2 Azurite Mine Overview Abandoned Underground Gold Mine, Located in North Central WA on USFS Administered Land Northwest of Mazama, Near Harts Pass Recreation Area & Pacific Crest Trail Remote with Poor Access, Steep Terrain Several RTE Species Aquatic and Terrestrial Inventoried Roadless/Non Motorized Management Area High Value for Potential Wilderness Area in Future

3 Azurite Mine Location AZURITE MINE MAZAMA

4 OVERVIEW OF AZURITE MINE FROM TINSON ADIT CADY PASS TAILINGS ~55,000 CY ~4 acres MILL AREA WENATCHEE ADIT WASTE ROCK ~25,000 CY ~1 acre MILL CREEK OFFICE BUILDING

5 Azurite Mine Early History Claims Staked 1916 Azurite Copper Company (renamed Azurite Gold) 1918 to 1931 Underground Development 1934 ASARCO Leased Mine 1934 to TPD Mill and Infrastructure 1936 to 1942 Development, Production ~73, opt gold 1942 ASARCO Removes Equipment

6 Historic Photos 1936

7 Azurite Mine Recent History 1995 Discovery Assessment (USFS) 2002 IAM Open File Report (WA DNR) 2004/2005 CERCLA Site Inspection (USFS/CES) 2005 Reprocessing Study (USFS/CES); PRP Report (USFS) 2006 to 2007 ASARCO Bankruptcy Claim/Settlement 2006 to 2008 EE/CA & Risk Assessment (ASARCO/MFG) 2007 to 2010 Data Gaps/Removal Design (USFS/CES) 2011 Removal Action Activities

8 Final Removal Action Alternative Access Road Improvements / Bridge Replacement (2010) Temporary Access Road Across Mill Creek (2011) Mill Creek Diversion Away from Waste Rock Pile (2011) Onsite Covered Repository (2011) Waste Rock and Mill Area Blended with Tailings Reinforced Stabilized Slope/Repository Toe Berm Multi Layer Cover, HDPE Membrane, and Talus/Rock Cover Physical Hazard Closures (2011) Revegetation (2011) USFS Lead

9 Construction Challenges Weather Conditions (rain, snow, heat)

10 Construction Challenges Weather Conditions (rain, snow, heat) Typical Construction Window (late June early October) Steep Slopes / Difficult Terrain Limited Onsite Staging Areas All Borrow Material from Onsite Remote Access/Logistics/Communication

11

12 2011 Removal Action Summary Turnkey Design/Build Contract Structure CES Prime Contractor Palm Construction Main Subcontractor (Local) Mobilization July 11, weeks late (weather) Continuous Work Schedule, CES and Subs Demobilization September 26, week early

13 OVERVIEW OF AZURITE MINE REMOVAL ACTION STABILIZED SLOPE Construct to retain Repository TAILINGS PILE Contour with WR/Mill Soils, and Construct Repository WASTE ROCK Excavate and Haul to Repository MILL AREA Excavate and Haul to Repository

14 Camp, Equipment and Manpower Remote Camp (internet, phones, running water, flushing toilets, showers, washer/dryer, cook, tents/campers) 3 Excavators 2 Loaders 3 Dozers 2 Off Road, Articulated Haul Trucks Roller Compactor, Water Truck, Misc. Work Trucks Bear Proof Storage Containers Manpower 10 to 20 (Palm/Subs) / 1 to 3 (CES)

15 Equipment

16 Remote Camp Overview

17 Remote Camp Facilities

18 Remote Camp Lodging

19 Remote Camp Fuel Storage

20 Erosion and Sediment Control Run On Ditches Waste Rock / Tailings Silt Fence Borrow Area / Waste Rock Filter Berms Borrow Area / Waste Rock Sedimentation Pond Tailings / Repository

21 Mill Creek Crossing and Diversion Access Waste Rock Pile, and Transport to Repository Three, 48 inch CMPs Temporarily Divert Mill Creek Away From Waste Rock Pile

