Non-Revenue Water (NRW) and Cost Recovery in Urban India: Case of Bangalore. Maitreyee Mukherjee a Namrata Chindarkar b Jenny Grönwall c

Size: px
Start display at page:

Download "Non-Revenue Water (NRW) and Cost Recovery in Urban India: Case of Bangalore. Maitreyee Mukherjee a Namrata Chindarkar b Jenny Grönwall c"

Transcription

1 Non-Revenue Water (NRW) and Cost Recovery in Urban India: Case of Bangalore Maitreyee Mukherjee a Namrata Chindarkar b Jenny Grönwall c a Corresponding Author: Institute of Water Policy, National University of Singapore, 469C Bukit Timah Road, Singapore ; sppmamu@nus.edu.sg b Lee Kuan Yew School of Public Policy, National University of Singapore, 469C Bukit Timah Road, Singapore c Stockholm International Water Institute, Linnégatan 87A, Box , Stockholm, Sweden ABSTRACT This paper examines the issue of non-revenue water (NRW) in urban India taking the city of Bangalore as a case study. Using empirical evidence from a survey conducted among 601 lowincome households in Bangalore, we investigate the major sources of NRW for water utilities and propose policy recommendations based on the analysis. Our key finding is that public stand posts and public wells, which supply free water, are a non-trivial source of NRW. In addition, we find that revenue generation from metered tap connections is sub-optimal. Further, we observe potential revenue being shifted away from the public water utilities towards private providers as several households pay for water obtained from neighbors, tankers, or other private sources. Drawing upon our findings, we propose a new tariff structure for urban water utilities to consider. We also review the implementation of pre-payment metering (PPM) for public stand posts in other developing countries and its feasibility in Bangalore. Key words Increasing block tariff; Non-revenue water; Pre-payment metering; Urban water; Volumetric pricing 1

2 1. INTRODUCTION The Planning Commission of India (2012) estimates that the country s urban population comprising 380 million people (as per 2011 census) is predicted to increase to 600 million by Rapid urbanization in India has been accompanied with severe resource constraints, especially water. This poses a tough challenge for policymakers. While water demand management has been at the core of most urban policy discussions, an issue that has not been sufficiently addressed is that of non-revenue water (NRW). Formally, NRW is the difference between the volume of water put in the distribution system and the volume that is ultimately billed to consumers (Kingdom et al., 2006). It comprises of real and apparent losses to the water utilities. Real losses are caused by poor infrastructure, which results in losses from the raw water source to the final consumer. Apparent losses on the other hand are associated with inadequate metering, incompetent tariff structure, and unauthorized consumption (Alegre et al., 2000; Frauendorfer et al., 2010). In developing countries such as India, NRW is associated with ageing infrastructure, apparent losses, and corruption (Gonzalez-Gomez et al., 2011). It is argued that poor management capacity and weak institutions augment the losses for water utilities in these countries. Reducing NRW requires skilled staff such as engineers and a crew of plumbers as well as managers with autonomy and decision-making ability (Kingdom et al., 2006). Often, the decisions that need to be made are politically unfavorable such as disconnecting unauthorized connections in urban slums, which in India form critical vote banks. Moreover, it is argued that the water utilities are particularly prone to corruption and political manipulation. As water utilities in India are monopolistic government agencies, they suffer from problems of non-transparency and imperfect information (Elshorst & O Leary, 2005). A further issue pertaining to NRW in urban India is that of tariff structure and cost recovery. The main sources of revenue for water utilities are water taxes that are based on property values and water user charges that are based on volumetric consumption (Singh et al., 2005). A study by the World Bank and the National Institute of Urban Affairs (NIUA) found that of 260 cities and towns surveyed in India, 36% implemented the fixed rate per household per month tariff structure, which was the highest proportion. Only 6% implemented increasing block tariff (IBT), 2

3 while only 2% implemented a combination of fixed rate and IBT (NIUA, 2001). In addition, pricing or optimal tariff rate is also an issue. The NIUA study found that tariff structures set in most cities do not reflect actual costs incurred. The average operating and maintenance (O&M) cost in metropolitan cities is INR 15/m 3. However, the typical water user charge is between INR /m 3. 1 The figures highlight the inefficient tariff structure and low cost recovery by water utilities in urban India. Even though the problem of NRW in urban India is acknowledged by policymakers, a significant gap is the lack of empirical evidence at the household-level on the extent of NRW due to apparent losses. In this paper, we aim to address this gap using the case study of Bangalore. Using a household survey conducted by the Institute of Water Policy (IWP), National University of Singapore in the urban slums of Bangalore in we examine whether public stand posts and public wells are notable sources of NRW. We also assess whether water utilities are losing revenue due to insufficient metering. To delve into other plausible reasons for NRW, we examine whether revenue is being shifted away from water utilities towards private providers, due to the poor quality or absence of supply. The survey consists of a sample of 601 households in six wards. It focused only on households residing in urban slums. This was because these households depend largely on public stand posts and public wells, for which there are no water user charges. 2 Further, these areas tend to have inadequate metering and a high proportion of unauthorized connections. Our findings suggest that public stand posts and public wells, which are provided by the water utility for free, are nontrivial sources of NRW. In addition, we find that revenue generation from metered tap connections is sub-optimal. We also observe potential revenue being shifted away from the public water utility towards private providers as several households pay for water obtained from neighbors, tankers, or other private sources. 1 The figures in the study reflect 2001 prices but are nevertheless useful for purposes of illustration. 1 Indian Rupee (INR) = USD as of May 30, As will be discussed in subsequent sections, water provided through public stand posts and public wells has a high cost of production. While making explicit normative arguments is beyond the scope of this paper, we propose policy recommendations taking the equity aspect into consideration. 3

4 Drawing upon our findings we propose policy options which can potentially help reduce NRW in urban India more generally, as slum settlements and inadequate metering are common across cities. Specifically, we propose a revised volumetric pricing model for domestic consumers, which would recover the cost of production of water and ensure that the low-income households are not burdened. In addition, we provide a review of pre-paid smart card water metering policies from developing countries, which have been used for public stand posts. We argue that in addition to generating revenue, these policy options are likely to induce conservation among consumers. Our recommendations are based on our findings from the survey and are plausibly different from the course of action proposed by Bangalore s water utility board. Interviews with officials from the Bangalore Water Supply and Sewerage Board (BWSSB) suggested that there might be eventual phasing out of public stand posts, replacing them with private metered connections for each slum household, which would be billed under a new tariff structure. The feasibility of this policy is unknown in the light of issues pertaining to illegal squatting and lack of proper home ownership titles. While we acknowledge these concerns, we consider them beyond the purview of our data and analysis. This paper is organized as follows. Section 2 provides a brief overview of NRW in Bangalore due to real losses, current tariff structure, and status of metering. Sections 3.1 and 3.2 present the empirical analysis of NRW and discuss the results. Section 4 proposes policy options and section 5 concludes. 2. CURRENT UNDERSTANDING OF NRW IN BANGALORE Over the past couple of decades, Bangalore has experienced rapid urbanization and population growth, stressing its available water resources. Presently, the city s water supply is largely dependent on the Cauvery Water Supply Scheme, which was first commissioned in 1974, and subsequently improved through stages I, II, III and IV (Table 1). Water is pumped to the city, through a distance of around 100 kilometers and at an elevation of 500 meters. The water is stored at T.K Halli reservoir, treated, and distributed to the city. This involves significant expenditure on electricity, costing nearly INR 5 billion (10 9 ) (USD 82.4 million) annually 4

5 (Central Groundwater Board, 2008). According to the Cauvery River Water Disputes Tribunal, Bangalore can withdraw a maximum of 538 million m 3 of water per year. At this level, the average daily extraction limit is about 1425 MLD. 3 With completion of the Cauvery Stage IV Phase II infrastructure scheme in 2012, the city is already pumping around 1410 MLD each day, of which about 30% is lost to leakage, designated as NRW due to real losses (The Times of India, 22 Feb 2013). Hence only about 900 MLD are received by the city, which is much less than the current demand of about 1700 MLD (BWSSB, 2013). Table 1. Projected provision of Cauvery Water Supply Scheme (CWSS) for Bangalore Year of commissioning Stage of CWSS Potential supply (MLD) 1974 I II III IV, Phase I IV, Phase I IV, Phase II 500 Source: BWSSB The city s main water utility is the Bangalore Water Supply and Sewerage Board (BWSSB), which is a government agency. Though the networks for surface water and sewage distribution have gradually expanded beyond the city core, the BWSSB service area is essentially limited to the city core and former city municipal councils (CMCs) under the Greater Bangalore Water and Sewerage Project (GBWASP). About 110 former villages at the fringes remain under the jurisdiction of Bruhat Bangalore Mahanagara Palike (BBMP), which is also a government agency. The IWP survey revealed that the core area of the city receives better service with regular Cauvery water supply, with the frequency being daily or every other day. However, the situation changes as one moves towards the newly added non-core areas, where the supply by the water utility board is unreliable. 3 1 MLD (million liters per day) = 1000 m 3 per day. 5

