1 RAJESH UPRETY Presenting Author Photo Present Affiliation Academic Qualification Area of Specialization OIL INDUSTRY SAFETY DIRECTORATE B.TECH (MECHANICAL), PGDBM (Specialization in Marketing) PIPE AND COATING Achievements / Awards INSTRUMENTAL IN INTRODUCING DUAL FBE COATING IN INDIA Authors PIPELINE INTEGRITY MANAGEMENT FOR PIGGABLE & NON-PIGGABLE PIPELINES

2 PIPELINE INTEGRITY MANAGEMENT SYSTEM OBJECTIVES OF PIPELINE INTEGRITY MANAGEMENT SYSTEM ARE: TO MAINTAIN INTEGRITY OF CROSS COUNTRY PIPELINES. AT ALL TIMES TO ENSURE PUBLIC SAFETY, PROTECT ENVIRONMENT AND ENSURE CONTINUOUS AVAILABILITY OF PIPELINE FOR TRANSPORTATION WITHOUT INTERRUPTIONS, THEREBY MINIMIZING THE BUSINESS RISKS AND THROUGHPUT LOSS.

3 PIPE TRIANGLE PIPE PLEASURE PAIN 3

4 TOTAL PIPELINE NETWORK IN INDIA PIGGABLE PIPELINE : 40,000 KM NON-PIGGABLE PIPELINE : 5000 KM (EXCLUDING GAS/ OIL FLOW LINES) SUB-SEA SPM LINES (SINGLE LINES) 4

5 Number of Onsite Incidents Onsite Incidents Trend last three years (till date) (till date) 0 Ref & GPP PL MO E& P Total

6 Number of Fatalities Fatalities in Onsite Incidents - Trend (till date) Ref & GPP * Ref & GPPs : 28 Fatalities in a single Incident in ** Marketing Operations (MO): 05 Fatalities in a single incident in *** E&P: three children drowned at well site in PL MO E& P (till

7 PIPELINE INTEGRITY EXAMPLE : FLASH FIRE DURING GRINDING OPERN AT NIGHT IN A TANK FARM (MISSING BOUNDARY PILLARS/TP/TLP, SOP, ESD, CP MONITORING, COATING SUEVEY) EXAMPLE : TWO CASES OF SEAM FAILURE IN A CRUDE PL WITHIN 18 YEARS OF SERVICE (SURGE ANALYSIS, HYDRAULICS, LDS, VALVES, WT) EXAMPLE : FIRE & EXPLOSION IN A NATURAL GAS PIPELINE LEADING TO MULTIPLE FATALTIES (PIGGING, COATING)

8 CATAGORIES OF PIGGABLE/ NON- PIGGABLE LINES FROM PIGGING POINT OF VIEW THERE ARE FOUR CATAGORIES OF PIPELINES : 1. PIGGABLE LINES IN WHICH REGULAR CLEANING PIGGING IS CARRIED OUT. 2. PIGGABLE LINES IN WHICH CLEANING PIGGING IS NOT CARRIED OUT. 3. NON-PIGGABLE PIPELINES SUCH AS WELL FLOW LINES/ JETTY LINES. 4. SPM / SUB-SEA LINES HAVING NO LOOP.

9 BASIC CONCERN FOR PIGGABLE PIPELINES(PIGGING DONE REGULARLY) 1. PIGGABLE LINES IN WHICH REGULAR CLEANING PIGGING IS CARRIED OUT. PIG RESIDUE ANALYSIS IS NOT CARRIED OUT REGULARLY. PROPER STATISTICAL ANALYSIS IS NOT CARRIED OUT TO ESTABLISH TREND OF INTERNAL CORROSION.

10 BASIC CONCERN FOR PIGGABLE PIPELINES(PIGGING NOT DONE REGULARLY) 2. PIGGABLE LINES IN WHICH CLEANING PIGGING IS NOT CARRIED OUT. BASIC DETAILS ABOUT THE HEALTH OF THE PIPELINE ARE NOT AVAILABLE. PRIODICITY FOR MAINTENANCE IS NOT FOLLOWED OR IGNORED. SINCE COMMISSIONING PROPER CLEANING PIGGING HAS NOT BEEN DONE. HIGH APPREHENSION OF CONDENSATE AND WAX DEPOSITION CANNOT BE OVER RULED.

11 BASIC CONCERN FOR NON-PIGGABLE PIPELINES 3. NON-PIGGABLE PIPELINES SUCH AS FLOW LINES/ JETTY LINES. THERE IS NO FOCUSSED ATTENTION ON THESE PIPELINES. THERE IS NO CATHODIC PROTECTION FOR SOME UNDERGROUND PIPELINES. MONITIORING SYSTEM NOT IN PLACE IN LINE WITH OISD-GDN-233. IN SOME PIPELINES IT HAS BEEN OBSERVED THAT EVEN CORROSION PROBES/ COUPONS ARE NOT USED.

12 CHALLENGES FOR MONITORING INTERNAL CORROSION OF NON-PIGGABLE PIPELINES 4. SPM / SUB-SEA LINES HAVING NO LOOP. FIT FOR PURPOSE SUBJECT TO VARIOUS CONDITIONS IS NOT A SOLUTION. AWARENESS ABOUT VARIOUS TECHNIQUES AVAILABLE FOR ASSESSING INTERNAL CORROSION SUCH AS DIRECT ASSESSMENT. EXPLORING POSSIBILITY OF PIGGING THE LINE BY USING MODERN TECHNOLOGY. EXPLORING POSSIBILITY OF CONVERTING THE LINE TO A PIGGABLE LINE.

13 CHALLENGES FOR MONITORING INTERNAL CORROSION OF NON-PIGGABLE PIPELINES THREATS IN LACK OF PIGGING IT MAY RESULT IN HEAVY DEPOSITION OF WAX IN CASE OF CRUDE PIPELINES. IT MAY RESULT IN DEPOSITION OF CONDENSATE IN CASE OF NATURAL GAS PIPELINES, WHICH MAY SPEED UP INTERNAL CORROSION RATE.

14 OVERVIEW OF OISD-STD-233 a) INSPECTION PROCEDURE FOR CROSS-COUNTRY PIPELINES : i. INTERNAL INSPECTION ii. PRESSURE TESTING SUCH AS HYDROTESTING iii. COMBINATION OF i) & ii) b) INSPECTION PROCEDURE FOR NON-PIGGABLE PIPELINES : i. EXTERNAL CORROSION DIRECT ASSESSMENT (ECDA) ii. INTERNAL CORROSION DIRECT ASSESSMENT (ICDA) iii.stress CORROSION CRACKING DIRECT ASSESSMENT (SCCDA)

15 OVERVIEW OF OISD-STD-233 c) INTERNAL CORROSION : a) EFFECTIVENESS OF CORROSION MITIGATION MEASURES SHOULD BE CHECKED ONCE IN SIX MONTHS BY ANALYSING CORROSION COUPON. b) ER PROBES/ ECN PROBES/ LPR (LINEAR POLARISATION TECHNIQUE) PROBES SHOULD BE INSTALLED. c) IF RATE OF INTERNAL CORROSION IS > 1 mpy, CORROSION INHIBITOR SHALL BE USED. d) WHENEVER REPLACEMENT OF PIPELINE IS CARRIED OUT, INTERNAL VISUAL INSPECTION SHALL BE CARRIED OUT.

16 OVERVIEW OF OISD-STD-233 d) STRESS CORROSION CRACKING (SCC) : a) PRESENCE OF H 2 S CAN LEAD TO SERIOUS SULPHIDE STRESS CRACKING OF STEELS, WHICH CAUSES STEPWISE CRACKING IN STEEL. ITS MITIGATION CAN BE DONE IN TWO WAYS BY INJECTING CHEMICAL INHIBITORS & BY TREATING STEEL WITH CERTAIN ALLOYING ELEMENTS & CONTROLLING ITS HARDNESS. B) SCC IS A SELECTIVE EXTERNAL CORROSION ATTACK RESULTING FROM A COMBINATION OF DISBONDED COATING, TENSILE STRESS, AND CERTAIN ENVIRONMENTAL FACTORS.

17 a) HISTORICAL DATA b) PIPELINE MAPS & GEO DETAILS (DEPTH, LAND PROFILE ETC.,) c) BASIC TECHNICAL DATA SUCH AS PIPE DIA, WT,GRADE, FLOW RATE, DESIGN PRESSURE, COATING TYPE, CP PARAMETERS ETC., d) PRESENCE OF LIQUID WATER e) PRESENCE OF H 2 S, CO 2 OR O 2. f) CORROSION MONITORING DATA INCLUDING TYPE OF MONITORING (E.G., COUPONS, ELECTRIC RESISTANCE ETC.,) g) PIPELINE SURVEY DATA : SOIL RESISTIVITY DATA, COATING SURVEY DATA OVERVIEW OF OISD-STD-233 e) PIPELINE DATA REQUIRED FOR DIRECT ASSESSMENT :

18 OVERVIEW OF OISD-STD-233 f) DIRECT ASSESSMENT (DA) METHOD g) INSPECTION PROCEDURE FOR PIPELINE HAVING EXTERNAL COATING BUT WITHOUT CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT BASED OR SACRIFICIAL CURRENT BASED). h) INSPECTION PROCEDURE FOR PIPELINE HAVING EXTERNAL COATING BUT WITH CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT BASED OR SACRIFICIAL CURRENT BASED). i) HYDROTESTING

19 FEW CASE STUDIES (1) CASE-I : THE LINE WAS COMMISSIONED IN 1999 AND IPS WAS CARRIED OUT IN THE YEAR THE IPS REPORT WAS NOT MADE AVAILABLE AS IT WAS INFORMED THAT THE SAME IS UNDER REVIEW BY TPI. PIG RESIDUE ANALYSIS SHOWED IRON CONTENT AS HIGH AS 49%. THERE WAS NO ACTION TAKEN BY THE OPERATOR.

