Regional flood modelling in Western Australia: Application of regression based methods using ordinary least squares

Size: px
Start display at page:

Download "Regional flood modelling in Western Australia: Application of regression based methods using ordinary least squares"

Transcription

1 19th International Congress on Modelling and Simulation, Perth, Australia, December Regional flood modelling in Western Australia: Application of regression based methods using ordinary least squares M. Taylor a, K. Haddad a, M. Zaman a and A. Rahman a a School of Engineering, University of Western Sydney, Australia mel.taylor@uws.edu.au Abstract: Flooding is one of Australia s costliest natural disasters, which on average costs around $AUD400 million annually. In alone, the cost of flood damage has exceeded $AUD20 billion. Flood estimation is therefore crucial in assessing and managing flood risks. Flood Frequency Analysis (FFA) is one of the most commonly adopted techniques used to estimate floods with an associated frequency, known as design floods. These design floods are used in the planning and design of water infrastructure projects, along with various floodplain planning regulations. FFA largely relies on the existence of long recorded streamflow data. Due to the sheer size of Australia and the substantial costs involved, streamflow gauges are generally restricted to the highly populous and coastal regions of Australia. As design flood estimates are quite often needed in ungauged catchments, which have insufficient, unreliable or no streamflow data, an alternative method known as Regional Flood Frequency Analysis (RFFA) is generally adopted for design flood estimation. RFFA attempts to substitute the lack of temporal data with spatial data, to make more accurate flood estimates at ungauged sites. The most commonly adopted RFFA techniques include the Probabilistic Rational Method (PRM), the Index Flood Method (IFM) and the Quantile Regression Technique (QRT). The national guideline for design flow estimation, Australian Rainfall and Runoff (ARR) 1987, currently recommends a particular form of the PRM and the IFM for use in Western Australia (WA). The PRM has been widely criticised due to the simplistic assumption involved in plotting and interpolating the dimensionless runoff coefficients. At the same time, identifying homogeneous regions in connection with the IFM, has also proven to be problematic in Australia. Regression-based RFFA techniques have, however, shown promise in a number of recent studies across Australia and are the standard method in some other countries, such as the United States. The aim of the paper is to develop and compare two regression-based techniques: the QRT and the Parameter Regression Technique (PRT). In the QRT, individual flood quantiles are regressed against the catchment characteristics; while in the PRT, the parameters of a probability distribution (here the Log Pearson type 3 distribution is considered) are regressed against the catchment characteristics. An ordinary least squares regression method is used in this study for developing the prediction equations. The study uses streamflow and catchment characteristic data from 206 catchments across WA and part of the Northern Territory to develop regional prediction equations. The dataset was divided into three regions, according to the Australian Drainage Divisions (VI, VII and VIII), with 125, 12 and 69 catchments respectively. Independent testing of the QRT and the PRT was carried out on independent test catchments, which were randomly selected and were not used in the development of the prediction equations. It has been found that both the QRT and PRT provide reasonable predictions. The developed prediction equations are also relatively easy to apply as they only contain two predictor variables, being catchment area and design rainfall intensity. It should be noted that results from GLS regression for WA presented in Haddad et al. (2011b) should be more reliable than this study. The findings from this study and other relevant RFFA studies would form the basis of recommendation of a new RFFA for WA in the upcoming edition of ARR. Keywords: squares. Regional flood frequency analysis, Western Australia, regression technique, ordinary least 3803

2 1 INTRODUCTION Flooding is one of Australia s costliest natural disasters, which on average costs around $AUD400 million annually. In alone, the cost of flood damage has exceeded $AUD20 billion. To assess flood risk and adopt appropriate control measures, one needs to estimate flood discharge of a given Average Recurrence Interval (ARI), which is commonly referred to as design floods. This design flood is widely used in flood risk management e.g. determining the habitable floor level, design of bridges, culverts, flood control levees, sluices, weirs and spill-ways. Design floods can be estimated using Flood Frequency Analysis (FFA), but this requires a long period of recorded streamflow data. Australia has an abundance of streams, many of which are isolated due to the sheer size of the continent. It is for this reason and the fact that streamflow gauging is relatively expensive that there are little to no streamflow records at many locations of interest. Under these circumstances, Regional Flood Frequency Analysis (RFFA) is commonly adopted to estimate design floods, which attempts to use data from nearby gauged catchments to make flood estimation at ungauged sites of interest. There have been notable researches on flow prediction in ungauged basins (PUB) (e.g. Sivapalan, 2003). Many different RFFA techniques have been proposed for design peak flow estimation, including the Probabilistic Rational Method (PRM), the Index Flood Method (IFM) and the Quantile Regression Technique (QRT). The Australian national guideline for flow estimation, Australian Rainfall and Runoff (ARR), recommended several RFFA methods (I. E. Aust., 1987), e.g. the PRM and IFM were recommended for use in Western Australia (WA). The PRM is widely used due to its simplicity and ease of application; nevertheless it is based on a dimensionless runoff coefficient which is assumed to vary smoothly over geographical space (Hodgkins et al., 2007; Young et al., 2009). It has been found that the runoff coefficient may show sharp variation within a close proximity, reflecting discontinuities at catchment boundaries. French (2002) noted that the isopleths of the runoff coefficient in ARR1987 ignore the existence of watercourses. Pirozzi et al. (2009), Rahman et al. (2008) and Rahman and Hollerbach (2003) investigated the PRM and attempted to link the runoff coefficient with catchment characteristics, but they had little success. There is a lack of independent testing of the PRM and users have little knowledge about the uncertainty in design flood estimates derived from the PRM. Another commonly used technique, the IFM, is also limited in that it requires the hydrologic region to be acceptably homogeneous (Hosking and Wallis, 1993); however, in the case of Australia, identifying acceptably homogeneous regions has been found to be difficult (e.g. Bates et al., 1998). Since the release of the 3rd edition of ARR in 1987 there have been notable advances in RFFA. Moreover, there is an additional 24 years of hydrological data available (including streamflow data) at many locations across Australia, which would increase the accuracy of new RFFA methods. Recently, the National Committee on Water Engineering (NCWE) has put together 21 projects to revise ARR. Project 5 focuses on the development of new RFFA methods for Australia. This paper focuses on Western Australia and in particular compares two regression based RFFA methods, the QRT and the Parameter Regression Technique (PRT). The PRT regionalises the first three moments of the Log-Pearson Type 3 (LP3) distribution (explained in Section 3). An Ordinary Least Squares (OLS) regression method is adopted in this study as a first step to develop regional prediction equations. In a complementary paper (Haddad et al. 2011b) an advanced method employing the Generalised Least Squares Regression (GLS) along with Region-Of-Influence (ROI) approach (Burn, 1990) for WA has been adopted. The results from Haddad et al. (2011b) are likely to be more reliable than the results of this preliminary study since the GLS regression considers the inter-station correlation of the annual maximum flood series and ROI better deals with spatial heterogeneity in RFFA. 2 THE QUANTILE AND PARAMETER REGRESSION TECHNIQUES The quantile regression technique (QRT) was originally developed by the United States Geological Survey (USGS), and due to the ongoing development it has remained the leading technique of the USGS to estimate flood quantiles in ungauged catchments (Brutsaert, 2005). The method estimates flood quantiles through multiple regression between recorded streamflow data and a set of climatic/catchment characteristics within a region (Pandey & Nguyen, 1999). The quantile regression technique is expressed as follows: = (1) where,,, are catchment/climatic characteristics;,,,, are the regression coefficients and is the flood magnitude with year ARI (flood quantile). There are a number of methods available to determine the regression coefficients, OLS, weighted least squares (WLS) and GLS. The OLS method is the simplest of the three and finds the best fitting regression parameters by minimising the sum of squared residuals. For the OLS estimator to be accurate and efficient the peak flow at each site must be uncorrelated, every site should have equal record lengths and at-site flood quantiles should have equal variance, which is unlikely to be satisfied in hydrological regression (Tasker & Stedinger, 1989). The GLS regression method is further explained in Haddad et al. (2011a). 3804

