CAMBRIDGE ASSESSMENT SHAFTESBURY ROAD, CAMBRIDGE TRAVEL PLAN

Size: px
Start display at page:

Download "CAMBRIDGE ASSESSMENT SHAFTESBURY ROAD, CAMBRIDGE TRAVEL PLAN"

Transcription

1 CAMBRIDGE ASSESSMENT SHAFTESBURY ROAD, CAMBRIDGE TRAVEL PLAN MARCH 2014

2 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks 1 st version 2 nd version Final Version Date 05/03/ /03/ /03/2014 Prepared by UKMJI002 UKMJI002 UKMJI002 Signature Checked by UKJDH475 UKJDH475 UKJDH475 Signature Authorised by UKJDH475 UKJDH475 UKJDH475 Signature Project Report number File reference Triangle Site, Cambridge Travel Plan Triangle WSP Draft Travel Plan v1.docx Triangle Site, Cambridge Travel Plan Triangle WSP Draft Travel Plan v2.docx Triangle Site, Cambridge Travel Plan Triangle WSP Final Travel Plan.docx

3 The Triangle, Shaftesbury Road, Cambridge New Headquarters for TRAVEL PLAN 26/03/2014 Client 1 Hills Road Cambridge CB1 2EU Consultant WSP UK Ltd Hills Road Cambridge CB2 1LA Tel: +44 (0) Fax: +44 (0) Registered Address WSP UK Limited WSP House, 70 Chancery Lane, London, WC2A 1AF Dated: 26/03/2014

4 Table of Contents 1 Introduction Development Proposals Aims, Objectives and Targets Initial Travel Plan Measures Travel Plan Management, Monitoring and Review Summary Figures Figure 1 Detailed Site Location Plan Appendices Appendix A Site Access and Circulation Parameter Plan

5 1 Introduction 1.1 Background This Travel Plan has been prepared by WSP for. It accompanies the outline planning application for the proposed Triangle development, a new headquarters for, at Shaftesbury Road, Cambridge. This document should be read in conjunction with the Transport Assessment which also accompanies the outline planning application The Travel Plan is a long-term strategy to encourage staff and visitors to travel by more sustainable transport options, and reduce their reliance on the private car. This involves consideration of travel opportunities associated with the Triangle and then introducing a package of measures aimed at promoting more sustainable travel amongst staff and visitors The Department for Transport s (DfT s) Travel Plan Pyramid below helps demonstrate how successful Travel Plans are built on the firm foundations of a good location and site design. Additional hard and soft measures then need to be integrated into the design and occupation of the site. For the Triangle, car parking restraint will be an important means of reducing car use. The bottom two layers of the DfT s pyramid provide the foundation for a reduction in car usage and are an integral part of the development strategy for the Triangle. Dated: 26/03/2014 1

6 1.1.4 The benefits, to both the employer, employees and the wider local community, from an effective Travel Plan, are shown below. The Environment and Local Community Better air quality, reduced congestion, better use of existing infrastructure Visitors The Employer Staff Better information on alternatives modes for planning journeys to the site Staff arrive to work on time Good public image Potential cost savings Reduced on site congestion Reduced parking problems Improved access for visitors, customers and deliveries Greater work productivity Less time commuting Reduces stress Cost savings for car sharers Improved quality of life Improved health 1.2 Development of the Travel Plan This Travel Plan has been produced following discussions with, Cambridgeshire County Council transport officers and the Travel for Work Partnership, of which are already a member are in the process of explaining the expected commitments that are implicit in the Travel Plan to its existing staff before any move to the proposed development site, in order to help establish sustainable travel patterns from the beginning of occupation of the Triangle. Work elsewhere in Cambridgeshire has found this to be an important aspect of the overall travel planning process. Future staff will be advised about the Travel Plan and opportunities available for travelling to the Triangle site prior to being employed by The target of this Travel Plan is to seek a car driver mode share of no more than 7.2% of staff travelling to work on an average working day for the fully occupied development. This would correspond to the proposed car parking provided within the development An integral part of the Travel Plan is the appointment by of a Travel Plan Co-ordinator (TPC), who will be responsible for the development and management of the Travel Plan, and accountable for the achievement of its aims, objectives and targets. Dated: 26/03/2014 2

7 1.2.5 Any Travel Plan is a working document which needs updating from time to time to take account of the latest best practice in the travel planning field. Furthermore, because travel planning is an ever-evolving process, some of the measures and initiatives in this Travel Plan may become unsuitable in future when the site is being occupied, while others not considered at this stage may come forward as being appropriate Therefore, this Travel Plan will be an evolving document that will change and develop over time to reflect the changing characteristics of, their staff and their changing travel patterns, and changing non-car travel opportunities. It will be a live document, so that achieving the staff car driver mode share target is maintained This first iteration of the Travel Plan accompanies the outline planning application. In due course, a Pre-Occupation Travel Plan will be prepared, based on a revised and updated version of this Travel Plan. The Pre-Occupation Travel Plan would be approved at least one year before the move to the Triangle site, to help the TPC focus on preparing staff and visitors for the forthcoming relocation. After the first occupation, the Travel Plan would be updated again, based on travel habits experienced with occupation of the site. 1.3 Structure of this Travel Plan The structure of this Travel Plan is as follows: Section 2 describes the development and presents the estimated travel demand. This information is based on the Transport Assessment; Section 3 sets out the aims and objectives of the Travel Plan, along with the car driver mode share target; Section 4 identifies measures to meet the Travel Plan target set in Section 3; Section 5 looks at the management of the Travel Plan and the process of monitoring and review that will be required as the Travel Plan is implemented; Section 6 summarises the Travel Plan. Dated: 26/03/2014 3

8 2 Development Proposals 2.1 Site Location Level 1 of the DfT Travel Plan Pyramid The proposed development lies to the east of Shaftesbury Road, north and west of the Cambridgeshire Guided Busway, and south of the Stephen Perse Sixth Form College and Kaleidoscope residential development. The proposed site location, in the context of Cambridge city centre, is shown on Figure 1. The site is currently occupied by Cambridge University Press (CUP), including the Edinburgh B1 office building comprising 5,116sqm Gross internal Floor Area (GFA) and B8 warehousing comprising 8,633sqm GFA Isochrones included in the Transport Assessment (TA) show that the site is highly accessible by walking and cycling and public transport, helped by the proximity of the railway station, new bus interchange within the CB1 development, and the Cambridgeshire Guided Busway (CGB) cycleway. The TA describes this accessibility in more detail, along with analysis of existing staff travel patterns The Triangle s location itself provides an excellent foundation for the Travel Plan i.e. Level 1 of the DfT s Travel Plan Pyramid. The site has good accessibility by non-car modes of transport with the rest of Cambridge and the surrounding area. 2.2 Development Proposals The Triangle development proposes the redevelopment of the site to replace the existing CUP office and warehouse with a new high quality B1 office building to accommodate up to 3,000 staff, and comprising about 39,200sqm GFA (internal). This will involve the relocation of staff from s existing offices in and around central Cambridge. The site access and circulation parameter plan, prepared by Eric Parry Architects, is attached at Appendix A. 2.3 Development Travel Demand The travel demand generated by the development is presented in the Transport Assessment, including the unfettered travel demand by mode, i.e. that which is based on the stated preferences of staff in the travel survey. This indicates that about 31% of staff would like to be able to drive to the Triangle site The Transport Assessment also presents analysis on the travel demand by mode taking into account the constrained car parking available on-site, at 189 spaces, on the basis that one car parking space represents one member of staff driving to work on a typical working day. The associated mode share analysis in the Transport Assessment indicates that 7.2% of staff would be able to drive to and park at the Triangle The unfettered travel demand by mode is compared with that resulting from the constrained car parking provision and Travel Plan in Table 1 below. Dated: 26/03/2014 4

