1 CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015
2 Background A Task Force established by CIC Comprising Government, Clients, Consultants, Contractors and Professional Bodies Representing the Task Force s general consensus view Good practice
3 Importance of Selecting the Right Consultant Consultant s fee makes up a low percentage of the total project cost Consultant s impact is substantial Good design is fundamental to project success
4 Benefits of Adopting Reference Materials 1. Better project outcome 2. Better relationships 3. Greater transparency
5 Consultant Procurement Process FOUR STAGES: 1. Procurement Strategy 2. Selection of Tenderers and Tendering 3. Tender Evaluation and Contract Award 4. Performance Assessment
6 Stage 1 : Procurement Strategy 6
7 Objectives of a Design Procurement Strategy 1. Achieve project programme and budget 2. Reduce project risks 3. Minimise interfaces 4. Maximise use of contractor s expertise 5. Promote the widest participation 6. Provide open, fair, objective and transparent tender process. 7
8 Key Issues of a Design Procurement Strategy 1. Design Responsibility: Employer/Contractor 2. Consultancy Packaging 3. Form of Contract 4. Tendering Method 5. Tender Assessment Criteria
9 Developing a Design Procurement Strategy Key Issues 9
10 ISSUE 1: Design Responsibility 1. Fundamental issue 2. The most appropriate project delivery whether by employer led design or design and build approach 3. A hybrid is common 4. Decision affects the scope of services for design consultancies
11 ISSUE 2: Consultancy Packaging 1. Minimise design interfaces 2. Opportunity for wider participation 3. Critical or specialist systems 4. Phased development 5. Use of option
12 ISSUE 3: Single/Multi-discipline Consultancy 1. Depends on project complexity and Client s capability 2. Multi-discipline consultancies provide a single point of responsibility 3. Single discipline consultancies provides more direct control over the design but Client takes interface management responsibility
13 ISSUE 4: Use of Framework Agreement Used when the scope of services cannot be pre-defined Term contract with a call off arrangement This provides flexibility and efficiency Fosters long term relationship/retention of knowledge
14 ISSUE 5: Achieving Value for Money 1. Aligning with commercial objectives 2. Appropriate technical emphasis 3. Promoting long term relationship 4. Encouraging wide participation to obtain healthy competition 5. Promoting innovation
15 Stage 2: Selection of Tenderers & Tendering 15
16 Method of Selecting Tenderers 1. Open Tender 2. Selective Tender 3. Single Tender / Sole Sourcing 4. Direct Negotiation 5. Design Competition
17 Choice between Open and Selective Tender 1. Depends on the type and complexity of consultancy 2. Open tender allows tenderers to form their own teams 3. Selective tender allows short-listing of qualified consultants before tender and reduction of abortive tender work
18 Single Tender / Sole Sourcing 1. Exception rather than rule 2. Examples of possible application: highly specialist services competitive tender fails there is a clear advantage in terms of continuity a long term business relation exists to provide confidence of successful performance, etc. speed is critical
19 Consultancy Tender Documents 1. Expression of Interest (EOI) 2. Request for Proposal (RFP) Invitation to Tender Consultancy Agreement Scope of Services Fee Proposal Instructions to Tenderers
20 Tender Submission 1. Form of Tender with Fee Proposal 2. Technical Proposal 3. Financial Information 4. Company Information
21 Obtaining Competitive Bids 1. Robust tender documentation 2. Equitable contract 3. Good communication 4. Sound tendering process
22 Potential Areas for Improvement 1. Classification and banding of Consultants 2. Simplified Requirements on Proposal Documents 3. Lack of Definition in Scope
23 Stage 3 : Tender Evaluation & Contract Award 23
24 Objective and Principles 1. To obtain the most advantageous tender 2. Open, transparent, formal, objective and fair process 3. Selection based on capability with due technical focus 4. Relevance to business needs and requirements 5. Confidentiality 6. Audit trail
