Entergy Louisiana, LLC

Size: px
Start display at page:

Download "Entergy Louisiana, LLC"

Transcription

1 . Entergy Louisiana, LLC An Integrated Resource Plan ( ) Scope and Structure This document describes Entergy Louisiana, LLC s ( ELL ) long-term integrated resource plan ( IRP ) 1 for the period The IRP represents a component of the Entergy System s Strategic Resource Plan ( SRP ) for the same period. The SRP for the Entergy System as a whole is described in a separate document; the underlying modeling constructs and assumptions are presented in the documentation associated with the SRP. For well over the past half century, ELL has planned and operated as part of a larger integrated system the Entergy System. 2 Entergy Arkansas Inc. ( EAI ) and Entergy Mississippi Inc. ( EMI ) have provided notice that as of December 2013 and November 2015, respectively, they will withdraw from the Entergy System Agreement. That means that, for the time being, ELL will be planned and operated under the terms of a 5-company System Agreement as of 2014 (excluding EAI), and a 4-company System Agreement as of 2016 (excluding EMI). The future is uncertain. The future Entergy System may or may not include EAI and EMI, depending on whether a successor System Agreement is realized. Excluding EAI and EMI from the larger integrated system will result in higher resource requirements for the remaining four Operating Companies, including ELL. The IRP assumes, as a base planning assumption, that EAI and EMI will terminate participation in the System Agreement by December 2013 and November 2015, respectively. Accordingly, the IRP results in a plan that positions ELL for reliable and 1 Throughout this document, unless otherwise noted, the term IRP refers to the IRP for ELL which is a component of the Strategic Resource Plan for the Entergy System and the Entergy Operating Companies. 2 The Entergy Operating Companies are planned and operated as a single, integrated electric system, pursuant to the Entergy System Agreement. The six Entergy Operating Companies include Entergy Arkansas, Inc. ( EAI ), Entergy Gulf States Louisiana, LLC ( EGSL ), Entergy Louisiana, LLC ( ELL ), Entergy Mississippi, Inc. ( EMI ), Entergy New Orleans, Inc. ( ENO ), and Entergy Texas, Inc. ( ETI ). The electric generation and bulk transmission facilities of these Operating Companies are planned and operated on an integrated, coordinated basis as a single electric system pursuant to the terms and conditions of the Entergy System Agreement and are referred to collectively as the Entergy System or the System. ELL- 1

2 economic operations as part of the 5-company and eventually 4-company Entergy System. With the exit of EAI and EMI from the Entergy System Agreement, the 4- company System will face new resource planning challenges. In addition to the challenges posed by potential national and state initiatives to address greenhouse gas emissions (including renewable portfolio standards ( RPS ), demand-side management ( DSM ) and smart grid evolution, and new cap and trade programs limiting CO 2 emissions), unprecedented volatility in natural gas prices, and the aging generating fleet, the 4-company System also must address replacement capacity once EAI and EMI withdraw from the Entergy System Agreement. The IRP assumes, as a base planning assumption, that EAI and EMI will exit the Entergy System Agreement and the four remaining Operating Companies will be planned and operated as an integrated 4-company System. The IRP includes capacity expansion scenarios that provide guidance regarding future resource needs and additions. It is not possible at this time to predict the outcome of uncertainties surrounding load growth, new nuclear resources, solid fuel resources, renewable portfolio standards, and the aging generating fleet. However, this plan results in adequate resources to meet the 4-company System needs under the current assumptions. With that background, this IRP presents ELL s perspective on its: resource requirements over the next 20 years; current resource portfolio; Reference Planning Scenario for meeting long-term needs with a combination of Demand-Side Management and traditional and renewable generating units; and plans for addressing uncertainties including several alternative planning scenarios. Regulatory Context for ELL s Integrated Resource Planning The Louisiana Public Service Commission ( LPSC ) has opened a docket investigating the potential for implementing an IRP process. However, the docket is currently inactive pending resolution of a separate re-evaluation of a new RPS for Louisiana. ELL-2

3 ELL s Future Resource Requirements The foundation for the IRP is an estimate of the future energy and capacity needs of ELL s customers. This estimate requires estimates of the amount of capacity and energy that ELL s customers will use, and an estimate of the amount of reserves that should be included in the IRP to provide reliable service. Load Forecast The load forecast is developed using statistical and economic modeling techniques that are described in the SRP. 3 The application of those modeling techniques to ELL results in the reference, high load growth, and low load growth cases shown in the following Figure ELL-1. Figure ELL-1: Entergy Louisiana, LLC. Firm Non-coincident Peak Load (Load Sensitivity Cases ) (MW) Reference 5,109 5,334 5,539 5,494 5,559 5,641 5,679 5,687 5,694 5,708 High Growth Low Growth 5,160 5,387 5,595 5,651 5,707 5,764 5,822 5,880 5,939 5,998 5,099 5,109 5,119 5,129 5,139 5,150 5,160 5,170 5,181 5, Reference 5,717 5,565 5,732 5,735 5,746 5,586 5,599 5,605 5,609 5,461 High Growth Low Growth 6,058 6,119 6,180 6,242 6,304 6,367 6,431 6,495 6,560 6,626 5,201 5,212 5,222 5,233 5,243 5,254 5,264 5,275 5,285 5,296 Reserve Margins The IRP describes ELL s requirements as part of the larger integrated Entergy System. The 4-company Operating System must have adequate resources to reliably meet customer needs. The plan does not assume that ELL will maintain sufficient generating capacity to reliably meet its own requirements as a standalone Operating Company, but as part of a larger integrated system. 3 Chapter 3 of the SRP provides additional details regarding the load forecasting process. ELL-3

4 This ability is measured in terms of peak load plus an adequate provision for planning reserves. Peak load (shown in Figure ELL-1) refers to the level of highest customer demand during the year. If resources are sufficient to meet peak demand, resources should be sufficient to meet demand throughout the remainder of the year. Both customer demand and the availability of resources within the portfolio to meet demand are matters of uncertainty. Unknown events such as an unusually hot summer or an unplanned outage of a generating unit can create situations in which the System s ability to meet the experienced peak load is challenged. To protect against the consequences of such unknown events the IRP consistent with good utility practice provides for an additional amount of resources above projected peak demand, referred to as the planning reserve margin. The planning reserve margin may be expressed as a MW amount or as a percentage of the peak load. A number of factors influence the level of planning reserves that are required to provide reliability. One of the most important variables is the size of the generating units within the portfolio in relation to peak load. Relying on large generating stations involves greater risk because an outage at a single unit has more significant consequences. Therefore, the larger the generating units within the portfolio in relation to peak load the greater the planning reserve margin that is required. This relationship has consequences for the level of planning reserves that will be required in light of EAI and EMI exiting the System Agreement. In recent years the System has planned for about a 17% reserve margin. This target was developed using a technique known as a Loss of Load Probability ( LOLP ) assessment. The LOLP technique is widely used throughout the industry for determining reserve margins. LOLP assesses the probability that resources will be adequate to meet load in light of uncertainties regarding customer load variability and of unit outages. Results of the LOLP assessment indicated that a 17% reserve margin provided sufficient capacity to serve load for all but one day in ten years, also a traditional measure of reliability used within the industry. However, the loss of EAI and EMI would result in a smaller electric system. At the same time, the size of the four remaining Operating Companies generating units would not change. Because the size of the generating units as compared to the peak load increases, the LOLP assessment indicates a need for additional planning reserves for the 4-company System to achieve the same level of reliability. The results of the LOLP calculations indicate much higher reserve requirements for a 4-company System. ELL-4

5 In determining the target planning reserve margins, the IRP considered the following: The actual operating configuration of the 5-company System and 4-company System, after EAI and EMI exit the System Agreement, is uncertain. A number of actions may be available to mitigate risk and lower required reserve margins after the exit of EAI and EMI including possible reserve sharing arrangements. In recognition of these factors, the IRP sought to determine a level of target planning reserves that balanced the objective of providing adequate resources to maintain reliability while avoiding commitment to long-term resources that may ultimately prove to be unnecessary. Accordingly, the IRP established the planning reserve margins for the 5-company System and the 4-company System based on the loss of the single largest generating unit. This analysis yields a planning reserve margin of 18% for the 5-company System ( ) and 20% for the 4-company System (2016 and beyond). For operating companies planned and dispatched within the integrated system, a 10% reserve margin is used for each company. The 10% planning reserve margin ensures that each Operating Company provides a proportionate share of the resources that are expected to be used for overall System reliability and coordinated dispatch. The 10% reserve margin represents a guideline used solely for the purposes of Operating Company Portfolio Planning within the context of operation within the System. Other Uncertainties In addition to load, a number of uncertainties will affect long-term resource requirements and the alternatives available to meet those needs. Carbon The issue of potential climate change associated with atmospheric greenhouse gases has received growing attention among the scientific community, in the media, and with governmental policy makers. A number of bills proposing to regulate carbon emissions have been proposed in the United States Congress. It is not possible to predict whether CO 2 legislation will eventually be enacted, and if so, when it would become effective or what form it would take. However, any form of CO 2 legislation would likely result in higher cost of electric generation because emissions from power plants are a major source of carbon, primarily in the form of CO 2. Moreover, because alternative technologies emit different levels of CO 2 per MWh of generation, CO 2 legislation would likely have an effect on the relative economics of supply ELL-5

