1 MATERIALS AND RESOURCES
2 MR- P1: STORAGE AND COLLECTION OF RECYCLABLES To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills. PREREQUISITE REQUIREMENTS Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building. Collection and storage areas may be separate locations. Recyclable materials must include mixed paper, corrugated cardboard, glass, plastics, and metals. Take appropriate measures for the safe collection, storage, and disposal of two of the following: batteries, mercury-containing lamps, and electronic waste. POTENTIAL TECHNOLOGIES AND STRATEGIES Designate an area for recyclable collection and storage that is appropriately sized and located in a convenient area. Identify local waste handlers and buyers for glass, plastic, metals, office paper, newspaper, cardboard and organic wastes. Instruct occupants on recycling procedures. Consider employing cardboard balers, aluminum can crushers, recycling chutes and other waste management strategies to further enhance the recycling program. 62
3 MR- P2: CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLANNING To reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials. PREREQUISITE REQUIREMENTS Develop and implement a construction and demolition waste management plan: Establish waste diversion goals for the project by identifying at least five materials (both structural and nonstructural) targeted for diversion. Approximate a percentage of the overall project waste that these materials represent. Specify whether materials will be separated or commingled and describe the diversion strategies planned for the project. Describe where the material will be taken and how the recycling facility will process the material. Provide a final report detailing all major waste streams generated, including disposal and diversion rates. Alternative daily cover (ADC) does not qualify as material diverted from disposal. Landclearing debris is not considered construction, demolition, or renovation waste that can contribute to waste diversion. POTENTIAL TECHNOLOGIES AND STRATEGIES Consider reusing existing, previously occupied building structures, envelopes and elements. Remove elements that pose a contamination risk to building occupants and upgrade components that would improve energy and water efficiency, such as windows, mechanical systems and plumbing fixtures. 63
4 MR- 1: LIFE-CYCLE IMPACT REDUCTIONS To encourage adaptive reuse and optimize the environmental performance of products and materials. 3 S OR Demonstrate reduced environmental effects during initial project decision-making by reusing existing building resources or demonstrating a reduction in materials use through life-cycle assessment. Achieve one of the following options. OPTION 1 (3 S) Historic Building Reuse Maintain the existing building structure, envelope, and interior nonstructural elements of a historic building or contributing building in a historic district. To qualify, the building or historic district must be listed or eligible for listing in the local, state, or national register of historic places. Do not demolish any part of a historic building or contributing building in a historic district unless it is deemed structurally unsound or hazardous. For buildings listed locally, approval of any demolition must be granted by the local historic preservation review board. Any alteration (preservation, restoration, or rehabilitation) of a historic building or a contributing building in a historic district on the project site must be done in accordance with local or national standards for rehabilitation, whichever are applicable. OPTION 2 (1 ) Renovation of Abandoned or Blighted Building Maintain at least 50%, by surface area, of the existing building structure, enclosure, and interior structural elements for buildings that meet local criteria of abandoned or are considered blight. The building must be renovated to a state of productive occupancy. Up to 25% of the building surface area may be excluded from credit calculation because of deterioration or damage. OR OPTION 3 (2 S) Building and Material Reuse 64
5 Reused products/materials have to constitute 5% of the project s total material cost value. (The percentage decide the amount of credits) The following approach can achieve this credit by using: Reused Materials found on site: Fixed components such as doors, cabinetries, posts etc. that no longer serve their original function are refurbished, reconditioned and installed for a different use or in a different location. Reused Materials found off site: Use of salvaged materials found off site. They must be previously used or they may be relocated from another facility. Temporary structures: Temporary formwork, framing and structures etc. that can be reused many times before disposal (5-10 cycles of usage) can also be included. If the temporary structures are not new procurement for this project but have been used previously in other project/s, state the number of re-use that are remaining (e.g. use of system formwork is encouraged). REQUIRED SUBMISSION FOR DESIGN ASSESSMENT List of anticipated reused or salvaged materials for the project Cost of each proposed reused or salvaged materials. Establish the estimated Total Cost of the materials for the project REQUIRED SUBMISSION FOR POST CONSTRUCTION ASSESSMENT Documentation during the construction stage including photographs of the reused materials List of reused or salvaged materials used in the project after completion and their locations in the building. Cost of each reused or salvaged materials either based on actual cost paid or replacement value of the material. Provide the Actual Total Cost of the materials in the project. Describe any deviations or additions to the DA submission. OR OPTION 4 (2 S) Whole-Building Life-Cycle Assessment For new construction (buildings or portions of buildings), conduct a life-cycle assessment of the project s structure and enclosure that demonstrates a minimum of 10% reduction, compared with a reference building, in at least three of the six impact measures listed below, one of which must be global warming potential. No impact category assessed as part of the life-cycle assessment may increase by more than 5% compared with the reference building. The reference and design buildings must be of comparable size, function, orientation, and operating energy performance as defined in EA Prerequisite Minimum Energy Performance. The service life of the reference and design buildings must be the same and should fully account for maintenance and replacement. Use the same life-cycle assessment software tools and datasets to evaluate both the reference case and the design case, and report all listed impact categories. 65