25 Tender Evaluation Methods 1. Lowest fee (may include a technical passing mark) 2. Combined technical and fee evaluation (Two envelope system) 3. Combined technical and fee evaluation (Three envelope system)
26 Determining the Appropriate Tender Evaluation Method Depending on complexity of the project: 1. Nature of the works 2. Need for specialist input 3. Number of design disciplines involved / design interface coordination 4. Interface with existing facilities and operations 5. Opportunity for design and build 6. Programme challenge
27 Tender Assessment Team Team leader: To maintain objectivity and provide guidance on objectives Composition Multi-functional team of technically competent members Declaration of interest Preparation of assessment guidelines Expert opinion
28 Tender Assessment Process 1. Form tender assessment team 2. Pre-determine tender evaluation criteria 3. Declare interest before commencement of assessment 4. Complete technical assessment before opening price 5. Hold tender interview / presentation as appropriate 6. Open tender prices 7. Address tender qualifications to maintain level playing field 8. Determine the most advantageous tender
29 Potential Areas for Improvement 1. Consideration of Corporate Experience in Marking Scheme of Technical Proposals 2. Focus on Designated Consultant Team in Technical Assessment 3. Revamp of the Two-envelope System
30 Stage 4 : Performance Assessment 30
31 Performance Assessment Criteria General attributes eg. the project team Concept, feasibility and planning Design development Construction drawings and specifications Tender Construction Commissioning and handover
32 Feedback Into Future Procurement Performance records to be considered in technical assessment of future tenders
33 THANK YOU
Disclaimer. Enquiries. Enquiries on this publication may be made to the CIC Secretariat at:
Disclaimer Whilst reasonable efforts have been made to ensure the accuracy of the information contained in this publication, the CIC nevertheless would encourage readers to seek appropriate independent
More informationProcurement Process: General Requirements
Procurement Process: General Requirements The University has a legal requirement to comply with EU Procurement Directives, which govern the way in which public sector procurement is conducted for contracts
More informationJOB DESCRIPTION. Job title. Senior Procurement Manager. 2-year fixed term contract. Band 2. 52,312-64,208 per annum. Main purpose of the job:
JOB DESCRIPTION Job title Senior Procurement Manager 2-year fixed term contract Band 2 52,312-64,208 per annum Main purpose of the job: The Finance and Procurement Team provides a full range of finance
More informationFebruary Procurement Overview
February 2017 Procurement Overview The Strategic Procurement objective TCHC Strategic Procurement team is committed to open, fair and transparent procurement practices to achieve best value for money in
More informationJOB DESCRIPTION. Line Management responsibility for the Programmes Senior Programme Officers and Programme Officers
JOB DESCRIPTION DIRECTORATE: SECTION: JOB TITLE: Business & Skills Programme and Fund Services Assistant Programmes Manager RESPONSIBLE TO: Programmes Manager SUPERVISORY RESPONSIBILITY: KEY RELATIONSHIPS:
More informationProcurement & Probity Policy (v3.0)
Procurement & Probity Policy (v3.0) VERSION HISTORY Rev No. Date Revision Description Approval 1.0 2 March 2015 Amalgamation of Procurement Policy and probity procedures to create new Policy. 2.0 23 June
More informationLM028: Procurement & Contract Management Negotiation
LM028: Procurement & Contract Management Negotiation LM028 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: A contract can stand or fall on the expertise and performance of the Purchasing
More informationNorth American Development Bank. Engagement of Consultants
North American Development Bank Engagement of Consultants ENGAGEMENT OF CONSULTANTS This Note has been prepared by the North American Development Bank (the Bank) to assist staff and borrowers in the implementation
More informationGREATER SHEPPARTON CITY COUNCIL and GOULBURN VALLEY REGIONAL COLLABORATIVE ALLIANCE