6 alternatives. Consequently, assumptions regarding potential CO 2 cost represent a key input in the 2009 SRP Update. In order to consider the effects of carbon uncertainty on resource choice and portfolio design, the 2009 SRP Update relies on a range of projected CO 2 cost outcomes. The Reference Case assumes a 2013 nominal CO 2 emission price target of $15 per ton with straight line interpolation to a 2020 nominal CO 2 emission price target of $50 per ton. By 2028, under the Reference Case, the nominal CO 2 emission price target may be $58.58 per ton. Renewable Portfolio Standards There is growing discussion regarding the potential implementation of a Renewable Portfolio Standard ( RPS ) (also sometimes known as a Renewable Energy Standard ) either at the federal or state level. Several bills have been proposed in the U.S. Congress that would establish various targets for renewable generation and differing levels of compliance cost. If enacted, a federal RPS likely will result in higher cost for customers. Renewable generation alternatives generally are more costly than conventional generation alternatives. Fuel Long-term natural gas price levels remain uncertain. A wide range of factors may affect natural gas price levels and volatility in the future. Natural gas prices are expected to vary between $6.04 in 2009 (nominal $/MMBtu) to $10.06 in 2020 (nominal $/MMBtu), based on the Reference Case. Current Resource Portfolio The ultimate objective of an IRP is to inform the decisions that must be made in the course of the development of a future resource portfolio. The need to acquire future resources is not determined just by an estimate of future resource requirements. After there is an estimate of the level of resources that will be needed in the future, the next step in the development of an IRP is an assessment of the current portfolio of resources. This assessment should consider the amount, type, and age of the existing fleet. Then, current resources can be compared to future requirements to develop expectations regarding the need for additional resource acquisitions in the future. Figure ELL-2 lists the resources in ELL s current resource portfolio. Figures ELL-3 and ELL-4 characterize the portfolio mix based on the attributes of fuel and resource age. These figures illustrate a few key points: ELL-6

7 ELL s existing portfolio of generating units has a total combined capability of 6,370 MW including 20 units at 12 sites. The resource mix includes a significant amount element of nuclear capacity (1,600 MW) representing 25% on a capacity basis. The portfolio includes only 259 MW of modern gas-fired combined cycle combustion turbine ( CCGT ) capacity, including ELL s allocation of the Perryville facility (134 MW) and a long-term PPA with Occidental Chemical associated with the output of Occidental s Taft facility (125 MW). 4 4 The Taft-Occidental contract is divided into three components: 295 MW is considered baseload capacity, 125 MW is considered CCGT capacity, and 60 MW is considered peaking ELL-7

8 Figure ELL-2: Entergy Louisiana, LLC. Current Owned & Long Term Resources Unit Supply Role Fuel Age 2008 Summer Capacity (MW) Buras 8 Peaking Gas Grand Gulf Baseload Nuclear Little Gypsy 1 Seasonal Load Following Gas Little Gypsy 2 Seasonal Load Following Gas Little Gypsy 3 Seasonal Load Following Gas ISES (EPI) Baseload Coal Ninemile 3 Seasonal Load Following Gas Ninemile 4 Seasonal Load Following Gas Ninemile 5 Seasonal Load Following Gas Oxy Taft Core Load Following Gas Perryville 1 Core Load Following Gas Perryville 2 Peaking Gas 8 39 River Bend 30 Baseload Nuclear Sterlington 6 Peaking Gas Sterlington 7 Peaking Gas Toledo Bend Peaking Hydro n/a 23 Waterford 1 Seasonal Load Following Gas Waterford 2 Seasonal Load Following Gas Waterford 3 Baseload Nuclear 24 1,169 Vidalia Peaking Hydro n/a 66 WBL 5 Baseload Nuclear & Coal 110 TOTAL 6,370 5 The ELL Wholesale Base Load (WBL) transaction, totaling 110 MW, purchases a portion of ANO 1, ANO 2, Grand Gulf 1, Independence 1, White Bluff 1 and White Bluff 2 from EAI on a life-of-unit basis. ELL-8

9 Figure ELL-3: Entergy Louisiana, LLC. Portfolio Fuel Mix (2009) Gas & Oil 73% Coal 1% Hydro 1% Nuclear 25% Figure ELL-4: Entergy Louisiana, LLC. Portfolio Age (2009) Yrs 39% >40 Yrs 24% <30 Yrs 37% Load Shape Analysis In the long run, the principle of matching resources to customer load shape results in a portfolio of resources that meet customer needs at the lowest reasonable cost. A cost-effective portfolio recognizes that the time-varying nature of customer demand calls for a mix of generating resources to meet differing operating roles. Determining portfolio needs therefore requires consideration of customer load shape requirements. Load shape determines functional requirements. Figure ELL-5 illustrates a common construct for assessing and explaining the mix of resources that will be needed within a portfolio. This construct, known as a load duration curve, provides a simple way of assessing and describing the overall type of resources needed to meet customer needs. In the chart on the right, load levels are shown on the vertical axis. The curve represents load over the period of a year sorted from the highest load level to the lowest. ELL-9

10 Points along the curve indicate the MW levels of capacity needed to meet generalized supply roles. Figure ELL-5: Illustrative Load Duration Curve Analysis HOURLY LOAD GENERATION CAPACITY REQUIREMENTS Max Load ~ 21 GW Reserve Peaking Load Following MW Min Load ~ 11 GW Chronological Hours (One Year) MW Base Load Load Duration Curve Rearranges Hourly Load The results of the load duration curve analysis are used throughout this report to describe the resource needs for the Entergy Operating Companies and for assessing how well resources are matched to load shape requirements. However, while a valuable tool, a load duration curve analysis also has limitations. The results of load shape analysis are intended as general guidelines for portfolio planning purposes without consideration of practical operational requirements. As described later in this chapter, the System must have sufficient flexible capacity to meet and respond to changing load conditions in order to maintain a stable electric grid. The load duration curve analysis does not explain this requirement. Moreover, in assessing existing resources relative to load shape requirements, each unit has been assigned within a specific supply role. In actuality, the distinction between supply roles is neither sharp nor static. Supply Roles This SRP update considered a number of generalized supply roles in assessing long-term resource needs. The supply role requirements, which are intended as general guidelines for portfolio planning purposes without consideration of practical operational requirements, are described as follows: Baseload The aggregate customer demand for electricity that persists most hours of the year is the baseload requirement. As a guideline, baseload requirements are determined by the level of firm load that is expected to be exceeded during 85% of the hours in a year. ELL-10

11 Core Load Following The aggregate customer demand for electricity that is greater than baseload requirement, but less than seasonal load following requirement. As a guideline, core load following requirements are determined by the level of firm load expected to be exceeded during 30% of the hours in a year. Seasonal Load Following The aggregate customer demand for electricity that is greater than core load following requirement, but less than peaking requirement. As a guideline, seasonal dispatch requirements are determined to be the level of firm load that is expected to be exceeded during 15% of the hours in a year. Peaking The aggregate customer demand for electricity that is greater than seasonal load following requirement, but less than reserve requirement. Reserve The target reserve margin, as described earlier, to maintain reliability by protecting against the consequence of potential unknown events. Consistent with the identified supply role requirements, resource alternatives appropriate for serving each supply role can be identified. Each resource alternative has its own unique cost and performance characteristics that allow it to be functionally and economically suited to serving certain supply roles. Figure ELL-6: Entergy Louisiana, LLC Summary of Capacity Position by Supply Role (MW) 7,000 6,000 5,000 4,000 3,000 2,000 1,000 < Reserve < Peaking < Seasonal LF < Core LF < Base Load Peaking / Reserve > Seasonal LF > CCGT > Nuclear & Coal > 0 Requirements Difference Capability ELL-11

12 The results of the analysis presented in Figure ELL-6 comparing ELL s resource needs with its current portfolio of long-term resources indicate the following key points: ELL s current portfolio of nuclear and coal capacity is short of its base load requirements by 838 MW. ELL s current portfolio includes only 259 MW of modern gasfired combined cycle combustion turbine ( CCGT ) capacity, Perryville (134 MW) and Oxy-Taft (125 MW) 6. Modern gasfired CCGT resources are the technology of choice to meet incremental load following needs. 7 Consequently, incremental long-term resource additions can be expected to be weighted toward gas-fired CCGT resources. ELL s current portfolio is heavily weighted toward seasonal load following resources. The amount of gas fired capacity in the portfolio exceeds current seasonal load following needs. ELL s current portfolio of long-term resources currently meets planning reserve margin, and, in fact is long by about 750 MW, based on a 10% reserve margin. 8 This surplus, however, will decrease due to load growth and potential unit deactivations. Challenges ELL s resource portfolio faces a number of challenges. Potential Unit Deactivations ELL s current portfolio of long-term resources may potentially have 1,040 MW of resources deactivate over the planning horizon. Additional capacity must be added to replace the attrition of existing capacity. Age of Existing Resources The existing portfolio of long-term resources includes a number of gas-fired resources that are in excess of 35 years of age. In and of itself, the age of a generating unit is not the determinant as to whether any specific unit should be deactivated or retired. The ability of a generating unit to continue to 6 The Taft-Occidental contract is divided into three components: 295 MW is considered baseload capacity, 125 MW is considered CCGT capacity, and 60 MW is considered peaking 7 This is explained in detail in Chapter 10 (Generation Technologies) of the SRP. 8 The 10% reserve margin represents a guideline used solely for the purposes of Operating Company Portfolio Planning within the context of operation within the System. This guideline does not represent the reserve margin requirements for the System and standalone Operating Companies. ELL-12

