Faro Mine Remediation Project - A Risk-Based Approach to Work Planning - April, 2016
|
|
- Quentin Atkins
- 6 years ago
- Views:
Transcription
1 Faro Mine Remediation Project - A Risk-Based Approach to Work Planning - April, 2016
2 Agenda Faro Mine Site Background History Site Overview Conceptual Closure Plan Remediation Schedule Faro Mine Site Project Challenges Faro Mine Site Risk-Based Work Plan Degrading Site Conditions (North Fork Rose Creek) Engineering Risk (Down Valley Hydraulic Upgrades) Next Steps 2
3 Faro Mine Site History Timeline Faro Mine Site History OPERATION - Open pit mine produced lead and zinc 1998 RECEIVERSHIP - Last operator (Anvil Range Mining Corporation) went into receivership and Deloitte and Touche court -appointed Interim Receiver DEVOLUTION - Authority to manage public lands and resources, including abandoned mine sites, was transferred to the Government of Yukon (YG). -INAC maintained liability and responsibility for funding the remediation of the Faro Mine; YG took over administration and control of land and water -The First Nations identified as having been most affected by the mine are the Ross River Dena Council, Liard First Nation, Kaska Dena Council and Selkirk First Nation 2006 OBJECTIVES All three parties agree on Closure Objectives for the Faro Site. 1. Protect human health and safety 2. Protect and, to the extent practicable, restore the environment including land, air, water, fish and wildlife 3. Return the mine site to an acceptable state of use that reflects pre-mining land use where practicable 4. Maximize local and Yukon socio-economic benefits 5. Manage long-term site risk in a cost-effective manner CONCEPTUAL CLOSURE PLAN - All three parties agree to the preferred closure options. 3
4 Faro Mine Site Overview 4
5 Faro Mine Site Conceptual Closure Plan Water Management Capture Acid Rock Drainage Seepage/Runoff Upgrade Surface Water Diversions Dams and Impoundments Upgrade Dams and Spillways Stabilize Open Pit Wall Tailings and Waste Rock Regrade and Cover Tailings Regrade and/or Cover Waste Rock Other Demolition of Infrastructure Remediate Contaminated Soil 5
6 Faro Mine Site Remediation Schedule Phase 1 Project Assessment Phase 2 Project Definition Phase 3 Project Implementation Phase 4 Monitoring and Maintenance Site Assessment Care and Maintenance Identify Remediation Approach Conceptual Closure Plan Interim Remediation Work Regulatory Approvals Care & Maintenance Full-Site Remediation Post-Remediation Adaptation Care and Maintenance Water Treatment Long-Term Monitoring All funding provided by the Federal Contaminated Sites Action Plan 6
7 Faro Mine Site Project Challenges October 2013 In October 2013, elevated level of zinc was discovered through ongoing routine monitoring March 2014 The project drills seven wells at the toe of the Intermediate Waste Rock to try and find the source of the seep. July 2014 The project drills ten additional wells upstream of the Rock Drain to try and find the source of the seep. January 2015 Newly constructed Seepage Interception System commences operation. 7
8 Faro Mine Site Risk-Based Work Plan Participants: INAC & Yukon Government Independent Peer Review Panel Constraints: Limited funding and timing ($225M over 4 years) Methodology: Consequence (Environmental, Special Considerations, Legal, Costs, Community/Media Reputation, Human Health & Safety) Severity (Low, Minor, Moderate, Major, Critical) Likelihood (Almost Certain, Likely, Possible, Unlikely, Very Unlikely) 8
