TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)

Size: px
Start display at page:

Download "TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)"

Transcription

1

2

3 TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2) CONTRACT ITEM NO. CONTRACT ITEM UNIT BUCKHORN ROAD UPPER SECTION BUCKHORN ROAD LOWER SECTION PROJECT TOTALS PLAN AS CONST. PLAN AS CONST. PLAN AS CONST. 21 Clearing and Grubbing LUMP SUM Removal of Pipe EACH Removal of Structural Plate Pipe EACH Removal of Fence LIN FT ,61 23 Unclassified Excavation (Complete in Place) CU YD 46,956 47,319 94, Select Subgrade Material CU YD 9,552 8,65 18, Muck Excavation (Complete in Place) TON Rock Excavation (Complete in Place) CU YD 36,1 93,61 129,71 23 Rock Scaling SQ YD 5,5 3,6 9,1 23 Soil Nail LIN FT 7,5 5,6 13,1 23 Rock Bolts EACH ,2 23 Blading HR Test Pits EACH Structure Excavation (Complete in Place) CU YD 3,84 2,18 5, Structure Backfill (Special) CU YD 3,72 1,686 4, Topsoil CU YD 2,6 3, 5,6 27 Stockpile Topsoil CU YD 2,6 3, 5,6 28 Erosion Log (12 Inch) (Weed Free) LIN FT 22,25 22,25 44,5 28 Concrete Washout Structure EACH Erosion Control Supervisor LUMP SUM Reset Fence LIN FT 1,325 1,775 3,1 21 Reset Rail Gate EACH Seeding (Native) ACRE Mulching (Hydraulic) ACRE Soil Amendment ACRE Willow Cuttings EACH 9,2 7,6 16,8 216 Soil Retention Blanket SQ YD 12,5 12,5 25, 34 Aggregate Base Course (Class 5) CU YD 8,87 7,991 16,86 54 Retaining Wall System (Gabion) SQ FT 6,716 6, Retaining Wall System (Rockery) SQ FT 6,276 5,718 11, Riprap (12" MINUS ROCK) CU YD 3,144 3,737 6, Riprap (3" MINUS ROCK) CU YD 7,848 9,331 17, Riprap D5=18" CU YD , Riprap D5=24" CU YD 3,61 1,333 4, Riprap D5=36" CU YD Concrete Class D (Wall) CU YD 1,484 1,173 2, Form Liner (Wall) SQ YD ,4 61 Cap Stone EACH Structural Concrete Coating SQ FT 1, , Reinforcing Steel (Epoxy Coated) LB 354, , ,33 CONTINUED ON NEXT SHEET

4 TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (2 OF 2) CONTRACT ITEM BUCKHORN ROAD UPPER SECTION BUCKHORN ROAD LOWER SECTION PROJECT TOTALS CONTRACT ITEM UNIT NO. PLAN AS CONST. PLAN AS CONST. PLAN AS CONST ' X 12' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 14' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 14' Foot Three Sided Concrete Box Culvert (Precast) LIN FT X 16' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 22' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 22' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 22' Foot Three Sided Concrete Box Culvert (Precast) LIN FT '' X 22' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 22' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 24' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 24' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 26' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 26' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 28' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 28' Foot Three Sided Concrete Box Culvert (Precast) LIN FT ' X 3' Foot Three Sided Concrete Box Culvert (Precast) LIN FT Inch Corrugated Steel Pipe (Complete in Place) LIN FT Inch Reinforced Concrete Pipe (Complete in Place) LIN FT 1,46 1,21 2, Inch Reinforced Concrete Pipe (Complete in Place) LIN FT Inch Reinforced Concrete Pipe (Complete in Place) LIN FT Inch Corrugated Steel End Section (Complete in Place) EACH Inch Reinforced Concrete End Section (Complete in Place) EACH Inch Reinforced Concrete End Section (Complete in Place) EACH Inch Reinforced Concrete End Section (Complete in Place) EACH Fence Barbed Wire with Metal Posts LIN FT ,26 67 Fence Barbed Wire (Temporary) LIN FT 1,8 1,8 67 End Post EACH Corner & Line Brace Post EACH Foot Gate Metal EACH Field Office (Class 1) EACH Sanitary Facility EACH Construction Surveying LUMP SUM Mobilization LUMP SUM Construction Traffic Control LUMP SUM Flagging HR 25, 25, 5, 63 Traffic Control Management DAY Traffic Control Inspection DAY F/A Minor Contract Revisions F/A $2, $2, $4,

5 EARTHWORK TABULATION PAY ITEMS CUBIC YARD (CY) UNCLASSIFIED EXCAVATION 94,275 ROCK EXCAVATION 129,71 STRUCTURE EXCAVATION 5,948 RIPRAP ARMORING 3,689 SURFACING (AGGREGATE BASE COURSE - CLASS 5) 16,254 SURFACING (SELECT SUBGRADE MATERIAL) 18,328 STOCKPILE TOPSOIL 5,6 TOPSOIL 5,6 - FOR INFORMATION ONLY - UNCLASSIFIED EXCAVTION CUBIC YARD (CY) UPPER SECTION (MAIN ROADWAY) 44,723 ROADWAY OBLITERATION SITE 1 1,727 ROADWAY OBLITERATION SITE 2 56 SUBTOTAL 46,956 STATION - STATION LEFT/RIGHT FT LT 4 6, RT 26 3, LT 119 1, LT 1 1,75 3 SUBTOTAL 879 6,716 6, LT 315 3, LT 14 1,97 3 SUBTOTAL TOTAL 1,334 6,716 11, ) STATIONING BASED ON ROADWAY CENTERLINE. LENGTH STATION - STATION WALLTABULATION RETAINING WALL SYSTEM (GABION BASKET) UPPER SECTION LOWER SECTION SQUARE FEET (SQ FT) ROADWAY SURFACING TABULATION AGGREGATE BASE COURSE (ABC) CLASS 5 UPPER SECTION CU YD ,87 9,552 LOWER SECTION ,991 8,65 TOTAL 16,86 18,157 RETAINING WALL SYSTEM (ROCKERY) SELECT SUBGRADE MATERIAL NOTES: 1) SHAPING, SCARIFYING, MOISTURE DENSITY, AND COMPACTION SHALL BE COMPLETED ON ALL ROADWAYS PRIOR TO SURFACING OPERATIONS AND SHALL BE CONSIDERED SUBSIDIARY TO THE ABC BID ITEM. 2) VOLUME BASED ON FOUR INCH THICKNESS FOR BOTH ABC AND SELECT SUBGRADE MATERIAL. 3) SURFACING SHALL BE TREATED WITH A DUST SUPPRESSANT EACH TEST PITS LOWER SECTION (MAIN ROADWAY) 44,82 ROADWAY OBLITERATION SITE ROADWAY OBLITERATION SITE 4 97 ROADWAY OBLITERATION SITE 5 1,423 SUBTOTAL 47,319 ROCK EXCAVATION TOTAL 94,275 CUBIC YARD (CY) UPPER SECTION 36,1 LOWER SECTION 93,61 STRUCTURE EXCAVATION TOTAL 129,71 CUBIC YARD (CY) UPPER SECTION 3,84 LOWER SECTION 2,18 TOTAL 5,948 EMBANKMENT (INCLUDES ALL ROADWAY, ROAD OBLITS, ADJUSTMENTS APPROACHES, PIPES, ETC.) UPPER SECTION 43,567 LOWER SECTION 93,793 EARTHWORK BALANCE TOTAL 137,36 UNCLASSIFIED EXCAVATION (INCLUDING 4% SWELL) 94,275 ROCK EXCAVATION 129,71 STRUCTURE EXCAVATION 5,948 ROADWAY EMBANKMENT -137,6 STRUCTURE BACKFILL -4,758 SURFACING (AGGREGATE BASE COURSE - CLASS 5) -16,254 SURFACING (SELECT SUBGRADE MATERIAL) -18,328 RIPRAP ARMORING (ROADWAY & STRUCTURES) -3,689 APPROACH EMBANKMENT -1,164 MATERIAL TO BE WASTED OFFSITE TOTAL 21,131 1) STRUCTURE EXCAVATION INCLUDES THE REMOVAL OF THE EXISTING RIPRAP. 2) SEE STRUCTURE TABULATION FOR STRUCTURE EXCAVATION QUANTITIES. 3) OBLITERATION OF EXISTING ROADWAYS ARE INCLUDED IN THE UNCLASSIFIED EXCAVATION BID ITEM

