1 PROJECT BRIEF 1. IDENTIFIERS PROJECT NUBER: PROJECT NAE: Philippines - CEPALCO Distributed Generation PV Power Plant DURATION: 2 years IPLEENTING AGENCY: World Bank EXECUTING AGENCY: International Finance Corporation (IFC) REQUESTING COUNTRY: Philippines ELIGIBILITY: Ratified the UNFCCC on August 2, 1994 GEF FOCAL AREA: Climate Change GEF PROGRAING FRAEWORK: Operational Program #7 2. SUARY: Solar Photovoltaic (PV) technology is a cost-effective generating source of electricity that is in the process of establishing itself in off-grid markets around the world. However, on-grid applications so far have been limited to a few installations in developed countries, even though PV offers various advantages as distributed generating sources. The two reasons for this lag are the high costs of PV compared to thermal alternatives and the need for additional energy storage because of the interruptible and variable nature of solar energy. To demonstrate PV s effectiveness in addressing distribution system capacity issues, a 1 W distributed generation PV power plant is proposed to be built and integrated into the 80 W distribution network of the Cagayan de Oro Power & Light Company (CEPALCO), a private utility operation on the island of indanao in the Philippines. The PV system will be operated in conjunction with an existing 7 W hydroelectric plant with dynamic load control, thereby enabling the joint PV/hydro resource to reduce both distribution level and system level demand, effectively providing firm generating capacity. The PV plant will also assist in postponing the need for additional substation installations in the CEPALCO distribution system for a period of up to three years. The project will thus reduce the need of CEPALCO to purchase additional quantities of thermal plant-based power, thereby reducing its emissions of greenhouse gases. However, more importantly, it is expected that this plant will provide the first, full-scale demonstration of the environmental and, ultimately, also economic benefits of the conjunctive use of hydro and PV-based power, as well as the first significant use of grid-connected PV in a developing country. If, as is expected, the large-scale introduction of this technology helps in substantially reducing PV systems costs, widespread applications worldwide are likely to result. There exist some 360,0 W of potentially suitable hydro plants in high-solar insolation regions of developing countries that could benefit from such conjunctive operations with additional PV power plants. 3. COSTS AND F INANCING (ILLION US$): GEF: Co-financing: Total Project Costs: $4.025 million (includes PDF Block A grant) $ million $7.0 - $8.0 million 4. ASSOCIATED F INANCING (ILLION US$): $21 million IFC capital financing facility for CEPALCO 5. OPERATIONAL FOCAL POINT ENDORSEENT: Ramon Paje, Undersecretary, DENR 1

2 6. IA CONTACT: Dana R. Younger, IFC/GEF Coordinator, Tel.(202) ; Fax (202) , 2

3 BACKGROUND AND CONTEXT 1. Photovoltaic (PV) technologies, based on the direct conversion of sunlight into electrical energy, provide a potentially unlimited source of electrical energy, because the earth s yearly energy input from the sun amounts to more than 10,0 times current world consumption of primary energy. Solar insolation in most of the developing countries of the world varies from 2,0 to over 2,5 kwh/m 2 per year. Today s PV systems are capable of converting between 7 to 15 percent of this amount into electricity and, with further development, are expected to convert between 15 to 25 percent. This means that less than one tenth percent of the available land area in these regions would be needed to supply all of their current primary energy needs. 2. So far, however, the supply of energy from PV, compared to total energy consumption is minuscule. Counting total shipments between 1982 and 1997, the total installed world PV capacity, at the end of 1997, has been estimated to amount to about 744 W p, producing, perhaps, around 1.4 TWh of electricity per year. By comparison, in 1996 the total world production of electricity amounted to 13,720 TWh (4,942 TWh in non-oecd countries), or almost 10,0 times more. 3. So far, PV has been shown to be the least-cost option for supplying electricity for high value uses in off-grid locations. In on-grid applications, a number of niche markets have been identified in industrialized countries. ost of them are related to the firming up of peak-load power demands on extended feeder lines that have reached the limit of their transmission capacity. In these cases, PV facilities located next to the load can reduce the need for distribution network reinforcement. A number of these so-called distributed generation applications have been made in the US, Europe and Japan. Other applications of distributed generation have been the various thousand or million roof programs, most of which are ongoing (particularly in Japan and Germany). However, all of them are heavily subsidized, or depend in part on green power tariff surcharges levied against consumers (as in a program being undertaken in Sacramento, California). Few, if any projects of these types of PV installations have been undertaken in the developing world. 4. The two major reasons for the low penetration of PV in network applications are costs and the need for additional back-up systems because of the interruptible nature of solar energy supplies. The current average cost of a mid-sized PV installation per installed kw p is $6,9, exclusive of storage or back-up costs 1. This compares to between $4 to $2,0 for alternative, conventional generation sources (thermal or hydro). In terms of average lifetime costs, delivered per kwh costs from conventional sources amount to between $0.05 and $0.14, while those from PV range between $0.30 to $0.38 in high insolation areas (20 to 25 kwh/m 2 /year). In addition, solar energy is available only during (sunny) daylight periods, and in variable amounts. If short-term storage has to be added to the PV system to meet system peakload demand, the cost for PV increases to between $0.42 to $0.55 per kwh Recent projections indicate that PV systems costs may fall within the next few years to around $3,0/kW p or less. This would reduce per kwh costs in high insolation areas to between 1 It must be noted that the average costs per kwh for PV generating plants are far more sensitive to the rate of discount chosen than are those of thermal plants. This is because of the long life expectancy of PV plants and their very low operating and maintenance costs. 2 Data based on Dennis Anderson, The Economics of Photo-Voltaic Technologies, draft, Oct

4 $0.15 to $0.18, excluding 3 supplemental storage. This would bring PV within striking distance of the $0.14 to $0.25 costs for delivered, flat to spiky peak power supplies, as cited by Anderson (1998). Throughout the developing world, there are a significant number of countries or regions, which face peakload power costs at that level. any of them also have substantial, already developed hydroelectric resources with substantial storage capabilities, but insufficient water inflows to operate at maximum capacity at all times. For these systems, conjunctive operations with added PV generating facilities could firm up the energy supplies from both sources, thereby effectively converting low-value, interruptible PV generation into firm, high-value peakload power, without the need for additional backup facilities (see figure 1). The potential market is very large, consisting of several hundreds of thousands of megawatts of already installed hydro capacity. 6. For the Philippines, the development of indigenous and, in particular, renewable energy resources has the highest priority for the Government of the Philippines. In 1996, some 56% of the country s power production depended on imported oil or coal. At the end of 1997, total installed capacity was about 14,0 W. According to the National Power Corporation (NAPOCOR), the country s state-owned generating company, by 25 an additional 12,978 W will be required, with another 79,160 W to be added between then and Of this generation mix, some 3,947 W are expected to be supplied from renewable energy sources, plus 5,115 W from geothermal and 4,732 W from hydro. Currently, somewhat over 3,0 W of hydroelectric plants are in operation. On indanao alone, the installed hydro capacity is W. Almost all of the existing hydro plants are water constrained, which makes them suitable candidates for conjunctive operations with PV generating plants. 7. To promote the development of renewable energy resources, the Government has established the New and Renewable Energy Program (NREP) which is being implemented by the Department of Energy (DOE) through its Non-Conventional Energy Division. It aims to accelerate the promotion and commercialization of new and renewable energy systems. As part of these efforts, a major objective is: to develop economically viable new and renewable energy systems to levels of technical maturity at which these can be commercially competitive with conventional energy. The promotion and development of integrated network PV generating facilities would be part of this mandate. RATIONALE AND OBJECTIVES 8. The International Finance Corporation (IFC), the private sector affiliate of the World Bank Group, proposes to utilize GEF funds to partially finance the installation of a 1 W p PV-based power plant, to be integrated with the power distribution network of the investor-owned Cagayan Electric Power and Light Company Inc. (CEPALCO) on the island of indanao. The objective of the proposed project is to demonstrate the technical, operational and, ultimately, economic feasibility of utilizing PV based solar energy for supplementing and firming up the productive capacity of existing hydro projects, initially in the Philippines, but also as a model which can be replicated elsewhere in the developing world. In the Philippines alone there exist several thousand W of hydro capacity that likely could be utilized in such conjunctive operations. This would eliminate the 3 According to the US DOE s PVaT program, PV module manufacturing costs are expected to fall from a current level of between $2 to $2.50 per W p at current world-wide industry production capacity levels of some 120 W p /year to 1 to $1.50/W p when production capacity increases to 350 W p /year. This capacity level is expected to be reached by the year 20, based on already announced industry expansion plans. 2

