1 ENVIRONMENTAL BASELINE STUDY ANYWHERE Location: Site coordinates Area name: Official name or nick name Issued by: Organisation/unit that issue the EBS Surveyor: Organisation/unit that perform the EBS Date: Date(s) when the EBS was performed
2 Content 1. INTRODUCTION Objective/purpose Methodology SITE/PROPERTY LOCATION GENERAL SITE SETTINGS Current use(s) of the property Past use(s) of the property Current uses of adjoining properties Past uses of adjoining properties Current or past use of the surrounding area Geologic, hydro-geological, hydrologic, or topographic conditions Facility information Roads Water supply Sewage disposal system Fire protection system INTERNAL AND EXTERNAL OBSERVATIONS Hazardous material (HM) and petroleum products Storage tanks Odours Pools of liquid Drums Hazardous waste (HW) and waste petroleum products Unidentified substance containers Electrical hazards Radiological hazards PCBs Medical/biohazard waste Internal observations of facilities External observations ENVIRONMENTAL SAMPLING Environmental sampling Environmental standards DELETIONS AND DEVIATIONS FINDINGS AND CONCLUSIONS STATEMENT QUALIFICATION STATEMENT REFERENCES... 8 Appendices
3 EXECUTIVE SUMMARY Describe - the geographical area investigated; - the overall focus of the report; e.g. - current environmental situation of the area; - the environmental impact related to current and future activities; - adopted risk management practices; - recommendations to mitigate significant environmental impact of the past and to reduce the risk of impact related to any future area of expansion 3
4 1. INTRODUCTION 1.1 Objective/purpose 1.2 Methodology List the methodology used and limitations encountered during the initial (or updated) site reconnaissance or the closure inspection. Describe the method used to reconnoitre the property; for example, the use of grid patterns or other systematic approach. List and describe any limitations encountered during the reconnaissance such as physical obstructions, bodies of water, pavement, weather, or uncooperative occupants. 2. SITE/PROPERTY LOCATION List the legal address and grid location or latitude and longitude (GPS position). 3. GENERAL SITE SETTINGS Note whether the site was visually observed or identified from interviews or record reviews. For an updated initial EBS or a closure EBS, the site should always be visually observed. 3.1Current use(s) of the property List the current property use of the property. Be as specific as possible. 3.2 Past use(s) of the property List all known past property use(s). If a past use is likely to have involved the use, treatment, storage, disposal, or generation of hazardous materials or petroleum products, include a detailed description or indicators of this use. A closure EBS should include information obtained from Environmental Conditions Reports (ECRs) as well. 3.3 Current uses of adjoining properties List the current property use of adjoining properties. Be as specific as possible. 3.4 Past uses of adjoining properties If a past use is likely to have indicated recognized adverse environmental conditions, include a detailed description. 3.5 Current or past use of the surrounding area List general types of past uses; i.e., residential, agricultural, or industrial. Generally limit surroundings to that which can be seen or would clearly affect the area, such as upstream on a waterway 4
5 3.6 Geologic, hydro-geological, hydrologic, or topographic conditions List the conditions and give a general description of the topography in the area. If indicated, analyze the likelihood of contaminant migration on or to the property through the soil or groundwater from the adjacent properties or the surrounding areas. 3.7 Facility information List facilities, their location, number, current/past use, owner, size, number of stories, year constructed, condition and type of construction. 3.8 Roads List all public thoroughfares adjoining the property and describe all roads, streets, parking areas and walkways. 3.9 Water supply List and differentiate all sources of potable and non-potable water Sewage disposal system Describe sewage disposal systems on the property and their general condition and approximate age Fire protection system Describe any fire protection systems on the property 4. INTERNAL AND EXTERNAL OBSERVATIONS To the extent visually/physically observed or identified from interviews or record reviews (list actual source). 