6 MR- 2: MATERIALS DISCLOSURE AND OPTIMIZATION To encourage disclosure about environmental attributes and increase the use of products and materials with environmentally, economically, and socially preferable life-cycle impacts. 3 S AND/OR OPTION 1 (1 ) Material Ingredient Reporting Provide the following information on building materials: Manufacturer Inventory: Publish a complete content inventory for the building products to be identified by name. Health Product Declaration: Publish a complete Health Declaration for the building products with full disclosure of known hazards in compliance with the requirements by the Lagos State Safety Commission. OPTION 2 (2 S) Material ingredient optimization Use products that document their material ingredient optimization Are sourced from product manufacturers who engage in validated and robust safety, health, hazard, and risk programs which at a minimum document at least 99% (by weight) of the ingredients used to make the building product or building material, and Are sourced from product manufacturers with independent third party verification of their supply chain that at a minimum verifies: Processes are in place to communicate and transparently prioritize chemical ingredients along the supply chain according to available hazard, exposure and use information to identify those that require more detailed evaluation Processes are in place to identify, document, and communicate information on health, safety and environmental characteristics of chemical ingredients Processes are in place to implement measures to manage the health, safety and environmental hazard and risk of chemical ingredients Processes are in place to optimize health, safety and environmental impacts when designing and improving chemical ingredients Processes are in place to communicate, receive and evaluate chemical ingredient safety and stewardship information along the supply chain Safety and stewardship information about the chemical ingredients is publicly available from all points along the supply chain. 66
7 MR- 3: RESPONSIBLE SOURCING OF MATERIALS To protect ecosystems, respect cultural and community values, and improve land use through responsible extraction of raw materials used for building products and materials. 3 S AND/OR OPTION 1 (1 ) Responsible Extraction of Raw Materials Use permanently installed new building products and materials that meet applicable responsible extraction criteria. Responsible extraction criteria : Mined or quarried materials. For raw materials that are mined or quarried using practices covered in the Framework for Responsible Mining, obtain signed letters from the owners of the manufacturing companies and their raw materials suppliers, stating that they have reviewed and understood the Framework for Responsible Mining and publicly declared their commitment to responsible mining. Each raw material supplier must provide an independently audited checklist listing the entire Framework for Responsible Mining s Leading Edge Issues, and identifying which Leading Edge measures they are currently taking. Bio-based materials. Bio-based raw materials must meet ASTM Test Method D6866 and be legally harvested, as defined by the exporting and receiving country. Exclude hide products, such as leather and other animal skin material. Other biobased products must meet the Sustainable Agriculture Network s Sustainable Agriculture Standard. Other extracted materials. For raw materials that are not mined, quarried, or biobased, extraction and manufacture must meet all applicable laws for the exporting and receiving countries, including human rights laws. Product manufacturers must make publicly available a 3rd party verified corporate sustainability report that includes the following: A commitment to long-term ecologically responsible land use; A commitment to reducing environmental harms from extraction and/or manufacturing processes; Evidence of their economic and social support of adjacent communities; a commitment to meeting applicable standards or programs voluntarily that address responsible sourcing criteria; Their labor practices; and Their governance structure. OPTION 2 (2 S) 67
8 Regional Materials Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 km radius of the project site for 20% (based on cost) of the total material value. Mechanical, electrical and plumbing components shall not be included. Only include materials permanently installed in the project. This credit must be evaluated early in the design process as materials and products that can be sourced locally can be established. The contractors and suppliers are to verify the availability of materials which are extracted/ harvested/ recovered and manufactured locally. This will ensure that the project team is aware on the availability of such materials and give focus on the materials that will contribute the most to this credit. REQUIRED SUBMISSION FOR DESIGN ASSESSMENT (DA) List of products that are extracted/harvested/recovered and manufactured within 500 km of the project site. Provide the following: Name of the manufacturer, Product cost, AND The distance between the project site and the manufacturer. Determine the estimated total Material Cost. Calculate the percentage of regional materials used = Total Cost of Regional Materials (RM) / Total Material Cost (RM). REQUIRED SUBMISSION FOR POST CONSTRUCTION ASSESSMENT List of products that are extracted/harvested/recovered and manufactured within 500 km of the project site after completion. Provide the following: Name of the manufacturer, Product cost, AND The distance between the project site and the manufacturer. Determine the Actual Total Material Cost. Calculate the percentage of regional materials used = Total Cost of Regional Materials (RM) / Total Material Cost (RM). Describe any deviations or additions to the DA submission. POTENTIAL TECHNOLOGIES AND STRATEGIES Establish a project goal for locally sourced materials, and identify materials and material suppliers that can achieve this goal. During construction, ensure that the specified local materials are installed, and quantify the total percentage of local materials installed. Consider a range of environmental, economic and performance attributes when selecting products and materials 68
