1 NPP I&C status In Brazil and Recommendations to IAEA 26th Meeting of the IAEA TWG-NPPIC May 2017 Vienna Salomão Gonçalves O. Jr Fuad Kassab Junior Eletrobras Eletronuclear University of São Paulo

2 Contents 1. Brazil data 2. NPP data 3. Fleet modernization Angra unit 1 and Recommendations to IAEA programme (2018 to 2021)

3 1- Brazil data Area: km2 World s 5 th largest country Population: million World s 5 th largest population GDP: 1.98 trillion US$ World s 8 th economy GDP Per Capita: US$ 10,3 Inh 77 th Electricity Production/yr:450 TWh 10 th (Nuclear: MW 1.49 %) Elec. Consumption Per Capita: 90 th 2.4 KWh

4 1- Brazil data Sources: ONS (National Electrical System Operator) Ministry of Mines and Energy Hydro is the main source (>65%). The prediction for renewables in 2017 will be very close to AHE MADEIRA MW (Madeira River) AHE BELO MONTE MW now 3.2 MW (Xingu River)

5 1- Brazil data Brazilian Nuclear Industry

6 2- NPP data ANGRA 2 ANGRA 1 There are currently two NPPs in operation(angra 1 and Angra 2) and one under construction (Angra 3).

7 2- NPP data Future plans Six new NPPs in the northeast

8 2- NPP data (Angra 1) Westinghouse PWR type, two loops, 657 MWe Analog I&C predominant Digital Turbine Control System (Electrical Overspeed Trip) Digital Feedwater and Heater Drain Control System 2- NPP data (Angra 2) Areva (formerly KWU), PWR type, four loops, 1350 MWe Analog and digital hardwired I&C predominant Digital Reactor Control System (JS) Reactor Limitation System Similarities: Conventional Analog Human-Machine Interface Plant Process Computer - HW PLC and SW PC based sys Digital, hardwired Reactor Protection System.

9 2- NPP data (Angra 3 under construction) Areva PWR type, four loops, 1400 MWe Base for HFE Program ANGRA 3 ANGRA 2 Standard NUREG 0711 NUREG 0711 covers IEC Plant Pre-Konvoi Pre-Konvoi Control Room Display Based Conventional Procedures eom Paper PICS OM690 Operating and Hardware Panel Monitoring Sys Version 5 SICS Safety shut down / and timely limited operation Hardware Panel Operating Crew 5 Person shift 5 Persons shift Operating Manual Pre-Konvoi Pre-Konvoi

10 3- Fleet Modernization (Angra 1) What we have done successfully regarding Monitoring? Plant Process Computer (Research Institute) Vent Stack Computer (Research Institute) Sub-cooling Margin Monitor (Research Institute) Turbine Vibration Monitoring (Rovsing) Leakage Monitoring System (Westinghouse) Loose Parts Monitoring System (Areva) What we are planning to do regarding Monitoring? Replacement of Main Transformers (500Kv) new monitoring sys. Replacement of Radiation Monitors (R11 & R12) Upgrade of Reactor Coolant Pump Vibration Mon. Sys. (Rovsing) Upgrade of Digital Rod Position Indication System (DRPI)

11 3- Fleet Modernization (Angra 1)

12 3- Fleet Modernization (Angra 1) What we have done successfully regarding Control? Replacement of transmitters (Emerson) and Foxboro Modules for NUS Level Control System of Heater Exchangers (Yokogawa Sinlge Loop) Pressure Control of the Biological Barrier Ventilation Sys (Siemens SL) Upgrade of Reactor Protection System (replacement of electronic cards) Upgrade of Control Rod Drive Mechanism (replacement of cards) Upgrade of Turbine and Feed Water Ctrl Sys. (West./Emerson Ovation) Full Scope Simulator System (Training Center new building) What we are planning to do regarding Control? NSSS upgrade Pzr Level and Pressure, Chemical Volume Ctrl, Reactor Ctrl (Average Temp., Overpower and Over temp. delta T loops), Rod Insertion Limit (RIL), Steam Dump (SD), Rod Speed Ctrl, Safety Injection and Accumulator (SA) loops.

13 3- Fleet Modernization (Angra 1)

14 3- Fleet Modernization (Angra 2) COOPERATION WITH THE EUROPEAN COMMISSION Eletronuclear developed a two year project with the EC to upgrade Safety Related I&C of Angra 2. The project aimed to define a strategy for the replacement of the existing analogue I&C equipment currently used in Angra 2, mainly the systems important to safety. The project reached its conclusion in the beginning of The results has been used to modernize Angra 2 safety related I&C.

15 3- Fleet Modernization (Angra 2) What we have done successfully regarding Monitoring? Upgrade of Plant Process Computer SICA Installation of Thermal Transient Monitoring System Upgrade of LPMS and Vibration Monitoring System Upgrade of Aeroball System Upgrade of Reactor Vessel Level Instrumentation System What we are planning to do regarding Monitoring? Modernization of Gas Stack Monitoring (KLK) Modernization of Radiation System (replacement SINUPERM M) Modernization of Physical Protection System - (CZ)

16 3- Fleet Modernization (Angra 2) What we have done successfully regarding Control? Modernization of Chlorination System Modernization of Turbine Building Crane Control Modernization of Polar Bridge Crane Control Modernization of Boiler Control Loops Modernization of Reactor Control System (JS) What we are planning to do regarding Control? Modernization of Refueling Machine

17 4- Recommendations to IAEA programme (2018 to 2021) HFE Angra unit 1 - Simplified guidance to aid in definition of MCR/MCB End Point Vision. I&C digital upgrade for process control systems. Angra unit 3 HFE requirements FSAR chapter 18; New technologies applied to digital I&C systems (Ex: Neural Network, Fuzzy Inference Systems and Big Data) ; Tech Meeting topics to exchange informations Control loops tuning for non expected transients (Ex: 100% load rejection), System Health Management, V&V of digital I&C upgrades and VDU based MCR design; Cyber Security Managing external and internal security of digital systems. Managing domain policies. Ageing management of electrical equipment and components (IGALL).