9 Mode of Travel for Journeys to Work Unfettered, i.e. Without Travel Plan (stated preferences of staff in November staff travel survey) With Travel Plan and Constrained Car Parking Provision of 189 Spaces Bicycle 27% 30% Car Driver 31% 7.2% Car Passenger with Cambridge Assessment Driver Car Passenger dropped off by non- Driver 3% 10.8% 1% 2% Cambridgeshire Guided Bus 3% 7.5% Motorbike 1% 1% Park and Cycle 2% 2.5% Park & Ride 2% 6% Conventional Bus 6% 7% Train 16% 16% Walk 6% 8% Other 2% 2% Total 100% 100% Table 1: Travel Mode Shares With Travel Plan and Proposed Car Parking Provision, Compared with Scenario Without Travel Plan The comparison between the unfettered travel demand by mode and that constrained by the on-site car parking provision indicates that the development will require a significant modal shift to non-car modes from current expectations of staff. This Travel Plan and its evolution through the planning and design process to the eventual operation of the development is an important means by which this mode shift will be achieved. Dated: 26/03/2014 5

10 3 Aims, Objectives and Targets 3.1 Aims and Objectives The aim of this Travel Plan is to promote and highlight travel choices, with measures to encourage staff and visitors to reduce their reliance on the private car and increase walking, cycling and public transport as means of accessing the Triangle site. Associated with this aim is that staff are fully aware of and prepared for the travel choices available to them for the Triangle before the move to the site, which is planned for A further aim of the Travel Plan is to help staff and visitors overcome potential anxieties on changing travel habits. For instance, an employee who has always driven a car to work may be apprehensive about cycling to work or using the bus for the first time, because they do not have the experience in travelling by these modes. The Triangle Travel Plan seeks to address these anxieties so that staff and visitors have the confidence to use other modes of travel A longer term aim of the Travel Plan is that explores the Travel Plan developing as part of a potential wider Area Travel Plans (ATPs) which are being explored by Cambridgeshire County Council and the Travel for Work Partnership. Such an ATP could involve the Cambridge University Press and other employment sites in the vicinity of the Triangle development The primary objective of the Triangle Travel Plan will be to reduce the single occupancy car mode share, compared to the scenario assuming no implementation of a Travel Plan. This objective will require a modal shift to walking, cycling, public transport and car sharing A secondary objective is for the development to accommodate its own car parking demand, so that there is no car parking displaced onto surrounding roads, albeit many of these are subject to no-waiting restrictions and residents only parking. 3.2 Targets Cambridgeshire s Travel for Work Partnership Travel Plan guidance makes clear that Travel Plans should include SMART (Specific, Measurable, Achievable, Realistic, Time-bound) targets related to outcomes achieved by the Travel Plan To help guide the progress of the Travel Plan, targets have been adopted that will be reviewed by the appointed Travel Plan Co-ordinator (TPC). These targets are distinguished between those delivering outputs and those achieving outcomes. Output Targets Output targets are related specifically to undertaking certain actions by a particular date, or trigger point, so that the TPC remains on course with the delivery of the different measures contained within this Travel Plan The initial output target is that the Pre-Occupation Travel Plan is submitted for agreement with Cambridgeshire County Council at least one year before the planned move. This would allow ample time for the TPC to convey the Travel Plan to staff and visitors, so that is fully prepared for the transport implications of the move to the Triangle. Dated: 26/03/2014 6

11 3.2.5 Related to this is an output target for to promote the Travel Plan through engagement with employees. This is so that all existing staff are prepared for the move to the Triangle site at least six months beforehand, having been advised of the Travel Plan measures and initiatives to assist with the change in travel habits required as a result of the relocation Initial engagement with staff has already taken place through the recent travel survey and should be repeated once outline planning permission for the development is granted. This engagement will be gradually enhanced as the relocation to the Triangle site moves nearer A related output target is for all staff to be offered Personalised Travel Planning before the move, which is discussed in more detail in Section 4, and which aims to provide bespoke advice to individual employees on travel to the Triangle, should they request this. Such advice can help with overcoming anxieties in changing modes of travel A further output target is that all potential new staff interviewed before Cambridge Assessment move to the Triangle are advised of the relocation to the Triangle site and of the associated travel choices that will be available to them. Similar advice would be provided to regular visitors to These output targets seek to achieve a soft landing, so that staff and visitors are fully prepared for the change in travel requirements from first occupation of the Triangle site. Outcome Targets Outcome targets are specifically related to the anticipated results of implementing the Travel Plan measures and initiatives The key output target for the Triangle development is to achieve a staff car driver mode share of no more than 7.2%. This means that no more than 189 employees out of a total of 2,625 employees would be driving a car to and parking at the site on a typical workday (i.e. 87.5% of the eventual workforce of 3,000 staff, to allow for absences), which corresponds to the number of car parking spaces provided. On first occupation in 2018, there would be 2,013 employees travelling to the site on a typical day, out of a workforce of 2,300 staff, so the car driver mode share would be 9.4% (i.e. 189 / 2,013) As indicated in the previous section, the target staff car driver mode share will require a significant change in staff s existing expectations on opportunities to drive to the Triangle. Nevertheless, the target is considered achievable and realistic, given that the move to the Triangle is some time away and staff can be advised of the travel choices long beforehand, and therefore be fully prepared for the move. The target has also been discussed with officers of Cambridgeshire County Council and the Travel for Work Partnership, who consider it achievable A related target is to achieve an average car occupancy of 2.5, meaning that, for example, two cars travelling to and parking at the site will be occupied by five people in total, including car drivers and car passengers. This target will require the promotion of a car sharing scheme A concern has been expressed that the constrained car parking will result in displaced car parking off-site, but there are few if any opportunities for this in the vicinity of the site because most roads are subject to residents only parking or no waiting restrictions, as described in the Transport Assessment. Furthermore, would be willing to explore the potential to provide a contribution to Cambridgeshire County Council to pursue a residents only parking zone for the nearby Accordia development. Dated: 26/03/2014 7

12 While the car driver target currently appears challenging, it does relate to an existing employer who has a vested interest in achieving through various travel planning measures and initiatives the car driver mode share target, so that its business activities and workforce continue to operate successfully. Furthermore, the timescales involved mean that there is ample time available to fully prepare staff and visitors of the move The staff car driver mode share target is SMART because: Specific it applies to s staff; Measurable travel surveys and monitoring will establish mode shares and monitor progress; Achievable / Realistic since the target is specific to staff, and there are few if any opportunities to drive a car and park nearby; Time-bound achieving the target on the development s car driver mode share is related to the completion of the development when employ 3,000 staff Measures are described in the following section to achieve the above car driver mode share target. The management of the Travel Plan is set out in Section 5, describing the management, monitoring, review and long term sustainability of the Travel Plan Targets relating to increased public transport use, walking, cycling and car sharing are not considered necessary in this instance, since it may be that one sustainable mode is promoted at the expense of the other. Dated: 26/03/2014 8

