WISCONSIN RIVER AND PFIFFNER PIONEER PARK POND REMEDIATION

Size: px
Start display at page:

Download "WISCONSIN RIVER AND PFIFFNER PIONEER PARK POND REMEDIATION"

Transcription

1 WISCONSIN RIVER AND PFIFFNER PIONEER PARK POND REMEDIATION 4/15/2016 Western Dredging Association (WEDA) Environmental Excellence Award Submittal

2 SUMMARY Wisconsin River and Pfiffner Pioneer Park Pond Remediation Environmental dredging and subaqueous capping was performed in the Wisconsin River (River) and the Pfiffner Pioneer Park Pond (Pond), at a Former Manufactured Gas Plant (MGP) site in Stevens Point, Wisconsin. The Remedial Action was initiated on October 5, 2015 and substantially completed by December 9, The Remedial Contractor was J.F. Brennan Company, Inc. (Brennan), and design and construction quality assurance was provided by Natural Resource Technology, Inc. (NRT). The 3 month, $2 million construction project entailed several facets beyond traditional remediation as it was performed in a City Park located downtown Stevens Point, Wisconsin. Challenges were presented during the project requiring a high level of communication, innovation, teamwork, and ability. Approximately 2,300 cubic yards of dredge material were removed from the Pond and River. The objective of the Remedial Action was to mechanically excavate and/or cap contaminated sediments in areas with elevated polycyclic aromatic hydrocarbons, xylenes, lead, and mercury concentrations. Environmental control measures (e.g., erosion controls, turbidity curtain, oil boom, contact water management pad), were installed prior to commencement of Remedial Action operations and maintained throughout the duration of the Remedial Action. River turbidity and ambient air were monitored to confirm the effectiveness of these measures. The River Remedial Action encompassed approximately 0.4 acres. River sediment dredging was performed to remove contaminated sediment followed by placement of a residual sand layer. A minimum 15-inch thick subaqueous cap consisting of sand mixed with activated carbon was placed in the River where sediment concentrations were above the remedial action level and slope stability limited further dredging. The River cap was overlain with armor stone. The 0.3 acre Pond Remedial Action consisted of dredging approximately 15 inches of sediment prior to placement of a 15-inch thick subaqueous sand cap amended with activated carbon. Dredge material was transported to the upland contact water management pad and stabilized prior to transportation to the landfill for disposal. Debris encountered during dredging was also landfilled. Dredge material contact water collected from the contact water management pad was batch-treated by Infrastructure Alternatives Inc. (IAI) with a mobile on-site treatment system to meet permit requirements prior to discharge to the Wisconsin River. Over the course of the 3 month project, the remediation team worked diligently within the confined limits of construction and incorporated proven technologies to successfully remediate the contaminated waterway. As of the date of this submittal, the project has zero recordable injuries and zero lost time incidents among all contractors on-site. Award Category Environmental Dredging Page 1

3 PROJECT TEAM MEMBERS Wisconsin River and Pfiffner Pioneer Park Pond Remediation Owners and Stakeholders A private Midwest utility City of Stevens Point U.S. Environmental Protection Agency Wisconsin Department of Health Services Wisconsin Department of Natural Resources Engineer of Record Natural Resource Technology, Inc. Designer and Owner s Representative WEDA Member Prime Contractor J.F. Brennan Company, Inc. Dredging, Excavation, Material Stabilization, Subaqueous Adsorptive Cap Installation Sustaining WEDA Member Key Subcontractors Infrastructure Alternatives, Inc. Mobile Contact Water Treatment System WEDA Member TestAmerica Laboratories, Inc. Air Sample Chemical Analytical Laboratory Pace Analytical Services, Inc. Soil, Sediment, and Water Chemical Analytical Laboratory WEDA Member Wimme Sand and Gravel, Inc. Backfill and Waste Material Trucking Chief Industrial Services comprised of Chief Liquid Waste, Inc. and sister company Chief Waste Treatment Corp. Contact Water Transportation and Disposal Advanced Disposal Cranberry Creek Landfill, LLC Dredge Material Disposal Facility Nominating Entity Natural Resource Technology, Inc. Page 2

