1 Sustainable Alternatives to Building Demolition 2005 States Solid Waste Conference Phoenix, AZ It s Not Just Garbage Anymore Tom Napier Construction Engineering Research Laboratory Champaign, IL

2 WHAT CAUSES DEBRIS? Response to an Army Mission Upgrade capabilities Improve quality of life for soldiers and their families Remove obsolete buildings from inventory

3 DEBRIS Demolishing ONE WWII-era barracks building Debris: 118 tons Demolition cost: ~$20,000 On-post landfill: free tipping; $28-50/ton life cycle Off-site landfill: $18-90/ton; not incl. hauling

4 DEBRIS One barracks building, cont d Creates > 40 Metric Tons Carbon Equivalent (MTCE)* Creates > 160 Metric Tons C0 2 Equivalent (MTC0 2 E)* Equivalent to > 30 passenger cars / year Embodied energy ~ 960 million BTU* Other life-cycle effects** Soil erosion Depleted CO 2 sequestration Altered habitat * USEPA WAste Reduction Model (WARM) ** AIA Environmental Resources Guide

5 DEBRIS Why is the Army concerned? Est. 26 Million Tons over the next 15 years Up to 80% of some installations solid waste Reduced Army landfill capacity ~$1Million/acre to operate over landfill s life 30% fewer C&D landfills from mid-1980 s to mid-1990 s Higher disposal costs in future

6 DEBRIS A liability or a RESOURCE? ITS NOT JUST GARGAGE ANYMORE!!!

7 SUSTAINABLE ALTERNATIVES TO BUILDING DEMOLITION

8 ALTERNATIVES Benefits of diverting demolition debris. a partial list Economic Landfill Environmental Social Ethical

9 ALTERNATIVES MAINE TOWNSHIP HIGH SCHOOL, DES PLAINES IL, circa 1929

10 WHAT S REUSABLE OR RECYCLABLE?

11 REUSABLE / RECYCLABLE Concrete Recyclable Compacted base Engineered fill Fill Erosion control Trails Recycling concrete is common, if not universal

12 REUSABLE / RECYCLABLE Lumber Reusable Resale Value added (millwork, etc) Lumber salvage is somewhat nichemarket Timber salvage market is widely available

13 REUSABLE / RECYCLABLE Lumber Recyclable (clean) Mulch Engineered wood products Boiler fuel Wood recycling & grinding services are widely available

14 REUSABLE / RECYCLABLE Metals Reusable Pre-engineered metal buildings most practical Recyclable New metal Metal recycling is the rule rather than the exception

15 REUSABLE / RECYCLABLE Gypsum Drywall Reusable (clean scrap) Resale (minimum halfsheets, typical) Recyclable (clean scrap) Drywall manufacturing Soil amendments Most recycled GWB comes from construction sites Demolition drywall is problematic if LBPcontaminated Recycling infrastructure is regional Agricultural markets could expand

16 REUSABLE / RECYCLABLE Asphalt roofing Recyclable Hot mix asphalt Cold patch Ground cover Fuel New roofing (pre-consumer materials) Recycling infrastructure is limited, but expanding

17 REUSABLE / RECYCLABLE Carpet Reusable Resale Restoration Recyclable New carpet Other polymer products Waste-to-energy & cement kilns Leased as a service Recycling infrastructure is limited, but expanding

18 REUSABLE / RECYCLABLE Acoustic tile Reusable Resale Recycling New acoustic tile Armstrong World Industries is the only recycler to date

19 REUSABLE / RECYCLABLE Other reusable architectural items Insulation Vinyl siding Wood siding Doors Windows Interior paneling T&G flooring Etc.

20 REUSABLE / RECYCLABLE Other reusable mechanical & electrical items Furnaces & heaters Air conditioning units (residential capacity) Duct accessories Plumbing fixtures & equipment Electrical fixtures & equipment Etc.

