1 Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band 11 August 2014
2 Presentation Outline General Introduction Background: Tailings Dams and Causes of Tailings Dam failure Mt. Polley failure Mt. Polley disaster what next? Four key factors that influence mine tailings dam safety Ideas for Secwepemc to prevent this ever happening in Secwepemc territory
3 Disclaimer Dr. Andrea Kennedy and Bridgeway Consulting Inc. has had no direct involvement with the Mt. Polley mine, Mt. Polley tailings dam nor the Mt. Polley disaster. All information presented in this presentation is available from public sources. Any opinions provided by Dr. Kennedy are hers alone and based on her previous experience, not based on knowledge of the Mt. Polley mine and disaster directly. The information provided is presented as background only and not as advice. No decisions of any kind should be made based on this presentation. Dr. Andrea Kennedy is a professional engineer (nonpracticing ) with a Masters of Applied Science degree in civil engineering, water resources. Her research focussed on mine tailings impoundments and water management.
4 Background Tailings Tailings are extremely fine waste rock produced through the milling process at mines. High water content makes tailings difficult to manage, store and control. Tailings ponds or Tailings Storage Facilities TSFs are: embankment type dams, often built with a starter core of clay and till to prevent seepage. TSF sometimes used to store other waste or submerge PAG The relative volume of tailings from mines is increasing as ore quality and availability is decreasing.
5 Background Tailings and Dams Nearly 2,000 total dams in BC, most are earth-fill Possibly 200 are tailings dams Approximately one failure per year, mostly small dams and low consequence (for the years , MoE memorandum). ICOLD reports 36,000 large dams world wide with a failure rate of 1%. ICOLD reports tailings dams have double the failure rate of other large dams.
6
7 Typical Mechanisms of Failure The #1 cause of tailings dam failures has been unusual weather followed closely by management, in the period Overtopping as a precursor of dam failure, or primary cause. Overtopping can be due to inadequate spillway design, debris blockage of spillways, or settlement of the dam crest 2. Foundation defects, including settlement and slope instability 3. Piping which is internal erosion caused by seepage, is the third main cause. Seepage often occurs around hydraulic structures, such as pipes and spillways; through animal burrows; around roots of woody vegetation; and through cracks in dams, dam appurtenances, and dam foundations. 4. Structural failure of the materials used in dam construction 5. Inadequate maintenance. Source: ICOLD
8 Background: Mt. Polley Imperial Metals is a mid-sized BC-based mining company with extensive mine operating experience. Mt. Polley mine is a copper, gold mine and has held permits since There are still many unknowns Unknowns include: what led to the breach of the dam how severe the environmental damage will be when Imperial Metals will be able to stop the flow of fluid and tailings from the tailings storage pond consistency of the sediment/tailings content of the tailings who is responsible how the damage will be cleaned up and/or remediated
9 Mt. Polley Disaster What We Know Mt. Polley tailings dam breached August 4, million cubic metres of wastewater and 4.5 million cubic metres of contaminated tailings were released.
10
11
12
13
14
15 Mt. Polley Disaster What We Know Mt. Polley tailings dam breached August 4, million cubic metres of wastewater and 4.5 million cubic metres of contaminated tailings were released. 300 Imperial Metals employees are working on site, particularly on the temporary dyke to contain the tailings. Drinking water quality guidelines are currently met in most of Quesnel River. Ministry says Fraser River and Fraser River fish not affected.
16 Mt. Polley Disaster What We Know Much of the information about mine tailings ponds and dams is only available through FOI. BC MoE Reputable engineering firm, Knight Piesold completed their stint as engineer of record with the following warning sent to government and Imperial Metals: The embankments and the overall tailings impoundment are getting large and it is extremely important that they be monitored, constructed and operated properly to prevent problems in the future, Knight Piesold, managing director Ken Brouwer Technically, experts say that pore water pressures, freeboard and exposed beach are important factors in stability. According to public sources, Imperial Metals had begun research into water treatment with UBC for the discharge of water.
