Brief Introduction to CCPM

Size: px
Start display at page:

Download "Brief Introduction to CCPM"

Transcription

1 CRITICAL CHAIN BUFFER SIZING: A COMPARATIVE STUDY ALEXANDRA B. TENERA Department of Industrial and Mechanical Engineering University Nova of Lisboa, Caparica, Portugal Brief Introduction to CCPM activities have some uncertainty, particularly regarding their durations. The recognition that uncertainty lies at the heart of project planning has been inducing several efforts in project scheduling under uncertainty since the end of fifties (Ang, Abdelnour, & Chaker, 1975; Diaz & Hadipriono, 1993; Herroelen & Leus, 2005). However, studies show that achieving scope, cost, or time still doesn t always happen especially in the project duration (Interlink Consulting, 2006; Tenera, 2006). Several sources of uncertainty in a project can be easily identified inducing different types of uncertainty and dealing with that may require different management approaches and strategies (De Meyer & Loch, 2002; Pich, Loch, & Meyer, 2002). The presence of uncertainty can stimulate the creation of buffers to reduce the consequences of possible disruptions. The use of project time buffers explicitly introduced in the project schedule has long been suggested (Hamburger, 1987), but more recently Goldratt (1997) promoted the intentional introduction of both project and feeding buffers in the project schedule to improve critical chain stability and to increase the probability of achieving a promised or agreed-upon project duration. Focused buffer consumption to control and to manage the project schedule execution through project uncertainty has also been promoted. This approach, best known as critical chain project management (CCPM), could be viewed as a way of trade-off between stability and makespan (Herroelen & Leus, 2005), and has been considered a promising methodology for project management (Herroelen & Leus, 2001; McKay & Morton, 1998). So, how these buffers are created and managed might be at the core of the improvement of project management. Developed using the Goldratt s theory of constraints (TOC), CCPM makes some strategic changes in how projects are traditionally planned, scheduled, and managed: CCPM emphasizes resource behavior in project schedule aiming to reduce project schedule changes and time overruns. The critical chain project planning and scheduling addresses uncertainty in form of activity duration variation. Premeditated introduction of time buffers in project schedule along with buffer consumption is used to manage the project schedule; To reduce project delays caused by Parkinson s Law (work expands to fill all the time available) but at the same time, accounting for Murphy s Law critical chain scheduling (Patrick, 1999) promotes several mechanisms: Build the schedule with target durations that are too tight to allow diversion of attention; Don t use activities due dates; Don t allow multitasking and resources interruptions. In CCPM the critical chain is the set of activities that defines the overall duration of the project, taking into account precedence and also resource dependencies. Critical chain requires the construction of a feasible schedule with only the time to do the work in each activity. This estimate is usually described as corresponding to a 50% confidence level or an average duration. Resource conflicts are resolved by moving tasks earlier in time (Newbold, 1998). There are two general kinds of resources in CCPM projects: the ones who perform critical activities and those who don t. It is necessary to make ensure that critical chain resources are available when the preceding activity is done, without relying on fixed due dates. For that resource buffers are considered in schedule, which traditionally works as wake-up calls in schedule. If one activity is completed before its scheduled duration the work done should be immediately forward, this behavior called relay runner tries to make use of all the occurred anticipations. 1

2 One of the main steps of CCPM to build the project schedule is to pull out the safety of each estimated activity duration and get target duration for each activity. Then, in the following steps, is to aggregate all of the safety at the end of the project, where it acts as a protection of the project due date, called project buffer (PB). Feeding buffers (FB) are placed whenever a non-critical activity joins the critical chain, in order to protect the critical activities against negative variations of the feeding chains. Like in the TOC applied to production, buffer management is the main schedule control mechanism used, which needs to assess buffer penetration or consumption in order to accepted rescheduling or not. As an activity takes longer than the schedule foresees, buffers are consumed. On the other hand, as they take less time, those buffers are replenished. Therefore, one of the main challenges of the CCPM is the adequate sizing of the time buffers. If the buffers were dimensioned beyond the necessary size, immediate practical implications happen, for example: unnecessary addition of costs and/or anticipated investments or eventual losses of market chances. On the other hand, if buffers were underestimated it may increase the probability of duration overruns, which can represent financial penalties and reliable loss from the part of the customer or market. If buffers are adequately sized, the project conclusion date should be satisfied and rarely exceeded. However, in both cases the size of the project buffer can depend on the desired probability for completing the project schedule and should be determined according to it. After the Goldratt s (1997) proposal of the critical chain principles of scheduling and management for projects, several authors suggested different methods for sizing projects and feeding buffers, which will be presented and discussed in the following section. Current Buffer Sizing Methods CCPM builds schedules with activities target durations tight and finished to start (FS) dependencies in a schedule as late as possible (ALAP). A safety margin is aggregated at the end of the project, where it acts as a protection of the project due date, called project buffers (PB), and in feeding buffers (FB), placed whenever a non-critical activity joins the critical chain, to protect critical activities against variations of the feeding chains. For project and feeding buffers sizing (BfS) several methods have been proposed. Goldratt (1997) suggested a practical and simple cut of 50% in the pessimistic duration (d Ci ) and to schedule a buffer of 50% of the trimmed duration of the chain with n activities. Variations of the method have been used considering 50% of the sum of the differences between a tendency measure (T) and the estimated pessimistic duration of the chain activities (n) as presented in formula (1), which permits considering the asymmetry of the underlying variability in activity. n C (1) i BfS = 0.5 ( d T ) 11 = Newbold (1998) and Leach (2000) detailed and developed the Goldratt s critical chain concepts and launch two other classical methods. Newbold (1998) revealed the approximated formula (2) assuming lognormal distributions functions for activity duration with mean μ ˆ i and pessimistic durations, d Ci. n i= 1 ( d ˆ C i) 2 BfS = 2 μ /2 (2) i This approximated formula was developed assuming: lognormal distributions functions for activity duration, pessimistic durations, d Ci, associated to a 90% confidence level on the the estimation, the applicability of the Central Limit Theorem and two standard deviations for sizing the buffer. Herroelen and Leus (2001) showed that in these conditions the difference considering 90% durations and the estimated mean durations, μ ˆ i, should have a smaller number of standard deviation then the two considered, which could result in practical terms in smaller buffers than expected if the assumed conditions occurs. Leach (2000) considered the square root of the sum of squares of the differences between the upper bounds of the estimated activity duration, U i, and the lower bounds, L i, for all activities of the longest chain feeding the buffer (3), 2

3 assuming no specific distribution function. This formula can be considered a generalization of the formula (2); it is a distribution free formula, and; if the lower bound is considered to be the mean duration and the upper bound the pessimistic duration considered on (3) both formulas will produce the same results. n i= 1 ( ) 2 i (3) i BfS = U L Other less known methods have also been proposed. Hoel and Taylor (1999) suggested that the size of the project buffer should depend on the desired probability for completing the project schedule and would be determined according to it. They used Monte Carlo simulation to project buffer sizing considering the difference between simulated percentile duration and the simulated mean and no feeding buffers. In this situation if the schedule slack is less than the expected variability of the non critical chains, ignoring feeding buffers can produce impacts on critical activities and this will be against the theoretical principles of the critical chain scheduling (Goldratt, 1997). Shou and Yeo (2000) proposed to estimate project buffers sizes by classifying activities in four different uncertainty levels according to the activities relative dispersion and the level of safety desired. They suggested that the same method could be applied to feeding buffers but they didn t try it. Park and Penã-Mora (2004) proposed applying simulation and system dynamics to buffer sizing in specific projects such as fast track construction and concurrent design projects (2006). In these last approaches buffers sizes and positions are continuous updated according to the dynamics of project execution in these special types of projects. The SMC Approach The need for practical and proper sizing of time buffers in CCPM scheduling led to the development of a different approach to buffer sizing based on the CCPM concepts and by using a simulation technique (Monte Carlo) the SMC method (which stands for Simulação para a Melhoria da Calendarização). The underlying logic of the proposed method is to size buffers addressing the risk of overrun the scheduled date of last activities of the chains (Tenera, 2006), the buffers will be designed considering the project schedule in the ALAP logic, as proposed in CCPM methodology. Considering, as an example, a very simple project network without resource constraints (Figure 1) for simplification with activities, A i, interrelated with FS activities relations, schedule in an ALAP logic assuming target durations for each activity. From Figure 1 it is possible to identify activities A1, A2, A3 e A4 as the critical activities of the project and activities A5 and A6, as non critical activities. A1 SNET A2 A3 A4 PB dc Shed dc P A5 SNET A6 FB dc Shed dc P Figure 1. SMC Logic 3