GREATER SHEPPARTON CITY COUNCIL and GOULBURN VALLEY REGIONAL COLLABORATIVE ALLIANCE Policy Number 13.POL1 Version 3.0 Adopted February 2013 Last Reviewed July 2016 Business Unit: Responsible Officer: Approved
More informationLM032: Advanced Tendering Procedures & Bid Evaluation
LM032: Advanced Tendering Procedures & Bid Evaluation LM032 Rev.001 CMCT COURSE OUTLINE Page 1 of 6 Training Description: The engagement and management of contractors and suppliers is a vital part of the
More informationGiorgiana Teccuci Aisha Nadar
Giorgiana Teccuci Aisha Nadar Role of the Consulting Engineer in the Context of the New Yellow Book & its Dispute Board Provisions Agenda The FIDIC Contracts The Consulting Engineer and their role What
More informationBIS Research & Evaluation Framework. Guide for Buyers
BIS Research & Evaluation Framework Guide for Buyers Framework reference: CR150025BIS BIS Research & Evaluation Framework: Guide for Buyers Update 22 June 2016 1 P age Research & Evaluation Framework Contract
More informationBlackpool Multi Academy Trust Competitive Tendering Policy
1 Blackpool Multi Academy Trust Competitive Tendering Policy Implementation Date: January 2014 Adopted by Board: 27 January 2014 Review period: 1 year Review date: September 2016 Person responsible for
More informationBusiness Opportunities. and Insurance Board. with the Workplace Safety. Becoming a WSIB Supplier
Business Opportunities with the Workplace Safety and Insurance Board Becoming a WSIB Supplier Business Opportunities with the Workplace Safety and Insurance Board If you are interested in becoming a WSIB
More informationProvincial Government Review of the Professional Reliance Model Submission from Association of Consulting Engineering Companies of BC
Provincial Government Review of the Professional Reliance Model Submission from Association of Consulting Engineering Companies of BC January 2018 Provincial Government Review of the Professional Reliance
More informationYemen Procurement Reforms and e-procuremente
Yemen Procurement Reforms and e-procuremente Yehya Al-Ashwal Ashwal Chairman of the Technical Committee the High Tender Board (Yemen Public Procurement) MENA Regional Seminar on Preventive Anti- Corruption
More informationAudit services outline procurement strategy
Audit services outline procurement strategy November 2016 High quality independent audit is one of the cornerstones of public accountability. It gives assurance that taxpayers money has been well managed
More informationRESOLUTION NO. A RESOLUTION EXEMPTING THE DESIGN AND CONSTRUCTION OF WTP , VINE
RESOLUTION NO. 6583 A RESOLUTION EXEMPTING THE DESIGN AND CONSTRUCTION OF WTP- 17-02, VINE STREET WATER TREATMENT PLANT ( WTP) IMPROVEMENTS PROJECT FROM THE COMPETITIVE BIDDING PROCESS AND APPROVING AN
More information5 Award of Mobility Plus and On-Demand Transit Service Contracts
Clause 5 in Report No. 8 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 17, 2018. 5 Transit Service Contracts Committee
More informationProcurement Policy. Date: September 2016 Version: Final Author: Fiona Ward (Head of Procurement)
Procurement Policy Date: September 2016 Version: Final Author: Fiona Ward (Head of Procurement) 1. Purpose and Application This Procurement Policy applies to and binds all Directors, Managers and Employees
More informationProcurement framework for managing Commissioning changes
Procurement framework for managing Commissioning changes 1. Introduction This framework sets out NHS Kernow s management of major changes to the commissioning of services. Applying a consist approach for
More informationUNDP Procurement. UNDP Angola Procurement
UNDP Procurement The term procurement refers to the process of acquiring goods, works and services. The process spans the whole cycle from identification of needs, choosing the adequate procurement methods,
More informationAUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER IN LEADERSHIP AND MANAGEMENT
AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED IN LEADERSHIP AND MANAGEMENT The Stage 2 Competency Standards are the profession's expression of the knowledge and skill base, engineering
More informationProcurement Process: Architects & Professional Engineering Services. Procurement.
