1 DRAFT PROGRAMMATIC AGREEMENT AMONG THE CITY OF NEW ORLEANS, THE HOUSING AUTHORITY OF NEW ORLEANS, THE LOUISIANA STATE HISTORIC PRESERVATION OFFICER, AND THE ADVISORY COUNCIL ON HISTORIC PRESERVATION REGARDING THE REDEVELOPMENT OF THE IBERVILLE PUBLIC HOUSING DEVELOPMENT, 401 TREME STREET, NEW ORLEANS APPENDIX A Note: the following is the text of Appendix A as of 5/17/12, and it incorporates comments from Dr. Chip McGimsey (SHPO) and Mr. Ken Carlton (MBCI). On 5/17/12, ESI personnel and Shirley Smith (City) met with Dr. McGimsey to clarify some of his comments. These are currently being incorporated into the appendix and will be made available to the consulting parties as soon as they are completed. Formatted: Left Formatted: Font: Bold, Font color: Red Phase I/II Archaeological Survey Background Research: Research will be undertaken to delineate the locations which are known to possess a high potential to contain archaeological sites. This research will include examination of records on file at the Louisiana Division of Archaeology, Baton Rouge, Louisiana. Historical data will also be reviewed, particularly historic cartographic sources (e.g., Sanborn and Robinson map), nineteenth-century New Orleans City Directories, and census records. The maps will be overlaid on current maps using geographic information systems (GIS) technology in order to identify key locations for deposits of unique historical value. Cultural resources reports, site files, and NRHP records will be reviewed for the project area. Geomorphological data, and aerial photographs will be examined and reviewed. Historical research will include a review of available secondary documentation such as local and regional historic archives and court records. The background research will be used by the City, to develop prehistoric and historic contexts that will be the basis for evaluating the National Register eligibility of archaeological properties that may be identified. Antebellum city directories give only minimal indications of commercial and residential development in the project area, but it appears that the neighborhood was home to an ethnically and racially mixed community similar to that growing in the nearby Treme area. Most commercial enterprises were limited to corner groceries and woodworking-related trades in this time period. In addition, the Pelican No. 4 Fire Company on Basin Street near Conti was established by the 1850s (and lasted at the location all the way through the Storyville era). By the second half of the nineteenth century, a number of sites with potentially unique archaeological resources can be identified within the project area. These include brewery-related facilities (including a bottling works on City Square 184), a Masonic lodge (the St. Andrews Lodge No. 5 on City Square 185), an African-American school (also on City Square 185), a Chinese laundry (on City Square 156), and a Civil War veterans hall (on City Square 155). In addition, the character of the neighborhood as a tenderloin was becoming firmly established by the latter part of the nineteenth century, eventually leading to the designation of most of the project area as the red light district known as Storyville ( ). High priority properties connected with this period in the site area s history include the line of larger brothels fronting Basin Street between Bienville and Conti (e.g. Countess Willie Piazza s brothel at 317 Basin Street, where Jelly Roll Morton was often employed to play the piano); saloons, shooting galleries, and dance halls, many also with significant connections to the history of New Orleans jazz music (e.g. the Frenchman s saloon, at the corner of Bienville and Villere); and drug stores (including at least two on City Square 156 and another on City Square 186). Field Investigations. Fieldwork will begin in Development Blocks I and J. These two blocks are located in the southern portion of the APE and will be the first to be redeveloped. The methods detailed here will be utilized throughout the APE.

2 Because ESI has previously performed archaeological construction monitoring within the Iberville Housing Project, we have an understanding of the preservation at the site and the nature and extent of cultural deposits likely to be encountered. Having this knowledge, we believe that it is extremely likely that National Register test excavations and ultimately, archaeological data recovery (mitigation) will be necessary within the project area. Accordingly, we recommend Phase I/II investigations to expedite the identification of cultural deposits on each of the blocks within the current housing complex so as to meet the needs of the construction schedule. As per the Louisiana Division of Archaeology guidelines for archaeological investigations in urban contexts, this methodology must be approved by the SHPO and the Mississippi Band of Choctaw Indians (MBCI) prior to the commencement of fieldwork and may be subject to modification. Shovel Testing. Louisiana One-Call will be contacted prior to any excavations within the housing project. Archaeological survey of the project area will consist of shovel/auger tests excavated at five (5) meter (m) (16.4 ft) gridded intervals throughout the accessible areas of the housing project. It should be noted that examination of paved areas, including the blocks outside of the current housing project slated for mixed-use development, will have to be handled separately during demolition. It is our experience within the Iberville Housing Project that subsurface disturbance is generally confined to within 1 m (3.3 ft) of the existing structures, and that numerous pockets of intact archaeological resources exist between buildings and the subsurface utilities. Furthermore, roads and parking lots in the HANO complexes of this age have concealed many significant archaeological features even though the depth of disturbance has reached over two feet (70 cmbs). Thus, another objective of Phase I survey is to confirm this observed pattern of utilities disturbance through the accessible areas of the complex. The resources concealed by the roads and parking areas will have to be accessed upon pavement removal during the demolition process. Methodology for demolition monitoring is described in a separate section of this appendix. Formatted: Font: Italic Judgmental shovel/auger testing, as necessary, will be focused on those areas thought to be of highest interest as a result of the examination of the historic map overlays and review of city directories, with an effort being made to sample both areas where features are likely located as well as areas with a high probability of containing sheet midden. Antebellum city directories give only minimal indications of commercial and residential development in the project area, but it appears that the neighborhood was home to an ethnically and racially mixed community similar to that growing in the nearby Treme area. Most commercial enterprises were limited to corner groceries and woodworking-related trades in this time period. In addition, the Pelican No. 4 Fire Company on Basin Street near Conti was established by the 1850s (and lasted at the location all the way through the Storyville era). By the second half of the nineteenth century, a number of sites with potentially unique archaeological resources can be identified within the project area. These include brewery-related facilities (including a bottling works on City Square 184), a Masonic lodge (the St. Andrews Lodge No. 5 on City Square 185), an African-American school (also on City Square 185), a Chinese laundry (on City Square 156), and a Civil War veterans hall (on City Square 155). In addition, the character of the neighborhood as a tenderloin was becoming firmly established by the latter part of the nineteenth century, eventually leading to the designation of most of the project area as the red light district known as Storyville ( ). High priority properties connected with this period in the site area s history include the line of larger brothels fronting Basin Street between Bienville and Conti (e.g. Countess Willie Piazza s brothel at 317 Basin Street, where Jelly Roll Morton was often employed to play the piano); saloons, shooting galleries, and dance halls, many also with significant connections to the history of New Orleans jazz music (e.g. the Frenchman s saloon, at the corner of Bienville and Villere); and drug stores (including at least two on City Square 156 and another on City Square 186).