6 STRUCTURE TABULATION STATION STRUCTURE EXCAVATION CY CONCRETE CLASS D (WALL) STRUCTURE BACKFILL (SPECIAL) LB REINFORCIN G STEEL (EPOXY COATING) SY STRUCTURA L CONCRETE COATING FORM LINER CAP STONE THREE SIDED CONCRETE BOX CULVERT (PRECAST) 6.5'x12' 4.74'x14' 6.5x14' 5.14'X16' 4.25'x22' 4.9'x22' 5.9'X22' 7.75'X22' 8.5'x22' 4.5'x24' 5.5'x24' 5.5'x26' 8.9'x26 3.5'x28' 4.74'x28' 7.75'x3' UPPER SECTION , STRUCTURE , STRUCTURE , STRUCTURE , STRUCTURE , STRUCTURE , STRUCTURE , STRUCTURE , STRUCTURE , STRUCTURE , APPROACH , STRUCTURE , STRUCTURE , STRUCTURE 12 SUBTOTAL 3,84 1,484 3,72 354,624 1, LOWER SECTION , TWIN CABIN GULCH , STRUCTURE , STRUCTURE , STRUCTURE , SHEEP CREEK , STRUCTURE , STOVE PRAIRIE CREEK SUBTOTAL 2,18 1,173 1, , TOTAL 5,948 2,657 4, ,33 1,547 1, LF REMARKS NOTES: 1) CONCRETE BOX SIZES ARE RISE x WIDTH (INSIDE). 2) CONCRETE FOR WINGWALLS, FOOTERS, TOE WALLS, AND STEM WALLS SHALL BE CONCRETE CLASS D (WALLS). 3) FORM LINERS AND CAP STONES SHALL ONLY BE USED WHERE FOREST SERVICE PROPERTY IS ADJACENT THE ROADWAY. 4) PRECAST SECTIONS SHALL HAVE DAYTON (OR APPROVED EQUAL) EMBED DOWELS FOR WINGWALL CONNECTIONS. structures on forest service = 7 (3 minor twin cabin, sheep gulch, stove prairie creek)

7 RIPRAP TABULATION (1 OF 2) CY STATION - STATION LEFT/RIGHT LENGTH RIPRAP 12" MINUS RIPRAP 3" MINUS RIPRAP D5=18" RIPRAP D5=24" RIPRAP D5=36" REMARKS UPPER SECTION STRUCTURE STRUCTURE RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING A RT ROADWAY ARMORING B STRUCTURE LT ROADWAY ARMORING B LT ROADWAY ARMORING A LT ROADWAY ARMORING A STRUCTURE RT ROADWAY ARMORING A RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT 15 ROADWAY ARMORING B RT ROADWAY ARMORING B STRUCTURE LT ROADWAY ARMORING B STRUCTURE STRUCTURE STRUCTURE RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING A RT ROADWAY ARMORING B RT ROADWAY ARMORING A RT ROADWAY ARMORING A RT ROADWAY ARMORING B STRUCTURE LT ROADWAY ARMORING A LT ROADWAY ARMORING B LT ROADWAY ARMORING A LT ROADWAY ARMORING A LT ROADWAY ARMORING B STRUCTURE RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING B STRUCTURE STRUCTURE 12 SUBTOTAL 7,62 3,144 7, ,61 LOWER SECTION CONTINUED NEXT SHEET SEE TYPICAL SECTIONS FOR ROADWAY ARMORING TYPE A & B DETAILS. LIMITS MAY CHANGE DURING CONSTRUCTION BASED ON EXISTING VEGETATION, BEDROCK, OR EXISTING ARMORING.

8 RIPRAP TABULATION (2 OF 2) CY STATION - STATION LEFT/RIGHT LENGTH RIPRAP 12" MINUS RIPRAP 3" MINUS RIPRAP D5=18" RIPRAP D5=24" RIPRAP D5=36" REMARKS LOWER SECTION RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ,34 ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING B TWIN CABIN GULCH RT ROADWAY ARMORING A RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING B STRUCTURE RT ROADWAY ARMORING B STRUCTURE RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING B RT ROADWAY ARMORING B STRUCTURE LT ROADWAY ARMORING B SHEEP CREEK STRUCTURE RT ROADWAY ARMORING B RT ROADWAY ARMORING B STOVE PRAIRIE CREEK RT ROADWAY ARMORING B SUBTOTAL 7,749 3,737 9, , TOTAL 15,369 6,881 17,179 1,143 4, NOTE: RIPRAP SHALL BE GENERATED WITHIN THE PROJECT LIMITS. SEE TYPICAL SECTIONS FOR ROADWAY ARMORING TYPE A & B DETAILS. LIMITS MAY CHANGE DURING CONSTRUCTION BASED ON EXISTING VEGETATION, BEDROCK, OR EXISTING ARMORING.

