1 NATIONAL CONSTRUCTION, RENOVATION AND DEMOLITION NON-HAZARDOUS SOLID WASTE MANAGEMENT PROTOCOL

2

3 EXECUTIVE SUMMARY Construction, Renovation and Demolition (CRD) waste accounts for approximately 30 % of the waste produced annually in Canada. A large portion of CRD waste can be diverted from landfill through reuse or recycling initiatives. The CRD Waste Management Protocol has been developed as a complimentary implementation tool for the National CRD Non-Hazardous Solid Waste Management Strategy. Together, they provide direction for Real Property Services to undertake non-hazardous solid waste management actions for CRD projects. The inclusion of waste management into CRD projects has evolved as a consequence of federal policies, provincial regulations, research projects determining best practices as well as the goals outlined in the PWGSC Sustainable Development Strategy (SDS). Purpose of the protocol To facilitate the integration of waste management practices in CRD projects. Goal of the protocol To provide clear and concise guidelines for project and property managers, contractors, architecture and engineering consultants and environmental consultants, to find cost effective and environmentally responsible alternatives to traditional waste disposal practices. To provide practical "how to" information to facilitate waste reduction. Intensive CRD waste management is a relatively new issue for most project managers. Until recently, waste generated during CRD projects was traditionally disposed directly into landfills without the implementation of waste diversion initiatives. However, as landfill restrictions and disposal costs are increasing, contractors and their clients are realizing the importance of sound waste management practices. These practices are becoming more demanding and generally require more planning, training and on-site implementation time than has been customary. In fact, demonstration projects have shown that the diversion of waste from landfill can reduce project disposal costs by up to 30 %. Waste management planning should become a routine part of every project to achieve reduced environmental impacts and cost savings. Each project will generate different CRD waste types as situations change, new technologies arise and problems and opportunities are seen in a new light. With the CRD Waste Management Protocol, the implementation of a successful waste management program can become a reality and a benchmark for the future.

4

5 TABLE OF CONTENTS 1.0 INTRODUCTION PROTOCOL RATIONALE FEDERAL REGULATIONS AND POLICIES PROVINCIAL REGULATIONS AND POLICIES ENVIRONMENTAL IMPACTS POTENTIAL COST SAVINGS 7 3.0OVERVIEW OF THE PROTOCOL CONTENTS OF THE PROTOCOL PART I - THE WASTE MANAGEMENT STRATEGY PART II - THE WASTE DIVERSION WORKPLAN THE PROJECT FRAMEWORK PROJECT BRIEFING THE NATIONAL MASTER SPECIFICATION NMS NON-HAZARDOUS WASTE AND MATERIALS MANAGEMENT SPECIFICATIONS CONSTRUCTION, RENOVATION AND DEMOLITION CONTRACT DOCUMENTS THE PRIME CONSULTANT DESIGN FOR DISASSEMBLY THE WASTE MANAGEMENT SPECIALIST THE GENERAL CONTRACTOR PROPOSED CONTRACTING PROCEDURE ADDITIONAL CONTRACTING PROCEDURES THE WASTE MANAGEMENT STRATEGY THE PRELIMINARY EVALUATION PRE-AUDIT ACTIVITIES IDENTIFICATION OF MATERIALS TYPES QUANTIFICATION OF MATERIALS FINAL WASTE AUDIT COMPONENTS THE WASTE DIVERSION WORKPLAN IDENTIFYING AREAS OF GREATEST WASTE DIVERSION POTENTIAL ASSESSING WASTE DIVERSION PRIORITIES 31 1

6 7.3 OPPORTUNITIES FOR REUSING, RECYCLING AND REDUCING WASTES FINAL WASTE DIVERSION WORKPLAN COMPONENTS THE WASTE DIVERSION WORKPLAN REPORT SELECTION OF A GENERAL CONTRACTOR SUBCONTRACTOR COMMITMENT APPOINTMENT OF A FACILITATOR IMPLEMENTATION COMMUNICATING TO SITE PERSONNEL DEVELOPING A COMMUNICATIONS STRATEGY INCENTIVES REWARDS PROJECT TRACKING MONITORING AND TRACKING OF WASTE DIVERSION PRACTICES WRITING THE REPORT 50 2

7 APPENDIX A - SAMPLE REQUEST FOR PROPOSAL (SELECTING A PRIME CONSULTANT) A1 APPENDIX B - SAMPLE REQUEST FOR PROPOSAL (FOR INCLUSION FOR DEMOLITION WASTE AUDIT &WASTE REDUCTION WORKPLAN WHEN HIRING A GENERAL CONTRACTOR) B1 APPENDIX C - SAMPLE REQUEST FOR PROPOSAL (SELECTING A GENRAL CONTRACTOR) C1 APPENDIX D - CRD WASTE MANAGEMENT COST BENEFIT SCREENING PROCESS D1 APPENDIX E - SAMPLE LETTER OF NOTIFICATION E1 APPENDIX F - SAMPLE WASTE AUDIT WORKSHEET F1 APPENDIX G - SAMPLE WASTE AUDIT & WASTE REDUCTION WORKPLAN REPORT G1 APPENDIX H - SAMPLE PROJECT WASTE TRACKING FORMS H1 APPENDIX I - SAMPLE SITE COMMUNICATION CHECKLISTS I1 APPENDIX J - SAMPLE SITE WASTE TRACKING FORMS J1

8

9 1.0 INTRODUCTION The diversion of construction, renovations and demolition (CRD) waste from landfill sites is an issue gaining attention within both the public and private sectors. Surveys have indicated that up to 30% of total municipal waste streams is generated by CRD activities. This material represents an inefficient use of natural resources, consumes valuable landfill space and contributes to escalating disposal costs. These increasing costs of disposal are ultimately reflected in job costs, as contractors must incorporate anticipated disposal costs in job bids. Facts such as these highlight the need for taking action on reducing and diverting as much waste as possible from CRD activities. Over the past few years, the Federal Government of Canada has taken substantial strides towards greening its operations. Firstly, pursuant to the 1995 amendments to the Auditor General Act, federal government departments were required to table their Sustainable Development Strategies (SDS) in the House of Commons by December 31, In response to this legislative requirement, Real Property Services (RPS) of Public Works and Government Services Canada (PWGSC) has developed sustainable development commitments which establishes the branch's goals, objectives and actions for integrating sustainable development principles into its policies and operations. Secondly, as part of its SDS, RPS integrates the requirements of the Greening of Government Operations policy, approved by Cabinet in April This policy commits federal departments and agencies to address specific issues in their SDSs. Non-Hazardous solid waste management has been included as one of the priority areas within the RPS sustainable development commitments and one of the seven issues endorsed in the Greening of Government Operation's Best Practices. 1

10 PWGSC is committed to conducting its business in the most environmentally responsible way possible, consistent with its objectives of sustainable development. With this commitment in mind, several initiatives have been undertaken. Recently, a National CRD Non-hazardous Solid Waste Management Strategy was prepared to provide the framework to assist department branches to meet its objectives and targets relating to CRD solid waste management. The RPS Construction, Renovation and Demolition Waste Management Protocol has been developed as a complimentary implementation tool. A large portion of CRD waste can be diverted from landfill through reuse or recycling initiatives. At the same time, it must be recognized that a managed approach to handling CRD waste requires additional time and resources for planing and execution. In a well-planned and executed waste management program, these additional investments are commonly offset or more than offset by cost savings and revenues. Responding to the PWGSC sustainable development commitments, PWGSC project managers are beginning to embrace the principles of waste reduction in CRD projects. 2.0 PROTOCOL RATIONALE The inclusion of waste management into CRD projects has evolved as a consequence of federal policies, provincial regulations, and research projects that have determined best practices. The following provides rationale for the development of this protocol. 2.1 FEDERAL REGULATIONS AND POLICIES At present, there are no binding federal regulations or legislation requiring the implementation of solid waste reduction measures for CRD waste. However, federal government policies have recently been developed. 2

