1 ENVIRONMENTAL NOTIFICATION FORM Atlantic Link Project Coleson Cove, New Brunswick, Canada, to Plymouth, Massachusetts PREPARED FOR Clean Power Northeast Development A subsidiary of Emera, Inc Lower Water Street Halifax, Nova Scotia, Canada B3J 3S8 PREPARED BY 500 Southborough Drive Suite 105B South Portland, ME SEPTEMBER 15, 2017

2

3 September 15, 2017 Ref: Secretary Matthew A. Beaton Executive Office of Energy and Environmental Affairs Attn: MEPA Office 100 Cambridge Street, Suite 900 Boston, MA Re: Environmental Notification Form Atlantic Link Project Coleson Cove, New Brunswick, Canada, to Plymouth, Massachusetts Dear Secretary Beaton, On behalf of Clean Power Northeast Development (a wholly-owned subsidiary of Emera, Inc.), VHB is pleased to submit the enclosed Environmental Notification Form ( ENF ) for the Atlantic Link Project (the Project ) located primarily within the Atlantic Ocean, between Coleson Cove, New Brunswick, Canada, and Plymouth, Massachusetts. The Project involves the installation of a subsea high-voltage direct-current ( HVdc ) transmission line to deliver clean energy from Atlantic Canada to Massachusetts, approximately 19 miles of which will traverse Massachusetts state waters. At landfall in Plymouth, the Project would include the construction of an underground HVdc cable extending approximately 2,375 feet, HVdc converter station, substation, and transmission line tap within currently undeveloped land owned by Entergy (owner of Pilgrim Station). Construction of the Project will serve the public interest by providing Massachusetts and the New England electricity system with long-term access to clean energy at stable prices from land-based wind farms and hydro facilities in Atlantic Canada. We anticipate that the MEPA Office will notice the ENF for public review in the September 20, 2017, edition of the Environmental Monitor and that comments will be due October 10, Pursuant to 301 CMR 11.16(2), a copy of this ENF will be distributed to those agencies and individuals on the ENF Distribution List (see Attachment D) and additional copies are available upon request. Requests for copies of the ENF can be directed to me at or via at gpaquette@vhb.com. We look forward to working with you and your staff during the review of this Project. Sincerely, Gil A. Paquette, CWB, PWS Director of Energy & Environmental Services gpaquette@vhb.com \\vhb\proj\portland\ \docs\various\mepa\enf\atlantic Link - ENF - Cover Letter docx

4

5 Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office Environmental Notification Form For Office Use Only EEA#: MEPA Analyst: The information requested on this form must be completed in order to submit a document electronically for review under the Massachusetts Environmental Policy Act, 301 CMR Project Name: Atlantic Link Project Street Address: Atlantic Ocean Coleson Cove, New Brunswick (Canada) to Plymouth, MA Municipality: Plymouth Watershed: Cape Cod Bay-Rocky Point to Cape Cod Canal Universal Transverse Mercator Coordinates: Converter Station: Latitude/Longitude: Converter Station: , Easting: / Northing: Estimated commencement date: 2020 Estimated completion date: 2022 Project Type: Utility - Transmission Line Status of project design: 10 %complete Proponent: Clean Power Northeast Development (a subsidiary of Emera, Inc.) Street Address: 1223 Lower Water Street Municipality: Halifax State: Nova Scotia, Canada Zip Code: B3J 3S8 Name of Contact Person: Gil A. Paquette Firm/Agency: VHB Street Address: 500 Southborough Dr., Suite 105B Municipality: South Portland State: ME Zip Code: Phone: Fax: GPaquette@vhb.com Effective January 2011

6 Does this project meet or exceed a mandatory EIR threshold (see 301 CMR 11.03)? Yes No 301 CMR 11.03(7)(a)4. Construction of electric transmission lines with a Capacity of 230 or more kv, provided the transmission lines are five or more miles in length along new, unused or abandoned right of way. If this is an Expanded Environmental Notification Form (ENF) (see 301 CMR 11.05(7)) or a Notice of Project Change (NPC), are you requesting: a Single EIR? (see 301 CMR 11.06(8)) Yes No a Special Review Procedure? (see 301CMR 11.09) Yes No a Waiver of mandatory EIR? (see 301 CMR 11.11) Yes No a Phase I Waiver? (see 301 CMR 11.11) Yes No (Note: Greenhouse Gas Emissions analysis must be included in the Expanded ENF.) Which MEPA review threshold(s) does the project meet or exceed (see 301 CMR 11.03)? 301 CMR 11.03(7)(a)4. Construction of electric transmission lines with a Capacity of 230 or more kv, provided the transmission lines are five or more miles in length along new, unused or abandoned right of way. Which State Agency Permits will the project require? EFSB/DPU: Approval to construct, G.L. c. 164, 69J and 72 Request for zoning exemptions, G.L. c. 40A, 3 MassDEP: Chapter 91 Waterways License Massachusetts Wetlands Protection Act 401 Water Quality Certification MHC/BUAR: Project Notification Form / Section 106 National Historic Preservation Act Consultation NHESP: Massachusetts Endangered Species Act - potential Conservation and Management Permit CZM: Coastal Zone Management Program Consistency Review (including Massachusetts Ocean Management Plan) DMF: Consultation with Division of Marine Fisheries DCR: Massachusetts Ocean Sanctuaries Act Review Identify any financial assistance or land transfer from an Agency of the Commonwealth, including the Agency name and the amount of funding or land area in acres: None - 2 -

7 Summary of Project Size & Environmental Impacts LAND Total site acreage (ROW and converter site easements) New acres of land altered (ROW, HDD pad, and converter site) Acres of impervious area (Footprint of converter site elements) Square feet of new bordering vegetated wetlands alteration (HDD pad) Square feet of new other wetland alteration (HDD/trench in Land Under the Ocean) Acres of new non-water dependent use of tidelands or waterways Existing Change Total , ,462 (temporary) STRUCTURES Gross square footage (Footprint of converter site elements) 0 139, ,408 Number of housing units Maximum height (feet) (Typical station with lightning protection) TRANSPORTATION 0 approx. 80 approx. 80 Vehicle trips per day Parking spaces WASTEWATER Water Use (Gallons per day) Water withdrawal (GPD) Wastewater generation/treatment (GPD) Length of water mains (miles) Length of sewer mains (miles) Has this project been filed with MEPA before? Yes (EEA # ) No Has any project on this site been filed with MEPA before? Yes (EEA # ) No - 3 -

8 GENERAL PROJECT INFORMATION all proponents must fill out this section PROJECT DESCRIPTION NOTE: The project description should summarize both the project s direct and indirect impacts (including construction period impacts) in terms of their magnitude, geographic extent, duration and frequency, and reversibility, as applicable. It should also discuss the infrastructure requirements of the project and the capacity of the municipal and/or regional infrastructure to sustain these requirements into the future. Describe the existing conditions and land uses on the project site: Clean Power Northeast Development ( CPNE, or the Company ) plans to install and operate a subsea highvoltage direct-current ( HVdc ) transmission line to deliver clean energy from Atlantic Canada to Massachusetts. The proposed HVdc cable landing point would be located on an undeveloped segment of the shore of Plymouth, Massachusetts, in the vicinity of the Pilgrim nuclear generating plant scheduled to be taken out of service in An HVdc underground cable, DC converter station, and 345 kilovolt ( kv ) transmission interconnection substation would also be constructed at this location. Existing conditions in this area are identified in Attachment A2. Plymouth is located within the Seaboard Lowlands section of the New England physiographic province, which has elevation and relief that is typically limited to a range of a few hundred feet. The site is characterized by irregular, undulating terrain with short slopes and is underlain by loose glacial till, ice-contact deposits, and glaciofluvial material with predominantly sandy textures and some cobbles and stones. The soils are generally well-drained, with a few wetlands in topographic depressions. Major streams and watercourses are absent within the proposed project area. The proposed HVdc cable landing point, buried cable, DC converter station, and transmission interconnection substation would be located on currently undeveloped forested land that is under the ownership of Entergy, the owner of Pilgrim station. Species of oak, white pine, and pitch pine are predominant tree species at the site. The shore of Cape Cod Bay is located north of the project area. Residential development is located approximately 600 to 1,000 feet east and southeast of the project area. The existing Pilgrim nuclear facility is located approximately 500 feet to the northwest, and electric transmission rights-of-way with two existing 345 kv transmission lines and other conserved forest land are located southwest and west of the site. As shown in Attachments B and C, the subsea cable portion of the route passes through mapped rare species habitat, the Cape Cod Bay Ocean Sanctuary, and the Stellwagen National Marine Sanctuary. There are also shellfish harvesting areas in Cape Cod Bay. Describe the proposed project and its programmatic and physical elements: The preferred transmission line route will be located within a ROW connecting Coleson Cove, New Brunswick, Canada, to Plymouth, Massachusetts, for a total length of approximately 337 miles, over 99 percent of which will be subsea to simplify construction, provide greater reliability, and reduce cost. The majority of the transmission line route occurs in United States federal waters; however, short sections of the transmission line route will traverse Massachusetts state waters for a total of approximately 19 miles. The total length of the submarine transmission line route in US federal waters (i.e., exclusive of MA State waters) will be approximately 190 miles. The route is shown in Attachment A. Atlantic Link would provide Massachusetts and the New England electricity system with long-term access to clean energy at stable prices from land-based wind farms and hydro facilities in Atlantic Canada. The project is being developed in response to an upcoming procurement for clean energy mandated by the Commonwealth of Massachusetts under An Act to Promote Energy Diversity, which was signed into law by Governor Charlie Baker in August, 2016 (Ch. 188 of the Acts of 2016); specifically, in response to a Request for Proposals issued March 31, 2017 by electric distribution companies in Massachusetts for Long-Term Contracts for Clean Energy Projects ( As required in the Act, the Project will also contribute to Massachusetts legally-required efforts to reduce greenhouse gas emissions under its Global Warming Solutions Act - 4 -

