1 Efficient Control of Potable Water Distribution Raed Al Nuaimi 1 *, Rajendra Kumar Ramakrishnan 1, and Mohammed Barghothi 1 1 AECOM Middle East Ltd., P.O. Box 1419, Al Ain, United Arab Emirates (*correspondence: raed.nuaimi@aecom.com) FORMAT: 6-12 page paper and 35 minute PowerPoint presentation KEYWORDS DCS, VFD, SCADA, District Metering Area, Flow Control ABSTRACT Service providers struggle to control potable water pump stations that are distributing to public consumer networks with varying demands while maintaining pumping efficiency, especially while the consumer points are physically located at different elevations. Many service providers have tried to introduce Variable speed drives to control the pump discharge and thereby trying to achieve energy efficient operations. A DCS pumping station control system was designed based on flow; it utilizes local control system at selected points of the network, i.e. DMA (District Metering Areas) where a flow control valve is installed to control flow, in addition to logging of other data like water quality parameters. The summation of the individual actual flows at each DMA is used to manipulate the speed and/or the number of running pumps, so that the pump station outlet pressure is always kept at the exact value required to meet the demand at that instant of time, regardless where the pumped water is consumed. The system eliminates the need for different pressure head discharge headers in areas where consumer points are at different elevations and provides a built-in leak detection capability. Model Driven control can be achieved utilizing logged data collected from the network. This efficient control system optimizes energy usage, limits water consumption and helps for faster detection and rectification of water leakage. Introduction Many conventional pumping stations use the pressure at the header or at pre-identified critical/control points along the water network as the main target control data input point, while others depend on the tanks levels. These systems will operate without real appreciation to the exact consumer needs during the day, mainly in terms of flow and pressure; compromising the system efficiency. In many of the cases it will be required to install a bypass from the pump back to the reservoir, where the pump target pressure at the set point results in more than demanded flow. Another physical complication in the operation of pumping stations is the control over the number of pumps running at a time, notwithstanding the decrease of pump efficiency, with the increase of number of pumps

2 Al Nuaimi et al 2 running. In a defined network two pumps might not give double the flow to the system even though they consume almost double the power. Similarly, a third pump will not triple the flow to the system while consuming not less than three times the power of a single pump (Ertin, N. Dean, L. Moore, & L. Priddy). This inefficiency can be, to a certain degree blamed for the soaring operation costs of water systems reaching up to 65% of the water services yearly operational cost (F. Boulos, Wu, & Hou Orr, 2001) There have been similar attempts in recent years to develop optimal control algorithms to assist in operation of complex water distribution systems. The various algorithms were oriented towards determining least-cost pump scheduling policies (proper on-off pump operation) using different programs (F. Boulos, Wu, & Hou Orr, 2001). Many of these studies remained as theories without actual application in the operation process due to complexity, which might require experts dedicated for operation, or due to dependency on the system of which the mathematical solutions were derived from. Another reason could be the inadaptability of the proposed schedulers to the dynamic nature of the water systems operation, mainly the water demand which shall directly affect the pressure. In many cases, the scheduler will be used by designers based on planning data/input, and may not be calibrated with actual demand and pressure data during commissioning or after some time in operation.. Even in cases where the scheduler is applied as a model and satisfactory results are obtained, an advanced control system/automation is still required to depict the model (theory) in actual operation. In this paper, a control system for a water distribution system utilizing variable speed pumps is considered. The system supplies multiple consumption points with different hydraulic characteristics (elevation, distance, flow, etc.). The control system is based on flow scheduler, utilizing the flow control, on-line telemetry, Instrumentation and Control apparatus aiming at reducing the operating costs through maintaining the pumping station operating in the best possible efficiency (minimum number of running pumps, efficiency of each pump, delivering the exact pressure required to deliver the actual demand). Study Drivers The figure below shows a pumping station serving several consumption points. A consumption point, is defined as any demand point equipped with local control facility. It can be a bulk consumer tank; a sub distribution zone where water is stored and pumped later or a District Metering Area. Consumption points are located at different distances and elevations. In case of a conventional pressure control system, the highest consumption point or critical point is considered as the main driver. The pumps should target a certain pressure required to deliver demand at hydraulically remote points. This pressure value needs to be estimated from hydraulic modeling and further verified on site. This scenario will work efficiently with the estimated number of pumps in case the system is operating exactly as depicted in the model, or during testing and commissioning. In real world, some tanks will be filled before others (for tank based consumer points), demand varies with time (though average is fixed), in this case, the target pressure will remain the same yet more than required, and therefore excess flow will be discharged from the pump and needs to be bypassed back to the tank. Another example for inefficiency is

3 Al Nuaimi et al 3 the operation of pumps to fill the different tanks without actual realization of whether this water will be consumed or stored. The only limitation for the flow supplied is the hydraulic capacity of the system. This situation might lead to the running of several pumps simultaneously, while only one pump may suffice for the actual demand. Figure-A System Design In order to have better water management capability with multiple consumer points and ensure that the pumps are at optimum power consumption, the flow data at the consumer can be utilized in the control system. The system is based on the flow scheduler model where the pumping capacity is shared between consumption points. Each consumption point is equipped with a local flow control system receiving a remote set point from pumping station scheduler. According to conservation of mass, all points shall receive their share of the total pumped flow if it is maintained at the summation of the instantaneous values of flow required at consumption points (assuming no leakage). The local control system clips the flow, at low hydraulic resistance points, restricting them from receiving more than their share allocated by the scheduler. This will cause the pressure to rise, thus allowing water to reach the high hydraulic resistance points.

