Silver Line Phase III Hazardous Materials Technical Appendix

Size: px
Start display at page:

Download "Silver Line Phase III Hazardous Materials Technical Appendix"

Transcription

1 Silver Line Phase III Hazardous Materials Technical Appendix Introduction This Technical Appendix contains a description of hazardous materials release locations occurring within the limits of construction for the core section and each alignment alternative of the Silver Line Phase III Project, including the Charles Street, Tremont Street, Columbus Avenue, and Stuart Street alternatives. Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup records were reviewed for sites within the vicinity of the proposed alignments. A total of 33 releases of oil and hazardous materials were reported in the vicinity of the alignments. Twenty-seven of these reported releases have achieved a Response Action Outcome (RAO); one has achieved a Waiver Completion Statement (WCS); one requires No Further Action, while the remaining four are in either Phase II or Phase IV of the Massachusetts Contingency Plan (MCP) process. Core Tunnel Segment South Station (DEP Nos , , , ) MADEP records reviewed indicate that multiple releases of oil, waste oil, and unknown chemicals have occurred at South Station along the railroad tracks. In December 1995, waste oil was detected in soil at concentrations of 13,000 ug/kg. This release to the soil was investigated and Phase I, Phase II, and Phase III reports were completed. An RAO for this release was achieved after the Phase III was completed. In March 1999, there was a release of approximately 25 gallons of diesel fuel from a pipe onto the railroad track right of way at South Station. An RAO for this release was achieved. In January 2001, there was a release of approximately 10 gallons of an unknown oily chemical from a vehicle onto the right of way. An RAO for this release was achieved. In June 2001, there was a release of approximately 10 gallons of an unknown oily chemical from a transformer. An RAO for this release was achieved. Based on the RAOs and the inferred groundwater flow direction towards Fort Point Channel (away from the alignment), releases on this site are not expected to impact the alignment. 711 Atlantic Avenue, (DEP No ) In September of 1988, a Phase 1 investigation was conducted on this site. During this investigation it was learned that an estimated 1,000 gallons of fuel oil had historically leaked and collected at the bottom of an onsite boiler. A sump pump was used to extract this oil. In July 1989, a 6,670-gallon tank was removed from this location. Both groundwater and soil samples collected during removal of this tank showed only localized impacts to soils which are not anticipated to extend into the alignment. This location is currently classified by MADEP as a No Further Action site. Two Financial Center, 201 Essex Street (DEP No ) Soil and groundwater from this location were analyzed to pre-characterize the site prior to construction of new buildings. Total petroleum hydrocarbons (TPH), semi-volatile organic compounds (SVOCs), and lead were detected in multiple samples. While a historic 5,000-gallon underground storage tank (UST) located in a vault at this location was removed in 1991, no evidence of a release associated with this tank was observed at that time.

2 The contaminants that have been identified at the site are attributed to miscellaneous materials historically used to fill the property. It was estimated that 8,000 cubic yards of contaminated fill material and 34,500 cubic yards of clean soil were removed during the construction on the Two Financial Center project. A Class B-1 RAO was achieved in June 2004; however, based on the proximity to the alignment, contamination detected in the fill on this site may also be present in the fill of the alignment. Bedford Kingston Parcel, 1 Lincoln Street (DEP No ) Soil and groundwater were analyzed to pre-characterize the site prior to construction at this location. Volatile Organic Compounds (VOCs), TPH, SVOCs, and lead were detected above reportable concentrations. This site is related to two other releases (RTN and RTN ). An RAO was achieved for this location; however, based on the proximity to the alignment, it is possible that contamination detected in the fill on this site may also be present in the fill of the alignment. 1 Lincoln Street, Intersection of Essex and Lincoln Streets (DEP No ) Approximately 20 gallons of hydraulic oil was released from an electric service utility vehicle to the asphalt pavement within the alignment at this location. Some hydraulic oil migrated to surface soil, although the MADEP file indicates it did not penetrate more than six inches below grade. Impacted soils were removed, and an RAO was achieved. Based on the location of this release within the alignment, TPH detected in confirmatory soil samples may also be present in the fill of the alignment. 88 Kingston Street (DEP No ) A release of mineral oil dielectric fluid from an electric transmission conduit impacted soil in the street at this location (within the alignment). Extractable Petroleum Hydrocarbons (EPH) and Polycyclic Aromatic Hydrocarbons (PAHs) were detected above reportable concentrations in the soil subsequent to the release. A bioremediation product was applied to soils to expedite natural attenuation. An RAO was achieved, but based on the location within the alignment and remediation method, it is possible that soils in the fill at this location may still contain the above contaminants above reportable concentrations. Liberty Center, Essex Street and Washington Street (DEP No ) The soil and groundwater was analyzed to pre-characterize the site prior to construction of new buildings. TPH, PAHs, polychlorinated biphenyls (PCBs), and lead were detected above reportable concentrations in the soil. The contaminants on site were attributed to miscellaneous materials historically used to fill the property. In October 2003, a Release Abatement Measure (RAM) Plan was submitted. The RAM Status Report No.1 was submitted in February RAM Status Report No. 2 was submitted in August 2004, which stated that five USTs were discovered and removed. Based on the proximity to the alignment, historical contamination detected in the fill on this site may also be present in the fill of the alignment. Opera House Expansion, 539 Washington Street, (DEP No ) Results of subsurface explorations and the pre-characterization testing program performed in March 2003 as part of the expansion program indicated that the Site was filled land. Petroleum hydrocarbons were detected at levels exceeding Reportable Concentrations at the Site.

