1 VCS VALIDATION REPORT VCS VALIDATION OF NEW ZEALAND HOUSEHOLD ENERGY EFFICIENT LIGHTING PROJECTS (HELP) REPORT NO REVISION NO. 01 DET NORSKE VERITAS

2 VCS VCS VALIDATION REPORT Date of first issue: Project No.: Approved by: Organisational unit: DNV Certification, International Climate Change Services Client: Energy Mad Pty Ltd Client ref.: Chris Mardon DET NORSKE VERITAS CERTIFICATION AS Veritasveien 1, 1322 HØVIK, Norway Tel: Fax: Org. No: NO MVA Summary: The proposed project consists of the installation of Compact Fluorescent Lamps as replacement for incandescent lamps in domestic households in the main urban areas of New Zealand. DNV Certification has made a validation of the New Zealand Household Energy Efficient Lighting Projects in New Zealand (hereafter called the project ). The validation was performed on the basis of the Voluntary Carbon Standard 2007 criteria for voluntary projects, as well as criteria given to provide for consistent project operations, monitoring and reporting. The validation consisted of the following three phases: i) desk review of the project design decument, the baseline study and the monitoring plan, ii) onsite audit and followup audit including interviews with project stakeholders and iii) the resolution of outstanding issues and the issuance of the final determination report and opinion. In summary, it is DNV Certification s opinion that the project meets all relevant VCS requirements for a Voluntary projects. The verification of reported emission reductions is based on the information made available to us and the engagement conditions detailed in this report. DNV can not guarantee the accuracy or correctness of this information. Hence, DNV cannot be held liable by any party for decisions made or not made based on this report. Report No.: Subject Group: Environment Indexing terms Report title: Key words Service Area Verification VCS Validation of New Zealand Household Energy Efficient Lighting Projects (HELP) Climate Change Kyoto Protocol Validation Clean Development Mechanism Market Sector Process Industry Work carried out by: Simon Dawes Work verified by: Kumaraswamy Chandrashekara Date of this revision: Rev. No.: Number of pages: No distribution without permission from the client or responsible organisational unit free distribution within DNV after 3 years Strictly confidential Unrestricted distribution 2002 Det Norske Veritas AS All rights reserved. This publication or parts thereof may not be reproduced or transmitted in any form or by any means, including photocopying or recording, without the prior written consent of Det Norske Veritas AS. Head Office: Veritasvn. 1, N-1322 HØVIK, Norway

3 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT Table of Content Page 1 INTRODUCTION Objective Scope GHG Project Description 2 2 METHODOLOGY Review of Documents Follow-up Interviews Resolution of Clarification and Corrective Action Requests 6 3 VERIFICATION FINDINGS Project design Baseline Additionality Monitoring Plan Calculation of GHG Emissions Environmental Impacts 10 4 COMMENTS BY PARTIES, STAKEHOLDERS AND NGOS VALIDATION OPINION REFERENCES Appendix A JI Validation Protocol Page i

4 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT Abbreviations CAR CEF CFL CH 4 CL CO 2 CO 2e DNV EIA ERU(s) GHG IPCC JI MP MVP N 2 O NGO PDD UNFCCC GWP Corrective Action Request Carbon Emission Factor Compact Fluorescent Lamp Methane Clarification request Carbon dioxide Carbon dioxide equivalent Det Norske Veritas Environmental Impact Assessment Emission Reduction Unit(s) Greenhouse gas(es) Intergovernmental Panel on Climate Change Joint Implementation Monitoring Plan Monitoring and Verification Plan Nitrous oxide Non-governmental Organisation Project Design Document United Nations Framework Convention for Climate Change Global Warming Potential Page ii

5 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT 1 INTRODUCTION 1.1 Objective Energy Mad Pty Ltd has commissioned DNV Certification AS to undertake a validation of the New Zealand Household Energy Efficient Lighting Projects (HELP) against the requirements of AM0046, Distribution of efficient light bulbs to households and of the Tool for the demonstration and assessment of additionality (version 3) in accordance with the Voluntary Carbon Standard (Version 1). The purpose of the validation is to have an independent third party assess the project design. In particular, the project s baseline, monitoring plan and compliance with the methodology and relevant criteria of the VCS (version 1) are validated in order to confirm that the project design as documented is sound and meets the identified criteria. The validation was carried out in accordance with the requirements of the VCS (version 1). In accordance with the requirements of the Voluntary Carbon Standard (2007) Project Start Date, we confirm that the contract for validation of the New Zealand Household Energy Efficient Lighting Projects (HELP) was signed on 1 May As the contract was signed before 19 November 2007 and as this validation is completed before 19 May 2008 the project may be completed as a VCS (version 1) project under the grandfathering provisions. 1.2 Scope DNV Certification AS proposes to conduct the verification in accordance with the requirements of the VCS/1 and our Agreement with Energy Mad. We will conduct sufficient verification procedures to enable us to express an opinion on the following matter; that in all material respects the following project elements are fairly presented and in compliance with requirements of the VCS/1 and AM0046 (as amended): 1. Project additionality; 2. Project emission abatement study (including establishment of the baseline and with project emission profiles); and 3. Project monitoring plan. Conditions will be recommended where necessary to enable the applicant to meet the requirements of the VCS/1 for the issue of VERs. DNV Certification AS has, based on the recommendations in the Validation and Verification Manual, employed a risk-based approach in the validation process, focusing on the identification of significant risks for project implementation and the generation of ERUs. The validation is not meant to provide any consulting towards client and other project participants. However, stated request for clarifications and/or corrective actions may provide input for improvement of the project design. Page 1

6 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT 1.3 GHG Project Description The New Zealand Household Energy Efficient Lighting Projects ( HELP Project ) is designed to reduce greenhouse emissions through the replacement of less efficient incandescent lamps with more efficient compact fluorescent lamps. The lamps were sold through a voucher redemption process at numerous retail outlets across the major urban areas of New Zealand in a number of discrete campaigns with different project partners. The distribution projects were for the purpose of assessing uptake and utilisation of CFLs and the effect of their installation on electricity demand and consumption, and for the purpose of reducing greenhouse emissions. Lamps were distributed from 30 October 2004 to 6 September A number of surveys were conducted during the course of the distribution projects to assess consumer response to the CFLs. A round of monitoring and analysis was done at the commencement of the project to assess the baseline usage of incandescent lamps, and was followed up with an identical assessment of the utilisation of CFLs distributed as part of the project. A further round of monitoring and analysis was conducted of the hours of use of project CFLs in 97 households to determine lamp hours of use and household consumption patterns as a basis for validation of the overall energy reduction and thus greenhouse abatement of all lamps. The project sample group was located in the New Zealand region of Christchurch. Hours of daylight and overall patterns of energy consumption and household demographics vary widely across New Zealand, and so a single sample group located in one region does not provide sufficient data to calculate national emission abatement. BRANZ Ltd, an independent building assessment and testing agency, has conducted a ten year longitudinal study of household energy use patterns, including lighting usage, across five New Zealand regions. Results list the average household lighting consumption in each month in each of the regions. These results provide a set of ratios to adjust the one month, one region project sample results across New Zealand to all project lamps in all seasons. The PDD estimates a total emission abatement from as 1,078,000 tonnes CO 2 -e, with the abatement from as 180,000 tonnes CO 2 -e. Average abatement for each year through the crediting period is 107,800 tonnes CO 2 -e. 2 METHODOLOGY The validation consisted of the following three phases: 1. a desk review of the project design documentation 2. follow-up interviews onsite with project stakeholders 3. the resolution of outstanding issues and the issuance of the final validation report and opinion. We undertook the following procedures as part of the onsite and desktop verification: Verification of eligibility: i. Review of the legal arrangements; ii. Confirmation by review of documentation that all eligibility requirements have been met; and Page 2

7 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT iii. Confirmation that any necessary approvals have been gained, including review of any NZ Government decision relating to the project; Verification of Emission/Abatement Study: i. Verification of record keeping procedures, interviews with relevant managerial and operational personnel and review of the overall data management process to confirm that the record keeping procedures are effective and comply with good record-keeping practice. DNV will: 1. Review the data management practices for compliance with good practice; 2. Interview staff involved in data management to ensure there is understanding of the data management practices; 3. Conduct random checks of data transcription to ensure that data has not been entered in error and all data has been entered; and 4. Test the data management system to determine the strength of the system and as to whether it is capable of detecting errors. ii. Review the calculation methodology associated with the project. DNV will: 1. Confirm that the approved methodology has been effectively transferred to databases and spreadsheets and perform check calculations; and 2. Review the application of statistical uncertainty within the model. iii. Confirmation that the calculations to determine achieved avoided emissions are fairly presented, including independent check calculations and review of the overall process to ensure that the methodology is effective and robust; Verification of the Project Monitoring Plan: i. Review of the internal control procedures used to maintain the integrity of recordkeeping and various databases and processes; ii. Review of the individual requirements contained within the Greenhouse Friendly Guidelines to confirm that the project arrangements are implemented and effective; and iii. Observation and review of relevant documentation. Findings established during the validation can either be seen as a non-fulfilment of validation protocol criteria or where a risk to the fulfilment of project objectives is identified. Corrective Action Requests (CAR) are issued, where: 1. mistakes have been made with a direct influence on project results; 2. validation protocol requirements have not been met; or 3. there is a risk that the project would not be accepted as a JI project or that emission reductions will not be verified. Page 3

