1 Model Lift Irrigation Scheme (Lecture notes by Dr.S.S.Rao) Contents 1. Introduction Guideline lines for small lift irrigation schemes Lift irrigation on surface water Size and Location Command Area / Cropping Pattern Design Water Availability Water Lifting Permission Soil Characteristics Power Civil Works Pumping Machinery Number of Stages Project cost Command Area Map A typical design of small lift irrigation scheme on surface water Groundwater based small lift irrigation schemes
2 1. Introduction A conventional lift irrigation scheme consists of civil works like intake well, intake pipe, jack well, pump house, rising main and distribution system to suit the command area. The lift irrigation schemes can broadly be grouped as Medium / large and single stage and large & Medium with multi stage pumping systems wherein water is pumped more than 50 m height and have a command area more than 40 ha. Small river lift irrigation schemes whose cultural command varies between 10 and 40 ha with a total head of less than 50 m of single stage pumping and which do not require conventional civil works like intake well, intake pipe, jack well, pump house are more user friendly and can be operated by the local farmers themselves without much problem. Generally, the lift irrigation systems have to be designed as per the field requirements considering the land and water availability, the people s participation and their requirement etc. However, it is necessary to design a few models for easy physical and financial planning and making people involve in their projects. Brief guidelines are given below for model small lift irrigation scheme. 2
3 2. Guideline lines for small lift irrigation schemes. The following guidelines are prepared which would facilitate in designing as well as appraisal of such schemes. These guidelines are only indicative and could be modified to suit the local conditions Lift irrigation on surface water Size and Location The cultural command area should be restricted up to ha only under small lift irrigation schemes. Lift irrigation schemes on surface water source with command area more than 40 ha may be considered as medium / large schemes and the technical and financial appraisal may be carried out as as per the guidelines pertaining to large lift irrigation schemes. The scheme area should be as close to source of water as possible and land holdings are contiguous as far as possible from design optimization point of view Command Area / Cropping Pattern The command area has to be demarcated and as far as possible to be adjoining. The cropping pattern has to be fixed and water requirement has to be estimated Design The design discharge for small lift irrigation scheme should be assessed based on peak water requirements for envisaged cropping pattern and area of crops during kharif, rabi and summer seasons based on water requirement norms Water Availability It is necessary to ascertain the availability position of water from sources like river, canal, ponds, tanks or any other surface water body. It should preferably be perennial in nature and should have adequate flow to support the quantity of water to be pumped for the proposed scheme Water Lifting Permission Water lifting permission should be obtained for private individuals or societies from Government Department authorized to issue such permissions. The water lifting permission should indicate the period, area and percentage of different crops in each season. Long duration water lifting permission is required if the implementing agency desires to take loan Soil Characteristics Soil characteristic should broadly be known for its suitability for various crops proposed in the scheme Power Normally the power availability for large schemes is considered to be 16 hours per day but in case of small lift irrigation scheme up to 40 ha command area, power availability may be considered at maximum of 12 hours. If the command area is less than 10 ha then 8 hours of power supply can be considered on economic considerations. 3
4 Civil Works Intake Well This is a civil structure required for guiding the water in the sump well / jacks well. In some cases, this structure is necessary even for small schemes to take care of water level fluctuations in the river. It also provides silt free water for the pumping operations. However, for small lift schemes, this need not be insisted upon Intake Pipe This structure is not necessary for small schemes Jack Well and Pump House This structure is not necessary for small schemes Suction Pipes for Pump set The following table may be followed in determining the diameter of suction and delivery pipes for various discharge ranges: (lps) Diameter of Suction pipe (NABARD) Rising Main Rising main should be designed based on discharge and total pumping head. It is expected that the total pumping head in normal cases will not exceed 50m. The total length of the rising main should not exceed 3000 m. The diameter of rising main recommended for RCC pipes and Rigid PVC pipes for various discharges are given below: 4