13 provide economic and reliable service is a function of capital expenditures, service role, and general condition. However, experience indicates that at some point it is likely that it will be more economic to replace existing capacity rather than to continue to incur capital and operating and maintenance expenses. Baseload and Core Load-following Needs ELL s portfolio lacks sufficient base load and modern gas-fired CCGT capacity. System resources must support ELL s base load and core load following requirements. Reference Planning Scenario There are a myriad of uncertainties affecting future resource needs and alternatives available to meet those needs. However, a Reference Planning Scenario has been developed for ELL which charts a course through a reasonable set of assumptions, and results in a plan that satisfies the planning objectives while providing the flexibility to respond to changing conditions. The Reference Planning Scenario is a reference point that can be used to evaluate a variety of future outcomes, but the outcome of a wide number of uncertainties will affect customer needs and the best portfolio choices to meet those needs over the next two decades. This section describes the Reference Planning Scenario, by discussing: Portfolio assumptions; Recommendations regarding strategic direction; and Plans for addressing uncertainties (including several alternative planning scenarios) The Reference Planning Scenario describes a portfolio of resources to meet ELL customer needs for the next 20 years. The Reference Planning Scenario: Balances the supply objectives of reliability, cost minimization, and risk mitigation; Accomplishes these planning objectives while considering utilization of natural resources and effects on the environment; Outlines a disciplined approach to resource additions while allowing the flexibility to respond to changing circumstances; Meets the bulk of reliability needs through long-term resources (owned or power purchase contracts); ELL-13

14 Includes the addition of gas-fired CCGT resources to meet loadfollowing needs and overall reliability requirements; Includes the addition of reasonable levels of renewable generation and DSM to address fuel diversity and to meet overall capacity needs. Reference Planning Scenario Assumptions The Reference Planning Scenario assumes that incremental resource needs will be met primarily by gas-fired CCGT resources coupled with economically attractive levels of renewable generation and DSM consistent with regulatory mandates and appropriate cost recovery mechanisms. Specific portfolio assumptions include the following: 1,000 MW of existing gas-fired steam capacity is deactivated. 800 MW of gas-fired CCGT resources are added. 500 MW of renewable generation resources are added between 2014 and 2028, representing a level of economically attractive renewable generation that is realistically achievable given current cost estimates. Entergy Services, Inc. conducted a Request for Information ( RFI ) relating to renewable generation and, depending on federal and/or state RPS activity, may conduct a Request for Proposals for renewable generation within the next year. The results of those initiatives will inform future planning efforts and will result in appropriate adjustments to the levels of renewable generation included in future SRP Updates. The continued operation of all existing coal-fired capacity throughout the planning horizon. The continued operation of all existing nuclear facilities throughout the planning horizon. The addition of 22 MW (160 MW Utility total) of nuclear capacity through an uprate at the Grand Gulf Nuclear Station in 2012 and 25 MW (125 MW Utility total) of nuclear capacity through an uprate at the River Bend Station in However, there have been no final decisions to implement the uprates. If the projects prove to be uneconomic or technically unfeasible, this capacity would be replaced with additional CCGT resources. No new solid fuel or nuclear facilities additions (other than the uprates previously discussed) over the following 20 years. Potential new nuclear capacity is addressed among the alternative planning scenarios. ELL-14

15 Strategic Recommendations The Reference Planning Scenario incorporates the following strategic recommendations: Focus on gas-fired CCGT capacity as the basic building block of the portfolio. Pursue reasonable levels of economically attractive renewable generation. The levels and type of renewable generation actually deployed will depend on evolving mandates and an on-going assessment of cost and availability, including market tests with suppliers. The Reference Planning Scenario indicates that: Near-term renewable resource additions are anticipated to be primarily biomass. 50 MW of renewable capacity (700 MW for all six of the Operating Companies) may be added to ELL s portfolio over the first 10 years. Continue to monitor the costs and benefits of new nuclear and solid fuel and propose specific plans to implement these options in the future if and when analyses results warrant. The Reference Planning Scenario does not reflect an expectation that any new nuclear or solid fuel resources will enter service over the 20 year planning horizon. However, it would be appropriate to maintain readiness of new nuclear through spending levels consistent with results of on-going assessment. Continue to develop long-term integrated planning efforts with Entergy Transmission to identify portfolio solutions that best balance planning objectives. Results of integrated supply and transmission planning efforts that are now allowed subsequent to FERC Order 717 may result in adjustments to the timing and location of resource needs. Pursue cost-effective DSM, consistent with the following discussion. Demand Side Management Assumptions The Reference Planning Scenario assumes that, over the SRP planning horizon, ELL-sponsored DSM programs reduce peak load by 264 MW and reduce cumulative energy consumption by 740 GWh by 2028 at an eventual cost of $170 million (nominal $, cumulative). These results are consistent ELL-15

16 with a detailed potential study recently prepared by ICF International, a leading consulting firm in the DSM community. 9 The ICF International study found a potential of about 140 MW over first 10 years for ELL, adjusted for reasonable implementation and approval timeline. Figure ELL-7: Entergy Louisiana, LLC. DSM Potential Assumption Cumulative Non-Coincident Peak Demand Reduction (MW) and Energy Saved (GWh) Demand Reduction Energy Saved Demand Reduction Energy Saved Barriers to DSM Implementation Traditional rate regulation presents several barriers or disincentives to electric utility investment in DSM resources. These include regulatory lag associated with recovering the incremental investment and expenses of programs, the lack of an opportunity to earn a comparable return on DSM programs as with other utility investments, and the loss of revenues that frequently accompanies DSM programs that reduce a utility s contribution to its fixed costs. A regulatory framework that addresses these three elements will ultimately benefit all stakeholders and encourage utility support for the continued development and implementation of DSM programs and begin to position investments in DSM and supply side resources on an equivalent basis for the Company. Regulatory Framework for Cost Recovery As ELL pursues cost-effective DSM as a means for meeting a portion of its future resource needs, the regulatory framework for treatment of DSM investments will need to be addressed. An equitable regulatory framework that addresses the removal of the disincentives for the implementation of DSM programs is a fundamental prerequisite to creating a successful DSM 9 The ICF, International study is discussed in detail in Chapter 9 of the SRP. ELL-16

17 environment. The lack of necessary regulatory mechanisms means that DSM and supply-side resources are not on a level playing field. Appropriate mechanisms must be implemented to ensure that the benefits of DSM accrue to customers and that investors are adequately compensated for their investment. It is important to note that the LPSC has recently opened a new rulemaking docket to address energy efficiency. Based on recent comments of the LPSC Staff, it is anticipated that the energy efficiency rulemaking will begin in earnest during early DSM is an important component of the resource planning process and requires that the Company properly assess the market achievable potential and make adjustments as needed due to changes in external market forces, changes to Operating Company schedules for implementing DSM programs as well as the advanced metering infrastructure ( AMI ) systems that enable demand response programs. Changes to these assumptions and others may result in the need to revise the overall DSM resource potential or the timing of when those resources may be available. Uncertainty The amount of market-achievable DSM potential that should be reflected in the 2009 SRP Update is subject to a variety of factors, many of which are highly uncertain. These DSM assumptions are not intended as definitive commitments to particular programs, program levels, or program timing. The level of DSM programs that will be implemented over the planning horizon will depend on a number of factors including: The level of DSM that the Operating Companies retail regulators agree should be deployed, and the implementation of appropriate regulatory review, approval, and cost recovery mechanisms to allow the Operating Companies a reasonable opportunity to recover the costs associated with those programs; The relative cost of DSM versus alternative supply-side options. Chapter 10 discusses the uncertainties that affect supply-side alternatives, both conventional and renewable alternatives. The cost and availability of supply-side alternatives are matters of uncertainty which could alter the relative attractiveness of DSM alternatives. Experience with the DSM programs. As DSM programs are implemented over time, ELL will be able to refine the estimates of market-achievable potential, the cost of implementing programs, and the speed at which programs can be deployed. ELL-17

18 Renewable Generation Assumptions Subject to various assumptions and uncertainties, it is reasonable to expect that renewable generation will become a component of ELL s long-term supply portfolio over the next decade. However, it is not realistic to assume that renewable generation will be able to technically or economically satisfy all or even most of ELL s incremental needs. 10 However, in light of a growing interest from policymakers and the potential for renewables to mitigate the effects of regulations regarding CO 2, the Reference Planning Scenario assumes 450 MW of renewable generation will be added to ELL s portfolio over the planning horizon, as shown in Figure ELL-8. Figure ELL-8: Entergy Louisiana, LLC. Reference Planning Scenario Renewable Generation Resource Additions Renewable Generation Resource Additions ( ) COD Technology Size (MW) Operating Company 2018 Biomass 50 ELL 2019 Biomass 100 ELL 2021 In-Stream Hydro 50 ELL 2022 In-Stream Hydro 50 ELL 2023 In-Stream Hydro 50 ELL 2023 Off-System Wind 150 ELL Total 450 Deactivation Assumptions In addition to being able to meet growing load, additional resources will be needed in the future to replace any part of the current portfolio that can no longer be expected to be technically or economically viable. Thus, the resource planning process must incorporate assumptions regarding the continued viability of the existing generating units that comprise the current portfolio. 11 As part of the ongoing planning process, the existing units are assessed to determine their ability to economically remain in the portfolio relative to other available resource alternatives. The results of this assessment can change because the projected cost to maintain a generating unit can be affected by unexpected equipment degradation or failure and unanticipated 10 Chapter 10 of the SRP presents a detailed technical and economic discussion of renewable resources. 11 A more complete discussion of the process for evaluating potential unit deactivations is discussed in Chapter 8 of the SRP. ELL-18