9 Faro Mine Site Risk-Based Work Plan Conceptual Closure Plan: Divided into 10 sub-projects The Scenario: (sub-project #1) won t be completed until (year) and, recognizing the ongoing deterioration of site conditions, results in additional significant impact on a valued ecosystem component. Lessons Learned: Ensure the right people are involved in the process Clearly articulate all constraints, assumptions, decisions No such things as too much information! Challenge all assumptions (no status quo option). 9
10 Faro Mine Site Risk-Based Work Plan Work Package Risk Notes 10a North Fork Rose Creek Diversion Very High Implement! 1 Water Treatment Plant High Mitigation Plan 8 Waste Rock High Linked to 10a 2 Infrastructure Upgrades Moderately High Assess Risk 10b Faro Creek Diversions Moderately High Mitigation Plan 7 Tailings Moderate Down 9a Cross Valley Dam Moderate Valley 9b Intermediate Dam Moderate Hydraulic 10c Rose Creek Diversion Moderate Upgrades 3 Building Demolition Low n/a 4 Emergency Tailings Area Low n/a 5 Cross Valley Dam Seepage System Low n/a 6 Surface Water Management Low n/a 10
11 Deteriorating Site Conditions - North Fork 11
12 Engineering Risk Down Valley Intermediate Dam Spillway Rose Creek Diversion Channel 12
13 Next Steps Design: North Fork Rose Creek Diversion (2016) Down Valley Hydraulic Upgrades ( ) Closure Plan ( ) Regulatory: Closure Plan ( ) Implement: North Fork Rose Creek Diversion ( ) Down Valley Hydraulic Upgrades ( ) Closure Plan (2021+) 13
Canadian Abandoned Mines: Indian and Northern Affairs Program Update and Case Study
Canadian Abandoned Mines: Indian and Northern Affairs Program Update and Case Study Clinton Creek Asbestos Mine (Yukon) Lou Spagnuolo & Michael Nahir Outline Introduction Program Mandate Classification
More informationBuilding a Culture of Safety at Faro Mine Complex Faro, Yukon
Building a Culture of Safety at Faro Mine Complex Faro, Yukon Thaidra Sloane Yukon Government James Carss Parsons Inc. Government 1 What is Faro Mine Complex? 2 2 Faro Mine Located in the Yukon on a 2,500
More informationCorona & Twin Peaks Mine Drainage Treatment Project
Corona & Twin Peaks Mine Drainage Treatment Project A novel approach to cleaning up mine waste and ongoing discharges from three mercury mines on private property Sara Husby, Project Lead Stephen McCord,
More informationFinancial and Other Considerations Mt. Nansen Mine Case Study. Hugh Copland, DIAND Mining Land Use and Reclamation
Financial and Other Considerations Mt. Nansen Mine Case Study Hugh Copland, DIAND Mining Land Use and Reclamation Orphan Mines Workshop Winnipeg, MB June 26/27, 2001 Outline -Yukon Abandoned Mines -Challenges
More informationCoal Combustion Facility Assessment Report. October 20, 2010
Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians
More informationDraft Mine Closure Plan. 17 October 2018 Longlac & Geraldton
Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval
More informationand the Mining Sector
A Case History on Ross River Kaska and the Mining Sector Presentation at CBERN S Mapping Ethical Issues Workshop, Vancouver, Nov 20, 2009 By Bruce McKnight Background RR area in southeastern Yukon has
More informationCategory 1 Waste Rock Stockpile Groundwater Containment System
Memorandum To: Jennifer Saran, Poly Met Mining Inc. Project: 23690862.00-042-008 1.0 Introduction The Co-Lead Agencies have requested a summary of the four containment systems that are planned for the
More informationEVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012
EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA Natalie Tashe November 9, 2012 1 GEOGRAPHIC CONTEXT 2 DEFINING WILDLIFE HABITAT 3 OUTLINE 1. Mine Cycle for reclamation
More informationTulsequah Chief Mine Remediation Options
Tulsequah Chief Mine Remediation Options D.Ritchie, D.Taylor, R.Brown & S.Theben Northern Latitudes Reclamation Workshop, Whitehorse September 12, 2018 1 AGENDA 1. Site overview 2. Remediation study 3.