4.1 Hazardous material (HM) and petroleum products Describe uses and types of products used on the property, and the approximate amount and storage conditions. Indicate if treatment, storage, disposal, or generation occurred on the property. 4.2 Storage tanks Describe size, location, condition, and approximate age of all above and belowground storage tanks. 4.3 Odours Describe any noticeable odours and their source. 4.4 Pools of liquid Note all surface water and describe all pools or sumps that contain water or other liquids that may contain HM. 4.5 Drums Describe all drums and their conditions. If they are known to contain no HM, list contents only. 5
6 4.6 Hazardous waste (HW) and waste petroleum products Describe all products to include type, amount, and manner/condition of storage. 4.7 Unidentified substance containers Describe any open or damaged containers suspected of containing HM or petroleum products 4.8 Electrical hazards Describe any potential electrical hazard 4.9 Radiological hazards Describe any potential radiological hazard 4.10 PCBs Include a description of electrical or hydraulic equipment likely to contain PCBs Medical/biohazard waste Identify any sources, accumulation and disposal issues 4.12 Internal observations of facilities Heating and cooling systems Describe, to include the fuel source and amount on hand Stains and corrosion Describe stains on floors, walls, and ceilings Drains and sumps Describe floor drains and sumps, characterize any standing fluids and assess where floor drains discharge Other Waste piles, abandoned drums, debris, odours, incinerators, ovens, heaters, etc External observations Pits, ponds and lagoons Describe the pit, pond, or lagoon, especially if it may have been used for HW disposal or waste treatment. Include a discussion and description of any on adjacent or adjoining properties as well Stained soil or pavement 6
7 Describe any stained soil or pavement Stressed vegetation Describe any stressed vegetation and probable cause Non-hazardous solid waste Describe any filled, graded, or mounded areas that would suggest the disposal of trash or solid waste Waste water Describe every discharge of a liquid into a stream or ditch that is adjacent to the property Wells Locate and describe all wells (monitoring, potable, dry, irrigation, injection, abandoned, etc.) on the property Septic systems List indications or the existence of on-site septic systems or cesspools Ambient air quality Smog, smoke, and odours from industrial facilities and many HW products can be detected easily. Terrain can also affect air quality. Mountains and canyons can cause temperature inversions, which impact air quality. Setting up base camps with heating units and vehicles in an area prone to temperature inversions can cause poor air quality. Prevailing winds should also be considered Noise Describe potential noise generating activities Electrical sources Describe electrical sources Unexploded ordnance Identify and ensure clearance before occupation Natural resources Talk to HN personnel regarding threatened or endangered plants or animals, wetlands, floodplains, etc., and describe briefly Cultural resources Talk to HN personnel regarding archaeological sites, cemeteries, historic buildings, monuments, etc., and describe briefly. 7
8 5. ENVIRONMENTAL SAMPLING 5.1 Environmental sampling List the types and quantities of environmental sampling. Describe the sampling plans (types and quantities of environmental samples taken), sampling methods (such as hot spot sampling, grid patterns); and the analyses (field and laboratory) analysis made 5.2 Environmental standards To provide some indication of the relevance of the reported concentrations, list the applicable environmental standards to which comparisons of the results have been made against, e.g. recognised national or international standards (if no host nation standard exist). 6. DELETIONS AND DEVIATIONS Describe all deviations or deletions from either the protocol (checklist) used or the environmental standards currently in use by DPKO/DFS. Discuss each one individually and in detail. 