1 Sewer Charge & Surcharge Provision Development, Implementation & Benefits 2013 Industrial Wastewater Conference Bethlehem, PA (October 4, 2013)
2 Human Waste Treatment History (1) Historically dilution in streams (Pits & discharge to streams) (2) 1887 : First biological treatment (Intermittent sand filter) in Medford, MA (3) 1899 : First Federal regulation of sewage Rivers & harbors Appropriations Refuse Act prohibiting discharge of solids to navigational waters without permit from US Army Corps of Engineers (4) 1901 First Trickling filter in Madison WI; 1909 Imhoff tank for solids settling; (5) 1914 liquid chlorine disinfection; (6) 1916 Activated sludge plant, St. Marcos, TX; 1940 s Secondary Treatment process to remove BOD (7) 1948 Federal Water Pollution Control Act for water quality surveys & construction of sewage collection and treatment plants Clean Water Act (8) 1960 Present : Treatment process advances include improved activated sludge processes, nutrient removals (ammonia, phosphorus, nitrates), oxic/anoxic systems, sequencing batch reactors, MBR, improved sludge digestion (high temp), etc.
3 Wastewater (Sewage) Treatment Plant & Treatment Capabilities (1) Design to treat human waste (domestic wastewater) (2) Design for specific parameters: BOD, TSS, NH3 (TKN) (Others: Phosphorus, Nitrate, Metals) (3) Treatment/Removal of Pollutants as a by product of biological treatment Biodegrade: O&G/TPHC, organics Release to air: Volatile organics Sludge Accumulation: Conventional pollutants, Metals, organics (untreated) (4) Untreated pollutants released to Surface Waters (submit to the permit) (5) Accumulated sludge Disposed offsite
4
5
6 Discharges to Sanitary Sewer System (1) Sanitary discharge from households; (2) Stormwater (runoffs/overflows/combined sewers) (3) Groundwater inflow/infiltration (4) Commercial Discharge (Non domestic in nature) (Restaurants, laundries, carwash, garages, print/photo, NCCW, etc.) (5) Industrial Wastewater (Manufacturing and processing)
7 Protecting Wastewater Treatment Plant Design for domestic wastewater (human / household waste) Protect the treatment plant from any plant interference, inhibition, and bypass from non designed or incompatible discharge sources; Document all criteria applicable to plant and its operations: plant Design, process inhibition, process interference, sludge quality interference, NPDES (stream) discharge criteria, sludge disposal criteria, and worker safety Define what quality of non domestic wastewater could be acceptable to protect the plant. Development of plant specific local discharge limits Adopt and implement the local sewer discharge limitations
8 Typical Local Discharge Limitations BOD (2) TSS 250 (2) NH 3 N) 25 (2) TKN 40 (2) Oil/Grease 100 Temp. 65 Celsius ph S.U. Arsenic (T) 1.00 Beryllium(T) 0.10 Cadmium(T) 0.25 Chromium(T) 2.12 Copper (T) 2.88 Lead (T) 2.22 Mercury (T) 0.13 Molybdenum 0.16 Nickel (T) 3.09 Selenium (T) 0.20 Silver (T) 2.60 Zinc (T) 4.26 Cyanide (T) 1.04 Flash Point F(Min.) Total Toxic Organics (TTO) (3) (1) All units in mg/l, unless otherwise specified. All limitsasdailymaximum(composite samples), except for the instantaneous limits for the grab sample parameters. (2) A surcharge option for higher BOD 5, TSS, NH 3, and/or TKN limits may be available (see Section 6.4). (3) TTO limits may be imposed on a case by case basis. Discharge of toxic or hazardous substances is also prohibited under Section V. See Appendix B for the list of Total Toxic Organics. 6.4 SURCHARGE PROVISION FOR CONVENTIONAL POLLUTANTS 6.5 EXCEPTION & EXEMPTION PROVISIONS
9 Plant Available Treatment Capacities & Future Planning Review available excess capacities for: Flow, BOD, TSS, Ammonia and other plant design parameters; Address the service area (participating municipalities) future planning and growth; Assess available excess treatment capacities for the Designed pollutant parameters
10 Typical Plant Design and Compliance Criteria (A) (B) Typical biological WWTP design criteria are (Varies with plants): (1) BOD mg/l (Influent) 90% Removal rate (EPA minimum 85%) (2) TSS mg/l (Influent) 90% Removal rate (EPA minimum (3) NH mg/l (Influent) 90 95% Removal rate Typical WWTP Discharge/Effluent Limitations: (1) BOD mg/l (2) TSS mg/l (3) NH mg/l (Varies Summer/Winter limits) (4) Others: Phosphorus, Nitrates, Metals (Additional pollutants and discharge limitations and requirements based upon Federal and State permits)
11 Plant Design, Actual Performance & Capacity (A) If the WWTP is operated as designed, typically plant has excess capacities available to treat additional BOD5, TSS and NH3; likely due to Higher pollutant removal rates (Consistent below the effluent discharge quality requirements)better compliance Lower plant influent pollutant concentrations (In recent years some increases in pollutant concentrations due to the water conservation) Note: Higher available loading capacity does not mean the plant will operate under same conditions and at the same efficiency with higher influent pollutant loads. Need to check available air/supply and treatment capacities, retention time, effects on nitrification and bio treatments, higher sludge capacity, effect on other treatment units, etc. What to do with the excess available pollutant treatment capacities available at the plant?