More informationManagement of Uranium Mine Waste Rock and Mill Tailings. Support Document to DIS-10-01
Management of Uranium Mine Waste Rock and Mill Tailings Support Document to DIS-10-01 March 2010 i Introduction SUPPORT DOCUMENT: DISCUSSION PAPER ON THE MANAGEMENT OF URANIUM MINE WASTE ROCK AND MILL
More informationCHRISTOPH WELS PROJECT EXPERIENCE (SELECTED STUDIES)
EDUCATION Ph.D., Hydrogeology, University of British Columbia, 1995 Fellowship, Environmental & Soil Chemistry, Syracuse University, 1991 M.Sc., Watershed Hydrology, Trent University, Ontario, 1989 B.Sc.,
More informationEnvironmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA) as a tool for sustainable mining Cheryl E. Wasserman Associate Director for Policy Analysis Office of Federal Activities Office of Enforcement and Compliance Assurance
More informationNovember 15, The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project
November 15, 2017 The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project OVERVIEW Team Introduction About the NJWSA About Round Valley About the Project Project Components
More informationCoeur d'alene Basin ROD Amendment
Coeur d'alene Basin ROD Amendment August 2012 Site Update Inside Which Parts of the River Basin are included in the RODA?...2 An Interim Remedy...2 Goals and Benefits of the Cleanup..3 Response to Public
More informationGiant Mine Remediation Project
Giant Mine Remediation Project Giant Mine Remediation Project The Long Road to Reclamation Atlantic Reclamation Conference October 2016 Presentation Objectives Provide an overview and history of the Giant
More informationTailings Seepage Paths Mapped using Electric-Based Technology
Tailings Seepage Paths Mapped using Electric-Based Technology Cecil Urlich 1, Andy Hughes 2, Val Gardner 3 1 AECOM, 1111 3 rd Avenue, Suite 1600, Seattle, Washington 98101, USA cecil.urlich@aecom.com 2
More informationIndian and Northern Affairs Canada Yukon Region The Waste Management Program. Keeping Yukon Clean. For your health and the health of the environment
Indian and Northern Affairs Canada Yukon Region The Waste Management Program Keeping Yukon Clean For your health and the health of the environment For information regarding reproduction rights, please
More informationAppendix A. Form 1 (section 18) Project Proposal
Appendix A Form 1 (section 18) Project Proposal PART 1 - PROPONENT CONTACT INFORMATION 1.1 Proponent (Name or Company Name): Yukon Government Community Infrastructure Branch 1.2 Project Title: Whistle
More informationCONCEPT NOTE LARGE VOLUME WASTE
Mining, Minerals and Sustainable Development Project CONCEPT NOTE LARGE VOLUME WASTE Background Large-scale mining operations, in particular open-pit, inevitably produce large volumes of waste. The classes
More informationClosure Planning for a Tailings Storage Facility in Western Australia
Closure Planning for a Tailings Storage Facility in Western Australia K. Bonstrom O Kane Consultants Pty. Ltd, Australia D. Chapman O Kane Consultants Inc, Canada D. Swain Perth, Australia M. O Kane O
More informationIron Mountain Mine Shasta County, California
CASE STUDY Iron Mountain Mine Shasta County, California August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from this publication
More informationOptions Evaluation for Remediation of the Gunnar Site Using a Decision-Tree Approach. T.L. Yankovich and A. Klyashtorin
Options Evaluation for Remediation of the Gunnar Site Using a Decision-Tree Approach T.L. Yankovich and A. Klyashtorin Some Relevant Concepts and Terminology: In general, orphaned or abandoned mines can
More informationACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT
ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT Pete Dronkers Northern Alaska Environmental Center WHAT IS ACID MINE DRAINAGE? (AMD) When a mine is built and operated, thousands or millions of tons of
More informationCeresco Dam Removal Project. Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries
