Integration of Antapaccay Project with Tintaya progressive closure plan

Size: px
Start display at page:

Download "Integration of Antapaccay Project with Tintaya progressive closure plan"

Transcription

1 Integration of Antapaccay Project with Tintaya progressive closure plan Mauricio Quiroz Xstrata Copper Project Development Luis Espinoza Xstrata Tintaya Liz Espinoza Xstrata Tintaya 24 November 2010 Mine Closure 2010

2 Agenda 1. Introduction 2. Tintaya existing operation and closure Plan 3. Antapaccay Project Tintaya Extension 4. Integration Antapaccay Tintaya 5. Antapaccay Integrated Closure Plan 6. Conclusions

3 1. Introduction Xcu at a glance

4 1. Introduction - Location

5 1. Introduction - Background Mining at Tintaya started in 1985, now is nearing the depletion of reserves End of mining is expected in 2012 and oxide plant to be halted in 2014 Incorating Antapaccay will make possible to extend the operational continuity until 2034 As the rate of operation in Tintaya mine declines, Antapaccay starts up The current plans call for the use of Tintaya existing facilities, conserving the human resources and production capacity installed locally

6 2. Tintaya - existing operation Production rate: tpy Cu Concentrate tpy Cu Cathods oz/t Au in Cu Concentrate

7 2. Tintaya Closure Plan Open pit: Construction of a perimeter barrier 3 m high around the open pit Construction of a perimeter surface water drainage system Inundation of the pit Process Facilities: Cleanup and removal of geomembranes Dismantlement and demolition of buildings Shaping and grading of the ground Placement of Type A and B cover Mining Wastes facilities : Slope angles flattened to 22 (2.5:1) Construction of surface water drainage system Demolition of associates infraestructure Placement of Type A cover

8 2. Tintaya Closure Plan

9 3. Antapaccay Project Tintaya Extension

10 3. Antapaccay Project lay out

11 3. Antapaccay Project Tintaya Extension Concentrator plant considers 1 x 40 SAG + 2 x 26 balls mills Cu concentrate will be thickened and filtered at the mine before being transported to the Port of Matarani for shipment to smelters. The flotation tailings will be sent by gravity flow to the tailings thickening plant, where they will be thickened for discharge to the existing open pit at the Tintaya as the final disposal arrangement. The proposed throughput rate for the concentrator plant is t/d. The average annual concentrate production rate is to be approximately 370,000 t/year during the 22 year life of mine, with average concentrate grade of around 36% copper.

12 3. Antapaccay Project Tintaya Extension

13 4. Integration Tintaya - Antapaccay SINERGIES Antapaccay will use existing operating infrastructure at Tintaya, such as: Power and fresh water supply Drinking water supply plants Domestic wastewater treatment plants Tintaya Electrical Substation Offices, dining halls and camps Fuel tanks and refueling system (fuel pumps) Auxiliary Facilities (hospital, composting plant) Mining trucks and shovels Concentrate reception and weighting plant at the Port of Matarani; Tintaya Open Pit will be employed as a storage facility for the tailings of Antapaccay,

14 4. Integration Tintaya - Antapaccay TINTAYA PROGRESSIVE CLOSURE Tintaya progressive closure actions will be implemented for those facilities that reach the end of their useful lifespan and that are not to be used by Antapaccay, like: Tintaya leach processing facilities (plant, ponds, leach pad, tanks, etc.) Tintaya concentrator plant facilities (for sulfide ore processing), Ccamacmayo and Huinipampa Tailings Storage Facilities, Tintaya waste rock dumps 20, 23, 28, 70 and Central, Borrow site areas and limestone quarry.

15 5. Antapaccay Integrated Closure Plan All new and existing (Tintaya) facilities that will be used by Antapaccay will be subject to an integrated closure plan at the end of Antapaccay lifespan According with Xstrata Sustainable Standards, all Xstrata Operations and Projects must develop, maintain and implement closure plans according to: Compliant with Xstrata s Business Principles, Policies, Sustainable Development Standards, all applicable regulatory obligations, and international standards. Based on a robust process developed at the commodity business level for identifying and assessing all significant SD risks and controls. Annually reviewed, including a review of assumptions and costestimates, to address any changes in circumstances such as changes in legal requirements, new technologies, the local environmental and community situation, etc. Developed and reviewed by appropriately experienced and competent persons including external experts, as necessary.