8 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT The term Clarification may be used where additional information is needed to fully clarify an issue. In order to ensure transparency, a validation protocol was customised for the project, according to the Validation and Verification Manual. The protocol shows, in a transparent manner, criteria (requirements), means of verification and the results from validating the identified criteria. The validation protocol serves the following purposes: 1. It organises, details and clarifies the requirements a VCS project is expected to meet; 2. It ensures a transparent validation process in that DNV documents how a particular requirement has been validated and the result of the validation. The validation protocol consists of three tables. The different columns in these tables are described in Figure 1. The completed validation protocol is enclosed in Appendix A to this report. Page 4

9 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT Validation Protocol Table 1: Mandatory Requirements for Voluntary Carbon Standard (Version 1) Project Activities Requirement Reference Conclusion Cross reference The requirements the project must meet. Gives reference to COP decision where the requirement is found. Validatin Protocol Table 2: Requirement Checklist This is either acceptable based on evidence provided (), a Corrective Action Request (CAR) of risk or non-compliance with stated requirements or a request for Clarification (CL) where further clarifications are needed. Used to refer to the relevant checklist questions in Table 2 to show how the specific requirement is validated. This is to ensure a transparent validation process. Checklist Question Reference Means of verification (MoV) The various requirements in Table 1 are linked to checklist questions the project shall meet. The checklist is organised in six different sections. Each section is then further sub-divided. The lowest level constitutes a checklist question. Gives reference to documents where the answer to the checklist question or item is found. Explains how conformance with the checklist question is investigated. Examples of means of verification are document review (DR) or interview (I). Comment The section is used to elaborate and discuss the checklist question and/or the conformance to the question. It is further used to explain the conclusions reached. and/or Conclusion This is either acceptable based on evidence provided (), or a Corrective Action Request (CAR) due to noncompliance with the checklist question (See below). A request for Clarification (CL) is used when the independent entity has identified a need for further clarification. N/A means not applicable. Validation Protocol Table 3: Resolution of Corrective Action Requests and Requests for Clarification report clarifications and corrective action requests Ref. to checklist question in table 2 Summary of project owner response Validation conclusion If the conclusions from the draft validation are either a Corrective Action Request or a Clarification Request, these should be listed in this section. Reference to the checklist question number in Table 2 where the Corrective Action Request or Clarification Request is explained. The responses given by the project proponent or other project participants during the communications with the independent entity should be summarised in this section. This section should summarise the independent entity s responses and final conclusions. The conclusions should also be included in Table 2, under Conclusion. Figure 1 Validation protocol tables Page 5

10 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT 2.1 Review of Documents The Project Design Document submitted by Energy Mad Pty Ltd and additional background documents related to the project design and baseline were reviewed. These documents included: Project Design Document Monitoring analysis spreadsheets Monitoring plan Survey reports CFL report and test data Summary of comments by local stakeholders 2.2 Follow-up Interviews In the period of 1 May 2007 to 30 August 2007, DNV Certification AS performed interviews with project stakeholders to confirm selected information and to resolve issues identified in the document review. Representatives of Energy Mad Pty Ltd were interviewed. The main topics of the interviews are summarised in Table 1. Table 1 Interview topics Interviewed organisation Chris Mardon, Energy Mad Pty Ltd Hamish Ewan Energy Mad Pty Ltd Interview topics Project design Data capture Calculation of abatement Public response to the program, including review of newspaper clippings Detailed review of calculation methodology 2.3 Resolution of Clarification and Corrective Action Requests The objective of this phase of the validation was to resolve the requests for corrective actions and clarification and any other outstanding issues which needed to be clarified for the DNV Certification s positive conclusion on the project design. The Corrective Action Requests and Clarification Requests raised by DNV Certification AS were resolved during communications between the Client and DNV Certification AS. To guarantee the transparency of the validation process, the concerns raised and responses given are summarised in chapter 3 below and documented in more detail in the validation protocol in Appendix A. Since modifications to the Project design were necessary to resolve DNV Certification AS s concerns, the Client decided to revise the documentation and resubmitted the final project design documentation on 30 August After reviewing the revised and resubmitted project documentation, DNV Certification AS issued this final validation report and opinion. Page 6

11 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT 3 VERIFICATION FINDINGS In the following sections the findings of the validation are stated. The validation findings for each validation subject are presented as follows: 1) The findings from the desk review of the original project design documents and the findings from interviews during the follow up visit are summarised. A more detailed record of these findings can be found in the validation protocol in Appendix A. 2) Where DNV Certification AS identified issues that needed clarification or that represented a risk to the fulfilment of the project objectives, a Clarification or Corrective Action Request, respectively, has been issued. The Clarification and Corrective Action Requests are stated, where applicable, in the following sections and are further documented in the validation protocol in Appendix A. The validation of the project resulted in three Corrective Action Requests and three Clarification Requests. 3) Where Clarification or Corrective Action Requests have been issued, the exchanges between the Client and DNV Certification AS to resolve these Clarification or Corrective Action Requests are summarised. 4) The conclusions of the validation are presented. The final validation findings relate to the project design as documented and described in the revised and resubmitted project design documentation. 3.1 Project design The project is replacement of existing incandescent lamps with compact fluorescent of generally equivalent lumen output in existing residential premises. The lamps were available for purchase at a discounted price by voucher redemption. Installation was by the householder which was asked to replace the incandescent lamps with the highest usage. The lamps were a new design with high power factor and low harmonic distortion to ensure that the quality of the grid supply was not adversely affected by the project. Individual distribution project were conducted with different retail and technical partners in different regions of New Zealand. The project had the support of the local electricity distributors and national transmission company as project partners. Distribution of lamps occurred between 30 October 2004 and 6 September The project was proposed as a New Zealand government project to reduce emissions (a New Zealand JI program) but was rejected after an adverse expert report. Review of the report findings and responsive comments made by Energy Mad satisfied the Verifier that the adverse conclusions of the expert report had either been satisfactorily rebutted or were not relevant to the VCS application. Distribution of lamps has been completed. Project crediting time is from 2006 to Baseline The baseline for the project is normal usage of incandescent lamps in residential households. The critical factors in determining energy consumption (and thus grid emissions) are: Page 7

12 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT Lamp rating Hours of use Supply voltage These three factors allow the energy used in a single lamp to be calculated with high accuracy. Lamp rating is nominated on the lamp and the New Zealand supply voltage is tightly regulated with a defined minimum level of 230v. Energy Mad developed an innovative method to determine the hours of use of each lamp. A thermal data logger was attached to the base of each lamp which tracked at 10 minute intervals (time and date stamped) the temperature of the lamp. At the completion of the monitoring period the data was downloaded and analysed. Suitable algorithms were developed to extract lamp usage data from the individual lamp temperature data points. Two sample groups were used in a preliminary assessment of the baseline. The first group was of households before the project with installed incandescent lamps, and the second group was after the project of installed CFLs. The difference between the two groups was tested (t-test, two samples, different variances, α = 0.05) and the hypothesis that the groups were from different populations was not proved. On this basis the project proceeded using a single post-project sample group using an energy saving calculation, being the difference in consumption between the original incandescent lamp and the new CFL lamp. BRANZ Ltd, an independent building assessment and testing agency, has a conducted a ten year longitudinal study of end user energy use across New Zealand. This research included household lighting. BRANZ provided the following data for each New Zealand region to Energy Mad: Average number of lamps per household Monthly average lighting loads per household in kwh/day This data is for all lamps in the household, whereas the project allows for replacement of up to the five highest usage lamps. Use of the BRANZ relationships for all lamps is a conservative estimate, as it will tend to overstate the total usage per household and understate the average lamp usage when compared with project data. A further, larger sample group of project households was monitored to determine energy savings and thus emission abatement. The lamp usage and lamp rating data from this sample was used to determine average lamps per household and average energy savings per household, as the BRANZ data was by household. The consumption in each New Zealand region and month from the BRANZ data was used to create a set of ratios to extrapolate the project energy saving to all project areas in New Zealand. 3.3 Additionality Installation of CFL s in New Zealand is not normal practice. Independent survey data documented in the PDD reveals usage across New Zealand has been around 5% for the last twenty years. There has been little observable market transformation to suggest that CFLs are becoming stronger in the market. The New Zealand government has not imposed any restrictions or requirements on the types of lamps able to be installed in New Zealand. The financial analysis in the PDD was a simple non-time weighted return on funds employed, and a hurdle rate of 10% was met by the project using the original forecast volume of VERs and Page 8