21 REUSABLE / RECYCLABLE A caution; not everything is salvageable Availability of working area on the site Materials quality, integrity Physical damage Obsolescence Contamination; biological, chemical Hazardous material Lead-based paint Glues and adhesives Complexity of disassembly Entanglement Connections Elevation Required equipment

22 REUSABLE / RECYCLABLE Some end uses FORT KNOX MATERIALS (O-HARE HOUSE) FORT CAMPBELL MATERIALS (CARR STABLE)

23 REUSABLE / RECYCLABLE AUSTIN TX HABITAT FOR HUMANITY RE-STORE

24 REUSABLE / RECYCLABLE Used building materials markets

25 REUSABLE / RECYCLABLE SALVAGED TIMBERS FROM A WEYERHAEUSER MILL Gates Residence, Medina, WA Price is no object

26 ARMY DECONSTRUCTION & DEBRIS REDUCTION EXAMPLES

27 EXAMPLES the Army Corps work in the area of deconstruction, and how the deconstruction process can be a method to increase the amount of recycling of construction-type materials.

28 EXAMPLES Allow diversion Aircraft Parking Replacement, Fort Campbell KY Contractor recycled 37,000 tons of existing concrete as compacted base for new pavement Economically more advantageous than purchasing virgin aggregate

29 EXAMPLES Encourage diversion Building 125, Wright Patterson AFB, OH 1950 s administrative building Partnership among Contactor, WPAFB/BCE, & USACE to reduce waste Diverted >60% via partial deconstruction Building 225, Fort Carson CO WWII-era GP warehouse DECAM requested contractor to deconstruct instead of demolish Diverted >80% of building materials for resale Troop units recycled concrete

30 EXAMPLES Specify mininum diversion Lee Village, Fort Campbell, KY 1950 s Family Housing neighborhood Specified minimum 40% debris diversion Achieved 55% diversion; 62% in subsequent demolition Facility Reduction, Fort Monroe, VA 7 WWII-era buildings Specified 40% minimum debris diversion Achieved 70 90% debris diversion over 7 buildings

31 EXAMPLES Contract for deconstruction Pilot deconstruction, Fort Campbell, KY 5 WWII-era buildings Contracted directly with HfH for deconstruction services Achieved 85% diversion Sold materials in HfH s Re-Store Building 919, Fort Hood, TX WWII-era HQ building Contracted directly with HfH for deconstruction services HfH Estimated 90% diversion Sold materials in HfH s Re-Store

32 EXAMPLES Sell recycle rights to public Building recycling program, Fort Knox, KY Recycle rights sold by auction Deconstructed > 500 buildings Saved > $5 M in demolition cost Diverted > 100,000 tons of debris Facility Reduction, Fort Gordon, GA 4 WWII-era GP warehouses Extensive outreach performed prior to auction Achieved 80% diversion Deconstructors recovered approx. $200,000 in lumber value

33 EXAMPLES Sell buildings to the public Facility Reduction Program, Fort McCoy, WI Buildings sold by bid & by auction Deconstructed > 140 buildings Saved > $3.5 M in demolition cost Diverted > 15,000 tons of debris, plus concrete Recovered enough material to build 300 homes

34 EXAMPLES Contract for recycling services Concrete recycling, Fort Campbell, KY Contractor recycles concrete on a periodic basis Fort Knox uses RCA for base, erosion control, & trails Recycled 90,000 tons in one year Saved > $640K in material costs Saved > $2.7 M in landfill life cycle cost

35 EXAMPLES Upcoming projects Fort Lewis WA Fort Jackson SC Fort Bragg NC Fort Hood, TX Pentagon Renovation (maybe)

36

37 CAN WE WORK TOGETHER? Identify Mutual Interests Develop Markets; Match Supply & Demand Adjust Business Practices Army: attract potential resources & services Industry: provide services to the Army SW jurisdictions: communicate, coordinate, & network among the stakeholders

38 WORKING TOGETHER Can you help us Information, education Sources of services Exchanges Experience Partnerships Industry capabilities & practices Criteria & standards Methods & techniques Economic data; values & costs Incentives Other

39

40 QUESTIONS? COMMENTS? Tom Napier, 217/

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE

More information

Construction / Demolition (C&D) Recycling Program

Construction / Demolition (C&D) Recycling Program Construction / Demolition (C&D) Recycling Program The State of California requires that all cities in the State divert at least 65% of its waste materials from landfills (AB 939). The City of Stockton

More information

Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY

Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY Cornell University ILR School DigitalCommons@ILR Buffalo Commons Centers, Institutes, Programs 2007 Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY Tara Stahl Follow

