1 ADEQ OPERATING AIR PERMIT Pursuant to the Regulations of the Arkansas Operating Air Permit Program, Regulation #26: IS ISSUED TO: Columbian Chemicals Company 713 Industrial Park Road El Dorado, AR Union County CSN: THIS PERMIT AUTHORIZES THE ABOVE REFERENCED PERMITTEE TO INSTALL, OPERATE, AND MAINTAIN THE EQUIPMENT AND EMISSION UNITS DESCRIBED IN THE PERMIT APPLICATION AND ON THE FOLLOWING PAGES. THIS PERMIT IS VALID BETWEEN: February 18, 1998 and February 17, 2003 AND IS SUBJECT TO ALL LIMITS AND CONDITIONS CONTAINED HEREIN. Signed: Keith A. Michaels Date Modified

2 SECTION I: FACILITY INFORMATION PERMITTEE: Columbian Chemicals Company CSN: PERMIT NUMBER: 906-AOP-R1 FACILITY ADDRESS: COUNTY: 713 Industrial Park Road El Dorado, AR Union CONTACT POSITION: Jim McGuffin / Robert Vigil TELEPHONE NUMBER: (870) REVIEWING ENGINEER: UTM North-South (Y): UTM East-West (X): Michael H. Watt Zone km Zone km 2

3 SECTION II: INTRODUCTION Summary of Permit Activity Columbian Chemicals Company owns and operates a carbon black manufacturing facility located at 713 Industrial Road, El Dorado, Arkansas. This facility manufactures carbon black using the oil furnace process. Columbian Chemicals is proposing to install a new unit (Unit D which involves SN-08, SN-31, SN-48, SN-49, SN-60, SN-61, and SN-63) in order to increase production of carcass carbon black and also install a new dryer stack for emissions from Unit B and Unit D (SN-24). (Note: Columbian Chemicals Company was allowed to install a separate dryer stack for Unit B under Permit #906-AOP-R0. However, the facility never installed the stack.) Process Description The oil furnace process is the dominant process used today in the manufacturing of carbon black. The feedstock consists primarily of an aromatic liquid hydrocarbon. The most common source of this feedstock is Gulf Coast oil refineries. Refinery cracking unit bottoms contain the condensed-ring hydrocarbons necessary for the carbon black process and can be obtained at an acceptable cost. The first step in the production process is a cracking or pyrolysis step. The hydrocarbon feedstock is heated and injected continuously into a reactor vessel. The reactor is a specially designed furnace with injection ports located strategically around the combustion zone. The heat necessary to initiate the carbon black process in the combustion zone is provided by either the hydrocarbon feed stock or natural gas. In the reaction zone, the hydrocarbon decomposes (i.e., cracks) to form carbon black. Careful control of the process (or combustion) air is required to insure that complete combustion does not occur. The particles of carbon black generated in the reactor are carried downstream with the process gas, which is commonly referred to as tail gas. This tail gas typically consists of approximately 10 to 17 percent carbon monoxide with smaller concentrations of other compounds, such as hydrogen sulfide, carbonyl sulfide, carbon disulfide, acetylene, particulate matter, sulfur dioxide, and oxides of nitrogen. The majority of the gas consists of nitrogen and contains about 40% water vapor. A portion of the tail gas is used as fuel for the dryers and boilers located at this facility. The remainder of the tail gas is currently vented to the atmosphere. Under this permit, the tail gas will be combusted in a thermal oxidizer system. In the event of routine maintenance or equipment malfunction, as provided for more specifically later in this permit, the facility will be permitted to vent a limited amount of tail gas to the atmosphere. 3

4 To stop the cracking process, water is used to cool the tail gases from the reactor to approximately 1,200 to 1,500EF (650 to 800EC). The carbon black laden tail gas is further cooled to about 450EF (230EC) by heat exchange, followed by additional injection of water. The carbon black is separated from the tail gas by high efficiency fabric filters. Each of the four units at this facility is equipped with its own collection system. After the separation of the tail gas and the carbon black, the carbon black is further processed to meet customer requirements. The two reactors located at Unit A produce general tread carbon black, the reactors located at Units B and D produce carcass carbon black, and the reactor located at Unit C produces specialty carbon black. A special beading process is part of the Unit A, Unit B, and Unit D reactor processes. Carbon black is mixed with water containing the beading binding agent and is dried in one of the unit dryers. The Unit C carbon black is beaded with a bead oil to form the specialty product. Consequently, there is not a dryer associated with Unit C. This facility also includes mechanical and air conveying systems that transfer the materials from the reactor/dryer system to the product storage area. The product is stored in bulk storage containers and may be shipped to the customer using one of three methods: bulk shipment in rail cars and hopper trucks, supersacks or tote bins, and smaller bags (typically 50-lb). Prevention of Significant Deterioration With the installation of the new equipment, SO 2 emissions will increase 9,121 tons per year, NO X emissions will increase 863 tons per year, and PM 10 emissions will increase 13 tons per year. All other pollutants proposed emissions are lower than the past actual emissions because of the addition of new control equipment and changes in emission factors. The emission increases of SO 2 and NO X will exceed the PSD Significant Increase Levels, while PM 10 emissions are below the PSD threshold. 4

5 BACT ANALYSIS For a PSD permit, the applicant must perform a BACT analysis for each new unit. The applicant must also perform a BACT analysis for each affected unit that is undergoing a physical change or a change in the method of operation. The BACT evaluation must address each pollutant subject to PSD review emitted by the unit. BACT is determined on a case-by-case basis for each source taking into account technical feasibility, energy and environmental impacts, and cost in a topdown approach. That is, after discarding the technically infeasible options, the applicant must consider the remaining technologies in order of control efficiency and document any findings which result in not using the most effective control technology. BACT analyses were conducted for the SO 2 and the NO X emissions from the new natural gas fired units (SN-31, SN-48, and SN-49), SN-23, SN-24, and SN-37. BACT Analyses for SO 2 & NO X from natural gas fired sources (SN-31, SN-48, and SN-49) The natural gas fired burners are specifically designed for the carbon black process and will not operate in excess of 500 hours in any consecutive twelve month period. Due to the low level of emissions from these burners (less than 0.01 tpy of SO 2 and 1.0 tpy of NO X per source), any controls would be economically infeasible. Therefore, BACT for sources SN-31, SN-48, and SN-49 is considered to be proper design and combustion practices. BACT Analysis for SO 2 from SN-23, SN-24, and SN-37 Under Permit #906-AOP-R0, use of a feedstock oil with a sulfur content of 3.0% by weight was determined to be BACT for this facility. Several methods of lowering the sulfur dioxide emissions from these sources were examined in the permit application. The pre-combustion control methods included lowering the sulfur content of the feedstock oil by either treating the feedstock or using a low sulfur content feedstock, and treating pre-oxidation and pre-dryer/tail gas boiler gases for hydrogen sulfide or other sulfur compounds. The post-combustion control methods examined in the permit application included treating the oxidized tail gas through flue gas desulfurization (FGD) processes and treating existing dryer and/or tail gas boiler streams individually, in addition to treating the oxidizer exhaust using flue-gas desulfurization processes. 5

6 Removal of sulfur from the feedstock oil was rejected because the theoretical methods for the sulfur removal would saturate the condensed ring hydrocarbons which are the basis of the carbon black process, and there are no other known methods to remove the sulfur from the oil which are commercially available and economic. The only technically feasible post combustion control technique was Non-Regenerative, Wet FGD with lime. The annual cost of this system was over $11,000,000. This option would also require an additional boiler or quench system and would generate approximately 84,000 tons of solid waste per year. No other carbon black plant has been required to install a FGD device. Post combustion control techniques were rejected due to economic unreasonableness, other environmental impacts, and lack of practical use of the equipment for that purpose. The maximum sulfur content of the feedstock oil currently in use at this facility is less than the limits for other facilities found in the RBLC database. Therefore, it has been determined that continuing to allow the facility to use feedstock oil with a maximum sulfur content of 3% by weight is the most technically and economically feasible method of controlling sulfur emissions at this facility. The facility may blend higher sulfur feedstocks with lower sulfur feedstocks to ensure that the sulfur content of the feed to the reactors is less then or equal to 3% by weight. BACT Analysis for NO x from SN-23, SN-24, and SN-37 Specific information could not be obtained on NO x control measures beyond proper combustion control or low NO x burners. Due to the peculiar characteristics of carbon black tail gas, conventional low NO x burners are not applicable for use in combusting tail gas. However, a variation has been developed such that the combustor proposed for this facility s new boilers and dryers will achieve 300 ppm by volume or less. 6

