Regulatory Reform at MassDEP and Amendments to the Wetlands Protection Act. AMWS Conference November 16, 2012
|
|
- Marjorie Fletcher
- 6 years ago
- Views:
Transcription
1 Regulatory Reform at MassDEP and Amendments to the Wetlands Protection Act AMWS Conference November 16, 2012
2 Background MassDEP 2002 MassDEP 2011 State budget cuts begin MassDEP budget significantly reduce budget from $65M to $46M Disinvestments in program functions MassDEP staff cut from 1,200 full time equivalents to approximately 840 (current numbers) To strategically cope with budget cuts Think and act differently given the current budget constraints Position the agency to meet the challenges of the future Bottom line: Regulatory Reform is a high priority in the Commonwealth and MassDEP.
3 Gathering Ideas for Reforms Moving Towards Promulgation Public process began with stakeholder input on Draft Action Plan March 2011 Wetlands and Waterways stakeholder meetings held December 2011 March 2012 Final Action Plan on the Website: inal.htm MassDEP has drafted regulatory changes for public comment. Promulgation early to mid-2013.
4 Principles followed in selection process No weakening of environmental standards No need to increase staff. Aim is to enable agency to manage our current duties with current staff levels: Finding time savings No legislative changes needed must be able to be implemented by the agency directly
5 Principles followed in selection process No transfer of responsibilities to municipalities No changes to the work driven by our federal obligations Note: Some ideas are being otherwise pursued (IT, more complex policy questions)
6 Theme: Disinvest from Low-Value Activities Focus agency & business time where environmental / public health value is added, and accelerate shovel-in-the-ground: c.91 Small Dock & Pier General License Wetlands: Instantaneous File Number Issuance; Targeted Permit Review (SOCs); Exemption for certain public good projects in outer 50 of buffer zone (highway & utility maintenance) Concurrent Programmatic Reviews for Waterfront Projects (c.91 License, Wetlands & MEPA)
7 Theme: Incentivize Good Behavior Renewable Energy Projects (access roads,...) Ecological Restoration (stream day-lighting..) Pilot Technology Projects (temporary & small scale for data-gathering)
8 Wetlands and Waterways Changes Permit Consolidation for coastal/dredging projects Single Application for WPA, 401, and c.91 Single Permit under WPA, 401, and c.91 General permitting for ecological restoration projects. For example: dam removal, stream daylighting, shellfish habitat restoration, fish passage, removing tidal restrictions (WPA) Exemption for resources created by stormwater management structures Promotes O & M for existing structures Filing requirements will apply to new structures proposed within resource areas.
9 Wetlands Protection Changes Incentivize preservation of Buffer Zone Consensus not reached on content of General Permit for outer 50 feet Adding new language to minor exemptions section related to utility installation Roadway maintenance Targeted Review by MassDEP- New SOP Assign WPA File Numbers immediately upon NOI submittal Limit NOI review and oversight in order to concentrate resources on SOC appeals to DEP while supporting Con Coms Strategically deploy SOC review on projects with significant resource area impacts Use Wetland Information Resource (WIRe) tracking system to implement this SOP
10 Wetlands Protection Changes Limited Project status for Renewable Energy Projects under WPA: Access roads A regulatory path for piloting new technologies (renewable energy technologies and others) WPA, Chapter 91 and 401
11 Waterways - Chapter 91 Changes New Policy on Extended License terms Coordinating license issuance with MEPA and Wetlands Protection permitting process Allows c. 91 review to start during MEPA process General License for small docks and piers Statutory amendment Eligibility criteria for inland and coastal docks Certification process created for coverage
12 Please comment on draft regulations! Coming soon Public notice versions of draft regulatory changes have been approved by EOEEA and Governor s office Notice to Legislative Committees (approval is required for promulgation) in the next few weeks. Public Comment Period anticipated in late January or early February, 2013 Final promulgation completed by the end of the year
13 Chapter 238 of the Acts of 2012 An Act relative to infrastructure investment, enhanced competitiveness and economic growth in the Commonwealth Abutter Notification: Section 49 Emergency Provisions: Section 50 Sewer: Section 48 Permit Extension Act: Sections 74 and 75
14 Abutter Notice Current Abutter Notice Provisions: Any person filing a Notice of Intent shall at same time give notice to all abutters within 100 feet of the property line of the land where the activity is proposed. Abutter is owner of land abutting the activity sharing a common boundary or corner with the site of the proposed activity in any direction including land located directly across a street, river, stream, brook, or canal. If separated from street or body of water, notification also to property owners not unreasonably distant from the project site.
