1 City of Bishkek & European Bank for Re & Development (EBRD) Bishkek Solid Waste Management Project Environmental and Social Plan ESAP/Final Final 9 November 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number Ove Arup & Partners International Ltd The Arup Campus Blythe Gate Blythe Valley Park Solihull B90 8AE United Kingdom

2 Document Verification Job title Job number Document title File reference Document ref Revision Date Filename Bishkek ESAP_26_02_2016.docx Draft 1 26 Feb 2016 Description First draft Name Prepared by Checked by Approved by Olga Skotareva Chris Stocks Colette Curran Signature Draft 2 31 Aug 2016 Filename Description Bishkek SWP ESAP Draft 2_31_08_2016.docx Second draft Prepared by Checked by Approved by Name Olga Skotareva Colette Curran - Signature Final 9 Nov 2016 Filename Description Bishkek SWP ESAP Final_8_11_2016.docx Final Prepared by Checked by Approved by Name Olga Skotareva Colette Curran Helen Davis Signature Issue Document Verification with Document ESAP/Final 9 November 2016

3 City of Bishkek & European Bank for Re & Development (EBRD) Contents Abbreviations 1 1 Introduction Page ESAP/Final 9 November 2016

4 City of Bishkek & European Bank for Re & Development (EBRD) Abbreviations BADS EBRD ESAP ESIA ESMS ESMMP FS KPIs LRP MBT PIU PRs SEP SPV Bishkek Authorised Disposal Site European Bank for Re and Development Environmental and Social Impact Assessment Environmental and Social Management System Environmental and Social Management and Monitoring Plan Feasibility Study (for the proposed Bishkek Solid Waste Management Project) Key Performance Indicators Livelihood Restoration Plan Mechanical Biological Treatment Project Implementation Unit Performance s Stakeholder Engagement Plan Special Purpose Vehicle Bishkek Sanitary Landfill ESAP/Final 9 November 2016 Page 1

5 City of Bishkek & European Bank for Re & Development (EBRD) 1 Introduction The City of Bishkek (the City ) seeks to improve its municipal solid waste ( MSW ) management system and has been working with the European Bank for Re and Development (the EBRD or the Bank ), to invest in a viable development project. The proposed (the Project ) comprises a sovereign loan of EUR 11 million and a grant of EUR 11 million to the Kyrgyz Republic to be on-lent to the City for the benefit of the municipal solid waste management company Tazalyk ( Tazalyk ) and a Special Purpose Vehicle Bishkek Sanitary Landfill (the Company or SPV ). The loan agreement was signed in The Project will priority investments in the waste management segment primarily in waste collection and disposal. The Bank commissioned a Feasibility Study (the FS ) that was completed in 2013, alongside the Environmental and Social Impact Assessment (ESIA) and an (ESAP). The FS determined a priority investment programme (the PIP ), evaluated its benefits, and assessed a proposed site for the new landfill, including assessing its environmental and social impacts. Since then, the City has taken a decision to use a different site for the new landfill to the north of the existing dumpsite, rather than the site assessed in the FS. To the Project, Ove Arup and Partners International Ltd. (the Consultant or Arup ) have been appointed by the City to undertake an Environmental and Social gap analysis for the newly proposed site, and update the necessary technical, environmental, and social studies and plans where practicable. This document provides an updated for mitigation of the environmental and social impacts and to move the Project towards compliance with EBRD s Environmental and Social (E&S) Policy (2014) and its Performance s (PRs). ESAP/Final 9 November 2016 Page 2

6 2 The following environmental and social actions are required to fulfil the requirements of the EBRD s E&S Policy (2014), within the timescale indicated. for discharging ESAP actions will lie with the City of Bishkek ed by the Project Implementation Unit (PIU), Talazyk, Contractor and the Landfill Operator, and will be passed to the relevant sub-contractors, if appropriate. The PIU (with of consultants) will also be responsible for monitoring actions discharged to contractors, and for ensuring completion within the agreed timescale. All actions, documents and plans required by this ESAP will need to be agreed with the Lender. The PIU will be required to report compliance with the ESAP to the EBRD through an Annual Environmental and Social Report (AESR). The AESR template is to be provided by the EBRD. Additionally, compliance with the ESAP will be assured through independent checks and audits undertaken on behalf of the Lenders. When relevant requirements from the ESAP previously developed in 2012 are included in the table below, they are marked as such in column. PR1 Assessment and Management of Environmental and Social (E&S) Impacts and Issues 1.1 Finalise the transfer of land ownership and recategorisation of the proposed site to be appropriate for the Legislative compliance Kyrgyz regulations EBRD PR1 Department of Architecture and Masterplanning of Bishkek City, works Land transfer completed. Documents confirming land ownership are in place. ESAP/Final 9 November 2016 Page 3

7 of a landfill and be under the ownership of the Municipal Council of Bishkek. (Appropriate changes are to be included in the City Masterplan.). PIU 1.2 Obtain necessary, environmental and sanitary permits prior to rehabilitation of the dumpsite, of the new landfill and development of associated sorting and MBT plants as well as additional composting of green waste. Legislative compliance. Kyrgyz regulations EBRD PR1 Contractor works A list of required and obtained approvals and permits is in place alongside the physical evidence of permits obtained. Among others, these to include: (i) formal approval by the Chief Sanitary Officer of the SPZ compliance for the new landfill location; (ii) approval of the State Ecological Expertise for the new landfill location. ESAP/Final 9 November 2016 Page 4

8 1.3 If required for the State Ecological Expertise for the new landfill location, prepare an Addendum to the FS in addition to the prepared updated ESIA documents, and undertake public hearings in accordance with the law. Legislative compliance. Minimise impact on environment and community by identifying and implementing adequate mitigation measures. Kyrgyz regulations PIU with PIU consultants Q works Assessments and documentation required to obtain the State Ecological Expertise for the new landfill location is in place. Evidence of conducted public hearings. Approval by the State Ecological Expertise is in place. 1.4 Secure necessary operational permits and permissions for all new operations. Compliance with local regulations. Local regulations EBRD PR1 PIU with PIU Landfill Operator operation A list of required and obtained permits is in place alongside the physical evidence of permit applications, and permits granted ESAP requirement Conditions of permits incorporated into operational plans and tender requirements. 1.5 Review existing environmental, Health & Safety and social practices to ensure they are fit for purpose and aligned with legal requirements and EBRD standards. Minimise H&S risk to workers. Effective management of environmental and social issues. EBRD PR1, In line with recognised E&S management systems (e.g. ISO and OHSAS 18001). Tazalyk own resources By Q Record of changes implemented as a result of E&S review. Evidence of the E&S review having been undertaken.. ESAP/Final 9 November 2016 Page 5