22 Mill Creek Crossing

23 Borrow Area Development Onsite Source for Screening / 3 Products 2 inch minus Stabilized Slope Fill, Road Bed/Base, Fill Material 40,000+ cubic yards used, more remains onsite 2 inch to 36 inch Repository cover, rocked diversion ditches ~20,000 cubic yards 36 inch plus Misc. Placement, armoring

24 Borrow Area Development

25 Borrow Area Development

26 Underground Working Closures Planned for 5 Closures (4 Adits / 1 Vent) Pre Cut Steel and Culverts Delivered to Site Final Onsite Fabrication Installation with Helicopter and Onsite Welder 4 Closures Burnham, Tinson, and Discovery Adits Discovery Vent Wenatchee Adit Collapsed No Bat Gate Installed

27 Burnham Adit Before

28 Burnham Adit After

29 Tinson Adit Before

30 Tinson Adit After

31 Discovery Adit Before

32 Discovery Adit After

33 Reinforced Stabilized Slope Designed to Stabilize/Retain the Repository Original Design was 15 feet (H) x 15 feet (W) 12 lifts Final Layout was 22 feet (H) x 25 feet (W) 17 lifts Competent Soil Deeper Than Planned Increased Quantities For Borrow Material/Geogrid Onsite QA/QC Testing All Final Tests Met Compaction Requirements (95% of Proctor) 23 days to build Bottom lifts ~ 1.5 days to complete Upper lifts ~ 1 day to complete

34 Reinforced Stabilized Slope Typical

35 Reinforced Stabilized Slope Lift 1

36 Reinforced Stabilized Slope Lift 4

37 Reinforced Stabilized Slope Lift 8

38 Reinforced Stabilized Slope Lift 12

39 Reinforced Stabilized Slope Lifts 14/15

40 Reinforced Stabilized Slope Complete

41 Reinforced Stabilized Slope Complete

42 Waste Rock Excavation and Placement Design Estimate was 22,000 bcy of Waste Rock 16,000 bcy Upper / 6,000 bcy Lower Risk Assessment Cleanup Goal 104 mg/kg Total Arsenic Revised Cleanup Goal 204 mg/kg Total Arsenic Additional Background Soil Sampling Used MTCA Stat 3.0 to Calculate Natural Background In Field Screening with Niton XRF (RPDs 33%) Final Quantities 13,500 bcy Upper WR 2,900 bcy Lower WR

43 Waste Rock Pile Before

44 Waste Rock Pile Removal

45 Waste Rock Pile Removal

46 Waste Rock Pile Final

47 Onsite Repository Overall Slope = 2.5:1 Reinforced Slope and Berm to Stabilize Repository Waste Rock Blended with Tailings to Achieve Slope In sloped Benches Every 9 Vertical Feet to Relieve Precip Repository Cover (Multi Layer) 1. Talus/Rock Cover Top 2. Geogrid oz Nonwoven Geotextile mil HDPE Membrane oz Nonwoven Geotextile 6. Waste Rock/Tailings Bottom

48 Repository Grading Plan

49 Repository Cross Section Detail

50 Tailings Pile Before

51 Tailings Pile Before

52 Tailings Pile Oxidation Profile

53 Repository Benching / Grading

54 Repository Benching / Grading

55 Repository Benching / Grading

56 Repository Benching / Grading

57 Repository Benching / Grading

58 Liner Installation

59 Liner Layers

60 Liner Installation

61 Liner Installation

62 Liner / Cover Installation

63 Liner / Cover Installation

64 Liner / Cover Installation

65 Repository Final

66 Repository Final

67 Repository / Tailings Pile Before

68 Repository Final

69

70 Summary Completed 4 Weeks Ahead of Schedule Field Changes Easily Made with Continuous Oversight & Communication No Health/Safety Concerns 3 Years of Long term O&M Inspections, & Monitoring Cost $2.5M Capital