13 4 Initial Travel Plan Measures 4.1 Introduction This section of the Travel Plan outlines a variety of measures that will be considered for implementation in order to achieve the Travel Plan aim, objectives and targets identified in the previous section. Because travel planning is an ever-evolving process, some of the measures and initiatives in this section may become unsuitable in the run-up to the move to the Triangle and when the site is being occupied, while others not considered at this stage may come forward as being appropriate. 4.2 Hard Measures Level 2 of the Travel Plan Pyramid Some of the potential Travel Plan measures are hard measures as part of the built environment, already incorporated into the site design itself along with off-site improvements. Such physical measures should influence employees travel patterns from the outset, and can reduce dependence upon the private car. They form Level 2 of the DfT s Travel Plan pyramid. These hard measures will be provided prior to first occupation of the development. The measures are summarised below: Improved connections for staff with the shared footway / cycleway running alongside the Cambridgeshire Guided Busway, at the northeastern and southeastern corners of the development. This will mean good walk and cycle accessibility of the site for staff from the CGB cycleway; propose to provide a contribution towards a new pedestrian link between the CGB cycleway and the Hills Road bridge, as part of their SCATP contribution, along which cyclists will be able to push their bicycles. This will mean a shorter route to the site for pedestrians and cyclists from the southeast area of Cambridge, enabling them to avoid the Hills Road / Brooklands Avenue junction; will explore the potential to provide a contribution for the implementation of a residents parking zone in the Accordia development, to mitigate the potential for displaced car parking from the Triangle site; Explore the provision of improved bus waiting facilities at the existing bus stops on Brooklands Avenue; Cycle parking will be provided in secure and covered locations near building entrances. A total of 1,050 spaces are proposed, which is equivalent to 40% of the daily number of staff travelling to the site on a daily basis once the site is fully occupied. There is space allocated for future increases in this provision to 1,325 spaces should monitoring show that demand exists for additional cycle spaces; Showers and lockers will be provided within buildings, along with changing rooms and rooms where cyclists and pedestrians can leave clothes to dry; Proposed provision of Real Time Passenger Information (RTPI) displays at prominent locations within the building, for example reception and foyer areas. This would be part of a transport information point at which staff and visitors could obtain up-to-date travel information and walking, cycling and public transport maps. Dated: 26/03/2014 9

14 4.2.2 Limiting and managing car parking provision is an important component of the Travel Plan and a determining factor in its success in achieving the reduction in the car driver mode share. This is because car trip generation is directly related to car parking provision. A total of 189 car parking spaces are proposed, which is equivalent to 7.2% of the number of staff travelling to the site on a typical day once the site is fully occupied. There will be a fair and equitable allocation of these spaces, with parking for those drivers identified as having no realistic alternative travel choices available. A large number of the car parking spaces will be allocated for car sharers. 4.3 The Travel Plan Co-ordinator Level 3 of the Travel Plan Pyramid A Travel Plan Co-ordinator (TPC) will be appointed by to take responsibility for the development and management of the Travel Plan and will be accountable for its delivery. The TPC role for the site would be fulfilled by a nominated employee of The TPC s input will vary depending on the stage of development and will be kept under review. They will, however, be located on site, and have local transport knowledge of Cambridge The Triangle TPC will be appointed at least one year before the planned Triangle moving-in date. This will allow focussed travel planning advice to be conveyed to existing staff, which will be an extension of the internal communication strategy on which Cambridge Assessment have already embarked. This involves advising existing staff on the travel opportunities available to them at the Triangle site, so that they are fully prepared for the move The TPC will establish a Travel Plan Steering Group within as a forum to exchange ideas, co-operate amongst employee groups, promote new ideas in sustainable transport and review annual staff travel survey results. Cambridgeshire County Council Travel Plan officers and the Cambridgeshire Travel for Work (TfW) Partnership will be invited to participate in this Group, advising on the latest good practice in travel planning. It would be through this Steering Group that the Travel Plan would be updated and improved over time as necessary The TPC will also fulfil the following roles, amongst others: Updating the Travel Plan as appropriate to reflect changes in walking, cycling and public transport networks since the date of this Travel Plan; Promoting the Travel Plan to staff and visitors, leading on the implementation and development of the Travel Plan, playing a central role in liaison with the Travel Plan s Steering Group; Give a human face to the Travel Plan explaining its purpose and the opportunities on offer. This may include offering personalised journey planning advice, which is described in more detail later in this section and whose aim is to demonstrate how non-car modes can meet an employee s particular day-to-day travel needs. This human face will be an important part in helping staff overcome possible anxieties they may have about changing travel habits; Helping establish and promote the individual measures in the Travel Plan described later in this section; Liaising with the TfW Partnership, public transport operators and other service providers such as car club operators; Dated: 26/03/

15 Co-ordinating the marketing and promotion of the Travel Plan to staff and visitors, which will involve raising awareness of the travel opportunities for the site and the potential health and financial benefits from reducing car trips; Monitoring the Travel Plan s implementation and progress towards the car driver mode share target, identifying measures which, although not considered at this stage, may come forward as being appropriate during the lifetime of the Travel Plan; Preparation and provision of a Travel Information Pack for employees, described in more detail later in this section, and explaining the rationale for the Travel Plan; Organising a car sharing scheme; Engaging with Cambridgeshire County Council and the TfW Partnership on their aspirations for an Area Travel Plan. 4.4 Soft Measures: Services and Facilities Level 4 of the Travel Plan Pyramid Provision of Information A key objective of the Travel Plan is to inform and advise staff and visitors of the travel choices available at the Triangle. This will be an extension of the internal staff communications strategy on which has already embarked, and will be escalated from at least one year before the move to the Triangle site (when the Pre- Occupation Travel Plan needs to be agreed with the County Council). This advice and support to staff will be instrumental in achieving the car driver mode share target as it will allow ample time for staff to become prepared in their travel choices for the move to the Triangle site This information and advice can significantly reduce hesitation about changing travel habits, which can then significantly increase mode shift away from car use. The advice can be as simple as advising an employee who has never travelled by bus how and when to let the bus driver know when to let them off their intended stop The TPC will be the key facilitator in the dissemination of this information and advice, engaging with staff and visitors. They will help set up various travel mode user groups discussed later in this section, to further assist with this provision of advice. This involvement of staff from an early stage is also an important part in achieving the aims, objectives and targets of this Travel Plan. Indeed, it is envisaged that there would be an exchange of information and advice between staff and the TPC (primarily via the transport user groups). Often, staff themselves have extremely helpful ideas on how to reduce reliance on driving to work The TfW Partnership will be invited to provide further advice and information at specially arranged events for staff Other sources of travel information will be available and are described below. Dated: 26/03/