4 Al Nuaimi et al 4 When the actual flow at a certain consumption point is less than the allocated share, the system evaluates the cause of the difference and accordingly updates the scheduler. The scheduler reacts to all signals from consumer points and adjusts the pumps speed accordingly. System Description Each consumption point is equipped with its own local control system as part of the distribution network DCS. It comprises of the following instrumentation as minimum: Flow Control Valve, Flow Meter, and Downstream Pressure Transmitter. The instrumentation is hooked up to a Remote Terminal Unit (RTU), the RTU performs all local control activities in addition to handling the communication with the pumping station central control system. According to the pumping scheme for a certain instance of time, the local control system receives the allocated share of pumping capacity available to the consumption point; this value is fed as a set point to the flow PID controller at the RTU. The PID control utilizes the flow meter signal as a feedback signal to the PID controller which in turn manipulates the flow at the set point. The nature of this flow control system is demand driven thus the PID controller works in clipping mode i.e. it manipulates the flow at/or below the given set point. If the flow is less than the set point (due to lower demand), the controller will drive the flow control device to fully opened position, but obviously can t force flow into the consumption area. The system communicates the following signals back to the central pumping station control system. The Actual Flow fed to the consumer (flow meter reading). Pressure downstream of the control valve. Required Flow Signal. The first two signals are self explanatory while the third will have different values. The summation of all Required Flow signal from consumer points is used as a set point to the pumping station flow control system. The Required Flow signal is interpreted by the control system as the value of flow the particular consumption point flow control valve is supposed to pass, while the Actual Flow is the actual value passing. If the summation of all required flow signals is equal to the pumping station discharge (i.e. the flow control system at the pumping station reached steady state), and one or more of the consumption points are reporting less Actual Flow than Required Flow supposed to pass, the control system reports the difference as leak, assuming all instruments are calibrated and speed-up the pumps to satisfy the starving consumption points, provided the total leak is less than a predefined limit. This is an add-on feature to the design. The Required signal is processed at the local control system prior to sending to the scheduler. The below table summarize how the signal is locally processed at the Local RTU. Table 1 Actual Flow with Respect to Allocated Flow Control Valve % Opened Pressure Low Returned signal Remarks/Action

5 Al Nuaimi et al 5 Less than Equal Greater than 100 Any 0 Value - x - - x - - Actual - - x - x - - Allocated Transient State otherwise malfunction x - Actual Malfunction x x - - Allocated Transient State otherwise malfunction x - - x - - x Allocated More pumping needed x - - x Actual Local consumer demand is covered- no more than the current actual flow can be consumed. System Optimization When the system is first commissioned, it follows the pumping scheme fed to the scheduler, based on a hydraulic model or old consumption data. In both cases it is far from being optimum, as hydraulic models need to make many assumptions and the actual friction losses may differ due to ageing or in case of any change in pipework from the designed route. The system shall be programmed to utilize the logged data to develop a model and predict the consumption scheme. The first step towards optimization is to use the average consumption as the demand for the scheduler. As data is accumulated and the consumption scheme approaches the real representation of the demand, the system manipulates pumping schedule towards optimum utilization of resources. Once the scheduler is optimized and the system is stable, the pumped quantity to a certain consumption point will be governed by the actual consumption, thus reducing the retention time in consumer tanks (if any), this will lead to better water quality. System Scalability The above description shows the minimum configuration required for the system to operate at reasonable efficiency. Depending on the implementation, the system can be programmed to utilize extra resource available to improve system performance. As an example, a system implemented in a transmission network, where all the water is supplied to storage tanks from which water will be distributed further. The signal from local level transmitter shall be utilized to determine the actual consumption scheme. Once this is determined the scheduler utilizes it to cover the actual demand and keeps the water level in the tank at a minimum level according to the demand. Keeping the minimum required level helps in two aspects. The first is, a better water quality resulting from minimum retention time within the tank. The second is, spare storage for use by the scheduler as a flow relief, when the system requires to run at certain speed to meet certain pressure, while the actual demand is less than the optimum flow for this pressure.

6 Al Nuaimi et al 6 Conclusions This new system design has high potential to be very effective and Green, especially when coupled with the new communication technologies available. It represents a new field for research and development especially on the model driven control and optimization algorithm. The system was adopted by a leading utility company in the gulf region. Design of an 8 MIGD potable water pumping station, utilizing this new approach to supply bulk quantity of potable water to 16 consumers with about 15 miles of pipe-work, is completed and is under tendering at the moment. Further research will be carried out when the system is constructed and put in operation. Bibliography C, B., M, M., M-V, L. L., CA, B., & CJ, B. (2003). Optimal Operation of Water Distribution Networks by Predictive Control Using MINLP. ISSN = Water SA Vol. 29, Ertin, E., N. Dean, A., L. Moore, M., & L. Priddy, K. (n.d.). Dynamic Optimization for Optimal Control of Water Distribution Systems. Batelle Memorial Institute. F. Boulos, P., Wu, Z., & Hou Orr, C. (2001). Optimal Pump Operation of Water Distribution Systems Using Genetic Algorithms. Pasanda, USA Camarillo, USA Kansas City, USA Markham, Canada. M. Waski, T., V. Chase, D., A. Savic, D., Grayman, W., Stephen, B., & Edmundo, K. (2009). Advanced Water Distribution Modeling and Management. Bentley Institute Press. Marino, M., & Afshar, M. (2005, October). A Convergent Genetic Algorithm for Pipe Network Optimization. Scientia Iranica, pp About the Authors: Raed Al Nuaimi has been in design, construction and commissioning of control systems serving refineries, power plants, water and waste water facilities for over 25 years. He is currently heading the Instrumentation and Control Department at AECOM Middle East Ltd. in United Arab Emirates. He is also the Honors & Awards chair of ISA UAE section. Rajendra Kumar Ramakrishnan has over 22 years of experience in project design, site execution including commissioning of water and waste water systems including treatment, transmission and distribution projects. Rajendra is currently heading the Mechanical Department of AECOM Middle East Ltd, Al Ain in the UAE. Mohhamed Barghothi has been in design of water and drainage systems for almost 8 years. He is currently working as a Senior Design Engineer AECOM Middle East in the United Arab Emirates for water supply systems at AECOM Middle East in the United Arab Emirates. Mainly responsible for hydraulic and surge studies for various potable water and reclaimed water pressure and gravity systems.