15 Application of New Exceptions Abutter notice provisions apply to all abutters within 100 feet of project, unless project locus is: LUW 50+ acres Linear shaped project Existing abutter provisions continue to apply to all inland (non-luw), <50 acres, linear shaped projects < 1,000 feet. Abutter - preserves 10.05(7)(a) appeal rights of any owner of land abutting the land on which the work is to be done
16 Proposed Regulatory Provisions Linear Shaped Project: for purposes of 310 CMR 10.05(4) means a project that is substantially longer than it is wide and is a project for the construction, reconstruction, expansion, repair or maintenance of facilities that will be used in the service of the public to provide electric, gas, water, telephone, telegraph and other communication services, a project by a public agency or authority for the construction, reconstruction, expansion, repair or maintenance of public roads or bike paths, or a project involving the construction of public railways. Project Site : means the area within the Project Locus that comprises the limit of work for the following proposed activities: dredging, excavating, filling, grading, the erection, reconstruction or expansion of a building or structure, the driving of pilings, the construction or improvement of roads or other ways, and the installation of drainage, stormwater treatment, environmentally sensitive site design practices, sewage and water systems. Project Locus : means the lot on which an applicant proposes to perform an activity subject to regulation under M.G.L. c. 131, 40.
17 Linear Shaped Projects
18 Projects on Lots > 50 Acres
19 Projects on Land Under Water
20 Greenfield, MA August 2011
21
22 Shelburne Falls, MA August 2011
23 Greenfield, MA August 2011
24 Emergencies and the Wetlands Act Emergency Certification process Emergency Regulations Promulgated for storm related clean up across large geographic areas Statutory amendment effective on November 5, 2012 authorizes Commissioner to issue an Emergency Declaration specifying activities and locations where work in wetlands and buffer zone may occur without individual Emergency Certification
25 Thank you! Lealdon Langley, Director Wetlands and Waterways Program Bureau of Resource Protection (617)
S.O.P. No. HMD
Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT
More informationCommonwealth of Massachusetts Executive Office of Energy and Environmental Affairs and Department of Environmental Protection
Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs and Department of Environmental Protection Technical Support Document on Proposed Regulatory Amendments to: 310 CMR 7.75
More informationState of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area
State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area Thaddeus L. Cohen, AIA Secretary November 2006 CONTENTS Part 1 - Summary
More informationNovember 2,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFIARS ON THE FINAL ENVIRONMENTAL IMPACT REPORT
MlTl ROMNEY Tel. (617) 626-1000 GOVERNOR Fax. (617) 626-1181 KERRY HEALEY hltp://www.mass.gavlenvir LIEUTENANTGOVERNOR ROBERT W. GOLLEDGE, JR November 2,2006 SECRETARY CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL
More informationCass County Soil Erosion & Sedimentation Control Program
Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that
More information5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE
5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE This section discusses the effect of the Proposed Action on navigable waterways, and the Proposed Action s consistency with coastal zone policies. 5.5.1 Navigable
More informationKRISTOPHER J. KRZYSTON, CEI, CEM
PERMITTING IN NEW JERSEY KRISTOPHER J. KRZYSTON, CEI, CEM Kristopher J. Krzyston Rutgers graduate 1994 B.S. Environmental Planning Certificate in G.I.S. Assistant Division Manager Environmental Science
More informationIngham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)
Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION
More informationFLOODPLAIN DEVELOPMENT AND BUILDING ORDINANCE
Town of Rye 10 Central Road Rye, NH 03870-0429 FLOODPLAIN DEVELOPMENT AND BUILDING ORDINANCE Item I. Definitions of Terms Item II. Permit Requirement Item III. Building Safety Review Item IV. Sanitary
More information15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines.