16 Triangle Website will include a Travel Plan page on their intranet site and on their website, which will provide up-to-date information and advice on the sustainable travel options available for accessing the Triangle site. Information on these sites will include details of local public transport routes, walking and cycle maps. It will also include links to websites offering travel information and advice, such as the TfW Partnership, the County Council s realtime bus service information website, and Liftshare s My PTP personalised travel planning website (which charges for bespoke travel advice). Travel Information Packs Staff will receive a Travel Information Pack prior to the move. Through the information provided in the pack, staff will be in a better position to make informed choices about how they choose to travel to and from the development. The pack will be updated on a regular basis by the TPC, and will include: An overview of the objectives and structure of the Travel Plan, why the Travel Plan is in place and what advice is available with regard to sustainable transport options; Details of incentives being offered to staff to encourage sustainable travel; Contact details of the TPC, should staff have any transport or travel problems, or ideas they wish to discuss; Up to date public bus and rail timetables (which are not included with this Travel Plan since services will change significantly prior to completion of the development). If necessary these timetables will be simplified and produced as pocket guides to make them easier to use and to carry in everyday travel; Details on how to access and register with the car share database; Pedestrian and cycle route maps from the development to and from the surrounding area, identifying bus stops and the railway station; Details of local taxi companies; Details on how to get involved in the Travel Plan Steering Group, described in more detail in the next section; and Details of the site s Walking Group, Bicycle User Group and Public Transport User Group, described later in this section. Personalised Travel Planning Personal Travel Planning (PTP) is a technique that delivers information, incentives and motivation to individuals to help them voluntarily make sustainable travel choices. It seeks to overcome regular and routine use of the car, enabling more journeys to be made on foot, bike, bus, train or as a car sharer Each employee at will be offered PTP by the TPC, to consider their current travel habits, and how to make non-car trips to the Triangle site. The TPC will explain the Travel Plan s aims and measures and offer staff a service of personalised journey planning, based on their individual circumstances and in light of the sustainable transport options available for their everyday journeys This process will assist staff in considering how they currently plan to travel to the Triangle and promote alternative methods for their journeys to work. Personalised journey planning will also help staff who might not otherwise use public transport realise there are local services available that can suit their needs. Such advice can help staff overcome apprehensiveness on changing long term travel habits. Dated: 26/03/

17 This PTP service will be available to staff from at least one year prior to the planned move to the Triangle, so staff can become prepared before the relocation As noted above, the Triangle website will include a link to Liftshare s My PTP website, which offers individuals bespoke integrated travel advice for their requirements. Measures to Promote Walking and Cycling The cycling isochrone plan in the Transport Assessment shows that a large area of Cambridge is within a reasonable cycling distance of the site. The Transport Assessment describes this accessibility in more detail, indicating that a significant number of staff could cycle to the site In addition to the hard walking and cycling measures and provision of information on walking and cycling routes in the Travel Information Pack, the TPC will promote the health and well-being benefits of walking and cycling. For example, regular cycling helps people lose weight, reduce stress and improve fitness. Cycling websites such as the Cambridge Cycling Campaign s will be actively marketed and which have further information on these health benefits The TPC will liaise with the TfW Partnership in order to provide cycle training opportunities for staff. TfW currently liaise with Outspoken Training, which is an organisation in Cambridge that provides (for a charge) cycle training and advice. The TPC will explore with TfW and Outspoken the opportunities for dedicated cycle training events (e.g. winter cycling) for staff The TPC will monitor the use of the cycling parking facilities, and seek solutions to provide additional parking facilities if there is sufficient demand. This could be by installing new cycle stands on land within the development that has been set aside for such future provision, and / or increasing the number of double-stacker cycle stands A Bicycle User Group (BUG) will be established by the TPC, comprised of staff who are interested in taking forward initiatives to promote and facilitate cycling in and around the development. The BUG would be set up before the move. It could be linked to the Cambridge Cycling Campaign The BUG will provide a forum for sharing information on cycle routes, cycling best practice, and to address any issues of concern regarding cycling or cycle safety. It will also enable less experienced cyclists to interact with established cyclists and obtain information, guidance and potentially a cycling buddy to accompany them on their journey to or from the Triangle site The BUG and the TPC, potentially with the assistance from the Cambridge Cycling Campaign, Outspoken Training and the TfW Partnership, will organise cycle events such as cycle to work weeks. The intention would be for cycling to become a habit for staff before the move to the Triangle On-site cycle maintenance and repairs will be available to staff (and is currently available at 1 Hills Road), courtesy of the Cambridge Bicycle Ambulance. This provision can help reassure less experienced and prospective cyclists that repairs can be made at the Triangle, instead of the need to spend time finding off-site cycle repair shops currently and will continue to be part of HMRC s Cycle to Work scheme, which allows staff to purchase bicycles tax-free. Dated: 26/03/

18 Pool bikes will be available to staff. These can be important for local business trips during the day. The TPC will explore the potential for these pool bikes to be electric cycles. The benefits of these are that there is less physical exertion involved when riding, so staff can arrive at meetings relatively composed (i.e. not sweating and out of breath). Electric cycles can also help prospective cyclists overcome potential fears that their cycle ride between home and the Triangle would be too long. They can use the electric cycle to gauge the amount of physical effort that would be involved on a conventional bicycle. Measures to Promote Public Transport Large areas of Cambridge are within a reasonable bus journey of the site, as indicated on the public transport isochrones in the Transport Assessment, which describes this accessibility in more detail. The site is also about a 6 minute walk from Cambridge railway station and the new bus interchange located within the CB1 development area To promote the use of bus, staff will be offered a 10% discount on fares. This is currently available through s membership of the Travel for Work Partnership A Public Transport User Group will be set up by the TPC, comprised of Cambridge Assessment staff, before the move to the Triangle. In a similar fashion to the BUG, the Public Transport User Group will enable information to be shared on bus routes and costs, and help prospective public transport users overcome potential hesitation on using public transport. Bespoke information on how public transport services can meet an employee s travel needs will be offered to staff by the TPC and the Public Transport User Group The Triangle website will have links to the County Council s website on real time bus passenger information, and to real time information on train services. A large display of real time passenger information will be provided in the main reception area of the building for visitors to plan their public transport journeys will allow some flexibility on start and finish times for staff travelling by public transport. Measures to Promote Efficient Car Use Car sharing aims to reduce single-occupancy vehicle trips and thus reduce the car parking demand at the Triangle. Because car parking will be limited, need to make the most efficient use of the available spaces. This means introducing a car sharing scheme, with the majority of car parking spaces allocated to car sharers. This Travel Plan has an average car occupancy target of 2.5 / vehicle, to encourage car sharing The TPC will promote the car share scheme. They will review staff home postcodes, travel choices, and likely routes into work, to identify potential car share drivers and passengers. They will arrange car share events such as car share coffee mornings, to help staff get to know other potential car sharers will provide a guaranteed ride home to car sharers. Under the guaranteed ride home scheme, if a member of staff has to leave at an unexpected time for emergency reasons and no practical alternative travel option is available, Cambridge Assessment will provide the means to take this person home. This may take the form of covering the cost of a taxi for that employee. The guaranteed ride home scheme will also help appease any concerns amongst employees, should their car sharing arrangements fail for any reason, that they are able to travel home. Dated: 26/03/

19 At the County level, Cambridgeshire County Council in partnership with Liftshare operates the CamShare scheme (via This scheme offers a free car share matching service for people who live, work and travel in and around Cambridge. The service aims to help automate the matching process by actively suggesting neighbours or colleagues who could be potential car sharer partners. The TPC will explore with staff whether this car share scheme would be suitable for their travel patterns. Dated: 26/03/