11 These federal policies ensure the federal government's commitment to protecting the environment, preventing the creation of pollution, and conserving resources by using processes, materials, products, and/or energy that avoids or minimizes the creation of pollutants and waste. In turn, these policies reduce the overall risk to human health and the environment. The federal policies relevant to solid waste reduction in CRD projects are described below. Amendments to the Auditor General Act, in 1995, required all federal government departments to develop a SDS and table it in the House of Commons by December In response to this legislative requirement, RPS has developed sustainable development commitments which outline the branch's goals, objectives and actions for integrating sustainable development principles into its policies and operations. The Greening of Government Operations policy, approved by Cabinet in April 1995, commits federal organizations to address specific issues in their SDSs. The goals of the policy and the SDS are to reiterate its priority to meet or exceed applicable environmental statues, regulations and policies, by developing and implementing Environmental Management Systems (EMS) and best practices on several operational issues. The RPS EMS will provide the framework by which the branch will be able to meet its objectives and targets relating to CRD solid waste management. As part of the requirements of the Greening of Government Operations policy and the Auditor General Act, PWGSC tabled its SDS in Parliament on April 22, Within the RPS branch, the Architecture and Engineering Services (A&ES) Division coordinated the development of the RPS SDS, which was approved by the RPS Management Committee on December 18,

12 The RPS SDS lays out goals, objectives and actions for integrating sustainable development principles into RPS policies and operations. The RPS SDS covers the full range of RPS's environmental responsibilities including: the development of a comprehensive EMS; the demonstration of environmental leadership; and the reiteration of its priority to meet or exceed applicable environmental legislation. The Framework for the Development of the RPS EMS and the accompanying RPS CRD Non-Hazardous Solid Waste Management Strategy address the management of non-hazardous solid waste generated in CRD projects. The following target had been established for the management of solid waste generated by CRD activities. Improve application of construction, renovation and demolition (CRD) waste management practices by at least 25% per year to reacgh full implementation by March 2004 (reflects SDGO target). The Canadian Council of Ministers of the Environment (CCME) solid waste reduction goal was to divert 50% of solid wastes sent for disposal (i.e. to landfill or incinerator) by the year 2000, relative to 1988 levels. 2.2 PROVINCIAL REGULATIONS AND POLICIES Ontario is the only province regulating the necessity of waste management programs for CRD projects. In 1994, the Ontario Ministry of the Environment (MOE) passed the 3Rs Regulations. The 3Rs Regulations are intended to ensure that municipalities as well as industrial, commercial and institutional sectors, develop programs to reduce the amount of material being sent to landfill. 4

13 The goal of the regulations was to reduce the amount of waste material requiring disposal in landfill, by at least 50% by the year 2000 compared to the base year of The two applicable regulations pertaining to CRD projects are Regulations 102/94 and 103/94. These regulations apply to CRD projects for one or more buildings with a total floor area of at least 2,000 square metres. The waste reduction activities required under Regulation 102/94 include the following: the completion of a waste audit which identifies the amount and nature of the waste that will be generated; the development of a waste reduction workplan which outlines specific achievable diversion options for reduction, reuse, and recycling; the implementation of a waste reduction workplan; the documentation of the waste audit and workplan results on forms provided by the MOE or forms that have been designed in similar format; and the retention of a copy of the audit and workplan documents on file for five years from completion of the project. Regulation 102/94 requires that the waste audit is conducted and the workplan completed before the beginning of the CRD project. Therefore, the audit and the workplan will need to be completed in conjunction with the project's other planning activities. Regulation 103/94, deals with ICI source separation programs which requires the following activities: the implementation of a source separation program for the reusable and recyclable materials listed in Regulation 102/94; 5

14 the specification of facilities that are sufficient for the collection, sorting, handling and storage of these materials; the communication of the source separation program and its successes to employees, patrons, and tenants; and reasonable effort in ensuring that the separated waste is reused or recycled. The Ontario 3Rs Regulations requires that CRD projects greater than 2,000 m 2 conduct a waste audit and develop a waste reduction workplan. However, above and beyond this requirement, the PWGSC SDS requires that projects whose area is less than 2,000 m 2 must also proceed with a preliminary evaluation in order to determine the extent of the waste management practices that should be undertaken. The requirement also applies to civil engineering projects where area is not a reasonable criteria of the scale of the project. In the instance of civil engineering projects, the preliminary evaluation process should be employed. This process is described in Section 6.1 of this protocol. 2.3 ENVIRONMENTAL IMPACTS As stated, CRD waste accounts for approximately 30% of the waste produced annually in Canada. This is problematic for a number of reasons. The most obvious problem is that seven million tonnes of this material are sent to landfill annually. Existing landfill sites are quickly reaching their capacity, resulting in the requirement of new landfill sites. Odours, increased traffic, and potential problems with ground and surface water contamination are among the many reasons why residents are opposed to the development of landfill sites in their neighborhood. Although new landfills are engineered to have leachate and methane control systems, older sites may not have these design features. In addition to the problems with leachate and methane gas build up, there is the loss of land to landfilling which, because of the need for disposal space, can no longer be used for a more productive purpose. 6

15 Less obvious, but equally important, is that the extraction and transformation of natural resources has its own environmental impacts. This includes habitat destruction, resource depletion, energy use, air pollution, water pollution and solid waste problems. The recovery of the natural resources that are embodied in CRD waste materials reduces the necessity to extract some of these natural resources. 2.4 POTENTIAL COST SAVINGS In the past, contractors have known that there are economic reasons for reducing the amount of materials that they dispose of and for salvaging metals and other selected materials. Demonstration projects have shown the diversion of waste from landfill can reduce project disposal costs by up to 30%. This is made possible through reduced tipping and haulage fees, as well as the sale of reusable and recyclable materials. The potential savings depends heavily on the project at hand and its location. Therefore, it is important to carefully analyze each case to determine the practical extent to which waste management activities should be pursued and the potential savings that may be expected. This potential for cost savings and/or revenue from the waste management initiative should either partially, completely or more than completely offset the additional expense and time required to implement the initiative. 3.0 OVERVIEW OF THE PROTOCOL The purpose of the CRD Waste Management Protocol is to facilitate the integration of waste management practices in CRD projects. The goal of the protocol is to provide clear and concise guidelines for project and property managers, architecture and engineering consultants, environmental consultants and contractors to facilitate their efforts to find cost effective and environmentally responsible alternatives to traditional waste disposal practices. 7

16 The protocol provides practical "how to" information to facilitate waste reduction. It will allow project managers to develop an inventory of materials that can be diverted from a proposed CRD project, prior to the actual commencement of the work. Once an inventory of materials is developed, managers will be able to more accurately: track the disposal costs of the CRD project; determine the potential for recycling and/or reuse of building materials; and arrange for proper disposal of waste that cannot otherwise be diverted from landfill. 4.0 CONTENTS OF THE PROTOCOL The protocol consists of two sections. They are a Waste Management Strategy and a Waste Diversion Work plan. The protocol also contains a number of Appendices that contain tools to assist in the CRD waste management process. 4.1 PART I - THE WASTE MANAGEMENT STRATEGY Successful waste diversion ratios are achieved if the process is clearly defined to all members of the project team. A waste management strategy provides communication through the development of contract documents, projects specifications and accurate evaluation of anticipated material types and quantities via a waste audit. The waste audit provides data that identifies areas where environmental impacts can be reduced. Once the material types and quantities have been identified, the process can continue to the development of project specifications and the development of contract processes and documents. The protocol also addresses the use of tools such as the National Master Specification (NMS) that can provide direction during the specification process. 8

17 4.2 PART II - THE WASTE DIVERSION WORKPLAN Following the development of the waste management strategy, the next step of the protocol addresses the development of a waste diversion workplan that provides direction during the project implementation stage. The workplan details the development of a systematic approach to the management of the materials that have been identified in the strategy. The waste diversion workplan has been based upon the 3Rs hierarchy, however, the order has been restructured to place the emphasis on reuse, then recycle and finally reduce. The waste diversion workplan also permits for the cataloging of materials that may have potential for on-site reuse or diversion to other facilities that will offer the materials for external reuse. Recycling of materials requires the identification of local markets and facilities. Many construction materials are generally recyclable. These materials may include wiring, metals or glass. Other materials such as asphalt shingles or drywall have regionally limited markets. Thus, for each project local recycling markets will require identification. The recyclability of construction materials is often affected by the degree of sorting required. Contaminated loads of materials are often disposed into landfill sites. Therefore, it is imperative that this issue be addressed during the development of the action plan. This portion of the protocol also addresses options for site setup to facilitate proper recycling. The protocol is structured to provide for the development of actions that will allow for optimized recycling percentages. During demolition procedures, the quantity of materials is fixed and reduction of quantity is not an option. However, on many construction projects it is possible to reduce materials such as packaging wastes and to reduce materials through the use of designing for resource efficiency and disassembly concepts. 9