4 Wisconsin River and Pfiffner Pioneer Park Pond Remediation Wisconsin River and Pfiffner Pioneer Park Pond Remediation WESTERN DREDGING ASSOCIATION (WEDA) ENVIRONMENTAL EXCELLENCE AWARD SUBMITTAL ENVIRONMENTAL BENEFITS This project was a major component of the overall remediation and restoration of the former manufactured gas plant facility. The 3-month construction window accommodated the City Park s scheduled activities and was performed outside of the typical aquatic spawning season to protect wildlife. The following statistics provide a scale of environmental benefits the project delivered. 2,500 tons of dredge material (sediment and debris) 112,700 gallons of contact water treated and discharged to the Wisconsin River 2,000 tons of sand placed to restore Pond and River 106 tons of granular activated carbon placed in River and Pond cap areas 46 tons of armor stone place over River cap 46 tons of riprap placed along Pond shoreline The remediation project was located within a popular City Park and in close proximity to residential and commercial development. The project setting presented unique challenges because residents and visitors to the City were accustomed to using the Park facilities, which had to be closed to secure the site. Site security included signage at nearby boat landings notifying boaters of potential on-water hazards, and signage on sidewalks and roadways notifying motorists and pedestrians of alternate routes around the work area. Prior to initiating dredging, the City expressed concerns for turtles in the Pond. Therefore, a net was run through the Pond to collect and relocate potentially present turtles. The effort did not result in collection of turtles and no evidence of turtles or other aquatic animals in the Pond were observed during dredging. Several logs in the Pond near an adjacent public arts center building were removed prior to dredging and replaced after cap installation to accommodate the fish and turtle habitat. To the extent practical, vegetation and trees were preserved to maintain habitat and esthetics of the Park. Two small trees near the Pond required removal to provide equipment access and were replaced during site restoration. Mechanical dredging with an environmental bucket (closed clamshell) was used to reduce sediment suspension, prevent release of contaminated sediment, and minimize residual contamination dispersion. The use of specialty dredging equipment and software ensured precise bucket placement and control of dredge cuts. A lined contact water management pad provided an area for dewatering and stabilizing dredged sediment and prevented contaminant transfer to upland soils. The contact water management pad also provided an area for equipment decontamination at the end of site work. Dredging equipment, methods, and a turbidity curtain were employed to minimize turbidity during dredging, capping, and residual sand layer placement. Solar powered real-time in-stream monitoring equipment and telemetry systems were used to verify remedial activities minimized turbidity. In general, contaminated River sediments were addressed by dredging a localized area of the River. However, a small sediment area within the River was capped with sand amended with Page 3

5 Wisconsin River and Pfiffner Pioneer Park Pond Remediation activated carbon where removal of contaminated sediment could not be achieved due to the proximity to the shoreline and possibility of destabilizing upland features. Contaminated Pond sediments were addressed by pre-dredging and placing a subaqueous sand cap amended with activated carbon over the Pond sediment. The overall environmental benefit is a remediated waterway through contaminant removal or capping. INNOVATION Project leadership took steps beyond traditional environmental protection efforts by working closely with the City and regulatory agencies. In addition, the project incorporated innovations in sequencing, mechanical dredging, temporary dredge material management, adsorptive cap installation, and environmental monitoring. Sustainable approaches were applied to protect the environment, public health, human communities, and wildlife by implementing measures such as limitation of idling time for contractor vehicles and equipment, and use of biodegradable hydraulic oil in all marine equipment. Sequencing Sequencing and achieving milestones was critical to accommodating City Park activities and completing the work prior to freezing Wisconsin weather setting in. The City Park is a popular destination for residents and visitors due to the many activities held at the Park, which is located downtown and along the waterway. Therefore, work could not begin until October 2015, limiting the construction window to 3 months to avoid shutting down for the winter and extending into the City Park s planned public activities in the spring. Therefore, a specific construction sequence was required to achieve project milestones. Flexibility and modifications to the sequencing plan were necessary with regard to dredge confirmation sample turn-around times and contingency re-dredge requirements. The general planned sequence of construction was to 1) dredge the Pond, 2) dredge the River, 3) cap the Pond, and 4) place the residual sand layer in the River. However, the presence of contamination deeper than anticipated for the design required additional dredging in the River. The extent of contamination was redefined through additional coring and conducting test pits, sending samples to the laboratory, and waiting for and assessing results. Progress was maintained by shifting efforts from the River to the Pond and initiating Pond capping sooner than initially planned. As the River re-dredge surfaces became available work returned to River dredging because dredge confirmation sample results were the critical path to completing work within the established schedule and before freezing temperatures set in. The onsite mobile water treatment plant (WTP) batch treated contact water, requiring the appropriate number of influent and effluent tanks to manage contact and dredge water, and be prepared for storm events contributing to contact water volume. Batch treatment allowed optimization of the treatment rate, resulting in constituent concentrations orders of magnitude less than the maximum discharge requirements. Mechanical Dredging Mechanical dredging was performed with an excavator with environmental bucket outfitted with state-of-the-art RTK-GPS positioning equipment, locational sensors, and Hypack Dredgepack. The excavator completed Pond dredging from the ground surface or from a temporary causeway. Dredging the River required barge-mounted equipment. Pond access was restricted by trees, landscaping, pedestrian walkways, and an art center building. Therefore, a temporary causeway was constructed in the Pond for heavy equipment to access and to mechanically dredge the Pond. The causeway was removed as Pond dredging was confirmed to achieve the design depth required for cap installation without reducing the Pond depth. Following dredging a minimum 15-inch thick adsorptive cap was installed in the Pond. River dredging encountered unanticipated non-aqueous phase liquid (NAPL) in a small area below the design dredge prism. Additional dredging was not possible due to the proximity to the shoreline and possibility of destabilizing Page 4