12 Plant Design, Actual Performance & Capacity (Example) NJPDES POTW DESIGN 2011 POTW DATA (1) DAILY 2011 POTW LOADINGS (3) Calculated Daily Safety Available (5) PARAMETERS LIMIT CONCEN. LOADINGS Influent Effluent Removal LOADING Domestic Commercial Industrial Loading For Factor Daily Loading CAPACITY Loading Loading Loading Ind./Comm. 10%) For Ind./Comm. (mg/l) (mg/l) (lbs/day) (mg/l) (mg/l) (% ) (lbs/day) (lbs/day) (lbs/day) (lbs/day) (lbs/day) (lbs/day) (lbs/day) FLOW in MGD BOD5 (6) TSS (< 1.00) NH (< 1.00) TKN (7) PHOSPHORUS(8)
13 Sewer Surcharge Option Develop data base for at least 2 3 years and verify excess capacities are available; Hold about 20 % loadings as reserve to address any variations & unforeseen event; Calculate available excess loadings for the design pollutants (BOD5, TSS, NH3) These excess loadings could be made available to industrial and commercial dischargers for a surcharge payment for the actual loadings discharge over the domestic equivalent loadings. Implementation of the sewer surcharge provision is not mandatory, but quite common and recommended (Could be beneficial to POTW and industries)
14 Sample Primary Treatment Removal Rates Treatment Process Removal Rates Pollutant Month-Year Plant Plant Primary Primary Secondary Nitrification Plant Primary Secondary Nitrification Total FLOW Influent Influent Effluent Effluent Effluent Effluent Removal Removal Removal Removal BOD5 (in MGD) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in % ) (in % ) (in % ) (in % ) 1st Quarter 2/14/11-2/15/ < % 32.23% 21.62% 99.19% 2nd Quarter 4/11/11-4/12/ < % 19.49% 20.87% 99.42% 3rd Quarter 7/11/11-7/12/ < % 28.22% 15.67% 99.41% 4th Quarter 10/3/11-10/4/ < % 36.36% 17.63% 99.37% 2011 AVERAGE < % 29.08% 18.95% 99.35% 2011 LOADINGS =Lbs/day influent load Lbs/day load Removed= TSS (in MGD) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in % ) (in % ) (in % ) (in % ) 1st Quarter 2/14/11-2/15/ % 23.22% 18.05% 99.29% 2nd Quarter 4/11/11-4/12/ % 11.84% 10.74% 99.36% 3rd Quarter 7/11/11-7/12/ < % 15.51% 6.54% 99.83% 4th Quarter 10/3/11-10/4/ < % 26.04% 16.98% 99.79% 2011 AVERAGE % 19.15% 13.07% 99.57% 2011 LOADINGS =Lbs/day influent load Lbs/day load Removed= NH3-N (in MGD) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in % ) (in % ) (in % ) (in % ) 1st Quarter 2/14/11-2/15/ % 5.79% 91.85% 98.08% 2nd Quarter 4/11/11-4/12/ % 16.52% 82.26% 98.45% 3rd Quarter 7/11/11-7/12/ % 20.00% 73.22% 98.36% 4th Quarter 10/3/11-10/4/ % 15.33% 80.12% 98.67% 2011 AVERAGE % 14.41% 81.86% 98.39% 2011 LOADINGS =Lbs/day influent load Lbs/day load Removed= P(T) (in MGD) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in MG/L) (in % ) (in % ) (in % ) (in % ) 1st Quarter 2/14/11-2/15/ % 4.85% 42.62% 71.97% 2nd Quarter 4/11/11-4/12/ % 4.88% 36.13% 67.92% 3rd Quarter 7/11/11-7/12/ % 17.85% 21.50% 67.51% 4th Quarter 10/3/11-10/4/ % 5.34% 40.25% 63.85% 2011 AVERAGE % 8.23% 35.12% 67.81% 2011 LOADINGS 73.5 =Lbs/day influent load Lbs/day load Removed= 49.8
15 Calculating Sewer Rates & Sewer Surcharge Rates (1) USEPA guidelines (early 1980 s) for User Charge & Related Revenue System Requirement for a POTW (2) More than one way to calculate rates, as long as it covers POTW costs and reasonably distribute them work related to corresponding pollutants removal (3) Basically calculating the treatment plant capital and operating costs and distributing the cost in the plant design parameters including: Flow (mostly sewer collection system operation) BOD5 TSS NH3 (TKN) Phosphorus & Others (if the plant is designed)
16 Sewer / User Rates (1) Applicable to all connections (Domestic and non Domestic discharges) (2) Includes Capital and operating costs, including debt obligations, O&M costs (3) Typically, based upon the discharge volume allocation (Equivalent Domestic Unit (EDU) and EDU multiple). (4) EDU could range from gallons/home/day (5) Some municipalities may have a fraction of EDU for lower size home ( e.g. 1 2 bedroom houses/apartments may have lower rates than 3 bedrooms)
17 Sewer Surcharge Rates Calculation (1) Allowed for only pollutants for which the plant is specifically designed (2) Sewer Surcharge Rates are in addition to the Sewer/User Charges (3) Sewer Surcharge Rates are calculated using only Plant O&M and Related Costs, including: All plant operation and maintenance costs, including electricity, chemicals, property maintenance, vehicles, sludge disposal cost, etc. Employee salaries and benefits Plant administration cost Regulatory and compliance cost Related engineering and legal cost DO NOT INCLUDED: Capital cost, debt service cost, IPP cost
18 Sewer Surcharge Rates Calculation (1) Breakdown of costs to specific Flow, BOD5, TSS, NH3 (TKN), etc. operations (2) Split O&M costs into specific process operations: Collection system (flow), primary treatment, biological/aeration treatment, nitrification, chemical treatment, disinfection, sludge operations, etc. (3) Estimate pollutant removal rate for each treatment unit operation (4) Split general cost items (administration, regulatory, legal, etc.) proportional to overall pollutant removal rates by each treatment unit. (5) Calculate surcharge rates ($$/pound of pollutant) for each pollutant: BOD5, TSS, NH3, etc.