Ceresco Dam Removal Project Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries Outline Overview of Ceresco Dam History Public Process Funding Dam Removal Ecosystem
More informationSä Dena Hes Mine Quartz Mining License QML Detailed Decommissioning and Reclamation Plan Report
Michelle Unger Senior Environmental Scientist michelle.unger@teck.com Teck Resources Limited Legacy Properties - Canada Bag 2000 Kimberley, BC V1A 3E1 +1 250 427 8422 Dir +1 250 427 8451 Fax +1 250 432
More informationBLUEBELL MINE - FORESHORE REMEDIATION OF GALENA BAY
BLUEBELL MINE - FORESHORE REMEDIATION OF GALENA BAY BJ. Donald, P.Eng., Teck Cominco Metals Ltd. WJ. Kuit, Teck Cominco Metals Ltd. and N.L. Sandstrom, P.Eng., Morrow Environmental Consultants Inc. Teck
More informationNovember 27, Bethlehem No. 1 Tailings Storage Facility. Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0
INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION AND REVIEW REPORT Bethlehem No. 1 Tailings Storage Facility Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0 Attention:
More informationFormer Brukunga Mine Site (SA) Lessons of a long-term remediation strategy
Former Brukunga Mine Site (SA) Lessons of a long-term remediation strategy Dealing with Derelict Mines 2016 Raul Mollehuara Project Director / Operations Brukunga Mine Site Overview - Background - Brukunga
More informationCooperating on Giant Mine Remediation
Cooperating on Giant Mine Remediation NOAMI Workshop October 26-27, 2006 Bill Mitchell Giant Mine Remediation Project Giant Mine C Shaft Headframe CON MINE Giant Mine Location 2 1 Giant Mine was commissioned
More informationTable of Contents. Nov. 2008
Nov. 2008 What is involved? Electrical loads in Yukon are increasing. By 2011, Yukon Energy expects to need additional renewable power to help minimize the use of diesel to generate electricity. As outlined
More informationControlling Surface Water at One of Canada s Largest Base Metals Operations: From Legacy Challenges to Environmental Award Winner
Controlling Surface Water at One of Canada s Largest Base Metals Operations: From Legacy Challenges to Environmental Award Winner Greg Noack, P.Eng., Associate, Klohn Crippen Berger Ltd., Toronto ON. Lawrence
More informationAppendix P. U.S. Fish and Wildlife Service Planning Aid Letter
Appendix P U.S. Fish and Wildlife Service Planning Aid Letter This page is intentionally left blank. United States Department of the Interior FISH AND WILDLIFE SERVICE Missouri Ecological Services Field
More informationInformation Request 37
Information Request 37 Information Request 37 37-1 Response to Information Request 37 Response to Information Requests 37a Response to Information Requests 37b 37-3 37-5 Federal Review Panel Information
More informationRecommendations for consideration by Tribal Leaders in response to infrastructure consultation - National Tribal Water Council
Recommendations for consideration by Tribal Leaders in response to infrastructure consultation - National Tribal Water Council Recommendation 1. Close the mining loopholes in the Clean Water Act Executive
More informationSeptember 2016 ID Competency Statement Type
September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for
More informationPlanning a Complex Mine Remediation. Remediation Technologies Symposium October 14-16, 2015.
Planning a Complex Mine Remediation Remediation Technologies Symposium October 14-16, 2015. History of Giant Mine Jurisdictions Stakeholders; interests Planning the Remediation Care & Maintenance Urgent
More informationTRANSBOUNDARY WATERS. Friends & Neighbors: Background on the Bilateral Working Group FALL Members of the Bilateral Working Group Alaska
TRANSBOUNDARY WATERS FALL 2017 Friends & Neighbors: Background on the Bilateral Working Group British Columbia (B.C.) and Alaska share many common interests and have a long history of working together.