6 upland features. Therefore, a cap consisting of sand mixed with activated carbon was placed over approximately 110 square yards of the River where removal of contaminated sediment could not be achieved. As planned, a minimum 6-inch thick sand layer was placed in the remaining River dredge areas to manage dredge residuals. Mechanical dredge positioning equipment minimized over-dredging while ensuring removal of target material. Mechanical dredging optimized production due to the numerous debris encountered and the size of debris (e.g., large rocks and logs from previous forestry practices). Bathymetric surveying was performed to document the dredge surface and develop elevation contours for comparison to the design dredge prism. Bathymetric surveys were performed using a 200 khz single-beam echo sounder and a laptop PC with Hypack Hydrographic Survey software was used for data acquisition and boat navigation. Temporary Dredge Material Management System To prevent contaminant transfer to upland soil, the contact water management pad was lined with a 30-mil (0.030-inch) thick scrim reinforced polyethylene covered with approximately 12-inch thick layer of gravel. The gravel provided drainage to the collection sump and protected the geomembrane from heavy equipment traffic. The perimeter of the pad was raised and protected by a robust concrete barrier to create a berm for water containment. The contact water management pad also provided an area for decontamination of equipment such as trucks, excavating equipment, barges, boats, etc. at the completion of site work. The onsite portable mobile WTP was enclosed in two semi tractor-trailers and capable of 150 gallons per minute (gpm) capacity. The mobile WTP included an inclined plate separator, sand filters, bag filters, and granular activated carbon (GAC) vessels, pumps, hoses, and ancillary tanks. Effluent water was batch treated and held in a tank until laboratory analysis confirmed constituents were below the discharge limits. The onsite mobile water treatment system consistently treated water to well below the discharge limits. Wisconsin River and Pfiffner Pioneer Park Pond Remediation Installation of Adsorptive Cap In preparation for cap installation, the carbon was soaked approximately 24 hours to fill the void space and decrease buoyancy. The target carbon-sand ratio was 7% on a dry weight basis (e.g., 7 pounds of dry carbon per 100 pounds of dry sand). Sand and carbon were loaded into separate hoppers that dumped onto conveyor belts with scales. The hopper scales were setup with a leader/follower PLC, which continually controlled the mixing rate of the activated carbon and sand. Based on the individual weights of the carbon and sand, the belt speeds were adjusted to convey the proper carbon and sand volume to achieve the 7% carbon-sand ratio. The carbon-sand ratio was also verified based on the quantity of sand and carbon used. Finally, uniform mixing was visually observed during cap thickness checks. Brennan s Broadcast Spreader System (BCS TM ) was used in the Pond and River to uniformly place a minimum 15-inch thick cap with an over placement allowance of 3 inches. Environmental Monitoring Solar powered remote monitoring buoys with nephelometer sondes were located upstream and downstream of the work area to ensure potential sediment disturbance during dredging and capping activities did not exceed the site-specific criteria of 70 NTU above upstream conditions. Site-specific turbidity was correlated to TSS concentrations through sampling and laboratory analysis. Upstream turbidity and downstream turbidity readings were continuously collected on 30-minute intervals throughout the duration of the project. Turbidity monitoring showed the remedial construction activities were performed to prevent significant impairment to the water quality. Routine air monitoring consisted of a weather station, real-time air monitoring, and 24-hour perimeter air monitoring. A weather station was established onsite to record meteorological conditions during the Remedial Action. Real-time air monitoring of total volatile organic compounds (TVOCs) respirable particles (PM10) was performed at regular intervals, typically four times per day. Time-weighted average (24-hour) perimeter air monitoring benzene, toluene, ethylbenzene, and xylenes (BTEX) and Page 5

7 naphthalene samples were collected every workday during dredging and sediment management activities and twice per week during other remedial work. Air quality limits were not exceeded for the duration of the project. ECONOMIC BENEFITS Project Specific There were several qualitative areas of economic benefit on this project, the first being the ability of all involved parties to work together to find ways to deliver better value to the stakeholders. This cohesive atmosphere minimized downtime when unforeseen challenges were encountered. New solutions were arrived at quickly, allowing the project to move forward without long delays. Innovations listed previously were very effective in delivering economic value. Project sequencing and coordination provided the client the benefits of increased production rates, while avoiding costly implementation of a temporary road structure. The implementation of the BCS showed the accuracy in which an absorptive cap could be placed, a task where few contactors are willing to take on substantial risk. This traditionally drives up the price of such a project, however a system such as the BCS in which there is confidence in accuracy, will consistently return cost savings to the stakeholders. Surrounding Economy The Wisconsin River is a recreational destination for camping, biking, fishing, and boating. Continued restoration, such as completed for this project will continue to improve the water quality for wildlife and users of the waterway. This type of environmental improvement further increases the desire to develop along the River. In addition, the project maximized use of local suppliers to limit the impact of transporting materials over long distances and support sustainability goals. Wisconsin River and Pfiffner Pioneer Park Pond Remediation TRANSFERABILITY Many of the innovations that were accomplished on this project are transferable to other projects. As stakeholders facing environmental projects look for new and economical ways to resolve the challenges they face, contractors and engineers are forced to think outside the box. In the environmental dredging industry, there is no one size fits all solution and it is imperative for a contractor to remain flexible and innovative. Many of the processes developed on this site can be used for future projects that are of different sizes and scale. All the equipment developed, and all of the approaches that were used here can be used on both very small sites and on the largest scale projects. The largest takeaway from this project is remediation and restoration of a contaminated waterway located in a City Park, central to the downtown was restored in less than three months by a scalable, temporary, and economical approach. Several of the methods used were proven effective in the remedial outcome and economic returns. OUTREACH AND EDUCATION Community outreach began with the permitting process and included notifying the district Alderwoman and presenting the project scope at municipal public meetings. Public communication and outreach efforts continued throughout the entire project. Local television stations and newspapers ran stories with interviews of key project personnel and project footage and photos. Notifications were posted at the construction site entrance and at the two local boat launches to educate recreationalists of the on water remedial activity. Signage provided a toll-free information line for the public to ask questions and provide any comments and concerns during construction. Weekly construction progress meetings were held with team members, City representatives, and approval agencies to provide a project status update and address potential or upcoming construction issues. Page 6

