1 Faro Mine Remediation Project - A Risk-Based Approach to Work Planning - April, 2016

2 Agenda Faro Mine Site Background History Site Overview Conceptual Closure Plan Remediation Schedule Faro Mine Site Project Challenges Faro Mine Site Risk-Based Work Plan Degrading Site Conditions (North Fork Rose Creek) Engineering Risk (Down Valley Hydraulic Upgrades) Next Steps 2

3 Faro Mine Site History Timeline Faro Mine Site History OPERATION - Open pit mine produced lead and zinc 1998 RECEIVERSHIP - Last operator (Anvil Range Mining Corporation) went into receivership and Deloitte and Touche court -appointed Interim Receiver DEVOLUTION - Authority to manage public lands and resources, including abandoned mine sites, was transferred to the Government of Yukon (YG). -INAC maintained liability and responsibility for funding the remediation of the Faro Mine; YG took over administration and control of land and water -The First Nations identified as having been most affected by the mine are the Ross River Dena Council, Liard First Nation, Kaska Dena Council and Selkirk First Nation 2006 OBJECTIVES All three parties agree on Closure Objectives for the Faro Site. 1. Protect human health and safety 2. Protect and, to the extent practicable, restore the environment including land, air, water, fish and wildlife 3. Return the mine site to an acceptable state of use that reflects pre-mining land use where practicable 4. Maximize local and Yukon socio-economic benefits 5. Manage long-term site risk in a cost-effective manner CONCEPTUAL CLOSURE PLAN - All three parties agree to the preferred closure options. 3

4 Faro Mine Site Overview 4

5 Faro Mine Site Conceptual Closure Plan Water Management Capture Acid Rock Drainage Seepage/Runoff Upgrade Surface Water Diversions Dams and Impoundments Upgrade Dams and Spillways Stabilize Open Pit Wall Tailings and Waste Rock Regrade and Cover Tailings Regrade and/or Cover Waste Rock Other Demolition of Infrastructure Remediate Contaminated Soil 5

6 Faro Mine Site Remediation Schedule Phase 1 Project Assessment Phase 2 Project Definition Phase 3 Project Implementation Phase 4 Monitoring and Maintenance Site Assessment Care and Maintenance Identify Remediation Approach Conceptual Closure Plan Interim Remediation Work Regulatory Approvals Care & Maintenance Full-Site Remediation Post-Remediation Adaptation Care and Maintenance Water Treatment Long-Term Monitoring All funding provided by the Federal Contaminated Sites Action Plan 6

7 Faro Mine Site Project Challenges October 2013 In October 2013, elevated level of zinc was discovered through ongoing routine monitoring March 2014 The project drills seven wells at the toe of the Intermediate Waste Rock to try and find the source of the seep. July 2014 The project drills ten additional wells upstream of the Rock Drain to try and find the source of the seep. January 2015 Newly constructed Seepage Interception System commences operation. 7

8 Faro Mine Site Risk-Based Work Plan Participants: INAC & Yukon Government Independent Peer Review Panel Constraints: Limited funding and timing ($225M over 4 years) Methodology: Consequence (Environmental, Special Considerations, Legal, Costs, Community/Media Reputation, Human Health & Safety) Severity (Low, Minor, Moderate, Major, Critical) Likelihood (Almost Certain, Likely, Possible, Unlikely, Very Unlikely) 8

9 Faro Mine Site Risk-Based Work Plan Conceptual Closure Plan: Divided into 10 sub-projects The Scenario: (sub-project #1) won t be completed until (year) and, recognizing the ongoing deterioration of site conditions, results in additional significant impact on a valued ecosystem component. Lessons Learned: Ensure the right people are involved in the process Clearly articulate all constraints, assumptions, decisions No such things as too much information! Challenge all assumptions (no status quo option). 9

10 Faro Mine Site Risk-Based Work Plan Work Package Risk Notes 10a North Fork Rose Creek Diversion Very High Implement! 1 Water Treatment Plant High Mitigation Plan 8 Waste Rock High Linked to 10a 2 Infrastructure Upgrades Moderately High Assess Risk 10b Faro Creek Diversions Moderately High Mitigation Plan 7 Tailings Moderate Down 9a Cross Valley Dam Moderate Valley 9b Intermediate Dam Moderate Hydraulic 10c Rose Creek Diversion Moderate Upgrades 3 Building Demolition Low n/a 4 Emergency Tailings Area Low n/a 5 Cross Valley Dam Seepage System Low n/a 6 Surface Water Management Low n/a 10

