SOUTH ORANGE COUNTY WATERSHED MANAGEMENT AREA 2013 INTEGRATED REGIONAL WATER MANAGEMENT PLAN An Integrated, Healthy and Balanced Watershed

Size: px
Start display at page:

Download "SOUTH ORANGE COUNTY WATERSHED MANAGEMENT AREA 2013 INTEGRATED REGIONAL WATER MANAGEMENT PLAN An Integrated, Healthy and Balanced Watershed"

Transcription

1 SOUTH ORANGE COUNTY WATERSHED MANAGEMENT AREA 2013 INTEGRATED REGIONAL WATER MANAGEMENT PLAN An Integrated, Healthy and Balanced Watershed The South Orange County Integrated Regional Water Management (IRWM) Plan has been developed from and coordinates with existing plans and research documents provided by the participating agencies in a manner that identifies and integrates regional projects to improve water supply, protect water quality, enhance the environment, and provide flood risk management. This Plan establishes a priority ranking to help further regional efforts to investigate the feasibility of, and identify funding for, these projects. Individual projects however, will go through the appropriate environmental review and permitting process as funding is secured. Two new components developed as appendices to the Plan will be adopted at a later date. The first is the Salt and Nutrient Management Plan for which South Orange County Wastewater Authority is serving as the lead agency. The second, the Groundwater Management and Facility Plan, is being led by Santa Margarita Water District on behalf of the San Juan Basin Authority. Both of these appendices are going through a separate review and adoption process by their lead agencies. Members of the Executive Committee, Management Committee, and the public are encouraged to participate in these processes. The review process for the Salt and Nutrient Management Plan has not been finalized by the State Water Resources Control Board so additional steps may be required by the State for this appendix. The Groundwater Management Plan is scheduled to be approved by its lead agencies in October. Once approved by their respective agencies the plans will be presented to the Executive Committee for formal adoption as finalized appendices to the Plan. 1 INTRODUCTION Located along the scenic and temperate southern coast of California, South Orange County is rich with history. Legacies passed on from native societies, once expansive cattle ranches, and twentieth century entrepreneurial farmers remain a part of the area s culture today. From the landmark Mission San Juan Capistrano near the stunning western coastline to the Cleveland National Forest in the east, South Orange County continues to be a destination known for beauty and a high quality of life. Following the national migration trends after World War II that drew citizens to Sunbelt cities, the region transitioned into one of the newest areas of urban development in the early 1960 s. Several cities incorporated over the subsequent decades, and the population has increased to over 500,000 residents. Most of the coastline is developed, and additional urbanization is anticipated in the backcountry ranch land over the next 20 years. Today, the region s social and cultural makeup includes a unique mix of equestrian lifestyle, authentic Mexican/Hispanic culture, and a progressive business industry. 1-1

2 The region s economy has come into its own from the shadows of Los Angeles to the north and San Diego to the south with a unique technological and business infrastructure. This is demonstrated by the diversity of industries represented from medical devices to construction as well as intellectual resources to support this diversity. The recent economic downturn hit the region early and particularly hard, as Orange County was home to countless mortgage brokers, particularly in the sub-prime area. The region s high-tech sector remains a diverse and driving force of the local economy. Venture capital investment appears to be growing again after a sharp decline in the first half of the decade. However, venture capital in the first half of 2009 was below the pace of 2008, suggesting peaks and valleys in future investment. After 10 years of unemployment rates typically lower than the state and U.S. averages, the region s unemployment rate spiked to 9.5% in 2009, which was similar to the rest of the nation. The region s income is rising slower than in past years, increasing 2.4% between 2006 and 2007, compared with 6% between 2005 and 2006, and 5.5% between 2004 and In 2009, the national inflation rate was negative (deflation), falling 0.34%. As a result, each dollar bought marginally more, but Orange County residents were unlikely to sense the advantage since per capita income declined 5.5% from $51,877 in 2008 to $49,020 in In 2010, income statistics for both the state and nation indicated a rebound of approximately 3%, reflected in Orange County as well. 2 The unemployment rate in Orange County dropped to 7.0 percent in November 2012, down from the 7.2 percent in October 2012, and below the year-ago estimate of 8.1 percent. This compares with an unadjusted unemployment rate of 9.6 percent for California and 7.4 percent for the nation during the same period. The California Employment Indicator Index, indicates that job growth is sluggish in Orange County industry employment is showing slight increases and fluctuations with some industries performing better than others, yet overall growth still remains slow due to the extensive impacts associated with the Great Recession. Orange County population growth has slowed. Migration into the County has slowed and even become negative in recent years leaving natural increase as the engine driving growth. Orange County continues to diversify its population yet, while all ethnicities are currently experiencing drops in birth rates, the Latino demographic is largely accountable for the majority of new births and by 2020 the Latino demographic is expected to become the new majority of the population. Overall, Orange County was ranked 38th in population percentage growth from 2000 to 2010 with 5.8%, compared to the state. 3 Figure 1-1 on the following page shows a map of South Orange County. 1 Orange County Business Council Orange County Community Indicators Report Available online: 2 Orange County Business Council Orange County Community Indicators Report Available online: 3 County of Orange - OC Economic Indicators Dashboard. December 2012 Metrics. Available online: 1-2