16 Elevación aprox. 5. Antapaccay Integrated Closure Plan OPEN PITS Closure of accesses and posting of warning signs Removal of equipment and 4000 remaining structures from inside msnm the pits, Installation of perimeter barriers made of mine waste rock material piled 3 m high 3500 msnm The pumping of water to dewater the pits will be halted and the pits will be inundated. SW Nivel Piezométrico (futuro) Nuevo Tajo Río Cañipia 3000 msnm 0 km 2 km 4 km distancia aprox.

17 5. Antapaccay Integrated Closure Plan OPEN PITS Surface water stream diversion work will be disassembled and a portion (45% of wet season flow) of the Cañipia River will be diverted toward the pits to reduce the filling time. The hydrological model forecasts that the filling of the pits will take around 17 years to complete before discharge towards the Cañipía River starts. discharge towards the river will start. After this period it is estimated that such discharge will amount to an average rate of 350 l/s.

18 5. Antapaccay integrated closure plan WASTE ROCK DUMPS Closure of accesses, posting of warning signs and installation of perimeter barriers by means of piling material all around. Re-grading of slopes to overall of 2.5H:1V (22 ), made gentler from the original slopes. The re-grading of slopes is to result in an increase in the basal areas of the waste rock dumps by m at the North waste rock dump and m at the South waste rock dump. Covering over with material of Type A cover Construction of masonry perimeter channels to divert surface runoff During the progressive closure of the Tintaya waste rock dumps, field testing will be carried out to identify the most adequate species for use in revegetation.

19 5. Antapaccay integrated closure plan TAILINGS In the closure stage the facility will be filled with water until reaching the phreatic levels of the water table; thereafter, discharge will take place towards the watercourse of the Tintaya River through a spillway. The discharge through the spillway will commence at approximately 8 years after closure, and the resulting flow rate will be around 60 l/s. The remaining constructed works include the control of accesses and the removal of the remaining civil works and, additionally, the implementation of a rock cover 0.5 m hick in those areas were the tailings are not submerged.

20 5. Antapaccay integrated closure plan POST CLOSURE MONITORING ACTIVITIES post-closure monitoring for an estimated minimum period of 5 years in accordance with Peruvian standards and regulations. The post-closure monitoring will include items such as groundwater levels and quality, surface water flows and quality, air quality and, finally, flora and fauna. The exact points for monitoring and the parameters to be monitored to be maintained in the post-closure monitoring program will be determined in the years preceding closure based on the results and observations made at the points used during the Project lifespan.

21 5. Antapaccay integrated closure plan POST CLOSURE LAY OUT

22 6. Conclusions The startup of the Antapaccay Project will make it possible: to continue mining activities in Tintaya district Maintaining the continuity of the community investment and social development initiatives being executed in the nearby communities and prolonging the contribution to local and regional economic wellbeing. The use of the Tintaya pit as a tailings storage facility during the operation of the Antapaccay Project will constitute the first experience of this kind in Peru. It requires an additional monitoring and control effort to enable it to be assured to both the communities and the authorities that tailings disposal is being performed in a safe manner without affecting the environment or the communities in the surroundings. The simultaneousness with which the Antapaccay operation and the progressive closure of Tintaya will both be carried out, which is the reason why the operational risks involved in this scenario will need to be adequately controlled.

23 Gracias!

Case Studies in ARD Management and Mine Closure

Case Studies in ARD Management and Mine Closure Case Studies in ARD Management and Mine Closure Rio Tinto US Sites Rich Borden and Vicky Peacey Rio Tinto April 2012 Environment in Rio Tinto 1 Proactive ARD Management for Mine Closure Proactive ARD management

More information

Kumtor Gold Company 2018

Kumtor Gold Company 2018 Kumtor Gold Company 2018 Kumtor Gold Company Kumtor is one of the highest gold deposits in the world. The deposit was discovered in the Central Tien Shan at an altitude of 4,200 meters in 1978. The Kumtor

More information

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan EIS Techni cal Support Document 20-12 Magino Project Environmental Impact Statement Technical Support Document 20-12 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION

More information

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval

More information

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Malachite Resources AGM. November For personal use only. Malachite Resources Limited Malachite Resources AGM November 2013 1 Malachite Resources Limited Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk

More information

Environmental Design Criteria for Project Engineering

Environmental Design Criteria for Project Engineering Environmental Design Criteria for Project Engineering Argentina Mining, Salta, September 2018 Simon Catchpole, February 2016 An Environmental Risk Model In the EA phase, the environmental professionals

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

LONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1

LONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1 LONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1 Yuni Rusdinar 2 Abstract. Freeport Indonesia currently operates a 760,000 t/d open pit mine that will operate until 2015, with the

