1 DRAFT MONITORING AND MAINTENANCE PLAN FOR HARDSCAPE AND METHANE AND H2S MONITORING PROBES AOI S. Moreno Drive Beverly Hills, CA Prepared for: BEVERLY HILLS UNIFIED SCHOOL DISTRICT 255 S. Lasky Drive Beverly Hills, CA EAI Project No June 10, 2016 Prepared by: ENVIRONMENTAL AUDIT, INC A Ortega Way Placentia, CA (714) = Phone (714) = Fax

2 TABLE OF CONTENTS 1.0 INTRODUCTION SITE DESCRIPTION ASSESSOR S PARCEL NUMBER LAND USE BACKGROUND INFORMATION AREA DESIGNATIONS INVESTIGATIONS REMOVAL ACTION FOR AOI REMEDIAL ACTION PLAN LAND USE COVENANT AND SOIL MANAGEMENT PLAN CHEMICALS OF POTENTIAL CONCERN BASELINE INSPECTION, MONITORING AND REPORTING BASELINE INSPECTION Hardscape Areas Monitoring Probes Interior Building Areas MONITORING Hardscape Areas Monitoring Probes Interior Building Areas REPORTING RESPONSE ACTIONS DAMAGED/DETERIORATED HARDSCAPE RESPONSE TO SEISMIC EVENT RESPONSE TO ELEVATED METHANE OR H2S READINGS LIMITATION REFERENCES SAB:2751:M&M:PLAN JUN2016 i EAI Project No. 2751

3 FIGURES 1: Site Location Map 2: Site Plan 3: Area of Interest Locations 4: Site Plan with Historical Oil Field Uses 5: Proposed Soil Vapor Probe Locations APPENDIX A: Monitoring Logs B: Soil Vapor Probe Construction Details TABLE OF CONTENTS SAB:2751:M&M:PLAN JUN2016 ii EAI Project No. 2751

4 1.0 INTRODUCTION On behalf of the Beverly Hills Unified School District (BHUSD), Environmental Audit, Inc. (EAI) is submitting this Monitoring and Maintenance Plan (M&M Plan) for hardscape and methane and hydrogen sulfide (H2S) monitoring probes in Area of Interest 5 (AOI 5) at the Beverly Hills High School (BHHS) located at 241 S. Moreno Drive, Beverly Hills, Los Angeles County, California (Site) (see Figure 1 and Figure 2) to the Department of Toxic Substances Control (DTSC) for review and approval. The BHUSD is proposing improvements and code upgrades to structural, mechanical, electrical, and plumbing systems at the BHHS, as well as demolition of certain facilities, and construction of new facilities, including an underground parking structure. The purpose of the M&M Plan is to describe the requirements necessary to effectively monitor and properly maintain hardscape areas, which function as an effective barrier between contaminants detected in soil and students, faculty and staff, and methane and H2S probes located in AOI 5 of the BHHS. The M&M Plan also outlines notification policies and procedures for discovery of damage or deterioration from use, weather, seismic activities, as well as any planned alternation from digging or excavation. SAB:2751:M&M:PLAN JUN EAI Project No. 2751

5 2.0 SITE DESCRIPTION The Site is located on the northwest corner of the intersection of West Olympic Boulevard and Spalding Drive in Beverly Hills with an address of 241 S. Moreno Drive (see Figure 1). The Site is comprised of approximately 25 acres of real property that is presently identified as the BHHS. The BHHS is covered by buildings, asphalt and concrete pavement, artificial turf, grass fields and landscaping (see Figure 2). Since 1979, all oil production activities have been consolidated and limited to an approximately 0.6 acre oil production facility located at the southwest corner of the BHHS that currently is and has been operated by Venoco Inc. since ASSESSOR'S PARCEL NUMBER The Site is identified by the County of Los Angeles by the following Assessor's Parcel Numbers: 2.2 LAND USE Size Assessor's Parcel Number (acres) ± ± ±5.32 Total ±25.11 The BHHS, which teaches ninth through twelfth graders (9 12), was originally built in 1927 by the Los Angeles High School District and became part of the BHUSD in Prior to development, the real property on which the school is located was primarily vacant land, but did include oil exploration activities. Land use surrounding the Site is a mixture of residential and commercial development (see Figure 2). Land use west of the BHHS is commercial, with residential development surrounding the campus in all other directions. SAB:2751:M&M:PLAN JUN EAI Project No. 2751

6 3.0 BACKGROUND INFORMATION 3.1 AREA DESIGNATIONS For purposes of assessment and reporting, the BHHS has been divided into eight areas of interest identified as follows (see Figure 3): Area of Interest Acres AOI 1 ±2.2 AOI 2 ±0.9 AOI 2A ±1.4 AOI 3 ±0.22 AOI 4 ±3.6 AOI 5 ±4.7 AOI 6 ±7.0 AOI 7 ±4.6 An approximately 0.6 acre oil production facility is located at the southwest corner of the BHHS that currently is and has been operated by Venoco Inc. since 1995 (see Figure 3), which coupled with the areas of interest comprise the school site. 3.2 INVESTIGATIONS Investigations have been conducted for all areas of interest at the BHHS under the oversight of the DTSC (see Section 4.0). These investigations identified chemicals in soil at all areas of interest at the BHHS, except AOI 3, at levels that require mitigation or remediation. A vapor intrusion human health risk assessment conducted for the BHHS using the maximum concentrations of all volatile organic compounds (VOCs) detected in soil gas and school exposure scenarios, estimated the incremental lifetime cancer risk (ILCR) to: (1) students at less than one per million for all areas of interest, except AOI 6. The area of AOI 6 where the estimated risks were greater than one per million is the location of the proposed underground parking structure; and (2) staff at less than one per million for all areas of interest, except AOI 6 and AOI 7. The ILCR for AOI 7 was estimated at 1.3 per million. AOI 7 currently is and will remain a play field with no habitable structures upon completion of the improvement project (see EAI, 2016C). Methane and H2S were detected in some areas of the BHHS at levels that require mitigation. 3.3 REMOVAL ACTION FOR AOI 1 A removal action (excavation and off site disposal of soil impacted with arsenic, total petroleum hydrocarbons as diesel [TPH D] and dieldrin) was completed in November 2015 for AOI 1 (see EAI, 2015H) and approved by DTSC in a letter dated January 7, Portable trailers have SAB:2751:M&M:PLAN JUN EAI Project No. 2751

7 been installed in AOI 1 and will be used to temporary house students, faculty and staff during the improvement project, which will be conducted in phases over several years. 3.4 REMEDIAL ACTION PLAN The BHUSD is in the process of preparing a Remedial Action Plan (RAP) to address contamination in other areas of the BHHS. 3.5 LAND USE COVENANT AND SOIL MANAGEMENT PLAN Because the risk assessment assumed exposure scenarios based on school use and soil above screening levels will remain at depths deeper than 5 feet, and existing hardscape areas will continue to be used as a barrier to prevent exposure to soil contamination, a deed restriction/land use covenant (LUC) will be recorded that prevents residential use of all real property that comprises the BHHS. A Soil Management Plan (SMP) has been submitted to DTSC providing guidance and protocols for conducting non remedial excavation work at the BHHS, such as excavation for footing extensions and micropile installation for seismic retrofitting of existing buildings, and trenching for the installation of new utility lines (see EAI, 2016D). SAB:2751:M&M:PLAN JUN EAI Project No. 2751