15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines. Estuarine shorelines AEC are those non-ocean shorelines
More informationUS Army Corps of Engineers and Stream Restoration Permitting
US Army Corps of Engineers and Stream Restoration Permitting Jack Dinne US Army Corps of Engineers-Baltimore Maryland Section Northern May 6, 2014 US Army Corps of Engineers Presentation Overview Corps
More informationa landowner whose parcel was subjected to the discharge of a neighbor's ditch which was being used to drain a swamp;
PA Act 167 Watershed Stormwater Management Planning DEFINITION Stormwater management has been traditionally defined as measures used by property owners and local governments to limit the amount of stormwater
More informationModule 3. Module 3a. As of July : A lot of local ESC ordinances are out of date! Virginia Erosion & Sediment Control Program
Module 3. Virginia Erosion & Sediment Control Program Module 3a. Statutory and Regulatory Requirements: Virginia Erosion and Sediment Control Law and Regulations As of July 1 2013: A lot of local ESC ordinances
More informationINTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 8 To provide accessible, effective and frequent intergovernmental opportunities to achieve consistency among all government agencies
More informationSECTION 11: REGULATORY FLOODWAYS
SECTION 11: REGULATORY FLOODWAYS Contents 11.1. The Floodway... 11-2 11.1.1. The floodway concept... 11-2 11.1.2. Floodway map... 11-2 11.1.3. Floodway permitting... 11-3 11.1.4. Changing the floodway...
More informationNew Mexico WATER RIGHTS FACT SHEET. August 15, 2001
New Mexico WATER RIGHTS FACT SHEET August 15, 2001 Water Rights System: New Mexico s water law is based on the doctrine of prior appropriation or "first in time - first in right. All waters in New Mexico
More informationNavigating the U.S. Army Corps of Engineers Regulatory Process
Navigating the U.S. Army Corps of Engineers Regulatory Process Angela Ryan Biologist Tampa Permits Section May 16, 2012 US Army Corps of Engineers JACKSONVILLE DISTRICT Regulatory Mission To protect the
More informationFlood Mitigation Facilities for Peabody Square Area
ENVIRONMENTAL NOTIFICATION FORM Flood Mitigation Facilities for Peabody Square Area Peabody, Massachusetts Submitted by: City of Peabody Department of Public Services Submitted to: Executive Office of
More informationHolly Swartz and Jason Shirey
Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes
More informationInstructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):
This PCN integrates the requirements of the U.S. Army Corps of Engineers (Corps) Nationwide Permit Program within the South Pacific Division (SPD), including the Albuquerque, Los Angeles, San Francisco,
More informationUnderstanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department
More informationZoning Permits 11-1 ZONING PERMITS
Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building
More informationConstruction Application for Permit (CAP) Instructions
Construction Application for Permit (CAP) Instructions A CAP is required to be completed and submitted to the Wayne Soil & Water Conservation District (SWCD) office for non-farm, earth-disturbing activities
More informationCHAPTER 110 SEWAGE DISPOSAL
110-1. Title. 110-6. System rehabilitation. 110-2. Purpose. 110-7. Liability. 110-3. Definitions. 110-8. Conflict with other 110-4. Applicability. regulations. 110-5. Applicable standards for sewage 110-9.
