1 Site Waste Management Plan (SWMP) London Road East Waste Transfer Station CONTENTS 1.0 Introduction 2.0 Project Information 3.0 Declaration 4.0 Distribution and Review 4.1 Distribution 4.2 Review 5.0 Pre-Construction Waste Reduction Initiatives 6.0 Duty of Care Summary Tables 6.1 Inert & Non-Hazardous Wastes 6.2 Hazardous Wastes 6.3 Waste Brought onto Site 7.0 Completion Report 7.1 Comparison with Predictions 7.2 Deviations from the Plan 7.3 Cost Savings 7.4 Declaration APPENDICES APPENDIX 1 APPENDIX 2 WASTE MONITORING FORMS DUTY OF CARE EVIDENCE DOCUMENTS NOTE: THIS PLAN MUST BE KEPT AT THE MAIN SITE OFFICE AND BE ACCESSIBLE TO ANY AUTHORISED OFFICER CARRYING OUT A REGULATORY CHECK Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 1 of 15

2 Site Waste Management Plan (SWMP) London Road East Waste Transfer Station 1.0 INTRODUCTION This Site Waste Management Plan (SWMP) has been developed to enable the insert name of Contractor to efficiently manage waste materials produced through the life of the project in accordance with construction best practices and to generally accord with principles of the (now repealed) Site Waste Management Plan Regulations It also covers waste materials brought onto site for use in the project. This SWMP applies to all activities throughout the project. The Plan includes: brief details of the project including who is responsible for maintaining this SWMP (Section 2.0); a declaration signed by the principal parties to manage waste efficiently and legally (Section 3); a record of who the SWMP has been distributed to and when and why the document was reviewed (Section 4); information transferred from pre-contract documents supplied by the client and designer (Section 5.0); evidence that the Duty of Care checks have been carried out on all the waste managed on this project (Section 6.0); a comparison of the predictions with the actual waste removed, deviations from the Plan, estimate of the cost savings by operating the SWMP and the declaration that the Plan has been properly managed (Section 7.0); the predictions and subsequent monthly quantities of waste produced on the project (Appendix 1); the Duty of Care documentary evidence for each of the waste streams (Appendix 2). Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 2 of 15

3 Site Waste Management Plan (SWMP) London Road East Waste Transfer Station 2.0 PROJECT INFORMATION Project Name Project Number Client Principal Contractor Person Responsible for updating this SWMP Role in the Project Site Address Insert project name Insert project number Insert Client name Insert Principal Contractor Insert name of person responsible Insert title of person responsible Insert Address of site Brief Description of Proposed Works Insert description of works... Project Value xxxxxxx Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 3 of 15

4 Site Waste Management Plan (SWMP) London Road East Waste Transfer Station 3.0 DECLARATION The Client, Principal Contractor and major Sub-contractors will take all reasonable steps to ensure that: (a) (b) all waste from the site is dealt with in accordance with the waste Duty of Care in Section 34 of the Environmental Protection Act 1990 and the Environmental Protection (Duty of Care) Regulations 1991; and material will be handled efficiently and waste managed appropriately. Client Representative Insert Client name Insert name of person responsible Signature Date Principal Contractor Representative Insert Principal Contractor Insert name of person responsible Signature Date Sub-Contractor Representative Signature Date Sub-Contractor Representative Signature Date Add more subcontractor signature boxes as required. Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 4 of 15

5 Site Waste Management Plan (SWMP) London Road East Waste Transfer Station 4.0 DISTRIBUTION & REVIEW 4.1 Distribution This SWMP must be kept on site at all times. The controlled copy, held by (insert name of person responsible for updating this SWMP), must be available for inspection to authorised officers of the Environment Agency or the Planning Authority (Buckinghamshire County Council). The controlled copy of this SWMP is held by: Name Position Company Insert name of person responsible Insert title of person responsible Insert Principal Contractor Each subcontractor that produces waste whilst on site will receive an uncontrolled copy of the SWMP and a representative shall sign the declaration in Section 3.0. Uncontrolled copies of this SWMP have been distributed to the following: Name Position Company Insert name Insert position Insert company name Add more names as required. Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 5 of 15

6 Site Waste Management Plan Doc. No.: (Insert) Title: SITE WASTE MANAGEMENT PLAN AMERSHAM WASTE TRANSFER STATION 4.2 Review This SWMP shall be reviewed as often as is required to ensure that it reflects the progress of the project and in any event, not less than every three months. Date Name Nature of Changes Signed Insert date eg. First Draft/Rev 01 (title as appropriate) eg. Final/Rev 02 (title as appropriate) Describe changes signature signature ditto Describe changes signature Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 6 of 15

7 Site Waste Management Plan Doc. No.: (Insert) Title: SITE WASTE MANAGEMENT PLAN AMERSHAM WASTE TRANSFER STATION 5.0 PRE-CONSTRUCTION WASTE REDUCTION INITIATIVES The following initiatives were implemented during the pre-construction stages to reduce the quantity of waste produced over the life of the project. These are taken from client s information and typically include refurbishment/design changes, improvements to the cut/fill balance, off site pre-fabrication, specifying site-won material etc. Type of Waste Eliminated or Minimised Quantity Saved Decision Taken Estimated Cost Saving* Insert information Insert amount Insert information on decision Insert xxx Insert information Insert amount Insert information on decision Insert xxx *Estimated Cost Saving includes the value of raw materials and the cost of disposal Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 7 of 15