La modellazione per la gestione efficiente della rete idrica Pedro Pina

La modellazione per la gestione efficiente della rete idrica Pedro Pina La modellazione per la gestione efficiente della rete idrica Pedro Pina Bentley Solutions for Infrastructure Buildings Rail and Transit Bridges Roads Utilities Campuses Power Generation Water and Wastewater

More information

INTEGRATION OF GIS WITH HYDRAULIC TRANSIENT MODELING: EXPLORING BENEFITS, APPLICATIONS AND IMPACT ON MODEL SKELETONIZATION

INTEGRATION OF GIS WITH HYDRAULIC TRANSIENT MODELING: EXPLORING BENEFITS, APPLICATIONS AND IMPACT ON MODEL SKELETONIZATION INTEGRATION OF GIS WITH HYDRAULIC TRANSIENT MODELING: EXPLORING BENEFITS, APPLICATIONS AND IMPACT ON MODEL SKELETONIZATION BongSeog Jung 1, Paul Boulos 2 1 Tebodin Middle East Ltd., UAE 2 Innovyze Inc.,

More information

The Next Generation Of Network Management And Leakage Detection Systems

The Next Generation Of Network Management And Leakage Detection Systems The Next Generation Of Network Management And Leakage Detection Systems 2016 AWWA Southwest Section Annual Conference Glyn Addicott - Hydraulic Analysis Group Overview The USA and Europe are both facing

More information

Available online at ScienceDirect. Procedia Engineering 186 (2017 )

Available online at   ScienceDirect. Procedia Engineering 186 (2017 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 186 (2017 ) 193 201 XVIII International Conference on Water Distribution Systems Analysis, WDSA2016 Demand Estimation In Water

More information

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT H A E S T A D M E T H O D S ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT F i r s t E d i t i o n Table of Contents Preface Continuing Education Units About the Software xv xix xxi Chapter 1 Introduction

More information

Utilities are constantly striving to

Utilities are constantly striving to Comprehensive Approach to Increase Effectiveness & Efficiency of Flushing Programs Using Latest Hydraulic & Water Quality Monitoring Tools Kelcia D. Mazana, Edward H. Talton Jr., and C. Robert Reiss Utilities

More information

Accounting Separation Methodology Statement. Upstream Services YW 2014/15

Accounting Separation Methodology Statement. Upstream Services YW 2014/15 Accounting Separation Methodology Statement Upstream Services YW 2014/15 Upstream Services YW 2014/15 Accounting Separation Methodology Statement Upstream Services Split - Yorkshire Water 2014/15 Yorkshire

More information

Available online at ScienceDirect. Procedia Engineering 89 (2014 )

Available online at   ScienceDirect. Procedia Engineering 89 (2014 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 89 (2014 ) 557 564 16th Conference on Water Distribution System Analysis, WDSA 2014 Energy Auditing As a Tool for Improving

More information

Experiences in DMA redesign at the Water Board of Lemesos, Cyprus

Experiences in DMA redesign at the Water Board of Lemesos, Cyprus Experiences in DMA redesign at the Water Board of Lemesos, Cyprus B. Charalambous Water Board of Lemesos, P.O.Box 50225, CY3602 Lemesos, Cyprus. E-mail: bambos@wbl.com.cy Keywords: DMA redesign; pressure

More information

Table of Contents. 3.1 Source Capacity Analysis

Table of Contents. 3.1 Source Capacity Analysis Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity

More information

Driving Operational Efficiency and Reducing Water Loss

Driving Operational Efficiency and Reducing Water Loss Mei Carmel ltd Haifa Water & Sewage corporation Use Case: Driving Operational Efficiency and Reducing Water Loss February 2018 Covering a challenging area with a steep topographical terrain and serving

More information

Technical Assessments for Pipelines

Technical Assessments for Pipelines Services and solutions Technical Assessments for Pipelines Experience In Motion The mission of Flowserve is to help pipeline operators optimize pumping system performance and maximize profitability. This

More information

Available online at ScienceDirect. Procedia Engineering 89 (2014 )

Available online at   ScienceDirect. Procedia Engineering 89 (2014 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 89 (2014 ) 1136 1143 16th Conference on Water Distribution System Analysis, WDSA 2014 Design and performance of district metering

More information

A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE

A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE Authors: Presenter: M. Garzoglio, L. Riccardo M. Garzoglio [Process Senior Eng. Fisia Italimpianti Italy] Abstract The Ras Abu Fontas

More information

Hydraulic Modeling and System Optimization

Hydraulic Modeling and System Optimization DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: Hydraulic Modeling and System Optimization Steven Jones, M.S., P.E. September 4, 2013 What is a Water System

More information

PETROLEUM STORAGE AND DISTRIBUTION FACILITIES STORM WATER REGULATION 168/94

PETROLEUM STORAGE AND DISTRIBUTION FACILITIES STORM WATER REGULATION 168/94 PDF Version [Printer-friendly - ideal for printing entire document] PETROLEUM STORAGE AND DISTRIBUTION FACILITIES STORM WATER REGULATION 168/94 Published by Quickscribe Services Ltd. Updated To: [includes

More information

B. Brunone University of Perugia C. Chiesa Metropolitana Milanese M. Ferrante - University of Perugia

B. Brunone University of Perugia C. Chiesa Metropolitana Milanese M. Ferrante - University of Perugia MM http://www.global- TEA leakagesummit-2013.com/ B. Brunone University of Perugia C. Chiesa Metropolitana Milanese M. Ferrante - University of Perugia Outline MM pipe system What do we know about leak

More information

RUNOFF REGULATIONS REQUIRE CREATIVE SOLUTION

RUNOFF REGULATIONS REQUIRE CREATIVE SOLUTION VOL. 2 NO. 4 The construction engineer s source for projects, products and technology RUNOFF REGULATIONS REQUIRE CREATIVE SOLUTION Red Rocks Revealed Creating Smart Water Networks Bridge Products and Software