7 BACT Summary Emission Unit Pollutant BACT Determination SN-23 SO 2 Maximum 3% sulfur by weight in blended feedstock oil SN-23 NO X Good combustion practice Emissions of # 300 ppm by vol. on a wet basis SN-24 SO 2 Maximum 3% sulfur by weight in blended feedstock oil SN-24 NO x Good combustion practice Emissions of # 300 ppm by vol. on a wet basis SN-31 SO 2 Proper design & good combustion practice SN-31 NO x Proper design & good combustion practice SN-37 SO 2 Maximum 3% sulfur by weight in blended feedstock oil SN-37 NO x Good combustion practice Emissions of # 300 ppm by vol. on a wet basis SN-48 & SN-49 SO 2 Proper design & good combustion practice SN-48 & SN-49 NO x Proper design & good combustion practice 7

8 AMBIENT AIR IMPACT ANALYSIS An air dispersion modeling analysis is a required part of a PSD permit application. The air dispersion modeling analysis is used to demonstrate that the emissions resulting from a proposed modification will not cause or contribute to a violation of any applicable National Ambient Air Quality Standard (NAAQS) or surpass a PSD increment. The USEPA requires that PSD modeling be performed in two stages: the significance analysis and the full impact analysis. The full impact analysis is further divided into the NAAQS and PSD Increment Analyses. SIGNIFICANCE ANALYSIS The significance analysis considers the emission increases associated with the proposed modifications at Columbian Chemicals Company in order to determine whether or not the modifications will have a significant impact upon the area surrounding the facility. If the results of the significance analysis are above the Modeling Significance Levels (MSLs), the full impact analysis will be required for that pollutant. In addition, if the results of the significance analysis are above the Monitoring De Minimis Concentrations, PSD ambient monitoring requirements must also be addressed for that pollutant. The PSD ambient monitoring is used to establish background air quality concentrations in the vicinity of the proposed sources. The Monitoring De Minimis Concentrations establish levels at which a facility would need to conduct pre-construction ambient air quality monitoring. The results of the significance analysis are contained in the following table. Maximum Predicted Concentration in Comparison with Modeling Significance Levels and Monitoring De Minimis Concentrations Pollutant Averaging Period Modeled Concentration (µg/m 3 ) PSD Modeling Significance Level (µg/m 3 ) PSD Monitoring De Minimis Concentrations (µg/m 3 ) SO 2 3-hour > hour > Annual > NO X Annual

9 AMBIENT MONITORING Columbian Chemicals was not required to address ambient monitoring for NO X due to the low concentration predicted in the significance analysis. However, the permittee was required to address ambient monitoring requirements for SO 2 because the 24-hour concentration predicted in the significance analysis exceeded the monitoring de minimis level. In lieu of conducting their own ambient monitoring, Columbian Chemicals requested, and the Department approved, the use of existing monitoring data from the Department s SO 2 monitor located in El Dorado. FULL IMPACT ANALYSIS Because the emission increases of sulfur dioxide associated with the proposed modifications are shown to have a potentially significant impact (i.e., ambient concentrations exceed MSLs), a full impact was conducted. The full impact analysis consists of a NAAQS and PSD Increment compliance demonstration. NAAQS ANALYSIS The NAAQS are maximum concentration ceilings measured in terms of the total concentration of a pollutant in the atmosphere. In the NAAQS analysis, Columbian Chemicals Company s emissions were combined with those from other nearby sources that have the potential to contribute significantly to receptors within the Radius of Impact (ROI) of Columbian Chemicals. The table below contains the results of the NAAQS analysis for sulfur dioxide. Modeled Concentration with Background in Comparison with the NAAQS Pollutant Averaging Period Modeled Concentration (µg/m 3 ) Modeled Concentration with Background (µg/m 3 ) NAAQS (µg/m 3 ) SO 2 3-hour , Highest, 2 nd Highest Concentration 2. Highest 24-hour Annual

10 PSD INCREMENT ANALYSIS PSD Increment is the maximum allowable increase in concentration that is allowed to occur above a set baseline concentration for a specific pollutant. The baseline concentration is defined for each pollutant and averaging time. It is the ambient concentration existing at the time that the first complete PSD permit application is submitted for a distinct area. PSD minor source trigger date for SO 2 has been established for Union county as August 8, Increment consuming sources were obtained using the same methodology for the NAAQS Analysis. Permitted dates of sources were evaluated to determine if the source was incrementconsuming or in the baseline. Emissions increases and decreases for all increment-affected sources located within the baseline area are modeled along with the emissions from Columbian Chemicals. The facility constructed an overall increment model. In this model, all increment consuming sources within the ROI were modeled. This was then compared to the total increment available. The highest results of the Increment Analysis for SO 2 is contained in the following table. Averaging Period Total Available Increment Analysis Results for SO 2 Maximum Modeled Increment Consumption (µg/m 3 ) Total Increment (µg/m 3 ) Percent of Increment Consumed 3-hour % 24-hour % Annual % According to (c)(4) of Regulation #19, if issuance of a permit would result in the consumption of more than 80% of the short-term increment or 50% of the available increment, the permittee shall submit an assessment of (a) the effects that the consumption would have upon the industrial and economic development within the area, and (b) alternatives to the consumption including alternative siting of the source or portions. The results of this analysis are included below. 10

11 a. Columbian Chemicals also performed increment consumption modeling using data from the facility only. This was done to show how the emissions changes at Columbian Chemicals alone would effect the available increment. The results of this modeling show that the impacts from Columbian Chemical alone are below the thresholds specified in Regulation The data are also representative of the increment consumption that is occurring around the plant itself, and therefore would not restrict development in the site vicinity. b. In the modeling that included all increment consuming sources, the results show that the maximum consumption is occurring near other facilities that are located away from the Columbian plant. It would not be feasible to consider an alternative site to this facility, as the increment consumption would be approximately the same wherever it is located. The proposed location is in an area that will have a limited impact on growth. Class I Area Impact Analysis The PSD Regulations require that written notification be provided to the Federal Land Manager in the event that a major source or modification is located within 100 kilometers of a Class I Area. Columbian Chemicals Company is located approximately 177 kilometers from the nearest Class I Area. Therefore, neither notification to the Federal Land Manager nor a Class I Area Impact Analysis is required. Additional Impacts Review Three areas constitute the Additional Impacts Review: a growth analysis, a soils and vegetation analysis, and a visibility analysis. The growth analysis includes a projection of the associated industrial, commercial, and residential growth that will occur in the area as a result of the source. The potential impact on the ambient air due to the growth is also a part of the analysis. Columbian Chemicals does not expect an increase in industrial, commercial, or residential growth as a result of the proposed modification. If all ambient concentrations are below the secondary NAAQS then soils and vegetation should not suffer any harmful effects as a result of the proposed modification. The modeling results were all below the secondary NAAQS levels. Through modeling, it has been shown that the proposed emission rates will not have a significant impact at any off property locations. Thus, the proposed modification will not cause any 11

12 visibility impairment. Regulations Permit #906-AOP-R1 is the second operating permit issued to Columbian Chemicals Company under Regulation 26. Columbian Chemicals is also subject to 40 CFR Part 60, Subpart Kb New Source Performance Standards for Volatile Organic Storage Vessels, Regulations of the Arkansas Operating Air Permit Program (Title V, Regulation #26), Regulations of the Arkansas Plan of Implementation for Air Pollution Control (SIP, Regulation #19), and Arkansas Air Pollution Control Code (Code, Regulation #18). The following table is a summary of emissions from the facility. Specific conditions and emissions for each source can be found starting on the page cross referenced in the table. This table, in itself, is not an enforceable condition of the permit. EMISSION SUMMARY Source No. Description Pollutant Emission Rates Cross Reference lb/hr tpy Page Total Allowable Emissions PM PM 10 SO 2 VOC CO NO x 4 4 2, , , , ,09 HAPs* Carbon - Disulfide* Carbonyl - Sulfide* Air Contaminants ** Hydrogen - Sulfide** TRS** Feedstock Oil Tank VOC Vapor Bag Collector Unit B PM 1.1 PM

13 EMISSION SUMMARY Source No. Description Pollutant Emission Rates Cross Reference lb/hr tpy Page 13 Vapor Bag Collector Unit A PM 1.0 PM Reject Pulsaire Collector Unit B PM PM Pulsaire Collector Unit A PM 2.0 PM Air Conveying Pulsaire Unit C PM PM Twilight Tank Baghouse (Unit A & B Start-ups) PM PM Boilers, Unit A Dryers Combined Stack PM PM 10 SO 2 VOC CO NO X Carbon - Disulfide Carbonyl - Sulfide Hydrogen - Sulfide TRS ,

14 EMISSION SUMMARY Source No. Description Pollutant Emission Rates Cross Reference lb/hr tpy Page 24 Units B & D Dryers Stack PM PM 10 SO 2 VOC CO NO X Carbon - Disulfide Carbonyl - Sulfide Hydrogen - Sulfide TRS , Tail Gas Bypass Stack PM PM 10 SO 2 VOC CO NO X Carbon - Disulfide Carbonyl - Sulfide Hydrogen - Sulfide TRS , , Natural Gas Coast Stack Unit A PM PM 10 SO 2 VOC CO NO x