9 PIPE CULVERT TABULATION (1 OF 2) STATION 24 INCH REINFORCED CONCRETE PIPE LIN FT 36 INCH REINFORCED CONCRETE PIPE 48 INCH REINFORCED CONCRETE PIPE UPPER SECTION 24 INCH REINFORCED CONCRETE END SECTION SUBTOTAL EACH 36 INCH REINFORCED CONCRETE END SECTION 48 INCH REINFORCED CONCRETE END SECTION CY RIPRAP CONTINUED ON THE NEXT SHEET. NOTE: RIPRAP MAY BE ELIMINATED BY THE ENGINEER BASED ON EXISTING ARMORING AND OR BEDROCK ENCOUNTERED.

10 PIPE CULVERT TABULATION (2 OF 2) STATION 24 INCH REINFORCED CONCRETE PIPE LIN FT 36 INCH REINFORCED CONCRETE PIPE 48 INCH REINFORCED CONCRETE PIPE LOWER SECTION 24 INCH REINFORCED CONCRETE END SECTION 48 INCH REINFORCED CONCRETE END SECTION SUBTOTAL PROJECT TOTAL EACH 36 INCH REINFORCED CONCRETE END SECTION CY RIPRAP NOTE: RIPRAP MAY BE ELIMINATED BY THE ENGINEER BASED ON EXISTING ARMORING AND OR BEDROCK ENCOUNTERED.

11 STATION REMOVAL OF PIPE REMOVAL OF PIPE CULVERT TABULATION EACH REMOVAL OF STRUCTURAL PLATE PIPE REMARKS UPPER SECTION " SPP L=46' " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE L=38' " SPP L=68' " CORR. STEEL PIPE L=3' " SPP L=66' " SPP L=53' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=36' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=3', 27' OFFFSET RT " CORR. STEEL PIPE L=3', 273' OFFSET RT " SPP L=42' " CORR. STEEL PIPE L=28' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=28' " CORR. STEEL PIPE L=2' " CORR. STEEL PIPE L=28' " HDPE APPROACH " HDPE L=32" " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE L=4' " CORR. STEEL PIPE L=2' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=2' " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=2' " CORR. STEEL PIPE APPROACH +65 SUBTOTAL 38 5 LOWER SECTION " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE L=3', OFFSET 13' RT " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=2' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=2' " SPP L=4' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=32' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=2' " CORR. STEEL PIPE L=2' " CORR. STEEL PIPE L=3', OFFSET 113' RT " CORR. STEEL PIPE L=3', OFFSET 172' RT " CORR. STEEL PIPE L=5' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=4' " CORR. STEEL PIPE L=4' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE APPROACH " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=33' APPROACH " CORR. STEEL PIPE L=3' " CORR. STEEL PIPE L=26' SUBTOTAL 33 1 TOTAL 71 6 NOTES: REMOVAL OF PIPE INCLUDES THE FLARED END SECTIONS, AND ANY SMALL CREATURE THAT CALL THAT PIPE HOME.

12 APPROACH TABULATION LOCATION WIDTH RADII FT EA CORRUGATED STEEL PIPE STEEL END SECTION REMOVAL OF PIPE 15 in 15 in UPPER SECTION EMBANKMENT MATERIAL AGGREGATE BASE COURSE (ABC) CLASS 5 REMARKS 5+66 LT PRIVATE APPROACH 6+81 RT PRIVATE APPROACH 8+83 RT PRIVATE APPROACH RT BALLARD ROAD RT PRIVATE APPROACH 18+8 LT PRIVATE APPROACH RT PRIVATE APPROACH LT PRIVATE APPROACH RT PRIVATE APPROACH LT PRIVATE APPROACH 14+5 RT CRYSTAL MTN ROAD RT PRIVATE APPROACH LT PRIVATE APPROACH LT PRIVATE APPROACH LT PRIVATE APPROACH RT PRIVATE APPROACH LT PRIVATE APPROACH LT PRIVATE APPROACH RT PRIVATE APPROACH LT PRIVATE APPROACH RT PRIVATE APPROACH LT BIG HORN DRIVE RT PRIVATE APPROACH LT PRIVATE APPROACH LT PRIVATE APPROACH RT PRIVATE APPROACH SUBTOTAL LOWER SECTION LT PRIVATE APPROACH LT PRIVATE APPROACH 46+3 RT FS TURNOUT 457+ RT FS ROAD LT TEMP ACCESS TO STOCK PILE RT PRIVATE APPROACH RT PRIVATE APPROACH RT DEER PATH STREET LT PRIVATE APPROACH RT PRIVATE APPROACH RT PRIVATE APPROACH RT WILDSONG ROAD LT SNOWDROP LANE RT PRIVATE APPROACH RT PRIVATE APPROACH 527+ LT PRIVATE APPROACH RT PRIVATE APPROACH SUBTOTAL TOTAL CY NOTE: ABC CLASS 5 WILL BE PLACED AT A DEPTH OF SIX INCHES.

13 FENCE TABULATION LINEAL FEET (LF) EACH STATION - STATION LEFT/RIGHT REMOVE FENCE RESET FENCE FENCE BARBED WIRE WITH METAL POSTS FENCE BARBED WIRE (TEMPORARY) RESET RAIL GATE END POST CORNER AND LINE BRACE POST UPPER SECTION 5+7 LT RT RT RT LT RT LT RT LT RT LT LT LT LT LT RT SUBTOTAL 785 1, LOWER SECTION RT RT LT LT LT RT LT SUBTOTAL 825 1, TOTAL 1,61 3,1 1, ) STATIONING BASED ON ROADWAY CENTERLINE. 2) ALL FENCE SHALL BE 4-STRAND BARB WIRE WITH METAL POSTS. EROSION CONTROL TABULATION ROCK STABILIZATION TABULATION LIN FT ACRE SQ YD EACH SQ YD LIN FT EACH LOCATION EROSION LOG (12 INCH) (WEED FREE) SEEDING (NATIVE) MULCHING (HYDRAULIC) SOIL AMENDMENT SOIL RETENTION BLANKET WILLOW CUTTINGS LOCATION ROCK STAIN ROCK SCALING SOIL NAIL ROCK BOLTS UPPER SECTION 22, ,5 9,2 LOWER SECTION 22, ,5 7,6 TOTAL 44, , 16,8 UPPER SECTION 15,5 5,5 7,5 6 LOWER SECTION 12,2 3,6 5,6 42 TOTAL 27,7 9,1 13,1 1,2 NOTES: 1) SEE LANDSCAPE PLANS FOR LOCATION DETAILS