More informationProceedings of the 18 th Annual British Columbia Mine Reclamation Symposium in Vernon, BC, The Technical and Research Committee on Reclamation
ARD GUIDELINES FOR MINE SITES IN BRITISH COLUMBIA William A. Price and John C. Errington Mine Review and Permitting Branch Ministry of Energy, Mines & Petroleum Resources 4th Floor, 1810 Blanshard Street
More informationPublic Notice: Application for Permit
US Army Corps Of Engineers Walla Walla District 201 North Third Avenue Walla Walla, WA 99362-1876 Public Notice: Application for Permit APPLICATION : NWW-2008-00579 WATERWAY: Bruno Creek Drainage, Pat
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationCivil and Geotechnical Engineering
Imagine the result Imagine the result Civil and Geotechnical Engineering for the Mining Industry Innovative, Sustainable and Grounded Solutions At ARCADIS, we understand the environment and how to engineer
More informationTailings Dams, Failures, and the proposed Casino Mine. February 23 rd, 2016 Hellaby Hall Presentation
Tailings Dams, Failures, and the proposed Casino Mine February 23 rd, 2016 Hellaby Hall Presentation Topics to be covered Yukon Conservation Society Overburden and Waste Rock Tailings Dry and Wet Acid
More informationNan Kay Ghawinji K e Dàkwäní Our way of life on this land Aishihik Dam Relicensing Update
Nan Kay Ghawinji K e Dàkwäní Our way of life on this land Aishihik Dam Relicensing Update July 2018 CAFN Yukon Energy Protocol Agreement CAFN and Yukon Energy entered into a co-management protocol agreement
More informationNorthern Contaminated Sites Program Performance Report
Northern Contaminated Sites Program Performance Report 2011-2012 For information regarding reproduction rights, please contact: Public Enquiries Contact Centre Aboriginal Affairs and Northern Development
More informationProsperity Gold-Copper Project MOE (Kym Keogh) Final Comments
ID# COMMENT/ TASEKO RESPONSE COMMITMENT REQUIRED CURRENT STATUS OF 1. Analysis results for selenium in fish tissues by the Proponent were varied. Virtually all the results were greater than guidelines
More informationProposed Millsite Reservoir Annual Dredging Sequence
Proposed Millsite Reservoir Annual Dredging Sequence Rollin H. Hotchkiss and Michael Suflita April 25, 2014 Figure 1 provides a basis for this discussion and shows both the median and average daily inflows
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationTVA Colbert Fossil Facility Ash Disposal Pond 4
2011 World of Coal Ash (WOCA) Conference May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/ TVA Colbert Fossil Facility Ash Disposal Pond 4 Improving Operations While Preparing for Closure May 10,
More informationEVALUATION OF METAL TRANSPORT INTO AND OUT OF TERRACE RESERVOIR, CONEJOS COUNTY, COLORADO, APRIL 1994 THROUGH MARCH 1995
EVALUATION OF METAL TRANSPORT INTO AND OUT OF TERRACE RESERVOIR, CONEJOS COUNTY, COLORADO, APRIL 1994 THROUGH MARCH 1995 By Sheryl A. Ferguson U.S. Geological Survey, WRD 201 W. 8th Street, Suite 200 Pueblo,
More informationMining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band
Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band 11 August 2014 Presentation Outline General Introduction
More informationSEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA
SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA Overview Romania has built 2,617 dams out of which 246 are large and medium dams and 1260 are small dams, as per
More informationSTAFF UPDATES FLOOD ZONE 9 ADVISORY BOARD MEETING
STAFF UPDATES FLOOD ZONE 9 ADVISORY BOARD MEETING Ross Valley Watershed Flood Risk Reduction Program RossValleyWatershed.org Contact us: 415 473 7226; lizlewis@marincounty.org February 16, 2017 Photo:
More informationMuskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1
Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV
More informationJennifer S. Simmons, National Mine Land Reclamation Center, West Virginia University, Morgantown, WV.