9 1.6 Develop and implement an E&S Management System. Effective management of environmental and social issues. EBRD PR1, EBRD PR2. EBRD PR4. In line with EBRD PR1, ISO and OHSAS requirements Contractor own resources Develop ESMS 4 months prior to works. ESMS based on the pertinent requirements of ISO14001 and OHSAS in place and operational. Policy, required procedures and plans are in place and implemented. A clear commitment from senior management in the Environmental Policy to ensure adequate resource is provided to enable staff to deliver requirements. An organisational chart clearly shows lines of ESMS responsibility, and reporting. Job descriptions with clear Roles and Responsibilities. Evidence of ESMS monitoring. Evidence of training provided. ESMS Audit Reports. 1.7 Implement the Environmental and Social Management and Monitoring Plan (ESMMP) developed as part of the 2012 ESIA. Minimise impact on environment and community by identifying and implementing adequate mitigation EBRD PR1 Contractor own resources, PIU with PIU consultants As per the ESMMP Plans and procedures required by the ESMMP are in place. Evidence of implementation is in place. Record of monitoring of ESMMP ESAP/Final 9 November 2016 Page 6

10 ESMMP should be seen in conjunction with the Addendum to ESIA prepared by Arup. Should any Project documents be reviewed or any conditions to the Project design and implementation added the ESMMP should be reviewed and amended accordingly. measures. implementation is in place. 1.8 Include appropriate clauses to tender documentation, ESMS and contractor documentation to ensure that national and Lender requirements regarding environmental, social and health and safety are imposed on to the, rehabilitation and, if relevant, operation Minimise impact on environment and community by identifying and implementing adequate mitigation measures. EBRD PR1, Best Practice 1 PIU with PIU consultants, Contractor own resources Relevant contract clauses in tender and contractor-related documentation. 1 The term Best Practice refers to non-legislative procedures and guidelines (may also be legal requirements in other countries) that are internationally recognised and accepted as being correct or most effective. ESAP/Final 9 November 2016 Page 7

11 contractors. Contract clauses for all subcontractors should ensure all relevant management and monitoring requirements included in the ESMMP are binding and enforced. 1.9 Implement actions related to technical requirements for landfill design presented in Appendix A of this ESAP. Safe design, compliance with EU requirements. EBRD PR1, PR3, EU Directives : EU Waste Directive 2008/98/EC, PIU consultants as necessary, Designer, Contractor During design stage and prior to works. Completed design. Record of design checks against actions recommended in technical requirements. Relevant procedures and records of implementation and monitoring are in place. EU Landfill Directive 99/31/EC, EU Industrial Emissions Directive (integrated pollution prevention and control) 2010/75/EU. ESAP/Final 9 November 2016 Page 8

12 1.10 Develop and implement a system of waste transfer and acceptance recording allowing information on the waste collected and received at the landfill to be gathered and reported. Effective system of waste transfer and acceptance. Minimise impact on environment. EBRD PR 1 EBRD PR 3 EU Waste Directive 2008/98/EC, EU Landfill Directive 99/31/EC Contractor own resources, Landfill Operator start of operation A system is in place. Reports on waste collected and received As a part of ESMMP, develop landfill environmental monitoring system including additional groundwater monitoring. The information collected should be in line with the recording and monitoring requirements of the EU Waste and Landfill Directives. Prevent environmental pollution incidents and accidents EBRD PR1, EBRD PR3, EU Waste Directive 2008/98/EC, EU Landfill Directive 99/31/EC PIU consultant operation Environmental monitoring plan is in place. Records of monitoring Develop and implement an Operational Management Plan (OMP) and procedures for its implementation. Effective and compliant management Clear operational procedures enable EBRD PR1 Best Practice Landfill Operator operation. Draft OMP and Operation manuals and plans and procedures completed. Manual and plans linked to job descriptions and necessary training 2012 ESAP requirement ESAP/Final 9 November 2016 Page 9

13 individual staff members to deliver good quality work and achieve desired goals for a new system with limited environmental and social impacts. requirements Document and rank existing waste collection points for improvement measures. Identify new collection points in areas not served at present. Development of improvement plan for collection points in the city and monitoring system Development of maintenance and replacement plan for containers and collection points. Effective waste collection system Reduce waste deposits around collection bins and in other nondesignated locations in the city Best Practice Tazalyk.own resources with PIU consultant as necessary. Commence immediately, Develop by end of Initial assessment of priority sites for investment in new containers and repair work completed. Annual report assessing status of sites and maintenance work undertaken. Quarterly report of inspections, and complaints, if relevant ESAP requirement 1.14 Develop and implement Mitigation of. PIU own Preliminary Draft Draft Plan is in place. ESAP/Final 9 November 2016 Page 10

14 landfill closure plan for the proposed landfill. Disclose the Plan publicly and to local community prior to implementation. landfill closure and impacts on local environmental and communities. resources during operation, ing consultant if necessary. Landfill Operator. to be developed no later than 1 year prior to closure. Final version no later than 6 months prior to closure. Final Plan is in place and disclosed for comments. Evidence of implementation. PR2 Labour and Working Conditions 2.1 Ensure appropriate human resources management system is in place, including procedures and processes related to human resource policies and procedures, non-employee workers, worker grievance mechanism, security personnel and supply chain. Management of human resources in accordance with the law and best practice EBRD PR2 Kyrgyz regulations (Kyrgyz Labour Code etc.) Contractor, PIU consultants Landfill Operator works. Evidence of Human Resources system is in place, i.e. relevant policies, procedures, assigned staff, etc. Human Resources and/or procurement procedures with respect to non-employee workers, worker grievance mechanism, security personnel and supply chain. 2.2 Incorporate provisions for working conditions compliant with national laws and EBRD requirements in tender documentation and contracts for contractors and Risk management and ensuring adequate labour conditions of contractors and EBRD PR 2, Best Practice Tazalyk, Landfill Operator and Contractor with PIU consultants as works. Tender documentation and contractual clauses contain requirements for operating health and safety management system, compliance with requirements on child labour, forced labour, ESAP/Final 9 November 2016 Page 11

15 suppliers. Undertake periodic internal labour conditions checks and audits against EBRD s. suppliers. necessary provision of equal opportunities, Kyrgyz Labour Code etc. Records of compliance checks of contractors and suppliers. 2.3 Review salary scales against job requirements. PIU to collect baseline information on conditions and salary levels of workers in comparable industries in public sector. PIU consultant and Tazalyk to review salary scales required for staffing needs. Ensuring salaries reflect experience and responsibility and are at the level satisfying average living standards to discourage personnel from undertaking waste unauthorised recycling activities. Ensure that there is no discrimination regarding gender, i.e. equal pay for work of equal value. PIU with of PIU consultants, HR department of Tazalyk. operation of the new landfill. PIU, Tazalyk to collate data before Q Evidence of analysis of salaries which considers gender differences and avoids discrimination. Job descriptions at the new landfill complex are attached to a salary scale. Evidence of completed reviews by company directors ESAP requirement 2.4 Include equal opportunity recruitment policy for staff and contract conditions for sub-contractors; and training Promote and facilitate equal opportunities (e.g. diversity and Best Practice PIU with PIU Landfill Operator By end 2016 for Tazalyk. The Equal Opportunity Policy is developed. The Policy as well as job advertisements, job descriptions for 2012 ESAP requirement ESAP/Final 9 November 2016 Page 12