More information

Yeelirrie Uranium Project. Environmental Management

Yeelirrie Uranium Project. Environmental Management Yeelirrie Uranium Project Environmental Management Yeelirrie Uranium Project Yeelirrie is one of Australia s largest undeveloped uranium deposits. The deposit is located approximately 660 km north east

More information

Borrow Pit and Quarry Management Procedure Environmental

Borrow Pit and Quarry Management Procedure Environmental 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to borrow pit (BP) and quarry management at the Roy Hill Project. This procedure applies to all personnel

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM FOR INTERNAL DISCUSSION PURPOSES ONLY TECHNICAL MEMORANDUM TO: Augusta Resource Corp. ATTENTION: Jamie Sturgess FROM: Troy Meyer Project Manager, Vector Colorado LLC (Vector) DATE: June 5, 2006 SUBJECT:

More information

NorthMet Project. Adaptive Water Management Plan

NorthMet Project. Adaptive Water Management Plan Version 9 Issue This document was prepared for Poly Met Mining Inc. by Barr Engineering Co. Version: 9 Page i Table of Contents Acronyms, Abbreviations and Units... 1 1.0 Introduction... 3 1.1 Purpose

More information

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept Open pit and underground mine The project has 31 Mt of ore reserve Ore to be processed at a rate of 4,650 t/d Life of mine is 20 years

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Quebrada Blanca Phase 2. April 2012

Quebrada Blanca Phase 2. April 2012 Quebrada Blanca Phase 2 April 2012 Forward Looking Information Both these slides and the accompanying oral presentation contain certain forward-looking statements within the meaning of the United States

More information

Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE

Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE Making the big difference to our customers Mining Industry

More information

GENERAL NOTES ENGINEERS OVERSIGHT 1. ALL ELEVATIONS, DIMENSIONS, ALIGNMENTS AND ORIENTATION OF ALL ELEMENTS SHOWN IN THE PLANS MUST BE APPROVED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE ( REP ENGINEER

More information

Introduction to Cyanide Gold Mining. ORCR USEPA July 2012

Introduction to Cyanide Gold Mining. ORCR USEPA July 2012 Introduction to Cyanide Gold Mining ORCR USEPA July 2012 ORE CHARACTERIZATION Gold occurs in a variety of geologic environments. Estimates of average abundance in the Earth's crust are on the order of

More information

Enviable water recovery in a desert environment a case study

Enviable water recovery in a desert environment a case study Mine Water Solutions 2013 J. Obemeyer, J. Enriquez and T. Alexieva 2013 InfoMine Inc, Vancouver, Canada, ISBN XXX Enviable water recovery in a desert environment a case study James R. Obermeyer, MWH Americas,

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

GEOCHEMICAL CHARACTERIZATION OF WASTE ROCK ANTAMINA MINE PERU

GEOCHEMICAL CHARACTERIZATION OF WASTE ROCK ANTAMINA MINE PERU GEOCHEMICAL CHARACTERIZATION OF WASTE ROCK ANTAMINA MINE PERU David Brown, Golder Associates Rens Verburg, Golder Associates Henri Letient, Antamina Celedonio Aranda, Antamina BC/MEND Workshop November

More information

APPENDIX 22C: CYANIDE MANAGEMENT PLAN

APPENDIX 22C: CYANIDE MANAGEMENT PLAN IV: onomic ents ment ome ability mic pment iness APPENDIX 22C: CYANIDE MANAGEMENT PLAN Volume V: additional yesa requirements 20 Effects of the Environment on the Project 20a Climate Change Report 21 Accidents

More information

Expansions in South America: Production, Projects and Sustainable Development

Expansions in South America: Production, Projects and Sustainable Development Expansions in South America: Production, Projects and Sustainable Development José Marún Executive General Manager South America Operations Division 18 September 2011 Organic production growth: South American

More information

Iván Arriagada, CEO Antofagasta Minerals. Producer Challenges

Iván Arriagada, CEO Antofagasta Minerals. Producer Challenges Iván Arriagada, CEO Antofagasta Minerals Producer Challenges Cautionary statement This presentation has been prepared by Antofagasta plc. By reviewing and/or attending this presentation, you agree to the

More information

Concessions for mining in Peru

Concessions for mining in Peru Lessons from Yanacocha: assessing mining impacts on hydrological systems and water distribution in the Cajamarca region, Peru. * Diana Raquel Vela Almeida, Froukje Kuijk, Nicolas Kosoy, Nilton Deza and

More information

Metal Recycling. Mining Impacts. Recycling of other mineral resources. Hazardous Work