13 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT a price of NZD4 per tonne CO 2 -e. A further analysis as part of the validation showed that the assumptions made are conservative, and that a hurdle rate of 10% IRR is appropriate based on New Zealand cash rates at the time with a suitable risk premium. With the reduced rate of abatement from the completed abatement calculation spreadsheet, a VER price of NZD4 is required to achieve an IRR of 10%. 3.4 Monitoring Plan The plan calls for annual performance of monitoring of a project sample group and data analysis and GHG reduction calculations using the same process as for the baseline study as documented in the PDD. The monitoring technology is low cost and an innovative use of an existing technology. The data is of high accuracy and readily able to be transformed into hours of lamp use information. The process for validation of the overall energy saving and thus GHG reduction is the methodology described in AM0046, with the exception as noted that the baseline sample group and the project sample group are the same. All data collected during the monitoring process is archived on the Energy Mad data server. Responsibility for monitoring is allocated in the PDD. The process for identification of the sample group, installation and collection of the data loggers, downloading and manipulation of the data and entry of the data into the calculation spreadsheet is clearly described. 3.5 Calculation of GHG Emissions Lamp projects were conducted in the major urban centres of New Zealand. The individual installations themselves were in normal residential dwellings, and the impacts to grid power consumption were in effect across the North and South Island of New Zealand. This is an appropriate boundary for the project. As a project to reduce grid electricity consumption by retrofitting more energy efficient products, the primary emission effect is through the reduction of emissions from marginal generating plant, on an ex poste basis. In the case of New Zealand, renewable energy sources are must run and coal/gas/oil fired generating plant is on the margin. The emission factor for grid electricity was fairly calculated from data provided by the New Zealand government held in the public domain. The fundamental assumption in calculation of the emission reduction is that the emission reduction in the project sample group is truly representative of the emission reduction in the whole population of households and lamps included in the project. The risks associated with this assumption are mitigated by use of the AM0046 calculation methodology and a number of other conservative assumptions. The assumptions made are: Installation rate 90% of lamps distributed are installed. This was confirmed by postproject surveys conducted by an independent agency. Network losses 10% of generated energy are grid losses Lost heating effect 10%. Incandescent lamps emit waste heat which has a heating effect on the household. It is assumed that 10% of the reduction in waste heat from the original lamps is replaced by conventional heating. It is not assumed that the reduction in summer heating has the effect of reducing cooling loads. This is a conservative assumption. Page 9

14 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT Market transformation 0%. Post implementation surveys have not revealed an increase in CFL uptake. This is a conservative assumption, and represents an offsetting impact to the free rider effect. Free riders 0%. This factor represents those consumers who received a project CFL but would have acquired them in any case. The low uptake in the normal CFL market supports an assumption of 0%. Take back 0%. The pre- and post-implementation surveys showed that hours of use of incandescent lamps and CFLs were not statistically different. Fallout 2% (due to broken CFLs not being replaced) As with AM0046, the final assessment of emission abatement was completed to a 95% certainty. 3.6 Environmental Impacts As this project simply required the replacement of incandescent lamps with new compact fluorescent lamps an Environmental Impact Assessment was not required. The CFLs themselves meet the applicable international standards and are able to be freely imported into New Zealand. They are of a type approved for connection to the New Zealand electricity grid. There are no restrictions in place regarding disposal of failed CFLs by the New Zealand waste industry. A national collection and recycling program for project installed CFLs that fail at any time during the crediting period was launched in September Page 10

15 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT 4 COMMENTS BY PARTIES, STAKEHOLDERS AND NGOS The VCS (version 1) does not require public posting for comment of the PDD. The project received considerable positive good publicity from local and regional newspapers in New Zealand during the distribution program. Press cuttings were sighted by the Verifier during the onsite follow up interviews. Page 11

16 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT 5 VALIDATION OPINION DNV Certification AS has performed a validation of the New Zealand Household Energy Efficient Lighting Projects (HELP). The validation was performed on the basis of the Voluntary Carbon Standard (Version 1), as well as criteria given to provide for consistent project operations, monitoring and reporting. The review of the project design documentation and the subsequent follow-up interviews have provided DNV Certification AS with sufficient evidence to determine the fulfilment of stated criteria. In our opinion, the project meets all relevant VCS (Version 1) requirements for projects and all relevant host country criteria. By reducing fossil fuel-based electricity consumption by replacement of high energy incandescent lamps with low energy compact fluorescent lamps, the project results in reductions of CO 2 -e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. An analysis of the investment and technological barriers demonstrates that the proposed project activity is not a likely baseline scenario. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of emission reductions. The validation is based on the information made available to DNV Certification AS and the engagement conditions detailed in this report. DNV Certification AS can not guarantee the accuracy or correctness of this information. Hence, DNV Certification AS. can not be held liable by any party for decisions made or not made based on the validation opinion. Page 12

17 Report No: , rev. 01 VCS VALIDATION VCS VALIDATION REPORT 6 REFERENCES Category 1 Documents: List documents provided by the Project Participants that relate directly to the GHG components of the project, (i.e. the Project Design Document and written approval of voluntary participation from the national focal point). /1/ PDD: New Zealand Household Energy Efficient Lighting Projects (HELP), dated 30 August 2007 /2/ AM0046: Distribution of efficient light bulbs to households /3/ Additionality Tool: Tool for the demonstration and assessment of additionality (version 3) /4/ Parsons Brinckerhof report /5/ Ecobulb tech spec ( /6/ BRANZ data /7/ Monitoring Manual (data logger installation) Category 2 Documents: Background documents related to the design and/or methodologies employed in the design or other reference documents. /8/ South Canterbury pre-promotion survey Persons interviewed: Persons interviewed during the validation, or persons contributed with other information that are not included in the documents listed above. /9/ Chris Mardon Energy Mad /10/ Hamish Ewan Energy mad - o0o - Page 13

18 VALIDATION PROTOCOL APPENDIX A VCS VERIFICATION PROTOCOL DET NORSKE VERITAS

19 Table 1 Mandatory Requirements for Voluntary Carbon Standard (Ver 1) (VCS) Project Activities Requirement Reference Conclusion Cross Reference / Comment 1. The project shall be one of the approved project categories VCU Clause 1 Table 2 A.1. The project is a VCU approved project category 3 End-use efficiency. 2. The geographic location is clearly defined VCU Clause 2 Table 2 A.1. The project occurs within premise connected to the NZ electricity grid. 3. The project abates one or more of the recognised greenhouse gases currently included in the Kyoto Protocol VCU Clause 3 Table 2 E.1.1. The project abates full fuel cycle marginal production grid emissions. 4. The project start date is on or after January 1, 2000 VCU Clause 4 Table 2 C.1.1. The project start date is January 1, Emission reductions were generated on or after January 1, 2000 VCU Clause 5 Table 2 C.1.1. The proposed project installation period is for 2005, 2006 and 2007 with a ten year crediting period. 6. The project has not included public funding or ODA VCU Clause 6 Table 2 A.3.1 The project developer has not received any direct funding for this project. 7. The project boundary includes all anthropogenic emission sources under control of the project that are material and reasonably attributable to the project activity 8. The project methodology is an approved CDM methodology, a combination of approved methodologies or another methodology adopting accepted best practice. VCU Clause 7 Table 2 A.1.2 The boundary includes emissions from use of CFLs. VCU Clause 8 Table 2 B.1 AM0046 Distribution of efficient light bulbs to households with adaptations applicable to NZ has been employed. JI Validation Protocol - Report No , rev. 01 Page A-1

20 Requirement Reference Conclusion Cross Reference / Comment 9. Secondary effects are incorporated into the calculation methodology in accordance with the WBCSD GHG PP 10. The project shall be additional in accordance with the requirements of the latest CDM Additionality Tool 11. The project has not had an adverse impact on sustainable development in the local community 12. The project shall adopt the monitoring process included in the approved CDM methodology (where used) or as an alternate method adopt best practice VCU Clause 9 CAR 2 VCU Clause 10 CAR 1 Table 2 B.2.2. B.2.8. Secondary effects associated with the marginal grid emission factor and installation rates, network losses, heating, free riders, takeback and fallout have been included. Risks to the baseline have not been considered. Amended PDD risks to the baseline have been considered in Section B2.6. Table 2 B.2.7. Three alternate scenarios (to the project) of no carbon sales, no change to status quo and market based growth of CFL usage were considered. Additionality is discussed and demonstrated in Section B3 of the amended PDD. VCU Clause 11 Table 2 F.1, A.3.1 There is no discernible negative impact arising form the replacement of incandescent lamps with CFLs. VCU Clause 12 Table 2 D. The monitoring plan is in general accordance with AM0046 with appropriate adjustments for NZ conditions. JI Validation Protocol - Report No , rev. 01 Page A-2

21 Table 2 Requirements Checklist A. General Description of Project Activity The project design is assessed. A.1. Project Boundaries Project boundaries are the limits and borders defining the GHG emission reduction project. A.1.1. Are the project s spatial (geographical) boundaries clearly defined? A.1.2. Are the project s system (components and facilities used to mitigate GHGs) boundaries clearly defined? /1/ DR Ref /1/ sa2.6 The project is an end-use energy efficiency program based on the replacement of incandescent lamps with compact fluorescent lamps. The locations of the project activities are clearly defined. The project takes place across a number of New Zealand urban and rural centres. The locations (actual and proposed) are described in s A2.6 /1/ DR Ref /1/ sa4.3, sd2.1 The project component used to mitigate GHG emissions is the installed CFL. The nature and characteristics of the CFLs used in this project have been tested to comply with the relevant IEC standards. The project boundary includes all anthropogenic emission sources under control of the project. Project monitoring is of hours of use of the CFL. The baseline is determined against the capacity and hours of use of the original incandescent lamp. * MoV = Means of Verification, DR= Document Review, I= Interview Page A-3

