1 sm0914f ai Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO

2 6.6 PRELIMINARY MODELING RESULTS FOR THE STORAGE ALTERNATIVES Following the preliminary screening exercise, Arcadis modeled the three remaining sites assuming the existing conveyance system with planned CIP projects configuration, and using the projected 2035 population data. Model simulations were run to determine the storage required at each location in order to reduce or eliminate SSOs downstream in the collection system. Four separate model scenarios were developed including: 1. Full Conveyance - Model full conveyance of sewage to the WWTP. 2. Add sufficient storage at the Bay Meadows Phase 2 Park to reduce the total flow to the WWTP to 80 mgd, eliminate SSOs in the upstream conveyance pipelines, and reduce surcharge downstream. 3. Add storage at San Mateo High School, and determine the size of required storage to eliminate SSOs upstream and reduce surcharge downstream. 4. Add storage at Abbott Middle School, and determine the size of required storage to eliminate SSOs upstream and reduce surcharge downstream. Under all scenarios, the model included all planned CIP projects and the Dale Avenue PS was sized as necessary to convey flows. In addition, minor cross-connections were made to improve collection system function. As required, pipeline diameters were then modified to eliminate SSOs and to reduce surcharge in the conveyance pipes to greater than 3 feet below grade under a 5-year, 6-hour design storm. If a planned CIP pipeline project could be downsized or eliminated and still meet these criteria, it was noted. Table 6.4 summarizes the flows to the Dale Avenue PS and storage basin for each of the scenarios evaluated as part of the February 2014 modeling simulations. This table also summarizes the storage equalization basin sizing and any modifications to the planned CIP projects for each scenario. The model results demonstrated that in-system storage at Abbott Middle School and San Mateo High School did not provide any significant benefits in terms of SSO elimination, trunk sewer surcharge reduction, or lower capital improvement costs. These two alternatives were eliminated from further analysis. 6.7 FINAL MODELING OF STORAGE ALTERNATIVES Based upon the preliminary modeling results, the City, Arcadis, and Carollo Engineers identified four wastewater/conveyance system/in-system storage system alternatives to be modeled to determine the preferred overall storage approach: 1. Alternative 1 Full Conveyance with storage at the WWTP. Onsite storage sized to limit PWWF through the secondary treatment train to 60 mgd. 2. Alternative 2 - Bay Meadows Storage sized to eliminate the South Trunk Sewer Project. October 2014 FINAL DRAFT 6-14 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

3 3. Alternative 3 - Bay Meadows Storage sized to limit flow to the Dale Avenue PS to the firm capacity of 67 mgd. 4. Alternative 4 - Bay Meadows Storage sized with the smallest sizing necessary to eliminate downstream SSOs and reduce surcharge to acceptable levels. Table 6.4 Storage Location Detroit Drive Parcel (WWTP) Bay Meadows Phase 2 Park Preliminary Model Results for Storage Basins Integrated Wastewater Master Plan City of San Mateo Peak Wet Weather Flow to Storage (mgd) 98.0 total to WWTP Peak Wet Weather Flow to Dale Ave PS (mgd) Recommended Storage Size (MG) Abbott Middle School San Mateo High School Modifications to Planned CIP Improvements? New 17.1 mgd Dale Ave. wet weather pump station required. Reduces 7,000 feet of South Trunk Phase 2 pipe from 42 /48 to 24 diameter. Eliminates SST 5 Hacienda Flores Relief Project. Provided minimal PWWF reduction The following sections discuss the results of these analyses Alternative 1: Full Conveyance Alternative with Storage at the WWTP (7.7 MG) Alternative 1 entails full conveyance of all flows to the WWTP with wet weather storage adjacent to the WWTP at the Detroit Drive property. Due to space limitations at the WWTP, the Detroit Drive location was identified as the most cost effective location for a large, below grade basin. Under this alternative, model simulations assumed that all planned capital improvements were implemented and flows to the WWTP were not limited by the current capacity of the Dale Avenue PS. This alternative results in a flow of 84.1 mgd to the WWTP from Dale Avenue PS, and will require a new upsized Dale Avenue PS (17.1 mgd capacity). The inclusion of flows from the Shoreview/Los Prados area (2.7 mgd), Mariner s Island (1.6 mgd), and EMID (9.5 mgd) make a total flow of 98.0 mgd to the WWTP influent junction box. The storage basin adjacent to the WWTP was sized using the Year 2035 flow hydrograph produced by the model (see Appendix K) and limiting flows to the secondary treatment system to 60 mgd, which resulted in a 7.7 MG buried storage tank. With this alternative, two major changes to the collection system planned CIP projects were identified and are summarized in Table 6.5. October 2014 FINAL DRAFT 6-15 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

4 One advantage to locating the storage facility adjacent to the WWTP, is that it provides the WWTP with some flexibility in operations, especially during the construction of large projects. The major disadvantage of this location is that immediate relief within the collection system is not provided, as would be with an in-system storage basin. In addition, conveyance facilities will need to be sized to convey PWWF to the WWTP. Table 6.5 Alternative 1 Major Changes to Planned Collection System Projects Integrated Wastewater Master Plan City of San Mateo Project ID Project Title Major Additions or Changes to CIP Projects WW-03 DAX-3 New Flow Equalization Storage New Dale Avenue Wet Weather PS Build new 7.7 MG storage basin at the corporation yard. Build new 17.1 mgd Dale Avenue Wet Weather PS Alternative 2: In-System Storage at Bay Meadows Park (12.8 MG) Alternative 2 looked at providing sufficient storage at the Bay Meadows Park to eliminate Phase 2 of the South Trunk Sewer Project (7,000 feet of 42-inch and 48-inch pipe). Under this alternative, model simulations assumed that all planned capital improvements were implemented and flows to the WWTP were not limited by the current capacity of the Dale Avenue PS. This alternative requires the construction of a 12.8 MG equalization basin. A basin this size would also reduce surcharge and eliminate SSOs in the area. This alternative does not eliminate storage at the WWTP, but reduces the volume required from 7.7 MG to 2.6 MG. Flow to Dale Avenue PS is reduced to 58.7 mgd (which is within its current capacity), so that a new wet weather pump station project would not be required under this alternative. Table 6.6 summarizes the major changes to the collection system planned CIP projects under this alternative. Table 6.6 Alternative 2 Major Changes to Planned Collection System Projects Integrated Wastewater Master Plan City of San Mateo Project ID Project Title Major Additions or Changes to CIP Projects WW-03 New Flow Equalization Storage Build new 2.6 MG storage basin at the corporation yard SAT-2 South Trunk Sewer Phase II Eliminate project of 7,000 feet of 42 /48 pipe SAT-3 South Trunk Phase III Build new 12.8 MG storage basin at the Bay Meadows Park The Bay Meadows Park was recently built as part of the Bay Meadows Phase II development, and current improvements include baseball fields and open grass areas. With a usable storage depth of 8 feet, a basin approximately 570 feet long by 350 feet wide would be required. Under this alternative, the entire park would require reconstruction, October 2014 FINAL DRAFT 6-16 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

5 which may cause some opposition by the residents. The cost and difficulty of constructing a 12.8 MG below-grade equalization tank outweighs the benefits of not building the South Trunk Sewer Project, and it was agreed that this alternative be eliminated from further consideration Alternative 3: In-System Storage at Bay Meadows Park (4.2 MG) Alternative 3 also provided wet weather storage at Bay Meadows Park sized to reduce surcharge and eliminate SSOs in the area and limit flows to the Dale Avenue PS to less than its maximum capacity of 67 mgd. This scenario resulted in a 4.2 MG equalization basin at Bay Meadows Park, while eliminating the need to upgrade the Dale Avenue PS. In addition, the conveyance pipelines in the Phase 2 of the South Trunk Sewer Project was downsized to 36 inches (from 42 inch and 48 inch pipe), and was still able to limit surcharge of the collection system to greater than 3 feet below grade. This alternative also requires construction of 4.0 MG of storage at the WWTP. The advantage of having two storage tanks (in-system and at the WWTP) is that it provides WWTP operators with much more flexibility for shut down of certain process trains during the major upcoming improvements. With a usable depth of 8 feet for storage, a basin approximately 350 feet long by 200 feet wide would be required. This alternative would entail reconstruction of the grass fields portion of the park. Table 6.7 summarizes the major changes to the collection system planned CIP projects under this alternative. Table 6.7 Alternative 3 Major Changes to Planned Collection System Projects Integrated Wastewater Master Plan City of San Mateo Project ID Project Title Major Additions or Changes to CIP Projects WW-03 New Flow Equalization Storage Build new 4.0 MG storage basin at the Detroit Drive Parcel SAT-2 South Trunk Sewer Phase II Reduce size of 7,000 feet of 42 /48 pipe to 36 pipe SAT-3 South Trunk Phase III Build new 4.2 MG storage basin at the Bay Meadows Park Alternative 4: In-System Storage at Bay Meadows Park (3.2 MG) Alternative 4 provides for the minimum wet weather storage at Bay Meadows Park, which was sized to reduce surcharge to acceptable levels and to eliminate SSOs in the area. This resulted in a 3.2 MG equalization basin in the collection system and a 5.6 MG storage basin at the WWTP. With a usable depth of 8 feet for storage, a basin approximately 350 feet by 150 feet would be required at the park, and would need reconstruction of the grass fields portion of the park. A new Dale Avenue PS wet weather pump station with 6.6 mgd capacity would be required under this alternative. Table 6.8 summarizes the major changes to the collection system planned CIP projects under this alternative. October 2014 FINAL DRAFT 6-17 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