9 MR- 4: RAPIDLY RENEWABLE MATERIALS To ensure that the building uses materials that will not contribute to environmental pollution. 2 S Demonstrate at least 75% (by area) of one or more specified building components are rapidly renewable. Demonstrate at least 35% (by area) of two or more specified building components are rapidly renewable. Demonstrate at least 15% (by area) of four or more specified building components are rapidly renewable. Demonstrate 2%/4% of all building materials/products used in the project is rapidly renewable materials. (Different credits for different percentage). The Client shall submit a summary sheet listing all finishes materials and highlighting the proposed rapidly renewable materials that meet the Credit Requirements and their use in the project (i.e. materials used in joinery, walls and partitions, floors, ceilings, or roof). Calculations demonstrating that the total area of rapidly renewable materials meet relevant Credit Point requirement. Extracts from specifications requiring the use of rapidly renewable materials. Drawings showing relevant area of proposed use. CALCULATIONS METHODOLOGY 69
10 MR- 5: CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT To reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials. 3 S Recycle and/or salvage nonhazardous construction and demolition materials. Calculations can be by weight or volume but must be consistent throughout. Exclude excavated soil, land-clearing debris, and alternative daily cover (ADC). Include wood waste converted to fuel (biofuel) in the calculations; other types of waste-to-energy are not considered diversion for this credit. Waste-to-energy systems run by the Lagos State Waste Management System may be considered waste diversion OPTION 1 (3 S) Diversion Path 1: Three Material Streams Divert at least 50% of the total construction and demolition material; diverted materials must include at least three material streams. OR Path 2: Four Material Streams Divert at least 75% of the total construction and demolition material; diverted materials must include at least four material streams. OR OPTION 2 (3 S) Reduction of Total Waste Material Do not generate more than 2.5 pounds of construction waste per square foot (12.2 kilograms of waste per square meter) of the building s floor area. POTENTIAL TECHNOLOGIES AND STRATEGIES Establish goals for diversion from disposal in landfills and incineration facilities and adopt a construction waste management plan to achieve these goals. Consider recycling cardboard, metal, brick, mineral fiber panel, concrete, plastic, clean wood, glass, gypsum wallboard, carpet and insulation Designate a specific area(s) on the construction site for segregated or comingled collection of recyclable materials, and track recycling efforts throughout the construction process. Identify construction haulers and recyclers to handle the designated materials. Note that diversion may include donation of materials to charitable organizations and salvage of materials on-site. 70
11 MR- 6: DESIGN FOR FLEXIBILITY Conserve resources associated with the construction and management of buildings by designing for flexibility and ease of future adaptation and for the service life of components and assemblies. 3 S Demonstrate the following: 90% of the building has regular rhythm to exposed facades (by area); Floor-to-floor heights of at least 3.6 meters; 90% of the windows are evenly distributed around exposed elevations (by area); 90% of interior, non-structural walls are demountable or movable (by area); and 90% of pipes, wiring and conduits are not permanently embedded in building materials REQUIRED SUBMISSION Brief narrative describing how the project intends to meet the Credit Requirements, including any calculations; Building elevations clearly indicating how the building has regular rhythm to exposed facades, floor-to-floor heights and distribution of windows; Typical floor plan indicating the location of any load bearing walls and other interior walls as well as any connections for movable/demountable walls; and Drawings indicating plumbing and electrical services are not to be permanently embedded in building materials. 71
Impact Barrier QT LEED Sheet
Impact Barrier QT LEED Sheet Overview Recycled rubber underlayment is a growing category for sound insulation within the construction industry and continues to increase in popularity as a practical solution
More informationATTACHMENT N LEED PROJECT PROCEDURES
ATTACHMENT N LEED PROJECT PROCEDURES 1. All subcontractors, sub-subcontractors and suppliers at all tiers are to include the following items in their trade scope of work: a. Submit data and documentation
More informationBalco, Inc. Elastomeric Expansion Joint Covers
Balco, Inc. Elastomeric Expansion Joint Covers Applicable Rating Systems: CI - Commercial Interiors RETAIL CI - Retail, Commercial Interiors Balco, Inc. Elastomeric Joint Cover Systems Contributes to LEED
More informationBalco, Inc. Type EV, Exterior Vertical Expansion Joint Covers
Balco, Inc. Type EV, Exterior Vertical Expansion Joint Covers Applicable Rating Systems: CI - Commercial Interiors RETAIL CI - Retail, Commercial Interiors Balco, Inc. Elastomeric Joint Cover Systems Contributes
More informationLEED V4 FACT SHEET FOR STEEL PRODUCTS USED IN CONSTRUCTION APPLICATIONS
LEED V4 FACT SHEET FOR STEEL PRODUCTS USED IN CONSTRUCTION APPLICATIONS Designers and builders have long recognized steel for its strength, durability and functionality. An important aspect of steel s
More informationLEED v4 Bulletin for BD+C New Construction and Major Renovation
LEED v4 Bulletin for BD+C Isolatek International is committed to sound environmental practice and operating in a sustainable manner. We are also committed to reducing our environmental impact while continually
More informationComponent Goal Performance Measurement Unit. meet the sustainability criteria. described below. described below. from landfills.