5 need for the additional installation of thermal power generation facilities (mainly diesel and oil-fired gas turbines) with their attendant emissions of greenhouse gases (GHGs) and various local pollutants (sulphur dioxides, nitrogen oxides, particulates and noise). 9. The project would fall under the GEF s Operational Program No.7, which, in paragraph 7.7. (a) places particular emphasis on the development of Photovoltaics for grid-connected bulk power and distributed power (grid reinforcement and loss reduction) applications. 10. The project would be the first sizable distributed PV network installation in a developing country. It would demonstrate the technical and operational feasibility of integrating operations utilizing the installed PV capacity, which is a non-firm, interruptible energy resource, with the limited stream flow of an existing hydroelectric project in such a way that the combined output of both facilities would be converted into high value, firm peakload power, to displace GHG-emitting thermal generation facilities. In addition, the project would reduce transmission and distribution losses by being installed within the low-voltage power distribution network. This would also delay expansion investments by CEPALCO in distribution plant and equipment. 11. A second major objective of the project would be to demonstrate the potential for bringing about large-scale utilization of PV generation in network applications throughout the developing world through replication of this project s approach (see Annex IV). Assuming the availability of a suitably designed GEF-funded program, it is expected that an increase in the overall market for PV systems by several magnitudes could be achieved, which when compared to the present, would provide the necessary base for reducing the currently still high costs of PV systems to levels that would make grid-connected PV increasingly competitive with other power generating sources. PROJECT ACTIVITIES, COPONENTS AND EXPECTED RESULTS 12. The project would consist of the installation of approximately 1 W p of PV generating plant in the power distribution network of CEPALCO in the central business district of Cagayan de Oro in indanao. The system would be operated in conjunction with an existing 7 W hydroelectric plant 4 with dynamic load control, thereby enabling the joint PV/hydro resource to reduce both distributionlevel and system-level demand, effectively providing firm generating capacity (see Figure 1). In the absence of the PV plant, the hydroplant would operate at between 3 W to 7 W capacity depending on available water flow. Solar Hydro Reduction in CEPALCO Peak Demand Figure 1. Conjunctive use of the PV and hydroelectric resources 4 This is the Bubunawan hydroplant, which will be commissioned in April This plant is connected via a 48 km dedicated transmission line directly to the Central business district of Cagayan de Oro, where the PV plant would be located. While this plant is essentially a run-of-the-river design, it does include a limited pondage, with storage equivalent to about 14 Wh of energy (or 2 hours of plant operation at full capacity). 3

6 13. Privatization of the government-owned NAPOCOR and restructuring of the transmission system provides opportunities for distributed generation, such as the PV/hydro plant concept. CEPALCO and other distribution utilities will be forced to purchase their own power from private power producers, and power generated from the distributed PV/hydro plant would displace high-cost marginal power supplied by small (50 W to 1 W) diesel power plants. 14. Transmission constraints will force developers to build smaller, more expensive power plants near load centers, which will make various alternatives more attractive in the foreseeable future. Furthermore, the PV plant would be connected directly to the distribution system, enabling CEPALCO to avoid additional capital charges for transmission capacity and ancillary services. 15. Non-economic benefits of distributed PV include: (i) increased independence from foreign oil supplies; (ii) protection against volatile fuel price swings; (iii) mitigation of risk in distribution capacity planning in an uncertain economic climate; (iv) firming up of voltage levels and frequency stabilization; (v) enhanced air quality from reduced NOx, SOx, and particulate emissions; and (vi) reduction in GHG emissions. Only the last of these is of direct interest to the GEF. Distributed Generation 16. A screening exercise identified the most promising location within CEPALCO s service territory to develop a PV plant. The Central (13.8 kv) distribution planning area, in and around the central commercial district of Cagayan de Oro city, was selected due to: arginal Distribution Capacity Costs. The area had the highest cost outlook to provide for local distribution capacity upgrades, including three new substations planned between 20 and Load Growth Rates. The area had the slowest load growth, such that the incremental capacity addition offered by the PV plant would be able to support load growth (and defer substation construction) for at least three years. Load Shapes. The area had a good match between daily load profiles and the pattern of solar radiation intensity (see figure 2). 17. As in the case of power distribution, the PV plant output does not directly coincide with system-level load. Unlike the case of power distribution, however, it is not possible to optimize the load/solar matching through judicious site selection. The peakloading for the total CEPALCO system, aggregated in Figure 2 for the period October 19-23, 1998, is shown to last for a period of about 10 hours (about 10: A to about 8: P). 4

7 Load (W) : A 2: A 3: A 4: A 5: A 6: A 7: A 8: A 9: A 10 :0 0 A Figure 2. CEPALCO Aggregate System-Level Load 11 :0 0 A 12 :0 0 P 1: P 2: P 3: P 4: P 5: P 6: P 7: P 8: P 9: P 10 :0 0 P 11 :0 0 P 12 :0 0 A PV/Hydro Conjunctive Use 18. A PV plant constructed in the CEPALCO service territory will reduce the daytime peak, but will be unable to carry load in the evening hours. However, by coordinating the output of the PV plant with hydroelectric power, it is possible to extend the available local peak generation availability into the evening hours and avoid capacity charges. \ 19. The Bubunawan Hydropower Plant, currently under construction, is a 7 W run-of-the-river facility with limited storage in Baungon, Bukidnon. Once the project is operational, Bubunawan Power Co. (BPC) will sell power to CEPALCO. The plant has a total storage capacity to deliver 7 W for about 2 hours. The benefits of a joint operation with the PV generating plant include: Enhanced Hydro Capacity. The PV plant would carry load during the daylight hours that would have been carried by the hydro plant. The PV plant would allow the hydro plant to retain its charge until late afternoon and early evening, effectively increasing the storage capacity of the hydro plant. Dispatchable Solar Power. The hydro plant overcomes a shortcoming of the PV plant by effectively enabling it to follow the load. By dispatching the hydro plant on a real-time basis in coordination with the PV plant and the CEPALCO system loads would be supported beyond the daylight operating time of the PV plant alone. Sunk Storage Cost. The Bubunawan project is currently under construction and is considered a sunk cost. The economic valuation of the PV plant, therefore, presumes the existence of the hydro plant. Only small incremental costs for additional communication and control systems would be required to achieve PV/hydro conjunctive use. 5

8 Seasonal Effects. Both PV and hydro are limited by resource availability. However, the two plants would be complementary. Additional water flow during the rainy season would offset the poor solar availability. Likewise, enhanced PV output during the dry season would offset the poor hydro availability. RISKS AND SUSTAINABILITY 20. Specific risks include: (i) macroeconomic risks such as devaluations of the currency and/or substantial increases in import duties or taxes, which would affect the financial viability of the project; (ii) potentially high land costs in areas most suitable for the installation of the PV module arrays or field(s); (iii) substantially lower solar insolation than estimated on the basis of presently available information; (iv) inability or unwillingness of the system s dispatchers to continually optimize the conjunctive use of the solar and hydro plants; (v) future bulk power tariffs that would value purchased peaking power at substantially lower prices than those assumed in this analysis; and (vi) new regulatory rules that would prohibit electric distribution companies from owning any generating facilities regardless of their technology or size. 21. Sustainability risks are deemed to be low, at least in terms of technological and operational characteristics. Today solar PV cell and module manufacturers are willing to guarantee their products for periods of up to twenty years, or for a period as long as the total assumed lifetime for the demonstration project. Operating and maintenance expenses of an operational solar PV module power plant are very low, because it contains no moving parts. STAKEHOLDER PARTICIPATION AND IPLEENTATION ARRANGEENTS 22. The implementing entity will be CEPALCO, a private, investor-owned utility with a peakload of about 80 W. It serves about 69,0 customers. It is the third largest electric distribution utility in the country. CEPALCO holds the power distribution license on the island of indanao for a coastal region reaching from the city of Cagayan de Oro in the west to the town of Jasaan in the northeast. CEPALCO obtains the bulk of its power supplies from NAPOCOR, which is expected to be privatized in the near future. NAPOCOR supplies power to CEPALCO through several substations at 138 kv or 69 kv respectively. While the company is mainly a distribution utility, it also holds part ownership in a 18 W diesel power plant owned by INERGY and in BPC, which is currently constructing a 7 W hydro power plant. CEPALCO has recently concluded a corporate financing package of some $21 million with IFC, consisting of both loans and an equity investment. Another, recently added minority shareholder of the company is the Hawaiian Electric Company, which, incidentally, also operates a PV rooftop power generating installation as part of its system in Hawaii. 23. CEPALCO has been consistently in the forefront of Philippine utilities with respect to the use of renewable energy resources and energy demand side management (DS) programs. In 1998, the company filed a substantive demand side management plan with the Philippines Energy Regulatory Board. The program contains specific time schedules for the various program components that the company has itself committed to undertake. As part of this program, CEPALCO is expected to collaborate actively with the IFC/GEF Efficient Lighting Initiative (ELI), which is still under appraisal in the Philippines. CEPALCO also has developed an active program for investments in renewable energy resources, including small hydro plants ranging from a few hundred kw to as much as 12 W, wind power installations, energy forest plantations in conjunction with wood-and 6