11 Deteriorating Site Conditions - North Fork 11

12 Engineering Risk Down Valley Intermediate Dam Spillway Rose Creek Diversion Channel 12

13 Next Steps Design: North Fork Rose Creek Diversion (2016) Down Valley Hydraulic Upgrades ( ) Closure Plan ( ) Regulatory: Closure Plan ( ) Implement: North Fork Rose Creek Diversion ( ) Down Valley Hydraulic Upgrades ( ) Closure Plan (2021+) 13

Canadian Abandoned Mines: Indian and Northern Affairs Program Update and Case Study

Canadian Abandoned Mines: Indian and Northern Affairs Program Update and Case Study Canadian Abandoned Mines: Indian and Northern Affairs Program Update and Case Study Clinton Creek Asbestos Mine (Yukon) Lou Spagnuolo & Michael Nahir Outline Introduction Program Mandate Classification

More information

Building a Culture of Safety at Faro Mine Complex Faro, Yukon

Building a Culture of Safety at Faro Mine Complex Faro, Yukon Building a Culture of Safety at Faro Mine Complex Faro, Yukon Thaidra Sloane Yukon Government James Carss Parsons Inc. Government 1 What is Faro Mine Complex? 2 2 Faro Mine Located in the Yukon on a 2,500

More information

Corona & Twin Peaks Mine Drainage Treatment Project

Corona & Twin Peaks Mine Drainage Treatment Project Corona & Twin Peaks Mine Drainage Treatment Project A novel approach to cleaning up mine waste and ongoing discharges from three mercury mines on private property Sara Husby, Project Lead Stephen McCord,

More information

Financial and Other Considerations Mt. Nansen Mine Case Study. Hugh Copland, DIAND Mining Land Use and Reclamation

Financial and Other Considerations Mt. Nansen Mine Case Study. Hugh Copland, DIAND Mining Land Use and Reclamation Financial and Other Considerations Mt. Nansen Mine Case Study Hugh Copland, DIAND Mining Land Use and Reclamation Orphan Mines Workshop Winnipeg, MB June 26/27, 2001 Outline -Yukon Abandoned Mines -Challenges

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval

More information

and the Mining Sector

and the Mining Sector A Case History on Ross River Kaska and the Mining Sector Presentation at CBERN S Mapping Ethical Issues Workshop, Vancouver, Nov 20, 2009 By Bruce McKnight Background RR area in southeastern Yukon has

More information

Category 1 Waste Rock Stockpile Groundwater Containment System

Category 1 Waste Rock Stockpile Groundwater Containment System Memorandum To: Jennifer Saran, Poly Met Mining Inc. Project: 23690862.00-042-008 1.0 Introduction The Co-Lead Agencies have requested a summary of the four containment systems that are planned for the

More information

EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012

EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012 EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA Natalie Tashe November 9, 2012 1 GEOGRAPHIC CONTEXT 2 DEFINING WILDLIFE HABITAT 3 OUTLINE 1. Mine Cycle for reclamation

More information

Tulsequah Chief Mine Remediation Options

Tulsequah Chief Mine Remediation Options Tulsequah Chief Mine Remediation Options D.Ritchie, D.Taylor, R.Brown & S.Theben Northern Latitudes Reclamation Workshop, Whitehorse September 12, 2018 1 AGENDA 1. Site overview 2. Remediation study 3.

More information

Management of Uranium Mine Waste Rock and Mill Tailings. Support Document to DIS-10-01

Management of Uranium Mine Waste Rock and Mill Tailings. Support Document to DIS-10-01 Management of Uranium Mine Waste Rock and Mill Tailings Support Document to DIS-10-01 March 2010 i Introduction SUPPORT DOCUMENT: DISCUSSION PAPER ON THE MANAGEMENT OF URANIUM MINE WASTE ROCK AND MILL

More information

CHRISTOPH WELS PROJECT EXPERIENCE (SELECTED STUDIES)

CHRISTOPH WELS PROJECT EXPERIENCE (SELECTED STUDIES) EDUCATION Ph.D., Hydrogeology, University of British Columbia, 1995 Fellowship, Environmental & Soil Chemistry, Syracuse University, 1991 M.Sc., Watershed Hydrology, Trent University, Ontario, 1989 B.Sc.,

More information

Environmental Impact Assessment (EIA)

Environmental Impact Assessment (EIA) Environmental Impact Assessment (EIA) as a tool for sustainable mining Cheryl E. Wasserman Associate Director for Policy Analysis Office of Federal Activities Office of Enforcement and Compliance Assurance

More information

November 15, The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project

November 15, The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project November 15, 2017 The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project OVERVIEW Team Introduction About the NJWSA About Round Valley About the Project Project Components