8 4.0 CHEMICALS OF POTENTIAL CONCERN The results of assessment work conducted to date for AOI 5 are provided primarily in three EAI reports for the BHHS titled "Draft Preliminary Endangerment Assessment Report, AOI 2A, AOI 4, AOI 5, AOI 6 and AOI 7," dated December 14, 2015, "Draft Vapor Intrusion Human Health Risk Assessment Addendum," dated February 2, 2016, and "Draft Revised Preliminary Endangerment Assessment Report AOI 5," dated June 8, The results of background research conduct for the BHHS and surrounding properties identified historical (see Figure 4) and current oil field activities as well as historical and current school buildings as sources of potential contamination that requires evaluation. The chemicals of potential concern (COPC) in soil by suspected sources are identified as follows: Oil Field Activities Total petroleum hydrocarbons as gasoline (TPH G), diesel (TPH D) and oil (TPH O). Volatile organic compounds (VOCs). Semi volatile organic compounds (SVOCs). Title 22 Metals. Historical/Current School Buildings Lead. Arsenic. Organochlorine pesticides (OCPs). Polychlorinated biphenyls (PCBs). The source(s) of potential contamination by area of interest is as follows: Use Area of Interest Oil Field School AOI 1 AOI 2 AOI 2A AOI 3 AOI 4 AOI 5 AOI 6 AOI 7 The chemicals detected in soil at AOI 5 above screening levels are as follows (see EAI, 2016E): SAB:2751:M&M:PLAN JUN EAI Project No. 2751

9 Chemical Landscape Hardscape Arsenic Cobalt Lead Total Chlordane 4,4' DDE Dieldrin PCB 1254 SAB:2751:M&M:PLAN JUN EAI Project No. 2751

10 5.0 BASELINE INSPECTION, MONITORING AND REPORTING Funding is presently available only for upgrading Buildings B1, B2 and B3 and all three buildings are currently vacant and will remain vacant until completion of the improvements. Improvements to Building B4 will not be initiated until funding is available. Interior upgrades for Buildings B1, B2 and B3 are scheduled to commence in June 2016 and do not require DTSC approval. Structural/seismic upgrades for Buildings B1, B2 and B3 are scheduled to begin in October 2016 and do require DTSC approval since soil will be excavated to expose and expand the footings. Improvements to Buildings B1, B2 and B3 are anticipated to be completed by the end of During this time period, students, faculty and staff normally located in Buildings B1, B2 and B3 will be housed in the temporary trailers located in AOI 1 (see Figure 3) and/or other areas of the campus. All monitoring, inspection and reporting will be conducted under the supervision of properly trained and certified personnel, e.g., registered geologist, registered engineer or certified industrial hygienist. 5.1 BASELINE INSPECTION Hardscape Areas Prior to implementation of the M&M Plan, an inspection of the hardscape areas will be conducted to identify each hardscape area, e.g., Building B1, Hardscape Area A, and to document the baseline condition of each hardscape area. It should be noted that excavation for footing extensions and micropile installation for seismic retrofitting of Building B1, Building B2, Building B3 and Building B4 will be conducted first and will require excavation in hardscape areas to expose and expand the footings, followed by repaving of the excavated areas. This excavation work will be conducted in accordance with the requirements contained in the SMP (see EAI, 2016D). Once this work has been completed, hardscape areas and the baseline condition of each hardscape area will be identified, including photographs, and a figure provided to DTSC documenting hardscape area locations Monitoring Probes For the reasons discussed in Section 5.1.1, the six additional probes (A5 SG7 through A5 SG12) to be installed for methane and H2S monitoring (see Figure 4 and EAI, 2016E) will be installed following completion of the seismic retrofitting of Building B1, Building B2 and Building B3. In the event any of the existing probes (A5 SG1 through A5 SG6) are destroyed or damaged during implementation of the improvement program, they will be replaced at the time the new probes are installed. Once this work has been completed, a figure and survey data will be provided to DTSC documenting probe locations. SAB:2751:M&M:PLAN JUN EAI Project No. 2751

11 5.1.3 Interior Building Areas Building upgrades may require modification of the interior layout of Building B1, Building B2, Building B3 and/or Building B4. Since selected interior areas of Building B1, Building B2, Building B3 and Building B4 will be monitored for methane and H2S, a figure depicting proposed interior building monitoring areas will be provided to DTSC for review and approval once interior upgrades are completed. 5.2 MONITORING Quarterly monitoring is proposed to be performed for the first three years, after which EAI is recommending that the monitoring data be reviewed and evaluated by DTSC to determine if the frequency of monitoring can be reduced to semi annual or annual. Regardless of the monitoring frequency, in the event of a significant seismic event (see Section 6.2), monitoring will be conducted within 24 hours of the event. Prior to use in the field, all instruments utilized for monitoring purposes will be properly calibrated, prior to each monitoring event, in accordance with the manufacturer's specifications. If a monitoring event identifies a hardscape area damaged or degraded to where underlying soil could be exposed or elevated methane or H2S readings, DTSC will be notified with 24 hours of the discovery and response actions implemented as outlined in Section Hardscape Areas Visual monitoring of the integrity of hardscape areas will be conducted to document the condition of each area and the results recorded on the Hardscape Monitoring Log (see Appendix A). Areas that are identified as being damaged or degraded to where underlying soil could be exposed, if not repaired, will be repaired immediately. The monitoring logs will create a chronological record of the integrity of each hardscape area to function as a barrier between contaminants detected in soil and students, faculty and staff Monitoring Probes Methane monitoring will be conducted for the vapor probes (see Figure 5) utilizing a Landtec GEM 2000 gas monitor and H2S a Jerome 631X analyzer. Three purge volumes of air will be removed from the probes prior to sampling (methane first followed by H2S) and the results recorded on the Vapor Probe Monitoring Log Methane and Hydrogen Sulfide (see Appendix A). In addition to sampling, the integrity of the probes will be assessed and repairs or replacement completed as necessary and documented in the monitoring report. SAB:2751:M&M:PLAN JUN EAI Project No. 2751

12 Existing probes A5 SG1 through A5 SG6 are triple nested, except A5 SG5, all containing probes at 5 and 15 feet, and 24 or 30 feet. Existing probe A5 SG5 is double nested at 5 and 15 feet and all the new probes (A5 SG7 through A5 SG12) will be double nested at 5 and 15 feet. Appendix B contains the soil vapor probe construction details for the existing probes, and the new probes will be constructed identical to A5 SG5. Monitoring will be conducted for the probes at depths of 5 and 15 feet Interior Building Areas Methane monitoring will be conducted for interior building areas utilizing a Landtec GEM 2000 gas monitor and H2S a Jerome 631X analyzer. The results will be recorded on the Building Monitoring Log Methane and Hydrogen Sulfide (see Appendix A). 5.3 REPORTING Quarterly monitoring reports are proposed to be submitted electronically to DTSC (Scarlett Xihong Zhai, PhD Xihong.Zhai@dtsc.ca.gov) in accordance with the following schedule: Reporting Period Report Due Date January March April 30 April June July 31 July September October 31 October December January 31 The reports will include the monitoring logs, figures and photographs and describe: Results of visual inspection of hardscape areas and probes. Comparison and discussion of inspection results against baseline data. Description of any repairs or improvements to hardscape areas and/or probes. Description of any significant changes in Site conditions or usage. Description of any response/contingency actions implemented. Copies of the monitoring logs and reports will be maintained on site in the Facilities and Planning Department Office. SAB:2751:M&M:PLAN JUN EAI Project No. 2751

