Principles PROJstudy.com. All rights reserved
|
|
- Jodie Austin
- 6 years ago
- Views:
Transcription
1 PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries The Swirl logo is a Trade Mark of the Office of Government Commerce 2010 PROJstudy.com. All rights reserved
2 Lesson Objectives Seven PRINCE2 Principles Continued Business Justification Learn from experience Defined roles and responsibilities Manage by stages Manage by exception Focus on products Tailor to suit the project environment Characteristics of Principles Importance of PRINCE2 Principles Definition and Explanation of Principles 2010 study.com. All rights reserved 2
3 The Seven PRINCE2 Principles Continued business justification Learn from experience Defined roles and responsibilities Manage by stages Manage by exception Focus on products Tailor to suit the project environment Characteristics of principles Universal, can be applied to any project Self validating, proven in practice Empowering 2010 PROJstudy.com. All rights reserved 3
4 The PRINCE2 Principles are integral to the PRINCE2 method because: The PRINCE2 principles enable the PRINCE2 method to be applied to any project irrespective of its scale, organization, type, etc. The principles ensure that the PRINCE2 method is applied in a manner that is ideal for a project to succeed. The principles enable the practitioners of PRINCE2 method to control and manage the projects effectively study.com. All rights reserved 4
5 Definition and Explanation of Principles Continued Business Justification A PRINCE2 project must have continued business justification Every project, including compulsory projects, must have business justification to begin with. This will ensure that poorly conceived projects that have no real benefits to the organization are never initiated and that the initiated projects strategies and objectives are aligned with those of the corporate. Justification should be documented in the Business Case The business justification should be documented in the Business Case and monitored during project execution at every key milestone to ensure that the project remains on track and aligned with the business goals throughout the project s life. Justification must remain valid The business justification must remain valid throughout the life of the project. Though the business justification can change it must remain consistent with the project. But if the justification becomes invalid at any point during the life of the project, the project must undergo premature closure PROJstudy.com. All rights reserved 5
6 Learn from Experience Identify and document lessons Learning from experience permeates the PRINCE2 method. At the beginning of the project, lessons from previous similar projects are identified and documented to verify if they could be applied for the benefit of the current project. During project execution, lessons from the current project are documented and verified to determine if they could be applied for the benefit of the current project or any of the future projects that are similar to the current one. At the end of the project, documented lessons are transferred to the centre of excellence or corporate management for use on future projects study.com. All rights reserved 6
7 Defined Roles and Responsibilities A PRINCE2 project will have a specific organization structure that contains agreed roles and responsibilities. All the three primary stakeholders (viz. sponsors, users and suppliers) interests need to be effectively represented in the project management team. Explanation: Projects can be implemented only with the involvement of the people who understand their roles and responsibilities. There should be a well defined reporting system to ensure that the flow of information on all aspects of project execution runs smooth. To ensure this, a PRINCE2 project will have four management levels: Corporate or programme management, Project Board, Project Manager, and Team Manager. The Project Board is vested with the authority to oversee the implementation of the project and is ultimately responsible for the success of the project. The Project Board is so constituted that the three primary stakeholder interests are represented study.com. All rights reserved 7
8 Manage by Stages A PRINCE2 project is planned, monitored and controlled on a stage-bystage basis. Management stages provide control points to senior management. Explanation: For ease of planning, execution and control, PRINCE2 projects are divided into management stages. Each management stage will have a Stage Plan as part of the overall Project Plan. The number of such stages depends on the nature and complexity of the project. But a PRINCE2 project must have minimum of two stages: Initiation stage and the rest of the project PROJstudy.com. All rights reserved 8