8 Site Waste Management Plan Doc. No.: (Insert) Title: SITE WASTE MANAGEMENT PLAN AMERSHAM WASTE TRANSFER STATION 6.0 DUTY OF CARE SUMMARY TABLES The following summary tables are used to ensure that (insert Principal Contractor) has carried out our Duty of Care checks on our waste contractors. We must carry out these checks and receive the documentary evidence before the waste goes off-site. WASTE DETAILS The List of Wastes codes can be found in: (insert name of document usually relates to the list of waste (EWC) codes) WASTE CARRIER The Carrier s registration details are found on the certificate (Ensure details match the contractor you are using and that the certificate is in date). The online checks on the waste carriers are carried out here for England & Wales at: Use a (insert Principal Contractor ) Waste Transfer Note (number of note) for Inert and Non-Hazardous Waste, and a Hazardous Waste Consignment Note (supplied by the contractor/regulator) for Hazardous Waste. DISPOSAL SITE The (insert Principal Contractor ) will find out from the waste carrier where they are taking the waste. The (insert Principal Contractor ) will request a copy of the relevant sections of the permit (front page showing permit number and the section covering the types of waste accepted) held by the site receiving the waste. The (insert Principal Contractor ) will check that the site is permitted to receive the type of waste that is being sent. This information is recorded on Tables 6.1 and 6.2. Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 8 of 15

9 Site Waste Management Plan Doc. No.: (Insert) Title: SITE WASTE MANAGEMENT PLAN AMERSHAM WASTE TRANSFER STATION 6.1 INERT & NON-HAZARDOUS WASTE WASTE DETAILS WASTE CARRIER DISPOSAL SITE Waste Type List of Wastes Code Source Name of Carrier and contact details Carrier Registration Details EA online check? Waste Transfer Note used single/annual Name of Site and contact details Environmental Permit or Exemption Details Conditions of Permit Checked? Describe the waste in words Enter the 6 figure List of Wastes code Enter the activity that produced the waste Enter name, address and contact details for the waste carrier Enter the registration number and expiry date State whether single or annual Note and expiry date if annual Enter name of site and contact details Enter waste licence number Confirm here that licence has been checked and contains types of waste we re sending & copy filed Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 9 of 15

10 Site Waste Management Plan Doc. No.: (Insert) Title: SITE WASTE MANAGEMENT PLAN AMERSHAM WASTE TRANSFER STATION 6.2 HAZARDOUS WASTES Site Hazardous Waste Registration Number: (insert number) WASTE DETAILS WASTE CARRIER DISPOSAL SITE Waste Type List of Wastes Code Source Name of Carrier and contact details Carrier Registration Details EA online check? Consignment Note used Number(s) Name of Site and contact details Environmental Permit or Exemption Details Conditions of Permit Checked? Describe the waste in words Enter the 6 figure List of Wastes code Enter the activity that produced the waste Enter name, address and contact details for the waste carrier Enter the registration number and expiry date Enter the number(s) of the Consignment Note(s) Enter name of site Enter waste licence and contact details number Confirm here that licence has been checked and contains types of waste we re sending & copy filed Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 10 of 15

11 Site Waste Management Plan Doc. No.: (Insert) Title: SITE WASTE MANAGEMENT PLAN AMERSHAM WASTE TRANSFER STATION 6.3 WASTES BROUGHT ONTO SITE WASTE DETAILS WASTE CARRIER PERMIT/EXEMPTION DETAILS Waste Type Tonnage List of Wastes Code Describe the waste in words Quantity Enter the 6 figure LoW code Source (i.e. process that produced it) Eg: demolition site, recycling facility Name of Carrier and contact details. Enter name, address and contact details for the waste carrier Carrier Registration Details Enter the registration number and expiry date EA/SEPA online check? Waste Transfer Note used single/annual State whether single or annual Note and expiry date if annual Type and Ref Number of Permit/Exemption used State whether exemption or standard permit and ref. number Expiry Date (if applicable) Insert date Conditions attached to permit/exemption Insert conditions eg: max quantity, max duration. Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 11 of 15

12 Site Waste Management Plan (SWMP) Amersham Waste Transfer Station 7.0 COMPLETION REPORT This section must be completed within 3 months of contract completion. 7.1 COMPARISON WITH PREDICTIONS The Predictions & Totals pages of the Waste Targets & Monitoring Form (insert doc no.) should be filed in this section once completed, in order to allow a comparison of the estimated quantities of each waste type against the actual quantities produced. 7.2 DEVIATIONS FROM THE PLAN Detail here the reasons why the actual waste quantities varied from the target quantity. 7.3 COST SAVINGS The cost savings as a result of diverting waste from landfill by operating this Site Waste Management Plan on this project are: (insert amount here) Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 12 of 15

13 Site Waste Management Plan (SWMP) Amersham Waste Transfer Station 7.4 DECLARATION I confirm that this Plan has been monitored on a regular basis and revised and updated as necessary, in accordance with construction best practices and the principles of the (now repealed) Site Waste Management Plan Regulations Name:... Signature:.. Date:.. Position:.. Company:. NOTE: THIS PLAN MUST BE KEPT FOR TWO YEARS AFTER COMPLETION OF THE PROJECT AT THE PRINCIPAL PLACE OF BUSINESS Once this section is complete, the whole document should be provided to the (insert title of person responsible, usually the Environmental Manager) to enable lessons learned to be disseminated throughout the company. Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 13 of 15