22 * MoV = Means of Verification, DR= Document Review, I= Interview Page A-4 A.2. Technology to be employed Validation of project technology focuses on the project engineering, choice of technology and competence/ maintenance needs. The validator should ensure that environmentally safe and sound technology and knowhow is used. A.2.1. Does the project design engineering reflect current good practices? A.2.2. Does the project use state of the art technology or would the technology result in a significantly better performance than any commonly used technologies in the host country? A.2.3. Is the project technology likely to be substituted by other or more efficient technologies within the project period? A.2.4. Does the project require extensive initial training and maintenance efforts in order to work as presumed during the project period? /1/ /4/ /5/ /1/ /4/ /1/ /4/ DR DR DR Ref /1/ sa4.3, /4/ and /5/ The CFLs used in the project are high power factor (~0.9) and low Total Harmonic Distortion (~17%) units of the latest spiral tube design. Lamps are provided in 15w and 20w sizes with a tested lamp life of hours. The technical specifications for the CFLs can be viewed at (accessed on 1 June 2007). Ref /1/ sa4.3 and /4/ The technology is state of the art for residential lighting. Ref /1/ sa4.3 and /4/ The technology is state of the art for residential lighting. Abatement is calculated ex poste based on monitoring data, and thus will explicitly adjust for any improvements in technology. Improvements in CFL technology are likely to be of only a marginal nature in terms of energy efficiency. /1/ DR Ref /1/ The project is of a type such that any reasonably capable adult could install the technology. The process to be

23 A.3. * MoV = Means of Verification, DR= Document Review, I= Interview Page A-5 A.2.5. Does the project make provisions for meeting training and maintenance needs? Compliance with host country requirements The project s contribution to sustainable development is assessed. A.3.1. Is the project in line with relevant legislation and plans in the host country? employed at the residential property is to simply replace an existing incandescent lamp with a CFL in its pre-existing fitting. All CFLs have now been installed. The critical project requirement is that lamps which fail prematurely are replaced and that the project lamps are not replaced with incandescent lamps. Training is provided for personnel engaged in survey and monitoring work to ensure that accurate survey and monitoring data has been obtained. Analysis and calculations of achieved abatement has been performed by technical personnel associated with the project and peer reviewed by a competent independent New Zealand research organisation specialising in the field (BRANZ). /1/ DR Training is provided for survey and monitoring staff. Information on installation of CFLs is provided on the CFL packaging. /1/ /4/ DR Ref /1/ sa4 The project was replacement of incandescent lamps with CFLs. The CFLs offered in the replacement program met the requirements of IEC : 88 + A1 : 91 + A2 : 2000 and EN : 93 + A1 : 93 + A2 : 2000 "Self-ballasted lamps

24 * MoV = Means of Verification, DR= Document Review, I= Interview Page A-6 A.3.2. Is the project in line with host-country specific JI requirements? B. Project Baseline The validation of the project baseline establishes whether the selected baseline methodology is appropriate and whether the selected baseline represents a likely baseline scenario. B.1. Baseline Methodology It is assessed whether the project applies an appropriate baseline methodology. for general lighting - Performance Specifications Clause 10" and IEC :2000 Electromagnetic Compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current up to and including 16 A per phase). The pilot aspects of the project were co-sponsored by lines companies and the NZ Government electricity Regulator. No funds in support of the project were received by Energy Mad. /1/ DR The project applied for approval as a New Zealand Project to Reduce Emissions but did not receive approval in a competitive process. Approval was not on the basis of additionality but following an assessment by an independent reviewer. The review process was not completed in accordance with the now available AM0046. This review undertaken against AM0046 has reached a different conclusion. B.1.1. Is the discussion and selection of the baseline /1/ DR Ref /1/ sb1, /2/ The process described in

25 methodology transparent? B.1.2. Does the baseline methodology specify data sources and assumptions? /1/ /2/ /6/ DR AM0046 is the basis for the baseline. Deviations from the AM0046 process are described and justified. The primary deviation is the absence of an ongoing Baseline Sample Group. A Baseline Sample Group and Project Sample Group were established for an initial pilot distribution, and it was found that the difference in lamp usage was not statistically significant. The use of Baseline and Project Sample Groups corrects the abatement claim in countries where installation of a CFL could induce increased lamp usage due to lower cost of usage and where general improvements in electricity supply and economic development could encourage changes in lamp usage. New Zealand is a stable developed economy, and as the initial survey did not demonstrate any change in lamp usage following installation of the CFLs it is reasonable to exclude the Baseline Sample Group from the baseline and project monitoring process. Ref /1/ sd2.1, /2/ nominates the following data items for monitoring: Utilisation hours Distribution losses Grid emission factor Number of Ecobulbs distributed * MoV = Means of Verification, DR= Document Review, I= Interview Page A-7

26 B.1.3. Does the baseline methodology sufficiently describe the underlying rationale for the algorithm/formulae used to determine baseline emissions (e.g. marginal vs. average, etc.) /1/ /6/ DR Operating time of each sampled appliance Net power of each sampled appliance Number of sampled Ecobulbs Number of households in the Project Sample Group Ref /6/ defines relative average household monthly lamp usage data in five New Zealand regions. This data is used to extrapolate data from the Project Sample Group (located in Christchurch) to other project distribution areas. It is proposed to establish multiple Project Sample Groups (in each of the five New Zealand regions) for crediting periods during CP1. Ref /1/ sd2.1 The methodology utilises the Project Sample Group data and the ref /6/ distribution data to extrapolate baseline emissions data for all project distribution regions based on usage in the Project Sample Group region. It is noted that the Baseline emissions are based on Project lamp usage hours being the same as Baseline lamp usage hours. It has been shown that the two groups are not from different populations (level of significance α = 0.05). Electricity consumption is assumed to be * MoV = Means of Verification, DR= Document Review, I= Interview Page A-8

27 B.2. B.1.4. Does the baseline methodology specify types of variables used (e.g. fuels used, fuel consumption rates, etc)? B.1.5. Does the baseline methodology specify the spatial level of data (local, regional, national)? Baseline Validation The choice of baseline will be validated with focus on whether the baseline is a likely scenario, whether the project itself is not a likely baseline scenario, and whether the baseline is complete and transparent. B.2.1. Is the application of the methodology and the discussion and validation of the chosen baseline transparent? at the marginal emission factor of fossil fuel generation, with all renewable generation being must run. The grid factor is calculated from measured emissions and generation in the year of abatement. /1/ DR Ref /1/ sd2.1, /2/ clearly nominates the following data items used in calculation of the baseline: Hours of lamp use Wattage of incandescent lamp to be replaced Supply voltage Grid marginal emission factor /1/ DR Ref /1/ sd2.1 The data is local (hours of use, lamp size) and national (grid marginal emission factor, supply voltage) /1/ DR Ref /1/ sb The application of the AM0046 methodology in this situation is clearly described. The difference between AM0046 and the proposed Baseline methodology is that there is no Baseline Sample Group or Baseline Cross Check Group. The rationale for this decision is that as the electricity and lighting market in CL 1 * MoV = Means of Verification, DR= Document Review, I= Interview Page A-9

28 The baseline is determined from hours of use of CFLs within the Project Sample Group and from the wattage of lamps * MoV = Means of Verification, DR= Document Review, I= Interview Page A-10 New Zealand is mature, and since the results from one cross check between a Baseline Sample Group and a Project Sample Group demonstrated there was no statistically significant difference in lamp usage between the two groups, Baseline Sample and Cross Check Groups were unnecessary. Data from the Project Sample Group was valid for both Project and Baseline hours of use calculations. This is a reasonable assumption. Members of the original Project Sample Group are located in the Christchurch region. Project Sample Groups for CP1 abatement will be located in the following key NZ Regional towns and cities: Auckland Hamilton Wellington Christchurch Dunedin/Invercargill A second assumption is that the Regional and Monthly lighting power data sourced from BRANZ can be successfully used to extend the validity of a single sample group across wider areas of New Zealand.