71 QUESTIONS

72 Extra Slides

73 Upper Mill Creek

74 Lower Mill Creek/Canyon Creek

75 Waste Rock Pile Before

76 Waste Rock Pile Removal

77 Waste Rock Pile Removal

78 Tailings Pile

79 Tailings Pile

80 Mill Area / Office Building

81 Waste Rock Pile

82 Waste Rock Pile

83 CERCLA Site Inspection Review Surface Water Pathway Aquatic Stations (Surface Water, Pore Water, Sediment, & Benthic)

84 Aquatic Stations Canyon Creek Stations Cady Pass Mill Creek Stations Azurite Mine Mill Creek Background Stations

85 CERCLA Site Inspection Review Surface Water Pathway Aquatic Stations (Surface Water, Pore Water, Sediment, & Benthic) Minimal impacts to Surface/Pore Water/Benthic Sediments impacted Near Mine (COCs: As, Cd, Cr, Cu, Ni, Zn) Complete Pathway for Receptors Soil Pathway 17 Test Pits 40 Tailings/WR/Soil Samples (COCs: As, Cu, Hg, and Pb) Tailings/WR ARD Potential ABP as low as 230 t CaCO 3 /Kt Background Soil Elevated with COCs Complete Pathway for Receptors

86 CERCLA Site Inspection Review (cont.) Air Pathway Complete Pathway for Receptors Groundwater Pathway Adit discharge/seeps (3) impacted (COCs: Al, As, Cu, Mn, Zn) Incomplete Pathway for Receptors Topographic Survey of Tailings, Mill Site, and WR Ecological Survey RTE species expected (Bull Trout, Spotted Owl) Engineering Evaluation / Cost Analysis (EE/CA) Recommended

87 Reprocessing Study Four tailings samples Gravity Poor Gold/Sulfide Recovery (14 28%/29 41%) Floatation Poor Gold/Sulfide Recovery (21 35%/16 27%), Excellent Recovery for As, Cu, and Zn. Historic Lime/CN used interferes with floatation tests Better gold recovery (60%) after lime/cn pretreatment Bottom Line Gravity Not economical Floatation Better recovery after pretreatment, but cons not marketable (low gold, high arsenic/base metals).

88 Engineering Evaluation/Cost Analysis Lead by ASARCO (MFG) with USFS/Ecology Oversight Additional Sampling Risk Assessment (Human and Ecological) Human Carcinogenic Risk for Recreational Exposure (Cleanup Goal 104 mg/kg total arsenic) Ecological Multiple Risks and COCs, Source Control Will Mitigate Risks Removal Objectives Isolate Wastes from Human and Ecological Receptors Eliminate Erosion and Mass Failure Potential

89 EE/CA (cont) Recommended Alternative Onsite Consolidation and Closure Place Waste Rock and Mill Soils Over Tailings Pile Construct Retaining Wall at Toe of Tailings Pile 1 foot Soil Cover, then 1 foot Talus/Rock Cover Erosion Controls/Physical Hazard Mitigation Cost Estimate $4.6M Capital $5.7M 30 Yr Net Present Worth

90 Removal Action Data Gaps 2007 Mill Creek Fish Barrier Survey Multiple Fish Barriers, No Fish Within 2.5 Miles

91 Removal Action Data Gaps 2007 Mill Creek Fish Barrier Survey Multiple Fish Barriers, No Fish Within 2.5 Miles Borrow Material Assessment Onsite Talus/Rock Areas

92 Removal Action Data Gaps 2007 Mill Creek Fish Barrier Survey Multiple Fish Barriers, No Fish Within 2.5 Miles Borrow Material Assessment Onsite Talus/Rock Areas Access Road Improvement Assessment Bridge Replacement/Repair, Culverts, and Switchbacks Repository Cover and Geotechnical Assessment Completed with GeoEngineers Recommended 2.5:1 Repository Slope with Retaining Wall Recommended a Multi Layer HDPE Liner, and Talus Cover

93 Removal Action Sequence 2011 Mobilization, Remote Camp and Staging Areas Erosion/Sediment Control Mill Creek Crossing and Diversion Borrow Area Development Underground Working Closures Reinforced Stabilized Slope Construction Waste Rock Excavation and Placement Repository Grading, and Liner/Cover Installation Revegetation/Demobilization

94 2010 Access Road Improvements CES Design, Palm Construction/USFS Bridge Installation Road Widening/Grading Switchback Improvements Culvert Installation