13 6.0 RESPONSE ACTIONS 6.1 DAMAGED/DETERIORATED HARDSCAPE Hardscape areas that are identified as being damaged or degraded to where underlying soil could be exposed, if not repaired, will be repaired immediately. An initial response action, prior to repaving, may be required. The initial action will include closure of the damaged area using barricades or other means, and may require the damaged area to be covered with heavy plastic sheeting until the area is repaved. Air monitoring during repaving work will be conducted in accordance with requirements of the SMP (see EAI, 2016D). 6.2 RESPONSE TO SEISMIC EVENT For the purposes of response planning, a significant seismic event is defined herein as the following "an earthquake of magnitude 5.0 or greater on the Richter Scale within 10 horizontal miles of the Site, recorded at a seismometer station." The following outlines the actions to be implemented within 24 hours of a significant seismic event: Conduct an inspection of hardscaped areas for cracking or other damage. Conduct an inspection of interior and exterior building spaces. Conduct a monitoring event as described in Section 5.2. If significant methane or H2S concentrations are detected in monitoring probes or inside the buildings pursuant to the guidelines contained in Section 6.3, implemented response actions and immediately notify DTSC. Prepare and submit an Incident Report to DTSC as soon as possible. 6.3 RESPONSE TO ELEVATED METHANE OR H2S READINGS Methane has not been detected in soil gas samples collected from any depth, i.e., 5, 15, 24 and 30 feet, in AOI 5 at or above the 5,000 parts per million volume (ppmv) guidance provided by DTSC for school sites (see DTSC, 2005) or the H2S guidance of ppmv. For purposes of determining the need for a response action, the following criteria are proposed for probe and indoor air readings: Methane H2S Source (ppmv) (ppmv) Response Probe 5, Check Indoor Air Readings. SAB:2751:M&M:PLAN JUN EAI Project No. 2751

14 Source Methane (ppmv) H2S (ppmv) Response (1) Indoor Air 2, Notify DTSC within 24 hours. Increase Air Exchange Rate In Affected Area, Re Test Indoor Air. If Re Test is Good (2), no Further Action is Required, other than submittal of an Incident Report. If Re Test is Bad, Evacuate Area and Contact DTSC to Determine Appropriate Course of Action. (1) Increase in air exchange rate to be completed/certified by a licensed HVAC contractor and certification include in the Incident Report. (2) Re test will include two events, the first 8 hours after increasing the air exchange rate and the second 24 hours after the first event. SAB:2751:M&M:PLAN JUN EAI Project No. 2751

15 7.0 LIMITATION Our professional services have been performed using the degree of knowledge, diligence, care, and skill ordinarily used under similar circumstances, by reputable environmental consultants practicing in this or similar localities at this time. EAI assumes that the information provided by third parties is true, accurate, and reliable. This report has been prepared for the BHUSD. Use of this report by any other party shall be at such party's sole risk. No other warranty, expressed or implied, is made as to the professional advice contained in this report. This report was prepared by the undersigned. Respectfully submitted, ENVIRONMENTAL AUDIT, INC. Brian C. Beltz, PG Project Geologist Brent H. Mecham, PG, REPA Project Manager Steven A. Bright, REP, REPA President SAB:BCB:BHM:sms SAB:2751:M&M:PLAN JUN EAI Project No. 2751

16 8.0 REFERENCES Department of Toxic Substances Control, "Advisory on Methane Assessment and Common Remedies at School Sites," dated July 2005 (DTSC, 2005). Environmental Audit, Inc., "Preliminary Endangerment Assessment Work Plan, Beverly Hills High School, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated May 1, 2015 (EAI, 2015A). Environmental Audit, Inc., "Field Sampling Work Plan for AOI 1, AOI 2A, AOI 4, AOI 5, AOI 6 and AOI 7,, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated July 1, 2015 (EAI, 2015B). Environmental Audit, Inc., "Draft Preliminary Endangerment Assessment Report, AOI 1, AOI 2, and AOI 3 (Temporary Trailer Locations),, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated July 30, 2015 (EAI, 2015C). Environmental Audit, Inc., "Amendment to Draft Preliminary Endangerment Assessment Report, AOI 1, AOI 2, and AOI 3 (Temporary Trailer Locations),, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated August 11, 2015 (EAI, 2015D). Environmental Audit, Inc., "Draft Removal Action Work Plan AOI 1 (Temporary Trailer Location),, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated September 3, 2015 (EAI, 2015E). Environmental Audit, Inc., "Responses to DTSC Comments on Draft Removal Action Work Plan AOI 1 (Temporary Trailer Location),, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated October 13, 2015 (EAI, 2015F). Environmental Audit, Inc., "Draft Preliminary Endangerment Assessment, AOI 2A, AOI 4, AOI 5, AOI 6, and AOI 7,, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated December 14, 2015 (EAI, 2015G). Environmental Audit, Inc., "Draft Removal Action Completion Report for AOI 1, Beverly Hills High School, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated December 16, 2015 (EAI, 2015H). Environmental Audit, Inc., "Response to DTSC Comment on Draft Removal Action Completion Report for AOI 1,, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated January 6, 2016 (EAI, 2016A). SAB:2751:M&M:PLAN JUN EAI Project No. 2751

17 Environmental Audit, Inc., "Response to DTSC Request for Information on Nested Soil Vapor Probes A2 SG4A and SG5A,, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated January 14, 2016 (EAI, 2016B). Environmental Audit, Inc., "Draft Vapor Intrusion Human Health Risk Assessment Addendum,, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated February 2, 2016 (EAI, 2016C). Environmental Audit, Inc., "Draft Soil Management Plan for Non Remediation Projects, Beverly Hills High School, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated April 20, 2016 (EAI, 2016D). Environmental Audit, Inc., "Draft Revised Preliminary Endangerment Assessment Report AOI 5,, 241 S. Moreno Drive, Beverly Hills, CA 90212," dated June 8, 2016 (EAI, 2016E). SAB:2751:M&M:PLAN JUN EAI Project No. 2751

18 FIGURES SAB:2751:M&M:PLAN JUN2016 EAI Project No. 2751

19 AF T DR SITE SOURCE: USGS TOPOGRAPHIC 7.5 MINUTE SERIES Beverly Hills, California Quadrangle (Revised 1995) SITE LOCATION MAP 241 S. Moreno Drive Beverly Hills, CA Project No N:\2751\SiteLocMa.cdr Figure 1

20 E U EN NT AV A R DU RESIDENTIAL VE S I DR N BI VE L G B4 I DR N OU LASKY DRIVE RESIDENTIAL SPALDING DRIVE B RO Y RESIDENTIAL B3 MO RE NO DR IV A E AF T B2 E B1 H TH EA AV U EN E F PFO H R PA K DR COMMERCIAL CE RY U NT VENOCO FACILITY D AR EV L C PI U BO RESIDENTIAL YM OL BUILDING DESCRIPTION BLDG A Main Class Rooms BLDG B1 Domestic Science BLDG B2 Old Class Rooms BLDG B3 Peters Auditorium BLDG B4 Salter Wing BLDG E Gymnasium BLDG F Swim Gym BLDG H Food Services BLDG L Science & Technology BLDG PFO Portable Facility Offices SOURCE: Google (04/23/14) SITE PLAN 241 S. Moreno Drive Beverly Hills, CA Project No N:\2751\Site Plan (rev.2).cdr 0 ~175 Figure 2

21 E U EN NT AV A R DU RESIDENTIAL VE S I DR N BI FORMER DIESEL UST VE L G B4 I DR N OU LASKY DRIVE RESIDENTIAL SPALDING DRIVE B RO Y RESIDENTIAL B3 MO AOI 4 RE NO AOI 5 3. Acres A DR IV 4.7 Acres E POSSIBLE HISTORIC SUMP LOCATIONS (BEFORE 1928) AF T B2 AOI 6 F 7.0 Acres E B1 MARS OIL CO. RODEO 114 PFO H AOI Acres COMMERCIAL AOI Acres BEVERLY HILLS OIL CO. RODEO 106 CHEVRON U.S.A INC. RODEO 107 CHEVRON U.S.A INC. RODEO 115 AOI 7 AOI 2 4. Acres 0.90 Acres LIKELY HISTORIC SUMPS AND SPILLS (BEFORE 1928) DR FORMER OIL TANKS R PA K AOI 2A 1.4 Acres RY U NT BEVERLY HILLS OIL CO. BEVERLY HILLS HIGH SCHOOL 1 VENOCO FACILITY CE BEVERLY HILLS OIL CO. BEVERLY HILLS HIGH SCHOOL 2 D AR EV L C PI U BO RESIDENTIAL YM OL BUILDING DESCRIPTION BLDG A Main Class Rooms BLDG B1 Domestic Science BLDG B2 Old Class Rooms BLDG B3 Peters Auditorium BLDG B4 Salter Wing BLDG E Gymnasium BLDG F Swim Gym BLDG H Food Services BLDG L Science & Technology BLDG PFO Portable Facility Offices EXPLANATION PROPOSED TEMPORAR TRAILER LOCATION ABANDONED OIL WELL SOURCE: Google (04/23/14) 0 ~175 AREA OF INTEREST LOCATIONS 241 S. Moreno Drive Beverly Hills, CA Project No N:\2751\Area o Interest Locations (rev.4).cdr Figure 3