9 waste biomass power plants, remote and on-grid PV generation facilities, wind power plants, as well as a domestic solar hot water heating program. However, it is constrained at this time from undertaking more than a handful of the most economic of these programs by capital constraints and return on investment criteria. CEPALCO maintains an active collaboration program with the Sacramento unicipal Utility District (SUD) in California, the owner and operator of the pathbreaking PV Pioneer program, which owns and operates PV generating facilities (in individual grid-connected plants of up to 2 W and dispersed rooftop installations) totaling several megawatts. 24. CEPALCO also collaborates closely with a number of non-governmental organizations, including Preferred Energy Incorporated (PEI), a non-profit organization, which promotes renewable energy, energy efficiency and DS in the Philippines. PEI is a minority shareholder in the Bubunawan hydro power plant. 25. CEPALCO has undertaken appropriate consultations with locally affected parties in Cagayan de Oro and will conduct a suitable environmental analysis of the proposed PV power plant during the appraisal phase. A detailed environmental assessment of CEPALCO s operations including the Bubunawan hydroplant and its transmission line has just been completed as part of the US$21 million IFC financing facility for CEPALCO. The PV plant itself will be subject to a similar environmental review consistent with IFC environmental and social guidelines and does not entail any involuntary resettlement. 26. CEPALCO will be the co-investor for the balance of the non-gef funding for the proposed PV generating plant. On the basis of the current, preliminary cost estimates, CEPALCO s total cost share will amount to between US$3 million and US$4 million including an appropriate share of capital costs and engineering design expenses. Its upfront investment in the project is equivalent to the estimated project net benefits over its 20-year lifetime, discounted at a rate of 10%. The company will manage project design, contracting and construction supervision. It has a wellqualified technical staff, with considerable knowledge in the operation of PV power generating facilities through its previous and ongoing collaboration with SUD. CEPALCO also has long experience as a utility construction contractor and has, through subsidiaries, undertaken a number of substantial utility construction contracts throughout the Philippines. INCREENTAL COSTS AND PROJECT FINANCING Preliminary Economic Analysis 27. The evaluation of distributed PV considers two economic alternatives for supporting growing loads in CEPALCO s Central (13.8 kv) planning area. These alternatives span a common study period from 20 through 2020, and are defined as follows: Baseline Conventional Distribution Planning The baseline assumption is to execute the existing expansion plan for the planning area, delayed by two years. The basis for the delay is based upon: (i) the economic downturn in 1998 which resulted in lower load growth than expected; and (ii) the additional capacity offered by forced air cooling at Camaman-an Substation. Three substation additions are included within the study period through 28, although additional capacity increases would be expected beyond this period. 7

10 Assumptions: Alternative Distributed PV/Hydro The GEF-funded alternative is to install a 1,0 kva (peak) PV plant within the planning area. This plant may be a single installation or it may comprise a number of separate systems distributed throughout the planning area. CEPALCO would coordinate control of the plant with the 7 W Bubunawan Hydropower Plant to optimize peakload reduction. The analysis assumes that conjunctive use of the PV and hydro results in firm generation capacity, which is provided for the life of the system and valued at the cost of diesel generation. The distributed PV/hydro resource will delay the need for CEPALCO to invest in the planned distribution capacity upgrades, effectively shifting all substation capital investments into the future. The availability of the PV generating plant s electricity will reduce CEPALCO payments for generation capacity, energy, transmission, and ancillary services, and these benefits are enhanced by reduced line losses through the transmission and distribution systems. A small benefit is attributed to the reduced substation maintenance associated with the delay in the planned capital investments. Costs include the capital cost of the PV system, installation and interconnection, and ongoing maintenance. Costs for the hydro system are not included since they are considered as sunk costs for purposes of his evaluation as they would be incurred in any event. 28. The key assumptions of the analysis are included in Table 1. The assumed marginal generation cost of P/ 4./kWh combines the estimated costs of generation capacity and energy at P/ 0.76/kWh and P/ 3.24/kWh, respectively, based upon a load factor of 71%. 8

11 Table 1. Key Assumptions POWER SYSTE Generation arginal generation cost P/ 4./kWh ($0.10/kWh) Generation capacity value P/ 40,0/kW ($1,0/kW) Transmission Transmission capacity P/ 155.4/kW-mo ($3.885/kW-mo) Transmission losses 4.5 % Ancillary Services Load following & frequency regulation P/ 5.60/kW-mo ($0.14/kW-mo) Spinning Reserve P/ 20.8/kW-mo ($0.52/kW-mo) Back-up power P/ 2/kW-mo ($5./kW-mo) DISTRIBUTION Planning area load growth 3 kva/yr Substation O & P/ 340/VA-yr ($850/VA/yr) Distribution losses (technical) 7% Power factor 0.9 FINANCIALS Base year 20 Discount rate (real) 10% per year Currency exchange rate P/ 40 = $1US PV PLANT Costs PV odules Power conditioning unit (PCU) Balance of system (BOS) Installation (turnkey basis) O& Performance Rating $3.40/Wp $0.50/Wp $1.40/Wp $1.30/Wp $15./Wh 10 kva Firm capacity (effective, with hydro) 6 kw PV Capacity factor 25% Lifetime (and study period) 20 years 29. Transmission capacity and ancillary services are based upon estimated service charges by the regional transmission company for power generated by the 18 W INERGY diesel plant. The load growth of 3 kw/year is based upon the assumed 2% growth rate for the central Cagayan de Oro commercial district. The Central (13.8 kv) planning area currently has an installed capacity of 15 VA. Distribution losses at CEPALCO are known to be about 10%, of which 7% are technical (3% is attributed to energy theft). Capital loans are assumed to be 20% per year with inflation at 10% per year. Consequently, the real discount rate is taken as 10% per year. The exchange rate of P/ 40 to the dollar is current as of the end of PV system costs include modules, power electronics, installation, and balance of system costs. odule costs assume that the plant is run at a leading power factor of 0.9 to support the 9

12 distribution voltage, however no economic benefit is assumed for voltage support. The plant is rated at 10 kva and 9 kw, but is assumed to provide 6 kw of effective firm capacity when operated in conjunction with the hydro plant (approximately 1 W at peak capacity). The total cost of the modules is based upon the DC field rating after accounting for a 5% power conversion loss (947 kw DC). The PV power plant is expected to generate approximately 1.9 GWh per year over its estimated 20-year lifespan. 31. The results of the analysis are provided in Table 2. Total estimated lifetime benefits are calculated to be P/ 120 million (US$3 million) which fall short of the estimated costs by P/ 158 million (approximately US$4 million). This shortfall represents the approximate amount, which would require support by the GEF for the project to be viable. Table 2. Results of Economic Analysis Benefits P/ $ Reduced Generation Capacity 14,280,0 357,0 Avoided Energy Purchases 61,320,0 1,533,0 Reduced Transmission Capacity 10,720,0 268,0 Avoided Ancillary Services 15,640,0 391,0 Deferred Substation Capital Investment 16,160,0 404,0 Deferred Substation aintenance 2,440,0 61,0 Total Benefits 120,560,0 3,014,0 Costs Engineering and Construction Supervision 4,0,0 1,0 PV Capital Cost 265,280,0 6,632,0 Hydro Capital Cost 0 0 PV plant maintenance 10,080,0 252,0 Total Costs 279,360,0 6,984,0 Shortfall 158,8,0 3,970,0 Detailed Appraisal Needs 32. The economic analysis presented above is intended to be the best current estimate based upon preliminary information collected during a pre-appraisal mission conducted in December A detailed appraisal and project plan will be required following the initial GEF Council endorsement to reduce key uncertainties prior to project commitment by CEPALCO and financial closure. The detailed appraisal will have to address the following key uncertainties: Solar/Hydro Resource atching. The economic benefits of the distributed PV system are based upon the concept for conjunctive use with the 7 W hydroelectric facility. This concept was the basis for crediting the plant with firm capacity, and resulted in savings in the form of avoided generation capacity, transmission capacity and ancillary services. A more detailed investigation is required to validate the concept, however, including a review of diurnal and seasonal hydrologic data and solar performance modeling. The analysis would also have to consider electric load variations over the year. 10

13 Solar onitoring. Instrumentation should be installed to begin collecting historical solar resource data in and around the city of Cagayan de Oro. This data would be used to estimate PV plant performance, and to document differences in microclimates for siting purposes. Preliminary Design and Cost Estimate. A basic plan needs to be developed including a preliminary plant design specification. This exercise would include evaluating various plant configuration options and committing to one concept, (e.g., choice between a single large plant or many small rooftop systems to make up the desired capacity). A preliminary design should be developed in sufficient detail to allow realistic cost estimates to be prepared and turnkey bid estimates solicited. Detailed Feasibility Study. A feasibility study should be conducted with detailed technical and financial calculations based upon the information developed above prior to proceeding to project implementation. 33. As this will be the first plant of its kind to be installed in a developing country setting, there are a number of cost uncertainties at this stage. IFC believes that its independent engineer s estimates and CEPALCO s experience with power plant engineering and construction cost control combined with a competitive procurement process should yield a final project cost in line with the estimates contained in this PCD. However, IFC wishes to note that due to the uncertainties noted above, there is some risk that at the time the project is presented to the GEF Council for its final endorsement, there will need to be a modest upward adjustment in the total project cost that would require additional GEF funds. Incremental Costs 34. As can be seen from the initial economic analysis presented previously, the specific, incremental costs of the project itself are estimated to be approximately US$4 million, out of total project costs of US$7 to US$8 million. This ratio of incremental to total costs would appear to be very high, if the analysis were to be limited to this individual project only and were to consider no more than the project-specific carbon dioxide savings of some 30,0 tons over the project s expected lifetime of 20 years. However, the CEPALCO 1 W PV power plant is assumed to be only the first commercial demonstration, although a singularly important one, to justify systematic development of a GEF-funded distributed generation PV program for selected GEF-eligible countries. At this time, it is too early to develop firm forecasts of the components, time requirements and incremental costs of such a program. The following, therefore, represents no more than a possible, even though quite reasonable scenario for such an overall development program. 35. Table 3 lists the assumed project and program components, incremental costs (to the GEF) and lifetime carbon savings of such a program. The scenario covers a period of 10 years. It is assumed that costs of the GEF supported PV network projects would initially decline at 10% p.a. in line with current industry projections. After five years, the scale-up in GEF-induced project volumes would result in PV system prices falling to $3,3/kW p and to $3,1/kW p after six years. Thereafter, prices are assumed to fall to $3,0/kW p or less, making PV generation cost competitive with alternative peakload power plants. The program would imply a total GEF investment of about US$57 million. To this may have to be added some US$2-5 million for PV network program development and promotion costs. The net lifetime carbon savings, for this 10-year program, would amount to about 22 million tons of carbon, at a cost of about $2.65/ton. The ultimate program effects 11