3 South Orange County Watershed Management Area Figure 1-1: South Orange County Map 1-3

4 Water is the key element for sustaining South Orange County economies that allow the region to thrive. Significant local investments in water, sewer, and flood infrastructure have been made in the past to allow the area to be served on a reliable basis. Planning and investments to carry the region through the next 25-year planning horizon are critical and are central to preserving the quality of life and planning for flood management; surface runoff management; watershed management; water use efficiency; water supply and reliability; recycled water; habitat preservation, conservation and restoration; water quality protection and improvement; resource stewardship; and related water resource management strategies. Figure 1-2 shows the South Orange County IRWM Plan Goals, which are discussed in further detail below and in Section 4 Objectives. Figure 1-2: South Orange County IRWMP Goals Water quality improvement efforts over the last decade have resulted in significant improvements in coastal water quality along the County beaches. The Heal the Bay Annual Report (2012) states that the County grades for year-round dry weather were excellent and wet weather grades fair, besting the 5 year average. Coastal and surface water quality remains an important component of the region s IRWM planning. Reducing runoff and improving the water quality in streams and along the beaches is a key goal for the region. 1-4

5 Another key goal of the region is the expansion and protection of the water supply and efficient use of the water. The South Orange County water supply originates predominately from imported sources, making the region subject to conditions and agencies outside of the region. The South Orange County IRWM Plan is aimed at diversifying water sources by developing a variety of local opportunities to decrease the reliance on imported sources. For example, the local San Juan Valley Groundwater Basin has been the subject of multiple management programs for treating existing brackish waters and managing wet year supplies for use during dry year conditions; South Orange County is a leader in implementing water recycling projects turning wastewater into a resource; urban water reuse projects are being developed to help reduce runoff and utilize a local resource; and water conservation projects have been a standard for many years including recent programs using weather-based irrigation controllers. Fiscal resources are also needed to improve the water quality in the local streams to protect the beneficial uses that are listed for these water bodies, and to increase where possible local supply through water reclamation, conservation, stormwater capture/treatment, and groundwater and seawater desalination. South Orange County is at the forefront of technological and management advances. For example, over the past decade the County of Orange, South Orange County cities, water and wastewater agencies, and interested citizens have been participating in watershed studies for the Aliso Creek, Dana Point Coastal Streams, Laguna Coastal Streams, San Juan Creek, San Clemente Coastal Streams, and San Mateo Creek watersheds. Watershed Management Plans were completed for the Aliso Creek, and San Juan Creek watersheds. These were among the first types of efforts that studied the overall health of the watershed and developed recommendations and actions for implementation on a collective basis among the many partners. Watershed Workplans 4 have been developed and are regularly updated for the following watersheds in the San Diego Region to comply with Directive G of the San Diego Regional Water Quality Control Board's Order (Regional Board Order No. R ): Aliso Creek Dana Point Coastal Streams Laguna Coastal Streams San Juan Creek San Clemente Coastal Streams San Mateo Creek 4 OC Watersheds, Watershed Workplans, available online 1/22/13: 1-5

6 The Watershed Workplans describe the Watershed Permittees' development and implementation of a collective watershed strategy to assess and prioritize the water quality challenges within the watershed's receiving waters, identify and model sources of the highest priority water quality problem(s), develop a watershed-wide best management practices (BMP) implementation strategy to abate highest priority water quality problems, and a monitoring strategy to evaluate BMP effectiveness and changing water quality prioritization in the watershed. South Orange County continues to implement watershed protection and policy compliance. Another example of the region s progressive approach to water management is the Municipal Water District of Orange County (MWDOC) and the South Orange County water districts water ongoing commitment to system reliability and development of a System Reliability Plan (September 2004). Phase 1 of the study identified both (1) water supply shortages by agency that would occur due to outages of critical components of the regional imported water distribution system, and (2) shortages due to potential supply shortages from extended and severe droughts. The Phase 1 study also identified a range of potential projects that could provide reliability enhancements to mitigate risks of potential regional distribution system outages. This effort provided the foundation for developing candidate water system and supply reliability improvements in Phase 2. The purpose of the Phase 2 plan was to demonstrate the benefits of additional investments to help prevent short-term water shortages caused by facility outages in an area that is over 90 percent reliant on imported water. The Phase 2 plan recommended a number of initiatives to improve water reliability, including ocean desalination in Dana Point to serve South Orange County. Phase 1 & 2 testing of the desalination project was completed from Activities of Phase 3, Extended Pumping and Pilot Plant Testing, started in 2010 and final reports were completed in May The final reports are anticipated in summer of An update to the 2004 South Orange County Water Reliability Study will be completed in This update summarizes the considerable investments and improvements resulting from the 2004 study including the ability to sustain short-term supply disruption from several days in the year 2000 to about 16 day or more in This update also includes a distinction between system and source reliability. The definitions of each are provided below: System Reliability having the infrastructure to continue meeting customer needs with various parts of the local or regional system out of order. We typically think in terms of days or weeks for durations of outages, although an outage of the Colorado River Aqueduct, the State Water Project, or even parts of the MET system could be out of operation for much longer following a major earthquake. Source Reliability having the water to put into the system on a sustainable basis into the future (main risks are extended drought, regulatory restrictions, and climate change impacts that impose or create delivery shortages on MET). We would typically be looking at shortages affecting us for durations of 1 to 3 years or longer. Local Projects that develop a new source of supply provide both system and source benefits. 1-6