More information

DEVELOPMENT AND USE OF SIMULATION TRAINERS FOR PIPELINE CONTROLLERS. D.M. Scott Enbridge Pipe Line Company Edmonton, Alberta, Canada

DEVELOPMENT AND USE OF SIMULATION TRAINERS FOR PIPELINE CONTROLLERS. D.M. Scott Enbridge Pipe Line Company Edmonton, Alberta, Canada IPC2000-254 DEVELOPMENT AND USE OF SIMULATION TRAINERS FOR PIPELINE CONTROLLERS D.M. Scott Enbridge Pipe Line Company Edmonton, Alberta, Canada ABSTRACT Enbridge is in the forefront of development and

More information

Transient and Succession-of-Steady-States Pipeline Flow Models

Transient and Succession-of-Steady-States Pipeline Flow Models Transient and Succession-of-Steady-States Pipeline Flow Models Jerry L. Modisette, PhD, Consultant Jason P. Modisette, PhD, Energy Solutions International This paper is copyrighted to the Pipeline Simulation

More information

The U.S Environmental Protection

The U.S Environmental Protection FWRJ Distribution System Water Quality Models Support Treatment Process Decisions Brandon Bryant, Michael Harber, and Robert Dehler The U.S Environmental Protection Agency (EPA) has estimated that over

More information

Environmental Engineering-I

Environmental Engineering-I Environmental Engineering-I Prof. Dr. Muhammad Zulfiqar Ali Khan Engr. Muhammad Aboubakar Farooq Water Distribution Systems & Analysis 1 Water Distribution Systems & Analysis References Water Supply &

More information

Increasing the efficiency of water distribution

Increasing the efficiency of water distribution 28 ABB review 4 11 Every drop counts Increasing the efficiency of water distribution Frederik Blank, Markus Gauder Drinking water is a precious but scarce commodity, and is not equally distributed on our

More information

MOE Guidelines on Surge/Transients

MOE Guidelines on Surge/Transients Corporate Office Hydratek & Associates Inc. 216 Chrislea Road, Suite 501 Woodbridge, Ontario L4L 8S5 Canada www.hydratek.com MOE Guidelines on Surge/Transients Introduction The Ministry of the Environment

More information

Hydraulic Modeling, PUDs & Managing Water System Growth

Hydraulic Modeling, PUDs & Managing Water System Growth Hydraulic Modeling, PUDs & Managing Water System Growth American Water Resources Association Intermountain Section October 9, 2013 Utah Division of Drinking Water Ying-Ying Macauley Presentation Topics

More information

PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains

PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains PROCEDURE F-6-1 PROCEDURES TO GOVERN THE SEPARATION OF SEWERS AND WATERMAINS 1. Sewers/sewage works

More information

Hydraulic Modeling Predicting and Resolving Water Quality Issues

Hydraulic Modeling Predicting and Resolving Water Quality Issues Alliance of Indiana Rural Water September 21, 2016 Hydraulic Modeling Predicting and Resolving Water Quality Issues Jim McNulty, P.G. Strand Associates, Inc. The content of this presentation is not to

More information

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor J. Komorita 1, P. Burke 2, B. Youker 2, and G. Crawford 2 1 King County, 2 CH2M HILL ABSTRACT Many Membrane Bioreactor (MBR)

More information

A Simulation Study Of The Sarir Field - Tobruk Terminal Crude Oil Pipeline

A Simulation Study Of The Sarir Field - Tobruk Terminal Crude Oil Pipeline A Simulation Study Of The Sarir Field - Tobruk Terminal Crude Oil Pipeline Awad Shamekh*, Salah Masheiti**, and Soad Ben Soud*** *Electrical and Electronic Engineering Department, University of Benghazi

More information

SPECIALIZED EQUIPMENT FOR CALIBRATION IN-LINE APPLIANCES FOR TESTING PHYSICAL PARAMETERS OF WATER QUALITY

SPECIALIZED EQUIPMENT FOR CALIBRATION IN-LINE APPLIANCES FOR TESTING PHYSICAL PARAMETERS OF WATER QUALITY SPECIALIZED EQUIPMENT FOR CALIBRATION IN-LINE APPLIANCES FOR TESTING PHYSICAL PARAMETERS OF WATER QUALITY Dumitru VLAD 1, Diana Mura BADEA 1, Valentina Daniela BAJENARU 1 1 National Institute of Research

More information

Reduction of Apparent Losses Using the UFR (Unmeasured-Flow Reducer) Case Studies

Reduction of Apparent Losses Using the UFR (Unmeasured-Flow Reducer) Case Studies Reduction of Apparent Losses Using the UFR (Unmeasured-Flow Reducer) Case Studies Sharon Yaniv* *A.R.I Flow Control Accessories, Kfar Charuv, 12932, Israel, Sharon@ari.co.il Abstract The demand for water

More information

0389VS: Simplification of points of telemetry u. Stage 03: Draft Modification Report

0389VS: Simplification of points of telemetry u. Stage 03: Draft Modification Report Stage 03: At what stage is this document in the process? : Simplification of points of telemetry u Simplification of the points of telemetry described within Annex E-1 of the Offtake Arrangements Document.

More information

How to establish an integrated production management system across the reservoir lifecycle

How to establish an integrated production management system across the reservoir lifecycle SPECAL TOPC: RESERVOR MONTORNG How to establish an integrated production management system across the reservoir lifecycle Stian Engebretsen 1* introduces an integrated production management workflow. ntroduction

More information

Automation Portfolio for the Water Industry

Automation Portfolio for the Water Industry Partner Day, Israel, July 2015 Automation Portfolio for the Water Industry siemens.com/answers Israeli Water Market Current Situation Figures in 2008 Israeli Water Market CAPEX of 700 Million USD, mainly

More information

Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems

Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems 1 Agenda: - Background - Objectives - Water Distribution System Overview - GIS and Hydraulic Modeling Relationship - Hydraulic

More information

Geographic Information System (GIS) in Big Data Analytics: A Case Study of Potable Water Sector in Egypt.