3 The Parameter Regression Technique (PRT) is similar to the QRT, but instead of quantiles, here the first three moments of the LP3 distribution are taken as the dependent variables in the regression analysis. Let be the annual maximum flood series at a site and =ln ( ), then the mean ( ), standard deviation ( ) and skew ( ) of the series are taken as dependent variables. = + where is flood quantile of years ARI and is the standardised LP3 frequency factor (which is a function of ) and can be obtained from ARR1987 or can be approximated using the Cornish-Fisher transformation (Fisher and Cornish, 1960). (2) 3 STUDY CATCHMENTS Several factors were considered when selecting suitable catchments for use in the WA; including, the catchment size, record length, any regulation (such as dams etc.) and land-use changes. It is suggested in ARR (I.E. Aust., 1987) that an arbitrary upper limit of 1000 km 2 be adopted for small to medium sized catchments; therefore, the initial dataset adopted 1000 km 2 as the upper limit. The imposed limit lead to a lack of suitable catchments in the northern parts of WA, therefore, additional stations with larger catchment areas were also included in the dataset. Also, part of NT, situated in Drainage Division VIII, was lumped with the WA as shown in Figure 1. Streamflow records are required to be long enough to accurately characterise the underlying flood probability distribution. However, there must also be a suitable number of gauged catchments available in RFFA for greater spatial coverage. For this reason, a balancing act is required to ensure streamflow records are long enough, whilst also ensuring that the spatial coverage of stations is adequate. The ARR revision team suggested a lower limit of 25 years of streamflow record length, which was initially adopted; however, this resulted in insufficient spatial coverage. The minimum record length was therefore taken as 19 years. It is also crucial that each catchment does not contain any major regulation (such as dams etc.) and that no major land-use changes have occurred throughout the period of the streamflow record. Based on the aforementioned criteria, a total of 206 catchments were selected across WA and the NT (Figure 1). The dataset was then divided into three regions, according to the Drainage Divisions VI, VII and VIII. These drainage divisions are defined by major topographical features and key climatic zones; therefore it seems appropriate to utilise these divisions. As central WA has a lack of data, drainage division XII was left out of the study. In order to test the accuracy of prediction equations, a number of test catchments were then selected from the dataset and put aside. The split-sample validation technique was applied to Drainage Divisions VI and VIII, with approximately 20% of sites were left out for independent testing. Alternatively, due to the lack of catchments available in Drainage Division VII, a bootstrapping technique was adopted where one catchment was left out and the regression equation was developed, the developed equation is then applied to the catchment that was left out. The procedure was repeated for all the sites in Division VII. The catchment information is summarised in Error! Reference source not found.. Drainage Division Figure 1: Distribution of catchments between drainage divisions VI, VII, and VIII. Table 1 Summary of catchment information for each drainage division from WA No. of Sites Record Length (yrs) Mean Catchment Area Record (km 2 ) Total Validation Min Max Length (yrs) Min Max VI VII Mean Catchment Area (km 2 ) 3805

4 VIII CATCHMENT DATA Seven climatic and catchment characteristics were initially selected for use in this study, following the findings of previous Australian studies (Rahman, 2005). The main criteria which was used in the study involved the relevance of the characteristic to the generation of peak flows (i.e. hydrologically meaningful), ability to obtain the relevant data (i.e. easily obtainable) and that each variable is largely uncorrelated with other selected variables. The climatic and physical catchment characteristics which were selected are listed below: Catchment area (area, km 2 ) the area of each catchment was obtained from the Department of Water. Design rainfall intensity (mm/h) the Bureau of Meteorology s (BOM s) IFD calculator was used to obtain each of the design rainfall intensities, along with the AUSIFD software. The design rainfall intensities ( ARI ) used in this study include 2, 2, 2, 50, 50, 50, 2, 5, 10, 20, 50, and 100, Slope of the central 75% of the mainstream (S1085, m/km) S1085 was adopted as it excludes the extremes found at each end of the mainstream. The slope was determined using 1:100,000 topographic maps and is equal to: 1085 = where. and are the elevations of the streambed at 85% and 10% of the stream length, respectively. Stream density (sden, km/km 2 ) it is the channel length per unit area of the catchment. Fraction forest (forest) it is the fraction of the basin covered by medium to dense forest, measured using 1:100,000 topographic maps. Mean annual rainfall (rain, mm) was obtained at the catchment outlet using the BOM s data CD of mean annual rainfall. Mean annual areal potential evapotranspiration (evap, mm) was obtained at the catchment outlet using the BOM s data CD of evaporation. 5 MEASURES OF MODEL ADEQUACY Each of the developed prediction equations were evaluated using a number of goodness-of-fit statistics. The coefficient of multiple determination ( ) and adjusted determine how accurately the model fits the observed data. Note that 0 1, where 1 indicates the model is a perfect fit. Standard error of the estimate (SEE) indicates the spread of predicted values about the prediction line, where a lower value indicates a better fitting model, i.e. less variance. Each regression equation was also checked to ensure that underlying assumptions of the model are met. The Durbin-Watson statistic (DW) is a measure of the correlation of the residuals where a value of 2 indicated that there is no serial correlation between residuals. The t-value for the coefficient and two-tailed significance level of t (P-value) indicates the significance of each predictor variable. Higher t-values and a low significance level (<0.10) indicates that the predictor is significant. The tolerance and variance inflation factor (VIF) measures the collinearity of a variable. A tolerance and VIF close to 1 indicate the predictor variables are not highly correlated. For highly correlated variables tolerance approaches zero, and VIF moves toward infinity. The preceding statistics provide useful information on the accuracy of prediction equations; however, the equations may have been affected by points outside the normal range. Outliers in the response variables were detected using standardised residuals. Values larger than an absolute value of three are classed as outliers. Influential points were identified using Cook's distance. 6 DEVELOPMENT OF PREDICTION EQUATIONS At-site flood frequency analysis is the first step in developing RFFA methods. The annual maximum series data was adopted in this study, which consists of the largest flood in each year of record. The at-site flood frequency analysis was performed using the FLIKE software (Kuczera, 1999). The program facilitates the use of a number of distributions and fitting procedures, including the LP3, Log-Normal (LN), Gumbel, Generalised Extreme Value and Generalised Pareto distribution, using either the Bayesian or L moments parameter fitting procedures, which were tested in this study. The LP3-Bayesian parameter fitting procedure provided the most consistent results and hence was adopted in this study. Each of the dependent variables, including the selected flood quantiles, for the QRT, and the LP3 moments/parameters, for the PRT, was regressed against each of the seven predictor variables. A natural log transformation was considered in the regression analysis for both the predictor and dependent variables. The Backward Multiple Regression technique in statistical package Predictive Analytical Software (PASW) was initially used; however, in most cases it produced impractical equations. Therefore, the Enter Multiple 3806