Facility Maintenance and Renovation Policy for Merchandise Mart Effective date: May 1, 2018 i. Scope This policy applies to any ongoing facility maintenance activities and any facility renovations that
More informationLEED v4 Technical Bulletin Building Design + Construction
LEED v4 Technical Bulletin Building Design + Construction Background This document outlines Carboline s contributions towards available LEED v4 credits. Carboline is committed to developing and manufacturing
More informationMATERIALS AND RESOURCES
LEED Rating System 3 rd Public Comment Draft MATERIALS AND RESOURCES Includes: Building Design & Construction Interior Design & Construction Existing Buildings: Operations and Maintenance Neighborhood
More informationLEED Green Building Leadership. LEED Data. Green Building Leadership
LEED Green Building Leadership LEED Data Green Building Leadership 02 www.kingspanaccessfloors.co.uk LEED Green Building Leadership Leadership in Energy & Environmental Design (LEED) LEED helps demonstrate
More informationLEED v4 Bulletin for BD+C New Construction and Major Renovation
LEED v4 Bulletin for BD+C Isolatek International is committed to sound environmental practice and operating in a sustainable manner. We are also committed to reducing our environmental impact while continually
More informationLEED v4 Bulletin for BD+C New Construction and Major Renovation
LEED v4 Bulletin for BD+C Isolatek International is committed to sound environmental practice and operating in a sustainable manner. We are also committed to reducing our environmental impact while continually
More informationBalco, Inc. Stair Nosings
Balco, Inc. Stair Nosings Applicable Rating Systems: CI - Commercial Interiors RETAIL CI - Retail, Commercial Interiors Balco, Inc. Stair Nosings Contributes to LEED Credits Zero maintenance, reducing
More informationTopic #8: LEED Materials & Resources
0/6/ Topic #8: LEED Materials & Resources References: LEED Green Building & ore oncepts Guide The Engineering Guide to LEED-N by Liv Haselbach USGB website: www.usgbc.org E 555: Sustainable Design and
More informationLearning to LEED: Day 2 Materials & Resources Quiz
Learning to LEED: Day 2 Materials & Resources Quiz 1. Number of Prerequisites in the Materials & Resources category: Number of Credits in the Materials & Resources category: Number of Points in the Materials
More informationLEED v4 Technical Bulletin Building Design + Construction
LEED v4 Technical Bulletin Building Design + Construction Background This document outlines Carboline s contributions towards available LEED v4 credits. Carboline is committed to developing and manufacturing
More informationSt. Monica Food Pantry Construction Waste Management and Disposal SBA-13105
St. Monica Food Pantry 01 7419-1 SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY: A. Work of this section includes administrative and procedural requirements for
More informationCarboline Fireproofing Products
Carboline Fireproofing Products Credit Contributions for Leadership in Energy and Environmental Design (LEED v2009) Carboline Company 800-848-4645 1/6/2014 Background Carboline fireproofing products can
More informationConstruction and Demolition Waste Management at UVM
Construction and Demolition Waste Management at UVM Definition of C&D Waste Waste material that is produced in the process of construction, renovation, or demolition of structures. Structures include buildings
More informationAlameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
SECTION 01505 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 1.01 SUMMARY A. Section specifies diversion of construction and demolition (non-hazardous) debris from landfill. B. Related requirements specified
More informationENVIRONMENTAL IMPACT ANALYSIS I. PUBLIC UTILITIES: SOLID WASTE 1. ENVIRONMENTAL CONDITIONS. a. Physical Setting
IV. ENVIRONMENTAL IMPACT ANALYSIS 1. ENVIRONMENTAL CONDITIONS a. Physical Setting Solid waste generated at the project vicinity is generally disposed of at the Sunshine Canyon Landfill located off San