9 Manage by Exception A PRINCE2 project has defined tolerances for each project objective to establish limits of delegated authority. Tolerances are set for time, cost, quality, scope, risk and benefits. Explanation: Manage by Exception principle serves the purpose of saving time for top management. This is ensured by delegation of authority to the various levels of management. As part of this delegation, tolerances are set for time, cost, scope, quality, risk, and benefits for each management level. When tolerances are forecast to be exceeded the issues are escalated to the immediately higher management level study.com. All rights reserved 9
10 Focus on Products A PRINCE2 project focuses on the definition and delivery of products particularly, quality requirements Projects are out-put oriented instead of activity oriented Clarity on acceptance criteria of project s products is provided by means of Product Descriptions Explanation: This principle ensures that project s products and their attributes are planned for well in advance and much before the activities for the production of these products are determined. In the absence of such planning, there is scope for acceptance disputes, rework, user dissatisfaction, etc PROJstudy.com. All rights reserved 10
11 Tailor to suit the Project Environment The PRINCE2 method is tailored to suit the project s environment, size, complexity, importance, capability and risk Explanation: PRINCE2 method of project management is tailored to suit the specific requirements of each project. It is important to note that such tailoring is done in respect of every project. If the PRINCE2 method is used across an organization it is said to be a embedded organization. Tailoring benefits project management by reducing the burden and increasing the level of control on the part of the management in the context of external and project factors study.com. All rights reserved 11
12 In this chapter, we have learnt about: Seven PRINCE2 Principles Continued Business Justification Learn from experience Defined roles and responsibilities Manage by stages Manage by exception Focus on products Tailor to suit the project environment Characteristics of Principles Importance of PRINCE2 Principles Definition and Explanation of Principles 2010 study.com. All rights reserved 12
PRINCE2 COURSE FOUNDATION. 1 Powered by POeT Solvers Limited
PRINCE2 COURSE FOUNDATION 1 www.pmtutor.org Powered by POeT Solvers Limited Principles PRINCE2 2 www.pmtutor.org Powered by POeT Solvers Limited Objectives To understand SEVEN Principles of PRINCE2 methodology
More information1. You should attempt all 60 questions. Each question is worth one mark. 3. Mark your answers on the answer sheet provided. Use a pencil (NOT pen).
The PRINCE2 Foundation Examination Sample Paper 1 Question Booklet Multiple Choice Exam Duration: 1 hour Instructions 1. You should attempt all 60 questions. Each question is worth one mark. 2. There is
More informationPRINCE 2009 Edition Quick Reference Card
PRINCE 2009 Edition Quick Reference Card Defined Roles and Responsibilities Learn from Experience Continued Business Justification Progress Plans Business Case Manage by Stages Change Preproject stage
More informationTailoring PRINCE2 to the project environment
1. The adoption of PRINCE 2 across an organisation is known as: A. Adapting B. Embedding C. Tailoring D. Reporting 2. Tailoring PRINCE 2 appropriately is: A. Implementing a portion of the method as the
More informationTailoring PRINCE2 to the Project Environment
1. refers to the appropriate use of PRINCE2 method on any given project. 2. The adoption of PRINCE2 across an organization is known as. 3. The danger of not tailoring PRINCE2 is that it can lead to project
More informationPASS4TEST. IT Certification Guaranteed, The Easy Way! We offer free update service for one year
PASS4TEST \ http://www.pass4test.com We offer free update service for one year Exam : PRINCE2 Title : PRINCE2 Foundation Vendor : PRINCE2 Version : DEMO 1 / 4 Get Latest & Valid PRINCE2 Exam's Question
More informationManaging Successful Bids with PRINCE2 2009
Managing Successful Bids with PRINCE2 2009 A road-map for successful business development David Warley. Bid to Win Ltd 1 After this workshop you will have: Knowledge Be able to apply PRINCE2 principles