20 FEW CASE STUDIES (2) CASE-II : SUB-SEA LINE WAS COMMISSIONED IN 2006, HOWEVER, PIGGING OPERATION NOT YET CARRIED OUT AS THERE WAS NO SCRAPPER LAUNCHING BARREL OR SCRAPPER RECEIVER BARREL. (3) CASE-III : IN ONE OF THE JETTY LINE, THERE WAS NO CATHODIC PROTECTION IN THE UNDERGROUND PIPELINE EVEN THOUGH EXTERNAL COATING WAS IN PLACE.

21 FEW CASE STUDIES (4) CASE-IV : OFF-SHORE CRUDE LINE WAS COMMISSIONED IN 2005, HOWEVER, PIGGING OPERATION NOT YET CARRIED OUT.

22 OTHER MAJOR INCIDENTS MAJOR INCIDENTS OCCURRED IN RECENT PAST

23 LOCATION MAP NARMADA SITE

24 SCHEMATIC VIEW OF THE NARMADA RIVER SITE

25

26

27

28

29 TOTAL NO. OF PIPELINES PASSING THROUGH NARMADA RIVER S.No. Pipeline Operator Pipe Size Remarks (1) Reliance (RGTIL) Natural Gas 48 OD x WT (25.4 mm), API 5L X70 Gr. Line is intact (2) GAIL India Natural Gas 30 OD x 19.1/11.9 mm WT, API 5L X 70 Gr. Snapped & burst (3) Reliance Industries Limited (RIL) Ch KM (NG) Natural Gas 26 OD x WT, API 5L X 60 Gr. Snapped & burst. Pipe has got stuck in the nearby electrical tower (4) Reliance Industries Limited (RIL)(NG) Ch KM 24 OD x WT API 5L X 60 Gr. Snapped & burst.

30 TOTAL NO. OF PIPELINES PASSING THROUGH NARMADA RIVER S.No. Pipeline Operator Pipe Size Remarks (5) Gujarat State Petronet Ltd., (GSPL NG) Ch KM 24 OD x (17.5 mm) WT, API 5L X 60 Gr. About 100 m pipeline is exposed. (6) ONGC (Ch KM) CRUDE OIL OD x (9.53 mm) WT, API 5L X 46 Gr. (7) IOCL (Amod Hazira Pipeline) OD x WT, API 5L X 60 Gr. Leakage in line Line is intact (8) ONGC (OPAL) Naptha OD x 0.25 WT, API 5L X 46 Gr. Under construction

31 ROOT CAUSE OF THE INCIDENT S.No CAUSE OF THE INCIDENT (1) IT WAS A NATURAL CALAMITY. UNPRECEDENTED SUDDEN FLOODS DUE TO HEAVY RAINS AND LARGE QUANTITY OF DISCHARGE OF WATER FROM SARDAR SAROVAR DAM. (2) THE RIVER BANK (SOUTH SIDE) WAS NOT REINFORCED, WHICH RESULTED IN HEAVY SOIL EROSION. (3) REMOVAL OF PLANTS AND VEGETATION DURING THE CONSTRUCTION OF ELECTRICAL TRANSMISSION TOWER OF TORRENT POWER CLOSE TO THE RIVER BANK, WHICH HAS RESULTED IN LOOSENING OF THE PARENT SOIL. (4) IRRIGATION DEPT. DID NOT PROVIDE ANY PRIOR WARNING BEFORE RELEASE OF ABRUPT WATER DISCHARGE IN SUCH A LARGE QUANTITY. (5) SOIL EROSION IS A GRADUAL PROCESS, WHICH TAKES NUMBER OF YEARS. PIPELINE OPERATORS SHOULD CLOSELY MONITOR SUCH BEHAVIOR OF THE RIVER COURSE AND THE ADJOINING BANKS ON A REGULAR BASIS.

32 ROOT CAUSE OF THE INCIDENT S.No CAUSE OF THE INCIDENT (6) IT WAS A NATURAL CALAMITY. UNPRECEDENTED SUDDEN FLOODS DUE TO HEAVY RAINS AND LARGE QUANTITY OF DISCHARGE OF WATER FROM SARDAR SAROVAR DAM. (7) BECAUSE OF THE EROSION OF THE SOIL FROM THE RIVER BANK, PIPE LINE, WHICH WAS BURIED IN THE GROUND BECAME EXPOSED AND PIPE LINE IN THE ERODED PORTION BECAME UNSUPPORTED. DUE TO THE FORCE OF WATER ON THIS EXPOSED PORTION OF PIPE LINE, IT STARTED OSCILLATING AND FINALLY ONE OF THE PIPELINES GOT SNAPPED DUE TO HEAVY OSCILLATION EFFECT IN HANGING PIPE LINE SECTION. THE VELOCITY OF WATER AND TURBULENCE IN THE RIVER WAS EXTREMELY HIGH AT THE TIME OF INCIDENT.

33 NATURAL GAS PIPELINE Leak/Burst site Date/Time of incident No. of fatalities th June 2014 at about 0545 hours Operating pressure 42 to 45 Kg/cm 2 Design pressure 72 Kg/cm 2 Pipeline size and grade 18 OD API 5L X60 Grade ORIGINATING STATION 18" (API 5L X-60) RIVER BRIDGE SV-1 SV-2 SV-5 SV-4/ I P HIGHWAY X-ING SV-3 (CANAL) (PIGGING STATION) RIVER X-ING SV-6 SV-7 SV-8 POWER PLANT 12

34 ANALYSIS / OBSERVATIONS OF THE FIRE INCIDENT CROSS COUNTRY PIPELINE SUPPLYING NATURAL GAS TO POWER PLANT THE PIPELINE WAS BEING OPERATED AT A LOWER FLOW RATE AND LOWER PRESSURE W.R.T. THE DESIGN PARAMETERS. PIPELINE WAS TRANSPORTING WET GAS WHILE IT WAS ORIGINALLY DESIGNED FOR TRANSPORTING DRY NATURAL GAS. THE GAS CONTAINED CO2 AND SOME TRACES OF SULPHUR. LEAKAGE TOOK PLACE AT THE LOWEST POINT WHERE THE PIPELINE WAS CROSSING A CANAL AT 6 O CLOCK POSITION. 34

35 FURTHER OBSERVATIONS OF THE FIRE INCIDENT IT WAS RAINING ON THE DAY OF THE INCIDENT, SO IT IS INFERRED THAT VAPOUR CLOUD FORMED DUE TO HEAVY WEATHER. A TEA STALL OWNER. WHO TURNED ON THE STOVE IN THE MORNING, POSSIBLY PROVIDED THE SOURCE OF IGNITION. THERE HAS BEEN A HISTORY OF PREVIOUS LEAKS NEAR THE PLACE OF ACCIDENT. 35

36 ROOT CAUSE OF THE FIRE INCIDENT LEAK DUE TO INTERNAL CORROSION PRESENCE OF CO2 LED TO FORMATION OF H2CO3. DURING EARLIER REPAIRS EXTERNAL COATING GOT DAMAGED RESULTING IN EXTERNAL CORROSION. IMPROPER PIGGING FOAM PIG USED INSTEAD OF SCRAPPER PIGS. PIG RESIDUE ANALYSIS NOT CARRIED OUT. IPS CARRIED OUT IN MAXIMUM METAL LOSS REPORTED IN IPS IS EQUIVALENT OF 50% OF WALL THICKNESS. USE OF WET NATURAL GAS INSTEAD OF DRY NATURAL GAS. NOT USING CORROSION INHIBITOR. 36

37 RECOMMENDATIONS PROPER CLEANING PIGGING TO BE CARRIED OUT REGULARLY FOLLOWED BY PIG RESIDUE ANALYSIS. INSTRUMENTED PIG SURVEY TO BE CARRIED OUT REGULARLY AND THE ANOMALY RECTIFICATION TO BE CARRIED OUT AS PER THE RECOMMENDATIONS. PROPER PROCEDURE TO BE MADE FOR REPAIR OF PIPELINE. ANY CHANGE FROM THE INITIAL CHANGE SHOULD BE ROUTED THROUGH A MANAGEMENT OF CHANGE PROCEDURE AFTER PROPER TECHNICAL ANALYSIS. CORROSION INHIBITOR TO BE USED IN THE LINE AS PER REQUIREMENT. IN ADDITION TO OFC COMMUNICATION THERE SHOULD ALSO BE ANOTHER STAND BY MODE OF COMMUNICATION. 37

38 MAJOR LAPSES NOTED OF-LATE IN THE PIPELINE INDUSTRY ON THE BASIS OF SOME MAJOR ACCIDENTS CHANGING DESIGN SERVICE WITHOUT PROPER TECHNICAL ANALYSIS OR WITHOUT PROPER MANAGEMENT OF CHANGE PROCESS. NOT LEARNING FROM PAST FAILURES & NOT CARRYING OUT PROPER ROOT CAUSE ANALYSIS. NOT CARRYING OUT PROPER CLEANING PIGGING & INTELLIGENT PIGGING SURVEY; NOT IMPLEMENTING RECOMMENDATIONS OF IPS SURVEY IN TIME. HIGH DEPENDENCY ON THIRD PARTY AGENCIES WITHOUT PROPER CONTROL. INADEQUATE LINE-PATROLLING.