5 (a) RCC Pipes (lps) Dia (lps)* Dia *(lps = litre per second) (b) Rigid PVC Pipes (lps) Dia (lps) Dia If direct tapping on the rising main is proposed for drawing partial discharge then such tapping should not exceed 2 numbers. Water hammer control devices in case of large schemes are necessary but in case of small lift irrigation schemes, it may not be required. However, the accessories like air valve, drain valve may be provided as per the topographic conditions. Apart from the PVC and RCC pipes, HDPE and AC pipes of equivalent class and diameter can also be allowed. Cast Iron (CI) and Mild Steel (MS) pipes are not recommended except for road crossing and nala crossing. 5
6 Delivery Chambers The delivery chamber of one minute retention capacity can be provided for release of water in the command area Distribution System Generally a chak size of 8 ha may be considered while designing the distribution system. If scheme economics does not permit use of underground pipes then open channels can be provided. For schemes up to 8 ha. command area only open channels need be provided Pumping Machinery Most of the small lift irrigation schemes require centrifugal pump sets for pumping surface water / groundwater. In case the fluctuations between low water level and high flood level is less than 4.5 m, then the puppets can be placed in the pump house subject to suitability of site conditions. If the pump sets are to be operated with shifting arrangements then it should not exceed 20 HP per unit. The permanent pump house can be provided if the water level in the river is more or less constant throughout the year. This may vary from site to site depending upon the stream hydrology. The centrifugal pump sets selected should conform to BIS standard i.e., IS: for Complete Pumping System. The usual formulae that may be applied for calculating the horse power of the centrifugal pump sets and discharge required to be pumped are given as under: (a) Break Horse Power BHP = (Q x H) / (75 x e) Where, BHP = Break Horse Power of the Centrifugal Pump set Q = in liters per second H = Total Head in meters (including friction losses) e = Overall efficiency of Pump set (as percentage) (b) required to be pumped: The discharge required for the envisaged command area may be calculated from the following formula: Qr = (28 x A x I) / (R x t) Where, Qr = Required discharge in litres per second (lps) A = Crop area in ha I = Depth of irrigation in cm R = Rotation period in days t = Working hours per day The discharge required to be pumped during different crop seasons can be calculated for kharif, rabi and summer seasons and the peak discharge i.e., maximum discharge should be adopted as the required discharge (Qr). 6
7 Number of Stages From the management point of view, the number of stages should not exceed two. Especially small lift irrigation projects, as far as possible, there should be only single stage pumping Project cost The project cost of the scheme should be based on the schedule of rates prevailing in the area Command Area Map A map of the command area showing layout drawing of civil works should be attached to the scheme along with a longitudinal section (L Section) for rising main indicating the Low Water Level (LWL), High Flood Level (HFL) position of fixed foundations, pump set, etc A typical design of small lift irrigation scheme on surface water A typical design of small lift irrigation scheme on surface water body is given below. The details of the scheme are as under: Basic details of the lift irrigation scheme Details Quantity Command Area (Ha) = 20 Cropping Pattern (ha) Kharif: Rabi: Summer Paddy = 10 Makai= 10 Wheat 8 Gram 5 Makai 2 Makai 5 Static Head (m) = 50 Length of rising main (m) = 3000 No of pumping hours (hrs) 12 The required design is as under: Max discharge (cum/hr= Total Head (m) Hp of pump sets = No of pump sets= 2 Diameter of rising main (m) Class of pipes = varies from 2.5 kg to 8 kg of different lengths. 7
8 Other details are shown in the design. The design varies depending on various factors like, command area, static head, length of rising main, cropping pattern etc. The actual design should be based on the field conditions. 2.2 Groundwater based small lift irrigation schemes If the lift irrigation scheme is proposed on the sub surface flow in a given alluvial/ hard rock formation then the intake well has to be designed as per the design criteria adopted for a dug well determined on the basis of aquifer characteristics. If the source of water is an existing irrigation well, the well discharge and command area to be adopted under small lift irrigation scheme could be similar to one that is as usually considered under a dugwell scheme. For schemes, contemplating well discharge of more than 6 lps in hard rock and 10 lps in alluvial areas, the availability of groundwater from such dug wells has to be ascertained from local groundwater department including stipulations of spacing criteria and clearance of scheme based on categorization of blocks/watersheds etc.. 8
Guidelines for Construction of Pipe Distribution Network (PDN) for Irrigation
Guidelines for Construction of Pipe Distribution Network (PDN) for Irrigation Mr. Sandesh B. Kulavmode 1, Dr.S.S.Valunjkar 2 1P.G. Student, Dept. of Civil Engineering, Government College of Engineering,
More informationTubewell Shallow Tubewell (h<7.5m) Deep tubewell (h>75m) Alternative technologies. Rain water harvesting etc.