9 (Chapter 298 of the Acts of 2008). The Project will also optimize infrastructure that would otherwise be unused (or underutilized) following closure in 2019 of the Pilgrim nuclear station. 1 Atlantic Link comprises two 320 kv direct-current, cross-linked polyethylene ( XLPE ) cables with a delivered capacity of 1000 MW, possibly bundled together along with one fiber optic cable, and buried in the ocean floor with subsea protection consisting of a combination of trenching, rock placement, and/or concrete mattressing. Each cable is approximately 5 inches in diameter. The cables will be bundled together for installation. For most of the route, the Company plans to bury the cables at a depth of 3 to 6 feet. Where the cables cannot be buried, they will be covered by rock placement or with protective mattressing. In Plymouth, an HVdc converter station, substation, and transmission line tap will be constructed. The cables will be buried between landfall and the converter station, and may be protected by a concrete barrier or buried in a concrete duct bank, as necessary. The proposed submerged transmission cable system will most likely be primarily installed via a burial device such as a jet plow, which uses high-pressure water jets to create a trench (the specific burial strategy will be determined by the selected installer). The burial device may be towed along the seafloor by a ship, or the device may be self-propelled, and will simultaneously create a trench, lay cable fed to the device from the ship, and infill the trench with native material. The burial device will allow the cable system installation to proceed rapidly, generally in a single pass of the device, with a very limited disturbance footprint. The installation will be supplemented with cable protection measures in discrete locations where target burial depths cannot be achieved, such as areas with hard-bottom sea floors. At the origin and landfall of the transmission line route, upland installation techniques will be utilized over short distances (2,375 feet in Massachusetts). Any on-land portion of the cables would be buried. In the transition area between upland and subsea, the cables will be installed using standard horizontal directional drill ( HDD ) techniques to avoid impacts to the intertidal zone. Describe the on-site project alternatives (and alternative off-site locations, if applicable), considered by the proponent, including at least one feasible alternative that is allowed under current zoning, and the reasons(s) that they were not selected as the preferred alternative: NOTE: The purpose of the alternatives analysis is to consider what effect changing the parameters and/or siting of a project, or components thereof, will have on the environment, keeping in mind that the objective of the MEPA review process is to avoid or minimize damage to the environment to the greatest extent feasible. Examples of alternative projects include alternative site locations, alternative site uses, and alternative site configurations. The Company considered several different landing and interconnection points, as well as two routes (including the proposed route) landing in Plymouth. These alternatives are described below, and the route and landing/interconnection points are shown in Attachment D. Proposed Route As described under the Project Description section, the proposed route would be located within a ROW connecting Coleson Cove, New Brunswick, Canada, to Plymouth, Massachusetts, for a total length of approximately 337 miles. The majority of the route will be subsea and occurs within US federal waters; however, approximately 19 miles of the route will traverse Massachusetts state waters. Alternative Route Like the proposed project, the routing alternative would connect Coleson Cove, New Brunswick, Canada, to Plymouth, Massachusetts. However, rather than approaching Plymouth from the northeast, this route would stay closer to the coast and approach Plymouth from the north via Massachusetts Bay. This route would pass through a Gulf of Maine ground fish habitat closure area as well as three Massachusetts Ocean Sanctuaries (North Shore, 1 If the RFP is not procured, the proponent may develop the Atlantic Link project subject to its assessment of market conditions at that time

10 South Essex, and Cape Cod Bay). It would also pass through a North Atlantic Right Whale Precautionary Area. This route would cross the Neptune LNG Pipeline and the Northeast Gateway Pipeline, and other infrastructure located within Massachusetts Bay. However, this route would avoid Stellwagen National Marine Sanctuary and the proposed Stellwagen Designated Habitat Research Area, North Atlantic Right Whale Critical Habitat, Fin Whale Core Habitat, and Humpback Whale Core Habitat. Landing/Interconnection Alternative #1 (Seabrook) Alternative #1 was potentially the least constrained offshore HVdc transmission line corridor. The major protected areas and constraints located offshore from Massachusetts could be avoided by landing the cables further north in New Hampshire, if geotechnical and other subsea site conditions allowed. However, the subsea cables would still need to cross the proposed Stellwagen Designated Habitat and Research Area ( DHRA ) and reference area. Nearshore constraints included the presence of extensive salt marshes, potential for eelgrass habitat, and a rivermouth at Hampton Harbor. These constraints could potentially be avoided by employing HDD techniques to land at Seabrook Station with sufficient depth to avoid being disturbed or damaged by periodic dredging operations at the Hampton Harbor rivermouth. Terrestrial constraints for this alternative would be based around the need to establish a new HVdc ROW, which would require landing at Salisbury Beach, Massachusetts. Potential constraints associated with the new ROW include dense residential and commercial development along part of the route, potential for seasonal construction constraints in an area that is heavily used for coastal summer tourism, potential for impacts to wetlands, streams, vernal pools, and rare species, and potential for having to manage disturbance of contaminated soil along a railroad ROW. From an electrical system stability perspective, it was determined that landing at Seabrook would result in the need for system upgrades in the form of additional high voltage line needing to be constructed, thereby increasing terrestrial environmental impacts and burdening landowners. Landing/Interconnection Alternative #2 (Gloucester) Alternative #2 was eliminated on the basis of being the worst landing point for interconnecting with existing 345 kv system. It would potentially need to cross the northern part of the Stellwagen National Marine Sanctuary ( NMS ) and/or the Stellwagen DHRA and reference area. Nearer to shore, this alternative would also cross the North Shore Ocean Sanctuary. The potential for geotechnical constraints is also high in the Cape Ann vicinity, with a very rocky shoreline, numerous offshore islands formed on bedrock, and a very shallow depth to bedrock in many areas. This alternative would also require siting the HVdc cables through Gloucester Harbor, which is a very active and busy commercial and recreational harbor. Upon landfall, this alternative lacks suitable existing electric transmission infrastructure and a ROW suitable for collocation, and has dense residential and commercial development, and again, a shallow depth to bedrock throughout much of Cape Ann. From an electrical system stability perspective, it was determined that landing at Gloucester would result in the need for system upgrades in the form of additional high voltage line needing to be constructed, thereby increasing terrestrial environmental impacts and burdening landowners. Landing/Interconnection Alternative #3 (Salem Harbor) Alternative #3 presented constraints related to the potential need to cross the Stellwagen NMS and the proposed Stellwagen DHRA and reference area, as well as the North Shore Ocean Sanctuary. Other nearshore constraints would also be encountered to reach the Salem Harbor Station site and included dredged channels, anchorage areas/berths, and the potential for shallow bedrock. A significant terrestrial constraint associated with the Salem Harbor landing point is the need for new electric transmission capacity. The site is situated next to a densely populated area in the northeastern section of Salem, with residences abutting the site to the west and north, and historic districts in the vicinity. The addition of a new 345 kv line would be challenging to site given the density of the existing development and limited available ROW. Landing/Interconnection Alternative #4 (Mystic Substation) Located in Lynn, just south of Salem Harbor, Alternative #4 presented constraints similar to Alternative #3 related to the potential need to cross the Stellwagen NMS and the proposed Stellwagen DHRA and reference area. However, unlike Alternative #3, a suitable location to site an HVdc converter station could not be identified. Additionally, urban construction and additional system upgrades would be required at this site to transmit the electricity provided by Atlantic Link. Landing/Interconnection Alternative #5 (Weymouth to Holbrook) Alternative #5 was the most challenging site from a nearshore siting perspective due to the presence of extensive subsea infrastructure within inner Massachusetts Bay, sewer lines and outfalls, and an historic/abandoned industrial dumping site. Against this backdrop of a complicated nearshore construction environment were - 6 -