18 Thanks to: Contact Information END Leonan dos Santos G. Eletronuclear Technical Director Fernando Futuro Eletronuclear Superintendent Renan Giese Eletronuclear Sup. Assistent Antonio C. de O. Affonso Eletronuclear Manager Leonard P. Eletronuclear Supervisor and all the I&C team of GEI.T Salomão Gonçalves O. Jr Fuad Kassab Junior

19

Hydrothermal Transition: Why nuclear in Brazil?

Hydrothermal Transition: Why nuclear in Brazil? Tokio, April 13th 2015 Leonam dos Santos Guimarães Hydrothermal Transition: Why nuclear in Brazil? There is a Brazil that many people know Amazon forest Football Carnival Coffee It keeps being successful,

More information

Angra 3 Current status and challenges to continue

Angra 3 Current status and challenges to continue Angra 3 Current status and challenges to continue Vienna February 2017 Introduction Brazilian Transmission Network Integrated electric power system: continental dimensions Manaus Fortaleza Itaipu Brasília

More information

Country Presentation. Ukraine

Country Presentation. Ukraine Country Presentation. Ukraine 25th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC) May 27-29, 2015,, Austria Vladimir Sklyar, RPC Radiy TOP5

More information

Thermal Hydraulic Simulations of the Angra 2 PWR

Thermal Hydraulic Simulations of the Angra 2 PWR Thermal Hydraulic Simulations of the Angra 2 PWR Javier González-Mantecón, Antonella Lombardi Costa, Maria Auxiliadora Fortini Veloso, Claubia Pereira, Patrícia Amélia de Lima Reis, Adolfo Romero Hamers,

More information

Lessons learned from Angra 1 & Angra 2 NPP s Outages

Lessons learned from Angra 1 & Angra 2 NPP s Outages Lessons learned from Angra 1 & Angra 2 NPP s Outages DO Diretoria de Operação SM.O Superintendência de Manutenção Preparado por: Luciano Junqueira Calixto Email: lucical@eletronuclear.gov.br Angra 1: Angra

More information

NPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview

NPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview NPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview Wilson Lam (wilson@cti-simulation.com) CTI Simulation International Corp. www.cti-simulation.com Sponsored by IAEA Modified

More information

SUPERVISORY SYSTEM FOR THE TURBINE GENERATOR SET OF ANGRA 1 NPP

SUPERVISORY SYSTEM FOR THE TURBINE GENERATOR SET OF ANGRA 1 NPP 2009 International Nuclear Atlantic Conference - INAC 2009 Rio de Janeiro,RJ, Brazil, September27 to October 2, 2009 ASSOCIAÇÃO BRASILEIRA DE ENERGIA NUCLEAR - ABEN ISBN: 978-85-99141-03-8 SUPERVISORY

More information

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level Nuclear Power Plant Safety Basics Construction Principles and Safety Features on the Nuclear Power Plant Level Safety of Nuclear Power Plants Overview of the Nuclear Safety Features on the Power Plant

More information

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level Nuclear Power Plant Safety Basics Construction Principles and Safety Features on the Nuclear Power Plant Level Safety of Nuclear Power Plants Overview of the Nuclear Safety Features on the Power Plant

More information

Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors)

Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors) Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors) 1.3.2016 Prof.Dr. Böck Technical University Vienna Atominstitut Stadionallee 2, 1020 Vienna, Austria ph: ++43-1-58801 141368 boeck@ati.ac.at

More information

New Framework for the Utilization of Nuclear Energy in the 21st Century

New Framework for the Utilization of Nuclear Energy in the 21st Century Vienna, September 20th 2006 New Framework for the Utilization of Nuclear Energy in the 21st Century Special Event at the 50th IAEA General Conference 19 21 September 2006 SECTION 2.A Assurances of Supply

More information

Development of a Performance Validation Tool for NSSS Control System

Development of a Performance Validation Tool for NSSS Control System IAEA-CN-164-4S1 Development of a Performance Validation Tool for NSSS Control System Suk-whun Sohn, In-ho Song, See-chae Jeong, Jong-joo Sohn, Eun-ki Kim Korea Power Engineering Company (KOPEC), Daejeon,

More information

Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant

Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant 8 Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant KOZO TABUCHI *1 MASAYUKI TAKEDA *2 KAZUO TANAKA *2 JUNICHI IMAIZUMI *2 TAKASHI KANAGAWA *3 ATMEA1 TM is a 3-loop 1100

More information

Module 06 Boiling Water Reactors (BWR)

Module 06 Boiling Water Reactors (BWR) Module 06 Boiling Water Reactors (BWR) 1.10.2015 Prof.Dr. Böck Vienna University oftechnology Atominstitute Stadionallee 2 A-1020 Vienna, Austria ph: ++43-1-58801 141368 boeck@ati.ac.at Contents BWR Basics