14 CR 44H - UPPER AND LOWER TYPICAL ROADWAY SECTION STATION 4+ TO STATION ' SUBGRADE WIDTH 24' NOTES: 1) SEE CROSS SECTIONS FOR DETAILS. 2).25:1 BACKSLOPES IN ROCK AREAS ONLY. 3) SLOPES MAY BE ADJUSTED IN THE FIELD DURING CONSTRUCTION FOR CONTOURING AND SLOPE BLENDING AS DIRECTED BY THE ENGINEER. FILL SLOPE VARIES 1.8' 2.7' 3' 9' 9' 3' 2.7' 1.8' SHLDR TRAVEL WAY TRAVEL WAY SHLDR ±4:1 7.5' CLEAR ZONE 4% SLOPE ROADWAY TOP WIDTH 4% SLOPE 7.5' CLEAR ZONE 4" AGGREGATE BASE COURSE (CLASS 5) 4" SELECT SURFACING MATERIAL EXISTING ROAD SURFACING TO REMAIN, SCARIFIED AND COMPACTED ±4:1 2:1 1.'.25 : 1 CUT SLOPE VARIES ROCK AREAS ONLY COMPACTED EMBANKMENT MATERIAL H:\186_44HLARC\DESIGN\SHEETS\typical sections.dwg, typical, 11/1/217 2:32:5 PM TYPICAL ROADWAY SECTIONS

15 CR 44H - UPPER AND LOWER ROADWAY RECONDITIONING & SURFACING ONLY SECTION SEE TABLE FOR LIMITS EXISTING ROADWAY WIDTH VARIES 24' ROADWAY TOP WIDTH 4% SLOPE 4% SLOPE 1' 4" AGGREGATE BASE COURSE (CLASS 5) 4" SELECT SURFACING MATERIAL TOP 6" TO BE SCARIFIED & RECOMPACTED EXISTING ROAD SURFACING TO REMAIN, SCARIFIED AND COMPACTED CREATE AND MAINTAIN EXISTING DRAINAGE CHANNEL SLOPE VARIES CR 44H - UPPER AND LOWER ROADWAY RECONDITIONING & SURFACING ONLY SECTION SEE TABLE FOR LIMITS EXISTING ROADWAY WIDTH VARIES 24' ROADWAY TOP WIDTH 4% SLOPE 4% SLOPE H:\186_44HLARC\DESIGN\SHEETS\typical sections.dwg, road resurf, 11/1/217 2:32:6 PM 1' 1' 4" AGGREGATE BASE COURSE (CLASS 5) 4" SELECT SURFACING MATERIAL TOP 6" TO BE SCARIFIED & RECOMPACTED EXISTING ROAD SURFACING TO REMAIN, SCARIFIED AND COMPACTED CREATE DRAINAGE DITCHES ON EACH SIDE OF ROADWAY SURFACING SECTIONS. OBLITERATE EXISTING ROADWAY OUTSIDE OF DITCHES. TYPICAL ROADWAY SECTIONS

16 CR 44H - UPPER AND LOWER TYPICAL ROADWAY SECTION NOTES: RIP RAP ARMORING - TYPE A 1) SEE CROSS SECTIONS FOR DETAILS. 2).25:1 BACKSLOPES IN ROCK AREAS ONLY. 3) SLOPES MAY BE ADJUSTED IN THE FIELD DURING CONSTRUCTION FOR CONTOURING AND SLOPE BLENDING AS DIRECTED BY THE ENGINEER. 4) BACK SLOPES AND ARMORING LIMITS MAY BE ADJUSTED BY THE FIELD ENGINEER BASED ON EXISTING GEOLOGICAL FORMATIONS, VEGETATION, BEDROCK AND EXISTING ARMORING. 5) CONTRACTOR SHALL MINIMIZE ACTIVITIES IN BUCKHORN CREEK AND IMPACTS TO VEGETATION DESIGNATED TO REMAIN. 6) BUCKHORN CREEK ELEVATION FLUCTUATES THROUGHOUT THE YEAR AND DEWATERTING MAY BE REQUIRED FOR ARMORING PURPOSES. * 3" MINUS ROCK (5% >24", 25% 12"-24", 25% < 12") ROCK AREAS.25 : 1* 7.5' CLEAR ZONE 29.4' SUBGRADE WIDTH 24' ROADWAY TOP WIDTH 7.5' CLEAR ZONE 1.8' 2.7' 3' 9' 9' 3' 2.7' 1.8' SHLDR TRAVEL WAY TRAVEL WAY SHLDR ±4:1 4% SLOPE 4% SLOPE ±4:1 3" THICK 3" MINUS ROCK* 4" AGGREGATE BASE COURSE (CLASS 5) BURY RIPRAP WITH 8" OF FINE ONSITE MATERIAL 4" SELECT SURFACING MATERIAL EXISTING ROADWAY SURFACING TO BE INCORPORATED INTO THE ROADWAY EMBANKMENT VARIES (1.5:1 to 2:1) 12" THICK 12" MINUS ROCK BUCKHORN CREEK (ELEVATION VARIES) TOTAL DEPTH 5" 3' H:\186_44HLARC\DESIGN\SHEETS\typical sections.dwg, TYPE A, 11/1/217 2:32:6 PM TYPICAL SECTIONS

