1 Linking Construction Process Improvement to Business Benefit Matthew Finnemore, Marjan Sarshar School of Construction & Property Management, University of Salford, Salford Abstract The construction industry is under increasing pressure to increase productivity and deliver a service of consistent quality [Latham 1994]. The Egan Report of July 1998 [Egan 1998], emphasised the call for productivity improvements and urged the industry to focus in particular on construction processes. SPICE [Sarshar et al. 2000] directly addresses this issue by developing a framework that provides direction and guidance for construction organisations to improve their processes. However, research in other sectors has suggested that for a process improvement initiative to be successfully implemented and embraced by management, it must be aligned with organisational strategy and real business benefit demonstrated. This paper introduces proposed research that sets out to investigate the ability of a SPICE construction process improvement initiative to deliver desired business benefits by aligning itself to the business strategy of the implementing organisation. Keywords - SPICE, process improvement, Balanced Scorecard, performance measurement.

2 1. CONSTRUCTION PROCESS IMPROVEMENT For many years, businesses within the construction sector have been implementing new initiatives to improve productivity and attain quality gains [Sarshar et al. 1998, British Quality Foundation 1996, KPI 2000]. However, despite new methods of working and technologies to improve productivity and attain quality gains, the targets set by Sir Michael Latham in 'Constructing the Team' [Latham 1994] have yet to be achieved. In his report of July 1998, Sir John Egan [Egan 1998] emphasised the call for productivity improvements and urged the industry to focus in particular on construction processes. Hammer and Champy [1993] also suggest that it is no longer enough for organisations to do traditional tasks better, but rather recommended that the old "Individual-based task-oriented" management concept be discarded completely and replaced with a "team-based process-oriented" management concept. However, until now, the industry has not had a recognised methodology or framework on which to base a process improvement initiative. The absence of guide-lines has meant that any improvements are isolated and benefits cannot be co-ordinated or repeated. The industry is unable to systematically assess construction process, prioritise process improvements, and direct resources appropriately. Moreover, it is not possible for companies to benchmark and measure their performance relative to other organisations. 2. SPICE (STRUCTURED PROCESS IMPROVEMENT FOR CONSTRUCTION ENTERPRISES) Structured Process Improvement for Construction Enterprises (SPICE) is a research project that is developing a process improvement framework for the construction industry. Increasing evidence from other sectors [Imai 1986, Paulk 1993] shows that continuous process improvement is based on many small, evolutionary steps, rather than revolutionary measures. The philosophies of W. Edwards Deming [1986] & Joseph Juran [1988] teach that real process improvement must follow a sequence of steps, starting with making the process visible, then repeatable, and then measurable. Using this philosophy, the SPICE project has been developed as an evolutionary step-wise model utilising extensive experience from the IT sector. The research focuses specifically on the use of the Capability Maturity Model (CMM) [Paulk 1993, Saidian 1995] which was developed for, and is used by the United States

3 Department of Defense. The framework is composed of two elements. The model itself, shown in Fig. (i), and the assessment mechanism. 2.1 Model 2.2 The Assessment Figure (i) - The SPICE Model The SPICE assessment approach is shown in Figure (ii) below. ON SITE Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Introduce Introduce & gain Improvement Implement and assessment Interview team management workshop and monitor Complete members Commitment final report improvement plan Questionnaire OFF SITE Analyse Questionnaire Responses Analyse collected data Figure (ii) The SPICE Assessment Approach

4 3. THE RESEARCH AREA The development of the SPICE framework has been carried out in close collaboration with industrial partners and is supported by the DETR. This close industrial collaboration has provided vital research direction, but has also raised some important questions that cannot be addressed within the scope of the SPICE research. A recurring theme raised during interviews with industry managers and throughout the case studies has been the alignment of a SPICE process improvement initiative with general business goals and strategies. Process improvement programmes are introduced in an organisation to target mid and long-term business goals that assure profitability and competitiveness in the global (IT) market [Ibanez 1998a]. Managers want to know the potential of a process improvement initiative to deliver real business benefit. If construction companies are to embrace the concepts of process improvement, it is vital that any potential business benefits can be demonstrated. Many organisations are making large investments in process improvement, and it is important that the benefits of those investments are quantified [Butler 1995]. It is proposed that further interviews will be conducted with industry representatives as part of the research to confirm this need for alignment and explore how this has been attempted by the case study participants to date. During the recent case study assessments, the improvement workshops (see Fig.(ii), stage 4) have typically generated improvement recommendations to the participating organisations. A management team has then reviewed these suggestions and decided which to take forward and implement. This prioritisation is based the feasibility of each, in terms of cost implications, resource requirements etc. and also their potential impact to the business. However, to date, this decision has generally been based on rule of thumb and experience. It is suggested that a more formal and accountable technique is required to align the process improvement suggestions with business aims, strategies and goals. 4. LINKING SPICE RESULTS TO BUSINESS OBJECTIVES The model(s) themselves provide no support in linking the improvement initiatives to the potential business results that could be expected [Ibanez 1998] but business and management literature is strewn with attempts to demonstrate that certain policies, strategies, tactics or activities lead to improved business performance [BQF 1998]. One of the thorniest problems confronting top management, Janson [1980] suggests, is how best to improve production efficiency - and how to find out whether any steps taken to foster that improvement actually

5 work. Dion's [1993] experiences at Raytheon suggest that for management to persevere with a process improvement initiative, two important ingredients are required: First, there must be some short term benefit to on-going projects, and second, there must be a meaningful quantification of what that benefit is. The IT sector has some experience in this field, and although it is acknowledged that several different methods can be used to show the benefits of process improvements [Butler 1995], significant benefits have been reported from implementing the CMM framework. For example, Hughes Aircraft (USA) reported a 5:1 Return on Investment (ROI), and Raytheon (USA) achieved a 7.7:1 ROI and 2:1 productivity gains [Saiedian 1995]. Industry analysis by J. Herbsleb [Herbsleb 1994, 1994a] showed that companies implementing CMM achieved an average of 35% productivity improvements and an average of 39% post delivery defect reduction. 5. BUSINESS PERFORMANCE MEASUREMENT TECHNIQUES Software process literature indicates that the term Return on Investment (ROI) is commonly used in the IT sector when reporting business benefit. Under this umberella term various type of metrics are employed by the software industry. Some of the more common elements are listed below. Defect Rates Productivity ROI terms Payback period Investment ROI Cost of Quality Cost of conformance Cost of non-conformance Maintenance Costs Earned Value Measures Weighted Milestone Fixed Formula Percentage complete estimates Percentage complete and milestone gates Equivalent completed units Earned standards Apportioned relationship to discrete work Level of effort These metrics include many tangible measures that are relatively easy to quantify. However, these terms often include various intangibles that are not only valid but also crucial to an accurate measurement of ROI. Less tangible items could include customer confidence, competitiveness, effects of downtime, impact on productivity, and lost opportunities. Because