WATER SUPPLY TECHNOLOGIES Dug well (h
More informationFeasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation
Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation Sandesh B. Kulavmode 1, Dr. S. S.Valunjkar 2 1,2 Department of Civil Engineering, Government College
More informationHydraulic Transient: Lift Irrigation Scheme
ISSN (e): 2250 3005 Volume, 05 Issue, 06 June 2015 International Journal of Computational Engineering Research (IJCER) Hydraulic Transient: Lift Irrigation Scheme Mohite Sudhir Ganpat 1, Morankar D.V.
More informationModule 9 : Sewage And Storm water Pumping Stations. Lecture 11 : Sewage And Storm water Pumping Stations
1 P age Module 9 : Sewage And Storm water Pumping Stations Lecture 11 : Sewage And Storm water Pumping Stations 2 P age 9.1 Introduction There are certain locations where it is possible to convey sewage
More informationThe Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management
The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives
More informationEconomic Analysis of Sub-Surface Drainage under Indira Gandhi Nahar Priyojna Command Area A Case Study
Agricultural Economics Research Review Vol. 20 July-December 2007 pp 361-374 Economic Analysis of Sub-Surface Drainage under Indira Gandhi Nahar Priyojna Command Area A Case Study R.S. Shekhawat 1 Abstract
More informationModel Layout/Components of a Drip Irrigation System
Dept. of Agril. Engg, BAU Lecture Note No. 7 FNRM-121 (Hydrology, Soil and Water Conservation) Instructor- Dr. M. Job First Year Semester II Dated: 15 th July &08 th Aug Drip Irrigation: It can be defined
More informationCreated by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq
Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure
More informationAALSO Summary of Formulas needed for Levels I, II and III.
AALSO Summary of Formulas needed for Levels I, II and III. The information provided below is used in the math portion of the proficiency exams. Please take time to review and learn how to use these formulas
More informationMaximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat
Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat Lukhawada Check dam across River hadaf, Taluka : Limkheda Funded
More informationUrban Rainwater Harvesting Systems: Promises and Challenges
TheWaterChannel Webinar #5 Urban Rainwater Harvesting Systems: Promises and Challenges By Vishwanath S Zenrainman@gmail.com www.ircsa.org www.rainwaterclub.org Thanks for coming. The webinar will begin
More informationThe purpose of distribution system is to deliver water to consumer with appropriate quality, quantity and pressure. Distribution system is used to
Water Distribution System INTRODUCTION The purpose of distribution system is to deliver water to consumer with appropriate quality, quantity and pressure. Distribution system is used to describe collectively
More informationTypes of Hydropower Facilities
Types of Hydropower Facilities 1 Impoundment Hydropower- uses a dam to store water. Water may be released either to meet changing electricity needs or to maintain a constant water level. 2 Run-of-River
More informationVALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING Question Bank CE2354 - ENVIRONMENTAL ENGINEERING - II Prepared By: Year: 3rd year Semester: 6th Semester R.THENMOZHI / A.P.Civil J.SHANMUGAPRIYA
More informationDecision-Making Support System for Irrigation Water management of Jingtai Chuan Pumping Irrigation Scheme at the Upper Reaches of Yellow River
Decision-Making Support System for Irrigation Water management of Jingtai Chuan Pumping Irrigation Scheme at the Upper Reaches of Yellow River Zhanyi GAO* Abstract Water resources scarcity problem is getting
More informationAALSO Proficiency Program Level I, II & III