Metal Recycling. Mining Impacts. Recycling of other mineral resources. Hazardous Work Mining Impacts Reading Today: Ch. 12 pp. 306-309, also Ch. 16 pp. 424-426 Wed: Ch. 13 Metal Recycling Benefits resource conservation less land disturbed by mining saves landfill space reduces energy consumption

More information

Mining Impacts. Metal Recycling. Reading Today: Ch. 12 pp , also Ch. 16 pp Wed: Ch. 13

Mining Impacts. Metal Recycling. Reading Today: Ch. 12 pp , also Ch. 16 pp Wed: Ch. 13 Mining Impacts Reading Today: Ch. 12 pp. 306-309, also Ch. 16 pp. 424-426 Wed: Ch. 13 Metal Recycling Benefits resource conservation less land disturbed by mining saves landfill space reduces energy consumption

More information

Closure of Jarosite Pond Facility, Timmins, Ontario. Design and Construction

Closure of Jarosite Pond Facility, Timmins, Ontario. Design and Construction Closure of Jarosite Pond Facility, Timmins, Ontario Design and Construction Andy Small AMEC December 2013 Outline Introduction Site description Closure options Design criteria Design Construction Water

More information

Reclamation, Closure and Postclosure Plan

Reclamation, Closure and Postclosure Plan Appendix 14 Reclamation, Closure and Postclosure Plan NorthMet Project September 2016 Contents 1.0 Introduction... 1 1.1 Objective... 1 1.2 Variances... 2 1.2.1 Subsequent Use... 2 1.2.2 Acceptable Reclamation

More information

Environmental Monitoring Results Summary

Environmental Monitoring Results Summary Environmental Monitoring Results Summary Quarter 1 2016 Name of Mine: CSA Mine Environment Protection Licence: EPL 1864 Licensee Name and Operator: Cobar Management Pty Ltd Licensee Address: PO Box 31,

More information

Review of ML/ARD Geochemistry & Water Quality Predictions

Review of ML/ARD Geochemistry & Water Quality Predictions Review of ML/ARD Geochemistry & Water Quality Predictions Presented by Kim Bellefontaine, M.Sc., P.Geo. Senior Mine Review Geologist, MEMPR With contributions from: Kelly Sexsmith, M.S., P.Geo. Senior

More information

Civil and Geotechnical Engineering

Civil and Geotechnical Engineering Imagine the result Imagine the result Civil and Geotechnical Engineering for the Mining Industry Innovative, Sustainable and Grounded Solutions At ARCADIS, we understand the environment and how to engineer

More information

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance Independent Expert Engineering Investigation and Review Panel Report on Mount Polley Tailings Storage Facility Breach Appendix G: Water Balance January 30, 2015 Report on Mount Polley Tailings Storage

More information

Rehabilitation Management

Rehabilitation Management Rehabilitation Management Andrea Sutton Chief Executive 27 August 2015 www.energyres.com.au Forward-looking statements This presentation has been prepared by Energy Resources of Australia Ltd ( ERA ) and

More information

Minto Mine. Mill Operations Plan

Minto Mine. Mill Operations Plan Minto Mine Mill Operations Plan 2018-01 Prepared by: Minto Explorations Ltd. Minto Mine January 2018 Minto Explorations Ltd. Minto Mine 2018 Mill Operations Plan Table of Contents 1 Introduction...1 1.1

More information

Summary of Peñasquito Technical Report - Goldcorp, December 31, 2007

Summary of Peñasquito Technical Report - Goldcorp, December 31, 2007 Summary of Peñasquito Technical Report - Goldcorp, December 31, 2007 History of Peñasquito Property In 1998 Western Silver acquired the entire Penãsquito property from Kennecott. Glamis Gold Inc. acquired

More information

The future of water in the mining industry Jerry Rowe

The future of water in the mining industry Jerry Rowe The future of water in the mining industry Jerry Rowe Hatch, Global Director Resources Management, 198 Union Blvd, Suite 200, Lakewood, CO, 80228, USA Abstract The current dynamics of the mining industry

More information

Operations Mine Site, Tote Road and Railway

Operations Mine Site, Tote Road and Railway Operations Mine Site, Tote Road and Railway 2 Panel Members Michael Anderson Richard Cook John Binns Fernand Beaulac Steve Walker Mike Lepage Michael Sheahan 3 The Panel will address: FEIS Volumes 3, 5,

More information

7th Annual Surface Water Monitoring and Standards Meeting SWiMS Chicago, IL March 18-20, 2008