22 E U EN NT AV A R DU RESIDENTIAL VE S I DR N BI FORMER DIESEL UST VE L G B4 I DR N OU LASKY DRIVE RESIDENTIAL SPALDING DRIVE B RO Y RESIDENTIAL B3 MO RE NO DR IV A E POSSIBLE HISTORIC SUMP LOCATIONS (BEFORE 1928) AF T B2 E B1 H TH EA AV U EN E F MARS OIL CO. RODEO 114 PFO H BEVERLY HILLS OIL CO. RODEO 106 COMMERCIAL CHEVRON U.S.A INC. RODEO 107 CHEVRON U.S.A INC. RODEO 115 LIKELY HISTORIC SUMPS AND SPILLS (BEFORE 1928) R PA K DR FORMER OIL TANKS RY U NT BEVERLY HILLS OIL CO. BEVERLY HILLS HIGH SCHOOL 1 VENOCO FACILITY CE BEVERLY HILLS OIL CO. BEVERLY HILLS HIGH SCHOOL 2 D AR EV L C PI U BO RESIDENTIAL YM OL BUILDING DESCRIPTION BLDG A Main Class Rooms BLDG B1 Domestic Science BLDG B2 Old Class Rooms BLDG B3 Peters Auditorium BLDG B4 Salter Wing BLDG E Gymnasium BLDG F Swim Gym BLDG H Food Services BLDG L Science & Technology BLDG PFO Portable Facility Offices EXPLANATION ABANDONED OIL WELL SOURCE: Google (04/23/14) SITE PLAN WITH HISTORICAL OIL FIELD USES 241 S. Moreno Drive Beverly Hills, CA Project No N:\2751\Site Plan w Former Oil (rev.2).cdr 0 ~175 Figure 4

23 DRAFT

24 APPENDIX A Monitoring Logs SAB:2751:M&M:PLAN JUN2016 EAI Project No. 2751

25 HARDSCAPE MONITORING LOG AOI 5 Inspector Name: Company: Signature: Purpose: Routine/Contingency (circle on) Hardscape Area Hardscape Condition Damaged Date Building Designation Good Deteriorated (1) Other (1) Needs Repair B1 B2 B3 B4 (1) = Specify in notes Notes: N:\2751\M&M PLAN\HardscapeLog 1 of 1

26 VAPOR PROBE MONITORING LOG METHANE AND HYDROGEN SULFIDE AOI 5 Inspector Name: Company: Signature: Purpose: Routine/Contingency (circle on) Date Vapor Probe A5 SG1 A5 SG2 A5 SG3 A5 SG4 A5 SG5 A5 SG6 A5 SG7 A5 SG8 A5 SG9 A5 SG10 A5 SG11 A5 SG12 Depth (feet bgs) Landtec Methane (ppmv) Jerome H2S (ppmv) Needs Repair Notes: N:\2751\M&M PLAN\ProbeLog 1 of 1

27 BUILDING MONITORING LOG METHANE AND HYDROGEN SULFIDE AOI 5 Inspector Name: Company: Signature: Purpose: Routine/Contingency (circle on) Date Building Room Landtec Methane (ppmv) Jerome H2S (ppmv) Issues B1 B2 B3 B4 Notes: N:\2751\M&M PLAN\BuildingLog 1 of 1

28 APPENDIX B Soil Vapor Probe Construction Details SAB:2751:M&M:PLAN JUN2016 EAI Project No. 2751

29

30

31

Department of Toxic Substances Control

Department of Toxic Substances Control Matthew Rodriquez Secretary for Environmental Protection Barbara A. Lee, Director 5796 Corporate Avenue Cypress, California 90630 Edmund G. Brown Jr. Governor October 15, 2015 Dr. Gary Woods, Superintendent

More information

APPENDIX A I. Public Notification of Field Work. DRAFT PEA REPORT AOI-1, AOI-2 AND AOI-3 Beverly Hills High School. EAI Project No.

APPENDIX A I. Public Notification of Field Work. DRAFT PEA REPORT AOI-1, AOI-2 AND AOI-3 Beverly Hills High School. EAI Project No. DRAFT PEA REPORT AOI-1, AOI-2 AND AOI-3 Beverly Hills High School APPENDIX A I Public Notification of Field Work BHM;2751;ORAFTPEAREPORT-AOll EAI Project No. 2751 ***** Beverly Hills U nifled School District

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

DRAFT PEA REPORT AOI-1, AOI-2 AND AOI-3 Beverly Hills High School FIGURES I. EAI Project No_ BHM:2751:DRAFTPEAREPORT-AOll

DRAFT PEA REPORT AOI-1, AOI-2 AND AOI-3 Beverly Hills High School FIGURES I. EAI Project No_ BHM:2751:DRAFTPEAREPORT-AOll DRAFT PEA REPORT AOI-1, AOI-2 AND AOI-3 FIGURES I BHM:2751:DRAFTPEAREPORT-AOll EAI Project No_ 2751 @ Environmental Audit, Inc. Project No. 2751 N:12751ISitelocMap.cdt SITE LOCATION MAP SOURCE: USGS TOPOGRAPHIC

More information

Material Characterization Report

Material Characterization Report SSI-Metro12 Facility Carteret, NJ Page 1 of 3 Please complete all sections of the form, sign where indicated and return completed form to: Soil Safe, Inc. 6700 Alexander Bell Dr., Suite 300, Columbia MD

More information

Feasibility Study GREENWICH HIGH SCHOOL ENVIRONMENTAL TESTING UPDATE. JOINT RELEASE Greenwich Board of Education and Town of Greenwich, Greenwich, CT

Feasibility Study GREENWICH HIGH SCHOOL ENVIRONMENTAL TESTING UPDATE. JOINT RELEASE Greenwich Board of Education and Town of Greenwich, Greenwich, CT GREENWICH HIGH SCHOOL ENVIRONMENTAL TESTING UPDATE Feasibility Study April 2013 Highlights: An environmental study of the Greenwich High School campus grounds has been completed. This study was completed

More information

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39 MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No. 2015031067) Van Nuys Fire Station 39 W.O. E170094B ENGINEERING mtm CITY OF LOS ANGELES Transmittal

More information

April 16, Dear Mr. Beedie:

April 16, Dear Mr. Beedie: April 16, 2012 Mr. Michael Beedie, P.E. City of Ft. Walton Beach Engineering Services Department 105 Miracle Strip Parkway SW Ft. Walton Beach, FL 32548 Re: Proposal for a Supplemental Site Assessment

More information

Facilities and Planning Department Measure E Update March 2017

Facilities and Planning Department Measure E Update March 2017 State Seismic Mitigation Program (SSMP) The District s application for SSMP funds for Horace Mann Building A will be reviewed for approval by the State Allocation Board at its next scheduled meeting on

More information

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS DIVISION 02 EXISTING CONDITIONS 02 01 00 MAINTENANCE OF EXISTING CONDITIONS 1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling

More information

CHAPTER 4 PROJECT ALTERNATIVES

CHAPTER 4 PROJECT ALTERNATIVES CHAPTER 4 PROJECT ALTERNATIVES Introduction Alternatives Rejected as Infeasible Description of Project Alternatives Environmental Impacts from the Project Alternatives Conclusion [This page intentionally