14 Site Waste Management Plan (SWMP) Amersham Waste Transfer Station APPENDIX 1 WASTE MONITORING FORMS The Waste Monitoring Form (insert doc number) is used to: Predict the types and quantities of waste produced by this project; Report on a monthly basis the types and quantities of waste actually produced by this project. The Predictions page of the Waste Monitoring Form (insert doc number) should be filed here. The monthly pages of (insert doc number) should be completed at the end of each month, and provided to (insert name/title) in the (insert eg. Admin Dept/HSEnv Dept), then printed and filed here. Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 14 of 15

15 Site Waste Management Plan (SWMP) Amersham Waste Transfer Station APPENDIX 2 DUTY OF CARE EVIDENCE DOCUMENTS For each waste type identified in Section 6, the following documentary evidence must be filed here before the waste goes off site: Copy of waste carrier s certificate; Check on Environment Agency website to verify carrier s certificate; Waste Transfer Note (insert doc number) or Hazardous Waste Consignment Note covering the movement of the waste; Copy of the relevant sections of the permit held by the site receiving the waste (eg. this should include the front page showing the permit number, and the section covering the types of waste accepted). Issue Number: 1 Issue Date: Insert Date Approved by: Insert Name Page 15 of 15

Construction Site Waste Management Process.

Construction Site Waste Management Process. Construction Site Waste Management Process. EMS DOCUMENT TYPE: ENVIRONMENTAL ASPECT: PURPOSE: Operational Control Document Waste Management To ensure we manage our waste in compliance with legislation

More information

DEFRA Consultation on Site Waste Management Plans for the Construction Industry (April 2007)

DEFRA Consultation on Site Waste Management Plans for the Construction Industry (April 2007) DEFRA Consultation on Site Waste Management Plans for the Construction Industry (April 2007) Summary The Department for Environment, Food and Rural Affairs is consulting on proposals to make Site Waste

More information

Beauly-Denny Replacement Transmission Line Project

Beauly-Denny Replacement Transmission Line Project Beauly-Denny Replacement Transmission Line Project for the Section from Beauly-Wharry Burn July 2010 Beauly-Denny Replacement Transmission Line Project Beauly-Denny Replacement Transmission Line Project

More information

Developments in Scottish Waste Management Legislation compared to England and Wales

Developments in Scottish Waste Management Legislation compared to England and Wales Developments in Scottish Waste Management Legislation compared to England and Wales Bruno P Bernacchi National Compliance Manager M.Sc. Waste Management Chartered Waste Manager (MCIWM) Chartered Environmentalist

More information

MATERIALS MANAGEMENT PLAN (MMP)

MATERIALS MANAGEMENT PLAN (MMP) MATERIALS MANAGEMENT PLAN (MMP) CONTENTS 1. INTRODUCTION...5 1.1 Background...5 1.2 Scope...5 1.3 Conclusions from the Environmental Impact Assessments...6 2. THE USE OF SITE-DERIVED MATERIALS...7 2.2

More information

Site Waste management Plan (SWMP)

Site Waste management Plan (SWMP) Author: M.Graney & Sons Ltd. 1. Project Title: Underpinning, Lower ground floor Extension and Refurbishment Works. 2. Location: 21 Old Church Street, London, SW3 5DL. 3. Nature of Project: The works comprise

More information

5 th July 2011 Vicki Cooper

5 th July 2011 Vicki Cooper Waste Legislation Compliance -avoiding the pitfalls 5 th July 2011 Vicki Cooper 360 Environmental Established in 2007 following career in waste management Support for businesses on waste legislation and

More information

BNPB3: Plasterboard - legislation and policy drivers

BNPB3: Plasterboard - legislation and policy drivers BNPB3: Plasterboard - legislation and policy drivers Version 1.6 This Briefing Note and referenced information is a public consultation document and will be used to inform Government decisions. The information

More information

ASSET MANAGEMENT SUSTAINABILITY POLICY 2016

ASSET MANAGEMENT SUSTAINABILITY POLICY 2016 ASSET MANAGEMENT SUSTAINABILITY POLICY 2016 SUSTAINABILITY POLICY STATEMENT FOR DEVELOPMENT PROJECTS In our activities as developers of buildings we uphold the aims of Sustainable Development: to enhance

More information

Hazardous Waste Management Policy

Hazardous Waste Management Policy Level 3 - H&S Policy Structure Hazardous Waste Management Policy BACKGROUND The University produces hazardous waste from all areas, not just laboratories and workshops, which means that this policy potentially

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

LEGISLATION AFFECTING WASTE BATTERIES

LEGISLATION AFFECTING WASTE BATTERIES INTRODUCTION THE WASTE PRODUCER There are several pieces of legislation that affect the storage, collection and recycling of waste batteries generated in the UK, and this guidance note gives an overview

More information

User Guide For Administrators, Project Users, and Read Only users

User Guide For Administrators, Project Users, and Read Only users User Guide For Administrators, Project Users, and Read Only users Version 4 August 2013 Page 1 of 48 V4 - Aug 2013 User Guidance Contents 1.0 What is BAM SMaRT?... 3 2.0 Getting Started (All)... 3 2.1

More information

For guidance on disposal of Polychlorinated Biphenyl (PCB) contaminated equipment or fluids, please refer to the Guidance Note NR/GN/ESD03.