More information

THE BRAZILIAN EXPERIENCE IN LICENSING ANGRA 2, A DELAYED NUCLEAR POWER PLANT

THE BRAZILIAN EXPERIENCE IN LICENSING ANGRA 2, A DELAYED NUCLEAR POWER PLANT IAEA-CN-82/03 THE BRAZILIAN EXPERIENCE IN LICENSING ANGRA 2, A DELAYED NUCLEAR POWER PLANT ALMEIDA, C. National Commission for Nuclear Energy Rua General Severiano 90 Rio de Janeiro 22294 900 RJ, Brazil

More information

Eletronuclear ( Brazil) Fukushima Response Plan

Eletronuclear ( Brazil) Fukushima Response Plan Eletronuclear ( Brazil) Fukushima Response Plan Edmundo Selvatici Site Manager Mario de Mello Ferreira Junior Manager, Materials Engineering Technical Meeting on Operational Experience with Implementation

More information

AREVA NP INAC October 23 rd André Salgado Brazil and South America

AREVA NP INAC October 23 rd André Salgado Brazil and South America INAC 2017 October 23 rd 2017 André Salgado Brazil and South America Agenda 1 business 2 Nuclear: answering new electricity market challenges From Areva Group to Areva NP New Areva Installed Base Components

More information

NEW SAFETY REQUIREMENTS AND LONG TERM OPERATION POLICY

NEW SAFETY REQUIREMENTS AND LONG TERM OPERATION POLICY NEW SAFETY REQUIREMENTS AND LONG TERM OPERATION POLICY EUROSAFE PARIS 07.11.11 By José Mª. Bernaldo de Quirós Almaraz N.P.P. Director Central Nuclear de Almaraz INDEX (1/1) 1. INTRODUCTION 2. NEW SAFETY

More information

Module 06 Boiling Water Reactors (BWR)

Module 06 Boiling Water Reactors (BWR) Module 06 Boiling Water Reactors (BWR) 1.3.2017 Prof.Dr. Böck Technical University Vienna Atominstitut Stadionallee 2, 1020 Vienna, Austria ph: ++43-1-58801 141368 boeck@ati.ac.at Contents BWR Basics Technical

More information

Advanced Monitoring and Diagnostics:

Advanced Monitoring and Diagnostics: Advanced Monitoring and Diagnostics: Experience at Luminant and the Benefits of Industry Collaboration Presented by Presenter Name/s Presented by: Charles Pike, Manager, M&D Services Energy Future Holdings

More information

Country Presentation. Ukraine

Country Presentation. Ukraine Country Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC) May 22-24, 2013,, Austria Vladimir Sklyar, RPC Radiy TOP5

More information

Leonam dos Santos Guimarães

Leonam dos Santos Guimarães Leonam dos Santos Guimarães FLEET AGING 67 NPPS being built in 15 countries 2005-2015: 42 new connections to the grid FUQING-2 First Grid Connection 06 Aug, 2015 First Grid Connection 06 Aug, 2015 ANGRA

More information

AREVA AND ATMEA NEW PROJECTS

AREVA AND ATMEA NEW PROJECTS AREVA AND ATMEA NEW PROJECTS LAS/ANS SYMPOSIUM July 23rd, 2014 Karl-Heinz POETS AREVA South America THE VOICE OF WISDOM DEFENDS NUCLEAR ENERGY Alternative sources of energy such as wind or solar are too

More information

BWR MODERNIZATION PROJECT: INSTALLATION OF A NEW DIGITAL FEEDWATER CONTROL SYSTEM

BWR MODERNIZATION PROJECT: INSTALLATION OF A NEW DIGITAL FEEDWATER CONTROL SYSTEM BWR MODERNIZATION PROJECT: INSTALLATION OF A NEW DIGITAL FEEDWATER CONTROL SYSTEM Javier Lasierra; Cristina Corrales; Mateo Ramos Control Rooms and Simulation Tecnatom Avda. Montes de Oca 1, 28703 San

More information

Steps towards a large-scale I&C modernization at the Paks NPP to support the planned plant service time extension

Steps towards a large-scale I&C modernization at the Paks NPP to support the planned plant service time extension Paks NPP Steps towards a large-scale I&C modernization at the Paks NPP to support the planned plant service time extension T. Túri, B. B Katics, J. Végh, E. Holló,, I. Varga e-mail: vej@sunserv.kfki.hu

More information

Challenges going from analog to digital controls in NPP NUCLEAR POWER EUROPE 2012

Challenges going from analog to digital controls in NPP NUCLEAR POWER EUROPE 2012 ABB, Atos, 2012 Challenges going from analog to digital controls in NPP NUCLEAR POWER EUROPE 2012 101216_BaldorIntegration_SteeCo_1_0 June 14, 2012 Slide 1 Summary ABB-Atos fully integrated nuclear solution

More information

Pertti Sakari Simola, TVO, President and CEO, Finland

Pertti Sakari Simola, TVO, President and CEO, Finland Pertti Sakari Simola, TVO, President and CEO, Finland Graduated from the Lappeenranta University of Technology, Finland, in 1973 Worked for UPM-Kymmene Corp as Vice President, Energy for seven years In

More information

ATMEA1 THE PROVEN TECHNOLOGY READY FOR LICENSING AND CONSTRUCTION

ATMEA1 THE PROVEN TECHNOLOGY READY FOR LICENSING AND CONSTRUCTION ATMEA1 THE PROVEN TECHNOLOGY READY FOR LICENSING AND CONSTRUCTION Andreas Goebel ATMEA President and CEO An 1 AREVA and MHI Company ATMEA INAC 2013 November 25 th, 2013 - Recife 1 Summary 1. ATMEA The

More information

Westinghouse SMR & Nuclear Fuel Overview

Westinghouse SMR & Nuclear Fuel Overview Westinghouse SMR & Nuclear Fuel Overview Carlos Leipner, Westinghouse VP Latin America Presented at LAS-ANS July 2014 Rio de Janeiro, Brasil 2014 Westinghouse Electric Company LLC, All Rights Reserved.