6 All BWSSB tap connections are claimed to be metered and water deliveries are charged according to a fixed rate 4. The tariff structure is different for domestic and commercial consumers. Moreover, apart from the piped connections, there are monthly charges for bore wells dug by individual households or commercial enterprises. The current domestic tariff structure includes five consumption blocks and a separate flat tariff for apartments (Table 2). This volumetric block tariff was last revised in February Since then, there have been two electricity tariff hikes, resulting in a 46% increase in BWSSB s power expenditures. Moreover, it is estimated that the real incurred cost of production and distribution of Cauvery water to the city is INR 32 per m 3 (Times of India, 7 Jul 2013). A simple comparison of the cost of production with the current tariff structure reveals that the revenue generated is inadequate to meet BWSSB s expenditure and deficits. It is estimated that not increasing its water charges in accordance with electricity tariff hikes has resulted in a loss of nearly INR 24 million from to for BWSSB. In spite of this loss, BWSSB has undertaken several capital investments in developing infrastructure for extension of the Cauvery Drinking Water project, Cauvery Stage IV Phase II project, and others 6 (The New Indian Express, 11 May 2013). Figure 1 graphically summarizes our preliminary analysis using secondary sources of total water loss starting from extraction of raw water from Cauvery to its delivery to households in the city. While transferring raw water (approximately 1410 MLD) from Cauvery to Bangalore city, 30% is estimated to be lost in transaction (The Times of India, 22 Feb 2013). Provision of water, at no charge through public stand posts and public wells, accounts for about 20% of the water distributed in Bangalore (Connors & Brocklehurst, 2006). Hence, public stand posts seem to be potential sources of NRW, which we will examine further. Additional sources of unaccounted 4 It is estimated that BWSSB has about 800,000 connections currently. From these, it generates INR 450 million in revenue, of which INR 350 million it has to spend as electricity costs and INR 100 million are other operating costs (The New Indian Express, 17 Oct 2013). 5 A revised tariff only for apartments was announced on July 7, However, the price blocks for the majority of consumers have not been revised. 6 The funds to offset deficit (due to subsidies and insufficient revenue collection) and undertake new projects have mostly come from government grants, BCC (Beneficiary Capital Contribution), market borrowings, and other international agency loans like those from Japan International Cooperation Agency (JICA), Japan Bank for International Cooperation (JBIC), World Bank etc. [BWSSB website: ; [AQ2] 6

7 losses during distribution include leakage, illegal connections, and faulty or defunct meters for which there is no official estimate available. Further, there is the issue of the inefficient tariff structure that fails to ensure minimum cost recovery. In subsequent sections of this paper, we examine in detail the revenue losses from different water supply sources. Table 2. Current domestic water tariff structure of BWSSB Water delivered (m 3 /month) Rate (INR per m 3 ) >75 36 High rise building/apartments residents 19* Source: BWSSB Note: There is a minimum monthly charge of INR 48, which is collected from all domestic customers. *Revised tariff for apartments as announced on July 7, Tariff charged as flat rate per m 3 of water. <Figure 1 about here> 3. EMPIRICAL ANALYSIS OF NRW 3.1 Data and results The IWP survey was conducted in six wards of Bangalore city to ensure representation of urban low-income households from the city core as well as the non-core areas. A sample of 100 households was randomly drawn from each of the six wards - Halsoor, Hebbal, Vijinapura, Kengeri, Shettihalli, and Bellanduru (Figure 2 and Table 3). <Figure 2 about here> 7

8 Table 3. Characteristics of the six wards included in the IWP survey Ward Estimated Area Water Utility Level of urbanization population (sq.kms) Board Bellandur 20, former villages BBMP Halsoor 35, core city area BWSSB Hebbal 24, core city area BWSSB Vijinapura 35, former CMC BWSSB Shettihalli partly former villages and partly former CMC BBMP & BWSSB Kengeri 24, former TMC BWSSB Source: BBMP website Note: BWSSB- Bangalore Water and Sewerage Supply Board; BBMP- Bruhat Bengaluru Mahanagara Palike; CMC- City Municipal Corporation; TMC- Town Municipal Corporation. Table 4 summarizes the various sources of water reported by the households. More than half of the survey respondents in Halsoor, and almost two thirds of those in Hebbal, report having access to an individual tap connection, providing them with water from the Cauvery River. The rest of the wards are mostly supplied by groundwater from bore wells (either through public stand posts or individual connections). The proportion of households obtaining water from a public stand post is highest in Kengeri (60%) and lowest in Vijinapura (4%). Although fair proportions of the Vijinapura households (22%) report obtaining water from tap connections supplied by a bore well, the public supply system at the time of the survey was poor (being supplied once or twice a month), forcing respondents to buy water from private wells or tankers. Another distinct water supply source found only in Vijinapura was private tankers sent by politicians. Respondents reported getting water free of charge from tankers supplied by politicians contesting the May 2013 state assembly elections. 8

9 Table 4. Sources of water reported by respondents Ward Households with bore well supplied tap connection (%) Households with Cauvery water supplied tap connection (%) Households depending upon public stand posts (%) Households depending upon private suppliers (%) Halsoor Hebbal Vijinapura Kengeri Bellandur Shettihalli Source: IWP survey of households, N=601 Note: The water sources are not unique and therefore the numbers may not add up to 100%. Table 5 summarizes the extent of metering among households connected to the Cauvery water tap connections while the primary water source for the households and whether they pay for it is summarized in Table 6. Proportion of metered tap connections is highest in Hebbal (87%) and Vijinapura (81%). However, it is relatively low in Halsoor (66%) and much lower in Kengeri (39%), Bellandur (29%), and Shettihalli (12%). The three main primary sources of daily water supply that emerged were individual tap connections (192 households), public stand posts (176), and private providers (180). Of those households relying primarily on an individual tap connection, 63% report paying for water, while 61% of those relying on private providers pay for their water. It is important to highlight here that the 63% who reported paying for individual tap connection are the ones who regularly pay water bills. 7 Only 2.3% of the households relying primarily on a public stand post report paying for water, while a small number relying on public wells did not pay for water at all. It was noted that a substantial proportion of households relying on private sources did not have to pay for 7 The remaining households in the sample were either yet to get a metered connection or had faulty meters and therefore were not paying water bills. There were also respondents who were receiving monthly bills but complained that the water supply was insufficient and too irregular. Residents paying bills reported the value to be ranging from INR Taken as a proportion of the total sample of 601 households, approximately 20% were paying regular water bills for their individual metered connections. 9

10 water as they were land owners themselves and owned private bore wells inside their household premises. Another category of households depending on private sources were tenants, who reported that water charges were incorporated in their rents. A few households also reported receiving water from neighbors, temples, or construction sites for free as a gesture of goodwill and therefore did not pay for it. Table 5. Proportion of metered tap connections Ward % Metered % Non-metered Halsoor Hebbal Vijinapura Kengeri Bellandur Shettihalli Total Source: IWP survey of households, N=601. Table 6. Primary water sources and payment status Primary source of daily water supply Number of respondents reporting the source as primary, and the proportion of those respondents who pay for water from that source Number Proportion who pay (%) Individual tap connection Public stand post Public well 8 0 Private provider Combination Total

11 Source: IWP survey of households, N=599. Of the 601 households interviewed, two households in Bellandur report a nearby lake as their primary water source. Combination refers to those households which access water from both public as well as private sources In Table 7 we examine the distribution of households by income category and whether they pay for accessing water from public sources, that is, water supplied by water utility boards. We observe that within each income category a majority of the households do not pay for accessing water from public sources. This is true even for households with income of INR 30,000 and above. Interestingly, the proportion of households paying for water from public sources decreases as we move to higher income categories. A plausible reason could be that many households in the higher income categories own private bore wells and therefore may not be accessing water from public sources. However, the relationship between income category and paying for public water sources is not statistically significant as the chi-squared statistic is 9.12 with a p-value of Table 7. Distribution of households obtaining water from public sources by income and their payment status Income category (INR per month) Number of respondents in each income category, and the proportion of those respondents who pay for water from a public water source Number Proportion who pay (%) 0 to 5, ,000 to 10, ,000 to 15, ,000 to 20, ,000 to 25, ,000 to 30, More than 30, Source: IWP survey of households, N=407. These data pertain to households with access to public water sources, which include individual connections, public stand posts, and public wells. 11

12 In Table 8, we look at the distribution of households by income category and whether they pay for accessing water from private providers like tankers, neighbors, and other sources. Interestingly, we observe that even in the lowest income categories the proportion of households paying for water from private providers is either higher or nearly the same as that of those paying for accessing public water supply. Therefore, there is some evidence that in the absence of public water supply, lower income households are likely to pay to access water from private providers. Table 8. Distribution of households obtaining water from private sources by income and their payment status Income category (INR per month) Number of respondents in each income category, and the proportion of those respondents who pay for water from a private water source Number Proportion who pay (%) 0 to 5, ,000 to 10, ,000 to 15, ,000 to 20, ,000 to 25, ,000 to 30, More than 30, Source: IWP survey of households, N=249. These data pertain to households with access to a private water supply. 3.2 Discussion Our findings reveal that only 63% of all households with individual connections are metered. Among the six surveyed wards, Halsoor and Hebbal have the highest proportion of households with tap connections supplying Cauvery water. The other four wards have less than 10% of households with access to Cauvery water tap connections (except Kengeri, with 16%). Vijinapura, which lies just at the border of the core area, was found to be the most water scarce with inadequate public water supply through tap connections and even the public stand posts (through bore wells) provided water to the residents only once or twice a month, leading to high dependency on private providers. 12