11 substantial terrestrial and offshore siting constraints, including crossing the middle of the Stellwagen NMS and potentially the proposed Stellwagen DHRA, as well as the North Shore Ocean Sanctuary and the South Essex Ocean Sanctuary; crossing very active shipping and boating areas; and limited available land for construction of an HVdc converter station at the existing Holbrook Substation. Landing/Interconnection Alternative #6 (Scituate Harbor) Alternative #6 was eliminated due to a combination of terrestrial, nearshore, and offshore siting constraints. While Alternative #6 would likely require a similar offshore route to that of the preferred alternative Plymouth due to their proximity, Alternative #6 would offer none of the added benefits of an ideal 345 kv interconnection site that is provided by the Preferred Project. It would require crossing the Stellwagen NMS and near or potentially through designated North Atlantic right whale critical habitat, as well as crossing the commercial shipping lane to Boston Harbor. Within Scituate harbor, there is extensive recreational and commercial marina activity and a maintained and periodically dredged channel, and the sheltered embayment has the potential to support valued coastal resources including tidal marshes, intertidal flats, and eelgrass beds. Terrestrial siting challenges include constrained space at the Auburn Street Substation for construction of an HVdc converter station, and the need to establish new ROW along municipal roads and the existing 115 kv ROW to the Auburn Street Substation. Landing/Interconnection Alternative #7 (Brayton) As with Alternative #1, Alternative #7 would avoid designated right whale critical habitat, the Stellwagen NMS, all Massachusetts waters including Ocean Sanctuaries and Ocean Management Plan areas, and offshore infrastructure in the vicinity of Massachusetts Bay. However, approaching nearshore waters, this alternative would encounter designated areas of particular concern and exclusion zones specified in the Rhode Island Ocean Special Area Management Plan, and state water use designations under the jurisdiction of the Rhode Island Coastal Resources Management Council. This alternative would also cross natural resources including two aquaculture sites, a shellfish management and spawning area, and a productive commercial quahog fishery; and existing infrastructure including cables and a natural gas pipeline. Furthermore, this route would require a much longer cable length and complex installation within a river system, resulting in a significantly higher expense than the proposed route. Summarize the mitigation measures proposed to offset the impacts of the preferred alternative: Most of the Project s potential environmental impacts would occur during construction and site development. Potential environmental impacts from project construction would be related to the subsea cable installation, the terrestrial cables, the DC converter station and substation construction, and transmission line tap construction. Subsea Cable Construction The proposed submerged transmission cable system will most likely be installed principally in soft bottom sediments using a burial device such as a jet plow. The jet plow could be towed along the seafloor by a ship, or the device may be self-propelled, and would simultaneously create a trench, lay cables fed to the plow from the ship, and infill the trench with native material. The trench would be less than two feet wide and approximately 6 feet deep and would infill immediately as the plow installs the cables. The cables would be buried to a depth of approximately 3 to 6 feet. Suspended sediment would be limited to the immediate installation area. The only direct impacts of the jet plow installation to the marine environment are in the footprint of the trench and jet plow, and these would be very short-term. Typically, use of a jet plow allows for 2 to 4 miles of cable to be installed per day. The subsea cables would have no significant environmental impacts during operation because it would be buried beneath the seafloor for most of its length. Where hard-bottom seafloor is encountered and the cables are not able to be buried in marine sediments, the cables would be covered with rocks or a protective mattress to armor the cables and hold them in-place. Where the cables are armored, potential environmental impacts would be limited to the footprint of the protective covering. The locations where the cables must be laid on the seafloor surface and armored will be minimized by pre-construction siting analysis. To date CPNE has completed desktop analysis and preliminary surveys to identify a transmission line corridor with the highest probability of encountering soft bottom sediments. CPNE will also complete detailed pre-construction field surveys and field data collection to maximize cable installation in soft bottom sediments that can be trenched rather than installed on hard seafloor bottom

12 A short segment of the cables would be installed using the HDD installation technique where it approaches the landfall location in Plymouth. HDD installation involves a GPS-guided drilling device that bores and reams a hole through the subsurface between a subsurface entry and exit location. The HDD construction would be a land to water installation, where the drilling device would penetrate the ground surface from a terrestrial starting point and exit the seafloor near the cable trench. The cables would be attached to the drilling device and pulled back through the subsurface HDD path to the terrestrial starting point to complete the cable landfall. The advantage of HDD installation is that the cables can be installed with no disturbance to the seafloor, the terrestrial surface, and nearshore resources (e.g., beaches, dunes, eelgrass beds, and marshes), except where the HDD enters and exits the ground or seafloor at the start and end points. This minimizes impacts to valued and protected shoreland, water, and wetland resources. A potential risk of HDD installation is the inadvertent return of lubricating drilling mud (water and bentonite clay), pressurized within the bore hole, to the seafloor surface. This can create temporary turbidity in the water from suspended sediment. This risk would be mitigated by monitoring the pressure of the drilling mud in the HDD bore hole, and through implementing an approved contingency plan to minimize and contain turbidity and sedimentation. The principal potential for environmental impact risks related to subsea cable construction are related to spawning and Essential Fish Habitat disturbance, harassment or injury to threatened, endangered, or protected marine species (i.e. marine mammals), and offshore sanctuary and cultural resources (i.e., Stellwagen NMS, Massachusetts Ocean Sanctuaries, or shipwrecks). The proposed subsea transmission line corridor has been sited to avoid and minimize crossings and impacts to protected areas and species associated with them. Furthermore, the subsea cables are expected to have no significant environmental impacts during operation because it would be buried beneath the seafloor for most of its length. The potential for impacts to these resources will be fully evaluated, minimized, and mitigated through completion of the various permit authorizations and agency consultations. Key among these will be consultations with the National Marine Fisheries Service ( NMFS ), the Massachusetts Division of Marine Fisheries ( DMF ), the Massachusetts Bureaus of Underwater Archaeological Resources ( MBUAR ), and the Massachusetts Historical Commission ( MHC ), under laws and regulations including the Marine Mammal Protection Act, the Endangered Species Act, Magnuson Stevens Fishery Conservation and Management Act, National Marine Sanctuaries Act, and the Massachusetts Ocean Sanctuaries Act. Terrestrial Cables, DC Converter Station Construction, and Transmission Line Tap Terrestrial components of the Project include buried HVdc cables, a DC converter station, substation, and electric transmission line tap. Construction of these elements of the project have the potential for short-term environmental impacts. The sequence of project construction would generally follow: Clearing and vegetation removal; Grading and site preparation; Construction, and Site restoration. The work would generally move from one end of the line to the other over the duration of the construction period. The transmission line corridor easement is 200 feet wide and 2,375 feet long; however, the disturbed area would be 50 feet wide and occupy approximately 2.7 acres, with the remaining 8.2 acres serving as a buffer to surrounding land uses. This area would require limited associated grading to facilitate equipment access during construction. The cables would be buried in an open trench less than two feet wide between landfall and the converter station. As design progresses, the cables may be protected by a concrete barrier or buried in a concrete duct bank, as necessary. The DC converter station and substation would be developed on an approximately 41-acre site and would require substantial site grading and preparation, although only 10 to 15 acres of the site would be developed to construct the facilities. Following construction, the HVdc cables and transmission line tap ROWs would be maintained in a shrub-meadow cover type. The DC converter station and substation would be permanently developed with electric transmission infrastructure. Potential construction-phase environmental impacts would be minimized by adhering to construction Best Management Practices ( BMPs ) and permit conditions, and implementation of an Environmental Inspection ( EI ) Program. Key elements of the BMPs and EI program would include implementation of erosion and - 8 -