AALSO Proficiency Program Level I, II & III Hello, and welcome to AALSO s 2010 Proficiency Program! AALSO offers a multi-level operator competency acknowledgment program based on test scores received from
More informationCardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:
CARDOK CARLIFT with Rigid chains technology Very fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built
More informationWater supply components
Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution
More informationPAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name
PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA
More informationSag Pipe (depressed sewers, or Inverted siphons) Dr. Sataa A. Al-Bayati(10-11)
بسم هللا الرحمن الرحيم Sag Pipe (depressed sewers, or Inverted siphons) Dr. Sataa A. Al-Bayati(10-11) A sewer that drops below the hydraulic gradient to pass under an obstruction, such as a railroad cut,
More informationSection V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES
Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public
More informationModule 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains
Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7: Hydraulic Design of Sewers and Storm Water Drains 7.0 HYDRAULIC DESIGN OF SEWERS AND STORM WATER DRAINS 7.1 General Consideration
More informationINTRODUCTION TO HDPE PIPES : -
INTRODUCTION TO HDPE PIPES : - HDPE pipes conform to IS-4984/95 and manufactured also as per IS-14333, ISO- 4427, ISO-4437 & DIN 8074 specifications. HDPE pipes are best preferred for potable water supply,
More informationlevel control gates Waterman Industries of Egypt WATERMAN
Automatic level control gates WATERMAN DOWNSTREAM LEVEL CONTROL Waterman Types "A" and "B" Automatic gates provide constant downstream water level control regardless of upstream level conditions or downstream
More informationin the Midsouth Management Chris Henry, Ph.D., P.E. Assistant Professor and Water Management Engineer Merritt McDougal Graduate Research Assistant
Lessons Pasture Learned / Hay from Irrigation Pump options Monitoring and in the Midsouth Management Chris Henry, Ph.D., P.E. Assistant Professor and Water Management Engineer Merritt McDougal Graduate
More information4.2 Discharge measurement by Velocity Area Method (Chitale, 1974)
4.2 Discharge measurement by Velocity Area Method (Chitale, 1974) This method comprises measuring the mean velocity V and the flow area 'A' and computing the discharge Q from the continuity equation. The
More information\j'hill Irriga.tion. in. Hirna.cna.l Pra.d.esn, In.d.ia.
\j'hill rriga.tion. in. Hirna.cna.l Pra.d.esn, n.d.ia. Under the Hill Area Lands and Water Developme nt (HALWD) Project in Himachal Pr:.l
More informationSABI Code of Practice for On-farm Irrigation Design
SABI Code of Practice for On-farm Irrigation Design This code was developed to provide guidelines for irrigators and those servicing irrigators on developing a new irrigation system or upgrading an existing
More informationEnergy Audits. Presented by: Phil Szabo Taylored Engineering Solutions and Research The Cotton Industries Pump and Energy Specialist
Energy Audits Presented by: Phil Szabo Taylored Engineering Solutions and Research The Cotton Industries Pump and Energy Specialist Improve Your Efficiency Contact: Phil Szabo 0408 886 576 Points for Discussion
More informationOn Site Detention System.
On Site Detention System. Setting new standards. NOTE: This OSD (On site detention system) brief should be read in conjunction with the Landscape Tanks brochure, which outlines all the features and benefits
More informationBIOROCK also provide systems for domestic wastewater treatment for communities ranging from 20 to150 persons.
