1 STORMWATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITY Poindexter Street Streetscape Improvements Phases 3 & 4 Chesapeake, Virginia For City of Chesapeake Public Works Department 306 Cedar Road, 3 rd Floor Chesapeake, Virginia By Bay Environmental, Inc. 648 Independence Parkway, Suite 100 Chesapeake, Virginia June 17, 2009

2 TABLE OF CONTENTS 1.0 POLICY AND GENERAL PROCEDURES... 2 a. Registration Statement... 2 b. Stormwater General Permit Compliance... 2 c. Notice of Termination SITE AND ACTIVITY DESCRIPTION... 5 a. Nature of the Construction Activity... 5 b. Intended Sequence and Timing Of Major Soil-Disturbing Activities... 5 c. Dates of Activities on Site... 5 d. Estimated Total Site Area To Be Disturbed... 5 e. Potential Pollutant Sources... 5 f. Receiving Waters... 5 g. Location and Description of Industrial Activity Discharge... 6 h. Location Map... 6 i. Site Map... 6 j. Estimate of Runoff Coefficient... 7 k. Existing Site Vegetation... 7 l. Total Maximum Daily Load... 7 m. Impaired Waters POLLUTANT REDUCTION CONTROLS... 9 a. Erosion and Sediment Controls... 9 b. Management practices...11 c. Stormwater management...12 d. Other controls...12 e. Applicable state or local programs MAINTENANCE AND INSPECTIONS...13 a. Maintenance...13 b. Inspections...13 c. Non-stormwater discharges...14 LIST OF APPENDICES Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H Appendix I VSMP Registration Statement Contractor Certification Statement Inspection and Maintenance Report Forms Notice of Termination Form Record of Stabilization and Construction Activity Dates Approved Erosion and Sediment Control Site Plans SWPPP Construction Site Notice Topographical Vicinity Map Stormwater Calculations Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page i

3 STORMWATER POLLUTION PREVENTION PLAN POINDEXTER STREET STREETSCAPE IMPROVEMENTS PHASES 3 & 4 THIS STORMWATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES HAS BEEN PREPARED IN CONFORMANCE WITH 4 VAC ET SEQ. The primary purpose of this plan is to ensure that effective stormwater pollution prevention practices are implemented for this project. The document is designed to provide guidance to the Contractor doing so. This Stormwater Pollution Prevention Plan should be read in conjunction with the Poindexter Street, Streetscape Improvements Phases 3 & 4 Plans prepared by LandMark Design Group. The Development Plans are incorporated herein by reference and contain additional information regarding Erosion and Sediment Control, Stormwater Management, and General On-Site Construction Operations. Construction Site Owner: City of Chesapeake Public Works Department 306 Cedar Road, 3 rd Floor Chesapeake, Virginia Location of Construction Site: Poindexter Street, between Guerriere Street and Chesapeake Avenue Chesapeake, Virginia Remit the General Permit Fee Form with a copy of the Registration Statement to: Department of Conservation and Recreation Division of Finance, Accounts Payable Attn: Stormwater Permits 203 Governor Street Richmond, Virginia Send the General Permit Registration Statement with a copy of the Fee Form and fee check to: Department of Conservation and Recreation Stormwater Permitting 203 Governor Street, Suite 206 Richmond, VA Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 1

4 1.0 POLICY AND GENERAL PROCEDURES A stormwater pollution prevention plan (SWPPP) shall be developed prior to submission of a registration statement. It will be implemented during the construction activity covered by the permit. The purpose of the SWPPP is to identify potential sources of pollutants that could potentially affect quality of stormwater discharges from the construction site and describe control measures used to minimize pollutants in stormwater on site. A Virginia Stormwater Management Program Permit is required from the Virignia Department of Conservation and Recreation for all land disturbing activities that disturb greater than one acre, or for land disturbing activities that disturb greater than 2,500 square feet within an area designated as a Chesapeake Bay Preservation Act Resource Protection Area or Resource Management Area. a. Registration Statement The Owner will file a complete Registration Statement for coverage under a VSMP general permit for stormwater discharges from construction activities with the Virginia Department of Conservation and Recreation and verification of coverage received from the Department of Conservation and Recreation prior to the commencement of land disturbing activities exceeding the thresholds noted above. The appropriate filing fee must be submitted to the Department of Conservation and Recreation, Division of Finance before the general permit will be issued. b. Stormwater General Permit Compliance All contractors and subcontractors will sign the certification statement contained herein indicating knowledge of and intent to comply with the stormwater pollution prevention plans. Contractor is regarded as the primary agent for ensuring compliance with the SWPPP for this construction project. The Contractor will ensure compliance with the requirements of the VSMP - Virginia Stormwater Management Program Permit For Stormwater Discharges From Construction Sites, including but not limited to the following items: Implementation, Documentation, and Inspections Necessary for Compliance with Stormwater General Permit Implementation of the SWPPP as developed for the site and in accordance with the general permit requirements with regard to erosion and sediment control, post-construction stormwater management, and other controls regarding solid materials, sediments and dust, and the demonstrated compliance with applicable State and/or local waste disposal, sanitary sewer or septic system regulations. Retention of the SWPPP, registration statement, and acknowledgement letter from the permit-issuing authority at the construction site. The SWPPP must be made available to the department and permit issuing authority for review at the time of an on-site inspection. A copy of this SWPPP must be kept in the owner s permanent project records for at least three years following submission of the Notice of Termination. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 2

5 A sign including a copy of the permit coverage letter with the registration number for the construction activity must be posted at the construction entrance. This sign must also have the name of the contact person and phone number to request a SWPPP review. Amendment of the SWPPP whenever there is a change in design, construction, operation, or maintenance, which has a significant effect on the potential for the discharge of pollutants to the surface waters of the State, or if the Plan proves to be ineffective in eliminating or significantly minimizing pollutants from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed to correct problems identified. If approval by a plan-approving authority is necessary for the control measure, revisions to the SWPPP shall be completed within seven calendar days of approval. Documentation of the dates when major grading activities occur, when construction activities temporarily or permanently cease on a portion of the site, and when stabilization measures are implemented. Inspections of disturbed areas of the construction site and areas used for storage of materials that are exposed to precipitation that have not been finally stabilized, structural control measures, and locations where vehicles enter or exit the site will be conducted on either of the following schedules: (1) at least once every 14 calendar days and within 48 hours following any runoff producing storm event OR (2) at least every 7 calendar days. Reports summarizing the inspections will be made in accordance to the regulations and retained as part of the SWPPP. All contractors and subcontractors will sign a copy of the certification statement as described in the general permit before conducting any professional services at the site identified in the Plan. All certifications will be included in the Plan. The SWPPP must clearly identify the contractor or subcontractors that will implement and maintain each measure identified in the SWPPP. The SWPPP shall be revised to identify any new contractor that will implement a measure. All documents, records, reports, and other information relevant to the general permit regulations will be given to the owner following final stabilization of the site. Where the site has been finally stabilized and all stormwater discharges from construction activities that are authorized by the general permit are eliminated, two copies of a Notice of Termination will be prepared for the owner to sign and submit to the Department of Conservation and Recreation. The structural stability of the permitted facilities will be ensured. Prohibition and Reporting of Releases of Substances Other Than Stormwater Execution of reporting requirements is required in the event of non-compliance of the general permit or if any un-permitted, unusual or extraordinary discharge enters or could be expected to enter surface waters of the State. Prohibition of non-stormwater discharges except as provided for in the general permit. Appropriate pollution prevention measures for non-stormwater components of discharge will be implemented. Execution of reporting requirements of 40 CFR Part 117 (1992) and 40 CFR Part 302 (1992). In addition, the discharge of hazardous substances or oil in the stormwater discharge from the construction site will be prevented or minimized in accordance with the stormwater pollution prevention plan. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 3