15 EMISSION SUMMARY Source No. Description Pollutant Emission Rates Cross Reference lb/hr tpy Page 29 Natural Gas Coast Stack Unit B PM PM 10 SO 2 VOC CO NO x Natural Gas Coast Stack Unit C PM PM 10 SO 2 VOC CO NO x Natural Gas Coast Stack Unit D PM PM 10 SO 2 VOC CO NO x Unit B Warehouse PM 0.5 PM Hopper Car Unloading Vent PM 6.9 PM Unit A Warehouse PM 0.4 PM Feedstock Oil Tank #7 VOC 24 15

16 EMISSION SUMMARY Source No. Description Pollutant Emission Rates Cross Reference lb/hr tpy Page 37 Thermal Oxidizer Stack PM PM 10 SO 2 VOC CO NO X Carbon - Disulfide Carbonyl - Sulfide Hydrogen - Sulfide TRS , , , , 40, and 41 Unit B Reactor Vents PM PM 10 SO 2 VOC CO NO x and 43 Unit C Reactor Vents PM PM 10 SO 2 VOC CO NO x , 45, 46, and 47 Unit A Reactor Vents PM PM 10 SO 2 VOC CO NO x

17 EMISSION SUMMARY Source No. Description Pollutant Emission Rates Cross Reference lb/hr tpy Page 48 and 49 Unit D Reactor Vents PM PM 10 SO 2 VOC CO NO x Unit D Vapor Bag Collector PM PM Air Conveying Pulsaire Unit D PM 2.1 PM Warehouse PM PM 10 * HAPs included in the VOC totals are indicated by an *. Other HAPs are not included in any other totals unless specifically stated. ** Air Contaminants such as ammonia, acetone, and certain halogenated solvents are not classified as VOC or HAPs

18 SECTION III: PERMIT HISTORY Cities Service Company owned and operated a carbon black manufacturing facility in El Dorado which began operation in the early 1950s. This facility was registered with the Department prior to July 30, In 1980, Cities Service Company formed Columbian Chemicals Company as a free-standing company. With the exception of replacing outdated or uneconomical equipment, the plant operations changed little until Permit #906-A was issued to Columbian Chemicals Company on January 18, This permit allowed the facility to make numerous modifications over a three year period. These modifications included replacing reactors on two units with newer state-of-the-art Columbian patented designs, replacing the bag filters and wet scrubbers on all units with newer technology bag filters, installing a new stack, and converting an existing natural gas fired boiler to use plant tail gas as its primary fuel. Permit #906-A expired on December 31, An extension on this permit was granted by the Director of the Department on December 14, This extension allowed the facility to continue operation under Permit #906-A through December 31, On November 1, 1994, this facility began operating under Consent Administrative Order (CAO) LIS Permit #906-AOP-R0 was issued to Columbian Chemicals Company on February 18, Columbian Chemicals proposed to install a thermal oxidizer to oxidize the unused tail gas which was previously vented to the atmosphere. Following the installation and startup of the thermal oxidizer, restrictions were placed on the use of the tail gas bypass stack, SN-27. Columbian Chemicals submitted a PSD permit application for these proposed modifications addressing emissions from all modified and affected units. The following are the proposed emission changes that were included in Columbian Chemicals PSD permit application and/or required by the Department. 1. A thermal oxidizer (SN-37) will be installed to oxidize the uncombusted tail gas. This gas was previously routed through the tail gas bypass stack (SN-27). As a result of the installation of the thermal oxidizer, there will be significant increases of sulfur dioxide and oxides of nitrogen emissions. However, permitted emissions of carbon monoxide will be greatly reduced. Construction of the thermal oxidizer will begin within 18 months of the issuance of this permit. Operation of this source will begin within 33 months from the date of issuance of this permit. 18

19 2. Columbian Chemicals will have the option to increase production with this permit. If the facility chooses to increase production, a new stack, SN-24, will be installed. This new stack will vent emissions from the Unit B dryers. The increase in production, as stated in several specific conditions and Plantwide Condition #11 and #12, may not take place until sources SN-24 and SN-37 have been installed and are operating. 3. Continuous operation of source SN-27 will cease upon the installation of source SN-37. The permittee will be allowed to use the bypass stack under the following two conditions: a. Emergency release of tail gases as allowed under 26.7(f) of Regulation 26, for which notification must be submitted under General Provision #8 of this permit, and b. During periods of planned maintenance which must coincide with the shutdown of either Unit A or Unit B. The permittee will be required to maintain documentation demonstrating that one of the two required units was shutdown and that the hours of operation for this source were not exceeded. The net emission increase will exceed the PSD significant emission rates for oxides of nitrogen (NO x ) and sulfur dioxide (SO 2 ). A summary of the net emission increases that are above the PSD significant emission rates is contained in the following table. Pollutant Net Emission Increase (tpy) PSD Significant Emission Rate (tpy) SO NO x The increased emissions from the thermal oxidizer will not affect any source besides SN-27 which will be taken out of service within 60 days of the installation of source SN-37 except as herein provided. All annual emissions at source SN-27 are decreasing as a result of the installation of the thermal oxidizer. The installation of the Unit B dryer stack will cause a change in the method of operation at SN-23. Three pollutants have significant increases at sources SN-24 and SN-37. However, these increases were not subject to PSD review due to reduction of these pollutants at other sources at the facility. The installation and operation of the thermal oxidizer is responsible for most of the creditable decreases in emissions. Based upon information submitted by the permittee, it is expected that sources SN-24, if the facility chooses to increase production, and SN-37 will be in operation within 33 months of permit issuance. Conditions have been placed in this permit 19

20 requiring that the decreases occur at the same time that the increased emissions occur. A summary of the net emission decreases is contained in the table below. Pollutant Net Emission Decrease (tpy) Actual Emissions (tpy) Permitted Emissions (tpy) CO 26, , TRS H 2 S VOC BACT Analysis for SO 2 from SN-23, SN-24, and SN-37 Currently, the permittee is allowed to use feedstock oil with a sulfur content of 2.9% by weight. Several methods of lowering the sulfur dioxide emissions from these sources were examined in the permit application. The pre-combustion control methods include lowering the sulfur content of the feedstock oil either by treating the feedstock or by using a low sulfur content feedstock, and treating pre-oxidation and pre-dryer/tail gas boiler gases for H 2 S and/or other sulfur compounds. The post-combustion control methods examined in the permit application include treating the oxidized tail gas through flue-gas desulfurization processes and treating existing dryer and/or tail gas boiler streams individually, in addition to treating the oxidizer exhaust using flue-gas desulfurization processes. Removal of sulfur from the feedstock oil was rejected because the theoretical methods for the sulfur removal would saturate the condensed ring hydrocarbons which are the basis of the carbon black process and there are no known methods which are commercially available and economic to remove the sulfur from the oil. The post combustion control techniques were also rejected due to cost and/or unavailability. The maximum sulfur content of the feedstock oil currently in use at this facility is less than the limits for other facilities found in the RBLC database. Therefore, it has been determined that continuing to allow the facility to use feedstock oil with a maximum sulfur content of 3% by weight is the most technically and economically feasible method of controlling sulfur emissions at this facility. The facility may blend higher sulfur feedstocks with lower sulfur feedstocks to ensure that the sulfur content of the feed to the reactors is less then or equal to 3% by weight. 20

21 21

22 BACT Analysis for NO x from SN-24 and SN-37 Specific information could not be obtained on NO x control measures beyond proper combustion control or low NO x burners. Due to the peculiar characteristics of carbon black tail gas, conventional low NO x burners are not applicable to the thermal oxidizer design. However, a variation has been developed such that the combustor proposed for this facility s thermal oxidizer will achieve 300 ppm by volume or less. BACT Summary Emission Unit Pollutant BACT Determination SN-23 SO 2 Maximum 3% sulfur by weight in blended feedstock oil SN-24 SO 2 Maximum 3% sulfur by weight in blended feedstock oil SN-24 NO x Good combustion practice SN-37 SO 2 Maximum 3% sulfur by weight in blended feedstock oil SN-37 NO x Good combustion practice Ambient Air Impact Analysis The results of the significance analysis for NO x from Columbian Chemicals were below the corresponding Modeling Significance Level. Therefore, the full impact analysis of NO x was not required. In addition, the modeling results were below the corresponding Monitoring De Minimis Concentration thus no ambient monitoring is required. The results of the significance analysis for SO 2 from Columbian Chemicals were above the corresponding Modeling Significance levels. Therefore, the full impact analysis was required for SO 2. The results of the full impact analysis were below the corresponding NAAQS levels. The significance analysis for SO 2 also showed that the Monitoring De Minimis Concentration was exceeded on a 24 hour average. In lieu of pre-construction monitoring, the Department has accepted the use of existing data from an SO 2 monitor located in El Dorado. The PSD Increment Analysis showed that no PSD increments would be completely consumed or exceeded. 22