4 Assuming the ALAP scheduling logic of CCPM, the start of non critical activities, not depending from preceding activities conclusion, should not start before their ALAP schedule start date (with buffers included). Time buffers should be sized using: an assumed risk level for time overrun of the last activity of the critical chain for project buffer sizing purpose (PB), and a risk level for time overrun of end schedule dates of non critical activities converging to critical activities in sizing feeding buffers (FB). To consider the effect of the ALAP schedule in the activities whose start schedule are not depending on precedence activities conclusion, start no earlier than (SNET) constraints can be imposed on the ALAP schedule while others should have a start ASAP, according to the relay runner behavior execution of the CCPM methodology. This logic can be called as an as soon as needed (ASAN) logic. Using this ASAN logic and network simulation the conclusion of the last activity of which chain converting to the critical chain and the last activity of the critical chain (A6 and A4 in the example) can be evaluate and the risk of overrun the schedule conclusion dates for these activities characterized. To define the risk of overrun schedule activities end time, Monte Carlo Simulation was chosen as the simulation tool; it is a well known tool, and it has been used in project management risk analysis. The use of Monte Carlo Simulation as a tool for project buffer sizing was already proposed by Hoel and Taylor (1999), but in their proposal the ALAP scheduling logic, as well as the use of explicit feeding buffers appeared not to be considered. The difference between the simulated end date of these activities, associated with a chosen confidence level (dc p ), and the schedule date (dc Shed ), will be the time buffer to schedule (4). This buffer is intended to reduce the impact of non critical activities in the critical chain and to protect the project end date against variability. Regarding this, feeding buffers insertion can require the creation of a gap on the critical chain, as the duration variability of non critical chain should not delay the schedule start of critical chain activities (Goldratt, 1997) in order to improve the stability of the critical chain. BfS = dc dc (4) p Shed Experimental Design To assess the impact of sizing methods, considering different network sizes, a block design logic approach was used (see Figure 2). The effect of the sizing method on the schedule was considered the main study variable although it was assumed that others factors, such as network size (block), could also affect the results. These two factors could have i levels and j networks. Each network had different network complexity (NC) and random uncertain duration (defined by a tendency variable (T), an optimistic duration (d Cg ) and pessimistic (d Ci ) duration). Using ANOVA analysis and statistical tests we could evaluate the impact of different buffer sizing on the network. Block Nets Nets. Nets Factor 1 2 j Method 1 (1) (2). (k) Method 2 (1) (2). (k) Method i (1) (2). (k) (1) = f 1 (NC, T, d Ci, d Cg ) (2) = f 2 (NC, T, d Ci, d Cg ) (k) = f k (NC, T, d Ci, d Cg ) Figure 2. Experimental Design Approach Several Resource Constrained Scheduling Problems (RCPSP) datasets are available to researchers in the Scheduling Problem Library (PSPLIB) on the internet ( To address the effect of buffer sizing methods, samples of networks, generated by ProGen for the Single Mode RCPSP (SMRCPSP), were used because: CCPM scheduling can be integrated in the resource constrained project scheduling problems; CCPM advocates that projects can be well modeled by a network where activities are represented by nodes, FS activity interdependency and all activities must be executed. Although other network sets have been used in other 4

5 works (Herroelen & Leus, 2001) ProGen data sets are generated by controlled design parameters (Kolisch, Sprecher, & Drexl, 1995). To model uncertainty in activity duration, Triangular distributions were used. These distributions are particularly interesting for risk simulation when little data is available (Law & Kelton, 1991; Vose, 1996); they present good results for risk analysis (Johnson, 2002); they are considered conceptually easy to communicate and implement and they admit several types of asymmetry. In this study, distributions were mostly right skewed (activities with durations within [m/3, 2m] and [2/3m, 2m] limits), but left skewed (activities with durations within [1/3m, 4/3m] limits) or symmetric (activities with durations within [1/3m, 4/3m] limits) were also included. The variable m represented three times the original activity deterministic duration and the optimistic and pessimistic limits were randomly generated in Excel. For sizing the buffers, three methods were considered: A variant of Goldratt s method based on formula (1), where the variability removed of each activity duration was the difference between the pessimistic estimated duration (the upper limit) and the modal value (m). The results are associated with the M50 designation. As proposed by Leach (2000) and designated by SQR, formula (3) was used with U i equals to the pessimistic estimated duration and L i the modal value (m); The proposed method, SMC, considering the difference of 95% confidence level on the simulated final date and the schedule final date as presented in Figure 1. The critical chain and feeding chains identification and the scheduling of each project were done with ProChain, which was used to calculate the buffers in the case of the M50 and SQR. In the SMC case the buffers were simulated using 1000 iterations software after RiskNet and Excel conversion of networks to Microsoft. To evaluate and compare the impact of the three methods, each project schedule was again simulated under the SNET and ASAP conditions Two main groups of measures were used to evaluate the impact of the CC/BM scheduling logic and the considered buffer sizing methods namely morphological and time measures. In the comparative evaluation of the impact four main aspects were assessed: buffers morphological impact, buffers sizes impact, buffers impact on project schedule duration and schedule lateness (Tenera, 2006) as described next. Morphological Impact Measures The following indicators measure the impact of CC/BM scheduling logic: Number of feeding buffers by the number of activities in the critical chain, n(fb s) / n(cc); Number of feeding buffers by the number of activities of the deterministic project schedule, n(fb s) / N; Number of activities in the critical chain by the number of activities of the deterministic project schedule, n(cc) / N. The ratios n(fb s) / n(cc) and n(fb s) / N are indicators of control points density during project execution giving a measure of control effort of CC/BM logic relating to the critical chain dimension and to project dimension. The n(cc) / N, is an indicator of the capacity of focusing of the CC/BM scheduling logic. Time Impact Measures To measure the impact of the sizing methods in the deterministic project schedule were considered several indicators to characterize three different aspects: Buffers sizes: on the project buffer (PBD) and feeding buffers (FBMD) Impact on project schedule duration: considering only a project buffer (DPB), with project and feeding buffers inserted (DB) and the DB / DD measuring the impact in schedule of the assumed uncertainty in project activities during project execution 5

6 Usage of buffers inserted on schedule: project buffer consumption (PBC) and feeding buffers consumption (FBMC), percentage of buffers inserted but not used (FBNC) and the standardized schedule lateness (ML/DD) The main results obtained are presented and discussed in the following section. Buffers Morphological Impact In Figure 3 the number of the network critical activities (n(cc)) by the number of the network activities (N) for all used networks represented by the number of the activities (30, 60, 120) and a configuration parameter, P, varying from 1 to 5, are presented. From Figure 3 it can be seen that although the number of activities in the project doubled the number of critical activities didn t increased so much representing only 9% to 30% of the networks activities. It should be noted that this proportion is higher for smaller projects than for projects with more activities. 0,40 0,30 n (CC) / N 0,20 0,10 0, Combination of the configuration parameters - P 30P 60P 120P Figure 3. Networks Critical Activities Evaluating the impact of the feeding buffers introduced in schedule (n(fb s)) and the number of the network activities (N) ( Figure 4) we can see that the number of feeding buffers incremented the network nodes between 9% and 30%. These especial nodes represent in CCPM scheduling control points of the project time performance and once again they were proportionally more in smaller projects than in bigger projects. 6