8 PROJECT FIGURES, DIAGRAMS, AND PHOTOGRAPHS Wisconsin River and Pfiffner Pioneer Park Pond Remediation Photo 1: Baseline survey of the Pond Photo 2: Solar powered remote monitoring buoy Photo 3: Checking Pond for turtles or other aquatic animals Photo 4: Construction of temporary causeway in the Pond Photo 5: Pond dredging Photo 6: Sediment stabilization using Calciment Page 7

9 Wisconsin River and Pfiffner Pioneer Park Pond Remediation Photo 7: Collecting treated water sample for laboratory analysis Photo 8: Calibrating turbidity buoy Photo 9: River dredging Photo 10: Debris removal from River Photo 11: Hydrographic surveying River dredge area Photo 12: Collection of dredge confirmation sampled for laboratory analysis Page 8

10 Wisconsin River and Pfiffner Pioneer Park Pond Remediation Photo 13: Sediment confirmation sample processing Photo 14: Adsorptive cap (GAC and sand) mixing system Photo 15: Adsorptive cap placement in the Pond using the BCS TM Photo 16: Adsorptive cap placement in the River using the BCS TM Photo 17: BCS TM control room Photo 18: Armor layer placement in the River Page 9

2015 WEDA Environmental Excellence Award East Branch Grand Calumet River Remediation Reaches 4a and 4b GREAT LAKES SEDIMENT REMEDIATION, LLC

2015 WEDA Environmental Excellence Award East Branch Grand Calumet River Remediation Reaches 4a and 4b GREAT LAKES SEDIMENT REMEDIATION, LLC 2015 WEDA Environmental Excellence Award East Branch Grand Calumet River Remediation Reaches 4a and 4b GREAT LAKES SEDIMENT REMEDIATION, LLC Summary The East Branch Grand Calumet River (EBGC) Project,

More information

Update on Lower Fox River Remediation Project, Green Bay, Wisconsin

Update on Lower Fox River Remediation Project, Green Bay, Wisconsin Update on Lower Fox River Remediation Project, Presented by P. LaRosa, PE, and D. Binkney, Anchor QEA, LLC R. Feeney, PE, and T. Blackmar, PE, Tetra Tech, Inc. G. Smith and D. Bauman, J.F. Brennan Company,

More information

Detailed Project Description

Detailed Project Description Detailed Project Description The current sedimentation patterns in the river have resulted in the expansion and downstream migration of the gravel bar. Because the portion of the bar that must be removed

More information

APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN

APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN SUMMARY The construction team of Environmental Restoration,

More information

Esquimalt Graving Dock Waterlot Remediation Mega-Site (Phase 1B): Design, Contracting, and Construction Challenges

Esquimalt Graving Dock Waterlot Remediation Mega-Site (Phase 1B): Design, Contracting, and Construction Challenges Esquimalt Graving Dock Waterlot Remediation Mega-Site (Phase 1B): Design, Contracting, and Construction Challenges Presented by Dan Berlin and Tom Wang, Anchor QEA, LLC Andrew Mylly and Rae-Ann Sharp,

More information

East Branch of Grand Calumet River, Reaches 4A/4B. WEDA WODCON XXI June 13-17, 2016 The Hyatt Regency, Miami, FL

East Branch of Grand Calumet River, Reaches 4A/4B. WEDA WODCON XXI June 13-17, 2016 The Hyatt Regency, Miami, FL East Branch of Grand Calumet River, Reaches 4A/4B WEDA WODCON XXI June 13-17, 2016 The Hyatt Regency, Miami, FL Project Representatives Agencies and Stakeholders USEPA Great Lakes National Program Office

More information

Summary: project description: goals, objectives, accomplishments

Summary: project description: goals, objectives, accomplishments Summary: project description: goals, objectives, accomplishments The Lower Fox River Cleanup Project is designed to reduce risk to human health and the environment due to the presence of PCBs in the river

More information

Introduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011

Introduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011 Introduction to Sediment Remediation Presented to: Lower Passaic River Community Advisory Group July 14, 2011 Overview Feasibility Considerations Conceptual Site Model Dredging / Capping Dredged Material

More information

REQUEST FOR CONSTRUCTION BIDS February 22, 2010

REQUEST FOR CONSTRUCTION BIDS February 22, 2010 REQUEST FOR CONSTRUCTION BIDS February 22, 2010 Roaring Branch Channel and Floodplain Restoration Project 1.0 Project Background Roaring Branch (watershed area ~ 41 square miles) flows generally west through

More information

GENERAL NOTES ENGINEERS OVERSIGHT 1. ALL ELEVATIONS, DIMENSIONS, ALIGNMENTS AND ORIENTATION OF ALL ELEMENTS SHOWN IN THE PLANS MUST BE APPROVED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE ( REP ENGINEER

More information

Greenfield Pond B Rehabilitation

Greenfield Pond B Rehabilitation Preliminary Investigation Report Centennial, Colorado November 15, 2011 Prepared for: Liverpool Metropolitan District Prepared by: Stantec Consulting Services, Inc. Table of Contents Executive Summary...