6 Prohibition of discharge of hazardous substances, oil, or pollutants resulting from on-site spills or releases. Management Measures and Response to Unintentional Releases All waste collection, control, treatment, management of pollutant activities and disposal facilities will be operated in a manner consistent with the general permit regulations. All feasible steps to minimize any adverse impacts to State waters resulting from noncompliance with conditions specified in the general permit will be taken. All reasonable steps to minimize, correct or prevent any discharge in violation of the general permit which has a reasonable likelihood of adversely affecting human health or the environment will be taken. c. Notice of Termination Where the construction site has been finally stabilized and all stormwater discharges from construction activities that are authorized by this permit are eliminated, the permitee will submit a Notice of Termination within 30 days after all permit authorized construction activities have been completed. The terms and conditions of the permit will remain in effect until a completed Notice of Termination is submitted. Coverage under the permit will be deemed terminated 7 days after the date the Notice of Termination is signed. Appendix D contains a copy of the Notice of Termination Form. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 4

7 2.0 SITE AND ACTIVITY DESCRIPTION a. Nature of the Construction Activity The purpose of this project is to conduct streetscape improvements along Poindexter Street between Guerriere Street and Chesapeake Avenue in the City of Chesapeake, Virginia. The total area to be disturbed is 2.52 acres. b. Intended Sequence and Timing Of Major Soil-Disturbing Activities This project includes the following general construction elements in order of the sequence of construction: (1) Installation of erosion and sediment control measures (2) Demolition of former structures (3) Installation of new structures (4) Final stabilization c. Dates of Activities on Site The Contractor shall document the dates of major grading activities, dates when grading has temporarily or permanently ceased, and dates when stabilization measures were initiated. Appendix E of this SWPPP contains Record of Stabilization and Construction Activity Forms. d. Estimated Total Site Area To Be Disturbed The construction limits encompass an area of disturbance that is approximately 2.52 acres of land. e. Potential Pollutant Sources An Environmental Site Assessment has been performed by LandMark Design Group and will be made available to the Contractor. Elevated levels of petroleum products may be present in the soil and/or groundwater. Take necessary precautions to insure the safety of all construction workers including personal protective equipment. Dewatering, if appropriate, should be conducted and excavated soils should be lawfully disposed. Follow all VPDES requirements for groundwater sampling during dewatering. Other potential pollutant sources, such as earthwork operations during construction, vehicle fueling, and temporary sanitary waste facilities are expected to exist on-site. Storage of fertilizers or chemicals is not anticipated. f. Receiving Waters The on-site storm drain pipes drain in a westerly direction to Scuffletown Creek, a tributary of the Southern Branch of the Elizabeth River. No net increase in stormwater runoff is anticipated. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 5

8 g. Location and Description of Industrial Activity Discharge No industrial activity discharge is anticipated as part of the proposed project. h. Location Map A US Geologic Survey topographic quadrangle map of the site and its one mile vicinity is located in Appendix H. i. Site Map The Poindexter Street Streetscape Improvements Phases 3 & 4 Plan is enclosed in Appendix F showing the location and limits of construction. The site map in the SWPPP should reflect current on-site conditions. As such, the map can be marked up to depict necessary items. The following features are included in the site map and comments on them are listed below: (1) Direction of Final Storm Flows & Slopes On-site drainage will drain to the stormwater pipes. Final slopes are depicted on the plans. (2) Areas of Disturbed & Undisturbed Sites Areas of disturbed and undisturbed sites will be depicted on the mapping in Appendix F. (3) Location of Major Structural and Non-Structural Control Measures Both structural and non-structural controls have been adopted for this project and are included in the Demolition and Erosion Control Plan included as a part of the Development Plan. If deviations from this plan are made on-site they should be noted on the mapping included in Appendix F. (4) Location of Stabilization Practices The location of proposed stabilization areas are shown on the Demolition and Erosion Control Plans included as a part of the Development Plan. As stabilization practices are utilized on-site they should be noted on the mapping in Appendix F. (5) Surface Waters The surface water receiving stormwater discharge is an off-site stream known as Scuffletown Creek located southwest of the site. (6) Locations Where Concentrated Stormwater Discharges to a Surface Water Stormwater discharges do not drain to any on-site surface water. Instead, the on-site storm drain collects water and directs it an existing piped drainage system, which ultimately discharges into Scufflletown Creek. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 6

9 (7) Locations of Off-Site Material, Waste, Borrow or Equipment Storage Areas No off-site material, waste, borrow, or equipment storage areas are anticipated for this project. (8) Locations of Other Potential Pollution Sources Other potential pollution sources should be added to the map when they are placed on-site, and deleted from the map when removed. These sources include but are not limited to temporary fuel tanks, dumpsters, and portable restroom facilities. (9) Areas of Final Stabilization As the project is completed the site map will be updated to show areas where final stabilization has been achieved. (10) Existing and Planned Paved Areas and Buildings There are no existing or planned buildings. A majority of the site consists of sidewalks, curbs and gutters, and roadways. Therefore, a majority of the site is paved, and will be paved at the end of construction, as this is a streetscape improvements project. (11) Locations of Permanent Stormwater Management Practices Post-Construction There are no permanent stormwater management practices planned for post-construction. j. Estimate of Runoff Coefficient The runoff coefficient was estimated at 0.75 in the original SWPPP (March 23, 2006 prepared on behalf of the City of Chesapeake). The SWPPP stated that the runoff coefficient was not proposed to change after construction activities. k. Existing Site Vegetation Some trees and shrubs exist on-site. Strict adherence should be made to the clearing limits depicted on the Plans developed by LandMark Design Group. All trees not removed will be protected from construction activities as shown on the Plans. l. Total Maximum Daily Load The state waters that the project will discharge into do not have established total maximum daily load standards. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 7

10 m. Impaired Waters The state water that the project will discharge into is Scuffletown Creek, a tributary of the Southern Branch of the Elizabeth River. The Elizabeth River, and its tributaries, are designated as impaired waters by the Virginia Department of Environmental Quality. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 8