18 5.0 THE PROJECT FRAMEWORK Intensive CRD waste management is a relatively new issue for most project managers. Until recently, waste generated during CRD projects was traditionally disposed of directly into landfills without the implementation of waste diversion initiatives. The costs associated with waste removal are routinely incorporated into bid pricing. However, as landfill restrictions and disposal costs are increasing, contractors and their clients are realizing the importance of sound waste management practices. These practices are becoming more demanding and generally require more planning, training and on-site implementation time than has been customary. In a well executed waste management program, these additional cost will be balanced by avoiding other costs such as haulage and tipping fees, the purchase of new materials, and by possible revenues from materials sales Prior to initiating actions regarding waste management, project managers must have a good understanding of the types and quantities of waste that will be generated and the diversion opportunities locally available. This section describes the initial planning requirements by providing a framework to ensure a systematic and thorough decision making process. Waste management planning should become a routine part of every project to achieve reduced environmental impacts and cost savings. Each project will generate different CRD waste types; situations change, new technologies arise, and problems and opportunities are seen in a new light. Consequently, plans become outdated if they are not assessed for each individual project. 5.1 PROJECT BRIEFING The objectives of a project are identified at the initial project briefing meeting. At this briefing, the project and property managers introduce the project and all relevant information. This includes: 10

19 the extent of the project; the necessity of a Prime Consultant, based on project size and complexity; project scheduling implications; required funding; and project details. In order for waste management to be successfully incorporated into CRD projects, these issues need to be incorporated at the initial planning stage. Initial contract documents are drafted based upon the decisions formed at this early level, and waste management requirements should be clearly defined in all related contract documents. 5.2 THE NATIONAL MASTER SPECIFICATION For most federal government projects, project managers use the National Master Specification (NMS) as a resource tool for writing construction, renovation and demolition specifications. Developed jointly by the public and private sector, the NMS is recognized by the Canadian construction industry as the leading construction specification tool. The NMS is a comprehensive library of construction specifications written in contract specification format. Its level of detail and complexity allows for maximum protection against duplication and errors, while minimizing the chances of misunderstandings, and liability in the delivery of construction contracts. The NMS is routinely reviewed by industry to ensure it represents current trade practices and construction technology. The following are also key characteristics that encourage the use of the NMS in the majority of federal CRD projects. Time Saving and Reduced Errors - using the NMS reduces time and costs involved in specification writing. Applicable project requirements can be selected from the NMS, resulting in clear and concise directions. Using this tool reduces the chances of error that can result from writing the document from scratch each time or copying specifications from a previous project. 11

20 Adaptability - because the NMS does not restrict the project team from using any products, design concepts, or construction techniques, it is flexible and suitable for use on projects of any scope or size. The sections of the NMS have been updated to include Environmental SPEC NOTES. These indicate to the specification writer where options have been identified that will reduce the environmental impacts of a project. This information identifies: materials selection, handling and installation processes; alternative disposal methods for CRD waste materials; and energy and water conservation technologies and practices. 5.3 NMS NON-HAZARDOUS WASTE AND MATERIALS MANAGEMENT SPECIFICATIONS The NMS has developed specifications for non-hazardous waste and materials management which are not specific to any particular project application. These specifications are currently published as Section and include the following components: a generic set of specifications which may be applied to a variety of CRD related projects; a waste audit sample schedule; a waste reduction workplan sample schedule; generic source separation guidelines; and a cost/revenue analysis workplan sample schedule to determine the economic status of waste reduction efforts. 12

21 5.4 CONSTRUCTION, RENOVATION AND DEMOLITION CONTRACT DOCUMENTS An integral part of all CRD projects are the contract documents. They set the legal conditions of the project by defining the scope of the work, the completion timeline and the associated costs. The contract documents include: the Agreement; the General Conditions; and the specifications and the drawings which detail the processes and materials that the contractor is to use on a project. Most project contracting procedures are similar. As new CRD projects evolve, PWGSC project managers introduce the project to senior management and request the necessary funding. Once approved, a request for proposal (RFP) is prepared for soliciting interest in the project. The RFP documents have traditionally defined the nature and scope of work to be performed and requests qualified firms to bid on the project. Depending on the size of the project, RFPs are either distributed to a selected number of consultants, or in the case where the project costs exceed $25,000, the RFP is advertised through an electronic open bidding system (MERX). The bids are evaluated using predefined selection criteria and a standard score sheet. The contract is then awarded based on the contractor qualifications and bid price. However, the RFP template document is currently under review and a slightly different approach to this procedure is being contemplated. 5.5 THE PRIME CONSULTANT Where the PWGSC project manager elects to have a prime consultant responsible for the delivery of all aspects of the CRD project, the project manager must prepare a request for proposal. The RFP outlines the scope of work and time frames, evaluation criteria and terms of agreement. In keeping with federal government and PWGSC departmental policy, the RFP must include the requirements of a waste management program and a commitment to specify 13

22 environmentally preferred materials where applicable and feasible. As with other managerial roles such as the head electrical engineer, mechanical engineer, or structural engineer, a waste management specialist can either be in-house or subcontracted through an environmental consulting firm. The prime consultant can influence the waste reduction and recycling initiatives of a project in many ways. For example, a packaging protocol for the project can be developed requiring suppliers to minimize or take back packing materials. During the planning phase, the prime consultant can work directly with architects and engineers to modify the project design to incorporate environmental design principles and indoor air quality issues for enclosed spaces. The prime consultant and the project end users can also incorporate Design for Disassembly principles that will reduce waste generation during future renovations. These principles, more generally applied to buildings and interior fitups, are discussed in the following section. The contract language relating to non-hazardous solid waste management are included in a sample RFP for selection of a prime consultant in Appendix A. 5.6 DESIGN FOR DISASSEMBLY The construction industry has traditionally relied upon standard assembly methods, products and routines. However, consumers and clients are starting to demand environmentally sustainable products and practices without cost increases or quality compromises. Unfortunately, during a CRD project materials are often not salvaged easily for reuse or recycling. The result is a high percentage of waste generation. In order to combat this problem steps can be taken early in a project to abate this scenario during future construction activities. Future disassembly should be a consideration during the design phase. By designing for disassembly, a greater number of materials and products may be reused or recycled with little effort, resulting in less waste generation and lower amounts of materials entering landfills. However, in order to employ 14

23 successful design for disassembly techniques, attention must be afforded to the specifics of material assemblies, product selection and connection details. For instance, making finishes more readily removable, leaving connections exposed or covering joints with an easily removable seam are three methods that promote disassembly. The use of reversible connections instead of nails to fasten wood framing and other materials allows for easy disassembly. The use of reversible screws and bolts, would allow removal from the material causing little damage, is an example of such connectors. Not only can the material be used again, but the screws and bolts can also be reused. In addition, by making the connections more accessible, disassembly will be facilitated and consequently, less waste will be generated. Other methods of disassembly include selecting materials that are fastened by a tongue and groove connection rather than the use of an adhesive compound. Adhesive compounds produce a permanent connection that contaminates the material and affects its recyclability. Consider the use of materials that are classic and timeless so they will endure the life of the building and not be removed during a renovation. Material choices such as the use of wood flooring is often left in place for the entire life cycle of a building, while ceramic tile may be changed two or three times during that same life-cycle due to fashion and patterning changes. It is also environmentally beneficial to determine from suppliers, which materials and products have well-established recycling and reuse markets. The end result of designing for disassembly is the implementation of techniques that result in substantially lower amounts of waste being produced during a renovation or demolition project. Such reductions decrease waste materials entering landfills. The increased amount of reuse and recyclability of materials 15