More information

Construction and Demolition Material Recycling Program

Construction and Demolition Material Recycling Program Construction and Demolition Material Recycling Program WMAC Meeting June 26, 2012 Purpose As part of the Waste Management Advisory Committee s (WMAC) defined role and associated task/project document:

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

H 7033 SUBSTITUTE A AS AMENDED ======== LC003107/SUB A ======== S T A T E O F R H O D E I S L A N D

H 7033 SUBSTITUTE A AS AMENDED ======== LC003107/SUB A ======== S T A T E O F R H O D E I S L A N D 01 -- H 0 SUBSTITUTE A AS AMENDED LC00/SUB A S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO HEALTH AND SAFETY -- FOOD RESIDUALS RECYCLING Introduced

More information

LEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources

LEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources LEED of the Knight Management Center Energy & Atmosphere Materials & Resources Energy & Atmosphere: 17 possible points LEED-NC Scorecard LEED for New Construction v2.2 Registered Project Checklist Project

More information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.

More information

C&D/wood debris management trends

C&D/wood debris management trends C&D/wood debris management trends by Peter Yost P romising C&D debris recovery results are beginning in the residential sector As the field of construction and demolition debris management develops, new

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

Construction Waste Minimization and Reuse Management

Construction Waste Minimization and Reuse Management Construction Waste Minimization and Reuse Management Mr.M.KalilurRahman 1, Mr.S.S.Janagan 2 1 Student M.E., (CE&M), Gnanamani College of Engineering, Namakkal-637018, Tamilnadu, India 2 Assistant Prof,

More information

INFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6).

INFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6). City and County of San Francisco Department of Building Inspection Edwin M. Lee, Mayor Tom C. Hui, S.E., C.B.O., Director INFORMATION SHEET NO. 5-04 DATE CATEGORY SUBJECT : June 22, 2015 Structural Demolition

More information

An Introduction to Recycling Construction and Demolition Waste

An Introduction to Recycling Construction and Demolition Waste An Introduction to Recycling Construction and Demolition Waste Course No: B04-005 Credit: 4 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge

More information

Venable Hall Demolition recycling and waste management

Venable Hall Demolition recycling and waste management UNC Chapel Hill Venable Hall Demolition recycling and waste management Planning: June 2004 July 2007 Decommission/demolition: August 2007 January 2008 Prepared by Sarah Myers January 9, 2009 Venable Hall

More information

Tompkins County Solid Waste Management Plan Executive Summary

Tompkins County Solid Waste Management Plan Executive Summary Tompkins County Solid Waste Management Plan Executive Summary Tompkins County has prepared a comprehensive, twenty-year Solid Waste Management Plan to comply with the requirements of the Solid Waste Management

More information

GREEN DEMOLITION CERTIFICATION

GREEN DEMOLITION CERTIFICATION GREEN DEMOLITION CERTIFICATION Authors: G. Bradley Guy, Associate Director; Timothy J. Williams, Research Coordinator (Powell Center for Construction and Environment, University of Florida, Gainesville,

More information

Manufacturing Program

Manufacturing Program Portland Cement Sustainable Manufacturing Program Andy O Hare, PCA April 2010 2010 Concrete Sustainability Conference 1 National Ready Mixed Concrete Association Presentation Overview Key PCA Initiatives

More information

A SYSTEM FOR ESTIMATING RESIDENTIAL CONSTRUCTION AND DEMOLITION DEBRIS

A SYSTEM FOR ESTIMATING RESIDENTIAL CONSTRUCTION AND DEMOLITION DEBRIS A SYSTEM FOR ESTIMATING RESIDENTIAL CONSTRUCTION AND DEMOLITION DEBRIS Authors: Ali Touran, James Wang, Christoforos Christoforou, Nasiru Dantata (Northeastern University, Boston, Massachusetts) ABSTRACT

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

CONSTRUCTION AND DEMOLITION PERMIT APPLICATION PACKAGE

CONSTRUCTION AND DEMOLITION PERMIT APPLICATION PACKAGE CONSTRUCTION AND DEMOLITION PERMIT APPLICATION PACKAGE CITY OF RANCHO SANTA MARGARITA 22112 El Paseo Rancho Santa Margarita, CA 92688 (949) 635-1800 x 6506 Revised July 2017 Construction and Demolition