19 operational requirements that significantly impact the unit condition. Therefore, these deactivation assumptions are for long-term capacity planning purposes only and should not be interpreted as a retirement schedule for existing generating units. All of the existing nuclear, coal, and hydro units as well as the modern simplecycle combustion turbine ( CT ) and CCGT units are expected to remain viable during the planning period. Older technology gas fired units with heat rates around 10,000 Btu/kWh are economic for load following roles at current expectations for natural gas prices and carbon legislation. However, as generating units age, it is reasonable to expect that their maintenance requirements may increase and/or that their reliability may decrease. Therefore, some currently operable gas-fired generating units will likely be deactivated during the planning period. Others will continue to operate. In some cases additional investment may be warranted to maintain performance. Figure ELL-9 shows the deactivation assumptions that form the basis for estimating ELL s resource needs. However, as indicated above, a decision has not been made to actually deactivate any specific unit. 1,200 Figure ELL-9: Entergy Louisiana, LLC. Capacity Deactivation Assumptions (MW) 1, , Total Based upon the Reference Case assumptions regarding load growth (including the effects of DSM), an assessment of the state of the current portfolio, renewable and DSM mandates, and the economics of alternative resources, the ELL-19

20 resource additions in ELL s Reference Planning Scenario are shown in the following four figures. Figure ELL-10: Entergy Louisiana, LLC. Summary of Reference Planning Scenario Resource Additions Resource Additions ( ) COD Technology Size (MW) Operating Company 2011 CCGT 387 ELL 2012 Nuclear Uprate 22 ELL 2015 CCGT 400 ELL 2015 Nuclear Uprate 25 ELL 2018 Biomass 50 ELL 2019 Biomass 100 ELL 2021 In-Stream Hydro 50 ELL 2022 In-Stream Hydro 50 ELL 2023 In-Stream Hydro 50 ELL 2023 Off-System Wind 150 ELL Total Total Total 1,284 ELL-20

21 Figure ELL-11: Entergy Louisiana, LLC. Reference Planning Scenario Capacity Additions by Type (MW) 1,400 1,200 1, CCGT Nuclear Uprates Renewables Figure ELL-12: Entergy Louisiana, LLC. Summary of Reference Planning Scenario Portfolio Composition (GW) Year Resource DSM Nuclear Coal Existing Hydro Existing Gas Renewable Generation CT / CCGT Limited- Term Purchases Total ELL-21

22 Figure ELL-13: Entergy Louisiana, LLC. Summary of Reference Planning Scenario Portfolio Composition (MW) 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1, DSM Nuclear Coal Existing Gas Existing Hydro CT / CCGT Renewables Limited-Term Purchase Alternative Planning Scenarios The Reference Planning Scenario charts a course for meeting customer needs that balances the planning objectives of reliability, reasonable cost, and risk mitigation. In doing so, the Reference Planning Scenario considers uncertainty and describes a portfolio of resources that is reasonably robust in accomplishing these objectives across a range of outcomes. However, the SRP recognizes that the outcome of a wide range of uncertainties will affect customer needs and the best alternatives to meet those needs. Alternative Planning Scenarios have been developed to describe how the Reference Planning Scenario would be adjusted in the future to respond to specific contingencies. These scenarios include: New Nuclear Planning Scenario High Growth Planning Scenario Low Growth Planning Scenario Each is described in the following sections. ELL-22

23 New Nuclear Planning Scenario Although the Reference Planning Scenario does not presume that a new nuclear facility will begin supplying capacity and energy to ELL s customers over the course of the planning period, the SRP recognizes that new nuclear offers the potential for an economic source of stable-priced base load capacity with zero carbon emissions. In light of this potential, the Reference Planning Scenario assumes the following strategic actions with respect to new nuclear: Continue to monitor the economics of new nuclear and propose to strike on this option in the future if and when analyses warrant. Maintain the readiness to evaluate and develop new nuclear through spending levels consistent with results of on-going assessment. The New Nuclear Planning Scenario describes how planned resource additions would be adjusted if results of on-going monitoring activities indicate that new nuclear technology proves to be a viable, economically attractive alternative to meet base load needs in the future. The New Nuclear Planning Scenario assumes the addition of new nuclear in the time frame. Detailed assumptions include the following: Two units, 1,000 MW each, are added in 2021 and 2024, respectively. ELL will own 40% of each unit for a total of 800 MW. Given lead times associated with new nuclear development, it is not anticipated that new nuclear could be incorporated into portfolios prior to the second half of the planning horizon. The unit capacity assumptions are generic representations of potential new nuclear unit additions and do not reflect an assumption as to the specific technology chosen. The actual unit size and number of units would depend on technology selected. If new nuclear is determined to be economic, it is not anticipated that more than 2,000 MW of new nuclear could be added in this planning horizon. The capital cost and challenges associated with development and construction limit the amount of new nuclear that realistically could be deployed within a defined time period. The GE ESBWR technology contemplates a unit size of about 1,500 MW. The Nuclear Planning Scenario assumes that if this technology were chosen, only one unit would be deployable within the planning horizon. New nuclear additions would be expected to replace comparable amounts of CCGT capacity in the Reference Planning Scenario. ELL-23

24 Figure ELL-14: Entergy Louisiana, LLC. Summary of New Nuclear Planning Scenario Portfolio Composition (GW) Year Resource DSM Nuclear Coal Existing Hydro Existing Gas Renewable Generation CT / CCGT Limited- Term Purchases Total Figure ELL15: Entergy Louisiana, LLC. Summary of New Nuclear Planning Scenario Portfolio Composition (MW) 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1, DSM Nuclear Coal Existing Gas Existing Hydro CT / CCGT Renewables Limited-Term Purchase ELL-24

25 Carbon Implications Nuclear generation results in zero carbon emissions. Consequently, replacing CCGT capacity with new nuclear capacity would be expected to result in a lower carbon footprint. High Growth Planning Scenario In addition to a reference case, the load forecast described above includes both high and low load growth projections. The High Growth Planning Scenario describes how planned resource additions would be adjusted if actual load growth tends toward the upper forecast. Load growth averages 2.0% over the 20 year planning horizon in the High Growth Planning Scenario. This scenario assumes that additional supply-side resources would be required over the planning horizon in order to meet higher projected loads. The High Growth Planning Scenario does not rely on specific assumptions as to the drivers of higher sustained load. Higher growth could be driven by a number of factors including, for example; Sustained strong economic growth within the region; Adoption of new electric technologies, such as, plug-in hybrid vehicles; and Deployment of DSM at lower levels than assumed in the Reference Planning Scenario. As described above, it is assumed for planning purposes that ELL will remain a participant in the Entergy System Agreement in whatever form that may take. Therefore, ELL s capacity additions will support the larger integrated 5- company, or 4-company, Entergy System. The System s overall capacity needs will depend on load growth. As a result, the 4-company Operating System (post EAI and EMI exit) will need 2,000 MW of additional capacity to meet reliability needs. ELL s planned capacity under the High Growth Planning Scenario is not expected to vary from that under the Reference Planning Scenario. Due to greater reliability requirements, these 2,000 MW of incremental capacity may be added to EGSL and ETI (1,000 MW each). Low Growth Planning Scenario The Low Growth Planning Scenario describes how planned resource additions would be adjusted if actual load growth tends toward the lower forecast. Load growth averages about 0.5% over the 20 year planning horizon in the Low Growth Planning Scenario. This scenario assumes that, as compared to the ELL-25

26 Reference Planning Scenario, fewer supply-side resources would be required over the planning horizon in order to meet lower projected load growth. The Low Growth Planning Scenario does not rely on specific assumptions as to the drivers of lower load. Lower loads could result from a number of factors including, for example: Sustained weak economic growth within the region; Adoption of energy efficiency by end use customers; and Higher levels of DSM deployment than assumed in the Reference Planning Scenario. As a result, compared with the Reference Planning Scenario, 1,000 MW less of incremental capacity is needed to meet reliability needs over the twenty year planning horizon for the 4-company Operating System (post EAI and EMI exit). ELL s planned capacity under the Low Growth Planning Scenario is not expected to vary from that under the Reference Planning Scenario. Instead, 1,000 MW of incremental capacity would be reduced within ETI s jurisdiction, due to lower reliability requirements. Other Key Portfolio Drivers The Alternative Planning Scenarios described above provide guidance relating to the effect of uncertainties pertaining to load growth and new nuclear. The outcomes of these uncertainties are unknown at this time. But, the implications of these uncertainties on portfolio design and the range of foreseeable outcomes suggest both a potential benefit from developing alternative scenarios and a reasonable basis for doing so. It is not possible, however, to predict all the factors that may affect portfolio design over the next 20 years. In the case of many other drivers the uncertainties become so unknown or so speculative, that constructing specific alternative planning scenarios becomes practically impossible or, at least, of little planning value. In some cases the drivers themselves may not be identifiable at this time. The strategic flexibility inherent in the Reference Planning Scenario (described in an earlier section within this chapter) provides the key tool for responding to changing circumstances. However, two additional uncertainties, while not incorporated into alternative planning scenarios merit additional discussion, plant betterment opportunities and renewable generation alternatives. ELL-26