7 0,40 0,30 n (FB's) / N 0,20 0,10 0, Combination of the configuration parameters - P 30P 60P 120P Figure 4. Feeding Buffers Weight in Networks Because the ratios n(cc) / N and n(fb s) / N could be considered as a measure of CC/BM focusing and control effort, results indicate that CCPM scheduling should be easier to implement in bigger projects than in smaller ones, because big projects allow a more focused management than in a smaller one. In the following sections for graphical identification of the networks the digit 3 will be used to represent networks with 30 activities, 6 to designate networks with 60 activities and the number 12 stands for networks with 120 activities. Last digit represents the configuration parameter, P, varying from 1 to 5. Buffers Sizes For sizing buffer evaluation PB duration (PBD) and the mean of the feeding s buffers durations (FBMD) were characterized. Comparing the project buffers of the three methods it can be found in the analysis that SMC generally generates smaller project buffers than the M50 and SQR and the M50 produces the largest ones (see Figure 5). Identical results can be seen in Figure 6 for feeding buffers mean sizes and in this case SMC detach more from the other methods. It should be noted that in smaller networks (with 30 and 60 activities) the SQR method produced on average higher feeding buffers than M50. 7

8 PBD [days] M50 SQR SMC Figure 5. Buffer Sizes FBMD [days] M50 SQR SMC Figure 6. Mean Feeding Buffers Sizes Buffers Impact on Scheduled Duration The results of the impact of buffers insertion, in terms of time, on deterministic schedule, are represented in Figure 7. As expected, initial deterministic duration of the project, using modal duration without buffers (DD), increased 8

9 when all buffers were inserted (DB) for all evaluated methods. The increase in the project duration revealed to be rather irregular (from 10% to 80%). Figure 7 shows that SMC method reduces the schedule duration of the projects considering project and feeding buffers schedule (DB), except in one case. This reduction was a consequence of smaller feedings and project buffers obtained with this method (Tenera & Cruz-Machado, 2007). The M50 method generally generated the longest schedules. DB / DD Figure 7. Buffers Impact on the Deterministic Schedule M50 SQR SMC In order to evaluated which type of buffers produces more impact on the project schedule, the increased on the deterministic duration caused only from project buffer insertion (DPB-DD) and the increased caused only by feeding buffers insertion (DB-DPB) standardized by the deterministic duration (DD) were calculated and results are exemplified in Figure 8 and Figure 9, for M50 and SMC, respectively Increment [percentage] (DPB-DD) / DD (DB-DPB) / DD Figure 8. M50: Buffers Impact 9

10 Increment [percentage] (DPB-DD) / DD (DB-DPB) / DD Figure 9. SMC: Buffers Impact Comparing the results from Figures 8 and 9, we can see that, although exceptions can occur, feeding buffers insertion produced smaller impact on the project schedule time than project buffer. The SMC method generated less impact than M50. These results can be extended to SQR method as we can see in Figure Increment [percentage] (DPB-DD) / DD (DB-DPB) / DD Figure 10. SQR: Buffers Impact 10

11 Buffers Consumption Buffer consumption results are presented in Figure 11 representing project buffer consumption (PBC) and mean feeding buffers consumption of the buffers used (FBMC) in M50 method and the proposed method, SMC, for illustrative proposes Buffer consumption [per M50: PBC M50: FBMC SMC: PBC SMC: FBMC Figure 11. Buffers Consumption Comparing the results of both methods we see that SMC have superior buffer usage than M50, because the consumption levels for both project and feeding buffers are higher. Results also show that in all evaluated methods project buffer was never exceeded, which is the main purpose of CCPM scheduling. Even if they proved to be able to not overrun the project end date, they also had always unused project buffer and the level of the project usage was generally lower than the mean consumption of the feeding buffers used. Although not shown it should also be notice that some buffers weren t used that indicates new research should be developed to improve feeding buffers schedule insertion. The difference between schedule project due date defined by DB and the simulated project conclusion date, considering the 95 percentile, was always positive in all projects and in all methods (Tenera, 2006). The results showed that project buffer was never totally consumed. This indicates that SMC as well as the other analyzed methods is able to not overrun project conclusion date and maybe considered somehow optimistic but SMC produces better results. Schedule Lateness To evaluate the schedule lateness of each method, a mean lateness (ML) was calculated by the arithmetic mean of the differences between project due date (defined by the DB) and the simulated mean date of feedings and project buffer. The result was standardized by the deterministic duration (DD) of each project. The values obtained with SMC are lower than in the other methods (Figure 12), which means that the mean consumption of buffers are closer to project schedule due date than in other methods. So, with SMC activities are concluded later than in the methods assessed improving the CCPM ALAP logic. In general, the results show that: Generally, buffers are reduced using the proposed method, than using classical methods; This reduction allows estimated project duration increasing project competitiveness proposal; buffers generally produced more impact in project duration than feeding buffers; 11

12 SMC method showed more buffer consumption than the other methods tested also without overruns; The proposed method, SMC, allows higher lateness than other methods improving the use of the ALAP logic and its potential benefits ML / DD M50 SQR SMC Figure 12. Schedule Lateness According to the obtained results, the proposed method contributes for a better time buffer sizing, producing reduced buffers, better estimated project durations, increasing schedule lateness and higher buffer consumption without overrun the estimated project duration. Conclusions This paper reviews different methods of project and feeding buffers sizing. The research on the impact of scheduling buffers against uncertainty in activity durations in projects used 15 networks and 60 simulations and three different methods of feeding and project buffer sizing were investigated. The research results showed that buffers can reduce the risk of project duration overruns, using feeding buffers can impact the project buffer size reducing it and project buffer generally produces more impact in project duration than feeding buffers. In this study the impact of buffer management wasn t considered assuming that if they were used we could reduce the project buffer even more without project duration overruns, hypotheses that should be investigated in the future. The research also shows that some of the feeding buffers inserted weren t used; thereby the insertion of feeding buffers needs further studies. The investigation revealed that CCPM is still available for improvements and the most known methods for buffer sizing can be considered optimistic as well as the proposed method, which should be improved by using at least a double step simulation process. The first step for feeding buffer sizing and the second to project buffer sizing considering the feeding buffers already inserted. As indicated by the experimental results the use of Monte Carlo simulation can improve the estimated project conclusion and the proposed method, SMC, has as main advantages: and feeding buffers are defined considering all activities and network characteristics like activity and resource interdependencies considering a ALAP logic; Generates better and reduced project duration than in the other two methods analyzed; The method uses well known simulation technique like Monte Carlo which is conceptually simple, flexible and taught in graduation schools; Can be applied using established computer applications available for use in real projects. 12