More information

Coeur d'alene Basin ROD Amendment

Coeur d'alene Basin ROD Amendment Coeur d'alene Basin ROD Amendment August 2012 Site Update Inside Which Parts of the River Basin are included in the RODA?...2 An Interim Remedy...2 Goals and Benefits of the Cleanup..3 Response to Public

More information

Giant Mine Remediation Project

Giant Mine Remediation Project Giant Mine Remediation Project Giant Mine Remediation Project The Long Road to Reclamation Atlantic Reclamation Conference October 2016 Presentation Objectives Provide an overview and history of the Giant

More information

Tailings Seepage Paths Mapped using Electric-Based Technology

Tailings Seepage Paths Mapped using Electric-Based Technology Tailings Seepage Paths Mapped using Electric-Based Technology Cecil Urlich 1, Andy Hughes 2, Val Gardner 3 1 AECOM, 1111 3 rd Avenue, Suite 1600, Seattle, Washington 98101, USA cecil.urlich@aecom.com 2

More information

Indian and Northern Affairs Canada Yukon Region The Waste Management Program. Keeping Yukon Clean. For your health and the health of the environment

Indian and Northern Affairs Canada Yukon Region The Waste Management Program. Keeping Yukon Clean. For your health and the health of the environment Indian and Northern Affairs Canada Yukon Region The Waste Management Program Keeping Yukon Clean For your health and the health of the environment For information regarding reproduction rights, please

More information

Appendix A. Form 1 (section 18) Project Proposal

Appendix A. Form 1 (section 18) Project Proposal Appendix A Form 1 (section 18) Project Proposal PART 1 - PROPONENT CONTACT INFORMATION 1.1 Proponent (Name or Company Name): Yukon Government Community Infrastructure Branch 1.2 Project Title: Whistle

More information

CONCEPT NOTE LARGE VOLUME WASTE

CONCEPT NOTE LARGE VOLUME WASTE Mining, Minerals and Sustainable Development Project CONCEPT NOTE LARGE VOLUME WASTE Background Large-scale mining operations, in particular open-pit, inevitably produce large volumes of waste. The classes

More information

Closure Planning for a Tailings Storage Facility in Western Australia

Closure Planning for a Tailings Storage Facility in Western Australia Closure Planning for a Tailings Storage Facility in Western Australia K. Bonstrom O Kane Consultants Pty. Ltd, Australia D. Chapman O Kane Consultants Inc, Canada D. Swain Perth, Australia M. O Kane O

More information

Iron Mountain Mine Shasta County, California

Iron Mountain Mine Shasta County, California CASE STUDY Iron Mountain Mine Shasta County, California August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from this publication

More information

Options Evaluation for Remediation of the Gunnar Site Using a Decision-Tree Approach. T.L. Yankovich and A. Klyashtorin

Options Evaluation for Remediation of the Gunnar Site Using a Decision-Tree Approach. T.L. Yankovich and A. Klyashtorin Options Evaluation for Remediation of the Gunnar Site Using a Decision-Tree Approach T.L. Yankovich and A. Klyashtorin Some Relevant Concepts and Terminology: In general, orphaned or abandoned mines can

More information

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT Pete Dronkers Northern Alaska Environmental Center WHAT IS ACID MINE DRAINAGE? (AMD) When a mine is built and operated, thousands or millions of tons of

More information

Ceresco Dam Removal Project. Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries

Ceresco Dam Removal Project. Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries Ceresco Dam Removal Project Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries Outline Overview of Ceresco Dam History Public Process Funding Dam Removal Ecosystem

More information

Sä Dena Hes Mine Quartz Mining License QML Detailed Decommissioning and Reclamation Plan Report

Sä Dena Hes Mine Quartz Mining License QML Detailed Decommissioning and Reclamation Plan Report Michelle Unger Senior Environmental Scientist michelle.unger@teck.com Teck Resources Limited Legacy Properties - Canada Bag 2000 Kimberley, BC V1A 3E1 +1 250 427 8422 Dir +1 250 427 8451 Fax +1 250 432

More information

BLUEBELL MINE - FORESHORE REMEDIATION OF GALENA BAY

BLUEBELL MINE - FORESHORE REMEDIATION OF GALENA BAY BLUEBELL MINE - FORESHORE REMEDIATION OF GALENA BAY BJ. Donald, P.Eng., Teck Cominco Metals Ltd. WJ. Kuit, Teck Cominco Metals Ltd. and N.L. Sandstrom, P.Eng., Morrow Environmental Consultants Inc. Teck