17 Mt. Polley What We Know The Ministry of Energy and Mines conducted a geotechnical inspection at the mine in September 2013, which resulted in no inspection orders related to the tailings facility. May 24, 2014: The ministry issued an advisory to Mount Polley Mining Corporation for exceedance of the height of effluent within the tailings impoundment. The effluent level returned to authorized levels commencing June 30, Brief extreme weather experienced in the Kamloops region at end of July, Link to Mt. Polley disaster unknown. Last measurements in early August 2014 indicated water levels were acceptable. At the time of the May incident, the distance between the water elevation and the crest of the dam (freeboard) was less than 1 meter. The water returned to authorized levels and freeboard was approximately 2.4 meters when last measured on Aug. 3. Mine records show that the operation was carrying out visual dam inspections and measuring freeboard at an acceptable frequency.
18 What next? For the Mt. Polley case, the path forward is unknown. Based on other dam failures: Multi-year clean up, largely funded by government. (Note that an August 9 th government bulletin said all clean-up would be funded by Imperial Metals.) Excavation of slurry / sediment Finger pointing in all directions Court cases and appeals Los Frailes tailings dam failed in Spain in Still in court in (15 years). Mining company Boliden. Boliden experienced another failure at Atitkek Sweden in 2000.
19 Four Key Factors 1. Regulations and Enforcement (what must be done) 2. Company Policies and Procedures (what corners are cut or what extra can be done) 3. Quality of Professional Services (Quality of advice, design, and maintenance work) 4. Natural effects (rain, floods, climate, embankment material variation, earthquakes, etc.)
20 Factor 1: Regulations Multiple Ministries with responsibilities for mine tailings ponds Dam safety regulations that apply to tailings dams are somewhat unclear, but typically the CDA Dam Safety Guidelines 2007 (and 2013 update) MoE Dam Safety Program suggests there are risks related to the regulation and management of tailings dams outside the MoE MoE suggested an internal review of all consequence classifications of dams. 2013/2014 Renewed MOU between Ministries renewing the MEMPR responsibility for tailings dams.
21 Factors 2 and 3: Company Policies and Procedures and Quality of Professional Services Unknown for Imperial Metals Evidence from other disciplines: Working with First Nations, consultation and consent.
22 Factor 4 Natural elements Reinstate meaningful regional hydrologic monitoring. Create some predictive capability that considers uncertainty of climate change for many elements. Review flood estimation practices.
23 Thoughts on Steps for Secwepemc Within a detailed Secwepemc mining policy, require: First Nation consent on the Hazard Classification of all dams. Best practices or clear minimum standards for design, maintenance, etc. Advocate for clear, specific mine tailings dam and TSF guidelines including for closure, specific to tailings. Provide Input Into Existing Regulations Inspection frequency Penalties
Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance
Independent Expert Engineering Investigation and Review Panel Report on Mount Polley Tailings Storage Facility Breach Appendix G: Water Balance January 30, 2015 Report on Mount Polley Tailings Storage
More informationPeter Lighthall, P.Eng. Consulting Geotechnical Engineer
Peter Lighthall, P.Eng. Consulting Geotechnical Engineer Cassiar Gold Corp. China Minerals Mining Corporation Suite 1100 1111 Melville Street Vancouver, BC V6E 3V6 Attn: Re: Ms. Patricia Fong Independent
More informationREPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014
INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT Giant Nickel Tailings Dams Submitted to: Barrick Gold Inc. PO Box 788 Penticton, BC V2A 6Y7 Attention: Robbin Harmati REPORT Reference Number: 1412161-003-R-Rev1-2000
More informationMOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY
MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001
More informationThe Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997.