16 for HR personnel on procedures to implement the policy. gender equality) and relevant technical skill mix in each of management, contract management and operational roles. and Tazalyk top management and HR. (Development of policy and procedures undertaken as part of Technical Assistance from EBRD Phase 3 prior to tendering as it forms part of the tender documentation. BADS rehabilitation. all personnel, and contract conditions for sub-contractors clearly state commitment to ensuring the equal opportunity. Recruitment procedures include relevant clauses. Relevant training undertaken. Job descriptions are developed. Annual report showing staffing levels demonstrating gender equality, diversity in relation to remuneration and recruiting. Initial Training modules are to be delivered using EBRD Phase 3 budget.) 2.5 As a part of HR MS, develop and implement a worker Grievance Mechanism (GM) available to direct employees and nonemployee workers during BADS rehabilitation, Project Management of worker relationships. EBRD PR 2 PIU Landfill Operator and Contractor. and reorganisation works on Project. Grievance mechanism procedure is developed. Records of grievances and their resolution are maintained and reported to management. Records of communication with Labour Union, where relevant. ESAP/Final 9 November 2016 Page 13

17 and operation. GM is communicated to subcontractor employees. Records are in place. 2.6 If a dedicated worker accommodation is required during phase, arrange its facilities in accordance with legal requirements and a guidance note by IFC and the EBRD. Ensuring adequate accommodation for workers. Kyrgyz regulations, EBRD PR2, Workers' accommodatio n: processes and standards - a guidance note by IFC and the EBRD 2 Contractor the use of worker accommodation Evidence of assessment in accordance with the EBRD/IFC guidance note. Respective regulatory approvals. PR3 Resource Efficiency and Pollution Prevention and Control 3.1 Implement pollution prevention measures described in the ESMMP (covering air emissions, noise pollution, dust, waste water, hazardous substance Effective environmental management. Minimise impact on environment, local community, and EBRD PR 3, EU Industrial Emissions Directive (integrated pollution Contractor, works The reviewed ESMMP is approved and implemented. All sub-plans, Procedures and Protocols required by the ESMMP are in place. Record of checks on implementation 2 ESAP/Final 9 November 2016 Page 14

18 and materials, pesticide use and management). workers. prevention and control) 2010/75/EU, (for example Inspections, Audits reports). 3.2 Develop and implement BADS Rehabilitation Plan, showing final profiles to shed surface water. Develop and implement technical specifications for final capping of BADS. Rehabilitation plan to include: Develop and implement Leachate Management Plan. Develop and implement Leachate and Water monitoring programme. Effective BADS rehabilitation, leachate and surface water management. EBRD PR3, EU Landfill Directive 99/31/EC, consultant. BADS Rehabilitation Plan showing final contours required to achieve these. Technical specifications for BADS capping (after reaching new profiles). Leachate and Surface Water Management Plan is in place. Leachate and Water Monitoring programme is in place. Water quality monitoring reports. Number of overflow discharges to river meeting discharge consent standards ESAP requirement 3.3 Develop specifications for landfill gas management system for BADS and new landfill. The system should include: Minimise risk of incidents and accidents related to gas emission, and gas migration. EBRD PR3, EU Landfill Directive 99/31/EC Contractor, Landfill Operator Landfill gas collection system installed and connected to flarestack. Monthly gas monitoring results, and record of actions taken in response ESAP requirement ESAP/Final 9 November 2016 Page 15

19 Sealed cells in the new landfill with gas migration layer under the seal; Porous layer beneath final restoration soils in rehabilitated landfill. Install gas collection system according to the specification. Monitor gas emissions at frequency required by developed specification. 3.4 Develop and implement fungal spores control plan to reduce its spreading from MBT plant and from new composting plants for green waste in the town. The plan should include, among others, monitoring programme, and requirements: To make appropriate Minimise risk of health impacts on workers and community. EBRD PR 3, UK Best Practice, Directive 2000/54/EC - biological agents at work Contractor Fungal spores control plan is in place Transmission bunds are constructed and maintained Results of monitoring programme, and record of action undertaken (if relevant). All operational phase actions to be part of the detailed Operational Management Plan 2012 ESAP requirement ESAP/Final 9 November 2016 Page 16

20 dust masks available for site workers. To locate windrows more than 300 metres from residential areas with soil bunds or maturation heaps to form barrier to transmission. To dampen windrows in dry weather. 3.5 Develop and implement pesticide control programme, including monitoring requirements for and operational phase. Ensure that there is compaction of waste in old and new landfill areas to limit availability of burrows for rats and snakes and that all wastes are covered with a metre of other waste or soils within one week to prevent hatching of fly larvae. Minimise risk of spreading diseases. Reduce risk of pests dispersing into the city during the and rehabilitation works. EBRD PR 3, Directive 2009/128/EC, Directive 2012/18/EU Landfill Operator. and operation phases. Pest control programme in place Quarterly review of complaints Monitoring results and record of action undertaken (if relevant) Number of sites with traps or baits for rats ESAP requirement ESAP/Final 9 November 2016 Page 17

21 3.6 Implement bird control measures at new sorting, MBT and landfill facilities. Reduce health impact on local community relating to pathogens transferred by birds. EBRD PR 3, consultant through procurement contract. Upon completion of of sorting and MBT plant Procurement contract includes requirement for netting the new windrows of high organic waste until degradation is well advanced to control birds ESAP requirement Landfill Operator. Netting are installed prior to operation. 3.7 As a part of Operational Management Plan, develop procedures for water management and cleaning process of MBT and the sorting plant(s). To ensure these procedures are implemented, include relevant requirements for sump installed at the sorting/mbt site and pumping system, hoses and sprays to enable cleaning of the hardstanding and spraying the windrows in the procurement contracts. Maintenance of the effective degradation process consultant through procurement contract. Landfill Operator. operation Relevant requirements included in the procurement contracts. Relevant procedures are in place and implemented. Procedures to include requirement for regular cleaning and spraying and to monitor water levels in the sump and top up as necessary. Sump and pump system installed prior to operation Record kept of water levels in sump ESAP requirement ESAP/Final 9 November 2016 Page 18

22 PR4 Health and Safety 4.1 Appoint Health and Safety personnel proportionately to the scope and scale of works within the Project. Effective management of occupational H&S issues Best Practice, EBRD PR1, EBRD PR2. EBRD PR4. Tazalyk, Landfill Operator, Contractor and consultant. first disbursement List of H&S personnel, including their qualification, and job description. 4.2 Ensure OHS management system applies to the works of their sub-contractors by incorporating health and safety provisions in tendering documentation and contracts for contractors and suppliers. Effective management of occupational H&S issues Best Practice, EBRD PR1, EBRD PR2. EBRD PR4. Tazalyk, Landfill Operator, Contractor and consultant. works commencing Tender documents include relevant requirements relating to provision of OHS management system. Relevant clauses in the contracts with contractors and suppliers. 4.3 Develop and implement maintenance programme for waste collection points. Reduce nuisance and risk of safety incidents to residents and users at waste collection points. EBRD PR4, Best Practice Developed and implemented by Tazalyk Sanitary Ecological Inspectorate to monitor During operation Maintenance programme is developed, included in the annual budget and implemented ESAP requirement ESAP/Final 9 November 2016 Page 19