6 it is less costly to compute an estimated ROI (because of the intangible values), Smith [1999] concludes that most ROI's are heavily estimated rather than measured. Smith goes on to say that good management planning should include the steps necessary to select the proper method to compute ROI, accurately report ROI, identify necessary success factors that relate directly to your product and organizational structure, then strategically leveraging them. In addition, companies have traditionally only looked to the quarterly and annual financial reports to indicate the success of the organisation, but this is only an indicator of past performance. Financial data in isolation only tells part of the story and can give misleading signals for continuous improvement and innovation [Kaplan 1992]. Companies are still using the traditional financial accounting model as they attempt to build internal assets and capabilities, and to forge linkages and strategic alliances with external parties. Financial performance measures worked well for the industrial era, but they are out of step with the skills and competencies companies are trying to master today [Kaplan 1992]. Epstein [1997] recommends that performance measurement systems should contain many nonfinancial indicators to complement financial ones, particularly with respect to customer perceptions and performance of internal processes. 6. THE BALANCED SCORECARD The 'Balanced Scorecard' performance measurement system developed at Harvard University [Kaplan 1996] attempts to address many of the issues mentioned by allowing executives to view a company from several perspectives simultaneously. It includes traditional financial measures that reveal the results of actions already taken, but also three sets of operational measures that show customer satisfaction, internal processes, and the organisations ability to learn and improve - operational measures that are the drivers of future financial performance. In this way, the scorecard is balanced because it represents external measures for shareholders and customers, and internal measures of critical business processes, innovation, and learning and growth. The measures are balanced between the outcome measures - the results of past efforts - and the measures that drive future performance. The Balanced Scorecard identifies a business as having four perspectives: Customer - How do customers see us? Internal / Business Processes - What must we excel at? Learning & Growth - Can we continue to improve and create value? Financial - How do we look to shareholders?

7 The Balanced Scorecard Framework and development route can be seen in Appendix A. As well as being a measurement tool for gauging business performance, the balanced scorecard is also used as a strategic business management system. With previous performance measurement systems, most organisations use their non-financial measures for local improvements only, for example their front-line and customer facing operations. The objectives and measures for the balanced scorecard however, are derived from a top-down process driven by the mission and strategy of the business unit. This means that rather than business improvements occurring locally, they have an organisation wide impact that addresses specific business objectives. The Balanced Scorecard has received much literary acclaim [Hepworth 1998], and a survey by Chow [1997] has indicated that managers consider the Balanced Scorecard concept to be extremely beneficial. It is therefore proposed that the Balanced Scorecard could be used to align process improvement suggestions resulting from a SPICE assessment with an organisations overall business aims and objectives. Additionally, benefits derived from a process improvement initiative could be demonstrated not only in financial terms, but also to include less tangible measures in the other three perspectives as well. 7. THE PROPOSED FRAMEWORK This area is under current investigation by the software industry [Ibanez 1998, 1998a]. The European Software Institute is developing a framework that aligns a balanced scorecard with software process improvement. They argue that by identifying relationships among the tangible objectives on the four perspectives, the business benefits of the software process improvement programme can be evidenced. They acknowledge that the value-added by aligning internal processes and activities to business objectives is an important factor for maintaining business competitiveness. This research will develop a similar framework for the construction industry based on Figure (iii). This will not be a duplication of the European Software Institute model since the transfer of innovation across geographical and industrial boundaries is not a linear one, but rather concepts very often need to be re-packaged, modified or tailored to suit the new environment. [Lillrank 1995] The research has also considered the importance of scoping when adopting this approach. Firstly, the target business unit. ie. whether the improvement initiative is being implemented at an organisational level or at individual project level. At project level, objectives should be the same as, or a sub-set of the overall business objectives.

8 SPICE ASSESSMENT BALANCED SCORECARD Delivers PROCESS IMPROVEMENT RECCOMENDATIONS Compare Delivers STRATEGIC MEASURES ALIGNED TO OBJECTIVES Delivers PRIORITISED PROCESS IMPROVEMENT RECCOMENDATIONS BASED ON BUSINESS OBJECTIVES Figure (iii) The Proposed Framework Secondly, the timing of assessment. Business objectives and priorities can change in a relatively short period of time especially within the context of an individual construction project that may only be a matter of months in duration. In addition, business objectives may change at any point during a process improvement cycle. A popular process improvement paradigm is based on a three phase cycle of stabilization, control, and change which applies the principles of Deming [1986] and Juran [1988]. Some believe that the rewards of process improvement are reaped only when an entire three-phase cycle has been completed. However, the experience of Raytheon [Dion 1994] states that benefits accrue during the first two phases as well. 8. LINKS BETWEEN SPICE AND THE FOUR BALANCED SCORECARD PERSPECTIVES SPICE focuses specifically on internal construction processes, which makes up one quarter (25%) of an overall balanced scorecard. However, Kaplan and Norton [1996] suggest that the success or failure of these processes can influence all perspectives of the Balanced Scorecard through a cause and effect relationship chain. (See Figure (iv))

9 Financial Return on Capital Emp. Customer Customer Loyalty On-time Delivery Internal/ Business Process Process Quality Process Cycle Time Process Improvements can impact all perspectives Learning & Growth Employee Skills Figure (iv) - Based on a diagram by Kaplan & Norton [1996] 9. RESEARCH METHODOLOGY The subject area will be first be investigated via a thorough literature review of related material. Specific data for the SPICE assessments and the Balanced Scorecards will be collected using the action research techniques defined by Lewin [1946]. This involves the planned intervention by the researcher into some naturally occurring events. In particular, case studies, have been identified as the most suitable method of investigation in this situation since the studies were based in a 'live' construction environment and the control mechanisms available under laboratory conditions could not be created. However, the research will not necessitate the extensive periods of time 'in the field' required by ethnological research to develop detailed observational evidence. The case studies will be carried out with close collaboration from industrial partners in order to validate the theories and proposals. It is hoped that by maximising industrial collaboration, the research and its findings will maintain a high degree of industrial credibility since it is generally acknowledged that there are large gaps between industrial perspectives and requirements, and the academic outlook [Brandon 1999]. However, Gill [1986] warns that close collaboration between the distinctive and very different cultures of the managerial and academic worlds gives rise to issues about whether the aims of the work

10 will be concerned primarily with problem solving for the particular organisation, or with producing theoretical generalizations for the wider community. Although the results of the case studies will be specific to the participating organisations, it is hoped that by analytic generalization, the theories developed will also be of use to the wider construction community. Case studies are generalizable to theoretical propositions and not to populations and universes [Yin 1994]. The goal of a single case study is to do a generalizing and not a particularizing analysis. 9.1 Specific Data Collection The data for the SPICE case study will be collected in accordance with the CMM framework [Paulk 1993] and consists of the following. Questionnaires Semi-structured interviews Document review The SPICE assessment, and in particular the semi structured interviews, relies extensively on an ideographic approach [Burrell & Morgan 1979] which emphasizes the analysis of subjective accounts that one generates by 'getting inside' situations and involving oneself in the everyday flow of life. However, to maintain the reliability and validity of the largely subjective data a chain of evidence is maintained via a tracibility matrix. This matrix ensures that each proposed finding is substantiated by multiple sources of data. The case study to develop a Balanced Scorecard will collect data in the method prescribed in Kaplan & Norton [1996] Workshops Semi-structured interviews 10. CONCLUSION The SPICE framework provides construction organisations with a structured approach to developing a series of potential process improvement activities. However, in isolation the model provides no guarantee or indication that the suggested improvement initiatives will deliver any desired business benefits. The Balanced Scorecard method of business management analyses an organisation simultaneously in four perspectives. The indicators identified in the scorecard to measure the

11 performance of each perspective are derived strategically 'top-down' from the organisations overall business objectives. In this way, only those activities that are considered vital to the organisations success are measured. By comparing these measures with the results of a SPICE assessment, the improvement suggestions derived could be methodologically prioritised for action according to their potential impact on the business.