For guidance on disposal of Polychlorinated Biphenyl (PCB) contaminated equipment or fluids, please refer to the Guidance Note NR/GN/ESD03. 1 Purpose This document provides information on how to effectively manage waste. This guidance is to support the requirements that are set out in the Level 2 Environment and Social Minimum Requirements

More information

Procedure 11 Recruitment and Training

Procedure 11 Recruitment and Training Procedure 11 Recruitment and Training Table of Contents 1 Introduction... 2 2 Head Office Personnel... 2 3 Auditors and Technical Expert Recruitment... 4 3.1 Flowchart of Recruitment Process... 4 3.2 Auditors

More information

Waste Management System.

Waste Management System. Waste Management System. Battery recycling Corporate Procedure: CP-WMS 006 Authorised by: Charlotte Winnert Issue number: Three Date of issue: 6 th August 2010 Purpose To define the University of Sheffield

More information

SOP-045 Waste Management Procedure for Contractors

SOP-045 Waste Management Procedure for Contractors Page 1 of 16 SOP-045 Waste Management Procedure for Contractors Last Review Details Refer to QPulse for full history Review Comments Review Owner Date Kindly review Marsh, Frank

More information

Construction Waste And The

Construction Waste And The Construction Waste And The Environment Alan Hodgson Senior Environmental Planning Officer Tees Valley Green Business Network Event 23 October 2008 Middlesbrough Covering Revisit once the slides are complete

More information

Procedure 14 Internal Audits

Procedure 14 Internal Audits Procedure 14 Internal Audits Table of Contents 1 Introduction... 2 2 Audit Planning... 2 2.1 Head Office... 2 2.2 Critical Locations... 3 3 Conducting the Audit... 3 4 Non-conformances... 3 5 Client file

More information

Waste Management System.

Waste Management System. Waste Management System. Battery recycling Corporate Procedure: CP-WMS 006 Authorised by: Charlotte Winnert Issue number: Five Date of issue: 13 June 2013 Purpose To define the University of Sheffield

More information

PERMANENT DOCUMENT CIG 023. Factory Inspection Report

PERMANENT DOCUMENT CIG 023. Factory Inspection Report PERMANENT DOCUMENT CIG 023 Factory Inspection Report WARNING: THIS DOCUMENT IS ONLY VALID IF USED BY ECS MEMBERS AND THEIR AUTHORISED AGENTS Approved by: ECS General Meeting 8-9 April 2014 No. of pages:

More information

Hazardous Waste Consignment Note Completion Guide ENGLAND & WALES ONLY

Hazardous Waste Consignment Note Completion Guide ENGLAND & WALES ONLY Hazardous Waste Consignment Note Completion Guide ENGLAND & WALES ONLY May 2015 Hazardous Waste Consignment Note Completion Guide This guide is to assist in how a Hazardous Waste Consignment Note should

More information

ASSET MANAGEMENT SUSTAINABILITY POLICY

ASSET MANAGEMENT SUSTAINABILITY POLICY ASSET MANAGEMENT SUSTAINABILITY POLICY SustainabILITY policy statement for development projects In our activities as developers of buildings we uphold the aims of Sustainable Development: to enhance the

More information

North West Site Waste Management Plan September 2011

North West Site Waste Management Plan September 2011 North West Site Waste Management Plan September 2011 Table of Contents Introduction... 1 Project Information... 1 Document Control... 4 Responsibilities... 4 Site Waste Management Plans Regulations 2008

More information

Assessing the costs and benefits of reducing waste in construction

Assessing the costs and benefits of reducing waste in construction Assessing the costs and benefits of reducing waste in New build concrete-framed office Value Percentage of 23m cost Cost saving potential 125,800 0.55% Additional costs to achieve these savings TOTAL POTENTIAL

More information

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004 RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL In accordance with ISO 14001:2004 Environmental Management System Manual Page 1 of 29 CONTENTS i ii iii iv

More information

Waste Duty of Care Guidelines Including Hazardous Waste Disposal Guidance

Waste Duty of Care Guidelines Including Hazardous Waste Disposal Guidance Waste Duty of Care Guidelines Including Hazardous Waste Disposal Guidance 1. Introduction As a University, we have a legal responsibility to ensure that we produce, store, transport and dispose of our

More information

Waste Management Plan

Waste Management Plan Plan Development Divisional Office Client Principal Contractor Principal Designer Lead Designer Location Description of Development Development Start Pewterspear Green Road, Warrington Manchester Neil

More information

McGrath works in partnership with Hackney Homes

McGrath works in partnership with Hackney Homes Case study: Achieving good practice waste recovery McGrath works in partnership with Hackney Homes Hackney Homes is using a partnering approach across the whole supply chain, to deliver the Decent Homes

More information

Integrated System Procedures Legionella Control Association Statement of Compliance

Integrated System Procedures Legionella Control Association Statement of Compliance Procedure No: IP-028 Rev No : 14 Rev Date : 20/07/2016 Page 1 of 7 The services offered by HBE (Healthy Built Environment) under the scope of this code of conduct are limited to: 1. Risk Assessment Services

More information

Waste Management System.