Procurement Process: Architects & Professional Engineering Services Procurement www.novascotia.ca/tenders Updated: February 2017 Table of Contents Contents INTRODUCTION:... 3 APPLICATION:... 3 SCOPE of
More informationLevel 6 NVQ Diploma in Construction Contracting Operations Management
Level 6 NVQ Diploma in Construction Contracting Operations Management Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements
More informationTemplate for ToR for Transaction Advisory Services
Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services
More informationATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES
Date: 16 August 2017 ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES CPG/2123/2017 A Political Economy Analysis (PEA) of Colombia s Rail Sector Colombia Prosperity Fund Programme 2017-2022
More informationIs Your Selection Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications Based Selection (QBS)
Is Your Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications Based (QBS) 1 Last update: February 12, 2009 Have You Reviewed Your Process Lately? Do
More informationJOB DESCRIPTION. Community Led Local Development (CLLD) Programme Manager. The four CLLD Local Action Groups across Cornwall (Functional Management)
JOB DESCRIPTION SECTION: JOB TITLE: TBC Community Led Local Development (CLLD) Programme Manager RESPONSIBLE TO: TBC, CDC The four CLLD Local Action Groups across Cornwall (Functional Management) SUPERVISORY
More informationQuotation Procedure TRIM: D12/85125P
Quotation Procedure TRIM: D12/85125P INTRODUCTION This procedure supports the University's Procurement Policy and outlines the process for the procurement of all goods and services for the University of
More informationExpression of Interest Guidelines. February Financial Services Page 1 of 8
February 2012 Financial Services Page 1 of 8 Financial Services EXPRESSION OF INTEREST GUIDELINES Responsible Position: Manager, Financial Operations Approved by: Chief Financial Officer Table of Contents
More informationSUB-CONTRACTING Charges Supply Chain Fees and POLICY
SUB-CONTRACTING Charges Supply Chain Fees and POLICY POLICY VERSION NUMBER 1 MEMBER OF STAFF RESPONSIBLE FOR POLICY Head of Apprenticeships & Employer Engagement RECORD OF REVISIONS TO POLICY DATE DETAILS
More informationSlide Headings Bullet Points Key Messages Time (mins)
Overall Duration hour 5 mins Total Number of Slides 36 Plan for Practical No. Exercises Duration 8 minutes Timing within Presentation Slides 33, 34, and 35 relate to the practical exercise Reference Material
More informationFRAMEWORK TO GUIDE THE DEVELOPMENT OF A FIRST NATION TENDERING POLICY
FRAMEWORK TO GUIDE THE DEVELOPMENT OF A FIRST NATION TENDERING POLIY 2 FRAMEWORK TO GUIDE THE DEVELOPMENT OF A TENDERING POLIY BY FIRST NATIONS IN RELATION TO FEDERALLY FUNDED APITAL PROJETS (EXLUDING
More informationBidding and Tendering. National Occupational Standards October 2018
Bidding and Tendering National Occupational Standards October 2018 Unit 3 Cherry Hall Road North Kettering Business Park Kettering, NN14 1UE T: 01536 739 189 E: skills@instructus.org www.instructus-skills.org
More informationProcurement manual for activities funded through the National Land Transport Programme
Procurement manual for activities funded through the National Land Transport Programme NZ Transport Agency www.nzta.govt.nz Copyright information This publication is copyright NZ Transport Agency. Material
More informationCaring for Customers : Embracing Change
Caring for Customers : Embracing Change Project Management Experience of the Hong Kong Housing Authority 12 May, 2006 Ms. Ada Y.S. Fung Deputy Director (Development and Construction) Hong Kong Housing
More informationProcurement Manager Outwood Grange Academies Trust. Application Pack
Procurement Manager Outwood Grange Academies Trust Application Pack Contents Welcome Letter The role Job Description Person Specification How to Apply Welcome Letter Dear applicant Thank you for taking
More informationCasework Technical Support (Social Welfare - Project Management)
Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend
More informationATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES. CPG/2124/2017 Political Economy Analysis (PEA) of Colombia s Agriculture Sector
Date: 01 August 2017 ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES CPG/2124/2017 Political Economy Analysis (PEA) of Colombia s Agriculture Sector You are invited to submit a tender
More informationAudit services procurement strategy
Audit services procurement strategy December 2016 High quality independent audit is one of the cornerstones of public accountability. It gives assurance that taxpayers money has been well managed and properly
More informationTOPIC GUIDE: TEMPLATE FOR TENDER DOCUMENTATION
TOPIC GUIDE: TEMPLATE FOR TENDER DOCUMENTATION Attached is a template which can be used when competitively tendering. It consists of: Covering Letter - You may wish to make slight amendments. Terms and
More informationUNITED NATIONS GLOBAL SERVICE CENTER United Nations Logistics Base, Brindisi, Italy UNLB United Nations Support Base, Valencia, Spain - UNSB
UNITED NATIONS GLOBAL SERVICE CENTER United Nations Logistics Base, Brindisi, Italy UNLB United Nations Support Base, Valencia, Spain - UNSB UN TENDER PROCESS 02 October 2012 Sasa Murganic 1. Framework
More informationSUPPLY CHAIN MANAGEMENT AND PROVIDER PAYMENTS POLICY
Introduction With the advent of the Apprenticeship Reforms in 2017, Skills Edge has identified the need to ensure the appropriate breadth and depth of provision to meet the diverse needs of our employers.