Acid Mine Drainage Neutralization at Augusta Lake, Indiana Mike Kalagian, Office of Surface Mining, Indianapolis, IN Jennifer S. Simmons, National Mine Land Reclamation Center, West Virginia University,
More informationROLE OF THE FIRM IN THE PROJECT
PROJECT DESCRIPTION Lake Loramie Dam is a Class I dam located in Lake Loramie State Park in Minster, Ohio. Lake Loramie originally served as the high feeder water supply for the Miami-Erie Canal that began
More informationVISUAL SITE INSPECTION REPORT
VISUAL SITE INSPECTION REPORT - 2016 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00318 DECEMBER 20, 2016 PREPARED
More informationKeystone and Rising Star Mines Shasta County, California
CASE STUDY Keystone and Rising Star Mines Shasta County, California August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from
More informationReview of ML/ARD Geochemistry & Water Quality Predictions
Review of ML/ARD Geochemistry & Water Quality Predictions Presented by Kim Bellefontaine, M.Sc., P.Geo. Senior Mine Review Geologist, MEMPR With contributions from: Kelly Sexsmith, M.S., P.Geo. Senior
More informationSouth St. Vrain / Hall Meadows Restoration Planning August 20, 2015
South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 Agenda Introductions Purpose & Goals of Meeting Planning Area Master Plan Restoration Planning: Cost Estimates, Grants, Scope, Timeline
More informationFor personal use only
23 January 2019 ASX: GRR HIGHLIGHTS Mining movements increased in Q4 after successful dewatering from the North Pit. Access to main ore zone restored. Cash and liquid investments of A$224.49 million and
More informationPecos, New Mexico USA Lead-Zinc Mill Tailings Site: Case Study of a Durable Solution to an Inactive Mine Waste Pollution Problem Paul Robinson
Pecos, New Mexico USA Lead-Zinc Mill Tailings Site: Case Study of a Durable Solution to an Inactive Mine Waste Pollution Problem Paul Robinson Southwest Research and Information Center PO Box 4524 Albuquerque,
More informationTecumseh AML Site 262 Warrick, Indiana
CASE STUDY Tecumseh AML Site 262 Warrick, Indiana August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from this publication
More informationJUNE 11, :00 4:00 PM MEETING NOTES
LOWER AMERICAN RIVER TASK FORCE TSAKOPOULOS LIBRARY GALLERIA 828 I STREET SACRAMENTO, CA JUNE 11, 2013 1:00 4:00 PM MEETING NOTES Agenda Item: Welcome, Introductions and Agenda Review See attached sign-in
More informationREPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014
INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT Giant Nickel Tailings Dams Submitted to: Barrick Gold Inc. PO Box 788 Penticton, BC V2A 6Y7 Attention: Robbin Harmati REPORT Reference Number: 1412161-003-R-Rev1-2000
More informationRe: Closure and Reclamation at Ekati
Independent Environmental Monitoring Agency P.O. Box 1192, Yellowknife, NT X1A 2N8 Phone (867) 669 9141 Fax (867) 669 9145 Website: www.monitoringagency.net Email: monitor1@yk.com March 31, 2006 David
More informationSMARA Reclamation Standards Review
SMARA Reclamation Standards Review Focused Discussion SMARA Section 3704.1 - Performance Standards for Reclamation and Section 2711 Extraction of Minerals Essential to Well-Being of the State and the Needs
More informationDelta Mercury Tributary Council May 7, 2013 Izzy Martin and Bob Schneider. Water Bonds and Mercury Remediation in the Sierra and Coast Range
Delta Mercury Tributary Council May 7, 2013 Izzy Martin and Bob Schneider Water Bonds and Mercury Remediation in the Sierra and Coast Range Questions? 1. Do we have the facts correct? 2. Who should administer
More informationPHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe
PHASE I ERNEST MINE COMPLEX Project Objectives The objective of the project was to develop an economically feasible, safe method of diverting all flows from the Ernest Mine Complex to a central discharge