39 MAJOR LAPSES NOTED OF-LATE IN THE PIPELINE INDUSTRY ON THE BASIS OF SOME MAJOR ACCIDENTS LACK OF S.O.P. FOR MAJOR ACTIVITIES LIKE REPAIR OF PIPELINE, COLD CUTTING, MUD PLUGGING, PIGGING, HOT-TAPPING ETC., NOT USING CORROSION-COUPONS/ CORROSION INHIBITORS. NON-AVAILABILITY OF A PROPER LEAK DETECTION SYSTEM. MANUAL OPERATION OF SECTIONALIZING VALVES. DIRECT CURRENT VOLTAGE GRADIENT (DCVG) SURVEY / CURRENT ATTENUATION TEST (CAT) SURVEY/ CP SURVEY NOT CARRIED OUT REGULARLY FOR ASSESSING CONDITION OF COATING.

40 ELEMENT OPERATIONS INTEGRITY MANAGEMENT SYSTEM RIGOROUS INTEGRITY MANAGEMENT SYSTEM PROVIDES FRAMEWORK FOR : (1) MANAGEMENT LEADERSHIP, COMMITMENT AND ACCOUNTABILITY (6) OPERATIONS & MAINTENANCE (7) MANAGEMENT OF CHANGE (2) RISK ASSESSMENT AND MANAGEMENT (3) FACILITIES DESIGN & CONSTRUCTION SPECS, CODES, STANDARDS (4) INFORMATION / DOCUMENTATION (5) PERSONNEL & TRAINING (8) THIRD PARTY SERVICES (9) INCIDENT INVESTIGATION & ANALYSIS (10) COMMUNITY AWARENESS & EMERGENCY PREPAREDNESS (11) OPERATIONS INTEGRITY ASSESSMENT AND IMPROVEMENT

41 THREATS TO OPERATING PIPELINE INTEGRITY

42 THREATS TO OPERATING PIPELINE INTEGRITY

43

44 PIPELINE INTEGRITY MANAGEMENT SYSTEM EFFECTIVE INTEGRITY MANAGEMENT OF AN ASSET COMPRISES OF : 1. DESIGN INTEGRITY (ASSURANCE THAT FACILITIES ARE DESIGNED IN ACCORDANCE WITH GOVERNING STANDARDS AND MEET SPECIFIED OPERATING REQUIREMENTS), 2. TECHNICAL INTEGRITY (APPROPRIATE WORK PROCESSES FOR INSPECTION AND MAINTENANCE SYSTEMS AND DATA MANAGEMENT TO KEEP THE OPERATIONS AVAILABLE) AND 3. OPERATIONAL INTEGRITY (APPROPRIATE KNOWLEDGE, EXPERIENCE, SOPS, COMPETENCE AND DECISION MAKING TO OPERATE THE PLANT AS INTENDED THROUGHOUT ITS LIFECYCLE.)

45 PIPELINE INTEGRITY MANAGEMENT SYSTEM DESIGN INTEGRITY : DESIGN OF A CROSS-COUNTRY PIPELINE IS VERY DIFFERENT FROM THAT OF PLANT PIPING SINCE IT IS NOT CONFINED TO A LIMITED AND PROTECTED AREA AND MAY PASS THROUGH DIFFERENT TYPES OF TERRAIN OVER WHICH THE OPERATOR HAS NO CONTROL. THEREFORE, ITS DESIGN HAS TO TAKE INTO CONSIDERATION BOTH NATURAL PHENOMENON AS WELL AS HUMAN ACTIVITIES ALONG THE ROUTE AND PROVIDE A SYSTEM ENSURING ITS LONG LIFE, OPERATABILITY AND EASE OF MAINTENANCE. WHILE CONCEPTUALIZING A NEW PIPELINE PROJECT MORE TIME SHOULD BE DEVOTED TO FREEZING DETAILED DESIGN AND ENGINEERING. STRESS ANALYSIS, SURGE RELIEF ANALYSIS, HYDRAULIC ANALYSIS, NETWORK ANALYSIS ETC., SHOULD BE DONE IN THE INITIAL STAGES AND NECESSARY DESIGN CHANGES TO BE CARRIED OUT REGARDING SELECTION OF PIPE, PIPE FITTINGS, VALVES, LAYOUT, P&ID ETC.,

46 DESIGN INTEGRITY SAFETY FACTORS IN DESIGN IS ACHIEVED BY : APPLICATION OF THE APPROPRIATE CODES AND SYSTEM HARDWARE COMPONENTS (ASME STANDARD & OISD STANDARDS). SELECTION OF PIPE MATERIAL AND ITS WALL THICKNESS, MATERIAL OF CONSTRUCTION FOR VALVES AND OTHER PIPE FITTINGS. CONSIDERING THE LOADS & STRESSES IMPOSED ON THE PIPELINE BY PHYSICAL PRESSURES AND FORCES, SUCH AS INTERNAL PRESSURE, STATIC LOADINGS AND WEIGHT EFFECTS. CONSIDER DYNAMIC LOADING, WHERE APPLICABLE, WIND, WAVES, EARTHQUAKE ETC., IDENTIFYING HIGH CONSEQUENCE AREAS & LOCATION CLASS. SPECIAL PROTECTIONS AT CROSSING LIKE RIVER/CANAL, RAIL, ROAD ETC.,

47 DESIGN INTEGRITY SAFETY FACTORS IN DESIGN ACHIEVED BY: (A) PIPE THICKNESS : THE NOMINAL WALL THICKNESS T FOR THE STEEL PIPE, SHALL BE CALCULATED IN ACCORDANCE WITH ASME B CONSIDERS LONGITUDINAL JOINT FACTOR FOR TYPE OF PIPELINE MANUFACTURING, FACTORS FOR RAIL, ROADS, RIVER CROSSINGS, PIPES ON BRIDGES, LOCATION CLASS ETC. CORROSION ALLOWANCE ADDED TO THE CALCULATED THICKNESS. (B) ALL PIPING JOINTS ARE WELDED (C)THE HAZOP AND RISK ANALYSIS (D) LOCATING SECTIONALIZING VALVES AT IDENTIFIED LOCATIONS FOR ISOLATIONS EASILY APPROACHABLE. SECTIONALIZING VALVES SHALL BE REMOTE OPERATED.

48 DESIGN INTEGRITY SAFETY FACTORS IN DESIGN ACHIEVED BY: (E) SURGE ANALYSIS TO PREVENT OVER-PRESSURIZATION ON CLOSURE. (F) FEATURE OF DE-PRESSURIZATION, SHUTDOWN & ISOLATION LOGIC AT PUMP STATIONS. (G) METERING STATIONS AND SCADA SYSTEMS PROVIDE CONTINUOUS MONITORING PIPELINE OPERATIONS. OVERSIGHT OF (H) LEAK DETECTION SYSTEM WITH PROVISION FOR IDENTIFICATION / LOCATION OF LEAK AND ISOLATION OF AFFECTED SECTION. (I) EXTERNAL COATING & CATHODIC PROTECTION FOR EXTERNAL CORROSION CONTROL. (J) INHIBITOR INJECTION FOR INTERNAL CORROSION CONTROL CASE.

49 TECHNICAL INTEGRITY INTERNAL HEALTH MONITORING PIPELINE PIGGING - PIGS ARE INSERTED INTO THE PIPELINE WHILE IT IS OPERATIONAL AND ARE CARRIED ALONG BY THE FLUID BEING PUMPED. CLEANING PIGS

50 TECHNICAL INTEGRITY INTERNAL HEALTH MONITORING THEIR BASIC PURPOSE OF PIGGING IS THREEFOLD: (1) CLEANING PIG - PROVIDE A WAY TO CLEAN DEBRIS AND SCALE FROM THE INSIDE OF THE PIPE, (2) INTELLIGENT PIG - INSPECT OR MONITOR THE CONDITION OF THE PIPE, (3) OR ACT AS A PLUG OR SEAL TO SEPARATE PRODUCTS IN MULTI- PRODUCT COMMERCIAL PIPELINES OR TO ISOLATE A SEGMENT FOR REPAIR WITHOUT DEPRESSURIZING THE REMAINDER OF THE PIPELINE. (4) PIG RESIDUE ANALYSIS TO BE CARRIED OUT REGULARLY TO MONITOR THE TREND OF INTERNAL CORROSION RATE.