3 Shovel tests will measure approximately 30 cm x 30 cm (12 in x 12 in) and will be excavated to sterile subsoil. If sterile soil is not reached within accessible depths of a shovel test ( cm [ in]), an auger test will be excavated in the base of the shovel test. Wherever possible, excavated soils will be screened through.25 in (.64 cm) mesh. Very clayey soils will be carefully trowel-sorted and examined for artifacts. The soil characteristics and stratigraphic associations of all positive shovel tests and a representative number of negative shovel tests will be recorded, profiled/drawn, and photographed. All cultural materials will be collected and returned to the laboratory for analysis and curation. All tests will be backfilled upon completion. The shovel test profiles will be used to develop an overall site stratigraphy. The location of each shovel test will be recorded utilizing a Trimble GeoExplorer XT Series hand-held unit with sub-meter accuracy. Backhoe Trenching. In addition to shovel tests, Bbackhoe trenches will be excavated in accessible areas of high interest based on shovel testing and background research. The backhoe will be utilized to expose a larger window on deposits and features than is possible during shovel testing. This will allow the Project Manager to assess the integrity of the feature deposits and its their research potential for further investigations. Mechanical excavations also can be used to expose deeply buried deposits and features for documentation and assessment more expeditiously than hand-excavated test units. A backhoe or trackhoe with a flat bucket will be utilized, and two archaeologists (one on each side of the machine) will monitor each backhoe during excavation for artifacts and evidence of features. Mechanical excavation is intended to remove overburden to expose intact deposits and features. Intact features and deposits will not be trenched through. Mechanically excavated soils will not be screened unless the Project Manager decides that screening is necessary within a specific context. However, the presence of human bone and/or the discovery of undisturbed features or artifact deposits would be appropriate reasons to begin screening excavated soil through.25 in (.64 cm) mesh, as well as to begin hand excavation. For the proposed treatment of human remains in general and specifically in the case of remains associated with St. Louis I Cemetery, please see Treatment of Human Remains below. Formatted: Font: Italic If mechanical excavations will be in the vicinity occupied housing units, trenches will be backfilled on a daily basis for the safety of the occupants and the preservation of the archaeological deposits. The locations of each trench will be recorded utilizing a Trimble GeoExplorer XT Series hand-held unit with sub-meter accuracy. Each trench will be photodocumented. Trenches that reveal intact deposits will be drawn in planview and profiled, as appropriate. Features and intact deposits that are exposed in the trenches will be recorded utilizing the GPS. Hand excavations within the trenches will be limited and focused on establishing integrity, extent, and association so that the NRHP status of the deposits may be assessed; complete excavation of features will have to be undertaken during mitigation. At the Project Manager s discretion, soil samples may be collected for flotation. For example, if an area of midden within an excavation unit exhibits little disturbance or appears rich in macrobotanicals, then a 10 liter (approximately half of a five gallon bucket) soil sample may be collected from each culture-bearing stratum excluding topsoil. During excavations, feature fill is usually collected for flotation. As noted above, complete excavation of features will be undertaken during mitigation. Thus, the sampling strategy for collecting feature fill for flotation is discussed in the Data Recovery Plan. Any artifacts collected during backhoe and hand excavations will be placed in ziplock bags. Each artifact bag or flotation sample will be labeled with the site number, trench number, depth below site datum, date, and excavator(s) name. Archaeological deposits that are encountered during backhoe excavations will be numbered and recorded on the site map. Each feature will be planned and profiled as is appropriate and possible given the extent of exposure. The feature will also be documented photographically during the excavation process. At the Project Manager s discretion, small features (i.e., those containing less than 30 liters [estimated] fill) may be excavated in their

4 entirety during this level of investigations. If such is the case, the feature will be photographed and drawn in planview. Then the feature will be cross-sectioned and one half will be excavated. At this point the feature will be rephotograhed and drawn in profile. The remainder of the feature will be excavated, then a final photograph will be taken and a planview drawn. All feature fill will be collected for flotation. Collected artifacts, floral, and faunal material, including those from flotation samples, will be analyzed using accepted archaeological practices. These data will be utilized to evaluate the archaeological deposits in terms of NRHP criteria. Black and white print and digital color photographs will be taken. A georeferenced site map for each block will be drafted. Site maps will include the locations of all shovel tests, the extent of surface scatter, site limits, and any topographic features or landmarks visible. Archaeological deposits that are encountered during shovel testing and backhoe excavations will be numbered and recorded on the site map. GPS data will be collected with a Trimble GeoExplorer XT Series hand-held unit. Louisiana Site Forms will be completed for each block, and the locations of these will be marked on the appropriate USGS 7.5 quadrangle. Each block will be treated as a single site containing multiple loci as per the Division of Archaeology conventions. If prehistoric, protohistoric, or historic deposits that pre-date the city square system are encountered, these will be delineated following the guidelines established by the Division of Archaeology rather than being tied to the city square system. However, the presence of human bone and/or the discovery of undisturbed features or artifact deposits would be appropriate reasons to begin screening excavated soil through.25 in (.64 cm) mesh, as well as to begin hand excavation. For the proposed treatment of human remains in general and specifically in the case of remains associated with St. Louis I Cemetery, please see Treatment of Human Remains below. If mechanical excavations will be in the vicinity occupied housing units, trenches will be backfilled on a daily basis for the safety of the occupants and the preservation of the archaeological deposits. Hand excavations within such trenches will necessarily be limited and focused on establishing integrity, extent, and association so that the NRHP status of the deposits may be assessed; complete excavation of features will have to be undertaken during mitigation. At the Project Manager s discretion, soil samples may be collected for flotation. Any artifacts collected during backhoe and hand excavations will be placed in ziplock bags. Each artifact bag or flotation sample will be labeled with the site number, trench number, depth below site datum, date, and excavator(s) name. Archaeological deposits that are encountered during backhoe excavations will be numbered and recorded on the site map. Each feature will be planned and profiled as is appropriate and possible given the extent of exposure. The feature will also be documented photographically during the excavation process. Collected artifacts, floral, and faunal material, including those from flotation samples, will be analyzed using accepted archaeological practices. These data will be utilized to evaluate the archaeological deposits in terms of NRHP criteria. Black and white print and digital color photographs will be taken. A georeferenced site map for each block will be drafted. Site maps will include the locations of all shovel tests, the extent of surface scatter, site limits, and any topographic features or landmarks visible. GPS data will be collected with a Trimble GeoExplorer XT Series hand-held unit. Louisiana Site Forms will be completed for each block, and the locations of these will be marked on the appropriate USGS 7.5 quadrangle. Each block will be treated as a single site containing multiple loci as per the Division of Archaeology conventions. If prehistoric, protohistoric, or historic deposits that pre-date the city square system are encountered, these will be delineated following the guidelines established by the Division of Archaeology rather than being tied to the city square system. Evaluation of Resources. ESI will provide recommendations concerning which sites and loci within sites are eligible or ineligible for nomination to the National Register of Historic Places (NRHP). The City and HANO will evaluate those sites that it determines, in consultation