Geographic Information System (GIS) in Big Data Analytics: A Case Study of Potable Water Sector in Egypt. Holding Company for Water & Waste water, Egypt Geographic Information System (GIS) in Big Data Analytics: A Case Study of Potable Water Sector in Egypt. Connecting Gears Mohamed Hasan Khalil, Ph.D., Holding

More information

Production Scheduling System for Oil and Gas Storage and Transportation Based on GIS and SCADA Technology

Production Scheduling System for Oil and Gas Storage and Transportation Based on GIS and SCADA Technology Production Scheduling System for Oil and Gas Storage and Transportation Based on GIS and SCADA Technology Binghe Liu School of Mechanical Engineering, Beijing Institute of Petrochemical Technology, China

More information

0389S: Simplification of points of telemetry. Stage 04: Final Modification Report

0389S: Simplification of points of telemetry. Stage 04: Final Modification Report Stage 04: What stage is this document in the process? : Simplification of points of telemetry u Simplification of the points of telemetry described within Annex E-1 of the Offtake Arrangements Document.

More information

Thesis Proposal ENHANCED PUMP SCHEDULE OPTIMIZATION FOR LARGE WATER DISTRIBUTION NETWORKS TO MAXIMIZE ENVIRONMENTAL & ECONOMIC BENEFITS

Thesis Proposal ENHANCED PUMP SCHEDULE OPTIMIZATION FOR LARGE WATER DISTRIBUTION NETWORKS TO MAXIMIZE ENVIRONMENTAL & ECONOMIC BENEFITS 0 Thesis Proposal ENHANCED PUMP SCHEDULE OPTIMIZATION FOR LARGE WATER DISTRIBUTION NETWORKS TO MAXIMIZE ENVIRONMENTAL & ECONOMIC BENEFITS By: S. Mohsen Sadatiyan A. Advisor: Carol J. Miller Outline 1 What

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

24 X 7 Water Supply Systems with Advance Transport and Distribution Modeling in Urban Water System

24 X 7 Water Supply Systems with Advance Transport and Distribution Modeling in Urban Water System 24 X 7 Water Supply Systems with Advance Transport and Distribution Modeling in Urban Water System Overview The Government of India recognizes the importance of 24x7 water supply. Accordingly, the Ministry

More information

Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006

Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006 Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006 With respect to the Conclusions on BAT for this horizontal BREF, the details of applicability and status

More information

ARE YOUR VARIABLE SPEED PUMPING APPLICATIONS DELIVERING THE PREDICTED SAVINGS? IMPROVING CONTROL TO MAXIMIZE RESULTS

ARE YOUR VARIABLE SPEED PUMPING APPLICATIONS DELIVERING THE PREDICTED SAVINGS? IMPROVING CONTROL TO MAXIMIZE RESULTS ARE YOUR VARIABLE SPEED PUMPING APPLICATIONS DELIVERING THE PREDICTED SAVINGS? IMPROVING CONTROL TO MAXIMIZE RESULTS University of Dayton, Dayton, Ohio Vijay Gopalakrishnan, Lead Engineer Alexandra Brogan,

More information

Integrated Process Risk Management (IPRM) for Refineries and Petrochemical Complexes

Integrated Process Risk Management (IPRM) for Refineries and Petrochemical Complexes Integrated Process Risk Management (IPRM) for Refineries and Petrochemical Complexes Keivan Torabi, Babak Karimi, Ranbir Parmar, Marcello Oliverio, and Keith Dinnie Nuclear Safety Solutions (NSS) Ltd.

More information

Smart Distribution System Applications

Smart Distribution System Applications Smart Distribution System Applications April 17, 2015 Amsterdam, Netherlands Carl Yates, M.A.Sc., P.Eng., General Manager Delivering Quality & Value For Over 70 Years History of Halifax Water Halifax Water

More information

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011 Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge Presentation to Board April 21, 2011 PRESENTATION OUTLINE Master Plan Overview Purpose and Approach Supply and Demand

More information

Alternatives to Optimize Gas Processing Operations

Alternatives to Optimize Gas Processing Operations Mark E. Roop esimulation, Inc. Houston, Texas, U.S.A. Jean Leger Enogex, Inc. Oklahoma City, Oklahoma, U.S.A. Steve Hendon esimulation, Inc. Houston, Texas, U.S.A. CHALLENGES AND REQUIREMENTS Gas processing

More information

MIYAHUNA Water Company Operation Directorate. MIYAHUNA NRW Management

MIYAHUNA Water Company Operation Directorate. MIYAHUNA NRW Management MIYAHUNA Water Company Operation Directorate MIYAHUNA NRW Management Service Area Introduction LCD has been established in 1999 for the major purpose of reducing and controlling losses in water network

More information

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel 5 Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel M. P. Cherian, Ari Pandian, Karen Ridgway and Gregory Barden The City of Columbus, Ohio, submitted a wet weather management plan

More information

Smart Pressure PUMP AUTOMATIC OPTIMISATION PRV AUTOMATIC OPTIMISATION NETWORK MONITORING PUMP REMOTE CONTROL CONTROL. Management Solutions

Smart Pressure PUMP AUTOMATIC OPTIMISATION PRV AUTOMATIC OPTIMISATION NETWORK MONITORING PUMP REMOTE CONTROL CONTROL. Management Solutions 1 i2o LOGGER NETWORK MONITORING PRV umpremote CONTROL PUMP REMOTE CONTROL PRV AUTOMATIC OPTIMISATION PUMP AUTOMATIC OPTIMISATION CONTENTS 1 Page Introduction 2 The Importance of Optimising Pressure - Every