27 Plant Betterment Initiative The Reference Planning Scenario assumes that 1,040 MW of ELL s existing gas-fired generation is deactivated over the coming twenty years. These deactivation assumptions were developed for long-range planning purposes, as a basis for assessing long-term incremental capacity needs, and not as a schedule of retirements for existing units. While the assumptions about unit deactivations consider knowledge of unit condition and expectations about future operating role, these assumptions do not represent a decision to deactivate any particular unit. Specific unit portfolio decisions are made during the tactical business planning process (three-year planning horizon) based on economic and technical evaluation considering projected forward cost, anticipated operating roles, and cost of supply alternatives. Plant betterment activities involve proactive repair and replacement of specific components to maintain capability and safety of a generating unit. These repairs and replacements are consistent with OEM/Vendor recommendations and good utility practice. Some of the existing gas-fired generating units may be candidates for refurbishment and/or upgrade beyond proactive repair and replacement. Planners and plant engineers are currently assessing potential opportunities presented by older gas-fired resources. In some cases continued additional spending at these units may provide customers with economic benefits by deferring more expensive incremental capacity needs. This analysis is ongoing and is anticipated to result in preliminary recommendations over the next twelve months. To the extent the analysis results in recommendations to proactively maintain existing gas-fired resources in operation beyond currently assumed deactivation dates, the Reference Planning Scenario would be adjusted accordingly by deferring incremental CCGT additions or reducing limited-term purchases or both. Renewable Generation The Reference Planning Scenario assumes that 450 MW of renewable generation is added over the twenty year planning horizon and provides assumptions about what type of technology might be deployed to achieve that level. These assumptions are based on current information about technology cost and availability, including projections of long-term cost for emerging technologies such as in-stream hydro. The actual amount and type of renewable generation that will be deployed over the twenty-year planning horizon will depend on actual prices, availability, as well as consideration of any federal and/or state mandates. Depending on possible federal and/or state legislation, the Entergy Operating Companies may conduct a RFP for renewable resources within the next twelve months. The results of that effort should provide additional information about the potential for renewable ELL-27

Entergy New Orleans, Inc.

Entergy New Orleans, Inc. . Entergy New Orleans, Inc. An Integrated Resource Plan (2009 2028) Scope and Structure This document describes Entergy New Orleans, Inc. s ( ENOI ) long-term integrated resource plan ( IRP ) 1 for the

More information

Strategic Resource Plan

Strategic Resource Plan Strategic Resource Plan An Integrated Resource Plan for the Entergy Utility System and the Entergy Operating Companies 2009 2028 Prepared by System Planning & Operations August 21, 2009 . Chapter 1 Executive

More information

2012 Integrated Resource Plan

2012 Integrated Resource Plan 2012 Integrated Resource Plan Entergy System This document describes the Entergy System s Integrated Resource Plan for the period 2012 2031. The Integrated Resource Planning Process results in a Preferred

More information

DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans

DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans ENTERGY GULF STATES LOUISIANA, L.L.C. & ENTERGY LOUISIANA, LLC LPSC DOCKET NO. I-33014 DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans This version

More information

APSC Docket No U Entergy Arkansas, Inc Integrated Resource Plan

APSC Docket No U Entergy Arkansas, Inc Integrated Resource Plan Entergy Arkansas, Inc. APSC FILED Time: 10/31/2012 2:33:12 PM: Recvd 10/31/2012 2:30:51 PM: Docket 07-016-U-Doc. 24 425 West Capitol Avenue P. O. Box 551 Little Rock, AR 72203-0551 Tel 501 377 4457 Fax

More information

Entergy Gulf States Louisiana, L.L.C. and Entergy Louisiana, LLC

Entergy Gulf States Louisiana, L.L.C. and Entergy Louisiana, LLC 2015 Integrated Resource Plan Entergy Gulf States Louisiana, L.L.C. and Entergy Louisian na, LLC LPSC Docket No. I 33014 Draft Report: Filed January 30, 2015 Draft Report Revision 1: Filed Aprill 15, 2015

More information

Generation Technology Assessment & Production Cost Analysis

Generation Technology Assessment & Production Cost Analysis SPO Planning Analysis Generation Technology Assessment & Production Cost Analysis EAI Stakeholder Meeting July 31, 212 Technology Life Cycle Technology Deployment Over Time Conceptual Research & Development

More information

ENTERGY NEW ORLEANS 2015 IRP RENEWABLES TECHNICAL CONFERENCE

ENTERGY NEW ORLEANS 2015 IRP RENEWABLES TECHNICAL CONFERENCE ENTERGY NEW ORLEANS 2015 IRP RENEWABLES TECHNICAL CONFERENCE Technology, Cost and Regulation of CO 2 SEPTEMBER 22, 2014 Note: All IRP materials presented here are marked preliminary subject to change prior

More information

Zero Net Carbon Portfolio Analysis

Zero Net Carbon Portfolio Analysis Zero Net Carbon Portfolio Analysis Prepared for: Platte River Power Authority December 12, 2017 www.paceglobal.com Agenda Background Methodology Assumptions Cases Findings and Recommendations Page 2 Background

More information

The Husker Power Plan: A New Energy Plan for Nebraska

The Husker Power Plan: A New Energy Plan for Nebraska The Husker Power Plan: A New Energy Plan for Nebraska By Sommer Energy, LLC Anna Sommer President Tel. 315-386-3834 anna@sommerenergy.com Applied Economics Clinic Elizabeth A. Stanton, PhD Director and

More information

Capacity Performance FAQ Response

Capacity Performance FAQ Response PJM Interconnection September 15, 2014 This page is intentionally left blank. PJM 2014 www.pjm.com 2 P age Contents FAQ Response Introduction... 4 Capacity Products... 4 Methodology for Establishing Maximum

More information

PGE s 2013 Integrated Resource Plan

PGE s 2013 Integrated Resource Plan PGE s 2013 Integrated Resource Plan OPUC Public Meeting 2014 Portland General Electric. All rights reserved. Today s topics IRP public process Load-resource balance Assumptions and inputs E3 low-carbon

More information

Entergy Arkansas, Inc Integrated Resource Plan. Compiled Presentation Materials

Entergy Arkansas, Inc Integrated Resource Plan. Compiled Presentation Materials Entergy Arkansas, Inc. 2015 Integrated Resource Plan Compiled Presentation Materials 1 Contents Per request from the Stakeholder Group, this document is a compilation of all materials that have been presented

More information

MTEP18 Futures. Planning Advisory Committee June 14, 2017

MTEP18 Futures. Planning Advisory Committee June 14, 2017 MTEP18 Futures Planning Advisory Committee June 14, 2017 Overview Objective: Present final MTEP18 Futures and an overview of stakeholder feedback Key Takeaways: Four Futures to be used in MTEP18 to consider

More information

New England States Committee on Electricity

New England States Committee on Electricity Renewable and Clean Mechanisms 2.0 Study Phase I: Scenario Analysis Winter 2017 New England States Committee on Electricity Overview Context Analytical Approach and Modeling Assumptions Scenario Analysis

More information

Zero Net Carbon Portfolio Analysis

Zero Net Carbon Portfolio Analysis Zero Net Carbon Portfolio Analysis Prepared for: Platte River Power Authority December 5, 2017 This Report was produced by Pace Global, a Siemens business ( Pace Global ) and is meant to be read as a whole

More information

2012 GENERATION TECHNOLOGY ASSESSMENT Generation Technology Cost & Performance Technical Supplement to 2012 ENO IRP

2012 GENERATION TECHNOLOGY ASSESSMENT Generation Technology Cost & Performance Technical Supplement to 2012 ENO IRP SPO PLANNING ANALYSIS 2012 GENERATION TECHNOLOGY ASSESSMENT Generation Technology Cost & Performance Technical Supplement to 2012 ENO IRP JANUARY 2012 UPDATE An understanding of generation technology cost

More information

Transforming America s Power Industry:

Transforming America s Power Industry: Transforming America s Power Industry: The Challenge 21-23 Executive Summary Prepared by: Marc W. Chupka Robert Earle Peter Fox-Penner Ryan Hledik The Brattle Group Prepared for: For a copy of the full

More information

PJM Interconnection, L.L.C. ( PJM ) submits hereby submits its responses to the United

PJM Interconnection, L.L.C. ( PJM ) submits hereby submits its responses to the United PJM Interconnection, L.L.C. 2750 Monroe Boulevard Audubon, PA 19403 Jacqulynn B. Hugee Associate General Counsel T: (610) 666-8208 F: (610) 666-8211 jacqulynn.hugee@pjm.com Via WPTORFI@ee.doe.gov Hoyt

More information

Portland General Electric 2016 Integrated Resource Plan. OPUC Public Meeting December 20, 2016

Portland General Electric 2016 Integrated Resource Plan. OPUC Public Meeting December 20, 2016 Portland General Electric 2016 Integrated Resource Plan OPUC Public Meeting December 20, 2016 Agenda Process and Compliance Approach and Summary Analysis Action Plan Next steps 2 2013 IRP Order Resource

More information

Electricity Markets. Rapid Conference May 17, Mike Rencheck Rencheck Consulting LLC

Electricity Markets. Rapid Conference May 17, Mike Rencheck Rencheck Consulting LLC Electricity Markets Rapid Conference May 17, 2016 Mike Rencheck Rencheck Consulting LLC Topics Market Formation - Basics 2016 / 2017 Forecasts Natural Gas, Renewable Portfolio Standards, and Climate Change