November 27, 2014 KGHM Ajax Mining Inc. Ajax Project Suite 200-124 Seymour Street Kamloops, BC V2C 2E1 ISSUED FOR USE FILE: V15103098-01 via Email: kate.parsons@kghm.com Attention: Subject: Kate Parsons,
More informationDankoe Mine. Report on 2014 Dam Safety Inspection of Tailings Storage Facility
Peter Lighthall, P.Eng Consulting Geotechnical Engineer Dankoe Mine Report on of Tailings Storage Facility Report prepared for 439813 BC Ltd. December 4, 2014 Peter Lighthall, P.Eng. Consulting Geotechnical
More informationVolume II: Hazard Annex Dam Failure
Volume II: Hazard Annex Dam Failure Causes and Characteristics of Dam Failure Dam Characteristics Dams are impervious structures that block the flow of water in a river or stream, capturing water behind
More informationMount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T F
Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T 250.790.2215 F 250.790.2613 May 21, 2015 Ministry of Environment Mining Operations Environmental Protection 2080 Labieux
More informationMOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY
MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY OPERATION, MAINTENANCE AND SURVEILLANCE MANUAL Rev. No. Revision Date Approved 0 Issued in Final December 22, 2004 1 Issued in
More informationMount Polley Mining Corporation IMPERIAL METALS CORPORATION
Mount Polley Mining Corporation IMPERIAL METALS CORPORATION 1--\Poo l4 ;;L- February 16, 2006 Nick Rose, P. Eng. Piteau Associates Engineering Ltd. 215-260 West Esplanade North Vancouver, BC V7M3G7 Dear
More informationNovember 27, Bethlehem No. 1 Tailings Storage Facility. Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0
INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION AND REVIEW REPORT Bethlehem No. 1 Tailings Storage Facility Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0 Attention:
More informationJune 30, 2015 Project No.: C Mr. Kent Christensen, P.Eng. General Manager Huckleberry Mines Limited PO Box 3000 Houston BC, V0J 1Z0
Suite 500-980 Howe Street Vancouver, BC Canada V6Z 0C8 Telephone (604) 684-5900 Fax (604) 684-5909 June 30, 2015 Project No.: 1193-005-C Mr. Kent Christensen, P.Eng. General Manager Huckleberry Mines Limited
More informationTailings Design and Operation Safety!
Tailings Design and Operation Safety! 1 January 13, 2016 You may have heard about: Mount Polley Buenavista de Cobre KUC Pinto Valley 2 January 13, 2016 Recent Case Events! August 4, 2014-Imperial Metals,
More informationReview of the 2014 Annual Dam Safety Inspection Report, 2-North Pit Tailings Disposal Facility, Quinsam Coal Mine
November 24, 2014 Quinsam Coal Corporation Hillsborough Resources Limited PO BOX 5000 Campbell River BC V9W 8A3 ISSUED FOR USE FILE: V15103102-01 via Email: gbg@hillsboroughresources.com Attention: Subject:
More informationTailings Storage Facility Conceptual Closure Plan Alternatives Assessment
Appendix 17.4-C Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment AJAX PROJECT Environmental Assessment Certificate Application / Environmental Impact Statement for a Comprehensive
More informationDirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management
Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management MEMORANDUM To: From: Subject: Mr. Brent Murphy, Vice President Environment Affairs Dirk van Zyl, Principal Engineer Review Comments
More informationKnight Piésold TAILINGS FACILITY 2014 DAM SAFETY INSPECTION REPORT BARRICK GOLD INC. GIANT NICKEL MINE. C O N S U L T I N G
TAILINGS FACILITY PREPARED FOR: Barrick Gold Nickel Plate Mine PO Box 788 Penticton, BC V2A 6Y7 PREPARED BY: Knight Piésold Ltd. Suite 1400 750 West Pender Street Vancouver, BC V6C 2T8 Canada p. +1.604.685.0543
More informationRESPONSE TO BCMEM SCREENING COMMENTS QUANTITATIVE PERFORMANCE OBJECTIVES
DATE January 27, 2016 REFERENCE No. TO Mr. Luke Moger Mount Polley Mining Corporation FROM Germán Pizarro and Terry Eldridge EMAIL German_Pizarro@golder.com; Terry_Eldridge@golder.com RESPONSE TO BCMEM