13 Nevertheless, the used of the Monte Carlo simulation technique for buffer sizing implies that organizations have the ability to follow the schedule assumptions and the estimation process is accurate. Otherwise, like in other methods available, the used of this tool can always be questionable. Acknowledgments The authors would like to thank the financial support from FLAD and also to ProChain Solutions and AGI for technical support received during this research. References Ang, A. H.-S., Abdelnour, J., & Chaker, A. A. (1975). Analysis of activity networks under uncertainty. Journal of the Engineering Mechanics Division, 101(4), De Meyer, A., & Loch, C. H. P., Michael T. (2002). Managing project uncertainty. MIT Sloan Management Review, 43(2), Diaz, C. F., & Hadipriono, F. C. (1993). Nondeterministic networking methods. Journal of Construction Engineering and Management, 119(1), Goldratt, E. M. (1997). Critical chain. Great Barrington, MA, EUA: North River Press. Hamburger, D. H. (1987). "On time" project completion-managing the critical path. Management Journal, XVIII(4), Herroelen, W., & Leus, R. (2001). On the merits and pitfalls of critical chain scheduling. Journal of Operations Management, 19(5), Herroelen, W., & Leus, R. (2005). scheduling under uncertainty: Survey of research potentials. European Journal of Operation Research, 165(2), Hoel, K., & Taylor, S. G. (1999). Quantifying buffers for project schedules. Production and Inventory Management Journal, 40(2), Interlink Consulting. (2006). Organizational project management baseline study. Retrieved November, 14, Johnson, D. (2002). Triangular approximations for continuous random variables in risk analysis. Journal of the Operational Research Society, 53(4), Kolisch, R., Sprecher, A., & Drexl, A. (1995). Characterization and generation of a general class of resourceconstrained project scheduling problems. Management Science, 41(10), Law, A. M., & Kelton, D. (1991). Simulation modeling and analysis (2ª ed.). Singapura: McGraw-Hill. Leach, L. (2000). Critical chain project management. Norwood, MA, EUA: Artech House. Lee, S., Park, M., & Pena-Mora, F. (2006). Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), McKay, K. N., & Morton, T. E. (Artist). (1998). Critical chain [Critical Chain]. Newbold, R. C. (1998). management in the fast lane. Boca Raton, FL, EUA: St. Lucie Press. Park, M., & Pena-Mora, F. (2004). Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), Patrick, F. S. (1999, April). Getting out from between Parkinson's rock and Murphy's hard place. PM Network, 13, Pich, M. T., Loch, C. H., & Meyer, A. (2002). On uncertainty, ambiguity, and complexity in project management. Management Science, 48(8),

14 Shou, Y., & Yeo, K. T. (2000, November 12-15). Estimation of project buffers in critical chain project management. Paper presented at the IEEE International Conference on Management of Innovation and Technology, Singapore. Tenera, A. (2006). Contribution for the improvement of uncertainty management in project duration through theory of constraints. Unpublished PhD Thesis, Universidade Nova de Lisboa, Lisboa. Tenera, A., & Cruz-Machado, V. (2007). Critical chain project management: A new approach for time buffer sizing. Paper presented at the Institute of Industrial Engineering Annual Conference, Nashville. Vose, D. (1996). Quantitative risk analysis: A guide to Monte Carlo simulation modelling. Chichester, RU: John Wiley & Sons. 14

15 This material has been reproduced with the permission of the copyright owner. Unauthorized reproduction of this material is strictly prohibited. For permission to reproduce this material, please contact PMI or any listed author.

Resource Allocation Optimization in Critical Chain Method

Resource Allocation Optimization in Critical Chain Method Annales UMCS Informatica AI XII, 1 (2012) 17 29 DOI: 10.2478/v10065-012-0006-2 Resource Allocation Optimization in Critical Chain Method Grzegorz Pawiński 1, Krzysztof Sapiecha 1 1 Department of Computer

More information

Recent Advances in Manufacturing Engineering

Recent Advances in Manufacturing Engineering An overview of Critical Chain applied to Project Management FRANCISCO CORREIA, ANTÓNIO ABREU ISEL, Polytechnic Institute of Lisbon, Lisbon, PORTUGAL 23546@alunos.isel.pt, ajfa@dem.isel.ipl.pt Abstract:

More information

Scheduling for Success with Critical Chain. Abstract

Scheduling for Success with Critical Chain. Abstract by Rob Newbold, September 2010 Abstract The Critical Chain scheduling approach described in this paper can be used to create good schedules that have provided substantial benefits in speed, predictability,

More information

Highlights of CCPM - Critical Chain Project Management The TOC way of managing projects By Oded Cohen International Director Goldratt Schools

Highlights of CCPM - Critical Chain Project Management The TOC way of managing projects By Oded Cohen International Director Goldratt Schools Highlights of CCPM - Critical Chain Project Management The TOC way of managing projects By Oded Cohen International Director Goldratt Schools ABSTRACT For many years the systemic approach to improve systems

More information

GPE engineering project management. Project Management in an Engineering Context

GPE engineering project management. Project Management in an Engineering Context GPE engineering project management Project Management in an Engineering Context Critical Chain Project Management (CCPM) CCPM and TOC Theory of Constraints views systems as chains The weakest link is the

More information

Introduction. Project Scheduling. Morgan State University ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Jason E. Charalambides, PhD, M.

Introduction. Project Scheduling. Morgan State University ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Jason E. Charalambides, PhD, M. Project Scheduling ARCH 738: REAL ESTATE PROJECT MANAGEMENT Morgan State University Jason E. Charalambides, PhD, M.ASCE, AIA, ENV_SP (This material has been prepared for educational purposes) Introduction

More information

Resource-Constrained Multi-Project Scheduling with Resource Moving Time for Construction Projects in Vietnam

Resource-Constrained Multi-Project Scheduling with Resource Moving Time for Construction Projects in Vietnam First International Conference on Construction In Developing Countries (ICCIDC I) Advancing and Integrating Construction Education, Research & Practice August 4-5, 2008, Karachi,, Pakistan Resource-Constrained

More information

Program Evaluation and Review Technique (PERT)

Program Evaluation and Review Technique (PERT) Program Evaluation and Review Technique (PERT) PERT Bar charts and CPM networks assume all activity durations are constant or deterministic. The assumption of constant durations may not be realistic because

More information

12/26/2013. Sharif University of Technology. Session#11. Instructor. Class time. Course evaluation. International Campus Kish

12/26/2013. Sharif University of Technology. Session#11. Instructor. Class time. Course evaluation. International Campus Kish International Campus Kish Sharif University of Technology Session#11 Instructor Omid Fatahi Valilai, Ph.D. Industrial Engineering Department, Sharif University of Technology Email: Fvalilai@Sharif.edu,

More information

Scheduling and Coordination of Distributed Design Projects

Scheduling and Coordination of Distributed Design Projects Scheduling and Coordination of Distributed Design Projects F. Liu, P.B. Luh University of Connecticut, Storrs, CT 06269-2157, USA B. Moser United Technologies Research Center, E. Hartford, CT 06108, USA

More information

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500 Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500 Thierry Labriet, STS STS SA, Lausanne, Switzerland +41 21 510 11 50 office@sts.ch www.sts.ch 1 Contents 1 Foreword... 3 2 Executive

More information

SCHEDULE RISK ANALYSIS ESSENTIALS FOR PROJECT SUCCESS

SCHEDULE RISK ANALYSIS ESSENTIALS FOR PROJECT SUCCESS SCHEDULE RISK ANALYSIS ESSENTIALS FOR PROJECT SUCCESS CSVA 2011 Conference Toronto, Ontario Nov 14-16, 2011 Laszlo A. Retfalvi P.Eng PMP PMI-RMP Retfalvi and Associates 1 Agenda of Session Key Take Aways

More information

Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8 th, 2008

Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8 th, 2008 Risk management is essential for any significant project. and is useful for any project where an unfavorable outcome is undesirable. Certain information about key project cost, performance, and schedule

More information

Operations Management

Operations Management 17-1 Project Management Operations Management William J. Stevenson 8 th edition 17-2 Project Management CHAPTER 17 Project Management McGraw-Hill/Irwin Operations Management, Eighth Edition, by William

More information

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com

More information

// How Traditional Risk Reporting Has Let Us Down

// How Traditional Risk Reporting Has Let Us Down // How Traditional Risk Reporting Has Let Us Down Dr. Dan Patterson, PMP CEO & President, Acumen November 2012 www.projectacumen.com Table of Contents Introduction... 3 What is Project Risk Analysis?...