More information

Environmental Implications of Increasing Wood Use in Building Construction. Dr. Jim Bowyer Dovetail Partners Minneapolis, MN

Environmental Implications of Increasing Wood Use in Building Construction. Dr. Jim Bowyer Dovetail Partners Minneapolis, MN Environmental Implications of Increasing Wood Use in Building Construction Dr. Jim Bowyer Dovetail Partners Minneapolis, MN Environmental Implications of Increasing Wood Use in Building Construction Importance

More information

Asbestos Elevator Industry Workshop November 25, 2015

Asbestos Elevator Industry Workshop November 25, 2015 Asbestos Elevator Industry Workshop November 25, 2015 BOB SWING CONTACT INFO EMAIL: Bob.Swing@ThyssenKrupp.com Phone: 604-499-5714 SOME ASBESTOS-CONTAINING MATERIALS Cement Pipes Cement Wallboard Cement

More information

CONSTRUCTION WASTE MANAGEMENT PLAN

CONSTRUCTION WASTE MANAGEMENT PLAN CONSTRUCTION WASTE MANAGEMENT PLAN Project: Construction Manager: Location: Prepared by: PREMIER FACILITY MANAGEMENT (PFM) Date: I. OBJECTIVES The objectives of this plan are to: 1. Recycle, reuse or salvage

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SAS International GSAS / QSAS compliance

SAS International GSAS / QSAS compliance Environmental Commitment SAS International is committed to ensuring environmental best practice throughout the life of its products to ensuring minimum impact upon the global environment. As a business

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. 531 N. Nash Street Hortonville, WI 54944-0099 Phone: 920-779-6011 Fax: 920-779-6552 www.hortonvillewi.org REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. Date Issued: February 5, 2016 Date Due: March

More information

Construction & Demolition (C&D) Materials Management in the Northeast in 2013 December 7, 2017

Construction & Demolition (C&D) Materials Management in the Northeast in 2013 December 7, 2017 Construction & Demolition (C&D) Materials Management in the Northeast in 2013 December 7, 2017 Prepared by the NEWMOA C&D Materials Management Workgroup State environmental agencies in the Northeast have

More information

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated. SECTION 024119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016)

Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016) Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016) Table of Contents Frequently Asked Questions 3 List of Organizations & Agencies....7 List

More information

Construction & Demolition Debris Reduction

Construction & Demolition Debris Reduction PDHonline Course C348 (2 PDH) Construction & Demolition Debris Reduction Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007 Project Highlights McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007 > 42.7% reduction in potable water usage achieved with high-efficiency low-flow fixtures > 94.6% of the construction

More information

LEED-2009 Green Building Rating System. New Construction & Major Renovations

LEED-2009 Green Building Rating System. New Construction & Major Renovations LEED-2009 Green Building Rating System New Construction & Major Renovations 1 The following pages are designed to assist Engineers acquire LEED Credits in the design of Green Sustainable building utilizing

More information

Land Reclamation Site Siting and Application Guidelines

Land Reclamation Site Siting and Application Guidelines Department of Environment and Local Government Land Reclamation Site Siting and Application Guidelines Rationale In an effort to reduce the cost associated with the transportation of demolition wastes,

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program The following table provides a brief description of the documentation that will be required of successful LIHTC

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

HOW COST EFFECTIVE C&D RECYCLING METHOD. Bradley Guy and Sean McLendon. And Recovery Options

HOW COST EFFECTIVE C&D RECYCLING METHOD. Bradley Guy and Sean McLendon. And Recovery Options I Wood Recycling And Recovery Options C&D RECYCLING METHOD HOW COST EFFECTIVE - -I University of Florida project compiles comparative data on demolition vs. deconstructionl salvage, and suggests policies

More information

Mecklenburg County Solid Waste Management Plan Public Meeting Tuesday, April 17 th

Mecklenburg County Solid Waste Management Plan Public Meeting Tuesday, April 17 th Mecklenburg County Solid Waste Management Plan 2012 Public Meeting Tuesday, April 17 th Why do we Plan? A requirement of the North Carolina Solid Waste Management Act of 1996 (NCGS 130A 309.09A) County

More information

Construction and Demolition Waste Used as Recycled Aggregates in Concrete: Solutions for Increasing the Marketability of Recycled Aggregate Concrete