More information

Entergy Services, Inc. Edward R. Wicker, Jr. Via Overnight Mail Re: LPSC Docket No. I-33014

Entergy Services, Inc. Edward R. Wicker, Jr. Via Overnight Mail Re: LPSC Docket No. I-33014 Entergy Services, Inc. 639 Loyola Avenue (70113) P.O. Box 61000 New Orleans, LA 70161-1000 Tel 504 576 3101 Fax 504 576 5579 Edward R. Wicker, Jr. Senior Counsel Legal Services - Regulatory April 15, 2015

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary I. Introduction Southern Indiana Gas and Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc. ( Vectren ) engaged in a planning exercise during 2016 to evaluate its electric

More information

Potential Impacts of a Renewable and Energy Efficiency Portfolio Standard in Kentucky

Potential Impacts of a Renewable and Energy Efficiency Portfolio Standard in Kentucky Potential Impacts of a Renewable and Energy Efficiency Portfolio Standard in Kentucky Prepared for the Mountain Association for Community Economic Development & the Kentucky Sustainable Energy Alliance

More information

Renewable Energy, Power Storage, and the Importance of Modeling Partitioned Power Markets

Renewable Energy, Power Storage, and the Importance of Modeling Partitioned Power Markets Renewable Energy, Power Storage, and the Importance of Modeling Partitioned Power Markets 2009 GTSP Technical Workshop May 28, 2009 College Park, MD Marshall Wise, Kate Calvin, Page Kyle, Steve Smith Joint

More information

Public Utility Regulatory Policy Act Standards

Public Utility Regulatory Policy Act Standards Document Type: EA Administrative Record Index Field: Final Environmental Document Project Name: PURPA Standards Project Number: 2007-4 FINAL ENVIRONMENTAL ASSESSMENT TENNESSEE VALLEY AUTHORITY Public Utility

More information

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh) For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold

More information

EVALUATION OF MIDWEST ISO INJECTION/WITHDRAWAL TRANSMISSION COST ALLOCATION DESIGN. Prepared by Scott Harvey and Susan Pope

EVALUATION OF MIDWEST ISO INJECTION/WITHDRAWAL TRANSMISSION COST ALLOCATION DESIGN. Prepared by Scott Harvey and Susan Pope EVALUATION OF MIDWEST ISO INJECTION/WITHDRAWAL TRANSMISSION COST ALLOCATION DESIGN Prepared by Scott Harvey and Susan Pope March 5, 2010 (Updated April 15, 2010) 1 TABLE OF CONTENTS I. Introduction...

More information

About Energy UK. Introduction

About Energy UK. Introduction REC 34-15 Energy UK response to DG Comp investigation of Investment Contract (early Contract for Difference) for Lynemouth power station biomass conversion 10 May 2015 About Energy UK Energy UK is the

More information

Electricity Grid of the Future. Program Director: Dr. Sonja Glavaski

Electricity Grid of the Future. Program Director: Dr. Sonja Glavaski Electricity Grid of the Future Program Director: Dr. Sonja Glavaski Outline ARPA-e Overview US Energy Landscape DERs and Grid Integration Grid of the Future (Vision & Long Term Goals) Going Forward The

More information

COGENERATION: Opportunities in Today s Power Markets

COGENERATION: Opportunities in Today s Power Markets COGENERATION: Opportunities in Today s Power Markets COGEN Europe Annual Conference 2005 10-11 March 2005 Paul Dillon Planning Executive: Europe, Middle East and Africa ExxonMobil Refining & Supply Taking

More information

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Contents Introduction... 3 Key Findings... 3 Background... 5 Methodology... 7 Inputs and Assumptions... 8 Load... 8 Fuel Prices... 9 Resources... 9 Pacific

More information

Integrated Resource Plan

Integrated Resource Plan 2011 Integrated Resource Plan Addendum Let s turn the answers on. June 27, 2011 For more information, contact: PacifiCorp IRP Resource Planning 825 N.E. Multnomah, Suite 600 Portland, Oregon 97232 (503)

More information

Impact of Regional Greenhouse Gas Initiative and Renewable Portfolio Standards on Power System Planning

Impact of Regional Greenhouse Gas Initiative and Renewable Portfolio Standards on Power System Planning Impact of Regional Greenhouse Gas Initiative and Renewable Portfolio Standards on Power System Planning Panel on Impacts of GHG Programs and Markets on the Power Industry PESGM2006 Montreal June 21, 2006

More information

Eastern Wind Integration and Transmission Study

Eastern Wind Integration and Transmission Study Eastern Wind Integration and Transmission Study NPCC Governmental/Regulatory Affairs Advisory Group February 23rd, 2010 Dave Corbus National Renewable Energy Lab 1 What is Needed to Integrate 20% Wind

More information

Table of Contents. 6.2 Socio-Economic Impacts of the Preferred Plan Five-Year Action Plan

Table of Contents. 6.2 Socio-Economic Impacts of the Preferred Plan Five-Year Action Plan Table of Contents 1 Preface... 1-1 2 Resource Plan Non-Technical Summary... 2-1 2.1 Synopsis... 2-1 2.2 Stakeholder Group Meetings... 2-4 2.3 Multi-State Jurisdictional Complexity... 2-5 2.4 Load Forecast...

More information

RESOURCE PLAN DECISIONS

RESOURCE PLAN DECISIONS RESOURCE PLAN DECISIONS Contents: 2-2. ELECTRIC RESOURCE PLAN Capacity Planning Standard Update Regional Resource Configuration Assumptions Resource Additions Summary Electric Results across Scenarios

More information

Regional Coordination in the West: Benefits of PacifiCorp and California ISO Integration

Regional Coordination in the West: Benefits of PacifiCorp and California ISO Integration Regional Coordination in the West: Benefits of PacifiCorp and California ISO Integration Technical Appendix October 2015 Regional Coordination in the West: Benefits of PacifiCorp and California ISO Integration

More information

MAY 1, Variable Generation Integration Costs

MAY 1, Variable Generation Integration Costs MAY 1, 2014 Variable Generation Integration Costs Executive Summary The addition of variable generation (wind and solar) to the electrical system introduces additional costs associated with unit dispatch

More information

Power Sector Transition: GHG Policy and Other Key Drivers

Power Sector Transition: GHG Policy and Other Key Drivers Power Sector Transition: GHG Policy and Other Key Drivers JENNIFER MACEDONIA ARKANSAS 111(D) STAKEHOLDER MEETING MAY 28, 214 5/23/14 POWER SECTOR TRANSITION: GHG POLICY AND OTHER KEY DRIVERS 2 Purpose

More information

1. Executive Summary Ameren Missouri

1. Executive Summary Ameren Missouri Ameren Missouri Ameren's Energy Vision for the Future Ameren's vision is "Leading the Way to a Secure Energy Future," and its mission is "To Power the Quality of Life." At the center of that vision and

More information

EXECUTIVE SUMMARY. In accordance with New Mexico Administrative Code, Integrated Resource Plan for Electric Utilities.

EXECUTIVE SUMMARY. In accordance with New Mexico Administrative Code, Integrated Resource Plan for Electric Utilities. July 3, 2017 EXECUTIVE SUMMARY Background Every three years, PNM is required to prepare an Integrated Resource Plan (IRP). 1 In this IRP, PNM has analyzed cost-effective power supply plans under two scenarios:

More information

Greenhouse Gas Emissions. Climate Change: Taking Action for the Future

Greenhouse Gas Emissions. Climate Change: Taking Action for the Future Greenhouse Gas Emissions Climate Change: Taking Action for the Future The energy industry across the United States is undergoing a major transformation by seeking lower-carbon energy sources while meeting

More information

Fred Stoffel. Tri-State Generation and Transmission Association, Inc. May 19, Utility Resource Planning Fundamentals

Fred Stoffel. Tri-State Generation and Transmission Association, Inc. May 19, Utility Resource Planning Fundamentals Fred Stoffel Tri-State Generation and Transmission Association, Inc. May 9, 202 Tri-State Overview Tri-State is a not-for-profit, wholesale power supplier owned by 44 electric cooperatives and public power

More information

Tucson Electric Power 2017 Integrated Resource Plan. Southern Arizona Regional Solar Partnership Jeff Yockey, PE

Tucson Electric Power 2017 Integrated Resource Plan. Southern Arizona Regional Solar Partnership Jeff Yockey, PE Tucson Electric Power 2017 Integrated Resource Plan Southern Arizona Regional Solar Partnership Jeff Yockey, PE May 2017 Integrated Resource Plan (IRP) Overview Just a Plan Additional steps for specific

More information

Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017

Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017 Evolution of the Grid in MISO Region Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017 1 MISO s mission is to ensure reliable delivery of low-cost energy through efficient,

More information

EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results

EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results Paul Sotkiewicz Chief Economist Muhsin Abdur-Rahman Senior Engineer, Market Simulation Members Committee Webinar November 17,

More information

CHP Savings and Avoided Emissions in Portfolio Standards

CHP Savings and Avoided Emissions in Portfolio Standards CHP Savings and Avoided Emissions in Portfolio Standards R. Neal Elliott, Anna Chittum, Daniel Trombley, and Suzanne Watson, American Council for an Energy-Efficient Economy ABSTRACT Combined heat and

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Page of BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF ITS 0 ELECTRIC RESOURCE PLAN ) ) )

More information

Nuclear Power Economics and Preservation. Presentation Prepared for NARUC Subcommittee on Accounting and Finance Michael Purdie March 29, 2017