23 Results of Significance Analysis Pollutant Averaging Period Concentration, (µg/m 3 ) Modeling Significance Level, (µg/m 3 ) Monitoring De Minimis Concentration, (µg/m 3 ) SO 2 3 hour 24 hour Annual NO x Annual Results of Full Impact Analysis Pollutant Averaging Period Concentration, (µg/m 3 ) NAAQS, (µg/m 3 ) SO 2 3 hour 24 hour Annual There is no primary NAAQS standard for SO 2 on a 3-hour average. Therefore, the secondary NAAQS standard has been used. Results of PSD Increment Analysis Pollutant Averaging Period Concentration, (µg/m 3 ) PSD Increment, (µg/m 3 ) SO 2 3 hour 24 hour Annual Class I Area Impact Analysis The PSD Regulations require that written notification be provided to the Federal Land Manager in the event that a major source or modification is located within 100 kilometers of a Class I Area. Columbian Chemicals Company is located approximately 177 kilometers from the nearest Class I Area. Therefore, neither notification to the Federal Land Manager nor a Class I Area Impact Analysis is required. 23

24 SECTION IV: EMISSION UNIT INFORMATION

25 SN-08 and SN-36 Feedstock Oil Tanks Source Description The feedstock oil tanks store the raw materials which are used at this facility. The carbon black feedstock is similar to residual #6 fuel oil. The material stored in these tanks has a vapor pressure less than 0.5 psia. Source SN-36 has a volume of m 3 (630, 000 gallons). Source SN-08 has a volume of m 3 (200,000 gallons). Therefore, under 40 CFR 610b(c), these sources are exempt from most of the requirements of 40 CFR Part 60, Subpart A, and 40 CFR Part 60, Subpart Kb. The only requirements are the notification and record keeping requirements. Specific Conditions 1. Pursuant to et seq of the Regulations of the Arkansas Plan of Implementation for Air Pollution Control (Regulation #19) effective February 15, 1999 and 40 CFR Part 52, Subpart E, the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by equipment limitations. SN Pollutant lb/hr tpy 08 VOC 36 VOC 2. Pursuant to of Regulation 19, A.C.A as referenced by and , and 40 CFR 70.6, the permittee shall not store any materials at sources SN-08 and SN-36 which have a true vapor pressure in excess of 0.5 psia. 3. Pursuant to of Regulation 19 and 40 CFR Part 52, Subpart E, the permittee shall maintain records of the dimensions of sources SN-08 and SN-36 on site. These records shall be made available to Department personnel upon request. 25

26 SN-12, SN-13, and SN-61 Vapor Bag Collectors Source Description These baghouses control the particulate emissions from the dryers located at Units A, B, and D. (Unit C does not have a dryer.) SN-12 is located at Unit B while SN-13 is located at Unit A and SN-61 is located at Unit D. Sources SN-12 and SN-13 were both installed or last modified in Source SN-61 is being installed under this permit. These sources are permitted to run at capacity for 8,760 hours per year. Therefore, no throughput records are required to be kept for these sources. Specific Conditions 4. Pursuant to et seq of Regulation #19 and 40 CFR Part 52, Subpart E, the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Condition #6, Plantwide Condition #13, and equipment limitations. SN Pollutant lb/hr tpy 12 PM PM PM Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Condition #6, Plantwide Condition #13, and equipment limitations. SN Pollutant lb/hr tpy 12 PM PM PM

27 6. Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not cause to be discharged to the atmosphere gases which exhibit an opacity greater than 5%. The opacity shall be measured in accordance with EPA Reference Method 9 as found in 40 CFR Part 60 Appendix A. Compliance with this condition will be demonstrated by Plantwide Condition #15. 27

28 SN-14, SN-15, SN-20, SN-32, SN-34, SN-62, and SN-63 Conveying, Reject, Equipment Vent, and Warehouse Bag Collectors Source Description At Unit A, carbon black is pneumatically conveyed from the main unit bag collector to the conveying pulseaire bag collector (SN-15) above the dense tank. The conveying pulseaire bag collector also receives carbon black rejected from the product screens, discharge from the warehouse bag collector, and venting from the dense tank and downstream mechanical conveying equipment. The Unit A warehouse bag collector (SN-34) vents some mechanical conveying equipment, the unit s bag packaging system, and the venting during the loading of hopper cars and trucks. Carbon black discharged from the collector is returned to the conveying pulseaire bag collector. At Unit B, powder carbon black is mechanically conveyed by a series of screw conveyors and a bucket elevator from the main unit bag collector to the dense tank and does not require a conveying pulseaire bag collector. Also at Unit B, a reject pulseaire bag collector (SN-14) is located above the dense tank to receive carbon black rejected from the product screens, discharge from the warehouse bag collector, venting from the dense tank, and downstream mechanical conveying equipment. The Unit B warehouse bag collector (SN-32) vents some mechanical conveying equipment, the unit s bag packaging system, and the venting during the loading of hopper cars and trucks. Carbon black discharged from the collector is returned to the reject pulseaire collector. At Unit C, powder carbon black is pneumatically conveyed from the main unit bag collector to the conveying pulseaire bag collector (SN-20) above the dense tank. Alternatively, carbon black from Unit C may be directed to Unit A, combining with the Unit A production for beading and drying. The conveying pulseaire bag collector also receives carbon black rejected from the product screens and venting from the dense tank, downstream mechanical conveying equipment, and loading railroad hopper cars and trucks. At Unit D, powder carbon black will be pneumatically conveyed from the main unit bag collector to the conveying pulseaire bag collector (SN-62) above the dense tank. The conveying pulseaire bag collector will also receive carbon black re-run from the start-up tank and venting from the dense tank. Unit D will have an equipment vent collector (SN-63) located above the start-up tank to handle venting of downstream mechanical conveying equipment (from dryer to storage tank) and venting from loading railroad hopper cars and trucks. Collected carbon black will be discharged into the Unit D start-up tank. 28

29 Specific Conditions 7. Pursuant to et seq of Regulation #19 and 40 CFR Part 52, Subpart E, the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Conditions #9, #10, and #12, Plantwide Condition #13, and equipment limitations. SN Pollutant lb/hr tpy 14 PM PM PM PM PM PM PM Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Conditions #9, #10, and #12, Plantwide Condition #13, and equipment limitations. SN Pollutant lb/hr tpy 14 PM PM PM PM PM PM PM

30 9. Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not cause to be discharged to the atmosphere gases which exhibit an opacity greater than 5%. The opacity shall be measured in accordance with EPA Reference Method 9 as found in 40 CFR Part 60 Appendix A. Compliance with this condition will be demonstrated by Plantwide Condition # Pursuant to of Regulation 19, 40 CFR 70.6, A.C.A as referenced by and and of Regulation 18, the permittee shall not exceed the limits set forth in the following table at the designated sources in any consecutive twelve month period. SN Process Rate Units (PRUs) , , Pursuant to of Regulation #19 and 40 CFR Part 52, Subpart E, the permittee shall maintain records which demonstrate compliance with Specific Condition #10. The records shall be updated on a monthly basis. These records shall be kept on site, provided to Department personnel upon request, and may be used by the Department for enforcement purposes. An annual total and each month s individual data shall be submitted to the Department in accordance with General Provision # Pursuant to of Regulation 19 and 40 CFR Part 52, Subpart E, the permittee shall test source SN-62 for PM 10 using EPA Reference Method 201A within 60 days of achieving maximum production but no later than 180 days after initial start-up. This test is being required because the net emissions increase of PM 10 is close to the PSD Significant Increase Level. This test is not required of all new sources which will be permitted to emit PM 10 due to their low level of emissions. 30

31 SN-21 Twilight Tank Bag Collector Source Description Units A and B share a twilight tank (start-up tank) which is divided into two compartments. On occasion, carbon black being reprocessed would be dense phase conveyed to the twilight tank, venting the air through the twilight tank bag collector (SN-21). Normally, the bag collector functions as a vent for the tank. Specific Conditions 13. Pursuant to et seq of Regulation #19 and 40 CFR Part 52, Subpart E, the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Condition #15, Plantwide Condition #13, and equipment limitations. Pollutant lb/hr tpy PM Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Condition #15, Plantwide Condition #13, and equipment limitations. Pollutant lb/hr tpy PM Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not cause to be discharged to the atmosphere gases which exhibit an opacity greater than 5%. The opacity shall be measured in accordance with EPA Reference Method 9 as found in 40 CFR Part 60 Appendix A. Compliance with this condition will be demonstrated by Plantwide Condition #15. 31