6 Table 6.8 Alternative 4 Major Changes to Planned Collection System Projects Integrated Wastewater Master Plan City of San Mateo Project ID Project Title Major Additions or Changes to CIP Projects WW-03 DAX-3 New Flow Equalization Storage New Dale Avenue Wet Weather Pump Station Build new 5.6 MG storage basin at the Detroit Drive Parcel Build new 6.6 mgd Dale Avenue Wet Weather PS SAT-2 South Trunk Sewer Phase II Reduce size of 3,900 feet of 48 pipe to 42 pipe SAT-3 South Trunk Phase III Build new 3.2 MG storage basin at the Bay Meadows Park CIP Modifications Common to All Alternatives Each of the alternatives evaluated resulted in some modifications to the planned CIP. Common modifications to the four alternatives are summarized below in Table 6.9. Table 6.9 Changes to Planned CIP Projects Common to All Alternatives Integrated Wastewater Master Plan City of San Mateo Project ID Project Title Major Additions or Modifications to CIP Projects SST-3 South Delaware/Bay Meadows Parallel Line SAT-1 South Trunk Phase 1 LPS-5 LPS-6 LPS-7 SNT-X5 SST-X2 SST-X3 SST-X5 Kehoe-Van Buren Relief Sewer Los Prados Replacement Los Prados 3 to Bahia Edinburgh St/Sonora Dr Relief El Camino Relief Extension 38th to 36th Hillsdale Relief Extension ADLP to Hacienda Yew St Relief Barneson to Hwy 92 Upsize diameter of 3,250 feet of 21 pipe to be installed to 36. Upsize 70 feet of 48 pipe to 60 downstream of Phase 1 and influent to DAPS wet well Upsize diameter of 1,500 feet of 12 pipe to be installed to 15 and 2,950 feet of 15 pipe to 18 New project: Upsize 2,100 feet of existing 21 sewer to 24 from Hancock to Highway 101 New project: Upsize 1,040 feet of existing 8 sewer to 10 from Los Prados 3 to Bahia Add to project: Upsize 120 feet of existing 8 sewer to 12 from MH X to MH303-07X. Add to project: Upsize 900 feet of existing 15 sewer to 18 from 36th to Hillsdale; upsize 40 feet of pipe from 15 to 24 at Hillsdale/El Camino, and upsize 450 feet of 24 to 30 from Hillsdale to 450 feet south of 31st. Add to project: Upsize 350 feet of existing 8 sewer to 12 from MH X to MH X Add to project: Upsize 79 feet of existing 10 sewer to 12 from MH X to MH X and upsize 200 feet of 8 sewer to 10 from MH X to MH X. October 2014 FINAL DRAFT 6-18 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

7 6.8 ALTERNATIVES COMPARISON The evaluation of the proposed storage alternatives took into consideration both economic and non-economic criteria. A set of evaluation criteria, consistent with the goals and objectives of the City, were developed to compare the alternatives. As the City has adopted sustainability goals and objectives, it was recommended that the Triple Bottom Line framework be used to evaluate the benefits and impacts of an alternative in the following areas: financial (costs), social (community), and environmental (reduction of SSOs). In addition, the criteria included a wastewater system operations category to consider technical criteria in evaluating storage size and location. Table 6.10 summarizes the criteria used in this analysis. Table 6.10 Alternatives Evaluation Criteria Integrated Wastewater Master Plan City of San Mateo Wastewater System Operations Costs Community Environment Flexibility of Operations Capital Costs Noise Reduction of SSOs Cleaning Effort Odor Ease of Access Visual Constructability For the purposes of comparing the alternatives, the evaluation criteria were split into economic and non-economic evaluations. The criteria for the wastewater system operations, community, and environment criteria are considered in the non-economic evaluation section of this chapter, while the criteria for the costs are considered in the economic evaluation section Non-Economic Evaluation For the non-economic evaluation of alternatives, a qualitative approach was used for all criteria. A comparison of the alternatives for the wastewater system operations, community, and environment categories is shown in Table For the wastewater system operations criteria, the alternatives differ significantly in the flexibility provided to the WWTP operations. The following is a summary of the non-economic evaluation of the proposed alternatives: Storage at the Detroit Drive site provides convenient local storage that can be used in the dry season by the WWTP to take other processes off line for repair or during construction, as needed. This site would be the most easily accepted by the community, since the WWTP is already located in the vicinity and there would be minimal change to noise, odor, or visual impacts. However, this alternative does not score well on environment, since it would not provide any relief to surcharge in the collection system. October 2014 FINAL DRAFT 6-19 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

8 Table 6.11 Alternative 1 Alternative 2 Alternative 3 Alternative 4 Legend: Summary of the Qualitative Screening Evaluation Integrated Wastewater Master Plan City of San Mateo Wastewater Alternative Description System Operations Community Environment Full Conveyance 12.8 MG Basin at Bay Meadows Park 4.2 MG Basin at Bay Meadows Park 3.2 MG Basin at Bay Meadows Park Meets criteria Partially meets criteria Does not meet criteria Alternative 2, the 12.8 MG storage at Bay Meadows, provides the most wet weather relief in the area of the collection system most prone to surcharge and SSOs, and ranks highly in this category. However, the large footprint and difficulty in construction led to a lower community score. In addition, while eliminating the South Trunk Sewer Project would help offset the costs of the large basin, it reduces flexibility in wastewater system operations by significantly reducing storage at the WWTP that is useful during repairs or rehabilitation at the WWTP. Alternative 3 provides the most operational flexibility since flow could either be reduced coming into the WWTP or an equivalent amount could be stored at the WWTP, with approximately 4.2 MG of storage provided at each location. Alternative 4 with 3.2 MG of storage does an adequate job of reducing SSOs, aiding system operations, and has less of an impact to the community than the larger basins. However, this alternative did not score high for any of the criteria. Each of the Bay Meadows alternatives allows the operators to reduce flow coming into the WWTP by varying amounts, but does not allow the flow to be diverted during construction since the storage basin location is 4.5 miles away from the WWTP. A large basin in the collection system does not eliminate the need for storage at the WWTP to meet peak flows to the WWTP. While two storage basins will require more operations and maintenance time and money, they also provide more flexibility. In addition, each of the in-system storage basin alternatives provides the potential for recycled water storage benefits. As the City s recycled water planning is in its infancy, conceptual plans did not look at storage to meet peak irrigation demands. Since the irrigation season is during the dry season, there may be an opportunity to use the wet weather basin storage for the recycled water system without additional cost. October 2014 FINAL DRAFT 6-20 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