More information

Nuclear I&C Systems Basics. The role of Instrumentation and Control Systems in Nuclear Power Plants, and their Characteristics

Nuclear I&C Systems Basics. The role of Instrumentation and Control Systems in Nuclear Power Plants, and their Characteristics Nuclear I&C Systems Basics The role of Instrumentation and Control Systems in Nuclear Power Plants, and their Characteristics Functions of Nuclear I&C Functions and significance of the Instrumentation

More information

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set -

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set - Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set - 2013 Learning Objectives After going through this presentation the participants are expected to be familiar with:

More information

RELAP5 Analysis of Krško Nuclear Power Plant Abnormal Event from 2011

RELAP5 Analysis of Krško Nuclear Power Plant Abnormal Event from 2011 RELAP5 Analysis of Krško Nuclear Power Plant Abnormal Event from 2011 ABSTRACT Andrej Prošek Jožef Stefan Institute Jamova cesta 39 SI-1000, Ljubljana, Slovenia andrej.prosek@ijs.si Marko Matkovič Jožef

More information

Module 06 Boiling Water Reactors (BWR) Vienna University of Technology /Austria Atominstitute Stadionallee 2, 1020 Vienna, Austria

Module 06 Boiling Water Reactors (BWR) Vienna University of Technology /Austria Atominstitute Stadionallee 2, 1020 Vienna, Austria Module 06 Boiling Water Reactors (BWR) Prof.Dr. H. Böck Vienna University of Technology /Austria Atominstitute Stadionallee 2, 1020 Vienna, Austria Contents BWR Basics Technical Data Safety Features Reactivity

More information

Country Report Switzerland 2011

Country Report Switzerland 2011 Country Report Switzerland 2011 Manfred Märzendorfer NPP Leibstadt Switzerland (KKL) 23 rd Meeting IAEA TWG-NPPCI Vienna 24. 26.05.2011 Slide 1 NPP s in Switzerland & quota on electricity production 2010

More information

NSSS Design (Ex: PWR) Reactor Coolant System (RCS)

NSSS Design (Ex: PWR) Reactor Coolant System (RCS) NSSS Design (Ex: PWR) Reactor Coolant System (RCS) Purpose: Remove energy from core Transport energy to S/G to convert to steam of desired pressure (and temperature if superheated) and moisture content

More information

Station Blackout Analysis for a 3-Loop Westinghouse PWR Reactor Using TRACE

Station Blackout Analysis for a 3-Loop Westinghouse PWR Reactor Using TRACE The Egyptian Arab Journal of Nuclear Sciences and Applications Society of Nuclear Vol 50, 3, (229-239) 2017 Sciences and Applications ISSN 1110-0451 Web site: esnsa-eg.com (ESNSA) Station Blackout Analysis

More information

TOPIC: KNOWLEDGE: K1.01 [2.5/2.5]

TOPIC: KNOWLEDGE: K1.01 [2.5/2.5] KNOWLEDGE: K1.01 [2.5/2.5] P283 The transfer of heat from the reactor fuel pellets to the fuel cladding during normal plant operation is primarily accomplished via heat transfer. A. conduction B. convection

More information

HTR-PM Project Status and Test Program

HTR-PM Project Status and Test Program IAEA TWG-GCR-22 HTR-PM Project Status and Test Program SUN Yuliang Deputy Director, INET/ Tsinghua University March 28 April 1, 2011 1 Project organization Government INET R&D, general design, design of

More information

THE ROLE OF PASSIVE SYSTEMS IN ENHANCING SAFETY AND PREVENTING ACCIDENTS IN ADVANCED REACTORS

THE ROLE OF PASSIVE SYSTEMS IN ENHANCING SAFETY AND PREVENTING ACCIDENTS IN ADVANCED REACTORS THE ROLE OF PASSIVE SYSTEMS IN ENHANCING SAFETY AND PREVENTING ACCIDENTS IN ADVANCED REACTORS M. Aziz Nuclear and radiological regulatory authority Cairo, Egypt moustafaaaai@yahoo.com Abstract Most of

More information

A PRACTICAL METHODOLOGY FOR CHECKING THE STATUS OF I&C SYSTEMS IN NPPS

A PRACTICAL METHODOLOGY FOR CHECKING THE STATUS OF I&C SYSTEMS IN NPPS A PRACTICAL METHODOLOGY FOR CHECKING THE STATUS OF I&C SYSTEMS IN NPPS Sung, C. and Chung, H. KHNP, Daejeon, Korea. Introduction There are several major factors to cause nuclear power plant (NPP) to shut

More information

Westinghouse Small Modular Reactor. Passive Safety System Response to Postulated Events

Westinghouse Small Modular Reactor. Passive Safety System Response to Postulated Events Westinghouse Small Modular Reactor Passive Safety System Response to Postulated Events Matthew C. Smith Dr. Richard F. Wright Westinghouse Electric Company Westinghouse Electric Company 600 Cranberry Woods