More information

Assessment Schedule - TS.5

Assessment Schedule - TS.5 The Assessor shall determine the business s commitment and support to good and safe working practices; also that it has a positive culture in all aspects of its work. In particular, the assessor shall

More information

Building Hydronic Systems Pressure Profile

Building Hydronic Systems Pressure Profile Building Hydronic Systems Pressure Profile For HVAC Project Managers Fachgesprach 6-B WTF Institute of Higher Learning Part -2 Actual Building Pressure Profile 1 All Results Rounded To Whole Number In

More information

Draft proposals for Test methods for close-coupled solar water heating systems - Reliability and safety

Draft proposals for Test methods for close-coupled solar water heating systems - Reliability and safety IEA/SHC Task 57, Subtask B Draft proposals for new test procedures B4: Final Draft Draft proposals for Test methods for close-coupled solar water heating systems - Reliability and safety HE Zinian Beijing

More information

Optimizing Canal Structure Operation in the Treasure Valley of Idaho

Optimizing Canal Structure Operation in the Treasure Valley of Idaho International Proceedings of Chemical, Biological and Environmental Engineering, Vol. 97 (2016) DOI: 10.7763/IPCBEE. 2016. V97. 7 Optimizing Canal Structure Operation in the Treasure Valley of Idaho Andrew

More information

Water and Wastewater Engineering Dr. B. S. Murty Department of Civil Engineering Indian Institute of Technology, Chennai

Water and Wastewater Engineering Dr. B. S. Murty Department of Civil Engineering Indian Institute of Technology, Chennai Water and Wastewater Engineering Dr. B. S. Murty Department of Civil Engineering Indian Institute of Technology, Chennai Water Distribution Networks Lecture # 37 Today we will talk about the distribution

More information

Modelling a Combined Sewage and Stormwater Flood Detention Basin

Modelling a Combined Sewage and Stormwater Flood Detention Basin Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip

More information

WATER NETWORK MANAGEMENT. Real-time monitoring and proactive decision making PROVIDING CLEAN WATER TO MORE THAN 100 MILLION HOMES WHITE PAPER

WATER NETWORK MANAGEMENT. Real-time monitoring and proactive decision making PROVIDING CLEAN WATER TO MORE THAN 100 MILLION HOMES WHITE PAPER WATER NETWORK MANAGEMENT Real-time monitoring and proactive decision making PROVIDING CLEAN WATER TO MORE THAN 100 MILLION HOMES WHITE PAPER Description of functionalities in AQUIS Water Network Management

More information

Water Services Guidelines

Water Services Guidelines Water Services Guidelines Updated Water Services Guidelines Page 1 TABLE OF CONTENTS 1. Purpose of The Service Standards... 2 2. New Service Connections... 2 3. Water Service During Building Construction...

More information

Company Introduction HEATERS. Joint Venture: TIME FOR A COOL CHANGE

Company Introduction HEATERS. Joint Venture: TIME FOR A COOL CHANGE Agenda 1. Introduction 2. Definition & Purpose of Control 3. Process Control Terms 4. Feedback & Feedforward Control 5. HEI Requirements for C&I 6. Turbine Back Pressure Control 7. When to Use 1-Speed,

More information

The Latest Generation of VFDs

The Latest Generation of VFDs The Latest Generation of VFDs Written by: Thomas R. Neuberger, Eaton Corporation Reduce maintenance, improve efficiency and solve key pump application challenges with variable frequency drive technology.

More information

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Reclaimed Water

More information

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920 Page 1 of 10 The following modifications/ amendment with respect to Technical Specification for BHEL s Technical specification no PE-TS-421-158-A001 shall apply. Bidder to note that existing clauses/ details

More information

Ground source heat pump system (vp) Design Envelope application guide

Ground source heat pump system (vp) Design Envelope application guide Ground source heat pump system (vp) Design Envelope File No: 9.564 Date: november 14, 2014 Supersedes: 9.564 Date: september 19, 2014 design envelope s performance improvements are among the top priorities

More information

The Future of Hydraulic Control in Water-Systems. By: Assaf Heimann May 9, Water Loss Conference, Cape Town, 2018

The Future of Hydraulic Control in Water-Systems. By: Assaf Heimann May 9, Water Loss Conference, Cape Town, 2018 The Future of Hydraulic Control in Water-Systems By: Assaf Heimann May 9, Water Loss Conference, Cape Town, 2018 A control valve in a water system is used to o automatically & automomuosly control hydraulic

More information

Storage and pumping capacity analysis using hydraulic modeling

Storage and pumping capacity analysis using hydraulic modeling Storage and pumping capacity analysis using hydraulic modeling G. MacPherson City of Chilliwack, B.C., Canada W. de Schaetzen & S. Cripps GeoAdvice Inc., Vancouver, B.C., Canada ABSTRACT: This paper summarizes

More information

Network Performance and Operational Analytics 24/7

Network Performance and Operational Analytics 24/7 Network Performance and Operational Analytics 24/7 View The IoT Platform for Water Systems with Built-In Analytics Designed by Water professionals for Utility Engineers Integrated Data Management and Network

More information

ENERGY EFFICIENY OF WATER DISTRIBUTION SYSTEMS

ENERGY EFFICIENY OF WATER DISTRIBUTION SYSTEMS ENERGY EFFICIENY OF WATER DISTRIBUTION SYSTEMS A limited number of options exist to save energy in water distribution operation. Turning off lights in pump stations and using pickup trucks with small engines

More information

ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION

ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION ABC AND AGC INTERFACE REQUIREMENTS TECHNICAL SPECIFICATION Published: September 2018 IMPORTANT NOTICE Purpose AEMO has prepared this document to provide information about the requirements for interfacing

More information

GRUNDFOS isolutions IN COMMERCIAL BUILDINGS

GRUNDFOS isolutions IN COMMERCIAL BUILDINGS GRUNDFOS isolutions IN COMMERCIAL BUILDINGS CREATING INTELLIGENT BUILDINGS Intelligent pump solutions enable high performance buildings To achieve an intelligent building, intelligent pumps are significant

More information

ScienceDirect. Numerical model of a district water distribution system in Bucharest. A.-M. Georgescu a, *, S. Perju a, S.-C. Georgescu b, A.