More informationGOVERNMENT OF KARNATAKA. Vidhanasoudha, Bangalore, dated:26 th September NOTIFICATION
GOVERNMENT OF KARNATAKA No:PWD 121 SO/FC 2003 Karnataka Government Secretariat, Vidhanasoudha, Bangalore, dated:26 th September 2003. NOTIFICATION In exercise of the powers conferred by sub-section (1)
More informationCompetitive Procurement Evaluation Process Audit
1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Competitive Procurement Evaluation Process Audit August 28, 2017 City of Edmonton 16417 Procurement Evaluation
More informationAUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER
AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED The Stage 2 Competency Standards are the profession's expression of the knowledge and skill base, engineering application abilities, and
More informationRequest for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES
Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES Issued October 18, 2017 DEADLINE Noon Wednesday, November 15, 2017 CONTACT: KRISTINA HANDT CITY ADMINISTRATOR 3800 Laverne Ave N Lake Elmo,
More informationNational Commissioning Board. Leading Integrated and Collaborative Commissioning A Practice Guide
National Commissioning Board Leading Integrated and Collaborative Commissioning A Practice Guide March 2017 Introduction The short practical guide is intended to stimulate commissioners and other senior
More information(Online Procurement Initiative)
Internet Negotiations (Online Procurement Initiative) Objective Share Intel s present findings in the application of Internet negotiations (I-NEG) for construction services and facilities equipment. Specifically,
More informationSOUTH AFRICAN MEDICAL RESEARCH COUNCIL
SOUTH AFRICAN MEDICAL RESEARCH COUNCIL SUPPLY CHAIN MANAGEMENT POLICY SUPPLY CHAIN MANAGEMENT POLICY Page 1 of 12 Document review and approval Revision history Version Author Date 1 National Manager Operations
More information11 AC Procurement and Management of Consultants
11 AC Procurement and Management of Consultants Policy number: 11 AC Version 5.0 Approved by Name of author/originator Owner (director) Governing Body Date of approval July 2017 Date of last review June
More informationConception Design Construction Operation.
4 Development Process and Procurement 4.1 The development process by which the project moves from the earliest ideas to the final completion of the facilities and their use can be considered as having
More informationCompetitive Tendering & Procurement Policy
Competitive Tendering & Procurement Policy Date Published 1 st June 2016 Version 1 Approved Date 9 th June 2016 Review Cycle Annually Review Date June 2017 Learning together; to be the best we can be 1.