51 TECHNICAL INTEGRITY INTERNAL HEALTH MONITORING : INTELLIGENT PIG PIGS THAT MONITOR THE CONDITION OF THE PIPE ARE IN-LINE INSPECTION TOOLS. MONITORING PIGS, ALSO CALLED INSTRUMENT PIGS OR SMART PIGS. GEOMETRY PIGS : CHECKS DEFORMATION, MISALIGNMENTS, BENDS, ELEVATION CHANGES AND DIRECTIONAL CHANGES TO THE PIPE. MAGNETIC FLUX LEAKAGE AND ULTRASONIC TECHNOLOGIES : FOR CRACKS DETECTION AND THICKNESS MEASUREMENT, CORROSION DETECTION, LEAK DETECTION.

52 TECHNICAL INTEGRITY EXTERNAL HEALTH MONITORING - PIPELINE COATING & CATHODIC PROTECTION: PROTECTIVE COATING : TO PREVENT DIRECT CONTACT BETWEEN THE PIPE & THE ENVIRONMENT & TO PREVENT ITS PARTICIPATION IN ELECTROCHEMICAL REACTIONS PROPERTIES REQUIRED (A) ELECTRICAL INSULATING PROPERTIES, RESISTANCE TO MOISTURE (B) MECHANICAL- ADHESION, ABRASION RESISTANCE, FLEXIBILITY, IMPACT RESISTANCE (C) STABILITY AGAINST TEMP CHANGE 3 LAYER POLYETHYLENE / POLYPROPYLENE OR FUSION BONDED EPOXY COATING IS PROVIDED

53 TECHNICAL INTEGRITY FOLLOWING COATING SURVEYS ARE DONE ON UNDERGROUND PIPELINES ONE MONTH AFTER THE COMMISSIONING OF IMPRESSED CURRENT SYSTEM: a. CLOSE INTERVAL COMPUTERIZED [ ON & OFF ] POTENTIAL LOGGING EVERY 1M OF PIPELINE ROW. b. PEARSON SURVEY ALONG PIPELINE ROW. c. CAT (CURRENT ATTENUATION TEST) EVERY 50M OF PIPELINE ROW. d. DCVG ( DIRECT CURRENT VOLTAGE GRADIENT) SURVEY AT DEFECT LOCATIONS INDICATED BY PEARSON, CIPL, CAT SURVEYS e. COATING CONDUCTANCE SURVEY AT AND MIDWAY BETWEEN CP STATIONS. f. CASING & CARRIER SHORT SURVEYS.

54 OPERATIONAL INTEGRITY ALL THE PIPELINE OPERATORS MUST HAVE A CORPORATE POLICY TO IMPROVE PIPELINE AND FACILITY INTEGRITY TO PROTECT THE SAFETY OF THE PUBLIC, THE ENVIRONMENT AND ITS EMPLOYEES.INTEGRITY MANAGEMENT GOALS SHALL INCLUDE : PROMOTE THE LONG TERM INTEGRITY OF THE PIPELINE SYSTEM CONDUCT BUSINESS IN A SAFE AND ENVIRONMENTALLY RESPONSIBLE MANNER COMPLY WITH APPLICABLE REGULATIONS AND STANDARDS DEMONSTRATE CONTINUOUS IMPROVEMENT THROUGH THE MONITORING OF PERFORMANCE MEASURES AND THROUGH ANNUAL RISK ASSESSMENTS ONLY ADEQUATELY TRAINED, SKILLED AND COMPETENT MANPOWER SHALL BE DEPLOYED FOR PIPELINE OPERATIONS. COMPLY WITH ALL THE STANDARD OPERATING PROCEDURES (SOP)

55 OPERATIONAL INTEGRITY PRESSURE SET POINTS SHOULD BE APPROPRIATELY DEFINED AND BUILT IN THE OPERATION PHILOSOPHY. ESD LOGIC (CAUSE AND EFFECT DIAGRAM) SHOULD BE PROPERLY DEFINED. CLEANING PIGGING HAS TO BE CARRIED OUT AS PER OISD GUIDELINES AND PIG- RESIDUE ANALYSIS SHOULD BE CARRIED OUT REGULARLY. THE RESULTS OF THE PIG-RESIDUE ANALYSIS SHOULD BE ANALYSED WITH THE HELP OF STATISTICAL TECHNIQUES TO WORK OUT THE TREND OF INTERNAL CORROSION RATE. NO SAFETY SYSTEMS SHOULD BE BY-PASSED.

56 ROU INSPECTION OPERATIONAL INTEGRITY INSPECTIONS CAN INVOLVE INDIVIDUALS WALKING THE ROU AND ALSO AERIAL SURVEILLANCE. A) NO DWELLING OR PERMANENT STRUCTURE IN ANY FORM SHALL BE PERMITTED WITHIN THE RIGHT OF USER B) CONTROLLING VEGETATION GROWTH IN THE FORM OF TREES, C) PREVENTING ENCROACHMENT FROM ABOVE AND BELOW GROUND STRUCTURES, D) MAINTAINING VISIBILITY OF PIPELINE MARKERS PATROLLING ( GROUND / AERIAL ) OF ROW / ROU TO BE CARRIED OUT REGULARLY (URBAN AREAS AND NON-URBAN AREAS) OBSERVE SURFACE CONDITIONS, LEAKAGE, CONSTRUCTION ACTIVITY, ENCROACHMENTS, WASHOUTS AND ANY OTHER FACTORS AFFECTING THE SAFETY AND OPERATION OF THE PIPELINE.

57 OPERATIONAL INTEGRITY MANAGEMENT OF CHANGE MONITORING & REVIEW OF OPERATING PARAMETERS TO WORK WITHIN THE OPERATING BARRIERS. STANDARD OPERATING PROCEDURES (SOP) INCLUDING EMERGENCY ISOLATIONS. SAFETY CONTROL SYSTEM MONITORING & PROOF TESTS OF ESD SYSTEMS. INTERPRETATION OF CATHODIC MONITORING RESULTS. INTERPRETATION OF PIGGING RESULTS & ACTIONS THERE OF. COATING HEALTH SURVEY & CORRECTIVE MEASURE.

58 CLASS LOCATION A CLASS LOCATION CAN CHANGE AS POPULATION GROWS AND MORE PEOPLE LIVE OR WORK NEAR THE PIPELINE. WHEN A CLASS LOCATION CHANGES, PIPELINE OPERATORS : MUST EITHER REDUCE THE PIPE'S OPERATING PRESSURE TO REDUCE STRESS LEVELS IN THE PIPE; REPLACE THE EXISTING PIPE WITH PIPE THAT HAS THICKER WALLS OR HIGHER YIELD STRENGTH TO YIELD A LOWER OPERATING STRESS AT THE SAME OPERATING PRESSURE; WHERE THE CLASS IS CHANGING ONLY ONE CLASS RATING, SUCH AS FROM A CLASS 1 TO CLASS 2 LOCATION, CONDUCT A PRESSURE TEST AT A HIGHER PRESSURE

59 PIPELINE INTEGRITY MANAGEMENT SYSTEM OTHER IMPORTANT ASPECTS OF THE PIPELINE INTEGRITY MANAGEMENT SYSTEM ARE : THE INLINE INSPECTION & MAINTENANCE PROCEDURES FOR ENSURING HEALTH INTEGRITY OF PIPELINES, STANDARD OPERATING PROCEDURES, THE CONTROL FOR MANAGEMENT OF CHANGE INCLUDING THE PROCESS SAFETY ASPECTS

60 CONCLUSION PIPES LAID UNDERGROUND CANNOT SPEAK, IT IS OUR DUTY TO CARE FOR THE PIPE & GIVE EITHER PAIN OR PLEASURE. NEED OF THE HOUR TO IS TO HAVE A SENSITIVITY TOWARDS PIPE. PIPELINE INTEGRITY MUST CONSIDER ALL ASPECTS OF DESIGN, CONSTRUCTION & OPERATION PHASES. PIPELINE INTEGRITY REQUIRES ADOPTING A FAILURES ARE PREVENTABLE MINDSET. ADOPTION OF CORROSION MANAGEMENT BEST PRACTICES CAN IMPROVE OVERALL PERFORMANCE OF PIPELINE OPERATIONS.

61

CCPS ASIA PACIFIC REGIONAL MEET ON PROCESS SAFETY

CCPS ASIA PACIFIC REGIONAL MEET ON PROCESS SAFETY 8 th CCPS ASIA PACIFIC REGIONAL MEET ON PROCESS SAFETY Chennai 22 th September 2014 Hirak Dutta ED-OISD Introduction Mode Of Transport Thru Pipeline Safe & Environment friendly and economic mode of transport

More information

Management System. Updated Document Review

Management System. Updated Document Review Pipeline Integrity Management System Updated Document Review 2Q 2011 POMA Subcommittee Meeting Introduction PIMS = A comprehensive, systematic and integrated management program Objectives: Provide information

More information

195LiquidsCatalog.