11 3.0 POLLUTANT REDUCTION CONTROLS a. Erosion and Sediment Controls Erosion and sediment control measures for this project consist of structural and non-structural controls. These measures are shown on the construction plan sheets in Appendix F with additional information in the project specifications. (1) An erosion and sediment control plan or an agreement in lieu of a plan shall be approved by the appropriate plan-approving authority for the land disturbing activity in accordance with the Virginia Erosion and Sediment Control Law ( et seq.) and regulations (4VAC50-30). Where applicable, a plan shall be developed in accordance with boardapproved annual general erosion and sediment control specifications. (2) All control measures required by the plan shall be designed, installed, and maintained in accordance with good engineering practices and the minimum standards of the Virginia Erosion and Sediment Control Law ( et seq. of the Code of Virginia) and regulations (4VAC50-30). The following additional information is provided to the Contractor for implementation of effective stabilization measures: (1) Provisions shall be made to minimize the transport of sediment onto the paved surface. Where sediment is transported onto a paved public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling, sweeping, and transporting to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual parcel lots as well as larger land disturbing activities. (2) Erosion and sediment control measures shall be installed and be made operational at the start of clearing operations. (3) The Contractor shall complete drainage facilities within thirty (30) days following the completion of rough grading at any point within the project. (4) Construction shall be sequenced so that grading operations can begin and end as quickly as possible. (5) Areas which are not to be disturbed shall be clearly marked by fencing, flags, signs, etc. (6) A. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant (undisturbed) for longer than thirty days. Permanent stabilization shall be applied to areas that are to be left dormant for more than thirty days. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 9

12 B. During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. C. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that, in the opinion of the local program administrator or his designated agent, is uniform, mature enough to survive and will inhibit erosion. The Contractor shall reseed areas as required to achieve the above. Hydroseeding may be used in place of mulching. D. Refer to spec section ST-01 for additional requirements on lawns and grades. (7) All storm sewer inlets that are operational during construction shall be protected so that sediment laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. (8) Cut and Fill Slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilization measures until the problem is corrected. (9) Periodic inspections and required maintenance shall be provided, especially after each significant storm. The project construction superintendent shall be responsible for the installation and maintenance of all erosion and sediment control measures. (10) All temporary erosion and sediment control measures shall be removed within thirty days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program administrator. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. (11) The terms and conditions of the City s VADEQ, VPDES, MS-3, and Stormwater Construction Permits, Spill Prevention Counter Measures Control Plan (SPCCP), and the Stormwater Pollution Prevention Plan shall be adhered to at all times. Temporary and permanent erosion and sediment control measures include, but are not limited to: Dust control Silt fence Silt fences are to be installed downslope of disturbed areas to filter sediment-laden runoff from sheet flow. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 10

13 Storm drain inlet protection All storm drain inlets shall be protected during construction. Sediment-laden water shall be filtered before entering the storm sewer inlets. Topsoiling All new topsoil shall be class b screened topsoil. Permanent seeding All permanent seeding shall be hydroseeded. Mulching Mulch straw or fiber will be used on topsoil areas which have been brought to final grade and have been seeded. This is to protect the slopes from erosion and to retain moisture until the new grass has become fully established. Soil stabilization blanket and matting A degradable soil stabilization blanket will be provided on slopes 3:1 or greater. These measures are in conformance with the minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook. Construction phase erosion and sediment controls are designed to retain sediment on-site to the maximum extent possible. Control measures will be installed, maintained and inspected by the Contractor in accordance with specifications, applicable codes and ordinances and good engineering practices. Erosion and sedimentation controls will be periodically inspected and maintained during construction and only removed once final stabilization of the site is achieved in accordance with the inspection schedule contained in the regulations. A record of these inspections will be maintained using the forms contained herein. b. Management practices (1) The plans should ensure that existing vegetation is preserved where possible and that disturbed portions of the site are stabilized. (2) The control measures must be properly selected, installed and maintained in accordance with good engineering practices and, where applicable, manufacturer specification. If periodic inspections or other information indicates a control has been used inappropriately, or incorrectly, the operator must replace or modify the control for site situations as soon as practicable and update the SWPPP in accordance with 4VAC50-60, the Final Construction General Permit, Section II C. (3) If sediment escapes the construction site, off-site accumulations of sediment must be removed as soon as practicable to minimize off-site impacts. If approval by a planapproving authority is necessary, control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. (4) Construction debris and construction chemicals exposed to stormwater shall be prevented from becoming a pollutant source in stormwater discharges. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 11

14 (5) Litter exposed to stormwater shall be prevented from becoming a pollutant source in stormwater discharges and the construction site shall be policed daily to control litter. c. Stormwater management This SWPPP is for a streetscape and drainage project. No post-construction stormwater management controls are proposed. d. Other controls (1) No solid materials, including building materials, garbage, and debris shall be discharged to surface waters of the state, except as authorized by a Clean Water Act 404 permit. (2) The Contractor shall ensure that compliance with applicable state or local waste disposal, sanitary sewer or septic system regulations is attained. (3) The Plans do not depict any on-site storage of construction or waste materials. Therefore, no materials are expected to be stored on-site. Should storage of waste materials occur appropriate sediment trapping measures will be employed. (4) An Environmental Site Assessment has been performed by LandMark Design Group and will be made available to the Contractor. Elevated levels of petroleum products may be present in the soil and/or groundwater. Take necessary precautions to insure the safety of all construction workers including personal protective equipment. Dewatering, if applicable, should be conducted and excavated soils should be lawfully disposed. Follow all VPDES requirements for groundwater sampling during dewatering. e. Applicable state or local programs The control measures implemented at the site shall be consistent with all applicable federal, state, or local requirements for erosion and sediment control and stormwater management. The SWPPP shall be updated as necessary to reflect any revisions to applicable federal, state, or local requirements that affect the control measures implemented at the site. The following plans are incorporated into this SWPPP by reference and are to be followed by the Contractor: Poindexter Street Streetscape Improvements Phases 3 & 4 Plans Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 12

15 4.0 MAINTENANCE AND INSPECTIONS a. Maintenance In general, all erosion and sediment control measures shall be checked after each rainfall or every fourteen days, whichever is most frequent, or alternatively, at least every seven days. These measures should be cleaned and repaired according to the following schedule: 1. Erosion and sediment control measures shall be checked regularly for undermining and deterioration and buildup or clogging with sediment. Corrective action will be taken immediately. 2. All seeded areas shall be checked regularly to see that a good stand is maintained. Areas shall be fertilized and re-seeded as necessary. 3. All temporary erosion and sediment control measures shall be disposed of within thirty (30) days after final site stabilization is achieved and vegetation is established. All control measures must be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. b. Inspections The Contractor will accomplish inspections and the Contractor will bear primary responsibility for inspections of all E & S devices and pollution prevention measures to ensure continuing effectiveness. The inspector must be considered qualified personnel. Qualified personnel means a licensed professional engineer, responsible land disturber (RLD), or other knowledgeable person who holds a certificate of competence from the board in the area of project inspection, is enrolled in the board s training program for project inspection or combined administrator, and successfully completes such program within one year of enrollment. Contractor inspections shall be conducted as follows: Either (1) at least once every 14 calendar days and within 48 hours following any runoff producing storm event OR (2) at least every 7 calendar days. Where areas have been finally or temporarily stabilized or runoff is unlikely due to winter conditions (e.g., the site is covered with snow or ice, or frozen ground exists) such inspections shall be conducted at least once every month. Inspections must include all areas of the site disturbed by construction activity, off-site areas (covered by the permit), and areas used for storage of materials that are exposed to precipitation. Inspectors must look for evidence of, or the potential for, pollutants entering a stormwater conveyance system. Control measures identified in the SWPPP shall be inspected for proper installation, maintenance, and operation. Discharge locations, where accessible, shall be inspected to ascertain whether control measures are effective in minimizing impacts to receiving waters. Where discharge locations are inaccessible, nearby downstream locations shall be inspected to the extent that such inspections are practicable. Locations where vehicles enter or exit the site shall be inspected for evidence of off-site sediment tracking. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 13