More informationPrequalification Questionnaire. for. Property Related Professional Services. PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE
Section A Prequalification Questionnaire for Property Related Professional Services PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE CONTENTS Section A Section B Section C Appendix 1 Appendix
More informationAdvanced Tendering Procedures & Bid Evaluation
An Intensive 5 Day Training Course Advanced Tendering Procedures & Bid Evaluation Effective Tendering, Bidding Strategies & Evaluation 10-14 Sep 2017, Dubai 21-MAY-17 This course is Designed, Developed,
More informationDeveloping carbon management systems
Developing carbon management systems More than just numbers, measuring and spreadsheets Chris Sowerby Principle Consultant 1 09/06/2010 Overview Why measure and manage carbon? What is a carbon management
More informationLevel 7 NVQ Diploma in Construction Senior Management. Qualification Specification
Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support for candidates 6 Links to National Standards / NOS
More informationLevel 7 NVQ Diploma in Construction Senior Management. Qualification Specification
Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support for candidates 6 Links to National Standards / NOS
More informationLevel 7 NVQ Diploma in Construction Site Management. Qualification Specification
Level 7 NVQ Diploma in Construction Site Management Qualification Specification ProQual 2016 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support
More informationGuide - Alternative Procurement - Unsolicited Proposals
1 Introduction 1.1 The Guidelines Good ideas are not the preserve of the public sector. AT welcomes unique, innovative and opportune proposals from business and individuals that support its vision and
More informationFinancial Reporting Council AUDIT TENDERS NOTES ON BEST PRACTICE
Financial Reporting Council AUDIT TENDERS NOTES ON BEST PRACTICE FEBRUARY 2017 The Financial Reporting Council (FRC) is the UK s independent regulator responsible for promoting high quality corporate governance
More informationCOF: Assessing, Analyzing and Improving the Role of our Current Learning Technologies in Student Success FORMAL RFP
COF: Assessing, Analyzing and Improving the Role of our Current Learning Technologies in Student Success FORMAL RFP I. GENERAL INFORMATION: Colleges of the Fenway ( COF ), is a consortium of six (6) colleges
More informationProcurement Policy. Education is for improving lives and for leaving your community and world better than you found it.
Procurement Policy Education is for improving lives and for leaving your community and world better than you found it. Review date: April 2020 Page 1 of 13 Contents 1. Introduction... 3 2. Principles...
More informationSkills Team Supply-Chain Fees and Charges Policy
Skills Team Supply-Chain Fees and Charges Policy Document Owner Quality and Compliance Director Change History Issue Issue Date List of Amendments or remarks as applicable 1 05/12/2017 Policy creation
More informationOffice of Business and Financial Services Procurement and Contracts Division Section
2510.2 SUBJECT: PROCUREMENT OF GOODS AND SERVICES :1 OBJECTIVE: To establish uniform procurement policies and procedures for the acquisition of goods and services consistent with the City s Procurement
More informationYORK REGION DISTRICT SCHOOL BOARD Policy and Procedure #465.0, Tendering Capital Construction and Maintenance Projects
WORKING DOCUMENT YORK REGION DISTRICT SCHOOL BOARD Policy and Procedure #465.0, Tendering Capital Construction and Maintenance Projects The Tendering Capital Construction and Maintenance Projects policy
More informationEnvironmental Planning & Coordination Organization
Environmental Planning & Coordination Organization Paryavaran Parisar, E-5 Arera Colony, Bhopal 462016 (M.P.) Tel.: 755-2466970, 2464318, 2465686, Fax: +91-755-2462136 E-mail.: epco.in, Website: www.epco.in
More informationALTERNATE FORMS OF PROJECT DELIVERY
ALTERNATE FORMS OF PROJECT DELIVERY 1 INTRODUCTION 1.1 BACKGROUND.1 In the building industry today, conventional methods of project delivery are being challenged by Clients, Consultants and Contractors
More informationAdvanced Tendering Procedures & Bid Evaluation Effective Tendering, Bidding Strategies & Evaluation
ISO 9001:2008 Certified ISO 29990:2010 Certified (Certificate No:1007049195) ISO 29990 (Certificate No: 1078694951) Advanced Tendering Procedures & Bid Evaluation 10-14 September 2017 Dubai, United Arab
More informationHow can the NPRA involve contractors early in E39 project?