17 CR 44H - UPPER AND LOWER TYPICAL ROADWAY SECTION RIP RAP ARMORING - TYPE B REMOVE EXISTING TOPSOIL IF ENCOUNTERED 7.5' CLEAR ZONE 29.4' SUBGRADE WIDTH 24' ROADWAY TOP WIDTH 7.5' CLEAR ZONE 1.8' 2.7' 3' 9' 9' 3' 2.7' 1.8' SHLDR TRAVEL WAY TRAVEL WAY SHLDR EXISTING VEGETATION TO REMAIN UNDISTURBED SLOPE VARIES ±4:1 4% SLOPE 4% SLOPE ±4:1 BURY RIPRAP WITH 8" OF FINE ONSITE MATERIAL 4" ABC (CLASS 5) 4" SELECT SURFACING MATERIAL 12" THICK 12" MINUS ROCK 3" THICK 3" MINUS ROCK VARIES (1.5:1 to 2:1) NOTES: 1) SEE CROSS SECTIONS FOR DETAILS. 2).25:1 BACKSLOPES IN ROCK AREAS ONLY. ROADWAY EMBANKMENT. EXISTING ROADWAY SURFACING TO BE SCARIFIED, INCORPORATED INTO THE EMBANKMENT AND COMPACTED. 3) SLOPES MAY BE ADJUSTED IN THE FIELD DURING CONSTRUCTION FOR CONTOURING AND SLOPE BLENDING AS DIRECTED BY THE ENGINEER. 4) EACH SITE TO BE EVALUATED PRIOR TO CONSTRUCTION AND FLAGGED AS TO WHICH VEGETATION IS TO REMAIN. TOTAL DEPTH 5" EXISTING ROADWAY SURFACING TO BE REMOVED AND INCORPORATED INTO THE EMBANKMENT. AREA TO BE TOPSOILED, SEEDED AND MULCHED. 3' BUCKHORN CREEK (ELEVATION VARIES) H:\186_44HLARC\DESIGN\SHEETS\typical sections.dwg, TYPE B, 11/1/217 2:32:7 PM 5) TOPSOIL SHALL BE SALVAGED WHERE AVAILABLE AND PLACED ON PROPOSED SLOPES AS AVAILABLE EXCLUDING ROCK AREAS. 6) BACK SLOPES AND ARMORING LIMITS MAY BE ADJUSTED BY THE FIELD ENGINEER BASED ON EXISTING GEOLOGICAL FORMATIONS, VEGETATION, BEDROCK AND EXISTING ARMORING. 7) CONTRACTOR SHALL MINIMIZE ACTIVITIES IN BUCKHORN CREEK AND IMPACTS TO VEGETATION DESIGNATED TO REMAIN. * 3" MINUS ROCK (5% >24", 25% 12"-24", 25% < 12") TYPICAL SECTIONS

18 CR 44H - UPPER AND LOWER TYPICAL ROADWAY SECTION ROADWAY OBLITERATION RIP RAP ARMORING - TYPE B EXISTING ROADWAY WIDTH VARIES 29.4' SUBGRADE WIDTH.25 : 1* 7.5' CLEAR ZONE 24' ROADWAY TOP WIDTH 7.5' CLEAR ZONE 1.8' 2.7' 3' 9' 9' 3' 2.7' 1.8' SHLDR TRAVEL WAY TRAVEL WAY SHLDR ±4:1 4% SLOPE 4% SLOPE ±4:1 3" THICK, 3" MINUS ROCK* BURY RIPRAP WITH 8" OF FINE ONSITE MATERIAL 4" AGGREGATE BASE COURSE (CLASS 5) VARIES (1.5:1 to 2:1) 4" SELECT SURFACING MATERIAL 12" THICK 12" MINUS ROCK NOTES: 1) SEE CROSS SECTIONS FOR DETAILS. 2).25:1 BACKSLOPES IN ROCK AREAS ONLY. 4.2' 3' BUCKHORN CREEK (ELEVATION VARIES) H:\186_44HLARC\DESIGN\SHEETS\typical sections.dwg, TYPE B road obliteration, 11/1/217 2:32:8 PM 3) SLOPES MAY BE ADJUSTED IN THE FIELD DURING CONSTRUCTION FOR CONTOURING AND SLOPE BLENDING AS DIRECTED BY THE ENGINEER. 4) EACH SITE TO BE EVALUATED PRIOR TO CONSTRUCTION AND FLAGGED AS TO WHICH VEGETATION IS TO REMAIN. 5) TOPSOIL SHALL BE SALVAGED WHERE AVAILABLE AND PLACED ON PROPOSED SLOPES AS AVAILABLE EXCLUDING ROCK AREAS. 6) BACK SLOPES AND ARMORING LIMITS MAY BE ADJUSTED BY THE FIELD ENGINEER BASED ON EXISTING GEOLOGICAL FORMATIONS, VEGETATION, BEDROCK AND EXISTING ARMORING. * 3" MINUS ROCK (5% >24", 25% 12"-24", 25% < 12") EXISTING ROADWAY SURFACING AND EMBANKMENT SHALL BE INCORPORATED INTO THE PROPOSED ROADWAY EMBANKMENT AREA TO BE TOPSOILED, SEEDED AND MULCHED. TYPICAL SECTIONS

19 CR 44H - UPPER AND LOWER TYPICAL ROADWAY SECTION NOTES: 1) SEE GRADING PLAN AND CROSS SECTIONS FOR ADDITIONAL DETAILS. 2) EXCAVATION LIMITS MAY BE ADJUSTED AS DIRECTED BY THE ENGINEER BASED ON EXISTING BOULDERS AND BEDROCK. 3) SLOPES MAY BE ADJUSTED IN THE FIELD DURING CONSTRUCTION FOR EXISTING VEGETATION, BEDROCK, CONTOURING AND SLOPE BLENDING AS DIRECTED BY THE ENGINEER. ROADWAY OBLITERATION STA to STA STA to STA. 31+ STA to STA STA to STA ) EACH SITE TO BE EVALUATED PRIOR TO CONSTRUCTION AND FLAGGED AS TO WHICH VEGETATION IS TO REMAIN. 5) SEE LANDSCAPING PLANS FOR PLANTING LOCATIONS. 6) CONTRACTOR SHALL MINIMIZE ACTIVITIES IN BUCKHORN CREEK AND IMPACTS TO VEGETATION DESIGNATED TO REMAIN. EXISTING CR44H ROADWAY WIDTH VARIES (18'-3') SLOPE VARIES EXCAVATION MATERIAL EXISTING TOPSOIL AND VEGETATION TO BE REMOVED. EMBANKMENT MATERIAL. H:\186_44HLARC\DESIGN\SHEETS\typical sections.dwg, road obliteration, 11/1/217 2:32:8 PM BUCKHORN CREEK 2.5' * SLOPE VARIES BENCH WIDTH 3' * EXISTING ROADWAY SURFACING TO BE SCARIFIED, INCORPORATED INTO THE BOTTOM PORTION OF THE EMBANKMENT AND COMPACTED. FINISHED SLOPE TO BE ROUGHENED, TOPSOILED, SEEDED, MULCHED AND RECEIVE PLANTINGS. SEE CROSS SECTIONS FOR ADDITIONAL DETAIL. TYPICAL SECTIONS OLD ROAD OBLITERATION