7th Annual Surface Water Monitoring and Standards Meeting SWiMS Chicago, IL March 18-20, 2008 7th Annual Surface Water Monitoring and Standards Meeting SWiMS Chicago, IL March 18-20, 2008 Comparison of Predicted and Actual Water Quality at Hardrock Mines The reliability of predictions in Environmental

More information

AGM - Lorena Gold Project

AGM - Lorena Gold Project AGM - Lorena Gold Project For personal use onlynovember 2015 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors

More information

Developing New Nickel Resources Voisey s Bay Project

Developing New Nickel Resources Voisey s Bay Project Developing New Nickel Resources Voisey s Bay Project Presentation to MEND Maritimes Workshop Halifax May 24, 2006 This presentation will include projections and other forward-looking statements. While

More information

For personal use only

For personal use only ACN. 000 317 251 MARKET RELEASE 4 th March 2013 ROCKLANDS COPPER PROJECT (CDU 100%) DEVELOPMENT UPDATE PICTORIAL UPDATE 10 Development of the Rocklands Group Copper Project, located just outside the major

More information

TAILING & HEAP LEACH FACILITY MANAGEMENT PURPOSE & OBJECTIVES CONTENT. 1. Planning & Design

TAILING & HEAP LEACH FACILITY MANAGEMENT PURPOSE & OBJECTIVES CONTENT. 1. Planning & Design PURPOSE & OBJECTIVES This Tailing & Heap Leach Facility Management Standard (the Standard ) sets the minimum Newmont requirements for the design and management of tailing storage facilities (TSF) and heap

More information

Technological Challenges in Mining

Technological Challenges in Mining The mining industry faces new challenges today. These are anything from technological challenges to social and economic. Worlds demand for minerals and raw material continue to be high. Technology has

More information

CMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017

CMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017 Advancing The Zafranal Project Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017 Forward-Looking Information These slides contain certain forward-looking statements

More information

The true cost of groundwater

The true cost of groundwater The true cost of groundwater Todd Hamilton SRK Consulting (Canada) Ltd. thamilton@srk.com March 8, 2016 Groundwater in mining How groundwater affects economics Managing groundwater 2 of 23 Contents Groundwater

More information

MINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015

MINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015 # 128 June 2015 MINIMUM ENGINEERING STUDY REQUIREMENT UPDATE The evaluation of a mining project from exploration through development and production is a lengthy and complicated process. Mine development

More information

Mining Impacts: A Case Study

Mining Impacts: A Case Study Mining Impacts: A Case Study Raymond K. Will William E. Motzer Tailings and Mine Waste 2008 Conference Colorado State University 2490 Mariner Square Loop, Suite 215, Alameda, CA Jamestown Mine Site Location

More information

AVANTI MINING INC. Kitsault Mine Project: Nisga a Community Presentation. April 2011

AVANTI MINING INC. Kitsault Mine Project: Nisga a Community Presentation. April 2011 AVANTI MINING INC. Kitsault Mine Project: Nisga a Community Presentation April 2011 Management of Avanti Craig J Nelsen President & CEO 30 years exploration and development experience Previously with Gold

More information

Highway 11 Realignment

Highway 11 Realignment Highway 11 Realignment Preferred Alternative Option 1D (optimized) Key Advantages (+) / Disadvantages (-) + Comparatively lowest cost to construct. Comparatively lowest construction complexity. + Optimal

More information

AGENDA: 1. Environmental Summary. 2. Community and Sustainability. 3. Project Progress. 4. Other Matters

AGENDA: 1. Environmental Summary. 2. Community and Sustainability. 3. Project Progress. 4. Other Matters AGENDA: 1. Environmental Summary Environmental Management Compliance Issues - Improvements 2. Community and Sustainability Local Employment Local Business Stakeholder Engagement 3. Project Progress Project

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com N E W S R E L E A S E April 17, AVINO ANNOUNCES

More information

AQM Copper Releases Positive Preliminary Economic Assessment for the Zafranal Copper Gold Project

AQM Copper Releases Positive Preliminary Economic Assessment for the Zafranal Copper Gold Project AQM Copper Releases Positive Preliminary Economic Assessment for the Zafranal Copper Gold Project Vancouver, British Columbia, AQM Copper Inc. (TSX.V: AQM; BVL: AQM) ( AQM or the "Company") is pleased

More information

Improvements in bi-metal production at the Brunswick plant, Costerfield.

Improvements in bi-metal production at the Brunswick plant, Costerfield. 1 Improvements in bi-metal production at the Brunswick plant, Costerfield. D Buchanan 1, V Cullinan 2 1. MAusIMM, Processing Plant Manager, Mandalay Resources Costerfield Operations, 1024 Heathcote Nagambie

More information

- TAILINGS AND WATER MANAGEMENT FOR A COLD REGIONS MINE - Dr. Michael Davies, P.Eng., P.Geo. and Mr. Mathieu Veillette, P.Eng., P.E.