Construction and Demolition Waste Used as Recycled Aggregates in Concrete: Solutions for Increasing the Marketability of Recycled Aggregate Concrete Construction and Demolition Waste Used as Recycled Aggregates in Concrete: Solutions for Increasing the Marketability of Recycled Aggregate Concrete Brett tttempest, Tara Cavalline, Janos Gergely, and

More information

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium Taubman Building, 15 Eliot St., Cambridge, MA, 02138 LEED CI V2009 GOLD The is a 2,943 square foot space located in the Taubman Building of the Harvard Kennedy School of Government. The project scope includes

More information

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Nova Scotia Environment and Labour CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Approval Date: October 24, 1997 Effective Date: October 24, 1997 Approved By: Peter Underwood Version Control:

More information

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment

More information

Manufactured Housing In the United States

Manufactured Housing In the United States Manufactured Housing In the United States Source: U.S. Census Bureau, industry analysis and proprietary sources The Manufactured Housing Institute (MHI) is a nonprofit national trade association representing

More information

Project & Environmental Review. Guidelines Demolition. May 2016

Project & Environmental Review. Guidelines Demolition. May 2016 Project & Environmental Review Guidelines Demolition May 2016 TABLE OF CONTENTS 1. Introduction... 3 2. Objectives... 3 3. Applicability and Building Permits... 3 4. Guidelines for Preparing a Project

More information

COST PREDICTION MODEL FOR DECONSTRUCTION AND IMPACT OF DESIGN FOR DECONSTRUCTION

COST PREDICTION MODEL FOR DECONSTRUCTION AND IMPACT OF DESIGN FOR DECONSTRUCTION COST PREDICTION MODEL FOR DECONSTRUCTION AND IMPACT OF DESIGN FOR DECONSTRUCTION Submitted by: AMOL TATIYA School of Planning, Design and Construction East Lansing MICHIGAN STATE UNIVERSITY MAY 2016 ABSTRACT

More information

SACRAMENTO County New Animal Care Facility LEED Elements

SACRAMENTO County New Animal Care Facility LEED Elements Construction Activity Pollution Prevention We reduced pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust generation by creating an Erosion and

More information

JMU Capital Projects SWaM Outreach Event Presentations

JMU Capital Projects SWaM Outreach Event Presentations JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom

More information

CO 2 Emissions Profile of U.S. Cement Industry

CO 2 Emissions Profile of U.S. Cement Industry CO 2 Emissions Profile of U.S. Cement Industry Overview Purpose of study Cement production process Energy consumption GHG emissions State-level analysis Background and Purpose Cement is a key industry

More information

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene March 2, 2018 Page 1 CURRENT CONSTRUCTION ACTIVITIES WEST ZONE Completed Final Paint in B6 Corridors. Completed Final Clean in CL1 Units. Continued Signing Off Punch List Items in the West Zone. Continued

More information

Market Analysis of Used Building Materials in Metro Vancouver

Market Analysis of Used Building Materials in Metro Vancouver Market Analysis of Used Building Materials in Metro Vancouver Prepared for Metro Vancouver February 2012 Kane Consulting LOCO BC Restraint Consulting Urban Fabric Market Analysis of Used Building Materials

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

RSMeans Contractor s Pricing Guide Residential Repair & Remodeling Costs 2015

RSMeans Contractor s Pricing Guide Residential Repair & Remodeling Costs 2015 Reliable 2015 construction cost information for the home repair and remodeling contractor Improve planning and budgeting with this comprehensive cost guide specifically designed for home improvement and

More information

Demolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.

Demolition Plan A1 A3. Scale: 3/32 = 1'-0 Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender. inc. 400-7 avenue edmonton, alberta, canada tr y t: (780) 48 47 f: (780) 48 00 e: lesnider@shaw.ca 4 door to North Common Corridor doors to door to F. H. C. Men Women ELEC/TEL UP Stairs DN F. H. C. DN

More information

A study on construction and demolition wastes from buildings in Seberang Perai

A study on construction and demolition wastes from buildings in Seberang Perai A study on construction and demolition wastes from buildings in Seberang Perai Faridah A.H.Asaari 1, Hasmanie Bt Abdul Halim 2, M Hasnain Isa 1 1 School Of Civil Engineering, Engineering Campus, Universiti

More information

Budget Estimate Basic Tenant Improvement

Budget Estimate Basic Tenant Improvement Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities

More information

MICHIGAN WOOD WASTE A CIRCULAR ECONOMY OPPORTUNITY!