7. FINDINGS AND CONCLUSIONS STATEMENT List the protocol used for the survey, exceptions to the protocol, and any evidence of recognized adverse environmental conditions 8. QUALIFICATION STATEMENT List the qualifications and duty position(s) of the individual(s) preparing the EBS. 9. REFERENCES List the references that has been used and where further information is available regarding methodology, environmental standards, e.g. UNDPKO and UNDFS (United Nations Department of Peacekeeping Operations and United Nations Department of Field Support) Environmental policy for UN field missions: Ref Effective date: 01 June 2009, United Nations, New York, USA. ASTM D (Reapproved 2005) Standard Practice for Conducting Environmental Baseline Surveys. West Conshohocken, PA: ASTM. Appendices List the appendicies included necessary to review the performance and results from the EBS such as; sampling plans and protocols, laboratory results, photos taken, templates used etc etc 8
This publication is available digitally on the AFDPO WWW site at:
BY ORDER OF THE COMMANDER UNITED STATES AIR FORCES IN EUROPE UNITED STATES AIR FORCES IN EUROPE INSTRUCTION 32-7068 16 MARCH 2004 Certified Current on 16 April 2014 Civil Engineering ENVIRONMENTAL BASELINE
More informationENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE
100 Broadway Road, Dracut, MA 01826 ENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE TO BE COMPLETED BY THE APPLICANT ADDRESS: 1a. Is the property used for an industrial use? 1b. Is any adjoining property used
More informationAPPENDIX A TRANSACTION SCREEN QUESTIONNAIRE
APPENDIX A TRANSACTION SCREEN QUESTIONNAIRE Instructions: Interview the owner of the property (or a knowledgeable representative). If the owner is the only major occupant of the property, skip over the
More informationEnvironmental Site Assessment for Lenders April EPA All Appropriate Inquiry and. ASTM Phase I Environmental Site Assessment
Environmental Site Assessment for Lenders April 2017 EPA All Appropriate Inquiry and ASTM Phase I Environmental Site Assessment 1 CONTENT 1. CERCLA Liability & AAI 2. Typical Contaminants Encountered 3.
More informationEnvironmental Questionnaire
CDC Name Applicant Name OC Name(s) (If applicant is an EPC) SBA 504 Loan Number (If assigned) SBA 504 Loan Name (If assigned) PART I - COLLATERAL PROPERTY Address: Current Owner: Current Operator of site
More informationPHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT
PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT Miscellaneous Property Group Various Properties South Burlington, Vermont 05403 October 14, 2011 Prepared for: Stantec Consulting Inc. 55 Green Mountain Drive
More informationFORM 4340 ENVIRONMENTAL QUESTIONNAIRE
FORM 4340 ENVIRONMENTAL QUESTIONNAIRE ENVIRONMENTAL QUESTIONNAIRE Persons to be Questioned The following questions should be asked of the current owner of the property any commercial occupant of the property
More informationPHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT
PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT AIP #74 Various Properties South Burlington, Vermont 05403 October 14, 2011 Prepared for: Stantec Consulting Inc. 55 Green Mountain Drive South Burlington,
More information(this cover page left intentionally blank)
4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant
More informationPHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT
PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT AIP #87 Various Properties South Burlington, Vermont 05403 October 14, 2011 Prepared for: Stantec Consulting Inc. 55 Green Mountain Drive South Burlington,
More informationPHASE I ENVIRONMENTAL SITE ASSESSMENT
PHASE I ENVIRONMENTAL SITE ASSESSMENT 11 Garden Street, Whitby, Ontario SUBMITTED TO: ABC Land Holdings Ltd. Suite 202, 1513 Dundas Street, Whitby, Ontario SUBMITTED BY: GAEA Technologies Ltd. 202, 1614
More informationStormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)
Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater
More informationpatersongroup Phase I - Environmental Site Assessment Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario Prepared For Regional Group
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS M. HAZARDS AND HAZARDOUS MATERIALS 1. ENVIRONMENTAL SITE ASSESSMENT