More informationReview of ML/ARD Geochemistry & Water Quality Predictions
Review of ML/ARD Geochemistry & Water Quality Predictions Presented by Kim Bellefontaine, M.Sc., P.Geo. Senior Mine Review Geologist, MEMPR With contributions from: Kelly Sexsmith, M.S., P.Geo. Senior
More informationMOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY
MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY OPERATION, MAINTENANCE AND SURVEILLANCE MANUAL Rev. No. Revision Date Approved 0 Issued in Final December 22, 2004 1 Issued in
More informationDecember 12, 2014
www.knightpiesold.com File No.:VA101-246/41-A.01 Cont. No.:VA14-01866 Kate Parsons Environmental Manager KGHM Ajax Mining Inc. 200-124 Seymour St. Kamloops, British Columbia Canada, V2C 2E1 Dear Kate,
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]
Diversion Channels DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent
More informationTailings mobilization estimates for dam breach studies
Tailings mobilization estimates for dam breach studies Daniel Fontaine, P.Eng, Violeta Martin, Ph.D., P.Eng, Knight Piésold Ltd., Vancouver, BC, Canada ABSTRACT Quantitative assessment of potential consequences
More informationDAMS AND OTHER HYDRAULIC STRUCTURES
GAP.2.9.1 A Publication of Global Asset Protection Services LLC DAMS AND OTHER HYDRAULIC STRUCTURES INTRODUCTION The purpose of a dam evaluation is to review the design, construction and performance history
More informationREPORT. Phase 1: Review Possibility of Mount Polley Mine Conditions at Afton TSF site
GEOTECHNICAL ENGINEERING SERVICES FOR AFTON TAILINGS STORAGE FACILITY Phase 1: Review Possibility of Mount Polley Mine Conditions at Afton TSF site Submitted to: Crystal Vandermeulen KGHM Ajax Mining Inc.
More informationUnderstanding of foundation conditions, water balance adequacy and filter adequacy at the closed Nickel Plate tailings impoundment near Hedley, BC
Barrick Gold Corporation 460 West 50 North, Suite 500 Salt Lake City, Utah 84101 27 June 2015 Al Hoffman, P.Eng. Chief Inspector and Executive Director, Health & Safety British Columbia Ministry of Energy
More informationKeeyask Generation Project. Physical Environment. Supporting Volume. Environmental Impact Statement
Keeyask Generation Project Environmental Impact Statement Supporting Volume Physical Environment June 2012 KEEYASK GENERATION PROJECT SUPPORTING VOLUME EFFECTS OF THE ENVIRONMENT ON THE PROJECT June 2012
More informationPERMIT AMENDMENT APPLICATION
Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T 250.790.2215 F 250.790.2613 PERMIT AMENDMENT APPLICATION UNDER THE BRITISH COLUMBIA MINES ACT MOUNT POLLEY MINE RETURN
More informationJuly 7, 2008 File: Mine No.:
.._. i53s4 BRITISH COLUMBIA The Best Place on Earth July 7, 2008 File: 18040-02-07 Mine No.: 1101163 Tim Fisch Mount Polley Mining Corporation Po Box 12 Likely BC, VOL 1 NO Dear Sir: Re: Mine Inspection
More informationFormal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information
Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information Name of Dam: Inspection Date: Current Weather: Weather During Last Week: Name of Creek,
More informationMemorandum of Understanding Regulation of Impoundments and Diversions on a Mine Site
Memorandum ofunderstanding between the Ministry ofenergy and Mines (MEM), the Ministry offorests, Lands and Natural Resource Operations (MFLNRO), and the Ministry of Environment (MoE), outlining the responsibilities
More informationVia October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226
17 October 2016 134 N. La Salle Street, Suite 300 Chicago, Illinois 60602 PH 312.658.0500 FAX 312.658.0576 www.geosyntec.com Via Email Mr. William Neal, P.E. Technological Specialist DTE Electric Company
More informationFactors affecting health of Ash Dyke and Preventive Measures. Kukreti RC Chowdhury Ujjwal Naresh D N
Factors affecting health of Ash Dyke and Preventive Measures Kukreti RC Chowdhury Ujjwal Naresh D N 1 1 ENVIRONMENTAL REGULATIONS Before any construction activity - MOEF clearance is a must MOEF stipulation
More informationSMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016
SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More informationCCR Rule Annual Inspection Report 2
Inspection Description An ARCADIS team performed the Trimble County Gypsum Storage Pond (GSP) 2015 annual inspection by a qualified professional engineer. The overall goal of the inspection was to ensure
More informationNew Gold Inc. Independent Third Party Review. Dam Safety Inspection Report. November 2014 M09783A04.730
November 2014 M09783A04.730 November 28, 2014 New Gold Inc. New Afton Box 948 Stn. Main, Kamloops, British Columbia V2C 5N4 Mr. Scott Davidson Environment and Social Responsibility Manager Dear Mr. Davidson:
More informationQ93 SAFETY. Gerald Zenz. Graz University of Technology Institute of Hydraulic Engineering and Water Resources Management
Q93 SAFETY Gerald Zenz Graz University of Technology President of Austrian National Committee on Large Dams 1 Dams - Important Infrastructure Hydropower Irrigation Drinking water Flood Protection Integral
More informationJim Bridger Power Plant
2015 Coal Combustion Residuals Annual Inspection Jim Bridger Power Plant Industrial Landfill Prepared for PacifiCorp Energy North Temple Office 1407 West North Temple Salt Lake City, Utah 84116 Final December
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More informationDraft Mine Closure Plan. 17 October 2018 Longlac & Geraldton
Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval
More informationReference No L-Rev0-1000
June 29, 2015 Reference No. Mr. Mark Slater Teck Coal Limited Greenhills Operations PO Box 5000 Sparwood, BC V0B 1H0 RESPONSE TO MINISTRY OF ENERGY AND MINES MEMORANDUM DATED FEBRUARY 3, 2015, REGARDING
More informationMaterial properties of Tailings from Swedish mines
Material properties of Tailings from Swedish mines I. Jantzer Luleå University of Technology, Sweden, Isabel.Jantzer@ltu.se A. Bjelkevik Sweco AB, Sweden, Annika.Bjelkevik@sweco.se K. Pousette Luleå University
More information19 November 2014 TE VIA COURIER. Glencore Canada Corporation P.O. Box King Street West, Suite 7200 Toronto, ON M5X 1E3
19 November 2014 TE143006 VIA COURIER Glencore Canada Corporation P.O. Box 405 100 King Street West, Suite 7200 Toronto, ON M5X 1E3 Attention: Mr. John Stroiazzo Reclamation Manager Dear John; Reference:
More informationModified Centreline Construction of Tailings Embankn1ents
Modified Centreline Construction of Tailings Embankn1ents J.P. Haile & K.J. Brouwer Knight Piesold Ltd. Consulting Engineers Suite 1400-750 West Pender Street Vancouver, B.C., Canada V6C 2T8 Abstract:
More information2017 ANNUAL DAM AND DIKE INSPECTION REPORT
2017 ANNUAL DAM AND DIKE INSPECTION REPORT ASH PONDS WELSH POWER PLANT CASON, TEXAS November, 2017 Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS-17-067
More informationBAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future
BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future Andy Fourie School of Civil, Environmental & Mining Engineering 1 BAP or BAT?
More informationBRALORNE TAILINGS STORAGE FACILITY UPDATED 2014 ANNUAL DAM SAFETY INSPECTION
BRALORNE TAILINGS STORAGE FACILITY UPDATED 2014 ANNUAL DAM SAFETY INSPECTION PREPARED FOR NOVEMBER 21, 2014 ISSUED FOR USE FILE: V15103090-01 Tetra Tech EBA Inc. 150, 1715 Dickson Avenue Kelowna, BC V1Y
More information2018 Annual Dam and Dike Inspection Report
218 Annual Dam and Dike Inspection Report Bottom Ash Pond Northeastern 3&4 Plant Public Service Company of Oklahoma Oologah, Oklahoma September 218 Prepared for: Public Service Company of Oklahoma Northeastern
More informationAnnual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station
Annual Inspection Report CCR Surface Impoundment MidAmerican Energy Company, Louisa Generating Station Final January 15, 2016 Annual Inspection Report CCR Surface Impoundment Prepared for MidAmerican Energy
More informationPonds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.
POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made
More informationTailings Storage and Heap Leaching in a Combined Facility A First for the Mining Industry
Tailings Storage and Heap Leaching in a Combined Facility A First for the Mining Industry Thomas F. Kerr, P.E., Knight Piésold and Co. Michael G. Skurski, P.E., Newmont Mining Co. Peter D. Duryea, Ph.D.,
More informationDam Safety and Seismicity
Dam Safety and Seismicity January 13, 2014 Fort St. John, BC John Nunn, P.Eng, M.Sc., M.I.C.E Chief Project Engineer Tim Little, P. Eng. Topics 1. The Practice of Dam Safety in BC Hydro 2. Bennett Dam
More informationSEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA
SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA Overview Romania has built 2,617 dams out of which 246 are large and medium dams and 1260 are small dams, as per
More information11.1 INTRODUCTION 11.2 SLOPE MANAGEMENT SYSTEM 11.1 GEOTECHNICAL AND SLOPE STABILITY
CHAPTER 11. GEOTECHNICAL AND SLOPE STABILITY 11.1 INTRODUCTION Geotechnical and stability related problems can occur on cut and fill slopes. These can be in the following forms: Subsidence resulting in
More informationBlack Butte Copper Project Mine Operating Permit Application (Revision 3) Water Management During Construction and Operations
Black Butte Copper Project Mine Operating Permit Application (Revision 3) APPENDIX K-2: Water Management During Construction and Operations Tintina Montana, Inc. July 2017 www.knightpiesold.com Mr. Bob
More informationUnderstanding of foundation conditions, water balance adequacy and filter adequacy at the closed Snip tailings impoundment in northwest BC
Barrick Gold Corporation 460 West 50 North, Suite 500 Salt Lake City, Utah 84101 27 June 2015 Al Hoffman, P.Eng. Chief Inspector and Executive Director, Health & Safety British Columbia Ministry of Energy
More informationDam Safety Inspection Report
Tel. (778) 899-5500 e-mail: JRTGeoEngineering@shaw.ca Dam Safety Inspection Report To: SnipGold Corp. Attention: Mr. Jon Zbeetnoff, President From: J. Roland Tosney, P.Eng. Subject: Johnny Mountain Mine
More informationChapter 11 Environment Regulating Industrial Wastewater Systems 1.0 MAIN POINTS
Chapter 11 Environment Regulating Industrial Wastewater Systems 1.0 MAIN POINTS Industrial activities (e.g., mining) generate wastewater. Industrial wastewater can contain various contaminants that are
More informationMcElroy s Run Impoundment Coal Combustion Residual Annual Report
Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia GAI Project Number: C150917.01 January 2016 Prepared for: Allegheny Energy Supply Company,
More informationFORM B: DAMMING AND DIVERSION OF WATER
APPLICATION FOR RESOURCE CONSENT FORM B: DAMMING AND DIVERSION OF WATER NOTES Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan
More informationAmerican Water Resources Association Philadelphia Metropolitan Area Section
American Water Resources Association Philadelphia Metropolitan Area Section Levee Evaluation and Certification under the NFIP November 18, 2010 Insert picture(s) here Agenda Background and Overview Flood
More information2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA. June 2015
2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA June 2015 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS,
More informationThird Party Review of Dam Safety Inspection Report MAX Molybdenum Mine
Third Party Review of Dam Safety Inspection Report MAX Molybdenum Mine Prepared for Forty Two Metals Inc. Prepared by SRK Consulting (Canada) Inc. 1CF011.000 December 2014 Third Party Review of Dam Safety
More informationFilter Tube Barriers (Instream)
Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo
More informationSTRUCTURAL STABILITY ASSESSMENT. Bremo Power Station CCR Surface Impoundment: North Ash Pond STRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT Bremo Power Station CCR Surface Impoundment: North Ash Pond ~,Dominion Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff,
More informationGENERAL NOTES ENGINEERS OVERSIGHT 1. ALL ELEVATIONS, DIMENSIONS, ALIGNMENTS AND ORIENTATION OF ALL ELEMENTS SHOWN IN THE PLANS MUST BE APPROVED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE ( REP ENGINEER
More informationTypes of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams
BIA Summer Water Resources Training Dam Safety Inspections Part 4 - Inspections July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Types of Inspections Periodic Inspections A comprehensive visual
More informationDevelopments in the Safety and Security of Mining Industry Dams
Developments in the Safety and Security of Mining Industry Dams John W. Fredland, P.E. Civil Engineer / Dam Safety Officer Mine Safety and Health Administration Tailings and Mine Waste `08 Conference Dam-Safety
More informationMOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE DESIGN OF THE TAILINGS STORAGE FACILITY TO ULTIMATE ELEVATION (REF. NO.
MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE DESIGN OF THE TAILINGS STORAGE FACILITY TO ULTIMATE ELEVATION (REF. NO. VA101-001/08-1) Rev. No. Revision Date Approved 0 Issued for Report March 14, 2005
More informationApplication for resource consent Form B Damming and diversion of water
Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or
More informationHISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY
HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:
More informationEnviroLeg cc NATIONAL WATER Reg p 1
EnviroLeg cc NATIONAL WATER Reg p 1 GN. 704 GG20119 4 June 1999 NATIONAL WATER ACT, 1998 (ACT NO. 36 OF 1998) REGULATIONS ON USE OF WATER FOR MINING AND RELATED ACTIVITIES AIMED AT THE PROTECTION OF WATER
More informationTailings System Safety Review for the Quirke Tailings Management Area in Elliot Lake
Tailings System Safety Review for the Quirke Tailings Management Area in Elliot Lake Shiu N. Kam (Golder Associates Ltd.) Maxine A. Wiber (Rio Algom Limited) Roger A. Payne (Consultant) John B. Davis (Golder
More informationImportant Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013
11 th PURDUE GEOTECHNICAL SOCIETY WORKSHOP Important Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013 Outline Introduction Brief history of evolution of filter design criteria Design
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationCoal Combustion Residuals Unit Structural Stability Assessment
Coal Combustion Residuals Unit Structural Stability Assessment Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C1500035.00
More information2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX
2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX GERS-16-168 OKLAUNION POWER STATION VERNON, TEXAS PREPARED BY AEP SERVICE CORPORATION CIVIL ENGINEERING DIVISION GEOTECHNICAL ENGINEERING SECTION 1
More information2017 Annual Dam and Dike Inspection Report
2017 Annual Dam and Dike Inspection Report Bottom Ash Pond Complex Mitchell Plant Wheeling Power Company & Kentucky Power Company Marshall County, West Virginia October 20, 2017 Prepared by: American Electric
More informationFailure Consequence Classification
Failure Consequence Classification Audience: Dam Safety Officers (DSO) Owners of small dams Community emergency preparedness coordinators Introduction This document provides an overview of failure consequence
More informationDTE Energy St. Clair Power Plant
DTE Energy St. Clair Power Plant Unit 6 Scrubber Basins CCR Rule Compliance Project Annual Inspection Report - 2017 Project Number: 60546402 June 30, 2017 Prepared by: 27777 Franklin Road, Suite 2000 Southfield,
More information2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016
2016 ANNUAL DAM AND DIKE INSPECTION REPORT Bottom Ash Ponds Rockport Plant Spencer County, Indiana December 6 th, 2016 Prepared for: Indiana Michigan Power Company Rockport Plant 2791 North US 231 Rockport,
More informationTAILING & HEAP LEACH FACILITY MANAGEMENT PURPOSE & OBJECTIVES CONTENT. 1. Planning & Design
PURPOSE & OBJECTIVES This Tailing & Heap Leach Facility Management Standard (the Standard ) sets the minimum Newmont requirements for the design and management of tailing storage facilities (TSF) and heap
More informationAnnual Inspection Report North CCR Surface Impoundment. MidAmerican Energy Company, Walter Scott Energy Center
Annual Inspection Report North CCR Surface Impoundment MidAmerican Energy Company, Walter Scott Energy Center Rev 0 July 2018 Annual Inspection Report North CCR Surface Impoundment Prepared for MidAmerican
More informationFINAL REPORT DAM SAFETY REVIEW. Mount Polley Mine Likely, British Columbia. Submitted to:
AMEC Earth & Environmental a division of AMEC Americas Limited 2227 Douglas Road, Burnaby, BC Canada V5C 5A9 Tel +1 (604) 294-3811 Fax +1 (604) 294-4664 www.amec.com FINAL REPORT DAM SAFETY REVIEW Mount
More informationDTE Energy Monroe Power Plant