12 11. References Brandon, P.S., et.al. (1999), "Engagement Leading to Enchantment", in Linking Construction Industry Needs and Construction Research Outputs, CRISP Consultancy Commission 98/1, London, June. British Quality Foundation (1996), "Guide to Self Assessment 97", British Quality Foundation British Quality Foundation (1998) "Evidence of Excellence", UK Excellence, December, Burrell, G & Morgan, G. (1979) "Sociological Paradigms and Organisational Analysis", Heinemann, London Butler, Kelley L, (1995) "The Economic Benefits of Software Process Improvement", Crosstalk, Software Technology Support Center, Hill Air Force Base, Utah, July, Volume 8, Number 7 Chow, Chee W. (1997), "Applying the Balanced Scorecard to Small Companies", Management Accounting Deming, W.E., (1986), "Out of the Crisis" MIT Center for Advanced Engineering Study, Cambridge, Mass. Dion, Raymond, (1993), "Process Improvement and the Corporate Balance Sheet" IEEE Software, Volume 10, Number 3, pp July Egan, Sir J. (1998), Rethinking Construction, HMSO, July Epstein, Marc J, (1997), "Translating Strategy into Action" Management Accounting, August pp Gill, John & Johnson, Phil, (1997), "Research Methods for Managers", Paul Chapman Publishing Ltd. Hammer, Michael & Champy, James (1993) "Reengineering the corporation : a manifesto for business revolution", London, Nicholas Brealey Publishing Ltd Hepworth, Paul (1998), "Weighing it up - a literature review for the balanced scorecard" Journal of Management Development, Vol.17 No.8 pp MCB University Press Herbsleb, J., et al, (1994), "Software Process Improvement: State of the Payoff." American Programmer, September

13 Ibanez, M & Reo, D. (1998), "Aligning Software Process Improvement with Business Goals. ESI Balanced IT Scorecard - First Results", Conference Proceedings of the Third Annual European Software Engineering Process Group Conference (SEPG) 1998 Ibanez, M & Reo, D. (1998a), "Measuring the impact of software process improvement on business objectives", European Software Institute, Parque Tecnologico de Zamudio Imai, M. (1986), "Kaizen: The Key to Japan's Competitive Success", Mc-Graw-Hill, New York, NY Janson, Robert L (1980) "Graphic indicators of operations", Harvard Business Review, November-December, Juran, J.M., (1988), "Juran on Planning for Quality" The Free Press, New York Kaplan, Robert S & Norton, David P (1992) "The Balanced Scorecard - Measures that drive performance", Harvard Business Review January-February, Kaplan, Robert S., Norton, David P. (1996), "The Balanced Scorecard; Translating Strategy Into Action", Harvard Business School Press, August KPI, The KPI Working Group, (2000), "KPI Report for The Minister for Construction", DETR Latham, Sir M. (1994), "Constructing the Team", HMSO Lewin, K. (1946), "Action Research and minority problems", Journal of Social Issues, Vol. 2, No. 4, pp Lillrank, P. "The Transfer of Management Innovations From Japan", Organisation Studies, (1995) Paulk, M. C. et al, (1993), "Capability Maturity Model for Software, version 1", Software Engineering Institute, Carnegie Mellon University, February Saiedian, H., Kuzara, N. (1995), SEI Capability Maturity Model s Impact on Contractors, IEEE Computer, January Sarshar, M., et al (1998) Standardised Process Improvement for Construction Enterprises (SPICE). Proceedings of 2 nd European Conference on Product and Process Modelling, Watford. Sarshar, M., et al (2000) An Introduction to SPICE, Construct IT, University of Salford Smith, Larry W & Steadman, A. Todd, (1999) "Gaining Confidence in Using Return on Investment and Earned Value" Crosstalk, Software Technology Support Center, Hill Air Force Base, Utah, April Yin, Robert K. (1994), "Case Study Research - Design and Methods", SAGE Publications Ltd.

14 12. APPENDIX A The development of the four perspectives of the Balanced Scorecard, Based on a diagram from Kaplan & Norton [1996]. What is My Vision of the Future? Statement of Vision Definition of SBU Mission Statement Vision Statement If My Vision Succeeds, How Will I Differ? To My Shareholders To My Customers With My Internal Management Processes With My Ability to Innovate and Grow What are the Critical Success Factors? What are the critical measurements? THE BALANCED SCORECARD

15 Filename: Bizarre Fruit 2000.doc Directory: H:\Papers Template: C:\Program Files\Microsoft Office\Templates\Normal.dot Title: Construction Process Improvement and Subject: Author: Dept of Surveying Keywords: Comments: Creation Date: 17/02/00 19:19 Change Number: 33 Last Saved On: 24/02/00 20:04 Last Saved By: Matthew Finnemore Total Editing Time: 473 Minutes Last Printed On: 13/03/00 18:05 As of Last Complete Printing Number of Pages: 14 Number of Words: 3,308 (approx.) Number of Characters: 18,856 (approx.)

CASE STUDIES IN CONSTRUCTION PROCESS IMPROVEMENT

CASE STUDIES IN CONSTRUCTION PROCESS IMPROVEMENT CASE STUDIES IN CONSTRUCTION PROCESS IMPROVEMENT M. Finnemore, M. Sarshar, R. Haigh SPICE Project Research Centre for the Built and Human Environment Bridgewater Building University of Salford Salford

More information

Balanced Scorecard. MA. DESIREE D. BELDAD, Ph.D. FEBRUARY 9, 2012

Balanced Scorecard. MA. DESIREE D. BELDAD, Ph.D. FEBRUARY 9, 2012 Balanced Scorecard MA. DESIREE D. BELDAD, Ph.D. FEBRUARY 9, 2012 IMAGINE ENTERING THE COCKPIT of a modern jet airplane and seeing only a single instrument there. How do you feel about boarding the plane

More information

Structured process improvement in facilities management organisations using the SPICE FM approach

Structured process improvement in facilities management organisations using the SPICE FM approach Structured process improvement in facilities management organisations using the SPICE FM approach Sarshar, M, Amaratunga, RDG and Haigh, RP Title Authors Type URL Published Date 2002 Structured process

More information

TOTAL QUALITY MANAGEMENT AND LIBRARIES AND INFORMATION CENTERS

TOTAL QUALITY MANAGEMENT AND LIBRARIES AND INFORMATION CENTERS TOTAL QUALITY MANAGEMENT AND LIBRARIES AND INFORMATION CENTERS Mr. Sanjay Patel L. M. College of Pharmacy, Ahmedabad, India ABSTRACT In this paper I am discussing Objectives in libraries, Quality Control,

More information

BALANCE SCORECARD. Introduction. What is Balance Scorecard?