Waste Management System. Waste Management System. Mobile Phone Recycling Corporate Procedure: CP-WMS 012 Authorised by: Charlotte Winnert Issue number: One Date of issue: 30 June 2011 Purpose To define the University of Sheffield

More information

Assessing the costs and benefits of reducing waste in construction

Assessing the costs and benefits of reducing waste in construction Assessing the costs and benefits of reducing waste in 20 new build timber-framed houses Value Percentage of 1.36m cost Cost saving potential 21,470 1.58% Additional costs to achieve these savings TOTAL

More information

European Pathway to Zero Waste: embedding sustainable procurement for public sector organisations in south east England

European Pathway to Zero Waste: embedding sustainable procurement for public sector organisations in south east England Final Report : embedding sustainable procurement for public sector organisations in south east England Report on the provision of bespoke advice on embedding sustainable procurement within procurement

More information

Assessing the costs and benefits of reducing waste in construction trade packages

Assessing the costs and benefits of reducing waste in construction trade packages Assessing the costs and benefits of reducing waste in construction trade packages Dense concrete blocks and facing bricks, with mineral wool insulation batts Value Percentage of 100k spend Cost saving

More information

WAMITAB Level 4 Certificate in Waste and Resource Management

WAMITAB Level 4 Certificate in Waste and Resource Management WAMITAB Level 4 Certificate in Waste and Resource Management Guided Learning Hours: 150 Total Qualification time: 156 Total Credits: 19 Qualification Code: 601/2388/6 WAMITAB Code: 4WRM6a (Physical Treatment)

More information

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM)

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM) Costs and benefits of reducing waste in construction Defence sector new build Woolwich single living accommodation modernisation (SLAM) Value Percentage of 3.2m construction cost Cost saving potential

More information

Collection point guide

Collection point guide Collection point guide As a Recolight collection point, we provide you with a free lamp recycling service. The service is completely free and made possible because we are entirely funded by our lamp producer

More information

Examples of Hazardous Wastes produced by the University include:

Examples of Hazardous Wastes produced by the University include: Introduction This guidance document outlines how hazardous waste should be managed and disposed of from University of Kent premises at the Canterbury and Medway campuses. Further information about collection

More information

SEALES ROAD HAULAGE LTD QUALITY PROTOCOL: PRODUCTION CONTROL SYSTEM OF FINE FILL MATERIAL & RECYCLED TYPE 1 803

SEALES ROAD HAULAGE LTD QUALITY PROTOCOL: PRODUCTION CONTROL SYSTEM OF FINE FILL MATERIAL & RECYCLED TYPE 1 803 SEALES ROAD HAULAGE LTD QUALITY PROTOCOL: PRODUCTION CONTROL SYSTEM OF FINE FILL MATERIAL & RECYCLED TYPE 1 803 Flow Chart for the acceptance and processing of waste Factory production protocol Products

More information

CITY OF RIO VISTA Construction and Demolition Waste Management Plan and Disposal Report

CITY OF RIO VISTA Construction and Demolition Waste Management Plan and Disposal Report WMP / RECYCLING Applicant CITY OF RIO VISTA Construction and Demolition Waste Management Plan and Disposal Report Address, City, Zip Phone Number Contractor License Number Construction Type Job Address

More information

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015)

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015) Alcester Academy To be the best that we can be Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015) ALCESTER ACADEMY MANAGING CONTRACTORS POLICY REVIEW PROCEDURES The Managing Contractors

More information

Collection point guide England & Wales

Collection point guide England & Wales Collection point guide England & Wales Lamp collection guide for England & Wales As a Recolight collection point, we provide you with a free lamp recycling service. The service is completely free and made

More information

Genetic Modification. University Health and Safety Policy. Version 1: September 2015 Author: Health & Safety Services 1

Genetic Modification. University Health and Safety Policy. Version 1: September 2015 Author: Health & Safety Services 1 Genetic Modification University Health and Safety Policy Author: Health & Safety Services 1 Genetic Modification Procedure to support University Health and Safety Policy CONTENT Section Page 1 Introduction

More information

Waste Scheme. Version 1.4

Waste Scheme. Version 1.4 St. Ivel Way, Warmley, Bristol BS30 8TY T: +44 (0) 117 967 2222 F: +44 (0) 117 961 4122 E: beh@barrettine.co.uk www.barrettine.co.uk Waste Scheme Version 1.4 Directors: C.J. Bailey A.R.L. Greer BSc D.J.

More information

SUSTAINABLE PROCUREMENT POLICY. Numbered Document: 12

SUSTAINABLE PROCUREMENT POLICY. Numbered Document: 12 POLICY Numbered Document: 12 Developed by: Richard Taylor Issued: 1 Nov 2018 1 Introduction 2 Sustainable Procurement Policy 3 Key Principles 4 Environmental Management 5 Materials & Products 5.1 Ethical

More information

only by companies in the Process Construction and Maintenance (PCM) Scheme.

only by companies in the Process Construction and Maintenance (PCM) Scheme. Updated on 24 Aug 2018 FORM A: APPLICATION FOR PROCESS You can use this form to apply for MOM s In-Principle Support (IPS) to recruit or renew Non- Traditional Source (NTS) or PRC workers for Process Maintenance

More information

CONSTRUCTION WASTE MANAGEMENT PLAN

CONSTRUCTION WASTE MANAGEMENT PLAN CONSTRUCTION WASTE MANAGEMENT PLAN The 2016 California Green Building Standards Code (Cal Green Code) is effective January 1, 2017. The Cal Green Code, Section 4.408 (Residential) and Section 5.408 (Nonresidential)

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

Certificate of Proper Waste Management of Waste in Germany

Certificate of Proper Waste Management of Waste in Germany Certificate of Proper Waste Management of Waste in Germany 1. The Record of Proper Waste Management (RPWM) Procedure Waste producers in Germany generating more than 2000 kg hazardous waste per year have