More information

AP1000 The PWR Revisited

AP1000 The PWR Revisited IAEA-CN-164-3S05 AP1000 The PWR Revisited Paolo Gaio Westinghouse Electric Company gaiop@westinghouse.com Abstract. For nearly two decades, Westinghouse has pursued an improved pressurized water reactor

More information

UFRJ Semana de Engenharia Nuclear

UFRJ Semana de Engenharia Nuclear UFRJ Semana de Engenharia Nuclear André Salgado Latin America Director 15/10/2018 1 Framatome at a glance For 60 years, Framatome's teams have been involved in developing safe and competitive nuclear power

More information

Westinghouse AP1000. Reactor

Westinghouse AP1000. Reactor Westinghouse AP1000 A Third Generation Nuclear Reactor International Council on Systems Engineering (INCOSE) September 18, 2013 Andrew Drake, PMP Director, AP1000 Engineering Completion Engineering, Equipment

More information

APR1400 Safe, Reliable Technology

APR1400 Safe, Reliable Technology APR1400 Safe, Reliable Technology OECD/NEA Workshop on Innovations in Water-cooled Reactor Technology Paris, Feb 11 12, 2015 Presented by Shin Whan Kim Contents 1. Introduction 2. Major Safety Design Characteristics

More information

NuScale: Expanding the Possibilities for Nuclear Energy

NuScale: Expanding the Possibilities for Nuclear Energy NuScale: Expanding the Possibilities for Nuclear Energy D. T. Ingersoll Director, Research Collaborations Georgia Tech NE 50 th Anniversary Celebration November 1, 2012 NuScale Power, LLC 2012 Allowing

More information

UKEPR Issue 05

UKEPR Issue 05 Title: PCER Sub-chapter 1.3 Comparison with reactors of similar design Total number of pages: 12 Page No.: I / II Chapter Pilot: P. KRUSE Name/Initials Date 10-10-2012 Approved for EDF by: A. MARECHAL

More information

Pakistan s HWR Activities

Pakistan s HWR Activities 14 th Meeting of the Technical Working Group on Advanced Technologies of Heavy Water Reactors (TWG-HWR) Vienna, Austria 18-20 June 2013 Pakistan s HWR Activities by Shahid Saghir, Senior Manager (Technical)

More information

BRAZILIAN NUCLEAR SECTOR Technical Meeting on Country Nuclear Power Profiles May 2016 IAEA Vienna

BRAZILIAN NUCLEAR SECTOR Technical Meeting on Country Nuclear Power Profiles May 2016 IAEA Vienna BRAZILIAN NUCLEAR SECTOR Technical Meeting on Country Nuclear Power Profiles 10-13 May 2016 IAEA Vienna Ricardo Fraga Gutterres Comissão Nacional de Energia Nuclear CNEN Brazil Population + 205 million

More information

DESIGN AND EVALUATION OF NEW OVERVIEW SCREENS FOR THE LABIHS SIMULATOR

DESIGN AND EVALUATION OF NEW OVERVIEW SCREENS FOR THE LABIHS SIMULATOR 2015 International Nuclear Atlantic Conference - INAC 2015 São Paulo, SP, Brazil, October 4-9, 2015 ASSOCIAÇÃO BRASILEIRA DE ENERGIA NUCLEAR - ABEN ISBN: 978-85-99141-06-9 DESIGN AND EVALUATION OF NEW

More information

Power Optimization Center Leveraging plant process data for advanced analytical diagnostics. June 16, 2016

Power Optimization Center Leveraging plant process data for advanced analytical diagnostics. June 16, 2016 Power Optimization Center Leveraging plant process data for advanced analytical diagnostics June 16, 2016 POWER OPTIMIZATION CENTER: OVERVIEW Jamie Dugan Equipment Reliability Manager Mike Batte Fleet

More information

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Application Set -

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Application Set - Format and Content of the Safety Analysis Report for Nuclear Power Plants - Application Set - 2013 Contents 1. Overview 2. Chapters and Content of a SAR Chapter 1 General Information Chapter 2, 3, 4, Chapter

More information

AP1000 European 21. Construction Verification Process Design Control Document

AP1000 European 21. Construction Verification Process Design Control Document 2.5 Instrumentation and Control Systems 2.5.1 Diverse Actuation System Design Description The diverse actuation system (DAS) initiates reactor trip, actuates selected functions, and provides plant information

More information

An Overview of the ACR Design

An Overview of the ACR Design An Overview of the ACR Design By Stephen Yu, Director, ACR Development Project Presented to US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation September 25, 2002 ACR Design The evolutionary

More information

The EnBW Strategyfor Decommissioningand DismantlingofNuclearPower Plants»

The EnBW Strategyfor Decommissioningand DismantlingofNuclearPower Plants» The EnBW Strategyfor Decommissioningand DismantlingofNuclearPower Plants» 40 th MPA-Seminar Stuttgart, 6 th & 7 th October2014 Peter Daiß, EnBW Kernkraft GmbH Content 1. Introduction and Company Profile

More information

ELETRONUCLEAR s Response to the Fukushima Dai-ichi Nuclear Accident

ELETRONUCLEAR s Response to the Fukushima Dai-ichi Nuclear Accident s Response to the Fukushima Dai-ichi Nuclear Accident Rio de Janeiro, July 3 rd, 2012 Paulo Vieira First Actions Taken by Eletronuclear Establishment of a Corporate Working group Follow up of the event,