BALANCE SCORECARD. Introduction. What is Balance Scorecard? BALANCE SCORECARD Introduction In this completive world where techniques are change in nights, it s very hard for an organization to stay on one technique to grow business. To maintain the business performance

More information

Quadrant I. Module 25: Balanced Scorecard

Quadrant I. Module 25: Balanced Scorecard Quadrant I Module 25: Balanced Scorecard 1. Learning Outcomes 2. Introduction 3. Balanced Scorecard Framework 4. Balanced Scorecard 5. Organisational Effectiveness 6. Balanced Scorecard & Organisational

More information

Ensuring BD Success With Metrics-Based Management

Ensuring BD Success With Metrics-Based Management Ensuring BD Success With Metrics-Based Management Presented by Vicki Griesinger, Director of Operations 16th Annual APMP Conference and Exhibits June 9, 2005 Capability Maturity Model and CMM are registered

More information

At the end of the programme, the participants should be able to:- Understand the real meaning and importance of KPIs and KRAs to the organisation

At the end of the programme, the participants should be able to:- Understand the real meaning and importance of KPIs and KRAs to the organisation PROGRAMME OBJECTIVES At the end of the programme, the participants should be able to:- Understand the real meaning and importance of KPIs and KRAs to the organisation Link PMS to KPIs and KRAs by having

More information

A Holistic Framework for Business Excellence

A Holistic Framework for Business Excellence Tutorials, J. Roberts Research Note 9 June 2003 A Holistic Framework for Business Excellence Most enterprises seek continuous improvement in the quality of their products, services and management. A holistic

More information

Theoretical Aspects of Economic Balanced Scorecard Analysis

Theoretical Aspects of Economic Balanced Scorecard Analysis Theoretical Aspects of Economic Balanced Scorecard Analysis Sergey Ivanovich Krylov Department of Accounting, Analysis and Audit Ural Federal University, Russian Federation E-mail: zali6770@yandex.ru Received:

More information

BALANCED SCORECARD (BSC) Ratapol Wudhikarn, Ph.d. Knowledge management College of Arts, Media and Technology

BALANCED SCORECARD (BSC) Ratapol Wudhikarn, Ph.d. Knowledge management College of Arts, Media and Technology BALANCED SCORECARD (BSC) Ratapol Wudhikarn, Ph.d. Knowledge management College of Arts, Media and Technology Contents IC and BSC A concept of BSC The BSC as a management system Why does business need a

More information

The 10th INternational Conference on Software Process Improvement Research into Education and training, INSPIRE 2005, March 2005,

The 10th INternational Conference on Software Process Improvement Research into Education and training, INSPIRE 2005, March 2005, Key Performance Indicators for Quality Assurance in Higher Education the Case of the Department of Informatics at the Technological Educational Institute of Thessaloniki, Greece Kerstin V. Siakas, Aristea-Alexandra

More information

Welcome Strategy Leader!

Welcome Strategy Leader! Essentials Guide to Strategic Planning Welcome Strategy Leader! To help close the gap between strategy and execution, we ve created the Essentials Guide to Strategic Planning, which provides an end-to-end

More information

Structured process improvements in facilities management organisations: Best practice case studies in the retail sector

Structured process improvements in facilities management organisations: Best practice case studies in the retail sector Structured process improvements in facilities management organisations: Best practice case studies in the retail sector Amaratunga, RDG, Haigh, RP and Baldry, D Title Authors Type URL Published Date 2005

More information

Balanced Scorecard: linking strategic planning to measurement and communication Gulcin Cribb and Chris Hogan Bond University, Australia

Balanced Scorecard: linking strategic planning to measurement and communication Gulcin Cribb and Chris Hogan Bond University, Australia Balanced Scorecard: linking strategic planning to measurement and communication Gulcin Cribb and Chris Hogan Bond University, Australia Abstract This paper discusses issues and strategies in implementing

More information

Strategy Map, Operational Atlas and Balanced Scorecard

Strategy Map, Operational Atlas and Balanced Scorecard Strategy Map, Operational Atlas and Balanced Scorecard Afshin Ariaei Department of Management, Rafsanjan Branch, Islamic Azad University, Iran Malikeh Beheshtifar 1 Department of Management, Rafsanjan

More information

Topic. Balanced Scorecard. Performance measurement. William Meaney MBA BSc. ACMA 1

Topic. Balanced Scorecard. Performance measurement. William Meaney MBA BSc. ACMA 1 Topic Balanced Scorecard Performance measurement William Meaney MBA BSc. ACMA 1 The Balanced Scorecard Performance measurement William Meaney MBA BSc. ACMA 2 Strategic Implementation People and Systems

More information

Business Plan

Business Plan Business Plan 2017-2018 rev. May 2017 MESSAGE FROM THE CEO As the Chief Executive Officer of PEC, I am pleased to present the 2017 2018 Business Plan, a tool that will enable the Cooperative to make informed

More information

Projecting, Monitoring and Measuring Business Value

Projecting, Monitoring and Measuring Business Value K. Harris Strategic Analysis Report 21 January 2003 Projecting, Monitoring and Measuring Business Value Enterprises perennially search for reliable methods to project, monitor and measure the performance

More information

Pramoul Nurach. Sairung Inlert

Pramoul Nurach. Sairung Inlert 1 2 Pramoul Nurach Sairung Inlert Pramoul Nurach is a Professional Development and Resources Manager of Microsoft Consulting Services. He had completed Bachelor Degree in Computer and Communication Engineering

More information

The Balanced Scorecard Factsheet 35

The Balanced Scorecard Factsheet 35 The Factsheet 35 You would use this approach to introduce a balanced set of measures covering, Customer, Business Processes and People. You will use these measures as part of a strategic planning tool

More information

The Balanced Scorecard

The Balanced Scorecard The Balanced Scorecard Translating Strategy Into Action Robert S. Kaplan David P. Norton Learning Objectives After successfully completing this lesson, you will be able to: 1. Explain the concept of balanced

More information

The importance of Balanced Scorecard in business operations

The importance of Balanced Scorecard in business operations The importance of Balanced Scorecard in business operations Maida Djakovac Novi Pazar, Serbia maidadj86@yahoo.com Abstract The aim of this paper is that to explore the role and importance of applying strategic

More information

DEVELOPING KEY PERFORMANCE INDICATORS. - The Balanced Scorecard Framework -

DEVELOPING KEY PERFORMANCE INDICATORS. - The Balanced Scorecard Framework - DEVELOPING KEY PERFORMANCE INDICATORS - The Balanced Scorecard Framework - The purpose of this presentation is to identify and address the key questions necessary to design an effective framework for performance