20 CREE N K CONTROL POINT 7 N = E = ELV = CONTROL POINT 5 N = E = ELV = N CONTROL POINT 8 N = E = ELV = CONTROL POINT 9 N = E = ELV = STA END UPPER SECTION EK CONTROL POINT 1 N = E = ELV = BU 235+ RE O H CK C RN INE CHL MAT CONTROL POINT 7 N = E = ELV = CR NOTE: CONTRACTOR'S SURVEYOR TO VERIFY PROJECT CONTROL PRIOR TO ANY CONSTRUCTION ACTIVITIES. IF ANY DISCREPANCY IS DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY. + CONTROL POINT 6 N = E = ELV = CONTROL POINT 3 N = E = ELV = STA 4+ BEGIN UPPER SECTION CR CONTROL POINT 4 N = E = ELV = CONTROL POINT 2 N = E = ELV = BUCK HORN H:\186_44HLARC\DESIGN\SHEETS\Control Points.dwg, UPPER, 1/5/217 7:36:18 AM CONTROL POINT 1 N = E = ELV = INE CHL MAT 175+ CONTROL POINT 1 N = E = ELV = UPPER SECTION SURVEY CONTROL

21 CHL MAT INE CONTROL POINT 13 N = E = ELV = NOTE: CONTRACTOR'S SURVEYOR TO VERIFY PROJECT CONTROL PRIOR TO ANY CONSTRUCTION ACTIVITIES. IF ANY DISCREPANCY IS DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY CONTROL POINT 15 N = E = ELV = CR 525+ RN C HO BUCK CONTROL POINT 13 N = E = ELV = H:\186_44HLARC\DESIGN\SHEETS\Control Points.dwg, LOWER, 1/5/217 7:36:34 AM 445+ INE CHL MAT CONTROL POINT 14 N = E = ELV = STA END LOWER SECTION N CONTROL POINT 16 N = E = ELV = CR 44 REEK LOWER SECTION SURVEY CONTROL N CREEK CONTROL POINT 12 N = E = ELV = BUCKHOR CR CONTROL POINT 11 N = E = ELV = CONTROL POINT 1 N = E = ELV = CONTROL POINT 9 N = E = ELV = STA BEGIN LOWER SECTION 345+ N 44+

22 H:\186_44HLARC\DESIGN\details\UPPER SECTION ROW & LAND OWNERSHIP SHEETS.dwg, sheet index, 1/5/217 7:4:47 AM N CASCADE CREEK FS 129 (BALLARD ROAD) SHT 15 SHT 16 SHT SHT 22 STA 4+ BEGIN UPPER SECTION SHT SHT 19 SHT 2 5+ SHT 21 CR 44H SHT T.7.N. R.72.W. 7+ BUCKHORN CREEK 8+ SHT 24 SHT 25 SHEET INDEX - UPPER SECTION CRYSTAL MOUNTAIN ROAD SHT 27 SHT SHT COUNTY ROAD 44H SHT SHT 31 SHT SHT 3 SHT 33

23 H:\186_44HLARC\DESIGN\details\UPPER SECTION ROW & LAND OWNERSHIP SHEETS.dwg, sheet index (2), 1/5/217 7:4:32 AM SHT 28 SHT 29 N SHT SHT SHT SHT SHT SHT SHT SHT 38 SHT 37 SHT 39 SHT SHT SHT 42 SHT T.7.N. R.72.W. SHEET INDEX - UPPER SECTION SHT 44 SHT SHT T.7.N. R.71.W. MOOSE RIDE ROAD STA END UPPER SECTION SHT 48 COUNTY ROAD 44H SHT 47

24 N T.7.N. R.72.W. SHT STA BEGIN LOWER SECTION TWIN CABIN GULCH DRAINAGE SHT 5 SHT 51 SHT 52 SHT 53 SHT 54 SHT 55 SHT 56 SHT SHT SHT 59 SHT SHT SHT 62 SHT SHT 64 SHT 65 H:\186_44HLARC\DESIGN\details\LOWER SECTION ROW & LAND OWNERSHIP SHEETS.dwg, sheet index, 1/5/217 7:44:18 AM SHEET INDEX - LOWER SECTION COUNTY ROAD 44H

25 N T.7.N. R.71.W STA END LOWER SECTION CR 27 T 62 SHT SHT SHT 65 SHT 66 SHT STOVE PRAIRIE CREEK 52+ SHT 77 SHT 78 H:\186_44HLARC\DESIGN\details\LOWER SECTION ROW & LAND OWNERSHIP SHEETS.dwg, sheet index (2), 1/5/217 7:44:24 AM SHT 68 SHT 69 SHEEP CREEK DRAINAGE SHT 7 SHT 71 SHT STREET DEER PATH SHT 73SHT 74 SHT WILD SONG ROAD SHEET INDEX - LOWER SECTION SHT 76 COUNTY ROAD 44H

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

Project # Brown County PCN i40h Replace Section Line Road Culvert

Project # Brown County PCN i40h Replace Section Line Road Culvert Project # 010-151 PCN i40h Replace Section Line Road Culvert R 64 W FREDERICK POP. 199 R 63 W R 62 W R 61 W 6 5 4 3 6 5 4 3 1 Dry 402 AVE 102 ST 387 AVE 12 388 AVE 390 AVE 7 8 9 10 11 12 391 AVE 393 AVE

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

Proposer shall make note of and/or incorporate all changes listed below into the requested

Proposer shall make note of and/or incorporate all changes listed below into the requested Request for Proposal (RFP) Bid No: 18-10-1940LE Addendum No. 4 Date: November 27, 2018 To: All Proposers Subject: Addendum No. 4 Consisting of nine (9) Pages RFP No.: Project Name: Owner: 18-10-1940LE

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Oversight / NHS INDEX OF SHEETS SHEET NO. TABULATION OF LENGTH & DESIGN DATA NEW AND REVISED STANDARDS

Oversight / NHS INDEX OF SHEETS SHEET NO. TABULATION OF LENGTH & DESIGN DATA NEW AND REVISED STANDARDS Oversight / NHS FHWA Oversight No Yes National Highway System No Yes EAGLE COUNTY HIGHWAY CONSTRUCTION BID PLANS OF PROPOSED FEDERAL AID PROJECT NO. SAR C440-010 SAFE ROUTES TO SCHOOL PROJECT OFF OF STATE

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

ITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum

ITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum KTA Contract No. 5677 KANSAS TURNPIKE AUTHORITY ALT 1 Schedule of Prices Contract No. 5677 County Leavenworth Type of Work: Remove and reconstruct Bridge 221.542 (120'-170'-170'-120' Weathering Steel Spans).

More information

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT DIVISION IV CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 4100 MEASUREMENT AND PAYMENT 4100 SCOPE... 2 4101 Clearing and Grubbing...

More information

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS. PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Contractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1.

Contractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1. KTA Contract No. 5677 KANSAS TURNPIKE AUTHORITY ALT 1 Schedule of Prices Contract No. 5677 County Leavenworth Type of Work: Remove and reconstruct Bridge 221.542 (120'-170'-170'-120' Weathering Steel Spans).

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

CITY OF ELKO BID TABULATION FOR Sports Complex

CITY OF ELKO BID TABULATION FOR Sports Complex CITY OF ELKO BID TABULATION FOR Sports Complex 2017-2018 NAME Granite Construction Great Basin Engineering Contractors Road & Highway Builders CLEARING EARTHWORK 1 33701200 Mobilization @ Per Lump Sum

More information

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION SECTION DESCRIPTION PAGE 1 General Quantities 3-1 2 Maintenance of Roadway and Drives 3-1 3 Liquid Asphalt Binder in Paving Mixture

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross

More information

Forsyth County Procurement

Forsyth County Procurement August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska

UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska (402) 4355441 1 URNRD201701 07252018 Drawn: STAFF not to scale Checked: RJK CONSTRUCTION EASEMENT (EXTENDS OUT 75FT ON EACH SIDE

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications.

Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications. Kansas Turnpike Authority Project 5677 Note regarding schedule of prices: Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

October Page 1

October Page 1 October 2017 - Page 1 Chapter 2 2018 SPEC BOOK CHANGES The new 2018 Spec Book was published online on August 24, 2017. See the section in the Design Scene Chapter 2 titled 2018 SPEC BOOK for specifics

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

LOCATED IN THE NE 1/4 SEC. 27, T45N, R7W TOWN OF DRUMMOND, WI. MISSISSIPPI District Office-WASHBURN

LOCATED IN THE NE 1/4 SEC. 27, T45N, R7W TOWN OF DRUMMOND, WI. MISSISSIPPI District Office-WASHBURN CHEQUAMEGONNICOLET NATIONAL FOREST WASHBURN RANGER DISTRICT BAYFIELD COUNTY, WISCONSIN SHEET 1 2 3 426 INDEX OF SHEETS CONTENTS COVER SHEET QUANTITIES & TYPICAL SECTIONS PLAN AND PROFILE ROAD SECTIONS

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP Public Works Department Donald J. Theisen, P.E. Director NOTICE TO BIDDERS Wayne H. Sandberg, P.E. Deputy Director/County Engineer Type of Work: ADDENDUM NO. 3 Dated: March 25, 209 SAP 082-68-022 Removing

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

Parks and Open Space 5201 St. Vrain Road Longmont, Colorado Fax:

Parks and Open Space 5201 St. Vrain Road Longmont, Colorado Fax: Parks and Open Space 5201 St. Vrain Road Longmont, Colorado 80503 303.678.6200 Fax: 303.678.6177 www.bouldercounty.org HALL RANCH 2 ACCESS ROAD REPAIRS Project Summary for Limited Impact Special Use Review

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

Taxiways P and P7 Drainage Improvements Re-bid CONTRACT NO ADDENDUM NUMBER ONE

Taxiways P and P7 Drainage Improvements Re-bid CONTRACT NO ADDENDUM NUMBER ONE Department of Aviation Airport Office Building 8500 Peňa Boulevard Denver, Colorado (303) 342-2200 www.flydenver.com March 3, 2015 Taxiways P and P7 Drainage Improvements Re-bid ADDENDUM NUMBER ONE This

More information

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS. Common Excavation (Contractor-Furnished)

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS. Common Excavation (Contractor-Furnished) SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS 205.1 DESCRIPTION Excavate, haul, place, remove and dispose of the specified materials. Construct the embankments as specified in the Contract Documents.

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

Sheet 2 of 27

Sheet 2 of 27 Sheet 1 of 27 Sheet 2 of 27 Sheet 3 of 27 Sheet 4 of 27 Sheet 5 of 27 INDEX OF PLANS SHEETS Sheet 1 to 5 (Incl.) Sheet 6 Sheet 7 to 9 (Incl.) Sheet 10 Sheet 11 to 13 (Incl.) Sheet 14 Sheet 15 Sheet 16

More information

MAY 11, 2017 T-MC-107A & T-MC-107B1

MAY 11, 2017 T-MC-107A & T-MC-107B1 Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE

More information

BOULDER COUNTY TRANSPORTATION DEPARTMENT ENGINEERING DIVISION OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES

BOULDER COUNTY TRANSPORTATION DEPARTMENT ENGINEERING DIVISION OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES Kelsey.Dempsey ::45 AM 5/4/208 pw:\\dcpwapp.bkr.mbakercorp.com:pwprod\documents\projects\lakewood_office\boulder_county_emergency_transportation\to3\08_sheet_files\06_structures\dgn\38067_wall_00.dgn GENERAL

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE

More information

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS 205.1 DESCRIPTION Excavate, haul, place, remove and dispose of the specified materials. Construct the embankments as specified in the Contract Documents.

More information

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 Sheet 1 of 7 GENERAL The Kansas Department of Transportation STANDARD SPECIFICATIONS FOR STATE ROAD AND

More information

Special Provision Item P-152 Excavation and Embankment

Special Provision Item P-152 Excavation and Embankment Special Provision Item P-152 Excavation and Embankment DESCRIPTION This item shall be constructed in conformity with FAA Standard Specification "Item P-152 Excavation and Embankment, except as herein modified

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA BASE BID 1 01000 MOBILIZATION 1.00 L. SUM $799,945.96 $799,945.96 $1,150,000.00 $1,150,000.00 2 01510 FIELD ENGINEER'S OFFICE 1.00 L. SUM $40,000.00 $40,000.00 $5,000.00 $5,000.00 3 ALL-1 4 ALL-2 5 MISC-1

More information

New Market Township. Driveway/Approach Permit

New Market Township. Driveway/Approach Permit Permit Number Address: New Market Township Driveway/Approach Permit No person may construct or reconstruct any Driveway/Approach to a Township road without first obtaining a permit and the initial approval

More information

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN project number 70 Reference Line 2-0" Reference 3 -" 6-0" 6-0" 3 -" Line Box Culvert Roadway Finished Channel -0" -0" E VIEW 20-0" Riprap 0-0" Riprap Outlet Invert El 87.0 Sta 233+00.00 Inlet Invert El

More information

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project

10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, May 6, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 28, 2018 The Platte County Board of Supervisors will

More information

ADDENDUM NO. 1. DATE ISSUED: June 1, 2018

ADDENDUM NO. 1. DATE ISSUED: June 1, 2018 ADDENDUM NO. 1 DATE ISSUED: June 1, 2018 BID #018-041 BIDDING AND CONTRACT DOCUMENTS FOR THE CLASS THREE LANDFILL CELLS 8-12 & CLASS TWO LANDFILL CLOSURE PROJECT GEORGETOWN COUNTY, SOUTH CAROLINA ****************************************************************************************************