24 and products also means a reduced impact on our natural resources, as the demand for new materials is diminished. 5.7 THE WASTE MANAGEMENT SPECIALIST The waste management specialist is responsible for ensuring that the greatest percentage possible of waste materials is diverted from landfill. This specialist should be a person who has a sound knowledge of recycling markets and construction practices. An effective and competent specialist will have a significant impact on achieving waste management goals when fully involved in all aspects of the waste diversion strategy and workplan. The roles and responsibilities of the specialist should include: the identification and interpretation of government policies and regulations; an evaluation of the types of materials that can be diverted to either reuse or recycling options; the preparation of a waste audit that clearly identifies anticipated materials types and quantities; and the preparation of a waste diversion workplan. A sample RFP for the development of a waste audit and waste reduction workplan has been included in Appendix B. As stated earlier, waste management requires additional planning and time. The project timeline must schedule the waste audit early in the project to ensure all waste diversion opportunities are identified. The waste diversion strategy and the workplan must be incorporated into the project specifications and instructions must be included in the tender documents for the general contractor. Following the issuing of the tender, the waste specialist s duties should include monitoring the progress towards the goals of the project. 16

25 The waste management specialist should also be available to promote and communicate waste reduction activities, including communication links, with all pertinent persons who can affect waste management achievements. Suggestions and input from these people should be taken and, where practical, incorporated into the waste management practices carried out on site. As waste materials are generated during activities on the site, the waste management specialist should liaise between all personnel involved in the project. These people include: clients; designers, engineers, and architects; materials buyer; site workers; contractors; sub trades; waste haulers; and recycling companies. The waste management specialist should be responsible for gathering documentation, such as waybills, so an accurate assessment of diversion rates can be determined. Accurate results will ensure cost comparisons are valid. Consequently, this will make the clients sensitive to new opportunities to reduce costs by promoting greater efforts toward waste management activities in future projects. 5.8 THE GENERAL CONTRACTOR The general contractor is ultimately responsible for responding to all municipal, provincial and federal legislation and policies and meeting the contract specifications. The project teams should remember that waste management in 17

26 CRD projects is a relatively new field for most contractors. As with the procurement of any services, a clear description of the project requirements in the tender documents is necessary to ensure that the respondent and PWGSC are aware of the responsibilities, deliverables, and end results that are expected. PWGSC will maximize its cost savings if the tender documents clearly demonstrate that there is potential for the salvage of materials. 5.9 PROPOSED CONTRACTING PROCEDURE The nature and extent of the project is described in the scope of work in the specification and drawing sections of the RFP. Currently, most CRD contracts do not contain specifications specifically requiring material recovery. However, contractors usually salvage and sell high value waste materials, such as copper piping and structural steel to offset project costs. Under this protocol, the extent of waste management practices to be integrated in the project will be identified during the preliminary evaluation to be completed as part of the Waste Management Strategy outlined below in Section 6.0. Where results of the preliminary evaluation indicate an opportunity, the results should then be incorporated into the contract documents. There are many approaches for integrating waste management into contracting procedures. The approach used by this protocol is built on the premise that the key to successful recovery and reuse is to make the process an integral part of the project, viewed in the same manner as electrical work, mechanical work or any other traditional project component. This means incorporating reuse and recycling components into the RFP by specifying material recovery goals into the scope of work, and employing an evaluation process that will emphasize potential contractors abilities to achieve high levels of recovery at competitive costs. When responding to an RFP, the contractor should clearly define and explain the reuse and recycling procedures that they intend to utilize in order to ensure 18

27 maximum economic and environmental benefits are realized. For example, procedures that divert high value dimensional lumber by recycling the material as mulch may result in high diversion rates, but the procedure does not achieve as high of an environmental or economic achievement as diverting the material to reuse. The NMS's construction and waste management specifications, the results of the waste management strategy and the waste diversion workplan should be included with the RFP for the contractors to use as references. In the area of waste management, the contractor s proposal should respond to the RFP by including an explanation as to how they plan to: achieve maximum recovery and reuse during project activities; offset project costs through the recovery of reusable and recyclable materials and the anticipated revenues from their sales and the avoidance of transport and tipping fees; establish procedures for collecting, separating and recycling waste materials and packaging; divert recyclable materials from landfill; dispose of or recycle hazardous wastes; and educate employees and subcontractors in order to ensure adherence to the waste management plan. When selecting the successful contractor, their experience in salvaging reusable materials should be weighed along with their commitment to meeting the recovery goals described in the RFP. All else being equal, a proposal that can achieve greater recovery and reuse should be favoured over one that achieves a lesser amount. 19

28 This approach will lead to the greatest potential for encouraging waste diversion on large projects as it requires the bidders to compete amongst themselves to demonstrate how they will achieve maximum materials recovery. At the same time, bidders have flexibility to decide how they will adjust their own business practices in response to local market conditions with the aim of meeting the waste diversion goals. A sample RFP that addresses waste management issues for a general contractor has been included in Appendix C ADDITIONAL CONTRACTING PROCEDURES There are several additional contracting procedures employed in the construction industry. One method is to negotiate material recovery and other waste management activities after awarding the contract to the general contractor. The client may request the contractor to prepare a waste management plan describing how maximum recovery of materials will be achieved. The client evaluates and approves the plan prior to the start of the project. The success of high recovery rates depends largely on the contractor's willingness to implement waste management activities that may have not been contemplated during the bidding process. If the contractor believes waste management is not profitable he may neglect all or most of the recovery activities. In addition, since the contractor has already been awarded the contract the negotiating position is not very strong. Therefore, it is preferable to have waste management practices incorporated into the contract prior to the commencement date rather than reopening the contract to negotiations later in the process. Another method, which can be used in smaller CRD projects, is a two-tier approach. The first step involves the recovery of reusable materials at the project site, where nonprofit organizations and other interested parties are given the opportunity to recover the materials that are of interest to them. Usually, there are no fees for the client or the contractors. The second step follows the 20

29 traditional contracting procedures for the CRD project. However, this option may not be possible on some sites due to security and liability concerns. Yet another method is to allow the bidding contractor to conduct their own waste materials audit and develop their own waste management workplan and diversion strategies according to general conditions defined in the RFP. The degree to which the diversion strategies and workplans are required to respond to department policy and objectives can be incorporated into the bid evaluation system. 6.0 THE WASTE MANAGEMENT STRATEGY As detailed previously, it is the responsibility of the waste management specialist to determine the practical extent of anticipated waste management practices. The first stage in this process is accomplished by developing a waste management strategy. The strategy is intended to gather general information that can be used to assess the overall waste management situation. It is a detailed analysis intended to measure the scope of the project and to gain an understanding of what types of materials will be generated. The following flowchart summarizes the stages required for the development of the waste audit report, the final product of the strategy. 21

30 The Preliminary Evaluation The Visual Inventory Identification of Potential Obstacles and benefits Selection of an Environmental Consultant The Initiation Meeting Pre-audit Activities Establishing a Schedule Notification Requirements Assembling Background Information Identification of Material Types Quantification of Materials Development of Waste Audit Report 6.1 THE PRELIMINARY EVALUATION The preliminary evaluation is an important first step to understanding the level of effort and scheduling that will be required. As with most project requirements, waste management procedures should reflect the nature and scope of the project. Smaller projects may be able to achieve acceptable waste diversion rates through a scaled down audit and workplan, whereas larger projects often require a more detailed evaluation as the possibility of oversights are compounded and opportunities magnified by the size of the project. Larger projects may involve multiple sub-contractors, large amounts of material and are subject to design constraints. Intense, short schedules may preclude the implementation of some or most waste management activities. 22

31 6.1.1 THE VISUAL INVENTORY The first stage is to identify material types and quantities of the expected waste material. A brief inventory of the materials can be determined by: performing a site visit or a walk through in order to visually inspect the material; having discussions with designers, engineers, property managers and tenants, etc.; and collecting and reviewing background information such as architectural, structural, mechanical, electrical and plumbing drawings. When performing the visual inventory, it is important to note the reuse and recycling options available regionally. Regional variances will impact upon the economic feasibility and extent of the intended waste diversion. However, in most markets in Canada a large quantity of CRD waste material can be diverted from landfill. In heavy civil engineering projects, where the materials are dominated by either structural metal components or concrete (reinforced or not), the metal components are almost always recovered for recycling and the concrete can generally be recycled in applications such as clean backfill or crushed sub-grade material IDENTIFICATION OF POTENTIAL OBSTACLES AND BENEFITS Following the visual inventory, the following issues should be investigated: required licences and permits associated with the disposal of materials; equipment necessary to collect, store and haul materials (e.g., bins, containers, crusher, etc.); storage needs i.e. is there sufficient storage on site to temporarily store the recovered material; 23