More information

November 27, Bethlehem No. 1 Tailings Storage Facility. Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0

November 27, Bethlehem No. 1 Tailings Storage Facility. Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0 INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION AND REVIEW REPORT Bethlehem No. 1 Tailings Storage Facility Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0 Attention:

More information

Former Brukunga Mine Site (SA) Lessons of a long-term remediation strategy

Former Brukunga Mine Site (SA) Lessons of a long-term remediation strategy Former Brukunga Mine Site (SA) Lessons of a long-term remediation strategy Dealing with Derelict Mines 2016 Raul Mollehuara Project Director / Operations Brukunga Mine Site Overview - Background - Brukunga

More information

Cooperating on Giant Mine Remediation

Cooperating on Giant Mine Remediation Cooperating on Giant Mine Remediation NOAMI Workshop October 26-27, 2006 Bill Mitchell Giant Mine Remediation Project Giant Mine C Shaft Headframe CON MINE Giant Mine Location 2 1 Giant Mine was commissioned

More information

Table of Contents. Nov. 2008

Table of Contents. Nov. 2008 Nov. 2008 What is involved? Electrical loads in Yukon are increasing. By 2011, Yukon Energy expects to need additional renewable power to help minimize the use of diesel to generate electricity. As outlined

More information

Controlling Surface Water at One of Canada s Largest Base Metals Operations: From Legacy Challenges to Environmental Award Winner

Controlling Surface Water at One of Canada s Largest Base Metals Operations: From Legacy Challenges to Environmental Award Winner Controlling Surface Water at One of Canada s Largest Base Metals Operations: From Legacy Challenges to Environmental Award Winner Greg Noack, P.Eng., Associate, Klohn Crippen Berger Ltd., Toronto ON. Lawrence

More information

Appendix P. U.S. Fish and Wildlife Service Planning Aid Letter

Appendix P. U.S. Fish and Wildlife Service Planning Aid Letter Appendix P U.S. Fish and Wildlife Service Planning Aid Letter This page is intentionally left blank. United States Department of the Interior FISH AND WILDLIFE SERVICE Missouri Ecological Services Field

More information

Information Request 37

Information Request 37 Information Request 37 Information Request 37 37-1 Response to Information Request 37 Response to Information Requests 37a Response to Information Requests 37b 37-3 37-5 Federal Review Panel Information

More information

Recommendations for consideration by Tribal Leaders in response to infrastructure consultation - National Tribal Water Council

Recommendations for consideration by Tribal Leaders in response to infrastructure consultation - National Tribal Water Council Recommendations for consideration by Tribal Leaders in response to infrastructure consultation - National Tribal Water Council Recommendation 1. Close the mining loopholes in the Clean Water Act Executive

More information

September 2016 ID Competency Statement Type

September 2016 ID Competency Statement Type September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for

More information

Planning a Complex Mine Remediation. Remediation Technologies Symposium October 14-16, 2015.

Planning a Complex Mine Remediation. Remediation Technologies Symposium October 14-16, 2015. Planning a Complex Mine Remediation Remediation Technologies Symposium October 14-16, 2015. History of Giant Mine Jurisdictions Stakeholders; interests Planning the Remediation Care & Maintenance Urgent

More information

TRANSBOUNDARY WATERS. Friends & Neighbors: Background on the Bilateral Working Group FALL Members of the Bilateral Working Group Alaska

TRANSBOUNDARY WATERS. Friends & Neighbors: Background on the Bilateral Working Group FALL Members of the Bilateral Working Group Alaska TRANSBOUNDARY WATERS FALL 2017 Friends & Neighbors: Background on the Bilateral Working Group British Columbia (B.C.) and Alaska share many common interests and have a long history of working together.

More information

Proceedings of the 18 th Annual British Columbia Mine Reclamation Symposium in Vernon, BC, The Technical and Research Committee on Reclamation

Proceedings of the 18 th Annual British Columbia Mine Reclamation Symposium in Vernon, BC, The Technical and Research Committee on Reclamation ARD GUIDELINES FOR MINE SITES IN BRITISH COLUMBIA William A. Price and John C. Errington Mine Review and Permitting Branch Ministry of Energy, Mines & Petroleum Resources 4th Floor, 1810 Blanshard Street

More information

Public Notice: Application for Permit

Public Notice: Application for Permit US Army Corps Of Engineers Walla Walla District 201 North Third Avenue Walla Walla, WA 99362-1876 Public Notice: Application for Permit APPLICATION : NWW-2008-00579 WATERWAY: Bruno Creek Drainage, Pat