32 SN-23 Unit A Dryers and Boilers Source Description No physical modification is occurring at this source with the issuance of this permit. However, some of the permitted emission rates are changing due to the use of new emission factors. Currently, this source vents emissions from the boilers and Unit A and B dryers. After the installation of source SN-24, the emissions from the Unit B dryers and boilers will be routed through the new stack. Emissions from this source are the result of the combustion of tail gas. The dryers and boilers are permitted to operate at capacity for 8,760 hours per year. Specific Conditions 16. Pursuant to et seq of Regulation #19 and 40 CFR Part 52, Subpart E, the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Conditions #19, #21, and equipment limitations. Pollutant lb/hr tpy PM 10 VOC CO Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Conditions #19, #21, and equipment limitations. Pollutant lb/hr tpy PM Carbon Disulfide Carbonyl Sulfide Hydrogen Sulfide TRS

33 18. Pursuant to et seq and et seq of Regulation 19 and 40 CFR Part 52, Subpart E, the permittee shall not exceed the emission rates set forth in the following table at source SN-23. The emission rates are based upon the capacity of the equipment. Compliance with this condition will be demonstrated by Specific Conditions #20 and #21, Plantwide Condition #11, and equipment limitations. Pollutant lb/hr tpy SO 2 NOX , Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not cause to be discharged to the atmosphere gases which exhibit an opacity greater than 5%. The opacity shall be measured in accordance with EPA Reference Method 9 as found in 40 CFR Part 60 Appendix A. Compliance with this condition will be demonstrated by Plantwide Condition # Pursuant to et seq and et seq of Regulation 19 and 40 CFR Part 52, Subpart E, the permittee shall not emit NO X in concentrations exceeding 300 ppm by volume. Compliance with this condition will be demonstrated by Specific Condition #21 and equipment limitations. 21. Pursuant to and et seq of Regulation 19 and 40 CFR Part 52, Subpart E, the permittee shall annually conduct the following tests using the indicated test method unless another method is approved by the Department at least 15 days prior to the test taking place. Pollutant SO 2 NO X EPA Reference Method 6C 7E TRS 15 33

34 22. Pursuant to and et seq of Regulation 19, 40 CFR Part 52, Subpart E, and A.C.A as referenced by and , the Department reserves the right to require CEMS for sulfur dioxide and total reduced sulfur at source SN-23 if the compliance tests show that the mass balance method of calculating the amount of sulfur being emitted is inaccurate. The Department will provide the permittee the CEMS standards in the future if necessary. Inaccurate is defined, for the purposes of this specific condition, as a deviation of more than 5% from the tested emission rate. 23. Pursuant to and et seq of Regulation 19, 40 CFR Part 52, Subpart E, and A.C.A as referenced by and , the permittee may propose an alternate method of demonstrating continual compliance for sulfur dioxide, oxides of nitrogen, and total reduced sulfur emissions to include monitoring flue gas temperature, oxygen content (in accordance with 40 CFR Part 60, Appendix B, Performance Specification 3), and the sulfur mass balance method. This method must demonstrate acceptability through the concurrent measurements during the first two compliance tests of this source. The first compliance test was performed prior to the issuance of this permit. 34

35 SN-24 Unit B and Unit D Dryer Stack Source Description Source SN-24 will vent the emissions from the Unit B and Unit D dryers. Emissions from this source will be the result of the combustion of tail gas. Specific Conditions 24. Pursuant to et seq of Regulation #19 and 40 CFR Part 52, Subpart E, the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Conditions #27, #29, and equipment limitations. Pollutant lb/hr tpy PM 10 VOC CO Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not exceed the emission rates set forth in the following table. Compliance with this condition will be demonstrated by Specific Conditions #27, #29, and equipment limitations. Pollutant lb/hr tpy PM Carbon Disulfide Carbonyl Sulfide Hydrogen Sulfide TRS

36 26. Pursuant to et seq and et seq of Regulation 19 and 40 CFR Part 52, Subpart E, the permittee shall not exceed the emission rates set forth in the following table at source SN-24. The emission rates are based upon the capacity of the equipment. Compliance with this condition will be demonstrated by Specific Conditions #28 and #29, Plantwide Condition #11, and equipment limitations. Pollutant lb/hr tpy SO NO X , Pursuant to of Regulation #18 and A.C.A as referenced by and , the permittee shall not cause to be discharged to the atmosphere gases which exhibit an opacity greater than 5%. The opacity shall be measured in accordance with EPA Reference Method 9 as found in 40 CFR Part 60 Appendix A. Compliance with this condition will be demonstrated by Plantwide Condition # Pursuant to et seq and et seq of Regulation 19 and 40 CFR Part 52, Subpart E, the permittee shall not emit NO X in concentrations exceeding 300 ppm by volume. Compliance with this condition will be demonstrated by Specific Condition #29 and equipment limitations. 29. Pursuant to and et seq of Regulation 19 and 40 CFR Part 52, Subpart E, the permittee shall conduct the following tests using the indicated test method unless another method is approved by the Department at least 15 days prior to the test taking place. The tests must be completed within 60 days of achieving maximum production but no later than 180 days after the initial start-up. Annual testing shall be performed for SO 2, NO X, and TRS. Pollutant SO 2 EPA Reference Method 6C CO 10 NO X 7E TRS 15 Opacity 9 36

37 30. Pursuant to and et seq of Regulation 19, 40 CFR Part 52, Subpart E, and A.C.A as referenced by and , the Department reserves the right to require CEMS for sulfur dioxide and total reduced sulfur at source SN-24 if the compliance tests show that the mass balance method of calculating the amount of sulfur being emitted is inaccurate. The Department will provide the permittee the CEMS standards in the future if necessary. Inaccurate is defined, for the purposes of this specific condition, as a deviation of more than 5% from the tested emission rate. 31. Pursuant to and et seq of Regulation 19, 40 CFR Part 52, Subpart E, and A.C.A as referenced by and , the permittee may propose an alternate method of demonstrating continual compliance for sulfur dioxide, oxides of nitrogen, and total reduced sulfur emissions to include monitoring flue gas temperature, oxygen content (in accordance with 40 CFR Part 60, Appendix B, Performance Specification 3), and the sulfur mass balance method. This method must demonstrate acceptability through the concurrent measurements during the first two compliance tests of this source. 37

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 2121-A IS ISSUED TO: 184 Wilson Mill Road Monticello, AR 71655 Drew County THIS PERMIT IS THE ABOVE REFERENCED PERMITTEE S AUTHORITY TO CONSTRUCT, MODIFY, OPERATE,

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: Peterson Farms, Inc. Feed Mill 2565 North Highway 59 Decatur, AR 72722 Benton County THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN

More information

Arkansas Department of pollution Control and Ecology Division of Air Pollution Control. Summary Report Relative to Permit Application

Arkansas Department of pollution Control and Ecology Division of Air Pollution Control. Summary Report Relative to Permit Application ----- Vr%/tXJ Arkansas Department of pollution Control and Ecology Division of Air Pollution Control Summary Report Relative to Permit Application Submitted By: Nekoosa Papers, Inc. Ashdown, Arkansas (Little

More information

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS The following information will be used for the technical review of a permit to install application

More information

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by Naughton Power Plant Chapter 6, Section 2 Construction Permit Application Submitted to the Wyoming Air Quality Division And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 March 2008 1.0

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 1986-AR-4 IS ISSUED TO: Tyson Foods, Inc. Cobb Feed Mill 2125 Country Club Road Siloam Springs, AR 72761 Benton County THIS PERMIT IS THE ABOVE REFERENCED PERMITTEE

More information

STATEMENT OF BASIS. Cheney Lime & Cement Company Landmark Plant Alabaster, Alabama Shelby County Facility No

STATEMENT OF BASIS. Cheney Lime & Cement Company Landmark Plant Alabaster, Alabama Shelby County Facility No STATEMENT OF BASIS Cheney Lime & Cement Company Landmark Plant Alabaster, Alabama Shelby County Facility No. 411-0019 This proposed Title V Major Source Operating Permit (MSOP) renewal is issued under

More information

Wyodak Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by

Wyodak Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by Wyodak Power Plant Chapter 6, Section 2 Construction Permit Application Submitted to the Wyoming Air Quality Division And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 March 2008 1.0 Introduction

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 0196-AR-5 IS ISSUED TO: Halliburton Energy Services, Inc. - Magnet Cove Chemical Facility 1743 Darby Lane Magnet Cove, AR 72104 Hot Spring County THIS PERMIT IS

More information

ASA Bloomingburg, LLC. Air permit-to-install (PTI) number Public Hearing Date April 18, 2006 Comment Period End Date April 25, 2006

ASA Bloomingburg, LLC. Air permit-to-install (PTI) number Public Hearing Date April 18, 2006 Comment Period End Date April 25, 2006 ASA Bloomingburg, LLC Air permit-to-install (PTI) number 01-01306 Public Hearing Date April 18, 2006 Comment Period End Date April 25, 2006 Summary of Comments and Ohio EPA Responses August 2006 Introduction

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit #: 1505-AR-2 IS ISSUED TO: Univar USA, Inc. 1925 Redmond Road Jacksonville, AR 72706 Pulaski County THIS PERMIT IS Univar USA, Inc. s AUTHORITY TO CONSTRUCT, MODIFY,

More information

State of the Art (SOTA) Manual for Stationary Gas Turbines

State of the Art (SOTA) Manual for Stationary Gas Turbines State of the Art (SOTA) Manual for Stationary Gas Turbines Original Date: July 1997 Revision Date: November 1999 State of New Jersey Department of Environmental Protection Air Quality Permitting Program

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: Shipley Baking Company, LLC 73 S 6 th Street Fort Smith, AR 72902 Sebastian County THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN

More information

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: TP-0120 Date Issued: December 26, 2012 This certifies that: Northeast Utilities Public Service

More information

PERMITTEE Seminole Electric Cooperative, Inc North Dale Mabry Highway Tampa, FL 33618

PERMITTEE Seminole Electric Cooperative, Inc North Dale Mabry Highway Tampa, FL 33618 PERMITTEE 16313 North Dale Mabry Highway Tampa, FL 33618 Authorized Representative: James R. Frauen, Project Director Air Permit No. 1070025-004-AC Units 1-2 Pollution Controls Upgrade Facility ID No.