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT

MARYLAND DEPARTMENT OF THE ENVIRONMENT MARYLA DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Suite 620 Baltimore, Maryland 21230-1719 410-537-3442 800-633-6101 x 3442 www.mde.state.md.us Land Management Administration Oil Control Program

More information

SOIL MANAGEMENT PLAN

SOIL MANAGEMENT PLAN SOIL MANAGEMENT PLAN BELFAST BOATYARD 39 & 41 FRONT STREET BELFAST, MAINE Prepared by: Ransom Consulting, Inc. 400 Commercial Street, Suite 404 Portland, Maine 04101 (207) 772-2891 March 22, 2013 1.0 INTRODUCTION

More information

Project Background. Project Purpose

Project Background. Project Purpose August 21, 2015 Ms. Suzanne Wynn Project Manager Gainesville Community Redevelopment Agency 802 NW 5th Avenue, Suite 200 Gainesville, Florida 32601 Re: Order of Magnitude Estimates for Environmental Assessment/Remediation

More information

Environmental Assessment of Soil and Soil Gas

Environmental Assessment of Soil and Soil Gas Environmental Assessment of Soil and Soil Gas Beverly Hills High School 241 South Moreno Drive, Beverly Hills, California 90212 August 22, 2003 Prepared by: A 18581 Teller, Suite 200 Irvine, California

More information

STATE CLEANUP PROGRAM INDEPENDENT CLOSURE PROCESS SITE CLOSURE State Form (11-09)

STATE CLEANUP PROGRAM INDEPENDENT CLOSURE PROCESS SITE CLOSURE State Form (11-09) STATE CLEANUP PROGRAM INDEPENDENT CLOSURE PROCESS SITE CLOSURE State Form 54166 (11-09) Indiana Department of Environmental Management Office of Land Quality 100 North Senate Avenue Mail Code 66-30 Room

More information

DRAFT ENVIRONMENTAL IMPACT REPORT

DRAFT ENVIRONMENTAL IMPACT REPORT DRAFT ENVIRONMENTAL IMPACT REPORT Beverly Hills High School, Hawthorne K-8 School, and El Rodeo K-8 School Improvement Project Prepared for: BEVERLY HILLS UNIFIED SCHOOL DISTRICT 255 South Lasky Drive

More information

Chapter 11: Hazardous Materials A. INTRODUCTION

Chapter 11: Hazardous Materials A. INTRODUCTION Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from

More information

February 8, Mr. Jeff Vanderdasson, P.E. PACLAND 6400 SE Lake Road, Suite 300 Portland, Oregon 97222

February 8, Mr. Jeff Vanderdasson, P.E. PACLAND 6400 SE Lake Road, Suite 300 Portland, Oregon 97222 Mr. Jeff Vanderdasson, P.E. PACLAND 6400 SE Lake Road, Suite 300 Portland, Oregon 97222 Re: Phase I Environmental Site Assessment Recommendations Letter NW 9th Street and NW Spruce Avenue Corvallis, Benton

More information

2016 SAN FRANCISCO EXISTING BUILDING CODE AB-110 ADMINISTRATIVE BULLETIN. Building Façade Inspection and Maintenance

2016 SAN FRANCISCO EXISTING BUILDING CODE AB-110 ADMINISTRATIVE BULLETIN. Building Façade Inspection and Maintenance 2016 SAN FRANCISCO EXISTING BUILDING CODE AB-110 ADMINISTRATIVE BULLETIN NO. AB-110 DATE 6/21/2017 SUBJECT TITLE Permit Review and Operations Building Façade Inspection and Maintenance PURPOSE REFERENCE

More information

RULE 4651 SOIL DECONTAMINATION OPERATIONS (Adopted April 16, 1992; Amended December 17, 1992; Amended September 20, 2007)

RULE 4651 SOIL DECONTAMINATION OPERATIONS (Adopted April 16, 1992; Amended December 17, 1992; Amended September 20, 2007) RULE 4651 SOIL DECONTAMINATION OPERATIONS (Adopted April 16, 1992; Amended December 17, 1992; Amended September 20, 2007) 1.0 Purpose The purpose of this rule is to limit volatile organic compound (VOC)

More information

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

Appendix D POINT LOMA HIGH SCHOOL WHOLE SITE MODERNIZATION AND ATHLETIC FACILITIES UPGRADE PROJECT. Environmental Issues Letter

Appendix D POINT LOMA HIGH SCHOOL WHOLE SITE MODERNIZATION AND ATHLETIC FACILITIES UPGRADE PROJECT. Environmental Issues Letter POINT LOMA HIGH SCHOOL WHOLE SITE MODERNIZATION AND ATHLETIC FACILITIES UPGRADE PROJECT Appendix D Environmental Issues Letter Prepared by Ninyo & Moore October 26, 2015 1(1R90 &/ft:oo~e~~, Js; Ge orechnrcal,1nt1

More information

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation TRC Wannalancit Mills 650 Suffolk Street Lowell, Massachusetts 01854 Main 978.970.5600 Fax 978.453.1995 Memorandum To: From: Subject: Rian Amiton; City of Brockton Planning Department John McRobbie and

More information

SOIL INVESTIGATION McLAREN BIKE SKILLS PARK SAN FRANCISCO, CALIFORNIA

SOIL INVESTIGATION McLAREN BIKE SKILLS PARK SAN FRANCISCO, CALIFORNIA FUGRO CONSULTANTS, INC. SOIL INVESTIGATION McLAREN BIKE SKILLS PARK SAN FRANCISCO, CALIFORNIA Prepared for: CITY OF SAN FRANCISCO RECREATION AND PARKS DEPARTMENT JUNE 2013 Fugro Project No. 04.72130038

More information

FOR THE HARPER-THIEL SITE 3201 MILLER ROAD WILMINGTON, DELAWARE

FOR THE HARPER-THIEL SITE 3201 MILLER ROAD WILMINGTON, DELAWARE DRAFT ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES FOR THE HARPER-THIEL SITE 3201 MILLER ROAD WILMINGTON, DELAWARE The objective of performing a remedial action is to reduce risk associated with contaminants

More information

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA)

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA) DRAFT Analysis of Brownfields Cleanup Alternatives (ABCA) Preliminary Evaluation Ball Square Station Site Boston Avenue and Broadway Somerville and Medford, Massachusetts Massachusetts DEP Release Tracking

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Land Use Control Remedial Design for Site 5 - Former Fire Training Area

Land Use Control Remedial Design for Site 5 - Former Fire Training Area Land Use Control Remedial Design for Site 5 - Former Fire Training Area Former Naval Air Station Joint Reserve Base (NAS JRB) Willow Grove, Pennsylvania Naval Facilities Engineering Command Mid-Atlantic

More information

15A NCAC 02T.1501 is proposed for readoption without substantive changes as follows:

15A NCAC 02T.1501 is proposed for readoption without substantive changes as follows: 1 1 1 1 1 1 1 1 0 1 SECTION.0 SOIL REMEDIATION 1A NCAC 0T.1 is proposed for readoption without substantive changes as follows: 1A NCAC 0T.1 SCOPE The rules in this Section apply to the Disposal or Treatment

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program www.pca.state.mn.us Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program This document describes the requirements for excavating petroleum-contaminated soil

More information

Phase II Environmental Site Assessment Review/Reuse Recommendations Pagnotti Property, Maffett and South Main Streets, Plains Township, PA

Phase II Environmental Site Assessment Review/Reuse Recommendations Pagnotti Property, Maffett and South Main Streets, Plains Township, PA January 8, 2018 Dr. Brian Costello WBASD Superintendent 730 S. Main Street Wilkes-Barre, PA 18711 Subject: Phase II Environmental Site Assessment Review/Reuse Recommendations Pagnotti Property, Maffett