13 Our empirical analysis finds that irrespective of regularity of supply or access to surface or groundwater, nearly 30% of all households depend upon public stand posts as their primary or fallback water source, and nearly all pay no water user charges, thus making it a non-trivial source of NRW. The magnitude of this loss seems even more significant in the core areas because the public stand posts and public wells here are being fed by Cauvery water, whose cost of production is estimated to be INR 32/m 3. In addition, we also find that nearly 37% (Table 6) of the households in the sample with metered tap connections do not pay any water user charges. In-depth responses revealed that this is either due to faulty meters or non-installation of meters at the time of the survey. Some of the households were also suspected to have illegal connections. Many households were highly unsatisfied because of irregular supply and hence felt no necessity to pay a water tariff. Thus, even metering does not seem to guarantee revenue generation for the water utility boards in Bangalore. We further find that households in the lowest income category pay for water from private providers if they have no access to water from public sources. In-depth responses revealed that on average households accessing water from neighbors or other private sources pay INR 2 per 20 liters (equal to INR 100/m 3 ). This is approximately 17 times more than the minimum tariff charged by BWSSB, which is INR 6/m 3 of consumption (BWSSB website). Those who buy tanker water pay even more, approximately INR 500 for 4 m 3 (equal to INR 125/m 3 ) (The New Indian Express, 15 Feb 2013). Therefore, poor service provision seems to be shifting potential revenue away from the water utility boards towards private providers thus augmenting NRW. 4. POLICY RECOMMENDATIONS Based on our findings, we argue that a plausible solution to reducing NRW is appropriate pricing of public water supply. Having identified public water sources as a non-trivial source of NRW, we focus on how the water utility boards might generate more revenue and at the same time ensure equity in access while inducing conservative behavior among consumers. Our recommendations are based on our findings from the analysis. Since the direction of the official policy is unknown, we assume two possible scenarios: 13

14 Scenario 1: the water utility board decides to phase out all public stand posts and replace them with individual connections under a new tariff structure that covers the cost of production and generates a fair profit. Scenario 2: the stand posts remain but the water purveyor decides to meter them to generate revenue, along with individual metered connections for those who can afford. 4.1 Scenario 1: revised volumetric pricing structure Previous studies suggest that subsidized water prices fail to benefit the low-income households for whom the subsidy was originally designed. This is because very few of these households have metered tap connections. Therefore, it is the middle and higher income households who enjoy the subsidy (Mathur & Thakur, 2003). Further, low-income households tend to have lower levels of water consumption. Therefore, broad consumption blocks turn out to be inefficient for volumetric pricing as broader consumption blocks with lower tariffs means that most of the consumers, including the middle and higher income households would fall within the first or second block. When households, which can otherwise afford to pay more, are supplied with highly subsidized water, the water utility does not generate adequate revenue as most consumers fall under subsidized broad consumption blocks. This results in inefficiencies for the water utility, and can consequently have an adverse effect on its service quality (Komives et al., 2005). Broad consumption blocks are also inefficient from the water conservation perspective as there is no monetary incentive to utilize less water. The purpose of our proposed volumetric water pricing model therefore is to generate enough revenue for the water utility to cover cost of production while also having enough funds for maintenance and expansion works. At the same time, we bear in mind the affordability of water prices for low-income households and their ability to pay. A graphical representation of our model is provided in Figure 3. Our volumetric pricing model heavily draws upon the model proposed by Wichelns (2012). The salient feature of the model is the differentiation of blocks for low and higher income households. Under this model, the water utility s revenue is estimated to be: Total Revenue = P 1 V 1 + P 2 V 2 + P 3 V 3 14

15 where, V 1 is the volume of water consumed by low-income households in Block 1, V 2 is volume of water consumed by higher-income households in Block 2, and V 3 is the volume of water consumed by higher-income households in Block 3. P 1, P 2, and P 3 are prices of water in each block. As against the current block pricing implemented by BWSSB, this model is designed to restrict only low-income households within parameters of Block 1, while others pay (at nonsubsidized rates) accordingly for their higher consumption. It is critical that the volume of water consumption as well as the price under Block 1 be optimal for the low-income households. The optimal value of P 1 is computed as: P 1 = Cost of Production of Water in Block 1 Subsidy The optimal value of P 2 then requires that the water utility be able to cover the cost of production as well as the subsidy offered under Block 1. We term this the recovery block. Therefore, the optimal value of P 2 is computed as: P 2 = Subsidies in Block 1 + Cost of Production of Water in Block 2 As the water utility needs to generate revenue enough to cover cost of production as well as generate profits to support maintenance and expansion works, the optimal value of P 3 is computed as: P 3 = Cost of Production of Water in Block 3 + Profits Required to Facilitate Mainenance and Expansion <Figure 3 about here> We draw upon our empirical findings, which suggest that there is revenue collection potential even among the low-income households, to simulate different tariff structures. For designing the appropriate blocks, we extrapolate that these low-income households, who currently pay nearly INR 100/m 3 to private providers would have the ability to pay at least INR 16/m 3, which is 50% of the INR 32/m 3 cost of production. Using these figures and applying our proposed model, we generate revenue collection simulations for the water utility boards using subsidy levels of 40%, 50%, and 60%. 15

16 From the IWP survey it was found that the average monthly water consumption of low-income households is approximately 43.2 LPCD. 8 For the purposes of our model, we assume average monthly water consumption of low-income households to be 50 LPCD. Extrapolating from this, the total households average monthly consumption would be between 6 to 9 m 3, depending on household size of 4 or 6 members. We use 0-8 m 3 as the volume of water that would be subsidized under Block 1 as this justifies our calculations and is also the lowest block being used in the current BWSSB tariff model. To determine the volume of water under Block 2, we draw upon the guidelines prescribed by Central Public Health and Environmental Engineering Organization (CPHEEO), which falls under the purview of the Ministry of Urban Development of the Government of India. According to CPHEEO (1999), each urban Indian consumer is entitled to 135 LPCD of water, which goes up to 150 LPCD for metro cities with full sewerage coverage. Using these limits, the average household water requirements for 4 and 6 member families have been estimated in Table 9. For an average 4-member family we estimate 16.2 m 3 as the optimum requirement. Therefore, we determine the volume of water under Block 2 to be 9-16 m 3. Beyond 16 m 3, the household would be over-consuming as per CPHEEO guidelines and therefore we estimate P 3 as twice the cost of production, that is, INR 64. This would enable the water utility to generate a profit for maintenance and expansion as well as induce conservation. Table 10 presents the simulated prices under our volumetric pricing model. It is important to highlight that the tariff blocks in our proposed model are based on basic consumption levels and not on income levels. Therefore, the high-consumption households would cross-subsidize the low-consumption households. While our model is not income-based, we argue that it would still benefit a large proportion of the lowincome households as they tend to consume less water in comparison to high-income households. 9 8 LPCD- Litres per Capita per Day 9 Low-income families who may not necessarily benefit from the subsidy are those with a large family size or multiple low-income families residing in the same dwelling. 16

17 Table 9. Estimated levels of optimal monthly water consumption for 4 and 6-member households depending on their daily requirements Water requirement (LPCD) 4 member family (m 3 /month) 6 member family (m 3 /month) Source: Authors calculations Table 10. Simulated prices per m 3 under each block for proposed volumetric pricing model Proposed Subsidy given under Block P 1 (0-8 m 3 ) P 2 (9-16 m 3 ) P 3 (>16 m 3 ) Scheme 1 [in INR] [in INR] [in INR] Block 1 Block 2 Block 3 Scheme I 60% Scheme II 50% Scheme III 40% Source: Authors calculations Note: All prices are estimated using INR 32/m 3 as the cost of production. P 1 denotes water price (in INR per cubic meter) in Block 1 with subsidized rates. P 2 denotes water price (in INR per cubic meter) in Block 2 which covers cost of production of Block 2 and the subsidy given in first block. So this is the recovery block. P 3 denotes water price (in INR per cubic meter) in Block 3 which is twice the cost of production and covers cost of production of Block 3 and also generates profits for maintenance and expansion. The argument underlying our revised pricing structure is that if water tariffs cannot cover the minimum cost of provision, then there is little incentive and lesser resources for the water utility to maintain and expand its infrastructure resulting in poor service-delivery. This augments the real losses for the water utility. Li (2013) observes that when the deficit incurred due to subsidies extended to low-income households is not totally covered by external or government agencies, utilities tend to lower service quality to cut costs. This in turn discourages households to invest in metered connections and to pay water bills regularly. As a result, even the apparent losses 17