More informationPRINCE2 Sample Papers
PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined
More informationPRINCE2 FOUNDATION INSTRUCTOR LED TRAINING
FACT SHEET PRINCE2 FOUNDATION INSTRUCTOR LED TRAINING LEARN PRINCE2 AND GAIN FIRST CLASS PROJECT MANAGEMENT SKILLS GreyCampus provides PRINCE2 Foundation Instructor Led Training that helps professionals
More informationPROJECT BOARD TERMS OF REFERENCE. Roles and Responsibilities
PROJECT BOARD TERMS OF REFERENCE Roles and Responsibilities 1 DOCUMENT CONTROL Change Control Table Version Amendment Description Release Date Updated by 0.1 First draft Alignment with new governance framework
More informationEXAM - PRINCE2-Practitioner PRINCE2 Practitioner Exam TOTAL QUESTIONS: 191
PRINCE2 EXAM - PRINCE2-Practitioner PRINCE2 Practitioner Exam TOTAL QUESTIONS: 191 1 Question: 1 Which of the following principles describes this statement?" xxx defines tolerances for each project objective
More informationFROM PRINCE TO 2009
FROM PRINCE2 2005 TO 2009 REFERENCE MANUALS The 2009 Refresh has brought about two new reference manuals: 1. Managing Successful Projects with PRINCE2 is written for those who manage or assist in the management
More informationPRINCE2 Foundation Revision Notes. Introduction
PRINCE2 Foundation Revision Notes Introduction These revision notes are not designed to be your only revision, they are however designed to provide the key points in each area that the exam questions normally
More informationFor Portfolio, Programme, Project, Risk and Service Management. APMP for PRINCE2 Practitioners Graham Williams, Principle Consultant, GSW Consulting
For Portfolio, Programme, Project, Risk and Service Management for Practitioners Graham Williams, Principle Consultant, GSW Consulting White Paper January 2010 2 for Practioners 2009 Introduction The main
More informationPRINCE2 walkthrough and Roadmap. Dave Litten
PRINCE2 walkthrough and Roadmap Dave Litten Step www.projex.com By Step Guide Copyright Copyright 2018 Projex Academy Cover and internal design Dave Litten https://www.projex.com/prince2-masterclass/ All
More informationPass4test Certification IT garanti, The Easy Way!
Pass4test Certification IT garanti, The Easy Way! http://www.pass4test.fr Service de mise à jour gratuit pendant un an Exam : PRINCE2 Title : PRINCE2 Foundation Vendor : PRINCE2 Version : DEMO 1 / 4 Get
More informationGE: PRINCE2 Pre Course Reading
Pre-course reading material purpose GE: PRINCE2 Pre Course Reading This Pre-Reading material has been designed to provide you with a background to PRINCE2 and its terminology. It provides some information
More informationPRINCE Process Terms and Definitions Wizard. The Project Management. Framework. Dave Litten s PRINCE2 Definitions
PRINCE2 2017 Dave Litten s PRINCE2 Definitions Process Terms and Definitions Wizard The Project Management www.projex.com/prince2-masterclass Framework David Geoffrey Litten PMP Primer Contents Welcome
More informationRole Profile. Senior Project Manager Integrated and Smart Travel. Two Year Fixed-term / Secondment (public sector bodies only)
Role Profile Role: Directorate(s): Contract: Salary: Purpose: Reports to: Key Role Outputs(KROs) these set out what must be achieved for the post holder to be successful in the role 1. Applied understanding
More informationNote: appendix may include further responsibilities or experience necessary for the particular role.
Job title Job family Lead Project Manager Project Management Proposed band E Job purpose To lead a major project, significant workstream of a programme, or portfolio of projects, to stakeholder expectations,
More informationManaging Successful Projects with PRINCE2
Managing Successful Projects with PRINCE2 Details of changes to the Reference Manual for the revised edition published 2002 1. Introduction The PRINCE2 Reference Manual has been revised. The objective
More informationLisa Hodges Owner/Principal Consultant
Lisa Hodges Owner/Principal Consultant Cornerstone Service Management unless otherwise stated. ITIL is a registered trademark of Axelos Limited. PRINCE2 is a registered trademark of Axelos Limited. PMBoK
More informationManagement of Risk: Guidance for Practitioners
Management of Risk: Guidance for Practitioners 2 Management of Risk: Guidance for Practitioners Written by Graham Williams of GSW Consultancy Limited, author of the 2007 edition of M_o_R and mentor to
More informationPRINCE2 Foundation Booklet
PRINCE2 Foundation Booklet PRINCE2 Foundation online course booklet By Frank Turley Ver 0.5 PRINCE2 2017 Foundation Booklet ii Colophon Title: Authors: Expert reviewers: PRINCE2 Foundation Booklet Frank