ScienceDirect. Numerical model of a district water distribution system in Bucharest. A.-M. Georgescu a, *, S. Perju a, S.-C. Georgescu b, A. Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 70 ( 2014 ) 707 714 12th International Conference on Computing and Control for the Water Industry, CCWI2013 Numerical model

More information

WATER LOSS CONTROL PROGRAMS

WATER LOSS CONTROL PROGRAMS WATER LOSS CONTROL PROGRAMS EPD Guidance Document August 2007 TABLE OF CONTENTS PART 1: Overview of Water Loss Control Programs 3 SUMMARY 3 BASIC DATA AND INFRASTRUCTURE REQUIREMENTS 3 ACTIVITIES TO REDUCE

More information

PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc

PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc. 1-800-345-3132 www.americanonsite.com ASD152-S122 ASD153-S124 ASD154-S124 ASD153-D124 ASD154-D124 2 ZONE DRIP W/ SIMPLEX 2

More information

RELIABILITY BASED OPTIMAL DESIGN OF A WATER DISTRIBUTION NETWORK FOR MUNICIPAL WATER SUPPLY

RELIABILITY BASED OPTIMAL DESIGN OF A WATER DISTRIBUTION NETWORK FOR MUNICIPAL WATER SUPPLY RELIABILITY BASED OPTIMAL DESIGN OF A WATER DISTRIBUTION NETWORK FOR MUNICIPAL WATER SUPPLY S.Chandramouli 1 and P.Malleswararao 2 1.Associate Professor, Department of Civil Engineering, GMRIT, Rajam,

More information

WATER SYSTEM PRESENTATION. Presenter: Mike Oemcke Company: OCWA Central New York s Water Authority Department: Water System Engineering

WATER SYSTEM PRESENTATION. Presenter: Mike Oemcke Company: OCWA Central New York s Water Authority Department: Water System Engineering WATER SYSTEM PRESENTATION 2017 Presenter: Mike Oemcke Company: OCWA Central New York s Water Authority Department: Water System Engineering OUTLINE SYSTEM OVERVIEW SOURCES OF SUPPLY MAJOR FACILITIES PRESSURE

More information

Report No. 3 of the Environmental Services Committee Regional Council Meeting of April 18, 2013

Report No. 3 of the Environmental Services Committee Regional Council Meeting of April 18, 2013 3 CONSULTANT SELECTION FOR SUPERVISORY CONTROL AND DATA ACQUISITION PROGRAMMABLE AUTOMATION CONTROLLER PANEL REPLACEMENT AND UPGRADES PROJECTS 78540 AND 78550 The Environmental Services Committee recommends

More information

SYSTEM ID: New York Tunnels System

SYSTEM ID: New York Tunnels System SYSTEM ID: New York Tunnels System NARRATIVE DESCRIPTION The New York Tunnels System represents the major water supply transmission tunnels for the City of New York in 1969. The system consists of 1 reservoir

More information

International Journal of Scientific & Engineering Research, Volume 4, Issue 7, July ISSN

International Journal of Scientific & Engineering Research, Volume 4, Issue 7, July ISSN International Journal of Scientific & Engineering Research, Volume 4, Issue 7, July-2013 847 Genetically Optimised Design Of Irrigation System Network Using Epanet As A Tool 1 Ms. Shikha Arora - PG student

More information

Measurement technology. Facts are essential for good decisions. Sensing, monitoring and data logging technology

Measurement technology. Facts are essential for good decisions. Sensing, monitoring and data logging technology Measurement technology Facts are essential for good decisions Sensing, monitoring and data logging technology Scan this code to receive the latest information about measurement technology Quality is a

More information

Leak detection and water loss management

Leak detection and water loss management Water Utility Journal 8: 25-30, 2014. 2014 E.W. Publications Leak detection and water loss management B. Charalambous 1, D. Foufeas 2 and N. Petroulias 3 1 J2C Water Ltd, Lemesos, Cyprus, e-mail: bcharalambous@cytanet.com.cy.

More information

International ejournals

International ejournals ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER

More information

Well Pad Automation Improves Capital Efficiency and Reduces Fiscal Risk Michael Machuca* Emerson Process Management

Well Pad Automation Improves Capital Efficiency and Reduces Fiscal Risk Michael Machuca* Emerson Process Management URTeC: 1874921 Well Pad Automation Improves Capital Efficiency and Reduces Fiscal Risk Michael Machuca* Emerson Process Management Copyright 2014, Unconventional Resources Technology Conference (URTeC)

More information

1.Background JICA PROJECT BRIEF NOTE. May 2014

1.Background JICA PROJECT BRIEF NOTE. May 2014 JICA PROJECT BRIEF NOTE Japanese Technical Cooperation for THE ASSISTANCE RELATED TO DELHI WATER SUPPLY IMPROVEMENT PROJECT IN CHANDRAWAL WATER TREATMENT PLANT COMMAND AREA - Accelerating Implementation

More information

Innovative testing of advanced PLCs of sewage water pumping stations

Innovative testing of advanced PLCs of sewage water pumping stations Innovative testing of advanced PLCs of sewage water pumping stations Ivo Pothof, Kees Kooij Industrial Flow Technology, WL Delft Hydraulics P.O. Box 177 2600 MH Delft, The Netherlands ivo.pothof@wldelft.nl,

More information

The Impact of Pressure Management Techniques on the Water Age in an Urban Pipe Network The Case of Kos City Network

The Impact of Pressure Management Techniques on the Water Age in an Urban Pipe Network The Case of Kos City Network Proceedings The Impact of Pressure Management Techniques on the Water Age in an Urban Pipe Network The Case of Kos City Network Anastasia Kravvari, Vasilis Kanakoudis * and Menelaos Patelis Civil Engineering