13 sedimentation controls, a spill prevention and countermeasures plan, regular environmental inspections and coordination between environmental compliance and construction personnel. If the project is proposed to be constructed in phases, please describe each phase: The Project will not be phased

14 AREAS OF CRITICAL ENVIRONMENTAL CONCERN: Is the project within or adjacent to an Area of Critical Environmental Concern? Yes (Specify ) No if yes, does the ACEC have an approved Resource Management Plan? Yes No; If yes, describe how the project complies with this plan. Will there be stormwater runoff or discharge to the designated ACEC? Yes No; If yes, describe and assess the potential impacts of such stormwater runoff/discharge to the designated ACEC. RARE SPECIES: Does the project site include Estimated and/or Priority Habitat of State-Listed Rare Species? (see m) Yes (Specify: PH 842/EH 682 and PH 945/EH 756) No HISTORICAL/ARCHAEOLOGICAL RESOURCES: Does the project site include any structure, site or district listed in the State Register of Historic Place or the inventory of Historic and Archaeological Assets of the Commonwealth? Yes (Specify PLY.F: Manomet Inventoried Area ) No If yes, does the project involve any demolition or destruction of any listed or inventoried historic or archaeological resources? Yes (Specify ) No WATER RESOURCES: Is there an Outstanding Resource Water (ORW) on or within a half-mile radius of the project site? Yes No; if yes, identify the ORW and its location. (NOTE: Outstanding Resource Waters include Class A public water supplies, their tributaries, and bordering wetlands; active and inactive reservoirs approved by MassDEP; certain waters within Areas of Critical Environmental Concern, and certified vernal pools. Outstanding resource waters are listed in the Surface Water Quality Standards, 314 CMR 4.00.) Are there any impaired water bodies on or within a half-mile radius of the project site? Yes No; if yes, identify the water body and pollutant(s) causing the impairment:. Is the project within a medium or high stress basin, as established by the Massachusetts Water Resources Commission? Yes No STORMWATER MANAGEMENT: Generally describe the project's stormwater impacts and measures that the project will take to comply with the standards found in MassDEP's Stormwater Management Regulations: The Project will be constructed in compliance with the Massachusetts Wetlands Protection Act and the MassDEP Stormwater Regulations. The majority of the stormwater management standards are not applicable to the proposed work. The primary applicable standard is Standard #8: Construction Period Pollution Prevention and Erosion and Sedimentation Controls. The Company will install erosion control devices and employ dewatering as needed. Daily inspections of all work areas and erosion controls will be conducted by construction crews and weekly inspections will be performed by an experienced environmental monitor

15 MASSACHUSETTS CONTINGENCY PLAN: Has the project site been, or is it currently being, regulated under M.G.L.c.21E or the Massachusetts Contingency Plan? Yes No; if yes, please describe the current status of the site (including Release Tracking Number (RTN), cleanup phase, and Response Action Outcome classification): Is there an Activity and Use Limitation (AUL) on any portion of the project site? Yes No; if yes, describe which portion of the site and how the project will be consistent with the AUL: Are you aware of any Reportable Conditions at the property that have not yet been assigned an RTN? Yes No; if yes, please describe: SOLID AND HAZARDOUS WASTE: If the project will generate solid waste during demolition or construction, describe alternatives considered for re-use, recycling, and disposal of, e.g., asphalt, brick, concrete, gypsum, metal, wood: The Company will recycle construction debris such as packaging materials, conductors, insulators, pallets, and wooden spools to the extent practical and as required by regulations. NOTE: Asphalt pavement, brick, concrete and metal are banned from disposal at Massachusetts landfills and waste combustion facilities and wood is banned from disposal at Massachusetts landfills. See 310 CMR for the complete list of banned materials.) Will your project disturb asbestos containing materials? Yes No; if yes, please consult state asbestos requirements at Describe anti-idling and other measures to limit emissions from construction equipment: During project construction, air quality impacts would include emissions from ships, barges, and land-based construction equipment. These impacts would include emissions from fossil fuel combustion, and fugitive dust emissions from land-based construction. These air quality impacts would be short-term. During operation of the Project, there may be a small standby generator on site that would be used only for black starts subsequent to system power interruptions. Air quality impacts from this infrequent use and from general operation of the facility would be de minimus, and limited to vehicles run by project operation and maintenance personnel. The Project s potential for air quality impacts would be reviewed by the EPA under Section 7627 of the Clean Air Act, and air quality impacts would be mitigated through compliance with state and federal regulatory requirements. The Company will establish standards and protocols for contractor operation of equipment in an environmental protection plan. DESIGNATED WILD AND SCENIC RIVER: Is this project site located wholly or partially within a defined river corridor of a federally designated Wild and Scenic River or a state designated Scenic River? Yes No; if yes, specify name of river and designation: If yes, does the project have the potential to impact any of the outstandingly remarkable resources of a federally Wild and Scenic River or the stated purpose of a state designated Scenic River? Yes No; if yes, specify name of river and designation: ; if yes, will the project will result in any impacts to any of the designated outstandingly remarkable resources of the Wild and Scenic River or the stated purposes of a Scenic River. Yes No; if yes, describe the potential impacts to one or more of the outstandingly remarkable resources or stated purposes and mitigation measures proposed

16 ATTACHMENTS: 1. List of all attachments to this document. See below. 2. U.S.G.S. map (good quality color copy, 8-½ x 11 inches or larger, at a scale of 1:24,000) indicating the project location and boundaries. Provided as Attachment A. 3. Plan, at an appropriate scale, of existing conditions on the project site and its immediate environs, showing all known structures, roadways and parking lots, railroad rights-of-way, wetlands and water bodies, wooded areas, farmland, steep slopes, public open spaces, and major utilities. Provided as Attachment B. 4 Plan, at an appropriate scale, depicting environmental constraints on or adjacent to the project site such as Priority and/or Estimated Habitat of state-listed rare species, Areas of Critical Environmental Concern, Chapter 91 jurisdictional areas, Article 97 lands, wetland resource area delineations, water supply protection areas, and historic resources and/or districts. Provided as Attachment C. 5. Plan, at an appropriate scale, of proposed conditions upon completion of project (if construction of the project is proposed to be phased, there should be a site plan showing conditions upon the completion of each phase). Please see Attachment C for the proposed location of the Project. At this time, engineered details are not available. 6. List of all agencies and persons to whom the proponent circulated the ENF, in accordance with 301 CMR 11.16(2). Provided as Attachment D. 7. List of municipal and federal permits and reviews required by the project, as applicable. Municipal (Town of Plymouth) Plymouth Zoning Board of Appeals o Zoning Bylaw Variance Approval Conservation Commissions o Massachusetts Wetlands Protection Act (310 CMR 10.00) o Plymouth Wetlands Protection Bylaw Plymouth Department of Public Works o Trench Permit Public Property Plymouth Building and Zoning Department o Trench Permit Private Property Federal US Department of Energy: o Presidential Permit US Army Corps of Engineers: o Section 10 Rivers and Harbors Act o Sections 403/404 Federal Clean Water Act US Environmental Protection Agency:

17 o National Pollutant Discharge Elimination System ( NPDES ) General Permit for Storm Water Discharges from Construction Activities o Clean Air Act Notice of Intent NMFS/USFWS: o Endangered Species Act review o Marine Mammal Protection Act review o Magnuson-Stevens Fishery Conservation and Management Act review o Migratory Bird Treaty Act review o National Marine Sanctuaries Act Section 310 Special Permit or Section Authorization Bureau of Ocean Energy Management o Outer Continental Shelf Lands Act easement o NEPA Review US Coast Guard o US Coast Guard Regulations Navigational Risk Assessment