5 with the SHPO and MBCI, require further investigation and will apply the National Register criteria for evaluation (36 CFR 60.4 [a-d]) to determine their significance and integrity. Such evaluations will apply standard archaeological methodologies, as defined in Louisiana Division of Archaeology Guidelines for Field Methods. Evaluation will identify those sites and individual loci that possess research potential under National Register criteria and the Louisiana Comprehensive Archaeological Plan and that retain those qualities of integrity and significance defined by the National Register criteria. This process will analyze field data within the appropriate prehistoric and historic context for the site. The City and HANO, in consultation with SHPO and MBCI, will assess the effects of each Phase of the Undertaking on any archaeological sites which it finds to be National Registereligible. The City and HANO will evaluate means to avoid or minimize any such adverse effects to National Register-eligible archaeological sites. Measures to be evaluated include but are not limited to encapsulation, preservation in situ, and construction fencing. If adverse effects to National Register-eligible archaeological sites may not be avoided, the City will develop appropriate mitigation as described in the Data Recovery Plan, below. Treatment of Human Remains. Review of historic maps indicates that the current footprint of St. Louis I Cemetery may be smaller than its historic extent. Therefore, it must be determined if burials are present outside of the cemetery and within the APE. Specifically blocks J and H have a high potential for burials as these blocks lie, respectively, immediately west and north of St. Louis I Cemetery. Mechanical excavation will be utilized to determine if intact burials are preserved outside the current boundaries of St. Louis I Cemetery. Mechanical excavation will cease if it appears evidence of a burial is encountered; hand excavation will be used to verify that a burial is present. No burials will be excavated; the purpose of this investigation is to document if in situ burials are present outside the boundaries of the current cemetery. A Physical Anthropologist/Human Osteologist will be present during work on the city blocks that are suspected to be part of St. Louis I Cemetery. Again, a backhoe or trackhoe with a flat bucket will be utilized, and two archaeologists (one on each side of the machine) will monitor each backhoe during excavation for evidence of burials. Mechanically excavated soils will not be screened unless the Project Manager decides that screening is necessary within a specific context. The presence of human bone would be appropriate reasons to begin screening excavated soil as well as to change to hand excavation. Standard.25 in (.64 cm) mesh will be used when soils are screened. If intact human burials, scattered human remains, or isolated human bone fragments are found, the Responsible Agencies shall follow the procedures outlined in the Louisiana Unmarked Human Burial Sites Act (Act 704; R.S. 8: , R.S. 36:209(I), and ). Pursuant to the law the Responsible Agency shall notify the City Attorney s Office, the New Orleans Police Department, and the Orleans Parish Coroner s Office within 24 hours of the discovery. The local law enforcement officials shall assess the nature and age of the human remains. If the coroner determines that the human remains are older than 50 years of age and are not a crime scene, the Responsible Agency shall ensure that the notice of the discovery required by Louisiana Unmarked Human Burial Sites Preservation Act (R.S. 8:671 et seq.) is given to the Secretary of Culture, Recreation, and Tourism (CRT) or the Secretary s designee by contacting the Louisiana Division of Archaeology at within 72 hours of the discovery. Following the notification, the Louisiana State Archaeologist, as the designee of the Secretary of CRT, will administer the remainder of the requirements of the law including but not limited to permits for excavation and disposition of the human remains. It is important to note that the purpose of this investigation is to establish whether burials are present within the APE, not to remove them. Consequently, excavations in the vicinity of a burial will cease immediately when a burial is identified. It is expected that identification of burials may include: (1) grave stains;

6 (2) coffin remains; and (3) articulated human bone. Because backfilling of all trenches will be done on a daily basis, no additional security will be implemented. Because isolated human bone fragments may be present, human bone in and of itself will not necessarily be indicative of the presence of a burial. Upon uncovering human bone with the backhoe or during hand excavation, the area will be carefully troweled to determine if articulated or closely associated human bone is present. If the bone proves to be an isolate, excavations will continue. The isolated human bone fragments will be collected, placed in paper bags that have been labeled with all provenience information, and will be stored in a secure location within the ESI laboratory for later reburial. The City, HANO, SHPO, and MBCI will be notified immediately when human bone fragments are collected. If, at any point during the investigations, human remains are determined to be American Indian, the Responsible Federal Agency shall consult relevant federally recognized tribes within XX hours/days and shall develop and implement a plan for the appropriate treatment of those remains in accordance with the Louisiana Unmarked Human Burial Sites Act or the Native American Graves Protection and Repatriation Act (NAGPRA) (25 USC 3001 et. seq. as appropriate). The plan shall include provisions for in-place preservation, excavation, and analysis, in accordance with a data recovery plan approved pursuant to this Agreement, and disposition of the remains as appropriate. The Responsible Federal Agency shall, in good faith, consult with the relevant parties in accordance with applicable law. Formatted: Font: Italic Demolition Monitoring. ESI will provide an archaeologist for on-site monitoring during ground-disturbing activities associated with demolition and construction at the Iberville housing project. A HANO contact will give one week notice to ESI prior to the initiation of activities that may cause subsurface disturbance at each site. The archaeologist will observe excavations, document site stratigraphy, record cultural features, and, if appropriate, collect artifacts uncovered during excavations. If significant (i.e. NRHP eligible) archaeological deposits are identified during ground-disturbing activities, a HANO point of contact will immediately be notified. The archaeologist will consult with the HANO contact and any contractors involved to determine how to proceed with development activities if such deposits should be uncovered. Archaeological features will be photographed and or drawn. In addition, representative soil profiles will be documented appropriately. Cultural materials will be cleaned, analyzed, and curated using standard procedures and methods. The results of monitoring will be incorporated into the technical report of investigations for the project. Artifact Analysis and Report Production. Cultural materials will be cleaned, analyzed, and curated using standard procedures and methods. If human bone is encountered during the laboratory analyses, the fragments will be placed in paper bags labeled with the provenience information, and moved to a secure location in the lab to await reburial. Management Summaries will be submitted for each City Square investigated. The management summary will include, but is not limited to: discussions of the proposed project, the regional prehistory, history, and previous cultural investigations, the local geomorphology and natural environment, the field and laboratory methodologies, the field results, the results of artifact analyses, conclusion, and recommendations. The management summary is sufficient to receive SHPO concurrence on recommendations for further work, and since such work is likely, the preference is to always have all phases of work contained in a single report. Any comments on the management summary will be addressed within 15 days of their receipt. Formatted: Highlight In addition to the Management Summary Reports for each block, ESI will prepare weekly field reports throughout the field investigations. Each weekly report will include a brief description of the field methods used, the locations investigated, site loci identified, and features found, if any. The City will forward the weekly field reports to the SHPO and MBCI.