5 Regression technique was adopted to allow for a trial-and-error approach, based on the most appropriate DW, t- value, P-value, tolerance and VIF statistic values. The models with the highest R 2, lowest SEE and that satisfied the underlying model assumptions in the best possible manner, were then taken as the best fitting models. There has been much debate about the inclusion or exclusion of outliers and influential points, as such in the first set of prediction equations outliers and influential points were determined using the standardised residuals, Cook s distance and centred leverage values, but kept in the dataset. Similarly in the second set of prediction equations, outliers and influential points were determined and removed from the dataset (with a maximum limit of 10% of the dataset). This was carried out for Drainage Divisions VI and VIII; however due to the lack of sites in Drainage Division VII, it was not feasible to remove any outliers. The original models in both cases were found to be superior; it is thought this could be due to the decrease in variability that occurs when these points are removed. The selected prediction equations for each drainage division are shown in Error! Reference source not found.. Drainage Division VI QRT PRT Table 2: Selected prediction equations for each drainage division ( ) = ( ) ln( 2 ) (3) ( ) = ( ) ln( 50 ) (4) ( ) = ( ) ln( 50 ) (5) ( ) = ( ) ln( 2 ) (6) ( ) = ( ) ln( 50 ) (7) ( ) = ( ) ln( 50 ) (8) = ( ) ln( 2 ) (9) = ; =, where and are regional average values (10) Drainage Division VII Drainage Division VIII QRT PRT QRT PRT ( ) = ( ) ln( 2 ) (11) ( ) = ( ) ln( 2 ) (12) ( ) = ( ) ln( 2 ) (13) ( ) = ( ) ln( 2 ) (14) ( ) = ( ) ln( 2 ) (15) ( ) = ( ) ln( 2 ) (16) = ( ) ln( 2 ) (17) = ; =, where and are regional average values (18) ( ) = ( ) ln( 50 ) (19) ( ) = ( ) ln( 50 ) (20) ( ) = ( ) ln( 50 ) (21) ( ) = ( ) ln( 50 ) (22) ( ) = ( ) ln( 50 ) (23) ( ) = ( ) ln( 50 ) (24) = ( ) ln( 50 ) (25) = ; =, where and are regional average values (26) Prediction equations for the QRT method for each region included area and design rainfall intensity. Area was found to be the most significant predictor variable across all flood quantiles and for the mean flood. Most prediction equations performed reasonably well, as can be seen in Error! Reference source not found.. Each of the developed prediction equations were examined for underlying assumptions and found to satisfy these 3807

6 assumptions quite well. No meaningful prediction equations could be developed for the standard deviation ( ) and skew ( ), therefore the regional average values were used. Table 3: Average goodness-of-fit statistics for each drainage division Drainage Division Method R 2 R 2 Adj SEE DW VI QRT PRT VII QRT PRT VIII QRT PRT MEASURES OF PREDICTION ERROR The following statistics were adopted to compare the QRT and PRT: = = 100% = 100% = (27) (28) (29) (30) The Root Mean Squared Error (RMSE) ratio provides an indication as to the overall accuracy of the model, a value of zero indicates the model is perfect; however, large values are undesirable. Relative Error (RE) indicates the accuracy of each prediction in relation to the observed value, with a value of zero being perfect and can also be either positive or negative. The Q pred /Q obs ratio indicates the amount of bias and accuracy of the model. It should be noted that although the RMSE ratio and RE are not true measures of the error associated with a model, both values give a reasonable indication of the error associated with a model for practical purposes, as both and have reasonably large uncertainties associated with them. 8 SPLIT-SAMPLE VALIDATION Prediction equations for each region were validated using a number of independent test catchments. Statistics that were used to evaluate the performance of each model included the RMSE ratio, median RE and Q pred /Q obs ratio. The median RE and RMSE ratio results, for the three drainage divisions, are shown in Error! Reference source not found.. It can be seen that the QRT produces a lower RE for drainage divisions VI and VII, with RE values of 60% vs. 67% and 31% vs. 41% for the QRT and PRT, respectively. In contrast, the PRT produces a lower RE for drainage division VIII, with RE values of 56% vs. 61% for the PRT and QRT, respectively. The RMSE ratio for each of the drainage divisions can be seen to be lower for the PRT; however, there is only a 0.3% difference between the PRT and QRT in drainage divisions VI and VII. Table 4: Relative error and Root mean squared error for Drainage Divisions VI, VII, and VII Drainage Division VI VII VIII Range Average Range Average Range Average Absolute PRT Median RE % QRT RMSE Ratio PRT % QRT CONCLUSIONS Prediction equations for the Quantile Regression Technique (QRT) and the Parameter Regression Technique (PRT) were developed for six flood quantiles (Q 2 to Q 100 ) in each of the three regions across WA. The final prediction equations for both methods contained two predictor variables, including catchment area and rainfall intensity of a given duration and ARI, which are easily obtainable from published data. Each of the developed 3808

7 prediction equations satisfied the underlying assumptions of the OLS regression well, as the residuals are approximately normally distributed. Region 2 should be used with care, as the lack of sites made the statistics hard to interpret. Each model was found to produce reasonably high R 2 and R 2 Adj, with smaller SEE values. Both the QRT and PRT performed relatively well, based on the independent testing, however a small number of catchments produced estimates which were grossly above or below the at-site flood frequency estimates. However, it should be noted that at-site flood frequency estimates are not free of error and they have a large uncertainty range, for higher ARIs in particular. It should be noted that results from GLS regression for WA presented in Haddad et al. (2011a) are likely to be more reliable than this study. The findings from this study and other relevant RFFA studies would form the basis of recommendation of a new RFFA for WA in the upcoming edition of ARR. 10 REFERENCES Bates, B.C., A. Rahman, R.G. Mein, and P.E. Weinmann (1998). Climatic and physical factors that influence the homogeneity of regional floods in south-eastern Australia. Water Resources Research, 34(12), Brutsaert, W. (2005). Hydrology: An Introduction, Cambridge University Press, Cambridge Burn, D.H. (1990). An appraisal of the region of influence approach to flood frequency analysis. Journal of Hydrological Sciences, 35(2), Fisher, R.A. and E.A. Cornish, (1960). The Percentile Points of Distributions Having Known Cumulants, Technometrics, 2(2), French, R. (2002). Flaws in the rational method, 27 th National Hydrology and Water Resources Symposium, Melbourne, May Haddad, K., Rahman, A. And Kuczera, G. (2011a). Comparison of Ordinary and Generalised Least Squares Regression Models in Regional Flood Frequency Analysis: A Case Study for New South Wales, Australian Journal of Water Resources (In press) Haddad, K., Rahman, A., Weeks, W., Kuczera, G. and Weinmann, P.E. (2011b). Towards a New Regional Flood Frequency Analysis Method for Western Australia, MODSIM 2011, Perth, December Hodgkins, G.A., Hebson, C. Lombard, P.J. and Mann, A. (2007). Comparison of peak-flow estimation methods for small drainage basins in Maine, U.S. Geological Survey, Scientific Investigations Report Hosking, J.R.M., and J.R. Wallis (1993). Some statistics useful in regional frequency analysis. Water Resources Research, 29(2), Institution of Engineers Australia (1987). Australian rainfall and runoff: A guide to flood estimation, vol. 1, I. E. Aust., Canberra Kuczera, G. (1999). Comprehensive at-site flood frequency analysis using Monte Carlo Bayesian Inference, Water Resources Research, 35(5), Pandey, G.R. and Nguyen, V.T.V. (1999). A comparative study of regression based methods in regional flood frequency analysis, Journal of Hydrology, 225, Pirozzi, J., Ashraf, M., Rahman, A., and Haddad, K. (2009). Design flood estimation for ungauged catchments in Eastern NSW: Evaluation of the Probabilistic Rational Method, 32 nd Hydrology and Water Resources Symposium, Newcastle, 30 November - 3 December, pp Rahman, A. (2005). A quantile regression technique to estimate design floods in ungauged catchments in southeast Australia, Australian Journal of Water Resources, 9(1), Rahman, A. and Hollerbach, D. (2003). Study of Runoff Coefficients Associated with the Probabilistic Rational Method for Flood Estimation in South-east Australia, 28 th Hydrology and Water Resources Symposium, Wollongong, November 2003, pp Rahman, A., Rima, K. and Weeks, W. (2008). Development of regional flood estimation methods using quantile regression technique: A case study for North-eastern part of Queensland, 31 st Hydrology and Water Resources Symposium, Adelaide, April, pp Tasker, G.D. and Stedinger, J.R. (1989). An operational GLS model for hydrologic regression, Journal of Hydrology, 111,