More information

U P D A T E O N T H E C L E A N U P O F H U N T E R S P O I N T N A V A L S H I P Y A R D

U P D A T E O N T H E C L E A N U P O F H U N T E R S P O I N T N A V A L S H I P Y A R D U P D A T E O N T H E C L E A N U P O F H U N T E R S P O I N T N A V A L S H I P Y A R D Prepared for the Hunters Point Citizens Advisory Committee by the San Francisco Department of Public Health with

More information

Brownfield Program in California

Brownfield Program in California Brownfield Program in California Weixing Tong, Ph.D. P.G., C.H.G., C.E.G. California Regional Water Quality Control Board Los Angeles Region Brownfield Definition Brownfields are real property, the expansion,

More information

CUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL

CUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL CUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL This protocol establishes procedures to be followed by waste generators petitioning the Cumberland

More information

CITIZENS GUIDE Proposed soil cleanup plans for Lockheed Martin s Middle River Complex. Introduction. In This Guide

CITIZENS GUIDE Proposed soil cleanup plans for Lockheed Martin s Middle River Complex. Introduction. In This Guide CITIZENS GUIDE Proposed soil cleanup plans for Lockheed Martin s Middle River Complex Fall 2013 Introduction What is a Remedial Action Plan? Why is Lockheed Martin filing one for cleanup of the soil in

More information

8.0 MITIGATION MONITORING AND REPORTING PROGRAM

8.0 MITIGATION MONITORING AND REPORTING PROGRAM 8.0 MITIGATION MONITORING AND REPORTING PROGRAM Public Resources Code, Section 21081.6 requires that mitigation measures identified in environmental review documents prepared in accordance with CEQA are

More information

VAP Introduction to the Voluntary Action Program. Division of Emergency and Remedial Response

VAP Introduction to the Voluntary Action Program. Division of Emergency and Remedial Response VAP 101 - Introduction to the Voluntary Action Program Division of Emergency and Remedial Response Ohio EPA Voluntary Action Program Created in 1994 Ohio Revised Code (ORC) 3746 Final Rules went into effect

More information

BS Marine Biology, California State University, Long Beach, 1978

BS Marine Biology, California State University, Long Beach, 1978 Education BS Marine Biology, California State University, Long Beach, 1978 Professional Licenses Professional Geologist California, 1994 (No. 5906) Professional Geologist Wyoming, 2009 (No. PG-3702) Professional

More information

4.14 HAZARDOUS MATERIALS

4.14 HAZARDOUS MATERIALS 4.14 HAZARDOUS MATERIALS INTRODUCTION The presence of hazardous materials is a part of everyday life that could affect residents, workers, and visitors within the County. Certain activities can pose a

More information

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES: AR No. IR No. EIELSON AFB ALASKA NOTES: Administrative Record Cover Sheet Aaron Lambert 2013.03.06 14:20:30-08'00' DEC/EPA Comments Dated 14 December 2012 on Draft QAPP, Phase 2 Source Evaluation at SS085

More information

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements Table of Contents City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements General Requirements Application & Processing Procedures o Plan Requirements

More information

FINAL PLAN OF REMEDIAL ACTION. Deemer Steel Site - Operable Unit-I New Castle, DE

FINAL PLAN OF REMEDIAL ACTION. Deemer Steel Site - Operable Unit-I New Castle, DE FINAL PLAN OF REMEDIAL ACTION Deemer Steel Site - Operable Unit-I New Castle, DE DNREC Project No. DE 1243 March 2002 Delaware Department of Natural Resources and Environmental Control Division of Air

More information

SOIL AND GROUNDWATER MANAGEMENT PLAN ADDENDUM COOLEY LANDING 2100 BAY ROAD EAST PALO ALTO, CALIFORNIA

SOIL AND GROUNDWATER MANAGEMENT PLAN ADDENDUM COOLEY LANDING 2100 BAY ROAD EAST PALO ALTO, CALIFORNIA SOIL AND GROUNDWATER MANAGEMENT PLAN ADDENDUM COOLEY LANDING 2100 BAY ROAD EAST PALO ALTO, CALIFORNIA PREPARED FOR: Ms. Sharon Jones City of East Palo Alto 1960 Tate Street East Palo Alto, California 94303

More information

APPENDIX IV.F Technical Memorandum Summarizing Potential Methane Issues (December 2009)

APPENDIX IV.F Technical Memorandum Summarizing Potential Methane Issues (December 2009) APPENDIX IV.F Technical Memorandum Summarizing Potential Methane Issues (December 2009) / A E A J E? I / A J A? D E? = - L E H A J = - C E A A H I 6 A? D E? = A H = @ K 5 K = H E E C 2 J A J E = A ) I

More information

AGENDA REPORT. Attachments: 1. Resolution No. 18-R Joint Community Letter Dated April 17, 2018

AGENDA REPORT. Attachments: 1. Resolution No. 18-R Joint Community Letter Dated April 17, 2018 AGENDA REPORT Meeting Date: November 20, 2018 Item Number: E 15 To: From: Honorable Mayor & City Council Vincent Chee, Project Manager Subject: A CONTINUATION OF DECLARATION THAT THE PUBLIC INTEREST AND

More information

(B) "Facility," for the purposes of this rule, means:

(B) Facility, for the purposes of this rule, means: 3745-27-13 Procedure to engage in filling, grading, excavating, building, drilling, or mining on land where a hazardous waste facility or solid waste facility was operated. (A) No person shall, without

More information

D2 Project Environmental Remediation Briefing August 21, 2018

D2 Project Environmental Remediation Briefing August 21, 2018 D2 Project Environmental Remediation Briefing August 21, 2018 The Union Square Revitalization Project (USQ) is a 2.4 million square foot transit-oriented, mixed use project that is transforming Union Square,

More information

MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS

MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS Planning & Economic Development 100 Santa Rosa Ave, Rm. 3 Santa Rosa, CA 95404 Phone: (707) 543-4691 Email: planning@srcity.org MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS To ensure safety to workers,

More information

QUARTERLY TECHNICAL PROGRESS REPORT JANUARY 2012 MARCH 2012 RCRA CORRECTIVE ACTION IND

QUARTERLY TECHNICAL PROGRESS REPORT JANUARY 2012 MARCH 2012 RCRA CORRECTIVE ACTION IND QUARTERLY TECHNICAL PROGRESS REPORT JANUARY 2012 MARCH 2012 RCRA CORRECTIVE ACTION IND 980 700 801 2915 DR. MARTIN LUTHER KING JR. BOULEVARD, ANDERSON, IN REVITALIZING AUTO COMMUNITIES ENVIRONMENTAL RESPONSE

More information

Department of Toxic Substances Control

Department of Toxic Substances Control Matthew Rodriguez Secretary for Environmental Protection Department of Toxic Substances Control Deborah O. Raphael, Director 9211 Oakdale Avenue Chatsworth, CA 91311 Edmund G. Brown Jr. Governor STATEMENT

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland 21230-1719 1-800-633-6101 http:/www.mde.state.md.us Darlington Citgo 3940 Conowingo Road, Darlington Harford County,

More information

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE PROPOSED PLAN OF REMEDIAL ACTION 560 Terminal Avenue New Castle, DE DNREC Project No. DE 1123 October 2002 Delaware Department of Natural Resources and Environmental Control Division of Air and Waste Management

More information

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures . GROUNDWATER AND SOILS 0.. Introduction.. Environmental Setting.. Applicable Regulations.. Impacts and Mitigation Measures... Project Impacts and Mitigation... Proposed Project... Construction Impacts

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION DELAWARE CAR COMPANY Second and Lombard Streets Wilmington, Delaware DNREC Project No. DE-1059 October 2000 Department of Natural Resources and Environmental Control Division

More information

Standard Operating Procedures: Building Feature Evaluation and Sampling Revision 1 Santa Susana Field Laboratory Ventura County, California