195LiquidsCatalog. 195LiquidsCatalog www.energyu.org www.midwestenergy.org 195 Abnormal Operating Conditions... 3 195-0060 General Abnormal Operating Conditions (CT60)... 3 195-0000 Documentation & Reporting... 3 195-0403

More information

PPTS OPERATOR ADVISORY: THE INS AND OUTS OF CORROSION RELEASES

PPTS OPERATOR ADVISORY: THE INS AND OUTS OF CORROSION RELEASES PPTS OPERATOR ADVISORY: THE INS AND OUTS OF CORROSION RELEASES Executive Summary This Advisory reviews corrosion releases in hazardous liquids pipeline facilities and along the pipeline right-of-way (ROW).

More information

National Academy of Sciences

National Academy of Sciences National Academy of Sciences Transportation Research Board Study of Pipeline Transportation of Diluted Bitumen PHMSA Regulatory Authority and Keystone XL Pipeline October 23, 2012-1 - Topics for Briefing

More information

AN INNOVATIVE APPROACH TO MANAGING THE INTEGRITY OF OIL AND GAS PIPELINES: PIPELINE INTEGRITY MANAGEMENT SYSTEM

AN INNOVATIVE APPROACH TO MANAGING THE INTEGRITY OF OIL AND GAS PIPELINES: PIPELINE INTEGRITY MANAGEMENT SYSTEM Petroleum & Coal ISSN 1337-7027 Available online at www.vurup.sk/petroleum-coal Petroleum & Coal 54 (1) 1-8, 2012 AN INNOVATIVE APPROACH TO MANAGING THE INTEGRITY OF OIL AND GAS PIPELINES: PIPELINE INTEGRITY

More information

Paper Number:

Paper Number: Paper Number: 2015-04 Implementing Pipelines Integrity Management Using KPIs Sherry Rao Charter Coating Service (2000) Ltd. #6, 4604, 13 St NE, Calgary, AB T2E 6P1 Phone: 1-403-250-3027 Email: srao@chartercoating.com

More information

Brian S. Wyatt Eur Ing, BSc, C Eng, MIM, FICorr, FIHT, FCS. Corrosion Control

Brian S. Wyatt Eur Ing, BSc, C Eng, MIM, FICorr, FIHT, FCS. Corrosion Control ADVANCED ADVANCED SYSTEMS OVERLINE OF OVERLINE ASSESSMENT ASSESSMENT OF OF COATINGS COATINGS AND AND CATHODIC CATHODIC PROTECTION PROTECTION Brian S. Wyatt Eur Ing, BSc, C Eng, MIM, FICorr, FIHT, FCS Corrosion

More information

Spire STL Pipeline Project

Spire STL Pipeline Project Spire STL Pipeline Project Resource Report 11 Reliability and Safety FERC Docket No. CP17- - FERC Application January 2017 Public RESOURCE REPORT 11 - RELIABILITY AND SAFETY SUMMARY OF FILING INFORMATION

More information

Distribution Integrity Management. Record Requirements

Distribution Integrity Management. Record Requirements Distribution Integrity Management Record Requirements CONTACT INFORMATION John West Transportation Specialist U.S. Department of Transportation PHMSA Office of Training and Qualifications Main: (405) 954-7219

More information

POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES

POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES A large percent of corrosion failures on cathodically protected structures are associated

More information

Company Name: Property Name:

Company Name: Property Name: Distribution Integrity Management: Guidance for Master Meter and Small Liquefied Petroleum Gas Pipeline Operators Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines Company Name:

More information

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and TECHNICAL STANDARDS & SAFETY AUTHORITY 14 th Floor, Centre Tower 3300 Bloor Street West Toronto, Ontario Canada M8X 2X4 IN THE MATTER OF: THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16

More information

Gas Transmission NPRM. David Johnson November 10, 2016

Gas Transmission NPRM. David Johnson November 10, 2016 Gas Transmission NPRM David Johnson November 10, 2016 Friday the 13 th came 5 days early! 2 A few statistical facts As published in the FR: 136 pages like this 103 pages of intro & preamble 33 pages of

More information

Another component of the depth of cover maintenance program will be regular in-water surveys of crossings with elevated scour potential.

Another component of the depth of cover maintenance program will be regular in-water surveys of crossings with elevated scour potential. CA PDF Page 1 of 16 2.0 PIPELINE CONDITION ASSESSMENT To demonstrate that the pipe for conversion from natural gas to oil service will be suitable for the intended service, an EA was completed to assess

More information

Convention on the Transboundary Effects of Industrial Accidents

Convention on the Transboundary Effects of Industrial Accidents ECONOMIC COMMISSION FOR EUROPE Convention on the Transboundary Effects of Industrial Accidents Convention on the Protection and Use of Transboundary Watercourses and International Lakes Printed at United

More information

192GasCatalog.

192GasCatalog. 192GasCatalog www.energyu.org www.midwestenergy.org 192-Abnormal Operating Conditions... 4 192-0101 Characteristics and Hazards of Natural Gas... 4 192-0201 Gas Detection and Alarm System Maintenance...

More information

Pipeline Integrity through Coatings and Cathodic Protection

Pipeline Integrity through Coatings and Cathodic Protection ICEPIM 2015 International Conference on Pipeline Integrity management Pipeline Integrity through Coatings and Cathodic Protection A.S.Khanna Corrosion Science & Engineering, Department of Metallurgical

More information

PIPELINE INTEGRITY MANAGEMENT SYSTEM: A COLOMBIAN MODEL FOR DEVELOPING COUNTRIES

PIPELINE INTEGRITY MANAGEMENT SYSTEM: A COLOMBIAN MODEL FOR DEVELOPING COUNTRIES PIPELINE INTEGRITY MANAGEMENT SYSTEM: A COLOMBIAN MODEL FOR DEVELOPING COUNTRIES Autors Hernando Gutiérrez de Piñeres Operations Vice President Promigas Marianella Ojeda Pipepline Integrity Coordinator

More information

PIPELINE INTEGRITY SOLUTIONS

PIPELINE INTEGRITY SOLUTIONS PIPELINE INTEGRITY SOLUTIONS Pipeline Integrity Management Services (PIMS) InVista Ultrasonic In-Line Inspection Technology Engineering Assessment and Consulting QuestIntegrity.com CHALLENGE CONVENTION

More information

Pipeline Integrity. QuestIntegrity.com CHALLENGE CONVENTION

Pipeline Integrity. QuestIntegrity.com CHALLENGE CONVENTION Pipeline Integrity Solutions Pipeline Integrity Management Services (PIMS) InVista Ultrasonic In-Line Inspection Technology Engineering Assessment and Consulting QuestIntegrity.com CHALLENGE CONVENTION

More information

Corrosion Rate Monitoring in Pipeline Casings. Jamey Hilleary Elecsys Corporation 846 North Mart-Way Ct. Olathe, KS, USA

Corrosion Rate Monitoring in Pipeline Casings. Jamey Hilleary Elecsys Corporation 846 North Mart-Way Ct. Olathe, KS, USA Corrosion Rate Monitoring in Pipeline Casings Jamey Hilleary Elecsys Corporation 846 North Mart-Way Ct. Olathe, KS, 66061 USA Jerry DeWitt Enbridge Energy Partners 1500 West Main St. Griffith, IN 46319

More information

THE CASE AGAINST CASINGS

THE CASE AGAINST CASINGS THE CASE AGAINST CASINGS Prior to 1993, the AREA Manual recommended that all pipelines carrying flammable gas and flammable liquids under the track to be encased in a larger steel pipe. This casing requirement

More information

oday s operators continue to face challenges in gathering quality cathodic protection (CP) data. Most operators employ indirect methods such as

oday s operators continue to face challenges in gathering quality cathodic protection (CP) data. Most operators employ indirect methods such as [ [ T oday s operators continue to face challenges in gathering quality cathodic protection (CP) data. Most operators employ indirect methods such as potential and coating survey techniques to monitor

More information

BSR GPTC Z TR x GM Referenced Standards Page 1 of 12

BSR GPTC Z TR x GM Referenced Standards Page 1 of 12 Page 1 of 12 PURPOSE: Review existing GM and modify as appropriate in light of Amendment 192 119. Regulations Section 192.620 To address increased risk of a maximum allowable operating pressure based on

More information

Mears Group, Inc. Integrity Assessment for Non-Piggable Pipelines By Jim Walton

Mears Group, Inc. Integrity Assessment for Non-Piggable Pipelines By Jim Walton Mears Group, Inc. Integrity Assessment for Non-Piggable Pipelines By Jim Walton External Corrosion Direct Assessment Why use ECDA? To evaluate the Cathodic Protection and Coating condition and give a forward

More information

Condensed Study Guide

Condensed Study Guide 192-0401 Corrosion Reactions This module will discuss a variety of corrosion types. Each type involves either a chemical reaction or an electrochemical reaction. Chemical Reaction Chemicals in the environment

More information

Chevron North Sea Limited (CNSL) operates more than 25 pipelines across three operated assets in the UK North Sea: Alba, Captain and Erskine.