19 HSA ADMINISTRATIVE COST Yearly Cost FLOW COST BOD5 COST TSS COST AMMONIA COST PHOSPHORUS COST Ref.# % Factor Cost % Factor Cost % Factor Cost % Factor Cost % Factor Cost 1100 Administration : Salaries & wages $198, % $42, % $62, % $74, % $13, % $5, Administration : Fringe benefits $98, % $20, % $31, % $36, % $6, % $2, Administration : Other $61, % $13, % $19, % $23, % $4, % $1, Administration : Insurance $9, % $2, % $3, % $3, % $ % $ Plant : Salaries & wages $1,540, % $328, % $486, % $575, % $104, % $44, Plant : Fringe benefits $776, % $165, % $245, % $290, % $52, % $22, Plant : Insurance $80, % $17, % $25, % $30, % $5, % $2, Plant : Electricity $330, % $ % $132, % $156, % $28, % $12, Plant : Sludge cost $162, % $ % $62, % $87, % $10, % $1, Plant : Fuel & water $167, % $ % $67, % $79, % $14, % $6, Plant : Maintenance supplies $78, % $ % $31, % $37, % $6, % $2, Plant : Maintenance services $149, % $ % $59, % $70, % $12, % $5, Plant : Equipment $20, % $ % $8, % $9, % $1, % $ Plant : Chemicals (Overall plant) $51, % $ % $20, % $24, % $4, % $1, Plant : Chemicals (Alum for P(T)) $50, % $0 0.00% $0 0.00% $0 0.00% $ % $50, Plant : Permits & Regulatory $20, % $ % $8, % $9, % $1, % $ Plant : Office supplies $13, % $ % $5, % $6, % $1, % $ Plant : Laboratory $122, % $ % $49, % $58, % $10, % $4, Plant : Safety $21, % $ % $8, % $10, % $1, % $ Professional Services (4) (7) $194, % $ % $78, % $92, % $16, % $7, Vehicle expense (5) $30, % $24, % $2, % $2, % $1, % $204 $0 $0 $0 $0 $ Township Reimbursement $64, % $64,015 $0 $0 $0 $ Administration : Fiscal Agent $ % $0 $0 $0 $0 $ Collection System $263, % $263,600 $0 $0 $0 $ Industrial Pretreatment Program (7) $210,600 $0 $0 $0 $0 $ Debt Service $225, % $225,000 $0 $0 $0 $ Plant Expansion $500, % $500,000 $0 $0 $0 $0 Total Other Admin. Costs $5,439,786 $1,666,613 $1,408,548 $1,679,429 $300,728 $173,852
20 Sewer Charges & Surcharge Allocating Excess capacity for Payment of Surcharge (1) Calculate overall plant excess capacities for each BOD5, TSS, NH3, etc. (2) Reserve about 20% of excess pollutant capacities (3) Allocate excess Available capacities to industrial/commercial dischargers (typically on a first come first serve basis) (4) Establish upper cutoff discharge limits (Concentrations and/or loadings) for each User, as necessary (5) Document, review and update Available excess capacities each year. (6) Recommended to update the sewer surcharge rates ($$/lb) every two years.
21 Sewer Charges & Surcharge Assessing Individual Surcharge Cost Equation #1: Rx = Ex (8.34) (365) (QT) (CT) Equation #2: S ind. = (Rx) (Q ind ) (C ind C x,l ) (8.34) Rx = Surcharge rate for parameter (x) in dollars per pound. Ex = Annual O&M cost of the POTW associated with treatment of parameter(s) in dollars per year. QT = Average daily influent flow to the wastewater treatment plant (POTW) in million gallons per day. CT = Average daily influent concentration of parameter (x) to the WTP in mg/l. X = Pollutant parameters e.g. BOD5, TSS, NH3, TKN, etc. (8.34) = Conversion factor. Sind. = Monthly sewer surcharge for Users/dischargers in dollars, which is summation of sewer surcharges for all applicable pollutant parameters. Q ind = Total monthly discharge from the User in millions of gallons. C ind = Average discharge concentration of pollutant parameter (x) in milligrams per liter of the Users discharge C x,l = Discharge (domestic Equivalent) concentration for the pollutant parameter (x) in mg/l.
22 Sewer Charges & Surcharge Case History (1) Beverage Manufacturer #1 (High BOD loadings) Typical range: Flow 70,000 gpd, BOD5 1,800 mg/l, TSS 600 mg/l Large WWTP with available excess loadings Issued a discharge permit with a surcharge provision (no cutoff limits) Monthly surcharge fees for BOD5 and TSS in the range of $14,000 (2) Beverage Manufacturer #2 (High BOD loadings) Typical range: Flow 350,000 gpd, BOD mg/l, TSS 1000 mg/l Medium WWTP with limited available loadings Issued a discharge permit with a surcharge provision (with cutoff limits) Monthly surcharge fees for BOD5 and TSS in the range of $125,000 $150,000
23 Sewer Charges & Surcharge Case History (Continued) (3) Food Processer #1 (High BOD & TSS loadings) Typical range: Flow 120,000 gpd, BOD5 2,200 mg/l, TSS 500 mg/l Large WWTP with available excess loadings Issued a discharge permit with a surcharge provision (no cutoff limits) Monthly surcharge fees for BOD5 and TSS in the range of $40,000 (4) Food Processer #2 (High BOD & TSS loadings) Typical range: Flow 250,000 gpd, BOD5 1,800 mg/l, TSS 600 mg/l Large WWTP with available excess loadings Issued a discharge permit with a surcharge provision (no cutoff limits) Monthly surcharge fees for BOD5 and TSS in the range of $60,000 $75,000
24 Sewer Charges & Surcharge Case History (Continued) (5) Cheese Processer #1 (High BOD & TSS loadings) Typical range: Flow 15,000 gpd, BOD5 900 mg/l, TSS 600 mg/l Large WWTP with available excess loadings Issued a discharge permit with a surcharge provision (no cutoff limits) Monthly surcharge fees for BOD5 and TSS in the range of $2,000 (6) Small Slaughter House (High BOD, TSS & NH3 loadings) Typical range: Flow 7,000 gpd, BOD5 8,000 mg/l, TSS 1,200 mg/l, NH3 100 mg/l Small WWTP with limited available excess loadings Issued a discharge permit with a surcharge provision (With cutoff limits) Monthly surcharge fees for BOD5 and TSS in the range of $20,000