7 Emergency Only Projects provide only system benefits. Finally, the updated study will include a new list of system and source reliability projects for consideration to more fully protect the area from longer periods of imported supply system outages and shortages. The region embraced the Integrated Regional Water Management Planning Act of 2002 to enhance forward planning in an even more coordinated fashion. In 2008, SBX2-1 (Perata) repealed and replaced the Act and appropriates funding from two initiatives passed by voters in Proposition 84 and Proposition 1E. The County of Orange, cities, and water and wastewater agencies of South Orange County formed the South Orange County IRWM Group in 2004 and subsequently developed and adopted the South Orange County IRWM Plan in The IRWM Group established the South Orange County IRWM region as a cooperative framework for planning and implementing water management strategies in the region. The South Orange County IRWM Group was recognized as a region during the Proposition 50 IRWM Program Implementation Grant effort in In 2007, the South Orange County IRWM Region was awarded Proposition 50 funding. Subsequently in 2009 the South Orange County Watershed Management Area (WMA) was recognized as a region during DWR s Regional Acceptance Process (RAP). The IRWM Group is incorporating project and planning elements of the South Orange County WMA within the IRWM Plan. The South Orange County IRWM Group embraces the IRWM model because it brings together short term and long term management strategies that will protect the water supply and water quality of the WMA. The South Orange County agencies maintain the belief that water management strategies can and should be integrated to provide a reliable water supply, protect and improve water quality, and achieve other objectives. The IRWM Plan is designed to help local agencies and governments manage their water, wastewater, and ecological resources. The purpose of the IRWM Group in developing this Plan is to identify potential projects intended to improve water quality and supply in order to investigate their feasibility, engage in long range water planning, to establish priorities among the proposals of the member entities and obtain potential funding. As the IRWM Plan is implemented, the County, as agent of the State of California, will serve as a conduit for funding to the individual agencies proposing the projects. This IRWM Plan does not commit any resources to implementation of any project nor does its creation constitute a commitment by the County or any member entity to carry out any of the proposed projects. Determinations to proceed with individual projects and required environmental review under the California Environmental Quality Act, will be performed by the individual agencies prior to approval of funding. Agencies within the coastal zone of South Orange County face unique environmental challenges relative to inland areas, including the protection of millions of visitors who 1-7

8 utilize the ocean for recreation each year, as well as protection of the unique marine resources from polluted runoff. This IRWM Plan includes strategies to comply with Clean Water Act and Porter-Cologne and protect beneficial uses of receiving waters to improve water quality of the coastline. Within the South Orange County WMA, the County coastline includes one ASBS area, Heisler Park Ecological Reserve. In addition, there are three locations within the South Orange County WMA that are on the California s Critical Coastal Areas (CCA) listing San Juan Creek, Aliso Creek, and Heisler Park Ecological Reserve. This IRWM Plan also supports the state priorities that relate to the California Water Plan Update 2009, the CALFED Bay-Delta Program, the Department of Water Resources (DWR) Water Recycling Task Force Recommendations, the SWRCB s Recycled Water Policy, Governor Schwarzenegger s 20x2020 Water Conservation Plan of 2010, greenhouse gas (GHG) emissions reduction goals of AB 32, the Water Desalination Task Force Recommendations, the California Ocean Plan, the California Watershed Action Plan, the TMDL List, the comprehensive Orange County Drainage Area Management Plan (DAMP), and the Regional Water Boards Watershed Management Initiative Chapters. The Plan does this through the integration of projects and programs that incorporate a wide range of water management strategies. Beneficial effects from implementation of proposed projects and programs will contribute to the goals and objectives of the local, regional and statewide priorities. 1-8

10.1 Local Water Planning

10.1 Local Water Planning 10 COORDINATION WITH EXISTING LOCAL/REGIONAL PLANS Each of the IRWM agencies plan and execute both short-term capital improvement programs and long-term plans and management programs. It is their plans,

More information

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan Water and Environment Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan December 11, 2006 Presentation Outline Purpose of IRWM Planning Status of Plan

More information

Integrated Regional Water Management

Integrated Regional Water Management Integrated Regional Water Management California Watershed Network March 20, 2007 John Woodling California Dept. of Water Resources Integrated Regional Water Management A cornerstone of the California Water

More information

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts

More information

Developing Metrics & Indicators for the California Water Plan. CA Sustainability Indictors Symposium February 23, 2011

Developing Metrics & Indicators for the California Water Plan. CA Sustainability Indictors Symposium February 23, 2011 Developing Metrics & Indicators for the California Water Plan CA Sustainability Indictors Symposium February 23, 2011 1 Update 2009 State s Blueprint Integrated Water Management & Sustainability 2 Update

More information

Local, State and Federal Funding Opportunities

Local, State and Federal Funding Opportunities Local, State and Federal Opportunities MWD Accelerated Recycled Water Retrofit Program MWD Local Resource Program Water Savings Incentive Program So Cal Water$mart $10M $10M Provides financial incentives

More information

Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017

Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017 Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017 What is the need for more State investment in water resources? What is the

More information

SECTION 1. REGIONAL PLANNING, OUTREACH, GOVERNANCE AND COORDINATION

SECTION 1. REGIONAL PLANNING, OUTREACH, GOVERNANCE AND COORDINATION SECTION 1. REGIONAL PLANNING, OUTREACH, GOVERNANCE AND COORDINATION 1.1 Introduction The North and Central Orange County Watershed Management Area Integrated Regional Water Management (IRWM) Plan (The

More information

IRWM Plan Update Kick-off Meeting. 5 March 2012 MWA Headquarters Apple Valley

IRWM Plan Update Kick-off Meeting. 5 March 2012 MWA Headquarters Apple Valley IRWM Plan Update Kick-off Meeting 5 March 2012 MWA Headquarters Apple Valley 1 WELCOME AND INTRODUCTIONS 2 Why? 3 History of the IRWM Program Prop 13 Prop 50 Prop 84 Funding areas California Water Plan