More informationPRINCE Update. Changes to the manual. AXELOS.com. April 2017 PUBLIC
PRINCE2 2017 Update s to the manual AXELOS.com April 2017 2 PRINCE2 2017 Update Contents 1 Introduction 3 2 Summary of changes 4 PRINCE2 2017 Update 3 1 Introduction This document provides a list of the
More informationPROJECT MANAGEMENT. By Pompeyo Rios
PROJECT MANAGEMENT By Pompeyo Rios PROJECT A project is a temporary endeavor undertaken to create a unique product, service, or result. Por example, constructing a building or plant, or implementing, improving,
More informationExam Duration: 2 hours and 30 minutes
The PRINCE2 Practitioner Examination Sample paper TR Question Booklet Multiple Choice Exam Duration: 2 hours and 30 minutes Instructions 1. You should attempt all 75 questions. Each question is worth one
More information2017 SPOCE Project Management Ltd Managing Successful Projects with PRINCE2 :2017
HO0483_1v3 Page 1 CONTENTS Contents... 1 Acknowledgements.... 2 Event Preparation Instructions Please Read And Follow Carefully... 3 PRINCE2 Primer... 7 PRINCE2 Principles... 9 PRINCE2 Themes... 11 PRINCE2
More informationPRINCE2 and the National and International Standards
PRINCE2 and the National and International Standards Robert Buttrick, Project Workout Limited White Paper December 2012 2 PRINCE2 and the National and International Standards Contents 1 Introduction 3
More information- Not Protectively Marked - NOTTINGHAMSHIRE POLICE JOB DESCRIPTION
NOTTINGHAMSHIRE POLICE JOB DESCRIPTION Job title: Department/Location: Responsible to: Responsible for: Project Manager Business & Finance Head of Programme Management N/A Date: 10 th September 2012 Library
More informationFoundation Sample Paper 1
MSP Foundation and Practitioner training ACADEMY Foundation Sample Paper 1 Copyright exists in all of this material. Copying of any kind is not permitted. D a r e t o C h a l l e n g e Page 259 Quint Wellington
More informationPRINCE2 in 60 Minutes Flat!
PRINCE2 in 60 Minutes Flat! Step By Step Guide Dave Litten www.projex.com Copyright Copyright 2016 Projex Academy Cover and internal design Projex Academy Media http://www.projex.com/prince2 All rights
More informationProject Integration Management. For the PMP Exam using PMBOK Guide 5 th Edition
Project Integration Management For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. Contacts Name: Khaled El-Nakib, PMP
More informationNote: appendix may include further responsibilities or experience necessary for the particular role.
Job title Job family Project Manager Project Management Proposed band D Job purpose To collaborate with a business or product owner to deliver a project, or many projects; deliver expected outcomes and
More informationMSP : The Basics. Kenn Dolan, Consultant, FPMS. AXELOS.com. APMG International 2010
Kenn Dolan, Consultant, FPMS AXELOS.com White Paper May 2010 Contents Background/history 3 Why would an organization use MSP? 3 Who uses MSP? 3 What are the benefits of using MSP? 3 An overview of the
More informationNote: appendix may include further responsibilities or experience necessary for the particular role.
Job title Job family Project Manager Project Management Proposed band D Job purpose To collaborate with a business or product owner to deliver a project, or many projects; deliver expected outcomes and
More informationProject Charter. A. General Information
A. General Information Project Title: Brief Project Description: Prepared By: Date: Version: B. Project Objective: Explain the specific objectives of the project. For example: What value does this project
More informationPASA GUIDANCE. Trustees Administration Governance Checklist. July 2018
PASA GUIDANCE Trustees Administration Governance Checklist July 2018 Administration Governance Occupational Pension Scheme Trustee Checklist The Pensions Administration Standards Association (PASA) has
More informationJob Description and Person Specification
Job Description Directorate/Group: Corporate and Business Support (CBS) Location: Southampton Post Title: Grade: Project Delivery Lead NERC Band 4 Post responsible to: Chief Operating Officer Posts responsible
More informationJOB DESCRIPTION ORGANISATIONAL STRUCTURE MAIN PURPOSE OF ROLE KEY RESPONSIBILITIES
JOB DESCRIPTION Job Title Project Manager Reports to Head of Business Support & Programme Management ORGANISATIONAL STRUCTURE Head of Business support & Programme Management Project Manager MAIN PURPOSE
More informationWhen is it appropriate to treat an initiative as a programme?