18 LAND SECTION all proponents must fill out this section I. Thresholds / Permits A. Does the project meet or exceed any review thresholds related to land (see 301 CMR 11.03(1) Yes No; if yes, specify each threshold: II. Impacts and Permits A. Describe, in acres, the current and proposed character of the project site, as follows: Existing Change Total Footprint of buildings Internal roadways Parking and other paved areas Other altered areas Undeveloped areas ROW Converter Station Site Total: Project Site Acreage B. Has any part of the project site been in active agricultural use in the last five years? Yes No; if yes, how many acres of land in agricultural use (with prime state or locally important agricultural soils) will be converted to nonagricultural use? C. Is any part of the project site currently or proposed to be in active forestry use? Yes No; if yes, please describe current and proposed forestry activities and indicate whether any part of the site is the subject of a forest management plan approved by the Department of Conservation and Recreation: Entergy is participating in the Chapter 61 tax program and has a Forest Management Plan in place approved by DCR. The Proponent is coordinating with Entergy to determine the status of current and proposed forestry activities on the site. D. Does any part of the project involve conversion of land held for natural resources purposes in accordance with Article 97 of the Amendments to the Constitution of the Commonwealth to any purpose not in accordance with Article 97? Yes No; if yes, describe: E. Is any part of the project site currently subject to a conservation restriction, preservation restriction, agricultural preservation restriction or watershed preservation restriction? Yes No; if yes, does the project involve the release or modification of such restriction? Yes No; if yes, describe: In 2013, Entergy and the Town of Plymouth entered into a Payment in Lieu of Tax Agreement ( PILOT Agreement ), in which a restrictive covenant prevented Entergy s property from being used for residential development as long as the PILOT Agreement is in effect. However, in 2016, Entergy negotiated an updated PILOT Agreement in which the restrictive covenant expired on June 30, F. Does the project require approval of a new urban redevelopment project or a fundamental change in an existing urban redevelopment project under M.G.L.c.121A? Yes No; if yes, describe: G. Does the project require approval of a new urban renewal plan or a major modification of an existing urban renewal plan under M.G.L.c.121B? Yes No; if yes, describe:

19 III. Consistency A. Identify the current municipal comprehensive land use plan Title: Town of Plymouth, Massachusetts: Master Plan, Date: August 2006 B. Describe the project s consistency with that plan with regard to: 1) economic development: The Project would contribute to the Town s non-residential tax base, which the Master Plan indicates Plymouth must increase to assure long-term fiscal stability. The Project also supports Economic Development Objective 1, which specifically identifies a goal to replace a portion of the expected losses in assessed valuation associated with the devaluation of the Pilgrim Nuclear Power Plant. The project will deliver an estimated $260 million in capital investment, as well as more than 900 full-time equivalent construction jobs and $217 million in wages for Massachusetts workers. The Town of Plymouth will receive ongoing tax revenue of $2.5 million annually, for the term of Atlantic Link s contract resulting from the Clean Energy RFP. In addition, Emera Inc. will contribute $750,000 annually for the benefit of low income customers in the Commonwealth by augmenting energy-related programs delivered in the Plymouth area by the South Shore Community Action Council. Clean Power Northeast, on behalf of Emera, has made a commitment to SSCAC for this funding over the term of the PPA that would be signed with Massachusetts electric utilities; the Board of SSCAC has agreed to deliver programs in a manner that maximizes direct benefit for low-income residents served by the agency. The local tax income and low-income commitment by Atlantic Link are direct, positive offsets to the loss of local economic benefits associated with the closure of the Pilgrim nuclear station in ) adequacy of infrastructure: The Master Plan indicates that Plymouth has faced accelerated residential growth that is expected to continue, and the Project will support the increased energy demand using renewable sources. 3) open space impacts: The Project is proposed on existing Entergy property. This property is identified in the Master Plan as containing approximately 1,600 acres of temporarily protected open space, protected as long as Entergy owns the property. The buried cables will require conversion of some existing forested areas into shrub/meadow vegetative communities, but will not result in any other permanent impacts to the existing open space. The new substation and converter station would be constructed within an approximately 41-acre site and require the development of approximately 10 to 15 acres within this land. 4) compatibility with adjacent land uses: The Project will be built within the existing Entergy property, consistent with existing energy infrastructure uses developed on other parts of the property including a nuclear generator, substation, and electric transmission ROWs. Extensive areas of undeveloped forested land are available around the proposed DC converter station site to facilitate a forested buffer that would be several hundred feet wide. C. Identify the current Regional Policy Plan of the applicable Regional Planning Agency (RPA) RPA: Old Colony Planning Council Title: Regional Policy Plan: A Guide for Shaping Our Communities and the OCPC Region Date: 2000 D. Describe the project s consistency with that plan with regard to: 1) economic development: The regional employment projections indicated that the Town of Plymouth was expected to have the greatest share of the region s new jobs. The Project will support and provide reliable energy for this future economic development. As described above, Atlantic Link s landfall in Massachusetts creates economic benefit to the Commonwealth. The project will deliver an estimated $260 million in capital investment, as well as more than 900 full-time equivalent construction jobs and $217 million in wages for Massachusetts workers. In addition, Emera Inc. will contribute $750,000 annually for the benefit of low income customers in the Commonwealth by augmenting energy-related programs delivered in the Plymouth area by the South Shore Community Action Council. Clean Power Northeast, on behalf of Emera, has made a commitment to SSCAC for this

20 funding over the term of the PPA that would be signed with Massachusetts electric utilities; the Board of SSCAC has agreed to deliver programs in a manner that maximizes direct benefit for low-income residents served by the agency. 2) adequacy of infrastructure: The Project is intended to provide a continued reliable source of electricity to customers in Massachusetts and New England. 3) open space impacts: The Project will be built within existing Entergy property with the land impacts noted in Section II above. The Project will not have any direct impacts to permanently protected open space

21 RARE SPECIES SECTION I. Thresholds / Permits A. Will the project meet or exceed any review thresholds related to rare species or habitat (see 301 CMR 11.03(2))? Yes No; if yes, specify, in quantitative terms: (NOTE: If you are uncertain, it is recommended that you consult with the Natural Heritage and Endangered Species Program (NHESP) prior to submitting the ENF.) To be determined. The subsea cables cross through rare species habitat. It is unclear at this time whether the Project will meet or exceed any review thresholds. The Company will work with NHESP to determine whether rare species or habitat is present, and whether the Project may result in impacts to rare species or habitat. If the Project is found to have potential impacts to rare species or habitat, the Company will work with NHESP to avoid and minimize impacts to habitat for the listed species to the extent possible. B. Does the project require any state permits related to rare species or habitat? Yes No There is a possibility that the Project may require a Conservation and Management Permit. The Company will coordinate with NHESP to avoid and minimize impacts to rare species and habitat. C. Does the project site fall within mapped rare species habitat (Priority or Estimated Habitat?) in the current Massachusetts Natural Heritage Atlas (attach relevant page)? Yes No. The subsea cables cross through PH 842/EH 682 and PH 945/EH 756, according to MassGIS data. D. If you answered "No" to all questions A, B and C, proceed to the Wetlands, Waterways, and Tidelands Section. If you answered "Yes" to either question A or question B, fill out the remainder of the Rare Species section below. II. Impacts and Permits A. Does the project site fall within Priority or Estimated Habitat in the current Massachusetts Natural Heritage Atlas (attach relevant page)? Yes No. If yes, 1. Have you consulted with the Division of Fisheries and Wildlife Natural Heritage and Endangered Species Program (NHESP)? Yes No; if yes, have you received a determination as to whether the project will result in the take of a rare species? Yes No; if yes, attach the letter of determination to this submission. 2. Will the project "take" an endangered, threatened, and/or species of special concern in accordance with M.G.L. c.131a (see also 321 CMR 10.04)? Yes No; if yes, provide a summary of proposed measures to minimize and mitigate rare species impacts. To be determined. The Company will work with NHESP to minimize impacts to habitat for the listed species to the extent possible

Atlantic Link: An Update. June 6, 2017

Atlantic Link: An Update. June 6, 2017 Atlantic Link: An Update June 6, 2017 About Emera Publicly traded (TSX: EMA); approximately CDN$29 billion in assets Constructing the 500 MW Maritime Link a 170-kilometre subsea HVdc cable between Newfoundland

More information

Plymouth Transportation Center MEPA Pre-Filing Consultation

Plymouth Transportation Center MEPA Pre-Filing Consultation Plymouth Transportation Center MEPA Pre-Filing Consultation Draft 3.8.12 Project Overview Project description, purpose, and need (see attached summary) Environmental Impacts No ENF thresholds triggered

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE PLYMOUTH HARBOR FEDERAL NAVIGATION PROJECT PLYMOUTH, MASSACHUSETTS

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE PLYMOUTH HARBOR FEDERAL NAVIGATION PROJECT PLYMOUTH, MASSACHUSETTS 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Michael Walsh nae-pn-nav@usace.army.mil Programs & Project Management Division Date: June 14, 2018 Comment Period Closes: July

More information

Public Notice NATIONWIDE PERMIT REISSUANCE FOR THE STATE OF OHIO

Public Notice NATIONWIDE PERMIT REISSUANCE FOR THE STATE OF OHIO Public Notice U S Army Corps of Engineers Huntington District In reply refer to Public Notice No. Issuance Date: March 02, 2012 LRH-201100098 Stream: Closing Date: N/A N/A Please address all comments and

More information

Public Notice: Wetland/Waterway/Water Quality Regulations

Public Notice: Wetland/Waterway/Water Quality Regulations Public Notice: Wetland/Waterway/Water Quality Regulations Pursuant to M.G.L. c.30a, the MA Department of Environmental Protection (DEP) gives notice of its intent to revise the following regulations under

More information

The following bullets provide an explanation for the necessary corrections and clarifications.