9 Based on non-economic factors, Alternatives 1 and 3 received the highest and approximately equivalent scores. Figure 6.4 shows the space required to accommodate 7.7 MG of storage on the Detroit Drive site (Alternative 1). Figure 6.5 is an aerial of the Bay Meadows site (Alternative 3) and shows an approximate sizing for the proposed 4.2 MG storage. The exact location available for storage on the Bay Meadows site is still undetermined, as the property will be a shared site with Parks and Recreation Economic Evaluation Construction and total project costs were prepared for each of the storage alternatives. The capital costs are presented in August 2014 dollars, which corresponds to a San Francisco Engineering News Record Construction Cost Index (ENR CCI) of Costs were prepared in accordance with the guidelines of the Association for the Advancement of Cost Engineering International (AACE International), 18R-97 for a Class 5 estimate. Appendix D provides the Basis of Cost used for all projects in the Integrated Wastewater Master Plan. Annual operation and maintenance (O&M) costs are assumed to be negligible compared to the capital cost and roughly equivalent for all alternatives since a small pump station, that would only be operated occasionally after wet weather events, would be required for each alternative. The only difference between the WWTP storage and the three Bay Meadows storage facilities is that off-site maintenance and cleaning would be required for the Bay Meadows alternatives resulting in a minimal increase in cost for the Bay Meadows sites associated with travel time and set-up. Table 6.12 summarizes the construction and total project costs, while details are provided in Appendix L Assumptions This section contains a list of general and site specific assumptions made during the cost estimating effort for all four alternatives: Reinforced concrete equalization basin. Top of basin would be 5 feet below grade, except at the Detroit Drive site where the basin cover would be at grade level. Two feet of freeboard would be used to prevent pressurization of basin. Basin would be divided into three compartments to allow sequential filling of compartments to minimize cleaning after each use. Excavated materials would not be suitable without pre-treatment for backfill. Imported materials would be used. (Final Geotechnical Investigation for Infrastructure Improvements, Bay Meadows Phase 2 dated September 2008 by Treadwell & Rollo). November 2014 FINAL DRAFT 6-21 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

10 LEGEND Corporation Yard WWTP Site Storage Basin Buried Tank 250 x 400 Figure MG STORAGE AT DETROIT DRIVE SITE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO sm0914f ai

11

12 Approximate size of 4.2 MG storage (350 x 200 ). Exact location is not determined and will be coordinated with the Parks Department. e h Av E 25 th Av e E t 25 S De la w ar e St Figure MG STORAGE TANK AT BAY MEADOWS PARK INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO sm1114f ai

13 Equalization basin would be fed via a below grade pump station structure located in the street. Cost of all influent piping/overflow structure have been included in the cost. Odor control system would consist of above-grade air scrubber system adjacent to equalization basin. Underground access would only be required for cleaning and access to pump station. A new below grade raw sewage pump station with three submersible pumps and comminutors (grinders) that pumps to 10 feet below grade would be used. No bar screens would be provided. Flow from the basin back to the collection system would be via gravity. Pipe size is based on emptying the entire basin within a 48-hour period after a wet weather event. Effluent piping would run from the equalization basin to closest sewer trunk line in adjacent street. Allowable soil bearing capacity is 2000 pounds per square foot (psf). (Based on Geotechnical Exploration for the South Trunk Sanitary Sewer Relief Line dated April 2011 by ENGEO Inc.). Soils with hydrocarbon contamination would be hauled to Ox Mountain Landfill in Half-Moon Bay. (Landfill determined by closest landfill to project that accepts soils with petroleum on the San Francisco Bay RWQCB Region 2 Landfill Waste Acceptance List). Groundwater with hydrocarbon contamination would be treated on site. (None of the landfills listed on the San Francisco Bay RWQCB Region 2 Landfill Waste Acceptance List accepted designated liquids). October 2014 FINAL DRAFT 6-24 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

14 Table 6.12 In-System Equalization Basin Cost Integrated Wastewater Master Plan City of San Mateo Storage Alternative Construction Cost (1) ($M) Total Project Cost (1) ($M) Alt 1 Full Conveyance N/A N/A Alt MG Storage at Bay Meadows Park Alt MG Storage at Bay Meadows Park Alt MG Storage at Bay Meadows Park $54.5 $77.9 $22.3 $31.9 $18.0 $25.7 Note: (1) Costs are provided as present value based on a ENR CCI number of corresponding to the San Francisco Index in August Costs are not escalated to future years. Total project costs include a 35 percent construction cost estimating contingency and 45 percent allowance for engineering, CEQA, legal, administration, construction management, and 10% unallocated contingency. 6.9 ALTERNATIVES COMPARISON WITHIN THE OVERALL WASTEWATER SYSTEM A comparison of the proposed alternatives is incomplete without evaluating how they fit into the overall wastewater system. An in-system storage basin does not necessarily eliminate the need for storage at the WWTP, since peak flows through the secondary treatment train and outfall must be limited to 60 mgd. In addition, the need for and size of a wet weather pump station at Dale Avenue is determined by the flow to the Dale Avenue PS during wet weather events, which is dependent upon the in-system storage size. The size of primary treatment facilities is dependant upon the flow from the Dale Avenue PS to the WWTP. Table 6.13 provides a more complete comparison of wastewater system costs in relation to storage, rather than focusing only on the cost of a single storage basin. As shown, 4.2 MG of in-system storage achieves the lowest overall cost. However, the overall costs for the four alternatives can be considered to be equivalent as they are all within the range of accuracy of this planning level cost estimate RECOMMENDED ALTERNATIVE Based on the economic and non-economic evaluation, Alternative 3 (4.2 MG in-system storage) is the recommended alternative, as it is the lowest cost alternative and provides the most benefits for operations and SSO reduction. In addition, providing in-system storage greatly reduces the size of the preliminary and primary treatment facilities and flow equalization at the WWTP, which is already a tight site. Alternative 1 (Full Conveyance) is a October 2014 FINAL DRAFT 6-25 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

15 viable alternate that should be carried through California Environmental Quality Act (CEQA) review for final determination of a preferred alternative. October 2014 FINAL DRAFT 6-26 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx

16 October 2014 FINAL DRAFT 6-27 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_06.docx Table 6.13 Design Criteria Wastewater Storage Alternatives Cost Comparison Integrated Wastewater Master Plan City of San Mateo Alternative 1 Full Conveyance Alternative MG EQ Basin Alternative MG EQ Basin Alternative MG EQ Basin PWWF to WWTP (mgd) Total PWWF through New WW Dale Avenue PS (mgd) In-System Storage (MG) Storage at Detroit Drive (MG) Project Costs ($M) In-system Storage w/ Odor Control -- $78.98 $32.35 $26.06 New Dale Avenue PS w/ Odor Control $ $6.21 Headworks w/ Odor Control $49.42 $40.21 $42.21 $45.68 Sedimentation Basins w/ Odor Control $47.71 $38.00 $40.11 $43.78 Detroit Drive Storage w/ Odor Control $52.45 $22.05 $31.13 $40.67 Collection System Pipeline Projects $68.74 $44.05 $63.56 $66.82 Total Project Cost $ $ $ $ Note: (1) Costs are provided as present value based on a ENR CCI number of corresponding to the San Francisco Index in August Costs are not escalated to future years. Total project costs include a 35 percent construction cost estimating contingency and 45 percent allowance for engineering, CEQA, legal, administration, construction management, and 10% unallocated contingency.

17

18 Chapter 7 WWTP EXISTING FACILITIES AND CAPACITY EVALUATION 7.1 PURPOSE This chapter provides an overview of the existing facilities at the City of San Mateo (City)/Estero Municipal Improvement District (EMID) jointly owned Wastewater Treatment Plant (WWTP) and includes the following: A description of existing facilities including the general function and configuration of the major liquid and solid stream treatment processes at the WWTP. A history of WWTP projects, including projects implemented to accommodate growth, and projects to address new regulatory requirements. A performance assessment summarizing the historical treatment performance of the overall WWTP and the performance of each major unit process. A capacity assessment summarizing the hydraulic and process capacity of each major unit process and the overall capacity of the WWTP. 7.2 SUMMARY OF KEY FINDINGS Performance Assessment The key findings and recommendations of the performance assessment include the following: During the five-year review period, the WWTP final effluent was in full compliance with all discharge requirements included in the WWTP s National Pollutant Discharge Elimination System (NPDES) permit. The performance of the primary clarifiers, with regards to carbonaceous biochemical oxygen demand (CBOD) and total suspended solids (TSS) removal, could not be evaluated directly for the entire review period because primary effluent samples are not collected and analyzed regularly. However, primary effluent data was collected as part of the wastewater characterization sampling program conducted in May This data was used to evaluate the performance of the primary clarifiers, which appear to be working well. The process performance data for the aeration basins and secondary clarifiers is provided below: Average solids retention time (SRT) of 2.5 days, assuming four aeration basins in service. October 2014 FINAL DRAFT 7-1 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