95

96

97

98

99

100

101

102

103

104 Mill Creek Diversion

105 Mill Creek Diversion

106 Discovery Vent Before

107 Discovery Vent After

108 Reinforced Stabilized Slope Lift 1

109 Reinforced Stabilized Slope Lifts 12/13

110 Azurite Mine Location AZURITE MINE CADY PASS ACCESS ROAD AZURITE MINE LOOKING SOUTH FROM CADY PASS

Location Mine Development Site Features Acid Mine Drainage Distribution of Metals Contamination Impacts to Ecosystem USFS Non-Time-Critical

Location Mine Development Site Features Acid Mine Drainage Distribution of Metals Contamination Impacts to Ecosystem USFS Non-Time-Critical Location Mine Development Site Features Acid Mine Drainage Distribution of Metals Contamination Impacts to Ecosystem 2010-11 USFS Non-Time-Critical Removal Action Q&A LOCATION AND SURFACE WATERS OR CA

More information

Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action

Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Todd Bragdon, CDM Smith Brandon Ball, Parametrix Bill Adams, EPA Region 10 Rod Zion, USACE Seattle Jeff Johnson, US BLM Rich

More information

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE SITE NOT TO SCALE 635-8-STOCKPILEPHGA- 00 SHEET: OF DRAWING INDEX: SHEET 2 OF 0 - NOTES SHEET 3 OF 0 - PLAN VIEW :000 SHEET 4 OF 0 - PLAN VIEW :000 WITH REFERENCE SHEET 5 OF 0 - PLAN VIEW :500 SHEET 6

More information

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL 902.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

Timber Sale Appraisal More Cow Bell Sale FG W

Timber Sale Appraisal More Cow Bell Sale FG W Timber Sale Appraisal Sale FG-341-2019-W00542-01 District: Forest Grove Date: January 24, 2019 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $2,048,273.85 $10,164.42 $2,058,438.27 Project

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM FOR INTERNAL DISCUSSION PURPOSES ONLY TECHNICAL MEMORANDUM TO: Augusta Resource Corp. ATTENTION: Jamie Sturgess FROM: Troy Meyer Project Manager, Vector Colorado LLC (Vector) DATE: June 5, 2006 SUBJECT:

More information

Hardrock AML Reclamation Award Program Application Cover Sheet. Project Title: Akron Mine and Mill Reclamation Project North Pile

Hardrock AML Reclamation Award Program Application Cover Sheet. Project Title: Akron Mine and Mill Reclamation Project North Pile Hardrock AML Reclamation Award Program Application Cover Sheet Project Title: Akron Mine and Mill Reclamation Project North Pile 1. Nomination Category: Remediation of Contamination Impacting the Environment

More information

Slash Water Bar Video

Slash Water Bar Video Slash Water Bar Video Water Bars Advantages Low cost for materials Use on site materials Disadvantages Not for active haul roads Can be damaged by ATV s and follow up users Broad-based Dip Long enough

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

VISUAL SITE INSPECTION REPORT 2018

VISUAL SITE INSPECTION REPORT 2018 VISUAL SITE INSPECTION REPORT 2018 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00614 January 9, 2019 PREPARED

More information

Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project. East Fork Ninemile Creek, Idaho May 3, 2016

Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project. East Fork Ninemile Creek, Idaho May 3, 2016 Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project East Fork Ninemile Creek, Idaho May 3, 2016 Tony Wesche, P.E. Pioneer Technical Services, Inc. and North Wind Group Presentation Topics

More information

Details of the Proposed Action

Details of the Proposed Action Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the

More information

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads No. 6 December, 1995 Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads Steve Holaday, Wisconsin Dept. of Natural Resources, and Jeff Martin, Dept. of Forestry, UW-Madison BMPs

More information

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION APPENDIX I BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION South Bay Salt Pond Restoration Project Phase 2 July 2015 Draft Environmental Impact Statement/Report 2185 N. California Blvd., Suite

More information

Diversion Dikes. Fe=0.95

Diversion Dikes. Fe=0.95 2.2 Diversion Dike Erosion Control Description: A diversion dike is a compacted soil mound, which redirects runoff to a desired location. The dike is typically stabilized with natural grass for low velocities

More information

Written Closure Plan. Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016 Written Closure Plan Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure

More information

Capping of Landfill Containing Hazardous Materials. Water Resources Research Center Conference

Capping of Landfill Containing Hazardous Materials. Water Resources Research Center Conference Capping of Landfill Containing Hazardous Materials Frank Caluya, Jr. P.E. PACDIV Water Resources Research Center Conference January 2003 Former Naval Air Station (NAS) Agana Landfill Removal Action NAS

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Port Gravina Quarry Operating Plan

Port Gravina Quarry Operating Plan 6/24/15 PND 151016 Port Gravina Quarry Operating Plan The Chugach Alaska Corporation (CAC) proposes to develop a quarry site within Port Gravina. In addition to the upland quarry, additional infrastructure,

More information

UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska

UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska (402) 4355441 1 URNRD201701 07252018 Drawn: STAFF not to scale Checked: RJK CONSTRUCTION EASEMENT (EXTENDS OUT 75FT ON EACH SIDE

More information

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT Nonmetallic Mining Reclamation & Operation Plan Amendment No. 1 (Includes modifications for Wash Plant construction) Mondovi Mine Town of Mondovi, Wisconsin Prepared for: Buffalo White Sand, LLC PO Box

More information

The following is a short summary of the definitions and acronyms associated with the evaluation process.

The following is a short summary of the definitions and acronyms associated with the evaluation process. CERCLA Activities in the Granite Creek Watershed Past Mining Activity Portions of the watershed were severely altered by lode and placer mining activities from the late 1800s up to 1950s. Mining effects

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE

More information

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION 1 TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION Draft 2/08/10 (Revised 02-14-11,Revised 02-21-11, Revised 03-03-11, Revised 04-19-11, Revised 04-20-11, Revised 05-05-11, Revised 05-09-11). DEFINITIONS

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13

Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13 Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13 Introduction/Background The Kobe Pumping Plant and Pipeline (the Project ) is located in Mesa and Garfield Counties near DeBeque, Colorado.

More information

SUBMITTAL REQUIREMENTS:

SUBMITTAL REQUIREMENTS: 9611 SE 36 th Street Mercer Island, WA 98040-3732 PHONE (206) 275-7605 FAX (206) 275-7726 Wet Season Grading Restriction (October 1 through April 1) Seasonal Development Limitation Waiver CHECKLIST FOR

More information

LANDFILL CLOSURE PLAN. Submitted To: Dominion Chesapeake Energy Center 2701 Vepco Street Chesapeake, Virginia 23323

LANDFILL CLOSURE PLAN. Submitted To: Dominion Chesapeake Energy Center 2701 Vepco Street Chesapeake, Virginia 23323 LANDFILL CLOSURE PLAN Chesapeake Energy Center Ash Landfill - Permit #440 Closure Plan Submitted To: Dominion Chesapeake Energy Center 2701 Vepco Street Chesapeake, Virginia 23323 Submitted By: Golder

More information

Civil and Geotechnical Engineering

Civil and Geotechnical Engineering Imagine the result Imagine the result Civil and Geotechnical Engineering for the Mining Industry Innovative, Sustainable and Grounded Solutions At ARCADIS, we understand the environment and how to engineer

More information

Solar Facilities on Landfills Engineering, Permitting, Construction, and Lessons Learned. Engineering from Site Approval through Construction

Solar Facilities on Landfills Engineering, Permitting, Construction, and Lessons Learned. Engineering from Site Approval through Construction Solar Facilities on Landfills Engineering, Permitting, Construction, and Lessons Learned Engineering from Site Approval through Construction Presented By: Mr. Duane C. Himes Team Leader Solid Waste Group

More information

Abandoned Mine Waste Repositories: Site Selction, Design, and Cost

Abandoned Mine Waste Repositories: Site Selction, Design, and Cost University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln U.S. Bureau of Land Management Papers U.S. Department of the Interior 2003 Abandoned Mine Waste Repositories: Site Selction,

More information

- Earthwork Operations & Equipments

- Earthwork Operations & Equipments - Earthwork Operations & Equipments Earthwork Operations Those construction processes that involve the soil or earth in its natural form and that precede the building of the pavement structure itself Basic