1 Programme Management Guide This guidance is for Senior Responsible Owners (SROs), Programme Managers and any others involved in delivering large-scale initiatives. It is designed to provide an overview
More information(Student Lifecycle Improvement Project)
JOB DESCRIPTION Job Title: Department: Location: Grade: Salary: Tenure: Hours : Project Manager (Student Lifecycle Improvement Project) Business Improvement Services Llandaff Campus 7AB 39,609 44,559 per
More informationProgramme Manager / Senior Project Manager, Strategy and Planning. Salary: Grade 8 ( 39,992 47,722 p.a. with flexibility to appoint up to 52,132)
CANDIDATE BRIEF Programme Manager / Senior Project Manager, Strategy and Planning Salary: Grade 8 ( 39,992 47,722 p.a. with flexibility to appoint up to 52,132) Two Year Fixed Term Contract (due to particular
More informationDeputy of training Plan and curriculums office. Title. Managing Successful Projects with PRINCE2 (Foundation level) Occupational group
Ministry of cooperatives Labour and Social Welfare Deputy of training Plan and curriculums office Iran Technical and Vocational Training Organization Job /Competency Training standard Title Managing Successful
More informationDo not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.
APM Project Fundamentals Qualification Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use
More informationJOB DESCRIPTION. Senior Project Manager.docx. Proposed band
Job title Job family Senior Project Manager Project Management Proposed band D Job purpose To deliver a project, or multiple projects and expected outcomes, to stakeholder expectations, within the agreed
More informationPRINCE2 - Project Initiation Documentation
Created/updated 05/11/17 PRINCE2 - Project Initiation Documentation Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Project Initiation Documentation
More informationService Design. ITIL is a registered trade mark of AXELOS Limited. The Swirl logo is a trade mark of AXELOS Limited 1
Service Design ITIL is a registered trade mark of AXELOS Limited. The Swirl logo is a trade mark of AXELOS Limited 1 Lesson Objectives Purpose, objectives, scope and value to business of Service Design
More informationPRINCE2 - Product Description
Created/updated 05/11/17 PRINCE2 - Product Description Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Product Description template
More informationPRINCE2 Foundation. PRINCE2 is a registered trade mark of AXELOS Limited
PRINCE2 Foundation PRINCE2 is a registered trade mark of AXELOS Limited Foundation exam 75 questions in 1 hour (5 trial questions) Pass mark: 35/70 Objective test questions (multiple choice) Closed book
More informationPrince 2 Foundation. Course Specifications. Course Summary. Course Outline. Serve Consulting Limited. Mode of Study : Online. Location : Ikeja, Lagos
Prince 2 Foundation Serve Consulting Limited Course Specifications Mode of Study : Online Location : Ikeja, Lagos Duration : 360 Day(s) Course Summary PRINCE2 (Projects IN Controlled Environments) is a
More informationProject Management Knowledge Areas SECTION III
Project Management Knowledge Areas SECTION III 1 Project Integration Management CHAPTER 4 2 The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all
More informationComparing PMBoK and PRINCE2 in 2013
Abstract Comparing PMBoK and PRINCE2 in 2013 G J Rankins CPPD MApplSc MBA This paper reports on a detailed comparison of the latest versions of the PMBoK (5th edition) [1] and PRINCE2 (5th edition) [2].
More informationInternational Diploma in Project Management. (Level 4) Course Structure & Contents
Brentwood Open Learning College (Level 4) Page 1 Unit 1 Overview of Project Management The unit 1 covers the following topics: What is A Project? What is Project Management? Project Constraints Tools and
More informationDetermine the project s level of complexity and agree with the owner the options and appropriate approach for delivery.