29 B.2.2. Has the baseline been determined using conservative assumptions where possible? removed, determined from interviews with the householders in the Project Sample Group. CL 1 the analysis of the difference between the baseline and project groups used to justify use of a single project group for monitoring has not been included in the PDD. The amended PDD includes a statistical analysis demonstrating that the two groups (project and baseline) are from the same population (α = 0.05). /1/ DR Ref /1/ sd2.1 The main variables in the baseline calculation are hours of use and wattage of the installed incandescent lamps, and variability in hours of use throughout each year and between regional areas. As discussed, it has been demonstrated that the baseline and project sample groups come from the same population. On this basis, the hours of use of the CFLs and energy consumption of the original incandescent lamps of the Project Sample determine the baseline energy consumption for the sample group. A new Project Sample group of 97 households and 355 lamps was used to measure the household and lamp consumption patterns for the baseline and the project. This data is used to determine CAR 3 * MoV = Means of Verification, DR= Document Review, I= Interview Page A-11

30 * MoV = Means of Verification, DR= Document Review, I= Interview Page A-12 B.2.3. Has the baseline been established on a projectspecific basis? B.2.4. Does the baseline scenario sufficiently take into account relevant national and/or sectoral policies, macro-economic trends and political aspirations? B.2.5. Is the baseline validation compatible with the available data? average household and average lamp consumption patterns for the sample region,, which are then extrapolated to the other project regions on the basis of the BRANZ regional household lighting and lamp usage consumption data. CAR 3 the PDD, calculation spreadsheet and BRANZ do not apply the different factors in the energy reduction calculation consistently. The revised PDD and calculation spreadsheet consistently apply the per household energy factors from the BRANZ data and include scheduled monitoring of the project sample group[. It is proposed to use project sample groups in each of the project regions for future abatement calculation during Commitment Period 1. /1/ DR Ref /1/ sb The baseline has been established specifically for this project by monitoring of project sites. /1/ DR Ref /1/ sb The NZ Government has not established any formal policies to actively support increased use of CFLs. This is the first project in NZ promoting the use of CFLs. These factors are sufficiently taken into account. /1/ DR Ref /1/ sb The baseline is reasonable. The data for lamp hours of use has been measured through the use of specific

31 B.2.6. Does the selected baseline represent a likely scenario in the absence of the project? B.2.7. Is it demonstrated that the project activity itself is not a likely baseline scenario (e.g. through (a) a flow-chart or series of questions that lead to a narrowing of potential baseline options, (b) a qualitative or quantitative assessment of different potential options and an indication of why the non-project option is more likely, (c) a qualitative or quantitative assessment of one or more barriers facing the proposed project activity or (d) an indication that the project type is not common practice in the proposed area of implementation, and not required by a Party s legislation/regulations)? /1/ /8/ DR devices to monitor the use of individual lamps. The methodology has been reviewed and assessed and found to fairly state the baseline consumption data. Ref /1/ sa2.2, sb, /12/ Despite the evident benefits of CFL lamp use, survey data indicates that public acceptance of the lamps without an initial incentive is low. The baseline does represent a likely scenario in the absence of the project. /1/ DR Ref /1/ sb3 Additionality is demonstrated. The three alternatives to the project are: 1. The project is undertaken, but not as a carbon market project. 2. no change to the status quo 3. market based dissemination of high quality CFLs to the domestic NZ market. Investment analysis only costs are noted, not the income from lamp resellers or reference to the program as a giveaway program. Common practice analysis it is demonstrated that the sale or free distribution of CFLs is not common practice and is not required by legislation. The rate of CFL uptake between 1986 and 2003 was found to be unchanged, at less than 5% of installed lamps in domestic situations. CAR 1 * MoV = Means of Verification, DR= Document Review, I= Interview Page A-13

VCS METHODOLOGY ELEMENT ASSESSMENT REPORT

VCS METHODOLOGY ELEMENT ASSESSMENT REPORT VCS METHODOLOGY ELEMENT ASSESSMENT REPORT Infra-red Automatic Refrigerant Leak Detection Efficiency Project REPORT NO. 2009-9189 REVISION NO. 02 Date of first issue: Project No.: 14 August 2009 99800011

More information

VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO

VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO (Registration Ref No. 0649) Monitoring period: 01 April 2003-30 November 2006. REPORT NO. 2006-2174

More information

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO. 2007-1142 REVISION NO. 02 Date of first issue: Project No.: 2007-07-09 44410005-08 Approved by: Organisational

More information

Risk Based Verification Cambodia cook stove project

Risk Based Verification Cambodia cook stove project Risk Based Verification Cambodia cook stove project Chee.Keong.Lai@dnv.com www.dnv.com/certification/climatechange Contents 1. Introduction of Det Norske Veritas AS 2. Risk Based Validation/Verification

More information

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Validation Report Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Report No. 806970, Revision 01 2006, April 12 TÜV ndustrie Service

More information

VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY

VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY REPORT NO. 2006-0712 REVISION NO. 02 DET NORSKE VERITAS VALIDATION REPORT Date

More information

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION page 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL (Version 01) CONTENTS Paragraphs Page ABBREVIATIONS... 4 I. INTRODUCTION... 1 5 5 A. Updates to the Manual... 6 4 II. TERMS FOR VALIDATING

More information

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT SAIHANBA EAST 45.05 MW WINDFARM PROJECT IN CHINA REPORT NO. 2006-1309 REVISION NO. 01 DET NORSKE VERITAS DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-05-26

More information

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION...

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION... Page 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL (Version 01.2) CONTENTS Paragraphs Page ABBREVIATIONS... 3 I. INTRODUCTION... 1 5 4 A. Updates to the Manual... 6 4 II. TERMS FOR VALIDATING

More information

Validation Report. Matrix Power Pvt. Ltd. (MPPL)

Validation Report. Matrix Power Pvt. Ltd. (MPPL) Validation Report Matrix Power Pvt. Ltd. (MPPL) Validation of the 4.5 MW Biomass (Agricultural Residues) Based Power Generation Unit of M/s Matrix Power Pvt. Ltd. (MPPL) project Report No. 6589 Revision

More information

Determination Report

Determination Report Determination Report Determination of the Pilot programmatic Joint Implementation project in North Rhine- Westphalia (JIM.NRW) JI Program of Activities in Germany (Track 1) Report No. 987901 2007-11-14

More information

VERIFICATION REPORT VEJO GUSIS,UAB

VERIFICATION REPORT VEJO GUSIS,UAB VEJO GUSIS,UAB VERIFICATION OF THE LIEPYNES WIND POWER PARK JOINT IMPLEMENTATION PROJECT MONITORING PERIOD: 1 JANUARY 2012 TO 31 OCTOBER 2012 REPORT NO. LITHUANIA-VER/0075/2012 REVISION NO. 01 BUREAU VERITAS

More information

Criteria Catalogue: VER+

Criteria Catalogue: VER+ Criteria Catalogue: VER+ Prepared / changed: IS-CMS-MUC approved: IS-CMS-MUC page 1 of 10 CONTENTS Acronyms...3 Definitions...3 A. CRITERIA CATALOGUE... 4 1. Eligibility Criteria...4 2. Additionality...4

More information

VALIDATION REPORT NINGXIA TIANJING MW WIND-FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT NINGXIA TIANJING MW WIND-FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT NINGXIA TIANJING 50.25 MW WIND-FARM PROJECT IN CHINA REPORT NO. 2006-1769 REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-10-23 45010012-9

More information

DETERMINATION REPORT REPORT NO REVISION NO. 02

DETERMINATION REPORT REPORT NO REVISION NO. 02 DETERMINATION REPORT CMM utilisation on the Joint Stock Company named Komsomolets Donbassa Coal Mine of DTEK (Donbasskaya Toplivnaya Energeticheskaya Kompanya) Project in Ukraine REPORT NO. 2008-0200 REVISION

More information

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following:

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following: Registration - Information and reporting checklist (Version 2.0) Version 1.0 of the information and reporting checklist was published in June 2010. The enclosed version 2.0 of this checklist represents

More information

How to Select a DOE and preparation for validation and verification Presentation Report

How to Select a DOE and preparation for validation and verification Presentation Report How to Select a DOE and preparation for validation and verification Presentation Report Introduction to DOE s The two key functions of DOEs are: Validation: assessing whether a project proposal meets the

More information

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN Rio Taquesi Hydroelectric Power Project UNFCCC Ref. No. 1031 SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

VALIDATION REPORT. Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO REVISION NO. 02

VALIDATION REPORT. Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO REVISION NO. 02 VALIDATION REPORT Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO. 2008-9027 REVISION NO. 02 VALIDATION REPORT Date of first issue: Project No.: 2008-01-17 66010392 Approved by: Organisational

More information

VALIDATION REPORT. Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) limited in India

VALIDATION REPORT. Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) limited in India Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) limited in India REPORT NO. 2007-9103-04 REVISION NO. 03 Date of first issue: Project No.: 2007-04-20 46069103 Approved

More information

Validation Report. Abonos Colombianos SA.

Validation Report. Abonos Colombianos SA. Validation Report Abonos Colombianos SA. VALIDATION OF THE CDM-PROJECT: PROJECT FOR THE CATALYTIC REDUCTION OF N 2 O EMISSIONS WITH A SECONDARY CATALYST INSIDE THE AMMONIA OXIDATION REACTORS OF THE NAN1

More information

CDM What and How? /

CDM What and How? / CDM What and How? Chee.Keong.Lai@dnv.com / SEA.Climate.Change@dnv.com http://www.dnv.com/services/certification/climate_change/ Contents 1. Introduction of Det Norske Veritas AS 2. What is CDM? 3. DNV

More information

Corporate Emissions Assessment Protocol

Corporate Emissions Assessment Protocol Corporate Emissions Assessment Protocol For the measurement, management, and reduction of organisations greenhouse gas emissions 1 1 Version 1_4 2 Part 1: Requirements The Carbon Trust About the Carbon

More information

VERIFICATION REPORT «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY

VERIFICATION REPORT «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY MEASURES AND REDUCTION OF GREENHOUSE GAS EMISSIONS INTO THE ATMOSPHERE AT STATE ENTERPRISE SELIDOVUGOL INITIAL

More information

DETERMINATION REPORT. Reduction of PFC emissions from RUSAL Krasnoyarsk Aluminium Smelter in Russian Federation REPORT NO REVISION NO.