How can the NPRA involve contractors early in E39 project? NTNU,DCEE 23.10.2017 What is ECI and it s benefits ECI is all bout involving the contractor in the early stage of project development, to integrate
More informationConsultancy to Revise the Caribbean Community Climate Change Centre s Procurement Handbook
UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT CLIMATE CHANGE ADAPTATION PROGRAM (USAID CCAP) Consultancy to Revise the Caribbean Community Climate Change Centre s Procurement Handbook TERMS OF REFERENCE
More informationChapter 15. Competitive Negotiation: Evaluating Proposals
Chapter 15. Competitive Negotiation: Evaluating Proposals Summary This chapter describes the steps to be taken in order to properly evaluate each proposal received in response to an RFP. Essential Information
More informationTsawwassen First Nation Procurement Policy. February, 2010
Tsawwassen First Nation Procurement Policy February, 2010 TFN Procurement Policy Page 0 of 10 Table of Contents 1. Authority... 2 2. Purpose and Scope... 2 3. Principles... 2 4. Purchasing authority and
More informationAudit report Written statement of response to the audit report from the health service CEO
1.1 Background From 26 June 2016, hospitals and health services mandated under Schedule 1 and 5 of the Health Services Act 1988 (Vic) must comply with the new Health Purchasing Victoria (HPV) Health Purchasing
More informationPOSITION DESCRIPTION TEAM LEADER, COMMUNICATIONS, ENGAGEMENT AND COMMUNITY RELATIONS
Team Classification Position Objective Communications Western Water Enterprise Agreement Band 7 Level A Level D FIXED TERM ROLE Hands-on leadership role. Coordination, development and delivery of business
More informationPOSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT
POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT Submission Date: September 23, 2015 Submitted To: Director, Fairness Monitoring Departmental
More informationDORSET PROCUREMENT. Procurement Strategy
DORSET PROCUREMENT Procurement Strategy 2018 2020 To provide procurement and commercial expertise that supports contracts and purchasing activity to deliver value for money, social value and added value
More informationThe Rail Industry Supplier Qualification Scheme - RISQS
The Rail Industry Supplier Qualification Scheme - RISQS RISQS The Railway Industry Supplier Qualification Scheme (RISQS) is the supplier pre-qualification service used by buyers of products and services
More informationRole Type Pay Band Location Duration Reports to: PB4/H Lagos Indefinite Procurement Manager W/A
Role Title Procurement Officer W/Africa Cluster (PCO) Role Information Role Type Pay Band Location Duration Reports to: Advisory, Policy and Expertise PB4/H Lagos Indefinite Procurement Manager W/A Role
More informationJob Title Senior Contract and Procurement Advisor. # of Hires Needed 1. Category Audit Services Group
Job Title Senior Contract and Procurement Advisor # of Hires Needed 1 Category Audit Services Group Education A post-secondary degree/diploma from a recognized university or community college OR completion
More informationTransformation Programme. Sourcing Workstream PROCUREMENT PLAN. Inland Revenue. 28/06/2013 v1.0 FINAL Reference:
Inland Revenue Transformation Programme Sourcing Workstream PROCUREMENT PLAN Project Sponsor: Greg James Prepared by: Sourcing Team Date: 28/06/2013 v1.0 FINAL Reference: 2013050 Document Control File
More informationPLEASURES AND PI OF PROCUREMENT
Brick Workshop 28 29/06/2017 Brymbo Ironworks PLEASURES AND PI OF PROCUREMENT PROCUREMENT The purchase of work, services, goods and assets PROCUREMENT PROCESS The actions taken in purchasing work, services,
More informationREQUEST FOR PROPOSAL (RFP)
ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) REQUEST FOR PROPOSAL (RFP) AUGUST 2017 CONSULTANCY SERVICES FOR THE DEVELOPMENT OF AN OCCUPATIONAL HEALTH AND SAFETY PROGRAM CONTENTS Page SECTION 1 : Invitation
More informationInternal Auditors for Craigowen Housing Association Period: 2 Years with an option to extend for 2 further periods of 12 months
Internal Auditors for Craigowen Housing Association Period: 2 Years with an option to extend for 2 further periods of 12 months BACKGROUND Craigowen Housing Association (CHA) requires a comprehensive and