32 landfill bans i.e. are there any restrictions or emergency permits at local landfill sites; local hauling and tipping fees; and time frames i.e. does the project time frame allow for additional efforts to complete extensive waste management procedures. 6.2 PRE-AUDIT ACTIVITIES The purpose of a CRD waste audit is to identify the types and quantities of waste materials generated by activities during the project. Numerous pilot projects have been conducted by various Federal departments to develop a methodology for conducting and tabulating the types and quantities of materials estimated during a waste audit. The following section details the process for developing a waste audit SELECTION OF AN ENVIRONMENTAL CONSULTANT If necessary, an environmental consultant specializing in CRD waste audits should be selected to assist with the development of the waste audit. The members of the audit team must have a general understanding of the facility operations and knowledge of the scope of the project. It is mandatory for the audit team to possess a diversity of skills. The audit team should be comprised of persons with following expertise: previous waste audit experience; knowledge of building envelopes and associated components, mechanical, electrical plumbing systems and fit-up techniques; knowledge of local building code requirements; an understanding of environmental legislation applicable to the project; and if required, knowledge of architectural and/or heritage issues and/or civil engineering construction practices. 24

33 6.2.2 THE INITIATION MEETING Before commencing the compilation of the waste audit data it is necessary to hold an initiation meeting with all the individuals involved, including project and property managers, site superintendents and designers. During this meeting, the following points should be clarified: the scope of the audit; the client s goals and objectives as well as specific departmental directives that are to be met; the audit process should be described, including a required time frame; review of the Hazardous Materials Report to identify any materials that will be exempted from the audit due to special disposal requirements; and key project contacts for obtaining appropriate information ESTABLISH A SCHEDULE The requirements of the waste management plan must be fully integrated into the project. A formal schedule outlining tasks and time frames should be established and agreed upon by all individuals who will be affected by and involved in the waste audit. The strategy and diversion workplan should be completed prior to and included with the final tender documents. The information included in the strategy and the diversion workplan will allow bidding contractors to fully understand the scope of anticipated waste diversion rates. In addition, the information contained in the report will allow the contractors to compile their quotes based upon project cost savings that can be realized through the diversion of the generated materials, unless PWGSC intends to reuse materials or reduce costs directly. 25

34 6.2.4 NOTIFICATION REQUIREMENTS Communication should be developed to inform tenants and building personnel of the auditing procedures. It is recommended that a letter be prepared to inform tenants, staff and all personnel within the facility of the audit. The letter should include: a description of the purpose of the audit; the dates of initiation and proposed completion of the audit; the name(s) of the auditor(s) who will be conducting the on-site work; and the resources (if any) required during the site work, such as inspection escorts or staff required for interviews. An example of a sample letter of notification is presented in Appendix E ASSEMBLING BACKGROUND INFORMATION Background information on the facility should be collected and reviewed. It should be determined if there are any specific security requirements for audit personnel. Security clearance may be required before access to occupied tenant space can be obtained. The tenant occupancy and activities should be determined, both historical and existing, to obtain a general understanding of the operations that have been conducted within the facility and to identify any specific structural components that may be hidden or incorporated into the facade. This can be accomplished with the assistance of an employee who is knowledgeable in the operations and maintenance of the building, and who will be able to accompany the auditor through the facility. This person is usually the building operator or the tenant officer who is responsible for the daily activities undertaken at the facility. 26

35 In many cases, much of the background information will not be available from the property and project managers, and consequently the auditor will be directed to other sources of information such as plans and files. 6.3 IDENTIFICATION OF MATERIALS TYPES After collecting and reviewing all background information, the next phase is to identify the types of materials that will be generated by the project activities. Some material types, such as finishing materials, will be easily identified by a visual examination, but others are not visually apparent. The auditor should also make note of components that have potential reuse opportunities. If the project is to be completed in phases the project timeline should be analyzed and the anticipated material types for each stage identified. During the audit, the auditor should note: potential sites for collection and storage of materials; materials identified in the Hazardous Materials Report that should not be included in the audit; and any other advisement, such as known hidden elements or readily reusable components that should be taken into account later when the diversion strategy is being developed. Typical material types that will be included in the audit consist of wood, gypsum, plaster, concrete, brick, ceramics, stone, metals, insulation, HVAC equipment, electrical components, composite materials (e.g. asphalt shingles, carpets, ceiling tiles, etc.), windows, doors and associated hardware, and plumbing fixtures and piping. During the identification procedure, the auditor should note any easily reusable fixtures, such as modular cabinetry, HVAC equipment or plumbing fixtures. These items should still be measured and inventoried, as they must be included in the waste audit. 27

Demolition Waste Management Plan Guidelines

Demolition Waste Management Plan Guidelines Demolition Waste Management Plan Guidelines A resource for Western Australian Local Government, Developers, Property Owners and Demolition Contractors Contents 1 Introduction... 2 2 Project Planning...

More information

APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION

APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION The following appendix includes information and standard drawings that are diagrammatic and are used only to convey intent. Construction Waste

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging non-hazardous

More information

MATERIALS AND RESOURCES

MATERIALS AND RESOURCES MATERIALS AND RESOURCES MR- P1: STORAGE AND COLLECTION OF RECYCLABLES To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills. PREREQUISITE REQUIREMENTS Provide

More information

Construction Waste Management Plan Guidelines. A resource for Western Australian Local Government, Developers, Property Owners and Builders

Construction Waste Management Plan Guidelines. A resource for Western Australian Local Government, Developers, Property Owners and Builders Construction Waste Management Plan Guidelines A resource for Western Australian Local Government, Developers, Property Owners and Builders Contents 1 Introduction... 2 2 Project Planning... 3 3 Construction

More information

1. Division 01 Section General Requirements Temporary Facilities and Controls.

1. Division 01 Section General Requirements Temporary Facilities and Controls. PAGE 024210-1 SECTION 024210 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following: SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Construction Waste Management and Disposal

Construction Waste Management and Disposal University of New Hampshire University of New Hampshire Scholars' Repository Division 01 General Requirements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 017419 - Construction Waste

More information

DEMOLITION WASTE MANAGEMENT PLANNING

DEMOLITION WASTE MANAGEMENT PLANNING DEMOLITION WASTE MANAGEMENT PLANNING DEMOLITION WASTE MANAGEMENT PLANNING Waste Management Plan This document will assist those people involved in the construction industry to effectively dispose of demolition

More information

SECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management.

SECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management. SECTION 01 35 63 CONSTRUCTION WASTE MANAGEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for Construction Waste Management. 1.2 DEFINITIONS A. Construction

More information

- SUPPLEMENT HISTORY TABLE Title 15 - BUILDINGS AND CONSTRUCTION. Chapter RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS

- SUPPLEMENT HISTORY TABLE Title 15 - BUILDINGS AND CONSTRUCTION. Chapter RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS Chapter 15.56 RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS Sections: 15.56.010 Findings and purpose. 15.56.020 Definitions. 15.56.030 Deconstruction Salvage Recovery. 15.56.040 Diversion

More information

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT SECTION 01505 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 1.01 SUMMARY A. Section specifies diversion of construction and demolition (non-hazardous) debris from landfill. B. Related requirements specified

More information

3.1 Sustainable Procurement Policy

3.1 Sustainable Procurement Policy Policy Statement This policy has been designed to drive best value for the expenditure of public funds on the acquisition of goods, services and construction through maximizing competition, adopting commercially

More information

A. THAT Council receive the following report for information regarding the results of the City s green demolition program to date.