More informationMATERIALS & RESOURCES (MR)
MATERIALS & RESOURCES (MR) MR Prerequisite 1: Storage and Collection of Recyclables Intent: The intent of this prerequisite is to reduce landfill waste produced by building occupants through the utilization
More informationProduct LEED Guide Vexcon Chemicals, Inc. 1
Product LEED Guide 2010 Vexcon Chemicals, Inc. 1 GI 205 12-08 LEED ENERGY AND AOSPHERE (EA) Buildings consume 60-70% of all electricity produced annually in the US. An effective strategy which contributes
More informationOVERVIEW OF PRESENTATION
OVERVIEW OF PRESENTATION PRESENTATION OUTLINE Introduction to Green Building Construction Waste Management Demolitions Waste Management C&D Waste Case Study Concrete Steel Timber Masonry Discussion GREEN
More informationMOVABLE WALLS. Environmental Stewardship Through Responsible Solutions. Rob Wittl Senior Manager and Product Expert Movable Walls, KI
MOVABLE WALLS 2 Environmental Stewardship Through Responsible Solutions Rob Wittl Senior Manager and Product Expert Movable Walls, KI 2 Movable Walls: Environmental Stewardship Through Responsible Solutions
More informationLEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources
LEED of the Knight Management Center Energy & Atmosphere Materials & Resources Energy & Atmosphere: 17 possible points LEED-NC Scorecard LEED for New Construction v2.2 Registered Project Checklist Project
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging non-hazardous
More informationASSA ABLOY Door Security Solutions Contribution Toward LEED v4 Certification
Door Security Solutions Contribution Toward LEED v4 Certification U.S. Green Building Council's Leadership in Energy and Environmental Design, or LEED, is used throughout the world to build healthy and
More informationCONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability
01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationSECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.
Buchtel/Perldns Community Learning Center GPD 2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 PART 1- GENERAL 1.1 SUMMARY SECTION 01524 CONSTRUCTION WASTE MANAGEMENT
More informationSECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL
SECTION 017418 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationCONSTRUCTION WASTE MANAGEMENT PLAN
CONSTRUCTION WASTE MANAGEMENT PLAN Project: Construction Manager: Location: Prepared by: PREMIER FACILITY MANAGEMENT (PFM) Date: I. OBJECTIVES The objectives of this plan are to: 1. Recycle, reuse or salvage
More informationA PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE
A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE San Francisco's new Green Building Requirements Ordinance ("Ordinance") went into effect on November 3, 2008. 1 It affects most new construction
More informationErrata Sheet. LEED for Schools Reference Guide First Edition for the document titled:
Errata Sheet for the document titled: LEED for Schools Reference Guide First Edition 2007 Notes: Updates to this document are posted on the LEED for Schools Rating System page and the Reference Guide electronic
More informationor
LEED Information for Calstone Concrete Paving Stones Developed by the USGBC (U.S. Green Building Council) membership, LEED the Leadership in Energy and Environmental Design Green Building Rating System
More informationLEED with COLD FORMED STEEL
LEED with COLD FORMED STEEL SUSTAINABLE STEEL Steel is one of the world s most sustainable construction materials. Its strength and durability coupled with its ability to be endlessly recycled without
More informationCONSTRUCTION WASTE MANAGEMENT PLAN
CONSTRUCTION WASTE MANAGEMENT PLAN The 2016 California Green Building Standards Code (Cal Green Code) is effective January 1, 2017. The Cal Green Code, Section 4.408 (Residential) and Section 5.408 (Nonresidential)
More informationBUILDING DEMOLITION REQUIREMENTS
BUILDING DEMOLITION REQUIREMENTS SUBMITTAL REQUIREMENTS 1. Completed permit application form. This permit application form and all other required forms can be downloaded at https:///documentcenter. 2.