DETERMINATION REPORT. Reduction of PFC emissions from RUSAL Krasnoyarsk Aluminium Smelter in Russian Federation REPORT NO REVISION NO. DETERMINATION REPORT Reduction of PFC emissions from RUSAL Krasnoyarsk Aluminium Smelter in Russian Federation REPORT NO. 2008-1624 REVISION NO. 01 DET NORSKE VERITAS DETERMINATION REPORT Date of first

More information

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E)12-004 REVISION NO. 03 GHG CERTIFICATION OFFICE KOREA ENERGY MANAGEMENT CORPORATION Date of first issue: Project No.: 19/06/2012 GHGCC(E)12-004

More information

FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY

FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY Document Prepared By Stantec Consulting Ltd. Methodology Element Title Revisions to AMS-III.BC to Include Mobile Machinery

More information

Validation of CDM Projects Real life examples of what a DOE looks for

Validation of CDM Projects Real life examples of what a DOE looks for Validation of CDM Projects Real life examples of what a DOE looks for Jonathan Avis, CDM Business Manager ERM Certification and Verification Services 2nd Floor, Exchequer Court 33 St Mary Axe London EC3A

More information

Concepts of Clean Development Mechanism. Confederation of Indian Industry

Concepts of Clean Development Mechanism. Confederation of Indian Industry Concepts of Clean Development Mechanism Kyoto Protocol UNFCCC & Kyoto Protocol Kyoto Treaty was drawn up in Kyoto, Japan, on 11 th December, 1997 to implement United Nations Framework Convention for Climate

More information

JI DETERMINATION REPORT FORM

JI DETERMINATION REPORT FORM JI DETERMINATION REPORT FORM (F-JI-DRep) - Version 01 (By submitting this form, an accredited independent entity requests the publication of a determination pursuant to paragraph 33 of the JI guidelines

More information

VALIDATION REPORT BHL PALIA KALAN PROJECT IN INDIA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT BHL PALIA KALAN PROJECT IN INDIA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT IN INDIA REPORT NO. 2006-9136-2 REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-11-29 2006-9136-2 Approved by: Organisational unit: Einar Telnes

More information

VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA

VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA REPORT NO. 2006-9131 REVISION NO. 02 DET NORSKE VERITAS VALIDATION REPORT Date of first

More information

Revision to the methodological tool. Combined tool to identify the baseline scenario and demonstrate additionality (Version 02.

Revision to the methodological tool. Combined tool to identify the baseline scenario and demonstrate additionality (Version 02. UFCCC/CCUCC demonstrate additionality (Version 02.1) Revision to the methodological tool demonstrate additionality (Version 02.1) 1 I. SCOPE AD APPLICABILIT This tool provides for a step-wise approach

More information

Annex 21. Methodological tool. Tool for the demonstration and assessment of additionality. (Version )

Annex 21. Methodological tool. Tool for the demonstration and assessment of additionality. (Version ) Page 1 Methodological tool Tool for the demonstration and assessment of additionality (Version 06.0.0) 1. The use of the Tool for the demonstration and assessment of additionality is not mandatory for

More information

National procedure for using Joint Implementation (JI) mechanism under Track I (National JI Track I Procedure)

National procedure for using Joint Implementation (JI) mechanism under Track I (National JI Track I Procedure) National procedure for using Joint Implementation (JI) mechanism under Track I (National JI Track I Procedure) ABBREVIATIONS AND DEFINITIONS 1. Additionality represents the main requirement to be fulfilled

More information

CDM AND VER VALIDATION PROTOCOL

CDM AND VER VALIDATION PROTOCOL APPENDIX A CDM AND VER VALIDATION PROTOCOL SAYALAR 30.4 MW WIND FARM PROJECT TURKEY FINAL REPORT NO. 2007-44003 REVISION NO. 01 Table 1 Mandatory Requirements for High Standard Voluntary Emission Reduction

More information

DETERMINATION REPORT CLIMATE CHANGE GLOBAL SERVICES (CCGS LLC)

DETERMINATION REPORT CLIMATE CHANGE GLOBAL SERVICES (CCGS LLC) DETERMINATION REPORT CLIMATE CHANGE GLOBAL SERVICES (CCGS LLC) DETERMINATION OF THE Wood waste to energy in Severoonezhsk, the Arkhangelsk Region, the Russian Federation REPORT NO. RUSSIA/0055-2/2009,

More information

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China Validation Report Beijing Guotou Energy Conservation Company Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China Report No. 712740 rev. 1 17 July 2006 TÜV SÜD ndustrie Service

More information

Qualification Management for Geological Storage of CO 2

Qualification Management for Geological Storage of CO 2 DNV SERVICE SPECIFICATION DNV-DSS-402 Qualification Management for Geological Storage of CO 2 JUNE 2012 This document has been amended since the main revision (June 2012), most recently in July 2013. See

More information

Validation Report. Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project MAR 5, Korea CDM Certification Office

Validation Report. Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project MAR 5, Korea CDM Certification Office Report No. AT201-200602, Revision 04 Validation Report Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project MAR 5, 2007 Korea CDM Certification Office KOREA ENERGY MANAGEMENT

More information

Guidelines for Quantifying GHG emission. reductions of goods or services through Global. Value Chain

Guidelines for Quantifying GHG emission. reductions of goods or services through Global. Value Chain Guidelines for Quantifying GHG emission reductions of goods or services through Global Value Chain March 2018 Ministry of Economy, Trade and Industry Table of Contents Introduction... 2 1. Use of the Guidelines...

More information

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN Sindicatum Carbon Capital Limited & PT. Odira Energy Persada Tambun LPG Associated Gas Recovery and Utilization Project UNFCCC Ref. No. 1144

More information

-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES

-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES -SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES I. Mandate The Subsidiary Body for Scientific and Technological Advice (SBSTA), at its twenty-fifth session

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 14064-2 First edition 2006-03-01 Greenhouse gases Part 2: Specification with guidance at the project level for quantification, monitoring and reporting of greenhouse gas emission

More information

VERIFICATION REPORT RENERGA,UAB

VERIFICATION REPORT RENERGA,UAB RENERGA,UAB VERIFICATION OF THE BENAICIAI WIND POWER PROJECT MONITORING PERIOD: 01 JANUARY 2012 TO 31 OCTOBER 2012 REPORT NO. LITHUANIA-VER/0071/2012 REVISION NO. 01 Report Template Revision 4, 13/07/2011

More information

DETERMINATION REPORT DETERMINATION OF THE VACHA CASCADE JOINT IMPLEMENTATION PROJECT IN BULGARIA REPORT NO REVISION NO.

DETERMINATION REPORT DETERMINATION OF THE VACHA CASCADE JOINT IMPLEMENTATION PROJECT IN BULGARIA REPORT NO REVISION NO. DETERMINATION REPORT DETERMINATION OF THE VACHA CASCADE JOINT IMPLEMENTATION PROJECT IN BULGARIA REPORT NO. 2003-1332 REVISION NO. 01 DET NORSKE VERITAS Report No: 2003-1332, rev. 01 DETERMINATION REPORT

More information

Product Carbon Footprint Protocol

Product Carbon Footprint Protocol Product Carbon Footprint Protocol Required data and documentation to achieve product carbon footprint certification in preparation for communication and labelling. Part 1: Requirements for Certification

More information

VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO REVISION NO. 0 DET NORSKE VERITAS

VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO REVISION NO. 0 DET NORSKE VERITAS VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO. 2005-1171 REVISION NO. 0 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2005-09-20 28624550

More information

Qualification Management for Geological Storage of CO 2

Qualification Management for Geological Storage of CO 2 DNV SERVICE SPECIFICATION DNV-DSS-402 Qualification Management for Geological Storage of CO 2 JUNE 2012 The electronic pdf version of this document found through http://www.dnv.com is the officially binding

More information

DETERMINATION REPORT GLOBAL CARBON BV

DETERMINATION REPORT GLOBAL CARBON BV DETERMINATION REPORT GLOBAL CARBON BV DETERMINATION OF THE WASTE HEAPS DISMANTLING WITH THE AIM OF DECREASING THE GREENHOUSE GASES EMISSIONS INTO THE ATMOSPHERE REPORT NO. UKRAINE/0070/2009 REVISION NO.

More information

VERIFICATION REPORT UNITED CARBON FINANCE

VERIFICATION REPORT UNITED CARBON FINANCE UNITED CARBON FINANCE LTD. VERIFICATION OF THE WASTE HEAPS DISMANTLING BY TEMP LTD-A IN UKRAINE FORTH PERIODIC FOR THE PERIOD 01/08/2012 30/11/2012 REPORT NO. UKRAINE-VER/0822/2012 REVISION NO. 02 BUREAU

More information

PCF IMPLEMENTATION NOTE Number 4 Version of April 21, Background

PCF IMPLEMENTATION NOTE Number 4 Version of April 21, Background Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PCF IMPLEMENTATION NOTE Number 4 Version of April 21, 2000 DOLGDWLRQHULILFDWLRQDQG&HUWLILFDWLRQIRU3&)3URMHFWV

More information

DETERMINATION REPORT. Implementation of resourcesaving technologies at JSC Ural Steel, Novotroitsk, Russia REPORT NO REVISION NO.