IV. ENVIRONMENTAL IMPACT ANALYSIS M. HAZARDS AND HAZARDOUS MATERIALS 1. ENVIRONMENTAL SITE ASSESSMENT A Phase I Environmental Site Assessment (Phase I ESA) for the proposed project was prepared by Gradient
More informationSubstation Developments Environmental Guidelines Checklist for Applicants
Substation Developments Environmental Guidelines Checklist for Applicants Effective date: February 1, 2016 These guidelines are intended to be used in conjunction with the flowchart in Figure 1 which conceptually
More informationEnvironmental Assessment Matrix
For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where
More informationGUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK
PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the
More informationENVIRONMENTAL CHECKLIST (WAC )
Fee: $400.00 Date Fee Paid: Received by: 186 Iron Horse Court, Suite 101, Yakima WA 98901 Phone: (509) 834-2050 Fax: (509) 834-2060 Website: http://www.yakimacleanair.org ENVIRONMENTAL CHECKLIST (WAC 197-11-960)
More informationChapter 11: Hazardous Materials A. INTRODUCTION
Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from
More informationAPPENDIX C REQUEST FOR REVIEW, APPLICATION INFORMATION, AND PROJECT COMMENTS
APPENDIX C REQUEST FOR REVIEW, APPLICATION INFORMATION, AND PROJECT COMMENTS Date Case GLENN COUNTY PLANNING AND PUBLIC WORKS AGENCY 777 North Colusa Street WILLOWS, CA 95988 (530) 934-6540 FAX (530)
More informationAPPLICATION PROCESSING
CEQA COMPLIANCE 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 BUSINESS PHONE: (209) 468-3121 Business Hours: 8:00 a.m. to 5:00 p.m. (Monday through Friday) APPLICATION PROCESSING STEPS STEP 1 STEP 2 CHECK
More informationWESTSIDE CREEKS ECOSYSTEM RESTORATION. Appendix G: Hazardous, Toxic and Radioactive Waste
WESTSIDE CREEKS ECOSYSTEM RESTORATION Appendix G: Hazardous, Toxic and Radioactive Waste HAZARDOUS, TOXIC AND RADIOACTIVE WASTE TECHNICAL APPENDIX The US Army Corps of Engineers, Fort Worth District,
More informationAppendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0
Appendix J Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION Version 3.0 April 2015 Table of Contents Section 1 General Information... 1 Section 2 State of Tennessee
More informationSCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE
SCHEDULE FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE This form must be completed in triplicate for any proposed activity
More informationTABLE OF CONTENTS. Page
TABLE OF CONTENTS Page 1 PROJECT INTRODUCTION... 1-1 1.1 PROJECT BACKGROUND... 1-2 1.2 PROJECT PROPONENT... 1-2 1.3 PROJECT OVERVIEW... 1-3 1.4 PROJECT REGULATORY APPROVAL PROCESS... 1-4 1.4.1 Existing
More informationEnvironmental Hazard Evaluations
Environmental Hazard Evaluations Item Type text; Proceedings Authors Ricci, Edward D. Publisher Arizona-Nevada Academy of Science Journal Hydrology and Water Resources in Arizona and the Southwest Rights
More informationpatersongroup Phase I Environmental Site Assessment Vacant, Undeveloped Land 1021 Thomas Spratt Place Ottawa, Ontario Prepared For
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment Vacant, Undeveloped Land 1021
More information15A NCAC 02C.0225 GROUNDWATER REMEDIATION WELLS (a) Groundwater Remediation Wells are used to inject additives, treated groundwater, or ambient air
15A NCAC 02C.0225 GROUNDWATER REMEDIATION WELLS (a) Groundwater Remediation Wells are used to inject additives, treated groundwater, or ambient air for the treatment of contaminated soil or groundwater.
More informationFORM B: ONSITE DISCHARGE OF TREATED EFFLUENT
APPLICATION FOR RESOURCE CONSENT FORM B: ONSITE DISCHARGE OF TREATED EFFLUENT NOTES Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional
More informationAppendix C Chapter 1 Initial Site Assessment Worksheet
Appendix C Chapter 1 Initial Site Assessment Worksheet Contents Section 1 Overview...1-2...1-3 C-1-1 Section 1 Overview Section 1 Overview Disclaimer The following worksheet is an example and provides
More informationSilverdale Water District 2018 Environmental Checklist
PURPOSE OF THE CHECKLIST: Project Name: Construction Agreement No.: Applicant: Abbreviated Legal Description: Assessor s Tax Parcel ID No.: Please read the following carefully before filling out the checklist.