More informationGuide Specification for Concrete for LEED v4 Projects
Guide Specification for Concrete for LEED v4 Projects LEED v4 Material and Resources (MR) In the past versions of LEED, the focus of material impacts has been on single attributes such as recycled content,
More informationNordic Structures Revised May 9, 2018
Nordic X-Lam GR-L306 Nordic Structures Revised May 9, 2018 Products: Nordic X-Lam Nordic Structures 1100 Avenue des Canadiens-de-Montréal, Suite 504 Montreal, Québec, Canada H3B 2S2 (514) 871-8526 www.nordic.ca
More informationNordic Structures Revised February 28, 2018
Nordic X-Lam GR-L306 Nordic Structures Revised February 28, 2018 Products: Nordic X-Lam Nordic Structures 1100 Avenue des Canadiens-de-Montréal, Suite 504 Montreal, Québec, Canada H3B 2S2 (514) 871-8526
More information- SUPPLEMENT HISTORY TABLE Title 15 - BUILDINGS AND CONSTRUCTION. Chapter RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS
Chapter 15.56 RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS Sections: 15.56.010 Findings and purpose. 15.56.020 Definitions. 15.56.030 Deconstruction Salvage Recovery. 15.56.040 Diversion
More informationSECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationC&D Recycling Market Overview and Identification
Building Materials Reuse Association- DECON 2007 C&D Recycling Market Overview and Identification Finding and Getting Materials to Market What to do with the materials you don t want? Types of Waste Market
More informationGreen Building Rating System For Commercial Interiors
Green Building Rating System For Commercial Interiors Ballot Draft October 2004 LEED-CI Rating System Ballot Draft 1 Disclaimer and Notices The U.S. Green Building Council authorizes you to view the LEED-CI
More informationSECTION (SECTION 01351) CONSTRUCTION WASTE MANAGEMENT
This is a guidance document with sample specification language intended to be inserted into project specifications on this subject as appropriate to the agency's environmental goals. Certain provisions,
More information1. Division 01 Section General Requirements Temporary Facilities and Controls.
PAGE 024210-1 SECTION 024210 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationCAMP BLANDING JOINT TRAINING CENTER CONSTRUCTION AND FACILITY MANAGEMENT OFFICE ARCHITECT S PROJECT # CFMO PROJECT #
SECTION 018113.13 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes general requirements and procedures for compliance with certain USGBC LEED prerequisites and credits needed for Project to obtain LEED
More informationConstruction Waste Management and Disposal
University of New Hampshire University of New Hampshire Scholars' Repository Division 01 General Requirements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 017419 - Construction Waste
More informationCity Department: 1. Project Name: 2. Project/Job Number: 3. Reporting Period: 4. Project Street Address: 5. City & County (if not in SF):
REQUEST TO SEND CONSTRUCTION & DEMOLITION DEBRIS MATERIAL DIRECTLY TO LANDFILL City and County of San Francisco Environment Code 7; Ordinance No. 204-11; SFE Regulations Environment Code Chapter 7 Section
More informationSECTION SUSTAINABILITY CERTIFICATION REQUIREMENTS LEED NC V3
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 81 13.01 SUSTAINABILITY CERTIFICATION REQUIREMENTS LEED NC V3 A. This section describes requirements and procedures which are additive to and compatible with
More informationCornell Rolling Counter Fire Doors Comprehensive Guide to Earning LEED v4 Credits
Cornell Rolling Counter Fire Doors Comprehensive Guide to Earning LEED v4 Credits 1 Cornell Rolling Counter Fire Doors Earning LEED v4 Credits Cornell Rolling Counter Fire Doors can provide a significant
More informationThe Joe Wark Environmental Award
The Joe Wark Environmental Award Purpose: To provide incentive for General Contractors/Owners of single-family and small multi-family (four units or less) construction projects to participate in building
More informationBalco, Inc. Aluminum Expansion Joint Covers
Balco, Inc. Aluminum Expansion Joint Covers Applicable Rating Systems: CI - Commercial Interiors RETAIL CI - Retail, Commercial Interiors Balco, Inc. Aluminum Joint Cover Systems Contributes to LEED Credits
More informationLEED-2009 Green Building Rating System. New Construction & Major Renovations
LEED-2009 Green Building Rating System New Construction & Major Renovations 1 The following pages are designed to assist Engineers acquire LEED Credits in the design of Green Sustainable building utilizing
More informationSAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION
SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings
More informationSECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management.
SECTION 01 35 63 CONSTRUCTION WASTE MANAGEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for Construction Waste Management. 1.2 DEFINITIONS A. Construction
More informationGuidelines for Qualifying and Quantifying Waste Diversion from Landfill Claims
Waste Diversion from Landfill Certification Guidelines for Qualifying and Quantifying Waste Diversion from Landfill Claims January 2014 Document #1.9 Rev. 2 2014 All Rights Reserved. 1.16.2014 Document
More informationCity of Brisbane Construction and Demolition Debris Recycling and Waste Reduction Plan
City of Brisbane Construction and Demolition Debris Recycling and Waste Reduction Plan This form is to be completed for all demolition, remodel, re-roofing and new construction projects covered by Ordinance
More informationMaking the Case for Construction Waste Management
Making the Case for Construction Waste Management Hazem Elzarka, PhD, PE, LEED AP University of Cincinnati Cincinnati, Ohio, USA Construction and demolition activities generate a large portion of the total
More informationALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations LEEDv4 Guideline February 1, 2017 Tony Sparks David Ritchey Stuart Ingham Karen Alarid Kris Callori Noreen Richards
More informationAPPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION
APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION The following appendix includes information and standard drawings that are diagrammatic and are used only to convey intent. Construction Waste
More informationFOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.