More information

ENVIRONMENTAL DREDGING. Lower Duwamish Waterway. Enhanced Natural Recovery/Activated Carbon Pilot Study

ENVIRONMENTAL DREDGING. Lower Duwamish Waterway. Enhanced Natural Recovery/Activated Carbon Pilot Study ENVIRONMENTAL DREDGING Lower Duwamish Waterway Enhanced Natural Recovery/ March 17, 2017 Mr. Craig Vogt c/o Western Dredging Association WEDA Environmental Commission via: craig@craigvogt.com Mr. Vogt:

More information

J.F. Brennan Co., Inc. FULL SERVICE MARINE CONTRACTOR Lock and Dam Construction Hydraulic Dredging & Dewatering Specialty Construction and Diving

J.F. Brennan Co., Inc. FULL SERVICE MARINE CONTRACTOR Lock and Dam Construction Hydraulic Dredging & Dewatering Specialty Construction and Diving J.F. Brennan Co., Inc. FULL SERVICE MARINE CONTRACTOR Lock and Dam Construction Hydraulic Dredging & Dewatering Specialty Construction and Diving Brennan Marine Co., Inc. MARINE TRANSPORTATION SERVICES

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

DIRECT TRANSFER COAL FACILITY

DIRECT TRANSFER COAL FACILITY DIRECT TRANSFER COAL FACILITY Excavation and Dewatering MANAGEMENT PLAN - Final SUBMITTED June 1st, 2014 FRASER SURREY DOCKS COAL TRANSLOAD FACILITY PIT EXCAVATION AND DEWATERING MANAGEMENT PLAN Table

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

U. S. Steel Duluth Works - Spirit Lake Cleanup Plan FAQs

U. S. Steel Duluth Works - Spirit Lake Cleanup Plan FAQs St. Louis River Area of Concern U. S. Steel Duluth Works - Spirit Lake Cleanup Plan FAQs Spirit Lake is a large, open area in the St. Louis River that has cultural, historical, and recreational significance

More information

VISUAL SITE INSPECTION REPORT 2018

VISUAL SITE INSPECTION REPORT 2018 VISUAL SITE INSPECTION REPORT 2018 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00614 January 9, 2019 PREPARED

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Mill Creek Generating Station Louisville Gas & Electric Company Jefferson County, Kentucky October 2015 CCR Fugitive Dust Control Plan - Mill Creek Generating Station Page

More information

ODOR MANAGEMENT PLAN. Bridgeton Landfill St. Charles Rock Road Bridgeton, Missouri

ODOR MANAGEMENT PLAN. Bridgeton Landfill St. Charles Rock Road Bridgeton, Missouri ODOR MANAGEMENT PLAN Bridgeton Landfill 13570 St. Charles Rock Road Bridgeton, Missouri Date: 6-20-2014 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Background 1.2 Purpose of the 2.0 ODOR MONITORING 2.1 Identifying

More information

Prepared for the WEDA Midwest Chapter Meeting April Cincinnati, OH

Prepared for the WEDA Midwest Chapter Meeting April Cincinnati, OH Indiana Harbor and Canal (IHC) Environmental Maintenance Dredging Prepared for the WEDA Midwest Chapter Meeting April 2014 - Cincinnati, OH IHC Facility Operations & Dredging Contract was awarded on 30

More information

Enbridge Line 6B Incident Public Update and Availability Session

Enbridge Line 6B Incident Public Update and Availability Session Enbridge Line 6B Incident Public Update and Availability Session October 14, 2010 (Day 81) Division A Oil coming out of culvert on Talmadge Creek on first day of spill, July 26, 2010. Exposed pipeline

More information

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including

More information

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

Enbridge Site Plan Review Application Summary of Issues for Comstock Township Planning Commission

Enbridge Site Plan Review Application Summary of Issues for Comstock Township Planning Commission Enbridge Site Plan Review Application Summary of Issues for Comstock Township Planning Commission July 25, 2013 Comstock Township Planning Commission Meeting Background EPA Order - March 14, 2013 What

More information

EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE

EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE Ravi Sanga 1 ABSTRACT In 2003, the EPA entered into an agreed order with

More information

ADDENDUM #1. PROJECT: Montrose Water Sports Park Construction BID NO: FROM: Scott Murphy DATE: August 15, 2014

ADDENDUM #1. PROJECT: Montrose Water Sports Park Construction BID NO: FROM: Scott Murphy DATE: August 15, 2014 ADDENDUM #1 PROJECT: BID NO: 14-038 FROM: Scott Murphy DATE: Questions and Answers 1. Is angular or rounded rock wanted for this project? Answer: All foundation and pool armoring rock shall be angular.