BIOROCK multi-units How it works BIOROCK also provide systems for domestic wastewater treatment for communities ranging from 20 to150 persons. Groups of houses Houses or a number of apartments Small villages,
More informationSUPPLEMENTARY IRRIGATION TO RAIN-FED PADDY - A CASE STUDY OF KG. BEBULOH PADDY SCHEME
83 SUPPLEMENTARY IRRIGATION TO RAIN-FED PADDY - A CASE STUDY OF KG. BEBULOH PADDY SCHEME K. B. M. Shafiuddin MIEAust, CPeng, FIEB Sr. Lecturer, Civil Engineering Department Institute of Technology Brunei
More informationAnnex O Irrigation Systems Modification Plan
Annex O Irrigation Systems Modification Plan Table O1 Figure O1 Figure O2 Pump Station Data Typical Water Intake Pipeline Routing Map H:\WP\1346\Appendices\FEIS\D - Drawdown\CamRdy\App_D.doc Annex O: Irrigation
More informationPittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager
Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national
More informationENVIRONMENTAL ENGINEERING-I
ENVIRONMENTAL ENGINEERING-I Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati
More informationROOF TOP RAIN WATER HARVESTING. Manohar Patil
ROOF TOP RAIN WATER HARVESTING Manohar Patil Why harvest rainwater To arrest ground water To beneficiate water quality in aquifers To conserve surface water runoff To reduce soil erosion What is Rainwater
More informationDewatering solutions that work
Dewatering solutions that work COMPLETE RENTALS SERVICES FOR SEWAGE BY-PASS, CONSTRUCTION DEWATERING, FLOOD DRAINAGE, SURFACE IRRIGATION AND MINE DEWATERING Pumps, Mixers, Generators and Accessories Sewage
More informationRead Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED
Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are
More informationGrowing Wheat under Spate Irrigation In Dera Ismail Khan ( )
Growing Wheat under Spate Irrigation In Dera Ismail Khan (2006 07) M.J. Khan¹,, A. Razzaq¹, M.K. Khattak², L. Garcia³ 1 Project for Livelihood Improvement (PLI) D.I.Khan 1 Water Management Department,
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationMicro Hydroelectricity Installer Skills Assessment
Micro Hydroelectricity Installer Skills Assessment Philip V. Hofmeyer August 2011 Page 1 Overview: This document contains an extensive skills assessment for renewable energy professionals who intend to
More informationPARTS & ACCESSORIES: EATON DUPLEX BASKET STRAINERS FEATURES OPTIONS MODEL 53BTX DUPLEX (3/4 TO 4 ) MODEL 50 DUPLEX (5, 6, 8 )
PARTS & ACCESSORIES: MODEL BTX & 0 Section 64 Page 64. Issue E FEATURES MODEL BTX DUPLEX (/4 TO 4 ) Dynamic sealing design for long life Easy-to-operate lever handle no gear box required Unique seat and
More informationMEMORANDUM. The general findings of the assessment are as follows:
November 28, 2006 MEMORANDUM Project No.: 030009-002-01 To: From: Re: WRIA 31 Planning Unit Steve Germiat, LHG, CGWP, and Timothy J. Flynn, LHG, CWGP Evaluation of Winterizing Existing River Pump/Conveyance
More informationDESIGN OF SEWER SYSTEMS
Wastewater Engineering (MSc program) DESIGN OF SEWER SYSTEMS Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University 1. Sewer Materials
More informationValley. Water Application RELIABLE DURABLE PRECISE ADVANCED RESPONSIVE
Valley Water Application RELIABLE DURABLE PRECISE ADVANCED RESPONSIVE Choosing the Rig ht Sprinkler Package Deciding on the correct water application solution is vital to your pivot s performance. The
More informationDesign recommendations
Water & Wastewater Design recommendations Pump and pipe mechanical installation guidelines Contents Introduction... 3 Vibration... 4 Piping support... 5 foundations... 6 Anchor recommendations... 6 Pump
More informationADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities
ADDENDUM NO. TO Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities Date of Addendum: December, 00 Hethcoat & Davis, Inc. 78 Franklin Road,
More informationD-35 Series. Up to 37 gpm (140 l/min) D-35 Specialized Designs
D-35 Series Up to 37 gpm (14 l/min) D-35 Specialized Designs Hydra-Cell Slurry Duty pumps are specifically designed for abrasive slurry applications. See page 72 for complete specifications. The D-35 Hydra-Cell
More informationPipe Jacking. Japan Sewage Works Association
Pipe Jacking Japan Sewage Works Association June, 2013 1 Pipe Jacking Yosuke Matsumiya y.matsumiya@ngsk.or.jp Japan Sewage Works Association Suisui Bldg. 2-10-12 Uchikanda, Chiyodaku Tokyo 101-0047 Japan,
More informationSOLAR WATER PUMP KIT MODEL: SIS-10HP
SOLAR WATER PUMP KIT MODEL: SIS-10HP Model: SIS -10HP Pump Size: 6 Capacity in HP: 10 PV Size in kw: 10 Water head range 14-53 meter Water quantity range 20000-78000 liter per hour Quantity Description
More informationThe Impact Wear Behavior of Large Rocks on Slurry Pump Materials and Equipment.