16 Utility line installation, pipeline construction, and other examples of long, narrow, linear construction activities may limit the access of inspection personnel to the areas described above. Inspection of these areas could require that vehicles compromise temporarily or even permanently stabilized areas, cause additional disturbance of soils, and increase the potential for erosion. In these circumstances, controls must be inspected on the same frequency as other construction projects, but representative inspections may be performed. For representative inspections personnel must inspect controls along the construction site for 0.25 miles above and below each access point where a roadway, undisturbed right-ofway or other similar feature intersects the construction site and allows access to the areas described above. The conditions of the controls along each inspected 0.25 mile segment may be considered as representative of the condition of controls along that reach extending from the end of the 0.25 mile segment to either the end of the next 0.25 mile segment, or to the end of the project, whichever occurs first. Inspection locations must be listed in the report (form is located in Appendix C). Major observations should include: the location(s) of discharges of sediment or other pollutants from the site; amount of rainfall at the construction site since the previous inspection; weather information and a description of any discharges occurring at the time of inspection; location(s) of control measures that need to be maintained; location(s) of control measures that failed to operate as designed or proved inadequate for a particular location; and location(s) where additional control measures are needed that did not exist at the time of inspection. Contractor shall prepare a report summarizing the scope of the inspection, names and qualifications of personnel making the inspection, the dates of the inspection, major observations relating to the implementation of the SWPPP, and actions taken in accordance with Stormwater Regulations. The report shall be made and retained as part of the SWPPP. Inspection reports shall identify any incidents of noncompliance and corrective action required. Where a report does not identify any incidents of noncompliance, the report shall contain a certification that the facility is in compliance with the stormwater pollution prevention plan and this permit. The report shall be signed in accordance with the permit. Copies of the report forms to be completed by the inspector are attached in Appendix C. The inspection reports will be signed in accordance with the permit requirements. These reports will be provided to the operator who will retain these documents as part of the SWPPP for at least three years from the date that permit coverage expires or is terminated. c. Non-stormwater discharges No non-stormwater discharges are anticipated from this project, other than possible discharges from dewatering. If dewatering activities occur, necessary precautions should be taken to insure the safety of all construction workers, due to elevated levels of petroleum which may exist in the on-site groundwater. In addition, appropriate sediment reduction devices and VPDES requirements for groundwater sampling should be employed during dewatering. Contractor is authorized to discharge the following non-stormwaters, if necessary: Discharges from fire fighting activities Fire hydrant flushing Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 14

17 Waters used to wash vehicles where detergents are not used Water used to control dust Potable water sources including waterline flushing Routine external building wash down which does not use detergents Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled materials has been removed) and where detergents are not used Uncontaminated air conditioning or compressor condensate Uncontaminated groundwater or spring water Foundation or footing drains where flows are not contaminated with process materials such as solvents Uncontaminated excavation dewatering Landscape irrigation Water for dust control, waterline flushing, and others listed above may constitute a nonstormwater discharge from the site during the construction period. All downstream sedimentation and erosion controls will be in place prior to any non-stormwater discharges. These discharges will be directed to areas that are stabilized to minimize erosion. Except as described above, discharges of material other than stormwater must be in compliance with a VPDES permit (other than the stormwater discharge permits referenced herein) issued for the discharge. Poindexter Street Streetscape Improvements Phases 3 & 4 June 17, 2009 Stormwater Pollution Prevention Plan Page 15

18 APPENDIX A VSMP REGISTRATION STATEMENT

19 5.OCR DepaItmef1t C((cflsavaticn &.Reae<1!~Jn (CN~R\!INC.VIR(JNt~SNATURAl. &.R!(RL~riOO~11[Sou~t$ VSMP General Permit for Discharges of Stormwater from Construction Activities (VAR10) Registration Statement (Please Type or Print All Information) 1. Construction Activity Operator (The permit will be issued to this operator, and the Certification in Item #13 must be signed by the appropriate pers '}i{ssociated with this ~erator [see the in%(uctions}j Name: ~ I'LLL J A). \UCA.14~. (r'.;=. / ' r -" " Mailing Address: C;..J.r!); M~.I.~M' Ce.Jo-r Ctly: Ctu..~~ State: uk:.. Zip: ::<~d~ Phone: 2. (Must be included f renewals of coverage only) Existing Permit Coverage #: ~ (:(2t!J1- Address: ~ - ~ 3. Location of Construction Activity Town, Name:---#~ City, County: ;;~~~ ~e 7~(71; State: ' Zip: ~"b0"l- -- ~ P6~ 3+r Decimaldegrees to the nearest 15 seconds: Latitude 'P6-.~ '1~/ L Longitude 76- "A{- Y7 Location of all Offsite Support Activities to be Covered Under the Permit Name: AI ~ Address: Town, City, or County: State: Zip: If street address unavailable: Latitude Longitude 4. Status of Activity: Federal 0 State (1iI Public 0 Private 0 (Check one only) 5. The Nature of the Construction Activity (e.g., commercial, industrial, residential, C}gricultural, oil and gas, etc.): 6. Name of the Receiving Water(s): Hydrologic UnitCode (HUC): (Receivingwaters identified as impaired on the 305(b)/303(d)Water QualityAssessment Integrated Report or for which a TMDL WLA has been establishedfor stormwater discharges from a constructionsite shall be noted in an attached list.) 7. If the discharge is through a Municipal Separate Storm Sewer System (MS, the name of the municipal ~~r tor of the storm sewer:... U 6t9~. 6'J-Si 8. EstimatedProjectStart Date(mm/dd/yyyy): EstimatedProjectCompletionDate(mm/dd/yyyy):~ Total Land Area of Development (to the nearest one-tenthacre): d--#s}. ~ EstimatedAreato be Disturbed(to the nearest one-tenthacre): d., s}.. ~. 10. Is the area to be disturbed by the construction activity part of a larger common plan of development or sale? YesO N~ 11. Arenutrientoffsets intendedto be acquired for this activity?yesd N~Under considerationo 12. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VSMP Permit for Discharges of Stormwater from Construction Activities crior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 13. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the,system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and ~ M. Signat imprisonment for knowing violations." p. Date:. c-~-~ - 0 t. G~ ' pnntn~~. /A.IIIV\.) E. Tille: ~~. ~~ (Please sign in INK. The person signing this form must be authorized to sign on behalf the operator identified in Item #1 above.) Mail to: Departmentof Conservation and Recreation, StormwaterPermitting,203 Governor Street, Suite 206 Richmond, VA23219 (DCR ) (03/09)