- TAILINGS AND WATER MANAGEMENT FOR A COLD REGIONS MINE - Dr. Michael Davies, P.Eng., P.Geo. and Mr. Mathieu Veillette, P.Eng., P.E. - - Dr. Michael Davies, P.Eng., P.Geo. and Mr. Mathieu Veillette, P.Eng., P.E. AMEC Earth & Environmental Vancouver, British Columbia, Canada Pogo Gold Mine: Teck Cominco is the operator and the mine is

More information

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT Pete Dronkers Northern Alaska Environmental Center WHAT IS ACID MINE DRAINAGE? (AMD) When a mine is built and operated, thousands or millions of tons of

More information

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION RECLAMATION PLAN FOR (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally

More information

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Terry Eldridge Golder Associates S.A., Chile Ben Wickland Golder Associates Ltd., Canada Adrian Goldstone Dundee Precious Metals

More information

Brett Fletcher Executive General Manager PNG & Indonesian Operations

Brett Fletcher Executive General Manager PNG & Indonesian Operations Hidden Valley Brett Fletcher Executive General Manager PNG & Indonesian Operations Disclaimer Forward Looking Statement These materials include forward looking statements. Often, but not always, forward

More information

OUTOTEC INDUSTRIAL WATER TREATMENT

OUTOTEC INDUSTRIAL WATER TREATMENT OUTOTEC INDUSTRIAL WATER TREATMENT Outotec industrial water treatment provides tailored water treatment solutions to produce water that meets environmental discharge regulations. Our technologies maximize

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Appendix H. Haile Gold Mine EIS Reclamation Plan

Appendix H. Haile Gold Mine EIS Reclamation Plan Appendix H Haile Gold Mine EIS Reclamation Plan This page is left blank intentionally. HAILE GOLD MINE RECLAMATION PLAN February 2010 2913/R1 Prepared for: Haile Gold Mine Inc. 7283 Haile Gold Mine Road

More information

Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes

Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes 89 90 Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes Tongling Non-Ferrous Metals Group copper smelter Image credit: nerin.com 91 Analysis IV Environmental

More information

Inert Atmosphere Systems A New Approach to controlling AMD Discharges from Underground Mines

Inert Atmosphere Systems A New Approach to controlling AMD Discharges from Underground Mines Inert Atmosphere Systems A New Approach to controlling AMD Discharges from Underground Mines Nic Bourgeot1, John A. Muchan1, Andrew Sampaklis2, Nick Staheyeff2 and Jeff R. Taylor1 1Earth Systems Pty. Ltd.

More information

HARDY AND KIDD ACID DRAINAGE AND METAL LEACHING HISTORIES: CONTRASTS AND COMPARISONS

HARDY AND KIDD ACID DRAINAGE AND METAL LEACHING HISTORIES: CONTRASTS AND COMPARISONS HARDY AND KIDD ACID DRAINAGE AND METAL LEACHING HISTORIES: CONTRASTS AND COMPARISONS Ronald V. Nicholson,Ph.D. Stantec Consulting Ltd. 1 th Annual BC ML/ARD Workshop Vancouver, December 2-3, 23 THE ARD

More information

Tar Creek Superfund Site Ottawa, Oklahoma

Tar Creek Superfund Site Ottawa, Oklahoma CASE STUDY Tar Creek Superfund Site Ottawa, Oklahoma August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from this publication

More information

PERMIT AMENDMENT APPLICATION

PERMIT AMENDMENT APPLICATION Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T 250.790.2215 F 250.790.2613 PERMIT AMENDMENT APPLICATION UNDER THE BRITISH COLUMBIA MINES ACT MOUNT POLLEY MINE RETURN

More information

Incomplete Mining plan

Incomplete Mining plan Incomplete Mining plan Because Rio Tinto s most recent efforts to achieve a Congressional land exchange have stalled, Rio Tinto released an incomplete mining plan of operations in November of 2013, asserting

More information

Newmont Mining Corporation Tailing & Heap Leach Facility Management Standard

Newmont Mining Corporation Tailing & Heap Leach Facility Management Standard Page No: Page 1 of 5 1 PURPOSE AND OBJECTIVES This (the Standard ) sets the minimum Newmont requirements for the design and management of tailing storage facilities (TSF) and heap leach facilities (HLF)

More information

ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE

ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE Beadell Resources Limited (ASX: BDR) ( Beadell ) is pleased to provide an update on the construction of

More information

Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold/Moly (Silver) Project Pacific Booker Minerals Inc. Morrison Copper/Gold/Moly (Silver) Project Mr. ERIK TORNQUIST, Executive VP & COO November 2008 Forward Looking Statement This presentation may include forward-looking statements

More information

TERMS OF REFERENCE FOR THE PREPARATION OF A FOCUS REPORT. Regarding the Goldboro Gold Project Proposed by Anaconda Mining Inc.