More information

APPLICATION OF BALANCE SCORE CARD AT LONDON SOUTH BANK UNIVERSITY, UNITED KINGDOM

APPLICATION OF BALANCE SCORE CARD AT LONDON SOUTH BANK UNIVERSITY, UNITED KINGDOM International Journal of Economics, Commerce and Management United Kingdom Vol. IV, Issue 4, April 2016 http://ijecm.co.uk/ ISSN 2348 0386 APPLICATION OF BALANCE SCORE CARD AT LONDON SOUTH BANK UNIVERSITY,

More information

Quality Management of Software and Systems: Software Process Assessments

Quality Management of Software and Systems: Software Process Assessments Quality Management of Software and Systems: Software Process Assessments Contents Temporal development of the CMM and the assessment procedures Mature and Immature Processes Structure of the Capability

More information

Balance Score Card: An Implementation of Strategic Performance Metric

Balance Score Card: An Implementation of Strategic Performance Metric Balance Score Card: An Implementation of Strategic Performance Metric 1 Sunny O. Temile, 2 Dadang Prasetyo Jatmiko, 3 Dr. Eyesan Leslie Dabor, 4 Mr. Enakirerhil Lucky 1 PhD (Cand), Salford Business School,

More information

F.Burstein 1. The KMS Road Map. Evaluation Principle. Knowledge Management

F.Burstein 1. The KMS Road Map. Evaluation Principle. Knowledge Management IMS3012 Knowledge Management Lecture The Value Proposition of KM Dr. Henry Linger Lecture 11 IMS3012 - Semester 2, 2005 1 The KMS Road Map The first phase: evaluation of the infrastructure and aligning

More information

TOTAL PERFORMANCE SCORECARD

TOTAL PERFORMANCE SCORECARD Anca ȘERBAN Oana DUMITRAȘCU Department of Management, Marketing and Business Administration Faculty of Economics, "Lucian Blaga" University Sibiu, Romania TOTAL PERFORMANCE SCORECARD Keywords Balanced

More information

ERROR! BOOKMARK NOT DEFINED.

ERROR! BOOKMARK NOT DEFINED. TABLE OF CONTENTS LEAD AND LAG INDICATORS... ERROR! BOOKMARK NOT DEFINED. Examples of lead and lag indicators... Error! Bookmark not defined. Lead and Lag Indicators 1 GLOSSARY OF TERMS INTRODUCTION Many

More information

Change and project management

Change and project management Change and project management www.first.com What gets measured, gets d! -Change leader Change and Project Management Change and project management Prince 2, PMI and PCI When projects fail in an organisation,

More information

ACTIVITY BASED COSTING PERFORMANCE MEASUREMNENT ABC. Benchmarking

ACTIVITY BASED COSTING PERFORMANCE MEASUREMNENT ABC. Benchmarking PERFORMANCE MEASUREMNENT Benchmarking Measuring and benchmarking supply chain performance is a vital first step in any reengineering programme. Understanding the differences between value adding time and

More information

Module 9: Balanced Scorecard

Module 9: Balanced Scorecard file:///f /Courses/2009-10/CGALU/MA2/06course/01mod/m09intro.htm Module 9: Balanced Scorecard Overview Module 9 ties all previous modules together into a method for facilitating decision-making and performance

More information

Transactions on Information and Communications Technologies vol 11, 1995 WIT Press, ISSN

Transactions on Information and Communications Technologies vol 11, 1995 WIT Press,   ISSN A quality assessment method for application management R.M. Hather, E.L. Burd, C. Boldyreff Centre for Software Maintenance, University of Durham, Durham, DEI 3EL, UK, Email: ames@durham.ac.uk Abstract

More information

SW CMM. Capability Maturity Models. Level 1: Initial Level SW CMM (2) CS 390 Lecture 8 Improving the Software Process

SW CMM. Capability Maturity Models. Level 1: Initial Level SW CMM (2) CS 390 Lecture 8 Improving the Software Process CS 390 Lecture 8 Improving the Software Process 1987 U.S. Department of Defense task force: The fundamental problem with software is that the software process is badly managed DoD initiative: Software

More information

4 The balanced scorecard

4 The balanced scorecard SUPPLEMENT TO THE APRIL 2009 EDITION Three topics that appeared in the 2007 syllabus have been removed from the revised syllabus examinable from November 2009. If you have the April 2009 edition of the

More information

Performance measurement models: an analysis for measuring innovation processes performance

Performance measurement models: an analysis for measuring innovation processes performance Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Scienc es 124 ( 2014 ) 397 404 SIM 2013 Performance measurement models: an analysis for measuring innovation processes

More information

SOFTWARE PROCESS IMPROVEMENT AT ABB KRAFTWERKSLEITTECHNIK GMBH

SOFTWARE PROCESS IMPROVEMENT AT ABB KRAFTWERKSLEITTECHNIK GMBH SOFTWARE PROCESS IMPROVEMENT AT ABB KRAFTWERKSLEITTECHNIK GMBH Christoph Welsch +, Horst Lichter +, Manfred Zeller * + ABB Corporate Research, Heidelberg, Germany * ABB Kraftwerksleittechnik GmbH, Mannheim,

More information

Performance Management Frameworks A Need for Adaptation (focusing on the Balanced Scorecard).

Performance Management Frameworks A Need for Adaptation (focusing on the Balanced Scorecard). Performance Management Frameworks A Need for Adaptation (focusing on the Balanced Scorecard). Joe Molumby B Comm. C Dip AF, M Sc. (ITA), MIAFA, Examiner for P1 Managerial Finance. Traditionally performance

More information

A Model for Implementing HR S Strategic Role

A Model for Implementing HR S Strategic Role Expert Journal of Business a nd Management (2 0 1 3 ) 1, 36-41 2013 Th e Au thor. Publish ed by Sp rint In v estify. Business.Exp ertjou rn als.c om A Model for Implementing HR S Strategic Role Anca ȘERBAN

More information

GLOSSARY OF TERMS For Business Performance Management

GLOSSARY OF TERMS For Business Performance Management GLOSSARY OF TERMS For Business Performance Management September 2012 Table of Contents Table of Contents... 1 Introduction... 2 Glossary... 2 Page 1 Introduction Many terms we use when talking about Business

More information

Performance Measurement- A Balanced Score Card Approach

Performance Measurement- A Balanced Score Card Approach Performance Measurement- A Balanced Score Card Approach Dr. P. D. D. Dominic a, Dr.M.Punniyamoorthy b, Savita K. S. c and Noreen I. A. d a Computer Information Sciences Department Universiti Teknologi

More information

THE BALANCED SCORECARD: A KEY TO PERFORMANCE IMPROVEMENT?