More information

Schedule Margin. Contingency for Schedulers. John Owen, Product Manager Schedule and Risk, Deltek

Schedule Margin. Contingency for Schedulers. John Owen, Product Manager Schedule and Risk, Deltek Schedule Margin Contingency for Schedulers John Owen, Product Manager Schedule and Risk, Deltek Contingency / Management Reserve Let s start with a question Have you ever seen a project without any Contingency

More information

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A.

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A. Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION Raid Al-Aomar Classic Advanced Development

More information

Thus, there are two points to keep in mind when analyzing risk:

Thus, there are two points to keep in mind when analyzing risk: One-Minute Spotlight WHAT IS RISK? Uncertainty about a situation can often indicate risk, which is the possibility of loss, damage, or any other undesirable event. Most people desire low risk, which would

More information

Project Management CSC 310 Spring 2017 Howard Rosenthal

Project Management CSC 310 Spring 2017 Howard Rosenthal Project Management CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project Management - Traditional, Agile, Extreme 7TH Edition Authors:

More information

Critical Chain in Engineering Projects

Critical Chain in Engineering Projects Critical Chain in Engineering Projects IPMA, Eindhoven, Feb 16, 2012 Christoph Lenhartz COO, VISTEM GmbH & Co. KG Member of the Board, TOCICO Christoph Lenhartz Co-Founder & COO VISTEM GmbH & Co. KG Diplom-Kaufmann,

More information

Software Project Management

Software Project Management Software Project Management Dr. M.E. Fayad, Professor Computer Engineering Department College of Engineering, San José State University One Washington Square, San José, CA 95192-0180 E-mail: m.fayad@sjsu.edu

More information

The Performance of Heuristic Rules in Resource Constrained Project Scheduling

The Performance of Heuristic Rules in Resource Constrained Project Scheduling The Performance of Heuristic Rules in Resource Constrained Project Scheduling OSMAN HÜROL TÜRKAKIN Department of Civil Engineering Istanbul University 34320 Avcılar, Faculty of Engineering, Istanbul, Turkey

More information

Project Time Management

Project Time Management Project Time Management Understand the importance of project schedules and good project time management. Define activities as the basis for developing project schedules. Describe how project managers use

More information

ARCHIVES OF CIVIL ENGINEERING, LIX, 3, 2013

ARCHIVES OF CIVIL ENGINEERING, LIX, 3, 2013 DOI: 10.2478/ace-2013-0017 ARCHIVES OF CIVIL ENGINEERING, LIX, 3, 2013 IMPACT OF BASELINE TERMS ON THE COURSE OF CRITICAL PATHS AND TIME BUFFERS IN THE MODIFIED GOLDRATT S METHOD M. POŁOŃSKI 1, K. PRUSZYŃSKI

More information

Risk Analysis Overview

Risk Analysis Overview Risk Analysis Overview What Is Risk? Uncertainty about a situation can often indicate risk, which is the possibility of loss, damage, or any other undesirable event. Most people desire low risk, which

More information

December 25, 2017 CHAPTER 4 SUPPORTING PLANNING AND CONTROL: A CASE EXAMPLE

December 25, 2017 CHAPTER 4 SUPPORTING PLANNING AND CONTROL: A CASE EXAMPLE December 25, 17 CHAPTER 4 SUPPORTING PLANNING AND CONTROL: A CASE EXAMPLE Chapter Outline 4.1 Background What was the cause of the desperation that lead to the development of the Program Evaluation and

More information

David N Ford, Ph.D.,P.E. Zachry Department of Civil Engineering Texas A&M University. Project Dynamics. Research Project Descriptions

David N Ford, Ph.D.,P.E. Zachry Department of Civil Engineering Texas A&M University. Project Dynamics. Research Project Descriptions David N Ford, Ph.D.,P.E. Zachry Department of Civil Engineering Texas A&M University Project Dynamics Research Project Descriptions Index Lyneis, J. M. and Ford, D.N., Taylor, TR. A Project Control Model.

More information

CHAPTER 1. Basic Concepts on Planning and Scheduling

CHAPTER 1. Basic Concepts on Planning and Scheduling CHAPTER 1 Basic Concepts on Planning and Scheduling Eugénio Oliveira Scheduling, FEUP/PRODEI /MIEIC 1 Planning and Scheduling: Processes of Decision Making regarding the and ordering of activities as well

More information

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka Roser, Christoph, Masaru Nakano, and Minoru Tanaka. Comparison of Bottleneck Detection Methods for AGV Systems. In Winter Simulation Conference, edited by S. Chick, Paul J Sanchez, David Ferrin, and Douglas

More information

RiskyProject Professional 7

RiskyProject Professional 7 RiskyProject Professional 7 Project Risk Management Software Getting Started Guide Intaver Institute 2 Chapter 1: Introduction to RiskyProject Intaver Institute What is RiskyProject? RiskyProject is advanced

More information

Multi-Stage Scenario Tree Generation via Statistical Property Matching

Multi-Stage Scenario Tree Generation via Statistical Property Matching Multi-Stage Scenario Tree Generation via Statistical Property Matching Bruno A. Calfa, Ignacio E. Grossmann Department of Chemical Engineering Carnegie Mellon University Pittsburgh, PA 15213 Anshul Agarwal,

More information

APPLIED A NEW METHOD FOR MULTI-MODE PROJECT SCHEDULING

APPLIED A NEW METHOD FOR MULTI-MODE PROJECT SCHEDULING project, project scheduling, resource-constrained project scheduling, project-driven manufacturing, multi-mode, heuristic, branch and bound scheme, make-to-order Iwona PISZ Zbigniew BANASZAK APPLIED A

More information

Volume 8, No. 1, Jan-Feb 2017 International Journal of Advanced Research in Computer Science RESEARCH PAPER Available Online at

Volume 8, No. 1, Jan-Feb 2017 International Journal of Advanced Research in Computer Science RESEARCH PAPER Available Online at Volume 8, No. 1, Jan-Feb 2017 International Journal of Advanced Research in Computer Science RESEARCH PAPER Available Online at www.ijarcs.info A Study of Software Development Life Cycle Process Models

More information

Simulation of Lean Principles Impact in a Multi-Product Supply Chain

Simulation of Lean Principles Impact in a Multi-Product Supply Chain Simulation of Lean Principles Impact in a Multi-Product Supply Chain M. Rossini, A. Portioli Studacher Abstract The market competition is moving from the single firm to the whole supply chain because of

More information

Role of prototyping in the design process Selecting the correct prototyping strategy Linkage with design strategy: early or late concept lock

Role of prototyping in the design process Selecting the correct prototyping strategy Linkage with design strategy: early or late concept lock Lecture 10: Prototypes Prototyping Role of prototyping in the design process Selecting the correct prototyping strategy Linkage with design strategy: early or late concept lock Assignment You need to develop

More information

Construction Management - V1

Construction Management - V1 Construction Management - V1 How to manage a construction project (Building related project) Main steps in Project Management: Define project team, roles and responsibilities (internal & external) Define

More information

There seems to be a universal agreement on what a supply chain is. Jayashankar et al. [25] defines a supply chain to be

There seems to be a universal agreement on what a supply chain is. Jayashankar et al. [25] defines a supply chain to be ne previo conten Next: Intelligent Agents Up: No Title Previous: Introduction Supply Chain Management Introduction This chapter aims to give the supply chain management side of the theoretical background