More information

404(b)(1) EVALUATION

404(b)(1) EVALUATION 404(b)(1) EVALUATION SECTION 404(b)(1) EVALUATION DETAILED PROJECT REPORT AND ENVIRONMENTAL ASSESSMENT POMEROY SECTION 14 EMERGENCY STREAMBANK PROTECTION PROJECT POMEROY, OH I. INTRODUCTION As required

More information

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS These conditions ensure that activities carried out under Nationwide Permits (NWPs) do not

More information

ST. JOHNS RIVER WATER MANAGEMENT DISTRICT

ST. JOHNS RIVER WATER MANAGEMENT DISTRICT ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Eau Gallie River & Elbow Creek Restoration Dredging Melbourne, Florida Planning, Permitting, and Final Engineering Design June 11, 2015 Introductions St. Johns

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

Grand Calumet. River Revitalized

Grand Calumet. River Revitalized The Grand Calumet River Revitalized Imagine a Grand Calumet River safe for people, fish, birds and wildlife to utilize and enjoy. With the latest clean up efforts, performed under the Great Lakes Restoration

More information

SCHEDULE 3.1 DETAILED CONSTRUCTION PLAN Part B: Narrative Area B

SCHEDULE 3.1 DETAILED CONSTRUCTION PLAN Part B: Narrative Area B SCHEDULE 3.1 DETAILED CONSTRUCTION PLAN Part B: Narrative Area B SCHEDULE 3-1 DETAILED CONSTRUCTION PLAN Part B Narrative: Work Area B We will carry out the excavation for Work Area B as per Company s

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking Water Plant

Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking Water Plant Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 11 Article 21 January 2010 Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Details of the Proposed Action

Details of the Proposed Action Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the

More information

PLANNING AND ENGINEERING CONSIDERATIONS FOR A 1.5 MILLION CUBIC METER LAKE DREDGING PROJECT

PLANNING AND ENGINEERING CONSIDERATIONS FOR A 1.5 MILLION CUBIC METER LAKE DREDGING PROJECT William Hague, Honeywell John McAuliffe, Honeywell Edward Glaza, Parsons Paul LaRosa, Anchor QEA Paul Blue, Parsons PLANNING AND ENGINEERING CONSIDERATIONS FOR A 1.5 MILLION CUBIC METER LAKE DREDGING PROJECT

More information

Temporary Stream Crossing

Temporary Stream Crossing Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Temporary Stream Crossing

Temporary Stream Crossing Temporary Stream Crossing NS-4 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution

More information

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.) Module 2: Selection of Controls and Site Planning for Construction Site Erosion Prevention Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa,

More information

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION Community Development Department 949 E 2 nd Ave Durango, CO 81301 (970) 375-4810 fax (970) 375-4848 Contact Information City of Durango

More information

To: WEDA Environmental Award Committee. From: R.E. Staite Engineering. Feb. 26, Re: Application Environmental Dredging Award

To: WEDA Environmental Award Committee. From: R.E. Staite Engineering. Feb. 26, Re: Application Environmental Dredging Award To: WEDA Environmental Award Committee From: R.E. Staite Engineering Feb. 26, 2015 Re: Application Environmental Dredging Award Background: The R.E. Staite Engineering, Inc. ("RES") team successfully completed

More information

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT Nonmetallic Mining Reclamation & Operation Plan Amendment No. 1 (Includes modifications for Wash Plant construction) Mondovi Mine Town of Mondovi, Wisconsin Prepared for: Buffalo White Sand, LLC PO Box

More information

Hudson River PCBs Superfund Site

Hudson River PCBs Superfund Site PCBs Superfund Site Intermediate Design Report (IDR) Community Advisory Group Meeting August 31, 2005 1 Introduction Prepared by GE pursuant to the Administrative Order on Consent for Design (RD AOC) Design

More information

General Motors (Central Foundry Division) Cleanup Progress Update Massena, St. Lawrence County, NY

General Motors (Central Foundry Division) Cleanup Progress Update Massena, St. Lawrence County, NY General Motors (Central Foundry Division) Cleanup Progress Update Massena, St. Lawrence County, NY U.S. Environmental Protection Agency Spring 2016 Cleanup of GM Site Continues The cleanup of the GM site

More information

COFFERDAM (no.) CODE 803

COFFERDAM (no.) CODE 803 ILLINOIS URBAN MANUAL PRACTICE STANDARD COFFERDAM (no.) CODE 803 Source: Kane-DuPage Soil and Water Conservation District DEFINITION A cofferdam is a temporary structure within a waterway or body of water

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

A tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River.

A tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River. 4.5.1.3 DEWATERING DESCRIPTION Dewatering techniques are methods of addressing extracted ground or surface water encountered during construction. This temporary BMP addresses the installation and maintenance

More information

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 HILLIARD S POND DAM REMOVAL AND BIGELOW BROOK STREAM CHANNEL RESTORATION BID NO. 14/15-74

More information

May 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602

May 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 2011 Environmental Excellence Award Application May 4, 2011 Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 Contact: Mr. Channing Hayden, Jr. Director

More information

ONONDAGA LAKE CAPPING FIELD DEMONSTRATION WORK PLAN

ONONDAGA LAKE CAPPING FIELD DEMONSTRATION WORK PLAN CAPPING FIELD DEMONSTRATION WORK PLAN Prepared For: 301 Plainfield Road, Suite 330 Syracuse, New York 13212 Prepared By: Parsons 301 Plainfield Road, Suite 350 Syracuse, New York 13212 Phone: (315) 451-9560