More information

Smart Meters Programme Schedule 5.2. (Software) (CSP South version)

Smart Meters Programme Schedule 5.2. (Software) (CSP South version) Smart Meters Programme Schedule 5.2 (Software) (CSP South version) Schedule 5.2 (Software) (CSP South version) Amendment History Version Date Status v.1 Signature Date Execution copy SCHEDULE 5.2 SOFTWARE

More information

WASTE LEGISLATION - THE COST OF NON-COMPLIANCE

WASTE LEGISLATION - THE COST OF NON-COMPLIANCE WASTE LEGISLATION - THE COST OF NON-COMPLIANCE When you re managing several construction sites, spread across several counties, ensuring all the waste from each of them is handled in compliance with the

More information

Guidance statement - Premises notification for the Hazardous Waste Regulations

Guidance statement - Premises notification for the Hazardous Waste Regulations Guidance statement - Premises notification for the Hazardous Waste Regulations Background In 2009, the Hazardous Waste Regulations 1 (the Regulations) were amended so that all places where hazardous waste

More information

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663 August 2013, Rev 00 01 7419 Construction Waste Management PART 1. GENERAL 1.01 Requirements Include: A. Each Contractor provide: 1. Participation in Construction Waste Management plan, including separation

More information

Wylfa Newydd Project Site Preparation and Clearance Application

Wylfa Newydd Project Site Preparation and Clearance Application ENERGY WORKING FOR BRITAIN Wylfa Newydd Project Site Preparation and Clearance Application Environmental Management Plan Management of Materials and Waste Procedure Table of Contents 1 Introduction 1

More information

STANDARD OPERATING PROCEDURE TEAM INSPECTIONS

STANDARD OPERATING PROCEDURE TEAM INSPECTIONS PHARMACEUTICAL INSPECTION CONVENTION PHARMACEUTICAL INSPECTION CO-OPERATION SCHEME PI 031-1 Annex 29 July 2009 STANDARD OPERATING PROCEDURE TEAM INSPECTIONS PIC/S July 2009 Reproduction prohibited for

More information

INFORMATION ABOUT YOUR ORGANISATION

INFORMATION ABOUT YOUR ORGANISATION INFORMATION ABOUT YOUR ORGANISATION Your Organisation s name: Address: Town/City: Postcode: Date this information supplied: Your contact details for the Assessment: Email: Mobile phone: Office/work phone:

More information

Baselines and benchmarks 2009

Baselines and benchmarks 2009 Benchmarks and Baselines 2009 Executive Summary The aim of this work, which has been funded by the Construction Resources and Waste Platform 1, was to produce a set of benchmarks for the arsings for construction

More information

European Union (Packaging) Regulations, 2014

European Union (Packaging) Regulations, 2014 European Union (Packaging) Regulations, 2014 APPLICATION FOR REGISTRATION RENEWAL UNDER REGULATION 14 For period ending 31 st December 1. Registered Office of Company or Principal Place of Business (if

More information

To: FedEx Express Belgium EC 300/2008 Return by Fax at:

To: FedEx Express Belgium EC 300/2008 Return by Fax at: FedEx Express Account Number: Please see attached Appendix - A - for additional Account Numbers and/or Company Sites. To: FedEx Express Belgium EC 300/2008 Return by Fax at: 02 752 76 20 Account Consignor

More information

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers FACTORY INSPECTION PROCEDURES AND TESTS Requirements for Manufacturers Warszawa, February 1, 2012 CONTENTS Page No. FOREWORD 2 1 INTRODUCTION 2 2 DEFINITIONS 2 2.1 Factory Location/Manufacturer s Premises

More information

Waste Management Policy

Waste Management Policy Waste Management Policy Contents 1. Introduction 2. Policy Statement 3. Policy Objectives 4. Application 5. Organisation and Management 6. Glossary of Terms Document Control Information: Last updated on:

More information

Construction Waste Measurement Guide

Construction Waste Measurement Guide Draft V6 Last updated: February 2013 Construction Waste Measurement Guide A guide to measuring and reporting waste from construction activities 1 Introduction This document provides guidance on how to

More information

Environmental Guidance Document

Environmental Guidance Document Basic Preamble Environmental Guidance Document The Producer Responsibility Obligations (Packaging Waste) Regulations 2007 and 2010 amendments 1. First proposed in August 1992 and implemented in June 1996,

More information

Benefits of the WRAP SWMP Template. Birmingham, 1 April 2008

Benefits of the WRAP SWMP Template. Birmingham, 1 April 2008 Benefits of the WRAP SWMP Template Birmingham, 1 April 2008 Dehlia Farrow Associate Director Environment, Halcrow Use of WRAP SWMP Template Improve your project s waste and resource efficiency Demonstrate

More information

WAMITAB Level 4 Certificate in Waste and Resource Management

WAMITAB Level 4 Certificate in Waste and Resource Management WAMITAB Level 4 Certificate in Waste and Resource Management Guided Learning Hours: 30 Total Qualification time: 216 Total Credits: 22 Qualification Code: VRQ4 WAMITAB Code: 603/3581/6 VRQ406 (Physical

More information

Cannon will ensure all your hygiene requirements are met as your business needs evolve.