14 and resulting carbon savings would be very much larger, given the huge potential market for such installations worldwide in developing countries as cited earlier. 12

15 Start-Up Year Table 3. Scenario of Distributed Generation PV Investment Program Peak Capacity Cumulative Capacity Projected PV Costs/W GEF Incremental Costs* Cumulative Incremental Costs Lifetime Carbon Savings W W $ million $ million $ million tons , , , , , , less than ,644, ,289, ,578, ,867,6 Totals ,695,480 *Assumes that PV prices will fall by 10% p.a. between 20 and 23; in 24 the net subsidy would be reduced to $3/kW, in 25 to $1/kW, with competitive market prices reached by 26. onitoring, Evaluation and Dissemination 36. IFC s Environmental Projects Unit will undertake, in conjunction with CEPALCO, a detailed appraisal of the project prior to its implementation. This appraisal will determine the specific parameters for the project s design, capacity, the optimum site location(s) of the solar field(s), site specific solar insolation, the seasonal and daily availability of water resources for the optimum conjunctive PV-hydro operation, as well as the design of the optimal control equipment and instrumentation for it. Project components for the project s actual implementation will be procured by CEPALCO following its standard procurement guidelines and in conformance with IFC procedures. IFC will closely supervise the appraisal, implementation and operation of the project through regular supervision missions and appropriate financial controls. In order to ensure that CEPALCO s engineering designs are appropriate and that turnkey cost estimates are sound, IFC will retain independent engineers to review all relevant engineering designs and cost estimates on behalf of the GEF. Standard GEF project monitoring and evaluation will be performed by IFC on an expost basis for a minimum period of two to three years, to record plant performance operating characteristics. These will be recorded and made available to the GEF and other interested parties, particularly utilities and/or power plant developers who are interested in utilizing this technology elsewhere. The project is expected to play an important role throughout the developing world to demonstrate the validity as well as technical and economic efficacy of the conjunctive PV-hydro operational concept. 37. Special efforts will be made to develop appropriate dissemination materials and performance records for presentations to interested parties such as development and financing agencies, private and public utilities and private power plant developers. It is expected that CEPALCO will also make site tours available to interested parties. 13

16 38. The project proposal was subject to an independent review by a qualified expert from the STAP Roster. His summary comments are attached as Annex III. The reviewer comments that this is a very interesting and promising proposal. He states further that the proposal has been clearly thought through and presented. He finally concludes: Because this project has the potential to be widely replicated, it has high relevance to the objective of the GEF of reducing CO 2 emissions through the application of renewable energy and warrants high priority. 39. The reviewer also made a number of minor suggestions for clarification of the presentation. These comments have been incorporated in the text of this final Project Concept Document. 14

17 ANNEX 1 PAGE 1 OF 2 PROJECT PLANNING ATRIX SUARY VERIFIABLE INDICATORS EANS OF VERIFICATION CRITICAL ASSUPTIONS AND RISKS The project falls within the scope of GEF OP7, which specifically identifies photovoltaics for gridconnected bulk power and distributed power (grid reinforcement and loss reduction) applications as one of its priorities. The project also fulfills national policy objectives, which aim to achieve energy self-sufficiency by indigenous energy development. According to the Philippines New and Renewable Energy Program, a major objective is to develop economically viable new and renewable energy systems to levels of technical maturity at which these can be commercially competitive with conventional energy. GEF objectives as stated under GEF OP 7. Objectives as stated in the Philippines National Energy Plan and the Philippines New and Renewable Energy Program.. Determination of solar insolation as measured by a micro-site insolation study forming part of the appraisal. Careful selection of most suitable project site(s) that optimize solar energy production on the one hand and minimize land, construction and electric interconnection costs on the other. Installation of control system that optimized conjunctive PV hydro operation. 2 to 3 years of careful monitoring of plant performance after project completion. Detailed documentation of technological approach and of operational results for dissemination worldwide. Published GEF Operational Guidelines. Government policy documents detailing the objectives of the National Energy Plan and the New and Renewable Energy Program. Careful review of appraisal report and detailed engineering and cost studies. Project supervision during construction and subsequent, systematic monitoring of performance. Effective solar insolation at the proposed site will be approximately equal to or better than that calculated on the basis of currently available preliminary information. Plant equipment and installation costs will be within the estimated parameters or be less than currently estimated. CEPALCO will be able to optimally manage the conjunctive operation of the PV and hydroplant components of the system. Projected electric peak load prices from outside suppliers will be as high or higher than those projected in this analysis. The operational performance of the PVhydroplant system will be as projected in this analysis so that it can serve as a practical demonstration of the soundness of this technological approach for larger installations in the Philippines and throughout the world. Based in part on the performance of this plant, the world PV industry will be able and willing to plan production increases to such a level that scale economies will reduce PV prices to competitive levels with other types of peak load power plants. GEF, in collaboration with other multi and bilateral development agencies will support a systematic development program to achieve the above PV cost reduction objectives.

18 ANNEX 1 Page 2 OF 2 The project will demonstrate the viability of conjunctive PV-hydro operations, which will substantially increase the value of existing hydroplants. It will eliminate the need for backup energy storage facilities for the PV generation plant, making PV far more cost effective than it is otherwise. This will open up a huge, potential market for PV leading to scale economies that will make PV generating plants competitive with alternative, greenhouse gas producing thermal power plants. The main project component will consist of a 1 W PV collector array that will be integrated at subtransmission voltages into the CEPALCO distribution network, thereby reducing transmission losses. For operational purposes, the plant controls will be fully integrated with the controls of a small hydro power plant to permit their conjunctive operation for optimized utilization of the PV and hydro energy outputs. easurement of actual production of the PV generating plant in kwh of peak and residual non-peak output. Calculation of avoided thermal power plant-produced generation and resulting GHG emissions. Comparison of these results with simulated power generation that would take place in the absence of the PV power plant. Total project costs have been estimated at about US $7 million. US$4 million would be contributed by the GEF on a grant basis. The other $3 million, consisting of $2.73 of capital costs and about $0.25 million in PV plant maintenance costs would be contributed by CEPALCO. Establishment of a continuous recording system measuring solar insolation, PV and conjunctive hydroplant energy production during peak and non-peak demand periods. Public and private utilities and power developers will be prepared to systematically utilize cost competitive PV generating plants for conjunctive use with existing hydro power plants throughout the world. International financial agencies and private financing sources will be prepared to finance the high up-front, low operating cost, long-life PV plants in preference to shorter life, low capital cost, high operating cost thermal alternatives. Actual construction costs of the plant and control equipment will not be substantially higher than estimated in this preliminary analysis. Suitable and affordable sites for the PV plant can be found that optimize solar insolation, and minimize sub-transmission costs. 2

19 ANNEX 2 PAGE 1 OF 3 INCREENTAL COST ANALYSIS Broad Development Goals 1. The development goal of the distributed generation PV power plant is to prove the technical, operational and, ultimately, economic soundness of using PV generating plant conjunctively with existing, water-constrained hydroelectric power facilities. This will increase the total firm (i.e., dependable) energy capacity of both the solar and the hydro components. In addition, the plant will help to postpone the need for adding subtransmission and distribution facilities in an expanding power distribution system. 2. By adding PV generating facilities to already existing, but capacity constrained hydro plants, the capacity utilization of the latter can be optimized, while the energy produced by the PV plant is being converted from low-value, secondary (i.e., non-dependable) energy to primary energy, thereby replacing high-cost thermal, environmentally polluting peak load power supplies. Global Environmental Objectives 3. The global environmental objective of this first, conjunctive use distributed generation PV power plant is to prove the soundness of the technological approach so as to induce the widespread adoption of this technology in appropriate GEF-eligible countries on a worldwide basis. With appropriate financial support from the GEF, this will lead to substantial cost reductions for PV technology, which, in turn, will make the technology cost competitive with other alternatives. The results will be substantial reductions in the emissions of GHGs associated with electricity generation from alternative thermal power plants. A plausible scenario developed in Table 3 of the main text indicates carbon savings in excess over 22 million tons over a ten-year development horizon. Baseline 4. In the absence of the project, the sponsoring company, CEPALCO, would proceed with its presently planned investment and development program. The investment program would mainly consist of the timely installation of needed additional distribution facilities such as substations, reinforced transmission and distribution lines, and additional feeder cables. In addition, CEPALCO would purchase diesel power plant produced electricity to meet its peak load requirements from outside suppliers. The total costs of these components, both for the needed investments and energy purchases over the project s planning horizon of 20 years, would amount to an estimated total of US$3,014,0 expressed in discounted present values at 10% and January 1999 prices.