25 Sewer Charges & Surcharge Case History (Continued) (7) Restaurant / Catering #1 (High BOD, TSS, NH3 loadings) Typical range: Flow 5,000 gpd, BOD5 1,500 mg/l, TSS 1,200 mg/l, NH3 100 mg/l Small WWTP with limited available excess loadings Issued a discharge permit with a surcharge provision (with cutoff limits) Monthly surcharge fees for BOD5, TSS & NH3 in the range of $4,000/month (8) Industrial Manufacturer #1 (High BOD, COD & TSS loadings) Typical range: Flow 60,000 gpd, high variable BOD5, COD, TSS Medium WWTP (will not accept excess loading due chemical manufacturing) Permit with no surcharge provision (BOD5 350, COD 500, TSS 350 limits) Waste stream segregation (concentrates disposed offsite) Installed pretreatment system with equalization, DAF, biological (aeration) treatment, sludge collection (and offsite disposal)
26 Sewer Charges & Surcharge Surcharge Option or Pretreatment (Pay or Treat) (1) Typically industrial and commercial users are not in business of waste treatment (2) Pretreatment will most likely require biological treatment system (aerobic / anaerobic) (3) Pretreatment design, construction & operation cost varies with flow and load (4) Check available space (5) Check other regulatory compliance requirements (Construction permits, sludge disposal issues, air or other permits, safety) (6) Evaluate costs pretreatment and surcharge rates & decide.
27 Sewer Charges & Surcharge THANK YOU Contact Information: Richard Lulla, P.E. Senior Associate Hatch Mott MacDonald 111 South Wood Avenue Iselin, New Jersey
Water Quality Permitting Program Monitoring Matrix 1,2,3
State of Oregon Department of Environmental Quality Water Quality Permitting Program Monitoring Matrix 1,2,3 ITEM OR PARAMETER Total Flow (influent and/or effluent) 4 Flow Meter Calibration 5 (influent
More informationCITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012
CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY
More informationThe City of Grand Forks Industrial Pretreatment Program
The City of Grand Forks Industrial Pretreatment Program Background Environmental Protection Agency (EPA) was created in December 1970 through a Presidential Executive Order. The Clean Water Act passed
More informationWHERE DO THE PRETREATMENT PERMIT LIMITS COME FROM??? Amy Varinoski City of Mebane
WHERE DO THE PRETREATMENT PERMIT LIMITS COME FROM??? Amy Varinoski City of Mebane AND MOST IMPORTANTLY. ARE YOU MEETING YOUR CURRENT PRETREATMENT PERMIT LIMITS? IF NOT, CAN YOUR COMPANY PARTICIPATE IN
More informationMUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT
MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:
More informationINDUSTRIAL PRETREATMENT PROGRAM 101. MWEA IPP Seminar 2017
INDUSTRIAL PRETREATMENT PROGRAM 101 MWEA IPP Seminar 2017 George Davis Davis & Davis Elaine J. Venema, P.E. F&V Back to Basics: What is an Industrial Pretreatment Program? Background Clean Water Act (1972,
More informationWASTEWATER PROBLEMS ASSOCIATED WITH SOLVENTS
WASTEWATER PROBLEMS ASSOCIATED WITH SOLVENTS James L. Walsh, Jr., P.E. Senior Research Engineer Georgia Tech Research Institute Atlanta, Georgia 30332 Introduction There a number of advantages to elimination
More informationWASTEWATER TREATMENT
WASTEWATER TREATMENT Every community produces both liquid and solid wastes. The liquid portion-wastewater-is essentially the water supply of the community after it has been fouled by a variety of uses.
More informationLOCAL LIMITS METHODOLOGY,, ISSUES,, AND ALTERNATIVES
Presented to: Southern California Alliance of POTWs LOCAL LIMITS METHODOLOGY,, ISSUES,, AND ALTERNATIVES Barbara Sharatz September 25, 2012 Overview of Presentation Background Pollutants of Concern (POCS)
More informationPublic Notice. Issuance of Industrial Waste Discharge Permit
Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice
More informationNPDES WASTEWATER DISCHARGE PERMIT EVALUATION
NPDES WASTEWATER DISCHARGE PERMIT EVALUATION Department of Environmental Quality Eastern Region - Pendleton Office 700 SE Emigrant, Suite 330, Pendleton, OR 97801 Telephone: (541) 276-4063 PERMITTEE: City
More informationRemoval of High Ammonia Levels from Municipal Wastewater Using Humic Acid and Selective Bio-Augmentation
Removal of High Ammonia Levels from Municipal Wastewater Using Humic Acid and Selective Bio-Augmentation Prepared by: Brent W. Cowan, P.E. Coatesville, PA 19320 Steven M. Cawley Cawley Environmental Services,
More informationTROUBLESHOOTING OF NITRIFICATION UPSETS AT PHARMACEUTICAL WASTEWATER TREATMENT PLANT
TROUBLESHOOTING OF NITRIFICATION UPSETS AT PHARMACEUTICAL WASTEWATER TREATMENT PLANT ABSTRACT Jurek Patoczka, PhD, PE, Hatch Mott MacDonald 27 Bleeker Str., Millburn, NJ 07041 jurek.patoczka@hatchmott.com
More informationPRETREATMENT PROGRAM LOCAL LIMITS
PRETREATMENT PROGRAM LOCAL LIMITS Pacific Northwest Pretreatment Conference September 2015 Martie Groome - City of Greensboro NC PRETREATMENT PROGRAM LOCAL LIMITS Types of SIU Permit Limits What Does EPA
More informationWater and Waste Water Management in Yangon, Myanmar
Union of Myanmar Ministry of Agriculture and Irrigation Irrigation Department Water and Waste Water Management in Yangon, Myanmar Mu Mu Than Staff Officer, Irrigation Department Myanmar March,2010 Socio-economical
More informationGeneral Information on Nitrogen
General Information on Nitrogen What is nitrogen? Nitrogen was discovered in 1772 by Daniel Rutherford in Scotland Nitrogen gas makes up nearly 80% of the air we breathe Nitrogen gas is not toxic Nitrogen