Standard Operating Procedures: Building Feature Evaluation and Sampling Revision 1 Santa Susana Field Laboratory Ventura County, California Standard Operating Procedures: Building Feature Evaluation and Sampling Revision 1 Santa Susana Field Laboratory Ventura County, California Prepared for: The Boeing Company, The National Aeronautics and

More information

7.0 EVALUATION OF REMEDIAL ALTERNATIVES

7.0 EVALUATION OF REMEDIAL ALTERNATIVES 7.0 EVALUATION OF REMEDIAL ALTERNATIVES This section provides a description of the developed remedial alternatives based on viable remedial technologies and process options, as identified in Section 4.0,

More information

ASH MANAGEMENT PLAN. U.S. Environmental Protection Agency Region 4, Atlanta, GA. Mr. Joe Alfano, Remedial Project Manager

ASH MANAGEMENT PLAN. U.S. Environmental Protection Agency Region 4, Atlanta, GA. Mr. Joe Alfano, Remedial Project Manager ASH MANAGEMENT PLAN U.S. Environmental Protection Agency Region 4, Atlanta, GA Mr. Joe Alfano, Remedial Project Manager 404-562-8933 City of Jacksonville Environmental and Compliance Department Site Investigation

More information

520 Lafayette Road 520 Lafayette Road St. Paul, Minnesota St. Paul, Minnesota

520 Lafayette Road 520 Lafayette Road St. Paul, Minnesota St. Paul, Minnesota February 4, 2015 Ms. Shanna Schmitt, Project Manager Ms. Amy Hadiaris, Technical Analyst Minnesota Pollution Control Agency Minnesota Pollution Control Agency VIC Program VIC Program 520 Lafayette Road

More information

DRAFT. Phase II Environmental Site Assessment 929 Main Street City of Buffalo, Erie County, New York

DRAFT. Phase II Environmental Site Assessment 929 Main Street City of Buffalo, Erie County, New York DRAFT Phase II Environmental Site Assessment 929 Main Street City of Buffalo, Erie County, New York Prepared For: State University Construction Fund 353 Broadway Albany, New York 12246 April 2013 Prepared

More information

Management of Contaminated Soil. Click to edit Master subtitle style Peter Langtry, P.G., C.E.G Senior Principal Geologist

Management of Contaminated Soil. Click to edit Master subtitle style Peter Langtry, P.G., C.E.G Senior Principal Geologist Management of Contaminated Soil Peter Langtry, P.G., C.E.G Senior Principal Geologist Objectives Describe common soil contamination issues that can be encountered during construction/infrastructure projects

More information

HAZARDOUS MATERIALS PERMITS

HAZARDOUS MATERIALS PERMITS County of Santa Cruz HEALTH SERVICES AGENCY ENVIRONMENTAL HEALTH 701 OCEAN STREET, ROOM 312, SANTA CRUZ, CA 95060-4073 (831) 454-2022 FAX: (831) 454-3128 TDD/TTY Call 711 www.scceh.com HAZARDOUS MATERIALS

More information

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY Environmental Health Department 950 MAIDU AVENUE, SUITE 170 NEVADA CITY, CA 95959-8617 (530) 265-1222 FAX (530) 265-9853 http://mynevadacounty.com Amy Irani,

More information

EXECUTIVE SUMMARY. The following is our conclusions of the environmental issues at the Site based on our investigations:

EXECUTIVE SUMMARY. The following is our conclusions of the environmental issues at the Site based on our investigations: EXECUTIVE SUMMARY Engineers, Inc. (), on behalf of the Town of East Lyme, Connecticut performed a Phase II Environmental Site Assessment (Phase II ESA) on the property located at 224 Main Street (the Site

More information

IV. Environmental Impact Analysis E. Hazards and Hazardous Materials

IV. Environmental Impact Analysis E. Hazards and Hazardous Materials IV. Environmental Impact Analysis E. Hazards and Hazardous Materials 1. Introduction This section provides an analysis of the project s potential impacts relative to hazards and hazardous materials. The

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. HAZARDS AND HAZARDOUS MATERIALS 1. ENVIRONMENTAL SITE ASSESSMENT

IV. ENVIRONMENTAL IMPACT ANALYSIS M. HAZARDS AND HAZARDOUS MATERIALS 1. ENVIRONMENTAL SITE ASSESSMENT IV. ENVIRONMENTAL IMPACT ANALYSIS M. HAZARDS AND HAZARDOUS MATERIALS 1. ENVIRONMENTAL SITE ASSESSMENT A Phase I Environmental Site Assessment (Phase I ESA) for the proposed project was prepared by Gradient

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT 123 MAIN STREET SAN DIEGO, CALIFORNIA. September 15, 2002

PHASE I ENVIRONMENTAL SITE ASSESSMENT 123 MAIN STREET SAN DIEGO, CALIFORNIA. September 15, 2002 2847 Barnard Street San Diego California 92110 Phone 619.501.0185 Mobile 619.203.9774 Fax 619.501.9843 hoveyenv@cox.net Final Report PHASE I ENVIRONMENTAL SITE ASSESSMENT 123 MAIN STREET SAN DIEGO, CALIFORNIA

More information

SECTION UNDERGROUND STORAGE TANK REMOVAL

SECTION UNDERGROUND STORAGE TANK REMOVAL SECTION 02 65 00 UNDERGROUND STORAGE TANK REMOVAL SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Consider including unit prices for additional

More information

AWS 1500 October 19, Karen Maloney, Assistant Superintendent Novato Unified School District 1015 Seventh Street Novato, CA 94945

AWS 1500 October 19, Karen Maloney, Assistant Superintendent Novato Unified School District 1015 Seventh Street Novato, CA 94945 AWS 1500 October 19, 2015 Karen Maloney, Assistant Superintendent Novato Unified School District 1015 Seventh Street Novato, CA 94945 RE: Surface Sampling Report-Novato Charter School 940 C Street, Novato,

More information

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland 2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland Prepared for: Lockheed Martin Corporation Prepared by: Tetra Tech, Inc.

More information

Introduction. Remedial Action Objectives. In This Guide

Introduction. Remedial Action Objectives. In This Guide Addendum to Citizens Guide Proposed soil cleanup plans for additional Tax Blocks for Lockheed Martin s Middle River Complex Winter 2013-2014 Lockheed Martin Would Like to Invite the Community to a Public

More information

STATEMENT OF QUALIFICATIONS

STATEMENT OF QUALIFICATIONS ENVIRONMENTAL ENGINEERING, CONSTRUCTION, AND SUPPORT SERVICES STATEMENT OF QUALIFICATIONS 2006 VERSION 4.1 U.S. SBA 8(a) Certified Corporate Headquarters: 4097 Trail Creek Road Riverside, California 92505

More information

3.12 UTILITIES Introduction Environmental Setting

3.12 UTILITIES Introduction Environmental Setting 3.12 UTILITIES 3. Affected Environment and Environmental Analysis 3.12 UTILITIES 3.12.1 Introduction This section addresses the potential for impacting public utilities within the Port, the Main Channel,

More information

Section 3.11: Hazardous Materials

Section 3.11: Hazardous Materials Section 3.11: Hazardous Materials Section 3.11 Hazardous Materials 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION DRAVO SHIPYARD Operable Unit II RDC/Harbor Associates Properties Wilmington, Delaware DNREC Projects No. DE-1092 & DE-1096 February 2001 Department of Natural Resources and

More information

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required. Overview of Section 9 9.0 The GESC Permit Section provides a description of the Small Utility GESC Permit Program. Step 1. Determine if a GESC Permit is Applicable and if a Project Specific GESC Plan is

More information

February 28, 2006 Project No Robert Nowak Century City Realty LLC Constellation Boulevard Suite 1650 Los Angeles, California 90067