20 ANNEX 2 PAGE 2 OF 3 The Alternative and Its Global Environmental Benefits 5. The alternative would consist of the installation of a 1 W PV power generating plant, strategically located within a selected one hectare area or areas of the CEPALCO distribution network. By locating the PV plant close to appropriate load centers, the need for additional distribution facilities would be delayed, leading to cost reductions of the planned baseline investment program. Appropriate load controls would be incorporated so that the PV plant could be optimally operated in conjunction with a new hydroelectric power plant to which CEPALCO has access but which has limited storage capacity. This storage capacity would be utilized to replace the PV generating capacity at times in which sunshine is not available (i.e., evening peak load periods). This conjunctive operation would convert the PV generated energy into firm, peak load energy. 6. Conjunctive use of hydro and PV will reduce the need for purchased energy from outside diesel power plant operations. The total output of the PV plant over its projected 20-year life expectancy is estimated to be about 39 million KWh. This will reduce GHG emissions from these thermal generating facilities. The total avoided GHG emissions over the 20-year planning horizon for operation of the PV plant would be about 30,0 tons of CO The incremental costs of installing and operating the PV power plant instead of using the baseline alternative are estimated to be about US$4 million, based on current PV equipment market prices. The total costs of the PV alternative would amount to some US$7 million (expressed in present value terms), while the savings from reduced outside energy purchases and savings in capital costs resulting from the delay in distribution facility expansion would amount to about US$3 million, also expressed in present value terms. These costs are, by necessity, preliminary estimates. Exact costs will be established during project appraisal with GEF funding to be restricted to eligible incremental costs only. (a) Incremental Cost Table: Global Environmental Benefits Domestic Benefits Baseline Alternative Increment 0 30,0 tons of CO 2 emissions 30,0 tons of CO 2 avoided avoided 39 million KWh of Reduced air, water & noise Reduced air, water & diesel generated pollution, along with 39 million noise pollution peakload energy kwh of PV generated peakload energy Costs US$3,014,0 US$6,984,0 US$3,970,0 (b) Component Financing (in US$): Component GEF CEPALCO Total Independent Engineering Review* 1,0 1,0 PV Capital Costs** 3,9,0 2,732,0 6,632,0 Hydro Capital Costs PV Plant aintenance 0 252,0 252,0 Total 4,0,0 2,984,0 6,984,0 * Independent engineers retained by IFC as lender s representatives for validation of proposed uses of the GEF funds. ** This capital cost item includes reasonable engineering design expenses which will be capitalized into the project cost. 2

21 ANNEX 2 PAGE 3 OF 3 (c) Disbursement Projections Will be supplied after appraisal. (d) Project Financing per Expenditure Category: Will be supplied after appraisal.

22

23 ANNEX 3 PAGE 1 OF 3 STAP ROSTER TECHNICAL REVIEW Philippines: CEPALCO Distributed Generation PV Power Plant 1. Overall impression This is a very interesting and promising proposal. It addresses two key issues relating to the wide spread introduction of photovoltaics (PV) in grid systems in developing countries, firstly the avoidance of investment in electricity storage and secondly, if the follow-on project to replicate in sufficient other locations is implemented, it would contribute to the cost convergence of PV systems with fossil alternatives as a result of a faster rate of market growth and consequent economy of scale in PV system manufacture. The proposal has been clearly thought through and presented. 2. Relevance and Priority PV has the potential to become the largest global non-co 2 producing energy technology and requires a number of market stimulation initiatives on different applications to accelerate the technology down the learning curve to convergence with energy from fossil fuels. Successful demonstration of the concept of linking PV and hydro in a developing country situation should encourage private sector investment in other projects as the incremental costs for PV reduce, particularly if a follow-on project to buy down the costs until convergence was achieved, was approved. Because this project has the potential to be widely replicated, it has a high relevance to the objective of the GEF of reducing CO 2 emissions through the application of renewable energy and warrants a high priority. 3. Background and Context The project document covers the potential scope for PV and the current problems of high cost in sufficient detail. Under point 3 of the Background and Context I would suggest some minor modification to the text. Although I am aware that the Kerman substation project in California was justified on the grounds of distribution network reinforcement, I am not aware that such projects have become relatively numerous in the US, Europe and Japan. The reference to various million solar roofs initiatives is a bit misleading, as they are not directly relevant to this proposal. As far as I am aware none of the developed country roof programs (USA, Netherlands, Germany, Japan) were introduced for distribution network reinforcement reasons, but as market enabling schemes to stimulate increased PV manufacturing capacity (hence reduce the costs) and as part of commitments to increase the application of renewable energy. Each individual PV roof system is usually only a few kw and rather than usually subsidized, I believe all are heavily subsidized, due to the high initial PV system costs and also the relatively low value of the electricity displaced in the, primarily, domestic markets. Under point 4 I would also add that the cost of PV electricity is highly dependent on the discount factor applied.

Assessment of the Potential for the. Commercialization of Conjunctive. Executive Summary

Assessment of the Potential for the. Commercialization of Conjunctive. Executive Summary PV- Hydro Initiative Stages 1 & 2 Assessment of the Potential for the Commercialization of Conjunctive Photovoltaic - Hydro Power Generation Executive Summary Background and Objectives of the PV-Hydro

More information

are country driven and in conformity with, and supportive of, national development priorities;

are country driven and in conformity with, and supportive of, national development priorities; OPERATIONAL PROGRAM NUMBER 7 REDUCING THE LONG-TERM COSTS OF LOW GREENHOUSE GAS-EMITTING ENERGY TECHNOLOGIES 7.1 The United Nations Framework Convention on Climate Change (UNFCCC) seeks to stabilize atmospheric

More information

PREPARED FOR: ARIZONA PUBLIC SERVICE Updated Solar PV Value Report

PREPARED FOR: ARIZONA PUBLIC SERVICE Updated Solar PV Value Report PREPARED FOR: ARIZONA PUBLIC SERVICE 2013 Updated Solar PV Value Report MAY 2013 2013 Updated Solar PV Value Report Arizona Public Service May 10, 2013 This report has been prepared for the use of the

More information

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Proposal Concerning Modifications to LIPA s Tariff for Electric Service Proposal Concerning Modifications to LIPA s Tariff for Electric Service Requested Action: The Long Island Power Authority ( LIPA ) staff proposes revisions to the LIPA Tariff for Electric Service to authorize

More information

Methodology for calculating subsidies to renewables

Methodology for calculating subsidies to renewables 1 Introduction Each of the World Energy Outlook scenarios envisages growth in the use of renewable energy sources over the Outlook period. World Energy Outlook 2012 includes estimates of the subsidies

More information

Levelized Cost of New Generation Resources in the Annual Energy Outlook 2012

Levelized Cost of New Generation Resources in the Annual Energy Outlook 2012 July 2012 Levelized Cost of New Generation Resources in the Annual Energy Outlook 2012 This paper presents average levelized costs for generating technologies that are brought on line in 2017 1 as represented

More information

RENEWABLE POWER GENERATION COSTS IN 2014

RENEWABLE POWER GENERATION COSTS IN 2014 RENEWABLE POWER GENERATION COSTS IN Executive Summary The competiveness of renewable power generation technologies continued improving in 2013 and. The cost-competitiveness of renewable power generation

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR) Installed capacity (GW) Solar Rooftop Investment Program (RRP IND 49419) Sector Road Map SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR) 1. Sector Performance, Problems, and Opportunities

More information

PROJECT EXECUTIVE SUMMARY REQUEST FOR CEO ENDORSEMENT. GEF IA/ExA

PROJECT EXECUTIVE SUMMARY REQUEST FOR CEO ENDORSEMENT. GEF IA/ExA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GEFSEC PROJECT ID: 647 AGENCY S PROJECT ID: P041396 COUNTRY: Morocco PROJECT TITLE: Integrated

More information

Outline. Introduction to Wisconsin. Barriers to Generating Electricity from. Incentives and Regulations Intended to

Outline. Introduction to Wisconsin. Barriers to Generating Electricity from. Incentives and Regulations Intended to Experience of the United States in the Application of Incentives and Regulations for the Supply of Renewable Energy Chairperson Eric J. Callisto Public Service Commission of Wisconsin 20 May 2010 Outline

More information

DRAFT 8/11/08. I. Renewable Portfolio Standard. (a) The Commission shall establish minimum numerical portfolio standards for each investorowned

DRAFT 8/11/08. I. Renewable Portfolio Standard. (a) The Commission shall establish minimum numerical portfolio standards for each investorowned I. Renewable Portfolio Standard 0 0.00 Florida Renewable Portfolio Standard () Application and Scope. (a) The Commission shall establish minimum numerical portfolio standards for each investorowned electric

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:45460 Project Name Rural Electrification and Transmission Interconnection Project (RETP) Region EAST ASIA AND PACIFIC Sector Energy Project ID

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Interim Country Partnership Strategy: Maldives, 2014 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities A. Sector Performance 1. The Maldives

More information

Table 1: Financial Analysis for without and with storage scenarios

Table 1: Financial Analysis for without and with storage scenarios Note on Preliminary Financial and Economic Analysis for Energy Storage Solutions and Floating Solar Photovoltaic for India: Innovation in Solar Power and Hybrid Technologies Project Energy Storage Solutions:

More information

GEF Focal Area Climate Change (Operational Program No. 7)

GEF Focal Area Climate Change (Operational Program No. 7) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Country Region Sector Project Report No. India-Solar Thermal Power Project

More information

Terms of Reference. Development and Evaluation of Power and Heat Supply Options for Kosovo

Terms of Reference. Development and Evaluation of Power and Heat Supply Options for Kosovo Terms of Reference Development and Evaluation of Power and Heat Supply Options for Kosovo Background Coming out of post-conflict administration by the UN, Kosovo declared independence on February 17, 2008.