More informationPublic Notice. Issuance of Industrial Waste Discharge Permit
Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice
More informationBEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary
BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred
More informationLagoons Operation and Management in New Brunswick
Lagoons Operation and Management in New Brunswick Lagoons Provide secondary treatment to domestic wastewater by the action of bacteria stabilizing the organic matter in the wastewater. Benefits of lagoons:
More informationOperations Report. September 10, 2015
Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow
More informationBEDMINSTER MUNICIPAL AUTHORITY FEE SCHEDULE
BEDMINSTER MUNICIPAL AUTHORITY FEE SCHEDULE 2016 Water Rate Minimum Charge (Service Charge) Gallons (Usage Charge) Sewer Rate Minimum Charge {Service Charge) Gallons (Usage Charge) Separate Residential
More informationUV DISINFECTION OF LOW TRANSMITTANCE PHARMACEUTICAL WASTEWATER
UV DISINFECTION OF LOW TRANSMITTANCE PHARMACEUTICAL WASTEWATER Jurek Patoczka, PhD, PE Hatch Mott MacDonald, 27 Bleeker Str., Millburn, NJ 74 jurek.patoczka@hatchmott.com ABSTRACT An UV disinfection system
More informationJEDDAH INDUSTRIAL CITY
JEDDAH INDUSTRIAL CITY WASTEWATER TREATMENT PLANT A Presentation by : Engr. Mowafaq Al-Sugeir Managing Director ICDOC SAWEA 2007 WORKSHOP, AL-KHOBER 4 December 2007 Built & Being Operated by : on Build-Operate-Transfer
More informationJoshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015
Joshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015 EPA Industrial User Permitting Guidance Manual 833-R-12-001, September 2012 Update of the September 1989 manual Control Mechanisms
More informationNEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT
NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT ABSTRACT C. Yang*, L. Zhou**, W. Luo***, and L. Johnson**** *Corstar International Corp. 111
More informationUsing Washington State s Local Limits Spreadsheet. David J. Knight P.E. Environmental Engineer Water Quality Program June 22, 2016
Using Washington State s Local Limits Spreadsheet David J. Knight P.E. Environmental Engineer Water Quality Program June 22, 2016 Find your Happy Place AGENDA: Exciting Powerpoint Slides on Workbook Quick
More informationModule 20: Trickling Filters Answer Key
Module 20: Trickling Filters Answer Key Calculation Capital City WWTF, which processes 2.0 MGD, is required to nitrify to meet the 2.0 mg/l ammonia discharge limit stated in their NPDES permit. A table
More informationPOTW s As An Emergency Option For Dairy Manure Disposal
POTW s As An Emergency Option For Dairy Manure Disposal A POTW s Perspective 2011 Manure Summit February 15 & 16, 2011 Lambeau Field Atrium Chris Stempa, Deputy Utilities Director City of Appleton Wastewater
More informationAquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.
PHASED ACTIVATED SLUDGE SYSTEM PHASED ACTIVATED SLUDGE SYSTEM Aqua-Aerobic Systems has led the industry in time-managed, biological technology since 1984. In 2004, Aqua-Aerobic applied its expertise in
More informationSanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview
Sanitary Sewer Systems General Overview Sewage Collection System Pipes Pumping stations Maintenance entry points manholes Types of Sewage Sanitary Domestic sewage: human wastes and washwater from public
More informationTroubleshooting Activated Sludge Processes. PNCWA - Southeast Idaho Operators Section Pocatello, ID February 11, 2016 Jim Goodley, P.E.
Troubleshooting Activated Sludge Processes PNCWA - Southeast Idaho Operators Section Pocatello, ID February 11, 2016 Jim Goodley, P.E. Outline Process Types & Kinetics Influent Monitoring Process Monitoring
More informationBrighton Township Additional Flow at WWTP Monthly Operating Data Expanded and Updated Analysis
ARCHITECTS. ENGINEERS. PLANNERS. OHM 14 Advancing Communities' memorandum : June 23, 216 To: Brian Vick, Township Manager cc: Jacob Rushlow, PE, OHM Tom High, IA From: Ken Arnold, PE and Sherri Wright,
More informationPreparing for Nutrient Removal at Your Treatment Plant
Summer Seminar Emerging Issues in the Water/Wastewater Industry Preparing for Nutrient Removal at Your Treatment Plant Rajendra P. Bhattarai, P.E., BCEE Austin Water Utility Ana J. Peña-Tijerina, Ph.D.,
More informationDecentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI
Decentralized WW Management: Issues for Small-Scale WWTPs Mike Stephens MWEA Local Sections Committee Frankenmuth, MI Topics What is Decentralized Wastewater Treatment? What are small-scale facilities?
More informationCopies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100
MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033
More informationfinal report Water quality improvement strategy for a processing site
final report Project title: Water Quality Improvement Strategy Project code: P.PSH.0449 Prepared by: GHD Date published: July 2010 PUBLISHED BY Meat & Livestock Australia Limited Locked Bag 991 NORTH SYDNEY
More informationPRETREATMENT LOCAL LIMITS WHAT IT MEANS TO INDUSTRIES
Click to edit Master title style PRETREATMENT LOCAL LIMITS WHAT IT MEANS TO INDUSTRIES SPEAKERS Scott Smith Shri Vani Sripada February 20, 2014 Click to edit Master title style WHAT ARE LOCAL LIMITS &
More informationWASTEWATER TREATMENT. Nelson Environmental Inc. Nelson Environmental Inc.