3 Approximately 1,374 cubic yards of contaminated soil was excavated and transported off site as part of Ram activities in April A Class A-1 RAO was achieved in March 2004 for this Site. 2 Boylston Street (DEP No ) / Commonwealth Center Project, Washington and Avery Streets (DEP No ) Two 1,000-gallon underground storage tanks (USTs) were removed from the vicinity of the Chinatown subway station (2 Boylston Street). Soil screening performed during the removal of one of these tanks indicated that a release might have occurred and subsequent testing showed that volatile petroleum hydrocarbons (VPH) and extractable petroleum hydrocarbons (EPH) were present in soil and groundwater above reportable concentrations at this location. A total of 570 cubic yards of soil and 95,800 gallons of groundwater were disposed of off site. Soil and groundwater on the adjacent Commonwealth Center Project (Millennium Place) site has been impacted by No. 2 fuel oil. PAHs, PCBs, lead, and arsenic was detected above reportable concentrations on the Commonwealth Center Project Site. According to the RAM Completion Report, approximately 300,805 tons of soil was removed from the site during construction and approximately 125,365 tons of soil was disposed of as remediation waste. Both RTNs have Class A-2 RAOs, achieved in June 2002 and December 2002, respectively. Based on the proximity of these locations to the alignment, contamination detected in the soil and groundwater on these sites may also be present within the alignment. Colonial Theater, 96 Boylston Street (DEP No ) According to MADEP records, eight hundred gallons of No. 2 Fuel Oil was historically pumped into the fill pipe for a 275-gallon above ground storage tank (AST) instead of a 10,500 gallon AST in the basement at this location. When this happened, the 275-gallon AST burst, releasing oil into the sub-basement of this building and into a former coal chute containing a 10,500-gallon AST. Subsequent to this event, TPH was detected above reportable concentrations in the soil. Approximately 300 gallons of residual oil and 1,760 pounds of oil soaked soil and adsorbent material was disposed of off site. A Waiver Completion Statement was submitted for the site. Based on the proximity of this location to the alignment and the amount of oil recovered, contamination detected in the soil and groundwater on this site may also be present within the alignment. Piano Row Site, Boylston Street (DEP No ) No point sources of contamination have been identified at this location, but TPHs and lead were historically detected above reportable concentrations in the soil on the site. Elevated PAHs and lead were attributed to historic fill in files reviewed at MADEP. The MADEP file indicates that a Class B-1 RAO was achieved for this site in March 2004, but based on the proximity of this location to the core alignment, contamination detected in the fill at this location may also be present in the fill of the alignment. 10 Boylston Place, (DEP No ) No point sources of contamination have been identified at the Site, but the MADEP file indicates that levels of trichloroethylene, TPH, and lead in the soil at this location were historically above RCS-1 Reportable Concentrations. The soil contamination was attributed to urban fill that underlies the site. A Class B-1 RAO has been achieved for this site.

4 Tremont Street Alignment Corner of Stuart and Tremont Streets (Sawyer Lot), 245 Tremont Street (DEP No ) In 1998, a combined geotechnical and environmental site assessment was performed at this location. The assessment included analysis of soil samples. TPH, PAHs, arsenic and lead were detected above reportable concentrations in soil. A potential source was not identified. Additional sampling of soil and groundwater was performed and it was concluded that these contaminants were only detected in the fill material. However, several metals and VOCs were detected in the groundwater at low concentrations (below reportable concentrations). Hydrogeologic tests were performed to evaluate potential development possibilities for the site. Trace levels of the Methyl-tert-butyl-ether and chloroform were detected in monitoring wells on the northern side of property. No source was identified for these constituents. Shallow groundwater was mapped to flow in a southeasterly direction; therefore, these constituents might be migrating on the site from an off-site, upgradient source. As of December 2001, this location is at Phase IV of the MCP process. The alignment is upgradient of this site. Pumping of groundwater from the proposed alignment tunnel depths may draw groundwater with detectable levels of VOCs into the alignment. Tremont on the Common, 151 Tremont Street, (DEP No ) USTs located underneath the Tremont on the Common parking garage leaked No. 2, No. 4, and No. 6 fuel oil into the soils underneath these tanks. The source of the release is most likely historic overfills of the tanks during their operation, since inspections of the interiors of the tanks showed no obvious holes. A Class A-2 RAO was achieved in June Emerson Majestic Theatre, 219 Tremont Street (DEP No ) Thirty-five gallons of diesel fuel were released from a saddle tank onto a snow/ice covered asphalt paved surface on February 25, Twelve 55-gallon drums were generated and transported off site. A Class A-1 RAO was achieved for this site in April Action for Boston Community Development, Inc., 178 Tremont Street (DEP No ) According to MADEP files reviewed,, about 50 to 60 gallons of No.2 fuel oil was released at this location sometime between 1982 and 1987, likely during the filling of a 250,000-gallon AST in the sub-basement of this building. The AST vault contained the release and was never reported. The oil was not removed until February 6, 1996, at which time three 55-gallon drums of waste were removed. Subsurface investigations indicated that some of the oil had migrated through the concrete floor and into the soil and groundwater. EPH was detected in the soil above Reportable Concentrations and VOCs and EPHs were detected above Reportable Concentrations in groundwater. A Class A-2 RAO was achieved for this Site in October Mason Street, 165 Kneeland, (DEP No ) On February 24, 1999, shortly after a water main broke, a steam pipe ruptured on Mason Street. The rupture resulted in the release of greater than 2 pounds of asbestos, which exceeds a reportable quantity. An RAO was achieved for this site in December of Parkside Condominiums, 165 Tremont Street, (DEP No & ) Prior to recent construction at this location, a pre-characterization program that was conducted which indicated the presence of metals, PAHs and petroleum hydrocarbons in the soil. This was reported to MADEP on April 7, 1999, and approximately 322 tons of soil was removed from the Site in August of 1999.