7 Data Recovery Plan The City and HANO, in consultation with SHPO and MBCI, may consider a range of mitigation measures for adverse effects on National Register-eligible archaeological sites, such as individual site data recovery, representative site data recovery, education and public involvement efforts, or other reasonable and good faith efforts commensurate with the scale of the Undertaking, its effects on archaeological sites, and the significance of the adversely affected National Register-eligible archaeological sites. If the City and HANO determine, in consultation with SHPO and MBCI, that data recovery is required for individual or representative National Register-eligible archaeological sites, the City will develop one or more archaeological Data Recovery Plans. The City will forward two (2) copies of each Data Recovery Plan to SHPO and one copy to the MBCI, for those they are consulting on. If SHPO and MBCI does not comment within a 14-day review period of receipt of the plan, the City will assume that SHPO and MBCI concurs with the plans. The City will finalize and implement the Data Recovery Plans after consultation with SHPO and MBCI. The Data Recovery Plan may employ a sampling strategy to achieve the objectives of the data recovery and promote the efficient completion of each Phase of the Undertaking. Formatted: Highlight Data recovery may commence concurrently with evaluation efforts as necessary to allow for efficient completion of the work provided that the City consults with SHPO and MBCI. Data recovery will be conducted in accordance with the Louisiana Division of Archaeology field standards. It is anticipated that, by the time data recovery investigations are initiated, the individuals living in the units will be relocated. Once the units are no longer occupied, fencing will be installed around the work area. After the fencing is installed, excavations can be left open overnight. The City will ensure that a comprehensive report for the Undertaking, including the results of the archival research, field identification methods and results, site evaluation methods and results, and data recovery methods and results, is prepared. Final Louisiana Division of Archaeology site forms for all sites identified will accompany these this reports. This report will follow the standards of the Louisiana Division of Archaeology and will be submitted to SHPO and Signatories for review and comment. The City will curate prepare all archaeological materials, reports and associated records from the project in accordance with the standards of the Louisiana Division of Archaeology, and all collections and associated records will be curated with the Louisiana Division of Archaeology.

Unanticipated Discoveries Plan EXHIBIT J UNANTICIPATED DISCOVERIES PLAN FOR ARCHAEOLOGICAL PROPERTIES INCLUDING HUMAN REMAINS

Unanticipated Discoveries Plan EXHIBIT J UNANTICIPATED DISCOVERIES PLAN FOR ARCHAEOLOGICAL PROPERTIES INCLUDING HUMAN REMAINS EXHIBIT J UNANTICIPATED DISCOVERIES PLAN FOR ARCHAEOLOGICAL PROPERTIES INCLUDING HUMAN REMAINS I. Introduction... 1 II. Definitions... 1 III. Personnel... 3 IV. Archaeological Resource Identification/Training...

More information

ARCHAEOLOGICAL RESOURCES IN KING COUNTY

ARCHAEOLOGICAL RESOURCES IN KING COUNTY DNRP/WTD ARCHAEOLOGICAL RESOURCES IN KING COUNTY Historic Preservation Program, Department of Natural Resources and Parks 201 S. Jackson St., Suite 700 [MS: KSC-NR-0700], Seattle, WA 98104 (206) 477-4529

More information

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES 5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended (16 U.S.C. Section 470(f)) protects properties that

More information

Guidelines for Phase I, II, and III Archaeological Investigations. and Technical Report Preparation

Guidelines for Phase I, II, and III Archaeological Investigations. and Technical Report Preparation Guidelines for Phase I, II, and III Archaeological Investigations and Technical Report Preparation Prepared by the West Virginia State Historic Preservation Office Written by Patrick Trader Edited by Joanna

More information

6. The following paragraphs provide further interim guidance where the ACHP regulations are not specific to the Corps Regulatory Program:

6. The following paragraphs provide further interim guidance where the ACHP regulations are not specific to the Corps Regulatory Program: ENCLOSURE Subject: Interim Guidance for Implementing Appendix C of 33 CFR part 325 with the revised Advisory Council on Historic Preservation Regulations at 36 CFR part 800 1. Consulting parties. Public

More information

EXHIBIT H SECOND AVENUE SUBWAY PROJECT SITE PRIORITIZATION AND ADDITIONAL DOCUMENTARY RESEARCH PROTOCOL

EXHIBIT H SECOND AVENUE SUBWAY PROJECT SITE PRIORITIZATION AND ADDITIONAL DOCUMENTARY RESEARCH PROTOCOL I. Purpose and Need EXHIBIT H SECOND AVENUE SUBWAY PROJECT SITE PRIORITIZATION AND ADDITIONAL DOCUMENTARY RESEARCH PROTOCOL The Second Avenue Phase 1A Archaeological Assessment, dated March 2003 (herein

More information

WHEREAS, the VDOT anticipates receiving Federal financial assistance for the Project from the Federal Highway Administration (FHWA); and

WHEREAS, the VDOT anticipates receiving Federal financial assistance for the Project from the Federal Highway Administration (FHWA); and AMONG THE FEDERAL HIGHWAY ADMINISTRATION, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICER, THE VIRGINIA DEPARTMENT OF TRANSPORTATION, AND THE VIRGINIA CIVIL WAR TRAILS, INC. REGARDING THE ROUTE 646 (ADEN

More information

SOUTH CAROLINA STANDARDS AND GUIDELINES FOR ARCHAEOLOGICAL INVESTIGATIONS

SOUTH CAROLINA STANDARDS AND GUIDELINES FOR ARCHAEOLOGICAL INVESTIGATIONS SOUTH CAROLINA STANDARDS AND GUIDELINES FOR ARCHAEOLOGICAL INVESTIGATIONS The Council of South Carolina S C Professional Archaeologists The Council of South Carolina Professional Archaeologists, the South

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation 4.12 Historic Resources The following sections summarize the evaluation of potential impacts to historic resources for each alternative. Table 4.12-1 summarizes the results of the analysis. This section

More information

Appendix B Section 106 Memorandum of Agreement

Appendix B Section 106 Memorandum of Agreement VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT NATIONAL ENVIRONMENTAL POLICY ACT RECORD OF DECISION Appendix B Section 106 Memorandum of Agreement THIS PAGE INTENTIONALLY LEFT BLANK. MEMORANDUM OF AGREEMENT

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 4 Cultural Resources. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 4 Cultural Resources. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 4 Cultural Resources FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 4.0 CULTURAL RESOURCES... 4-1 REGULATORY OVERVIEW... 4-1 AREA OF POTENTIAL