More information

Project Management. Opportunity or Oxymoron? Stacy Munechika, PMP, PMI-ACP. PMI Rochester Chapter Professional Development Day May 2017

Project Management. Opportunity or Oxymoron? Stacy Munechika, PMP, PMI-ACP. PMI Rochester Chapter Professional Development Day May 2017 Project Management Opportunity or Oxymoron? Stacy Munechika, PMP, PMI-ACP PMI Rochester Chapter Professional Development Day May 2017 What makes project outcomes difficult to predict? Survey answers from

More information

Warning: Academics complain that there is no theory in Theory of Constraints John A. Ricketts (p. 9)

Warning: Academics complain that there is no theory in Theory of Constraints John A. Ricketts (p. 9) Reaching the Goal: How Managers Improve a Services Business Using Goldratt s Theory of Constraints John Arthur Ricketts Warning: Academics complain that there is no theory in Theory of Constraints John

More information

TIMEBOXING PLANNING: BUFFERED MOSCOW RULES

TIMEBOXING PLANNING: BUFFERED MOSCOW RULES TIMEBOXING PLANNING: BUFFERED MOSCOW RULES EDUARDO MIRANDA, INSTITUTE FOR SOFTWARE RESEARCH, CARNEGIE MELLON UNIVERSITY, SEPTEMBER 2011 ABSTRACT Time boxing is a management technique which prioritizes

More information

A Roadmap Approach For Implementing Theory of Constraints In Manufacturing Organisations

A Roadmap Approach For Implementing Theory of Constraints In Manufacturing Organisations A Roadmap Approach For Implementing Theory of Constraints In Manufacturing Organisations Prof. ND. Du Preez 1, Louis Louw 2 1 University of Stellenbosch, Industrial Engineering Department, South Africa

More information

Saving for a Rainy Day

Saving for a Rainy Day Saving for a Rainy Day by Karl Wiegers Principal Consultant Process Impact An article in a recent home remodeling magazine noted that "the prudent homeowner sets aside 20 percent of his budget for cost

More information

Project Planning and Estimating DJ

Project Planning and Estimating DJ Project Planning and Estimating DJ201 0807 Copyright ESI International August 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any

More information

Distribution Resource Planning (PP-SOP-DRP)

Distribution Resource Planning (PP-SOP-DRP) Distribution Resource Planning (PP-SOP-DRP) HELP.PPSOPDRP Release 4.6C SAP AG Copyright Copyright 2001 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form

More information

Estimating Project Schedule-Time and Cost

Estimating Project Schedule-Time and Cost Estimating Project Schedule-Time and Cost Chapter 5 5 1 Where We Are Now 5 2 1 Overview Seminar Agenda What is involved in schedule and cost management? In-depth Determining the sequence of activities

More information

ASSIGNMENT BUFFER CONTROL FOR CONSTRUCTION PROJECTS

ASSIGNMENT BUFFER CONTROL FOR CONSTRUCTION PROJECTS ASSIGNMENT BUFFER CONTROL FOR CONSTRUCTION PROJECTS Jeongki, Kim 39-dong 426-ho, Sillim-dong kjk0305@gmail.com Moonseo, Park 39-dong 433-ho, Sillim-dong mspark@snu.ac.kr Hyunsoo, Lee 39-dong 430-ho, Sillim-dong

More information

Before You Start Modelling

Before You Start Modelling Chapter 2 Before You Start Modelling This chapter looks at the issues you need to consider before starting to model with ARIS. Of particular importance is the need to define your objectives and viewpoint.

More information

Linear High Touch Time: A New TOC Application

Linear High Touch Time: A New TOC Application Linear High Touch Time: A New TOC Application Presented By: Lisa Scheinkopf, Yuji Kishira, and Amir Schragenheim Date: June 4, 2012 1 Standing On The Shoulders Process 1. Identify a giant, not a choopchick

More information

By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington November 12, 2009.

By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington November 12, 2009. OPT Report By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington 98195. November 12, 2009. The Goal Every manufacturing company has one goal to make

More information

Sensitivity and Risk Path Analysis John Owen, Vice President Barbecana, Inc.

Sensitivity and Risk Path Analysis John Owen, Vice President Barbecana, Inc. Sensitivity and Risk Path Analysis John Owen, Vice President Barbecana, Inc. Sensitivity Analysis Sensitivity Analysis shows us which tasks are creating uncertainty in a selected outcome. The outcome might

More information

CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER

CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER ABSTRACT CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER David, K. H. Chua 1, and Li Jun Shen 2 Constraint modeling is a necessary step in construction planning. The basic

More information

Application of a PERT-Type System and "Crashing" in a Food Service Operation

Application of a PERT-Type System and Crashing in a Food Service Operation Hospitality Review Volume 7 Issue 2 Hospitality Review Volume 7/Issue 2 Article 8 1-1-1989 Application of a PERT-Type System and "Crashing" in a Food Service Operation Glenn A. Leitch Michigan State University,

More information

Review: Simple schedule risk modelling with Safran Risk

Review: Simple schedule risk modelling with Safran Risk Creating value from uncertainty Broadleaf Capital International Pty Ltd ABN 24 054 021 117 www.broadleaf.com.au Review: Simple schedule risk modelling with Safran Risk With a view to exploring alternative

More information

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012 5.3.1 Define Scope: Inputs PMBOK Guide Fifth Edition 5.3.1.1 Scope Management Plan Described in Section 5.1.3.1.The scope management plan is a component of the project management plan that establishes

More information

Operational Excellence Methodology Continuous Improvement

Operational Excellence Methodology Continuous Improvement Operational Excellence Methodology Continuous Improvement Duvan Luong, Ph.D. Operational Excellence Networks In our everyday life, we all have objectives. Usually, the objectives are associated with obligations

More information

AN INCLUSIVE PROBABILISTIC BUFFER ALLOCATION METHOD

AN INCLUSIVE PROBABILISTIC BUFFER ALLOCATION METHOD Poshdar, M., González, V., Belayutham, S., 2015. An Inclusive Probabilistic Buffer Allocation Method.In: Proc. 23rd Ann. Conf. of the Int l. Group for Lean Construction. Perth, Australia, July 29-31, pp.

More information

What's New - Task Planning

What's New - Task Planning What's New - Task Planning by Dale Howard and Gary Chefetz With this chapter, teach yourself how to use Microsoft Project 2010 s new manual scheduling feature. This self-paced study guide includes hands-on

More information

SINGLE MACHINE SEQUENCING. ISE480 Sequencing and Scheduling Fall semestre

SINGLE MACHINE SEQUENCING. ISE480 Sequencing and Scheduling Fall semestre SINGLE MACHINE SEQUENCING 2011 2012 Fall semestre INTRODUCTION The pure sequencing problem is a specialized scheduling problem in which an ordering of the jobs completely determines a schedule. Moreover,

More information

A simple model for low flow forecasting in Mediterranean streams

A simple model for low flow forecasting in Mediterranean streams European Water 57: 337-343, 2017. 2017 E.W. Publications A simple model for low flow forecasting in Mediterranean streams K. Risva 1, D. Nikolopoulos 2, A. Efstratiadis 2 and I. Nalbantis 1* 1 School of

More information

DESIGN PROJECT FAILURE AVOIDANCE USING AUDITING APPROACH

DESIGN PROJECT FAILURE AVOIDANCE USING AUDITING APPROACH DESIGN PROJECT FAILURE AVOIDANCE USING AUDITING APPROACH Hsien-Jung Wu* & Hung-Wen Hsu *Dept. of Information Management, Mingdao University, Taiwan Dept. of Industrial Design, Tunghai University, Taiwan

More information

The Risks of Sharing Informatics Resources in Multi-project Environment

The Risks of Sharing Informatics Resources in Multi-project Environment The Risks of Sharing Informatics Resources in Multi-project Environment Rafael António Pinto Serina Instituto Superior Técnico rafael.serina@tagus.ist.utl.pt Prof. Dr. Pedro Manuel Sousa Instituto Superior

More information

BAE Systems Insyte Software Estimation

BAE Systems Insyte Software Estimation BAE Systems Software Estimation Steve Webb BAE Systems Estimating Focus Group Chairman Engineering Estimation & Measurement Manager 22 April 2008 1 Background BAE Systems Estimating Focus Group covers

More information

Misinformation Systems

Misinformation Systems Case 1-1 Ackoff s Management Misinformation Systems This case is from a classic article entitled Management Misinformation Systems. It was written by Russell L. Ackoff and appeared in Management Science.