Nuclear Power Economics and Preservation. Presentation Prepared for NARUC Subcommittee on Accounting and Finance Michael Purdie March 29, 2017 Nuclear Power Economics and Preservation Presentation Prepared for NARUC Subcommittee on Accounting and Finance Michael Purdie March 29, 2017 What is NEI? Our mission is, with member participation: - Develop

More information

Draft Whitepaper to Platte River Board of Directors

Draft Whitepaper to Platte River Board of Directors Draft Whitepaper to Platte River Board of Directors Report on Organized Power Markets RTOs and ISOs Presented for the October 2016 Board Meeting Overview This report on the potential formation of a regional

More information

COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL. September 17, 2014

COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL. September 17, 2014 COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL September 17, 2014 The PJM Industrial Customer Coalition ("PJMICC") appreciates the opportunity to submit these

More information

An economic assessment of the benefits of storage in South Africa

An economic assessment of the benefits of storage in South Africa An economic assessment of the benefits of storage in South Africa by Jeremy Hargreaves, Energy & Environmental Economics and Paul Frink, Energy Solutions, Parsons Energy storage technologies have many

More information

14 August 08

14  August 08 We vegotthepower After thirty years treading water, the nuclear power industry in the US is undergoing a renaissance. Paul Hinnenkamp, vice president of nuclear business development for Entergy Corporation,

More information

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard Section-by-Section Summary SB 838, C-engrossed version As passed by Oregon House of Representatives, May 23 rd, 2007.

More information

Wisconsin's Public Benefits Approach to Quantifying Environmental Benefits: Creating Different Emissions Factors for Peak/Off-Peak Energy Savings

Wisconsin's Public Benefits Approach to Quantifying Environmental Benefits: Creating Different Emissions Factors for Peak/Off-Peak Energy Savings Wisconsin's Public Benefits Approach to Quantifying Environmental Benefits: Creating Different Emissions Factors for Peak/Off-Peak Energy Savings David Sumi, PA Government Services Inc. Jeff Erickson,

More information

Beyond LCOE: The Value of CSP with Thermal Energy Storage

Beyond LCOE: The Value of CSP with Thermal Energy Storage CSP Beyond LCOE: The Value of CSP with Thermal Energy Storage energy.gov/sunshot Mark S. Mehos, Program Manager, CSP NREL Discussion SunShot and LCOE Understanding the Value of CSP with Thermal Energy

More information

Seventh Northwest Conservation and Electric Power Plan

Seventh Northwest Conservation and Electric Power Plan Seventh Northwest Conservation and Electric Power Plan CHAPTER 19: METHODOLOGY FOR DETERMINING QUANTIFIABLE ENVIRONMENTAL COSTS AND BENEFITS AND DUE CONSIDERATION FOR ENVIRONMENTAL QUALITY, FISH AND WILDLIFE,

More information

Market Impact Assessment: Preliminary DAM Results Overview

Market Impact Assessment: Preliminary DAM Results Overview Market Impact Assessment: Preliminary DAM Results Overview Nicole Bouchez, Ph.D. Michael Swider Market Issues Working Group April 24, 2017, Rensselaer NY Agenda Overview of the Integrating Public Policy

More information

General Session. Four Decades of Pursuing a Diversified Energy Portfolio at MIKE KOTARA. Senior Vice President

General Session. Four Decades of Pursuing a Diversified Energy Portfolio at MIKE KOTARA. Senior Vice President General Session Four Decades of Pursuing a Diversified Energy Portfolio at CPS Energy SPEAKER MIKE KOTARA Senior Vice President CPS Energy CPS Energy Background Electric & Gas utility serving the greater

More information

Policy Direction for Alberta s Capacity Market Framework

Policy Direction for Alberta s Capacity Market Framework Policy Direction for Alberta s Capacity Market Framework August 15, 2017 Alberta Department of Energy Table of Contents Executive Summary... 1 1 Introduction... 2 2 Policy Direction for Alberta s Capacity

More information

Summary of 2016 MISO State of the Market Report

Summary of 2016 MISO State of the Market Report Summary of 2016 MISO State of the Market Report Presented to: MISO Board Markets Committee David B. Patton, Ph.D. MISO Independent Market Monitor July 20, 2017 Introduction As the Independent Market Monitor

More information

Executive Summary PSE Integrated Resource Plan. Contents. Chapter 1: Executive Summary

Executive Summary PSE Integrated Resource Plan. Contents. Chapter 1: Executive Summary 1 2017 PSE Integrated Resource Plan Executive Summary The IRP is best understood as a forecast of resource additions that appear to be cost effective given what we know today about the future. We know

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY The 2016 SD Electricity Supply Resource Procurement Plan The 2016 South Dakota Electricity Supply Resource Procurement Plan ( Plan ) evaluates NorthWestern Energy s ( NorthWestern

More information

2017 TEN-YEAR SITE PLANS

2017 TEN-YEAR SITE PLANS REVIEW OF THE 2017 TEN-YEAR SITE PLANS OF FLORIDA S ELECTRIC UTILITIES NOVEMBER 2017 Table of Contents List of Figures... iii List of Tables... v List of Ten-Year Site Plan Utilities... vii Executive

More information

Wind Generation s Contribution to the Management of Average Cost and Cost Volatility for Indiana

Wind Generation s Contribution to the Management of Average Cost and Cost Volatility for Indiana Wind Generation s Contribution to the Management of Average Cost and Cost Volatility for Indiana Marco Velástegui Douglas J. Gotham Paul V. Preckel David G. Nderitu Forrest D. Holland State Utility Forecasting

More information

Integrated Planning Model (IPM ) Overview

Integrated Planning Model (IPM ) Overview Integrated Planning Model (IPM ) Overview September 2010 Disclaimer This presentation, prepared by ICF under contract with RGGI, Inc., is designed to support ongoing evaluation of state RGGI programs.

More information

2015 Economic Planning Study Assumptions

2015 Economic Planning Study Assumptions 2015 Economic Planning Study Assumptions Erik Winsand, ATC Economic Planning May 13, 2015 atcllc.com Introduction Process Overview and Timeline MISO MTEP16 Futures Assumptions Next Steps atcllc.com 2 Process

More information

PACIFICORP DEMAND-SIDE RESOURCE POTENTIAL ASSESSMENT FOR

PACIFICORP DEMAND-SIDE RESOURCE POTENTIAL ASSESSMENT FOR PACIFICORP DEMAND-SIDE RESOURCE POTENTIAL ASSESSMENT FOR 2017-2036 VOLUME 1: EXECUTIVE SUMMARY Prepared for: PacifiCorp February 14, 2017 Applied Energy Group, Inc. 500 Ygnacio Valley Road, Suite 250 Walnut

More information

USEA Briefing Washington DC. Neil Kern, July 21, 2016

USEA Briefing Washington DC. Neil Kern, July 21, 2016 USEA Briefing Washington DC Neil Kern, July 21, 2016 Safe Harbor Statement This document includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section

More information

INTEGRATED RESOURCE PLAN

INTEGRATED RESOURCE PLAN HOOSIER ENERGY INTEGRATED RESOURCE PLAN 2016 UPDATE WHAT IS RESOURCE PLANNING? Key features Inputs Resource mix n Member input n Board policies n Regulatory requirements n Risk adjusted least cost Energy

More information

The Role of Efficiency In Meeting PNW Energy Needs

The Role of Efficiency In Meeting PNW Energy Needs The Role of Efficiency In Meeting PNW Energy Needs Tom Eckman Manager, Conservation Resources Conservation Energy Efficiency As A Resource September 29, 2009 Conservation Slide 1 Today s Topics Energy

More information

BC Hydro Revenue Requirements Application Information Request #1

BC Hydro Revenue Requirements Application Information Request #1 BC Hydro Revenue Requirements Application Information Request #1 C28-2 By: Ludo Bertsch, Horizon Technologies Inc. For: ESVI Energy Solutions for Vancouver Island Society Date: July 5, 2006 1.0) Reference:

More information

PJM Interconnection Economic Analysis of the EPA Clean Power Plan Proposal

PJM Interconnection Economic Analysis of the EPA Clean Power Plan Proposal PJM Interconnection Economic Analysis of the EPA Clean Power Plan Proposal March 2, 2015 This page is intentionally left blank. PJM 2015 www.pjm.com 2 P age Contents Executive Summary 6 Introduction and

More information

Review of Manitoba Hydro Export Price Forecast for Needs For and Alternatives To (NFAT)

Review of Manitoba Hydro Export Price Forecast for Needs For and Alternatives To (NFAT) Review of Manitoba Hydro Export Price Forecast for Needs For and Alternatives To (NFAT) Douglas J. Gotham Purdue University TABLE OF CONTENTS Introduction 1 Manitoba Hydro s Supporting Information 1 Transmission

More information

SPP at a Glance. Located in Little Rock. Approximately 600 employees

SPP at a Glance. Located in Little Rock. Approximately 600 employees SPP at a Glance Located in Little Rock Approximately 600 employees Primary jobs electrical engineering, operations, settlements, and IT 24 x 7 operation Full redundancy and backup site 2 Regulatory Environment

More information

Viewpoint. Renewable portfolio standards and cost-effective energy efficiency investment

Viewpoint. Renewable portfolio standards and cost-effective energy efficiency investment Viewpoint Renewable portfolio standards and cost-effective energy efficiency investment A. Mahone a, C.K. Woo a,b*, J. Williams a, I. Horowitz c a Energy and Environmental Economics, Inc., 101 Montgomery