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

STORM WATER POLLUTION PREVENTION PROGRAM SAILOR BAR/ CUTTERS PIT SATELLITE STORAGE YARD

STORM WATER POLLUTION PREVENTION PROGRAM SAILOR BAR/ CUTTERS PIT SATELLITE STORAGE YARD COUNTY OF SACRAMENTO Public Works Agency Department of Transportation STORM WATER POLLUTION PREVENTION PROGRAM SAILOR BAR/ CUTTERS PIT SATELLITE STORAGE YARD SACRAMENTO COUNTY DEPARTMENT OF TRANSPORTATION

More information

The SENATE COMMITTTEE ON ENERGY AND NATURAL RESOURCES

The SENATE COMMITTTEE ON ENERGY AND NATURAL RESOURCES Statement of Tony L. Ferguson, Director of Minerals & Geology Management For the National Forest System U.S. Forest Service Before The SENATE COMMITTTEE ON ENERGY AND NATURAL RESOURCES Concerning The Forest

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM

WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM RANGE MANAGEMENT UNIT 2 Prepared for: Camp Stanley Storage Activity Boerne, Texas PREPARED BY: PARSONS Austin, TX May 2011 ADDENDUM TO WORK PLAN AND SAMPLING

More information

DRAFT SEDIMENT and EROSION CONTROL PLAN. BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION. Prepared by:

DRAFT SEDIMENT and EROSION CONTROL PLAN. BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION. Prepared by: DRAFT SEDIMENT and EROSION CONTROL PLAN BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION Prepared by: Electric Department 1.0 INTRODUCTION The Electric Department ( City ) is in the process of

More information

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage

More information

SURFACE IMPOUNDMENT CLOSURE PLAN. Possum Point Power Station Ponds ABC and E Permit # 617

SURFACE IMPOUNDMENT CLOSURE PLAN. Possum Point Power Station Ponds ABC and E Permit # 617 SURFACE IMPOUNDMENT CLOSURE PLAN Possum Point Power Station Ponds ABC and E Permit # 617 CLOSURE PLAN Submitted To: Possum Point Power Station 19000 Possum Point Road Dumfries, VA 22026 Submitted By: Golder

More information

SC-01 Surface Outlet and Baffle Sediment Basin

SC-01 Surface Outlet and Baffle Sediment Basin Greenville County Technical Specification for: SC-01 Surface Outlet and Baffle Sediment Basin 1.0 Surface Outlet and Baffle Sediment Basin This Specification contains requirements for the design and construction

More information

NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT

NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT To: Walter Johnson, NRG MD Ash Management LLC From: Jeffrey Hutchins, P.E., AECOM Date: January 6, 2016 RE: Annual

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

The Construction General Permit and Erosion Prevention and Sedimentation Control

The Construction General Permit and Erosion Prevention and Sedimentation Control The Construction General Permit and Erosion Prevention and Sedimentation Control Presented at the Tennessee Gas Association Conference April 23, 2008 More than thirty years ago, two-third of the nation's

More information

TECHNOLOGY OVERVIEW EXCAVATION AND DISPOSAL OF SOLID MINING WASTE

TECHNOLOGY OVERVIEW EXCAVATION AND DISPOSAL OF SOLID MINING WASTE TECHNOLOGY OVERVIEW EXCAVATION AND DISPOSAL OF SOLID MINING WASTE August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from

More information

Soil Erosion and Sedimentation Control Application Packet 2011

Soil Erosion and Sedimentation Control Application Packet 2011 Soil Erosion and Sedimentation Control Application Packet 2011 The following items are required to apply for a Soil Erosion and Sedimentation Control permit for a construction project in Chippewa County:

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine Closure Plan Limited Purpose Landfill TransAlta Centralia Mine Prepared for TransAlta Centralia Mining LLC December 5 East Front Street Suite Boise, Idaho 87 /6/5 This document was prepared under direct

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

CLOSURE OF THE 488-2D ASH BASIN & 488-4D ASH LANDFILL AT THE SAVANNAH RIVER SITE

CLOSURE OF THE 488-2D ASH BASIN & 488-4D ASH LANDFILL AT THE SAVANNAH RIVER SITE 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ CLOSURE OF THE 488-2D ASH BASIN & 488-4D ASH LANDFILL AT THE SAVANNAH RIVER SITE Paul R. Lear 1, Andrew

More information

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2) TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2) CONTRACT ITEM NO. CONTRACT ITEM UNIT BUCKHORN ROAD UPPER SECTION BUCKHORN ROAD LOWER SECTION PROJECT TOTALS PLAN AS CONST. PLAN AS CONST.