City of Boulder Residential Building Guide Green Building & Green Application Resource Conservation Ordinance 7565 www.bouldergeenpoints.com FOR ADDITIONS and REMODELS Before filling out this application,
More informationDemolition Waste Management Plan Guidelines
Demolition Waste Management Plan Guidelines A resource for Western Australian Local Government, Developers, Property Owners and Demolition Contractors Contents 1 Introduction... 2 2 Project Planning...
More informationLaGyp TM Gypsum Boards
LaGyp TM Gypsum Boards Red is now Green only with LaGyp TM LaGyp TM Gypsum Boards LaGyp TM Gypsum Boards are now certified by Green Building Council with 14 rating points. This makes LaGyp TM the Greenest
More informationDSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for the following: 1. Salvaging nonhazardous demolition
More informationPetersen Aluminum Leadership in Energy and Environmental Design (LEED ) Guidelines
Petersen Aluminum Leadership in Energy and Environmental Design (LEED ) Guidelines This guideline provides a summary of the USGBC s new LEED 2009 green building rating program. It offers an overview of
More informationCITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT Building and Safety Division Construction Waste Management Plan (CWMP) (Provide During Plan Review)
CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT Building and Safety Division Construction Waste Management Plan (CWMP) (Provide During Plan Review) Building permit applicants must prepare a Construction
More informationMECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING
SHEET TITLE ARCHITECTURAL A-0 COVER SHEET A-1 DEMOLITION NOTES A-2 DEMOLITION PLAN A-3 FLOOR PLAN NOTES A-4 FLOOR PLAN A-5 INTERIOR ELEVATIONS A-6 DOOR SCHEDULE A-7 DETAILS MECHANICAL M-1 LEGEND AND DETAILS
More informationMassaud Conference. Product Environmental Profile (PEP) Americas
Product Environmental Profile (PEP) Americas CALCULATIONS FROM 08/2016 Massaud Conference Product Environmental Profile is an environmental declaration according to the objectives of ISO 14021. Precise,
More informationSUSTAINABLE PURCHASING POLICY
SUSTAINABLE PURCHASING POLICY TABLE OF CONTENTS 1. INTRODUCTION... 2 2. GOALS AND SCOPE... 2 3. PERFORMANCE MEASUREMENT... 2 4. GUIDANCE FOR RESOURCES AND IMPLEMENTATION... 3 A. OVERVIEW... 3 B. ONGOING
More informationHUMAN HEALTH & MATERIAL CONSIDERATIONS IN LEED V4
HUMAN HEALTH & MATERIAL CONSIDERATIONS IN LEED V4 MARSHA GENTILE CSBA, LEED AP BD+C DIRECTOR, SUSTAINABILITY LEDCOR CONSTRUCTION LIMITED CSC LUNCHEON VANCOUVER ISLAND FEBRUARY 23, 2017 AGENDA Building
More informationInternational Beams, Inc. Revised June 20, 2018
IB Series I-Joists GR-L252 International Beams, Inc. Revised June 20, 2018 Products: IB-400, 600, 800 and 900 Prefabricated Wood I-Joists International Beams, Inc., 2010 Bld St-Elzear West, Laval, Quebec,
More informationDRAFT LEED EB Reference Guide Materials and Resources August 25, 2003
MATERIALS AND RESOURCES (MR) Building materials choices are important in sustainable design because of the extensive network of extraction, processing, and transportation steps required to process them.