5 Charles Street Alignment Parcel P2, Park Plaza, South Charles and Stuart Streets (DEP No ) Soil and groundwater samples collected at this location were analyzed prior to initiation of construction activities. VOCs, SVOCs, and lead were detected above reportable concentrations in soil and groundwater. Approximately 41,419 tons of contaminated soil and 105,380 tons of noncontaminated soil were removed during recent construction at this location. In November 2003, a RAM and Utility-Related Abatement Measure (URAM) Completion Report and a Class A-2 RAO Statement were submitted; however, based on the proximity to the alignment, it is possible that contamination detected in the fill on this location may also be present in the fill of the Charles Street Alternative alignment. Hertz Rent a Car, 30 Park Plaza (DEP No & ) In 1994, gasoline was released from a fill line connected to a UST on the Hertz Rent a Car site. A remedial design of non-aqueous phase liquid (NAPL) recovery enhanced by the use of surfactants was submitted in a November 1998 Remedy Implementation Plan (RIP). However, an Immediate Response Action was implemented because NAPL was detected at a thickness up to 1.63 feet. In 2000, a pressure test of the UST and fill lines indicated that there was a pinhole leak in the fill line. Approximately 775 gallons of product and groundwater were disposed of off site, and a Class A-2 RAO was achieved for this location in November Based on the proximity to the alignment, the nature of the release (constant leak for an unknown number of years), and the thickness of NAPL detected on the groundwater table, contamination detected in the soil and groundwater on this site may also be present within the alignment. Stuart Street Alignment According to MADEP files and historic boring data related to the Massachusetts Transportation Building, only one property (245 Stuart Street, Sawyer Lot) on the proposed Stuart Street alignment indicated recognized environmental conditions. The environmental conditions associated with this property are fully described under the Charles Street Alternative above. File reviews and research conducted in January 2005 did not indicate any updated information regarding this property since Columbus Avenue Alignment 200 Columbus Avenue, (DEP No ) MADEP was not able to identify any records for this property. According to the DEP on-line spills database, this 72-hour release, dated August 25, 1999 achieved a Class A2 RAO on August 31, Columbus Avenue, (DEP No ) According to DEP files, six USTs were removed from this location in March Soil contamination was observed during their removal. TPH concentrations ranged from 15 to 320 ppm and Xylene was detected at 2,400 ppb. An Immediate Response Action (IRA) was completed, and approximately 107 tons of contaminated soil was removed and transported off site in May A Class A-2 RAO was achieved for this site in May Our Lady of Victories Church, 27 Isabella Street, (DEP No )

6 In March 1996, Petroleum Management Inc. planned to clean and abandon in place a 2,000- gallon underground storage tank in the former coal room of a residential building at this location. TPH concentrations in two soil samples collected from beneath the ends of this tank during this operation were 5,970 and 8,660 ppm, respectively. TPH was also identified in an on-site monitoring well at 1.27 ppm. In June 1996, the UST was filled with a cement slurry, used for heating oil were pumped out. A Class B-2 RAO statement was submitted on October 16, 1996 and an Activity and Use Limitation was recorded for the property on October 19, Arlington Street, (DEP No , ) On March 17, 2003, a release of an unknown quantity of fuel oil occurred from an AST located in the basement of the building at this location. The AST was removed, a polyethylene vapor barrier was installed, an assessment of soil and indoor air was completed, and a limited soil removal was completed. No PAHs were identified. A Class A-2 RAO for this site was achieved in November Arlington Street, (DEP No ) According to MADEP files, on January 19, 1995, greater than 10 gallons of No. 4 fuel oil was released from the fill line of a UST onto a sidewalk at this location. Fuel oil migrated approximately 20 feet down Arlington Street into a concrete lined catch basin. Remedial actions followed which achieved a level of No Significant risk and therefore a Class A-1 RAO was achieved in March 1995.

D2 Project Environmental Remediation Briefing August 21, 2018

D2 Project Environmental Remediation Briefing August 21, 2018 D2 Project Environmental Remediation Briefing August 21, 2018 The Union Square Revitalization Project (USQ) is a 2.4 million square foot transit-oriented, mixed use project that is transforming Union Square,

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA)

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA) DRAFT Analysis of Brownfields Cleanup Alternatives (ABCA) Preliminary Evaluation Ball Square Station Site Boston Avenue and Broadway Somerville and Medford, Massachusetts Massachusetts DEP Release Tracking

More information

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts SPCC PLAN Raytheon Company Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts 6 November 2002 143.65 Environmental Resources Management

More information

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

Executive Summary. ES.1 Objectives and Scope

Executive Summary. ES.1 Objectives and Scope Executive Summary This Remedial Investigation and Focused Feasibility Study (RI/FFS) report was prepared on behalf of Northern States Power Co. (NSP) to document the findings of the multi-media environmental

More information

IXPER 70C Calcium Peroxide CASE STUDY

IXPER 70C Calcium Peroxide CASE STUDY IXPER 70C INTRODUCTION TO ENHANCED AEROBIC BIOREMEDIATION Enhanced aerobic bioremediation is a well-established and viable remediation technology for in situ degradation of a variety of petroleum hydrocarbon

More information

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation TRC Wannalancit Mills 650 Suffolk Street Lowell, Massachusetts 01854 Main 978.970.5600 Fax 978.453.1995 Memorandum To: From: Subject: Rian Amiton; City of Brockton Planning Department John McRobbie and

More information

New York State Department of Environmental Conservation August Receive Site Fact Sheets by . See "For More Information" to Learn How.

New York State Department of Environmental Conservation August Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation August 2013 FACT SHEET Environmental Restoration Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: 1201

More information

Technical Memorandum. Blum Junk Yard Properties. Assessment of Environmental Risk Related to Demolition of Properties at 411 and 501 E.