More information

Potential Impacts of Environmental Regulation on the U.S. Generation Fleet

Potential Impacts of Environmental Regulation on the U.S. Generation Fleet Potential Impacts of Environmental Regulation on the U.S. Generation Fleet Final Report An Edison Electric Institute analysis prepared by: ICF International Steven Fine Shanyn Fitzgerald Jesse Ingram January

More information

100 Percent Renewable Electricity in Sri Lanka by 2050

100 Percent Renewable Electricity in Sri Lanka by 2050 100 Percent Renewable Electricity in Sri Lanka by 2050 A UNDP/ADB study Manila, 5 June 2017 Dr. Milou Beerepoot, Regional Technical Advisor, UNDP Outline Background to the study A scenario for 100% RE

More information

INTEGRATED RESOURCE PLANNING REPORT TO THE INDIANA UTILITY REGULATORY COMMISSION. Submitted Pursuant to Commission Rule 170 IAC 4-7

INTEGRATED RESOURCE PLANNING REPORT TO THE INDIANA UTILITY REGULATORY COMMISSION. Submitted Pursuant to Commission Rule 170 IAC 4-7 INTEGRATED RESOURCE PLANNING REPORT TO THE INDIANA UTILITY REGULATORY COMMISSION Submitted Pursuant to Commission Rule 170 IAC 4-7 November 2, 2015 ii Table of Contents TABLE OF CONTENTS... III LIST OF

More information

Update on FERC, NERC, DOE & Congress John P. Hughes President & CEO Electricity Consumers Resource Council Washington DC

Update on FERC, NERC, DOE & Congress John P. Hughes President & CEO Electricity Consumers Resource Council Washington DC Council of Industrial Boiler Owners Technical Focus Group, Energy & Environmental Committee Meetings September 12-13, 2017 Arlington, Virginia Update on FERC, NERC, DOE & Congress John P. Hughes President

More information

PERFORMANCE-BASED REGULATION

PERFORMANCE-BASED REGULATION PERFORMANCE-BASED REGULATION Aligning utility incentives with policy objectives and customer benefits A 21 st Century Electricity System Issue Brief By Advanced Energy Economy September 2017 San Francisco

More information

An Economic Assessment of the Benefits of Storage in South Africa. by Jeremy Hargreaves, Energy & Environmental Economics

An Economic Assessment of the Benefits of Storage in South Africa. by Jeremy Hargreaves, Energy & Environmental Economics An Economic Assessment of the Benefits of Storage in South Africa by Jeremy Hargreaves, Energy & Environmental Economics USTDA/IDC Storage Assessment IDC commissioned the South Africa Energy Storage Technology

More information

Highlights and Key Results

Highlights and Key Results Highlights and Key Results June 15, 2015 Eric Lantz National Renewable Energy Laboratory 1 Program Name or Ancillary Text eere.energy.gov Wind Vision: Goals Understand the potential role of wind power

More information

A Holistic Approach to Energy Management Presented by Ari Kobb Manufacturing in America March 14-15, 2018

A Holistic Approach to Energy Management Presented by Ari Kobb Manufacturing in America March 14-15, 2018 A Holistic Approach to Energy Management Presented by Ari Kobb Manufacturing in America March 14-15, 2018 Before we start A Penny for Your Thoughts Please share your thoughts about this seminar at the

More information

Methodology for calculating subsidies to renewables

Methodology for calculating subsidies to renewables 1 Introduction Each of the World Energy Outlook scenarios envisages growth in the use of renewable energy sources over the Outlook period. World Energy Outlook 2012 includes estimates of the subsidies

More information

Acreage Needed in 2050 for Renewable Generation to Meet California s GHG Emission Reduction Goals California Energy Commission May 9, 2011

Acreage Needed in 2050 for Renewable Generation to Meet California s GHG Emission Reduction Goals California Energy Commission May 9, 2011 Acreage Needed in 2050 for Renewable Generation to Meet California s GHG Emission Reduction Goals California Energy Commission May 9, 2011 The Energy Commission has developed a calculator to assist the

More information

Expanding Hydropower and Pumped Storage s Contribution to Grid Resiliency and Reliability RFI#: DE-FOA

Expanding Hydropower and Pumped Storage s Contribution to Grid Resiliency and Reliability RFI#: DE-FOA DATE: February 21, 2018 Expanding Hydropower and Pumped Storage s Contribution to Grid Resiliency and Reliability RFI#: DE-FOA-0001886 SUBJECT: Request for Information (RFI) RESPONSE DUE: April 6, 2018

More information

Optimization and Flexibility First: The Clear Case for Energy Storage

Optimization and Flexibility First: The Clear Case for Energy Storage Optimization and Flexibility First: The Clear Case for Energy Storage Ontario s Long-Term Energy Plan (2017) Submission of Energy Storage Canada (ESC) December 16, 2016 1 Executive Summary In the last

More information

PJM Perspective of the EPA Clean Power Plan: Analysis

PJM Perspective of the EPA Clean Power Plan: Analysis PJM Perspective of the EPA Clean Power Plan: Analysis Consortium for Energy Policy Research Harvard University March 9, 2015 Cambridge, MA Muhsin K. Abdur-Rahman Senior Market Strategist Paul M. Sotkiewicz,

More information

Power Generation Asset Optimization: Optimal Generating Strategies in Volatile Markets (Case Study) Presented at POWER-GEN 2001 Las Vegas, Nevada

Power Generation Asset Optimization: Optimal Generating Strategies in Volatile Markets (Case Study) Presented at POWER-GEN 2001 Las Vegas, Nevada Power Generation Asset Optimization: Optimal Generating Strategies in Volatile Markets (Case Study) Presented at POWER-GEN 2001 Las Vegas, Nevada Presented By: Jason Kram, Power Costs, Inc. Scott Stallard,

More information

The Transformation of the New England Electric Grid and the Importance of Situational Awareness Tools

The Transformation of the New England Electric Grid and the Importance of Situational Awareness Tools SEPTEMBER 26, 2017 SPRINGFIELD, MA The Transformation of the New England Electric Grid and the Importance of Situational Awareness Tools North American SynchroPhasor Initiative NASPI Work Group Meeting

More information

Tracking New Coal-Fired Power Plants

Tracking New Coal-Fired Power Plants Tracking New Coal-Fired Power Plants National Energy Technology Laboratory Office of Systems Analyses and Planning Erik Shuster February 18, 2008 a Tracking New Coal-Fired Power Plants This report is intended

More information

Before the Public Utilities Commission of the State of South Dakota. In the Matter of the Application of Black Hills Power, Inc.

Before the Public Utilities Commission of the State of South Dakota. In the Matter of the Application of Black Hills Power, Inc. Direct Testimony Mark Lux Before the Public Utilities Commission of the State of South Dakota In the Matter of the Application of Black Hills Power, Inc. For the Phase In of Rates Regarding Construction

More information

NEWFOUNDLAND BOARD OF PUBLIC UTILITIES DATA RESPONSES TO THE CONSUMER ADVOCATE. Provide a copy of the report to the Board concerning Newfoundland

NEWFOUNDLAND BOARD OF PUBLIC UTILITIES DATA RESPONSES TO THE CONSUMER ADVOCATE. Provide a copy of the report to the Board concerning Newfoundland NEWFOUNDLAND BOARD OF PUBLIC UTILITIES DATA RESPONSES TO THE CONSUMER ADVOCATE CA181 Provide a copy of the report to the Board concerning Newfoundland Power Company s Study of Innovative Approaches to

More information

The Decarbonized Electrification Pathway: Taking Stock of Canada s Electricity Mix and Greenhouse Gas Emissions to 2030.

The Decarbonized Electrification Pathway: Taking Stock of Canada s Electricity Mix and Greenhouse Gas Emissions to 2030. The Decarbonized Electrification Pathway: Taking Stock of Canada s Electricity Mix and Greenhouse Gas Emissions to 2030 Final Report Research commissioned by CanSIA and CanWEA Dave Sawyer dave@enviroeconomics.ca

More information

Contract For Biomass-Fueled Generation. Presentation to the Gainesville City Commission May 7, 2009

Contract For Biomass-Fueled Generation. Presentation to the Gainesville City Commission May 7, 2009 Contract For Biomass-Fueled Generation Presentation to the Gainesville City Commission May 7, 2009 Presentation Outline Project History And Description Market Changes Adjustments To Original Proposal Economic

More information

THERMAL EFFICIENCY OF GAS FIRED GENERATION IN CALIFORNIA

THERMAL EFFICIENCY OF GAS FIRED GENERATION IN CALIFORNIA STAFF PAPER THERMAL EFFICIENCY OF GAS FIRED GENERATION IN CALIFORNIA Michael Nyberg Electricity Analysis Office Electricity Supply Analysis Division California Energy Commission DISCLAIMER This paper was

More information

Energy Storage Value for New York

Energy Storage Value for New York Energy Storage Value for New York P R E S E N T E D A T : IPPNY Spring Conference P R E S E N T E D B Y Judy Chang Coauthors: Johannes Pfeifenberger Roger Lueken Martha Caulkins Heidi Bishop M a y 8, 2018

More information

Regulated Price Plan. Manual

Regulated Price Plan. Manual Regulated Price Plan Manual Ontario Energy Board Issued February 16, 2016 (Replacing version issued on November 5, 2013) NOTE TO READERS: The February 16, 2016 revisions update the time of use pricing

More information