More information

ARCHAEOLOGICAL REQUIREMENTS OVERVIEW

ARCHAEOLOGICAL REQUIREMENTS OVERVIEW ARCHAEOLOGICAL REQUIREMENTS OVERVIEW The protection of New Jersey s archaeological heritage is an important part of New Jersey Historic Trust programs. All grants must address potential impacts to archaeological

More information

ARCHAEOLOGICAL REQUIREMENTS

ARCHAEOLOGICAL REQUIREMENTS ARCHAEOLOGICAL REQUIREMENTS The protection of New Jersey s archaeological heritage is an important part of New Jersey Historic Trust programs. All grants must address potential impacts to archaeological

More information

ANTIQUITIES PERMIT APPLICATION FORM ARCHEOLOGY

ANTIQUITIES PERMIT APPLICATION FORM ARCHEOLOGY ANTIQUITIES PERMIT APPLICATION FORM ARCHEOLOGY GENERAL INFORMATION I. PROPERTY TYPE AND LOCATION Project Name (and/or Site Trinomial) East Williamson County Events Center Access Road County (ies) Williamson

More information

Evaluation/Monitoring Report No. 248

Evaluation/Monitoring Report No. 248 OLD GENERAL HOSPITAL WOODSIDE AVENUE LISNAMALLARD COUNTY TYRONE LICENCE NO.: AE/12/132E NAOMI CARVER 1 Site Specific Information Site Name: Old General Hospital, Woodside Avenue, Omagh, Co. Tyrone Townland:

More information

ARCHAEOLOGICAL MONITORING PLAN:

ARCHAEOLOGICAL MONITORING PLAN: ARCHAEOLOGICAL MONITORING PLAN: MAGNOLIA PLACE PROJECT (APNS 032-311-120 AND 032-311-130) 106-110 & 120 TILTON AVENUE, SAN MATEO, CALIFORNIA Prepared for: Tim O Riordan O Riordan Construction 353 West

More information

PROGRAMMATIC AGREEMENT

PROGRAMMATIC AGREEMENT PROGRAMMATIC AGREEMENT AMONG THE U.S.D.A. FOREST SERVICE, PACIFIC SOUTHWEST REGION, U.S.D.A. FOREST SERVICE, INTERMOUNTAIN REGION S HUMBOLDT-TOIYABE NATIONAL FOREST, CALIFORNIA STATE HISTORIC PRESERVATION

More information

Phase I Archaeological Survey of the Lawrence University Garden, Appleton, Wisconsin

Phase I Archaeological Survey of the Lawrence University Garden, Appleton, Wisconsin Lawrence University Lux Archaeological Reports Anthropology Department 10-2-2009 Phase I Archaeological Survey of the Lawrence University Garden, Appleton, Wisconsin Lawrence University Follow this and

More information

Statement of Qualifications Page 1

Statement of Qualifications Page 1 Statement of Qualifications Page 1 ALPINE ARCHAEOLOGY OVERVIEW Alpine Archaeological Consultants, Inc. is a respected, fullservice archaeological consulting firm established to help clients implement their

More information

Chapter 16 Historic and Cultural Resources

Chapter 16 Historic and Cultural Resources Chapter 16 Historic and Cultural Resources 1 What is the definition of historic, cultural, and archaeological resources? A historic or cultural resource is any site, building, structure, object, district,

More information

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA CEQA and its Role in Historic Preservation Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA General CEQA Requirements and Limitations Mitigation Measures

More information

Summary of Phase I Archaeological Survey for the NICTD Double Track NWI, Gary, IN, to Michigan City, IN

Summary of Phase I Archaeological Survey for the NICTD Double Track NWI, Gary, IN, to Michigan City, IN Summary of Phase I Archaeological Survey for the NICTD Double Track NWI, Gary, IN, to Michigan City, IN INDOT Des. No. DHPA No. 19318 May 25, 2017 Summary of Phase I Archaeological Survey for the NICTD

More information

California Environmental Quality Act Part 1: CEQA Basics

California Environmental Quality Act Part 1: CEQA Basics California Environmental Quality Act Part 1: CEQA Basics California Preservation Foundation Webinar June 10, 2014 Presented by Chris McMorris Partner / Architectural Historian Overview of CEQA California

More information

NOTICE OF ADOPTION OF OFFICIAL PLAN AMENDMENT NO. 6 TO THE YORK REGION OFFICIAL PLAN

NOTICE OF ADOPTION OF OFFICIAL PLAN AMENDMENT NO. 6 TO THE YORK REGION OFFICIAL PLAN Subject: Amendment No. 6 to the York Region Official Plan, 2010 File No.: 190P-2010-006 Date of this notice: February 26, 2014 Last date of appeal: March 18, 2014 NOTICE OF ADOPTION OF OFFICIAL PLAN AMENDMENT

More information

EXHIBIT A SCOPE OF SERVICES FOR DISTRICT WIDE CULTURAL RESOURCE ASSESSMENT (CRA) & NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE SERVICES

EXHIBIT A SCOPE OF SERVICES FOR DISTRICT WIDE CULTURAL RESOURCE ASSESSMENT (CRA) & NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE SERVICES EXHIBIT A SCOPE OF SERVICES FOR DISTRICT WIDE CULTURAL RESOURCE ASSESSMENT (CRA) & NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE SERVICES I. PURPOSE AND OBJECTIVES The Florida Department of Transportation

More information

PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2015 ANNUAL REPORT

PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2015 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 201 PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2015 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2015 BAKER RIVER HYDROELECTRIC PROJECT FERC No.

More information

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake 2015 Recreation Residence Projects Odell Lake USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon Background The Crescent Ranger District maintains 66 recreation

More information

Section 4.14 Cultural and Historical Resources

Section 4.14 Cultural and Historical Resources Section 4.14 Cultural and Historical Resources This section summarizes the existing historical resources within the project area and evaluates the potential for impacts resulting from construction and

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

3.4 HISTORIC, ARCHEOLOGICAL, AND CULTURAL RESOURCES

3.4 HISTORIC, ARCHEOLOGICAL, AND CULTURAL RESOURCES 3.4 HISTORIC, ARCHEOLOGICAL, AND CULTURAL RESOURCES 3.4.1 Summary of Results Table 3.4-1 provides a summary of the cultural resources analysis of the Preferred Alternative. Each impact is analyzed for

More information

Tree Protection Policy

Tree Protection Policy Appendix F Tree Protection Policy The following is according to the City of Hamilton s special provision SP-97. General Tree Protection shall be in accordance with OPSS 801 as amended by this special provision.

More information

PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2014 ANNUAL REPORT

PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2014 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 201 PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2014 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2014 BAKER RIVER HYDROELECTRIC PROJECT FERC No.

More information

SepticDesign.ca Gunnell Engineering Ltd.