TERMS OF REFERENCE FOR THE PREPARATION OF A FOCUS REPORT. Regarding the Goldboro Gold Project Proposed by Anaconda Mining Inc. TERMS OF REFERENCE FOR THE PREPARATION OF A FOCUS REPORT Regarding the Goldboro Gold Project Proposed by Anaconda Mining Inc. NOVA SCOTIA ENVIRONMENT October 14, 2018 1.0 INTRODUCTION The Goldboro Gold

More information

Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania

Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania James A. Theriault 1, John Frostiak 2, Don Welch 1, 1 Golder Associates Ltd., Mississauga, Ontario, Canada 2 Barrick Gold Corporation,

More information

In-pit tailings disposal at Langer Heinrich TSFs in a unique hydrogeological setting

In-pit tailings disposal at Langer Heinrich TSFs in a unique hydrogeological setting In-pit tailings disposal at Langer Heinrich TSFs in a unique hydrogeological setting Tailings and Mine Waste Management for the 21 st Century 2015 Page number 373 in proceedings Prepared by: Cameron Hore

More information

Metallurgium TM. Lessons Learned from the Copper Industry Applied to Gold Extraction. John O. Marsden

Metallurgium TM. Lessons Learned from the Copper Industry Applied to Gold Extraction. John O. Marsden Metallurgium TM Lessons Learned from the Copper Industry Applied to Gold Extraction John O. Marsden Keynote Presentation at World Gold 2009 Conference, Johannesburg, South Africa, October 30 th, 2009 Overview

More information

For personal use only

For personal use only Positive Scoping Study: Aphrodite Gold Project 9 February 2012 Company Announcements Office Australian Securities Exchange Limited Positive Scoping Study for Aphrodite Gold Project Potential to Become

More information

A tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River.

A tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River. 4.5.1.3 DEWATERING DESCRIPTION Dewatering techniques are methods of addressing extracted ground or surface water encountered during construction. This temporary BMP addresses the installation and maintenance

More information

Chapter 10 Summary of Project Effects

Chapter 10 Summary of Project Effects Chapter 10 Summary of Project Effects MINAGO PROJECT Environmental Impact Statement i TABLE OF CONTENTS 10. SUMMARY OF PROJECT EFFECTS 10-1 10.1 Key Findings 10-1 10.1.1 Aquatic Habitat 10-1 10.1.2 Wildlife

More information

MINING, MINERALS & EXTRACTIVE INDUSTRIES

MINING, MINERALS & EXTRACTIVE INDUSTRIES MINING, MINERALS & EXTRACTIVE INDUSTRIES 01 Mining, Minerals & Extractive Industries Mining, Minerals & Extractive Industries 02 SLR Consulting is a leading consultancy operating within the mining, minerals

More information

SMARA Reclamation Standards Review

SMARA Reclamation Standards Review SMARA Reclamation Standards Review Focused Discussion SMARA Section 3704.1 - Performance Standards for Reclamation and Section 2711 Extraction of Minerals Essential to Well-Being of the State and the Needs

More information

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood Evaluation of Grade Engineering using Enterprise Optimization Michael Scott, Nick Redwood Who we are Not for Profit Research Organization Site implementation of stepchange innovation Grade Engineering

More information

Dry Stacking Operation at Pogo Mine, Alaska June 12, Sumitomo Metal Mining Pogo LLC

Dry Stacking Operation at Pogo Mine, Alaska June 12, Sumitomo Metal Mining Pogo LLC Dry Stacking Operation at Pogo Mine, Alaska June 12, 2014 Sumitomo Metal Mining Pogo LLC Contents 1. About Pogo Mine Geology Mining and paste backfill Process 2. Dry Stacking Operation About Dry Stack

More information

EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012

EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012 EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA Natalie Tashe November 9, 2012 1 GEOGRAPHIC CONTEXT 2 DEFINING WILDLIFE HABITAT 3 OUTLINE 1. Mine Cycle for reclamation