MICHIGAN WOOD WASTE A CIRCULAR ECONOMY OPPORTUNITY! MICHIGAN WOOD WASTE A CIRCULAR ECONOMY OPPORTUNITY! Michigan Forest Bioeconomy Conference February 1-2, 2017 Norman Christopher MSW (Municipal Solid Waste) Food Waste Household and Commercial Waste Packaging

More information

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS W hereas, pursuant to Chapters 11-4 and 2-30 of the Municipal Code of Chicago (the Code ),

More information

Table 11: Active C&D Debris Facilities in Florida (November 1998) DISTRICT C&D Disposal Land Clearing Debris Disposal

Table 11: Active C&D Debris Facilities in Florida (November 1998) DISTRICT C&D Disposal Land Clearing Debris Disposal Landfill Disposal Overview In 1980, Florida had approximately 500 open dumps. During this time period, it was a common practice to either burn or use one of these open dumps in order to alleviate the solid

More information

LEED GUIDE. March. How Centaur Flooring Can Contribute to Obtaining LEED v4 Credits. March

LEED GUIDE. March. How Centaur Flooring Can Contribute to Obtaining LEED v4 Credits. March March 2016 March LEED GUIDE How Centaur Flooring Can Contribute to Obtaining LEED v4 Credits. Revised on 03/31/16 Supersedes all previous versions. Check 1 website for updates. 3 What is LEED? Table of

More information

EPOXY INTEREST GROUP EPOXY-COATED REINFORCING STEEL IN PARKING GARAGES

EPOXY INTEREST GROUP EPOXY-COATED REINFORCING STEEL IN PARKING GARAGES EPOXY INTEREST GROUP EPOXY-COATED REINFORCING STEEL IN PARKING GARAGES An important aspect of garage design is to ensure that the structure provides a long repair-free life. Designers face many choices

More information

Asbestos Awareness Program

Asbestos Awareness Program Safety Manual 1 of 9 Safety Manual Sect: 1.0 Purpose 2.0 Scope Rel. Date: Last Review: This program covers Ardent policy related to asbestos, either discovered or suspected in the workplace. Ardent recognizes

More information

STRATEGY 1 Increase composting by county employees to achieve 85% waste diversion; continue education about including soiled paper in compost stream

STRATEGY 1 Increase composting by county employees to achieve 85% waste diversion; continue education about including soiled paper in compost stream INTRODUCTION Zero Waste or Darn Near is Boulder County s commitment to sensible resource management in government operations, where staff won a 2012 state award for reducing solid waste by 69% in county

More information

BUILDING ASSESSMENT REPORT for NMSU GREENHOUSES at NEW MEXICO STATE UNIVERSITY LAS CRUCES, NEW MEXICO

BUILDING ASSESSMENT REPORT for NMSU GREENHOUSES at NEW MEXICO STATE UNIVERSITY LAS CRUCES, NEW MEXICO BUILDING ASSESSMENT REPORT for NMSU GREENHOUSES at NEW MEXICO STATE UNIVERSITY LAS CRUCES, NEW MEXICO July 14, 2014 Prepared By: 6501 Americas Parkway NE, Suite 550 Albuquerque, New Mexico 87110-8154 (505)

More information

Davis Frame Co., Inc. Construction Budget Considerations

Davis Frame Co., Inc. Construction Budget Considerations Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability

More information

LEEN ND LEED Building Practices

LEEN ND LEED Building Practices HCPO Conference Green Communities/ Green Building THRUSDAY, September 24, 2009 LEEN ND LEED Building Practices Jerry Schmitz, Development Manager Overview Lend Lease and Actus Lend Lease Sustainable Neighborhoods:

More information

Pallets: A Growing Source of Recycled Wood

Pallets: A Growing Source of Recycled Wood Pallets: A Growing Source of Recycled Wood Robert J. Bush Vijay S. Reddy Philip A. Araman Abstract Considerable volumes of solid hardwoods, solid softwoods, and wood panels are used to manufacture pallets