More information

Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District

Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation U.S. Army Corps of Engineers New York District January 2004 APPENDIX H SECTION 404(b)(1) GUIDELINES EVALUATION SECTION 404(b)(1)

More information

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In WELCOME Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In PURPOSE OF THIS MEETING Rankin Construction Inc. (RCI) and their design consultant

More information

Weldcraft Boatyard Clean-up and Redevelopment Project

Weldcraft Boatyard Clean-up and Redevelopment Project Weldcraft Boatyard Clean-up and Redevelopment Project Habitat Mitigation Mike Stoner Environmental Director Port of Bellingham 1801 Roeder Avenue Bellingham, WA 98227 mikes@portofbellingham.com June 10,

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station)

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station) Inspection Report To: From: David Burton, Facility Manager (NRG Indian River Generating Station) Richard Southorn, P.E., P.G., CPSWQ Re: Indian River Landfill Annual CCR Unit Inspection Report No. 2 Inspection

More information

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS Planning Department 215 South 4 th Street, Suite F Hamilton, MT 59840 Phone 406-375-6530 Fax 406-375-6531 planning@rc.mt.gov FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS To initiate the permit

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39 MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No. 2015031067) Van Nuys Fire Station 39 W.O. E170094B ENGINEERING mtm CITY OF LOS ANGELES Transmittal

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

3 rd Annual TRIECA Conference March 25 & 26, CIVICA. Media Partner

3 rd Annual TRIECA Conference March 25 & 26, CIVICA. Media Partner 3 rd Annual TRIECA Conference March 25 & 26, 2014 www.trieca.com Thank you to all of our TRIECA 2014 Sponsors! CIVICA Media Partner TRIECA 2014 Evaluation of a Geotube and Hydraulic Dredging Approach to

More information

SPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS PID: Date: 3/8/18 C-R-S: UNI-TR

SPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS PID: Date: 3/8/18 C-R-S: UNI-TR SPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS C-R-S: UNI-TR 0308-00.57 PID: 99910 Date: 3/8/18 Special Provisions: UNI-TR 0308-00.57, PID 99910 Page 2 of 7 1. Waterway Permits Time Restrictions: USACE

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 02160 EROSION AND SEDIMENTATION CONTROL PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The Contractor shall be held to have read all Bidding Requirements; all of the General Conditions and Supplementary

More information

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY WESTRIDGE MARINE TERMINAL IN WATER EXCAVATION REPORT WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY Trans Mountain Pipeline ULC Kinder Morgan Canada

More information

Please print or type.

Please print or type. SOIL EROSION AND SEDIMENTATION CONTROL PERMIT APPLICATION 6-18-07 Ann kjjkjkff- ANN ARBOR CHARTER TOWNSHIP 3792 Pontiac Trail, Ann Arbor, Michigan 48105-9656 Phone (734) 663-3418 Website: www.aatwp.org

More information

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS C-44 Reservoir/STA System Discharge Project RFB: 6000000620 Addendum No. 1 March 2014 CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS HDR Engineering, Inc. SECTION 02401 DEWATERING, COFFERDAM AND BYPASS

More information

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER). Directive 055 Addendum Directive 055 Addendum: Interim Requirements for Aboveground Synthetically- Lined Wall Storage Systems, Updates to Liner Requirements, and Optional Diking Requirements for Single-Walled

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

Indiana Harbor and Canal Confined Disposal Facility

Indiana Harbor and Canal Confined Disposal Facility Indiana Harbor and Canal Confined Disposal Facility 2011 Technology Conference East Chicago, Indiana 16 November 2011 US Army Corps of Engineers Topics Construction Overview Facility Operations/Dredging

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

2010 Symposium ~ IMWA 2010 ~ Mid-Conference Excursion 5 Belinda Campbell, David Forrester. Sydney Tar Ponds and Collieries

2010 Symposium ~ IMWA 2010 ~ Mid-Conference Excursion 5 Belinda Campbell, David Forrester. Sydney Tar Ponds and Collieries ~ IMWA 2010 ~ 2010 Symposium Conference Theme: Mine Water & Innovative Thinking Mid-Conference Excursion 5 Belinda Campbell, David Forrester Sydney Tar Ponds and Collieries International Mine Water Association

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

OPERATION AND MAINTENANCE PLAN LINDEN ROAD SITE FLINT TOWNSHIP, MICHIGAN

OPERATION AND MAINTENANCE PLAN LINDEN ROAD SITE FLINT TOWNSHIP, MICHIGAN OPERATION AND MAINTENANCE PLAN LINDEN ROAD SITE FLINT TOWNSHIP, MICHIGAN Prepared For: GENERAL MOTORS CORPORATION Environmental and Energy Staff Remediation Group Prepared By: O Brien & Gere 3700 Grand

More information

PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS

PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS BACKGROUND The Port Master Plan for the Port of Los Angeles (Port) was certified by the California Coastal

More information

Meeting with PRRD Board

Meeting with PRRD Board Received DC Office May 11/17 Site C Project Peace River Channel Contouring and Side Channel Enhancement Meeting with PRRD Board Background - The Peace River has fluctuating water levels which can cause