More information

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA SREP Sub- Committee Meeting, Cape Town June 21, 2011 1 Introduction Kenya is one of the six Pilot Countries selected to benefit

More information

ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS

ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS A. Background SASEC Bangladesh India Electrical Grid Interconnection Project Additional Financing (BAN RRP 44192-14) ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS 1. The Bangladesh India Electrical

More information

RENEWABLE ENERGY POLICY OF BANGLADESH

RENEWABLE ENERGY POLICY OF BANGLADESH Final RENEWABLE ENERGY POLICY OF BANGLADESH POWER DIVISION MINISTRY OF POWER, ENERGY AND MINERAL RESOURCES GOVERNMENT OF THE PEOPLE S REPUBLIC OF BANGLADESH 6 NOVEMBER 2008 DHAKA CONTENTS 1 INTRODUCTION...

More information

Harnessing the sun s energy to power our future.

Harnessing the sun s energy to power our future. Installing a well designed Solar Matters PV system on your property or building will protect you from increasing electricity prices, increase the value of the property, and help keep our environment clean.

More information

IFC s Approach to Climate Change in the Electricity Sector

IFC s Approach to Climate Change in the Electricity Sector IFC s Approach to Climate Change in the Electricity Sector Oct 2008 Contents/Agenda 1. Climate Change, Economic Development, & the Electricity Sector 2. Mitigating Climate Change: Efficiency, Technology,

More information

The Optimal Approach to Firming Windpower

The Optimal Approach to Firming Windpower 5735 Hollister Avenue, Suite B Goleta, California 93117 T 805.683.9659 F 805.683.9671 www.gravitypower.net The Optimal Approach to Firming Windpower Summary As many regions of the world are staging massive

More information

ECONOMIC ANALYSIS. A. Macroeconomic Context

ECONOMIC ANALYSIS. A. Macroeconomic Context Yap Renewable Energy Development Project (RRP FSM 44469) ECONOMIC ANALYSIS A. Macroeconomic Context 1. The Federated States of Micronesia (FSM) have had poor growth performance for the past 5 years. From

More information

CHINA 2050 HIGH RENEWABLE ENERGY PENETRATION SCENARIO AND ROADMAP STUDY. Energy Research Institute National Development and Reform Commission

CHINA 2050 HIGH RENEWABLE ENERGY PENETRATION SCENARIO AND ROADMAP STUDY. Energy Research Institute National Development and Reform Commission CHINA 2050 HIGH RENEWABLE ENERGY PENETRATION SCENARIO AND ROADMAP STUDY Energy Research Institute National Development and Reform Commission ENERGY RESEARCH INSTITUTE NATIONAL DEVELOPMENT AND REFORM COMMISSION

More information

Gas & Steam Turbines in the planned Environmental Goods Agreement

Gas & Steam Turbines in the planned Environmental Goods Agreement Gas & Steam Turbines in the planned Environmental Goods Agreement Gas & steam turbines are a technology for generating thermal power in the form of electricity and/or heat or mechanical energy. They are

More information

REToolKit Case Study

REToolKit Case Study REToolKit Case Study México: Large Scale Renewable Energy Development Project (Phase 1 -$25M, Phase II - $45M) Prepared by Ted Kennedy Climate Change Team, World Bank 1. Introduction The World Bank, with

More information

The Impacts of the Green Communities Act on the Massachusetts Economy:

The Impacts of the Green Communities Act on the Massachusetts Economy: The Impacts of the Green Communities Act on the Massachusetts Economy: A Review of the First Six Years of the Act s Implementation Paul J. Hibbard Susan F. Tierney Pavel G. Darling Analysis Group, Inc.

More information

Envisioning a Renewable Electricity Future for the United States

Envisioning a Renewable Electricity Future for the United States Envisioning a Renewable Electricity Future for the United States Trieu Mai, Ph.D. GCEP Net Energy Analysis Workshop April 1, 215 Stanford University, CA NREL is a national laboratory of the U.S. Department

More information

Solar Photovoltaic (PV) GreenSmart Energy Performance Report

Solar Photovoltaic (PV) GreenSmart Energy Performance Report Solar Photovoltaic (PV) GreenSmart Energy Performance Report 2014-2016 A GreenSmart Energy Initiative TABLE OF CONTENTS INTRODUCTION... 1 TOTAL ELECTRICAL Production... 2 MONTHLY ELECTRICAL PRODUCTION...

More information

From: Keith Casey, Vice President, Market and Infrastructure Development

From: Keith Casey, Vice President, Market and Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: August 18, 2011 Re: Briefing on Renewable

More information

DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND

DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND June 1, 2009 DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND BACKGROUND 1. Low income countries face a

More information

CLEAN TECHNOLOGY FUND INVESTMENT CRITERIA FOR PUBLIC SECTOR OPERATIONS 1

CLEAN TECHNOLOGY FUND INVESTMENT CRITERIA FOR PUBLIC SECTOR OPERATIONS 1 CTF/TFC.2/3 January 16, 2009 Meeting of the CTF Trust Fund Committee Washington, D.C. January 29-30, 2009 CLEAN TECHNOLOGY FUND INVESTMENT CRITERIA FOR PUBLIC SECTOR OPERATIONS 1 1 These criteria are applicable

More information

INTEGRATION OF RENEWABLE BASED GENERATION INTO SRI LANKAN GRID

INTEGRATION OF RENEWABLE BASED GENERATION INTO SRI LANKAN GRID CEYLON ELECTRICITY BOARD INTEGRATION OF RENEWABLE BASED GENERATION INTO SRI LANKAN GRID 2018-2028 Dr. H.M Wijekoon Chief Engineer (Transmission Planning) Randika Wijekoon Electrical Engineer (Generation

More information

Shadow price of carbon in economic analysis. Guidance note

Shadow price of carbon in economic analysis. Guidance note Shadow price of carbon in economic analysis Guidance note This guidance note is intended to help World Bank staff value carbon emissions in economic analysis of investment project financing. The economic

More information

REVIEW OF POWER SYSTEM EXPANSION PLANNING IN VIETNAM

REVIEW OF POWER SYSTEM EXPANSION PLANNING IN VIETNAM Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REVIEW OF POWER SYSTEM EXPANSION PLANNING IN VIETNAM Tasks 1 and 2 Report Prepared for

More information

Integrated Resource Plan

Integrated Resource Plan 2011 Integrated Resource Plan Addendum Let s turn the answers on. June 27, 2011 For more information, contact: PacifiCorp IRP Resource Planning 825 N.E. Multnomah, Suite 600 Portland, Oregon 97232 (503)

More information

Session IV: Access to Electricity Services in Rural Areas

Session IV: Access to Electricity Services in Rural Areas Session IV: Access to Electricity Services in Rural Areas Mini Grids: Experience from India Debajit Palit Fellow and Internal Resource Advisor The Energy and Resources Institute, New Delhi Mini-Grids in

More information

2005 Integrated Electricity Plan

2005 Integrated Electricity Plan 2005 Integrated Electricity Plan Regional Workshops Round 1 Kitimat February 22, 2005 Workshop Objectives To provide a forum to learn, share and express regional preferences about future energy options

More information

Independent Power Production Policy

Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy October 2015 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy

More information

The impacts of nuclear energy and renewables on network costs. Ron Cameron OECD Nuclear Energy Agency

The impacts of nuclear energy and renewables on network costs. Ron Cameron OECD Nuclear Energy Agency The impacts of nuclear energy and renewables on network costs Ron Cameron OECD Nuclear Energy Agency Energy Mix A country s energy mix depends on both resources and policies The need for energy depends

More information

A. INTRODUCTION B. METHODOLOGY C. EXISTING CONDITIONS

A. INTRODUCTION B. METHODOLOGY C. EXISTING CONDITIONS Chapter 15: Energy A. INTRODUCTION The proposed project would generate a new demand for energy at the site. Currently that demand is limited to the existing New York City Department of Sanitation (DSNY)

More information

SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA

SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA By: Edward Ishengoma Assistant Commissioner Renewable Energy Ministry of Energy and Minerals Tanzania 25 July, 2013 CONTENTS 1. Introduction 2. Status of