The following bullets provide an explanation for the necessary corrections and clarifications. June 12, 2017 Ref: EEA # 15703 Ms. Page Czepiga MEPA Office Executive Office of Energy and Environmental Affairs 100 Cambridge Street, Suite 900 Boston, MA 02114 Re: Sudbury-Hudson Transmission Reliability

More information

The ~ommonwealth of Nassachusetts

The ~ommonwealth of Nassachusetts DEVAL L. PATRICK GOVERNOR The ~ommonwealth of Nassachusetts Executive Ofice of Energy adenvironmentafflffairs 100 cambridge Street, Suite 900 Boston, MA 02114 TIMOTHY P. MURRAY LIEUTENANT GOVERNOR July

More information

A. General Information

A. General Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Note: Before completing this form consult your local Conservation Commission regarding

More information

Quintillion Subsea Project Applicant Proposed Mitigation Statement

Quintillion Subsea Project Applicant Proposed Mitigation Statement 1. Avoidance of impacts to waters of the U.S., including wetlands: Please describe how, in your project planning process, you avoided impacts to waters of the U.S., including wetlands, to the maximum extent

More information

Chapter 750 WIND POWER GENERATION FACILITIES

Chapter 750 WIND POWER GENERATION FACILITIES Chapter 750 WIND POWER GENERATION FACILITIES 750.01 Purpose 750.02 Definitions 750.03 Designated Areas 750.04 Permitted Uses 750.05 Conditional Uses 750.06 Construction Standards 750.07 Application Requirements

More information

ATTACHMENT 1 GEPA CHECKLIST & Historical Archeological & Natural Heritage Preservation Documents

ATTACHMENT 1 GEPA CHECKLIST & Historical Archeological & Natural Heritage Preservation Documents ATTACHMENT 1 GEPA CHECKLIST & Historical Archeological & Natural Heritage Preservation Documents INTRODUCTION The 1991 Session of the Georgia General Assembly passed Senate Bill 97, as amended, and it

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

Environmental Check List Georgia Environmental Policy Act

Environmental Check List Georgia Environmental Policy Act Environmental Check List Georgia Environmental Policy Act Project No. : Project Name: GEORGIA IS AREA AFFECTED? IF AFFECTED, HOW SEVERELY? AREA/CATEGORY NO YES UNKNOWN MINOR MEDIAN MAJOR UNKNOWN 1. Wetlands

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: July 31,

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

WQMP AMENDMENT REVIEW CHECKLIST

WQMP AMENDMENT REVIEW CHECKLIST State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205 (fax) www.highlands.state.nj.us WQMP AMENDMENT

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES The County will: GOALS AND OBJECTIVES 1.1 Conserve, Enhance, Protect, Maintain and Manage Vegetative, Water, Fish and Wildlife Resources Promote

More information

Flood Mitigation Facilities for Peabody Square Area

Flood Mitigation Facilities for Peabody Square Area ENVIRONMENTAL NOTIFICATION FORM Flood Mitigation Facilities for Peabody Square Area Peabody, Massachusetts Submitted by: City of Peabody Department of Public Services Submitted to: Executive Office of

More information

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 REPLY TO ATTENTION OF: JOINT PUBLIC NOTICE U. S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT AND FLORIDA

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

Beverly. Produced in This report and associated map provide information about important sites for biodiversity conservation in your area.

Beverly. Produced in This report and associated map provide information about important sites for biodiversity conservation in your area. CONSERVING THE BIODIVERSITY OF MASSACHUSETTS IN A CHANGING WORLD Beverly Produced in 2012 This report and associated map provide information about important sites for biodiversity conservation in your

More information

Science Park/West End Station Accessibility Improvements. Table of Contents

Science Park/West End Station Accessibility Improvements. Table of Contents Science Park/West End Station Accessibility Improvements Table of Contents Table of Contents Massachusetts Environmental Policy Act Environment Notification Form with Distribution List EXECUTIVE SUMMARY

More information

November 2,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFIARS ON THE FINAL ENVIRONMENTAL IMPACT REPORT

November 2,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFIARS ON THE FINAL ENVIRONMENTAL IMPACT REPORT MlTl ROMNEY Tel. (617) 626-1000 GOVERNOR Fax. (617) 626-1181 KERRY HEALEY hltp://www.mass.gavlenvir LIEUTENANTGOVERNOR ROBERT W. GOLLEDGE, JR November 2,2006 SECRETARY CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL

More information

APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS

APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS Any project that is referred to DFO is reviewed to determine if there is likely to be a HADD to productive fish habitat as defined under Section 35

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit Issue Date: March 4, 2016 Expiration Date: April 4, 2016 US Army Corps of Engineers No: NWP-2015-432 30-Day Notice Oregon Department of State Lands No: 58511 Interested

More information

Corps Regulatory Program Jurisdiction and Permits

Corps Regulatory Program Jurisdiction and Permits Corps Regulatory Program Jurisdiction and Permits Council of Texas Archeologists Meeting Austin, TX April 2018 Jimmy Barrera Regulatory Archeologist/Project Manager Fort Worth District US Army Corps of

More information

Atlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT

Atlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT Atlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT Hurricane Sandy General Reevaluation Report August 2016 New York (and New York City Local

More information

Chapter 5 Regulatory Coordination and Compliance

Chapter 5 Regulatory Coordination and Compliance Chapter 5 Regulatory Coordination and Compliance This chapter provides an update on the federal, state, and local laws and regulations that required the City to coordinate with regulatory agencies to obtain

More information

Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP

Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP #33 NWP #36 NWP #37 NWP #39 NWP #42 NWP #45 NWP #46

More information

KRISTOPHER J. KRZYSTON, CEI, CEM

KRISTOPHER J. KRZYSTON, CEI, CEM PERMITTING IN NEW JERSEY KRISTOPHER J. KRZYSTON, CEI, CEM Kristopher J. Krzyston Rutgers graduate 1994 B.S. Environmental Planning Certificate in G.I.S. Assistant Division Manager Environmental Science

More information

Ocean Management Planning DCPC: Planning for Offshore Development. Informational Forums June 1, 6, and 8, 2011

Ocean Management Planning DCPC: Planning for Offshore Development. Informational Forums June 1, 6, and 8, 2011 Ocean Management Planning DCPC: Planning for Offshore Development Informational Forums June 1, 6, and 8, 2011 Ocean Management Planning DCPC Review of Context, DCPC process DCPC Guidelines Renewable Energy

More information

Short-term (Construction) Impacts and Potential Mitigation

Short-term (Construction) Impacts and Potential Mitigation 4 Short-term (Construction) Impacts and Potential Mitigation CHAPTER 4. SHORT-TERM (CONSTRUCTION) IMPACTS AND POTENTIAL MITIGATION This chapter describes short-term (construction) impacts that could result

More information

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

CATEGORY a protection of the natural environment, its ecosystems and biodiversity. 29. ENVIRONMENTAL DEVELOPMENT PERMIT AREA CATEGORY a protection of the natural environment, its ecosystems and biodiversity. The requirement to obtain an environmental development permit is cited in Section

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD. Testimony of. Susan Moberg, P.W.S. on behalf of

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD. Testimony of. Susan Moberg, P.W.S. on behalf of STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD In re : : Docket No. SB-00-0 () : Testimony of Susan Moberg, P.W.S on behalf of June, 00 PROV-- d/b/a NationalGrid 0 0 PREFILED

More information

4.10 LAND USE ENVIRONMENTAL SETTING

4.10 LAND USE ENVIRONMENTAL SETTING 4.10 LAND USE 4.10.1 ENVIRONMENTAL SETTING The proposed Project consists of construction and operation of two 8-inch crude oil pipelines (within one trench) and equipment for storage and pumping from the