DETERMINATION REPORT. Implementation of resourcesaving technologies at JSC Ural Steel, Novotroitsk, Russia REPORT NO REVISION NO. Implementation of resourcesaving technologies at JSC Ural Steel, Novotroitsk, Russia REPORT NO. 2007-9049 REVISION NO. 01 Date of first issue: Project No.: 2007-05-10 7506501 DET NORSKE VERITAS Organisational

More information

Standard for Validation, Verification and Audit

Standard for Validation, Verification and Audit Standard for Validation, Verification and Audit Carbon Competitiveness Incentive Regulation Version 2.0 June 2018 Title: Standard for Validation, Verification and Audit Number: 2.0 Program Name: Carbon

More information

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT Document Prepared By: Bureau Veritas Certification Holding SAS Report No.BVC/China-VR/7066/2012 Project Title Version Report ID Yunnan Mangli Hydropower

More information

JI DETERMINATION REPORT

JI DETERMINATION REPORT JI DETERMINATION REPORT JSC ZAPORIZHSTAL RECONSTRUCTION OF THE OXYGEN COMPRESSOR PLANT AT THE JSC ZAPORIZHSTAL, UKRAINE. Report No.: 8000361502 08/193 TÜV NORD CERT GmbH JI/CDM Certification Program Langemarckstrasse

More information

International Water Purification Programme

International Water Purification Programme GOLD STANDARD FINAL VERIFICATION /CERTIFICATION REPORT International Water Purification Programme Report No.: EC09(B)2016006 Report Date: 13/03/2018 China Classification Society Certification Company 40,

More information

Validation Report. Triveni Engineering and Industries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, India

Validation Report. Triveni Engineering and Industries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, India Validation Report Triveni Engineering and ndustries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, ndia Report No. 877510, Revision 01 2006, December 21 TÜV SÜD ndustrie

More information

Determination Report

Determination Report Determination Report Determination of the Kimle Wind Turbine Park HUNGARY Report No. 536103-K 2004-12-17 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management Service Westendstr. 199-80686 Munich -

More information

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5 - 1 - Annex 5 Appendix A 1 to the simplified modalities and procedures for small-scale CDM project activities CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL SCALE PROJECT ACTIVITIES

More information

Carbon Audit Report for Yau Lee Construction Company Limited

Carbon Audit Report for Yau Lee Construction Company Limited Carbon Audit Report for Yau Lee Construction Company Limited (May 2011 April 2012 and May 2012 April 2013) (Rev 3) Prepared by Business Environment Council Limited 8 July 2013 BEC reference: C2486 TABLE

More information

GS VALIDATION & VERIFICATION REPORT

GS VALIDATION & VERIFICATION REPORT GS VALIDATION & VERIFICATION REPORT 4.5 MW BIOMASS (LOW DENSITY CROP RESIDUES) BASED POWER GENERATION UNIT OF MALAVALLI POWER PLANT PVT LTD, INDIA REPORT NO. 2007-4003 REVISION NO. 01 DET NORSKE VERITAS

More information

VALIDATION REPORT QUIMOBÁSICOS HFC RECOVERY AND DECOMPOSITION PROJECT IN MEXICO REPORT NO REVISION NO. 02 DET NORSKE VERITAS

VALIDATION REPORT QUIMOBÁSICOS HFC RECOVERY AND DECOMPOSITION PROJECT IN MEXICO REPORT NO REVISION NO. 02 DET NORSKE VERITAS VALIDATION REPORT QUIMOBÁSICOS HFC RECOVERY AND DECOMPOSITION PROJECT IN MEXICO REPORT NO. 2005-1191 REVISION NO. 02 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2005-09-25 28924638

More information

DET NORSKE VERITAS VCS METHODOLOGY ELEMENT ASSESSMENT REPORT. Methodology for Weatherization of Single and Multi-Family Buildings

DET NORSKE VERITAS VCS METHODOLOGY ELEMENT ASSESSMENT REPORT. Methodology for Weatherization of Single and Multi-Family Buildings VCS METHODOLOGY ELEMENT ASSESSMENT REPORT Methodology for Weatherization of Single and Multi-Family Buildings REPORT FOR: VCS ASSOCIATION DNV report number 2010-9319 Revision 02 DET NORSKE VERITAS ERROR!

More information

VERIFICATION AND CERTIFICATION REPORT

VERIFICATION AND CERTIFICATION REPORT VERIFICATION AND CERTIFICATION REPORT Datang Zhangzhou Wind Power Co., Ltd Fujian Zhangpu Liuao 45MW Wind Power Project SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories TYPE II - ENERGY EFFICIENCY IMPROVEMENT PROJECTS Project participants shall take into account the general guidance to the methodologies, information on additionality, abbreviations and general guidance

More information

Determination Report

Determination Report Determination Report Determination of Bayerngas Ökobonusprogramm Gewerbe- und Industriekunden JI Program of Activities in Germany (Track 1) Report No. 1101506 2008-07-22 TÜV SÜD Industrie Service GmbH,

More information

OPPORTUNITIES AND CHALLENGES OF GEOTHERMAL CLEAN DEVELOPMENT MECHANISM PROJECTS IN KENYA

OPPORTUNITIES AND CHALLENGES OF GEOTHERMAL CLEAN DEVELOPMENT MECHANISM PROJECTS IN KENYA Presented at Short Course on Geothermal Project Management and Development, organized by UNU-GTP, KenGen and MEMD-DGSM, at the Imperial Botanical Beach Hotel, Entebbe, Uganda, November 20-22, 2008. GEOTHERMAL

More information

VERIFICATION REPORT EKORESURSAI,UAB INITIAL AND FIRST PERIODIC VERIFICATION OF THE LAPES LANDFILL GAS UTILIZATION AND ENERGY GENERATION

VERIFICATION REPORT EKORESURSAI,UAB INITIAL AND FIRST PERIODIC VERIFICATION OF THE LAPES LANDFILL GAS UTILIZATION AND ENERGY GENERATION EKORESURSAI,UAB INITIAL AND FIRST PERIODIC VERIFICATION OF THE LAPES LANDFILL GAS UTILIZATION AND ENERGY GENERATION MONITORING PERIOD: 1 JULY 2008 TO 31 DECEMBER 2009 REPORT NO. LITHUANIA-VER/0003/2010

More information

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories CDM Executive Board /Version 03 TYPE II - ENERGY EFFICIENCY IMPROVEMENT PROJECTS Project participants shall take into account the general guidance to the methodologies, information on additionality, abbreviations

More information

Lithuania s Initial Report under the Kyoto Protocol. Calculation of Assigned Amount under Article 7, paragraph 4, of the Kyoto Protocol

Lithuania s Initial Report under the Kyoto Protocol. Calculation of Assigned Amount under Article 7, paragraph 4, of the Kyoto Protocol Lithuania s Initial Report under the Kyoto Protocol Calculation of Assigned Amount under Article 7, paragraph 4, of the Kyoto Protocol Ministry of Environment of the Republic of Lithuania Vilnius, July

More information

Overgas Inc. AD. Reduction of Greenhouse Gases by Gasification in the Varna Municipality. Determination Report

Overgas Inc. AD. Reduction of Greenhouse Gases by Gasification in the Varna Municipality. Determination Report ABCD Reduction of Greenhouse Gases by Gasification in the Varna Municipality Determination Report This report contains 18 pages 2005 KPMG Sustainability B.V., member of KPMG International, a Swiss cooperative.

More information

Monitoring and Verification Plan Graneros Plant Fuel Switching Project June Prepared by

Monitoring and Verification Plan Graneros Plant Fuel Switching Project June Prepared by Monitoring and Verification Plan Graneros Plant Fuel Switching Project June 2003 Prepared by MGM International, Inc. Ayacucho 1435, 9 B C1111AAM Buenos Aires Argentina Table of Contents 1. Introduction

More information

AMAYO PHASE II WIND POWER PROJECT

AMAYO PHASE II WIND POWER PROJECT AMAYO PHASE II WIND POWER PROJECT Report No: 8000402033-11/558 Date: 2012-03-21 TÜV NORD CERT GmbH JI/CDM Certification Program Langemarckstraße, 20 45141 Essen, Germany Phone: +49-201-825-3335 Fax: +49-201-825-3290

More information

VALIDATION REPORT. Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO REVISION NO.

VALIDATION REPORT. Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO REVISION NO. VALDATON REPORT Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO. 2007-1017 REVSON NO. 02 VALDATON REPORT Date of first issue: Project No.: 2007-02-20 28924579

More information

VERIFICATION REPORT SIA VIDZEME EKO

VERIFICATION REPORT SIA VIDZEME EKO VERIFICATION REPORT SIA VIDZEME EKO VERIFICATION OF THE WASTE HEAP #1, #2, #3 AND #5 DISMANTLING OF FRUNZE MINE WITH THE AIM OF DECREASING GREENHOUSE GASES EMISSION INTO THE ATMOSPHERE INITIAL AND FIRST

More information

CDM Module 1. Introduction to Programmatic CDM (PoA) Lesson 2. How does the Programmatic CDM Work? Select Next to begin. Menu November 2011.

CDM Module 1. Introduction to Programmatic CDM (PoA) Lesson 2. How does the Programmatic CDM Work? Select Next to begin. Menu November 2011. CDM Module 1 Introduction to Programmatic CDM (PoA) Lesson 2 How does the Programmatic CDM Work? November 2011 Select Next to begin Next> Lesson Partners and Collaborators How does the Programmatic CDM

More information

National Carbon Offset Standard. Version 2

National Carbon Offset Standard. Version 2 National Carbon Offset Standard Version 2 1 March 2012 Contents 1. Introduction... 1 1.1 Carbon offsetting in the context of a carbon price... 1 1.2 Objectives of the Standard... 1 2. Normative reference...