More information

SIMULATOR BENEFITS BEYOND TRAINING. ENGINEERING ACTIVITIES SUPPORT

SIMULATOR BENEFITS BEYOND TRAINING. ENGINEERING ACTIVITIES SUPPORT 1 Tecnatom 2018 Proprietary information SIMULATOR BENEFITS BEYOND TRAINING. ENGINEERING ACTIVITIES SUPPORT 2018 2 Outline Rationale Examples Conclusions 3 Rationale 4 Modern Simulators features Models

More information

Tube support plate clogging up of French PWR steam generators

Tube support plate clogging up of French PWR steam generators Tube support plate clogging up of French PWR steam generators Herve BODINEAU & Thierry SOLLIER IRSN - Reactor Safety Division BP17 92262 Fontenay-aux-Roses Cedex France Abstract: Between 2004 and 2006,

More information

AP1000 European 21. Construction Verification Process Design Control Document

AP1000 European 21. Construction Verification Process Design Control Document 2.4 Steam and Power Conversion Systems 2.4.1 Main and Startup Feedwater System See Section 2.2.4 for information on the main feedwater system. Design Description The startup feedwater system supplies feedwater

More information

Small and Modular Reactor Development, Safety and Licensing in Korea

Small and Modular Reactor Development, Safety and Licensing in Korea Small and Modular Reactor Development, Safety and Licensing in Korea IAEA TWG-LWR Vienna, June 18-20, 2013 Presented by Jong-Tae Seo 1 Outline I. SMR Development in Korea II. SMART Development III. SMART

More information

ABSTRACT DESING AND IMPLEMENTATION OF FORCED COOLING TOWERS FOR LOVIISA NPP SAFETY- AND RESIDUAL HEAT REMOVAL (RHR) COOLING CIRCUITS

ABSTRACT DESING AND IMPLEMENTATION OF FORCED COOLING TOWERS FOR LOVIISA NPP SAFETY- AND RESIDUAL HEAT REMOVAL (RHR) COOLING CIRCUITS ABSTRACT DESING AND IMPLEMENTATION OF FORCED COOLING TOWERS FOR LOVIISA NPP SAFETY- AND RESIDUAL HEAT REMOVAL (RHR) COOLING CIRCUITS S.Tarkiainen, T.Hyrsky, I.Paavola, A.Teräsvirta Fortum Nuclear and Thermal

More information

Brazil US DER Tech Forum Advanced Monitoring and Diagnostics

Brazil US DER Tech Forum Advanced Monitoring and Diagnostics Brazil US DER Tech Forum Advanced Monitoring and Diagnostics Applying the Industrial Internet of Things to Cost Optimize Distributed Energy Resources Clinton E. Carter Dale Higginbotham Josh McSpadden

More information

Time response measurements of the Angra 1 nuclear power plant using direct and indirect methodologies

Time response measurements of the Angra 1 nuclear power plant using direct and indirect methodologies Int. J. Nuclear Energy Science and Technology, Vol. 5, No. 1, 2010 41 Time response measurements of the Angra 1 nuclear power plant using direct and indirect methodologies Iraci Martinez Pereira* and Roberto

More information

59th ISA Power Industry Division (POWID) Symposium 2016

59th ISA Power Industry Division (POWID) Symposium 2016 59th ISA Power Industry Division (POWID) Symposium 2016 ISA Volume 514 Charlotte, North Carolina, USA 27 30 June 2016 ISBN: 978-1-5108-3472-9 Printed from e-media with permission by: Curran Associates,

More information

Reactor Power Drift in Nuclear Generating Plants

Reactor Power Drift in Nuclear Generating Plants Reactor Power Drift in Nuclear Generating Plants Frank D. Todd, True North Consulting Bill Kettenacker, Scientech Presented at the EPRI P2EP Meeting Savannah Georgia July 25 th, 2008 Background Due to

More information

Instrumentation & Control Research for NPP at Western University in Canada

Instrumentation & Control Research for NPP at Western University in Canada Instrumentation & Control Research for NPP at Western University in Canada Jin Jiang NSERC/UNENE Senior Industrial Research Chair Department of Electrical and Computer Engineering The University of Western

More information

Refurbishment of CANDU Reactors: A Canadian Perspective & Overview of Ontario s Current Program

Refurbishment of CANDU Reactors: A Canadian Perspective & Overview of Ontario s Current Program Refurbishment of CANDU Reactors: A Canadian Perspective & Overview of Ontario s Current Program Agenda What is a CANDU Reactor? Why is a mid-life refurbishment necessary? What steps are involved in CANDU

More information

Recent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C

Recent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C Int. Conf. on Topical Issues in Nuclear Installation Safety, Vienna Austria, 6~9 Jun. 2017 Recent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C Contents 1. Introduction

More information

Safety Aspects of SMRs: A PRA Perspective

Safety Aspects of SMRs: A PRA Perspective Safety Aspects of SMRs: A PRA Perspective Mohammad Modarres Minta Martin Professor of Engineering Director, Reliability Engineering Program Department of Mechanical Engineering University of Maryland,

More information

Our Contribution to the Forum

Our Contribution to the Forum Our Contribution to the Forum General presentation of the EPR TM Reactor CR1.1.1 Robustness PART 1 Margins - Simplicity PART 2 Quality of design and construction Quality of materials Redundancy PART 3

More information

Application of STPA to ESF-CCS. Dong-Ah Lee, Jang-Soo Lee, Se-Woo Cheon, and Junbeom Yoo

Application of STPA to ESF-CCS. Dong-Ah Lee, Jang-Soo Lee, Se-Woo Cheon, and Junbeom Yoo Application of STPA to ESF-CCS Dong-Ah Lee, Jang-Soo Lee, Se-Woo Cheon, and Junbeom Yoo Contents Background: KNICS experiences Introduction: New HA approach Application: Case study of STPA Conclusion Discussion