More information

CHAPTER 5 WASTEWATER FLOWS

CHAPTER 5 WASTEWATER FLOWS CHAPTER 5 WASTEWATER FLOWS 5.1 REGIONAL FACILITIES Regional Water Recycling Plants Figure 5-1 illustrates the service area boundaries for IEUA s four water recycling plants. The four Regional facilities

More information

ALAMEDA COUNTY WATER DISTRICT GROUNDWATER MANAGEMENT POLICY

ALAMEDA COUNTY WATER DISTRICT GROUNDWATER MANAGEMENT POLICY ALAMEDA COUNTY WATER DISTRICT GROUNDWATER MANAGEMENT POLICY (Adopted January 26, 1989) (Amended March 22, 2001) TABLE OF CONTENTS Page BACKGROUND 1 AUTHORIZATION 1 POLICY STATEMENT 2 OBJECTIVES 2 ATTACHMENT

More information

Desalination. Section 10 SECTION TEN. Desalination

Desalination. Section 10 SECTION TEN. Desalination SECTION TEN Desalination Section 10 Desalination SECTION 10 Desalination West Basin s experience in recycled water treatment includes substantial knowledge on methods used for the removal of salt from

More information

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination WATER ELEMENT INTRODUCTION Water is one of the most critical resources for the Merced County economy and for the quality of life of its residents. Both surface water and groundwater supplies are an important

More information

SOUTH ORANGE COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN

SOUTH ORANGE COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN SOUTH ORANGE COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN 2006 Total Watershed Efficiency May 2006 South Orange County Integrated Regional Water Management Plan Contacts County of Orange Resources

More information

A COOPERATIVE PROJECT OF THE CITIES OF ALISO VIEJO AND LAGUNA BEACH, THE COUNTY OF ORANGE, AND THE ORANGE COUNTY FLOOD CONTROL DISTRICT

A COOPERATIVE PROJECT OF THE CITIES OF ALISO VIEJO AND LAGUNA BEACH, THE COUNTY OF ORANGE, AND THE ORANGE COUNTY FLOOD CONTROL DISTRICT 2013 LAGUNA COASTAL STREAMS WATERSHED WORKPLAN JANUARY 1,, 2013 A COOPERATIVE PROJECT OF THE CITIES OF ALISO VIEJO AND LAGUNA BEACH, THE COUNTY OF ORANGE, AND THE ORANGE COUNTY FLOOD CONTROL DISTRICT 2013

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

SPECIAL BOARD OF DIRECTORS MEETING. 1:00 p.m.

SPECIAL BOARD OF DIRECTORS MEETING. 1:00 p.m. 4677 Overland Avenue San Diego, California 92123 SPECIAL BOARD OF DIRECTORS MEETING Board Room February 13, 2014 1:00 p.m. 1. Call to order. 2. Roll call Determination of a quorum. A. Report on proxies

More information

The City and MID adopted this 2010 UWMP in Copies of the adoption resolutions are included in Appendix B. ES-1

The City and MID adopted this 2010 UWMP in Copies of the adoption resolutions are included in Appendix B. ES-1 ES.1 INTRODUCTION This (UWMP) has been prepared for the City of Modesto (City) and the Modesto Irrigation District (MID) by West Yost Associates (West Yost) as a joint UWMP. This 2010 UWMP for the City

More information

2 Vision and Objectives

2 Vision and Objectives 2 Vision and Objectives This chapter addresses requirements set forth in the Objectives Standard included in the 2012 IRWM Program Guidelines (DWR 2012). Consistent with DWR s 2012 Guidelines, the objectives

More information

Corporate Environmental Water Stewardship Go Green. Todd Reeve October 17, 2017

Corporate Environmental Water Stewardship Go Green. Todd Reeve October 17, 2017 Corporate Environmental Water Stewardship Go Green Todd Reeve October 17, 2017 Freshwater & Business Risk #1 threat (World Economic Forum 2016) 2/3 rd of companies report water as substantive risk* 44%

More information

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF) Attention: Water Planning Committee Unit Cost of New Local Water Supply Alternatives (Information) Purpose This report discusses current unit costs for new local water supply alternatives including water

More information

Local Resource Management in Southern California

Local Resource Management in Southern California Abstract Local Resource Management in Southern California José Vergara and Anatole Falagan 1 With a population of nearly 18 million, the Southern California region has demands in excess of 3.8 million

More information

Revised 8-4. Board of Directors Water Planning and Stewardship Committee. September 11, 2007 Board Meeting. Subject. Description

Revised 8-4. Board of Directors Water Planning and Stewardship Committee. September 11, 2007 Board Meeting. Subject. Description Board of Directors Water Planning and Stewardship Committee September 11, 2007 Board Meeting Subject Adopt criteria for conveyance options in implementation of Long Term Delta Plan Description Revised

More information

Case Study: Climate Change Adaptation in the City of Irvine, CA. ND-GAIN Urban Adaptation Assessment Gracie Georgi

Case Study: Climate Change Adaptation in the City of Irvine, CA. ND-GAIN Urban Adaptation Assessment Gracie Georgi Case Study: Climate Change Adaptation in the City of Irvine, CA ND-GAIN Urban Adaptation Assessment Gracie Georgi 8.11.17 Author Gracie Georgi is a junior at the University of Notre Dame studying Political