The Impact Wear Behavior of Large Rocks on Slurry Pump Materials and Equipment. Robert J. Visintainer V.P. of Engineering and R&D GIW Industries Inc. Dan Wolfe Sr. Associate Mechanical Syncrude Canada
More informationNZQA registered unit standard version 4 Page 1 of 5
Page 1 of 5 Title Describe drinking-water supply reticulation systems Level 5 Credits 8 Purpose People credited with this unit standard are able to describe: the reticulated services found on public and
More informationA reliable solution for ditching, underpassing and rainwater drainage
PIPES AND CHAMBERS CULVERT PIPES A reliable solution for ditching, underpassing and rainwater drainage Culvert pipes are used to convey drain pipe water or rainwater under the ground. The smallest (110
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL
DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL Mail To: WDEQ/WQD ATTN: UIC Program 122 W. 25 th St. 4W Cheyenne, WY
More informationWASTEWATER PUMPING STATION INVENTORY
Page 1 WASTEWATER PUMPING STATION INVENTORY Civic Address: Year Constructed: Pump Station Type (circle): Building (Y/N): SUBMERSIBLE DRYWELL SELF-PRIMING Holding Tank (Y/N): Valve Chamber (Y/N): Connected
More informationTHAI-AUSTRALIAN NORTHEAST VILLAGE WATER RESOURCE PROJECT
THAI-AUSTRALIAN NORTHEAST VILLAGE WATER RESOURCE PROJECT Report No. 10 SPRING DEVELOPMENT APPRAISAL NONG SUNG MUKDAHARN June 1987 Kevin Hewison (Sociologist) Graham Jackson (Engineer) TABLE OF CONTENTS
More informationDewatering solutions that work
Dewatering solutions that work COMPLETE RENTALS SERVICES FOR SEWAGE BY-PASS, CONSTRUCTION DEWATERING, FLOOD DRAINAGE, SURFACE IRRIGATION, AND MINE DEWATERING Pumps, Mixers, Generators, and Accessories
More informationTYPICAL INSTALLATION INSTRUCTIONS
TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect
More informationCOMPLETE PADDY PACKAGE FOR FARMERS BY VST SHAKTI VST SHAKTI
COMPLETE PADDY PACKAGE FOR FARMERS BY VST SHAKTI VST SHAKTI INDEX INTRODUCTION 01 Field Preparation [Cultivator] 02 Puddling [with Rotary Drum / Lugged Wheels] 03 Transplanting [VST Shakti Rice Transplanter]
More informationProspectives and Limits of Groundwater Use in Pakistan
Prospectives and Limits of Groundwater Use in Pakistan International Waterlogging and Salinity Research Institute, Lahore, Pakistan Abstract Groundwater use in Pakistan has increased due to increased demand
More informationVariable Frequency Drives Opportunities in Agriculture
Variable Frequency Drives Opportunities in Agriculture PUBLIC INFORMATION Presented by Robin Priestley Rockwell Automation Rev 5058-CO900E Market Drivers Cost Volatility Reduce costs Maintain Competitive
More informationWATER TREATMENT PLANT BASED ON REVERSE OSMOSIS TECHNOLOGY litres Per Hour
WATER TREATMENT PLANT BASED ON REVERSE OSMOSIS TECHNOLOGY Capacity: 25000 litres Per Hour 1 TECHNICAL SPECIFICATIONS Flow Rate : Feed Water : 48000 LPH Treated Water : 25000 LPH 1 RAW WATER PUMP To feed
More informationEstimate FOR THE SEPTIC TANK
Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks
More informationPRECAST RECTANGULAR CHAMBERS
STANDARD MODELS GENERAL ROUGH SKETCH Available for: Sewer manhole, valve chamber, trouser manhole, and pumping station. Ø60-Ø762 ADJUSTMENT RING 7-00-2-0 20-2 30-60 RING 200-30 60-60 000-220 9ø 6 FLAT
More informationSEPARATORS A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND
SEPARATORS A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND Separators A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND Surface water drains normally discharge to a watercourse or indirectly into underground
More informationThe Flygt 2600 dewatering pump series. The new force in dewatering
The Flygt 26 dewatering pump series The new force in dewatering The new force in dewatering unbeatable in tough environments The Flygt 26 series from ITT Water & Wastewater represents a major breakthrough
More informationSPRINKLE IRRIGATION SYSTEM Appropriate irrigation technology for smallholder farmers