DTE Energy Monroe Power Plant Inactive Bottom Ash Impoundment CCR Rule Compliance Project Annual Inspection Report - 2018 Project Number: 60516675 September 7, 2018 Prepared by: 27777 Franklin Road, Suite
More information2017 Annual Surface Impoundment Inspection
2017 Annual Surface Impoundment Inspection Cell 3 Prepared for Minnkota Power Cooperative, Inc. Milton R. Young Station January 2018 2017 Annual Surface Impoundment Inspection Cell 3 Prepared for Minnkota
More informationMontana Resources. Conceptual Plans for Permitting Continued Mining Through May 2016
Montana Resources Conceptual Plans for Permitting Continued Mining Through 2040 May 2016 Existing Permit Open pit currently permitted to produce ore in excess of 20 years; Sufficient non ore (waste) rock
More informationIMPERIAL METALS CORPORATION
Mount Polley Mining Corporation IMPERIAL METALS CORPORATION 2010 Environmental and Reclamation Report Submitted to: Ministry of Energy and Mines And Ministry of Environment Prepared by: Mount Polley Mining
More informationA Review of the Report on Mount Polley Tailings Storage Facility Breach, Independent Expert Engineering Investigation and Review Panel
A Review of the Report on Mount Polley Tailings Storage Facility Breach, Independent Expert Engineering Investigation and Review Panel David M Chambers Center for Science in Public Participation Revised
More informationEarth Brickwork Concrete Plain Radial Drum Roller Flap. fixed. Weirs Barrages. mobile. rockfills. Gravity butress Arch Arch-gravuty Cupola.
Dams type 1 Weirs Barrages fixed mobile Earth Brickwork Concrete Plain Radial Drum Roller Flap embankment Earthfills rockfills Dams Concrete gravity Arch Gravity butress Arch Arch-gravuty Cupola 2 Dams
More informationResources are available to assist you in completing this analysis in the Risk Analysis Resources section.
Hazard Risk Analysis Dam Failure and Structural Collapse Dam Failure Structural Collapse Buildings Structural Collapse - Transportation Dam Failure and Structural Collapse This section covers both dam
More informationGeotechnical Design and Factors of Safety
Geotechnical Design and Factors of Safety Technical Bulletin Ontario Ministry of Natural Resources This publication is available online at: Ontario.ca/dams Ces documents sont offerts en anglais seulement
More informationCoal Combustion Facility Assessment Report. October 20, 2010
Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians
More informationDAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District
DAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District COL Reinhard Koenig, PE Commander, USACE Alaska District Patricia S. Opheen, PE Chief, Engineering Division
More informationTypes of Inspections
BIA Summer Water Resources Training Dam Safety Inspections Part 4 - Inspections July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Types of Inspections Periodic Inspections A comprehensive visual
More informationTailings Dams: When We Start Worrying. Clara Balasko, MSc, PE Dave Bentel
Tailings Dams: When We Start Worrying Clara Balasko, MSc, PE Dave Bentel Operational Monitoring Why operational monitoring is important Indication that this is an issue before incident occurs What to monitor
More informationRequest Number 9: Accidents & Malfunctions Dam Safety Cumulative Effects
Request Number 9: Accidents & Malfunctions Dam Safety Cumulative Effects References: EIS Guidelines Sec. 23.2; EIS Vol. 5, Section 37.2; EIS, Vol. 6, Technical Memo Dam Safety; Meeting Notes BC Hydro,
More informationSCHEDULE A DOCUMENTATION AND CORRESPONDENCE FOR THE PROSPERITY GOLD-COPPER PROJECT (Project) Produced by or for Taseko Mines Limited March 17, 2009 Ap
SCHEDULE A DOCUMENTATION AND CORRESPONDENCE FOR THE PROSPERITY GOLD-COPPER PROJECT (Project) Produced by or for Taseko Mines Limited March 17, 2009 April 2009 April 13, 2009 April 16, 2009 April 20, 2009