More information

Funding Stormwater Services

Funding Stormwater Services Funding Stormwater Services Public Works Officers Institute March 10, 2016 By Mitch Avalon Consultant, County Engineers Association of California Pine Creek Flooding, Concord 1958 Overview Ballot Measure

More information

3.6 HYDROLOGY AND WATER QUALITY Environmental Setting

3.6 HYDROLOGY AND WATER QUALITY Environmental Setting 3.6 HYDROLOGY AND WATER QUALITY This section of the Environmental Impact Report (EIR) describes existing hydrology and water quality resources, and analyzes potential impacts resulting from implementation

More information

Project Prioritization

Project Prioritization Project Prioritization The Santa Ana Watershed Project Authority (SAWPA), as the regional watershed planning group for the Santa Ana River Watershed, has been facilitating efforts to implement a watershed

More information

Colorado River Challenges Impacts to Southern Arizona

Colorado River Challenges Impacts to Southern Arizona Colorado River Challenges Impacts to Southern Arizona 2 3 4 5 Colorado River Basics 7 States, 2 Nations Annual Flow 15.0 MAF 40 Million People All of the Major Cities in Southwest 5.5m Irrigated Acres

More information

National Water Research Institute January 7, 2012, E-Newsletter

National Water Research Institute January 7, 2012, E-Newsletter National Water Research Institute January 7, 2012, E-Newsletter In This Issue NWRI Has Over 1,000 Twitter Followers! NWRI "Water From Water" Video Series Now on YouTube Comments Welcome for USBR Colorado

More information

MAJOR THEMES IN ARIZONA S WATER FUTURE

MAJOR THEMES IN ARIZONA S WATER FUTURE Chapter 2 MAJOR THEMES IN ARIZONA S WATER FUTURE KATHY JACOBS AND MARSHALL A. WORDEN Seven major themes or overarching concerns regarding Arizona s water future are discussed in succeeding chapters. Information

More information

The Los Angeles Desalination Project

The Los Angeles Desalination Project DRAFT PROPOSAL The Los Angeles Desalination Project Author: Brian Nissen Company: Bella Machines www.bellamachines.com The Los Angeles Desalination Project CALIFORNIA WATER The California water crisis

More information

Managed Groundwater Recharge to Support Sustainable Water Management. A Sacramento Valley Perspective November 8, 2017

Managed Groundwater Recharge to Support Sustainable Water Management. A Sacramento Valley Perspective November 8, 2017 To advance the economic, social and environmental sustainability of Northern California by enhancing and preserving the water rights, supplies and water quality. Managed Groundwater Recharge to Support

More information

City of Los Angeles/Department of Public Works/Sanitation On-call Consultant Services Contracts

City of Los Angeles/Department of Public Works/Sanitation On-call Consultant Services Contracts City of Los Angeles/Department of Public Works/Sanitation On-call Consultant Services Contracts Task Order Solicitation (TOS) SN-44 For Specialized and Expert Regulatory Services August 2015 1. Introduction

More information

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants Tahoe-Sierra Integrated Regional Water Management Plan July 2014 K/J 1270036 Photo courtesy of Matthew Grimm South Tahoe Public Utility District Prepared By Kennedy/Jenks Consultants 10850 Gold Center

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council.

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council. U.S. Water Budget Figure 10.18 10-9 Source:Data from The Nation s Water Resources 1975-2000, Vol. 1, U.S. Water Resources Council. Average U.S. Precipitation Figure 10.19 10-10 Source: U.S. Water Resources

More information

Los Angeles 3 rd Regional

Los Angeles 3 rd Regional Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager San Diego, A Cadillac Desert; Sustainable Strategies for Living in a Desert Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager Green Lunch Bag Series September 24, 2014 San Diego County

More information

A7. Economic Analysis Water Supply Cost and Benefits

A7. Economic Analysis Water Supply Cost and Benefits A7. Economic Analysis Water Supply Cost and Benefits Attachment 7 identifies the costs and water supply benefits attributed to the seven projects proposed for implementation in the Santa Barbara County

More information

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999 WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999 The following table indicates the draft goals and objectives for the Santa Clara Basin WMI process. The overall objectives

More information

ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS

ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS [This page has been left blank intentionally] Assessment of Program Effectiveness 1. Assessment of your agency's compliance with permit requirements, based

More information

2015 Urban Water Management Plan for Mojave Water Agency

2015 Urban Water Management Plan for Mojave Water Agency Courtesy: Google Earth FINAL 2015 Urban Water Management Plan for Mojave Water Agency Prepared by Kennedy/Jenks Consultants June 2016 300 North Lake Avenue, Suite 1020 Pasadena, California 91101 626-568-4300

More information

SECTION C-12.0 WATERSHED PLANNING

SECTION C-12.0 WATERSHED PLANNING C-12.0 WATERSHED PLANNING C-12.1 Introduction The Fourth Term Permits have, with varying degrees of specificity, required the Permittees to develop and implement a watershed-based approach to urban stormwater

More information

An Update of Coastal Desalination Status in the West Coast

An Update of Coastal Desalination Status in the West Coast An Update of Coastal Desalination Status in the West Coast Joseph Wong, Brown and Caldwell CA-NV AWWA Fall Conference September 30 October 3, 2013 Sacramento, California Map of Proposed Desalination Plants

More information

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County The Carlsbad Desalination Plant is capable of delivering more than 50 million gallons of fresh, desalinated drinking water per day enough to serve approximately 400,000 people in San Diego County. Commercial

More information

Assessment of the Health of Santa Ana River Watershed

Assessment of the Health of Santa Ana River Watershed Assessment of the Health of Santa Ana River Watershed 1. 1.0 Introduction Human well-being is inextricably tied to the services provided by healthy ecosystems and yet vulnerable to the increased threats

More information

Chapter 1. Introduction

Chapter 1. Introduction Chapter 1 Introduction James P. Heaney, Robert Pitt, and Richard Field Introduction Stormwater has traditionally been considered a nuisance, requiring rapid and complete drainage from areas of habitation.