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November

More information

Produkt Declaration - LEED 2009 New Construction And Major Renovations NC & CS

Produkt Declaration - LEED 2009 New Construction And Major Renovations NC & CS OL REFLECT 2K- Product Rating The product fulfills the requirements for adhesives and sealants and contribute to achieve one LEED credit within IEQ Credit 4.1. The product fulfills the requirements for

More information

Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project

Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project Jacqueline D. Thompson, M.U.E.P. and Howard H. Bashford, Ph.D., P.E. Arizona State University

More information

Building green via design for deconstruction and adaptive reuse

Building green via design for deconstruction and adaptive reuse Building green via design for deconstruction and adaptive reuse T. Saleh1, A. Chini1 1M.E. Rinker Sr. School of Building Construction, University of Florida, Gainesville, Florida, United States of America

More information

Linde FUSRAP Site Tonawanda, New York

Linde FUSRAP Site Tonawanda, New York Linde FUSRAP Site Tonawanda, New York U.S. Army Corps of Engineers Building Strong Buffalo District February 2016 FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM The Formerly Utilized Sites Remedial Action

More information

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Minnesota Healthcare Engineers Association, Fall Conference Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Categories of Rehabilitation Work in Healthcare Facilities Bob Dehler, P.E. robert.dehler@state.mn.us

More information

CONSTRUCTION & DEMOLITION WASTE Rules, 2015

CONSTRUCTION & DEMOLITION WASTE Rules, 2015 CONSTRUCTION & DEMOLITION WASTE Rules, 2015 Ministry of Environment, Forest and Climate Change NOTIFICATION [To be published In the Gazette of India, Part-II, Section-3, Sub-section (ii)] Dr. Sanjeev Agrawal,

More information

Procedure for Department Managed Repair and Renewal Projects Under $15,000

Procedure for Department Managed Repair and Renewal Projects Under $15,000 Applies to: All Medical School Departments GUIDELINES: Issued: March 28, 2012 Revised: February 8, 2016 PURPOSE: To provide guidance to departments for repair and renewal projects with an estimated budget

More information

RENOVATION ESTIMATING & BUDGET GUIDE TYPICAL COSTS OF RESIDENTIAL CONSTRUCTION AND HOME REMODELLING

RENOVATION ESTIMATING & BUDGET GUIDE TYPICAL COSTS OF RESIDENTIAL CONSTRUCTION AND HOME REMODELLING RENOVATION ESTIMATING & BUDGET GUIDE TYPICAL COSTS OF RESIDENTIAL CONSTRUCTION AND HOME REMODELLING REPRINTED WITH PERMISSION THE CANADIAN BUILDING CONSULTING GROUP INC. Revised: April 2016 1. ROOFING

More information

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #154 Douthit Hills Student Community, Clemson University Project Tony Greene

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #154 Douthit Hills Student Community, Clemson University Project Tony Greene January 19, 2018 Page 1 CURRENT CONSTRUCTION ACTIVITIES WEST ZONE Completed Carpet & Base in B6 Corridor. Completed 1 ST Coat of Paint in B4 Corridor. Completed 2 ND Coat of Paint in C3 Units Completed

More information

2016/2017 MATERIALS MANAGEMENT CALL FOR PROJECTS PROJECT SUMMARY SLIDE

2016/2017 MATERIALS MANAGEMENT CALL FOR PROJECTS PROJECT SUMMARY SLIDE APPLICANT: City of Denton Solid Waste & Recycling GRANT ADMINISTRATOR: Nicholas Vincent KEY PARTNERS: 2016/2017 MATERIALS MANAGEMENT CALL FOR PROJECTS PROJECT SUMMARY SLIDE PROJECT TITLE: Purchase Slow

More information

Construction Summary

Construction Summary Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -

More information

The re use of Construction and Demolition Waste as a factor of sustainability of the construction sector

The re use of Construction and Demolition Waste as a factor of sustainability of the construction sector The re use of Construction and Demolition Waste as a factor of sustainability of the construction sector Christiana Alexandridou Dpt. Of Chemical Engineering «Circular economy and valorization/recycling:

More information

Note: Niagara Region has determined that it is necessary to provide additional information relating to the above referenced Request for Tender.