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 0422-AR-5 IS ISSUED TO: Riceland Foods, Inc. - Waldenburg Hwy. 49 North and Lake Hogue Road Waldenburg, AR 72475 Poinsett County THIS PERMIT IS THE ABOVE REFERENCED

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit #: 1349-AR-2 IS ISSUED TO: FM Structural Plastic Technology, Inc. dba FM Corporation 3535 Hudson Road Rogers, AR 72757 Benton County THIS PERMIT IS FM CORPORATION s

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: International Paper Conway Container 730 Enterprise Avenue Conway, AR 72032 Faulkner County THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR

More information

STATEMENT OF BASIS. NAICS Description: All Other Miscellaneous Chemical Product and Preparation Manufacturing NAICS Code:

STATEMENT OF BASIS. NAICS Description: All Other Miscellaneous Chemical Product and Preparation Manufacturing NAICS Code: STATEMENT OF BASIS For the issuance of Draft Air Permit # 0196-AR-9 1. PERMITTING AUTHORITY: Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317 2.

More information

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1987-AOP-R4 AFIN:

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1987-AOP-R4 AFIN: STATEMENT OF BASIS For the issuance of Draft Air Permit # 1987-AOP-R4 1. PERMITTING AUTHORITY: Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317

More information

STATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P.

STATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P. I. FACILITY INFORMATION Newark Bay Cogeneration Partnership L.P. is located at 414-514 Avenue P, Newark, New Jersey, Essex County and consists of a 120-megawatt cogeneration plant. The facility is owned

More information

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No. 412-0011 This draft initial Title V Major Source Operating Permit (MSOP) is issued

More information

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2 RULE 20.4 NEW SOURCE REVIEW PORTABLE EMISSION UNITS (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED AND EFFECTIVE 4/27/16)

More information

Statement of Basis. Daikin America, Inc. Morgan County Decatur, Alabama

Statement of Basis. Daikin America, Inc. Morgan County Decatur, Alabama Statement of Basis Daikin America, Inc. Morgan County Decatur, Alabama 712-0061 Daikin America, Inc. ( Daikin ) has applied for renewal of Major Source Operating Permit No. 712-0061. This proposed Title

More information

ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY DIVISION OF AIR POLLUTION CONTROL. Summary Report Relative to Permit Application

ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY DIVISION OF AIR POLLUTION CONTROL. Summary Report Relative to Permit Application ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY DIVISION OF AIR POLLUTION CONTROL Summary Report Relative to Permit Application Submitted By: Contact Position: Owens Corning Fort Smith Facility Walker

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: 1910 Baldor Drive Ozark, AR 72949 Franklin County THIS PERMIT IS BALDOR ELECTRIC COMPANY S AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN THE EQUIPMENT

More information

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2 RULE 20.4 NEW SOURCE REVIEW PORTABLE EMISSION UNITS (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED AND EFFECTIVE 4/27/16)

More information

Kinder Morgan Operating, LP - Hickman Bulk Terminal Permit #: 2325-A AFIN: 47-00882 List of Acronyms and Abbreviations A.C.A. AFIN CFR CO HAP lb/hr No. NOx PM PM 10 SO 2 Tpy UTM VOC Arkansas Code Annotated

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: Borden Chemical, Inc. 185 North Industrial Drive Hope, AR 71801 Hempstead County THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN

More information

502(b)(10) Permit for Part 70 Source

502(b)(10) Permit for Part 70 Source 502(b)(10) Permit for Part 70 Source Permit Attachment No.: 2075-139-0002-V-03-1 Effective Date: November 9, 2015 Facility Name: Mailing Address: Parent/Holding Company: 862 West Ridge Road Gainesville,

More information

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 0747-AOP-R4 AFIN: PERMITTING AUTHORITY:

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 0747-AOP-R4 AFIN: PERMITTING AUTHORITY: STATEMENT OF BASIS For the issuance of Draft Air Permit # 0747-AOP-R4 AFIN: 66 00294 1. PERMITTING AUTHORITY: Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas

More information

Recent Air Pollution Control and Permit Experience in the Lime Industry. Steven Klafka, P.E., DEE Wingra Engineering, S.C. Madison, Wisconsin

Recent Air Pollution Control and Permit Experience in the Lime Industry. Steven Klafka, P.E., DEE Wingra Engineering, S.C. Madison, Wisconsin Recent Air Pollution Control and Permit Experience in the Lime Industry Steven Klafka, P.E., DEE Wingra Engineering, S.C. Madison, Wisconsin Air Quality Permit for Lime Kiln Subject to PSD regulations.

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: 1007 Vulcan Road Haskell, AR 72015 Saline County THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN THE EQUIPMENT AND/OR FACILITY IN

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: Bekaert Corporation 1881 Bekaert Drive Van Buren, AR 72956 Crawford County THIS PERMIT IS YOUR AUTHORITY TO NSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN THE EQUIPMENT

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT Proposed Revision to State Implementation Plan (SIP) to Address Federal Clean Air Act Requirements for Reasonably Available

More information

Table of Contents. (a) APPLICABILITY (b) EXEMPTIONS (c) DEFINITIONS... 2

Table of Contents. (a) APPLICABILITY (b) EXEMPTIONS (c) DEFINITIONS... 2 RULE 20.2 NEW SOURCE REVIEW NON - MAJOR STATIONARY SOURCES (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED (date of adoption);

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. January 26, NEW SOURCE REVIEW PERMIT TO INSTALL No.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. January 26, NEW SOURCE REVIEW PERMIT TO INSTALL No. MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION January 26, 2005 NEW SOURCE REVIEW PERMIT TO INSTALL No. 307-04 ISSUED TO Nitro-Vac Heat Treat, Inc. LOCATED AT 23080 Dequindre Warren,

More information

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1937-AR-4 AFIN:

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1937-AR-4 AFIN: STATEMENT OF BASIS For the issuance of Draft Air Permit # 1937-AR-4 1. PERMITTING AUTHORITY: Arkansas Department ofenvironmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317 2.

More information

Emission Control Technology Review for NorthMet Project Processing Plant RS58A

Emission Control Technology Review for NorthMet Project Processing Plant RS58A Emission Control Technology Review for NorthMet Project Processing Plant RS58A PolyMet Mining Inc. October 2007 Emission Control Technology Review for NorthMet Project Processing Plant RS58A PolyMet Mining

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 2361-AR-1 IS ISSUED TO: EnviraPAC Monticello, LLC 346 Firing Range Road Monticello, AR 71655 Drew County THIS PERMIT IS THE ABOVE REFERENCED PERMITTEE S AUTHORITY

More information

PSD Background Presentation

PSD Background Presentation PSD Background Presentation May 3 rd 2011 John Holmes 1 Prevention of Significant Deterioration (PSD): Overview Federal preconstruction permitting applies to new major stationary sources and major modifications

More information

Wellington Development WVDT, LLC Greene Energy Resource Recovery Project 3. GENERAL CONDITIONS

Wellington Development WVDT, LLC Greene Energy Resource Recovery Project 3. GENERAL CONDITIONS 3. GENERAL CONDITIONS 2 a) This Plan Approval authorizes the construction of two waste coal-fired, circulating fluidized bed (CFB) boilers and a steam generator capable of producing 580 gross megawatts

More information

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY ADEQ ARK A N S A S Departmentof Environmental Quality FEB 2 2 2018 Ashley Roundtree, Envirorunental Specialist Southwestern Electric Power Company d/b/a Flint Creek Power Plant P.O. Box 660164 Dallas,

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: Rineco 1007 Vulcan Road Haskell, AR 72015 Saline County THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN THE EQUIPMENT AND/OR FACILITY