A. THAT Council receive the following report for information regarding the results of the City s green demolition program to date. ADMINISTRATIVE REPORT Report Date: November 16, 2015 Contact: Albert Shamess Contact No.: 604.873.7300 RTS No.: 10655 VanRIMS No.: 08-2000-20 Meeting Date: December 16, 2015 TO: FROM: SUBJECT: Standing

More information

Request for Proposals Strategic Planning Facilitation

Request for Proposals Strategic Planning Facilitation Request for Proposals Strategic Planning Facilitation Deadline for Submission: March 6, 2019 1 Section 1: Terms and Conditions 1.1 Issuing Department or Division Department of Operations 1.2 Synopsis or

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for the following: 1. Salvaging nonhazardous demolition

More information

ATTACHMENT N LEED PROJECT PROCEDURES

ATTACHMENT N LEED PROJECT PROCEDURES ATTACHMENT N LEED PROJECT PROCEDURES 1. All subcontractors, sub-subcontractors and suppliers at all tiers are to include the following items in their trade scope of work: a. Submit data and documentation

More information

Construction and Demolition Material Recovery Facility Feasibility Study

Construction and Demolition Material Recovery Facility Feasibility Study FINAL REPORT North Central Texas Council of Governments Construction and Demolition Material Recovery Facility Feasibility Study AUGUST 2007 This study was funded through a solid waste management grant

More information

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS GENERAL The commercial bidding process is a well-defined path of positioning oneself to be the successful bidder amongst a group purporting to offer the same quality materials and labor. There are certain

More information

SECTION SALVAGE, REUSE AND RECYCLING

SECTION SALVAGE, REUSE AND RECYCLING SECTION 02061 SALVAGE, REUSE AND RECYCLING (Note to author: This Specification does not replace Demolition Section 02060. Instead it is used in conjunction with it when there is salvage, reuse and/or recycling

More information

Careers List Professional Careers in Construction

Careers List Professional Careers in Construction Careers List Professional Careers in Construction Architect Designs buildings, including the preparation of detailed construction drawings and specifications, and advises on their construction. May specialize

More information

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL SECTION 017418 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Procurement Process: Architects & Professional Engineering Services. Procurement.

Procurement Process: Architects & Professional Engineering Services. Procurement. Procurement Process: Architects & Professional Engineering Services Procurement www.novascotia.ca/tenders Updated: February 2017 Table of Contents Contents INTRODUCTION:... 3 APPLICATION:... 3 SCOPE of

More information

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663 August 2013, Rev 00 01 7419 Construction Waste Management PART 1. GENERAL 1.01 Requirements Include: A. Each Contractor provide: 1. Participation in Construction Waste Management plan, including separation

More information

Forests Branch. Final Report. Independent Forest Audit Terms of Reference Review. December 2011

Forests Branch. Final Report. Independent Forest Audit Terms of Reference Review. December 2011 Forests Branch Final Report Independent Forest Audit Terms of Reference Review Resources and Labour Audit Service Team Ontario Internal Audit Division Ministry of Finance Serving: Table of Contents EXECUTIVE

More information

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105 St. Monica Food Pantry 01 7419-1 SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY: A. Work of this section includes administrative and procedural requirements for

More information

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls. Buchtel/Perldns Community Learning Center GPD 2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 PART 1- GENERAL 1.1 SUMMARY SECTION 01524 CONSTRUCTION WASTE MANAGEMENT

More information

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. 531 N. Nash Street Hortonville, WI 54944-0099 Phone: 920-779-6011 Fax: 920-779-6552 www.hortonvillewi.org REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. Date Issued: February 5, 2016 Date Due: March

More information

PROCUREMENT - FOLLOW-UP

PROCUREMENT - FOLLOW-UP PROCUREMENT - FOLLOW-UP 25. PROCUREMENT - FOLLOW-UP BACKGROUND.1 The Government Purchases Act controls the acquisition of goods in government. The Act assigns responsibility for acquisition of goods to

More information

Competitive Procurement Evaluation Process Audit

Competitive Procurement Evaluation Process Audit 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Competitive Procurement Evaluation Process Audit August 28, 2017 City of Edmonton 16417 Procurement Evaluation

More information

Waste Management Policy

Waste Management Policy Waste Management Policy Contents 1. Introduction 2. Policy Statement 3. Policy Objectives 4. Application 5. Organisation and Management 6. Glossary of Terms Document Control Information: Last updated on:

More information

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services T: +27 21 462 4502 F: +27 21 462 4509 E: info@sahra.org.za South African Heritage Resources Agency - Head Office 111 Harrington Street Cape Town P.O. Box 4637 Cape Town 8001 ANNEXURE A SCOPE OF WORK FOR

More information

ORDINANCE NO. IT IS ORDAINED by the City Council of the City of San Carlos as follows:

ORDINANCE NO. IT IS ORDAINED by the City Council of the City of San Carlos as follows: ORDINANCE NO. ORDINANCE OF THE CITY OF SAN CARLOS AMENDING THE SAN CARLOS MUNICIPAL CODE, ADDING CHAPTER 8.05 RELATING TO RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS IT IS ORDAINED by

More information

Choosing an External Auditor: A Guide to Making a Sound Decision, Developed by the Mid-America Intergovernmental Audit Forum

Choosing an External Auditor: A Guide to Making a Sound Decision, Developed by the Mid-America Intergovernmental Audit Forum Choosing an External Auditor: A Guide to Making a Sound Decision, Developed by the Mid-America Intergovernmental Audit Forum Introduction Regardless of the type or size of public entity you are affiliated

More information

Construction Waste Minimization and Reuse Management

Construction Waste Minimization and Reuse Management Construction Waste Minimization and Reuse Management Mr.M.KalilurRahman 1, Mr.S.S.Janagan 2 1 Student M.E., (CE&M), Gnanamani College of Engineering, Namakkal-637018, Tamilnadu, India 2 Assistant Prof,

More information

DATE: August 20, 2012 REPORT NO. PW CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION

DATE: August 20, 2012 REPORT NO. PW CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION PUBLIC WORKS COMMISSION DATE: August 20, 2012 REPORT NO. PW2012-032 TO: FROM: CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION GEOFF RAE, MBA, P.ENG. GENERAL MANAGER, PUBLIC WORKS

More information

Introduction. Challenges Related to Waste Reduction and Reuse AGENDA ITEM 6

Introduction. Challenges Related to Waste Reduction and Reuse AGENDA ITEM 6 AGENDA ITEM 6 To: Russ Smith, Senior Manager, Environmental Resource Management From: Maura Walker Date: August 7, 2012 Re: Stage 1 Integrated Solid Waste and Resource Management Plan Issues for Consideration

More information

Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY

Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY Cornell University ILR School DigitalCommons@ILR Buffalo Commons Centers, Institutes, Programs 2007 Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY Tara Stahl Follow

More information

The Pilot Deconstruction Report

The Pilot Deconstruction Report The Pilot Deconstruction Report The Pilot Deconstruction Project was a community effort to determine the value of the materials contained in the buildings at the former Fort Ord. The term "deconstruction"

More information

Making the Case for Construction Waste Management

Making the Case for Construction Waste Management Making the Case for Construction Waste Management Hazem Elzarka, PhD, PE, LEED AP University of Cincinnati Cincinnati, Ohio, USA Construction and demolition activities generate a large portion of the total

More information

Update: Draft Long Term Waste Management Strategy. Public Works and Infrastructure Committee

Update: Draft Long Term Waste Management Strategy. Public Works and Infrastructure Committee PW11.3 STAFF REPORT ACTION REQUIRED Update: Draft Long Term Waste Management Strategy Date: February 11, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee Acting Deputy

More information

The Waste Strategy Process

The Waste Strategy Process The Waste Strategy Process TORONTO 1 WASTE STRATEGY WHERE ARE WE? 4 The Strategy recommends Review of current waste policies and programs, including management policies, WHAT ARE THE how to manage any

More information

Potential Changes to Ontario s Building Code: PARKING STRUCTURES

Potential Changes to Ontario s Building Code: PARKING STRUCTURES Ministry of Municipal Affairs Potential Changes to Ontario s Building Code: PARKING STRUCTURES Building and Development Branch Fall 2017 Consultation This consultation paper is for discussion purposes.