Technical Memorandum. Blum Junk Yard Properties. Assessment of Environmental Risk Related to Demolition of Properties at 411 and 501 E. Technical Memorandum Blum Junk Yard Properties Assessment of Environmental Risk Related to Demolition of Properties at 411 and 501 E. 15 th Street 9/16/15 40140060.13 Prepared For: Steven Sampson Brown

More information

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup A. THIS FORM IS BEING USED TO: (check one) 1. Log Date: 10/24/2017 Log Time: 11:18 AM PM 2. Assign a (RTN) to a Release or TOR Report. a. Reportable Release or TOR. b. Release that is Less Than the Reporting

More information

5.14 CONTAMINATED MATERIALS

5.14 CONTAMINATED MATERIALS 5.14 CONTAMINATED MATERIALS 5.14.1 Introduction Contaminated materials are toxic or potentially harmful substances that may be present in soil, groundwater, and building materials. Contaminated materials

More information

OVERVIEW SCOPE OF WORK (SOW)

OVERVIEW SCOPE OF WORK (SOW) Site Description The subject property is occupied by the former Parker Service Station, which contained a former Service Garage (now called Former Garage) and Filling Station Store (now called Storage

More information

ROUX ASSOCIATES, INC. Environmental Consulting & Management

ROUX ASSOCIATES, INC. Environmental Consulting & Management February 28, 2012 PARTIAL RESPONSE ACTION OUTCOME STATEMENT (RAO) 17 Central Street Property Peabody Essex Museum RTN 3-23396 Prepared for PEABODY ESSEX MUSEUM East India Square Salem, Massachusetts 01907

More information

Material Characterization Report

Material Characterization Report SSI-Metro12 Facility Carteret, NJ Page 1 of 3 Please complete all sections of the form, sign where indicated and return completed form to: Soil Safe, Inc. 6700 Alexander Bell Dr., Suite 300, Columbia MD

More information

EXECUTIVE SUMMARY. The following is our conclusions of the environmental issues at the Site based on our investigations:

EXECUTIVE SUMMARY. The following is our conclusions of the environmental issues at the Site based on our investigations: EXECUTIVE SUMMARY Engineers, Inc. (), on behalf of the Town of East Lyme, Connecticut performed a Phase II Environmental Site Assessment (Phase II ESA) on the property located at 224 Main Street (the Site

More information

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39 MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No. 2015031067) Van Nuys Fire Station 39 W.O. E170094B ENGINEERING mtm CITY OF LOS ANGELES Transmittal

More information

Remediation Approach. W-3839 July 6, 2009

Remediation Approach. W-3839 July 6, 2009 W-3839 July 6, 2009 Scott Alfonse City of New Bedford Department of Environmental Stewardship 133 William Street, Room 304 New Bedford, MA 02740 Re: Opinion of Probable Remediation Costs Former Polymerine

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION DELAWARE CAR COMPANY Second and Lombard Streets Wilmington, Delaware DNREC Project No. DE-1059 October 2000 Department of Natural Resources and Environmental Control Division

More information

New York State Department of Environmental Conservation

New York State Department of Environmental Conservation New York State Department of Environmental Conservation FACT SHEET Voluntary Cleanup Program Rochester Gas and Electric Corporation (RG&E) February 2014 RG&E-Brockport MGP Site, Perry and Erie Street(s)

More information

CENTENNIAL MILLS EXISTING ENVIRONMENTAL CONDITIONS Prepared by PDC 7/28/06

CENTENNIAL MILLS EXISTING ENVIRONMENTAL CONDITIONS Prepared by PDC 7/28/06 CENTENNIAL MILLS EXISTING ENVIRONMENTAL CONDITIONS Prepared by PDC 7/28/06 Background The following is a building by building (area) description of remaining or suspect environmental conditions at. Full

More information

New York State Department of Environmental Conservation. Receive Site Fact Sheets by . See "For More Information" to Learn How.

New York State Department of Environmental Conservation. Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation November 2013 FACT SHEET Brownfield Cleanup Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: West 28th

More information

Introduction to Brownfields: Site Assessment and Cleanup

Introduction to Brownfields: Site Assessment and Cleanup consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Barry Giroux, P.E., LEP, Senior Project Manager TAB Technical Assistance for Brownfields Team

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION 273 West Main Street, Norton, MA 02766 Tel: (508) 226-1800 Fax: (508) 226-1811 MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION CITGO BULK STORAGE TERMINAL 385 QUINCY AVENUE BRAINTREE, MASSACHUSETTS

More information

John Kubiczki, LSP, PG Senior Project Manager

John Kubiczki, LSP, PG Senior Project Manager John Kubiczki, LSP, PG Senior Project Manager 155 West Street, Suite 6, Wilmington, MA 01887 800-659-1202 john_kubiczki@efiglobal.com Years Experience: 40 Professional Summary: Mr. Kubiczki is a New Hampshire

More information

Introduction to Brownfields: Site Assessment and Cleanup

Introduction to Brownfields: Site Assessment and Cleanup consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Ileen S. Gladstone, P.E., LSP, LEED AP Vice President & Senior Practice Leader TAB Technical Assistance

More information

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases:

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases: 2646 Palma Drive, #450 Ventura, CA 93003 P 805-654-9611 F 805-654-9613 October 17, 2014 UCSB Environmental Health & Safety Attn: Ms. Jodi Woods 565 Mesa Road Santa Barbara, California 93106-5132 RE: Public

More information

ENVIRONMENTAL SUMMARY OF CATALYST AREA 1

ENVIRONMENTAL SUMMARY OF CATALYST AREA 1 ENVIRONMENTAL SUMMARY OF CATALYST AREA 1 Phase I Environmental Site Assessment and Phase II Environmental Site Assessment for 55 South River Street. Environmental Response Program WDNR File Review for,

More information

SOIL AND GROUNDWATER MANAGEMENT PLAN MAINE ENERGY RECOVERY COMPANY SITE BIDDEFORD, MAINE

SOIL AND GROUNDWATER MANAGEMENT PLAN MAINE ENERGY RECOVERY COMPANY SITE BIDDEFORD, MAINE SOIL AND GROUNDWATER MANAGEMENT PLAN MAINE ENERGY RECOVERY COMPANY SITE BIDDEFORD, MAINE MARCH 19, 2015 JN: 12-3259.1 Report Prepared by: Summit Environmental Consultants 640 Main Street Lewiston, Maine