8 Young, C.B., McEnroe, B.M. and Rome, A.C. (2009). Empirical determination of rational method runoff coefficients, Journal of Hydrologic Engineering, 14(12),

A study on initial and continuing losses for design flood estimation in New South Wales

A study on initial and continuing losses for design flood estimation in New South Wales 19th International Congress on Modelling and Simulation, Perth, Australia, 12 16 December 2011 http://mssanz.org.au/modsim2011 A study on initial and continuing losses for design flood estimation in New

More information

INVESTIGATION ON AT-SITE FLOOD FREQUENCY ANALYSIS IN SOUTH-EAST AUSTRALIA

INVESTIGATION ON AT-SITE FLOOD FREQUENCY ANALYSIS IN SOUTH-EAST AUSTRALIA INVESTIGATION ON AT-SITE FLOOD FREQUENCY ANALYSIS IN SOUTH-EAST AUSTRALIA K. Haddad and A. Rahman School of Engineering, University of Western Sydney, Locked Bag 1797, Penrith South DC, NSW 1797, Australia

More information

INTEGRATION OF MONTE CARLO SIMULATION TECHNIQUE WITH URBS MODEL FOR DESIGN FLOOD ESTIMATION

INTEGRATION OF MONTE CARLO SIMULATION TECHNIQUE WITH URBS MODEL FOR DESIGN FLOOD ESTIMATION INTEGRATION OF MONTE CARLO SIMULATION TECHNIQUE WITH URBS MODEL FOR DESIGN FLOOD ESTIMATION Ataur Rahman 1, Don Carroll 2, Erwin Weinmann 3 1 Physical Infrastructure Centre, School of Civil Engineering,

More information

Application of the Joint Probability Approach to Ungauged Catchments for Design Flood Estimation

Application of the Joint Probability Approach to Ungauged Catchments for Design Flood Estimation Application of the Joint Probability Approach to Ungauged Catchments for Design Flood Estimation By Tanvir Mazumder Student ID: 13762067 M. Eng. (Hons) Thesis School of Engineering and Industrial Design

More information

Report. Flood Hydrology Technical Report Red Hill Mining Lease EIS 23 AUGUST BM Alliance Coal Operations Pty Ltd.

Report. Flood Hydrology Technical Report Red Hill Mining Lease EIS 23 AUGUST BM Alliance Coal Operations Pty Ltd. Report Flood Hydrology Technical Report Red Hill Mining Lease EIS 23 AUGUST 2013 Prepared for BM Alliance Coal Operations Pty Ltd Project Manager: URS Australia Pty Ltd Chris Taylor Senior Associate Level

More information

SEES 503 SUSTAINABLE WATER RESOURCES. Floods. Instructor. Assist. Prof. Dr. Bertuğ Akıntuğ

SEES 503 SUSTAINABLE WATER RESOURCES. Floods. Instructor. Assist. Prof. Dr. Bertuğ Akıntuğ SEES 503 SUSTAINABLE WATER RESOURCES Floods Instructor Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus SEES 503 Sustainable Water Resources

More information

ESTIMATION OF FLOW-DURATION CURVES AT UNGAGED SITES IN SOUTHERN NEW ENGLAND. By Stacey A. Archfield, Richard M. Vogel, and Sara L.

ESTIMATION OF FLOW-DURATION CURVES AT UNGAGED SITES IN SOUTHERN NEW ENGLAND. By Stacey A. Archfield, Richard M. Vogel, and Sara L. ESTIMATION OF FLOW-DURATION CURVES AT UNGAGED SITES IN SOUTHERN NEW ENGLAND By Stacey A. Archfield, Richard M. Vogel, and Sara L. Brandt Department of Civil and Environmental Engineering, Tufts University,

More information

A comparative study of the methods for estimating streamflow at ungauged sites

A comparative study of the methods for estimating streamflow at ungauged sites 22nd International Congress on Modelling and Simulation, Hobart, Tasmania, Australia, 3 to 8 December 2017 mssanz.org.au/modsim2017 A comparative study of the methods for estimating streamflow at ungauged

More information

Comparison between Design Event and Joint Probability Hydrological Modelling

Comparison between Design Event and Joint Probability Hydrological Modelling Comparison between Design Event and Joint Probability Hydrological Modelling H. Mirfenderesk 1, D. Carroll 1 E. Chong 1, M. Rahman 1, M Kabir 1, R. Van Doorn 1, S. Vis 1 1 Gold Coast City Council, QLD

More information

Simulation of Climate Change Impact on Runoff Using Rainfall Scenarios that Consider Daily Patterns of Change from GCMs

Simulation of Climate Change Impact on Runoff Using Rainfall Scenarios that Consider Daily Patterns of Change from GCMs Simulation of Climate Change Impact on Runoff Using Rainfall Scenarios that Consider Daily Patterns of Change from GCMs F.H.S. Chiew a,b, T.I. Harrold c, L. Siriwardena b, R.N. Jones d and R. Srikanthan

More information

DEVELOPMENT AND ASSESSMENT OF A REFINED PROBABILISTIC RATIONAL METHOD FOR DESIGN FLOOD ESTIMATION IN SOUTH AFRICA

DEVELOPMENT AND ASSESSMENT OF A REFINED PROBABILISTIC RATIONAL METHOD FOR DESIGN FLOOD ESTIMATION IN SOUTH AFRICA DEVELOPMENT AND ASSESSMENT OF A REFINED PROBABILISTIC RATIONAL METHOD FOR DESIGN FLOOD ESTIMATION IN SOUTH AFRICA Johannes Pieter Calitz SEMINAR Submitted in partial fulfilment of the requirements for

More information

A strategy for quality controlling hourly rainfall observations and its impact on hourly streamflow simulations