18 increase. Proper pricing of water also serves to encourage consumers to use water judiciously and reduce wastage. This would result in decreased demand thus reducing pressures on supply, curtail energy expenditure thus decreasing cost of production, and consequently generate more savings for the water utility. The survey also found that as many as households were sharing water and bill charges from metered tap connections. This essentially means that a large volume of water is being consumed but only one meter is being charged at a flat rate providing no incentive for optimally using or conserving water. The proposed pricing model would also discourage such sharing of connections as households will not get subsidized rates if their consumption is higher. Based on the proposed pricing in Table 10, we simulate the revenue generated per household under each block in Table 11. As is observed, from Block 3 onwards, our model is able to raise sufficient revenue to cover costs and generate profits for the water utility. In terms of pricing water for the middle and higher income groups, our model is a lot more economically efficient as compared to the current (revised) tariff for apartment blocks, which is a flat tariff of INR 19/m 3 for apartments. At the current rate, the water utility would still not be able to cover the cost of production, let alone generate profits. 18

19 Table 11. Simulated per household cost of production of water and revenue collected under each block Block 1 Block 2 Block 3 8 m 3 /month 16 m 3 /month 18 m 3 /month 24 m 3 /month 27 m 3 /month Calculation 8*P 1 8*P 1 +8*P 2 8*P 1 +8*P 2 +2*P 3 8*P 1 +8*P 2 +8*P 3 8*P 1 +8*P 2 +11*P 3 Cost production 10 of % subsidy % subsidy % subsidy Source: Authors calculations Calculating the effectiveness of the proposed volumetric pricing model In order to determine whether our proposed pricing model would be effective, we use the following population distribution in the city of Bangalore 20% urban poor or low income, 50% middle income, and 30% higher income (Connors & Brocklehurst, 2006) and extrapolate the revenue that would be generated, against the simulated per household cost of production of water and monthly bills collected. Interviews with BWSSB officials revealed the number of metered tap connections in Bangalore to be 0.7 million. For purposes of simplicity, we assume that there are 1 million connections under BWSSB. Since we do not know the exact monthly water consumption of these households, we assume that the low-income households consume within the volume under Block 1 while the middle and higher income groups consume a mean value between the volume ranges of Block 2 and Block 3. The estimated total revenue generated can therefore be computed as shown in Appendix 1. The net revenue generated under each of the subsidy schemes is positive and ranges from INR 33.2 million to INR 43.6 million. Thus, in terms of positive returns, our proposed model does seem to be effective. 10 Cost of production is taken to be INR 32/m 3, which is the current cost of production to get Cauvery water. 19

20 4.2 Scenario 2: pre-payment metering (PPM): an option to consider If the water utility decides not to phase out public stand posts and public wells, it is essential to consider alternative policy options especially given our empirical finding that public stand posts and public wells contribute significantly to NRW. One such option is the pre-payment meter (PPM), where the public or community water source is also metered. As there is no evidence from urban India on metering community water sources, we draw upon cases from other developing countries and evaluate its feasibility. PPMs for electricity, gas, telecom and water, have been widely utilized by governments in the developing world as an effective tool to recover costs, shorten realization time of profit, and induce conservational attitudes among customers. PPM with its smart metering technology has dual benefits. First, it avoids non-payment and consumer debts as consumers pay upfront for the water. And second, it captures and stores the water usage information of each registered consumer in its data logging system thus enabling the water utility to monitor and benchmark consumption (Stewart et al., 2010). PPM is being actively adopted in many developing countries such as South Africa, Uganda, Brazil, and Bangladesh. Under this technology, consumers are provided with a registered card, which needs to be topped up with cash balance. Each time they want to draw water from a tap, they swipe their card and enter the amount of water they wish to draw. Water is then dispensed and charged accordingly. Given the technology, a third benefit of this system that we identify is disqualification of illegal connections and prevention of meter tampering. In South Africa, PPM for public standpipes has been in operation since In 2003, PPM was introduced for urban households in Johannesburg. The main purpose of the policy intervention was to cope with the problem of over-supply and lack of ownership of water consumption by residents. Here the residents were entitled to a monthly free supply of 6 m 3, after which they were required to pay for every additional m 3 of water consumed. This indeed led to much less usage of water by households, as many tried to consume within the free limit. Similarly in Palmas, Brazil, installation of PPM lead to a 38% decrease in water consumption and 56% dip in monthly water bill (Ruiters, 2007). 20

21 Berg and Mugisha (2010) use optimization models to show that in Kampala, Uganda, PPM public stand posts have been successful in meeting financial limitations (low investment) and social objectives (serving larger populations) while ensuring regular revenue collection for the water utility. They conclude that PPM is an effective technological tool for serving the urban poor. In Barind district of Bangladesh, Barind Multi-purpose Development Authority (BMDA) has introduced PPM for irrigation water. Though it is mainly an energy measuring unit, this scheme has helped in proper management of groundwater draft. The user pays upfront for electricity consumption and hence tends to use optimal amount of water (Saiful, 2013). Even though there are definite advantages to PPM, in South Africa specifically, it has received some criticism due to procedural lapses in poor neighborhoods such as Orange Farm and Phiri. The cause of discontent was that each household was entitled to only 6 m 3 of water per month irrespective of the number of people sharing one smart card. The Johannesburg High Court ruled that as per basic human rights, each person within a household should be entitled to 1.5 m 3 /month and ordered changes in the policy accordingly (Bond & Dugard, 2008). Therefore, the issue of fair distribution is critical for successful implementation of PPM Feasibility of PPM for public stand posts in Bangalore As suggested by our findings, a significant portion of the water supplied to the city of Bangalore is in fact NRW distributed through free public stand posts and public wells. As a measure to control these losses, BWSSB started a new service delivery scheme in slums in With the help of local NGOs and support from donor funds, they are attempting to bring every slum household under their coverage of metered tap connections (Connors & Brocklehurst, 2006). Our interviews with BWSSB officials revealed that once this project is completed, all public stand posts in the city would be sealed and shutdown. While the project undertaken by BWSSB is rational from the revenue generation perspective, it seems less feasible in view of land legalization issues. We found in our survey that many of the households in the slums are non-notified. Many are merely temporary settlements of laborers clustered in tents (without permanent walls and roof), which do not fall under the category of slums. Such temporary laborers often rely either on public stand posts or private tanker supply. 21

22 The question that therefore arises is how the water utility board would provide individual metered connections to these illegal and temporary settlements. A further issue with the BWSSB metering project for slums is the application and installation fee that the urban low-income households need to pay. Currently, BWSSB charges INR 5000 to install a new metered connection. Moreover, the cost of laying out and extending the metered pipeline inside the house has to be borne by the household. From the in-depth responses in the IWP survey, we found that households expressed discontent as even after getting the metered connection they could not draw water. This was because they needed a pump to generate the necessary water pressure and it was not affordable for them to invest in a pump. Raghupati and Foster (2002) observe that in many Indian cities the average official connection cost is USD 20, while practically the expenditure needed for expansion of services per household is around USD 150. But even after receiving considerable subsidies, many low-income households cannot afford to bear charges of individual piped connections. Therefore, the question of affordability for metered tap connections among the urban low-income households is a critical issue that the water utility boards need to consider. In comparison, PPM might be a more feasible option. The stand posts are already installed in several urban slum settlements. Drawing upon similar interventions in Africa, the estimated cost of installing a PPM is approximately USD 100. The tariff structure for PPMs could be similar or lower than our proposed volumetric pricing for metered tap connections. PPM would lessen the burden of paying for individual connections for the urban low-income households. Instead, they can share the costs with their neighbors and the community while having individual registered smart cards. From the perspective of the water utility board, they would be relieved from their task of legalizing several slum households so that they can be brought under the piped network expansion scheme (Connors & Brocklehurst, 2006). 5. CONCLUSION Cities in India are facing complex water supply and allocation problems. Reducing NRW is the biggest challenge faced by the water utility boards. In this paper, we examined whether public stand posts and public wells are notable sources of NRW in Bangalore. Our analysis using a 22

23 survey of 601 low-income urban households indicates that public stand posts and public wells, which supply free water to the poor, indeed are non-trivial sources of NRW. Around 30% of the households in our sample depend upon public stand posts as their primary or fallback water source, and nearly all pay no water user charges. While it might be assumed that metering will ensure revenue collection, we find that nearly 37% of the households in our sample with metered tap connections do not pay any user charges owing to faulty or absence of metering. Further, we also observe that potential revenue from low-income households is being shifted away towards private providers. Households living in wards where water service delivery was very poor depended on neighbors, tankers, and other private suppliers and paid nearly 17 times more than the BWSSB water tariff for the same amount of water. To enable water utility boards to recover cost more effectively, we propose a volumetric pricing model that would likely reduce NRW. As the water utility is able to reduce apparent losses, consequently they would be able to invest in infrastructure effective in reducing real losses too. The current tariff structure is insufficient to cover the minimum cost of provision. Therefore, our proposed model is designed in a way to reduce the price burden on the urban low-income households while discouraging the middle and higher income households from free-riding on the water subsidy. The key feature of our model is that since low-income households consume less water, the subsidy is levied only on a narrow block of water consumption so as to prevent the better off households from consuming water under the subsidized block. We also recommend narrowing subsequent blocks of consumption so that wasteful consumption of water is discouraged. Thus, the model satisfies the goals of efficiency, equity, and sustainability (both from a resources as well as financial perspective). We also test the efficiency of our pricing model and find that it is likely to generate a profit under different subsidy scenarios. Further, we propose that instead of sealing off public stand posts and naively moving towards metering every urban poor household, the urban water utility boards in India could consider metering the stand posts on a pre-payment basis, taking lessons from other developing countries such as South Africa, Uganda, Brazil, and Bangladesh. This would enable cost-sharing among the low-income households while generating necessary revenue for the water utility. Ultimately, 23