20 APPENDIX B CONTRACTOR CERTIFICATION STATEMENT

21 POINDEXTER STREET STREETSCAPE IMPROVEMENTS PHASES 3 & 4 CHESAPEAKE, VIRGINIA I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Signed: Company Name: CONTRACTOR S CERTIFICATION The contractor and subcontractor(s) that will implement the controls identified in this SWPPP must each sign a contractor s certification to be included in the SWPPP. I certify under penalty of law that I understand the terms and conditions of this Virginia Stormwater Management Program (VSMP) general permit that authorizes the stormwater discharges associated with land disturbing activities from the construction site identified as part of this certification. SIGNATURE (Name and Title) FOR (Company Address, Telephone) RESPONSIBLE FOR Date: Date: Date:

22 APPENDIX C INSPECTION AND MAINTENANCE REPORT FORMS

23 POINDEXTER STREET STREETSCAPE IMPROVEMENTS PHASES 3 & 4 CHESAPEAKE, VIRGINIA STORMWATER POLLUTION PREVENTION PLAN INSPECTION AND MAINTENANCE REPORT FORM Note: This form (3 pages) is to be completed either (1) at least once every 14 calendar days and within 48 hours following any runoff producing storm event OR (2) at least every 7 calendar days. INSPECTOR: PHONE #: DATE: TIME: WEATHER CONDITIONS: INSPECTOR S QUALIFICATIONS: DAYS SINCE LAST RAINFALL: AMOUNT OF LAST RAINFALL INCHES CURRENT STAGE OF CONSTRUCTION: HAVE REQUESTED CHANGES TO SWPPP BEEN IMPLEMENTED? yes / no HAS SEDIMENT DISCHARGED SINCE LAST INSPECTION? yes / no LOCATION OF DISCHARGES OF SEDIMENT OR OTHER POLLUTANTS FROM THE SITE: IS THE SITE IN COMPLIANCE WITH THE SWPPP AND GENERAL PERMIT? yes / no ITEMS INSPECTED ITEM # POLLUTANT CONTROL MEASURE IMPLEMENTED? IN COMPLIANCE? 1 Updated SWPPP located on site 2 Construction Entrance 3 Sediment Barriers 4 Storage/Disposal areas REQUESTED ACTION TO BE TAKEN or RELEVANT NOTES ABOUT CONTROL MEASURE 5 Sediment traps 6 Check dams 7 Storm drain inlet protection 8 Silt fence

24 9 Diversion Dike(s) 10 Tree Protection Temporary stabilization of denuded areas Stockpiles are stabilized or BMP s are in place? Permanent stabilization provided within 14 days of activity 14 Adequate permanent stabilization 15 Turbidity curtains installed & maintained 16 Public roads free of debris Discharge points free of sediment deposits at receiving waters Natural resources protected with BMP s Trash/litter collected & dumpsters covered Vehicle and equipment fueling, cleaning, & maintenance areas free from spills, leaks and other deleterious material Temporary fuel tanks in accordance with SWPPP permit, location and containment systems Washout facilities clearly marked and maintained Wash water dewatering discharges properly controlled Dewatering structures/sediment trapping devices in place All applicable regulations for working in or crossing live watercourses are being met Are utility trenches stabilized properly All temporary control structures that are no longer needed have been removed All control structure repairs and sediment removal have been performed A sign located near the site entrance is displaying the permit cover letter Rainfall is being recorded for the site s vicinity 31 Other Observations

25 POINDEXTER STREET STREETSCAPE IMPROVEMENTS PHASES 3 & 4 CHESAPEAKE, VIRGINIA STORMWATER POLLUTION PREVENTION PLAN INSPECTION AND MAINTENANCE REPORT FORM CHANGES REQUIRED TO THE POLLUTION PREVENTION PLAN: REASONS FOR CHANGES: CHANGES MADE BY: ON OR BEFORE: I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. PRINT NAME AND TITLE OF CONTRACTOR: SIGNATURE: DATE & TIME: PRINT NAME AND TITLE OF INSPECTOR: SIGNATURE: DATE & TIME: NOTICE GIVEN TO: DATE & TIME: NOTICE GIVEN BY:

26 APPENDIX D NOTICE OF TERMINATION FORM

27 1. Construction Activity Operator: VSMP General Permit Notice of Termination - Construction Activity Stormwater Discharges (VAR10) (Please Type or Print All Information) Name: Mailing Address: City: State: Zip: Phone: 2. Name and Location of Construction Activity (As listed on registration statement): Name: Address: City, Town or County: State: Zip: If street address unavailable: Latitude Longitude 3. VSMP Stormwater General Permit Number: 4. The Reason for Terminating Coverage Under the General Permit (The construction activity operator may only submit a Notice of Termination after one or more of the conditions below have been met): Necessary post-construction control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible; Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; Coverage under an alternative VPDES or VSMP permit has been obtained; or For residential construction only, temporary stabilization has been completed and the residence has been transferred to the homeowner. The Notice of Termination must be submitted within 30 days of one of the above conditions being met. Authorization to discharge terminates at midnight on the date that the Notice of Termination is submitted. 5. Permanent Control measures Installed: Attach a list of permanent control measures (both structural and non-structural) that will be installed at the construction site. For each BMP, include the following information: (a) Type of control measure installed and the date that it became functional as a permanent control measure; (b) Geographic location (county or city and Hydrologic Unit Code) (latitude and longitude may additionally be included if available); (c) Waterbody the control measures discharge into; and, (d) Number of acres that will be treated (to the nearest one-tenth of an acre). If no permanent control measures were installed please check this box 6. Participation in a Regional Stormwater Management Plan: Where applicable, attach the following information related to participation in a regional stormwater management plan: (a) type of regional facility to which the site discharges; (b) geographic location of any regional facility to which the site discharges (county or city and Hydrologic Unit Code); (c) geographic location of the site (county or city and Hydrologic Unit Code) (latitude and longitude may additionally be included if available); and (d) number of acres treated by a regional facility. 7. Nutrient Offsets: Where applicable, attach the following information related to nutrient offsets that were acquired in accordance with :1 of the Code of Virginia: (a) name of the broker from which offsets were acquired; (b) geographic location (county or city and Hydrologic Unit Code) of the broker s offset generating facility; (c) number of nutrient offsets acquired (lbs. per acre per year); and (d) nutrient reductions achieved on site (lbs. per acre per year). 8. Certification: "I certify under penalty of law that I have read and understand this notice of termination and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Print Name: Signature: Title: Date: (DCR ) (03/09) (Please sign in INK. The person signing this form must be associated with the operator identified in Item #1 above.) Mail to: Department of Conservation and Recreation Stormwater Permitting 203 Governor Street, Suite 206 Richmond, VA 23219