More information

STATEMENT OF BASIS. NAICS Description: Soybean and Other Oilseed Processing NAICS Code:

STATEMENT OF BASIS. NAICS Description: Soybean and Other Oilseed Processing NAICS Code: STATEMENT OF BASIS For the issuance of Draft Air Permit # 1427-AOP-R14 1. PERMITTING AUTHORITY: Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317

More information

ARKANSAS DEPARTMENT OF POLLUfION CONTROL AND ECOLOGY DIVISION OF A1R POLLUfION CONTROL

ARKANSAS DEPARTMENT OF POLLUfION CONTROL AND ECOLOGY DIVISION OF A1R POLLUfION CONTROL ARKANSAS DEPARTMENT OF POLLUfION CONTROL AND ECOLOGY DIVISION OF A1R POLLUfION CONTROL Summary Report Relative to Permit Application Submitted By: International Paper Delight Pole Yard Highway 26 West

More information

CONSTRUCTION PERMIT. PERMIT NO: 09LP0202F Final Approval

CONSTRUCTION PERMIT. PERMIT NO: 09LP0202F Final Approval COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 09LP0202F Final Approval DATE ISSUED: September 3, 2013 Modification

More information

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96, Amended 1/12/12 (Effective 3/8/12)

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96, Amended 1/12/12 (Effective 3/8/12) RULE 201.3 Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96, Amended 1/12/12 (Effective 3/8/12) I. Purpose The purpose of this Rule is to allow relatively small sources of air pollution

More information

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: FP-T-0152 Date Issued: July 18, 2007 Administrative Permit Amendment: June 11, 2008 This certifies

More information

TECHNICAL FACT SHEET June 19, 2018

TECHNICAL FACT SHEET June 19, 2018 New Covert Generating Company, LLC Page 1 Purpose and Summary TECHNICAL FACT SHEET June 19, 2018 The Michigan Department of Environmental Quality (MDEQ), Air Quality Division (AQD), is proposing to act

More information

TECHNICAL FACT SHEET September 24, 2018

TECHNICAL FACT SHEET September 24, 2018 Copperwood Resources, Inc. Page 1 Purpose and Summary TECHNICAL FACT SHEET September 24, 2018 The Michigan Department of Environmental Quality (MDEQ), Air Quality Division (AQD), is proposing to act on

More information

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc.

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc. COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 PERMIT NO: CONSTRUCTION PERMIT DATE ISSUED: January 7, 2015 ISSUED TO: 13LR2446 Issuance 1

More information

\)0 l () Arkansas Department of pollution Control and Ecology Division of Air pollution Control. Summary Report Relative to Permit Application

\)0 l () Arkansas Department of pollution Control and Ecology Division of Air pollution Control. Summary Report Relative to Permit Application \)0 l () Arkansas Department of pollution Control and Ecology Division of Air pollution Control Summary Report Relative to Permit Application Submitted By: Nekoosa Papers Inc. Ashdown (Little River G,

More information

ADEQ JUN Julius Holmes Environmental Coordinator Cooper Tire & Rubber Company 3500 Washington Road Texarkana, AR Dear Mr.

ADEQ JUN Julius Holmes Environmental Coordinator Cooper Tire & Rubber Company 3500 Washington Road Texarkana, AR Dear Mr. ADEQ ARK A N S A S Department of Environmental Quality JUN 2 8 2017 Julius Holmes Environmental Coordinator Cooper Tire & Rubber Company 3500 Washington Road Texarkana, AR 71854 Dear Mr. Holmes: The enclosed

More information

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland Commonwealth of Kentucky Environmental and Public Protection Cabinet Department for Environmental Protection Division for Air Quality 803 Schenkel Lane Frankfort, Kentucky 40601 (502) 573-3382 AIR QUALITY

More information

Arkansas Department of Pollution Control and Ecology Division of Air Pollution Control. Summary Report Relative to Permit Application

Arkansas Department of Pollution Control and Ecology Division of Air Pollution Control. Summary Report Relative to Permit Application Arkansas Department of Pollution Control and Ecology Division of Air Pollution Control Summary Report Relative to Permit Application Submitted By: Nekoosa Papers Inc. Ashdown (Little River County) CSN:

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: Litte Rock Wastewater - Adams Field 1001 Temple Street Little Rock, AR 72202 Pulaski THIS PERMIT IS Litte Rock Wastewater - Adams Field s AUTHORITY TO CONSTRUCT,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc. AIR EMISSION PERMIT NO. 03700070-001 IS ISSUED TO Van Hoven Company, Inc. VAN HOVEN COMPANY, INC. 505 Hardman Avenue South South Saint Paul, Dakota County, Minnesota 55075-2413 The emission units, control

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 77-17 Page 1 of 7 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011)

POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011) RULE 370. POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011) A. Applicability 1. General Applicability: This Rule shall apply to any stationary source

More information

PART 70 PERMIT TO OPERATE

PART 70 PERMIT TO OPERATE G =Missouri Department of Natural Resources ~ Air Pollution Control Program PART 70 PERMIT TO OPERATE Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized to operate

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 8, PERMIT TO INSTALL No A

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 8, PERMIT TO INSTALL No A MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION November 8, 2007 PERMIT TO INSTALL No. 541-88A ISSUED TO Clariant Corporation Masterbatches Division LOCATED AT 926 Elliott Road Albion,

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. July 24, 2015 PERMIT TO INSTALL ISSUED TO St. Marys Cement, Inc.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. July 24, 2015 PERMIT TO INSTALL ISSUED TO St. Marys Cement, Inc. MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION July 24, 2015 PERMIT TO INSTALL 115-15 ISSUED TO St. Marys Cement, Inc. (US) LOCATED AT 16000 Bells Bay Road Charlevoix, Michigan IN THE

More information

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY ADEQ ARK A N S A S Department of Environmental Quality JUN 13 2017 Randall Goudeau Environmental Manager CB&1 EI Dorado 205 Louis Hurley Road El Dorado, AR 71730 Dear Mr. Goudeau: The enclosed Permit 2l47-AR-2

More information

Huber Engineered Woods, LLC, TV Page 1 of 7

Huber Engineered Woods, LLC, TV Page 1 of 7 Facility Name: Huber Engineered Woods, LLC City: Commerce County: Jackson AIRS #: 04-13-157-00014 Application #: 23530 Date SIP Application Received: Date Title V Application Received: Permit No: 2493-157-0014-V-03-2

More information

Prevention of Significant Deterioration (PSD) Permitting. Scoping Meeting

Prevention of Significant Deterioration (PSD) Permitting. Scoping Meeting Prevention of Significant Deterioration (PSD) Permitting Scoping Meeting April 6, 2010 Dave Warner Director of Permit Services 1 Overview Prevention of Significant Deterioration (PSD) Permitting Program

More information

52.21 Prevention of significant deterioration of air quality

52.21 Prevention of significant deterioration of air quality 52.21 Prevention of significant deterioration of air quality Link to an amendment published at 75 FR 31606, June 3, 2010. (a) (1) Plan disapproval. The provisions of this section are applicable to any

More information

MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT AIR QUALITY DIVISION. August 13, PERMIT TO INSTALL No D

MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT AIR QUALITY DIVISION. August 13, PERMIT TO INSTALL No D MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT AIR QUALITY DIVISION August 13, 2010 PERMIT TO INSTALL No. 468-83D ISSUED TO Greater Detroit Resource Recovery Facility LOCATED AT 5700 Russell

More information

PM2.5 NAAQS Implementation & Permitting in Georgia

PM2.5 NAAQS Implementation & Permitting in Georgia PM2.5 NAAQS Implementation & Permitting in Georgia Georgia Environmental Conference Jekyll Island, Georgia August 25, 2016 Brad James, P.E. Overview Current UFP Regulation (as PM 2.5 ) PM 2.5 NAAQS SIP

More information

PUBLIC PARTICIPATION DOCUMENTS For Holland Board of Public Works Holland, Michigan

PUBLIC PARTICIPATION DOCUMENTS For Holland Board of Public Works Holland, Michigan STATE OF MICHIGAN Rick Snyder, Governor DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION CONSTITUTION HALL 525 WEST ALLEGAN STREET P.O. BOX 30260 LANSING, MICHIGAN 48909-7760 www.michigan.gov/air

More information

Marquette General Health System December 11, 2001 Permit No B Page 1 of 8. Table of Contents

Marquette General Health System December 11, 2001 Permit No B Page 1 of 8. Table of Contents Permit No. 252-93B Page 1 of 8 Section Table of Contents Page Alphabetical Listing of Common Abbreviations/Acronyms... 2 General Conditions... 3 Emission Unit Identification... 5 Flexible Group Identification...

More information

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015.