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

Civil and Geotechnical Engineering

Civil and Geotechnical Engineering Imagine the result Imagine the result Civil and Geotechnical Engineering for the Mining Industry Innovative, Sustainable and Grounded Solutions At ARCADIS, we understand the environment and how to engineer

More information

Tailings Dams, Failures, and the proposed Casino Mine. February 23 rd, 2016 Hellaby Hall Presentation

Tailings Dams, Failures, and the proposed Casino Mine. February 23 rd, 2016 Hellaby Hall Presentation Tailings Dams, Failures, and the proposed Casino Mine February 23 rd, 2016 Hellaby Hall Presentation Topics to be covered Yukon Conservation Society Overburden and Waste Rock Tailings Dry and Wet Acid

More information

Nan Kay Ghawinji K e Dàkwäní Our way of life on this land Aishihik Dam Relicensing Update

Nan Kay Ghawinji K e Dàkwäní Our way of life on this land Aishihik Dam Relicensing Update Nan Kay Ghawinji K e Dàkwäní Our way of life on this land Aishihik Dam Relicensing Update July 2018 CAFN Yukon Energy Protocol Agreement CAFN and Yukon Energy entered into a co-management protocol agreement

More information

Northern Contaminated Sites Program Performance Report

Northern Contaminated Sites Program Performance Report Northern Contaminated Sites Program Performance Report 2011-2012 For information regarding reproduction rights, please contact: Public Enquiries Contact Centre Aboriginal Affairs and Northern Development

More information

Prosperity Gold-Copper Project MOE (Kym Keogh) Final Comments

Prosperity Gold-Copper Project MOE (Kym Keogh) Final Comments ID# COMMENT/ TASEKO RESPONSE COMMITMENT REQUIRED CURRENT STATUS OF 1. Analysis results for selenium in fish tissues by the Proponent were varied. Virtually all the results were greater than guidelines

More information

Proposed Millsite Reservoir Annual Dredging Sequence

Proposed Millsite Reservoir Annual Dredging Sequence Proposed Millsite Reservoir Annual Dredging Sequence Rollin H. Hotchkiss and Michael Suflita April 25, 2014 Figure 1 provides a basis for this discussion and shows both the median and average daily inflows

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

TVA Colbert Fossil Facility Ash Disposal Pond 4

TVA Colbert Fossil Facility Ash Disposal Pond 4 2011 World of Coal Ash (WOCA) Conference May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/ TVA Colbert Fossil Facility Ash Disposal Pond 4 Improving Operations While Preparing for Closure May 10,

More information

EVALUATION OF METAL TRANSPORT INTO AND OUT OF TERRACE RESERVOIR, CONEJOS COUNTY, COLORADO, APRIL 1994 THROUGH MARCH 1995

EVALUATION OF METAL TRANSPORT INTO AND OUT OF TERRACE RESERVOIR, CONEJOS COUNTY, COLORADO, APRIL 1994 THROUGH MARCH 1995 EVALUATION OF METAL TRANSPORT INTO AND OUT OF TERRACE RESERVOIR, CONEJOS COUNTY, COLORADO, APRIL 1994 THROUGH MARCH 1995 By Sheryl A. Ferguson U.S. Geological Survey, WRD 201 W. 8th Street, Suite 200 Pueblo,

More information

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band 11 August 2014 Presentation Outline General Introduction

More information

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA Overview Romania has built 2,617 dams out of which 246 are large and medium dams and 1260 are small dams, as per

More information

STAFF UPDATES FLOOD ZONE 9 ADVISORY BOARD MEETING

STAFF UPDATES FLOOD ZONE 9 ADVISORY BOARD MEETING STAFF UPDATES FLOOD ZONE 9 ADVISORY BOARD MEETING Ross Valley Watershed Flood Risk Reduction Program RossValleyWatershed.org Contact us: 415 473 7226; lizlewis@marincounty.org February 16, 2017 Photo:

More information

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV

More information

Jennifer S. Simmons, National Mine Land Reclamation Center, West Virginia University, Morgantown, WV.