More information

TABLE OF CONTENTS LIST OF ACRONYMS A. SITE IDENTIFICATION 1 B. BACKGROUND AND PURPOSE 2 C. METHODS 2 D. RESULTS 3 E. CONCLUSIONS AND RECOMMENDATIONS 4

TABLE OF CONTENTS LIST OF ACRONYMS A. SITE IDENTIFICATION 1 B. BACKGROUND AND PURPOSE 2 C. METHODS 2 D. RESULTS 3 E. CONCLUSIONS AND RECOMMENDATIONS 4 TABLE OF CONTENTS PAGE LIST OF ACRONYMS i A. SITE IDENTIFICATION 1 B. BACKGROUND AND PURPOSE 2 C. METHODS 2 D. RESULTS 3 E. CONCLUSIONS AND RECOMMENDATIONS 4 F. REFERENCES 4 TABLES TABLE 1 SUMMARY OF GROUNDWATER

More information

Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California

Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California October 2 nd, 2014 Insert then choose Picture select your picture. Right click your picture and

More information

FINAL PLAN OF REMEDIAL ACTION. Deemer Steel Site - Operable Unit-I New Castle, DE

FINAL PLAN OF REMEDIAL ACTION. Deemer Steel Site - Operable Unit-I New Castle, DE FINAL PLAN OF REMEDIAL ACTION Deemer Steel Site - Operable Unit-I New Castle, DE DNREC Project No. DE 1243 March 2002 Delaware Department of Natural Resources and Environmental Control Division of Air

More information

I. Introduction and Background

I. Introduction and Background M-0817 February 18, 2014 Kathy Castagna EPA New England - Region 1 5 Post Office Square, Suite 100 Mail Code (OSRR07-3) Boston, MA 02109-3912 Re: Analysis of Brownfield Cleanup Alternatives 116 Cook Avenue,

More information

A. INTRODUCTION AND METHODOLOGY

A. INTRODUCTION AND METHODOLOGY Chapter 14: Contaminated Materials A. INTRODUCTION AND METHODOLOGY OVERVIEW This chapter describes the potential for soil and groundwater contamination to exist in the project alignment. It summarizes

More information

3.11 HAZARDOUS MATERIALS

3.11 HAZARDOUS MATERIALS 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general areas of potentially contaminated properties along the proposed

More information

Tyree 26 Town Forest Road, Webster, MA Fax: Phone:

Tyree 26 Town Forest Road, Webster, MA Fax: Phone: Tyree 26 Town Forest Road, Webster, MA 01570 Fax: 508-640-0370 Phone: 508-640-0300 April 9, 2012 Massachusetts Department of Environmental Protection Northeast Regional Office 205B Lowell Street Wilmington,

More information

Mill Street Corridor Assessment/Cleanup Overview

Mill Street Corridor Assessment/Cleanup Overview Mill Street Corridor Assessment/Cleanup Overview Former S. Bent Mill Site Site History Overview Circa 1867 to 1992 - S. Bent Mill Company (furniture manufacturing) Circa early 1900s - expansion of the

More information

Hazardous Materials December 9, Hazardous Materials Existing Conditions

Hazardous Materials December 9, Hazardous Materials Existing Conditions 3.11 3.11.1 Existing Conditions A description of the Project Site can be found in the Section 2.0, Project Description, of this DEIS. Specific properties constituting the subject property are included

More information

A. INTRODUCTION AND METHODOLOGY

A. INTRODUCTION AND METHODOLOGY Chapter 14: Contaminated Materials A. INTRODUCTION AND METHODOLOGY This chapter examines the potential for subsurface contamination (contaminated soil, soil gas, or groundwater) to affect project construction

More information

SOIL MANAGEMENT PLAN

SOIL MANAGEMENT PLAN SOIL MANAGEMENT PLAN BELFAST BOATYARD 39 & 41 FRONT STREET BELFAST, MAINE Prepared by: Ransom Consulting, Inc. 400 Commercial Street, Suite 404 Portland, Maine 04101 (207) 772-2891 March 22, 2013 1.0 INTRODUCTION

More information

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS DIVISION 02 EXISTING CONDITIONS 02 01 00 MAINTENANCE OF EXISTING CONDITIONS 1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling

More information

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting Modern Electroplating Site Update Dudley Vision Advisory Task Force September 2008 Meeting 1 Modern Electroplating Uncontrolled Waste Site Key elements that define a site relative to MA DEP and US EPA

More information

Site Background December 2005

Site Background December 2005 Site Background December 2005 The South of Runway 18-36 Area consists of the lowland area surrounding the southern portion of runway 18-36. It extends from the East Canal of the airport ditch system on

More information

PROPOSED DECISION DOCUMENT. CE - E. 17th St. Station Voluntary Cleanup Program New York, New York County Site No. V00541 October 2017

PROPOSED DECISION DOCUMENT. CE - E. 17th St. Station Voluntary Cleanup Program New York, New York County Site No. V00541 October 2017 PROPOSED DECISION DOCUMENT CE - E. 17th St. Station Voluntary Cleanup Program New York, New York County Site No. V00541 October 2017 Prepared by Division of Environmental Remediation New York State Department

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT

MARYLAND DEPARTMENT OF THE ENVIRONMENT MARYLA DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Suite 620 Baltimore, Maryland 21230-1719 410-537-3442 800-633-6101 x 3442 www.mde.state.md.us Land Management Administration Oil Control Program

More information

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By:

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By: CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, 2016 Prepared By: SHANNON & WILSON, INC. 5430 Fairbanks Street, Suite 3 Anchorage, Alaska 99507 (907)