More information

Development of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine

Development of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine Development of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine TSF 1 TSF 2 November 28, 2018 TSF 3W TSF 3E Westwood Mine Cau$onary Statement 2 Outline Doyon-Bousquet-LaRonde

More information

LIFE Project Number LIFE03 ENV/GR/ Layman s Report

LIFE Project Number LIFE03 ENV/GR/ Layman s Report LIFE Project Number LIFE03 ENV/GR/000213 LIFE PROJECT NAME Rehabilitation of abandoned bauxite surface mines using alumina red mud as filler (REFILL) Reporting Date 30-11-2006 The large open pit areas

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001

More information

SteveJan Consultants Inc Adams Rd. Campbell River, BC V9W 1R9 Tel/Fax: Cell:

SteveJan Consultants Inc Adams Rd. Campbell River, BC V9W 1R9 Tel/Fax: Cell: SteveJan Consultants Inc. 405 9 Adams Rd. Campbell River, BC V9W 1R9 Tel/Fax: 250-926-6094 Cell: 250-850-9002 MEMORANDUM DATE: November 7, 2012 TO: FROM: RE: Mr. Bob Holmes Director Minerals Development

More information

Extraction Process Design Basis

Extraction Process Design Basis AI Project Update Joslyn North Mine Project 5 Process 5.1 Introduction This section describes the project bitumen extraction process and includes: process description material balance energy balance technology

More information

BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future

BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future Andy Fourie School of Civil, Environmental & Mining Engineering 1 BAP or BAT?

More information

To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER

To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER 1 COMPONENTS OF ENGINEERED LANDFILL a) A Liner System b) A Leachate Collection Facility c) A Gas Control

More information

AN OVERVIEW OF TAILINGS MANAGEMENT SYSTEM SELECTION

AN OVERVIEW OF TAILINGS MANAGEMENT SYSTEM SELECTION AN OVERVIEW OF TAILINGS MANAGEMENT SYSTEM SELECTION TAILINGS SYSTEM SELECTION OBJECTIVE: Provide Guidance Encourage Discussion Discuss Custom Assessment of Tailings Management Systems THE PRESENTATION:

More information

Lorena Mine Project. Preliminary Mine Plan - Water Supply

Lorena Mine Project. Preliminary Mine Plan - Water Supply Lorena Mine Project Preliminary Mine Plan - Water Supply Prepared for: Prepared by: September 2013 i TABLE OF CONTENTS Table of Contents... i 1 INTRODUCTION... 1 2 WATER DEMANDS... 2 3 WATER SOURCES...

More information

Motivations for Sustainable Development in Mining Areas

Motivations for Sustainable Development in Mining Areas Motivations for Sustainable Development in Mining Areas Bernhard Dold Division of Geosciences and Environmental Engineering, Luleå Technical University, Luleå, Sweden Sustainable Mining Research & Consultancy

More information

The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR. Authors: A Hoyle, D Bennett, and P Walker

The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR. Authors: A Hoyle, D Bennett, and P Walker The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR Authors: A Hoyle, D Bennett, and P Walker IRP Presentation Summary 1. Phu Kham mineralogy and implications for process design

More information

Water Issues Relating to Unconventional Oil and Gas Production

Water Issues Relating to Unconventional Oil and Gas Production Water Issues Relating to Unconventional Oil and Gas Production John Veil 410 212 0950 john@veilenvironmental.com www.veilenvironmental.com National Research Council Workshop on the Development of Unconventional

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

For personal use only

For personal use only 4 AUGUST 2017 TROPICANA GOLD MINE UPDATE Independence Group NL ( IGO or the Company ) (ASX: IGO) is pleased to provide a progress report on initiatives to further maximise and optimise the Tropicana Gold

More information

Labrador Iron Mines Holdings Limited

Labrador Iron Mines Holdings Limited Labrador Iron Mines Holdings Limited Rehabilitation and Closure May 10, 2016 Re-establishing Flow to the Un-named Tributary Evolution of the Un-named Tributary James Mine Dewatering was required to lower

More information

Location Mine Development Site Features Acid Mine Drainage Distribution of Metals Contamination Impacts to Ecosystem USFS Non-Time-Critical

Location Mine Development Site Features Acid Mine Drainage Distribution of Metals Contamination Impacts to Ecosystem USFS Non-Time-Critical Location Mine Development Site Features Acid Mine Drainage Distribution of Metals Contamination Impacts to Ecosystem 2010-11 USFS Non-Time-Critical Removal Action Q&A LOCATION AND SURFACE WATERS OR CA

More information

URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI

URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI OUTLINE Introduction History of Mining in Malawi Operations

More information