24 the effectiveness of these policies hinges upon institutional reform as well as service improvements. 24

25 Income group APPENDIX Appendix 1. Computation of total revenue generated from proposed pricing model Number of connections (millions) Average monthly bill Average cost of production Total Revenue (million INR) Total Cost (million INR) Net (million INR).5 ( )/2=576 ( )/2= ( )/2=832 ( )/2= % subsidy Low-income (30.8) Middleincome Higherincome Net revenue (million INR) 50% subsidy Low-income (25.6) Middleincome.5 ( )/2=576 ( )/2= Higherincome.3 ( )/2=832 ( )/2= Net revenue (million INR) % subsidy Low-income (20.4) Middleincome.5 ( )/2=576 ( )/2= Higherincome.3 ( )/2=832 ( )/2= Net revenue (million INR) 43.6 Source: Authors calculations Note: We assume a maximum average consumption of higher-income households, who typically have larger living spaces and modern sanitation, to be 24 m 3 /month. 25

26 REFERENCES Alegre, H., Baptista, J. M., Jr., E. C., Cubillo, F., Duarte, P., Hirner, W., Merkel, W., & Parena, R. (2006). Performance Indicators for Water Supply Services. IWA Publishing, London. Bangalore Water Supply and Sewerage Board. (2013). Available at: (Accessed August 10, 2014). Berg, S. V. & Mugisha, S. (2010). Pro-poor water service strategies in developing countries: Promoting justice in Uganda s urban project. Water Policy, 12(4), Bond, P. & Dugard, J. (2008). The case of Johannesburg Water: What really happened at the prepaid parish pump? Law, Democracy, and Development, 12(1), Bruhat Bengaluru Mahanagara Palika. (2013). Available at: (Accessed July 15, 2013). Central Groundwater Board. (2008). Groundwater Information Booklet - Bangalore Urban District, Karnataka. Ministry of Water Resources, Government of India, New Delhi. Central Public Health and Environmental Engineering Organization. (1999). Manual on Water Supply and Treatment. Ministry of Urban Development, Government of India, New Delhi. Connors, G. & Brocklehurst, C. (2006). Connecting the Slums: A Utility's Pro-Poor Approach in Bangalore. Water and Sanitation Program - South Asia, The World Bank, New Delhi. Elshorst, H. & Leary, D. O. (2005). Corruption in the water sector: Opportunities for addressing a pervasive problem. Paper Presented at the World Water Week, Stockholm, August Frauendorfer, R. & Liemberger, R. (2010). The Issues and Challenges of Reducing Non-Revenue Water. Asian Development Bank, vii-42, Metro Manila. 26

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER) Greater Colombo Water and Wastewater Management Improvement Investment Program (RRP SRI 45148) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

More information

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities Dhaka Environmentally Sustainable Water Supply Project (RRP BAN 42173) SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and

More information

Case Study for the 2006 HDR PRIVATE VERSUS PUBLIC IN WATER PROVISION: ENCOURAGING CASE OF SRI LANKA

Case Study for the 2006 HDR PRIVATE VERSUS PUBLIC IN WATER PROVISION: ENCOURAGING CASE OF SRI LANKA Case Study for the 2006 HDR PRIVATE VERSUS PUBLIC IN WATER PROVISION: ENCOURAGING CASE OF SRI LANKA Cecilia Tortajada Vice President Third World Centre for Water Management Atizapan, Mexico, E- mail: ctortajada@thirdworldcentre.org

More information

The Challenge of Managing Non-Revenue Water

The Challenge of Managing Non-Revenue Water The Challenge of Managing Non-Revenue Water Roland Liemberger Regional Director, Asia Miya Group roland.liemberger@miya-water.com Page 1 Putting things in perspective One of the major challenges facing

More information

Executive Summary. Water Sewerage Authority: Feasibility Study

Executive Summary. Water Sewerage Authority: Feasibility Study Executive Summary Water Sewerage Authority: Feasibility Study The aim of Mission Smart City is to efficiently utilize available Assets, Resources, and Infrastructure to enhance the quality of Urban Life

More information

Asset management for environmental infrastructure

Asset management for environmental infrastructure Sustainable Development and Planning II, Vol. 1 505 Asset management for environmental infrastructure A. R. Perks 1, S. Devnani 1, R. Denham 1 & M. N. Thippeswamy 2 1 R.V. Anderson Associates Limited,

More information

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary: CARTAGENA, COLOMBIA Case Study (Water) Project Summary: Cartagena is a city of almost 900,000 people on the northern coast of Colombia, and serves as the capital of one of the country s departments (states),

More information

DESIGN OF 24X7 WATER SUPPLY SYSTEMS

DESIGN OF 24X7 WATER SUPPLY SYSTEMS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DESIGN OF 24X7 WATER SUPPLY SYSTEMS A Case study: Ahmedabad city 1 Swarup Varu and 2 Dipsha Shah 1 Graduate Student, 2 Professor School of Building Science

More information

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Jaffna and Kilinochchi Water Supply and Sanitation Project (RRP SRI 37378) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES A. Sector Road Map 1. Sector Performance,

More information

Challenges in the delivery of Water and Sanitation

Challenges in the delivery of Water and Sanitation Challenges in the delivery of Water and Sanitation Urban Team Indian Council for Research on International Economic Relations The challenge of delivering water Rapid urban growth leads to greater demand

More information

ECONOMIC ANALYSIS: PROJECT LOAN

ECONOMIC ANALYSIS: PROJECT LOAN Rajasthan Urban Sector Development Program (RRP IND 42267) ECONOMIC ANALYSIS: PROJECT LOAN A. Introduction 1. The economic analysis was conducted for water and wastewater subprojects in six project cities

More information

Geothermal Hot Water Supply of Saburtalo District in Tbilisi, Georgia

Geothermal Hot Water Supply of Saburtalo District in Tbilisi, Georgia Geothermal Hot Water Supply of Saburtalo District in Tbilisi, Georgia 1. Project brief The project proposal Geothermal hot water supply of Saburtalo district in Tbilisi, Georgia has been developed in order

More information

KARNATAKA URBAN WATER SECTOR IMPROVEMENT PROJECT (KUWASIP)

KARNATAKA URBAN WATER SECTOR IMPROVEMENT PROJECT (KUWASIP) KARNATAKA URBAN WATER SECTOR IMPROVEMENT PROJECT (KUWASIP) 1. Background: Introduction: The World Bank assisted Karnataka Urban Water Sector Improvement Project (KUWASIP) is a project for reforms in Water

More information

Optimising social inclusion in urban water supply in Ghana

Optimising social inclusion in urban water supply in Ghana First SWITCH Scientific Meeting University of Birmingham, UK 9-10 Jan 2006 Optimising social inclusion in urban water supply in Ghana K. B. Nyarko*, S. N. Odai and K. B. Fosuhene Civil Engineering Department

More information

Water Pricing Experiences in India: An Insight

Water Pricing Experiences in India: An Insight 2015; 1(10): 751-755 ISSN Print: 2394-7500 ISSN Online: 2394-5869 Impact Factor: 5.2 IJAR 2015; 1(10): 751-755 www.allresearchjournal.com Received: 22-07-2015 Accepted: 24-08-2015 Paul D Madhale Research

More information

Bangalore Water Supply and Sewerage Board. Sub:- Water Crisis in Bengaluru- BBC Report appeared in News Papers on 12th February - Response of BWSSB

Bangalore Water Supply and Sewerage Board. Sub:- Water Crisis in Bengaluru- BBC Report appeared in News Papers on 12th February - Response of BWSSB Bangalore Water Supply and Sewerage Board Sub:- Water Crisis in Bengaluru- BBC Report appeared in News Papers on 12th February - Response of BWSSB *-*-* The BBC news that Bengaluru will face severe water

More information

SECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities Water Sector Improvement Program (RRP PAL 44031) SECTOR ASSESSMENT: WATER AND SANITATION Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Anticipated water supply shortfall by 2010.