More information

AUDIT MEMORANDUM. Focus of Audit: September 4, 2001 Class A-3 Response Action Outcome. MCP Status: A-3 RAO (Permanent Solution with Conditions)

AUDIT MEMORANDUM. Focus of Audit: September 4, 2001 Class A-3 Response Action Outcome. MCP Status: A-3 RAO (Permanent Solution with Conditions) AUDIT MEMORANDUM Date: November 17, 2017 To: Rebecca Woolley, Section Chief, CERO Audits FILE From: Joe Laughton, CERO Audits Re: RTN: 2-3000173 Former Buckley & Mann Property Norfolk Focus of Audit: September

More information

Tribal LUST Site Case Studies Pine Ridge Reservation, EPA Region Tribal Lands Forum Koos Bay, OR

Tribal LUST Site Case Studies Pine Ridge Reservation, EPA Region Tribal Lands Forum Koos Bay, OR Tribal LUST Site Case Studies Pine Ridge Reservation, EPA Region 8 2012 Tribal Lands Forum Koos Bay, OR Janice Pearson, USEPA, Region 8 Underground Storage Tank Unit Chief LUST Sites Pine Ridge Indian

More information

Permanent Solution Statement. and Immediate Response Action Completion Report Release Tracking Number

Permanent Solution Statement. and Immediate Response Action Completion Report Release Tracking Number Permanent Solution Statement and Immediate Response Action Completion Report Release Tracking Number 4-25035 Site Location Name: Easton Mobile Home Park 305 Turnpike Street Unit 173 Easton, MA 02375 Prepared

More information

Environmental Overview: 39 th Avenue Greenway. What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified

Environmental Overview: 39 th Avenue Greenway. What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified Recognized Environmental Conditions VB/I-70 Superfund Site (OU-1, OU-2) Planned Investigations Next Steps

More information

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 Prepared for: THE MICHIGAN CITY REDEVELOPMENT COMMISSION 100 EAST MICHIGAN BOULEVARD

More information

January 13, Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region East Avon Lima Road Avon, New York 14454

January 13, Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region East Avon Lima Road Avon, New York 14454 January 13, 2017 Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region 8 6724 East Avon Lima Road Avon, New York 14454 Re: Quarterly Monitoring Report Third Quarter 2016 Buckeye

More information

PROPOSED DECISION DOCUMENT. CE - E. 14th St. (StuyTown) Works Voluntary Cleanup Program New York, New York County Site No. V00535 October 2017

PROPOSED DECISION DOCUMENT. CE - E. 14th St. (StuyTown) Works Voluntary Cleanup Program New York, New York County Site No. V00535 October 2017 PROPOSED DECISION DOCUMENT CE - E. 14th St. (StuyTown) Works Voluntary Cleanup Program New York, New York County Site No. V00535 October 2017 Prepared by Division of Environmental Remediation New York

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland 21230-1719 1-800-633-6101 http:/www.mde.state.md.us Darlington Citgo 3940 Conowingo Road, Darlington Harford County,

More information

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES: AR No. IR No. EIELSON AFB ALASKA NOTES: Administrative Record Cover Sheet Aaron Lambert 2013.03.06 14:20:30-08'00' DEC/EPA Comments Dated 14 December 2012 on Draft QAPP, Phase 2 Source Evaluation at SS085

More information

Collect deeper soil samples and groundwater from beneath site?

Collect deeper soil samples and groundwater from beneath site? Uncertainties for which sampling is (i.e., to be incorporated into Work Plan). No. Uncertainty Recommended Resolution/ 1 SS005 No evidence of Acquire samples from three closest MOGas in soil. Tank as surface

More information

IMMEDIATE RESPONSE ACTIONS MASSDEP RTN

IMMEDIATE RESPONSE ACTIONS MASSDEP RTN Former Revere Copper Products, Inc. New Bedford, Massachusetts Request for Determination of Applicability May 2017 IMMEDIATE RESPONSE ACTIONS MASSDEP RTN 4-26614 Request for Determination of Applicability

More information

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017 PROPOSED DECISION DOCUMENT CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017 Prepared by Division of Environmental Remediation New York State Department

More information

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE PROPOSED PLAN OF REMEDIAL ACTION 560 Terminal Avenue New Castle, DE DNREC Project No. DE 1123 October 2002 Delaware Department of Natural Resources and Environmental Control Division of Air and Waste Management

More information

Chapter 11: Hazardous Materials A. INTRODUCTION

Chapter 11: Hazardous Materials A. INTRODUCTION Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from

More information

State of Oregon Department of Environmental Quality

State of Oregon Department of Environmental Quality State of Oregon Department of Environmental Quality Memorandum To: Rich Muza, US Environmental Protection Agency, Region 10 Date: April 5, 2013 Through: From: Subject: Keith Johnson, NWR Cleanup Manager

More information

December 12, Former Raytheon Facility 430 Boston Post Road, Wayland, Massachusetts

December 12, Former Raytheon Facility 430 Boston Post Road, Wayland, Massachusetts Public Involvement Meeting December 12, 2002 Former Raytheon Facility 430 Boston Post Road, Wayland, Massachusetts Purpose of Meeting PART I Update on on-going assessment and in situ remedial pilot study:

More information

Introduction. Remedial Action Objectives. In This Guide

Introduction. Remedial Action Objectives. In This Guide Addendum to Citizens Guide Proposed soil cleanup plans for additional Tax Blocks for Lockheed Martin s Middle River Complex Winter 2013-2014 Lockheed Martin Would Like to Invite the Community to a Public

More information

PROPOSED DECISION DOCUMENT Third Avenue Brownfield Cleanup Program New York, New York County Site No. C March 2013

PROPOSED DECISION DOCUMENT Third Avenue Brownfield Cleanup Program New York, New York County Site No. C March 2013 PROPOSED DECISION DOCUMENT 1676 Third Avenue Brownfield Cleanup Program New York, New York County Site No. C231079 March 2013 Prepared by Division of Environmental Remediation New York State Department