28 INSTRUCTIONS for FORM DCR VSMP General Permit Notice of Termination - Construction Activity Stormwater Discharges General A VSMP General Permit Notice of Termination must be submitted when an operator no longer wishes to be covered under the VSMP General Permit for Stormwater Discharges from Construction Activities. Mail to: Department of Conservation and Recreation Stormwater Permitting 203 Governor Street, Suite 206 Richmond, VA Section 1 Activity Operator Information Give the legal name of the person, firm, public organization, or any other entity that was issued the general permit for the site described in this Notice of Termination. Do not use a colloquial name. Enter the complete address and phone number of the operator. Section 2 Activity Location Information Enter the activity's official name and complete street address, including city, state and ZIP code. If the activity or site lacks a street address, indicate the latitude and longitude to the nearest 15 seconds of the approximate center of the site. Section 3 Permit Information Enter the existing VSMP Stormwater General Permit number assigned to the activity or site identified in Section 1 that the operator wishes to be terminated. Section 4 Reason for Termination Check the appropriate statement indicating the reason for submitting this Notice of Termination. The Notice of Termination may only be submitted after one or more of the following conditions have been met: 1. Necessary post-construction control measures included in the SWPPP for the site are in place and functioning and final stabilization has been achieved on all portions of the site for which the operator is responsible; 2. Another operator has assumed control over all areas of the site that have not been finally stabilized; 3. Coverage under an alternative VPDES or VSMP permit has been obtained; or 4. For residential construction only, temporary stabilization has been completed and the residence has been transferred to the homeowner. The Notice of Termination must be submitted within 30 days of one of the above conditions being met. Authorization to discharge terminates at midnight on the date that the Notice of Termination is submitted. Section 5 Permanent Control Measures Installed Attach a list of the permanent control measures (both structural and non-structural) that will be installed at the construction site. For each control measure, include the following information: (a) Type of control measure installed (b) Geographic location (county or city and Hydrologic Unit Code) (c) Waterbody the control measure discharge into (d) Number of acres that will be treated (to the nearest one-tenth of an acre) Check the box if no permanent control measures were installed. Section 6 Participation in a Regional Stormwater Management Plan Where applicable, attach the following information related to participation in a regional stormwater management plan: (a) type of regional facility to which the site discharges; (b) geographic location of any regional facility to which the site discharges (county or city and Hydrologic Unit Code); (c) geographic location of the site (county or city and Hydrologic Unit Code) (latitude and longitude may additionally be included if available); and (d) number of acres treated by a regional facility. Section 7 Nutrient Offsets Where applicable, attach the following information related to nutrient offsets that were acquired in accordance with :1 of the Code of Virginia: (a) name of the broker from which offsets were acquired; (b) geographic location (county or city and Hydrologic Unit Code) of the broker s offset generating facility; (c) number of nutrient offsets acquired (lbs. per acre per year); and (d) nutrient reductions achieved on site (lbs. per acre per year). Section 8 Certification State statutes provide for severe penalties for submitting false information on this Notice of Termination. State regulations require this Notice of Termination to be signed as follows: For a corporation: by a responsible corporate officer. For the purpose of this section, a responsible corporate officer means: (1) A president, secretary, treasurer, or vicepresident of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (2) the manager of one or more manufacturing, production, or operating facilities provided the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures For a partnership or sole proprietorship: by a general partner or the proprietor; or For a municipality, state, Federal, or other public facility: by either a principal executive officer or ranking elected official. The Department of Conservation and Recreation reserves the right to request additional information not directly addressed by the registration statement if, in its discretion, a facility or operation poses a potential impact on water quality. (DCR ) (03/09)

29 APPENDIX E RECORD OF STABILIZATION AND CONSTRUCTION ACTIVITY DATES

30 RECORD OF STABILIZATION AND CONSTRUCTION ACTIVITY Major Grading Activities Date Grading Temporarily or Permanently Ceased Date

31 Stabilization Measures Initiated Date

32 APPENDIX F APPROVED EROSION AND SEDIMENT CONTROL SITE PLANS

33 Plans are included in the original hard copy, but are not included in the Adobe Acrobat Version due to file size.

34 APPENDIX G SWPPP CONSTRUCTION SITE NOTICE The SWPPP Construction Site Notice must be completed and made weatherproof by the Contractor. It must then be posted at the main construction entrance in a readable location at the jobsite. The project-specific VSMP Permit Authorization for the construction site shall be made weatherproof by the Contractor and prominently posted by the Contractor with the SWPPP Construction Site Notice.

35 SWPPP CONSTRUCTION SITE NOTICE FOR THE VSMP GENERAL PERMIT City Project Name and Number City Project Inspector Contact Information Contractor Name & Number Project Description

36 APPENDIX H TOPOGRAPHICAL VICINITY MAP

37

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum LOUISIANA URBAN STORMWATER COALITION EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum SWPPP NOTIFICATION SIGN Post sign at entrance of site or areas where the public can easily access.

More information

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction

More information

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth

More information

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Small Construction Sites

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Small Construction Sites Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Small Construction Sites National Pollutant Discharge Elimination System (NPDES) General Permit # Prepared for: Date: Prepared

More information

Storm Water Pollution Prevention Plan (SWPPP)

Storm Water Pollution Prevention Plan (SWPPP) Storm Water Pollution Prevention Plan (SWPPP) In Compliance with: Storm Water Construction General Permit No. VAR10 Virginia Stormwater Management Program (VSMP) Westbrook Fairfax County, Virginia WSSI

More information

Module 4 Regulatory requirements for Land Disturbing Activities

Module 4 Regulatory requirements for Land Disturbing Activities Module 4 Regulatory requirements for Land Disturbing Activities MODULE 4 REGULATORY REQUIREMENTS FOR A LDA Module 4a Overview MODULE 4A REGULATORY REQUIREMENTS FOR A LDA ESC Regulations Overview 1990 First

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY 1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations

More information

COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia Tel.

COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia Tel. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Tel. (434) 296-5832 Fax (434) 972-4126 Stormwater Pollution Prevention Plan (SWPPP)

More information

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Tel. (434) 296-5832 Fax (434) 972-4126 Stormwater Pollution Prevention Plan (SWPPP)

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

SITE DESIGN ENGINEER'S STATEMENT:

SITE DESIGN ENGINEER'S STATEMENT: SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED

More information

11 Ways to Avoid Storm Water Fines. No Exceptions!

11 Ways to Avoid Storm Water Fines. No Exceptions! 11 Ways to Avoid Storm Water Fines Do not start until you have gone over this with a SWPPP Rep. No Exceptions! 1. Contact Mark Atwood at 801-319-1331 or Jake Pettersson at 801-709-4463. 2. Submit a Notice

More information

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

Nevada Department of Transportation (NDOT)

Nevada Department of Transportation (NDOT) Nevada Department of Transportation (NDOT) Stormwater Pollution Prevention Plan (SWPPP) Template for Construction Activities NDOT STORMWATER COMPLIANCE & ENFORCEMENT Table of Contents Page # STORM WATER

More information

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012 State of Georgia Department of Natural Resources Environmental Protection Division For official use only NOTICE OF INTENT NOI - Version 2012 For Coverage Under NPDES General Permit GAR050000 (2012 IGP)

More information

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants

More information

Construction site inspections are conducted for all projects that receive an approved site plan and proceed to construction.