SepticDesign.ca Gunnell Engineering Ltd. SepticDesign.ca Gunnell Engineering Ltd. Presentation Summary Best Practices Code Context Prior to Attending the Site When on Site Site Assessment Assessing Existing Sewage Systems The Septic Test Pit

More information

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -

More information

Section mstoric DISTRICT REVIEW BOARD ESTABLISHED.

Section mstoric DISTRICT REVIEW BOARD ESTABLISHED. CHAPTER 155: mstoric PRESERVATION Section 155.01 Purpose 155.02 Historic District Review Board established 155.03 Purpose of the Historic District Review Board 155.04 Duties of the Historic District Review

More information

It will be of particular interest to those potentially affected by the Government s proposals for high speed rail.

It will be of particular interest to those potentially affected by the Government s proposals for high speed rail. HIGH SPEED TWO INFORMATION PAPER E8: ARCHAEOLOGY This paper outlines HS2 Ltd's approach to assess and reduce as far as reasonably practicable the impact on archaeological remains that could result from

More information

JOSHUA TREE SURVEY REPORT FOR THE BURRTEC WASTE AND RECYCLING SERVICES YUCCA VALLEY FACILITY YUCCA VALLEY, SAN BERNARDINO COUNTY, CALIFORNIA

JOSHUA TREE SURVEY REPORT FOR THE BURRTEC WASTE AND RECYCLING SERVICES YUCCA VALLEY FACILITY YUCCA VALLEY, SAN BERNARDINO COUNTY, CALIFORNIA JOSHUA TREE SURVEY REPORT FOR THE BURRTEC WASTE AND RECYCLING SERVICES YUCCA VALLEY FACILITY YUCCA VALLEY, SAN BERNARDINO COUNTY, CALIFORNIA Prepared By: Lake Elsinore, California 92530 (909) 772-9009

More information

Certificate of Appropriateness Review Packet

Certificate of Appropriateness Review Packet Certificate of Appropriateness Review Packet When a Certificate of Appropriateness is required Historic preservation categories of review Decisions on applications for a Certificate of Appropriateness

More information

Figure Preferred Alternative Modified Alternative 2 Means of Egress

Figure Preferred Alternative Modified Alternative 2 Means of Egress Figure 7.5-4 Preferred Alternative Modified Alternative 2 Means of Egress Science Park/West End Station Accessibility Improvements Section 4(f) Statement Measures to Minimize Harm Measures to minimize

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) REC & PARK: 210V HYDE STREET 0336/003 Case No. 2017-016267ENV Permit No. Addition/ Alteration

More information

ARCHAEOLOGICAL SURVEY AND TESTING: CASTROVILLE'S COUNTRY VILLAGE, UNIT ONE, MEDINA COUNTY, TEXAS. Ralph Snavely

ARCHAEOLOGICAL SURVEY AND TESTING: CASTROVILLE'S COUNTRY VILLAGE, UNIT ONE, MEDINA COUNTY, TEXAS. Ralph Snavely ARCHAEOLOGICAL SURVEY AND TESTING: CASTROVILLE'S COUNTRY VILLAGE, UNIT ONE, MEDINA COUNTY, TEXAS Ralph Snavely Center for Archaeological Research The University of Texas at San Antonio Archaeological Survey

More information

AN ARCHAEOLOGICAL ASSESSMENT (PHASE I) OF THE WEST SALADO CREEK OUTFALL PROJECT, SOUTHEASTERN BEXAR COUNTY, TEXAS

AN ARCHAEOLOGICAL ASSESSMENT (PHASE I) OF THE WEST SALADO CREEK OUTFALL PROJECT, SOUTHEASTERN BEXAR COUNTY, TEXAS AN ARCHAEOLOGICAL ASSESSMENT (PHASE I) OF THE WEST SALADO CREEK OUTFALL PROJECT, SOUTHEASTERN BEXAR COUNTY, TEXAS Ronald W. Burkett and Jeffery A. Huebner I Center for Archaeological Research The University

More information

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # ) H.O. 03/24/14 SP-14-01 Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS #201400001) Request: Approval of a Special Permit for major earthmoving in the A (General Agriculture)

More information

The following sections provide the approved standard infiltration testing specifications.

The following sections provide the approved standard infiltration testing specifications. APPENDIX F.2 INFILTRATION TESTING To properly size and locate stormwater management facilities, it is necessary to characterize the soil infiltration conditions at the location of the proposed facility.

More information

ESTIMATE OF QUANTITIES

ESTIMATE OF QUANTITIES Sheet 1 of 9 INDEX OF SHEETS Sheet 1 Sheet 2 Sheets 3 & 4 Sheets 5-7 Sheets 8 & 9 Layout Map Index of Sheets Estimate of Quantities Environmental Commitments & Plan Notes Tables of Spot Asphalt Concrete

More information

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703) Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA 20155 Phone (703) 754-6750 Work Request # UNDERGROUND DISTRIBUTION FACILITIES AGREEMENT (FOR COMMERCIAL CUSTOMER) Developer/Builder/Owner

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: July 5, 2017 EXPIRATION

More information

British Columbia Heritage Inspection Permit Guide for Impact Assessment Applications

British Columbia Heritage Inspection Permit Guide for Impact Assessment Applications British Columbia Heritage Inspection Permit Guide for Impact Assessment Applications Revised November 2012 Province of British Columbia Ministry of Natural Resource Operations Archaeology Branch Table

More information

Article 7. COMMERCIAL AND MIXED USE ZONES

Article 7. COMMERCIAL AND MIXED USE ZONES COMMERCIAL AND MIXED USE ZONES 24-21 Article 7. COMMERCIAL AND MIXED USE ZONES Sections: 24-21 Purpose of the Commercial and Mixed Use s 24-22 Land Use Regulations for Commercial and Mixed Use s 24-23

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

FY 2016 Secretary of Defense Environmental Awards Alabama ARNG

FY 2016 Secretary of Defense Environmental Awards Alabama ARNG CLEARED For Open Publication U.S. Army Nomination Apr 19, 2017 Department of Defense OFFICE OF PREPUBLICATION AND SECURITY REVIEW CULTURAL RESOURCES MANAGEMENT - TEAM FY 2016 Secretary of Defense Environmental

More information

IRVINE UNIFIED SCHOOL DISTRICT MITIGATION MONITORING AND REPORTING PROGRAM FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL

IRVINE UNIFIED SCHOOL DISTRICT MITIGATION MONITORING AND REPORTING PROGRAM FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL IRVINE UNIFIED SCHOOL DISTRICT MITIGATION MONITORING AND REPORTING PROGRAM FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL Prepared for: IRVINE UNIFIED SCHOOL DISTRICT Facilities Planning & Construction

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

CHAPTER 21: COMMITMENT OF RESOURCES

CHAPTER 21: COMMITMENT OF RESOURCES CHAPTER 21: COMMITMENT OF RESOURCES 21.1 INTRODUCTION In accordance with the National Environmental Policy Act (NEPA) and the Council on Environmental Quality s implementing procedures under Title 40,