19 Average mixed liquor suspended solids (MLSS) concentration of 1,000 milligrams per liter (mg/l). Average sludge volume index (SVI) of 176 milliliters per gram (ml/g); 90th percentile SVI of 255 ml/g. The hydraulic and solids loading rates of the gravity thickeners could not be evaluated, because primary sludge data has not historically been collected by the City. The process loading of the dissolved air floatation thickener (DAFT) was evaluated beginning in February 2012 when the City stopped sending a portion of the waste activated sludge (WAS) to the gravity thickener, to be blended with the primary sludge. The current operational mode is to send WAS to the DAFT and primary sludge to one of the gravity thickeners. In the February through May 2012 time period, the average hydraulic and solids loading rates for the DAFT were 0.5 gallons per minute per square foot (gpm/sf) and 6.8 pounds per day per square foot (ppd/sf), respectively. The performance and process loading for the anaerobic digesters could not be evaluated in the current configuration for the entire review period, because the City only began operating in series mode in October The average volatile solids reduction during the time period from October 2010 until the present was 69 percent. It is recommended that the City conduct additional process monitoring including: Regular monitoring of the primary effluent CBOD and TSS to evaluate process performance more accurately. Periodical monitoring of the primary sludge flow and concentration to evaluate process loading in the gravity thickeners in the future Hydraulic Capacity Analysis The key findings and recommendations of the hydraulic capacity analysis include the following: Primary Clarifiers 1 and 2 are a hydraulic capacity bottleneck, with the effluent weirs becoming submerged when plant influent flow reaches 20 million gallons per day (mgd). The primary clarifiers can not easily be retrofitted to fix this hydraulic limitation, so it is recommended that Primary Clarifiers 1 and 2 be replaced. Findings from the condition assessment, provided in Chapter 8, support this recommendation. The new primary treatment facilities would be designed to handle the recommended hydraulic capacity. There is a significant amount of headloss, at high flows, through the submerged gate and orifice in the Aeration Basin Influent Mixing Box at the head of the influent October 2014 FINAL DRAFT 7-2 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

20 channel, which limits the hydraulic capacity of the primary clarifiers and the aeration basins. Due to the geometry of the aeration basin influent channel, it is difficult to achieve an optimal flow split between the five aeration basins. A computational fluid dynamic (CFD) model of the influent channel is recommended to evaluate and provide recommendations to optimize the flow split. It is recommended that the design of new wastewater treatment processes include the ability to proportionately distribute the flow, such as flow splitting structures Process Capacity Analysis The key findings and recommendations of the process capacity analysis include the following: The liquid treatment process capacity is limited by the MLSS concentration and the solids loading rate of the existing secondary clarifiers under dry weather and wet weather conditions. The calculated limiting clarifier inlet MLSS concentration, with all five clarifiers in service, is approximately 1,650 mg/l assuming that the secondary flow rate is limited to 40 mgd through primary effluent bypass or upstream equalization and all aeration tanks and all secondary clarifiers are in service during wet weather. The equivalent ADWF capacity is approximately 16 mgd. With the exception of the centrifuges, the solids handling facilities have an equivalent ADWF capacity greater than the permitted ADWF of 15.7 mgd. The centrifuge hydraulic capacity of 95 gpm limits the centrifuge process capacity to approximately 14.6 mgd ADWF, with one centrifuge in standby. The simulated peak digested sludge production at this condition requires continuous (24 hours per day, 7 days per week) centrifuge operation. However, the 2003 solids dewatering improvements project included provisions for a second duty (third) centrifuge. This would double the reliable centrifuge hydraulic capacity to 190 gpm, eliminating the need for continuous centrifuge operation to handle peak digested sludge production. 7.3 PLANT HISTORY The WWTP was originally constructed in the 1930s and 1940s and has been expanded over time to accommodate growth in the service area and to provide higher levels of treatment. Major projects at the WWTP, over the years, include the following: Primary Clarifiers 1 and 2 were constructed in 1934 and 1948, respectively. These projects also included appurtenant facilities. In 1953, Primary Clarifier 3 was added to address growth in the service area. In 1968, the Administration Building, the Electrical Shop, and Effluent Pump Station No. 1 were added. October 2014 FINAL DRAFT 7-3 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

21 In 1976, a major expansion of the WWTP, including the addition of secondary treatment, was completed. The following facilities were constructed as part of the expansion: Primary Clarifier 4. Aeration Basins 1 through 4. Secondary Clarifiers 1 through 4. Effluent Pressure Filters. Chlorine Contact Basins 1 and 2. Gravity Thickeners 1 and 2. Solids Handling Building. In 1992, the following facilities were added: Influent Junction Box (IJB). Aeration Basin 5. Secondary Clarifier 5. Sodium Hypochlorite Facility. Sodium Bisulfite Facility. DAFT and Thickener Control Building. Anaerobic Digester 1. In 2005, the City completed a major solids handling project, which included the following facilities: Primary sludge and scum screening equipment. Primary sludge grit removal equipment. Anaerobic Digester 2. Digested Sludge Storage Tank. Centrifuge. Cake conveyance and storage hoppers. Figure 7.1 is a site plan of the WWTP, including all existing facilities, as well as it and illustrates how the WWTP has expanded over the decades. 7.4 DESCRIPTION OF EXISTING TREATMENT FACILITIES Treatment processes at the WWTP consist of primary clarification, secondary treatment through aeration basins and secondary clarifiers, partial effluent filtration, disinfection, and solids handling. Final effluent from the WWTP is pumped to the discharge outfall and discharged into the San Francisco Bay. The facilities are described further in the following sections and a WWTP process flow diagram is provided in Figure 7.2. October 2014 FINAL DRAFT 7-4 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

22 Sludge Storage Tank Digester Control Building Anaerobic Digester 1 Approximate Time of Construction Anaerobic Digester Maintenance Building Biofilter Gas Conditioning Facilities Biofilter Primary Clarifier 4 Solids Handling Building Cake Hopper Influent Junction Box Primary Clarifier 1 Biofilter Primary Clarifier 3 Surge Tank MCC Building Abandoned Facilities Primary Sludge Pump Building Effluent Pump Station #2 Abandoned Facilities Aeration Basins 1 Fuel Oil Storage 2 Effluent Pump Station #1 Electrical Shop Generator #5 Hypochlorite Storage Facility Thickener Control Building Administration Building Primary Clarifier 2 Gravity Sludge Thickeners DAFT Main Treatment Structure Secondary Clarifiers 1 Sodium Bisulfite Storage 1 Chlorine Contact Basins Pump Pit 4 Secondary Clarifier 5 Effluent Filters Figure 7.1 EXISTING FACILITIES LAYOUT INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO sm0914f ai

23

24 From Collection System From Collection System From Collection System From Collection System Mariner s Island Lift Station No. 59 (EMID) Dale Ave Pump Station (City) Flint Pump Station Influent Junction Box Primary Sludge and Scum Pumps Primary Clarifiers Aeration Basins RAS Pumps Secondary Clarifiers WAS Pumps Filter Feed Pump Station Effluent Pressure Filters Dissolved Air Flotation Thickeners (DAFTs) Chlorine Contact Basins Effluent Pumping Anaerobic Digester 1 Effluent Outfall Anaerobic Digester 2 Discharge to SF Bay Digested Sludge Storage Tank Centrifuges Sludge Screens Grit Pumps Grit Classifiers Sludge Flow Control Chamber Gravity Thickeners Digester Feed Pumps Cake Pump Cake Hopper Scum Screens Disposal LEGEND Liquid Stream Solids Stream Figure 7.2 EXISTING FACILITIES PROCESS FLOW SCHEMATIC INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO sm0914f ai

25

26 The WWTP has a permitted ADWF capacity rating of 15.7 mgd; and the design peak wet weather flow (PWWF) capacity for each unit process is provided in Table 7.1. Design criteria for each unit process are provided in Appendix M. Table 7.1 PWWF Design Capacity (1) Integrated Wastewater Master Plan City of San Mateo Unit Process PWWF Capacity (mgd) Influent Junction Box 60 Primary Clarifiers (2) 60 Aeration Basins 40 Secondary Clarifiers 40 Effluent Filters 40 Chlorine Contact Basins 60 Outfall 60 Note: (1) PWWF criteria from Contract No , Main Plant Expansion, HDR, May (2) Per hydraulic calculations, performed as part of this analysis, the effluent weirs on Primary Clarifiers 1 and 2 are submerged at a flow above 20 mgd Influent Flow Distribution Raw wastewater from the service area enters the WWTP at the influent junction box (IJB) through four force mains: two 30-inch lines from the Dale Avenue Pump Station (PS), one 20-inch line from EMID, and one 14-inch line from Mariner s Island. The combined influent flow passes through a six-foot parshall flume for influent flow measurement. An ultrasonic level transmitter continuously measures the water surface elevation (WSE) at the flume. This level measurement is converted to flow at the metering panel. Plant recycle flows are brought back into the IJB downstream of the flume, where the influent sample is drawn, so that recycle flows are not included in the influent flow measurement or influent concentrations. The combined influent and recycle flows are distributed over four downward opening weir gates to the four primary clarifiers. The length of each weir gate is proportional to the surface area of the corresponding clarifier, to approximate an appropriate flow split Primary Treatment The primary treatment facilities consist of four primary clarifiers, six primary sludge pumps, and three primary scum pumps. The clarifiers are center-feed, peripheral-withdrawal type clarifiers. In the clarifiers, suspended solids gradually settle to the bottom of the tanks as primary sludge. The primary effluent, the liquid portion of the flow, flows by gravity to the October 2014 FINAL DRAFT 7-7 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