Chevron North Sea Limited (CNSL) operates more than 25 pipelines across three operated assets in the UK North Sea: Alba, Captain and Erskine. EFFECTIVE USE OF IN-LINE INSPECTION TECHNOLOGIES TO SUPPORT PIPELINE INTEGRITY MANAGEMENT By Peter Smith, Chevron North Sea Limited and Andrew Wilde, MACAW Engineering Ltd, UK Abstract Chevron North Sea

More information

Carlos Melo University of Calgary, Canada Petroamazonas EP, Ecuador

Carlos Melo University of Calgary, Canada Petroamazonas EP, Ecuador . Paper Number: 017-01 Key Performance Indicators (KPIs) for Evaluation of Status in the Gathering Pipelines of an Oil Production Field of the Amazon Basin in Ecuador Carlos Melo University of Calgary,

More information

Integrity Management Program for

Integrity Management Program for Compliance Assurance Protocol Integrity Management Program for Pipelines April 2018 Version 1.9 Table of Contents BACKGROUND... 4 SAFETY CULTURE... 4 COMPLIANCE ASSURANCE PROCESS... 5 PHASE ONE... 5 PHASE

More information

Catasrophic Failure of Aging Underground Pipelines Is Inevitable Under Certain Corrosion Conditions

Catasrophic Failure of Aging Underground Pipelines Is Inevitable Under Certain Corrosion Conditions Catasrophic Failure of Aging Underground Pipelines Is Inevitable Under Certain Corrosion Conditions M.ZEE,PHD FELLOW OF NACE, FELLOW OFASM Zee@exova.com (412)952-9441 NACE CERTIFIED CORROSION/ MATERIALS

More information

CORROSION ENGINEERING AND CATHODIC PROTECTION

CORROSION ENGINEERING AND CATHODIC PROTECTION UNI EN ISO 9001:2008 QMS certified for activities reported in certify N. K062 CESCOR Srl Via Maniago 12, 20134 MILANO (Italy) +39 02 26412538 fax +39 02 26412546 info@cescor.it www.cescor.it CORROSION

More information

CUI (CORROSION UNDER INSULATION) MECHANISM THEORY AND PRACTICE

CUI (CORROSION UNDER INSULATION) MECHANISM THEORY AND PRACTICE CUI (CORROSION UNDER INSULATION) MECHANISM THEORY AND PRACTICE Prepared By: Mohammed AbuALRub SAFCO Reliability Dept. December 10, 2015 CONTENT Introduction CUI PhenomenaMain components of the cold insulation

More information

Mitigation of Internal Corrosion in Oil Effluent Pipeline Systems

Mitigation of Internal Corrosion in Oil Effluent Pipeline Systems BEST MANAGEMENT PRACTICES Mitigation of Internal Corrosion in Oil Effluent Pipeline Systems 2009-0012 The Canadian Association of Petroleum Producers (CAPP) represents 130 companies that explore for, develop

More information

What s Next Establishing Reassessment Intervals

What s Next Establishing Reassessment Intervals What s Next Establishing Reassessment Intervals NACE ECDA Seminar Houston January 26- January 28 2009 Kevin C. Garrity, P.E. DNV Topics Covered Focus is ECDA - Reassessment Methodology, - Corrosion Growth

More information

Refining Corrosion Technologist NACE-RCT-001

Refining Corrosion Technologist NACE-RCT-001 Refining Corrosion Technologist NACE-RCT-001 NACE Cathodic Protection Technologist (CP3) Essay Exam Exam Preparation Guide March 2018 Copyright 2016 by NACE International Institute. All rights reserved.

More information

Cathodic Protection Influencing Factors and Monitoring

Cathodic Protection Influencing Factors and Monitoring Lecture 17 Cathodic Protection Influencing Factors and Monitoring Keywords: Coated Surfaces, Protection Criterion, Anode Materials, Pipeline Protection. For large structures such as underground pipe lines,

More information

Preventing and Mitigating Corrosion to Advance Pipeline Integrity Pipeline Safety Trust Conference November 2, 2017 New Orleans, LA

Preventing and Mitigating Corrosion to Advance Pipeline Integrity Pipeline Safety Trust Conference November 2, 2017 New Orleans, LA Preventing and Mitigating Corrosion to Advance Pipeline Integrity 2017 Pipeline Safety Trust Conference November 2, 2017 New Orleans, LA Causes of Liquids Pipeline Releases 2012-2016 TOTAL RELEASES (2,100

More information

FEASIBILITY STUDY FOR AN UNPIGGABLE SUBSEA PIPELINE A CASE STUDY OF AN OFFSHORE PIPELINE

FEASIBILITY STUDY FOR AN UNPIGGABLE SUBSEA PIPELINE A CASE STUDY OF AN OFFSHORE PIPELINE FEASIBILITY STUDY FOR AN UNPIGGABLE SUBSEA PIPELINE A CASE STUDY OF AN OFFSHORE PIPELINE James Stewart, Inessa Yablonskikh, Baker Hughes, a GE company (BHGE) ABSTRACT Managing the long-term integrity of

More information

Advances In ILI Allow Assessing Unpiggable Pipelines. By Lisa Barkdull and Ian Smith, Quest Integrity Group, Houston

Advances In ILI Allow Assessing Unpiggable Pipelines. By Lisa Barkdull and Ian Smith, Quest Integrity Group, Houston As seen in Pipeline & Gas Journal, August 2011 edition Advances In ILI Allow Assessing Unpiggable Pipelines By Lisa Barkdull and Ian Smith, Quest Integrity Group, Houston Advances in in-line inspection

More information

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities PRE-CONSTRUCTION As the proposed operator of a portion(s) of the Customer owned facilities, Dominion Energy Transmission, Inc. (DETI) shall require the following documentation for review and approval prior

More information

Updated December Pembina. Engin. Submitted to: Prepared by: Prepared: September Updated:

Updated December Pembina. Engin. Submitted to: Prepared by: Prepared: September Updated: Pembina Redwater Manifold Expansion at Edmonton Terminal Reactivation Engin eering Assessment Submitted to: National Energy Board of Canada ( NEB ) Prepared by: Prepared: September 2016 Updated: December

More information

Review Paper SAFETY OF NATURAL GAS CROSS COUNTRY PIPELINE NETWORKS, IN INDIAN CONTEXT

Review Paper SAFETY OF NATURAL GAS CROSS COUNTRY PIPELINE NETWORKS, IN INDIAN CONTEXT Raufeek M H, et al., International Journal on Occupational Health & Safety, Fire & Environment Allied Science ISSN 2349-977X Review Paper SAFETY OF NATURAL GAS CROSS COUNTRY PIPELINE NETWORKS, IN INDIAN

More information

Colonial Pipeline Company - Managing Operational Risk

Colonial Pipeline Company - Managing Operational Risk Colonial Pipeline Company - Managing Operational Risk Topics Background information on Colonial Pipeline Departmental versus Enterprise GIS ArcGIS Pipeline Data Model (APDM) + Geodatabase as foundation

More information

Evaluation of Key Performance Indicators (KPI s) in Crude Oil Transmission Pipeline

Evaluation of Key Performance Indicators (KPI s) in Crude Oil Transmission Pipeline . Paper Number: 2017-02 Evaluation of Key Performance Indicators (KPI s) in Crude Oil Transmission Pipeline Raghav Ravichandran CSIR-Central Electrochemical Research Institute, India Abstract This paper

More information

The Advancement of Direct Assessment Methodologies for Difficult-to-Assess Piping

The Advancement of Direct Assessment Methodologies for Difficult-to-Assess Piping NACE: August 2010 The Advancement of Direct Assessment Methodologies for Difficult-to-Assess Piping Area Potential Earth Current Inspections for station piping Andy Jensen Sr. Consultant, NACE CP Technologist

More information

Detecting metal loss and pipeline wall thinning with a combination of Ultrasonic Testing (UT) and Magnetic Flux Leakage (MFL)

Detecting metal loss and pipeline wall thinning with a combination of Ultrasonic Testing (UT) and Magnetic Flux Leakage (MFL) Detecting metal loss and pipeline wall thinning with a combination of Ultrasonic Testing (UT) and Magnetic Flux Leakage (MFL) Wolfgang Krieg ROSEN Swiss AG Abstract In-line inspections with Ultrasonic

More information

COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS. By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK

COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS. By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK ABSTRACT Composite repairs have been utilised within the transmission pipeline

More information

Available online at ScienceDirect. Procedia Engineering 86 (2014 )

Available online at  ScienceDirect. Procedia Engineering 86 (2014 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 86 (2014 ) 597 605 1st International Conference on Structural Integrity, ICONS-2014 Corrosion Risk Analysis, Risk Based Inspection

More information

SPE MS. Copyright 2015, Society of Petroleum Engineers

SPE MS. Copyright 2015, Society of Petroleum Engineers SPE-177570-MS EVO Series 1.0 - Latest Generation of UT Crack and Corrosion Tools For High Speed Pipeline Inspection T. Hennig, NDT Global Corporate Ltd.; G. Lokwani, NDT Middle East Copyright 2015, Society

More information

Cathodic Protection Shielding by Pipeline Coatings

Cathodic Protection Shielding by Pipeline Coatings Cathodic Protection Shielding by Pipeline Coatings Greg Ruschau Jeff Digulio ExxonMobil Upstream Company This presentation includes forward-looking statements. Actual future conditions (including economic