More information

Service Level Benchmarking of

Service Level Benchmarking of Service Level Benchmarking of Bruhat Bangalore Mahanagara Palike Bangalore Two days results workshop on 14-15 Dec 09 City Profile 2001 Census Population of BMP 43.01 lakhs (58.92-BBMP) Present estimated

More information

The "Calculation of Operational and Financial Indicators for Water and Sewerage Utilities in Kazakhstan" was prepared under a contract with the

The Calculation of Operational and Financial Indicators for Water and Sewerage Utilities in Kazakhstan was prepared under a contract with the PRESENTATION Operational and Financial Indicators of Water Utilities in Based on the 2003 Survey and Tariff Policy Improvement in the Water and Sewerage Sector Mr. Nurlan Shadibekovich Aldabergenov, Director

More information

Arghyam s Inputs to the Pre-Budget Consultation of the Finance Minister with Social Sector related groups

Arghyam s Inputs to the Pre-Budget Consultation of the Finance Minister with Social Sector related groups Arghyam s Inputs to the Pre-Budget Consultation of the Finance Minister with Social Sector related groups 4 January, 2013 Launch a Research Initiative to Mainstream Groundwater into Urban Water Supply

More information

The Market For Small-Scale Piped Water Systems In Kenya SSAWA. Market Brief

The Market For Small-Scale Piped Water Systems In Kenya SSAWA. Market Brief The Market For Small-Scale Piped Water Systems In Kenya SSAWA Market Brief ISSUE no1 JUNE 2011 INTRODUCTION Over half of the population of Kenya lacks access to clean and reliable sources of drinking water.

More information

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES Country Partnership Strategy: Bhutan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The

More information

Energy and resource efficiency in Urban Water Management : Challenges & potential ti for enabling paradigm shift

Energy and resource efficiency in Urban Water Management : Challenges & potential ti for enabling paradigm shift Energy and resource efficiency in Urban Water Management : Challenges & potential ti for enabling paradigm shift Dr Suresh Kumar Rohilla Programme Director Water Management, CSE February 28, 2013 CSE CCBP

More information

WATER SUPPLY AND SANITATION IN SLUMS PAS PROJECT, INDIA. Monitoring in Urban Settings, Stockholm CEPT University, August

WATER SUPPLY AND SANITATION IN SLUMS PAS PROJECT, INDIA. Monitoring in Urban Settings, Stockholm CEPT University, August 2 WATER SUPPLY AND SANITATION IN SLUMS PAS PROJECT, INDIA Monitoring in Urban Settings, Stockholm CEPT University, August 24 2011 WHAT IS PAS? A sustainable statewide performance assessment system for

More information

USAID FROM THE AMERICAN PEOPLE

USAID FROM THE AMERICAN PEOPLE USAID FROM THE AMERICAN PEOPLE I. Executive Summary USAID Water and Development Country Plan for Lebanon Despite relatively abundant natural water resources, Lebanon faces a significant water deficit exacerbated

More information

ECONOMIC ANALYSIS. 2. Economic rationale. The investment program economic rationale is as follows:

ECONOMIC ANALYSIS. 2. Economic rationale. The investment program economic rationale is as follows: Urban Services Improvement Investment Program (RRP GEO 43405) ECONOMIC ANALYSIS 1. Methodology. The economic analysis for the Urban Services Improvement Investment Program followed the Guidelines for the

More information

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Country Partnership Strategy: Pakistan, 2015 2019 SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1.

More information

Improving Water & Sanitation Services: The ADB GOI PPP Initiative. Anouj Mehta Head PPPs and Finance Unit (India), ADB

Improving Water & Sanitation Services: The ADB GOI PPP Initiative. Anouj Mehta Head PPPs and Finance Unit (India), ADB Improving Water & Sanitation Services: The ADB GOI PPP Initiative Anouj Mehta Head PPPs and Finance Unit (India), ADB 1 Status & Needs Huge Urbanisation Pressures Pressures on Water & Sanitation Systems

More information

Service Delivery of Water: Challenges faced by Metropolitan Cities

Service Delivery of Water: Challenges faced by Metropolitan Cities Service Delivery of Water: Challenges faced by Metropolitan Cities Urban Team Indian Council for Research on International Economic Relations The challenge of delivering water Rapid urban growth leads

More information

Water supply and sanitation in Latin America (moving toward sustainability following two decades of reforms)

Water supply and sanitation in Latin America (moving toward sustainability following two decades of reforms) Water supply and sanitation in Latin America (moving toward sustainability following two decades of reforms) By Andrei S. Jouravlev Economic Affairs Officer, Natural Resources and Infrastructure Division,

More information

The Economic Challenge of Reduced Water Consumption

The Economic Challenge of Reduced Water Consumption The Economic Challenge of Reduced Water Consumption Summary EurEau members support the objective to increase resource efficiency, in particular for water and energy use. Decreasing water consumption has

More information

Ex post evaluation Armenia

Ex post evaluation Armenia Ex post evaluation Armenia Sector: Drinking water, water management, waste water/solid waste (1402000) Project: Municipal Infrastructure (KIP) I (1999 65 286)* Open programme, municipal infrastructure

More information

Malaysia s experience

Malaysia s experience United Nations Department for Economic and Social Affairs (UNDESA) In collaboration with Economic and Social Commission for Asia and the Pacific (UNESCAP) Capacity Building Workshop on Partnerships for

More information

Executive Summary of the Urban Services Review Paper 1

Executive Summary of the Urban Services Review Paper 1 1 Executive Summary of the Urban Services Review Paper 1 1 background Access to safe water and sanitation is essential for health, security, livelihoods, and quality of life. Inadequate access to safe

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Power Sector Rehabilitation Project (RRP KGZ 44198) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunity a. Introduction 1. The Kyrgyz Republic is a landlocked

More information

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map Second Greater Mekong Subregion Corridor Towns Development Project (RRP VIE 46443-004) SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance,

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: India Project: Orissa Integrated Sanitation Improvement Project (Loan Agreement: 03/30/2007; Loan Amount: 19,061 million yen; Borrower: The President

More information

A Report on Reduction of Non Revenue Water in Kundapura Municipal Water Supply

A Report on Reduction of Non Revenue Water in Kundapura Municipal Water Supply A Report on Reduction of Non Revenue Water in Kundapura Municipal Water Supply Town Municipal Council Kundapura Udupi (Dist) Ph: 08245-230410 Fax: 08254-230410 E-Mail: co_kundapur@yahoo.co.in (1) Background

More information

Presentation from 2016 World Water Week in Stockholm. The authors, all rights reserved. SIWI siwi.org

Presentation from 2016 World Water Week in Stockholm.   The authors, all rights reserved. SIWI siwi.org Presentation from 2016 World Water Week in Stockholm www.worldwaterweek.org The authors, all rights reserved SIWI siwi.org The politics and practice of getting water to the urban poor Lessons from African

More information

Case Study UNDERGROUND SEWERAGE SYSTEM ALANDUR. Sewerage

Case Study UNDERGROUND SEWERAGE SYSTEM ALANDUR. Sewerage Case Study UNDERGROUND SEWERAGE SYSTEM ALANDUR Sewerage 1 CASE OVERVIEW Country: India ULB: Alandur, Chennai Metropolitan Area in Tamil Nadu Sector: Urban Basic Services Sub-Sector: Sewerage Award Date:

More information

General Rate Case Application Information

General Rate Case Application Information General Rate Case Application Information I. About San Jose Water Company II. III. IV. General Information About Rates Summary of San Jose Water Company s 2015 General Rate Case Application Frequently

More information

Investing in Sustainable cities. Water Management in urban areas: Yangon s case

Investing in Sustainable cities. Water Management in urban areas: Yangon s case Investing in Sustainable cities Water Management in urban areas: Yangon s case I. Water management: general perspective The main goals of urban water and waste water management are : provide clean water

More information

WATER. Moves towards urban water sector reform have brought. Tariff Structures in Six South Asian Cities. Do they target subsidies well?

WATER. Moves towards urban water sector reform have brought. Tariff Structures in Six South Asian Cities. Do they target subsidies well? PAPER 3 WATER TARI S & SUBSIDIES IN SOUTH ASIA Tariff Structures in Six South Asian Cities RE ORM O THE WATER AND SANITATION SECTOR is occurring in many countries, and offers the potential to improve services

More information

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Additional Financing for Melamchi Water Supply Project (RRP NEP 31624) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems,

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

NAME OF ULB BASTI. Location of source of drinking water

NAME OF ULB BASTI. Location of source of drinking water Water Supply NAME OF ULB BASTI 1. Assess the Service Level Gap The first step is to assess the existing situation and service levels gaps for Water Supply (AMRUT Guidelines; para 3 & 6). This will also

More information

Maintenance and Sustainability

Maintenance and Sustainability chapter 10 Since its inception, the MVP has made substantial progress in addressing the infrastructure and energy indicators outlined in the Millennium Development Goals. Looking ahead at the next five

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Azerbaijan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Azerbaijan is rich in energy resources. The

More information

Business models for solar-powered irrigation in Ethiopia

Business models for solar-powered irrigation in Ethiopia Business models for solar-powered irrigation in Ethiopia Background This brief describes three business models for smallholder solar pump irrigation in Ethiopia, each with the potential to improve agricultural

More information

Diagnostic City Water Assessments

Diagnostic City Water Assessments Model Terms of Reference Diagnostic City Water Assessments www.adb.org/water May 2006 TABLE OF CONTENTS Abstract A. Background B. Objectives C. Scope D. Methodology of Surveys E. The Questionnaires F.