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015. SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015 Air Emissions Permit Program Contents I. Air Permitting Introduction

More information

STATE OF MISSISSIPPI AIR POLLUTION CONTROL PERMIT

STATE OF MISSISSIPPI AIR POLLUTION CONTROL PERMIT STATE OF MISSISSIPPI AIR POLLUTION CONTROL PERMIT AND PREVENTION OF SIGNIFICANT DETERIORATION AUTHORITY TO CONSTRUCT AIR EMISSIONS EQUIPMENT THIS CERTIFIES THAT Mississippi Silicon LLC Burnsville, Mississippi

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 15, 2013 PERMIT TO INSTALL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 15, 2013 PERMIT TO INSTALL MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION November 15, 2013 PERMIT TO INSTALL 143-13 ISSUED TO Newberry Correctional Facility LOCATED AT 13747 East County Road 428 Newberry, Michigan

More information

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96 RULE 201.3 Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96 I. Purpose The purpose of this Rule is to allow relatively small sources of air pollution to avoid requirements of Rule 201.1

More information

The requirement to obtain a Part 70 operating permit under this rule shall not apply to:

The requirement to obtain a Part 70 operating permit under this rule shall not apply to: RULE 1301. PART 70 OPERATING PERMITS GENERAL INFORMATION (Adopted 11/09/1993, revised 8/15/1996, 4/17/1997, 9/18/1997, 1/18/2001, 6/19/2003, 1/20/2011, and 8/25/2016) A. Applicability The provisions of

More information

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC DRAFT AIR EMISSION PERMIT NO. 07900006 004 Major Amendment IS ISSUED TO Miller Milling Co LLC Miller Milling Co LLC 100 2nd Avenue Southwest New Prague, Le Sueur County, MN 56071 The emission units, control

More information

ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY DIVISION OF AIR POLLUTION CONTROL. Summary Report Relative to Permit Application

ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY DIVISION OF AIR POLLUTION CONTROL. Summary Report Relative to Permit Application ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY DIVISION OF AIR POLLUTION CONTROL Summary Report Relative to Permit Application Submitted By: Ash Grove Cement Company Highway 108 West P.O. Box 130

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM. October 27, 2010

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM. October 27, 2010 ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM October 27, 2010 SUBJECT: TO: Review of Application Installation Permit 0750-I001 Synthetic Minor Source Operating Permit Basic Carbide Corporation

More information

STATEMENT OF BASIS. BFI Waste Systems of Arkansas, LLC (Model Fill Landfill) 3817 Mabelvale Pike Little Rock, Arkansas 72204

STATEMENT OF BASIS. BFI Waste Systems of Arkansas, LLC (Model Fill Landfill) 3817 Mabelvale Pike Little Rock, Arkansas 72204 STATEMENT OF BASIS For the issuance of Air Permit # 1614-AOP-R4 1. PERMITTING AUTHORITY: Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317 2. APPLICANT:

More information

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL CHAPTER 1200-03-10 REQUIRED SAMPLING, RECORDING, AND REPORTING TABLE OF CONTENTS 1200-03-10-.01 Sampling

More information

STATEMENT OF BASIS. for the issuance of Draft Air Permit # 1681-AOP-R4

STATEMENT OF BASIS. for the issuance of Draft Air Permit # 1681-AOP-R4 1. PERMITTING AUTHORITY: STATEMENT OF BASIS for the issuance of Draft Air Permit # 1681-AOP-R4 Arkansas Department of Environmental Quality 8001 National Drive Post Office Box 8913 Little Rock, Arkansas

More information

STATEMENT OF BASIS. NAICS Description: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing NAICS Code:

STATEMENT OF BASIS. NAICS Description: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing NAICS Code: STATEMET OF BASIS For the issuance of Draft Air Permit # 0759-AR-11 AFI: 47 00194 1. PERMITTIG AUTHORITY: Arkansas Department of Environmental Quality 5301 orthshore Drive orth Little Rock, Arkansas 72118-5317

More information

NARRATIVE. Manny Patel Ginger Payment DATE: June 15, 2015

NARRATIVE. Manny Patel Ginger Payment DATE: June 15, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

RULE 214 FEDERAL NEW SOURCE REVIEW Adopted (Amended ) INDEX

RULE 214 FEDERAL NEW SOURCE REVIEW Adopted (Amended ) INDEX RULE 214 FEDERAL NEW SOURCE REVIEW Adopted 10-28-10 (Amended 8-23-12) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 103 SEVERABILITY 110 EXEMPTION: EMERGENCY EQUIPMENT 111 [RESERVED] 112 EXEMPTION: NON-MAJOR

More information

ADEQ NON-CRITERIA POLLUTANT CONTROL STRATEGY Revised April 2015

ADEQ NON-CRITERIA POLLUTANT CONTROL STRATEGY Revised April 2015 ADEQ NON-CRITERIA POLLUTANT CONTROL STRATEGY Revised April 2015 BACKGROUND Under the federal Clean Air Act, EPA is obligated to establish ambient air quality standards for 6 commonly found criteria pollutants:

More information

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For AIR EMISSION PERMIT NO. 03700020-001 IS ISSUED TO ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE 68103-0500 For CONAGRA FLOUR MILLING COMPANY - HASTINGS 2005 South Vermillion Street Hastings, Dakota

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-80b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED REG ALBERT LEA, LLC PROJECT FREEBORN COUNTY

More information

GOVERNMENT of PUERTO RICO OFFICE OF THE GOVERNOR ENVIRONMENTAL QUALITY BOARD

GOVERNMENT of PUERTO RICO OFFICE OF THE GOVERNOR ENVIRONMENTAL QUALITY BOARD GOVERNMENT of PUERTO RICO OFFICE OF THE GOVERNOR ENVIRONMENTAL QUALITY BOARD Air Quality Area STATEMENT OF BASIS Title V Initial Permit The Puerto Rico Environmental Quality Board (EQB) is issuing a draft

More information

Notice of Intent Application

Notice of Intent Application Utah Power Plant Units 1, 2, and 3 Repowering Notice of Intent Application Submitted to Utah Division of Air Quality Prepared for Kennecott Utah Copper LLC Prepared by: December 2010 Notice of Intent

More information

Callidus Oxidizer Systems. Thermal and Catalytic Oxidizer Systems

Callidus Oxidizer Systems. Thermal and Catalytic Oxidizer Systems Callidus Oxidizer Systems Thermal and Catalytic Oxidizer Systems Meet the Thermal Oxidizer Experts Wide Range of Applications Honeywell UOP Callidus is an industry leader in environmental combustion technology.

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. February 3, NEW SOURCE REVIEW PERMIT TO INSTALL No.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. February 3, NEW SOURCE REVIEW PERMIT TO INSTALL No. MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION February 3, 2005 NEW SOURCE REVIEW PERMIT TO INSTALL No. 605-89B ISSUED TO Medtronic Biomedicus, Inc. LOCATED AT 520 Watson Street SW Grand

More information

Technical Manual Guideline on Air Quality Impact Modeling Analysis

Technical Manual Guideline on Air Quality Impact Modeling Analysis New Jersey Department of Environmental Protection Division of Air Quality Bureau of Technical Services Technical Manual 1002 Guideline on Air Quality Impact Modeling Analysis November 2009 Table of Contents

More information

February 21, Permit: APC-82/1209-CONSTRUCTION (Amendment 5) Petroleum Coke Storage and Handling Complex

February 21, Permit: APC-82/1209-CONSTRUCTION (Amendment 5) Petroleum Coke Storage and Handling Complex Permit: APC-82/1209-CONSTRUCTION (Amendment 5) Petroleum Coke Storage and Handling Complex 4550 Wrangle Hill Road Delaware City, Delaware 19706 ATTENTION: Andrew Kenner Vice President and General Manager

More information

An Overview on GHG PSD Permitting

An Overview on GHG PSD Permitting An Overview on GHG PSD Permitting Extended Abstract # 64 Melissa Hillman, Trinity Consultants, 1990 California Avenue, 8 th Floor, Walnut Creek, CA 94596 INTRODUCTION As of January 2, 2011, new and modified

More information

Attachment 4 to the Technical Support Document for Permit Action Number C. Comments and Response to Comments

Attachment 4 to the Technical Support Document for Permit Action Number C. Comments and Response to Comments Attachment 4 to the Technical Support Document for Permit Action Number 06100067-001 C. Comments and Response to Comments I. Correspondence from Governmental Organizations 1. Comments by John Bunyak, National

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. April 22, PERMIT TO INSTALL No ISSUED TO Gilreath North, Inc.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. April 22, PERMIT TO INSTALL No ISSUED TO Gilreath North, Inc. MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION April 22, 2003 PERMIT TO INSTALL No. 50-03 ISSUED TO Gilreath North, Inc. LOCATED AT One Augat Drive Boyne City, Michigan 49712 IN THE

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. March 17, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. March 17, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION March 17, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL 220-03 ISSUED TO Federal Mogul Powertrain, Inc. LOCATED AT 560 Avis Drive Ann Arbor,