More information

R-TANK SPECIFICATIONS

R-TANK SPECIFICATIONS TECHNICAL STORMWATER MANAGEMENT R-TANK SPECIFICATIONS PART 1 GENERAL 1.01 Related Documents A. Drawings, technical specification and general provisions of the Contract as modified herein apply to this

More information

Washington County Landfill Reconstruction Project: Progress Updates

Washington County Landfill Reconstruction Project: Progress Updates Home Site Index Glossary What's New Ask MPCA Visitor Center MPCA Home > Clean Up > Perfluorochemicals > Perfluorochemical (PFC) Waste Sites > Washington County Site Progress Updates Washington County Landfill

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT August 28, 2017 Please find the following addendum to the below mentioned BID. Addendum No.: 1 Bid#: 416-15-17-53-2 Project Name: Lower W-15 Area

More information

ET COVER SYSTEM IN ARID ENVIRONMENTS

ET COVER SYSTEM IN ARID ENVIRONMENTS ET COVER SYSTEM IN ARID ENVIRONMENTS JUSTIFYING THE USE OF AN EVAPO TRANSPIRATIVE COVER SYSTEM FOR CAPPING AN INDUSTRIAL WASTE PILE SAVES CLIENT MILLIONS Martin E. Carlson, PE May 8, 2018 PRESENTATION

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 8 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Note: This Special Provision is generally written in the imperative mood. The subject, the

More information

Calumet Placer & Bear Track Lode Mines Project Description

Calumet Placer & Bear Track Lode Mines Project Description Calumet Placer & Bear Track Lode Mines Project Description A gold mining operation is proposed at the Calumet and Bear Track mines in Township 22 North, Range 6 East, Sections 23 & 25 approximately three

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

Texas Commission on Environmental Quality

Texas Commission on Environmental Quality Texas Commission on Environmental Quality Permit For Municipal Solid Waste (MSW) Management Facility Issued under provisions of Texas Health and Safety Code Chapter 361 MSW Permit No.: 2383 Name of Site

More information

Brickhaven No.2 Mine Tract A Structural Fill

Brickhaven No.2 Mine Tract A Structural Fill CCR Compliance Supplement: Closure and Post-Closure Plan Brickhaven No.2 Mine Tract A Structural Fill Charah, Inc. Moncure, NC July 2015 NOTE: This plan is intended to replace the Closure and Post-Closure

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities

More information

Decision Memo - Elko Grade Improvement Project, Jarbidge Ranger District, Elko County, Nevada

Decision Memo - Elko Grade Improvement Project, Jarbidge Ranger District, Elko County, Nevada Forest Service Humboldt-Toiyabe National Forest Ruby Mountains/Jarbidge Ranger Districts P. O. Box 246 Wells, NV 89835 File Code: 7730 Date: February 28, 2011 Route To: (7730) Subject: To: Decision Memo

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Introduction The analysis of the Warren Wagon Road Improvement Project is tiered to the 2003 Environmental

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

Fabric Drop Inlet Protection

Fabric Drop Inlet Protection Fabric Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Block

More information

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017 Site C Clean Energy Project Monthly Environmental Monitoring Summary Report - February 2017 Prepared by BC Hydro Submitted May 8, 2017 Page 1 of 17 Table of Contents Introduction... 4 Project Progress...

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

Soil Erosion and Sedimentation Control (SESC) Information and Application Packet

Soil Erosion and Sedimentation Control (SESC) Information and Application Packet ARENAC COUNTY BUILDING DEPARTMENT SOIL EROSION & SEDIMENT CONTROL P.O. BOX 724 * 120 NORTH GROVE ST * STANDISH, MI 48658 PH. 989-846-9791 FAX: 989-846-9188 This institution is an equal opportunity provider.