More information

ASSESSMENT REPORT METHODOLOGY FOR IMPROVED FOREST MANAGEMENT THROUGH CONVERSION OF LOGGED TO PROTECTED FORESTS REPORT NO REVISION NO.

ASSESSMENT REPORT METHODOLOGY FOR IMPROVED FOREST MANAGEMENT THROUGH CONVERSION OF LOGGED TO PROTECTED FORESTS REPORT NO REVISION NO. ASSESSMENT REPORT METHODOLOGY FOR IMPROVED FOREST MANAGEMENT THROUGH CONVERSION OF LOGGED TO PROTECTED FORESTS REPORT NO. 2010-9415 REVISION NO. 03 ASSESSMENT REPORT Date of first issue: Project No.: 17

More information

Existing knowledge from CDM/JI on baseline and emission reduction calculation. Version Harry Vreuls and Li Hua

Existing knowledge from CDM/JI on baseline and emission reduction calculation. Version Harry Vreuls and Li Hua Existing knowledge from CDM/JI on baseline and emission reduction calculation. Version 24032010 Harry Vreuls and Li Hua Introduction This paper gives a short overview of the CDM/JI methodologies and summaries

More information

CDM Programme of Activities Call for Public Inputs

CDM Programme of Activities Call for Public Inputs CDM Programme of Activities Call for Public Inputs Pty Ltd August, 2008 2 Programmatic CDM The opportunity Cool nrg International welcomes the opportunity to provide input into the call for public comments

More information

Lesson 1: Introduction to GHG Projects and Project Level Accounting. Page 1 Learning Objectives

Lesson 1: Introduction to GHG Projects and Project Level Accounting. Page 1 Learning Objectives Lesson 1: Introduction to GHG s and Level Accounting Page 1 Learning Objectives Upon completion of this lesson, you will be able to understand: Rationale for undertaking GHG projects Difference between

More information

DETERMINATION REPORT UAB NAUJOJI ENERGIJA

DETERMINATION REPORT UAB NAUJOJI ENERGIJA UAB NAUJOJI ENERGIJA DETERMINATION OF THE CIUTELIAI WIND POWER JOINT IMPLEMENTATION PROJECT REPORT NO. LITHUANIA-DET/0056/2012 REVISION NO. 02 Report Template Revision 7, 29/10/2010 Date of first issue:

More information

CARBON OFFSETS WWF-AUSTRALIA POSITION

CARBON OFFSETS WWF-AUSTRALIA POSITION CARBON OFFSETS WWF-AUSTRALIA POSITION Properly designed and implemented carbon offsets reduce carbon pollution. Conversely, poorly designed and/or implemented carbon offsets can contribute to carbon pollution

More information

Validation Report. Biogas de Juarez S.A de C.V. Ciudad Juarez Landfill Gas to Energy Project. 2007, August 20

Validation Report. Biogas de Juarez S.A de C.V. Ciudad Juarez Landfill Gas to Energy Project. 2007, August 20 Validation Report Biogas de Juarez S.A de C.V Ciudad Juarez Landfill Gas to Energy Project. REPORT NO. 978560 2007, August 20 TÜV SÜD Industrie Service GmbH Carbon Management Service Westendstr. 199-80686

More information

VERIFICATION REPORT VERIFICATION OF THE ASSOCIATED GAS RECOVERY PROJECT OJSC NK-ROSNEFT REPORT NO: RUSSIA-VER/0232/2013 REVISION 01

VERIFICATION REPORT VERIFICATION OF THE ASSOCIATED GAS RECOVERY PROJECT OJSC NK-ROSNEFT REPORT NO: RUSSIA-VER/0232/2013 REVISION 01 OJSC NK-ROSNEFT VERIFICATION OF THE ASSOCIATED GAS RECOVERY PROJECT FOR THE KOMSOMOLSKOYE OIL FIELD MONITORING PERIOD #2: 1 MARCH 2012 31 DECEMBER 2012 REPORT NO: RUSSIA-VER/0232/2013 REVISION 01 Report

More information

Approved consolidated baseline and monitoring methodology ACM0013

Approved consolidated baseline and monitoring methodology ACM0013 Approved consolidated baseline and monitoring methodology ACM0013 Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology

More information

DETERMINATION REPORT. CMM utilisation on the Joint Stock Company Coal Company Krasnoarmeyskaya Zapadnaya N o 1 Mine Project in Ukraine

DETERMINATION REPORT. CMM utilisation on the Joint Stock Company Coal Company Krasnoarmeyskaya Zapadnaya N o 1 Mine Project in Ukraine DETERMINATION REPORT CMM utilisation on the Joint Stock Company Coal Company Krasnoarmeyskaya Zapadnaya N o 1 Mine Project in Ukraine Title of the project in Ukrainian language: УТИЛІЗАЦІЯ ШАХТНОГО МЕТАНУ

More information

VERIFICATION / CERTIFICATION REPORT

VERIFICATION / CERTIFICATION REPORT VERIFICATION / CERTIFICATION REPORT ARAPUTANGA CENTRAIS ELÉTRICAS S. A. - ARAPUCEL - SMALL HYDROELECTRIC POWER PLANTS PROJECT, IN BRAZIL (UNFCCC Registration Ref. No. 0530) Monitoring Period: 1 January

More information

Validation and Verification: VCS

Validation and Verification: VCS Validation and Verification: VCS Mr N.VASASMITH GHG Assessor Scope 13.1 Meeting room 3, Zone B, Queen Sirikit National Convention Center 2012 January 24 Prepare by Ms S.THONGSONG 1 Introduction VCS is

More information

CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS A. General description of CDM programme activity (CPA) B. Eligibility of CPA

More information

Validation Report. Datang Zhangzhou Wind Power Co., Ltd. VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project.

Validation Report. Datang Zhangzhou Wind Power Co., Ltd. VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project. Validation Report Datang Zhangzhou Wind Power Co., Ltd VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project REPORT NO. 948571 2007, August 30 TÜV SÜD Industrie Service GmbH Carbon

More information

Gold Standard Validation Report

Gold Standard Validation Report Gold Standard Validation Report Thai Biogas Energy Company Ltd. (TBEC) GOLD STANDARD VALIDATION OF THE CDM PROJECT: TBEC THA CHANG BIOGAS PROJECT REPORT NO. 1237633-GS 459 21 January 2011 TÜV SÜD Industrie

More information

DETERMINATION RE~~==I

DETERMINATION RE~~==I CERTIFICATION Reviewed urer V"ta ertifi tion Holding SA BUREAU VERITAS DETERMINATION RE~~==I GLOBAL CARBON BV DETERMINATION OF THE "Production modernisation at JSC Amurmetal, Komsomolskon-Amur, Khabarovsk

More information

Tips on PDD Preparation

Tips on PDD Preparation Tips on PDD Preparation What is PDD for? The PDD (Project Design Document) was developed by the CDM Executive Board in conformity with the relevant modalities and procedures for the Project Design Document

More information

Determination Report

Determination Report Determination Report Determination of the Benaiciai Wind Power Project, Lithuania, Report No. 907778 Revision 2 2008, May 5 TÜV SÜD Industrie Service GmbH, Carbon Management Service Westendstr. 199-80686

More information

PCF IMPLEMENTATION NOTE Number 3 Version of April 21, Background

PCF IMPLEMENTATION NOTE Number 3 Version of April 21, Background PCF IMPLEMENTATION NOTE Number 3 Version of April 21, 2000 %DVHOLQH0HWKRGRORJLHVIRU3&)3URMHFWV Background 33330 The Kyoto Protocol (KP) provides for the possibility of creating transferable greenhouse

More information

VALIDATION REPORT LIAONING KANGPING 24.65MW WIND FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT LIAONING KANGPING 24.65MW WIND FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALDATON REPORT LAONNG KANGPNG 24.65MW WND FARM PROJECT N CHNA REPORT NO. 2006-1174 REVSON NO. 01 DET NORSKE VERTAS VALDATON REPORT Date of first issue: Project No.: 2006-04-23 63602108 Approved by: Organisational

More information

VERIFICATION REPORT JSC IVANO-FRANKIVSK CEMENT

VERIFICATION REPORT JSC IVANO-FRANKIVSK CEMENT VERIFICATION REPORT JSC IVANO-FRANKIVSK CEMENT VERIFICATION OF THE IVANO-FRANKIVSK CEMENT SWITCH FROM WET-TO-DRY CEMENT AND FUEL SAVINGS FOR COAL DRYING (FIFTH FOR THE PERIOD 01/01/2012-31/12/2012) REPORT

More information

Qualifying Explanatory Statement for PAS 2060 Declaration of Achievement to Carbon Neutrality

Qualifying Explanatory Statement for PAS 2060 Declaration of Achievement to Carbon Neutrality SCS Global Services PAS 2060 Qualifying Explanatory Statement Qualifying Explanatory Statement for PAS 2060 Declaration of Achievement to Carbon Neutrality Prepared for: Planet Labs Date Completed: August

More information