More information

Toronto Waste Strategy

Toronto Waste Strategy Toronto Waste Strategy (Text-only version) Robyn Shyllit Public Consultation Unit Tel: (416) 392-3760 TTY: (416)-338-0889 wastestrategy@toronto.ca March 29, 2016. Below is the text from the presentation

More information

Section 34 Brieser Construction SH&E Manual

Section 34 Brieser Construction SH&E Manual Brieser Construction SH&E Manual April 23 2010 This written program documents the steps has taken to minimize General Refuse and Construction & Demolition debris resulting from various construction activities

More information

Electronic Medical Devices and Equipment Stewardship Plan for British Columbia

Electronic Medical Devices and Equipment Stewardship Plan for British Columbia 7115 Millcreek Drive Mississauga, (Ontario) L5N 3R3 Telephone: 905-858-2450 Fax: 905-858-2462 www.abbott.ca Electronic Medical Devices and Equipment Stewardship Plan for British Columbia September 12,

More information

POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT

POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT Submission Date: September 23, 2015 Submitted To: Director, Fairness Monitoring Departmental

More information

EXHIBIT A. 1) General:

EXHIBIT A. 1) General: 1) General: EXHIBIT A FINDINGS OF FACT FOR EXEMPTION FROM COMPETITIVE BIDDING AND USE OF THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) METHOD OF CONTRACTING FOR TILLAMOOK PUD OPERATIONS CENTER AND

More information

Request for Proposals for Marketing Services

Request for Proposals for Marketing Services Request for Proposals for Marketing Services Proposal Deadline: 3:00pm CST, Friday, December 8 th, 2017 Engineers Geoscientists Manitoba, an Association requesting marketing plan development proposals

More information

REQUEST FOR PROPOSAL. Organics Processing Facility Feasibility Analysis

REQUEST FOR PROPOSAL. Organics Processing Facility Feasibility Analysis REQUEST FOR PROPOSAL Organics Processing Facility Feasibility Analysis November 2011 REQUEST FOR PROPOSAL (RFP) Organics Processing Facility Feasibility Analysis November 2011 1. Statement of Purpose The

More information

Chapter 4 Department of Government Services

Chapter 4 Department of Government Services Procurement of Goods and Services Phase I Chapter 4 Department of Government Services Procurement of Goods and Services Phase I Contents Introduction... 131 Why We Completed this Audit..... 131 Objectives.........

More information

SEMINOLE TRIBE OF FLORIDA INVITATION TO BID

SEMINOLE TRIBE OF FLORIDA INVITATION TO BID Solicitation #: ITB 151-2017 Title: Description: SEMINOLE TRIBE OF FLORIDA INVITATION TO BID General Home Repairs (Big Cypress Reservation) The Housing Department of the Seminole Tribe of Florida is requesting

More information

RFI - Qualification Based Selection Model and Social Procurement

RFI - Qualification Based Selection Model and Social Procurement RFI - Qualification Based Selection Model and Social Procurement ANNEX A QUESTIONS # Question Response Q1 Please provide a brief description of your organization (100 words or less). Your response could

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

OVERVIEW OF PRESENTATION

OVERVIEW OF PRESENTATION OVERVIEW OF PRESENTATION PRESENTATION OUTLINE Introduction to Green Building Construction Waste Management Demolitions Waste Management C&D Waste Case Study Concrete Steel Timber Masonry Discussion GREEN

More information

Cambridgeshire County Council County Planning, Minerals and Waste

Cambridgeshire County Council County Planning, Minerals and Waste Cambridgeshire County Council County Planning, Minerals and Waste Guidance on Waste Audit and Management Strategies for submission in support of a planning application or to fulfil a requirement of a planning

More information

A Proposed Framework for a Waste-Free Ontario Ministry of the Environment and Climate Change Technical Briefing

A Proposed Framework for a Waste-Free Ontario Ministry of the Environment and Climate Change Technical Briefing A Proposed Framework for a Waste-Free Ontario Ministry of the Environment and Climate Change Technical Briefing Fall 2015 Purpose Overview: Background Proposed Legislation: Waste-Free Ontario Act, including:

More information

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY LOWER SAUCON TOWNSHIP

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY LOWER SAUCON TOWNSHIP REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY LOWER SAUCON TOWNSHIP Released on July 21, 2016 Police Operations Study REQUEST FOR PROPOSAL ( RFP ) 1. PURPOSE OF THE STUDY The Township of Lower Saucon

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

Executive Order GREENING THE GOVERNMENT THROUGH LEADERSHIP IN ENVIORNMENTAL MANAGEMENT

Executive Order GREENING THE GOVERNMENT THROUGH LEADERSHIP IN ENVIORNMENTAL MANAGEMENT Executive Order 13148 - - - - - - - GREENING THE GOVERNMENT THROUGH LEADERSHIP IN ENVIORNMENTAL MANAGEMENT By the authority vested in me as President by the Constitution and the laws of the United States

More information

A Waste Recycling Plan for. Municipality of Grey Highlands. Prepared with assistance from CIF & Waste Diversion Ontario And Genivar Consultants

A Waste Recycling Plan for. Municipality of Grey Highlands. Prepared with assistance from CIF & Waste Diversion Ontario And Genivar Consultants A Waste Recycling Plan for Municipality of Grey Highlands Prepared with assistance from CIF & Waste Diversion Ontario And Genivar Consultants Table of Contents 1. Introduction...2 2. Overview..3 3. Study

More information

Construction Site Waste Management Process.

Construction Site Waste Management Process. Construction Site Waste Management Process. EMS DOCUMENT TYPE: ENVIRONMENTAL ASPECT: PURPOSE: Operational Control Document Waste Management To ensure we manage our waste in compliance with legislation

More information

BOMA BEST Sustainable Buildings 3.0 Waste Auditing Requirements

BOMA BEST Sustainable Buildings 3.0 Waste Auditing Requirements BOMA BEST Sustainable Buildings 3.0 Waste Auditing Requirements This document provides the requirements for completing an audit compliant with the BEST Practice. For a more comprehensive description of

More information

Facilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation

Facilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation Federal/Provincial Environmental Assessment Coordination in Ontario A Guide for Proponents and the Public Facilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation

More information

Award process for a quality-based biosolids management program in Durham region

Award process for a quality-based biosolids management program in Durham region Award process for a quality-based biosolids management program in Durham region John Thompson, Regional Municipality of Durham Thom Sloley, Regional Municipality of Durham Janice (Patterson) Janiec, CH2M

More information

SCOPE OF WORK FOR PROFESSIONAL SERVICES: HET POSTHUYS ELECTRICAL UPGRADE

SCOPE OF WORK FOR PROFESSIONAL SERVICES: HET POSTHUYS ELECTRICAL UPGRADE ANNEXURE A T: +27 21 462 4502 F: +27 21 462 4509 E: info@sahra.org.za South African Heritage Resources Agency - Head Office 111 Harrington Street Cape Town P.O. Box 4637 Cape Town 8001 SCOPE OF WORK FOR

More information

Mid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision

Mid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision Mid-America Intergovernmental Audit Forum Selecting an External Auditor Guide for Making a Sound Decision May 2007 Foreword The benefits of having a high-quality audit of a government's financial statements

More information

Washington, D.C. London New Delhi Chicago San Francisco Scottsdale West Chester Sydney The Corporate Executive Board: What the Best Companies Do Toolbox.com is a wholly owned subsidiary of the Corporate

More information

RESIDENTIAL WASTE DIVERSION STRATEGY November 30, 2015

RESIDENTIAL WASTE DIVERSION STRATEGY November 30, 2015 RESIDENTIAL WASTE DIVERSION STRATEGY November 30, 2015 Waste & Recycling Services Table of Contents WHY DO WE NEED A STRATEGY?...2 WHAT ARE WE WASTING?...4 WHAT ARE WE DIVERTING?...5 WHAT COULD WE DO

More information

City and County of San Francisco

City and County of San Francisco City and County of San Francisco Office of the Controller CITY SERVICES AUDITOR REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION CONTRACT AUDIT AND PROJECT CONSULTING SERVICES RFQ#CON2013-11 CONTACT: Mary Hom,

More information

Construction Waste Management

Construction Waste Management Best Practices for an Environmentally Optimized Job Site Photo: courtesty turner Construction Waste Management Learning Objectives After completing this course, you will be able to: Describe waste recycling

More information

Who we are: Multidisciplinary team of 20 FTE, including urban planners, civil engineers, economists, scientists, architects, LEED APs, GIS.