23 implementation. 4.4 As a part of ESMS establish and implement noise monitoring requirements and mitigation measures to control noise problems relating to collection system and to operations at the landfill complex including noise and noise through rehabilitation of the old landfill. Mitigation measures to include: Time restriction for noisy activities during and operation Location of permanent sources of noise to be as far away from residential areas as possible (sorting plant, composting plant, gas flare, site entrance area with weighbridge and Compliance with local and EU regulation Minimise risk of grievances. Kyrgyz regulations, EU Directive 2002/49/EC (EU Noise Directive), EBRD PR3, EBRD PR 4 Contractor, Tazalyk, Landfill Operator. Mitigation measures and monitoring requirements are identified prior to works. Implementation during the whole and operational phase. Limited monitoring programme during pre phase to establish background concentrations Mitigation measures included in the ESMMP. Record of monitoring. Record of grievances ESAP requirement ESAP/Final 9 November 2016 Page 20

24 wheel cleaner); Noise screening bunds and screen planting to be planned in advance of the installation of equipment. 4.5 Develop and implement programme to identify sources of special and hazardous municipal waste and arrange future separate collection system. Effective pollution prevention. Minimise impact of exposure to hazardous substance by community. EBRD PR3 EBRD PR4 Contractor, Landfill Operator. Upon introduction of a new waste system. Sources of hazardous waste are identified by inspectors. Amount of this waste is quantified, and arrangements for collection are in place ESAP requirement 4.6 Develop a detailed traffic management plan (CTMP). Construction arrangement should ensure that the passing of vehicles through informal settlements is avoided. Management of EHS risks to workers, road users and communities from traffic. Local regulations,, EBRD PR 2, EBRD PR 4. Contractor works. The CTMP is in place, approved by the respective authority, appropriately disclosed and implemented. Evidence of relevant information being distributed to the drivers. Evidence of relevant information being distributed to the community. Evidence of internal inspections checking implementation. 4.7 Develop and implement safety and security Management of EHS risks during EBRD PR 4, PIU Relevant procedures are in place and implemented. ESAP/Final 9 November 2016 Page 21

25 procedures for s and phased access to the BADS by waste pickers during its rehabilitation, including fencing. BADS rehabilitation and security during. (e.g. Voluntary Principles on Security and Human rights: luntaryprincipl es.org/ ) Contractor and rehabilitation works. Record of monitoring / checks carried out. 4.8 Develop Emergency Preparedness and Response Plan for Project and operation. Contractor should obtain approvals from respective authority and emergency services. Engage affected communities and agencies about these plans and any subsequent changes made to these. Minimise impact on workers, community and environment arising from emergency situations. EBRD PR4, the Contractor, Landfill Operator. work Emergency Preparedness and Response Plan in place and implemented. Record of consultation with local authorities. Record of approvals by the respective authority. Record of information provided to the community. Record of drills Follow design specification to ensure that all equipment as well as the landfill infrastructure will be designed to meet Kyrgyz Compliance with EU and Kyrgyz standards EBRD PR4, Kyrgyz regulations, EU Waste Directive PIU with PIU consultant to arrange for competent design checkers. Design phase Record of design checks. Record of approvals from local regulators. Issuance of permits. ESAP/Final 9 November 2016 Page 22

26 and EU Standards. 2008/98/EC, This should include considerations of seismicity of the area. EU Landfill Directive 99/31/EC, EU Industrial Emissions Directive (integrated pollution prevention and control) 2010/75/EU, PR5 Land Acquisition, Involuntary Resettlement and Economic Displacement 5.1 Through the Detailed Project Design, avoid the potential for resettlement impact from and operation of the access road, if feasible. Should this not be possible, prepare and implement a Resettlement Plan (RAP) and conduct stakeholder engagement for PAPs in Mitigation of resettlement impacts EBRD PR 5 Designer (detailed design), Contractor Detailed design phase Design drawings demonstrating that resettlement is avoided. Developed RAP (if impact is unavoidable) and evidence of its communication/disclosure and its implementation. Communication records (if relevant). ESAP/Final 9 November 2016 Page 23

27 accordance with the Project Resettlement Framework. 5.2 In case of any additional land acquisition and access needs (permanent or temporary) for the Project, undertake assessment of land acquisition and resettlement impacts and be compliant with resettlement principles set in EBRD PR5. Assessment and mitigation of land acquisition, resettlement impacts. EBRD PR 5 Contractor, consultant On-going before/during Details of affected land or access (e.g. cadastral records). Communication records. Transfer, approval, permit records. Assessment/survey and inclusion into the LRP or RAP, or development of an addendum to LRP/RAP. Records of mitigation/implementation. 5.3 Review if residents of the dormitory may face any impacts following the detailed design specifications, particularly in terms of access to their living areas, or in relation to project activities. Establish the residents socio-economic profile and vulnerability in relation to above issues. Mitigation of livelihood impact Mitigation of major health risks from /rehabil itation activities. EBRD PR 5 EBRD PR 10 consultant 3-4 Q 2016 Survey records. Records of assessment and mitigation measures if such are necessary. Appropriate clauses in a Construction Management Plans and health and safety management procedures. Communication and grievance records, including with PAPs. ESAP/Final 9 November 2016 Page 24

28 5.4 Update the LRP once the assessment and socioeconomic survey of waste pickers is complete to include: (i) provision of training to waste pickers related to accessing finance and business advice to establish SMEs, with a particular focus on such training and programmes tailored for women and young people; Mitigation of livelihood impact and build positive and effective relationship with PAPs. 3Q 2016 Updated LRP inclusive of specified provisions. Reviewed specific stakeholder engagement plan. (ii) updated stakeholder engagement and grievance mechanism for PAPs (considering the updated SEP); 5.5 Implement the updated LRP. Mitigation of livelihood impact. Compliance with the EBRD requirements. EBRD PR5 Contractor and relevant City Departments. first disbursement and as per agreed implementation schedule (scheduled from 4Q 2016.) Updated implementation programme. Developed/reviewed implementation targets and KPIs, budget, resources and responsibilities. Stakeholder engagement log. ESAP/Final 9 November 2016 Page 25

29 Grievance/feedback records. 5.6 Implement monitoring and evaluation provisions of the updated LRP, including independent completion audit and monitoring of stakeholder engagement activities. Effective implementation of the LRP. EBRD PR 5 Independent relevant City Departments as necessary. As per agreed Monitoring and evaluation schedule. Monitoring schedule. Monitoring reports. Mid-term evaluation report (if deemed appropriate). Completion Audit report. PR6 Biodiversity and Living Natural Resources 6.1 Consult with ecologist on the best measures to mitigate impacts on migratory birds, should there be a potential for impacts, and include them in the ESMMP. Protect nesting colony of bee eaters at North east corner of current dumpsite. EBRD PR6 consultant Mitigation measures identified prior to works. If applicable, detailed mitigation measures included in the ESMMP and operation stage plans and demonstrable evidence of their implementation ESAP requirement Implementation throughout and operation. 6.2 When possible enhance biodiversity, through planting and restoration Increase biodiversity values in the area EBRD PR6 The Restoration Plan is prepared prior to Detailed planting / restoration Plan is in place, and includes measures to enhance biodiversity in the area ESAP requirement ESAP/Final 9 November 2016 Page 26