More information

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form 2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork

More information

2018 Roadway Erosion Control CONTRACT NO ADDENDUM NUMBER TWO

2018 Roadway Erosion Control CONTRACT NO ADDENDUM NUMBER TWO July 27, 2018 2018 Roadway Erosion Control ADDENDUM NUMBER TWO This Addendum Number Two supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge

More information

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON MAY 15, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON MAY 15, 2018: ADDENDUM NO. PROJECT NO. 3-8-0 PAGE ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 5, 08: Q# PBQs regarding Project 3-8-0: Reference 3 Concrete Walk is,870 SQ YD in the Bid Express file. The quantity

More information

COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING

COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING GENERAL GRADING REQUIREMENTS GRADING STANDARDS Unless otherwise recommended in a soils engineering or engineering geology report, approved by the County,

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 August 8, 2018 The Cuming County Board of Supervisors will be

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

Timber Sale Appraisal More Cow Bell Sale FG W

Timber Sale Appraisal More Cow Bell Sale FG W Timber Sale Appraisal Sale FG-341-2019-W00542-01 District: Forest Grove Date: January 24, 2019 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $2,048,273.85 $10,164.42 $2,058,438.27 Project

More information

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 CBBEL PROJECT NO. 02-0065.H0226 ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 Modification No. 1 In regards to the COBBLESTONE PAVERS specification,

More information

Dial or (800)

Dial or (800) GENERAL NOTES 2 EROSION CONTROL ITEMS TO BE PLACED AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER. NO TREES (AND/OR SHRUBS) ARE TO BE REMOVED WITHOUT THE APPROVAL OF THE ENGINEER. 2 EXCAVATION FOR

More information

Sweet Creek Road Retaining Wall Replacement. Mapleton, OR

Sweet Creek Road Retaining Wall Replacement. Mapleton, OR Sweet Creek Road Retaining Wall Replacement Mapleton, OR Technical Information Project Completion Date: April 30, 2013 Project Location: Mapleton, OR Size of Project: 15,000 SF, 870 CY Concrete Strength

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

SHOULDER DETAIL CONCRETE CURB SHOULDER DETAIL ASPHALT CURB SHOULDER DETAIL PAVEMENT JOINT DETAIL PAVEMENT JOINT DETAIL NORMAL SECTION COMMON AND ASPHALT ALTERNATE NOTES ITEM LEGEND EX. ITEM LEGEND CONCRETE

More information

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. 2017-1 43 SOUTH GRANVILLE WATER AND SEWER AUTHORITY H STREET BY-PASS

More information

ADDENDUM NO. 1. 1:30 PM, Thursday, September 14, 2017 (Not Changed)

ADDENDUM NO. 1. 1:30 PM, Thursday, September 14, 2017 (Not Changed) ADDENDUM NO. 1 TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Construct Range Macon Training Site Macon, Missouri PROJECT NO. T1805-01 Bid Opening Date is: 1:30 PM, Thursday, September 14, 2017 (Not

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

ADDENDUM NUMBER FOUR

ADDENDUM NUMBER FOUR Department of Aviation Airport Office Building 8500 Peňa Boulevard Denver, Colorado (303) 342-2200 www.flydenver.com March 28, 2017 2017 Annual Airfield Pavement Rehabilitation CONTRACT NO. 201733182 ADDENDUM

More information

Ministry of Forests, Lands and Natural Resource Operations

Ministry of Forests, Lands and Natural Resource Operations Ministry of Forests, Lands and Natural Resource Operations Southern Engineering Group N2-38 FINDLAY CREEK FINDLAY-LAVINGTON FSR 12.6km SITE INFORMATION N SITE No. N2-38 STRUCTURE No. N2-38A FSR NAME &

More information

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford Seymour Road Replacement Bridge Addendum #1 April 27, 2015 To: From: Cc: All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford RE: Construction Bid Information

More information

LM2-18 Site Photos Laura Creek

LM2-18 Site Photos Laura Creek LM2-18 Site Photos Laura Creek View of Laura Creek culvert and embankment looking North-Northeast LM2-18 Site Photos Laura Creek 6 high Gabion wall View of road along canal looking upstream towards Laura

More information

RAPID INFILTRATION BASINS REVIEW CHECKLIST

RAPID INFILTRATION BASINS REVIEW CHECKLIST Water Quality RAPID INFILTRATION BASINS REVIEW CHECKLIST Wastewater Technical Review and Guidance FACILITY NAME Water/Wastewater/#5.65, May 2001 DATE CONSULTING ENGINEER SITE INSPECTION (DATE & INSPECTOR)

More information

DRUMHELLER & DISTRICT SOLID WASTE MANAGEMENT ASSOCIATION SPECIFICATIONS FOR SLIDE REHABILITATION AND RIP RAP REHABILITATION

DRUMHELLER & DISTRICT SOLID WASTE MANAGEMENT ASSOCIATION SPECIFICATIONS FOR SLIDE REHABILITATION AND RIP RAP REHABILITATION DRUMHELLER & DISTRICT SOLID WASTE MANAGEMENT ASSOCIATION SPECIFICATIONS FOR SLIDE REHABILITATION AND RIP RAP REHABILITATION SEPTEMBER, 2017 INVITATION TO BID The Drumheller & District Solid Waste Management

More information

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted

More information

Appendix B Sample Plan Notes

Appendix B Sample Plan Notes The Sample plan notes included in this Appendix are the most frequently used. Each note is accompanied by a Designer Note in an attempt to give some guidance as to when the note should be used and how

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

Intro. ADA Operations Contact Info

Intro. ADA Operations Contact Info Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us

More information

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road Financial Services Purchasing Division 215 N. Mason St. 2 nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS

More information

BID PROPOSAL PROPOSAL OF, corporation, a partnership consisting of, an individual doing business as,

BID PROPOSAL PROPOSAL OF, corporation, a partnership consisting of, an individual doing business as, Access Roads BID PROPOSAL PROPOSAL OF, corporation, a partnership consisting of, an individual doing business as, THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Eagle to Horn Ranch Trail Project

Eagle to Horn Ranch Trail Project Eagle to Horn Ranch Trail Project Addendum #1 Issued May 2, 2017 Proposal responses shall acknowledge receipt of this Addendum. Failure to do so may render the Proposal non responsive. The following changes,

More information