THE BALANCED SCORECARD: A KEY TO PERFORMANCE IMPROVEMENT? THE BALANCED SCORECARD: A KEY TO PERFORMANCE IMPROVEMENT? 1 Salini Bafaneli, 2 Gosekwang Setibi 1 Independent Researcher, Gaborone, Botswana, 2 Department of Management, University Of Botswana Abstract:

More information

Developing Enterprise-Wide Measures for Tracking Performance of Acquisition Organizations

Developing Enterprise-Wide Measures for Tracking Performance of Acquisition Organizations Pittsburgh, PA 15213-3890 Developing Enterprise-Wide Measures for Tracking Performance of Acquisition Organizations Wolfhart Goethert Carnegie Mellon University Pittsburgh, PA 15213-3890 Sponsored by the

More information

Practical Process Improvement: the Journey and Benefits

Practical Process Improvement: the Journey and Benefits Practical Process Improvement: the Journey and Benefits 27-29 September 2004 Colin Connaughton AMS Metrics Consultant CMM, Capability Maturity Model, and Capability Maturity Modeling are registered in

More information

Performance Indicators in Software Project Monitoring: Balanced Scorecard Approach

Performance Indicators in Software Project Monitoring: Balanced Scorecard Approach Performance Indicators in Software Project Monitoring: Balanced Scorecard Approach Lj. Kazi, B. Radulovic and Z. Kazi University of Novi Sad, Technical faculty Mihajlo Pupin, Zrenjanin, Serbia leremic@tfzr.uns.ac.rs,

More information

INNOVATIVE ORGANIZATION ACTIVITY ANALYSIS BY MEANS OF THE BALANCED SCORECARD

INNOVATIVE ORGANIZATION ACTIVITY ANALYSIS BY MEANS OF THE BALANCED SCORECARD INNOVATIVE ORGANIZATION ACTIVITY ANALYSIS BY MEANS OF THE BALANCED SCORECARD Sergey Krylov Nina Ilysheva Abstract The paper considers basic aspects of the applied strategic innovative analysis based on

More information

ARTICLE BUILDING HOSPITAL BALANCED SCORECARD BY USING DECISION SUPPORT APPROACH Ufuk Cebeci*

ARTICLE BUILDING HOSPITAL BALANCED SCORECARD BY USING DECISION SUPPORT APPROACH Ufuk Cebeci* ISSN: 0976-3104 ARTICLE BUILDING HOSPITAL BALANCED SCORECARD BY USING DECISION SUPPORT APPROACH Ufuk Cebeci* Department of Industrial Engineering, Istanbul Technical University, TURKEY ABSTRACT Background:

More information

SUPPLY CHAIN MANAGEMENT IN FACILITIES MANAGEMENT USING THE i2i MODEL

SUPPLY CHAIN MANAGEMENT IN FACILITIES MANAGEMENT USING THE i2i MODEL SUPPLY CHAIN MANAGEMENT IN FACILITIES MANAGEMENT USING THE i2i MODEL M.L. Nelson, M. Sarshar School of Construction and Property Management, University of Salford, Salford, M7 9NU E-mail: M.M.Nelson@salford.ac.uk

More information

Chart 1.1 The business planning process

Chart 1.1 The business planning process 1 1 Introduction This book is designed for those with an inspired idea who wish to translate it into a successful new business or incorporate it in an existing business. Usually, the first challenge for

More information

Implementation of the CO BIT -3 Maturity Model in Royal Philips Electronics

Implementation of the CO BIT -3 Maturity Model in Royal Philips Electronics Implementation of the CO BIT -3 Maturity Model in Royal Philips Electronics Alfred C.E. van Gils Philips International BV Corporate Information Technology Eindhoven, The Netherlands Abstract: Philips has

More information

Management Accounting and Control System

Management Accounting and Control System Management Accounting and Control System Rewan Kumar Dahal Lecturer, Nepal Commerce Campus Abstract A larger entity of the cost management system which assists executives in fulfilling organizational objectives

More information

Design and Implementation of a Management Control System

Design and Implementation of a Management Control System Year XV, No. 17/2015 195 Design and Implementation of a Management Control System Anca Antoaneta VĂRZARU 1 1 University of Craiova varzaruanca@yahoo.com Abstract: This paper tries to implement a management

More information

CORPORATE VALUE CREATION, INTANGIBLES, AND VALUATION: A DYNAMIC MODEL OF CORPORATE VALUE CREATION AND DISCLOSURE

CORPORATE VALUE CREATION, INTANGIBLES, AND VALUATION: A DYNAMIC MODEL OF CORPORATE VALUE CREATION AND DISCLOSURE CORPORATE VALUE CREATION, INTANGIBLES, AND VALUATION: A DYNAMIC MODEL OF CORPORATE VALUE CREATION AND DISCLOSURE by John Holland, Department of Accounting and Finance, University of Glasgow, 65-71 Southpark

More information

TOTAL QUALITY MANAGEMENT IN EDUCATION: PROSPECTS, ISSUES AND CHALLENGES

TOTAL QUALITY MANAGEMENT IN EDUCATION: PROSPECTS, ISSUES AND CHALLENGES TOTAL QUALITY MANAGEMENT IN EDUCATION: PROSPECTS, ISSUES AND CHALLENGES N. Ravindran Research Scholar, Department of Educational Technology, Bharathidasan University Tiruchirappalli Dr. R. Karpaga Kamaravel

More information

Workshops to Jumpstart Measurement Planning

Workshops to Jumpstart Measurement Planning Workshops to Jumpstart Measurement Planning Bob MacIver July 24,2000 Rationale for Workshop Strategy Measurement is an evolutionary process Workshops are a primary tool to accelerate planning and development

More information

Session 8 Balanced Scorecard and Communication Protocol

Session 8 Balanced Scorecard and Communication Protocol Session 8 Balanced Scorecard and Communication Protocol How to Create a Successful Balanced Scorecard What is a Balanced Scorecard The balanced scorecard is a concept and tool first conceived by by Robert

More information

An Introduction to Strategic Planning for Service Organizations

An Introduction to Strategic Planning for Service Organizations A Jolt Consulting Group White Paper An Introduction to Strategic Planning for Service Organizations April 2011 PO BOX 1217, SARATOGA SPRINGS, NY 12866 PAGE 1 of 9 Table of Contents Strategic Planning Challenges...