Job title Senior Project Manager - Migration Job family Project Management Grade 9 Job purpose The Senior Project Manager will deliver a project or multiple projects and expected outcomes, to stakeholder
More informationPRINCE Pilot. Case Study. Sarah Chambers, Head of Programme Management, Global Information Systems. Case Study. AXELOS.com. The APM Group 2009
PRINCE2 2009 Pilot Case Study Sarah Chambers, Head of Programme Management, Global Information Systems AXELOS.com Case Study June 2009 Contents Executive summary 3 Context and background about the British
More informationPOSITION DESCRIPTION
Programme Delivery Manager POSITION DESCRIPTION Unit/Branch, Directorate: Location: Capability Directorate Wellington Salary range: J $106,860 - $160,290 Purpose of position: The Programme Delivery Manager
More informationTHE STANDARD FOR PROGRAM MANAGEMENT
THE STANDARD FOR PROGRAM MANAGEMENT COURSE STRUCTURE INTRODUCTION Module 1 PROGRAM MANAGEMENT PERFORMANCE DOMAINS Module 2 PROGRAM STRATEGY ALIGNMENT Module 3 PROGRAM BENEFITS MANAGEMENT Module 4 COURSE
More informationPOSITION DESCRIPTION
POSITION DESCRIPTION Role Description This role will be responsible for the project management and successful delivery of the Procurement Transformation project. The project s objectives are to gain
More informationUniversity of St Andrews Financial Operating Procedure Management of Business Transformation Initiatives
University of St Andrews Financial Operating Procedure Management of Business Transformation Initiatives Updated: October 2017 1. Introduction This procedure exists to ensure operational adherence with
More informationNote: appendix may include further responsibilities or experience necessary for the particular role.
Job title Job family Project Manager Project Management Proposed band D Job purpose To collaborate with a business or product owner to deliver a project, or many projects; deliver expected outcomes and
More informationECIPMD4 Manage agreed project changes
Overview This standard is about managing agreed project changes. All projects are subject to variation, and changes may be required for example to the timetable, budget, project objectives and project
More informationSample Scenario 1 Multi Questions version 3.0 (Nov 05 Manual) Document Control Information
Sample Scenario 1 Multi Questions version 3.0 (Nov 05 Manual) Document Details Document Control Information Document Name: Sample Scenario 1 Multi Questions version 3.0 (Nov 05 Manual) Purpose of Document:
More informationSample Material - Not for Reprint. Workbook with Exams FOR TRAINER FOUNDATION. Version 5.6
PRINCE 2 FOUNDATION Workbook with Exams FOR TRAINER PRINCE2 is a Registered Trade Mark of the Offi ce of Government Commerce in the United Kingdom and other countries. Copyright 2011, ITpreneurs Nederland
More informationManaging Successful Programmes (MSP ): A basic overview. Rod Sowden, Aspire Europe Ltd. AXELOS.com. The Stationery Office 2011
Managing Successful Programmes (MSP ): A basic overview Rod Sowden, Aspire Europe Ltd AXELOS.com White Paper December 2011 Contents Introduction 3 1 What is programme management? 3 2 Types of programme
More informationJob profile. Programme Manager (Social Care IT Systems) Grade N
Job profile Programme Manager (Social Care IT Systems) Group: Care, Welbeing and Learning Service: Directorate Location: Civic Centre Line Manager: Service Directors Car User Status: Casual Grade N Job
More informationRole and person profile
Role and person profile Post title: Technical Programme Manager Location: Guildford/Manchester Division: Qualifications and Markets Department: QPPOP Reports to: Head of QPPOP Programme Responsible for:
More informationPosition Description for the role of Global General Manager
Position Description for the role of Global General Manager WHO WE ARE We create and sell a world-beating umbrella. But our vision goes beyond status; it's about leading by example in innovation, technology
More informationSESSION 308 Wednesday, November 2, 3:00 PM - 4:00 PM Track: The Specialist