Cannon will ensure all your hygiene requirements are met as your business needs evolve. duty of care Cannon will ensure all your hygiene requirements are met as your business needs evolve. We have produced this guidance leaflet to enable our customers to be aware of the implications of recent

More information

CENTRAL MARKS DEPARTMENT II. Ref: CMD-II/16:

CENTRAL MARKS DEPARTMENT II. Ref: CMD-II/16: CENTRAL MARKS DEPARTMENT II Ref: CMD-II/16: 15939 06 09 2013 Subject : Implementation of Scheme of Testing & Inspection, Doc: STI/15939/1, for BIFENTHRIN WP as per IS 15939:2011. The Scheme of Testing

More information

Aberdeen Harbour Expansion Project. Construction Environmental Management Document

Aberdeen Harbour Expansion Project. Construction Environmental Management Document Aberdeen Harbour Expansion Project Construction Environmental Management Document 11th May 2017 Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Chapter 6 Chapter 7 Chapter 8 Chapter 9 Chapter

More information

SSIP DEEMED TO SATISFY APPLICATION ADDITIONAL CDM/PD ADVISER ROLES INFORMATION ABOUT YOUR ORGANISATION

SSIP DEEMED TO SATISFY APPLICATION ADDITIONAL CDM/PD ADVISER ROLES INFORMATION ABOUT YOUR ORGANISATION SSIP DEEMED TO SATISFY APPLICATION ADDITIONAL CDM/PD ADVISER ROLES INFORMATION ABOUT YOUR ORGANISATION Your Organisation s name: Address: Town/City: Postcode: Date this information supplied: Your contact

More information

Demolition Waste Management Plan Guidelines

Demolition Waste Management Plan Guidelines Demolition Waste Management Plan Guidelines A resource for Western Australian Local Government, Developers, Property Owners and Demolition Contractors Contents 1 Introduction... 2 2 Project Planning...

More information

Sustainability Best Practice Case Study. Reducing Waste, Reducing Cost. The UK construction industry waste challenge

Sustainability Best Practice Case Study. Reducing Waste, Reducing Cost. The UK construction industry waste challenge Sustainability Best Practice Case Study Reducing Waste, Reducing Cost With the construction industry sending 17% of its total waste produced to landfill each year and spiralling landfill costs the UK government

More information

RSPH Level 4 Certificate in Asbestos Laboratory and Project Management

RSPH Level 4 Certificate in Asbestos Laboratory and Project Management RSPH Level 4 Certificate in Asbestos Laboratory and Project Management August 2016 Guided Learning Hours 18 Total Qualification Time 140 Ofqual Qualification Number 603/0275/6 Description Laboratory managers

More information

Guidance on the Storage and Recommissioning of Traction and Rolling Stock

Guidance on the Storage and Recommissioning of Traction and Rolling Stock Guidance on the Storage and Recommissioning of Traction and Rolling Synopsis This document gives guidance on the storage and recommissioning of traction and rolling stock that is withdrawn from operation

More information

MMU Non-hazardous Waste Management Procedure

MMU Non-hazardous Waste Management Procedure 1. Introduction and Purpose To explain how waste and recycling is managed at Manchester Metropolitan University (MMU). To ensure that waste management objectives and targets are achieved. To ensure that

More information

Construction Waste Management Plan Guidelines. A resource for Western Australian Local Government, Developers, Property Owners and Builders

Construction Waste Management Plan Guidelines. A resource for Western Australian Local Government, Developers, Property Owners and Builders Construction Waste Management Plan Guidelines A resource for Western Australian Local Government, Developers, Property Owners and Builders Contents 1 Introduction... 2 2 Project Planning... 3 3 Construction

More information

State of the Nation Report

State of the Nation Report State of the Nation Report Landfilling Practices and Regulation in Scotland Contents 1. Summary of Solid Waste Management Sector... 2 2. Overview of Landfill Practices... 5 3. Key Stakeholders in the solid

More information

CONTROLLING CONTRACTORS (Completely Rewritten)

CONTROLLING CONTRACTORS (Completely Rewritten) CONTROLLING CONTRACTORS (Completely Rewritten) 1.0 Purpose To ensure that the Health, Safety and Environmental risks associated with the employment of contractors are controlled through compliance with

More information

BUREAU OF INDIAN STANDARDS (CMD II)

BUREAU OF INDIAN STANDARDS (CMD II) BUREAU OF INDIAN STANDARDS (CMD II) Our Ref: CMD/16:15477 01 12 2006 Subject: STI for IS 15477:2004. Title: Adhesive for Use with Ceramic Tiles and Mosaics. The Scheme of Testing and Inspection for IS

More information

Environmental Policy

Environmental Policy Environmental Policy July 2014 C.E.P Demolition Ltd Yard E Barclay Curle Complex 739 South Street Whiteinch Glasgow G14 0BX Tel: 0141 569 1577 0141 569 1579 Email: enquiries@cepdemolition.co.uk Section

More information

ORDERING OF GOODS AND SERVICES AND PAYMENT OF ACCOUNTS

ORDERING OF GOODS AND SERVICES AND PAYMENT OF ACCOUNTS SECTION 10 ORDERING OF GOODS AND SERVICES AND PAYMENT OF ACCOUNTS TABLE OF CONTENTS Page Contacts for Section 10 3 10.1 Introduction 5 10.2 Orders for goods and services 5 10.3 Ordering via the Internet

More information

F.No. S/22-Gen-402/ /AM(I) Part-I Date: PUBLIC NOTICE No. 56/2018

F.No. S/22-Gen-402/ /AM(I) Part-I Date: PUBLIC NOTICE No. 56/2018 OFFICE OF THE COMMISSIONER OF CUSTOMS (NS-III), MUMBAI ZONE-II, JAWAHARLAL NEHRU CUSTOM HOUSE, NHAVA SHEVA, TALUKA URAN, DISTRICT RAIGAD, MAHARASHTRA-400707. F.No. S/22-Gen-402/2017-18/AM(I) Part-I Date