More information«Improving management of construction and demolition waste»
«Improving management of construction and demolition waste» What is DEMOCLES? DEMOCLES (The keys of demolition) is a 2 years collaborative project involving more than 40 French stakeholders of construction
More informationLEED GUIDE. March. How Centaur Flooring Can Contribute to Obtaining LEED v4 Credits. March
March 2016 March LEED GUIDE How Centaur Flooring Can Contribute to Obtaining LEED v4 Credits. Revised on 03/31/16 Supersedes all previous versions. Check 1 website for updates. 3 What is LEED? Table of
More informationSection 34 Brieser Construction SH&E Manual
Brieser Construction SH&E Manual April 23 2010 This written program documents the steps has taken to minimize General Refuse and Construction & Demolition debris resulting from various construction activities
More informationConstruction Waste Management
Best Practices for an Environmentally Optimized Job Site Photo: courtesty turner Construction Waste Management Learning Objectives After completing this course, you will be able to: Describe waste recycling
More informationIntroduction to LEED v4 Lyle Scott May 22, 2014
Introduction to LEED v4 Lyle Scott May 22, 2014 Agenda Introduction to LEED v4 Taking a Global Approach New and More Stringent Major & Resources Introduction to LEED v4 Global Approach LEED Online Alternative
More informationWhat s New in LEED v4
July 2017 AIA Course Number: LEED17A What s New in LEED v4 A focus on Material & Resources (MR) and Indoor Environmental Quality (IEQ) AIA Registration 2 Armstrong World Industries is a registered provider
More informationSECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 81 13.21 SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES A. This section describes general requirements and procedures to comply with the Green Building
More informationRoseburg RIGIDLAM LVL Roseburg Forest Products Company Revised May 31, 2018
Roseburg RIGIDLAM LVL GR-L289 Roseburg Forest Products Company Revised May 31, 2018 Products: 1.3E, 1.5E, 2.0E, 2.2E, and 2.3E Laminated Veneer Lumber Roseburg Forest Products Company, 4500 Riddle Bypass
More informationCONSTRUCTION WASTE MANAGEMENT AND DISPOSAL FORM CWM-1
FORM CWM-1 FORM CWM-1: CONSTRUCTION WASTE IDENTIFICATION Packaging: Cardboard Packaging: Boxes Sheet or Film Packaging: Polystyrene Packaging: Pallets or Skids Packaging: Crates Packaging: Paint Cans Pails
More informationThermiser Insulated Rolling Doors Comprehensive Guide to Earning LEED v4 Credits
Thermiser Insulated Rolling Doors Comprehensive Guide to Earning LEED v4 Credits 1 Thermiser Insulated Rolling Doors Earning LEED v4 Credits Cookson s Thermiser Insulated Rolling Doors can provide a significant
More information4043 N. Ravenswood Suite 207 Chicago, IL
Green is Simply Good Practice A Demonstration of How Good Design Strategies and Construction Practices Can Achieve a LEED for Homes Certification Often it seems that the motivation for being green comes
More informationLEED REQUIREMENTS. Source reference: Supplemental Guidance to the Minimum Program Requirements (MPR), Rev. 2, 9/1/2011
OVERVIEW: The University of Illinois at Urbana-Champaign Facilities Standards includes language to comply with LEED Building Design and Construction Rating System developed by the U.S. Green Building Council.
More informationMASSEY HOFFMAN ARCHITECTS
Green is Simply Good Practice How Good Design Strategies and Construction Practices can Achieve a LEED for Homes Certification Often it seems that the motivation for building green comes from the desire
More informationCITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS
CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS W hereas, pursuant to Chapters 11-4 and 2-30 of the Municipal Code of Chicago (the Code ),
More informationC. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:
02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"
More informationBOMA BEST Sustainable Buildings 3.0 Waste Auditing Requirements
BOMA BEST Sustainable Buildings 3.0 Waste Auditing Requirements This document provides the requirements for completing an audit compliant with the BEST Practice. For a more comprehensive description of
More informationA. Product data. Unless otherwise indicated, submit the following for each type of product provided under work of this Section:
This is a guidance document with sample specification language intended to be inserted into project specifications on this subject as appropriate to the agency's environmental goals. Certain provisions,
More informationMaterials & Resources
Materials & Resources SS WE EA MR EQ Overview Building materials choices are important in sustainable design because of the extensive network of extraction, processing and transportation steps required
More informationGreen Building KPIs. Fermacell PE INTERNATIONAL. from BREEAM and LEED that are relevant for selected fire protection and building board products
Fermacell Green Building KPIs from BREEAM and LEED that are relevant for selected fire and building products 31/05/2012 PE INTERNATIONAL Contact: Dr. Peter Shonfield The Portergate Ecclesall Road Sheffield
More informationLEED Application Guide for Multiple Buildings and On Campus Building Projects
LEED Application Guide for Multiple Buildings and On Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011
More informationCambridgeshire County Council County Planning, Minerals and Waste
Cambridgeshire County Council County Planning, Minerals and Waste Guidance on Waste Audit and Management Strategies for submission in support of a planning application or to fulfil a requirement of a planning
More informationGRC 20 th Annual Conference
Salvaging Recycling, New Developments in Construction and Demolition Materials Andy Lake CSI NDA CMRA Recycling Infrastructure Process Specialist ABP Technology Armstrong World Industries GRC 20 th Annual
More informationSECTION GREEN BUILDING POLICY IMPLEMENTATION
SECTION 01390 [Note: The intent of this section is to identify Contractor specific work required for achievement of the University Green Building Policy. The policy applies to all new facilities, and partially
More informationGreen Request for Proposal ( RFP )