More information

Nitya Jacob y Programme Director - Water

Nitya Jacob y Programme Director - Water Nitya Jacob y Programme Director - Water Centre for Science and Environment Set up in 1980, CSE is a public interest research and policy advocacy organization (NGO) It promotes sustainable development

More information

MUNICIPAL NETWORK FOR ENERGY EFFICIENCY (MUNEE)

MUNICIPAL NETWORK FOR ENERGY EFFICIENCY (MUNEE) MUNICIPAL NETWORK FOR ENERGY EFFICIENCY (MUNEE) The Regional Network for the Efficient Use of Energy and Water Resources (RENEUER) Еvaluation of the Energy and Water Tariffs for Households Authored by:

More information

National Association of Regulatory Utility Commissioners Regulatory Partnership Program

National Association of Regulatory Utility Commissioners Regulatory Partnership Program National Association of Regulatory Utility Commissioners Regulatory Partnership Program The Energy Regulation Board of Zambia (ERB) and the Pennsylvania Public Utility Commission (PUC) Third Activity Cost

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: Ukraine Name of the Project: Bortnychi Sewage Treatment Plant Modernization Project Loan Agreement: June 15, 2015 Loan Amount: 108.193 billion yen

More information

Excreta Matters: 7 th Citizens Report on the state of India s Environment. An agenda for water-prudent and waste-wise India.

Excreta Matters: 7 th Citizens Report on the state of India s Environment. An agenda for water-prudent and waste-wise India. Excreta Matters: 7 th Citizens Report on the state of India s Environment An agenda for water-prudent and waste-wise India Need to reinvent Rapid urbanization is creating new water stresses Violence is

More information

East Asia Urban Sanitation Review

East Asia Urban Sanitation Review EAP REGION URBAN SANITATION REVIEW East Asia Urban Sanitation Review Presentation prepared by Bank Team September 2013 Outline Sector Overview Issues Recommendations 1. Sector Overview PURPOSE OF THE STUDY

More information

WATER. The aim of this paper is to provide a scorecard for current. A Scorecard for India PAPER 2 TARI S & SUBSIDIES IN SOUTH ASIA

WATER. The aim of this paper is to provide a scorecard for current. A Scorecard for India PAPER 2 TARI S & SUBSIDIES IN SOUTH ASIA PAPER 2 WATER TARI S & SUBSIDIES IN SOUTH ASIA A Scorecard for India RE ORM O THE WATER AND SANITATION SECTOR is occurring in many countries, and offers the potential to improve services to all. Of particular

More information

Restoring Urban Infrastructure and Services in Nigeria

Restoring Urban Infrastructure and Services in Nigeria Findings reports on ongoing operational, economic and sector work carried out by the World Bank and its member governments in the Africa Region. It is published periodically by the Africa Technical Department

More information

Innovative taxation models for urban. ecosystem sanitation. Stockholm World Water Week 29 th August 2018

Innovative taxation models for urban. ecosystem sanitation. Stockholm World Water Week 29 th August 2018 Innovative taxation models for urban ecosystem sanitation Stockholm World Water Week 29 th August 2018 Innovative taxation models for urban ecosystem sanitation Innovative redistributive financing models

More information

Community Finance as Instruments to Facilitate WatSan Services to the Urban Poor - WaterAid s Experiences in South Asia -

Community Finance as Instruments to Facilitate WatSan Services to the Urban Poor - WaterAid s Experiences in South Asia - Community Finance as Instruments to Facilitate WatSan Services to the Urban Poor - WaterAid s Experiences in South Asia - Timeyin Uwejamomere (Policy Officer Urban) Capacity Building Workshop for Partnerships

More information

THE WATER SECTOR IN KENYA

THE WATER SECTOR IN KENYA THE WATER SECTOR IN KENYA Introduction The Kenya Vision 2030 goal on water and sanitation under the social pillar is access to water and sanitation for all by 2030. Kenya is a water scarce country and

More information

Grand Challenges - Karnataka Channelizing Innovations for Social Impact A KBITS-IKP Program. CALL 6, August 30 to October 15, 2017

Grand Challenges - Karnataka Channelizing Innovations for Social Impact A KBITS-IKP Program. CALL 6, August 30 to October 15, 2017 Grand Challenges - Karnataka Channelizing Innovations for Social Impact A KBITS-IKP Program CALL 6, August 30 to October 15, 2017 Introduction Over the past few years, the startup ecosystem in Karnataka,

More information

Uganda: Water Supply and Sanitation Fort Portal and Kasese Water supply and sanitation small systems

Uganda: Water Supply and Sanitation Fort Portal and Kasese Water supply and sanitation small systems Ex-post evaluation Uganda: Water Supply and Sanitation Fort Portal and Kasese OECD sector BMZ project ID Project-executing agency Consultant 14030 - Water supply and sanitation small systems 1988 65 685

More information

Ex-ante Evaluation (for Japanese ODA Loan)

Ex-ante Evaluation (for Japanese ODA Loan) Ex-ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Kerala Water Supply Project (III) Loan Agreement: March 31, 2009 Loan Amount: 12,727 million Yen Borrower: The

More information

SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES. Comprehensive Water, Sewer, and Stormwater Rate Study

SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES. Comprehensive Water, Sewer, and Stormwater Rate Study SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES Comprehensive Water, Sewer, and Stormwater Rate Study Draft-Final Report / July 17, 2018 5619 DTC Parkway Suite 850 Greenwood Village, CO 80111 Phone 303.305.1135

More information

Using tariff structures as a demand management instrument: The case of Kampala

Using tariff structures as a demand management instrument: The case of Kampala 34th WEDC International Conference, Addis Ababa, Ethiopia, 2009 WATER, SANITATION AND HYGIENE: SUSTAINABLE DEVELOPMENT AND MULTISECTORAL APPROACHES Using tariff structures as a demand management instrument:

More information

Pragati Maidan, New Delhi May 2019

Pragati Maidan, New Delhi May 2019 Including Implementing Smart Cities Transforming India for our Citizens Pragati Maidan, New Delhi 22-24 May 2019 www.smartcitiesindia.com Co- Message Since its launch in 2015, Smart Cities India expo has

More information

NO ONE LEFT BEHIND ENSURING EQUITABLE ACCESS TO WATER AND SANITATION

NO ONE LEFT BEHIND ENSURING EQUITABLE ACCESS TO WATER AND SANITATION United Nations Economic Commission for Europe World Health Organization Regional Office for Europe Protocol on Water and Health to the Convention on the Protection and Use of Transboundary Watercourses

More information

Karnataka economic restructuring overview; piloting sub-national loans

Karnataka economic restructuring overview; piloting sub-national loans Collaborative for the Advancement of the Study of Urbanism through Mixed Media Karnataka economic restructuring overview; piloting sub-national loans Deposition by Karnataka state Introduction Kar looked

More information

Brief description, overall objective and project objectives with indicators

Brief description, overall objective and project objectives with indicators India: Rural water supply, Rajasthan Ex post evaluation report OECD sector BMZ project ID 1993 65 420 Project executing agency Consultant Year of ex post evaluation 1402000 / Water supply, sanitation und

More information

Comparison of powers and revenue sources of selected cities

Comparison of powers and revenue sources of selected cities Comparison of powers and revenue sources of selected cities Report prepared by the Chief Administrative Officer, City of Toronto, June, 2000 (updated October 2001) Constitutional status/ City powers Constitutional

More information

K M L Mathur Director, International. D. B. Panse Council member IWWA 22 nd October,2015.

K M L Mathur Director, International. D. B. Panse Council member IWWA 22 nd October,2015. SUSTAINABLE WATER DEVELOPMENT OF INDIA K M L Mathur Director, International. D. B. Panse Council member IWWA 22 nd October,2015. India is the 7th largest country by geographic al area 2nd-most populous

More information

Subsidies for Waterworks and Water Tariff Determination in Japan

Subsidies for Waterworks and Water Tariff Determination in Japan Regional Economic Workshop Water tariffs and affordability Subsidies for Waterworks and Water Tariff Determination in Japan Masao Shibuya Director of International Division Japan Water Works Association

More information

Scheme of Charges setting out Default tariffs applicable to non-household customers in the Portsmouth Water supply area

Scheme of Charges setting out Default tariffs applicable to non-household customers in the Portsmouth Water supply area Scheme of Charges setting out Default tariffs applicable to non-household customers in the Portsmouth Water supply area 1.lntroduction This Scheme of Charges sets out the Default Charges applicable to

More information

Why all (Urban) Hydrology is Social Hydrology? Evidence from Bangalore, India

Why all (Urban) Hydrology is Social Hydrology? Evidence from Bangalore, India Why all (Urban) Hydrology is Social Hydrology? Evidence from Bangalore, India * D.Malghan, V. Mehta, R. Gowswami, E. Kemp-Benedict, S. Muddu, D. Wong (*To whom all correspondence must be addressed: dmalghan@iimb.ernet.in,

More information

Urban Growth and Planning : Experiences from India

Urban Growth and Planning : Experiences from India Urban Growth and Planning : Experiences from India Srinivas Chary Vedala Director, Urban Governance and Infra Development, ASCI ASCI schary@asci.org.in Urban share of total population in 2011 (per cent)

More information

Dr. Muhammad Ashfaq Dr. Ifran Ahmad Baig

Dr. Muhammad Ashfaq Dr. Ifran Ahmad Baig Dr. Muhammad Ashfaq Dr. Ifran Ahmad Baig Sequence of Presentation Background and Existing Situation Consumption pattern Existing situation Future scenario Key issues Water efficiency Recommendations Background

More information

Malini V Shankar. Principal Secretary, Water Supply and Sanitation Department, Mumbai

Malini V Shankar. Principal Secretary, Water Supply and Sanitation Department, Mumbai Malini V Shankar Principal Secretary, Water Supply and Sanitation Department, Mumbai 1950 Development of world cities Development of World Cities World Cities exceeding 5 million residents Data source:

More information

SUSTAINABLE WATER DEVELOPMENT OF INDIA. K M L Mathur Director, International. D. B. Panse Council member IWWA 22 nd October,2015.