Construction site inspections are conducted for all projects that receive an approved site plan and proceed to construction. Standard Operating Procedures for implementation of the Stormwater, Erosion and Sedimentation Inspection Program for Construction Sites Discharging Stormwater to the MS4 Construction site inspections are

More information

Module 3. Module 3a. As of July : A lot of local ESC ordinances are out of date! Virginia Erosion & Sediment Control Program

Module 3. Module 3a. As of July : A lot of local ESC ordinances are out of date! Virginia Erosion & Sediment Control Program Module 3. Virginia Erosion & Sediment Control Program Module 3a. Statutory and Regulatory Requirements: Virginia Erosion and Sediment Control Law and Regulations As of July 1 2013: A lot of local ESC ordinances

More information

Small Site Stormwater Quality Permit Application

Small Site Stormwater Quality Permit Application Small Site Stormwater Quality Permit Application PUBLIC WORKS ADMINISTRATION BUILDING (PWA) STORMWATER DIVISION 2525 WEST FIRST STREET LOVELAND, CO 80537 GENERAL INFORMATION (970) 962-2772 www.cityofloveland.org/stormwater

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018 STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -

More information

CITY OF MANASSAS NPDES PHASE II STORMWATER PERMIT VSMP SMALL MS4 PROGRAM PLAN MINIMUM MEASURES AND BEST MANAGEMENT PRACTICES

CITY OF MANASSAS NPDES PHASE II STORMWATER PERMIT VSMP SMALL MS4 PROGRAM PLAN MINIMUM MEASURES AND BEST MANAGEMENT PRACTICES Public education Publish an article that addresses stormwater issues such as recycling, yard waste collection, hazardous waste handling, and illegal discharges Publish at least 2 articles a year in a local

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL

More information

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP) Elements of the Storm Water Management Plan Storm Water Pollution Prevention Plan (SWPPP) Small Construction Site Storm Water Management Rodney Hendrick Water Quality Specialist LSU Ag Center Plan Requirements

More information

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Arlington s New Stormwater Management Ordinance. Informational Meeting May 28, 2014

Arlington s New Stormwater Management Ordinance. Informational Meeting May 28, 2014 Arlington s New Stormwater Management Ordinance Informational Meeting May 28, 2014 Outline Overview Plan submission and review P2 plan/implementation Construction inspection SWMF construction Landscape

More information

JEFFERSON COUNTY STORM WATER MANAGEMENT

JEFFERSON COUNTY STORM WATER MANAGEMENT JEFFERSON COUNTY STORM WATER MANAGEMENT B-210 Courthouse, Birmingham, Alabama 35203 Telephone: (205) 325-8741 Erosion and Sedimentation Control Measures for Commercial Projects (Plans Requirements) -All

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

Virginia Stormwater Management Permitting

Virginia Stormwater Management Permitting Virginia Stormwater Management Permitting Construction Activities J. Douglas Fritz Overview of VSMP Construction Stormwater Permitting Discharges from regulated Construction Activities are industrial discharges

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to

More information

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs) VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM B - ANIMAL FEEDING OPERATIONS (AFOs) Department of Environmental Quality Rev. 02-2013 VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR All the documents shown today are in the MN Stormwater Manual on the page titled 2018 Construction Stormwater Permit Public Notice and Public Informational

More information

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009 Clean Water Act Industrial Stormwater Applicability Flowchart July 2009 Office of Compliance Office of Enforcement and Compliance Assurance U.S. Environmental Protection Agency 1200 Pennsylvania Avenue,

More information

RESIDENTIAL BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive

More information

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

Ordinance amending the San Francisco Public Works Code by adding Article 4.2, FILE NO. ORDINANCE NO. 1 [Stormwater Management.] Ordinance amending the San Francisco Public Works Code by adding Article., sections., requiring the development and maintenance of stormwater management

More information

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE 62-621.300(7)(b), F.A.C.) For FDEP Internal Use Only Permit : FLR INSTRUCTIONS:

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Virginia Stormwater Management Program SPECIFIC SUBJECT: Application of the

More information

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed Ordinance Controlling Construction Site Soil Erosion, Sediment, and Other Wastes and Storm Water Runoff Part III.G.2:

More information

Whitewater River Region SWMP. APPENDIX L BMPs for Fire Fighting Agency Activities

Whitewater River Region SWMP. APPENDIX L BMPs for Fire Fighting Agency Activities Whitewater River Region SWMP APPENDIX L June 2009 INTENT The purpose of this plan is to identify Best Management Practices (BMPs) used by fire fighting agencies for management of Urban Runoff in the Whitewater

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN

CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN Chapter Organization 9.1 Purpose... 9-1 9.2 Applicability... 9-1 9.2.1 Exemptions... 9-2 9.3 Design Criteria... 9-3 9.4 Erosion and Sediment Control (ESC)

More information

Appendix B Stormwater Pollution Prevention Plan Outline

Appendix B Stormwater Pollution Prevention Plan Outline Outline Annotated Outline of SWPPP Components to meet General Permit Requirements This appendix presents a recommended structure for a traditional construction site Stormwater Pollution Prevention Plan

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION TOWN OF WAYLAND MASSACHUSETTS 01778 CONSERVATION COMMISSION TOWN BUILDING 41 C0CHITUATE ROAD TELEPHONE: (508) 358-3669 FAX: (508) 358-3606 Wayland s Wetlands and Water Resources Bylaw CHAPTER 194 (D-768)

More information

Town of Fortville Utility Street Standards

Town of Fortville Utility Street Standards Town of Fortville Utility Street Standards SECTION 02101 - TEMPORARY EROSION AND DUST CONTROL PART 1 - GENERAL 1.1 DESCRIPTION A. Temporary Erosion and Dust Control measures must meet the current Town

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

STORMWATER POLLUTION PREVENTION PLAN

STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN TOWN OF WHITE BEAR, MINNESOTA Date: May 31, 2006 Project No. 13597.000 White Bear Township Storm Water Pollution Prevention Plan BMPS Following are the BMPs included

More information

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

STORMWATER POLLUTION PREVENTION PLAN (SWP3) City of Moore, Oklahoma Community Development Department 301 North Broadway Moore, Oklahoma 73160 STORMWATER POLLUTION PREVENTION PLAN (SWP3) The SWP3 is a written narrative describing the site, potential

More information

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES S107J31-1215 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES October 26, 2015 SECTION 106 CONTROL OF MATERIAL Section 106.08 Storing Materials of the Specifications

More information

APPENDIX G Fire BMPs

APPENDIX G Fire BMPs APPENDIX G Fire BMPs BEST MANAGEMENT PRACTICES Plan for URBAN RUNOFF MANAGEMENT PARTICIPATING RIVERSIDE COUNTY FIRE FIGHTING AGENCIES City of Corona Fire Department City of Hemet Fire Department City of

More information

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN Bates College 55 & 65 Campus Avenue Housing Lewiston, Maine Introduction The following plan outlines the anticipated inspection and maintenance procedures

More information

Hazardous Waste Management

Hazardous Waste Management Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective

More information

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance

More information

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180 EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: 1-16-07 (Rev 1-15-08) SP1 G180 General Schedule and conduct construction activities in a manner that will minimize soil erosion and the resulting sedimentation

More information

City of Grand Junction Illicit Discharge Detection and Elimination Manual

City of Grand Junction Illicit Discharge Detection and Elimination Manual City of Grand Junction Illicit Discharge Detection and Elimination Manual A. IDDE Program Goals The goal of the Illicit Discharge Detection and Elimination (IDDE) Program is, to the maximum extent practicable,