27 secondary treatment facilities. Mechanical scrapers collect settled sludge and skimmer arms collect floatable scum in the primary clarifiers. There are four sludge pumps for Primary Clarifiers 1 through 3 located in the Primary Sludge Pump Building to the east of the clarifiers. Each clarifier has a dedicated sludge pump, with the fourth pump serving as standby. Primary Clarifier 4 has two dedicated sludge pumps, with one serving as standby. The primary sludge pumps pump settled solids from the primary clarifiers to the sludge screens in the Solids Handling Building for pretreatment. There is one scum pump to serve Primary Clarifiers 1 and 2, while Primary Clarifiers 3 and 4 have dedicated scum pumps. The primary scum pumps pump scum from the primary clarifiers to the scum concentrator in the Solids Handling Building. Primary effluent is typically piped to the aeration basins for secondary treatment. During extreme wet weather flow, there is the option to bypass the aeration basins and send a portion (up to 20 mgd) of the primary effluent directly to the chlorine contact basins. In December 2012, Primary Clarifier 3 experienced failure of its sludge collection mechanism. Carollo Engineers, Inc. (Carollo) prepared a technical memorandum (TM) documenting the failure and providing repair recommendations. This TM is provided as Appendix N Secondary Treatment The secondary treatment facilities include five aeration basins, seven aeration blowers, five secondary clarifiers, and return activated sludge (RAS) and waste activated sludge (WAS) pumping systems Aeration Basins Primary effluent enters the aeration basins at the activated sludge mixing box and flows through the aeration basin influent channel, where it is split amongst the five aeration basins via two submerged slide gates per basin. The aeration basins provide biological treatment by maintaining a population of microorganisms that break down organic matter present in the primary effluent. The liquid in the aeration basins is referred to as mixed liquor and the microorganisms, commonly referred to as bugs, include bacteria, protozoa and fungi. The microorganisms are naturally present in wastewater and require food and oxygen to survive. The aeration basins are supplied with dissolved oxygen so the microorganisms metabolize soluble organic matter present in the influent, and grow and multiply. The mixed liquor flows from the aeration basins to the secondary clarifiers, where the microorganisms settle out of the mixed liquor as sludge. To maintain a healthy population of microorganisms in the aeration basins, a portion of the settled sludge is returned to the aeration basins, and is referred to October 2014 FINAL DRAFT 7-8 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

28 as RAS. RAS from the secondary clarifiers is piped back to the aeration basin influent channel for distribution to the aeration basins. Air is distributed to the aeration basins with a fine bubble diffused air system. Approximately 14,840 ceramic diffusers are mounted at the bottom of the aeration basins. To meet the oxygen demand throughout the length of the basin, the diffuser density is tapered in each aeration basin Blowers Seven multi-stage, centrifugal-type blowers supply air to the aeration basins. One blower not operable due to a failure, but has not been repaired due to the redundancy in the system. The units are located in the blower room of the Main Treatment Structure. Four of the blowers are designed to deliver a maximum of 4,450 standard cubic feet per minute (scfm) each; the remaining three blowers deliver a maximum of 7,000 scfm each. Only two of the smaller blowers can be operated on emergency power. The airflow rate through the blowers can be adjusted, if desired, by adjusting the motorized inlet throttling valves. Air from the blowers is discharged into a common header for distribution to the aeration basins. Each aeration basin is equipped with two motorized valves and two laterals, for a total of ten valves and ten laterals. The laterals branch off to grids of polyvinyl chloride (PVC) piping, which are secured to the floor of each basin. The diffusers are mounted on these grids. The diffusers in Aeration Basins 1 through 4 are fine bubble ceramic diffusers, while Aeration Basin 5 has membrane diffusers. Each aeration basin is also equipped with two dissolved oxygen probes, which are used to adjust airflow to maintain a dissolved oxygen setpoint Secondary Clarifiers Mixed liquor flows from the aeration basins, over effluent weirs, and into the collection channel. It then flows through a series of isolation slide gates for distribution into the five secondary clarifiers, four square and one circular. Mixed liquor settles to the bottom of the clarifiers and the clarified liquid portion of the effluent flows over effluent weirs and to the effluent filters for further treatment. Each secondary clarifier has a sludge and scum removal system. If the effluent filters are in service, secondary effluent is collected and a portion is piped to the Filter Feed Pump Station. If the effluent filters are not in service, secondary effluent flows by gravity to the influent mixing boxes of the chlorine contact basins RAS and WAS Pumping To maintain an inventory of biomass (microorganisms), solids settled in the secondary clarifiers are continually returned to the aeration basins. The RAS flow from the four square clarifiers is pumped from the RAS wet well by any combination of six RAS pumps, each with a maximum capacity of 2,360 gallons per minute (gpm). The RAS flow from the circular October 2014 FINAL DRAFT 7-9 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

29 clarifier is pumped by one of two dedicated RAS pumps, each with a maximum capacity of 4,420 gpm. All of the RAS pumps are equipped with variable frequency drives (VFDs), so that RAS flow can be paced with WWTP influent flow. Historically, RAS has been pumped at an average rate equivalent to approximately 100 percent of the plant influent flow. However, the WWTP is currently operating the RAS pumps at a flow rate equivalent to 70 percent of the influent flow rate. The WAS pump station pumps excess solids generated in the secondary treatment process to the sludge thickening facilities. WAS is pumped from the 24-inch RAS line and piped to the DAFT for thickening prior to digestion. The WWTP currently wastes 24 hours per day, 7 days per week Effluent Pressure Filters There are six pressurized effluent filters at the WWTP, but one is currently out of service and requires extensive repair prior to being brought back on-line. Filtration of the secondary effluent is used to meet permit requirements for TSS, especially the more stringent summer requirements. A portion of the secondary effluent is typically pumped to the effluent filters through motorized valves on the discharge header of the Filter Feed Pump Station. Flow passes down through the mixed media, where solids are trapped. The media is supported by layers of gravel over the underdrain system. Filtered effluent is discharged through motorized control valves and is piped into the filtration bypass line that flows to the chlorine contact basin influent mixing boxes. Accumulated solids are flushed out of the filters by periodically pumping filtered effluent up through the media from the bottom. This backwashing can either be initiated manually or automatically based on time or high headloss through the filters Disinfection Facilities Prior to final discharge, partially filtered secondary effluent is disinfected with sodium hypochlorite. When there are peak flows greater than 40 mgd, primary effluent can be blended with the secondary effluent at the head of Chlorine Contact Basin 2 prior to hypochlorite injection. Disinfection facilities include two chlorine contact basins, chemical metering pumps and chemical storage tanks. Partially filtered secondary effluent flows through the influent channel, where it is distributed between two chlorine contact basins to the influent mixing boxes. Chemical feed pumps, located on the deck next to the contact basins, meter sodium hypochlorite from the two 1,000-gallon day tanks into each contact basin. At the entrance to the contact basins, chemical induction units diffuse and mix the sodium hypochlorite with the contact basin influent flow. Four 10,500-gallon bulk storage tanks are located at the sodium hypochlorite facility on the northeast side of the WWTP. Transfer pumps pump sodium hypochlorite solution from the bulk storage tanks to the day tanks. October 2014 FINAL DRAFT 7-10 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