SESSION 308 Wednesday, November 2, 3:00 PM - 4:00 PM Track: The Specialist Speaking the Same Language: Best Practice Project and Service Management Lisa Hodges Owner/Principal Consultant,Cornerstone Service
More informationPRINCE2 Benefits - Overview - Qualifications. BCS Chester and North Wales Branch 30 th April 2012
PRINCE2 Benefits - Overview - Qualifications BCS Chester and North Wales Branch 30 th April 2012 About Charles Ryder Pre 1996 project manager using PRINCE 1996 Accredited as PRINCE2 trainer Post 1996 project
More informationIII PMF MANAGEMENT SOLUTIONS. Course Number Project Management Course Overview
III PMF MANAGEMENT SOLUTIONS Course Number Project Management Course Overview House Keeping Beep beep (prepare to evacuate): Whoop whoop (evacuate): Follow the red hat (fire warden). Designated evacuation
More informationUsing PRINCE2 To Enhance Your PMBOK Guide Experience and Knowledge Base
Written and provided by Expert Reference Series of White Papers Using PRINCE2 To Enhance Your PMBOK Guide Experience and Knowledge Base 1-800-COURSES www.globalknowledge.com Using PRINCE2 To Enhance Your
More informationA partnership/collaboration from Bayer through setting up and implementing a global FSP strategy on a local level
A partnership/collaboration from Bayer through setting up and implementing a global FSP strategy on a local level Keith Francis, Strategic Alliance Management, Global Clinical Development Operations, Bayer
More informationASSORTMENT PLAYBOOK FOR RETAILERS
6STEPS to partnering with your vendor community to deliver the product information your consumers expect. Managing product information has never been easy, and it becomes even more difficult as consumers
More informationPRINCE2 - Highlight Report
Created/updated 05/11/17 PRINCE2 - Highlight Report Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Highlight Report template
More informationGuidance on project management
BSI Standards Publication NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW raising standards worldwide Guidance on project management BRITISH STANDARD National foreword This British
More informationLisa Hodges Owner/Principal Consultant
Lisa Hodges Owner/Principal Consultant ITIL is a registered trademark of Axelos Limited. PRINCE2 is a registered trademark of Axelos Limited. PMBoK is a registered trademark of Project Management Institute.
More informationProject Management for Non-Profits What s in it for you? Benefits of Improved Project Management (PM) Skills, Techniques and Processes.
Project Management for Non-Profits What s in it for you? Benefits of Improved Project Management (PM) Skills, Techniques and Processes Nov 2014 1 Overview What is a project? Impact on organizational results
More informationGlossary of Terms and Definitions
Glossary of Terms and Definitions OGC Glossary v06, Mar 2008 Note for readers A) This glossary may be freely downloaded. B) This glossary uses international English which has been adopted to reflect and
More informationChapter 2: Project Methodologies and Processes
Chapter 2: Project Methodologies and Processes True/False 1. A methodology provides a systematic way to plan, manage, and execute projects. Ref: INTRODUCTION 2. The Project Management Body of Knowledge
More informationSenior Manager Project Management Office
JOB DESCRIPTION Senior Analyst Project Management Office ROLE TITLE SECTION/DIVISION: REPORTS TO: DIRECT REPORTS (FTE): INDIRECT REPORTS (FTE): PRIMARY PURPOSE OF THE ROLE: Senior Analyst Project Management
More informationGUIDE TO THE CHANGES IN PMP simpl learn i
GUIDE TO THE CHANGES IN PMP- 2015 simpl learn i Table of contents Introduction the purpose of this manual 1 New Tasks: Initiating 3 New Tasks: Planning 4 New Tasks: Executing 6 New Tasks: Monitoring and
More informationAGILE AND PRINCE2. Happy bedfellows?
AGILE AND PRINCE2 Happy bedfellows? Let s start with some assumptions! We assume that we are dealing with organisations that have PRINCE2 and want to run Agile projects We assume that you are NOT an Agile
More informationNote: appendix may include further responsibilities or experience necessary for the particular role.
