At the End of This Guidance Section 1 Applicant

More information

CASE NUMBER: 15SN0608 APPLICANT: Verizon Wireless

CASE NUMBER: 15SN0608 APPLICANT: Verizon Wireless STAFF S ANALYSIS AND RECOMMENDATION Board of Supervisors (BOS) Public Hearing Date: FEBRUARY 11, 2015 BOS Time Remaining: 365 DAYS Applicant s Agent: JEFFERY GEIGER (804-771-9500) Applicant s Contact:

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

COBBETTS POND WATERSHED PROTECTION ORDINANCE SECTION 1: WATERSHED PROTECTION ORDINANCE 1.1 Authority and Statement of Intent a. Pursuant to RSA 674:

COBBETTS POND WATERSHED PROTECTION ORDINANCE SECTION 1: WATERSHED PROTECTION ORDINANCE 1.1 Authority and Statement of Intent a. Pursuant to RSA 674: COBBETTS POND WATERSHED PROTECTION ORDINANCE SECTION 1: WATERSHED PROTECTION ORDINANCE 1.1 Authority and Statement of Intent a. Pursuant to RSA 674: 21, the Town of Windham adopts a Watershed Protection

More information

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed Ordinance Controlling Construction Site Soil Erosion, Sediment, and Other Wastes and Storm Water Runoff Part III.G.2:

More information

STAFF REPORT. To: Planning Commission Meeting date: December 14, 2016 Item: UN Prepared by: Robert Eastman. To allow a vehicle impound yard

STAFF REPORT. To: Planning Commission Meeting date: December 14, 2016 Item: UN Prepared by: Robert Eastman. To allow a vehicle impound yard # 6 ) UN-79-16 ABC TOWING, TITAN TOWING, AND TOW GUY TOWING SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 14, 2016 Item: UN-79-16 Prepared by: Robert Eastman

More information

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD PLANS OF THE CITY OF LA QUINTA, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS

More information

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN)

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN) Narrative Report Information Worksheet City and County of Denver, Demolition and Construction Activities Stormwater Management Plan (SWMP) Revised 2/12/2013 as entry form A. PROJECT LOCATION Name of Project

More information

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Members of the Red Fox Run Property Owner s Association, Inc. Attached are the guidelines of the Architectural Review Committee

More information

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN Yorktown Power Station Coal Combustion Residual Management Submitted To: Yorktown Power Station 1600 Waterview Road Yorktown, VA 23692 Submitted By:

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside

More information

Chapter CONSTRUCTION SITE EROSION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for

More information

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential

More information

April 12, 2006 Planning Commission Meeting. Landfill Energy Systems

April 12, 2006 Planning Commission Meeting. Landfill Energy Systems DATE: April 04, 2006 TO: FROM: RE: Salt Lake City Planning Commission Marilynn Lewis, Principal Planner April 12, 2006 Planning Commission Meeting CASE#: 410-06-03 COUNCIL DISTRICT: APPLICANT: STATUS OF

More information

15A NCAC 02B.0281 FALLS WATER SUPPLY NUTRIENT STRATEGY: STORMWATER REQUIREMENTS FOR STATE AND FEDERAL ENTITIES The following is the stormwater

15A NCAC 02B.0281 FALLS WATER SUPPLY NUTRIENT STRATEGY: STORMWATER REQUIREMENTS FOR STATE AND FEDERAL ENTITIES The following is the stormwater 15A NCAC 02B.0281 FALLS WATER SUPPLY NUTRIENT STRATEGY: STORMWATER REQUIREMENTS FOR STATE AND FEDERAL ENTITIES The following is the stormwater strategy, as prefaced in Rule 02B.0275, for the activities

More information

PLAN SUBMISSION, BUFFERING AND SETBACK FROM TRANSMISSION PIPELINES

PLAN SUBMISSION, BUFFERING AND SETBACK FROM TRANSMISSION PIPELINES PLAN SUBMISSION, BUFFERING AND SETBACK FROM TRANSMISSION PIPELINES Note: The sections of this ordinance are intended to be enacted as part of a Township s Subdivision and Land Development Ordinance. AN

More information

TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO ADOPTED: October 1, EFFECTIVE: October 22, 2018

TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO ADOPTED: October 1, EFFECTIVE: October 22, 2018 TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO. 2018-1 ADOPTED: October 1, 2018 EFFECTIVE: October 22, 2018 An Ordinance to add provisions for large solar energy systems to the Township Zoning

More information

ARCHITECTURAL CONTROL COMMITTEE NEW CONSTRUCTION AND EXISTING HOMES RULES AND REGULATIONS

ARCHITECTURAL CONTROL COMMITTEE NEW CONSTRUCTION AND EXISTING HOMES RULES AND REGULATIONS ARCHITECTURAL CONTROL COMMITTEE NEW CONSTRUCTION AND EXISTING HOMES RULES AND REGULATIONS Purpose and Authority: Mountain Creek Hollow is an architecturally controlled community, so established to protect

More information

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN Yorktown Power Station Coal Combustion Residual Management Submitted To: Yorktown Power Station 1600 Waterview Road Yorktown, VA 23692 Submitted By:

More information