Jennifer S. Simmons, National Mine Land Reclamation Center, West Virginia University, Morgantown, WV. Acid Mine Drainage Neutralization at Augusta Lake, Indiana Mike Kalagian, Office of Surface Mining, Indianapolis, IN Jennifer S. Simmons, National Mine Land Reclamation Center, West Virginia University,

More information

ROLE OF THE FIRM IN THE PROJECT

ROLE OF THE FIRM IN THE PROJECT PROJECT DESCRIPTION Lake Loramie Dam is a Class I dam located in Lake Loramie State Park in Minster, Ohio. Lake Loramie originally served as the high feeder water supply for the Miami-Erie Canal that began

More information

VISUAL SITE INSPECTION REPORT

VISUAL SITE INSPECTION REPORT VISUAL SITE INSPECTION REPORT - 2016 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00318 DECEMBER 20, 2016 PREPARED

More information

Keystone and Rising Star Mines Shasta County, California

Keystone and Rising Star Mines Shasta County, California CASE STUDY Keystone and Rising Star Mines Shasta County, California August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from

More information

Review of ML/ARD Geochemistry & Water Quality Predictions

Review of ML/ARD Geochemistry & Water Quality Predictions Review of ML/ARD Geochemistry & Water Quality Predictions Presented by Kim Bellefontaine, M.Sc., P.Geo. Senior Mine Review Geologist, MEMPR With contributions from: Kelly Sexsmith, M.S., P.Geo. Senior

More information

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 Agenda Introductions Purpose & Goals of Meeting Planning Area Master Plan Restoration Planning: Cost Estimates, Grants, Scope, Timeline

More information

For personal use only

For personal use only 23 January 2019 ASX: GRR HIGHLIGHTS Mining movements increased in Q4 after successful dewatering from the North Pit. Access to main ore zone restored. Cash and liquid investments of A$224.49 million and

More information

Pecos, New Mexico USA Lead-Zinc Mill Tailings Site: Case Study of a Durable Solution to an Inactive Mine Waste Pollution Problem Paul Robinson

Pecos, New Mexico USA Lead-Zinc Mill Tailings Site: Case Study of a Durable Solution to an Inactive Mine Waste Pollution Problem Paul Robinson Pecos, New Mexico USA Lead-Zinc Mill Tailings Site: Case Study of a Durable Solution to an Inactive Mine Waste Pollution Problem Paul Robinson Southwest Research and Information Center PO Box 4524 Albuquerque,

More information

Tecumseh AML Site 262 Warrick, Indiana

Tecumseh AML Site 262 Warrick, Indiana CASE STUDY Tecumseh AML Site 262 Warrick, Indiana August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from this publication

More information

JUNE 11, :00 4:00 PM MEETING NOTES

JUNE 11, :00 4:00 PM MEETING NOTES LOWER AMERICAN RIVER TASK FORCE TSAKOPOULOS LIBRARY GALLERIA 828 I STREET SACRAMENTO, CA JUNE 11, 2013 1:00 4:00 PM MEETING NOTES Agenda Item: Welcome, Introductions and Agenda Review See attached sign-in

More information

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014 INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT Giant Nickel Tailings Dams Submitted to: Barrick Gold Inc. PO Box 788 Penticton, BC V2A 6Y7 Attention: Robbin Harmati REPORT Reference Number: 1412161-003-R-Rev1-2000

More information

Re: Closure and Reclamation at Ekati

Re: Closure and Reclamation at Ekati Independent Environmental Monitoring Agency P.O. Box 1192, Yellowknife, NT X1A 2N8 Phone (867) 669 9141 Fax (867) 669 9145 Website: www.monitoringagency.net Email: monitor1@yk.com March 31, 2006 David

More information

SMARA Reclamation Standards Review

SMARA Reclamation Standards Review SMARA Reclamation Standards Review Focused Discussion SMARA Section 3704.1 - Performance Standards for Reclamation and Section 2711 Extraction of Minerals Essential to Well-Being of the State and the Needs

More information

Delta Mercury Tributary Council May 7, 2013 Izzy Martin and Bob Schneider. Water Bonds and Mercury Remediation in the Sierra and Coast Range

Delta Mercury Tributary Council May 7, 2013 Izzy Martin and Bob Schneider. Water Bonds and Mercury Remediation in the Sierra and Coast Range Delta Mercury Tributary Council May 7, 2013 Izzy Martin and Bob Schneider Water Bonds and Mercury Remediation in the Sierra and Coast Range Questions? 1. Do we have the facts correct? 2. Who should administer

More information

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe PHASE I ERNEST MINE COMPLEX Project Objectives The objective of the project was to develop an economically feasible, safe method of diverting all flows from the Ernest Mine Complex to a central discharge

More information

Environmental Risk Assessments of Coal Ash Impoundments

Environmental Risk Assessments of Coal Ash Impoundments 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Environmental Risk Assessments of Coal Ash Impoundments George M. Huddleston III, Kathy W. Webb, Heather

More information

Environmental Regulation & Mine Permitting in Ontario

Environmental Regulation & Mine Permitting in Ontario Environmental Regulation & Mine Permitting in Ontario A Presentation to the Ad Hoc Committee on Mining Lake Superior Work Group Mark O Brien, Mineral Development Consultant MNDMF, Thunder Bay Agenda Regulatory