More information

APWA Project of the Year 2017 Category: Environmental, Less than $5 Million. Shoreline Drive Storm Drain Repair AWARD SUBMITTAL

APWA Project of the Year 2017 Category: Environmental, Less than $5 Million. Shoreline Drive Storm Drain Repair AWARD SUBMITTAL APWA Project of the Year 2017 Category: Environmental, Less than $5 Million C K Shoreline Drive Storm Drain Repair K, O AWARD SUBMITTAL PUBLIC WORKS PROJECT OF THE YEAR NOMINATION FORM SUBMITTAL DEADLINE:

More information

Dredging and Dredged Material Disposal Overview

Dredging and Dredged Material Disposal Overview Dredging and Dredged Material Disposal Overview Tim Welp Timothy.L.Welp@usace.army.mil 601.634.2083 The process of dredging consists of the following stages: - Excavation (loosening or dislodging) of the

More information

Portland Harbor CAG Feasibility Study Sediment Capping and Treatment Concepts. July 14, 2010 Jim McKenna Carl Stivers

Portland Harbor CAG Feasibility Study Sediment Capping and Treatment Concepts. July 14, 2010 Jim McKenna Carl Stivers Portland Harbor CAG Feasibility Study Sediment Capping and Treatment Concepts July 14, 2010 Jim McKenna Carl Stivers 1 Quick Review! June Dredging and Monitored Natural Recovery! July Capping and Treatment!

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

Enbridge Oil Spill. Kalamazoo. Marshall. Augusta Battle Creek. Galesburg Ceresco. Release Site. Morrow Lake

Enbridge Oil Spill. Kalamazoo. Marshall. Augusta Battle Creek. Galesburg Ceresco. Release Site. Morrow Lake Enbridge Oil Spill Augusta Galesburg Morrow Lake Release Site Area August 4, 2010 Area Area August 5, 4, 2010 Area August September 5, 20, 2010 2012 Area September 20, 2012 September 17, 2014 Talmadge

More information

Industrial Services.

Industrial Services. Industrial Services www.hcr-llc.com HCR provides sludge removal and waste minimization services with expertise in the full suite of dewatering services, customized to accomplish each customer s specific

More information

EVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO

EVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO EVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO D. Plomb 1, S. Cieniawski 2, and D. Pham 3 ABSTRACT The Ashtabula River Area of Concern (AOC)

More information

During Ash Impoundment Construction Activities

During Ash Impoundment Construction Activities 2015 World of Coal Ash (WOCA) Conference in Nasvhille, TN - May 5-7, 2015 http://www.flyash.info/ Total Suspended Solids Monitoring During Ash Impoundment Construction Activities Rachel Combs (TVA) Gabe

More information

Re: Erosion Control Report and Drawings Requirements Accompanying Document

Re: Erosion Control Report and Drawings Requirements Accompanying Document Re: Erosion Control Report and Drawings Requirements Accompanying Document This document was created to help engineers and other design staff to better understand, meet and exceed the erosion control requirements

More information

CONSTRUCTION SPECIFICATION FOR DEWATERING

CONSTRUCTION SPECIFICATION FOR DEWATERING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector Contractors, Illicit Discharges, & Best Management Practices Chris Allen Stormwater Inspector What is an Illicit Discharge? Georgetown County Stormwater Ordinance defines an Illicit Discharge as: Any activity

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

NC2 ASH DISPOSAL AREA

NC2 ASH DISPOSAL AREA POST-CLOSURE PLAN OPPD NEBRASKA CITY GENERATING STATION FOSSIL FUEL COMBUSTION ASH DISPOSAL AREA NC2 ASH DISPOSAL AREA Prepared for: OMAHA PUBLIC POWER DISTRICT NEBRASKA CITY GENERATING STATION OTOE COUNTY,

More information

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No Part 2 Project s Can Be IMPACT ON LAND 1. Will there be an effect as a result of a physical change to project site? Any construction on slopes of 15% or greater (15-foot rise per 100 feet of length) or

More information

City of Reno Public Works

City of Reno Public Works City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV 89505 (775) 334-3304 (775) 334-1226 FAX SPECIAL CONDITIONS OF APPROVAL FOR Permit # EAE11-00XXX Applicant: Job Description:

More information

MAXIMIZING THE ECONOMICS OF CLEAN WATER USING A HYDRAULIC DREDGE AND A MECHANICAL DEWATERING PLANT: CASE STUDY OF LAKE DELAVAN, DELAVAN WISCONSIN

MAXIMIZING THE ECONOMICS OF CLEAN WATER USING A HYDRAULIC DREDGE AND A MECHANICAL DEWATERING PLANT: CASE STUDY OF LAKE DELAVAN, DELAVAN WISCONSIN MAXIMIZING THE ECONOMICS OF CLEAN WATER USING A HYDRAULIC DREDGE AND A MECHANICAL DEWATERING PLANT: CASE STUDY OF LAKE DELAVAN, DELAVAN WISCONSIN Thomas B. Amaro and Dennis Thomas Anybody Wanna go to the

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Modular Sediment Barriers (Instream)

Modular Sediment Barriers (Instream) Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information