More informationEnvironmental Risk Assessments of Coal Ash Impoundments
2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Environmental Risk Assessments of Coal Ash Impoundments George M. Huddleston III, Kathy W. Webb, Heather
More informationEnvironmental Regulation & Mine Permitting in Ontario
Environmental Regulation & Mine Permitting in Ontario A Presentation to the Ad Hoc Committee on Mining Lake Superior Work Group Mark O Brien, Mineral Development Consultant MNDMF, Thunder Bay Agenda Regulatory
More informationThe legacy of the Cold War - Cleaning up Abandoned Uranium Mine Sites in North Saskatchewan
The legacy of the Cold War - Cleaning up Abandoned Uranium Mine Sites in North Saskatchewan Alexey Klyashtorin, David Sanscartier, Mark Calette, Chris Reid, Skye Ketilson, and Ian Wilson Saskatchewan Research
More informationNICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview
NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview 1 INTRODUCTION Screening level environmental impact assessment provided in application package Many of the potential
More informationThe Gold King Mine Acid Drainage Spill
The Gold King Mine Acid Drainage Spill Janick F. Artiola, Extension Water Quality Specialist Department of Soil, Water & Environmental Science What Happened? Impacts What can Be Done To Prevent This? Flow
More informationTransport Canada Navigable Waters Protection Act & Canadian Environmental Assessment Act John Mackie and Linda Sullivan
Transport Canada Navigable Waters Protection Act & Canadian Environmental Assessment Act John Mackie and Linda Sullivan 1 Transport Canada s participation in the Federal Review Panel Process Transport
More informationConverting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant
Converting slurry tailings facilities to filtered dry stacks a case history John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Objectives General discussion on the geotechnical issues. Case
More informationClowhom Project Water Use Plan Monitoring Programs Annual Report: For Water Licenses , and Conditional Water License
Monitor of Aquatic Wildlife in Wetlands Affected by Dam Operations Role of Littoral Zone in Governing Clowhom Reservoir Productive Capacity Validation of the Effective Littoral Zone Performance Measure
More informationReclamation and Closure Cost Planning and Estimation and the Mining Life Cycle. Presenter: Lois Boxill, P.Eng., P.E.
Reclamation and Closure Cost Planning and Estimation and the Mining Life Cycle Presenter: Lois Boxill, P.Eng., P.E. Overview Preludes to Closure Cost Estimation Reclamation and the Mining Life Cycle Public
More informationCDF059 Tributary Flow Augmentation, Version 4 January 25, 2013
This form has been developed to document changes to the NorthMet Project (Project) and/or Project SDEIS Water Modeling resulting from the water modeling process. The forms will be used during the water
More informationPlan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission
Plan Rollout Presentation July 31, 2014 Michael G. Hahn, P.E., P.H. Chief Environmental Engineer Southeastern Wisconsin Regional Planning Commission # 219703 Racine County Flooding Recommendations and
More informationAppendix M Part 1. Wetland Reserve Program. U.S. Army Corps of Engineers Memphis District
Appendix M Part 1 Wetland Reserve Program U.S. Army Corps of Engineers Memphis District St. Johns Bayou and New Madrid Floodway (SJNM) Project Wetlands Reserve Program (WRP) Introduction: The Wetlands
More informationDevelopment of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine
Development of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine TSF 1 TSF 2 November 28, 2018 TSF 3W TSF 3E Westwood Mine Cau$onary Statement 2 Outline Doyon-Bousquet-LaRonde
More informationII. STUDY RESULTS. In our opinion the following results may be presented based on the data contained in this report.