More information

DUBAI ELECTRICITY AND WATER AUTHORITY GUIDELINES FOR NEW DEVELOPMENT PROJECTS UPDATE

DUBAI ELECTRICITY AND WATER AUTHORITY GUIDELINES FOR NEW DEVELOPMENT PROJECTS UPDATE DUBAI ELECTRICITY AND WATER AUTHORITY GUIDELINES FOR NEW DEVELOPMENT PROJECTS UPDATE - 2010 POWER & WATER PLANNING (WATER TRANSMISSION PLANNING) DUBAI ELECTRICITY AND WATER AUTHORITY WATER TRANSMISSION

More information

Water System Modeling A Unique Way to Use Meter Technology. John Brady, PE x 1121

Water System Modeling A Unique Way to Use Meter Technology. John Brady, PE x 1121 Water System Modeling A Unique Way to Use Meter Technology John Brady, PE 610-373-6667 x 1121 jbrady@entecheng.com Steve Riley, PE NE MD Client Manager John Brady, PE Hydraulic Modeler Engineering Consultant

More information

Less Loss is our Gain Water Loss Control in Los Angeles

Less Loss is our Gain Water Loss Control in Los Angeles Less Loss is our Gain Water Loss Control in Los Angeles December 5, 2017 Peter Dugan, Water Loss Task Force Project Engineer Reynold Wong, Water Loss Task Force Project Engineer LADWP California s Largest

More information

Water Distribution Management and reduction of NRW

Water Distribution Management and reduction of NRW Water Distribution Management and reduction of NRW Managing Director Jens Pedersen, Watertech Ltd. Denmark. The views expressed in this paper are the views of the authors and do not necessarily reflect

More information

ZEBRA MUSSEL PROJECT STATUS

ZEBRA MUSSEL PROJECT STATUS ZEBRA MUSSEL PROJECT STATUS San Benito County Water District July 8, 2008 Reviewed by: Prepared by: Ali Hasan Christopher Dinsmore, PE Introduction HDR has been contracted with San Benito County Water

More information

Renewable Energy xxx (2012) 1e8. Contents lists available at SciVerse ScienceDirect. Renewable Energy

Renewable Energy xxx (2012) 1e8. Contents lists available at SciVerse ScienceDirect. Renewable Energy Renewable Energy xxx (2012) 1e8 Contents lists available at SciVerse ScienceDirect Renewable Energy journal homepage: www.elsevier.com/locate/renene Opportunistic maintenance for wind farms considering

More information

FULL SCALE PILOT STUDY USING THE VTX PROCESS FOR THE REMOVAL OF SULFIDE AT THE VIRGINIA INITIATIVE PLANT

FULL SCALE PILOT STUDY USING THE VTX PROCESS FOR THE REMOVAL OF SULFIDE AT THE VIRGINIA INITIATIVE PLANT FULL SCALE PILOT STUDY USING THE VTX PROCESS FOR THE REMOVAL OF SULFIDE AT THE VIRGINIA INITIATIVE PLANT Ghosn, S. Plant Manager, and Groszek, G. Lead Operator. Virginia Initiative Plant, Hampton Roads

More information

Energy Savings Analysis Generated by a Real Time Energy Management System for Water Distribution

Energy Savings Analysis Generated by a Real Time Energy Management System for Water Distribution Energy Savings Analysis Generated by a Real Time Energy Management System for Water Distribution Sarah Thorstensen Derceto Ltd, Auckland, New Zealand sthorstensen@derceto.com Abstract Washington Suburban

More information

Hydraulics Laboratory Experiment Report

Hydraulics Laboratory Experiment Report Hydraulics Laboratory Experiment Report Name: Ahmed Essam Mansour Section: Title: "1", Monday 2-5 pm Centrifugal Pumps Date: 27 November, 2006 Objectives: To study the performance of a centrifugal pumps

More information

PLC BASED ADVANCE WATER DISTRIBUTION SYSTEM

PLC BASED ADVANCE WATER DISTRIBUTION SYSTEM PLC BASED ADVANCE WATER DISTRIBUTION SYSTEM PROJECT REFERENCE NO. : 37S0819 COLLEGE : CHANNABASAVESHWARA INSTITUTE OF TECHNOLOGY, GUBBI BRANCH : ELECTRONICS AND COMMUNICATION ENGINEERING GUIDE : DR. SURESH

More information

A Genetic Algorithm on Inventory Routing Problem

A Genetic Algorithm on Inventory Routing Problem A Genetic Algorithm on Inventory Routing Problem Artvin Çoruh University e-mail: nevin.aydin@gmail.com Volume 3 No 3 (2014) ISSN 2158-8708 (online) DOI 10.5195/emaj.2014.31 http://emaj.pitt.edu Abstract

More information

Oil & Gas Industry. Smart Remote Automation. An Extension of PlantWeb Digital Architecture. PlantWeb

Oil & Gas Industry. Smart Remote Automation. An Extension of PlantWeb Digital Architecture. PlantWeb Oil & Gas Industry Smart Remote Automation An Extension of PlantWeb Digital Architecture PlantWeb 1 Improve Your Profitability Today s oil and gas companies face a formidable array of challenges: Achieve

More information

Reducing the electricity cost of a Three-Pipe Water Pumping System a case study using software

Reducing the electricity cost of a Three-Pipe Water Pumping System a case study using software Reducing the electricity cost of a Three-Pipe Water Pumping System a case study using software W Rautenbach North West University DLW Krueger North West University E H Mathews North West University and

More information

NRW REDUCTION STRATEGY

NRW REDUCTION STRATEGY NRW REDUCTION STRATEGY PREAMBLE : Potable water is becoming scarcer; often making it more energy intensive to procure. More energy is required to pump water to greater distances and from deeper depth in