20 5 Travel Plan Management, Monitoring and Review 5.1 The Travel Plan Pyramid Level 5: Marketing and Promotion, Monitoring and Review The marketing, promotion, monitoring and review of the Travel Plan forms the top level of the DfT s Travel Plan Pyramid, Level 5. The other four levels of the pyramid therefore form the basis for this marketing and review, and the successful marketing of the Travel Plan will only be possible if these other four levels meet the requirements of a successful Travel Plan. It is therefore considered that each level of the development s Travel Plan Pyramid will provide the basis for a successful Travel Plan to be operated and managed at the Triangle development, and which achieves the target of reducing the car driver mode share to 7.2%. 5.2 Management Structure and Roles The implementation and management of the Travel Plan, including the arrangements for setting up the various transport user groups, will require a Steering Group. This will be set up by within 3 months of the approval of the Pre-Occupation Travel Plan, which itself will be required one year before the planned move The Steering Group will initially comprise the TPC and Cambridgeshire County Council Travel Plan officers in an advisory role. It will also be essential to involve Cambridge Assessment staff. This will assist with the long term sustainability of the Travel Plan The Steering Group will play an important role during the early period of the Travel Plan, from early occupation to the first monitoring and review of the Travel Plan. It would assist guiding the implementation, monitoring and review process, enabling necessary high level decisions to be made, and helping to secure partnerships and maintain momentum of the Travel Plan The Steering Group will include a formal management and review arrangement and a practical means of achieving strong and constructive partnerships. This would be important if the early monitoring of the Travel Plan indicates that the Travel Plan targets are not being met, in which case the Steering Group would bring key stakeholders together, e.g. the Cambridge Cycling Campaign and the TfW Partnership, so that further initiatives can be explored The TPC would chair the Steering Group, which would meet every six months to monitor the implementation and management of the Travel Plan and take action as appropriate will remain responsible for delivering the Travel Plan, and there will be a clear line of responsibility to for achieving the target and objectives set out in this Travel Plan. Dated: 26/03/

21 5.3 Raising Awareness, Marketing and Promotion The marketing of the Travel Plan has been discussed in the previous section as a part of the duties of the TPC. In summary, the aim will be to market the Travel Plan to staff at an early stage, even before the move to the site, to encourage sustainable travel patterns from the beginning of the development rather than being retrofitted. A new development maximises the potential benefits of such advice and marketing, and evidence suggests that people find it much easier to change their travel habits at the same time as making other lifestyle changes, such as employment locations. The on-going promotion of the Travel Plan will also be a key duty of the TPC. 5.4 Monitoring and Review To determine the effectiveness of the Travel Plan, and so that future revisions to it are effective, monitoring and review of the targets, objectives and measures set out in this Travel Plan will take place at regular intervals by the Steering Group The primary element of monitoring will be a questionnaire-based survey, which will be completed by staff annually to determine travel patterns to and from the site. The survey will need to be agreed with the County Council beforehand. Secondary monitoring elements will include recording membership and signup rates to the travel plan measures, including the walking and cycling groups, car share scheme, and requests for Personal Travel Planning. These additional sources of data will be useful to gauge indications of trends in employees travel mode choice and attitudes to travelling sustainably The TPC will arrange a travel survey of staff 6 months prior to the move. Further travel surveys will then be undertaken annually. The results of these surveys will be written up in an Annual Travel Plan Monitoring Report The monitoring before the move will be important because it will assist with identifying potential further Travel Plan measures or refinements in order to achieve the car driver target as soon as the Triangle is occupied. This will minimise potential disruption and confusion on travelling to the site in the early stages of the development s occupation, so that staff are prepared and there is a soft landing on first occupation of the Triangle site If monitoring shows that the Travel Plan targets are being met over a consistent period of time, the extent of monitoring requirements may become less. This would be agreed with Cambridgeshire County Council Draft Annual Travel Plan Monitoring Reports will be produced by the TPC and submitted to Cambridgeshire County Council within 30 days after receipt of the above survey data for approval. These draft reports will present the findings of the travel surveys, and identify progress towards the Travel Plan target. They will make recommendations as appropriate on the need to review any previously agreed targets along with Travel Plan measures, depending on progress towards the Travel Plan target Cambridgeshire County Council will provide comments on the Draft Annual Travel Plan Monitoring Reports within 30 days of receipt. On approval by Cambridgeshire County Council, the TPC will make the Annual Travel Plan Monitoring Reports available to the Steering Group and staff. The TPC will implement the recommendations in the approved Annual Travel Plan Monitoring Reports which may include: Modifications to the previously agreed targets; Modifications to the activities undertaken throughout the previous period, i.e. the measures implemented, the Travel Plan s promotion and marketing, and management, based on the approved Annual Travel Plan Monitoring Report; Dated: 26/03/

22 Implementation of any further measures if the Annual Travel Plan Monitoring Reports find that the Travel Plan is not meeting its objectives within the agreed timescales; The production of a draft revised Travel Plan for the period following the relevant Annual Monitoring Report, to be submitted to Cambridgeshire County Council within 30 days of the approval of the Annual Monitoring Report. The County Council will then confirm approval or rejection within 30 working days of receipt of the draft revised Travel Plan. 5.5 Enforcing the Travel Plan The Travel Plan forms part of the planning application documentation and is therefore an integral part of any permission that may be granted. The Travel Plan could be secured by planning condition will be obliged to implement the provisions of the Travel Plan. This will include appointment of the TPC role along with their duties to prepare the Annual Travel Plan Monitoring Reports and revisions to the Travel Plan as identified in the Annual Monitoring Reports, so that the Travel Plan targets are achieved. Dated: 26/03/

23 6 Summary 6.1 This Travel Plan has been prepared by WSP for the Triangle development, Cambridge. Its key aims are to reduce car trips and improve travel choices by non-car modes for staff and visitors at the Triangle. It has a target to reduce the car driver mode share to 7.2%. 6.2 The DfT s Travel Plan Pyramid helps demonstrate how to achieve a successful Travel Plan, and the Triangle Travel Plan applies to each level of the Travel Plan Pyramid as follows: Level 1 Location: The site s location provides an excellent foundation for the Travel Plan. It has good accessibility with the rest of Cambridge, particularly the city centre, by non-car modes; Level 2 Physical Measures: The physical aspects of the development s layout will influence staff travel patterns from the outset, reducing dependence upon the private car; Level 3 Travel Plan Co-ordinator: This role will be funded by Cambridge Assessment and will co-ordinate the on-going development and management of the Travel Plan, including assessment of further measures; Level 4 Services and Facilities: Travel Information Packs and promotion of travel by public transport, car sharing, walking and cycling measures will be provided as part of the Travel Plan, to meet the aims and objectives of the Travel Plan. Advice on travel choices available will also be offered to staff by the Travel Plan Coordinator; Level 5 Marketing, Promotion, Awareness Raising, Monitoring and Review: A marketing and communication strategy is key to the success of the Travel Plan. The development s marketing strategy will aim to raise awareness of the key services and facilities implemented as part of the Travel Plan and disseminate travel information to staff even before the move. This is to assist with achieving a soft landing for the move, with staff and visitors fully prepared for the change in travel requirements from first occupation of the Triangle. Monitoring and review will take place at regular intervals so that the Travel Plan, which is a working document, is updated from time to time to take account of the latest best practice in the field. 6.3 With the package of measures described in the Travel Plan, and the key role played by the Travel Plan Co-ordinator in promoting non-car modes and communicating alternatives to staff, the Travel Plan s target of reducing s car driver mode share to 7.2% for the Triangle development is considered realistic and achievable.. Dated: 26/03/

24 FIGURES Dated: 26/03/2014

25 Figure 1 Site Location Plan Dated: 26/03/2014

26

27 APPENDICES Dated: 26/03/2014

28 Appendix A Site Access and Circulation Parameter Plan Dated: 26/03/2014

29

30 Dated: 26/03/2014

31 WSP UK Ltd Hills Road Cambridge CB2 1LA UK Tel: +44 (0) Fax: +44 (0)

APPENDIX 17 MOBILITY MANAGEMENT PLANS

APPENDIX 17 MOBILITY MANAGEMENT PLANS APPENDIX 17 MOBILITY MANAGEMENT PLANS Mobility Management and Travel Planning Meath County Council regards mobility management as an important element in the promotion of sustainability and in the achievement

More information

Workplace Travel Plans A guide for Swindon developers

Workplace Travel Plans A guide for Swindon developers Workplace Travel Plans A guide for Swindon developers Incorporating the use of Modeshift Starsfor to create Travel Plans and support planning applications Contents What this guidance does... 3 What is

More information

SCDC is a core Steering Group partner in the Cambridgeshire Travel For Work Partnership (TfW).