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Plans Dated Addition/ Demolition Alteration (requires HRER if over 45

More information

Attachment 1 Findings and Conditions

Attachment 1 Findings and Conditions 2451 Ridge Road Use Permit #04-10000066 Attachment 1 Findings and Conditions APRIL 10, 2008 CEQA FINDINGS 1. The project is categorically exempt from the provisions of the California Environmental Quality

More information

Central NSW Regional Contaminated Land Policy Template

Central NSW Regional Contaminated Land Policy Template Central NSW Regional Contaminated Land Policy Template Contamination Central: Supporting safe, stable and sustainable redevelopment of land in Central West NSW. Funded by the New South P a g e 1 {Instruction

More information

TC PERMITTING USES OF CULTURAL RESOURCES (Public) Table of Contents

TC PERMITTING USES OF CULTURAL RESOURCES (Public) Table of Contents TC-1.01 Purpose.02 Objectives.03 Authority.04 Responsibility.05 References.06 Policy.07 File and Records Maintenance Table of Contents.1 Authorizing Scientific Uses of Cultural Resources.11 Limitations

More information

A certified historic structure is any structure, subject to depreciation as defined by the Internal Revenue Code, that is:

A certified historic structure is any structure, subject to depreciation as defined by the Internal Revenue Code, that is: United States Department of the Interior National Park Service Historic Preservation Certification Application Instructions This application is to be filled out in accordance with regulations set forth

More information

JOINT PUBLIC NOTICE May 14, 2018

JOINT PUBLIC NOTICE May 14, 2018 JOINT PUBLIC NOTICE May 14, 2018 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Water Permits Division 7400 Leake Avenue

More information

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4 When will the Turnpike have right-of-way and parcel maps available? We anticipate receipt of 100% plans, parcel sketches and legal descriptions in late June or early July of 2015. When will the Turnpike

More information

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS This chapter summarizes the results of feasibility level investigations undertaken to identify solutions to the water and related land resource problems

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

STATE OF OREGON CULTURAL RESOURCES SURVEY COVER

STATE OF OREGON CULTURAL RESOURCES SURVEY COVER STATE OF OREGON CULTURAL RESOURCES SURVEY COVER (Updated 6/10/2013) Please submit reports unbound. Author(s) Name: Blake, Karry Title of Report: Results of Cultural Resources Monitoring for the Sadri-East

More information

Division 20 Portal Widening/Turnback Facility Project ES. Executive Summary

Division 20 Portal Widening/Turnback Facility Project ES. Executive Summary EXECUTIVE SUMMARY This Executive Summary is intended to provide the reader with a concise summary of the Los Angeles County Metropolitan Transportation Authority (Metro) Division 20 Portal Widening/ Turnback

More information

Conservation Considerations for Archaeology Collections.

Conservation Considerations for Archaeology Collections. Conservation Considerations for Archaeology Collections. The following discussion is adapted from the SHA Standards and Guidelines for the Curation of Archaeological Collections (1993) and the NPS Museum

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Phase 1B Archaeological Survey

Phase 1B Archaeological Survey Phase 1B Archaeological Survey Cassadaga Wind Project Towns of Charlotte, Cherry Creek, Arkwright, and Stockton, Chautauqua County, New York Prepared for: EverPower Wind Holdings, Inc. 1251 Waterfront

More information

AMERICAN SAMOA POWER AUTHORITY OFFICE OF PROCUREMENT REQUEST FOR PROPOSALS ( RFP ) Provision of

AMERICAN SAMOA POWER AUTHORITY OFFICE OF PROCUREMENT REQUEST FOR PROPOSALS ( RFP ) Provision of AMERICAN SAMOA POWER AUTHORITY OFFICE OF PROCUREMENT REQUEST FOR PROPOSALS ( RFP ) Provision of Phase I Archaeological Survey and Reporting Services for East Side Villages Wastewater Collection System

More information

CITY OF PHOENIX URBAN RENEWAL PLAN

CITY OF PHOENIX URBAN RENEWAL PLAN CITY OF PHOENIX URBAN RENEWAL PLAN Phoenix Urban Renewal Agency June, 2005 CITY OF PHOENIX URBAN RENEWAL PLAN CITY OF PHOENIX URBAN RENEWAL PLAN ACKNOWLEDGEMENTS This urban renewal plan was prepared with

More information

Re: Dawson Geophysical Company s Proposed San Rafael Saddle 3-D Geophysical Exploration Project, Emery County, Utah.

Re: Dawson Geophysical Company s Proposed San Rafael Saddle 3-D Geophysical Exploration Project, Emery County, Utah. 12 December 2006 Price Field Office Bureau of Land Management Attn: Don Stephens 125 South 600 West Price, Utah 84501 Re: Dawson Geophysical Company s Proposed San Rafael Saddle 3-D Geophysical Exploration

More information

U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement

U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement Name of Project: Maintenance Dredging AIWW Vicinity Jupiter

More information

AN ARCHAEOLOGICAL SURVEY OF THE PROPOSED NATURAL GAS PIPELINE LOCATION TIE-IN IN ORANGE COUNTY, TEXAS

AN ARCHAEOLOGICAL SURVEY OF THE PROPOSED NATURAL GAS PIPELINE LOCATION TIE-IN IN ORANGE COUNTY, TEXAS AN ARCHAEOLOGICAL SURVEY OF THE PROPOSED NATURAL GAS PIPELINE LOCATION TIE-IN IN ORANGE COUNTY, TEXAS By William E. Moore Brazos Valley Research Associates Contract Report Number 82 2001 AN ARCHAEOLOGICAL

More information

Centre for Archaeological Fieldwork Evaluation/Monitoring Report No Monitoring Report No. 224

Centre for Archaeological Fieldwork Evaluation/Monitoring Report No Monitoring Report No. 224 Monitoring Report No. 224 Monitoring of the consolidation of Harryville Motte (ANT 037:022) Ballymena County Antrim LICENCE NO.: AE/11/48E Brian Sloan 1 Site Specific Information Site Name: Harryville

More information

Tender Document and Specification

Tender Document and Specification Tender Document and Specification for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor CONTRACT 2014-02 March 2014 CONTENTS Instruction to Tenderers... 3 Foreword

More information

Shallow Depth Graves

Shallow Depth Graves Institute of Cemetery & Crematorium Management Policy relating to Shallow Depth Graves Issued by the Institute of Cemetery and Crematorium Management ICCM National Office, City of London Cemetery, Aldersbrook

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

AN ARCHAEOLOGICAL SURVEY FOR THE MILITARY HIGHWAY WATER SUPPLY CORPORATION NORTH SYSTEM 12 WATERLINE LOOP PROJECT IN CAMERON COUNTY, TEXAS