More information

A Guide to the. Incorporating the Essential Elements of Strategy Within Your Organization. Empower

A Guide to the. Incorporating the Essential Elements of Strategy Within Your Organization. Empower A Guide to the Balanced Scorecard Incorporating the Essential Elements of Strategy Within Your Organization This guide covers Create Keeping strategy creation practical, focused and agile Empower Empowering

More information

Managing IS Development Projects Using a Generalised Set of Scorecard Perspectives

Managing IS Development Projects Using a Generalised Set of Scorecard Perspectives Managing IS Development Projects Using a Generalised Set of Scorecard Perspectives Abstract Phil Brook Information Systems Academic Group Faculty of Management University of Western Sydney Sydney, Australia

More information

Architecture Strategy Choreographs the Dance of Change

Architecture Strategy Choreographs the Dance of Change Architecture Strategy Choreographs the Dance of Change Dana Bredemeyer and Ruth Malan Bredemeyer Consulting Tel: (812) 335-1653 Email: dana@bredemeyer.com Web: Outline Architecture 501 or Architecture

More information

This course book preview is provided as an opportunity to see the quality of the course material and to help you determine if the course matches your

This course book preview is provided as an opportunity to see the quality of the course material and to help you determine if the course matches your This course book preview is provided as an opportunity to see the quality of the course material and to help you determine if the course matches your needs. The preview is provided in a PDF form that cannot

More information

CHAPTER III THE BALANCED SCORECARD APPROACH. 3.3 Strategic management system assumption. 3.5 Applications of the Balanced Scorecard approach

CHAPTER III THE BALANCED SCORECARD APPROACH. 3.3 Strategic management system assumption. 3.5 Applications of the Balanced Scorecard approach CHAPTER III THE BALANCED SCORECARD APPROACH 3.1 Introduction 3.2 The Balanced Scorecard model 3.2.1 Developing a Balanced Scorecard 3.3 Strategic management system assumption 3.4 The cause-and-effect assumption

More information

Business Process Management Today and Tomorrow

Business Process Management Today and Tomorrow BPM 2008 Business Process Management Today and Tomorrow Paul Harmon Executive Editor Business Process Trends 2008 BPTrends Associates. All Rights Reserved. Agenda Yesterday Independent process traditions,

More information

Project Management Maturity Model (PMMM) in educational organizations

Project Management Maturity Model (PMMM) in educational organizations Available online at www.sciencedirect.com Procedia Social and Behavioral Sciences 9 (2010) 1641 1645 WCLTA 2010 Project Management Maturity Model (PMMM) in educational organizations C. Demir a *, brahim

More information

Asset performance evaluation

Asset performance evaluation Asset performance evaluation A recipe for success or failure Aditya Parida and Christer Stenström Division of Operation and Maintenance Engineering LuleåUniversity of Technology, 971 87 Lulea, Sweden Aditya.parida@ltu.se

More information

A Model for Business Process Management Maturity

A Model for Business Process Management Maturity Association for Information Systems AIS Electronic Library (AISeL) ACIS 2004 Proceedings Australasian (ACIS) December 2004 A Model for Business Process Management Maturity Michael Rosemann Tonia de Bruin

More information

The Impact of Capability Maturity Model Integration on Return on Investment in IT Industry: An Exploratory Case Study

The Impact of Capability Maturity Model Integration on Return on Investment in IT Industry: An Exploratory Case Study Engineering, Technology & Applied Science Research Vol. 7, No. 6, 2017, 2189-2193 2189 The Impact of Capability Maturity Model Integration on Return on Investment in IT Industry: An Exploratory Case Study

More information

Development of Performance Model: A New Measurement Framework for Non-Profit Organization

Development of Performance Model: A New Measurement Framework for Non-Profit Organization Available at www.ictom.info www.sbm.itb.ac.id www.cob.uum.edu.my The 3rd International Conference on Technology and Operations Management Sustaining Competitiveness through Green Technology Management

More information

[Company] [Company Address] [Project Name] [Sub-Project, phase, etc.]

[Company] [Company Address] [Project Name] [Sub-Project, phase, etc.] This template is downloaded from project-management.magt.biz [Company] [Company Address] Tel: Fax: [Company Phone] [Company Fax] [Company E-mail] May 16, 2015 [Ref. number] Marc Arnecke, PMP [Sub-Project,

More information

QUALITY - THE END OR JUST THE BEGINNING?

QUALITY - THE END OR JUST THE BEGINNING? The Sixth QHE Seminar The End of Quality? Birmingham, 25 26 May, 2001 QUALITY - THE END OR JUST THE BEGINNING? 1 INTRODUCTION This paper builds on the work of the author and a consortium of collaborators

More information

The Balanced Scorecard

The Balanced Scorecard By Dr. Warren Helfrich The Balanced Scorecard Originated by Drs. Robert Kaplan (Harvard Business School) and David Norton as a performance measurement framework. Believed that if strategic non financial

More information

SOFTW ARE PRODUCTIVITY CONSORTIUM

SOFTW ARE PRODUCTIVITY CONSORTIUM SOFTW ARE PRODUCTIVITY CONSORTIUM Integrating PSM and the Balanced Scorecard David N. Card March 26, 2002 Agenda Problem Statement Balanced Scorecard Mapping PSM and BSC Implementing BSC with PSM Summary

More information

Chapter 2: The Balanced Scorecard and Strategy Map Objective 1

Chapter 2: The Balanced Scorecard and Strategy Map Objective 1 Test Bank for Management Accounting Information for Decision Making and Strategy Execution 6th edition by Atkinson Kaplan Matsumura and Young Link download Test Bank for Management Accounting Information

More information

SYLLABUS - MARKETING LEADERSHIP AND PLANNING (20 credits)

SYLLABUS - MARKETING LEADERSHIP AND PLANNING (20 credits) Chartered Postgraduate Diploma in Marketing (Level 7) SYLLABUS - MARKETING LEADERSHIP AND PLANNING (20 credits) Total Qualification Time: 200 Hours The purpose of this unit is to enable students to develop

More information

The Balanced Scorecard as a Basis for Strategic Company Management in the Context of the World Economy Transformation

The Balanced Scorecard as a Basis for Strategic Company Management in the Context of the World Economy Transformation Asian Social Science; Vol. 11, No. 3; 2015 ISSN 1911-2017 E-ISSN 1911-2025 Published by Canadian Center of Science and Education The Balanced Scorecard as a Basis for Strategic Company Management in the

More information

The Balanced Scorecard Information to Drive Performance

The Balanced Scorecard Information to Drive Performance The Balanced Scorecard Information to Drive Performance Introduction Every organisation recognises the importance of measuring: as well as providing the means of monitoring the achievement of the organisation

More information

Implementation and Practicalities of Balance Scorecard: A Case Study

Implementation and Practicalities of Balance Scorecard: A Case Study Page 61 Implementation and Practicalities of Balance Scorecard: A Case Study G.Sreelakshmi # and Prof.D.Suryachandra Rao * # Research Scholar, Krishna University, Andhra Pradesh, India. * Dean, Faculty

More information

9. Project Quality Management- Introduction

9. Project Quality Management- Introduction Construction Project Management (CE 110401346) 9. Project Quality Management- Introduction Dr. Khaled Hyari Department of Civil Engineering Hashemite University Content Quality: What? (The concept of quality)

More information

Influence of quality management systems on the environmental changes and the work conditions in industry

Influence of quality management systems on the environmental changes and the work conditions in industry Influence of quality management systems on the environmental changes and the work conditions in industry D. Zawada-Michulka': R. Strulak' and A. A1 - Hassan2 l Technical University of Szczecin, Szczecin,

More information

SHORT ANSWER QUESTIONS (KEY) UNIT- I

SHORT ANSWER QUESTIONS (KEY) UNIT- I SHORT ANSWER QUESTIONS (KEY) UNIT- I 1. Define quality. Quality is the totality of characteristics of an entity that bear on its ability to satisfy stated and implied needs. 2. What do you mean by quality