Who we are: Multidisciplinary team of 20 FTE, including urban planners, civil engineers, economists, scientists, architects, LEED APs, GIS. Founded in 1998 to work at the nexus of environmental sustainability and economic development. Who we are: Multidisciplinary team of 20 FTE, including urban planners, civil engineers, economists, scientists,

More information

Audit of Procurement Practices

Audit of Procurement Practices Unclassified Internal Audit Services Branch Audit of Procurement Practices February 2014 SP-608-03-14E You can download this publication by going online: http://www12.hrsdc.gc.ca This document is available

More information

Ex AC. Examination for Architects in Canada Examen des architectes du Canada

Ex AC. Examination for Architects in Canada Examen des architectes du Canada Ex AC Examination for Architects in Canada Examen des architectes du Canada General and Specific Objectives Theme 1 general objective specific objectives rogramming 1.1 Understand the process for the preparation

More information

RFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers

RFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers 1. Question Is pre-registration required for the pre-proposal conference on May 3? Answer Pre-registration is not required. Please refer to Section I-8 of the RFP for further information. 2. Question Please

More information

Public Private Partnership Procurement and Opportunities.

Public Private Partnership Procurement and Opportunities. Public Private Partnership Procurement and Opportunities. C.J. Liebenberg. CJL Consult, Pretoria, 0039, South Africa, cliebenberg@cjlconsult.co.za ABSTRACT Pressure to improve waste management and to comply

More information

Construction and Demolition Material Recycling Program

Construction and Demolition Material Recycling Program Construction and Demolition Material Recycling Program WMAC Meeting June 26, 2012 Purpose As part of the Waste Management Advisory Committee s (WMAC) defined role and associated task/project document:

More information

Amity School District 4J

Amity School District 4J Amity School District 4J Code: DJCA-AR Adopted: 10/11/00 Revised/Readopted: 06/22/05 Personal Services Contracts I. Personal Services Contracts Defined A. Personal services contracts include, but are not

More information

To Bid or Not To Bid

To Bid or Not To Bid To Bid or Not To Bid That Should NOT Be a QUESTION When soliciting bids for various purchases, including asphalt and road equipment, townships have a variety of tools at their fingertips. From requests

More information

Effective Technical RFP Development: A Guide for Jurisdictions and Other Organizations December 19, 2016

Effective Technical RFP Development: A Guide for Jurisdictions and Other Organizations December 19, 2016 Effective Technical RFP Development: A Guide for Jurisdictions and Other Organizations December 19, 2016 HLN Consulting, LLC 72810 Hedgehog St. Palm Desert, CA 92260 858/538 2220 (Voice) 858/538 2209 (FAX)

More information

Best Practices Manual

Best Practices Manual Best Practices Manual Canada, C1A 7L3 Page 1 of 18 Table of Contents Introduction 0 Division 00 - Bid Documents 0.1 Alternate Bids 0.2 To be developed 1 Division 01 - General Requirements 1.1. Tender Document

More information

RESOLUTION NO. A RESOLUTION EXEMPTING THE DESIGN AND CONSTRUCTION OF WTP , VINE

RESOLUTION NO. A RESOLUTION EXEMPTING THE DESIGN AND CONSTRUCTION OF WTP , VINE RESOLUTION NO. 6583 A RESOLUTION EXEMPTING THE DESIGN AND CONSTRUCTION OF WTP- 17-02, VINE STREET WATER TREATMENT PLANT ( WTP) IMPROVEMENTS PROJECT FROM THE COMPETITIVE BIDDING PROCESS AND APPROVING AN

More information

EXHIBIT 6 Preconstruction Work

EXHIBIT 6 Preconstruction Work EXHIBIT 6 Preconstruction Work The following tasks shall be accomplished by the CM/GC as part of its obligations during the preconstruction phase. The work is to be coordinated with the services requirements

More information

1.0 Explore alternative methods for recovery of designated materials Examine diversion of additional materials at the public drop off depot

1.0 Explore alternative methods for recovery of designated materials Examine diversion of additional materials at the public drop off depot 1.0 Explore alternative methods for recovery of designated materials 1.1 City to explore alternative methods to provide recovery service for a range of divertible materials such as construction and demolition

More information

Reduce Reuse Recycle. Waste reduction, recycling AND economic benefit via sustainable design? BECOR - Green with Envy 12 September 2001

Reduce Reuse Recycle. Waste reduction, recycling AND economic benefit via sustainable design? BECOR - Green with Envy 12 September 2001 Public Works and Government Services Services gouvernementaux Acknowledgements Craig Boyle 1, Vince Catalli 2, Peter Kalinger 3 and Jim Palmquist 1 Technology Directorate, AES, Real Property Services,

More information

SECTION (SECTION 01351) CONSTRUCTION WASTE MANAGEMENT

SECTION (SECTION 01351) CONSTRUCTION WASTE MANAGEMENT This is a guidance document with sample specification language intended to be inserted into project specifications on this subject as appropriate to the agency's environmental goals. Certain provisions,

More information

LEED with COLD FORMED STEEL

LEED with COLD FORMED STEEL LEED with COLD FORMED STEEL SUSTAINABLE STEEL Steel is one of the world s most sustainable construction materials. Its strength and durability coupled with its ability to be endlessly recycled without

More information

City of Dawson Creek Request for Proposals No

City of Dawson Creek Request for Proposals No City of Dawson Creek Request for Proposals No. 2011-29 SANITARY SEWER MASTER PLAN The City of Dawson Creek is requesting proposals for the creation of a Sanitary Sewer Master Plan. All contract documents

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

ANNOUNCEMENT REQUEST FOR PROPOSALS (RFP)

ANNOUNCEMENT REQUEST FOR PROPOSALS (RFP) Fleetwood Community Pool Feasibility Study ANNOUNCEMENT REQUEST FOR PROPOSALS (RFP) The chair of Parks and Recreation of the Fleetwood Borough in Berks County, Pennsylvania, is accepting proposals for

More information

Sustainable Alternatives to Building Demolition

Sustainable Alternatives to Building Demolition Sustainable Alternatives to Building Demolition 2005 States Solid Waste Conference Phoenix, AZ It s Not Just Garbage Anymore Tom Napier Construction Engineering Research Laboratory Champaign, IL WHAT CAUSES

More information

DATE: July 10, 2018 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: July 10, 2018 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration DATE: July 10, 2018 REPORT NO. PW2018-046 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager Public Works Commission 1.0 TYPE OF REPORT

More information

Calgary Housing Company Asset Management Audit

Calgary Housing Company Asset Management Audit Calgary Housing Company Asset Management Audit October 5, 2015 THIS PAGE INTENTIONALLY LEFT BLANK ISC: UNRESTRICTED Table of Contents Table of Contents... 3 Executive Summary... 5 1.0 Background... 7 2.0

More information

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) PART 1 - PROJECT TITLE PAGE February 8, 2018 Project No. PROJECT NAME PART 2 - PROJECT GUIDELINES 2.1 BIDDERS/CONTRACTORS SHOULD CHECK

More information

Multi-Stream Waste and Recycling Receptacles in Recreation facilities

Multi-Stream Waste and Recycling Receptacles in Recreation facilities Public Report To: From: Report Number: Community Services Committee Ron Diskey, Commissioner, Community Services Department CS-18-59 Date of Report: September 7, 2018 Date of Meeting: September 13, 2018

More information

Table of Contents. Project Agreement Schedule 14

Table of Contents. Project Agreement Schedule 14 Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...

More information

Audit of the Initiation Phase of the New Bridge for the St. Lawrence Corridor (NBSLC) Project

Audit of the Initiation Phase of the New Bridge for the St. Lawrence Corridor (NBSLC) Project 2014-709 Audit of the Initiation Phase of the New Bridge for the St. Lawrence Corridor (NBSLC) Project May 14, 2015 Office of Audit and Evaluation TABLE OF CONTENTS MAIN POINTS... i INTRODUCTION... 1

More information

Periodic Comprehensive Review of the External Auditor

Periodic Comprehensive Review of the External Auditor Periodic Comprehensive Review of the External Auditor TOOL FOR AUDIT COMMITTEES January 2014 ENHANCING AUDIT QUALITY AUDIT COMMITTEES iii Table of Contents Introduction 1 1. Determine the scope, timing

More information

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district

More information

CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:

CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form: CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form: Please complete and submit this form with your building permit application. 80% of all demolition and construction material must be recycled.

More information