More information

STATE OF WASHINGTON FINAL DECISIONS AND SECTION 401 WATER QUALITY CERTIFICATION CONDITIONS FOR THE CORPS OF ENGINEERS 2017 NATIONWIDE PERMIT PROGRAM

STATE OF WASHINGTON FINAL DECISIONS AND SECTION 401 WATER QUALITY CERTIFICATION CONDITIONS FOR THE CORPS OF ENGINEERS 2017 NATIONWIDE PERMIT PROGRAM STATE OF WASHINGTON FINAL DECISIONS AND SECTION 401 WATER QUALITY CERTIFICATION CONDITIONS FOR THE CORPS OF ENGINEERS 2017 NATIONWIDE PERMIT PROGRAM In addition to all the U.S. Army Corps of Engineers

More information

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM COASTAL ZONE MANAGEMENT CONSISTENCY DETERMINATION FOR THE IMPROVEMENT DREDGING OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT (NEW HAVEN, CONNECTICUT) SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW

More information

Minnesota EAW Supplement

Minnesota EAW Supplement Appendix I: Minnesota EAW Supplement Lower Pool 2 Channel Management Study: Boulanger Bend to Lock and Dam No. 2 Minnesota EAW Item Identification A supplement prepared for the Minnesota DNR to identify

More information

SEPA Environmental Checklist

SEPA Environmental Checklist Purpose of the Checklist: The State Environmental Policy Act (SEPA), chapter 43.21 RCW, requires all governmental agencies, including the City of Ferndale to consider the environmental impacts of a proposal

More information

Imperial s Sarnia Products Pipeline

Imperial s Sarnia Products Pipeline Imperial s Sarnia Products Pipeline Waterdown to Finch Project Community Information Session Imperial s Waterdown to Finch Project Important infrastructure to the Greater Toronto and Hamilton Area (GTHA).

More information

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P.O. BOX NEW ORLEANS, LOUISIANA DEPARTMENT OF THE ARMY GENERAL PERMIT

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P.O. BOX NEW ORLEANS, LOUISIANA DEPARTMENT OF THE ARMY GENERAL PERMIT REPLY TO ATTENTION OF Operations Division Regulatory Branch DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P.O. BOX 60267 NEW ORLEANS, LOUISIANA 70160-0267 DEPARTMENT OF THE ARMY GENERAL

More information

PERMIT APPLICATION FEES Fees must be paid at time of application

PERMIT APPLICATION FEES Fees must be paid at time of application Permits SEPA Checklist Permit # Staff use Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful

More information

Grafton Hydro, LLC. 55 Union Street, 4 th Floor Boston, MA, USA Tel: Fax: October 9, 2015

Grafton Hydro, LLC. 55 Union Street, 4 th Floor Boston, MA, USA Tel: Fax: October 9, 2015 Grafton Hydro, LLC 55 Union Street, 4 th Floor Boston, MA, 02108-2400 USA Tel: +617-710-1114 Fax: +617-367-3796 October 9, 2015 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First

More information

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018 APPLICANT: Sargento Foods Inc. Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018 REFER TO: 2010-2909-RJH SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge dredged and fill

More information

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA REPLV TO ATTENTION OF: DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 CESAM-RD-M April15, 2014 PUBLIC NOTICE NO. SAM-2014-00275-TMZ

More information

Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study

Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study Draft Integrated Feasibility Report & Environmental Assessment Appendix E: Pertinent Correspondence & Environmental

More information

Special Public Notice

Special Public Notice US Army Corps of Engineers Alaska District Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Special Public Notice Date: June 14, 2016 Identification No: POA-2016-6 Expiration

More information

The release of the Final Environmental Impact Statement (FEIS) for the Bogue

The release of the Final Environmental Impact Statement (FEIS) for the Bogue This document is scheduled to be published in the Federal Register on 03/05/2018 and available online at https://federalregister.gov/d/2018-04408, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 18, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS H201 Sacramento,

More information

ENVIRONMENTAL CHECKLIST (WAC )

ENVIRONMENTAL CHECKLIST (WAC ) Fee: $400.00 Date Fee Paid: Received by: 186 Iron Horse Court, Suite 101, Yakima WA 98901 Phone: (509) 834-2050 Fax: (509) 834-2060 Website: http://www.yakimacleanair.org ENVIRONMENTAL CHECKLIST (WAC 197-11-960)

More information

City of Valdosta Land Development Regulations

City of Valdosta Land Development Regulations Chapter 324 Section 324-1 Environmental Planning Criteria Protection of Groundwater Recharge Areas (A) Purpose and Intent. Pursuant to O.C.G.A. 12-2-8 and the Georgia Department of Natural Resources (DNR),

More information

Joint Agency Application to Conduct Marine Aquaculture in Connecticut. Part I. INSTRUCTIONS

Joint Agency Application to Conduct Marine Aquaculture in Connecticut. Part I. INSTRUCTIONS Joint Agency Application to Conduct Marine Aquaculture in Connecticut Part I. INSTRUCTIONS 1. Complete the application form using blue or black ink. 2. Include all supporting documents (see checklist,

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R November 21, 2017

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R November 21, 2017 THIS IS NOT A PAID ADVERTISEMENT Public Notice U.S. Army Corps of Engineers Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2017-00716

More information

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No. Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 13, 2019

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 13, 2019 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2012-0699 February 13, 2019 Application

More information

Application fee: $ payable to Stevens County Land Services A completed environmental checklist Any other supplemental information.

Application fee: $ payable to Stevens County Land Services A completed environmental checklist Any other supplemental information. SEPA CHECKLIST FOR ENVIRONMENTAL REVIEW STEVENS COUNTY LAND SERVICES PLANNING DIVISION Street Address: 260 S. Oak Courthouse Annex, Colville, WA Mailing Address: 215 S. Oak Courthouse Annex, Colville,

More information

Response: Eastern Shore will require additional permanent easement and temporary workspace (TWS) in the following municipalities:

Response: Eastern Shore will require additional permanent easement and temporary workspace (TWS) in the following municipalities: 2. There are multiple properties throughout the Chester County portion of the 2017 Expansion Project area which contain preservation easements on them. Eastern Shore Natural Gas Company should be aware

More information

COMMONWEALTH of VIRGINIA

COMMONWEALTH of VIRGINIA Molly Joseph Ward Secretary of Natural Resources COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing address: P.O. Box 1105,

More information

Appendix E : Guidelines for Riparian Buffer Areas

Appendix E : Guidelines for Riparian Buffer Areas Appendix E : Guidelines for Riparian Buffer Areas This document should be read in conjunction with the CRCA Planning Policy. 1.0 PURPOSE The purpose of this document is to summarize the recommendations

More information

55e CommonweaCth of Massachusetts wecutive Ofice of energy and~nvironmentalgffairs 100 Cam6ridge Street, Suite 900 Boston, MA 02114

55e CommonweaCth of Massachusetts wecutive Ofice of energy and~nvironmentalgffairs 100 Cam6ridge Street, Suite 900 Boston, MA 02114 Deval L. Patrick GOVERNOR Timothy P. Murray LIEUTENANT GOVERNOR Ian A. Bowles SECRETARY 55e CommonweaCth of Massachusetts wecutive Ofice of energy and~nvironmentalgffairs 100 Cam6ridge Street, Suite 900

More information

SANDY HOOK CHANNEL, NEW YORK HARBOR FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING

SANDY HOOK CHANNEL, NEW YORK HARBOR FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING Public Notice In replying refer to: Public Notice No. Sandy Hook Channel, NY Harbor FY17 Published: 14 February 2017 Expires: 14 March 2017 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN:

More information

Site Plan and Subdivision Review

Site Plan and Subdivision Review Site Plan and Subdivision Review Municipal Land Use Framework Environmental Resource Inventory Master Plan Zoning Land Use Regulation Ordinance requirements for each zone Lot size, setbacks parking, cluster

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: February

More information

New Jersey Department of Environmental Protection

New Jersey Department of Environmental Protection New Jersey Department of Environmental Protection Assistant Commissioner Marilyn Lennon Land Use Management Division of Land Use Regulation Manager Virginia Kopkash September 16, 2013 Transformation of

More information

Endangered Species Act. Allows designation of significant habitat for listed species. ch. 131A, 1 et seq. (1990)