SPRINKLE IRRIGATION SYSTEM Appropriate irrigation technology for smallholder farmers SUPPLY CHAIN JANASEWA AGRO INPUT CENTER Distributor THAPA MOULD AND DIE (TMD) Manufacturer & Distributor SITAL AGROVET
More informationSECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES
SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable
More informationPRECAST CEMENT PRODUCTS
Profile No.: 30 NIC Code: 23959 PRECAST CEMENT PRODUCTS 1. INTRODCUTION: Reinforced cement concrete products are becoming popular as modular house and apartment buildings are based on standard designs.
More informationINDUS BASIN IRRIGATION SYSTEM: WATER BUDGET AND ASSOCIATED PROBLEMS
INDUS BASIN IRRIGATION SYSTEM: WATER BUDGET AND ASSOCIATED PROBLEMS Dr. Shahid Ahmad and Rashida Majeed* Abstract Around 74% of mean annual river flows (140 MAF) are diverted to the canal system and the
More informationReducing Energy Use and Costs for Pumping Water
Reducing Energy Use and Costs for Pumping Water Advanced Pumping Efficiency Program Helping California Peter Canessa Program Manager M.S. Irrigation and Drainage Registered Agricultural Engineer in California
More informationLearning objectives. Upon successful completion of this lecture, the participants will be able to:
Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design
More informationGRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14
Planning and Building Department 525 San Anselmo Avenue Building Division San Anselmo, CA 94960 Phone: (415) 258-4616 Fax: (415) 454-4683 GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter
More informationSummary of Preparatory Study
Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic
More informationPART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):
PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer
More informationTYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:
Effluent Pumps: Effluent pumps are the pumps most often used in small on-site systems. They are designed to pump effluent, the effluent flowing out of a septic tank. This effluent is relatively clear liquid
More informationProducer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2000)
Updated 04/09/13 Producer Statement Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2000) Issued by : To : To be supplied to: Property Location:. (approved qualified design professional) (owner)
More informationNairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES
Nairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES 26/10/2015 Item Description Qty Unit Supply, deliver, install, test and commission the following borehole equipment including all materials
More informationBehavior Adaptations to Climatic Variability in the Use of Water for Drinking and Sanitation in the Dry Region of Sri Lanka
Behavior Adaptations to Climatic Variability in the Use of Water for Drinking and Sanitation in the Dry Region of Sri Lanka Professor. G.M. Bandaranayake Water Resources Studies Department of Geography
More informationcompact efficient reliable
compact efficient reliable The compact turbine system for highest demands in terms of efficiency and ecology in hydropower compact efficient reliable Milestones 2006 Commissioning DIVE-Turbine prototype
More informationConstruction OS&H Project planning and control for safe OS&H
Construction OS&H Project planning and control for safe OS&H Summary General principles of project planning and control OS&H by design as a key element of project planning and control OS&H performance
More informationVillage of Arlington Heights. Sewer Back-up Rebate Program
Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington
More information5.3 Flood Protection Plan
5.3 Flood Protection Plan 5.3.1 Existing Conditions (1) Land Elevation The majority of land in the study area is characterized as undeveloped land such as agricultural, unused land and forests which have
More informationWATER AWARENESS PROGRAM (WAP) FOR FARMERS (Moga, Punjab)