More informationCONDUCTING EFFECTIVE. FACILITY AUDITS and ENVIRONMENTAL ASSESSMENTS. May, 2011
CONDUCTING EFFECTIVE FACILITY AUDITS and ENVIRONMENTAL ASSESSMENTS May, 2011 WHY AUDIT FACILITIES? Minimize Environmental Liabilities Environmental Impacts Human Health Threats Compliance Violations resulting
More informationENVIRONMENTAL CHECKLIST
City of Hoquiam Planning and Building Division 609 8 th St. Hoquiam, WA 98550-3522 Tel: 360-532-5700 ext. 211, Fax: 360-538-0938 Website: www.cityofhoquiam.com ENVIRONMENTAL CHECKLIST Purpose of checklist:
More informationCHECKLIST FOR ECOLOGICAL ASSESSMENT/SAMPLING
CHECKLIST FOR ECOLOGICAL ASSESSMENT/SAMPLING Introduction The checklist that follows provides guidance in making observations for an ecological assessment. It is not intended for limited or emergency response
More informationEnvironmental Information Worksheet
Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project
More informationEnvironmental Baseline Surveys
Environmental Baseline Surveys Negotiating the EBS Process WHY AN EBS? What regulations mandate an EBS? Comprehensive Environmental Response, Compensation, and Liability Act (1980) 40 CFR Part 373 requires
More informationPERMIT APPLICATION FEES Fees must be paid at time of application
Permits SEPA Checklist Permit # Staff use Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful
More informationSEPA Environmental Checklist
Purpose of the Checklist: The State Environmental Policy Act (SEPA), chapter 43.21 RCW, requires all governmental agencies, including the City of Ferndale to consider the environmental impacts of a proposal
More informationAppendix A Stormwater Site Plan Report Short Form
Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within
More informationAPPENDIX F ASTM USER QUESTIONNAIRE
APPENDIX F ASTM USER QUESTIONNAIRE Project No. 366158 December 16, 2016 2009 and 2011 Addison Street, Berkeley, CA 94704 Mark Morrisette December 5, 2016 Unknown Unknown property engineering controlsinstitutional
More informationNiagara College Greenhouse Nursery 135 Taylor Road, Niagara-on-the-Lake, Ontario Phase I Environmental Site Assessment
Niagara College Greenhouse Nursery 135 Taylor Road, Niagara-on-the-Lake, Ontario Phase I Environmental Site Assessment Prepared by: Sunmola Abeeb Environmental Management & Assessment, Niagara College
More informationWhat is an illicit discharge?
What is an illicit discharge? The EPA defines an illicit discharge as any discharge to the municipal separate storm sewer system (MS4) that is not composed entirely of stormwater, except for discharges
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationUnderstanding the Water System
W Water Is a Natural Resource Understanding the Water System Cost WATER QUALITY in KENTUCKY The Water Cycle Figure 1. Trends in Water Withdrawals and Population, 1950 to 1995. Millions of People/Billion
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields
DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields DOCUMENT NUMBER: 260-0500-001 TITLE: Policy for Coordinating Immediate Responses and Final Remediation of Releases
More informationApplication fee: $ payable to Stevens County Land Services A completed environmental checklist Any other supplemental information.
SEPA CHECKLIST FOR ENVIRONMENTAL REVIEW STEVENS COUNTY LAND SERVICES PLANNING DIVISION Street Address: 260 S. Oak Courthouse Annex, Colville, WA Mailing Address: 215 S. Oak Courthouse Annex, Colville,
More informationF3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report
F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Air Quality & Odour Net Effects Analysis
More informationRCRA CLOSURE OF MATERIALS DISPOSAL AREA P, LOS ALAMOS NEW MEXICO. Criswell, C.William Roy F. Weston Inc., Albuquerque, New Mexico
RCRA CLOSURE OF MATERIALS DISPOSAL AREA P, LOS ALAMOS NEW MEXICO Criswell, C.William Roy F. Weston Inc., Albuquerque, New Mexico Bostick, Kenneth V., EES-15 Richard Romero, ESH-19, Los Alamos National
More informationF3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report
F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis
More informationPRELIMINARY ASSESSMENT TECHNICAL GUIDANCE
PRELIMINARY ASSESSMENT TECHNICAL GUIDANCE Josh Gradwohl NJDEP, Bureau of Case Assignment and Initial Notice Kathi Stetser Roux Associates, Inc. PRELIMINARY ASSESSMENT PURPOSE GUIDANCE To provide investigators
More informationINCOMPLETE APPLICATION WILL NOT BE ACCEPTED.
CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Port Orchard, WA 98366 (360) 874-5533 permitcenter@cityofportorchard.us SEPA ENVIRONMENTAL
More informationAPPLICATION PROCESSING
CEQA COMPLIANCE 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 BUSINESS PHONE: (209) 468-3121 Business Hours: 8:00 a.m. to 5:00 p.m. (Monday through Friday) APPLICATION PROCESSING STEPS STEP 1 STEP 2 CHECK
More informationpatersongroup Phase I - Environmental Site Assessment Retirement Home Colonial Road Ottawa (Sarsfield), Ontario Prepared For
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archeological Studies Retirement Home - 2980 Colonial Road Ottawa
More informationDraft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report
Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis & Prepared By: JANUARY, 2014 Executive Summary Two expansion alternatives were
More informationGRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW
GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation
More informationErosion & Sedimentation Control Policy
Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of
More informationSTORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No
STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total
More informationImplementation of Underground Injection Control Program Regulations for Class V Shallow Disposal Systems
Implementation of Underground Injection Control Program Regulations for Class V Shallow Disposal Systems CPOW 2016 Annual Education Conference Lakewood, Colorado January 21, 2016 Wendy Cheung Underground
More informationPurpose - Minimize or eliminate potential adverse impacts of waste or produced water from drilling operations.
Evaporative Pond Facilities Policies Purpose - Minimize or eliminate potential adverse impacts of waste or produced water from drilling operations. Requires a Conditional Use Permit. Provides guidance
More informationNUISANCE AND GENERAL SANITATION REGULATION
Province of Alberta PUBLIC HEALTH ACT NUISANCE AND GENERAL SANITATION REGULATION Alberta Regulation 243/2003 With amendments up to and including Alberta Regulation 162/2014 Office Consolidation Published
More informationIf you have any questions, feel free to contact the office of the Planning Commission at
Attention: Enclosed, is an application for a zoning permit for the Townships of Amboy, Franklin, Fulton & York. You may return your application and check made payable to: ZONING FEES Fulton County Regional
More informationA tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River.
4.5.1.3 DEWATERING DESCRIPTION Dewatering techniques are methods of addressing extracted ground or surface water encountered during construction. This temporary BMP addresses the installation and maintenance
More informationPreliminary Land Hazard Assessment
Inter-American Development Bank Environmental Safeguards Unit TECHNICAL NOTE Preliminary Land Hazard Assessment No. IDB - TN - 533 An Aid for Non-Specialists Author: Alexander Wardle, C.Geol, CPG. Contributors:
More informationReclamation Manual Design Data Collection Guidelines Chapter 5 Typical Design Data Package Template
Reclamation Manual The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing a design data collection request, design data collection