More information

Introduction Page I-1 INTRODUCTION

Introduction Page I-1 INTRODUCTION Introduction Page I-1 INTRODUCTION The Arcata General Plan: 2020 will help shape how the city of Arcata will look, function, provide services, and manage resources for the next 20 years. The plan is the

More information

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection 4.15.3.1 ENVIRONMENTAL SETTING Wastewater Collection The City owns, operates, and maintains the local sewer lines that collect wastewater generated within the City. The existing sewer lines include a gravity

More information

Model Monitoring Program for Municipal Separate Storm Sewer Systems in Southern California

Model Monitoring Program for Municipal Separate Storm Sewer Systems in Southern California Model Monitoring Program for Municipal Separate Storm Sewer Systems in Southern California A report from the Stormwater Monitoring Coalition s Model Monitoring Technical Committee August 004 Technical

More information

Newport Bay Watershed Executive Committee

Newport Bay Watershed Executive Committee Newport Bay Watershed Executive Committee June 21, 2017 Discussion Calendar AGENDA ITEM 1 ACTION MINUTES OF THE MARCH 15, 2017 MEETING Amanda Carr, County of Orange Recommended Action Approve the action

More information

The New Economies of the Redwood Region in the 21 st Century 1

The New Economies of the Redwood Region in the 21 st Century 1 The New Economies of the Redwood Region in the 21 st Century 1 William Stewart 2 Abstract The redwood region of California has experienced a number of major land use changes over the past one hundred and

More information

BIG CHICO CREEK WATERSHED ALLIANCE

BIG CHICO CREEK WATERSHED ALLIANCE BIG CHICO CREEK WATERSHED ALLIANCE Input for County Integrated Water Resources Plan I Description of Organization Contact Person: Susan Strachan, Chair P.O. Box 461 Chico, CA 95928 (530) 894-1308 Website:

More information

POTABLE WATER ELEMENT

POTABLE WATER ELEMENT Goal 4.0. Provide current and future residents of the County's utility service areas, and large users of the regional raw water system a cost-effective and equitable potable or raw water supply system

More information

INFRASTRUCTURE INTRODUCTION AND VISION FOR THE FUTURE

INFRASTRUCTURE INTRODUCTION AND VISION FOR THE FUTURE INTRODUCTION AND VISION FOR THE FUTURE Orange residents, businesses and visitors rely on public infrastructure to carry out their daily duties. Population growth and new development continues to increase

More information

State of the Estuary Report 2015

State of the Estuary Report 2015 State of the Estuary Report 2015 Technical Appendix People Recycling Water Peter Vorster vorster@bay.org The Bay Institute TECHNICAL APPENDIX: RECYCLED WATER USE CONTEXT Most of the surface and ground

More information

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT EXHIBIT B CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT PROPOSED AMENDMENTS Table of Contents Objective Page Sanitary Sewer Sub-Element 3A.1 Secure reserve capacity at the South Central Regional

More information

San Diego Basin Study IRWM RAC Meeting

San Diego Basin Study IRWM RAC Meeting San Diego Basin Study IRWM RAC Meeting April 4 th, 2018 Allison Danner U.S. Bureau of Reclamation adanner@usbr.gov Sarah Brower, Ph.D. City of San Diego sbrower@sandiego. gov Agenda Task 2.4 Updates Review

More information

Environmental Geography

Environmental Geography Environmental Geography Lecture 13 Water Pollution Lecture 13: Water Pollution I. Water Pollution A. Groundwater B. Surface Water C. Regulation II. Water Use in California 1 I. Water Pollution Types of

More information

Monterey GWR Project: a Sustainable Return on Investment Assessment of Desalination and Water Reuse

Monterey GWR Project: a Sustainable Return on Investment Assessment of Desalination and Water Reuse Subscribe to HDR Publications SUSTAINABLE RETURN ON INVESTMENT Monterey GWR Project: a Sustainable Return on Investment Assessment of Desalination and Water Reuse By Jeremy Cook Senior Economist, Omaha,

More information

Santa Barbara County-Wide Integrated Stormwater Resource Plan

Santa Barbara County-Wide Integrated Stormwater Resource Plan Santa Barbara County-Wide Integrated Stormwater Resource Plan Stakeholder Kickoff Meeting South County October 10, 2017 North County October 12, 2017 Discussion Topics Stormwater Resource Plan (SWRP) project

More information

Santa Margarita River WQIP. Consultation Committee Meeting September 7, 2016

Santa Margarita River WQIP. Consultation Committee Meeting September 7, 2016 Santa Margarita River WQIP Consultation Committee Meeting September 7, 2016 1 Welcome and Introductions Responsible Agencies Riverside County Flood Control & Water Conservation District Counties Riverside

More information

Frequently Asked Questions Updated July 17, 2015

Frequently Asked Questions Updated July 17, 2015 Frequently Asked Questions Updated July 17, 2015 1. What is California WaterFix? California WaterFix is a proposal backed by the administrations of Governor Edmund G. Brown Jr. and President Barack Obama