A strategy for quality controlling hourly rainfall observations and its impact on hourly streamflow simulations 21st International Congress on Modelling and Simulation, Gold Coast, Australia, 29 Nov to 4 Dec 2015 www.mssanz.org.au/modsim2015 A strategy for quality controlling hourly observations and its impact on

More information

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments ENGINEER - Vol. XXXXIV, No. 04, pp, [29-36], 2011 The Institution of Engineers, Sri Lanka Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged s W.M.D.Wijesinghe and

More information

Analysis of the Performance of Rainwater Tanks in Australian Capital Cities

Analysis of the Performance of Rainwater Tanks in Australian Capital Cities Analysis of the Performance of Rainwater Tanks in Australian Capital Cities 1 Peter J Coombes and 2 George Kuczera 1 Post Doctoral Fellow, School of Engineering, University of Newcastle, Callaghan NSW

More information

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA American Journal of Water Resources, 2014, Vol. 2, No. 4, 99-105 Available online at http://pubs.sciepub.com/ajwr/2/4/3 Science and Education Publishing DOI:10.12691/ajwr-2-4-3 Estimating the 100-year

More information

REGIONAL FLOOD FREQUENCY ANALYSIS FOR PHILIPPINE RIVERS

REGIONAL FLOOD FREQUENCY ANALYSIS FOR PHILIPPINE RIVERS REGIONAL FLOOD FREQUENCY ANALYSIS FOR PHILIPPINE RIVERS LEONARDO Q. LIONGSON National Hydraulic Research Center and Department of Civil Engineering University of the Philippines, Diliman, Quezon City,

More information

Flood Forecasting - What Can You Do With Your Data?

Flood Forecasting - What Can You Do With Your Data? Flood Forecasting - What Can You Do With Your Data? C Druery 1, D McConnell,2 1 WorleyParsons, Sydney, NSW 2 WorleyParsons, Sydney, NSW Abstract Driven by the large scale flooding over the past several

More information

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH INTRODUCTION Water is a common chemical substance essential for the existence of life and exhibits many notable and unique

More information

An evaluation of hydrological models for predicting mean-annual runoff and flood quantiles for water quality modelling

An evaluation of hydrological models for predicting mean-annual runoff and flood quantiles for water quality modelling 20th International Congress on Modelling and Simulation, Adelaide, Australia, 1 6 December 2013 www.mssanz.org.au/modsim2013 An evaluation of hydrological models for predicting mean-annual runoff and flood

More information

To estimate the magnitude of a flood peak the following alternative methods available: 1. Rational method 2. Empirical method

To estimate the magnitude of a flood peak the following alternative methods available: 1. Rational method 2. Empirical method Methods for estimating flood To estimate the magnitude of a flood peak the following alternative methods available: 1. Rational method 2. Empirical method 3. Unit-hydrograph technique 4. Flood-frequency

More information

MAGNITUDE AND FREQUENCY OF FLOODS IN RURAL BASINS OF SOUTH CAROLINA, NORTH CAROLINA, AND GEORGIA

MAGNITUDE AND FREQUENCY OF FLOODS IN RURAL BASINS OF SOUTH CAROLINA, NORTH CAROLINA, AND GEORGIA MAGNITUDE AND FREQUENCY OF FLOODS IN RURAL BASINS OF SOUTH CAROLINA, NORTH CAROLINA, AND GEORGIA Toby D. Feaster 1, John C. Weaver 2, and Anthony J. Gotvald 3 AUTHORS: 1 Hydrologist, U.S. Geological Survey,

More information

Current Methods for Flood Frequency Analysis

Current Methods for Flood Frequency Analysis Current Methods for Flood Frequency Analysis US Army Corps of Engineers Beth Faber, PhD, PE USACE, Hydrologic Engineering Center Workshop on Non-Stationarity, Hydrologic Frequency Analysis, and Water Management

More information

A DESIGN FLOOD ESTIMATION PROCEDURE USING DATA GENERATION AND A DAILY WATER BALANCE MODEL

A DESIGN FLOOD ESTIMATION PROCEDURE USING DATA GENERATION AND A DAILY WATER BALANCE MODEL A DESIGN FLOOD ESTIMATION PROCEDURE USING DATA GENERATION AND A DAILY WATER BALANCE MODEL W. C. Boughton P. I. Hill Report 97/8 October 1997 Boughton, W.C. (Walter C.) A design flood estimation procedure

More information

PROJECT 23 STAGE 3: RETENTION AND DETENTION

PROJECT 23 STAGE 3: RETENTION AND DETENTION Supported By PROJECT 23 STAGE 3: RETENTION AND DETENTION Dr Brett C Phillips 2 Detention and Retention Work carried out by What is Detention and Retention Dr Brett C Phillips Dr Allan Goyen Dr Tina Fang

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network

More information

Chapter 6. The Empirical version of the Rational Method

Chapter 6. The Empirical version of the Rational Method Chapter 6 The Empirical version of the Rational Method The Empirical version is named because the parameters it uses (apart from rainfall data) are arbitrary and are generally based on experience or observation

More information

Does a fifteen-hour shift make much difference? Influence of time lag between rainfall and discharge data on model calibration

Does a fifteen-hour shift make much difference? Influence of time lag between rainfall and discharge data on model calibration 22nd International Congress on Modelling and Simulation, Hobart, Tasmania, Australia, 3 to 8 December 2017 mssanz.org.au/modsim2017 Does a fifteen-hour shift make much difference? Influence of time lag

More information

Relationships between low-flow characteristics of South African streams

Relationships between low-flow characteristics of South African streams Relationships between low-flow characteristics of South African streams VY Smakhtin * and M Toulouse Institute for Water Research, Rhodes University, PO Box 94, Grahamstown, 64, South Africa Ecole Nationale

More information

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b* The Effect of Land Changes Towards in Sg. Pandan Perwira Bin Khusairi Rahman 1,a* and Kamarul Azlan bin Mohd Nasir 1,b 1 Faculty of Civil Engineering, Universiti Teknologi Malaysia, Malaysia a * wirakhusairirahman@gmail.com,

More information

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments The Process for Designing for Shallow Groundwater and Small Rainfall Event Management in Urban Developments Bill Till* and Emma Monk *Presenting Author The Decision process for stormwater management in

More information

Bayesian Total Error Analysis For Hydrological Models: Preliminary Evaluation Using Multi-Site Catchment Rainfall Data

Bayesian Total Error Analysis For Hydrological Models: Preliminary Evaluation Using Multi-Site Catchment Rainfall Data Bayesian Total Error Analysis For Hydrological Models: Preliminary Evaluation Using Multi-Site Catchment Rainfall Data Thyer, M.A. 1, B. Renard 1, D. Kavetski 1, G. Kuczera 1 S. Srikanthan 2 1 School of

More information

Estimating the Magnitude of Peak Flows for Steep Gradient Streams in New England. Dr. Jennifer Jacobs, PI

Estimating the Magnitude of Peak Flows for Steep Gradient Streams in New England. Dr. Jennifer Jacobs, PI Estimating the Magnitude of Peak Flows for Steep Gradient Streams in New England Dr. Jennifer Jacobs, PI Prepared for The New England Transportation Consortium November 17, 2010 NETCR81 Project No. NETC

More information

Evaluation of Alternative Statistical Methods for Estimating Frequency of Peak Flows in Maryland

Evaluation of Alternative Statistical Methods for Estimating Frequency of Peak Flows in Maryland Evaluation of Alternative Statistical Methods for Estimating Frequency of Peak Flows in Maryland (SP907C4B) Final Report Submitted to MARYLAND DEPARTMENT OF TRANSPORTATION STATE HIGHWAY ADMINISTRATION

More information

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design TECHNICAL MEMORANDUM FROM: Ken MacKenzie and Ryan Taylor SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design DATE: June 7, 2012 The purpose of this memorandum

More information

Estimating unmetered stock and domestic water use

Estimating unmetered stock and domestic water use 18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 2009 http://mssanz.org.au/modsim09 Estimating unmetered stock and domestic water use Lowe, L 1, M. Vardon 2, T. Etchells 1, H. Malano 1

More information

What s so hard about Stormwater Modelling?