More information

Immediate Response Action (IRA) Status Report

Immediate Response Action (IRA) Status Report Immediate Response Action (IRA) Status Report Site: The Wakefield Corporation, Wakefield, MA RTN 3-31274 Prepared For: The Wakefield Corporation, Wakefield, MA 01880 Prepared by: 51 Portsmouth Avenue,

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION DRAVO SHIPYARD Operable Unit II RDC/Harbor Associates Properties Wilmington, Delaware DNREC Projects No. DE-1092 & DE-1096 February 2001 Department of Natural Resources and

More information

CLASS A-3 RESPONSE ACTION OUTCOME (RAO) STATEMENT 1100 MASSACHUSETTS AVENUE DORCHESTER, MASSACHUSETTS RTN

CLASS A-3 RESPONSE ACTION OUTCOME (RAO) STATEMENT 1100 MASSACHUSETTS AVENUE DORCHESTER, MASSACHUSETTS RTN CLASS A-3 RESPONSE ACTION OUTCOME (RAO) STATEMENT 1100 MASSACHUSETTS AVENUE DORCHESTER, MASSACHUSETTS RTN 3-23660 PREPARED FOR: South Bay (E&A) LLC Boston, Massachusetts PREPARED BY: GZA GeoEnvironmental,

More information

Receive Site Fact Sheets by . See "For More Information" to Learn How. PUBLIC MEETING ANNOUNCEMENT:

Receive Site Fact Sheets by  . See For More Information to Learn How. PUBLIC MEETING ANNOUNCEMENT: FACT SHEET Manufactured Gas Plant Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Bay Shore Former Manufactured Gas Plant October 2015 Site 1-52-172 Bay Shore, NY Have

More information

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland 2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland Prepared for: Lockheed Martin Corporation Prepared by: Tetra Tech, Inc.

More information

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania 6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania The UGI Columbia Gas Plant site is located on less than 1 acre in an industrial area of the Borough of Columbia, Lancaster County,

More information

Section 3.11: Hazardous Materials

Section 3.11: Hazardous Materials Section 3.11: Hazardous Materials Section 3.11 Hazardous Materials 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general

More information

UNITED STATES FORGECRAFT

UNITED STATES FORGECRAFT UNITED STATES FORGECRAFT STATE PRIORITY LIST SITE FORT SMITH, ARKANSAS ADEQ 5301 Northshore Drive North Little Rock, Arkansas 72118 EPA RCRA ID No: ARD006341747 EPA CERCLA ID No: ARD006341747 AFIN: 66-00145

More information

MEMORANDUM. Pleasant Run Crossing Prospect Place West. The boundaries and approximate acreages for each of the parcels are depicted on Figure 1.

MEMORANDUM. Pleasant Run Crossing Prospect Place West. The boundaries and approximate acreages for each of the parcels are depicted on Figure 1. MEMORANDUM Date: May 19, 2017 To: From: Ms. Shannon Stahley Citizens Energy Group August Mack Environmental Subject: Environmental Conditions at Citizens Property Associated with the Former Coke and Manufactured

More information

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE.

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE. ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN 29 BELMONT AVENUE (FORMER EXXON STATION) BELFAST, MAINE Prepared for: City of Belfast 131 Church Street Belfast, Maine Prepared

More information

the former Honeywell plant building (3 Hamilton Avenue) a single-storey brick industrial/commercial building (233 Armstrong Street)

the former Honeywell plant building (3 Hamilton Avenue) a single-storey brick industrial/commercial building (233 Armstrong Street) consulting engineers memorandum to: Tega Developments - Mr. Spyro Dimitrakopoulos - spyro@tegadevelopments.com re: Environmental Remedial Action Plan Proposed Residential Building 233 Armstrong Street

More information

DRAFT. Introduction and Background. June 20, 2013 Project

DRAFT. Introduction and Background. June 20, 2013 Project Geotechnical Environmental and Water Resources Engineering June 20, 2013 Project 116320 Mr. Nick Hodgkins Maine Department of Environmental Protection 17 State House Station Augusta, ME 04333 Dear Nick:

More information

Columbia, Missouri, Manufactured Gas Plant Project Fact Sheet: August 2013

Columbia, Missouri, Manufactured Gas Plant Project Fact Sheet: August 2013 Columbia, Missouri, Manufactured Gas Plant Project Fact Sheet: August 2013 Ameren Missouri is committed to keeping customers informed about planned work at the Ameren Missouri service center property at

More information

Environmental Assessment of Soil and Soil Gas

Environmental Assessment of Soil and Soil Gas Environmental Assessment of Soil and Soil Gas Beverly Hills High School 241 South Moreno Drive, Beverly Hills, California 90212 August 22, 2003 Prepared by: A 18581 Teller, Suite 200 Irvine, California

More information

APPENDIX L: CONTAMINATED MATERIALS AND WASTE MANAGEMENT

APPENDIX L: CONTAMINATED MATERIALS AND WASTE MANAGEMENT APPENDIX L: CONTAMINATED MATERIALS AND WASTE MANAGEMENT L.1 INTRODUCTION Environmental Planning & Management, Inc. (EPM), as subconsultant to The Louis Berger Group, Inc., and on behalf of Metropolitan

More information

FINAL PLAN OF REMEDIAL ACTION FOR THE NVF-NEWARK COMPANY SITE NEWARK, DELAWARE

FINAL PLAN OF REMEDIAL ACTION FOR THE NVF-NEWARK COMPANY SITE NEWARK, DELAWARE FINAL PLAN OF REMEDIAL ACTION FOR THE NVF-NEWARK COMPANY SITE NEWARK, DELAWARE May, 1999 DNREC Project DE-199 Prepared by: Delaware Department of Natural Resources and Environmental Control Division of