30 Each contact basin has a serpentine arrangement with five passes to maximize contact with the sodium hypochlorite and minimize short-circuiting. Each basin has a length of 122 feet and a width of 37 feet, for a total volume of approximately 710,000 gallons. Prior to discharge, the disinfected effluent is dechlorinated with sodium bisulfite. The bisulfite solution is fed on the downstream side of each contact basin. Bisulfite feed pumps and bulk storage tanks are located in the Bisulfite Storage Facility. Each contact basin has an effluent weir that sets the level in the basin. Disinfected effluent flows over the effluent weirs and travels by gravity to the effluent pump station wet well for final discharge through the outfall and to the Bay Effluent Pumping Final effluent is pumped through the outfall by either of the two effluent pump stations, which discharge into a common header. A surge tank protects the outfall line from surges. Sampler pumps, automatic samplers, and a bioassay system are also located in the pump station Effluent Pump Station No. 1 Effluent Pump Station No. 1, which is used for normal dry-weather flow conditions, has four pumps, each equipped with a VFD. Two of the pumps have a rated capacity of 5,000 gpm each and two have a rated capacity of 9,000 gpm each. The pump controls are based on maintaining a level setpoint in the wet well Effluent Pump Station No. 2 Effluent Pump Station No. 2, which is used only for extreme wet-weather events, has three constant speed pumps, each with a rated capacity of 13,880 gpm. The pumps have soft starts and can be controlled by modulating the discharge valves to maintain a level setpoint, but they are typically operated manually Effluent Outfall Treated wastewater is discharged at Discharge Point 001 to the lower San Francisco Bay via a submerged outfall equipped with a multi-port diffuser. The outfall is approximately 3,700 feet offshore and 500 feet north of the San Mateo Bridge at a depth of approximately 40 feet below the mean WSE. In September 2012, Underwater Resources, Inc. (URI), performed an exterior condition assessment of the outfall diffuser and in October 2012, URI performed an interior condition assessment of approximately 3,100 feet of the outfall. Results from the condition assessments are included in Appendix O. In Fall of 2014, the City completed the outfall repair project that was recommended in URI s condition assessment. Pictures and drawings from the repair project are also included in Appendix O. October 2014 FINAL DRAFT 7-11 pw://carollo/documents/client/ca/san Mateo/8562C01/Deliverables/Master Plan Report/SM_07.docx

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

Inland Empire Utilities Agency Carollo Engineers, Inc. CH2M HILL

Inland Empire Utilities Agency Carollo Engineers, Inc. CH2M HILL TECHNICAL MEMORANDUM IEUA Wastewater Facilities Master Plan TM 8 CCWRF Future Plans PREPARED FOR: PREPARED BY: REVIEWED BY: Inland Empire Utilities Agency Carollo Engineers, Inc. CH2M HILL DATE: October

More information

SMCSD Headworks, Primary and Secondary Treatment Pre-Design

SMCSD Headworks, Primary and Secondary Treatment Pre-Design Technical Memorandum SMCSD Headworks, Primary and Secondary Treatment Pre-Design Water andenvironment Subject: Prepared For: Prepared by: Reviewed by: SMCSD Mark Takemoto, Dennis Gellerman Steve Clary

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

WASTEWATER TREATMENT PLANT AND DALE AVENUE PUMP STATION WET WEATHER CAPACITY ANALYSIS AND ALTERNATIVES EVALUATION

WASTEWATER TREATMENT PLANT AND DALE AVENUE PUMP STATION WET WEATHER CAPACITY ANALYSIS AND ALTERNATIVES EVALUATION WASTEWATER TREATMENT PLANT AND DALE AVENUE PUMP STATION WET WEATHER CAPACITY ANALYSIS AND ALTERNATIVES EVALUATION Prepared for City of San M ateo, California July 7, 2009 WASTEWATER TREATMENT PLANT AND

More information

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant Wet Weather Operating Plan July 2014 TABLE OF CONTENTS Section 1 Introduction and Overview. 1 Section 2 Wet Weather Operational Strategy....2 a.

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT 75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT Basis of Design Memorandum Design Memo No.: DM-7 (REVISED) Date: February 2005 Project/Task: 124487.001.420 Subject: Prepared by: Reviewed by: Hydraulic

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 3. EXISTING FACILITIES AND PERFORMANCE ASSESSMENT

WASTEWATER TREATMENT PLANT MASTER PLAN 3. EXISTING FACILITIES AND PERFORMANCE ASSESSMENT WASTEWATER TREATMENT PLANT MASTER PLAN 3. EXISTING FACILITIES AND PERFORMANCE ASSESSMENT This chapter reviews in detail the current condition of the individual components of the Napa Sanitation District

More information

Chapter 5: Treatment Assessment Future Condition

Chapter 5: Treatment Assessment Future Condition 2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment

More information

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing

More information

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831) FFR MONTEREY BAY UNIFIED AIR POLLUTION CONTROL DISTRICT PERMIT TO OPERATE 24580 SILVER CLOUD CT., MONTEREY, CA 93940 TELEPHONE (831) 647-9411 FAX (831) 647-8501 15018 OPERATION UNDER THIS PERMIT MUST BE

More information

Wastewater Treatment. Where does wastewater go when it leaves your house?

Wastewater Treatment. Where does wastewater go when it leaves your house? Wastewater Treatment Where does wastewater go when it leaves your house? Let s s take a look The process includes: Collection of wastewater Primary Treatment Secondary Treatment Solids Handling Influent

More information

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan Oak Orchard Wastewater Treatment Plant Wet Weather Operating Plan July 2014 TABLE OF CONTENTS Section 1 Introduction and Overview. 1 Section 2 Wet Weather Operational Strategy.3 a. Wet Weather Operation

More information

City of Hudson. Wastewater Treatment Plant Improvements. Columbia County, New York. Facility Plan. Delaware Engineering, P.C.

City of Hudson. Wastewater Treatment Plant Improvements. Columbia County, New York. Facility Plan. Delaware Engineering, P.C. City of Hudson Columbia County, New York Wastewater Treatment Plant Improvements Facility Plan Prepared By: Delaware Engineering, P.C. 28 Madison Avenue Extension Albany, New York 12203 (Phone) 518-452-1290

More information

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE City of Newark, Ohio HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE 22, 2011 High Rate Treatment Tanks/UV Wet Weather Screen Building JC2/Wet Weather Pump Station Wet Weather Control

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

Facilities Plan. Volume 2 Wastewater Facilities Assessment Report Executive Summary

Facilities Plan. Volume 2 Wastewater Facilities Assessment Report Executive Summary City of St. Joseph, Missouri Volume 2 Wastewater Facilities Assessment Report Executive Summary By Work Order No. 09-001 B&V Project 163509 October 29, 2010 Table of Contents 1.0 Introduction...1 2.0 TM-WW-1:

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope TABLE OF CONTENTS EXECUTIVE SUMMARY... Page ES-1 SECTION 1 INTRODUCTION 1.1 Background... 1-1 1.2 Purpose and Scope... 1-2 SECTION 2 BASIS OF DESIGN 2.1 Existing Discharge Permit... 2-1 2.2 Plant Capacity

More information

e~,5.eik REDDING, CALIFORNIA

e~,5.eik REDDING, CALIFORNIA e~,5.eik REDDING, CALIFORNIA Memorandum TO: Brian Huffaker, Director of Development Services DATE: January 20,2009 Hawkins Companies.~ FROM: Paul Reuter, Managing Engineer JOB NO.: 2031.01 SUBJECT: UPDATED

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION TABLE OF CONTENTS 2. Description of Water and Wastewater Systems... 2 2.1 General... 2 2.2 Existing Facilities Reference and Record Documents... 2 2.3 Existing Infrastructure Location and Legal Description...

More information

CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES

CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES Santa Clarita Valley Joint Sewerage System SCVJSS Conveyance System Solids Processing and Biosolids Management CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of Greater Chicago Today s Goals Discuss project background Provide

More information

2017 Annual Performance Report

2017 Annual Performance Report Newcastle Water Pollution Control Plant The Regional Municipality of Durham Newcastle Water Pollution Control Plant Environmental Compliance Approval (ECA): 3-2189-87-946 Dated July 26, 1994 Amendments:

More information

Notice of Preparation

Notice of Preparation Notice of Preparation To: From: County of Sacramento Department of Environmental Review and Assessment 827 7 th Street, Room 220 Sacramento, CA 95814 (916) 874-7914 Contact: Dennis E. Yeast Subject: Notice

More information

Operation and Control of Multiple BNR Processes in One WWTP

Operation and Control of Multiple BNR Processes in One WWTP Operation and Control of Multiple BNR Processes in One WWTP CENTRAL PLANT Williamsport Sanitary Authority s Chesapeake Bay and CSO Compliance Program Presented by: Phil Anderson 1 June 24, 2015 Purpose

More information

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope TABLE OF CONTENTS Page EXECUTIVE SUMMARY... ES-1 SECTION 1 INTRODUCTION 1.1 Background... 1-1 1.2 Purpose and Scope... 1-2 SECTION 2 HYDRAULIC AND PROCESS ASSESSMENT 2.1 Data Gathering and Analysis...