Endangered Species Act. Allows designation of significant habitat for listed species. ch. 131A, 1 et seq. (1990) , STATE AND LOCAL AUTHORITY FOR MARINE PROTECTION (2014). MASSACHUSETTS 1 State Authority for Marine Protection Summary of State Authority has designated by statute five Sanctuaries that cover most of

More information

APPLICANT: Seattle Public Utilities (SPU) Attention: Mr. Richard Fernandez P.O. Box Seattle, Washington Telephone: (206)

APPLICANT: Seattle Public Utilities (SPU) Attention: Mr. Richard Fernandez P.O. Box Seattle, Washington Telephone: (206) US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

PUBLIC NOTICE. Mr. Jon Morris Beacon Partners, Inc 610 East Morehead Street Charlotte, North Carolina 28202

PUBLIC NOTICE. Mr. Jon Morris Beacon Partners, Inc 610 East Morehead Street Charlotte, North Carolina 28202 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: July 31, 2013 Comment Deadline: August 30, 2013 Corps Action ID Number: SAW-2013-01263 The Wilmington District, Corps of Engineers

More information

404(b)(1) EVALUATION

404(b)(1) EVALUATION 404(b)(1) EVALUATION SECTION 404(b)(1) EVALUATION DETAILED PROJECT REPORT AND ENVIRONMENTAL ASSESSMENT POMEROY SECTION 14 EMERGENCY STREAMBANK PROTECTION PROJECT POMEROY, OH I. INTRODUCTION As required

More information

E. CONSTRUCTION PROCEDURES

E. CONSTRUCTION PROCEDURES E. CONSTRUCTION PROCEDURES The Project facilities would be constructed in accordance with established electric utility practices, best management practices, final engineering plans, CL&P s specifications

More information

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517) Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION

More information

Natural & Cultural Resources

Natural & Cultural Resources II. Natural & Cultural Resources Hydrology/Water Management The North Thousand Islands is located within the Banana River and within the Indian River Lagoon system. Significant waterbodies within the region

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

The commonwealth of Nassachusetts

The commonwealth of Nassachusetts Deval L. Patrick GOVERNOR Timothy P. Murray LIEUTENANT GOVERNOR Ian A. Bowles SECRETARY The commonwealth of Nassachusetts werutive Ofice of EnvironmentaCglairs 100 Cam6ndge Street, Suite 900 Boston, MA

More information

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830 THE TIMMONS REPORT Draft Executive Summary of Preliminary Engineering, Environmental and Master Planning Report for Meadowville Technology Park Chesterfield County, Virginia Submitted to: Mr. Jim Dunn

More information

Public Notice of Application for Permit

Public Notice of Application for Permit m US Army Corps of Engineers Alaska District Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: EXPIRATION DATE:

More information

November 16, 2017 Via Electronic Filing

November 16, 2017 Via Electronic Filing 414 Nicollet Mall Minneapolis, MN 55401 November 16, 2017 Via Electronic Filing Daniel P. Wolf Executive Secretary Minnesota Public Utilities Commission 121 7 th Place East, Suite 350 St. Paul, MN 55101

More information

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE 5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE This section discusses the effect of the Proposed Action on navigable waterways, and the Proposed Action s consistency with coastal zone policies. 5.5.1 Navigable

More information

Appendix C. Clean Water Act: Section 404(b)(1) Evaluation

Appendix C. Clean Water Act: Section 404(b)(1) Evaluation Appendix C Clean Water Act: Section 404(b)(1) Evaluation CLEAN WATER ACT: SECTION 404 (b) (1) EVALUATION CLEAN WATER ACT: SECTION 404 (b) (1) EVALUATION MONTAUK POINT STORM DAMAGE REDUCTION PROJECT MONTAUK

More information

ATTACHMENT 2A- Issues Tentatively Resolved Decisions from the Board of Supervisors Hearing on September 11, 2007

ATTACHMENT 2A- Issues Tentatively Resolved Decisions from the Board of Supervisors Hearing on September 11, 2007 1. Introduction (on pg 1-15) Add the following goal: A Community safe from climate change. Marin will be a leader in averting and adapting to aspects of climate change. 2. Biological Resources 2.A. Richardson

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

PUBLIC NOTICE. c/o Mr. Kenneth Fuller 925 Penderlea Highway Burgaw, North Carolina 28425

PUBLIC NOTICE. c/o Mr. Kenneth Fuller 925 Penderlea Highway Burgaw, North Carolina 28425 PUBLIC NOTICE Issue Date: 21 March 2016 Comment Deadline: 19 April 2016 Corps Action ID Number: SAW-2016-00507 The Wilmington District, Corps of Engineers (Corps) received an application from Pender County

More information

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0 Appendix J Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION Version 3.0 April 2015 Table of Contents Section 1 General Information... 1 Section 2 State of Tennessee

More information

ABBREVIATED NOTICE OF RESOURCE AREA DELINEATION YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS MARCH 2004 PREPARED FOR

ABBREVIATED NOTICE OF RESOURCE AREA DELINEATION YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS MARCH 2004 PREPARED FOR ABBREVIATED NOTICE OF RESOURCE AREA DELINEATION YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS MARCH 2004 PREPARED FOR YANKEE ATOMIC ELECTRIC COMPANY 49 YANKEE ROAD ROWE, MASSACHUSETTS 01367 PREPARED

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District FAIRBANKS FIELD OFFICE Regulatory Division (1145) CEPOA-RD 2175 University Avenue, Suite 201E Fairbanks, Alaska 99709-4927 Public Notice of Application for Permit

More information

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION TH 36/STH 64 St. Croix River Crossing 2005 Water Resources Preliminary Design Report APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION within the project area. Other methods of attaining this reduction

More information

Permit Application: Soil Erosion and Sediment Control Program

Permit Application: Soil Erosion and Sediment Control Program Missaukee Conservation District Soil Erosion and Sediment Control Program 6180 W. Sanborn Road, Suite 3 Lake City, MI 49651 Ph 231.839.7193 Fax 231.839.5411 http://missaukeecd.org/soil-erosion/ kate.nietling@macd.org

More information

An Introduction to the Corps of Engineers Regulatory Program

An Introduction to the Corps of Engineers Regulatory Program An Introduction to the Corps of Engineers Regulatory Program Kathleen Buckler Biologist/Project Manager Regulatory Branch NY Permit Evaluation Section Kathleen.a.buckler@usace.army.mil US Army Corps of

More information

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

ENVIRONMENTAL RESOURCE PERMIT APPLICATION ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. CENAP-OP-R-2015-167-24 Application No. In Reply Refer

More information

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS I. Site Information A. Location (Include site map of harvest area)

More information

DNR Coastal Resources Division Coastal Resources Management Programs. Brad Gane Assistant Director Coastal Resources Division

DNR Coastal Resources Division Coastal Resources Management Programs. Brad Gane Assistant Director Coastal Resources Division DNR Coastal Resources Division Coastal Resources Management Programs Brad Gane Assistant Director Coastal Resources Division Ecological Services Section Coastal Management Coastal Incentive Grants Water

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE ROYAL RIVER, YARMOUTH, MAINE

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE ROYAL RIVER, YARMOUTH, MAINE PUBLIC NOTICE 696 Virginia Road Concord, MA 01742-2751 In Reply Refer to: Programs Project Management Division Email: nae-pn-nav@usace.army.mil Date: February 28, 2013 Comment Period Closes: April 1, 2013

More information

1.0 REQUEST. SANTA BARBARA COUNTY PLANNING COMMISSION Determination of Flood Control Easement in Carpinteria Marsh

1.0 REQUEST. SANTA BARBARA COUNTY PLANNING COMMISSION Determination of Flood Control Easement in Carpinteria Marsh SANTA BARBARA COUNTY PLANNING COMMISSION 65402 Determination of Flood Control Easement in Carpinteria Marsh Deputy Director: Dave Ward Staff Report Date: April 11, 2008 Division: Development Review South

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: May 20, 2013 EXPIRATION

More information

Errata sheet for the Connecticut General Permits May 2, 2017

Errata sheet for the Connecticut General Permits May 2, 2017 Errata sheet for the Connecticut General Permits May 2, 2017 The Corps of Engineers, New England District, has compiled this list of corrections and clarifications for the Connecticut General Permits that

More information

EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM)

EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM) EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM) PROPOSED PROJECT: Matagorda Ship Channel Deficiency Study and Environmental Assessment (Nov 2017) 1. Review of Compliance (230.10(a)-(d)) A review

More information