February 28, 2006 Project No Robert Nowak Century City Realty LLC Constellation Boulevard Suite 1650 Los Angeles, California 90067 Project No. 10181 Robert Nowak 10250 Constellation Boulevard Suite 1650 Los Angeles, California 90067 Subject: Current Site Conditions and Evaluation of Potential Public Health Impacts 10131 Constellation

More information

REQUIREMENTS FOR PERMANENT CLOSURE OF UNDERGROUND HAZARDOUS SUBSTANCE STORAGE TANKS

REQUIREMENTS FOR PERMANENT CLOSURE OF UNDERGROUND HAZARDOUS SUBSTANCE STORAGE TANKS UT-30 HANDBOOK REQUIREMENTS FOR PERMANENT CLOSURE OF UNDERGROUND HAZARDOUS SUBSTANCE STORAGE TANKS County of Kern Public Health Services Department Environmental Health Division Hazardous Materials Management

More information

DRAFT FINAL FINDING OF SUITABILITY TO TRANSFER (FOST) FORT MCPHERSON, GEORGIA AMENDMENT #1 FORT MCPHERSON

DRAFT FINAL FINDING OF SUITABILITY TO TRANSFER (FOST) FORT MCPHERSON, GEORGIA AMENDMENT #1 FORT MCPHERSON DRAFT FINAL FINDING OF SUITABILITY TO TRANSFER (FOST) FORT MCPHERSON, GEORGIA AMENDMENT #1 FORT MCPHERSON MCPHERSON IMPLEMENTING LOCAL REDEVELOPMENT AUTHORITY PROPERTY Prepared by BASE REALIGNMENT AND

More information

Fairchild Air Force Base Atlas E Missile Site Sprague, Lincoln County, Washington

Fairchild Air Force Base Atlas E Missile Site Sprague, Lincoln County, Washington Health Consultation Fairchild Air Force Base Atlas E Missile Site Sprague, Lincoln County, Washington May 14, 1999 Prepared by The Washington State Department of Health Under a Cooperative Agreement with

More information

Soil Removal Report. Site: 93 rd Street Elementary School 330 East 93 rd Street Los Angeles, California 90003

Soil Removal Report. Site: 93 rd Street Elementary School 330 East 93 rd Street Los Angeles, California 90003 Soil Removal Report Site: 93 rd Street Elementary School 330 East 93 rd Street Los Angeles, California 90003 Prepared for Los Angeles Unified School District Los Angeles Unified School District Office

More information

I. OBJECTIVE DESCRIPTION OF THE PROPERTY

I. OBJECTIVE DESCRIPTION OF THE PROPERTY ATTACHMENT C STATE OF OREGON v. OREGON STATE UNIVERSITY CONSENT JUDGMENT (the PROSPECTIVE PURCHASER AGREEMENT ) TAX LOTS 1812060000110, 181206A000719, 1812060000111, 1812060000100 BEND, OREGON REMEDIAL

More information

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS

More information

Department of Toxic Substances Control

Department of Toxic Substances Control Matthew Rodriquez Secretary for Environmental Protection Department of Toxic Substances Control Deborah O. Raphael, Director 8800 Cal Center Drive Sacramento, California 95826-3200 Edmund G. Brown Jr.

More information

IRVINE UNIFIED SCHOOL DISTRICT RESOLUTION NO

IRVINE UNIFIED SCHOOL DISTRICT RESOLUTION NO IRVINE UNIFIED SCHOOL DISTRICT RESOLUTION NO. 14-15-35 RESOLUTION OF THE IRVINE UNIFIED SCHOOL DISTRICT BOARD OF EDUCATION ADOPTING THE INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION, APPROVING A MITIGATION

More information

CHAPTER 6 - How to Prepare a SWPPP

CHAPTER 6 - How to Prepare a SWPPP All construction sites which disturb an area of 1 acre or more, currently need a UPDES permit from the State of Utah. As a condition of the permit, a Stormwater Pollution Prevention Plan (SWPPP) must be

More information

APPENDIX J. Onsite Methane Report

APPENDIX J. Onsite Methane Report APPENDIX J Onsite Methane Report 707 Wilshire Boulevard Suite 3250 Los Angeles, CA 90017 213-213-9400 PHONE 818.772.1926 FAX www.trcsolutions.com March 23, 2012 VIA EMAIL SUBMITTAL Mr. Jon Holler Maintenance

More information

Environmental Information Form

Environmental Information Form CITY OF MODESTO Community and Economic Development Department/Planning Division 1010 Tenth Street, Suite 3300, P.O. Box 642 Modesto, CA 95353 (209) 577-5267 (209) 491-5798 FAX This questionnaire will assist

More information

Former Georgia-Pacific Mill Site

Former Georgia-Pacific Mill Site May 2018 The mission of DTSC is to protect California s people and environment from harmful effects of toxic substances by restoring contaminated resources, enforcing hazardous waste laws, reducing hazardous

More information

Environmental Overview: 39 th Avenue Greenway. What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified

Environmental Overview: 39 th Avenue Greenway. What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified Recognized Environmental Conditions VB/I-70 Superfund Site (OU-1, OU-2) Planned Investigations Next Steps

More information

Public Presentation. Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard

Public Presentation. Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard Public Presentation Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard Keith Forman, Navy Environmental Coordinator BRAC Program Management Office February 28, 2013 1 Welcome and Introductions

More information

Management of Kern County Erskine Wildfire Debris

Management of Kern County Erskine Wildfire Debris Management of Kern County Erskine Wildfire Debris To ensure safety to workers, the public, and the environment, certain protocols should be followed during a wildfire disaster when removing structural

More information

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2 Project: APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) PROJECT: 0029-005-130, C501, B645 RFP QUESTIONS AND ANSWERS-REVISION 2 Date: 12/04/09 Approaches and Bridge over Tye River (Rte. 29 NBL) Subject:

More information

Technical Memorandum. Blum Junk Yard Properties. Assessment of Environmental Risk Related to Demolition of Properties at 411 and 501 E.

Technical Memorandum. Blum Junk Yard Properties. Assessment of Environmental Risk Related to Demolition of Properties at 411 and 501 E. Technical Memorandum Blum Junk Yard Properties Assessment of Environmental Risk Related to Demolition of Properties at 411 and 501 E. 15 th Street 9/16/15 40140060.13 Prepared For: Steven Sampson Brown

More information

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE.

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE. ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE Prepared for: City of Belfast 131 Church Street Belfast, Maine Prepared

More information

Alaska Department of Environmental Conservation Division of Spill Prevention and Response

Alaska Department of Environmental Conservation Division of Spill Prevention and Response Alaska Department of Environmental Conservation Division of Spill Prevention and Response REQUEST FOR QUOTE (RFQ) 180000031 1003 2 nd Street, Douglas Heating Oil Tank Investigation Date of Issue: October

More information

Orange County Central Utility Facility Upgrade IP

Orange County Central Utility Facility Upgrade IP MITIGATION MONITORING AND REPORTING PROGRAM The California Public Resources Code, Section 21081.6, requires that a lead or responsible agency adopt a mitigation monitoring and reporting plan when approving

More information

4.10 SAFETY/RISK OF UPSET EXISTING CONDITIONS

4.10 SAFETY/RISK OF UPSET EXISTING CONDITIONS 4.10 SAFETY/RISK OF UPSET EXISTING CONDITIONS Within the Westchester-Playa del Rey Community Plan Area (CPA), manufacturing, processing, and research and development activities involve procedures, chemicals

More information

WESTSIDE PURPLE LINE EXTENSION PROJECT, SECTION 2 ADVANCED PRELIMINARY ENGINEERING Contract No. PS

WESTSIDE PURPLE LINE EXTENSION PROJECT, SECTION 2 ADVANCED PRELIMINARY ENGINEERING Contract No. PS LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY WESTSIDE PURPLE LINE EXTENSION PROJECT, SECTION 2 ADVANCED PRELIMINARY ENGINEERING Contract No. PS-4350-2000 Beverly Hills High School Master Plan