More information

An integration model for planning and scheduling problems with constrained resources

An integration model for planning and scheduling problems with constrained resources An integration model for planning and scheduling problems with constrained resources Pilar Tormos 1, Federico Barber 2, Antonio Lova 1 1 Dpto.de Estadística e Investigación Operativa, Polytechnic University

More information

Managing an ITIL SaaS Implementation IT program: A Case Study. Abstract. Introduction

Managing an ITIL SaaS Implementation IT program: A Case Study. Abstract. Introduction Managing an ITIL SaaS Implementation IT program: A Case Study Gottfried Rudorfer, PMP, ITIL Expert, CA Technologies Abstract The case study Managing an ITIL SaaS Implementation IT program provides insight

More information

Managing Complex Organizations: A Simplified Approach

Managing Complex Organizations: A Simplified Approach Managing Complex Organizations: A Simplified Approach Managing Complex Organizations: A Simplified Approach James R. Holt, Professor, PE Washington State University 9300 Bellwood Drive, Fredericksburg,

More information

Utilization vs. Throughput: Bottleneck Detection in AGV Systems

Utilization vs. Throughput: Bottleneck Detection in AGV Systems Utilization vs. Throughput: Bottleneck Detection in AGV Systems Christoph Roser Masaru Nakano Minoru Tanaka Toyota Central Research and Development Laboratories Nagakute, Aichi 480-1192, JAPAN ABSTRACT

More information

THE CONTRACTS GROUP LTD. THE SOCIETY OF CONSTRUCTION LAW DELAY & DISRUPTION PROTOCOL 2 nd Edition

THE CONTRACTS GROUP LTD. THE SOCIETY OF CONSTRUCTION LAW DELAY & DISRUPTION PROTOCOL 2 nd Edition THE CONTRACTS GROUP LTD. THE SOCIETY OF CONSTRUCTION LAW DELAY & DISRUPTION PROTOCOL 2 nd Edition 18 January 2017 SCL Delay & Disruption Protocol 2 nd Edition INTRODUCTION TIME - Methods of Delay Analysis

More information

Plan Your Work, Work Your Plan. Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology

Plan Your Work, Work Your Plan. Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology Plan Your Work, Work Your Plan Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology Agenda Understand what a project is Understand the basics of

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

Hybrid Model applied in the Semiconductor Production Planning

Hybrid Model applied in the Semiconductor Production Planning , March 13-15, 2013, Hong Kong Hybrid Model applied in the Semiconductor Production Planning Pengfei Wang, Tomohiro Murata Abstract- One of the most studied issues in production planning or inventory management

More information

+? Mean +? No change -? Mean -? No Change. *? Mean *? Std *? Transformations & Data Cleaning. Transformations

+? Mean +? No change -? Mean -? No Change. *? Mean *? Std *? Transformations & Data Cleaning. Transformations Transformations Transformations & Data Cleaning Linear & non-linear transformations 2-kinds of Z-scores Identifying Outliers & Influential Cases Univariate Outlier Analyses -- trimming vs. Winsorizing

More information

Transactions on the Built Environment vol 34, 1998 WIT Press, ISSN

Transactions on the Built Environment vol 34, 1998 WIT Press,  ISSN Improving the Dutch railway services by network-wide timetable simulation Jurjen S. Hooghiemstra", Dick M. Middelkoop", Maurice J.G. Teunisse^ " Railned, Dept. of Innovation, P.O.Box 2025, 3500 HA Utrecht,

More information

Strengths & Drawbacks of MILP, CP and Discrete-Event Simulation based Approaches for Large-Scale Scheduling

Strengths & Drawbacks of MILP, CP and Discrete-Event Simulation based Approaches for Large-Scale Scheduling Strengths & Drawbacks of MILP, CP and Discrete-Event Simulation based Approaches for Large-Scale Scheduling Pedro M. Castro Assistant Researcher Laboratório Nacional de Energia e Geologia Lisboa, Portugal

More information

INTRODUCTION TO PROJECT MANAGEMENT. Sergey V. Nesterov MD, PhD, PMP

INTRODUCTION TO PROJECT MANAGEMENT. Sergey V. Nesterov MD, PhD, PMP INTRODUCTION TO PROJECT MANAGEMENT Sergey V. Nesterov MD, PhD, PMP Our PROGRAMME: 1. INTRODUCTION TO PROJECT MANAGEMENT 2. STARTING A PROJECT 3. WORK MOTIVATION 4. COMMUNICATION 5: TEAMS AND TEAMWORK 6:

More information

Dynamic Simulation and Supply Chain Management

Dynamic Simulation and Supply Chain Management Dynamic Simulation and Supply Chain Management White Paper Abstract This paper briefly discusses how dynamic computer simulation can be applied within the field of supply chain management to diagnose problems

More information

COORDINATING DEMAND FORECASTING AND OPERATIONAL DECISION-MAKING WITH ASYMMETRIC COSTS: THE TREND CASE

COORDINATING DEMAND FORECASTING AND OPERATIONAL DECISION-MAKING WITH ASYMMETRIC COSTS: THE TREND CASE COORDINATING DEMAND FORECASTING AND OPERATIONAL DECISION-MAKING WITH ASYMMETRIC COSTS: THE TREND CASE ABSTRACT Robert M. Saltzman, San Francisco State University This article presents two methods for coordinating

More information

Sawtooth Software. Sample Size Issues for Conjoint Analysis Studies RESEARCH PAPER SERIES. Bryan Orme, Sawtooth Software, Inc.

Sawtooth Software. Sample Size Issues for Conjoint Analysis Studies RESEARCH PAPER SERIES. Bryan Orme, Sawtooth Software, Inc. Sawtooth Software RESEARCH PAPER SERIES Sample Size Issues for Conjoint Analysis Studies Bryan Orme, Sawtooth Software, Inc. 1998 Copyright 1998-2001, Sawtooth Software, Inc. 530 W. Fir St. Sequim, WA

More information

Project Planning, Scheduling and Preparation of Quality Assurance Control Documents

Project Planning, Scheduling and Preparation of Quality Assurance Control Documents Project Planning, Scheduling and Preparation of Quality Assurance Control Documents J.SHARANYASREENIVAS 1, G.GAJALAKSHMI 2, K.RAVI THEJA 3 1P.G Student M.Tech (Structural Engg. and construction managment),

More information

Notes. Strategic Planning: Different Aspects of Modes and Mode-switching Dilip Roy

Notes. Strategic Planning: Different Aspects of Modes and Mode-switching Dilip Roy Notes present short pieces which are research-based, experience-based or idea-based. Strategic Planning: Different Aspects of Modes and Mode-switching Dilip Roy This paper by Dilip Roy deals with executives'

More information

CONTINUOUS RESERVOIR SIMULATION INCORPORATING UNCERTAINTY QUANTIFICATION AND REAL-TIME DATA. A Thesis JAY CUTHBERT HOLMES

CONTINUOUS RESERVOIR SIMULATION INCORPORATING UNCERTAINTY QUANTIFICATION AND REAL-TIME DATA. A Thesis JAY CUTHBERT HOLMES CONTINUOUS RESERVOIR SIMULATION INCORPORATING UNCERTAINTY QUANTIFICATION AND REAL-TIME DATA A Thesis by JAY CUTHBERT HOLMES Submitted to the Office of Graduate Studies of Texas A&M University in partial

More information

TELECOMMUNICATIONS USAGE AND PUBLIC TRANSPORT PASSENGERS TRAVEL BEHAVIOUR IN LAGOS, NIGERIA AGUNLOYE, O.O.