What s so hard about Stormwater Modelling? What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While

More information

Distribution Of Hydrological Losses For Varying Rainfall And Antecedent Wetness Conditions

Distribution Of Hydrological Losses For Varying Rainfall And Antecedent Wetness Conditions City University of New York (CUNY) CUNY Academic Works International Conference on Hydroinformatics 8-1-2014 Distribution Of Hydrological Losses For Varying Rainfall And Antecedent Wetness Conditions Sithara

More information

Groundwater Statistical Methods Certification. Neal South CCR Monofill Permit No. 97-SDP-13-98P Salix, Iowa. MidAmerican Energy Company

Groundwater Statistical Methods Certification. Neal South CCR Monofill Permit No. 97-SDP-13-98P Salix, Iowa. MidAmerican Energy Company Groundwater Statistical Methods Certification Neal South CCR Monofill Permit No. 97-SDP-13-98P Salix, Iowa MidAmerican Energy Company GHD 11228 Aurora Avenue Des Moines Iowa 50322-7905 11114654 Report

More information

Groundwater Statistical Methods Certification. Neal North Impoundment 3B Sergeant Bluff, Iowa. MidAmerican Energy Company

Groundwater Statistical Methods Certification. Neal North Impoundment 3B Sergeant Bluff, Iowa. MidAmerican Energy Company Groundwater Statistical Methods Certification Neal North Impoundment 3B Sergeant Bluff, Iowa MidAmerican Energy Company GHD 11228 Aurora Avenue Des Moines Iowa 50322-7905 11114642 Report No 11 October

More information

Groundwater Statistical Methods Certification. Neal North CCR Monofill Permit No. 97-SDP-12-95P Sergeant Bluff, Iowa. MidAmerican Energy Company

Groundwater Statistical Methods Certification. Neal North CCR Monofill Permit No. 97-SDP-12-95P Sergeant Bluff, Iowa. MidAmerican Energy Company Groundwater Statistical Methods Certification Neal North CCR Monofill Permit No. 97-SDP-12-95P Sergeant Bluff, Iowa MidAmerican Energy Company GHD 11228 Aurora Avenue Des Moines Iowa 50322-7905 11114642

More information

Analysis of Flood Routing

Analysis of Flood Routing Dhaka Univ. J. Sci. 6(): 69-73, 014 (July) Analysis of Flood Routing Md. Motaleb Hossain Department of Mathematics, Dhaka University, Dhaka 1000, Bangladesh (Received: 6 May 01; Accepted: 4 May 014) Abstract

More information

Non-linearity of the runoff response across southeastern Australia to increases in global average temperature

Non-linearity of the runoff response across southeastern Australia to increases in global average temperature 188 Hydro-climatology: Variability and Change (Proceedings of symposium J-H02 held during IUGG2011 in Melbourne, Australia, July 2011) (IAHS Publ. 344, 2011). Non-linearity of the runoff response across

More information

Hydrology and Water Resources Engineering

Hydrology and Water Resources Engineering Hydrology and Water Resources Engineering SUB GSttingen 214 868 613 K.C. Patra 't'v Mai Narosa Publishing House New Delhi Chennai Mumbai Calcutta CONTENTS Preface vii 1. Introduction 1 1.1 General 1 1.2

More information

Water quality of road runoff in the Blue Mountains, NSW, Australia

Water quality of road runoff in the Blue Mountains, NSW, Australia Geo-Environment and Landscape Evolution III 151 Water quality of road runoff in the Blue Mountains, NSW, Australia S. Riley 1, S. Shrestha 1, P. Hackney 2 & R. A. Mann 3 1 Sustainable Engineering and Technology

More information

Analysis of Flow Estimation Methods for Small Hydropower Schemes in Bua River

Analysis of Flow Estimation Methods for Small Hydropower Schemes in Bua River Energy and Power Engineering, 2015, 7, 55-62 Published Online February 2015 in SciRes. http://www.scirp.org/journal/epe http://dx.doi.org/10.4236/epe.2015.72005 Analysis of Flow Estimation Methods for

More information

Sensitivity Testing of a Biophysical Toolbox for Exploring Water Resources Utilisation and Management Options

Sensitivity Testing of a Biophysical Toolbox for Exploring Water Resources Utilisation and Management Options Sensitivity Testing of a Biophysical Toolbox for Exploring Water Resources Utilisation and Management Options W.S. Merritt a, B.F.W. Croke a,b, and A.J. Jakeman, a a Centre for Resource and Environmental

More information

Review Methods for design flood estimation in South Africa

Review Methods for design flood estimation in South Africa Review Methods for design flood estimation in South Africa JC Smithers* School of Engineering, University of KwaZulu-Natal, South Africa Abstract The estimation of design floods is necessary for the design

More information

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1.1 Introduction The Hydrologic Model of the Upper Cosumnes River Basin (HMCRB) under the USGS Modular Modeling System (MMS) uses a

More information

What is a representative pan factor value for the eastern Pilbara? Aditya Jha

What is a representative pan factor value for the eastern Pilbara? Aditya Jha What is a representative pan factor value for the eastern Pilbara? Aditya Jha Parsons Brinckerhoff Australia Pty Ltd, Level 5, 503 Murray St, Perth, Western Australia 6000, AJha@pb.com.au Abstract The

More information

Insights from editing the ARR Urban Book. Peter J Coombes

Insights from editing the ARR Urban Book. Peter J Coombes Insights from editing the ARR Urban Book Peter J Coombes Motivation for revision of ARR Many practices and data in ARR 1987 are outdated More rainfall and streamflow data Improved understanding of climate

More information

CHAPTER 5 RESULTS AND ANALYSIS

CHAPTER 5 RESULTS AND ANALYSIS CHAPTER 5 RESULTS AND ANALYSIS This chapter exhibits an extensive data analysis and the results of the statistical testing. Data analysis is done using factor analysis, regression analysis, reliability

More information

Appendix D Flood Assessment

Appendix D Flood Assessment Appendix D Flood Assessment Mount Pleasant Operation Rail Modification Flood Assessment MACH Energy Australia Pty Ltd 0744-09-B3, 19 December 2017 Report Title Client Report Number Mount Pleasant Operation

More information

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). 1. Stream Network The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). First Order Streams streams with no tributaries. Second Order Streams begin at

More information

Mean vs Median Analysing Stormwater Drainage Results with ARR 2016

Mean vs Median Analysing Stormwater Drainage Results with ARR 2016 Analysing Stormwater Drainage Results with ARR 2016 INTRODUCTION Watercom Pty Ltd - Stack, Kus (November 2018) Bob Stack Director, Watercom Pty Ltd, Wolli, NSW, Australia E-mail: bobstack@watercom.com.au