More information

BALANCED SCORE CARD FOR MEASURING BANK PERFORMANCE. Keywords: Bank Performance, Performance Management, Balanced Scorecard

BALANCED SCORE CARD FOR MEASURING BANK PERFORMANCE. Keywords: Bank Performance, Performance Management, Balanced Scorecard BALANCED SCORE CARD FOR MEASURING BANK PERFORMANCE Prof. S. Visalakshi Asst. Professor, Manipal University Research Scholar, Department of Management Studies, Pondicherry University Prof. R. Kasilingam

More information

The development of a comprehensive framework for measuring business performance in construction

The development of a comprehensive framework for measuring business performance in construction Loughborough University Institutional Repository The development of a comprehensive framework for measuring business performance in construction This item was submitted to Loughborough University's Institutional

More information

Welcome Back Thursday, April 13, Session 8. Engagement Certificate. Welcome to the world: Addison Grace Costello. Agenda

Welcome Back Thursday, April 13, Session 8. Engagement Certificate. Welcome to the world: Addison Grace Costello. Agenda Welcome Back Thursday, April 13, 2017 Session 8 Welcome to the world: Addison Grace Costello Agenda 8:30 8:55 Agenda Assignment Review 8:55 11:30 Building a Balanced Scorecard Creating a Communication

More information

Why Performance Measurement?

Why Performance Measurement? March 2016 Why Performance Measurement? An Introduction Measuring programmatic achievement on a regular basis can provide significant value to organizations that use the derived data to guide strategic

More information

IMPACT OF PERFORMANCE MANAGEMENT REVIEWS: EVIDENCE FROM AN ENERGY SUPPLIER

IMPACT OF PERFORMANCE MANAGEMENT REVIEWS: EVIDENCE FROM AN ENERGY SUPPLIER IMPACT OF PERFORMANCE MANAGEMENT REVIEWS: EVIDENCE FROM AN ENERGY SUPPLIER Dr. Veronica Martinez and Dr Mike Kennerley Centre for Business Performance, Cranfield University, Cranfield, Bedfordshire, MK43

More information

... Organizational Performance and Competence Management. STF Kompetens - Sweden. The success of any organization is always about management

... Organizational Performance and Competence Management. STF Kompetens - Sweden. The success of any organization is always about management . Organizational Performance and Competence Management......... The success of any organization is always about management Tommie Johansson and Centre for Socio-Eco-Nomic Development (CSEND), 2001. All

More information

Organisational Readiness and Software Process Improvement

Organisational Readiness and Software Process Improvement Organisational Readiness and Software Process Improvement Mahmood Niazi a, David Wilson b and Didar Zowghi b a School of Computing and Mathematics, Keele University, ST5 5BG, UK mkniazi@cs.keele.ac.uk

More information

ANALYZING LOGISTICS FIRMS BUSINESS PERFORMANCE

ANALYZING LOGISTICS FIRMS BUSINESS PERFORMANCE ANALYZING LOGISTICS FIRMS BUSINESS PERFORMANCE S. APAK İ. ORBAK A.C. TOMBUŞ Ö. TOMBUŞ 4 Maltepe University/Industrial Engineering Department, Istanbul, Turkey Abstract: The aim of this study is to determine

More information

Supporting the Design of a Management Accounting System of a Company Operating in the Gas Industry with Business Process Modeling

Supporting the Design of a Management Accounting System of a Company Operating in the Gas Industry with Business Process Modeling Supporting the Design of a Management Accounting System of a Company Operating in the Gas Industry with Business Process Modeling Nikolaos A. Panayiotou and Ilias P. Tatsiopoulos National Technical University

More information

Sample Chapter. Producing Meaningful Metrics

Sample Chapter. Producing Meaningful Metrics 8 Producing Meaningful Metrics The purpose of every process is to produce an outcome that is of value to its customer. Metrics provide the ability to determine how capable a process is of producing the

More information

Introduction to Balanced Scorecard

Introduction to Balanced Scorecard Introduction to Balanced Scorecard Dave Erickson MFMER slide-1 Disclosures Relevant Financial Relationship(s): Nothing to Disclose Off Label Usage: Nothing to Disclose MFMER slide-2 1 Dave Erickson Senior

More information

Measuring Performance Systems and Structures to drive improvement

Measuring Performance Systems and Structures to drive improvement Measuring Performance Systems and Structures to drive improvement 2 Workshop Objectives Understand the principles of performance management Learn how to develop performance measures Understand the tools

More information

REFERENCES. José Maria Viedma Marti Polytechnic University of Catalonia, Spain

REFERENCES. José Maria Viedma Marti Polytechnic University of Catalonia, Spain xvii Foreword Today, the management of companies and organizations takes place in a new context that has different names, such as information society, knowledge society, and knowledge economy. Each one

More information

Agenda. Enterprise Risk Management Defined. The Intersection of Enterprise-wide Risk Management (ERM) and Business Continuity Management (BCM)

Agenda. Enterprise Risk Management Defined. The Intersection of Enterprise-wide Risk Management (ERM) and Business Continuity Management (BCM) The Intersection of Enterprise-wide Risk (ERM) and Business Continuity (BCM) Marc Dominus 2005 Protiviti Inc. EOE Agenda Terminology and Process Introductions ERM Process Overview BCM Process Overview

More information

Revista Economica 67:6 (2015) THE ISSUE OF ASSESING HR IMPACT FOR THE STRATEGIC HUMAN RESOURCE MANAGEMENT

Revista Economica 67:6 (2015) THE ISSUE OF ASSESING HR IMPACT FOR THE STRATEGIC HUMAN RESOURCE MANAGEMENT THE ISSUE OF ASSESING HR IMPACT FOR THE STRATEGIC HUMAN RESOURCE MANAGEMENT Emanoil MUSCALU "Lucian Blaga" University of Sibiu, Romania Abstract: The new tendencies in the theory and practice of human

More information

ITAG RESEARCH INSTITUTE

ITAG RESEARCH INSTITUTE ITAG RESEARCH INSTITUTE Linking the IT Balanced Scorecard to the Business Objectives at a Major Canadian Financial group Wim Van Grembergen University of Antwerp (UFSIA) Ronald Saull Information Services

More information

Building Project Performance Evaluation Model

Building Project Performance Evaluation Model Building Project Performance Evaluation Model Wadugodapitiya, R. R. M. M. K. Department of Building Economics, University of Moratuwa (email: manjulawadugodapitiya@yahoo.com) Sandanayake, Y. G. Department

More information

Theoretical formulation of a framework for measuring business performance in construction

Theoretical formulation of a framework for measuring business performance in construction Loughborough University Institutional Repository Theoretical formulation of a framework for measuring business performance in construction This item was submitted to Loughborough University's Institutional

More information

CRM scorecard-based management system: Performance evaluation of Saudi Arabian banks

CRM scorecard-based management system: Performance evaluation of Saudi Arabian banks Original Article CRM scorecard-based management system: Performance evaluation of Saudi Arabian banks Abdullah S. Al-Mudimigh is Associate Professor and a senior IT Consultant at the College of Computer

More information