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW HOUSE BILL 609

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW HOUSE BILL 609 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW 2011-374 HOUSE BILL 609 AN ACT TO PROMOTE THE DEVELOPMENT OF WATER SUPPLY RESERVOIRS AND OTHER WATER SUPPLY RESOURCES, TO PROVIDE THAT FUNDS

More information

TABLE OF CONTENTS LIST OF FIGURES LIST OF ATTACHMENTS

TABLE OF CONTENTS LIST OF FIGURES LIST OF ATTACHMENTS TABLE OF CONTENTS 2.0 TRANSMISSION SYSTEM OVERVIEW... 2-1 2.1 PROPOSED PROJECT OBJECTIVES... 2-2 2.2 SAFETY, RELIABILITY AND RESILIENCY, AND OPERATIONAL FLEXIBILITY AND CAPACITY... 2-5 2.2.0 Pipeline Safety...

More information

Executive Action Plan September 2017 v5 Final. Central Orange County Watershed Management Area. Executive Action Plan

Executive Action Plan September 2017 v5 Final. Central Orange County Watershed Management Area. Executive Action Plan Executive Action Plan September 2017 v5 Final Central Orange County Watershed Management Area Executive Action Plan 2017-22 Newport Bay Watershed Executive Committee September 20, 2017 1 Page intentionally

More information

Chapter 8 National Economic Development and Locally Preferred Alternative

Chapter 8 National Economic Development and Locally Preferred Alternative Chapter 8 National Economic Development and Locally Preferred Alternative Determination of Feasibility This chapter considers the feasibility of the NED Plan and the Locally Preferred Alternative. As indicated

More information

ATTACHMENT 4 Section Project Status Quarterly Report - Dec 31, 2015 Measure V - Clean Beaches and Ocean Parcel Tax

ATTACHMENT 4 Section Project Status Quarterly Report - Dec 31, 2015 Measure V - Clean Beaches and Ocean Parcel Tax ATTACHMENT 4 Section 3.0 - Project Status Quarterly Report - Dec 31, 2015 Completed Projects Description Bicknell Avenue Green Street Pier Storm Drain Improvement Pier Water Quality Improvement Permeable

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

2.1 Overview. Chapter 2 Project Objectives and Purpose and Need

2.1 Overview. Chapter 2 Project Objectives and Purpose and Need 1 Chapter The BDCP sets out a comprehensive conservation strategy for the Delta designed to restore and protect ecosystem health, water supply, and water quality within a stable regulatory framework. The

More information

Clean water. From nature.

Clean water. From nature. Clean water. From nature. Natural Treatment System Save water. Do your part. Did you know that over watering or a broken sprinkler on your property can contribute to ocean pollution? Excess watering creates

More information

Stormwater Programs. BIA Meeting June 5, Jason Uhley

Stormwater Programs. BIA Meeting June 5, Jason Uhley Stormwater Programs BIA Meeting June 5, 2014 Jason Uhley Chief of Watershed Protection Riverside County Flood Control and Water Conservation District Presentation Outline Clean Water Act Stormwater Program

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to

More information

Bob Jaques, Seaside Basin Watermaster Technical Program Manager. Gus Yates, Senior Hydrologist, Todd Groundwater

Bob Jaques, Seaside Basin Watermaster Technical Program Manager. Gus Yates, Senior Hydrologist, Todd Groundwater 6 April 2015 MEMORANDUM To: From: Re: Bob Jaques, Seaside Basin Watermaster Technical Program Manager Gus Yates, Senior Hydrologist, Todd Groundwater Groundwater Management Options and Recommendations

More information

Shaina Keseley MPCA-Rochester Watershed Project Manager

Shaina Keseley MPCA-Rochester Watershed Project Manager Shaina Keseley MPCA-Rochester Watershed Project Manager Why study Minnesota s waters? Basis of Clean Water work: Federal Clean Water Act of 1972 Goal Fishable/Swimmable by 1983 MPCA completes work for

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

LOS ANGELES. City of Los Angeles. Adel Hagekhalil 1 Marty Adams 2 Inge Wiersema 3. 1 Los Angeles Bureau of Sanitation

LOS ANGELES. City of Los Angeles. Adel Hagekhalil 1 Marty Adams 2 Inge Wiersema 3. 1 Los Angeles Bureau of Sanitation LOS ANGELES City of Los Angeles Adel Hagekhalil 1 Marty Adams 2 Inge Wiersema 3 1 Los Angeles Bureau of Sanitation 2 Los Angeles Department of Water and Power 3 Carollo Engineers, Inc. 1 t CHAPTER 1 General

More information

Solano Multi-Species Habitat Conservation Plan

Solano Multi-Species Habitat Conservation Plan Solano Multi-Species Habitat Conservation Plan 580,000 Acres 37 Covered Species 4 Natural Communities 12,000 acres of Proposed Development Approximately 23,000 acres will be Preserved Plan Participants

More information

Testimony of. Senator Barbara Boxer. Senate Committee on Energy and Natural Resources Subcommittee on Public Lands, Forests, and Mining

Testimony of. Senator Barbara Boxer. Senate Committee on Energy and Natural Resources Subcommittee on Public Lands, Forests, and Mining Testimony of Senator Barbara Boxer Senate Committee on Energy and Natural Resources Subcommittee on Public Lands, Forests, and Mining Hearing on S. 771, the Soledad Canyon Settlement Act and S. 483, the

More information

March 16, The Honorable Donald J. Trump President of the United States The White House 1600 Pennsylvania Ave. N.W. Washington, DC 20500