SCDC is a core Steering Group partner in the Cambridgeshire Travel For Work Partnership (TfW). Briefing: Cambridgeshire Travel for Work Partnership SCDC is a core Steering Group partner in the Cambridgeshire Travel For Work Partnership (TfW). TfW provides travel solutions for Cambridgeshire employers

More information

Devon and Cornwall Police Framework Travel Plan Devon and Cornwall Police. January 2012

Devon and Cornwall Police Framework Travel Plan Devon and Cornwall Police. January 2012 Devon and Cornwall Police Framework Travel Plan Devon and Cornwall Police January 2012 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date Prepared by Signature Checked by Signature

More information

Local Transport Plan. Implementation Plan ( )

Local Transport Plan. Implementation Plan ( ) Local Transport Plan Implementation Plan (2011-2015) www.cheshireeast.gov.uk/travel Contents 1 Introduction 2 Initiatives to Ensure a Sustainable Future 3 Initiatives to Create Conditions for Business

More information

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION HIGH SPEED TWO INFORMATION PAPER E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION This paper outlines the framework for the control and management of traffic associated with the construction of the Proposed

More information

itrace and TRAVL compliancy new way to plan document type: Technical Note

itrace and TRAVL compliancy new way to plan document type: Technical Note itrace and TRAVL compliancy new way to plan document type: Technical Note 1 1. Introduction Guidance for workplace travel planning for development recommends that all development related travel plans in

More information

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps Report To: Greater Cambridge City Deal Executive Board 3 rd March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A428/A1303 Better

More information

BRENTFORD COMMUNITY STADIUM. Framework Travel Plan (Match Day) Uses

BRENTFORD COMMUNITY STADIUM. Framework Travel Plan (Match Day) Uses BRENTFORD COMMUNITY STADIUM Framework Travel Plan (Match Day) Uses 24/05/2013 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Issue 1 Issue 2 Date 17 May 2013 24 May

More information

Mercia EnviRecover ENERGY FROM WASTE FACILITY HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE SITE OPERATIONAL TRAVEL PLAN

Mercia EnviRecover ENERGY FROM WASTE FACILITY HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE SITE OPERATIONAL TRAVEL PLAN 1557-01-TP01(Rev B) Mercia EnviRecover ENERGY FROM WASTE FACILITY HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE SITE OPERATIONAL TRAVEL PLAN Prepared on behalf of: AXIS Camellia House 76 Water

More information

Transport Assessment Guidelines November 2015 Cambridgeshire County Council

Transport Assessment Guidelines November 2015 Cambridgeshire County Council Transport Assessment Guidelines November 2015 Cambridgeshire County Council Introduction The National Planning Policy Framework (NPPF, March 2012) states that All developments that generate significant

More information

SWDP 4: Moving Around South Worcestershire. SWDP 4: Moving Around South Worcestershire. Managing Travel Demand

SWDP 4: Moving Around South Worcestershire. SWDP 4: Moving Around South Worcestershire. Managing Travel Demand SWDP 4: Moving Around South Worcestershire Managing Travel Demand A. Proposals must demonstrate that: the layout of development will minimise demand for travel, they offer genuinely sustainable travel

More information

Workplace Travel Planning Guide

Workplace Travel Planning Guide Workplace Travel Planning Guide Welcome to the Get Healthy at Work Workplace Travel Planning Guide. We hope you find this guide practical and easy to follow. It will help your organisation to develop and

More information

Park and Ride Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Park and Ride Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland Park and Ride Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary 01 Introduction The City of Southampton lies at the western end of the South Hampshire sub-region. The wider urban South Hampshire area, consisting of Southampton, Eastleigh, Fareham,

More information

ATOC Guidance Note Planning for Special Events

ATOC Guidance Note Planning for Special Events ATOC Guidance Note Planning for Special Events Synopsis This Guidance Note provides advice on operational, safety and contingency factors to take into consideration when planning for special events. Authorised

More information

campaigning by the Railway Development Society Limited

campaigning by the Railway Development Society Limited campaigning by the Railway Development Society Limited Department for Transport A14 Challenge Team Roads Policy Great Minster House, 33 Horseferry Road, London SW1P 4DR Please Reply to: 24 Bure Close St.

More information

Regional Travel Demand Management Plan

Regional Travel Demand Management Plan Regional Travel Demand Management Plan Adopted October 2009 Quality for life Regional Travel Demand Management Plan Adopted October 2009 For more information, contact: Greater Wellington 142 Wakefield

More information

Workplaces PTP Methodology

Workplaces PTP Methodology Workplaces PTP Methodology Version: 2.0 Date: 21.02.14 Author: Table of contents Introduction... 3 Overview of a Workplaces PTP Project... 3 Stage 1 Employer engagement... 4 Securing workplace support

More information

Radstone Fields, Brackley Construction Traffic Management Plan Taylor Wimpey & Barratt Strategic

Radstone Fields, Brackley Construction Traffic Management Plan Taylor Wimpey & Barratt Strategic Radstone Fields, Brackley Construction Traffic Management Plan Taylor Wimpey & Barratt Strategic April 2011 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft for Client Draft following

More information

The London Land-Use and Transport Interaction Model (LonLUTI)

The London Land-Use and Transport Interaction Model (LonLUTI) The London Land-Use and Transport Interaction Model (LonLUTI) October 2014 Contents 3 Introduction 4 Why do we need transport models? 6 TfL s suite of models 8 What is LonLUTI? 12 How was LonLUTI developed?

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018

Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall Greater Cambridge Partnership Recommendations from the Ely to Cambridge A10 Transport Study and proposed

More information

EXECUTIVE SUMMARY ORGANIZATION OF REPORT

EXECUTIVE SUMMARY ORGANIZATION OF REPORT EXECUTIVE SUMMARY Over the past year, the Dillon Consulting team conducted a comprehensive review of public transit in Guelph. The City of Guelph has for many years been a leader among Canadian municipalities

More information

1 EXECUTIVE SUMMARY. 1.1 Introduction

1 EXECUTIVE SUMMARY. 1.1 Introduction 1 EXECUTIVE SUMMARY 1.1 Introduction 1.1.1 As part of the Second East Sussex Local Transport Plan (LTP2) an accompanying Accessibility Strategy was published in March 2006. The strategy identified a number

More information

That will also contribute to achievement of a number of objectives and policies in the Regional Policy Statement.