More information

L A Z A R D ' S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S V E R S I O N 7. 0

L A Z A R D ' S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S V E R S I O N 7. 0 C O N F I D E N T I A L A U G U S T 2 0 1 3 L A Z A R D ' S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S V E R S I O N 7. 0 Introduction Lazard s Levelized Cost of Energy Analysis ( LCOE )

More information

Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji

Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji Ministry of Economy Republic of Fiji Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji Pre-feasibility Study Results December 2017 Context of National Policy and Nationally

More information

Designing Successful Energy Savings Targets

Designing Successful Energy Savings Targets Designing Successful Energy Savings Targets Although successful energy savings targets share common elements, state policymakers and regulators have flexibility in designing targets to take advantage of

More information

Renewable energy in the Wellington Region

Renewable energy in the Wellington Region Report 08.46 Date 4 February 2008 File ENV/03/03/01 Committee Author Regional Sustainability Committee Bruce Geden, Special Projects Coordinator Renewable energy in the Wellington Region 1. Purpose To

More information

Using DSM to Help Meet Clean Air Act Requirements: A Case Study

Using DSM to Help Meet Clean Air Act Requirements: A Case Study Using DSM to Help Meet Clean Air Act Requirements: A Case Study Christopher J. Holmes and Kevin Neal, PSI Energy Steve Nadel, ACEEE Under the Clean Air Act Amendments (CAAA) of 1990, utilities must substantially

More information

ECONOMIC ANALYSIS. A. Introduction and Economic Rationale

ECONOMIC ANALYSIS. A. Introduction and Economic Rationale Demand-Side Energy Efficiency Sector Project (RRP IND 48224) A. Introduction and Economic Rationale ECONOMIC ANALYSIS 1. Energy Efficiency Services Limited (EESL) was created by the Ministry of Power within

More information

POLICY BRIEF #25 BUILDING GLOBAL ENERGY INTERCONNECTION (GEI) TO PROMOTE 2030 AGENDA FOR SUSTAINABLE ENERGY DEVELOPMENT.

POLICY BRIEF #25 BUILDING GLOBAL ENERGY INTERCONNECTION (GEI) TO PROMOTE 2030 AGENDA FOR SUSTAINABLE ENERGY DEVELOPMENT. POLICY BRIEF #25 BUILDING GLOBAL ENERGY INTERCONNECTION (GEI) TO PROMOTE 2030 AGENDA FOR SUSTAINABLE ENERGY DEVELOPMENT Developed by: Global Energy Interconnection Development and Cooperation Organization,

More information

Synopsis Report. Government of the Northwest Territories. Assessment for Natural Gas Power Conversions in Tulita, NT. April 2011

Synopsis Report. Government of the Northwest Territories. Assessment for Natural Gas Power Conversions in Tulita, NT. April 2011 Synopsis Report Government of the Northwest Territories Assessment for Natural Gas Power Conversions in Tulita, NT April 2011 COPYRIGHT 2011 BY ASSOCIATED ENGINEERING (B.C.) LTD. All copyright and other

More information

ECONOMIC ANALYSIS. Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (RRP VIE 46391)

ECONOMIC ANALYSIS. Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (RRP VIE 46391) Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (RRP VIE 46391) ECONOMIC ANALYSIS 1. The project has several core and noncore subprojects, including and reinforcement of substations and

More information

New York Battery and Energy Storage Technology Consortium, Inc.

New York Battery and Energy Storage Technology Consortium, Inc. VIA ELECTRONIC FILING April 21, 2016 Hon. Kathleen H. Burgess Secretary to the Commission New York State Public Service Commission Empire State Plaza, Agency Building 3 Albany, New York 12223-1350 Re:

More information

SUMMARY OF OPERATION EVALUATION. A wind farm. November 2013 EBRD EVALUATION DEPARTMENT

SUMMARY OF OPERATION EVALUATION. A wind farm. November 2013 EBRD EVALUATION DEPARTMENT SUMMARY OF OPERATION EVALUATION A wind farm November 2013 EBRD EVALUATION DEPARTMENT The Evaluation Department (EvD) at the EBRD evaluates the performance of the Bank s completed projects and programmes

More information

ECONOMIC ANALYSIS. A. Background and Approach

ECONOMIC ANALYSIS. A. Background and Approach A. Background and Approach ECONOMIC ANALYSIS Rural Renewable Energy Development Project (RRP BHU 42252) 1. Economic analysis was undertaken to determine the economic viability of the project. The analysis

More information

International Renewable Electricity Standards Concept Paper July 1, 2014

International Renewable Electricity Standards Concept Paper July 1, 2014 International Renewable Electricity Standards Concept Paper July 1, 2014 I. Introduction Melissa Powers Associate Professor and GEI Director This document outlines different strategies for deploying and

More information

4 NEED AND DESIRABILITY FOR THE PROJECT

4 NEED AND DESIRABILITY FOR THE PROJECT 4 NEED AND DESIRABILITY FOR THE PROJECT 4.1 Introduction In many countries, including South Africa, economic growth and social needs are resulting in substantially greater energy demands, in spite of continued

More information

Renewable Energy Is it feasible in a distillery environment?

Renewable Energy Is it feasible in a distillery environment? Renewable Energy Is it feasible in a distillery environment? Andrew Bright, ITPEnergised SWA Guide Published in 2012 Details on a range of technologies Information on subsidies Numerous examples of the

More information

Risks And Opportunities For PacifiCorp State Level Findings:

Risks And Opportunities For PacifiCorp State Level Findings: Risks And Opportunities For PacifiCorp State Level Findings: Oregon Author: Ezra D. Hausman, Ph.D. A Risks and Opportunities for PacifiCorp, State Level Findings: Oregon Power Generation at Bonneville

More information

Global Environment Facility

Global Environment Facility Global Environment Facility GEF/C.25/11 April 29, 2005 GEF Council Meeting June 6-8, 2005 Agenda Item 17 COST EFFECTIVENESS ANALYSIS IN GEF PROJECTS Recommended Council Decision The Council, having reviewed

More information

Cost-effective OPEX-models for energy storage as game changer for improving operation and resilience of electricity

Cost-effective OPEX-models for energy storage as game changer for improving operation and resilience of electricity Cost-effective OPEX-models for energy storage as game changer for improving operation and resilience of electricity by Nicolas Boruchowicz, Daniel Günther and Lars Stephan, and EE Publishers How to Future-Proof

More information

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES Evangelos Dialynas Professor in the National Technical University of Athens Greece dialynas@power.ece.ntua.gr

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL

More information

Outstanding Unresolved Issues

Outstanding Unresolved Issues Public Advisory Group Special Session on Analysis for 2018 IRP Outstanding Unresolved Issues as of January 11, 2018 1/11/2018 1 New Issues 1/11/2018 2 Weighted Average Cost of Capital (WACC) should be

More information

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND Re-submission Date: 27 November 2009 PART I: PROJECT IDENTIFICATION INDICATIVE CALENDAR GEF PROJECT ID: 4004 PROJECT

More information

Elmwood Golf Course Solar PV Initial Feasibility Study

Elmwood Golf Course Solar PV Initial Feasibility Study Elmwood Golf Course Solar PV Prepared by: SAC Consulting Contact: Email: Fiona Salter fiona.salter@sac.co.uk Phone: 0131 603 7513 Date: 27 th August 2015 1 Contents 1 Contents... 1 2 Introduction... 1

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.:51272 Project Name CBF Sidi

More information

Briefing Paper for the SageCon Partners Estimates of Oregon Renewable Development through 2025

Briefing Paper for the SageCon Partners Estimates of Oregon Renewable Development through 2025 Briefing Paper for the SageCon Partners Estimates of Oregon Renewable Development through 2025 Phil Carver, Oregon Dept. of Energy January 23, 2014 Revisons based in PacifiCorp comments as of January 22

More information

PASADENA WATER AND POWER MEMORANDUM. August 9, 2016

PASADENA WATER AND POWER MEMORANDUM. August 9, 2016 PASADENA WATER AND POWER MEMORANDUM August 9, 2016 To: Environmental Advisory Committee From: Gurcharan Bawa Interim General Manager Subject: Pasadena Solar Program Updates This report is for information

More information

Calculation of Demand Curve Parameters

Calculation of Demand Curve Parameters Calculation of Demand Curve Parameters Rationale 4.1 Resource adequacy standard 4.1.1 The resource adequacy standard announced by the Government of Alberta prescribes a minimum level of reliability as

More information

(Financed by the Japan Fund for Poverty Reduction)

(Financed by the Japan Fund for Poverty Reduction) Technical Assistance Report Project Number: 45124 Regional Capacity Development Technical Assistance (R-CDTA) December 2011 Smart Grid Capacity Development (Financed by the Japan Fund for Poverty Reduction)

More information

Additional Information on Project Components

Additional Information on Project Components Additional Information on Project Components A. Part A: Ashuganj 450 MW Combine Cycle Power Plant 1. Description 1. The proposed project involves retirement of the existing combined cycle power plant (CCPP)