30 schemes. Consult with the ecologist about the proposed solutions. Consider inclusion in the Restoration Plan a high proportion of local vascular plants to enhance the river corridor and increase biodiversity. relevant City Departments work. PR7 PR8 Indigenous People NOT APPLICABLE Cultural Heritage 8.1 Implement archaeological survey requirements of ESMMP. Any findings of this survey will need to be appropriately recorded, reported and further action completed. Adequate and effective management of archaeological and cultural heritage issues. EBRD PR8 Contractor works Record of surveys undertaken. Archaeological finds report (if relevant) Implementation of findings (if relevant) 8.2 Obtain community feedback on any areas of cultural value within the Project Adequate and effective management of EBRD PR8 consultant Record of communication with community. Information obtained from the ESAP/Final 9 November 2016 Page 27

31 area, in conjunction with the recommended archaeological survey or as part of the socio-economic survey for the LRP. archaeological and cultural heritage issues. works community is adequately interpreted by the expert, and when relevant survey requirement are amended. 8.3 Obtain confirmation from the Ministry of Culture confirming that there is no known cultural heritage on the new landfill location. Adequate and effective management of archaeological and cultural heritage issues. EBRD PR8 PIU works Written record of confirmation from the Ministry of Culture. 8.4 Develop and implement a Chance Finds Procedure, in coordination with appropriate authority. Adequate Management of accidental archaeological finds. EBRD PR 8. Contractor and Landfill subcontractor. Procedure is developed prior to works. Chance Finds Procedure is in place. Annual report of any archaeological finds. Implementation during. PR 10 Information Disclosure and Stakeholder Engagement 10.1 Implement the updated SEP. Ensure its regular review and update. Compliance with the EBRD requirements. EBRD PR 10 consultants, Once approved, then on-going. Communication log. Updated information on the website. ESAP/Final 9 November 2016 Page 28

32 Proactive stakeholder engagement. Relevant City Departments, Contractor. Update on SEP implementation in the Annual Environmental and Social Report. Up-to-date SEP Establish and implement a public grievance mechanism in compliance with the EBRD and best practice requirements. Proactive stakeholder engagement and management of impacts to public. EBRD PR 10, Best Practice Contractor and sub-contractors, consultant. Establish prior to activities/ operations. Implementation is on-going Evidence of grievance mechanism is approved. Contractor: GM procedure is disseminated to PAPs. PIU: GM procedure is publicly available. Workers are trained on how to handle/pass public grievances. Grievance records. ESAP/Final 9 November 2016 Page 29

33 ESAP/Final 9 November 2016

Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP

Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP Darial Energy LLC Dariali Hydro Power Plant Construction and Operation Project Environmental and Social Plan, Dariali HPP Tbilisi 2014 Dariali Energy JSC, the Sponsor, is planning construction and operation

More information

Performance Requirements

Performance Requirements Environmental and Social Policy 15 Performance Requirements PR 1: Environmental and Social Appraisal and Management Introduction 1. The EBRD considers it important that all companies receiving EBRD financing

More information

EBRD Performance Requirement 10

EBRD Performance Requirement 10 EBRD Performance Requirement 10 Information Disclosure and Stakeholder Engagement Introduction 1. This Performance Requirement (PR) recognises the importance of an open and transparent engagement between

More information

Environmental and Social Action Plan Adjaristskali Hydropower Plants

Environmental and Social Action Plan Adjaristskali Hydropower Plants Environmental and Social Plan Adjaristskali Hydropower Plants The International Finance Corporation (IFC), the Asian Development Bank (ADB), and the European Bank for Reconstruction and Development (EBRD)

More information

EBRD Performance Requirement 1

EBRD Performance Requirement 1 EBRD Performance Requirement 1 Assessment and Management of Environmental and Social Impacts and Issues Introduction 1. This Performance Requirement (PR) establishes the importance of integrated assessment

More information

Environmental and Social Policy

Environmental and Social Policy Environmental and Social Policy Contents Foreword 2 Purpose 2 Commitments 2 Environmental and Social Assessment 3 Operations financed directly 4 Operations financed through Financial Intermediaries 4 Environmental

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Global Reporting Initiative (GRI) G4 Content Index

Global Reporting Initiative (GRI) G4 Content Index Global Reporting Initiative (GRI) G4 Content Index EVRAZ Highveld has adopted the GRI framework and guidelines for sustainability reporting since 2007. Following release of the GRI G4 sustainability reporting

More information

Issue 7 24 February Job number

Issue 7 24 February Job number 11/39341499_1 1 Cuadrilla Bowland Limited Temporary Shale Gas Exploration at Preston New Road LCC Application Ref: LCC/2014/0096 Issue 7 24 February 2017 This report takes into account the particular instructions

More information

Chapter 13 Management and Implementation

Chapter 13 Management and Implementation Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction

More information

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES EMIOLA ABASS June 13, 2017 COURSE OBJECTIVE This course has been designed to provide guidance to

More information

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E ENVIRONMENTAL AUDITING GUIDE MIDDLE EAST GASES ASSOCIATION (MEGA) European Business Center, Office BC 25 Dubai Investments Park, PO Box: 166 Dubai-UAE Tel: +971-4-8135525 / Fax: +971-4-8135575 / E-mail:

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries

More information

Principles for environmental and social responsibility

Principles for environmental and social responsibility issued by: Principles for environmental and social responsibility Sustainable development is dependent on a balance between economic considerations, social responsibility and environmental protection.

More information

Protocol for Consultation with Trade Union Safety representatives.

Protocol for Consultation with Trade Union Safety representatives. Protocol for Consultation with Trade Union Safety representatives. Introduction The purpose of this protocol is to outline the arrangements within the School for consulting and cooperating with Trade Union

More information

Environmental and Social Compliance Assurance Plan

Environmental and Social Compliance Assurance Plan Environmental and Social Compliance Assurance Plan CAL00-PMT-60-Y-TTM-0005 Doc. Title: Environmental and Social Compliance Assurance Plan Page: 2 of 57 TABLE OF CONTENTS Glossary of Terms... 5 List of

More information

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date

More information

PBL Environmental Management System. Staff Awareness Training. This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group

PBL Environmental Management System. Staff Awareness Training. This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group PBL Environmental Management System Staff Awareness Training This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group Staff Awareness The aim of this package is to give you some

More information

Level of Reporting on GRI Indicators, 'in accordance' Core. Fully Significant Changes during 2016

Level of Reporting on GRI Indicators, 'in accordance' Core. Fully Significant Changes during 2016 Level of Reporting on GRI Indicators, 'in accordance' Core GENERAL STANDARD DISCLOSURES 'IN ACCORDANCE' CORE General Standard Disclosures Description Level of Reporting Location: For partially or not reported

More information

Quality and Environmental Business Process Manual

Quality and Environmental Business Process Manual PMC SOIL SOLUTIONS 2 Fountain Court Victoria Square St Albans Hertfordshire AL1 3TF T: 01727 822500 F: 01727 821600 E: headoffice@pmcsoilsolutions.com W: www.pmcsoilsolutions.com Quality and Environmental

More information

Template for ToR for Transaction Advisory Services

Template for ToR for Transaction Advisory Services Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services

More information

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17 Quality Manual DRAFT Page 1 of 17 Document Acceptance and Release Notice This is Revision A1 of the East Coast Designer Builders Quality Manual. The Manual is a managed document. For identification of