More information

A62 UT PRE-CONSTRUCTION MEETING AGENDA

A62 UT PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

Tool for measuring the recovery rates in CDEW MRFs

Tool for measuring the recovery rates in CDEW MRFs Guidance notes Tool for measuring the recovery rates in CDEW MRFs Guidance notes for the Site-Specific Waste Analysis Tool (SSWAT) to measure recovery rates of construction, demolition and excavation waste

More information

Managing Contractors (Scotland)

Managing Contractors (Scotland) Managing Contractors (Scotland) University Health and Safety Policy Author: Health & Safety Services 1 Managing Contractors Procedures (Scotland) to support University Health and Safety Policy CONTENT

More information

Halving Waste to Landfill

Halving Waste to Landfill Case study: BAM Construct Halving Waste to Landfill BAM Construct UK was one of the first contractors to sign up to the Halving Waste to Landfill industry commitment in 2008. Since then, BAM has been working

More information

Health and Safety Policy Standard

Health and Safety Policy Standard Health and Safety Policy Standard Issue Date: 1 st July 2010 Authority: Directors, AES Group Applicability: AES Group covering all business divisions, operating companies and business units throughout

More information

REDUCE REUSE RECYCLE RECOVER. Calculation and Payment of the Waste Disposal Levy GUIDANCE FOR WASTE DISPOSAL FACILITY OPERATORS VERSION TWO

REDUCE REUSE RECYCLE RECOVER. Calculation and Payment of the Waste Disposal Levy GUIDANCE FOR WASTE DISPOSAL FACILITY OPERATORS VERSION TWO REDUCE REUSE RECYCLE RECOVER Calculation and Payment of the Waste Disposal Levy GUIDANCE FOR WASTE DISPOSAL FACILITY OPERATORS VERSION TWO Disclaimer While every effort has been made to ensure that this

More information

[Insert name of product/s covered by the protocol]

[Insert name of product/s covered by the protocol] [Insert name of product/s covered by the protocol] WRITTEN: CHECKED: Signature: Position: Date: AUTHORISED TO PROCEED: Signature: Position: Date: Insert name of transferring site Insert name of receiving

More information

Regulation No. 281 of the Government of the Republic of Estonia of 28. September Procedure for Import, Export and Transit of Strategic Goods

Regulation No. 281 of the Government of the Republic of Estonia of 28. September Procedure for Import, Export and Transit of Strategic Goods Regulation No. 281 of the Government of the Republic of Estonia of 28. September 1999 Procedure for Import, Export and Transit of Strategic Goods I. General Provisions Para. 1. This Procedure regulates

More information

Section 11 Audit Procedures

Section 11 Audit Procedures Section 11 Control System & Audit Section 11 Audit 11.1 Adherence to the control system 11.1.1 Any operator who produces, prepares, stores, or imports from a third country organic products or who places

More information

GUIDELINES FOR COMPLETION OF PLANT HEALTH ASSURANCE CERTIFICATES

GUIDELINES FOR COMPLETION OF PLANT HEALTH ASSURANCE CERTIFICATES GUIDELINES FOR COMPLETION OF PLANT HEALTH ASSURANCE CERTIFICATES REVISION REGISTER Revision No. Date of Issue Amendment Details 01 04/06/07 NEW ISSUE 02 11/12/09 UPDATED ISSUE 03 25/11/10 UPDATED ISSUE

More information

WASTE MANAGEMENT January 2014

WASTE MANAGEMENT January 2014 WASTE MANAGEMENT January 2014 How Are We Doing? LTI s 0 in last 12 months Period Location Oil & Gas Base AFR Oil & Gas Sites AFR Total AFR December 0 0 0 2013 0 0 0 Statistics presented one month in arrears.

More information

Design out. Waste Workshop. A guidance document produced by Network Rail in collaboration with:

Design out. Waste Workshop. A guidance document produced by Network Rail in collaboration with: Design out Waste Workshop A guidance document produced by Network Rail in collaboration with: Guidance on Designing out Waste: How to run a Design out Waste Workshop This document provides guidance on

More information

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

BS EN ISO 9001 QUALITY ASSURANCE MANUAL PAC PRICE ARTHUR CONSULTANCY BS EN ISO 9001 QUALITY ASSURANCE MANUAL COPY NO: 025 ISSUE: 4 QUALITY ASSURANCE MANUAL BS EN ISO 9001 CONTENTS PAC Price Arthur Consultancy - Building Services Consulting Engineers

More information

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority

More information

CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:2933 (Part 1)

CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:2933 (Part 1) CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:2933 (Part 1) 20 03 2014 Subject: Implementation of revised STI for IS 2933 (Part for ENAMEL, EXTERIOR: (a) UNDERCOATING (b) FINISHING SPECIFICATION PART 1

More information

Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp

Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp Case study Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp By thinking Best Value, not Least Cost when reviewing the way they procure and manage

More information

Crane/Lifting Operations Supervisor

Crane/Lifting Operations Supervisor Background New S/NVQ: The S/NVQ Level 3 in Controlling Lifting Operations will become the scheme requirement for demonstration of competence for the categories of A61 Appointed Person and Crane/Lifting

More information