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Virginia Stormwater Management Program SPECIFIC SUBJECT: Application of the

More information

Appendix C.1 Page. Best Management Practices for. Municipal Activities

Appendix C.1 Page. Best Management Practices for. Municipal Activities Appendix C.1 Best Management Practices for Municipal Activities In accordance with Section F.3.a of the Permit, the City of La Mesa has developed an inventory of BMPs that may be implemented at high, medium,

More information

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide Roscommon County SESC Program 500 Lake Street Roscommon, Michigan 48653 Phone: 989-275-8323 Fax: 989-275-8640 Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide INCLUDED ATTACHMENTS

More information

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit) CHESAPEAKE BAY TMDL ACTION PLAN (2013 2018 MS4 General Permit) Piedmont Virginia Community College A Plan for Achieving a 5% Reduction of Existing Loads June 30, 2015 Main Campus This plan satisfies the

More information

Chapter 6 Regulations and Requirements

Chapter 6 Regulations and Requirements Chapter 6 Regulations and Requirements The information in this chapter is provided to help you comply with other Tacoma and Washington State regulations, which may apply to your project, industry or business

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES

City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES ANNUAL SUBMITTAL FORM DEADLINE: 5:00 PM ON FEBRUARY 15, 2017

More information

Common Plan of Development Storm Water Pollution Prevention Plan for: Operator(s):

Common Plan of Development Storm Water Pollution Prevention Plan for: Operator(s): Common Plan of Development Storm Water Pollution Prevention Plan for: Insert Subdivision Name Address City, State, Zip Code Operator(s): Insert Company Name Company Representative Name Address City, State,

More information

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Erosion and Sediment Control Plan for a Timber Harvesting Operation 3930-FM-WM0155 Rev. 7/2004 Erosion and Sediment Control Plan for a Timber Harvesting Operation 1. GENERAL INFORMATION A. Location Municipality B. Timber sale area = acres Date County C. Landowner Name

More information

Stormwater Construction General Permit CGP-2013

Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit (CGP) Stormwater Outreach for Regional Municipalities MS4 Statewide Summit June 18, 2013 Prepared by Chris Henninger

More information

National Pollutant Discharge Elimination System Stormwater Program MS4 Annual Report Format

National Pollutant Discharge Elimination System Stormwater Program MS4 Annual Report Format Annual Report Format National Pollutant Discharge Elimination System Stormwater Program MS4 Annual Report Format Check box if you are submitting an individual Annual Report with one or more cooperative

More information

SITE PLAN Scale 1"= 10'

SITE PLAN Scale 1= 10' Data Input Area (yellow shading) Site Plan Name = PS 58 Rehab Site Plan Address = 716B Prescott Circle If double frontage lot, enter "1" If modifying developed site, enter "1" 1 Total area of the site

More information

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control Inspecting Construction Site BMPs Kristin Kerr EOA, Inc. Outline of Presentation Back to Basics Erosion and Sediment Control Good Site Non-Stormwater Run-on and Run-off Control Construction Inspection

More information

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN May, 2017 CITY OF MERCER ISLAND 2017 S T O R M W A T E R M A N A G E M E N T P R O G R A M ( S W M P ) P L A N May 2017 City of Mercer

More information

STORM WATER MANAGEMENT PLAN

STORM WATER MANAGEMENT PLAN STORM WATER MANAGEMENT PLAN Table of Contents Executive Summary ES.1 Overview of pg. ES-1 ES.2 Program Management pg. ES-1 ES.3 Program Development and Implementation pg. ES-1 ES.4 Proposed Strom Water

More information

POLLUTION PREVENTION AFTER CONSTRUCTION

POLLUTION PREVENTION AFTER CONSTRUCTION POLLUTION PREVENTION AFTER CONSTRUCTION..CHAPTER.. 10 This chapter describes the pollution prevention measures to be taken once the site has been permanently and finally stabilized and no additional construction

More information

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM Page 1 of 10 INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM S A N F R A N C I S C O P U B L I C U T I L I T I E S C O M M I S S I O N Wastewater Enterprise/Collection System Division 3801

More information

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Appendix K: Soil Erosion and Sedimentation Control Plan Check List Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT

More information

DOCUMENT SPECIAL PROVISIONS

DOCUMENT SPECIAL PROVISIONS DOCUMENT 00813 SPECIAL PROVISIONS ADDENDUM NO. 1, DECEMBER 16, 2016 PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING STEEL FOR CONTRACTS BID ON OR AFTER APRIL 5, 2011 ENGLISH UNITS December 12, 2016

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE I Bob STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE Permit Years 1through 5 (June 1, 2013 to June 1, 2018) Submitted to Maine DEP December 2013 Revised April 2014 Table of Contents

More information

QSD/QSP Training Module 9 SWPPP Preparation

QSD/QSP Training Module 9 SWPPP Preparation QSD/QSP Training Module 9 SWPPP Preparation Anna Lantin, P.E., CPESC, CPSWQ Overview and Learning Objectives Given a project Risk Level or LUP Type, you will learn to: Prepare a compliant SWPPP Determine

More information

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517) Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION

More information

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

Building Permit Application Office Use Only Please Print Clearly in Ink or Type APPLICANT INFORMATION City of Bowling Green Neighborhood and Community Services 707 E. Main Ave PO Box 430 Bowling Green, KY 42102 0430 Phone: 270 393 3676 & 270 393 3615 Fax: 270 393 3223 www.bgky.org

More information

FACT SHEET STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION

FACT SHEET STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION FACT SHEET STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMITS NO. GAR100001, NO. GAR100002 and NO. GAR100003

More information

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation

More information

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative Model Poultry Burial E&S Plan (7-2-15) 1. GENERAL INFORMATION Name of project Name of person responsible Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative Address Phone number Municipality

More information

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields 4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater

More information

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities Development Services 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 issaquahwa.gov Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction

More information

Module 1: Construction Site Erosion Control

Module 1: Construction Site Erosion Control Module 1: Construction Site Erosion Control Problems and Regulations Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL Problems Associated with Erosion

More information

SECTION 903 EROSION CONTROL

SECTION 903 EROSION CONTROL SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,

More information

CITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS

CITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS CITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS July 2009 TABLE OF CONTENTS CHAPTER Chapter 1: Purpose... 2 Chapter 2: Definitions...2-4 Chapter 3: Disclaimer of Liability....4

More information

Virginia Department of Transportation Pollutant Discharge Elimination System

Virginia Department of Transportation Pollutant Discharge Elimination System Virginia Department of Transportation Pollutant Discharge Elimination System General Permit for Stormwater Discharges from Small Municipal Separate Storm Sewer Systems Serving the Urbanized Areas of Virginia

More information

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois Storm Water Pollution Prevention Plan Wastewater Treatment Facility and Streets & Parks Facility Village of Fox River Grove, Illinois Village of Fox River Grove, Illinois Storm Water Pollution Prevention

More information

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist UMD Storm Water Program Construction Requirements Greg Archer, MBA Environmental Compliance Specialist Phase 2 Regulatory Overview Dec. 1999 EPA issues Phase 2 Federal Register Municipalities (MS4) from

More information