More informationREQUEST FOR PROPOSALS FOR THE APPOINTMENT OF SECRETARIAT SERVICES FOR THE FOOD AND BEVERAGES MANUFACTURING SECTOR EDUCATION AND TRAINING AUTHORITY
13 Autumn Road, Rivonia, 2128 PO Box 245, Gallo Manor, 52 South Africa Tel: +27 (011) 253 7300 Fax: +27 (011) 253 7333 www.foodbev.co.za TERMS OF REFERENCE REQUEST FOR PROPOSALS FOR THE APPOINTMENT OF
More informationProcurement Code Changes Highlights 2017
Procurement Code Changes Highlights 2017 Purpose of Chapter (Utah Procurement Code) Utah Code 63G-6a-102 (1) To ensure transparency in the public procurement process; (2) To ensure the fair and equitable
More informationJOB DESCRIPTION. Assistant Estates Project Manager. Grade: 7. Estates and Facilities Division. Senior Estates Project Manager. Job Function/Purpose:
JOB DESCRIPTION Job Title: Assistant Estates Project Manager Grade: 7 Division: Reporting to: Estates and Facilities Division Senior Estates Project Manager. Job Function/Purpose: To professionally manage
More information5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods
PROCUREMENT 5/21/13 Agenda Common Tendering Systems Procurement Methods 1 Agenda Common Tendering Systems Procurement Methods Common Tendering Systems Competitive / Open-bid: (Qualified) contractors are
More informationForeword. We would like to thank the dedicated organisations who participated in this work. On behalf of the Get It Right Initiative
A Guide to Improving Value by Reducing Design Error Synopsis 13 key recommendations July 2018 Foreword Members of the Get It Right Initiative, from across all disciplines, have collaborated to create this
More informationMay 2018 FC 170/12. Hundred and Seventieth Session. Rome, May Appointment of the External Auditor for the period
May 2018 FC 170/12 E FINANCE COMMITTEE Hundred and Seventieth Session Rome, 21-25 May 2018 Appointment of the External Auditor for the period 2020-25 Queries on the substantive content of this document
More informationAVIATION AUTHORITY POLICY
PURPOSE: To establish a policy for the selection of development related professional services firms, including design-build firms for professional services and the Consulting Engineer, pursuant to the
More informationRequest for Qualifications: RFQ # Market Research Contractors. Table of Contents
Request for Qualifications: RFQ # 50817 Market Research Contractors Table of Contents 1. Introduction... 2 2. RFQ Background... 2 3. Objectives... 2 4. Background Information... 2 5. Technical Competence...
More informationProcurement Standard. For further information contact
Procurement Standard www.metrotrains.com.au/doing-business-with-metro For further information contact procurement@metrotrains.com.au Table of Contents 1. Introduction... 2 1.1 About Metro... 2 2. Procurement
More informationSELECTING YOUR AUDITOR
SELECTING YOUR AUDITOR A GUIDE TO TENDERING THE EXTERNAL AUDITOR APPOINTMENT FOR PUBLICLY FUNDED, THIRD SECTOR AND NOT-FOR-PROFIT BODIES APRIL 2018 1. INTRODUCTION This guide has the following sections:
More informationProcurement Options for NZ Construction Contracts
1 P a g e Tool Box Resource Procurement Options for NZ Construction Contracts A wide variety of contract arrangements have evolved in NZ for use on construction contracts. The following describes the most
More informationManager, Sourcing Supply and Contracts, Grid Projects Approved By:
Procurement Policy ISSUE DETAILS Effective Date: 1 Policy Owner: Chief Executive Officer Written By: Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Transpower Board of Directors Minute
More informationThe Provision of North West Non-Emergency Patient Transport Services
The Provision of North West Non-Emergency Patient Transport Services NHS Blackpool Clinical Commissioning Group on behalf of the 33 North West Clinical Commissioning Groups Final Evaluation Report for
More informationPROCUREMENT STRATEGY &
THENUE HOUSING ASSOCIATION PROCUREMENT STRATEGY 2016-17 & 2017-18 1. BACKGROUND Under the terms of the Procurement Reform (Scotland) Act 2014 a contracting authority which is likely to spend in excess
More informationRequest for Proposal (RFP)
Request for Proposal (RFP) BOK INFORMATION TECHNOLOGY RISK ASSESSMENT Date of Issue Closing Date Place Enquiries Table of Contents 1. Project Introduction... 3 1.1 About The Bank of Khyber... 3 1.2 Critical
More information