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY e MERLON INTERNATIONAL LLC EL FAYUM DEVELOPMENT PROJECT EGYPT MERLON INTERNATIONAL LLC EL FAYUM DEVELOPMENT PROJECT EGYPT JUNE 2015 Prepared for: European Bank for Reconstruction and Development. Prepared

More information

Business Principles. Business Principles

Business Principles. Business Principles Business Principles Business Principles 1 1.1. Introduction As one of Europe s leading independent oil and gas companies, Cairn Energy PLC ( Cairn or the Company ) aims to discover, develop and deliver

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy To ensure the effective availability of essential products and services, BCQ has raised this Business Continuity Policy in support of a comprehensive program for business continuity,

More information

Environmental and Social Review Summary. Kribi and Dibamba Operations

Environmental and Social Review Summary. Kribi and Dibamba Operations Environmental and Social Review Summary Kribi and Dibamba Operations This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA s Board

More information

Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic

Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic and Social Action Plan (ESAP) Item PS 1: Assessment and Management of and Social Risks and Impacts 1.1 and Social Management System (ESMS)

More information

Railway Interface Planning Scheme Rules (RIPS Rules)

Railway Interface Planning Scheme Rules (RIPS Rules) Contents 1. Purpose.. 1 2. Scope... 2 3. Scheme Rules.... 3 4. Roles and Responsibilities... 4 5. Management System Requirements... 7 6. Investigating Breaches of the Railway Interface Planning Scheme

More information

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017 COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017 As a member of the International Counsel on Mining and Metals (ICMM), Anglo American adheres to the ICMM Assurance

More information

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure The Guidance Notes provide guidance for the Borrower on the application of the Environmental and Social Standards (ESSs), which form part of the World Bank s 2016 Environmental and Social Framework. The

More information

RB s Policy on Human Rights and Responsible Business* - Detailed Requirements

RB s Policy on Human Rights and Responsible Business* - Detailed Requirements 1 of 6 A No Child Labour. Limitation of Work by Young Workers Definition of a child: any person less than 15 years of age; except: a) where local law stipulates a higher age for work or mandatory schooling,

More information

CHISINAU SOLID WASTE PROJECT

CHISINAU SOLID WASTE PROJECT REPORT N O FINAL CHISINAU SOLID WASTE PROJECT STAKEHOLDER ENGAGEMENT PLAN PUBLIC MARCH 2018 CHISINAU SOLID WASTE PROJECT STAKEHOLDER ENGAGEMENT PLAN Public Date: March 2018 Contact details: Mariana Nazarenco

More information

Quality, Health, Safety & Environment Manual

Quality, Health, Safety & Environment Manual Page 1 of 14 DOCUMENT RELEASE AUTHORIZATION Prepared, Reviewed and Issued by: Management Representative: ( ) Approved by: Chairman and Managing Director ( ) Issued as: CONTROLLED COPY / UNCONTROLLED COPY

More information

Responsible Sourcing Policy

Responsible Sourcing Policy June 2015 Document Owner Group Procurement Version 5.1 Date of Issue 08 June 2015 Creation Date: June 2015 Page 2 of 13 1 Purpose, Scope & Priorities 1.1 Purpose The purpose of this document is to describe

More information

Multilateral Investment Guarantee Agency. Performance Standards on Environmental and Social Sustainability

Multilateral Investment Guarantee Agency. Performance Standards on Environmental and Social Sustainability Multilateral Investment Guarantee Agency Performance Standards on Environmental and Social Sustainability Performance Standard on Environmental and Social Sustainability TABLE OF CONTENTS Overview i Performance

More information

EHQMS Manual & Policy Document

EHQMS Manual & Policy Document Quality management input comprises the standard requirements from ISO 9001:2015 which are strategically deployed by our organization to achieve customer satisfaction through process control. Environmental

More information

22C Summary of Legislation and Standards Relevant to Labour and Working Conditions

22C Summary of Legislation and Standards Relevant to Labour and Working Conditions 22C Summary of Legislation and Standards Relevant to Labour and Working Conditions Categories Human resource policies and procedures Working conditions and terms of employment Hours of work and leave Working

More information

Evaluation of the Promotion of Environmental and Social Standards in DEG s Indirect Financing Case Study Report Bank Windhoek, Namibia

Evaluation of the Promotion of Environmental and Social Standards in DEG s Indirect Financing Case Study Report Bank Windhoek, Namibia Evaluation of the Promotion of Environmental and Social Standards in DEG s Indirect Financing Case Study Report Bank Windhoek, Namibia Prepared for DEG November 2016 Citrus Partners LLP 180 Piccadilly

More information

Information Governance Policy

Information Governance Policy Information Governance Policy Version: 4.0 Ratified by: NHS Bury Clinical Commissioning Group Information Governance Operational Group Date ratified: 19 th September 2017 Name of originator /author (s):

More information

AKTAU WASTE MANAGEMENT PROJECT

AKTAU WASTE MANAGEMENT PROJECT GKP KOKTEM AKTAU WASTE MANAGEMENT PROJECT NON-TECHNICAL SUMMARY COWI Engineering, Environmental and Economic Consulting LLC 3-5, bld. 1, Gazetny Lane 125993 Moscow Russian Federation Tel+7 495 629 93

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

Quality Management System. Manual MASTER COPY

Quality Management System. Manual MASTER COPY Quality Management System Manual MASTER COPY Revisions: Date Summary Rev. July 2010 14 Oct 2010 28 Jan 2011 9 Feb 2011 9 June 2011 6 March 2012 11 July 2013 13 July 2017 Initial Draft Issued Minor changes

More information

Verify Category A Audit Content

Verify Category A Audit Content Verify Category A Audit Content V10.0 Achilles Group Limited, 2014. All rights reserved. Objective The objective of this document is to provide suppliers who have registered for a Verify Category A (V10.0)

More information

Environmental Management Programme (EMP)

Environmental Management Programme (EMP) Appendix D Environmental Management Programme (EMP) Please note that although Construction and Operational Phase measures are included in this EMP they are relevant to the issued Waste Management Licence

More information

Pest Control. Introduction

Pest Control. Introduction Introduction The company has established, documented and implemented a pest control system for the site, which is maintained in order to meet the requirements of the Food Safety Quality Management System

More information

C&A Europe 2014 Sustainability Report

C&A Europe 2014 Sustainability Report C&A Europe 2014 Sustainability Report GRI Index This Index provides the location within our Report of content covered by the Global Reporting Initiative (GRI) G 3.1 guidelines for sustainability reporting.

More information

Equality and Diversity UK

Equality and Diversity UK 2017 UK Scheme Action Plan UK Ltd welcomes the opportunity to launch its 2017 Scheme as part of our fundamental commitment to equality, diversity inclusion opposition to all forms of discrimination our

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date

More information

BASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA)

BASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) BASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) HSE specialists, environmental engineers, design engineers, project managers and senior project managers involved in conceptual design, Front-End

More information

Environmental and Social Management Plan Çanakkale Bridge and Malkara - Çanakkale Motorway Project Final Draft. December 2017.