More information

The legacy of the Cold War - Cleaning up Abandoned Uranium Mine Sites in North Saskatchewan

The legacy of the Cold War - Cleaning up Abandoned Uranium Mine Sites in North Saskatchewan The legacy of the Cold War - Cleaning up Abandoned Uranium Mine Sites in North Saskatchewan Alexey Klyashtorin, David Sanscartier, Mark Calette, Chris Reid, Skye Ketilson, and Ian Wilson Saskatchewan Research

More information

NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview

NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview 1 INTRODUCTION Screening level environmental impact assessment provided in application package Many of the potential

More information

The Gold King Mine Acid Drainage Spill

The Gold King Mine Acid Drainage Spill The Gold King Mine Acid Drainage Spill Janick F. Artiola, Extension Water Quality Specialist Department of Soil, Water & Environmental Science What Happened? Impacts What can Be Done To Prevent This? Flow

More information

Transport Canada Navigable Waters Protection Act & Canadian Environmental Assessment Act John Mackie and Linda Sullivan

Transport Canada Navigable Waters Protection Act & Canadian Environmental Assessment Act John Mackie and Linda Sullivan Transport Canada Navigable Waters Protection Act & Canadian Environmental Assessment Act John Mackie and Linda Sullivan 1 Transport Canada s participation in the Federal Review Panel Process Transport

More information

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Converting slurry tailings facilities to filtered dry stacks a case history John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Objectives General discussion on the geotechnical issues. Case

More information

Clowhom Project Water Use Plan Monitoring Programs Annual Report: For Water Licenses , and Conditional Water License

Clowhom Project Water Use Plan Monitoring Programs Annual Report: For Water Licenses , and Conditional Water License Monitor of Aquatic Wildlife in Wetlands Affected by Dam Operations Role of Littoral Zone in Governing Clowhom Reservoir Productive Capacity Validation of the Effective Littoral Zone Performance Measure

More information

Reclamation and Closure Cost Planning and Estimation and the Mining Life Cycle. Presenter: Lois Boxill, P.Eng., P.E.

Reclamation and Closure Cost Planning and Estimation and the Mining Life Cycle. Presenter: Lois Boxill, P.Eng., P.E. Reclamation and Closure Cost Planning and Estimation and the Mining Life Cycle Presenter: Lois Boxill, P.Eng., P.E. Overview Preludes to Closure Cost Estimation Reclamation and the Mining Life Cycle Public

More information

CDF059 Tributary Flow Augmentation, Version 4 January 25, 2013

CDF059 Tributary Flow Augmentation, Version 4 January 25, 2013 This form has been developed to document changes to the NorthMet Project (Project) and/or Project SDEIS Water Modeling resulting from the water modeling process. The forms will be used during the water

More information

Plan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission

Plan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission Plan Rollout Presentation July 31, 2014 Michael G. Hahn, P.E., P.H. Chief Environmental Engineer Southeastern Wisconsin Regional Planning Commission # 219703 Racine County Flooding Recommendations and

More information

Appendix M Part 1. Wetland Reserve Program. U.S. Army Corps of Engineers Memphis District

Appendix M Part 1. Wetland Reserve Program. U.S. Army Corps of Engineers Memphis District Appendix M Part 1 Wetland Reserve Program U.S. Army Corps of Engineers Memphis District St. Johns Bayou and New Madrid Floodway (SJNM) Project Wetlands Reserve Program (WRP) Introduction: The Wetlands

More information

Development of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine

Development of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine Development of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine TSF 1 TSF 2 November 28, 2018 TSF 3W TSF 3E Westwood Mine Cau$onary Statement 2 Outline Doyon-Bousquet-LaRonde

More information

II. STUDY RESULTS. In our opinion the following results may be presented based on the data contained in this report.

II. STUDY RESULTS. In our opinion the following results may be presented based on the data contained in this report. II. STUDY RESULTS In our opinion the following results may be presented based on the data contained in this report. STREAM QUALITY General: Seventy-one (71) stream reading stations were established on

More information

For 100 years private mining and refining

For 100 years private mining and refining June 2001 programs and initiatives The Deloro Mine Site Cleanup Project Through its cleanup actions the Ministry of the Environment has reduced the loadings of arsenic to the Moira River by more than 80