More information

Stranded Assets in the Utilities Sector as Europe Moves to a Low Carbon Society

Stranded Assets in the Utilities Sector as Europe Moves to a Low Carbon Society Investment Research Stranded Assets in the Utilities Sector as Europe Moves to a Low Carbon Society Gary Buesser, CFA, Director, Research Analyst Alistair Godrich, CFA, Vice President, Research Analyst

More information

ECONOMIC ANALYSIS. A. Introduction

ECONOMIC ANALYSIS. A. Introduction Supporting Electricity Supply Reliability Improvement Project (RRP SRI 49216) ECONOMIC ANALYSIS A. Introduction 1. The main objective of the proposed project is to increase the adequacy and availability

More information

Appendix 13. Renewable Energy Market Potential

Appendix 13. Renewable Energy Market Potential Appendix 13. Renewable Energy Market Potential Briefing Paper for the SageCon Partners Estimates of Oregon Renewable Development through 2025 Phil Carver, Oregon Dept. of Energy January 22, 2014 Summary

More information

Renewable Energy Feasibility Study for Ione Band of Miwok Indians

Renewable Energy Feasibility Study for Ione Band of Miwok Indians Renewable Energy Feasibility Study for Ione Band of Miwok Indians By: Community Assessment of Renewable Energy and Sustainability & The Renewable and Appropriate Energy Laboratory Contents i. About CARES

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name EGAT

More information

Distributed Generation Technologies A Global Perspective

Distributed Generation Technologies A Global Perspective Distributed Generation Technologies A Global Perspective NSF Workshop on Sustainable Energy Systems Professor Saifur Rahman Director Alexandria Research Institute Virginia Tech November 2000 Nuclear Power

More information

Response of AfDB to Germany on Approval by mail: Morocco: One Wind Energy Plan

Response of AfDB to Germany on Approval by mail: Morocco: One Wind Energy Plan Response of AfDB to Germany on Approval by mail: Morocco: One Wind Energy Plan October 28, 2011 Morocco CTF IP Update and ONE Wind Plan Project Consolidated Set of Answers to Questions Raised by Germany

More information

Roadmap for Solar PV. Michael Waldron Renewable Energy Division International Energy Agency

Roadmap for Solar PV. Michael Waldron Renewable Energy Division International Energy Agency Roadmap for Solar PV Michael Waldron Renewable Energy Division International Energy Agency OECD/IEA 2014 IEA work on renewables IEA renewables website: http://www.iea.org/topics/renewables/ Renewable Policies

More information

Renewable Electricity Futures

Renewable Electricity Futures Renewable Electricity Futures Trieu Mai, Ph.D. PSERC Webinar September 4, 2012 NREL/PR 6A20 56168 Renewable Electricity Futures Study (2012). Hand, M.M.; Baldwin, S.; DeMeo, E.; Reilly, J.M.; Mai, T.;

More information

Northumbria Research Link

Northumbria Research Link Northumbria Research Link Walker, S. L. et al. (2005) 'Potential for microgeneration : study and analysis'. London: DTI, with Energy Saving Trust, Element Energy and E- Connect This report is available

More information

IssuesLetter. Making Room for Renewables

IssuesLetter. Making Room for Renewables IssuesLetter Making Room for Renewables Considering the benefits and opportunities renewable energy resources offer to society and the barriers they face, it is not surprising that countries and states

More information

Renewable Electricity Futures

Renewable Electricity Futures Renewable Electricity Futures Technical Context for Progress Toward Clean Energy in the West : Transmission s Critical Role Rocky Mountain Clean Energy Transmission Summit History Colorado Center, Denver

More information

Abstract. The renewable energy revolution

Abstract. The renewable energy revolution Pumped Hydro Energy Storage and the Renewable Energy Revolution Professor Andrew Blakers Australian National University Andrew.blakers@anu.edu.au Ph 02 6125 5905 September 2015 Abstract In Australia and

More information

SECTOR ASSESSMENT (SUMMARY): POWER

SECTOR ASSESSMENT (SUMMARY): POWER Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) A. Power Generation SECTOR ASSESSMENT (SUMMARY): POWER 1. The energy sector in Bangladesh is characterized by an acute

More information

Business Programs: Commercial and Industrial Renewable Energy Loan Program. Technical Application and Instructions

Business Programs: Commercial and Industrial Renewable Energy Loan Program. Technical Application and Instructions Business Programs: Commercial and Industrial Renewable Energy Loan Program Technical Application and Instructions DEFINITIONS Annual Cost Savings is the amount of energy cost savings that results from

More information

COMPETITIVENESS OF NUCLEAR ENERGY AN INTERNATIONAL VIEWPOINT. Nuclear Power Plants for Poland, Warsaw 1-2 June 2006

COMPETITIVENESS OF NUCLEAR ENERGY AN INTERNATIONAL VIEWPOINT. Nuclear Power Plants for Poland, Warsaw 1-2 June 2006 COMPETITIVENESS OF NUCLEAR ENERGY AN INTERNATIONAL VIEWPOINT Power Plants for Poland, Warsaw 1-2 June 2006 Evelyne BERTEL OECD Energy Agency Bertel@nea.fr Introduction Economic competitiveness, which always

More information

Solar - Program 187. Program Overview

Solar - Program 187. Program Overview Program Program Overview The U.S. Department of Energy estimates that solar power will represent approximately 1% of worldwide electric generation capacity in less than five years, and trends suggest that

More information

PACIFICORP: PRIVATE GENERATION RESOURCE ASSESSMENT FOR LONG TERM PLANNING

PACIFICORP: PRIVATE GENERATION RESOURCE ASSESSMENT FOR LONG TERM PLANNING PACIFICORP: PRIVATE GENERATION RESOURCE ASSESSMENT FOR LONG TERM PLANNING AUGUST 30, 2018 1 DISCLAIMER Notice Regarding Presentation This presentation was prepared by Navigant Consulting, Inc. (Navigant)

More information

ECONOMIC ANALYSIS. A. Introduction

ECONOMIC ANALYSIS. A. Introduction Solar Power Development Project (RRP SOL 48346) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis of the Solar Power Development Project in Solomon Islands was conducted in accordance with the

More information

Power Saver TM Program

Power Saver TM Program Power Saver TM Program COMMERCIAL SOLAR PHOTOVOLTAIC PERFORMANCE-BASED INCENTIVE PROGRAM GUIDELINES These guidelines govern the procedures and qualifications for incentives under the Austin Energy Commercial

More information

(a) The Commission shall establish a Renewable Portfolio Standard Rule (hereafter called

(a) The Commission shall establish a Renewable Portfolio Standard Rule (hereafter called I. Renewable Portfolio Standard.00 Florida Renewable Portfolio Standard () Application and Scope. (a) The Commission shall establish a Renewable Portfolio Standard Rule (hereafter called RPS Rule ) that

More information

Technical and economic evaluation of electricity generation cost from solar photovoltaic technology in Nigeria: A case study of Kano State

Technical and economic evaluation of electricity generation cost from solar photovoltaic technology in Nigeria: A case study of Kano State American Journal of Engineering Research (AJER) e-issn: 2320-0847 p-issn : 2320-0936 Volume-5, Issue-9, pp-105-110 www.ajer.org Research Paper Open Access Technical and economic evaluation of electricity

More information

From Restructuring to Decarbonization: Operational and Market-Design Challenges in New England

From Restructuring to Decarbonization: Operational and Market-Design Challenges in New England SEPTEMBER 25, 2018 WASHINGTON, DC From Restructuring to Decarbonization: Operational and Market-Design Challenges in New England USAEE/IAEE North American Conference Evolving Energy Realities Gordon van

More information

California s Approach to Designing a Feed-in Tariff. Sara Kamins California Public Utilities Commission June 19, 2014

California s Approach to Designing a Feed-in Tariff. Sara Kamins California Public Utilities Commission June 19, 2014 California s Approach to Designing a Feed-in Tariff 1 Sara Kamins California Public Utilities Commission June 19, 2014 California Public Utilities Commission: About Us Regulates privately owned electric,

More information

Study on the value of flexibility in the management and design basis of distribution networks in France

Study on the value of flexibility in the management and design basis of distribution networks in France Study on the value of flexibility in the management and design basis of distribution networks in France Summary - Version dated 7 December 2015 This document is a translation of E-CUBE Strategy Consultants

More information

Risk Identification and Mitigation for Small Scale Renewable Energy Power Projects in Indonesia

Risk Identification and Mitigation for Small Scale Renewable Energy Power Projects in Indonesia Risk Identification and Mitigation for Small Scale Renewable Energy Power Projects in Indonesia Prepared by: Bill Meade Director, Tetra Tech (USA) CLEAN POWER ASIA 29-30 April 2013 Bangkok, Thailand Presentation

More information

UK Future Energy Scenarios. Richard Smith Future Transmission Networks Manager

UK Future Energy Scenarios. Richard Smith Future Transmission Networks Manager UK Future Energy Scenarios Richard Smith Future Transmission Networks Manager January 2012 Cautionary Statement This presentation contains certain statements that are neither reported financial results

More information

CAMBODIA ENERGY SECTOR

CAMBODIA ENERGY SECTOR CAMBODIA ENERGY SECTOR Overview of potential electricity sector opportunities June 2018 Background This summary paper has been prepared by Investing In Infrastructure Cambodia (3i) a development program

More information