Environmental and Social Management Plan Çanakkale Bridge and Malkara - Çanakkale Motorway Project Final Draft. December 2017. ERM Environmental Resources Management SRL Environmental and Social Management Plan - 1915 Çanakkale Bridge and Malkara - Çanakkale Motorway Project Final Draft December 2017 Prepared by: ERM Prepared

More information

EXXARO SUPPLIER CODE OF CONDUCT

EXXARO SUPPLIER CODE OF CONDUCT EXXARO SUPPLIER CODE OF CONDUCT INTENT The implementation of this code will provide: Exxaro s standards for compliance by all suppliers; Focus areas that, if appropriately addressed, should keep both Exxaro

More information

The Hotelbeds Group Supplier Code of Conduct. Guidance for suppliers to Hotelbeds Group and its subsidiaries ( Hotelbeds Group )

The Hotelbeds Group Supplier Code of Conduct. Guidance for suppliers to Hotelbeds Group and its subsidiaries ( Hotelbeds Group ) The Hotelbeds Group Supplier Code of Conduct Guidance for suppliers to Hotelbeds Group and its subsidiaries ( Hotelbeds Group ) 1. Introduction Hotelbeds Group (HBG) is committed to sustainable, ethical

More information

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved.

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved. STANDARD Document information Version: v4.8 Dec 2012 Language: English Date: Dec 2012 (c) 2012 European Water Partnership. All rights reserved. PAGE LEFT BLANK ON PURPOSE European Water Stewardship (EWS)

More information

University Business Classification Scheme

University Business Classification Scheme University Business Classification Scheme Introduction The University Business Classification Scheme is a conceptual representation of an organisation s business. It describes an organisation s business

More information

Respect for Human Rights. Environmental Management G4-17 P3 P10 P82 G4-18 G4-19 G4-20 G4-21 G4-22 G4-23 G4-24 P57 P95 G4-25 G4-27 P15 P24 P82 P9 P13

Respect for Human Rights. Environmental Management G4-17 P3 P10 P82 G4-18 G4-19 G4-20 G4-21 G4-22 G4-23 G4-24 P57 P95 G4-25 G4-27 P15 P24 P82 P9 P13 103 Data IndexIndependent Practitioners AssuranceGRI Content Index GRI Content Index The following table compares Sustainability Report 2017 and GRI Sustainability Reporting Guidelines version 4. Information

More information

QM Management of Pests and Vermin

QM Management of Pests and Vermin Introduction The company has established, documented and implemented a pest control system for the site, which is maintained as part of the operational programmes in order to meet the requirements of the

More information

GRI Index Table - compliance table to GRI G3 guidelines

GRI Index Table - compliance table to GRI G3 guidelines GRI Index Table - compliance table to GRI G3 guidelines The 2010 SKF Sustainability Report covers the reporting period January to December 2010. Since 2000, SKF has adopted the Global Reporting Initiative

More information

Environmental and Social Review Summary. Congo Equipment - Expansion

Environmental and Social Review Summary. Congo Equipment - Expansion Environmental and Social Review Summary Congo Equipment - Expansion This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA s Board of

More information

QCC Global Ltd. United Nations Global Compact. Communications on Progress. From May 2016 to May QCC Keeping your business, your business

QCC Global Ltd. United Nations Global Compact. Communications on Progress. From May 2016 to May QCC Keeping your business, your business QCC Global Ltd United Nations Global Compact Communications on Progress From May 2016 to May 2017 Date 13 April 2016 QCC Keeping your business, your business 1 ISO Document Control Details The following

More information

WHS Management Plans

WHS Management Plans WHS Management Plans Disclaimer This Guide provides general information about the obligations of persons conducting a business or undertaking and/or persons in control of premises and workers under the

More information

Chapter 14 Overall Project Assessment

Chapter 14 Overall Project Assessment Chapter 14 Overall Project Assessment TABLE OF CONTENTS 14 OVERALL PROJECT ASSESSMENT... 14-1 14.1 Introduction... 14-1 14.2 Development of the ESIA... 14-1 14.2.1 Adopted Process... 14-1 14.2.2 Challenges

More information

Princes Square Shopping Centre Sustainability Policy. June 2014

Princes Square Shopping Centre Sustainability Policy. June 2014 Princes Square Shopping Centre Sustainability Policy June 2014 Contents 2 Sustainability Policy Princes Square s Environmental Management System (EMS) describes our strategy for managing our environmental

More information

Corporate Responsibility Policy

Corporate Responsibility Policy Generator & Switchgear Services Generator & Switchgear Services Policy For further information please contact: sales@burtonwoodgroup.com Burtonwood Generator & Switchgear Services Ltd Unit 2, St Michaels

More information

Humantech Environmental Management System Manual

Humantech Environmental Management System Manual Humantech Management System Version 1.0 March 2014 Humantech, Inc. Humantech Management System Revision No.: 1 Date : 03-10-14 Prepared by: Approved by: (EMR) President Revision History Revision Date Description

More information

Humber Information Sharing Charter

Humber Information Sharing Charter External Ref: HIG 01 Review date November 2016 Version No. V07 Internal Ref: NELC 16.60.01 Humber Information Sharing Charter This Charter may be an uncontrolled copy, please check the source of this document

More information

SAMSUNG HEAVY INDUSTRIES

SAMSUNG HEAVY INDUSTRIES SHI SAMSUNG HEAVY INDUSTRIES APPENDIX Relating to Samsung Heavy Industries Co., Ltd. s Sustainability Report for the calendar year 2015 This has been prepared for Samsung Heavy Industries Co., Ltd. in

More information

ISO 9001:2015 ISO 14001:2015 OHSAS

ISO 9001:2015 ISO 14001:2015 OHSAS JSM Group Management System Manual January 2017 ISO 9001:2015 ISO 14001:2015 OHSAS 18001:2004 National Electricity Registration Scheme (NERS) Fleet Operators Recognition Scheme (FORS) Issue & Amendment

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE TRANS-EUROPEAN NORTH-SOUTH MOTORWAY (TEM) 65th Steering Committee and EIA Workshop ENVIRONMENTAL IMPACT ASSESSMENT Best practices and challenges in Bosnia

More information

Waste Management Policy

Waste Management Policy Waste Management Policy Contents 1. Introduction 2. Policy Statement 3. Policy Objectives 4. Application 5. Organisation and Management 6. Glossary of Terms Document Control Information: Last updated on:

More information

Railway Corridor VIII - Eastern section

Railway Corridor VIII - Eastern section Republic of Macedonia February 2012 Environmental and Social Management and Monitoring Plan Railway Corridor VIII - Eastern section Contract No: C21196/EBSF-2010-07-101 Macedonian Railways: Feasibility

More information

Scaffold Public Documents - SPD16

Scaffold Public Documents - SPD16 Scaffold Public Documents - SPD16 Innovative strategies, methods and tools for occupational risks management of manufactured nanomaterials (MNMs) in the construction industry GUIDE FOR THE IMPLEMENTATION