Job title Job family Project Manager Project Management Proposed band D Job purpose To collaborate with a business or product owner to deliver a project, or many projects; deliver expected outcomes and
More informationEstablishing a Medical Licensing Assessment Programme Board
Agenda item: 8 Report title: Report by: Action: Establishing a Medical Licensing Assessment Programme Board John Carr, Programme Manager, MLA john.carr@gmc-uk.org, 0161 240 8308 To consider Executive summary
More informationManaging Successful Programmes 2011 Glossary of Terms and Definitions
Version 2, November 2011 This glossary: is subject to terms and conditions agreed to by downloading the glossary, uses international English which has been adopted to reflect and facilitate the international
More informationUNIVERSITY OF CAMBRIDGE INFORMATION SERVICES COMMITTEE PROJECT AND PROGRAMME GOVERNANCE: DOCUMENTATION GUIDE: STAGE GATES
UNIVERSITY OF CAMBRIDGE INFORMATION SERVICES COMMITTEE PROJECT AND PROGRAMME GOVERNANCE: DOCUMENTATION GUIDE: STAGE GATES Document Status: Approving Body: Last Update: Author: Approved Information Services
More informationWho Should be on Your Project Team: The Importance of Project Roles and Responsibilities
Who Should be on Your Project Team: The Importance of Project s and One significant factor contributing to the success of projects is having the right people engaged in the process. Who are the right stakeholders
More informationAPM Project Management Qualification
for PRINCE2 Practitioners APM Project Management Qualification for PRINCE2 Practitioners Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6th edition The syllabus
More informationAgile Governance from the Top Down. James Yoxall Webinar 22 August, 2012
Agile Governance from the Top Down James Yoxall Webinar 22 August, 2012 The Problem Senior management do not feel in control of Agile projects They need to achieve a level of confidence to fulfil their
More informationProject Management (BPM1313) Project Charter
Project Management (BPM1313) by Dr. Adekunle Qudus Adeleke Faculty of Industrial Management adekunle@ump.edu.my Aims To further broaden the students knowledge on project charter and elements Expected Outcomes
More informationEuropean Shuai Jiao Union. Governance. Promotion and Development of Chinese Shuai Jiao in Europe. Document Status: Draft Version 2
Promotion and Development of Chinese Shuai Jiao in Europe Document Status: Draft Version 2 Office of the Secretary General December 2012 Contents 1 Introduction 2 2 Roles and Responsibilities 3 Programme
More informationProject Management Handbook
Project Management Handbook Version 0.1 September 2011 1 CONTENTS Introduction 3 The Project Lifecycle 3 Aspyre 4 Project or Programme 5 Project Management 6 Phase 1 Prepare 7 Project Brief 7 Business
More informationEAST SUSSEX FIRE AUTHORITY Job Description
EAST SUSSEX FIRE AUTHORITY Job Description Job Title: Project Manager - FireWatch Job Family: JF6 Specialist/Technical Manager (subject to evaluation) Reporting to: Programme Officer Manager Responsible
More informationFinancial and Cash Management Task Force
Financial and Cash Management Task Force Recommended Enterprise Project Governance 12/1/08 1.1 It is important to address the proper structure for governing projects that will be implementing enterprise
More informationJOB DESCRIPTION. Senior Business Analyst Proposed band
Job title Senior Business Analyst Job family Business Analysis Proposed band D Job purpose To undertake the business analysis function within Design & Engineering ensuring that business requirements and
More informationCRO Oversight - Laissez-faire vs. Micromanagement - oder: Wie viel ist zu viel?
CRO Oversight - Laissez-faire vs. Micromanagement - oder: Wie viel ist zu viel? X. Interdisziplinaeres Expertengespraech, PPH plus Frankfurt, Mai 8 th, 2015 Jens Opitz Head Corporate Clinical Operations
More informationThe Project Management Office (PMO) Introduction
The Project Management Office (PMO) Koos Taljaard October 2018 Our leaders are great thinkers. We need to take those ideas, make sure they are grounded and able to be executed. The PMO helps us do that.
More informationJUNE Assurance for high risk projects
JUNE 2010 Assurance for high risk projects Our vision is to help the nation spend wisely. We apply our unique perspective of public audit to help Parliament and government drive lasting improvement in
More informationAPMP for PRINCE2 Practitioners The APM Project Management Qualification
for PRINCE2 Practitioners APMP for PRINCE2 Practitioners The APM Project Management Qualification Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6th edition The