More information

PRISM Heat Removal Safety Systems

PRISM Heat Removal Safety Systems PRISM Heat Removal Safety Systems 5 th IAEA/GIF SFR Safety Workshop David Powell Ph.D. 23/24 June 2015 Copyright 2013 GE Hitachi Nuclear Energy International All rights reserved PRISM: The Commercialization

More information

VVER-440/213 - The reactor core

VVER-440/213 - The reactor core VVER-440/213 - The reactor core The fuel of the reactor is uranium dioxide (UO2), which is compacted to cylindrical pellets of about 9 height and 7.6 mm diameter. In the centreline of the pellets there

More information

RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP

RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP P. Krupa Ingeneer, e-mail: Krupa_Peter@ebo.seas.sk Bohunice NPPs Introduction The centre of upgrading activities in VVER NPP is clearly in

More information

Specific Design Consideration of ACP100 for Application in the Middle East and North Africa Region

Specific Design Consideration of ACP100 for Application in the Middle East and North Africa Region Specific Design Consideration of ACP100 for Application in the Middle East and North Africa Region IAEA Technical Meeting on Technology Assessment of Small Modular Reactors for Near Term Deployment 2 5

More information

ADVANCED I&C SYSTEMS FOR NUCLEAR POWER PLANTS FEEDBACK OF EXPERIENCE

ADVANCED I&C SYSTEMS FOR NUCLEAR POWER PLANTS FEEDBACK OF EXPERIENCE International Conference Nuclear Energy in Central Europe 2001 Hoteli Bernardin, Portorož, Slovenia, September 10-13, 2001 www: http://www.drustvo-js.si/port2001/ e-mail: PORT2001@ijs.si tel.:+ 386 1 588

More information

EPRI Utility Requirement Document

EPRI Utility Requirement Document EPRI Utility Requirement Document 11 February 2015 Sang-Baik KIM Analyst, NEA NDD Overview of URD Background and Objectives - Purpose of the URD is to present a clear, comprehensive set of design requirements

More information

Design of Traditional and Advanced CANDU Plants. Artur J. Faya Systems Engineering Division November 2003

Design of Traditional and Advanced CANDU Plants. Artur J. Faya Systems Engineering Division November 2003 Design of Traditional and Advanced CANDU Plants Artur J. Faya Systems Engineering Division November 2003 Overview Canadian Plants The CANDU Reactor CANDU 600 and ACR-700 Nuclear Steam Supply Systems Fuel

More information

Technologies of HTR-PM Plant and its economic potential

Technologies of HTR-PM Plant and its economic potential IAEA Technical Meeting on the Economic Analysis of HTGRs and SMRs 25-28 August 2015, Vienna, Austria Technologies of HTR-PM Plant and its economic potential Prof. Dr. Yujie Dong INET/Tsinghua University

More information

THE DESIGN CHARACTERISTICS OF ADVANCED POWER REACTOR Advanced NPP Development Office Korea Hydro & Nuclear Power Co., Ltd.

THE DESIGN CHARACTERISTICS OF ADVANCED POWER REACTOR Advanced NPP Development Office Korea Hydro & Nuclear Power Co., Ltd. International Conference on Opportunities and Challenges for Water Cooled Reactors in the 21 th Century Vienna, IAEA, Oct. 27-30, 2009 THE DESIGN CHARACTERISTICS OF ADVANCED POWER REACTOR 1400 KIM, HAN-GON

More information

UNIT-5 NUCLEAR POWER PLANT. Joining of light nuclei Is not a chain reaction. Cannot be controlled

UNIT-5 NUCLEAR POWER PLANT. Joining of light nuclei Is not a chain reaction. Cannot be controlled UNIT-5 NUCLEAR POWER PLANT Introduction Nuclear Energy: Nuclear energy is the energy trapped inside each atom. Heavy atoms are unstable and undergo nuclear reactions. Nuclear reactions are of two types

More information

Applying RISMC Methods, Tools, and Data to Enhance Safety and Economics through Industry Application Demonstrations

Applying RISMC Methods, Tools, and Data to Enhance Safety and Economics through Industry Application Demonstrations Session 2-2: Economics of Plant Life Management Paper # IAEA-CN-246-149 Applying RISMC Methods, Tools, and Data to Enhance Safety and Economics through Industry Application Demonstrations Ronaldo Szilard,

More information

NPP-Nuclear Island Design From conceptual design to Project execution

NPP-Nuclear Island Design From conceptual design to Project execution NPP-Nuclear Island Design From conceptual design to Project execution Atoms for the Future Paris SFEN - October 14, 2014 D. Lanchet NPP-Nuclear Island Design From conceptual design to Project execution

More information

The Application of the Design Safety Requirements to the Passive SMART

The Application of the Design Safety Requirements to the Passive SMART Technical Meeting on Challenges in the Application of the Design Safety Requirements for Nuclear Power Plants to Small and Medium Sized Reactors 4~8 September 2017, Vienna, Austria The Application of the

More information

Human Resources and Training: A Mandatory Gate for Water Cooled Reactors in the 21st Century

Human Resources and Training: A Mandatory Gate for Water Cooled Reactors in the 21st Century Human Resources and Training: A Mandatory Gate for Water Cooled Reactors in the 21st Century Any reproduction, alteration, or transmission to any third party of any part of this document or its content