More information

Best Available Techniques & Prioritization of Mine Impacted Lands

Best Available Techniques & Prioritization of Mine Impacted Lands Best Available Techniques & Prioritization of Mine Impacted Lands The Gold Rush Hydraulic Mining Hard Rock Mining Mercury Entrained in the Sediment Deer Creek 1908 Greenhorn Creek 2011 Heavy Metals & Physical

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

Sunnyhurst & Earnsdale Impounding Reservoirs reducing the risk of failure

Sunnyhurst & Earnsdale Impounding Reservoirs reducing the risk of failure Sunnyhurst & Earnsdale Impounding Reservoirs reducing the risk of failure by Gary Harrison S unnyhurst and Earnsdale Impounding Reservoirs (IR) are situated 1.5km to the west of Darwen town centre in Lancashire

More information

Newsletter BMC. 5Th Edition. June, Our formal tender process for the 2016 field program at Kudz Ze Kayah has concluded based on

Newsletter BMC. 5Th Edition. June, Our formal tender process for the 2016 field program at Kudz Ze Kayah has concluded based on 5Th Edition BMC Newsletter June, 2016 LOCAL CONTRACTORS Our formal tender process for the 2016 field program at Kudz Ze Kayah has concluded based on performance capacity, safety and transparency. Nearly

More information

Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects

Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects TECHNICAL MEMORANDUM Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects TO: COPIES: PREPARED BY: Tulsa County File CH2M HILL DATE: September 2,

More information

Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management

Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management MEMORANDUM To: From: Subject: Mr. Brent Murphy, Vice President Environment Affairs Dirk van Zyl, Principal Engineer Review Comments

More information

GREENS CREEK MINE FINANCIAL ASSURANCE REVIEW

GREENS CREEK MINE FINANCIAL ASSURANCE REVIEW 1.0 Introduction GREENS CREEK MINE FINANCIAL ASSURANCE REVIEW Page 1 of 8 Sarah Zuzulock, MS Center for Science in Public Participation June 2003 The Greens Creek mine is a joint venture between Kennecott

More information

Seasonal and Pumped Storage Hydro Opportunity Search in the Carmacks to Faro Road and Power Line Corridor, An Office Study

Seasonal and Pumped Storage Hydro Opportunity Search in the Carmacks to Faro Road and Power Line Corridor, An Office Study Seasonal and Pumped Storage Hydro Opportunity Search in the Carmacks to Faro Road and Power Line Corridor, An Office Study Prepared for Yukon Conservation Society (YCS) June 25, 2015 Prepared by John F.

More information

INAC NortherN CoNtAmINAted sites ProgrAm Progress report

INAC NortherN CoNtAmINAted sites ProgrAm Progress report INAC No r t h e r n Co n t a m i n a t e d Sites Program Pr o g r e s s Re p o r t 2005-2010 Published under the authority of the Minister of Indian Affairs and Northern Development and Federal Interlocutor

More information

May 2009 Semiannual Report

May 2009 Semiannual Report Environment Submitted to: Submitted by: CNA Holdings, Inc. AECOM Dallas, Texas Atlanta, Georgia 60135443 November 2009 May 2009 Semiannual Report Needmore Road Landfill Facility Salisbury, North Carolina

More information

The following is a short summary of the definitions and acronyms associated with the evaluation process.

The following is a short summary of the definitions and acronyms associated with the evaluation process. CERCLA Activities in the Granite Creek Watershed Past Mining Activity Portions of the watershed were severely altered by lode and placer mining activities from the late 1800s up to 1950s. Mining effects

More information

Monitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio

Monitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio Monitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio Prepared by: EnviroScience, Inc. 5070 Stow Rd Stow OH 44224 (330) 688-0111 Year Ending: December 31, 2013 I. Project Overview The following

More information

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance Independent Expert Engineering Investigation and Review Panel Report on Mount Polley Tailings Storage Facility Breach Appendix G: Water Balance January 30, 2015 Report on Mount Polley Tailings Storage

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

Human Health and Ecological Risk Assessment at Teck Cominco s Kimberley Operations:

Human Health and Ecological Risk Assessment at Teck Cominco s Kimberley Operations: Human Health and Ecological Risk Assessment at Teck Cominco s Kimberley Operations: Overview of Regulatory Process and Preliminary Findings of the Problem Formulation Authors: C. Wilson, P.Eng., R.Wilson,

More information

Use of Conceptual Site Models to Support EMA Effluent Permit Applications

Use of Conceptual Site Models to Support EMA Effluent Permit Applications Use of Conceptual Site Models to Support EMA Effluent Permit Applications Version 1.2 March 2018 Prepared by: Ministry of Environment and Climate Change Strategy Use of Conceptual Site Models to Support

More information