More information

This report was prepared by Stanley Abraham, Bioremediation of Hydrocarbon-Contaminated Soil

This report was prepared by Stanley Abraham, Bioremediation of Hydrocarbon-Contaminated Soil This report was prepared by Stanley Abraham, Vice President, Industrial Systems Corp. LLC, PO Box 61, Postal Code 134, Shattia, Muscat, Sultanate of Oman, Oman. Bioremediation of Hydrocarbon-Contaminated

More information

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program www.pca.state.mn.us Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program This document describes the requirements for excavating petroleum-contaminated soil

More information

REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 1 FORMER WEST 45 TH STREET GAS WORKS New York, New York (Site Number V00532)

REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 1 FORMER WEST 45 TH STREET GAS WORKS New York, New York (Site Number V00532) REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 1 FORMER WEST 45 TH STREET GAS WORKS New York, New York (Site Number V00532) CONSOLIDATED EDISON CO. OF NEW YORK, INC. 31 01 20 th Avenue Long Island City, NY

More information

Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins

Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 15 Article 7 June 2010 Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins

More information

McKissack & McKissack Washington, DC

McKissack & McKissack Washington, DC REPORT ON ASTM PHASE I ENVIRONMENTAL SITE ASSESSMENT AND LIMITED PHASE II SUBSURFACE SAMPLING POTOMAC AVENUE & 1 ST STREET SW WASHINGTON, DC by Haley & Aldrich, Inc. McLean, Virginia for McKissack & McKissack

More information

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY File No. 0506-013-07 Contaminated Media Management Plan Midland

More information

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y Containment, Caps & Liners While excavation and treatment are common solutions for many soil and groundwater remediation projects, containment can sometimes be a more appropriate and more economical alternative.,

More information

Triad Case Studies from the Navy. Tim Shields and Adrianne Saboya U.S.Navy PWC Environmental Department San Diego, CA

Triad Case Studies from the Navy. Tim Shields and Adrianne Saboya U.S.Navy PWC Environmental Department San Diego, CA Triad Case Studies from the Navy Tim Shields and Adrianne Saboya U.S.Navy PWC Environmental Department San Diego, CA The Navy PWC Road to Triad Site ite Characterization and Analysis nalysis Penetrometer

More information

Updated Massachusetts Indoor Air Quality Threshold Values: A Case Study

Updated Massachusetts Indoor Air Quality Threshold Values: A Case Study International Journal of Soil, Sediment and Water Volume 2 Issue 2 Article 3 August 2009 Updated Massachusetts Indoor Air Quality Threshold Values: A Case Study Richard G. Stromberg LFR Inc., rick.stromberg@lfr.com

More information

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Residual Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Background Information Linebach Funkhouser, Inc. (LFI) personnel performed permanent closure, assessment and corrective

More information

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN FORSTER MANUFACTURING 581 DEPOT STREET WILTON, MAINE REV.

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN FORSTER MANUFACTURING 581 DEPOT STREET WILTON, MAINE REV. ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES & CONCEPTUAL REMEDIAL ACTION PLAN FORSTER MANUFACTURING 581 DEPOT STREET WILTON, MAINE REV. 0 Prepared for: Town of Wilton, Maine 158 Weld Road Wilton, Maine

More information

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA)

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA) Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial National Oilheat Research Alliance (NORA) Forward Heating oil is used to heat many private homes as well as small commercial

More information

Updated Massachusetts Indoor Air Quality Threshold Values: A Case Study

Updated Massachusetts Indoor Air Quality Threshold Values: A Case Study Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 14 Article 30 January 2010 Updated Massachusetts Indoor Air Quality Threshold Values: A Case Study Richard

More information

STATEMENT OF QUALIFICATIONS

STATEMENT OF QUALIFICATIONS ENVIRONMENTAL ENGINEERING, CONSTRUCTION, AND SUPPORT SERVICES STATEMENT OF QUALIFICATIONS 2006 VERSION 4.1 U.S. SBA 8(a) Certified Corporate Headquarters: 4097 Trail Creek Road Riverside, California 92505

More information

SECTION MONITORING WELL ABANDONMENT

SECTION MONITORING WELL ABANDONMENT SECTION 027300 MONITORING WELL ABANDONMENT PART I GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 1 - GENERAL REQUIREMENTS,

More information

ACTIVITY AND USE LIMITATION OPINION Portion of W.R. Grace & Co.-Conn. Disposal Site Cambridge, Massachusetts RTN

ACTIVITY AND USE LIMITATION OPINION Portion of W.R. Grace & Co.-Conn. Disposal Site Cambridge, Massachusetts RTN DRAFT Revised 19 January 2005 EXHIBIT C ACTIVITY AND USE LIMITATION OPINION Portion of W.R. Grace & Co.-Conn. Disposal Site Cambridge, Massachusetts In accordance with the requirements of 310 CMR 40.1074,

More information

Former NCBC Davisville Site 16 Former Creosote Dip Tank and Fire Training Area

Former NCBC Davisville Site 16 Former Creosote Dip Tank and Fire Training Area Former NCBC Davisville Site 16 Former Creosote Dip Tank and Fire Training Area Review of Site 16 Information Phase III Quality Assurance Project Plan Scope of Work Implementation and Schedule Site 16 Map

More information

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION IPEC 13 November 2013 CLIQUEZ ET MODIFIEZ LE TITRE PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS 1. IN-SITU THERMAL REMEDIATION

More information

Green Remediation of Petroleum Contaminated Groundwater Using Oxygen Injection in Western Maine

Green Remediation of Petroleum Contaminated Groundwater Using Oxygen Injection in Western Maine Green Remediation of Petroleum Contaminated Groundwater Using Oxygen Injection in Western Maine Brian Bachmann, CG Keith Taylor, CG 2012 Maine Water Conference March 14, 2012 Introduction Typically in

More information