March 16, The Honorable Donald J. Trump President of the United States The White House 1600 Pennsylvania Ave. N.W. Washington, DC 20500 March 16, 2016 The Honorable Donald J. Trump President of the United States The White House 1600 Pennsylvania Ave. N.W. Washington, DC 20500 Dear President Trump: On behalf of our organizations, which

More information

CALFED Drinking Water Quality Program

CALFED Drinking Water Quality Program CALFED Drinking Water Quality Program Sacramento Sacramento River Sacramento Valley Region Delta Bay Region Region San Joaquin Valley Region Suisun Marsh Bay-Delta San Joaquin River Stockton Southern California

More information

NORTH COAST INTEGRATED REGIONAL WATER MANAGEMENT PLAN

NORTH COAST INTEGRATED REGIONAL WATER MANAGEMENT PLAN NORTH COAST INTEGRATED REGIONAL WATER MANAGEMENT PLAN Integrated Coastal Watershed Management Plan IMPLEMENTATION PROPOSAL, ROUND 2, STEP 2 ATTACHMENT 13: LETTERS OF SUPPORT OR OPPOSITION Integrated Regional

More information

Water & Environment. Preparing for the future

Water & Environment. Preparing for the future Water & Environment Preparing for the future Implementing sustainable business solutions In a world increasingly focused on energy efficiencies, water usage, climate change, sustainable practices, global

More information

Guide to the Santa Margarita Water District Records. No online items

Guide to the Santa Margarita Water District Records.  No online items http://oac.cdlib.org/findaid/ark:/13030/kt0n39q6rg No online items Processed by Cyndi Shein; machine-readable finding aid created by Cyndi Shein Special Collections and Archives The UCI Libraries P.O.

More information

CRS Report for Congress Received through the CRS Web

CRS Report for Congress Received through the CRS Web Order Code RS20569 Updated January 9, 2003 CRS Report for Congress Received through the CRS Web Water Resource Issues in the 108th Congress Betsy A. Cody Specialist in Natural Resources Policy Resources,

More information

West Placer Groundwater Sustainability Agency Community Meeting February 16, 6 to 8 p.m. McBean Pavilion in Lincoln

West Placer Groundwater Sustainability Agency Community Meeting February 16, 6 to 8 p.m. McBean Pavilion in Lincoln West Placer Groundwater Sustainability Agency Community Meeting February 16, 6 to 8 p.m. McBean Pavilion in Lincoln Community meeting overview The West Placer Groundwater Sustainability Agency held its

More information

PRESENTATION TITLE. Orange County Water and Beyond!

PRESENTATION TITLE. Orange County Water and Beyond! Orange County Water and Beyond! PRESENTATION TITLE Karl W. Seckel, P.E. Assistant General Manager Municipal Water District of Orange County April 3, 2018 Topics for Presentation Water Basics Water Conservation

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Entering a New Era of Water Management

Entering a New Era of Water Management Entering a New Era of Water Management Building Livable Communities: Innovative Solutions for Changing Communities Local Government Commission March 22, 2015 Martha Davis Executive Manager/Assistant General

More information

Land Use Planning Workshop #2: Summary Notes

Land Use Planning Workshop #2: Summary Notes Land Use Planning Workshop #2: Summary Notes Introductions/Purpose Lewis Michaelson (Katz and Associates) opened the workshop with self-introductions and explained the purpose of the workshop. Rosalyn

More information

2005 Urban Water Management Plan

2005 Urban Water Management Plan 2005 Urban Water Management Plan Long Beach Board of Water Commissioners Frank Clarke, President William B. Townsend, Vice-President Stephen T. Conley, Member Helen Z. Hansen, Member Kevin L. Wattier,

More information

Water Management Representatives

Water Management Representatives Bay Area Water Supply and Conservation Agency A multicounty agency authorized to plan for and acquire supplemental water supplies, encourage water conservation and use of recycled water on a regional basis.

More information

Meeting California s Water Needs

Meeting California s Water Needs California Urban Water Agencies Meeting California s Water Needs Water Reuse Update March 2014 Updated October 2014 On the cover (clockwise from top-left): SFPUC s Living Machine enables building-scale

More information

Subtitle E Delaware River Basin Conservation

Subtitle E Delaware River Basin Conservation S. 612 144 (b) LIABILITY. The Department of the Interior shall not be liable for the failure to carry out any obligation or activity authorized by this subtitle if adequate appropriations are not provided

More information

ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER

ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER Public Draft Habitat Conservation Plan/Natural Community Conservation Plan TASK ORDER NO. ICF-11 and Amendment 1 Contractor:. Request for Services under

More information

Western Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington

Western Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Western Washington Hydrology Model (WWHM) Software Introduction Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Clear Creek Solutions Hydrology Expertise Clear Creek

More information

WATERSHED. Maitland Valley. Report Card 201

WATERSHED. Maitland Valley. Report Card 201 Maitland Valley WATERSHED Report Card 201 The Maitland Valley Conservation Authority has prepared this report card as a summary on the state of our forests, wetlands, surface water, and ground water resources.

More information

General Plan Update Workshop 6 Agriculture, Conservation, & Open Space February 23, 2005

General Plan Update Workshop 6 Agriculture, Conservation, & Open Space February 23, 2005 General Plan Update Workshop 6 Agriculture, Conservation, & Open Space February 23, 2005 Municipal Services Agency Planning and Community Development Department Workshop Outline GPU Update Background &

More information