More information

Introduction, HYDROGRAPHS

Introduction, HYDROGRAPHS HYDROGRAPHS Sequence of lecture Introduction Types of Hydrograph Components of Hydrograph Effective Rainfall Basin Lag or Time Lag Parts of Hydrograph Hydrograph Analysis Factors Affecting Hydrograph Shape

More information

Chapter 4 "Hydrology"

Chapter 4 Hydrology Chapter 4 "Hydrology" Revised TxDOT Hydraulics Manual Jorge A. Millan, P.E., CFM TxDOT Design Division/Hydraulics 2012 Transportation Short Course October 17, 2012 Chapter 4 Sections 1 Hydrology s Role

More information

Effective Discharge Calculation

Effective Discharge Calculation Effective Discharge Calculation by D. S. Biedenharn and R. R. Copeland PURPOSE: The purpose of this Technical Note is to describe the methodology kwn as the effective discharge approach for estimating

More information

Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination

Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination CAB/2KTF/EET 1221/1413 Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination Course Code : CV 312 / CV 507 Course Name : Engineering Hydrology Time : 3 Hours ] [ Max. Marks

More information

A simple model for low flow forecasting in Mediterranean streams

A simple model for low flow forecasting in Mediterranean streams European Water 57: 337-343, 2017. 2017 E.W. Publications A simple model for low flow forecasting in Mediterranean streams K. Risva 1, D. Nikolopoulos 2, A. Efstratiadis 2 and I. Nalbantis 1* 1 School of

More information

Probabilistic Analysis of Peak Daily Rainfall for Prediction purposes in Selected Areas of Northern Nigeria.

Probabilistic Analysis of Peak Daily Rainfall for Prediction purposes in Selected Areas of Northern Nigeria. 54 Salami, A. W. et. al (2016). Probabilistic Analysis of Peak Daily Rainfall for Prediction purposes in Selected Areas of Northern Nigeria. NJTR Vol 11; 54-59 Probabilistic Analysis of Peak Daily Rainfall

More information

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method

More information

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011

More information

RAINWATER TANK OPTIONS FOR STORMWATER MANAGEMENT IN THE UPPER PARRAMATTA RIVER CATCHMENT

RAINWATER TANK OPTIONS FOR STORMWATER MANAGEMENT IN THE UPPER PARRAMATTA RIVER CATCHMENT RAINWATER TANK OPTIONS FOR STORMWATER MANAGEMENT IN THE UPPER PARRAMATTA RIVER CATCHMENT Peter J. Coombes 1, Andrew Frost 1, George Kuczera 1, Geoff O Loughlin 2 and Stephen Lees 3 1 Civil, Surveying and

More information

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed

More information

Closure Planning for a Tailings Storage Facility in Western Australia

Closure Planning for a Tailings Storage Facility in Western Australia Closure Planning for a Tailings Storage Facility in Western Australia K. Bonstrom O Kane Consultants Pty. Ltd, Australia D. Chapman O Kane Consultants Inc, Canada D. Swain Perth, Australia M. O Kane O

More information

Introduction to Hydrology, Part 2. Notes, Handouts

Introduction to Hydrology, Part 2. Notes, Handouts Introduction to Hydrology, Part 2 Notes, Handouts Precipitation Much of hydrology deals with precipitation How much? How frequently/infrequently? What form? How quickly? Seasonal variation? Drought frequency?

More information

Brannen Lake Storage Feasibility Potential Effects on Water Levels

Brannen Lake Storage Feasibility Potential Effects on Water Levels Brannen Lake Storage Feasibility Potential Effects on Water Levels Brannen Lake Storage Feasibility Potential Effects on Water Levels Prepared for: BC Conservation Foundation #3, 1200 Princess Royal Avenue

More information

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED Mark Pennington, Engineer, Pattle Delamore Partners Ltd, Tauranga ABSTRACT The Rational Method has been in use in some form or another at least since

More information

ACCEPTED VERSION. Engineers Australia

ACCEPTED VERSION. Engineers Australia ACCEPTED VERSION Michael, Seth Westra, Feifei Zheng, Mark Babister, Ivan Varga Developing water level maps in the joint probability zone influenced by extreme tide and rainfall events Proceedings of the

More information

Context of Extreme Alberta Floods

Context of Extreme Alberta Floods Context of Extreme Alberta Floods Introduction Design of water management and stream crossing infrastructure requires determination of hydrotechnical design parameters. These parameters often consist of

More information

Propagation of input errors: implications for model simulations and risk analysis

Propagation of input errors: implications for model simulations and risk analysis Risk in Water Resources Management (Proceedings of Symposium H03 held during IUGG2011 in Melbourne, Australia, July 2011) (IAHS Publ. 347, 2011). 101 Propagation of input errors: implications for model

More information

COMPOUND CHANNEL MODELLING CAPABILITY ASSESSMENT OF 1D HYDRAULIC MODEL

COMPOUND CHANNEL MODELLING CAPABILITY ASSESSMENT OF 1D HYDRAULIC MODEL COMPOUND CHANNEL MODELLING CAPABILITY ASSESSMENT OF 1D HYDRAULIC MODEL Jahangir Islam and Nick Brown Auckland Council ABSTRACT (200 WORDS MAXIMUM) Accurate modelling of streams or open channels in urban

More information

IDENTIFYING FLOOD CONTROL LOTS IN THE HORNSBY LGA

IDENTIFYING FLOOD CONTROL LOTS IN THE HORNSBY LGA IDENTIFYING FLOOD CONTROL LOTS IN THE HORNSBY LGA B.C. Phillips 1, R.S. Thomson 1, T. Fang 1, S. Yu 1, A. Boyd 2 1 Cardno (NSW/ACT) Pty Ltd, Sydney, NSW 2 Hornsby Shire Council, Hornsby, NSW Introduction

More information

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE Bodo Hellberg, Stormwater Action Team, Auckland Regional Council Matthew Davis, Stormwater Action Team, Auckland Regional Council ABSTRACT This paper focuses

More information

Hydrology. Section C. Introduction

Hydrology. Section C. Introduction Section C Hydrology Introduction This section provides the available hydrologic data for the and some analysis of the bed mobility in response reaches of the WAU. The does not receive any significant snow

More information

HYDROLOGICAL SYSTEMS MODELING Vol. II - Dynamic-Stochastic Models of River Runoff Generation - A. N. Gelfan

HYDROLOGICAL SYSTEMS MODELING Vol. II - Dynamic-Stochastic Models of River Runoff Generation - A. N. Gelfan DYNAMIC-STOCHASTIC MODELS OF RIVER RUNOFF GENERATION A. N. Gelfan Water Problems Institute of Russian Academy of Sciences, Moscow, Russia Keywords: dynamic-stochastic model, watershed model, stochastic

More information

Impacts of Outliers in Flood Frequency Analysis: A Case Study for Eastern Australia

Impacts of Outliers in Flood Frequency Analysis: A Case Study for Eastern Australia Technical Paper Impacts of Outliers in Flood Frequency Analysis: A Case Study for Eastern Australia A.S. Rahman 1,*, K. Haddad 1, A. Rahman 1 1 School of Computing, Engineering and Mathematics, University