More informationCity of Grand Junction Illicit Discharge Detection and Elimination Manual
City of Grand Junction Illicit Discharge Detection and Elimination Manual A. IDDE Program Goals The goal of the Illicit Discharge Detection and Elimination (IDDE) Program is, to the maximum extent practicable,
More informationHAZARDOUS MATERIAL ASSESSMENT
DIVISION 2 EXISTING CONDITIONS Includes the following sections: 02 26 00 Hazardous Material Assessment 02 41 00 Demolition 02 41 13 Selective Site Demolition 02 41 19 Selective Structure Demolition 02
More informationPrepared for Florida State University Facilities Planning& Construction By Environmental Health & Safety Tallahassee, Fl
SITE ASSESSMENT CHECKLIST FOR DEMOLITION AND RENOVATION PROJECTS INSERT BUILDING NAME FSU BUILDING NUMBER XXX CAMPUS OF FLORIDA STATE UNIVERSITY TALLAHASSEE, FLORIDA Prepared for Florida State University
More informationConceptual Site Model Considerations - Terrestrial/Groundwater
Site Description Site Conditions Location: Size: Site Status: Active Inactive Unknown Describe present site conditions using information obtained during property inspection or sitespecific documents to
More informationINTERNAL AUDIT DIVISION REPORT 2018/127. Audit of waste management in the United Nations Interim Security Force for Abyei
INTERNAL AUDIT DIVISION REPORT 2018/127 Audit of waste management in the United Nations Interim Security Force for Abyei Despite the challenging environment and several initiatives launched, significant
More informationApplication for Gas Exploration and Production
1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for
More informationGENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION
GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA March 25, 2006 INTRODUCTION This document is intended to provide general guidance for use in conducting
More informationENVIRONMENTAL/SANITARY CODES OF JEFFERSON COUNTY, KANSAS CHAPTER II: WASTEWATER DISPOSAL
ENVIRONMENTAL/SANITARY CODES OF JEFFERSON COUNTY, KANSAS CHAPTER II: WASTEWATER DISPOSAL SECTION 2-1.0 PURPOSE AND INTENT OF CODE: Domestic wastewater is a potential source of disease and water pollution,
More informationCITY OF SNOHOMISH 116 UNION AVENUE SNOHOMISH, WASHINGTON (360)
CITY OF SNOHOMISH 116 UNION AVENUE SNOHOMISH, WASHINGTON 98290 (360) 568 3115 WWW.SNOHOMISHWA.GOV STATE ENVIRONMENTAL POLICY ACT (SEPA) CHECKLIST PURPOSE OF CHECKLIST The State Environmental Policy Act
More informationCITY OF SNOHOMISH 116 UNION AVENUE SNOHOMISH, WASHINGTON (360)
CITY OF SNOHOMISH 116 UNION AVENUE SNOHOMISH, WASHINGTON 98290 (360) 568 3115 WWW.SNOHOMISHWA.GOV STATE ENVIRONMENTAL POLICY ACT (SEPA) CHECKLIST PURPOSE OF CHECKLIST The State Environmental Policy Act
More informationINDUSTRIAL WATER & SEWER USE SURVEY. 3. Operator (If different from the Owner, the name of the person, or firm, legally the operating the facility):
INDUSTRIAL WATER & SEWER USE SURVEY 1. Facility (PROVIDE THE OFFICIAL OR LEGAL NAME OF THE FACILITY) 2. Owner - The name of the person, firm, or organization that legally owns the facility. 3. Operator
More informationApplication fee of $150.00, payable to Stevens County Land Services A completed environmental checklist Any other supplemental information.