AN ARCHAEOLOGICAL SURVEY FOR THE MILITARY HIGHWAY WATER SUPPLY CORPORATION NORTH SYSTEM 12 WATERLINE LOOP PROJECT IN CAMERON COUNTY, TEXAS AN ARCHAEOLOGICAL SURVEY FOR THE MILITARY HIGHWAY WATER SUPPLY CORPORATION NORTH SYSTEM 12 WATERLINE LOOP PROJECT IN CAMERON COUNTY, TEXAS Antiquities Permit 5558 By William E. Moore Brazos Valley Research

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Field Operations

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Field Operations DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Field Operations DOCUMENT NUMBER: 021-0200-001 TITLE: Policy for Pennsylvania Natural Diversity Inventory (PNDI) Coordination During Permit Review and Evaluation

More information

Cultural Resources Survey Work Plan (Appendix I to PDI WP)

Cultural Resources Survey Work Plan (Appendix I to PDI WP) (Appendix I to PDI WP) Remedial Design Lower 8.3 Miles of the Lower Passaic River Operable Unit Two of the Diamond Alkali Superfund Site In and About Essex, Hudson, Bergen and Passaic Counties New Jersey

More information

BOND STREET STATION UPGRADE LUL Works 2 Stratford Place Site London W1

BOND STREET STATION UPGRADE LUL Works 2 Stratford Place Site London W1 BOND STREET STATION UPGRADE LUL Works 2 Stratford Place Site London W1 City of Westminster Written Scheme of Investigation for Archaeological Investigations National Grid Reference: 528545 181145 Contract

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific

More information

Function or Use. present and historic physical appearance. - x See continuation

Function or Use. present and historic physical appearance. - x See continuation --- -_--_-_-------------------------- ---_-_------_-------------------------- ----------------- 6. Function or Use ----------------- --_----_----_--I--------------- -_---_---_------ -----------4-----------

More information

5.0 EXEMPT ALTERATIONS AND CLASSES OF ALTERATIONS

5.0 EXEMPT ALTERATIONS AND CLASSES OF ALTERATIONS Downtown Oakville Heritage Conservation District 5-1 5.0 EXEMPT ALTERATIONS AND CLASSES OF ALTERATIONS 5.1 INTRODUCTION Under Section 42 of the Ontario Heritage Act, a permit is required for the erection,

More information

C. BOARD MEMBER REQUESTS & INFORMATIONAL ITEMS

C. BOARD MEMBER REQUESTS & INFORMATIONAL ITEMS NON-AGENDA May 5, 2017 Board Policy: EL-7 Communication and Support to the Board The BAOs shall inform and support the Board in its work. Page # A. NEWSLETTERS & BRIEFINGS 4 ACWA e-news: 05/03/17 B. CEO

More information

The British Museum policy on human remains

The British Museum policy on human remains The British Museum policy on human remains Introduction The British Museum has developed a policy with regard to the human remains in its collections according to the recommendations of the Code of Practice

More information

Tender Document and Specifications for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor.

Tender Document and Specifications for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor. Tender Document and Specifications for Council Property Assorted Painting and between Parks and Recreation and Contractor. CONTRACT 2014-02 November 2014 CONTENTS Instruction to Tenderers... 3 Foreword

More information

NORTH VINEYARD STATION SPECIFIC PLAN

NORTH VINEYARD STATION SPECIFIC PLAN NORTH VINEYARD STATION SPECIFIC PLAN 604-10. INTENT. It is the intent of the Board of Supervisors in adopting this Specific Plan to allow development of the North Vineyard Station area in a manner consistent

More information

OVERVIEW. 500 South. Trolley Square. 600 South. Approximate location of proposed staircase and doorway

OVERVIEW. 500 South. Trolley Square. 600 South. Approximate location of proposed staircase and doorway SALT LAKE CITY HISTORIC LANDMARK COMMISSION REQUEST BY TROLLEY SQUARE ASSOCIATES LLC, REPRESENTED BY MARK BLANCARTE FOR APPROVAL OF AN EXTERNAL STAIRCASE ON THE MAIN BUILDING AT TROLLEY SQUARE LOCATED

More information

ASH MANAGEMENT PLAN. U.S. Environmental Protection Agency Region 4, Atlanta, GA. Mr. Joe Alfano, Remedial Project Manager

ASH MANAGEMENT PLAN. U.S. Environmental Protection Agency Region 4, Atlanta, GA. Mr. Joe Alfano, Remedial Project Manager ASH MANAGEMENT PLAN U.S. Environmental Protection Agency Region 4, Atlanta, GA Mr. Joe Alfano, Remedial Project Manager 404-562-8933 City of Jacksonville Environmental and Compliance Department Site Investigation

More information

INTENT OBJECTIVES HISTORIC DESIGNATIONS

INTENT OBJECTIVES HISTORIC DESIGNATIONS TOWN OF LOS GATOS RESIDENTIAL DEVELOPMENT STANDARDS FOR ALL SINGLE FAMILY AND TWO-FAMILY DWELLINGS IN ALL ZONES EXCEPT THE RESOURCE CONSERVATION AND HILLSIDE RESIDENTIAL ZONES INTENT These development

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

Mount Umunhum Environmental Restoration and Public Access Project

Mount Umunhum Environmental Restoration and Public Access Project Mount Umunhum Environmental Restoration and Public Access Project Draft Environmental Impact Report SCH# 2010122037 PREPARED FOR: Midpeninsula Regional Open Space District 330 Distel Circle Los Altos,

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

Remaining Wetland Acreage 16,194,500 8,784,200 7,410,300-46%

Remaining Wetland Acreage 16,194,500 8,784,200 7,410,300-46% LOUISIANA Original Wetland Acreage Remaining Wetland Acreage Acreage Lost % Lost 16,194,500 8,784,200 7,410,300-46% Louisiana Wetlands: Palustrine wetlands, which include swamps, scrub-shrub, wetlands,

More information

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY The requirements contained herein are established to provide for orderly and systematic use of the county road rights-of-way within Union

More information

Phase 1B Archaeological Survey

Phase 1B Archaeological Survey Phase 1B Archaeological Survey Baron Winds Project Towns of Cohocton, Dansville, Fremont, and Wayland, Steuben County, New York Prepared for: EverPower Wind Holdings, Inc. 1251 Waterfront Place, 3rd Floor

More information

Geophysical Survey of Wisconsin Burial Site OU-0069: Grand Chute Pioneer Cemetery

Geophysical Survey of Wisconsin Burial Site OU-0069: Grand Chute Pioneer Cemetery Lawrence University Lux Archaeological Reports Anthropology Department 12-2016 Geophysical Survey of Wisconsin Burial Site OU-0069: Grand Chute Pioneer Cemetery Lawrence University Follow this and additional

More information