The OPTAER system provides reliable nutrient removal in pond based wastewater treatment plants combining cost-effective technologies and low maintenance requirements. WASTEWATER TREATMENT PrintStudioOne.com
More informationReasonable Potential Analysis & Impacts to Pretreatment Programs. Raj Kapur Clean Water Services
Reasonable Potential Analysis & Impacts to Pretreatment Programs Raj Kapur Clean Water Services Agenda Water Quality Standards (WQS) & Recent Changes Reasonable Potential Analysis Pollutants of Concern
More informationN.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS
N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS Statutory authority: N.J.S.A. 13:1B-3 et seq., 13:1D-1 et seq., 13:1E-1 et seq., 26-2C-1 et seq.,
More informationTHE USE OF PROCESS MODELING SOFTWARE IN INDUSTRIAL WASTEWATER TREATMENT - CASE STUDIES THAT ADDRESS AIR EMISSION, METALS REMOVAL AND WATER REUSE
THE USE OF PROCESS MODELING SOFTWARE IN INDUSTRIAL WASTEWATER TREATMENT - CASE STUDIES THAT ADDRESS AIR EMISSION, METALS REMOVAL AND WATER REUSE Malcolm Fabiyi, PhD, MBA; Rajeev Goel, PhD, P.Eng., PE Hydromantis
More informationTOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Previous Page. Water and Sewer. Article II. Sewers -- Prohibited Discharges.
TOWN OF HASTINGS, FLORIDA TOWN CODE Chapter 18 Previous Page Water and Sewer Article II Sewers -- Prohibited Discharges. Sec. 18-20. General Prohibition No Person shall discharge or cause to be discharged
More informationPermit Evaluation Report
Permit Evaluation Report Oregon Department of Environmental Quality Western Region Office, Salem 750 Front St Salem, OR 97301 Permittee: City of Florence 250 Highway 101 Florence, OR 97439 Existing Permit
More informationReview of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng
Review of WEFTEC 2016 Challenge & Overview of 2017 Event Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Agenda Review 2016 Challenge Provide overview of updates to 2017 event Frequency WEFTEC Scores
More informationCase Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.
Case Study BiOWiSH Aqua Municipal Wastewater Bathurst Waste Water Treatment Works Australia BiOWiSH Aqua Executive Summary The main objective of the validation was to quantify cost savings in using BiOWiSH.
More informationNPDES WASTEWATER DISCHARGE PERMIT EVALUATION
NPDES WASTEWATER DISCHARGE PERMIT EVALUATION Department of Environmental Quality Eastern Region - Bend Office 475 NE Bellevue Drive, Suite 110; Bend, OR 97701 Telephone: (541) 388-6146 PERMITTEE: City
More informationHillsdale Wastewater Treatment Plant
Hillsdale Wastewater Treatment Plant SRF Project Plan Public Hearing sdgfdgdf June 10, 2014 Presented by: Jeff Pugh, PE and Elaine Venema, PE Synopsis/Agenda Purpose of Presentation Project Background
More informationMinnesota Pollution Control Agency
Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE
More informationIndian Health Service Sanitation Facilities Construction Program Wastewater Lagoon Operation & Maintenance
Indian Health Service Sanitation Facilities Construction Program Wastewater Lagoon Operation & Maintenance http://www.dsfc.ihs.gov By: Christen P. Glime, P.E., District Engineer Santa Fe District Office,
More informationAnaerobic Digester Optimization with Bio-Organic Catalyst. NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08
Anaerobic Digester Optimization with Bio-Organic Catalyst NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08 Municipal Anaerobic Digester Optimization Program Index! Overview
More informationTexas Commission on Environmental Quality Page 1 Chapter 30 - Occupational Licenses and Registrations
Texas Commission on Environmental Quality Page 1 SUBCHAPTER J: WASTEWATER OPERATORS AND OPERATIONS COMPANIES ''30.331, 30.337, 30.340, 30.342, 30.346, 30.348, 30.350, 30.355 Effective September 27, 2007
More informationActivated Sludge Process Control: Nitrification
Activated Sludge Process Control: Nitrification 60 th Annual KWWOA Conference, Session 1: April 11, 2017 Dan Miklos, Senior Associate, Midwest Region, Hazen and Sawyer Agenda Overview of the Utopia Plant
More information4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS
4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS 4.1 EXISTING UNPERMITTED INDUSTRIAL USERS Within 60 calendar days after the effective date of this SUO, or at such time when the participant ties into the Authority's
More informationAquaNereda Aerobic Granular Sludge Technology
Aerobic Granular Sludge AquaNereda Aerobic Granular Sludge Technology The AquaNereda Aerobic Granular Sludge (AGS) Technology is an innovative biological wastewater treatment technology that provides advanced
More informationNutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT
Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT Presentation Outline 1. Nutrient removal, treatment fundamentals 2. Treatment strategies Treatment methods: CAS, SBR,
More informationWASTEWATER EFFLUENT DISPOSAL PUBLICLY OWNED TREATMENT WORKS (CAMP BARRETT WASTEWATER PUMP STATION)
ENVIRONMENTAL STANDARD OPERATING PROCEDURE 17 WASTEWATER EFFLUENT DISPOSAL PUBLICLY OWNED TREATMENT WORKS (CAMP BARRETT WASTEWATER PUMP STATION) 1. Version, Date. 1, 12 Feb 08 (EMS) 2. Purpose. This document
More informationPresence And Effects Of Aromatic Hydrocarbons On Sewage Treatment Efficiency
Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 14 Article 2 January 21 Presence And Effects Of Aromatic Hydrocarbons On Sewage Treatment Efficiency Bozena
More informationAmmonia Removal and ph Adjustment in Aerated Lagoons
Ammonia Removal and ph Adjustment in Aerated Lagoons WWOA 45 th Annual Conference Thursday, October 6 th, 2011, 8:50 AM Presented by: Jeremiah Wendt, PE SEH Overview Ammonia Background Chemistry Toxicity
More informationTechnical Memorandum-Low Cost Retrofits for Nitrogen Removal at Wastewater Treatment Plants in the Upper Long Island Sound Watershed
Technical Memorandum-Low Cost Retrofits for Nitrogen Removal at Wastewater Treatment Plants in the Upper Long Island Sound Watershed Prepared by JJ Environmental, LLC Prepared for NEIWPCC First Draft:
More informationOVERVIEW OF MDE WATER & WASTEWATER OPERATOR TREATMENT CERTIFICATION REQUIREMENTS. September 26, 2013
OVERVIEW OF MDE WATER & WASTEWATER OPERATOR TREATMENT CERTIFICATION REQUIREMENTS September 26, 2013 PRESENTERS: E. Lee Haskins R.S. & Lawrence Robinson Telephone: 410-537 537-31673167 E-Mail: lhaskins@mde.state.md.us
More informationWEFTEC.06. **Cobb County Water System, Marietta, Georgia
CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick
More informationArchaeaSolutions, Inc. Improved Wastewater Processing Driven by Arkea
ArchaeaSolutions, Inc. Improved Wastewater Processing Driven by Arkea Background ArchaeaSolutions, Inc. is a high-science company focused on the use of Archaea organisms to assist natural cycle processes.
More informationWastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013
Wastewater Treatment Plant Facility Plan Update City Project #11-013 City of Liberty, Missouri May 6, 2013 Background 2 HDR Begins Feasibility Study to Evaluate Construction of a New Wastewater Treatment
More informationCarbon Canyon Water Recycling Facility Title 22 Engineering Report
Carbon Canyon Water Recycling Facility Title 22 Engineering Report April 2014 Introduction Regulatory Requirements Inland Empire Utilities Agency Carbon Canyon Water Recycling Facility Title 22 Engineering
More informationANAEROBIC TREATMENT OF PAPER MILL WASTEWATER
ANAEROBIC TREATMENT OF PAPER MILL WASTEWATER M. Eeckhaut 1, J.P. Ombregt 1, B. Vanderhaegen 2, M. Bambridge 3, A. Ginnis 4 Abstract In this paper the performance of an anaerobic wastewater treatment plant
More informationClark County Water Reclamation District January 1, 2017
Clark County Water Reclamation District January 1, 2017 DEFINITIONS Unless specifically indicated otherwise, the meaning of terms in these Service Rules shall be as follows. 1. Accidental Discharge Accidental
More informationEVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT
EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT Matthew Valade, P.E. July 25, 2014 Barboe.pptx Presentation Outline Project Background Why Dewater Croton Residuals Offsite?
More informationUse of Biowin for Process Troubleshooting / Design for a Unique Wastewater
Use of Biowin for Process Troubleshooting / Design for a Unique Wastewater OWEA Plant Operations and Lab Analysis Workshop W. James Gellner Outline Introduction / Problem Overview Plant Issues Biowin Overview
More informationWastewater Treatment Processes
Wastewater Treatment Processes (Sep 27 th and 28 th, 2016) by Dr. Arun Kumar (arunku@civil.iitd.ac.in) Objective: To learn about processes used in tertiary treatment Courtesy: Dr. Irene Xagoraraki, MSU,
More informationPrimary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies
Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies Presentation Outline Primary Clarifier Odor Challenges Odor Treatment Options Case Study Anson-Madison
More informationWastewater Management Guidance Manual
Water and Wastewater Brewers Association Wastewater Management Guidance Manual 1 table of contents acknowledgements....3 introduction....4 section one....5 1.1 Background...5 1.2 Benchmarking Results...6
More informationFate of Organic Matter from Leachate Discharged to Wastewater Treatment Plants
Fate of Organic Matter from Leachate Discharged to Wastewater Treatment Plants D e b ra Re i n h a r t, P h D, PE, BCEE S t e p h a n i e C. Bolya rd, E P I U n i vers i t y o f C e n t ra l F l o r i
More informationRemoving Heavy Metals from Wastewater
Removing Heavy Metals from Wastewater Engineering Research Center Report David M. Ayres Allen P. Davis Paul M. Gietka August 1994 1 Removing Heavy Metals From Wastewater Introduction This manual provides
More informationDealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017
Dealing with Unexpected Wastewater Treatment Plant Disruptions February 16, 2017 Location Map WPCP History Original WPCP constructed on this site in 1928 consisting of primary treatment and chlorination;
More informationLessons Learned: How a Small Village Handled a Brewery Expansion
Lessons Learned: How a Small Village Handled a Brewery Expansion Presenters: Blair Selover (FVOP), Dan Schlaff (Village of Dexter) & Tony Grant (NUBCo) Proposed Agenda Introduction Initial Situation Original
More information4 Angles. Pilot-scale Evaluation of AirPrex for Phosphorus Management. Innovation Program Phosphorus Initiative JTAC 4/22/2017
Pilot-scale Evaluation of AirPrex for Phosphorus Management JTAC Innovation Program Phosphorus Initiative 4 Angles Liquid stream TP removal Solids TP removal 1 2 3 4 2 1 Phosphorus Initiative: Solids Stream
More informationBIOLOGICAL PHOSPHOROUS REMOVAL AN OPERATOR S GUIDE
BIOLOGICAL PHOSPHOROUS REMOVAL AN OPERATOR S GUIDE ABSTRACT If you have ever faced a rising effluent phosphorous concentration and you are relying on biological phosphorous removal, the information offered
More informationCase History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction
Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants Charles C. Ross, P.E. Environmental Treatment Systems, Inc. Atlanta, Georgia John S. Cox, P.E. John S. Cox
More informationRecycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE
Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE Agenda Overview of regulatory program Specific guidance on: Mulching Composting
More informationMUNICIPAL WASTEWATER PERMITS
MUNICIPAL WASTEWATER PERMITS TCEQ Water Quality & Stormwater Seminar September 17, 2014 Dex Dean & Becca Moore 512-239-4671 APPLICATION FORMS 10053-inst 10053 10054 Instructions for Completing the Domestic
More informationCopper Corrosion Control