WATER AWARENESS PROGRAM (WAP) FOR FARMERS (Moga, Punjab) Understand Conserve Protect Nestlé India OBJECTIVE OF THIS PROGRAM This program has been specially designed by Nestlé to create awareness amongst
More informationRAINWATER HARVESTING. In Urban Areas
RAINWATER HARVESTING In Urban Areas Akash Ganga Trust Rain Centre No.4, 3rd Trust Link Street, Mandavelipakkam, Chennai 600 028. Ph: 2461 6134 Website : www.raincentre.org R s. 5/ - Introduction W ater
More information2. Circulating Water System
SUPPLEMENTAL OXYGENATION OF ELECIRIC GENERATING STATION COOLING WATER G. FRED LEE and GEORGE A. FREY* Department of Civil Engineering, Colorado State University, Fort Collins, CO 80523, U.S.A. (Received
More informationSub. Code:
(ISO/IEC - 700-005 Certified) Model Answer: Summer 07 Sub. Code: 750 Important Instructions to examiners: ) The answers should be examined by key words and not as word-to-word as given in the model answer
More information22 Tubewell Drainage Systems
22 Tubewell Drainage Systems WK Boehmer' and J Boonstra2 221 Introduction ' Tubewell drainage is a technique of controlling the watertable and salinity in agricultural areas It consists of pumping, from
More informationCity of Ottawa Water, Wastewater and Stormwater Rate Structure Review
City of Ottawa Water, Wastewater and Stormwater Rate Structure Review The City of Ottawa is developing a new rate structure to fund its water, wastewater and stormwater infrastructure. We need your help
More informationDIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1
DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work
More informationSection 7 Hydraulic Model Development and Evaluation Criteria
Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.
More informationProducer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2012)
Producer Statement Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2012) Issued by: To: To be supplied to: Property Location:. (approved qualified design professional) (owner) Kaipara District Council...
More informationOPTIMAL UTILIZATION OF IRRIGATION WATER BY USE OF PIPE DISTRIBUTION NETWORK (PDN) INSTEAD OF CANAL DISTRIBUTION NETWORK (CDN) IN COMMAND AREA
India Water Week 2012 Water, Energy and Food Security : Call for Solutions, 10-14 April 2012, New Delhi OPTIMAL UTILIZATION OF IRRIGATION WATER BY USE OF PIPE DISTRIBUTION NETWORK (PDN) INSTEAD OF CANAL
More informationRWSSHP Resource Manual # 3b. Spring Development. Construction Manual
RWSSHP Resource Manual # 3b Spring Development Construction Manual Introduction This manual is Part B of Manual#3 Hand Dug Wells and Spring Development Construction, which in turn is part of a series of
More informationCACHE VALLEY STORM WATER DESIGN STANDARDS. As Amended by Logan City November 2010
CACHE VALLEY STORM WATER DESIGN STANDARDS As Amended by Logan City November 2010 Updated November 2010 Table of Contents A. Definitions... 3 B. Design Requirements... 5 1. Storm Event... 5 2. Allowable
More informationTariff Circular & Tariff Schedules. (Effective from 01 st April 2015)
Tariff Circular & Tariff Schedules (Effective from 01 st April 2015) Madhya Gujarat Vij Company Limited Corporate Office, S.P. Vidyut Bhavan, Race Course, Vadodara-390 007 1465/2014 ANNEXURE: TARIFF SCHEDULE
More informationOptimization of Water Allocation in Canal Systems of Chengai Irrigation Area
Optimization of Water Allocation in Canal Systems of Chengai Irrigation Area Zhiliang Wang, Zhenmin Zhou (North China College of WRHP, Zhengzhou, Henan 450045, China) Abstract: Chengai Yellow River Irrigation
More informationLecture 20: Groundwater Introduction
Lecture 20: Groundwater Introduction Key Questions for Groundwater 1. What is an aquifer? 2. What is an unconfined aquifer? 3. What is groundwater recharge? 4. What is porosity? What determines the magnitude
More informationWater Resource Management in the Mississippi Delta
Water Resource Management in the Mississippi Delta Dave Kelly Water Resource Specialist Yazoo Mississippi Delta Joint Water Management District Stoneville, Mississippi Mississippi River Valley Alluvial
More information