SUSTAINABLE WATER DEVELOPMENT OF INDIA. K M L Mathur Director, International. D. B. Panse Council member IWWA 22 nd October,2015. SUSTAINABLE WATER DEVELOPMENT OF INDIA K M L Mathur Director, International. D. B. Panse Council member IWWA 22 nd October,2015. India is the 7th largest country by geographic al area 2nd-most populous

More information

Guidelines for setting water tariffs

Guidelines for setting water tariffs GuidelinesforSetting Water Tariffs: Industrial and Commercial Consumers Page ix Guidelines for setting water tariffs With a Focus on Industrial, Commercial and Other Non-residential Consumers Executive

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2796 Project Name. Andhra Pradesh Rural Water Supply & Sanitation Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2796 Project Name. Andhra Pradesh Rural Water Supply & Sanitation Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2796 Project Name Andhra

More information

Where All the Water Has Gone? An Analysis of Unreliable Water Supply in Bangalore City. Krishna Raj

Where All the Water Has Gone? An Analysis of Unreliable Water Supply in Bangalore City. Krishna Raj Where All the Water Has Gone? An Analysis of Unreliable Water Supply in Bangalore City Krishna Raj ISBN 978-81-7791-163-3 2013, Copyright Reserved The Institute for Social and Economic Change, Bangalore

More information

Dale Barrie Training & Technical Assistance Specialist. Iowa Rural Water Association - Dale Barrie 1

Dale Barrie Training & Technical Assistance Specialist. Iowa Rural Water Association - Dale Barrie 1 Dale Barrie Training & Technical Assistance Specialist Iowa Rural Water Association - Dale Barrie 1 Goals for rates Type of rate structure which is best for you Who should be involved What information

More information

Guidelines on Required Minimum Service Level for Water Service Provision

Guidelines on Required Minimum Service Level for Water Service Provision REPUBLIC OF RWANDA RWANDA UTILITIES REGULATORY AGENCY Guidelines on Required Minimum Service Level for Water Service Provision June 2009 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DEFINITIONS... 3 3. OBJECTIVES...

More information

Presentation on Status of Water and Sanitation in. By V. C. Kumar, Executive Engineer,

Presentation on Status of Water and Sanitation in. By V. C. Kumar, Executive Engineer, Presentation on Status of Water and Sanitation in Bangalore By V. C. Kumar, Executive Engineer, BWSSB B B M P Dasarahalli Byatrayanpura Yelahanka Core area 245 Sq. Km 8 ULB 330 Sq. Km 110 Villages 225

More information

Small Private Sector Providers in Water Supply and Sanitation an overview and some experiences from the World Bank and WSP

Small Private Sector Providers in Water Supply and Sanitation an overview and some experiences from the World Bank and WSP Small Private Sector Providers in Water Supply and Sanitation an overview and some experiences from the World Bank and WSP Meike van Ginneken Sr. Water and Sanitation Specialist, World Bank With thanks

More information

LGIU Local Government Information Unit

LGIU Local Government Information Unit Page 1 of 7 LGIU Local Government Information Unit Independent Intelligent Information Positively charged: Audit Commission report (LGiU) 28/1/2008 Author: Janet Sillett Reference No: PB 1724/08L This

More information

Water Supply. Yes we have collected Census 2011 data table is mentions below:- S.No Source Particulars Numbers Tap Water Connection

Water Supply. Yes we have collected Census 2011 data table is mentions below:- S.No Source Particulars Numbers Tap Water Connection 1. Assess the Service Level Gap Water Supply City Name Bareilly The first step is to assess the existing situation and service levels gaps for Water Supply (AMRUT Guidelines; para 3 & 6). This will also

More information

Energy, the water sector and rapid urbanization in the South. Lessons from Asia, Africa and Latin America

Energy, the water sector and rapid urbanization in the South. Lessons from Asia, Africa and Latin America Energy, the water sector and rapid urbanization in the South Lessons from Asia, Africa and Latin America Structure of presentation Introduction the context and overview of efficiency and energy-related

More information

Sustainable Water Management - Goa Initiatives

Sustainable Water Management - Goa Initiatives Sustainable Water Management - Goa Initiatives Date:27-09.2013 Er. ANAND WACHASUNDAR PROJECT DIRECTOR JICA Project. PWD 1 Goa About Goa Population(2011 Census) 14.57Lakhs Urban Population 62.17% Area 3702

More information

Water Demand and Waste Water Management, Rajkot, India

Water Demand and Waste Water Management, Rajkot, India Water Demand and Waste Water Management, Rajkot, India Seventh Regional Workshop on Integrated Resource Management in Asian Cities: The Urban Nexus 19 th July, 2017 Tanjungpinang, Indonesia Rajkot, India

More information

Case Study Brasov, Romania

Case Study Brasov, Romania Public Disclosure Authorized WATER GLOBAL PRACTICE Case Study Brasov, Romania WSS GSG UTILITY TURNAROUND SERIES Public Disclosure Authorized Teodor Popa and Maria Salvetti AUGUST 217 Key Characteristics

More information

Special Publication SJ2004-SP27. Affordability Analysis of Alternative Water Supply

Special Publication SJ2004-SP27. Affordability Analysis of Alternative Water Supply Special Publication SJ2004-SP27 of Alternative Water Supply of Alternative Water Supply Technical Memorandum February 9, 2004 TABLE OF CONTENTS Section Page EXECUTIVE SUMMARY i A. Background and Scope

More information

6c. BASIC AMENITIES IN TAMILNADU

6c. BASIC AMENITIES IN TAMILNADU 6c. BASIC AMENITIES IN TAMILNADU The availability of basic amenities such as housing, drinking water, electricity and sanitation facilities indicates the quality of life of the people. Even after 50 years

More information

Impact of localised Energy Efficiency (EE) and Renewable Energy (RE) on City of Cape Town s finances over the next 10 years Report.

Impact of localised Energy Efficiency (EE) and Renewable Energy (RE) on City of Cape Town s finances over the next 10 years Report. Impact of localised Energy Efficiency (EE) and Renewable Energy (RE) on City of Cape Town s finances over the next 10 years Report February, 2014 Sustainable Energy Africa Introduction Over the past few

More information

IMPLEMENTATION OF FREE BASIC SERVICES BY MUNICIPALITIES PROVINCIAL & LOCAL GOVERNMENT PORTFOLIO COMMITTEE 21 JUNE Contents

IMPLEMENTATION OF FREE BASIC SERVICES BY MUNICIPALITIES PROVINCIAL & LOCAL GOVERNMENT PORTFOLIO COMMITTEE 21 JUNE Contents IMPLEMENTATION OF FREE BASIC SERVICES BY MUNICIPALITIES PROVINCIAL & LOCAL GOVERNMENT PORTFOLIO COMMITTEE 21 JUNE 2005 Contents PURPOSE PROGRESS TO DATE IMPLEMENTATION CHALLENGES PROJECT CONSOLIDATE: Support

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Irrigation Management Improvement Project (RRP BAN 45207) A. Approach and Methodology 1. Approach ECONOMIC AND FINANCIAL ANALYSIS 1. The economic and financial analysis of the Irrigation Management Improvement

More information

INNOVATIONS IN DEVELOPMENT

INNOVATIONS IN DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INNOVATIONS IN DEVELOPMENT Metering and Billing Water Use in Rural Punjab Punjab Rural

More information

OFFICE OF MUNICIPAL CORPORATION, KORBA (C.G.) SECTOR WISE SLIP TEMPLATE: WATER SUPPLY

OFFICE OF MUNICIPAL CORPORATION, KORBA (C.G.) SECTOR WISE SLIP TEMPLATE: WATER SUPPLY OFFICE OF MUNICIPAL CORPORATION, KORBA (C.G.) HEAD OFFICE SAKET BHAWAN,I.T.I. CHOWK KORBA WEB:-www.korbamunicipal.inEMAIL :- corporationkorba@gmail.com SECTOR WISE SLIP TEMPLATE: WATER SUPPLY 1. Assess

More information