SEPA CHECKLIST FOR ENVIRONMENTAL REVIEW STEVENS COUNTY LAND SERVICES PLANNING DIVISION Street Address: 260 S. Oak Courthouse Annex, Colville, WA Mailing Address: 215 S. Oak Courthouse Annex, Colville,
More informationCITY OF MERCER ISLAND
Exhibit B CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergov.org Inspection Requests: Online: www.mybuildingpermits.com VM: 206.275.7730
More informationSpill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts
SPCC PLAN Raytheon Company Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts 6 November 2002 143.65 Environmental Resources Management
More informationIX: HAZARDOUS WASTE MANAGEMENT
IX: HAZARDOUS WASTE MANAGEMENT 9.0 INTRODUCTION The Government of India has promulgated the Hazardous Waste (Management and Handling) Rules, 1989 and the aegis of Environment (Protection) Act, 1886 through
More informationStreamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators
Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information
More informationPhase I Environmental Site Assessment
Phase I Environmental Site Assessment 97204 Prepared for: Multnomah County 401 NE Dixon Avenue, Suite 274 97227 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 1 2.0 PROPERTY AND REPORT INFORMATION... 3 2.1
More informationIntroduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and
Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that
More informationENVIRONMENTAL CHECKLIST
Purpose of checklist: City of Bremerton Department of Community Development 345-6 th Street, Suite 600 Bremerton, WA 98337-1873 Phone: (360) 473-5275 Fax: (360) 473-5278 ENVIRONMENTAL CHECKLIST UPDATED
More informationSANKO GEOTHERMAL POWER PROJECT EFFLUENT MANAGEMENT PLAN
Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal
More informationCHAPTER 6 - How to Prepare a SWPPP
All construction sites which disturb an area of 1 acre or more, currently need a UPDES permit from the State of Utah. As a condition of the permit, a Stormwater Pollution Prevention Plan (SWPPP) must be
More informationInformation Requirements Table for Liquid Waste
Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry
More informationSURVEYING EXCESS DOE FACILITIES FOR TRANSFER TO DEACTIVATION AND DECOMMISSIONING
SURVEYING EXCESS DOE FACILITIES FOR TRANSFER TO DEACTIVATION AND DECOMMISSIONING C. A. Negin, Project Enhancement Corporation J. P. Hayfield, Jr., Polestar Applied Technology, Inc. A. P. Szilagyi, U. S.
More informationO Road Corridor Improvements Feasibility Analysis
O Road Corridor Improvements Feasibility Analysis Prepared for Mesa County by Amec Foster Wheeler December 2017 Table of Contents List of Appendices... i Executive Summary... 1 Background... 1 Report Structure...
More informationTITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 616. INDUSTRIAL WASTEWATER SYSTEMS SUBCHAPTER 1. INTRODUCTION [AMENDED]
TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 616. INDUSTRIAL WASTEWATER SYSTEMS SUBCHAPTER 1. INTRODUCTION [AMENDED] 252:616-1-1. Purpose 252:616-1-2. Definitions [AMENDED] 252:616-1-2. Definitions
More informationROADS: OPERATION AND MAINTENANCE
ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service
More informationEnvironmental Design Criteria for Project Engineering
Environmental Design Criteria for Project Engineering Argentina Mining, Salta, September 2018 Simon Catchpole, February 2016 An Environmental Risk Model In the EA phase, the environmental professionals
More informationEnvironmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
More informationGuidance on each of the 23 basic elements follows: Plan Index showing locations of required items: The plan index should include a list of the
Guidance on each of the 23 basic elements follows: A1 Plan Index showing locations of required items: The plan index should include a list of the required items in the rule and where they occur in the
More informationCW EXISTING SERVICES, UTILITIES AND STRUCTURES TABLE OF CONTENTS
February 2003 CW 1120 - EXISTING SERVICES, UTILITIES AND STRUCTURES TABLE OF CONTENTS 1. DESCRIPTION...1 1.1 General...1 1.2 Standard Construction Specification References...1 1.3 Standard Detail Drawing
More informationAppendix B Stormwater Site Plan Submittal Requirements Checklist
Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following
More informationSEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM
SEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM This form shall be completed in its entirety by a New Hampshire certified or licensed septic system evaluator. This form shall be signed by both the septic
More informationGuidance Document for Storm Water Pollution Prevention Plan (SWPPP) Submittal. A2 Plat showing building lot numbers/boundaries and road layout/names:
Exhibit SW12-3 Page 1 of 10 Guidance Document for Storm Water Pollution Prevention Plan SECTION A CONSTRUCTION PLAN ELEMENTS A1 Plan Index showing locations of required items: The plan index should include
More informationParlee Beach Water Quality Summary
Parlee Beach Water Quality Summary Introduction This document presents a summary of the report of the Steering Committee for the Parlee Beach Water Quality project. The Committee was comprised of representatives
More informationAppendix A: SWPPP Template Instructions
Appendix A: SWPPP Template Instructions To help you develop the narrative section of your construction site SWPPP, EPA has created this electronic SWPPP template. The template is designed to help guide
More informationENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009
ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,