More information

Singapore s Experience of Water Loss Reduction. Lai Kah Cheong Chief Engineer 7 Sep 17

Singapore s Experience of Water Loss Reduction. Lai Kah Cheong Chief Engineer 7 Sep 17 Singapore s Experience of Water Loss Reduction Lai Kah Cheong Chief Engineer 7 Sep 17 Biodata of Singapore ~34km Singapore, 718 km2 ~53km Population, 5.6m Annual rainfall 2,400 mm Average water demand

More information

Dates of Innovation Development: January, 2014 to July 2015 Web site: Summary Description: Cathodic Protection

Dates of Innovation Development: January, 2014 to July 2015 Web site:  Summary Description: Cathodic Protection 2017 Award Nomination Title of Innovation: Ultrasound Cathodic Protection Test Station Nominee(s) Eugene (Gene) B. Silverman PhD, Berkeley Springs Instruments LLC Category: Cathodic Protection Coatings

More information

HIGH ENERGY PIPING INSPECTION PROGRAM

HIGH ENERGY PIPING INSPECTION PROGRAM HIGH ENERGY PIPING INSPECTION PROGRAM JOEL LUNDQUIST STRESS ANALYSIS SECTION B&V ENERGY AGENDA About Black & Veatch Introduction Power Piping Code Initial Baseline Assessment Evaluation by Non-Destructive

More information

Review of Cathodic Protection Systems for Concrete Structures in Australia Lessons Learnt and Future Directions

Review of Cathodic Protection Systems for Concrete Structures in Australia Lessons Learnt and Future Directions Review of Cathodic Protection Systems for Concrete Structures in Australia Lessons Learnt and Future Directions A. Cheaitani Remedial Technology Pty Ltd, Sydney, Australia SUMMARY: Impressed current cathodic

More information

HT-406 Specification Guide

HT-406 Specification Guide 2.101 Part 1 - General Pre-insulated HDPE-Jacketed Steel Piping Systems suitable for Steam, Condensate Return, and High Temperature Heating Water. 1.1 Pre-insulated Piping - Furnish a complete HDPE jacketed

More information

Prevention solution for corrosion issues in CO2 removal units in ammonia plants

Prevention solution for corrosion issues in CO2 removal units in ammonia plants Prevention solution for corrosion issues in CO2 removal units in ammonia plants Case Study Report Doc. No: AKH01-STD-ENG-RPT-001 Contents 1. Introduction... 2 2. Background... 2 3. Conclusion... 4 4. Lessons

More information

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships Transmission Pipeline Opportunities Advancing Project Development in India through Public Private Partnerships 22 23 February, 2007 Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline

More information

GPA GCC (Corrosion in Gas Plants) 28 November 2007 (Bahrain)

GPA GCC (Corrosion in Gas Plants) 28 November 2007 (Bahrain) Root Cause Analysis Booster Station 150 Stainless Steel Piping Failure Kuwait Oil Company Gas Management Group GPA GCC (Corrosion in Gas Plants) 28 November 2007 (Bahrain) M. F. Al-Otaibi, A. W. Al-Mithin

More information

I. COMPARSION OF CORROSION MONITORING SYSTEMS IN THE OIL AND GAS INDUSTRY

I. COMPARSION OF CORROSION MONITORING SYSTEMS IN THE OIL AND GAS INDUSTRY Quality on the Move! Corporate Headquarters: 2449 West Park Avenue P.O. Box 1690 Gray, LA 70359 www.nvindt.com T: 1-877-638-6841 F: 985-876-9355 info@nvindt.com I. COMPARSION OF CORROSION MONITORING SYSTEMS

More information

Cathodic Protection. Cathodic Protection for Pipelines, Storage Tanks and Process Industrial Plant Assets - 2 days. Major Benefits of Attending

Cathodic Protection. Cathodic Protection for Pipelines, Storage Tanks and Process Industrial Plant Assets - 2 days. Major Benefits of Attending Cathodic Protection Cathodic Protection for Pipelines, Storage Tanks and Process Industrial Plant Assets - 2 days 2018 Major Benefits of Attending APPRECIATE the fundamentals of Cathodic Protection design

More information

DOUBLE WALLED PIPING SYSTEMS

DOUBLE WALLED PIPING SYSTEMS DOUBLE WALLED PIPING SYSTEMS The design and construction of a double wall pipe is more complex than a single wall pipe because of the additional pipe, associated welds and tie in procedures. There are

More information

General Discussion of Corrosion Monitoring Considerations in Pipeline Design

General Discussion of Corrosion Monitoring Considerations in Pipeline Design Rohrback Cosasco Systems, Inc. 11841 East Smith Avenue Santa Fe Springs, CA 90670 Tel: +1 (562) 949-0123 Fax: +1 (562) 949-3065 www.rohrbackcosasco.com General Discussion of Corrosion Monitoring Considerations

More information

Refining Corrosion Technologist NACE-RCT-001

Refining Corrosion Technologist NACE-RCT-001 Refining Corrosion Technologist NACE-RCT-001 NACE Cathodic Protection Specialist (CP 4) Essay Exam Exam Preparation Guide March 2018 Copyright 2016 by NACE International Institute. All rights reserved.

More information

U.S. DOT Pipeline and Hazardous Materials Safety Administration

U.S. DOT Pipeline and Hazardous Materials Safety Administration U.S. DOT Pipeline and Hazardous Materials Safety Administration Priority Issues for 2017+ - -2 2 - - Organizational Updates Leveraging Lessons from Prior Years Congressional Mandates and Recommendations

More information

CIVIL ENGINEERING CONSTRUCTION SBC2253

CIVIL ENGINEERING CONSTRUCTION SBC2253 CIVIL ENGINEERING CONSTRUCTION SBC2253 OIL AND GAS STRUCTURE Sr Dr. Mohd Saidin Misnan Department of Quantity Surveying Faculty of Built Environment Universiti Teknologi Malaysia INTRODUCTION Pipeline

More information

Part 192 Corrosion Enforcement Guidance

Part 192 Corrosion Enforcement Guidance Part 192 Corrosion Enforcement Introduction The materials contained in this document consist of guidance, techniques, procedures and other information for internal use by the PHMSA pipeline safety enforcement

More information

In-Line Inspection using Ultrasonic Technology

In-Line Inspection using Ultrasonic Technology In-Line Inspection using Ultrasonic Technology Dr. Thomas Hennig NDT Global GmbH & Co KG Friedrich List Str. 1 76297 Stutensee Germany Jason Chan NDT Global Tampines Industrial Park A Tampines Street 93

More information

GREEN THREAD Piping Systems

GREEN THREAD Piping Systems Bulletin No. A1300 February 15, 2006 SMITH FIBERCAST GREEN THREAD Piping Systems PRODUCT GREEN THREAD pipe is filament wound using an amine cured epoxy resin and fiberglass and has a resin-rich liner reinforced

More information

Pipeline Integrity: Combining Coating Integrity and Cathodic Protection Surveys

Pipeline Integrity: Combining Coating Integrity and Cathodic Protection Surveys Pipeline Integrity: Combining Coating Integrity and Cathodic Protection Surveys ABSTRACT Elizabeth Nicholson B. Eng, NACE CP-3 Cathodic Protection Technologist, Corrosion Technician General Manager Cathodic

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events)

Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events) Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events) TABLE OF CONTENTS 12 HAZARD ANALYSIS AND RISK ASSESSMENT... 12-1 12.1 Introduction... 12-1 12.2 Pipeline Design and Risk... 12-1 12.2.1

More information

Ohio s One-Stop Utility Resource. Gas Pipeline Safety. Ed Steele, Section Chief Gas Pipeline Safety Section

Ohio s One-Stop Utility Resource. Gas Pipeline Safety. Ed Steele, Section Chief Gas Pipeline Safety Section Gas Pipeline Safety Ed Steele, Section Chief Gas Pipeline Safety Section Program Structure The Gas Pipeline Safety Program is a Federally certified program (Intrastate and Interstate agent) In order to

More information

COMPOSITE USAGE IN THE PIPELINE INDUSTRY TAMMY BOMIA

COMPOSITE USAGE IN THE PIPELINE INDUSTRY TAMMY BOMIA COMPOSITE USAGE IN THE PIPELINE INDUSTRY TAMMY BOMIA OUTLINE What is a Composite Field Applied ARO Pipeline Integrity ASME PCC2, Article 4.1 Conclusion WHAT IS A COMPOSITE? Various Laminates FIBER-REINFORCED

More information

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS PDF Version [Printer-friendly - ideal for printing entire document] NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS Published by Quickscribe Services Ltd. Updated To: [includes Federal Regulation SOR/2016-134

More information

Inspection of water injection pipelines and future needs. By: Mikael Georgson and Roger Hunsbedt. Statoil ASA

Inspection of water injection pipelines and future needs. By: Mikael Georgson and Roger Hunsbedt. Statoil ASA Inspection of water injection pipelines and future needs By: Mikael Georgson and Roger Hunsbedt Statoil ASA Abstract Statoil ASA has recently inspected several water injection pipelines that have shown

More information

ATTACHMENT A: FINDINGS

ATTACHMENT A: FINDINGS ATTACHMENT A: FINDINGS 1.0 CEQA FINDINGS 1.1 CEQA Exemption The County Planning Commission finds that the proposed project is exempt from environmental review under the California Environmental Quality

More information

The Hidden Damage Done (HDD?)