More information

MANAGING CONTRACTORS ENVIRONMENTAL AND SOCIAL PERFORMANCE

MANAGING CONTRACTORS ENVIRONMENTAL AND SOCIAL PERFORMANCE MANAGING CONTRACTORS ENVIRONMENTAL AND SOCIAL PERFORMANCE AN OVERVIEW OF IFC S GOOD PRACTICE NOTE RAYMI C. BELTRAN SENIOR ENVIRONMENTAL SPECIALIST - EMENA JANUARY 25, 2018 PRESENTER: RAYMI BELTRAN Raymi

More information

Armenia: ENA-Modernisation of Distribution Network Stakeholder Engagement Plan: Draft Final Report

Armenia: ENA-Modernisation of Distribution Network Stakeholder Engagement Plan: Draft Final Report Armenia: ENA-Modernisation of Distribution Network Stakeholder Engagement Plan: Draft Final Report Prepared by June 2017 EBRD Armenia: ENA - Modernisation of Distribution Network Stakeholder Engagement

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

HUMAN RESOURCES COMMITTEE CHARTER

HUMAN RESOURCES COMMITTEE CHARTER HUMAN RESOURCES COMMITTEE CHARTER Objective The objective of the Human Resources Committee is to assist the Board in discharging its duty to oversee the establishment of appropriate human resources policies

More information

M. Özgür Şakı, Senior Waste Expert M. Özgür Şakı, Kıdemli Atık Uzmanı 22 May 2018, Ankara

M. Özgür Şakı, Senior Waste Expert M. Özgür Şakı, Kıdemli Atık Uzmanı 22 May 2018, Ankara Dissemination Workshop Yayım Toplantısı M. Özgür Şakı, Senior Waste Expert M. Özgür Şakı, Kıdemli Atık Uzmanı 22 May 2018, Ankara GHGs caused by Waste Sector Turkey s total GHG emissions in 2016 was 496

More information

Stakeholder Engagement Plan Code Of Practice

Stakeholder Engagement Plan Code Of Practice a Stakeholder Engagement Plan Code Of Practice COP 302 Revision 00 A Revisions Paragraph Revision Change Date - 00 Created 20/02/2014 B Approval Name Signature Date Compiled by Dieter Klingenberg 20/02/2014

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Industrial Relations Management Plan

Industrial Relations Management Plan Industrial Relations Management Plan Doc. Title: Industrial Relations Management Plan Page: 2 of 44 Contents Glossary of Terms... 5 List of Acronyms and Abbreviations... 6 1. Industrial Relations Management

More information

9.0 Environmental Protection Program

9.0 Environmental Protection Program 9.0 Environmental Protection Program 9.1.1 Overview Manitoba Hydro s Environmental Protection Program (EPP) provides the framework for the delivery, management and monitoring of environmental and socio-economic

More information

Bioenergia Los Pinos Project Americas Clean Energy Fund II (AEF II): Proposed Investment. January 2017 Prepared by SCLEA

Bioenergia Los Pinos Project Americas Clean Energy Fund II (AEF II): Proposed Investment. January 2017 Prepared by SCLEA Bioenergia Los Pinos Project Americas Clean Energy Fund II (AEF II): Proposed Investment January 2017 Prepared by SCLEA 1 INTRODUCTION As required by the guidelines for investing of Americas Energy Fund

More information

Business Responsibility Policy

Business Responsibility Policy Business Responsibility Policy Copyright 2016 Mahindra & Mahindra Ltd. All rights reserved. 1 May 17, 2017. Name of Document Business Responsibility Policy Version 2.0 State whether Policy/Code/ Manual/

More information

Tech Mahindra Business Responsibility Policy

Tech Mahindra Business Responsibility Policy Tech Mahindra Business Responsibility Policy Copyright 2015, Tech Mahindra. All rights reserved. Table of Contents 1. BACKGROUND... 3 2. OBJECTIVE... 3 3. SCOPE AND APPLICABILITY... 3 4. POLICY STATEMENTS...

More information

Evaluation of Occupational Health & Safety Management System

Evaluation of Occupational Health & Safety Management System Section 1 Legal Obligation Employers have a duty of care to provide a safe workplace and systems of work, to consult with workers, to identify and manage workplace hazards and to keep them informed about

More information

Environmental and Social Management Plan

Environmental and Social Management Plan Environmental and Social Management Plan Capital Works State Highway 205 / Schist Street Intersection Upgrade 21 September 2015 NZTA142200 Page ii Record of amendment Amendment number Description of change

More information

INFORMATION GOVERNANCE STRATEGY IMPLEMENTATION PLAN

INFORMATION GOVERNANCE STRATEGY IMPLEMENTATION PLAN INFORMATION GOVERNANCE STRATEGY & IMPLEMENTATION PLAN 2015-2018 Disclaimer The latest version of this document is located on PTHB intranet. Please check the review date and if there are any doubts contact

More information

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY PROPOSED ENVIRONMENTAL SUSTAINABILITY PERFORMANCE CONTRACT GUIDELINES FOR MINISTRIES, DEPARTMENTS AND AGENCIES (MDAs) FOR 2017-2018 FINANCIAL YEAR NB: National

More information

RESPONSIBLE SOURCING POLICY

RESPONSIBLE SOURCING POLICY RESPONSIBLE SOURCING POLICY Introduction CCL Products (India) Limited herein after referred as CCL recognizes its responsibility to ensure sound social, ethical and environmental practices within its own

More information

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries IGF Geneva 2016 MPF-SDG Comparative Analysis Perrine Toledano CCSI, Head: Extractive Industries SDG and MPF: Can they connect? The Sustainable Development Goals (SDGs) form the post-2015 global development

More information

CODE OF SUPPLIER RESPONSIBILITY

CODE OF SUPPLIER RESPONSIBILITY CODE OF SUPPLIER RESPONSIBILITY OUR VALUES IN ACTION What s inside this document Foreword 1 1 Introduction 2 Our approach to Responsible Business 3 Our Group commitments 3 What you need to do 4 2 What

More information

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia WE EEN Wizard of the Environment: the Enterprise Europe Network Eurosportello del Veneto Via delle Industrie 19/C Venezia Directive 2008/98/EC on waste (Waste Framework Directive) The Directive introduces

More information

B1: THE MAIN PROVISIONS OF THE PLANNING REGIME

B1: THE MAIN PROVISIONS OF THE PLANNING REGIME HIGH SPEED TWO INFORMATION PAPER B1: THE MAIN PROVISIONS OF THE PLANNING REGIME This paper outlines the main provisions of the planning regime proposed for Phase One of the HS2 project. It will be of particular

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY

GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY A working plan is an essential document and consists of a written statement accompanied by plans, drawings and specifications detailing

More information

A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice

A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice Contents EXECUTIVE SUMMARY 03 INTRODUCTION _ 1.0 04 GENERAL REQUIREMENTS

More information

Walkaway Wind Power Pty Ltd

Walkaway Wind Power Pty Ltd Final For 2008 Performance Audit and Asset Management System Review Electricity Generation Licence EGL2 Audit Period 27 th January 2006 to 31 st January 2008 Audit Plan Authorisation Name Position Date

More information

Environmental and Social Review Summary. Ejuva One and Ejuva Two Solar Projects

Environmental and Social Review Summary. Ejuva One and Ejuva Two Solar Projects Environmental and Social Review Summary Ejuva One and Ejuva Two Solar Projects This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA

More information

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...