TELECOMMUNICATIONS USAGE AND PUBLIC TRANSPORT PASSENGERS TRAVEL BEHAVIOUR IN LAGOS, NIGERIA AGUNLOYE, O.O. Ethiopian Journal of Environmental Studies & Management 8(Suppl. 1): 752 758, 2015. ISSN:1998-0507 doi: http://dx.doi.org/10.4314/ejesm.v8i1.2s Submitted: September 11, 2014 Accepted: September 15, 2015

More information

Decision Making Delays with Regard to IT Investments

Decision Making Delays with Regard to IT Investments Available online at www.sciencedirect.com Procedia - Social and Behavioral Sciences 40 ( 2012 ) 258 263 2012 International Conference of Asia Pacific Business Innovation and Technology Management Decision

More information

The Differences Between CPM and Resource-Loaded Scheduling and How They Applied to The Martinez Tesoro Refinery Flare Header Replacement Project

The Differences Between CPM and Resource-Loaded Scheduling and How They Applied to The Martinez Tesoro Refinery Flare Header Replacement Project The Differences Between CPM and Resource-Loaded Scheduling and How They Applied to The Martinez Tesoro Refinery Flare Header Replacement Project Conor Carone California Polytechnic State University San

More information

PRODUCTION MANAGEMENT IN CONSTRUCTION REQUIREMENTS AND METHODS

PRODUCTION MANAGEMENT IN CONSTRUCTION REQUIREMENTS AND METHODS PRODUCTION MANAGEMENT IN CONSTRUCTION REQUIREMENTS AND METHODS G. Henrich and L. Koskela 1 PhD Student, SCRI, University of Salford, Salford-UK, M5 4WT 2 Professor, SCRI, University of Salford, Salford-UK,

More information

Project Management. Learning Objectives. What are Projects? Dr. Richard Jerz. Describe or Explain:

Project Management. Learning Objectives. What are Projects? Dr. Richard Jerz. Describe or Explain: Project Management Dr. Richard Jerz 1 Learning Objectives Describe or Explain: What are projects The role of the project manager Work breakdown structure Project management tools (Gantt, PERT, & CPM) The

More information

Microsoft Project Tips & Tricks. Project Solutions Group, Inc.

Microsoft Project Tips & Tricks. Project Solutions Group, Inc. Microsoft Project Tips & Tricks Project Solutions Group, Inc. Objectives Formatting & Printing Gantt Charts Leveling Resources Calculating Costs & Pricing Information Collecting & Entering Project Actuals

More information

developer.* The Independent Magazine for Software Professionals Automating Software Development Processes by Tim Kitchens

developer.* The Independent Magazine for Software Professionals Automating Software Development Processes by Tim Kitchens developer.* The Independent Magazine for Software Professionals Automating Software Development Processes by Tim Kitchens Automating repetitive procedures can provide real value to software development

More information

University of Huddersfield Repository

University of Huddersfield Repository University of Huddersfield Repository Hajjaji, Mufeed, Denton, Paul and Jackson, Steve The effectiveness of using project management tools and techniques for delivering projects Original Citation Hajjaji,

More information

The Basics of ITIL Help Desk for SMB s

The Basics of ITIL Help Desk for SMB s The Basics of ITIL Help Desk for SMB s This three-step process will provide you the information necessary to understand ITIL, help you write your strategic IT plan and develop the implementation plan for

More information

Course Outline. TEC D 205 Engineering Tech Project Planning Olympic College Bremerton, WA. Week 1 Chapter 4: DEFINING THE PROJECT

Course Outline. TEC D 205 Engineering Tech Project Planning Olympic College Bremerton, WA. Week 1 Chapter 4: DEFINING THE PROJECT Course Outline TEC D 205 Engineering Tech Project Planning Week 1 Chapter 4: DEFINING THE PROJECT 1. Step one: Defining the Project Scope A. Employing a Project Scope Checklist 1. Project objective 2.

More information

ER Monitoring Report (ER-MR)

ER Monitoring Report (ER-MR) Forest Carbon Partnership Facility (FCPF) Carbon Fund ER Monitoring Report (ER-MR) ER Program Name and Country: Reporting Period covered in this report: Number of net ERs generated by the ER Program during

More information

The Path to More Cost-Effective System Safety

The Path to More Cost-Effective System Safety The Path to More Cost-Effective System Safety Nancy Leveson Aeronautics and Astronautics Dept. MIT Changes in the Last 50 Years New causes of accidents created by use of software Role of humans in systems

More information

INCREASING THE FIRM EFFICIENCY USING TRANSACTION COST ECONOMICS SOFIA DAVID

INCREASING THE FIRM EFFICIENCY USING TRANSACTION COST ECONOMICS SOFIA DAVID INCREASING THE FIRM EFFICIENCY USING TRANSACTION COST ECONOMICS SOFIA DAVID Sofia DAVID, Lecturer, Ph.D. Faculty of Economic Science, University Dunarea de Jos Galati Keywords: efficiency, transaction

More information

Toward Effective Multi-capacity Resource Allocation in Distributed Real-time and Embedded Systems

Toward Effective Multi-capacity Resource Allocation in Distributed Real-time and Embedded Systems Toward Effective Multi-capacity Resource Allocation in Distributed Real-time and Embedded Systems Nilabja Roy, John S. Kinnebrew, Nishanth Shankaran, Gautam Biswas, and Douglas C. Schmidt Department of

More information

UIC CODE 406. Capacity. 1st edition, June 2004 Original. La Capacité Kapazität

UIC CODE 406. Capacity. 1st edition, June 2004 Original. La Capacité Kapazität UIC CODE 1st edition, June 2004 Original Capacity La Capacité Kapazität Leaflet to be classified in Volume: IV - Operating Application: With effect from 1 June 2004 All members of the International Union

More information

PMP Sample Questions Click here for PMP Questions. Question No : 1 Which of the following is an output of Define Scope?

PMP Sample Questions  Click here for PMP Questions. Question No : 1 Which of the following is an output of Define Scope? PMP Sample Questions www.techfaq360.com Click here for 1600+ PMP Questions Question No : 1 Which of the following is an output of Define Scope? A. Accepted deliverables B. Change Requests C. Project document

More information

turning data into dollars

turning data into dollars turning data into dollars Tom s Ten Data Tips August 2012 Kanban Kanban is a relatively new party to the Agile family, a process improvement method aimed at making work flow more efficiently. You enhance

More information

RISK Variability in Accuracy Ranges: A Case Study in the Canadian Hydropower Industry

RISK Variability in Accuracy Ranges: A Case Study in the Canadian Hydropower Industry RISK.1721 Variability in Accuracy Ranges: A Case Study in the Canadian Hydropower Industry John K. Hollmann, PE CCP CEP DRMP, Raminder S. Bali, P.Eng, John M. Boots, P.Eng, Chantale Germain, P.Eng, Michel

More information