That will also contribute to achievement of a number of objectives and policies in the Regional Policy Statement. Board of Inquiry MacKays to Peka Peka Expressway Proposal Submitters Evidence Public Transport Voice 5 October 2012 Executive Summary Increasing modal share for public transport is a key outcome in the

More information

Cabinet Meeting 26 April 2017

Cabinet Meeting 26 April 2017 Cabinet Meeting 26 April 2017 Report title Decision designation Cabinet member with lead responsibility Key decision In forward plan Wards affected Accountable director Originating service Accountable

More information

A TDM Programme for the Glasgow 2014 Games and beyond the potential for legacy

A TDM Programme for the Glasgow 2014 Games and beyond the potential for legacy A TDM Programme for the Glasgow 2014 Games and beyond the potential for legacy. Mott MacDonald on behalf of Glasgow2014 1 Introduction The XX Commonwealth Games will be held from 23. July to 3rd August

More information

store for Buckshaw Village and Euxton

store for Buckshaw Village and Euxton A new Aldi food store for Buckshaw Village Aldi, the premium discount food retailer, with local developer Primrose Holdings, is proposing to develop land off Ordnance Road,. The site is currently vacant

More information

DRAFT - NHS Health Boards Transport Action Plan Checklist

DRAFT - NHS Health Boards Transport Action Plan Checklist Meeting: IPG Date: 3 rd September 2009 Item: 40/09 DRAFT - NHS Health Boards Transport Action Plan Checklist The purpose of this checklist is to help Health Boards draw up an action plan to improve access

More information

DAVID CARTER, DIRECTOR OF INFRASTRUCTURE

DAVID CARTER, DIRECTOR OF INFRASTRUCTURE REPORT TO: WECA COMMITTEE DATE: 30 NOVEMBER 2018 REPORT TITLE: DIRECTOR: AUTHOR: TRANSPORT UPDATE DAVID CARTER, DIRECTOR OF INFRASTRUCTURE JASON HUMM, HEAD OF TRANSPORT Purpose of Report: 1. To update

More information

Rail Decentralisation: Devolving decision-making on passenger rail services in England Response from Campaign for Better Transport

Rail Decentralisation: Devolving decision-making on passenger rail services in England Response from Campaign for Better Transport Rail Decentralisation: Devolving decision-making on passenger rail services in England Response from Campaign for Better Transport Summary of main points We support the devolution of decision-making on

More information

CCG CO12 Policy and Framework for Partnership Governance

CCG CO12 Policy and Framework for Partnership Governance Corporate CCG CO12 Policy and Framework for Partnership Governance Version Number Date Issued Review Date V2: 21/02/2015 29/04/2015 21/02/2018 Prepared By: Consultation Process: Formally Approved: 25/02/2015

More information

University Site: Land Between Madingley Road and Huntingdon Road (Parcel A); and

University Site: Land Between Madingley Road and Huntingdon Road (Parcel A); and Technical Note Project: North West Cambridge Transport Study To: Cambridgeshire County Council Subject: Additional Development Scenarios - University From: Atkins Date: 19/02/2009 cc: Executive Summary

More information

The Challenges of Travel Planning in the HE Sector

The Challenges of Travel Planning in the HE Sector The Challenges of Travel Planning in the HE Sector Overview 1. Background and TPS Experience 2. Key Challenges a) Environmental Management b) Operational Requirements c) Ongoing Engagement d) Monitoring

More information

APPENDIX B - GLOSSARY FEBRUARY 2017

APPENDIX B - GLOSSARY FEBRUARY 2017 APPENDIX B - GLOSSARY FEBRUARY 2017 DENVERMOVES Transit Denver Moves: Transit - ii - APPENDIX B TRANSIT AND MOBILITY GLOSSARY Amenities, stop or station: Objects or facilities (such as a shelter, bench,

More information

JULY This guide is to be used for the Sustainable Transport Credits in the Transport Category.

JULY This guide is to be used for the Sustainable Transport Credits in the Transport Category. JULY 2015 This guide is to be used for the Sustainable Transport Credits in the Transport Category. For information on this document, please contact: Green Building Council of Australia (02) 8239 6218

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Joint Planning Directors / Principal Planning Manager, South Cambridgeshire District Council

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Joint Planning Directors / Principal Planning Manager, South Cambridgeshire District Council SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Cambridge City Fringes Joint Committee 28 September 2009 AUTHOR/S: Joint Planning Directors / Principal Planning Manager, South Cambridgeshire District

More information

Local Plans CSRM Cambridge and South Cambridgeshire Local Plans Transport Report

Local Plans CSRM Cambridge and South Cambridgeshire Local Plans Transport Report Cambridge and South Cambridgeshire Local Plans Transport Report Cambridge City Council, Cambridgeshire County Council, South Cambridgeshire District Council 27 November 2015 Notice This document and its

More information

Hilary Holden, City Access Programme. City Access congestion reduction proposals: Consultation Responses and Next Steps

Hilary Holden, City Access Programme. City Access congestion reduction proposals: Consultation Responses and Next Steps Report To: Greater Cambridge City Deal Executive Board 25 January 2017 Lead Officer: Hilary Holden, City Access Programme City Access congestion reduction proposals: Consultation Responses and Next Steps

More information

OXFORD BROOKES UNIVERSITY INTERIM TRAVEL PLAN

OXFORD BROOKES UNIVERSITY INTERIM TRAVEL PLAN OXFORD BROOKES UNIVERSITY INTERIM TRAVEL PLAN 2016-2018 1 Oxford Brookes University Strategy for Enhancing the Student Experience At the heart of the strategy are six key principles which describe the

More information

Standards for developing Workplace Travel Plans. Summary edition. creating optimal mobility measures to enable reduced commuter emissions

Standards for developing Workplace Travel Plans. Summary edition. creating optimal mobility measures to enable reduced commuter emissions creating optimal mobility measures to enable reduced commuter emissions The full document can be downloaded from the COMMERCE website: www.commerce-eu.org Standards for developing Workplace Travel Plans

More information

Environment Committee 24 July 2014

Environment Committee 24 July 2014 Environment Committee 24 July 2014 Report of Title Parking Policy Wards All Status Public Enclosures Declan Hoare, Lead Commissioner for Housing and Environment Appendix A: Parking Policy Consultation

More information

9. Asset Management. 9. Asset Management. 9.2 Asset Management and the Shared Priorities. 9.1 Introduction. Headline Targets

9. Asset Management. 9. Asset Management. 9.2 Asset Management and the Shared Priorities. 9.1 Introduction. Headline Targets Headline Targets BVPI 223 - Principal Road Condition. BVPI 224a - Non-Principal Classified Road Condition. BVPI 224b - Unclassified Road Condition. BVPI 187 - Footway Condition. How we will tackle Asset

More information

Developing a Strategy for Smart and Integrated Ticketing

Developing a Strategy for Smart and Integrated Ticketing Developing a Strategy for Smart and Integrated Ticketing A response by CPRE to the DfT's consultation October 2009 Introduction 1. The Campaign to Protect Rural England (CPRE) welcomes the opportunity

More information

Managing travel to a major health campus: Travel plan for QEII Medical Centre

Managing travel to a major health campus: Travel plan for QEII Medical Centre Managing travel to a major health campus: Travel plan for QEII Medical Centre David Wake 1 1 Department for Planning and Infrastructure, Perth, Western Australia, Australia 1 Introduction Traffic congestion