More information

Timber Sale Appraisal Ten Points South Sale WL

Timber Sale Appraisal Ten Points South Sale WL Timber Sale Appraisal Sale WL-341-2019-50- District: Western Lane Date: June 18, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $290,447.68 $1,740.04 $292,187.72 Project Work: ($32,825.00)

More information

Automated Machine Guidance

Automated Machine Guidance House Select Committee on Strategic Planning and Long Term Funding Solutions October 24, 2016 Automated Machine Guidance Lamar Sylvester, PE State Construction Engineer Automated Machine Guidance (AMG)

More information

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

Lewis Passive Treatment System Upgrade Cherry Township, Sullivan County. Project Narrative

Lewis Passive Treatment System Upgrade Cherry Township, Sullivan County. Project Narrative Lewis Passive Treatment System Upgrade Cherry Township, Sullivan County Project Narrative Project Overview This project will rehabilitate and upgrade an existing passive treatment system in Cherry Township,

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project

Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project South Coast Water District Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project Board of Directors January 14-15, 2013 Overview of Construction Plan Highlights of Kiewit s Construction

More information

Common Construction-Site BMPs Quick Reference Guide

Common Construction-Site BMPs Quick Reference Guide Common Construction-Site BMPs Quick Reference Guide Installation and Inspection Requirements For more information visit the Town of Truckee Clean Water Program Website: http://www.townoftruckee.com/engineering/clean-water-program

More information

Tips with Creation of your Erosion and Sediment Control Plan

Tips with Creation of your Erosion and Sediment Control Plan Tips with Creation of your Erosion and Sediment Control Plan By Chris Droste, CESCO Senior Erosion Control Specialist Westmoreland Conservation District Forming Your Narrative Use the DEP checklist. Page

More information

Enbridge Line 6B Incident Public Update and Availability Session

Enbridge Line 6B Incident Public Update and Availability Session Enbridge Line 6B Incident Public Update and Availability Session October 14, 2010 (Day 81) Division A Oil coming out of culvert on Talmadge Creek on first day of spill, July 26, 2010. Exposed pipeline

More information

Pond Closure - Case Study[TP1]

Pond Closure - Case Study[TP1] 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Pond Closure - Case Study[TP1] By Pedro J Amaya, P.E. (1) (1) Civil Engineering and Geotechnical Engineering

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Terry Eldridge Golder Associates S.A., Chile Ben Wickland Golder Associates Ltd., Canada Adrian Goldstone Dundee Precious Metals

More information

CCP Annual Inspection Report

CCP Annual Inspection Report CCP Annual Inspection Report Brickhaven No. 2 Mine Tract A Structural Fill DWM Permit 1910, DEMLR Permit 19-25 Charah, Inc. Moncure, North Carolina October 2016 This page intentionally left blank. Charah,

More information

VICINITY MAP AND SITE MAP. Page 1 of 9

VICINITY MAP AND SITE MAP. Page 1 of 9 INTRODUCTION... 2 1. Background Information of West Bottom Ash Pond (BAP)... 2 1.1 Facility Location Description...2 1.2 Description of West BAP CCR Unit...2 1.2.1 Embankment Configuration...2 1.2.2 Construction

More information

Jobsite Layout Considerations

Jobsite Layout Considerations 1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration

More information

Project # Brown County PCN i40h Replace Section Line Road Culvert

Project # Brown County PCN i40h Replace Section Line Road Culvert Project # 010-151 PCN i40h Replace Section Line Road Culvert R 64 W FREDERICK POP. 199 R 63 W R 62 W R 61 W 6 5 4 3 6 5 4 3 1 Dry 402 AVE 102 ST 387 AVE 12 388 AVE 390 AVE 7 8 9 10 11 12 391 AVE 393 AVE

More information

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Closure Plan Ash Disposal Area PGE Boardman Power Plant FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was

More information

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

2017 Annual Inspection Report

2017 Annual Inspection Report 2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Hayden Station 13125 U.S. Highway 40 Hayden, Colorado 81638 January 18, 2018 Table of Contents Certification...

More information