The Hidden Damage Done (HDD?) The Hidden Damage Done (HDD?) Horizonal Directional Drill WHY USE HDD Inaccessible area for trenching Structures, geography, population Used at river crossings, beneath buildings, under roadways, railroad

More information

Subpart E Welding of Steel in Pipelines

Subpart E Welding of Steel in Pipelines Subpart E Welding of Steel in Pipelines 192.221 Scope This subpart prescribes minimum requirements for welding steel materials in pipelines. This subpart does not apply to welding that occurs during the

More information

SIMPLIFYING PIPELINE INSPECTION. THE INTEGRATION OF ADVANCED EDDY CURRENT SENSORS ONTO CONVENTIONAL FOAM PIGS. By: Steve Banks i2i Pipelines Ltd UK

SIMPLIFYING PIPELINE INSPECTION. THE INTEGRATION OF ADVANCED EDDY CURRENT SENSORS ONTO CONVENTIONAL FOAM PIGS. By: Steve Banks i2i Pipelines Ltd UK SIMPLIFYING PIPELINE INSPECTION. THE INTEGRATION OF ADVANCED EDDY CURRENT SENSORS ONTO CONVENTIONAL FOAM PIGS. Abstract By: Steve Banks i2i Pipelines Ltd UK Pigging tools for pipelines are typically dominated

More information

FRAZIER RELIABILITY SOLUTIONS

FRAZIER RELIABILITY SOLUTIONS (817) 416-4306 500 North Kimball Ave. Suite 103C Southlake, TX 76092 Frazier Reliability Solutions is a subsidiary of Frazier & Associates, Inc. Since 1996, Frazier Reliability Solutions has been providing

More information

Review of ASME Guidance Articles on Repair Strategies

Review of ASME Guidance Articles on Repair Strategies Review of ASME Guidance Articles on Repair Strategies Clay Rodery BP Chemicals Technology & Engineering Member/ASME Post Construction Standards Committee ASME PCC-2: Repair of Pressure Equipment and Piping

More information

Construction Issues 1

Construction Issues 1 Construction Issues 1 Safety Your safety is extremely important. Heavy loads and large equipment can present special risks Do not place yourself in harms way Make eye contact with heavy equipment operators

More information

Sustainability and Asset Protection at MWRA

Sustainability and Asset Protection at MWRA Massachusetts Water Resources Authority Sustainability and Asset Protection at MWRA Frederick A. Laskey Executive Director October 10, 2017 What Is MWRA? MWRA provides wholesale water and wastewater services

More information

From the desk of G. A. Aaker, Jr., PE.

From the desk of G. A. Aaker, Jr., PE. SAMPLE CALCULATIONS TO DETERMINE THE REQUIRED MINIMUM WALL THICKNESS PER DOT 192 / ASME B31.8 FOR GAS TRANSMISSION AND DISTRIBUTION PIPING SYSTEMS 192.103 GENERAL Pipe must be designed with sufficient

More information

In-Line Inspection Data Interpretation Appalachian Underground Corrosion Short Course (AUCSC)

In-Line Inspection Data Interpretation Appalachian Underground Corrosion Short Course (AUCSC) In-Line Inspection Data Interpretation 2018 Appalachian Underground Corrosion Short Course (AUCSC) By Terry Shamblin and W. K. Bill Deaton, P.E. May 15 th, 2018 For Consideration Discussion Question Does

More information

INGAA Foundation, Inc. Construction Safety and Construction QA/QC Workshop Houston, Texas. PHMSA Update on Construction and Inspection March 21, 2012

INGAA Foundation, Inc. Construction Safety and Construction QA/QC Workshop Houston, Texas. PHMSA Update on Construction and Inspection March 21, 2012 INGAA Foundation, Inc. Construction Safety and Construction QA/QC Workshop Houston, Texas PHMSA Update on Construction and Inspection March 21, 2012 Alan Mayberry - 1 - Today s Agenda Updates on the past

More information

ISO : (E)

ISO : (E) ISO 21809-3:2016-03 (E) Petroleum and natural gas industries - External coatings for buried or submerged pipelines used in pipeline transporta tion systems - Part 3: Field joint coatings Contents Page

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 11 Reliability and Safety FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 11.0 RELIABILITY AND SAFETY... 11-1 11.1 NATURAL GAS PIPELINE INDUSTRY

More information

INTERPRETATIONS NO. 11

INTERPRETATIONS NO. 11 INTERPRETATIONS NO. 11 Replies to Technical Inquiries September 1,1993, Through January 31,1999 Interpretations 11-1 Thmgh 11-26 It has been agreed to publish intepretations issued by the B31 Committee

More information

Capstone C O N S U L T A N T S

Capstone C O N S U L T A N T S Ultrasonic Pulse Velocity Tests These tests are primarily done to establish: the homogeneity of concrete presence of cracks, voids and other imperfections changes in quality of concrete over time this

More information

WHY OIL COMPANIES MUST GRASP THE CORROSION ISSUE Richard Pike

WHY OIL COMPANIES MUST GRASP THE CORROSION ISSUE Richard Pike WHY OIL COMPANIES MUST GRASP THE CORROSION ISSUE Richard Pike Corrosion may seem an unexciting subject, but international and state oil companies now need to place much higher priority on both the technology

More information

FLORIDA PUBLIC SERVICE COMMISSION

FLORIDA PUBLIC SERVICE COMMISSION FLORIDA PUBLIC SERVICE COMMISSION NATURAL GAS PIPELINE ANNUAL SAFETY REPORT 2017 DIVISION OF ENGINEERING Table of Contents Figures and Tables... iii Gas Safety Background... 1 Transmission Integrity Management

More information

Historical overview on Vacuum suitable Welding and fatigue resistance in Research Devices

Historical overview on Vacuum suitable Welding and fatigue resistance in Research Devices Historical overview on Vacuum suitable Welding and fatigue resistance in Research Devices Martin Wolf E-mail:emartin.wolf@gmail.com Summary New inventions change the approach of vacuum suitable welding

More information

INTRODUCTION TO ULTRASONIC IN-LINE INSPECTION OF CRA PIPELINES. Herbert Willems, Gerhard Kopp NDT Global, Germany

INTRODUCTION TO ULTRASONIC IN-LINE INSPECTION OF CRA PIPELINES. Herbert Willems, Gerhard Kopp NDT Global, Germany INTRODUCTION TO ULTRASONIC IN-LINE INSPECTION OF CRA PIPELINES Herbert Willems, Gerhard Kopp NDT Global, Germany ABSTRACT Pipelines manufactured from corrosion-resistant alloys (CRA) are becoming more

More information

Natural Gas Pipeline Safety A PARTNERSHIP WITH OUR CUSTOMERS AND THE COMMUNITIES WE SERVE

Natural Gas Pipeline Safety A PARTNERSHIP WITH OUR CUSTOMERS AND THE COMMUNITIES WE SERVE Natural Gas Pipeline Safety A PARTNERSHIP WITH OUR CUSTOMERS AND THE COMMUNITIES WE SERVE Tapping Into the Power of Cooperation and Communication GAS PIPELINE SAFETY STARTS WITH A PARTNERSHIP It feels

More information

Natural Gas Pipeline Safety A PARTNERSHIP WITH OUR CUSTOMERS AND THE COMMUNITIES WE SERVE

Natural Gas Pipeline Safety A PARTNERSHIP WITH OUR CUSTOMERS AND THE COMMUNITIES WE SERVE Natural Gas Pipeline Safety A PARTNERSHIP WITH OUR CUSTOMERS AND THE COMMUNITIES WE SERVE Tapping Into the Power of Cooperation and Communication GAS PIPELINE SAFETY STARTS WITH A PARTNERSHIP It feels

More information

ARE YOU PREPARED TO RESPOND TO A PIPELINE EMERGENCY?

ARE YOU PREPARED TO RESPOND TO A PIPELINE EMERGENCY? ARE YOU PREPARED TO RESPOND TO A PIPELINE EMERGENCY? IMPORTANT INFORMATION ABOUT PIPELINE SAFETY IN YOUR COMMUNITY. Know Recognize Respond Energy Transfer Partners, a Texas-based energy company founded

More information

Implementing Integrity Management - Final Rule (as amended) July 17, 2007

Implementing Integrity Management - Final Rule (as amended) July 17, 2007 Implementing Integrity Management - Final Rule (as amended) July 17, 2007 Integrity Management for Hazardous Liquid Pipeline Operators High Consequence Areas 195.450 Definitions. The following definitions

More information

TEST CORROSION AND CATHODIC PROTECTION

TEST CORROSION AND CATHODIC PROTECTION TEST CORROSION AND CATHODIC PROTECTION Objective (15 Questions = 30 marks) 1) Corrosion reactions are a. chemical reaction b. electrochemical reaction c. electrical reaction d. combustion reaction 2) Choose

More information