Copper Corrosion Control Prepared by the Palo Alto Regional Water Quality Control Plant Stephanie Hughes, Source Control Manager, City of Palo Alto stephanie_hughes@city.palo-alto.ca.us * 650-617-3165
More informationConceptual Design for a Future Wastewater Treatment Plant
Wastewater Master Plan DWSD Project No. CS-1314 Conceptual Design for a Future Wastewater Treatment Plant Technical Memorandum Original Date: April 1, 2003 Revision Date: September 2003 Author: CDM Table
More informationAs used in 314 CMR 7.00, the following words have the following meaning:
Version12-12-06 314 CMR 7.00: SEWER SYSTEM EXTENSION AND CONNECTION PERMIT PROGRAM Section 7.01: Purpose and Authority 7.02: Definitions 7.03: Activities Requiring a Permit 7.04: Additional Restrictions
More informationMANHEIM AREA WATER & SEWER AUTHORITY (MAWSA) Resolution : Fee Schedule
MANHEIM AREA WATER & SEWER AUTHORITY (MAWSA) Resolution 9-2017: Fee Schedule NOW THEREFORE BE IT RESOLVED that MAWSA hereby establishes the following fees for services rendered: 1. MONTHLY CHARGES 1.1
More informationWater Specialists for the Food & Beverage Sector creating value in water through innovation, creativity and expertise. ovivowater.
Water Specialists for the Food & Beverage Sector creating value in water through innovation, creativity and expertise ovivowater.com Ovivo - Industrial Markets A New Global Force in Water As society and
More informationAqua MSBR MODIFIED SEQUENCING BATCH REACTOR
MODIFIED SEQUENCING BATCH REACTOR MODIFIED SEQUENCING BATCH REACTOR For over three decades, Aqua-Aerobic Systems has led the industry in sequencing batch reactor technology with performance proven and
More informationEffect of holding time on E.coli Densities in Wastewater Samples
Effect of holding time on E.coli Densities in Wastewater Samples Nicki Sava-Schafer, Debmalya (Deb) Bhattacharyya, Mark Citriglia Northeast Ohio Regional Sewer District Outline What we (NEORSD) do? Bacteria
More informationTWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT
TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT Chester Yang, Ph.D., Gaowei Gu, Baowei Li, Hongyuan Li, Wanshen Lu, Lloyd Johnson,
More informationBenefits of On-line Monitoring of Carbon, Nitrogen and Phosphorus
Benefits of On-line Monitoring of Carbon, Nitrogen and Phosphorus New Jersey Water Environment Association Dan Davis Shimadzu Scientific Instruments Benefits of On-Line Monitoring Environment Consumers
More informationSanitary Sewer and Disposal Ordinance # Columbus Water Works. Columbus, Georgia
Sanitary Sewer and Disposal Ordinance #04-74 Columbus Water Works Columbus, Georgia August, 2004 Ordinance No. 83-101 (04-74) AN ORDINANCE AN ORDINANCE ADOPTED DECEMBER 27, 1983, AS AMENDED MAY 29,1990,
More informationINDUSTRIAL PRETREATMENT PROGRAM FOR THE K.I. SAWYER WWTP MARQUETTE COUNTY GWINN, MICHIGAN
INDUSTRIAL PRETREATMENT PROGRAM FOR THE K.I. SAWYER WWTP MARQUETTE COUNTY GWINN, MICHIGAN SEPTEMBER 5, 2017 TABLE OF CONTENTS SECTION 1 INTRODUCTION SECTION 2 2.1 Purpose and Scope... 5 2.2 Administration...
More informationFixed-Film Processes
Onsite Wastewater Treatment Systems Technology Fact Sheet 2 Fixed-Film Processes Introduction Description Fixed-film systems (FFS) are biological treatment processes that employ a medium such as rock,
More informationTriplepoint Environmental
Agenda 1. Brief Introduction 2. Overview of the Lagoon Ammonia Problem Causes and Effects of Ammonia Pollution Basics of Ammonia Removal 3. Review Conventional Wisdom 4. Compare Ammonal Treatment Options
More informationENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP
ENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP ENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP The new CEDAE, offering to the public the Environmental Visitation Center at Alegria WWTP, seals its commitment
More informationIntegrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP
Fishbeck, Thompson, Carr & Huber, Inc. Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP Jim Flamming, P.E., Senior Process Engineer, FTC&H Dave Woodman,
More informationNorthfield Township WWTP Capacity Evaluation Report
Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100
More informationWASTE WATER T*R*E*A*T*M*E*N*T T*E*C*H*N*O*L*O*G*I.E
WASTE WATER T*R*E*A*T*M*E*N*T T*E*C*H*N*O*L*O*G*I.E Many food processing operations generate high-strength wastewaters requiring unique approaches for costeffective treatment and residuals management.
More informationMARPAK modular biomedia WASTEWATER TREATMENT
MARPAK modular biomedia WASTEWATER TREATMENT The Marley MARPAK Difference SPX Cooling Technologies is a world leader in the design, manufacturing and construction of evaporative cooling products. The design
More informationNPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER
NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER Nathan Schmaus, P.E. *, Joseph Viciere, P.E., BCEE, CDM Smith CDM Smith, 1715 North Westshore Boulevard,
More information