More information

WWTF Capacity Assessment Project

WWTF Capacity Assessment Project Wastewater Treatment Facility Evaluation The Richland WWTF was constructed in 1985 to provide primary and secondary treatment for the City's wastewater. Section 3 includes a general description of the

More information

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006 Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: 13649553 Issue Date: October 23, 2006 Subject: WWTP Condition Assessment Auburn Plant 1. Grit Removal:

More information

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three

More information

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City has the oldest wastewater system in Gaza Strip; it consists of some of 280 kilometers

More information

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7.1 Description This alternative considers expanding the capacity of the existing lagoon treatment facility and changing the discharge

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment A Technical Memorandum Date: Project: Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation Subject: Task 3 Existing Grit Removal System Assessment This memorandum presents

More information

Pierce County Public Works and Utilities Sewer Utility Unified Sewer Plan Update

Pierce County Public Works and Utilities Sewer Utility Unified Sewer Plan Update Chambers Creek Wasterwater Treatment Plant Existing Treatment 4.1 Chambers Creek Regional Wastewater Treatment Plant (WWTP) 4.2 Biosolids at Chambers Creek Regional WWTP 4.3 Volume & Loading Characteristics

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities

Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities Thor Young 1* and Kristi Perri 1 1 GHD Inc., Bowie, Maryland * Email: thor.young@ghd.com ABSTRACT Flow conveyance

More information

Technical Memorandum No. 1

Technical Memorandum No. 1 To: From: Steve McGowan, P.E., BCEE Project Manager, Malcolm Pirnie, Inc. Eric Wang, P.E. Project Engineer, Malcolm Pirnie, Inc. Date: Subject: August 11, 28 (Final) Madison MSD Project No. 84251 Malcolm

More information

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology Environmental Improvements Associated with Springfield WWTP EHRT Tuesday, June 23 9:30 am Using the Compressed Media Filter Technology WWETCO WWETCO FlexFilter ENGINEERS CLUB OF ST. LOUIS Performance Testing

More information

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program DISCUSSION PAPER Capital Regional District Core Area Wastewater Management Program Macaulay/McLoughlin Point Wastewater Treatment Plant Discussion Paper Liquid Process Alternatives Evaluation 034-DP-1

More information

Inland Empire Utilities Agency CH2M HILL

Inland Empire Utilities Agency CH2M HILL TECHNICAL MEMORANDUM IEUA Wastewater Facilities Master Plan TM 6 RP-4 Future Plans PREPARED FOR: PREPARED BY: Inland Empire Utilities Agency CH2M HILL DATE: October 29, 2014 Executive Summary... 2 1.0

More information

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor J. Komorita 1, P. Burke 2, B. Youker 2, and G. Crawford 2 1 King County, 2 CH2M HILL ABSTRACT Many Membrane Bioreactor (MBR)

More information

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities Agenda Item IV A-1 (TAHOE) Meeting Date: 11-04-16 Douglas County Sewer Improvement District #1 Wastewater Reclamation Facilities Douglas County Sewer Improvement District No. 1 Wastewater Reclamation Plant

More information

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul

More information

UPGRADING FOR TOTAL NITROGEN REMOVAL WITH A POROUS MEDIA IFAS SYSTEM

UPGRADING FOR TOTAL NITROGEN REMOVAL WITH A POROUS MEDIA IFAS SYSTEM UPGRADING FOR TOTAL NITROGEN REMOVAL WITH A POROUS MEDIA IFAS SYSTEM T. Masterson, J. Federico, G. Hedman, S. Duerr BETA Group, Inc. 6 Blackstone Valley Place Lincoln, Rhode Island 02865 ABSTRACT The Westerly,

More information

A SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT

A SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT A SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT Timothy R. Tekippe, P.E.,* Robert J. Hoffman, P.E.,* Ronald J. Matheson,** Barry Pomeroy** *Carollo

More information

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL Alvin C. Firmin CDM Jefferson Mill, 670 North Commercial Street Suite 201 Manchester, New Hampshire 03101 ABSTRACT Sequencing

More information

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant April 7, 2014 Prepared by Jerry Blain, P.E., Project Associate Environmental Finance Center Funding for this Energy Assessment was provided

More information

Table of Contents TABLE OF CONTENTS... II LIST OF FIGURES... V LIST OF TABLES... VI EXECUTIVE SUMMARY... VII 1.0 INTRODUCTION... 1

Table of Contents TABLE OF CONTENTS... II LIST OF FIGURES... V LIST OF TABLES... VI EXECUTIVE SUMMARY... VII 1.0 INTRODUCTION... 1 Master Plan Table of Contents TABLE OF CONTENTS... II LIST OF FIGURES... V LIST OF TABLES... VI EXECUTIVE SUMMARY... VII 1.0 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 PURPOSE AND SCOPE... 1 1.3 ABBREVIATIONS

More information

Anderson Water Pollution Control Plant

Anderson Water Pollution Control Plant City of Anderson Wastewater Division Public Works Director Jeff Kiser Chief Plant Operator Plant Supervisor Operator III Operator I Phil DeBlasio Mike Hansen Tony Hinchliff Vacant Collections Supervisor

More information

Ditches for Energy Efficiency and Improved Nitrogen Removal

Ditches for Energy Efficiency and Improved Nitrogen Removal Upgrade of the Big Gulch WWTP Oxidation Ditches for Energy Efficiency and Improved Nitrogen Removal Thomas G. Authors: Thomas E. Coleman, dtec Systems Bridges, Mukilteo Water & Wastewater District Bend,

More information

RENNIA ENGINEERING DESIGN, PLLC CIVIL ENVIRONMENTAL STRUCTURAL. Report. Conceptual Wastewater Facility Plan. Olivet Center.

RENNIA ENGINEERING DESIGN, PLLC CIVIL ENVIRONMENTAL STRUCTURAL. Report. Conceptual Wastewater Facility Plan. Olivet Center. Report Conceptual Wastewater Facility Plan Olivet Center Town of Dover, NY APPLICANT: Olivet Management LLC 73 Wheeler Road Wingdale, NY 12594 LOCATION: NYS Route 22 and Wheeler Road Wingdale, NY 12594

More information

Compact Waste Water Treatment MBR /MBBR Technology

Compact Waste Water Treatment MBR /MBBR Technology Compact Waste Water Treatment MBR /MBBR Technology 1 Minimal Operation and Maintenance Costs and use of Chemicals 2 Recycle and Reuse water for Irrigation and Recreation 3 Save Water, Energy, Money and

More information

Inland Empire Utilities Agency CH2M HILL

Inland Empire Utilities Agency CH2M HILL TECHNICAL MEMORANDUM IEUA Wastewater Facilities Master Plan TM 5 RP-1 Future Plans PREPARED FOR: PREPARED BY: Inland Empire Utilities Agency CH2M HILL DATE: October 31, 2014 Executive Summary... 2 1.0

More information

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES Oxidation ditches are very popular wastewater treatment processes for small to medium sized municipalities that

More information

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT Chester Yang, Ph.D., Gaowei Gu, Baowei Li, Hongyuan Li, Wanshen Lu, Lloyd Johnson,

More information

Aeration Blower Requirements. Tom Jenkins 06/15/2016

Aeration Blower Requirements. Tom Jenkins 06/15/2016 Aeration Blower Requirements Tom Jenkins 06/15/2016 Aeration blowers receive a lot of attention from design engineers, suppliers, and end users. That is understandable since blowers account for more than

More information

SETTLING REVIEW CHECKLIST

SETTLING REVIEW CHECKLIST SETTLING REVIEW CHECKLIST Water Quality Wastewater Technical Review and Guidance FACILITY NAME CONSULTING ENGINEER DATE Water/Wastewater/#5.73, May 2001 SITE INSPECTION (DATE & INSPECTOR) PLANNING OR DESIGN

More information

CHAPTER 10 PRELIMINARY TREATMENT

CHAPTER 10 PRELIMINARY TREATMENT CHAPTER 10 PRELIMINARY TREATMENT TM 5-814-3/AFM 88-11, Volume III 10-1. General considerations. Preliminary treatment of wastewater includes screening, grinding, grit removal, flotation, equilization,