II. STUDY RESULTS In our opinion the following results may be presented based on the data contained in this report. STREAM QUALITY General: Seventy-one (71) stream reading stations were established on
More informationFor 100 years private mining and refining
June 2001 programs and initiatives The Deloro Mine Site Cleanup Project Through its cleanup actions the Ministry of the Environment has reduced the loadings of arsenic to the Moira River by more than 80
More informationBest Available Techniques & Prioritization of Mine Impacted Lands
Best Available Techniques & Prioritization of Mine Impacted Lands The Gold Rush Hydraulic Mining Hard Rock Mining Mercury Entrained in the Sediment Deer Creek 1908 Greenhorn Creek 2011 Heavy Metals & Physical
More informationEnvironmental Management Plan (EMP)
SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit
More informationSunnyhurst & Earnsdale Impounding Reservoirs reducing the risk of failure
Sunnyhurst & Earnsdale Impounding Reservoirs reducing the risk of failure by Gary Harrison S unnyhurst and Earnsdale Impounding Reservoirs (IR) are situated 1.5km to the west of Darwen town centre in Lancashire
More informationNewsletter BMC. 5Th Edition. June, Our formal tender process for the 2016 field program at Kudz Ze Kayah has concluded based on
5Th Edition BMC Newsletter June, 2016 LOCAL CONTRACTORS Our formal tender process for the 2016 field program at Kudz Ze Kayah has concluded based on performance capacity, safety and transparency. Nearly
More informationConceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects
TECHNICAL MEMORANDUM Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects TO: COPIES: PREPARED BY: Tulsa County File CH2M HILL DATE: September 2,
More informationDirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management
Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management MEMORANDUM To: From: Subject: Mr. Brent Murphy, Vice President Environment Affairs Dirk van Zyl, Principal Engineer Review Comments
More informationGREENS CREEK MINE FINANCIAL ASSURANCE REVIEW
1.0 Introduction GREENS CREEK MINE FINANCIAL ASSURANCE REVIEW Page 1 of 8 Sarah Zuzulock, MS Center for Science in Public Participation June 2003 The Greens Creek mine is a joint venture between Kennecott
More informationSeasonal and Pumped Storage Hydro Opportunity Search in the Carmacks to Faro Road and Power Line Corridor, An Office Study
Seasonal and Pumped Storage Hydro Opportunity Search in the Carmacks to Faro Road and Power Line Corridor, An Office Study Prepared for Yukon Conservation Society (YCS) June 25, 2015 Prepared by John F.
More informationINAC NortherN CoNtAmINAted sites ProgrAm Progress report
INAC No r t h e r n Co n t a m i n a t e d Sites Program Pr o g r e s s Re p o r t 2005-2010 Published under the authority of the Minister of Indian Affairs and Northern Development and Federal Interlocutor
More informationMay 2009 Semiannual Report
Environment Submitted to: Submitted by: CNA Holdings, Inc. AECOM Dallas, Texas Atlanta, Georgia 60135443 November 2009 May 2009 Semiannual Report Needmore Road Landfill Facility Salisbury, North Carolina
More informationThe following is a short summary of the definitions and acronyms associated with the evaluation process.
CERCLA Activities in the Granite Creek Watershed Past Mining Activity Portions of the watershed were severely altered by lode and placer mining activities from the late 1800s up to 1950s. Mining effects
More informationMonitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio
Monitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio Prepared by: EnviroScience, Inc. 5070 Stow Rd Stow OH 44224 (330) 688-0111 Year Ending: December 31, 2013 I. Project Overview The following
More informationIndependent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance
Independent Expert Engineering Investigation and Review Panel Report on Mount Polley Tailings Storage Facility Breach Appendix G: Water Balance January 30, 2015 Report on Mount Polley Tailings Storage
More informationE2. Water quantity, allocation and use
E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future
More informationHuman Health and Ecological Risk Assessment at Teck Cominco s Kimberley Operations:
Human Health and Ecological Risk Assessment at Teck Cominco s Kimberley Operations: Overview of Regulatory Process and Preliminary Findings of the Problem Formulation Authors: C. Wilson, P.Eng., R.Wilson,
More informationUse of Conceptual Site Models to Support EMA Effluent Permit Applications
Use of Conceptual Site Models to Support EMA Effluent Permit Applications Version 1.2 March 2018 Prepared by: Ministry of Environment and Climate Change Strategy Use of Conceptual Site Models to Support
More information