More informationRiverbank Stabilization Techniques Workshop Merrimack River, Haverhill, MA
Riverbank Stabilization Techniques Workshop Merrimack River, Haverhill, MA Dwight R. Dunk, PWS Association of Massachusetts Wetland Scientists September 30, 2011 Introduction Project History Design Development
More informationEnvironmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE
Environmental Management Chapter 335-1-6 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE CHAPTER 335-1-6 APPLICATION FEES TABLE OF CONTENTS 335-1-6-.01 Applicability
More informationWATER QUALITY MANAGEMENT PLAN PROCEDURES
PUBLIC WORKS DEPARTMENT DEVELOPMENT SERVICES DIVISION SUBDIVISION SERVICES SECTION City Hall East 200 S. Anaheim Boulevard. 2 nd Floor Anaheim, California 92805 www.anaheim.net/publicworks WATER QUALITY
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring
DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:
More informationModule 4 Regulatory requirements for Land Disturbing Activities
Module 4 Regulatory requirements for Land Disturbing Activities MODULE 4 REGULATORY REQUIREMENTS FOR A LDA Module 4a Overview MODULE 4A REGULATORY REQUIREMENTS FOR A LDA ESC Regulations Overview 1990 First
More informationGRAND NIAGARA Proposed Secondary Plan
GRAND NIAGARA Proposed Secondary Plan Public Open House #3 January 17. 2017 scope + process BUILT Grand Niagara Secondary Plan The Grand Niagara Secondary Plan will establish a framework for the future
More informationAddition to Section 4 - Special Use Regulations
Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of
More informationHydropower Project License Summary PIT RIVER, CA PIT 1 HYDROELECTRIC PROJECT (P-2687) Pit River below Pit 1 Powerhouse
Hydropower Project License Summary PIT RIVER, CA PIT 1 HYDROELECTRIC PROJECT (P-2687) Pit River below Pit 1 Powerhouse Photo: Hydropower Reform Coalition This summary was produced by the Hydropower Reform
More informationSTATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II
STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater
More informationErosion & Sedimentation Control Policy
Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of
More informationWalker County Manufactured Home Rental Community Regulations Infrastructure Development Plan
A. In accordance with Local Government Code Section 232.007, an Infrastructure Development Plan (IDP) is required for all manufactured home rental communities, as defined in Section A 1.0 E of these regulations,
More informationU.S. Army Corps of Engineers
U.S. Army Corps of Engineers New England District General Permits for Massachusetts Greg Penta, Policy, Analysis & Technical Support Branch Paul Sneeringer, MA Permitting & Enforcement Branch April 2015
More informationTHE CORPS REGULATORY AUTHORITY
Regulatory Branch THE CORPS REGULATORY AUTHORITY THE U.S. ARMY CORPS OF ENGINEERS REGULATORY AUTHORITY IS BASED UPON 1. SECTION 10 OF THE RIVERS AND HARBORS ACT OF 1899 (RHA) AND 2. SECTION 404 OF THE
More informationCITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT
CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards
More informationINSTRUCTIONS FOR USING THE GENERAL PERMIT...i A. GENERAL DESCRIPTION AND FEES
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS GENERAL PERMIT BWEW-GP-1 FISH HABITAT ENHANCEMENT STRUCTURES TABLE OF CONTENTS PAGE INSTRUCTIONS
More informationSTORMWATER MANAGEMENT PROGRAM. Table of Contents
STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public
More informationSOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form
SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE ADEM Form 305 8-02 1 July 10, 2002 M E M O R A N D U M TO: FROM: RE: Applicants Seeking a Permit for Solid Waste
More informationREGULATORY CHANGE FOR UTILITY VEGETATION MANAGEMENT IN THE US
REGULATORY CHANGE FOR UTILITY VEGETATION MANAGEMENT IN THE US WILL PORTER DIRECTOR OF CONSULTING RULES AND REGULATIONS CHANGE TO MEET SOCIETAL NEEDS State regulators commissions Customer Needs Electric
More informationCITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application
CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and
More informationBlue Earth County Code
Blue Earth County Code Sec. 114-116 Special Provisions (b) Agriculture use standards. (1)General cultivation farming, grazing, nurseries, horticulture, truck farming, sod farming and wild crop harvesting
More informationCOMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION
COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION SOUTHEAST REGIONAL OFFICE 20 RIVERSIDE DRIVE, LAKEVILLE, MA 02347 508-946-2700 DEVAL
More informationCOMMONWEALTH OF VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY WATER DIVISION. ELLEN GILINSKY, Ph.D DIRECTOR P.O.BOX 1105 Richmond, VA 23218
COMMONWEALTH OF VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY WATER DIVISION ELLEN GILINSKY, Ph.D DIRECTOR P.O.BOX 1105 Richmond, VA 23218 Subject: Water Guidance Memo No. 08-2012 Farm Pond or Impoundment
More informationPennsylvania s Phase III Watershed Implementation Plan
Pennsylvania s Phase III Watershed Implementation Plan Informational Meeting Pennsylvania House and Senate Agriculture and Rural Affairs Committees August 16, 2017 Agenda Why Are We Doing This? Progress
More informationTHE LEGISLATIVE FRAMEWORK FOR MUNICIPAL PLANNING, SUBDIVISION, AND DEVELOPMENT CONTROL
THE LEGISLATIVE FRAMEWORK FOR MUNICIPAL PLANNING, SUBDIVISION, AND DEVELOPMENT CONTROL Alberta Municipal Affairs February 1997 Updated March 2002 1.0 INTRODUCTION The authority for municipal planning,
More informationORDINANCE #16- PROPOSED ORDINANCE #16-14
ORDINANCE #16- PROPOSED ORDINANCE #16-14 AN ORDINANCE TO AMEND CHAPTER 21, ZONING, OF THE WILLIAMSBURG CODE BY ADDING ARTICLE III, DIVISION 9.1. CULINARY ARTS AND HOSPITALITY DISTRICT B-4 (PCR #16-008)
More informationSECTION 6: MITIGATION STRATEGY
SECTION 6: MITIGATION STRATEGY This section describes the process by which the Lehigh Valley Steering Committee and municipal planning partnership performed the update to the county and local mitigation
More informationVirginia Stormwater Management Permitting
Virginia Stormwater Management Permitting Construction Activities J. Douglas Fritz Overview of VSMP Construction Stormwater Permitting Discharges from regulated Construction Activities are industrial discharges
More informationThe following is required for a complete permit submittal for each unit.
P: (847)810-3503 OR (847)810-3503/3521, F: (847)615-4383 NEW MULTI-FAMILY DWELLING OR COMMERCIAL PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. NEW MULTI-FAMILY
More informationApplication Number: SP Project Name: Novo Nordisk Bright Sky Major Site Plan (acting as a Master Plan)
STAFF REPORT Town of Clayton Staff Report Planning Department 111 E. Second Street, Clayton, NC 27520 P.O. Box 879, Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Planning Board February 22, 2016
More informationPreface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)
Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)
More informationPOTABLE WATER ELEMENT
Goal 4.0. Provide current and future residents of the County's utility service areas, and large users of the regional raw water system a cost-effective and equitable potable or raw water supply system
More informationADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA
ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) 36-07-120 (Also see Heritage, Specimen, Memorial and Street Trees Ordinances 37-07-N adopted simultaneously on October 15, 2007) OF THE 1976 CODE OF
More informationEnvironmental Regulation: Updates from Tallahassee and Washington. Malcolm N. Means July 2017
Environmental Regulation: Updates from Tallahassee and Washington Malcolm N. Means July 2017 State Regulation 2 Pollution Notification Rule Fall 2016 Governor Scott orders DEP to issue an emergency rule
More informationKABA DEMOLITION INFORMATION PACKET
I. Demolition Process Checklist Structures Requiring No Permit Residential Structures 200 Square Feet or Less Commercial Structures 120 Square Feet or Less Structures Requiring No Bond 1 and 2 Family Residential
More informationBuzzards Bay. National Estuary Program
Buzzards Bay National Estuary Program Ian A. Bowles, Secretary September 5, 2008 Executive Office of Energy and Environmental Affairs Attn: Aisling Eglington, MEPA Office EEA No. 13940A 100 Cambridge Street,
More informationSoil Erosion and Sedimentation Control 12 Items required on a SESC Plan pursuant to Rule 1702
Soil Erosion and Sedimentation Control 12 Items required on a SESC Plan pursuant to Rule 1702 1. Scaled Map 2. Site Location 3. Proximity to lakes/streams 4. Limits of Earth Change 5. Predominant land
More informationEnvironmental Information Worksheet
Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project
More informationState of Georgia Department of Natural Resources Environmental Protection Division
General Permit No. GAR100000 State of Georgia Department of Natural Resources Environmental Protection Division Authorization To Discharge Under The National Pollutant Discharge Elimination System Storm
More informationAGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality
DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS 77553-1229 April 11, 2017 AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental
More informationBLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):
R-1A - ZONING REVIEW WORKSHEET Note: The items below must be reviewed and found in compliance prior to issuance of a zoning permit. Therefore, the appropriate data must be shown on the survey/lot development
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationTown of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL
CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with
More informationMassachusetts Department of Environmental Protection Bureau of Waste Site Cleanup
A. THIS FORM IS BEING USED TO: (check one) 1. Log Date: 10/24/2017 Log Time: 11:18 AM PM 2. Assign a (RTN) to a Release or TOR Report. a. Reportable Release or TOR. b. Release that is Less Than the Reporting
More informationEndangered Species Act. Allows designation of significant habitat for listed species. ch. 131A, 1 et seq. (1990)
, STATE AND LOCAL AUTHORITY FOR MARINE PROTECTION (2014). MASSACHUSETTS 1 State Authority for Marine Protection Summary of State Authority has designated by statute five Sanctuaries that cover most of
More informationReview of State and Federal Stormwater Regulations November 2007
Review of State and Federal Stormwater Regulations November 2007 By: James T. Spaulding, PE, CPESC Joseph M. Ducharme, Jr., PE TTG ENVIRONMENTAL CONSULTANTS, LLC 27 LOCKE ROAD, CONCORD, NH 03301-5301 TELEPHONE:
More informationCHAPTER 7. San Dieguito River Flooding Adaptation
CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,
More informationAppendix D - Evaluation of Interim Solutions
Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner
More informationREQUEST FOR CONSTRUCTION BIDS May 23, 2017
REQUEST FOR CONSTRUCTION BIDS May 23, 2017 Cambridge Greenway Trail / Railroad Bridge Replacement Flood Mitigation Project 1.0 Project Background A former railroad bridge that currently carries the Cambridge
More informationNOTICE OF PROPOSED RULE. Water Quality Practices. Relationship to Other Permitting Requirements. Publications Incorporated by Reference
NOTICE OF PROPOSED RULE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT RULE NO.: 40C-44.021 40C-44.065 40C-44.066 40C-44.071 40C-44.091 40C-44.101 40C-44.301 40C-44.900 RULE TITLE: Definitions Performance Standards
More informationRemaining Wetland Acreage 16,194,500 8,784,200 7,410,300-46%
LOUISIANA Original Wetland Acreage Remaining Wetland Acreage Acreage Lost % Lost 16,194,500 8,784,200 7,410,300-46% Louisiana Wetlands: Palustrine wetlands, which include swamps, scrub-shrub, wetlands,
More informationRequest for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood
Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood The Quinault Indian Nation (QIN) is pleased to present a Request for Proposal and
More informationManaging Adaptive REsponses to changing flood risk. Bergen. Haukås Watercourse HAUKUS
Managing Adaptive REsponses to changing flood risk Bergen. Haukås Watercourse HAUKUS 130405 Developers Long term ownership Wildlife Heritage Environment Water quality Water quantity Emergency planning
More informationMunicipal Stormwater Management Planning
Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental
More informationMEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY
MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY I. Purpose The purpose of this Memorandum of Understanding (MOU) is to establish communication protocols
More informationNationwide Permit General Conditions
Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific
More informationSoPo s SW Management Approach Purpose of SW Standards
Purpose of SW Standards May 2009: adopt comprehensive provisions to address SW impacts from development activities Recognizes that development / redevelopment: Reduces soil infiltration capacity Increases
More informationTITLE 51 - MANAGEMENT OF MARINE RESOURCES 51 MIRC Ch.3 CHAPTER 3. MANAGEMENT AND DEVELOPMENT OF LOCAL FISHERIES ARRANGEMENT OF SECTIONS
TITLE 51 - MANAGEMENT OF MARINE RESOURCES 51 MIRC Ch.3 CHAPTER 3. MANAGEMENT AND DEVELOPMENT OF LOCAL FISHERIES ARRANGEMENT OF SECTIONS Section 301. Short Title. 302. Management and development of local
More informationWETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors
Adverse effects as used in this section of the SOP means any adverse ecological effect on wetlands or areas of open water. Those effects, or impacts, include filling, excavating, flooding, draining, clearing,
More informationa. Structures subject to section Architectural & Site Design Standards must comply with the following additional fencing standards:
5.03.02 Fences and Walls A. All districts. 1. Whenever a property owner elects to construct a chain link fence, pursuant to the provisions herein, adjacent to an arterial or collector road in the urban
More informationSudbury to Hudson Transmission Reliability Project
Hudson, Massachusetts Board of Selectmen Presentation February 22, 2016 Revised 3-24-16 Page 4 revised last bullet on Route Analysis Process. Page 9 revised preferred route (overhead) visual simulation
More informationDAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN
DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN 2011-2015 4100 220 th Street West, Suite 102 Farmington, MN 55024 651-480-7777 www.dakotacountyswcd.org I. INTRODUCTION A. Purpose
More informationUS Army Corps of Engineers
I I I ' A I US Army Corps of Engineers LA River Ecosystem Restoration, CA Preconstruction Engineering and Design Phase 104791 LOS ANGELES DISTRICT SOUTH PACIFIC DIVISION August 15, 2017 1 Table of Contents
More informationCHAPTER I INTRODUCTION TO WYOMING WATER ADMINISTRATION
INTRODUCTION TO WYOMING WATER ADMINISTRATION Section 1. Constitutional Framework. a. The water within the boundaries of Wyoming is declared to be the property of the state by Section 1, Article 8 of the
More informationDECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT (FONSI)
DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR CASA LOMA RECREATION RESIDENCE PERMIT RENEWAL U.S. FOREST SERVICE CIBOLA NATIONAL FOREST SANDIA RANGER DISTRICT BERNALILLO COUNTY, NEW MEXICO
More information7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit
7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7.1 E-Permit and U-Permit Permit Description and Purpose The Excavation Permit (E-Permit) and the Utility Permit (U-Permit) are issued to allow construction,
More informationThe following is required for a complete permit submittal for each unit.
P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 MULTI-FAMILY OR COMMERCIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. MULTI-FAMILY
More informationLOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:
LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates
More informationKANAWHA RIVER, WEST VIRGINIA
Hydropower Project License Summary KANAWHA RIVER, WEST VIRGINIA LONDON-MARMET HYDROELECTRIC PROJECT (P-1175) Photo: US Army Corps of Engineers This summary was produced by the Hydropower Reform Coalition
More informationExecutive Summary of the Plan of Reorganization
Executive Summary of the Plan of Reorganization The Communities of Zionsville Area for Better Government (the Reorganization Committee ) consists of nine (9) members: three (3) from Eagle Township; three
More informationNRI/FSD and FOREST CONSERVATION EXEMPTION SUBMISSION REQUIREMENTS
Detailed description of the submission requirements for the NRI/FSD and forest conservation exemption requests may be found in the MNCPPC Trees Technical Manual. The applicant, applicant s agent, or qualified
More informationThe Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21; and by Saskatchewan Regulations
More informationILF Instrument Development and Execution. The North Carolina Experience September 15, 2010
ILF Instrument Development and Execution The North Carolina Experience September 15, 2010 Presentation Overview EEP Background Instrument Development Process Content of Agreement Q&A (but feel free to
More informationREQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #
REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #2018-010 for PROFESSIONAL SERVICES Architectural, Landscape Architectural, Appraisal, Title, Engineering and Survey FY 2018 Issue date: January 25, 2018 Lake
More informationUS Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition
US Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition Erin Endsley, Project Manager Mike Bares, Technical Analyst Minnesota Pollution Control Agency August 26, 2015 Outline Site history
More informationPublic Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:
Public Notice Applicant: City of Dallas Project No.: SWF- 2014-00151 Date: April 18, 2014 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It
More information