More information

Chapter 7 : Conclusions and recommendations

Chapter 7 : Conclusions and recommendations Chapter 7 : Conclusions and recommendations 7.1 Conclusions The main goal of this research was to investigate the modelling and rainfall data requirements for the design of combined sewer systems and the

More information

Building a Comprehensive Spatio-Temporal Database of Floodplain Inundation for Environmental Management in the Murray-Darling Basin, Australia

Building a Comprehensive Spatio-Temporal Database of Floodplain Inundation for Environmental Management in the Murray-Darling Basin, Australia nd International Congress on Modelling and Simulation, Hobart, Tasmania, Australia, to 8 December mssanz.org.au/modsim Building a Comprehensive Spatio-Temporal Database of Floodplain Inundation for Environmental

More information

Module 3. Lecture 6: Synthetic unit hydrograph

Module 3. Lecture 6: Synthetic unit hydrograph Lecture 6: Synthetic unit hydrograph Synthetic Unit Hydrograph In India, only a small number of streams are gauged (i.e., stream flows due to single and multiple storms, are measured) There are many drainage

More information

Flood Frequency Analysis of Tel Basin of Mahanadi River System, India using Annual Maximum and POT Flood Data

Flood Frequency Analysis of Tel Basin of Mahanadi River System, India using Annual Maximum and POT Flood Data Available online at www.sciencedirect.com ScienceDirect Aquatic Procedia 4 (2015 ) 427 434 INTERNATIONAL CONFERENCE ON WATER RESOURCES, COASTAL AND OCEAN ENGINEERING (ICWRCOE 2015) Flood Frequency Analysis

More information

Alberta Rainfall Runoff Response

Alberta Rainfall Runoff Response Alberta Rainfall Runoff Response Introduction The runoff response to a rainfall event is a function of many complex hydrologic processes. Some of the major factors in the rainfall-runoff process are basin

More information

Wildfire risk to water supply catchments: A Monte Carlo simulation model

Wildfire risk to water supply catchments: A Monte Carlo simulation model 19th International Congress on Modelling and Simulation, Perth, Australia, 12 16 December 2011 http://mssanz.org.au/modsim2011 Wildfire risk to water supply catchments: A Monte Carlo simulation model C.

More information

IDENTIFYING FLOOD RISK FOR RAPID CREEK

IDENTIFYING FLOOD RISK FOR RAPID CREEK IDENTIFYING FLOOD RISK FOR RAPID CREEK P Saunders 1, S Ruscheinsky 2 L Rajaratnam 3 1 Sinclair, Knight Merz, Darwin, NT 2 Sinclair Knight Merz, Sydney, NSW 3 Department of Land Resources Management, Darwin

More information

HYDROLOGY WORKSHEET 1 PRECIPITATION

HYDROLOGY WORKSHEET 1 PRECIPITATION HYDROLOGY WORKSHEET 1 PRECIPITATION A watershed is an area of land that captures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed where the

More information

Attachment 1. Categorical Summary of BMP Performance Data for Solids (TSS, TDS, and Turbidity) Contained in the International Stormwater BMP Database

Attachment 1. Categorical Summary of BMP Performance Data for Solids (TSS, TDS, and Turbidity) Contained in the International Stormwater BMP Database Attachment 1 Categorical Summary of BMP Performance Data for Solids (TSS, TDS, and Turbidity) Contained in the International Stormwater BMP Database Prepared by Geosyntec Consultants, Inc. Wright Water

More information

Risk-based assessment of climate change impact on storm drainage system

Risk-based assessment of climate change impact on storm drainage system Flood Recovery, Innovation and Response II 13 Risk-based assessment of climate change impact on storm drainage system Z. Alsaqqaf, H. Zhang & S. Mohamed Griffith School of Engineering, Griffith University,

More information

The use of GIS to derive distributed unit hydrographs for streamflow prediction

The use of GIS to derive distributed unit hydrographs for streamflow prediction 8 th World IMACS / MODSIM Congress, Cairns, Australia 3-7 July 29 http://mssanz.org.au/modsim9 The use of GIS to derive distributed unit hydrographs for streamflow prediction Gibbs, M.S., Maier, H.R.,

More information

Environmental Intelligence-Where To get the Data From?

Environmental Intelligence-Where To get the Data From? Environmental Intelligence-Where To get the Data From? Climate and Water Information and Services Dr. Amgad Elmahdi Manager Water Resources Assessment Section 24 July 2012 Presentation outline Bureau s

More information

Uncertainty in Hydrologic Modelling for PMF Estimation

Uncertainty in Hydrologic Modelling for PMF Estimation Uncertainty in Hydrologic Modelling for PMF Estimation Introduction Estimation of the Probable Maximum Flood (PMF) has become a core component of the hydrotechnical design of dam structures 1. There is

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

Hydrologic frequency analysis: History and contemporary research. Cameron Bracken University of Colorado at Boulder

Hydrologic frequency analysis: History and contemporary research. Cameron Bracken University of Colorado at Boulder Hydrologic frequency analysis: History and contemporary research Cameron Bracken University of Colorado at Boulder 1 Outline Intro to frequency analysis History Federal government guidance Contemporary

More information

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural

More information

Overview of Water Policy Challenges for Victoria. Dr Peter Coombes

Overview of Water Policy Challenges for Victoria. Dr Peter Coombes Overview of Water Policy Challenges for Victoria Dr Peter Coombes Insights from investigations into integrating urban drainage into water cycle management Working with Engineers Australia on this task

More information

Module 2 Measurement and Processing of Hydrologic Data

Module 2 Measurement and Processing of Hydrologic Data Module 2 Measurement and Processing of Hydrologic Data 2.1 Introduction 2.1.1 Methods of Collection of Hydrologic Data 2.2 Classification of Hydrologic Data 2.2.1 Time-Oriented Data 2.2.2 Space-Oriented

More information

Evaluation of Simhyd, Sacramento and GR4J rainfall runoff models in two contrasting Great Barrier Reef catchments

Evaluation of Simhyd, Sacramento and GR4J rainfall runoff models in two contrasting Great Barrier Reef catchments 20th International Congress on Modelling and Simulation, Adelaide, Australia, 1 6 December 2013 www.mssanz.org.au/modsim2013 Evaluation of Simhyd, Sacramento and GR4J rainfall runoff models in two contrasting

More information

Assessing ecological flow conditions for wetlands fed from ungauged stream reaches

Assessing ecological flow conditions for wetlands fed from ungauged stream reaches European Water 58: 119-126, 2017. 2017 E.W. Publications Assessing ecological flow conditions for wetlands fed from ungauged stream reaches A. Gül *, K. Ayyıldız, F. Barbaros and T. Baran Department of

More information

2

2 1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.

More information

of Surface Water Data (Environment Canada, 1994). The primary database consisted of

of Surface Water Data (Environment Canada, 1994). The primary database consisted of 45 5. HYDROLOGY 5.1 Database The hydrological data used in this study were extracted from the Hydat CD - ROM of Surface Water Data (Environment Canada, 1994). The primary database consisted of daily streamflow

More information

Grouping soil types based on soil properties- Impact on water balance modelling

Grouping soil types based on soil properties- Impact on water balance modelling 18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 9 http://mssanz.org.au/modsim9 Grouping soil types based on soil properties- Impact on water balance modelling Ji, F. 1, 2, M. Littleboy

More information