More information

Nuclear power. ME922/927 Nuclear 1

Nuclear power. ME922/927 Nuclear 1 Nuclear power ME922/927 Nuclear 1 The process The production of electricity by nuclear fission. Torness power station The impact of a neutron with a U 235 nucleus causes the fission process, from which

More information

Technology Development, Design and Safety Features of the CNP300 and A New Small PWR

Technology Development, Design and Safety Features of the CNP300 and A New Small PWR Technology Development, Design and Safety Features of the CNP300 and A New Small PWR and A New Small PWR By LIN Qian Shanghai Nuclear Engineering Research and Design Institute (SNERDI) Content SNERDI and

More information

Temelin 1000 MW Units Active Testing Stage - Commissioning Experience

Temelin 1000 MW Units Active Testing Stage - Commissioning Experience International Conference Nuclear Energy for New Europe 2003 Portorož, Slovenia, September 8-11, 2003 http://www.drustvo-js.si/port2003 1 ABSTRACT Temelin 1000 MW Units Active Testing Stage - Commissioning

More information

A. the temperature of the steam at the turbine exhaust increases. B. additional moisture is removed from the steam entering the turbine.

A. the temperature of the steam at the turbine exhaust increases. B. additional moisture is removed from the steam entering the turbine. P77 Overall nuclear power plant thermal efficiency will decrease if... A. the temperature of the steam at the turbine exhaust increases. B. additional moisture is removed from the steam entering the turbine.

More information

ANTARES Application for Cogeneration. Oil Recovery from Bitumen and Upgrading

ANTARES Application for Cogeneration. Oil Recovery from Bitumen and Upgrading ANTARES Application for Cogeneration Oil Recovery from Bitumen and Upgrading Michel Lecomte Houria Younsi (ENSEM) Jérome Gosset (ENSMP) ENC Conference Versailles 11-14 December 2005 1 Presentation Outline

More information

SCORPIO-VVER Core Monitoring and Surveillance System with Advanced Capabilities

SCORPIO-VVER Core Monitoring and Surveillance System with Advanced Capabilities SCORPIO-VVER Core Monitoring and Surveillance System with Advanced Capabilities Jozef Molnár, Radim Vočka, 19 th AER Symposium 21 25 September 2009 Varna, Bulgaria SCORPIO-VVER The Developers The first

More information

Instrumentation and Control to Prevent and Mitigate Severe Accident Conditions

Instrumentation and Control to Prevent and Mitigate Severe Accident Conditions Instrumentation and Control to Prevent and Mitigate Severe Accident Conditions SAMG-D Toolkit, Module 3, Chapter 3 Martin Gajdoš Nuclear Engineering, Slovenské elektrárne IAEA Workshop on the Development

More information

Applications of Nuclear Energy to Oil Sands and Hydrogen Production

Applications of Nuclear Energy to Oil Sands and Hydrogen Production Applications of Nuclear Energy to Oil Sands and Hydrogen Production IAEA Conference on Opportunities and Challenges for WCR in the 21 st Century, Vienna, Austria R. Duffey, S. Kuran and A. Miller 27-30

More information

A Research Reactor Simulator for Operators Training and Teaching. Abstract

A Research Reactor Simulator for Operators Training and Teaching. Abstract Organized and hosted by the Canadian Nuclear Society. Vancouver, BC, Canada. 2006 September 10-14 A Research Reactor Simulator for Operators Training and Teaching Ricardo Pinto de Carvalho and José Rubens

More information

Application of Selected Safety Requirements from IAEA SSR-2/1 in the EC6 Reactor Design

Application of Selected Safety Requirements from IAEA SSR-2/1 in the EC6 Reactor Design Application of Selected Safety Requirements from IAEA SSR-2/1 in the EC6 Reactor Design Technical Meeting on Safety Challenges for New NPPs 22-25 June 2015, Vienna, Austria - Copyright - A world leader

More information

Armenia Nuclear Power Profile. IAEA, Vienna May

Armenia Nuclear Power Profile. IAEA, Vienna May Armenia Nuclear Power Profile IAEA, Vienna 10-13 May General Information The referendum for independence of Armenia was held on 21 September 1991. Based on the results of the referendum (99% voted for

More information

3 Steps Approach : KHNP s Implementation of Post Fukushima Actions. ST(Sung-Tae) Yang. General Manager Corporate Safety Department KHNP

3 Steps Approach : KHNP s Implementation of Post Fukushima Actions. ST(Sung-Tae) Yang. General Manager Corporate Safety Department KHNP 3 Steps Approach : KHNP s Implementation of Post Fukushima Actions ST(Sung-Tae) Yang General Manager Corporate Safety Department KHNP Status of Nuclear Power Plants (As of Jan 2016) In Operation Under

More information

THE LARGE PROJECTS AT KOZLODUY NPP WITH FOCUS ON LONG TIME OPERATION AND AGEING MANAGEMENT

THE LARGE PROJECTS AT KOZLODUY NPP WITH FOCUS ON LONG TIME OPERATION AND AGEING MANAGEMENT THE LARGE PROJECTS AT KOZLODUY NPP WITH FOCUS ON LONG TIME OPERATION AND AGEING MANAGEMENT V. Popov Kozloduy NPP Email address of main author: Kozloduy NPP p.l.c. is a single-owner joint-stock company

More information

Chemical Engineering 693R

Chemical Engineering 693R Chemical Engineering 693R Reactor Design and Analysis Lecture 11 Nuclear Safety Spiritual Thought 2 2 Kings 6:16 And he answered, Fear not: for they that be with us are more than they that be with them.