More information

Attachment N o F Control & Monitoring

Attachment N o F Control & Monitoring Attachment N o F Control & Monitoring Attachment F1: Treatment, Abatement and Control Systems Air There is no treatment or abatement systems required for the minor air emission points or the potential

More information

When confronted with increasing peaking. Managing the deluge

When confronted with increasing peaking. Managing the deluge Located on more than 121 ha (300 ac) of land, the Trinity River Authority (Dallas) Central Regional Wastewater water resource recovery facility is an advanced secondary treatment facility and a winner

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

WWETCO FlexFilter and Bio-FlexFilter

WWETCO FlexFilter and Bio-FlexFilter Innovative Filter Technology Tool for Reducing Energy, Expanding Capacity, Wet Weather Management and Nutrient Control WWETCO WWETCO FlexFilter and Bio-FlexFilter AGENDA WWETCO FlexFilter & Bio-FlexFilter

More information

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY City of Modesto Wastewater Treatment Master Plan Jennings Road Secondary Treatment Facility WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY DRAFT June 2008 2700 YGNACIO VALLEY ROAD, SUITE

More information

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:

More information

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors: CHAPTER 5 Project Alternatives 5.1 Introduction The purpose of the alternatives analysis in an environmental impact report (EIR) is to describe a range of reasonable alternatives to the project that could

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

Liquid Stream Fundamentals: Grit Removal

Liquid Stream Fundamentals: Grit Removal FACT SHEET Liquid Stream Fundamentals: Grit Removal Grit removal is an essential component of the wastewater treatment process. Not only does the removal of grit help protect downstream equipment from

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project

More information

Comprehensive Biosolids and Bioenergy Planning Authors: Cameron Clark* 1, Irina Lukicheva 1, Anna James 1, Kathy Rosinski 1, Dave Parry 1

Comprehensive Biosolids and Bioenergy Planning Authors: Cameron Clark* 1, Irina Lukicheva 1, Anna James 1, Kathy Rosinski 1, Dave Parry 1 Comprehensive Biosolids and Bioenergy Planning Authors: Cameron Clark* 1, Irina Lukicheva 1, Anna James 1, Kathy Rosinski 1, Dave Parry 1 1 CH2M *Email: Cameron.Clark@ch2m.com KEYWORDS: biosolids, bioenergy,

More information

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system

More information

City of Oxnard. Public Works Integrated Master Plan WASTEWATER PROJECT MEMORANDUM 3.4 TREATMENT PLANT PERFORMANCE AND CAPACITY

City of Oxnard. Public Works Integrated Master Plan WASTEWATER PROJECT MEMORANDUM 3.4 TREATMENT PLANT PERFORMANCE AND CAPACITY This document is released for the purpose of information exchange review and planning only under the authority of Hugh Steve McDonald, December 2015, State of California, PE No. 44074 and Tracy Anne Clinton,

More information

BIOLOGICAL WASTEWATER BASICS

BIOLOGICAL WASTEWATER BASICS BIOLOGICAL WASTEWATER BASICS PRESENTATION GOALS EXPLAIN DIFFERENT TYPES OF WASTEWATER EXPLAIN THE DIFFERENT BIOLOGICAL SYSTEMS AND HOW THEY FUNCTION. COMPARE AND CONTRAST AEROBIC AND ANAEROBIC SYSTEMS

More information

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WEFTEC.06. **Cobb County Water System, Marietta, Georgia CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick

More information

6.2 Umgeni Water Owned Wastewater Works

6.2 Umgeni Water Owned Wastewater Works 6. WASTEWATER 6.1 Overview Umgeni Water owns and operates the Darvill and Ixopo Wastewater Works (WWW), but manages a number of other WWW on behalf of Municipalities. Management contracts are in place

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

Duffin Creek Water Pollution Control Plant Technical Information

Duffin Creek Water Pollution Control Plant Technical Information Duffin Creek Water Pollution Control Plant Technical Information Plant History The Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in the City of Pickering

More information

Zero Liquid Discharge Project Extends Potable Water Supplies

Zero Liquid Discharge Project Extends Potable Water Supplies http://dx.doi.org/10.5991/opf.2014.40.0078 Ryan R. Popko, PE, and Phillip J. Locke, PE, are with McKim & Creed (www.mckimcreed.com), Clearwater, Fla. Fred J. Greiner is with the city of Palm Coast, Fla.

More information

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1 APPENDIX A PRELIMINARY TECHNICAL SPECIFICATIONS FOR BIOSOLIDS MANAGEMENT SERVICES JEA Buckman Residuals Management Facility 1. Background JEA is seeking biosolids management services from experienced biosolids

More information

Request for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements

Request for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements For Wastewater Treatment Plant Expansion and other Plant Improvements By the City of Tracy April 31, 2017 Response Due: Wednesday, May 31, 2017 @ 3:00 PM City of Tracy Development Services Attention: Ripon

More information

Conceptual Design for a Future Wastewater Treatment Plant

Conceptual Design for a Future Wastewater Treatment Plant Wastewater Master Plan DWSD Project No. CS-1314 Conceptual Design for a Future Wastewater Treatment Plant Technical Memorandum Original Date: April 1, 2003 Revision Date: September 2003 Author: CDM Table

More information

APPENDIX D ONSITE WASTEWATER TREATMENT TECHNICAL MEMORANDUM

APPENDIX D ONSITE WASTEWATER TREATMENT TECHNICAL MEMORANDUM APPENDIX D ONSITE WASTEWATER TREATMENT TECHNICAL MEMORANDUM DRAFT FINAL TECHNICAL MEMORANDUM Crystal Geyser Onsite Wastewater Treatment PREPARED FOR: Richard Weklych/Crystal Geyser Barbara Brenner/Churchwell

More information

Wet Weather Conveyance and Treatment Evaluation

Wet Weather Conveyance and Treatment Evaluation Wet Weather Conveyance and Treatment Evaluation SausalitoMarin City Sanitary District February 2008 Innovative Solutions for Water and the Environment SausalitoMarin City Sanitary District Wet Weather

More information

CLR Process. Vertical Loop Configuration

CLR Process. Vertical Loop Configuration CLR Process Vertical Loop Configuration Vertical Configuration System Flexibility Parallel Operation Raw wastewater and return activated sludge are introduced at a single point in each standard CLR basin.

More information

Appendix D JWPCP Background and NDN

Appendix D JWPCP Background and NDN Appendix D JWPCP Background and NDN JWPCP Background JWPCP Water Quality Primary Clarifiers HPO Reactors Final Clarifiers Unit Influent Primary Effluent Secondary Effluent BOD mg/l 460 240

More information

OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS

OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS Authors: Andrea Giordano Luigi Petta ENEA, Ente per le Nuove Tecnologie, l Energia e l Ambiente Bologna, Italy Keywords: Maintenance, Wastewater,

More information

CEDAR CREEK Wastewater Treatment Facility

CEDAR CREEK Wastewater Treatment Facility CEDAR CREEK Wastewater Treatment Facility Where does the waste originate Private homes Businesses from? Condominium complexes Nursing homes Apartments ANY DWELING THAT USES WATER AND IS CONNECTED TO THE

More information

City of Girard, Ohio

City of Girard, Ohio BASIS OF DESIGN REPORT Girard Wastewater Treatment Facility Peak Flow Treatment and Equalization Improvements April 12, 2017 TABLE OF CONTENTS PAGE 1.0 INTRODUCTION 1 2.0 EXISTING & FUTURE FLOWS 3 3.0

More information

Wet Weather Planning for Wastewater Treatment Plants

Wet Weather Planning for Wastewater Treatment Plants Wet Weather Planning for Wastewater Treatment Plants June 23, 217 Peak Flow Management: Collection vs. Treatment Collection System Peak Flow Management Single 24 hour design storm I/I reduction SSO elimination

More information

Turbo4bio System For the Treatment of Sewage & Organic Effluents

Turbo4bio System For the Treatment of Sewage & Organic Effluents Turbo4bio System For the Treatment of Sewage & Organic Effluents Dr.Hans. H.Badreddine President Turbo4bio Page 1 Executive Summary The Turbo4bio system has been patented in the UK and Europe by Hans Bioshaft

More information

CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM. Cost Estimates... 3

CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM. Cost Estimates... 3 Technical Memorandum Date: To: Prepared by: Reviewed by: Project: Subject: Rick Koon District Manager Phone: (805) 995-3290 Cayucos Sanitary District 200 Ash Avenue Cayucos, CA 93403 Dylan Wade, P.E.,

More information