Note: Niagara Region has determined that it is necessary to provide additional information relating to the above referenced Request for Tender. Enterprise Resource Management Services 1815 Sir Isaac Brock Way, P.O. Box 1042, Thorold, ON L2V 4T7 Tel: 905-980-6000 Toll-free 1-800-263-7215 Fax: 905-682-8521 www.niagararegion.ca Page 1 of 4 Date:

More information

One That is Already Built.

One That is Already Built. Montgomery County Planning Board 2009 Growing Smarter Speaker Series Thursday, February 12 th, 2009 Green Building: Today s Practices Tomorrow s Challenges Carl Elefante, FAIA, LEED AP Principal Director

More information

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and Asbestos What is asbestos? Asbestos is a naturally occurring fibrous mineral that is mined from the earth and found in many parts of the world. Its composition is such that it can be separated into smaller

More information

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

KABA DEMOLITION INFORMATION PACKET

KABA DEMOLITION INFORMATION PACKET I. Demolition Process Checklist Structures Requiring No Permit Residential Structures 200 Square Feet or Less Commercial Structures 120 Square Feet or Less Structures Requiring No Bond 1 and 2 Family Residential

More information

ENVIRONMENTALLY PREFERABLE PURCHASING MODEL POLICY

ENVIRONMENTALLY PREFERABLE PURCHASING MODEL POLICY Revised June 2016 ENVIRONMENTALLY PREFERABLE PURCHASING PREPARED BY STOPWASTE 1.0 STATEMENT OF POLICY It is the policy of [Organization] to: Institute practices that reduce waste by increasing product

More information

ST ANNE S CATHOLIC CHURCH EXISTING CONDITIONS REPORT 84 AUSTIN ROAD, SEAFORD

ST ANNE S CATHOLIC CHURCH EXISTING CONDITIONS REPORT 84 AUSTIN ROAD, SEAFORD EXISTING CONDITIONS REPORT 84 AUSTIN ROAD, SEAFORD JULY 2016 INTRODUCTION This report has been prepared to assist with the review of the existing conditions at the existing St Anne s Catholic Church at.

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

CITY OF SOUTH GATE SCHEDULE OF FEES APPROVED

CITY OF SOUTH GATE SCHEDULE OF FEES APPROVED DESCRIPTION OF FEE - BUILDING & SAFETY PERMIT FEES - BUILDING $124 s.f. valuation PERMIT FEES - BUILDING ISSUANCE FEE $27 PERMIT FEES - BUILDING PERMIT TO RESTORE $46 PERMIT FEES - SPECIAL REVOLVING FUND

More information

March, Re: Source of Materials (steel) and Recycled Materials content LEED Program. To Whom it May Concern,

March, Re: Source of Materials (steel) and Recycled Materials content LEED Program. To Whom it May Concern, 15305 117 AVENUE EDMONTON ALBERTA CANADA T5M 3X4 TEL: (780) 455-5098 FAX: (780) 452-5969 TOLL FREE: (877) 703-4463 www.ferocorp.com. info@ferocorp.com March, 2017 Re: Source of Materials (steel) and Recycled

More information

ARCHITECTURE/ ENGINEERING

ARCHITECTURE/ ENGINEERING S ARCHITECTURE/ ENGINEERING NOVEMBER 25, 2013 CITY OF EL CENTRO COUNCIL CHAMBERS ADA RENOVATION ADDENDUM #02 All documents referenced in this addendum are available in electronic format at ftp site listed

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

Waste Management in Building and Construction Projects

Waste Management in Building and Construction Projects Waste Management in Building and Construction Projects Agenda CWM Strategy CWM Objectives Integrated Waste Management NADAFA Program Purpose of Waste Management in Building & Construction Projects Waste

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

The Many Ways of Going Green 2011 Rocky Mountain Asphalt Conference and Equipment Show. Stephen R. Mueller, P.E. Steve.

The Many Ways of Going Green 2011 Rocky Mountain Asphalt Conference and Equipment Show. Stephen R. Mueller, P.E. Steve. The 2011 Rocky Mountain Asphalt Conference and Equipment Show Stephen R. Mueller, P.E. Steve. Mueller@dot.gov EPA Mantra REDUCE Consume Less If Possible. RECYCLE Reuse Previously Produced Materials. REUSE