More information

Chapter 3 Stakeholder Interviews and Summary of Needs

Chapter 3 Stakeholder Interviews and Summary of Needs Chapter 3 Stakeholder Interviews and Summary of Needs 42 CHAPTER 3 STAKEHOLDER INTERVIEWS AND SUMMARY OF NEEDS CHAPTER 3. STAKEHOLDER INTERVIEWS AND SUMMARY OF NEEDS An extensive stakeholder interview

More information

Sustainable Development. Policy on Active Travel

Sustainable Development. Policy on Active Travel Sustainable Development Policy on Active Travel Date of Production = January 2010 Date of review = January 2011-1 Policy Statement The Trust recognises that travel and transport are determinants of health

More information

COUNCIL APPOINTMENT OF EXTERNAL AUDITOR

COUNCIL APPOINTMENT OF EXTERNAL AUDITOR Report No: 7/2017 PUBLIC REPORT COUNCIL 9 January 2017 APPOINTMENT OF EXTERNAL AUDITOR Report of the Director for Resources Strategic Aim: All Exempt Information Cabinet Member(s) Responsible: No Councillor

More information

Travel planning for new development in London

Travel planning for new development in London TransportforLondon Travel planning for new development in London Incorporating deliveries and servicing Travel planning for new development in London 1 Contents 1 Introduction 3 Background 3 What is a

More information

Eu Public- Private Smart Move High Level Group

Eu Public- Private Smart Move High Level Group Eu Public- Private Smart Move High Level Group Final Recommendations Follow up to the European Commission Transport White Paper and contribution to the EU 2020 Growth Agenda European Union // Eu Public-Private

More information

Agenda Item 7: Strategic Transport Forum Revised Terms of Reference

Agenda Item 7: Strategic Transport Forum Revised Terms of Reference Strategic Transport Forum 15 th December 2017 englandseconomicheartland@b uckscc.gov.uk Agenda Item 7: Strategic Transport Forum Revised Terms of Reference Recommendation: It is recommended that the Forum:

More information

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road Response to a Bridge Strike at a Bridge carrying the Railway over a Road A Protocol for Highway and Road Managers, Emergency Services and Bridge Owners NR/GPG/CIV/008 3 rd March 2009 Note This protocol

More information

Chapter TRIP REDUCTION AND TRAVEL DEMAND MANAGEMENT

Chapter TRIP REDUCTION AND TRAVEL DEMAND MANAGEMENT Chapter 10.72 TRIP REDUCTION AND TRAVEL DEMAND MANAGEMENT Sections: 10.72.010 Short title. 10.72.020 Authority. 10.72.030 Marin County congestion management agency (CMA). 10.72.040 Definitions. 10.72.050

More information

Guidelines for the Submission of a Transportation Study Level 2

Guidelines for the Submission of a Transportation Study Level 2 Guidelines for the Submission of a Transportation Study Level 2 For Site Development Applications in the City of North Vancouver Transportation Group, City of North Vancouver Engineering, Parks & Environment

More information

Employer TDM Benchmarking Survey 2018

Employer TDM Benchmarking Survey 2018 * 1. An Invitation to Employers/Workplaces with Employee Commute Programs: Best Workplaces for Commuters (BWC) at the National Center for Transit Research at the University of South Florida and the Employer

More information

Cambourne to Cambridge Better Bus Journeys Scheme: Strategic Outline Business Case Delivery Case City Deal Partnership.

Cambourne to Cambridge Better Bus Journeys Scheme: Strategic Outline Business Case Delivery Case City Deal Partnership. Cambourne to Cambridge Better Bus Journeys Scheme: Strategic Outline Business Case City Deal Partnership 21 September 2016 Notice This document and its contents have been prepared and are intended solely

More information

Moffett Towers. Final Transportation Demand Management (TDM) Plan. Jay Paul Company. Prepared for: Prepared by:

Moffett Towers. Final Transportation Demand Management (TDM) Plan. Jay Paul Company. Prepared for: Prepared by: Moffett Towers Final Transportation Demand Management (TDM) Plan Prepared for: Jay Paul Company Prepared by: January 10, 2008 TABLE OF CONTENTS I. Project Description 1 II. Site Facilities and Amenities

More information

Proposed Aldi Food Store. Caerphilly Road, Cardiff TRANSPORT ASSESSMENT. Prepared by: Entran Ltd

Proposed Aldi Food Store. Caerphilly Road, Cardiff TRANSPORT ASSESSMENT. Prepared by: Entran Ltd Proposed Aldi Food Store Caerphilly Road, Cardiff TRANSPORT ASSESSMENT Prepared by: Entran Ltd Entran is committed to reducing unnecessary waste in the environment. For this reason our paper reports are

More information

Choose NDC for Quality, Reliability and Unrivalled Experience

Choose NDC for Quality, Reliability and Unrivalled Experience Nationwide Data Collection Nationwide Data Collection (NDC) has currently established three regional offices in the UK which are located in Warwick, Ossett and London. We also have three regional offices

More information

Inter-relationships between parking policy and the travel plan

Inter-relationships between parking policy and the travel plan Car park management Car park management Parking is often high on the list of concerns amongst staff, patients and visitors at Trust sites located in outer London. In inner London, hospitals generally have

More information

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 Introduction Goals Policies, and Performance Measures Growth Forecast and Planned Land Use Development Key Recommendations i Executive Summary April

More information

HYWEL DDA UNIVERSITY HEALTH BOARD REDEPLOYMENT POLICY. 158 Supersedes: Classification Employment

HYWEL DDA UNIVERSITY HEALTH BOARD REDEPLOYMENT POLICY. 158 Supersedes: Classification Employment REDEPLOYMENT POLICY Policy Number: 158 Supersedes: Classification Employment Version Date of Date of Date made Review Approved by: No EqIA: Approval: Active: Date: V3 W&OD Committee 15.03.2018 21.03.2018

More information

WORCESTERSHIRE PARKWAY REGIONAL INTERCHANGE

WORCESTERSHIRE PARKWAY REGIONAL INTERCHANGE CABINET 16 JUNE 2016 WORCESTERSHIRE PARKWAY REGIONAL INTERCHANGE Relevant Cabinet Member Dr K A Pollock Relevant Officer Director of Economy and Infrastructure Local Member Mr R C Adams Recommendation

More information

Report of the Strategic Director Regeneration and Culture to the meeting of Executive to be held on 9 October AD

Report of the Strategic Director Regeneration and Culture to the meeting of Executive to be held on 9 October AD Report of the Strategic Director Regeneration and Culture to the meeting of Executive to be held on 9 October 2012. AD Subject: West Yorkshire Plus Transport Fund Summary statement: This report outlines

More information

TAG UNIT Modelling Smarter Choices DRAFT FOR CONSULTATION. November Department for Transport. Transport Analysis Guidance (TAG)

TAG UNIT Modelling Smarter Choices DRAFT FOR CONSULTATION. November Department for Transport. Transport Analysis Guidance (TAG) TAG UNIT 3.10.6 Modelling Smarter Choices November 2011 Department for Transport Transport Analysis Guidance (TAG) www.dft.gov.uk/webtag DRAFT FOR CONSULTATION Technical queries and comments on this TAG

More information

THE UNIVERSITY OF ABERDEEN CONSULTATION ON AVOIDANCE OF REDUNDANCY POLICY

THE UNIVERSITY OF ABERDEEN CONSULTATION ON AVOIDANCE OF REDUNDANCY POLICY THE UNIVERSITY OF ABERDEEN CONSULTATION ON AVOIDANCE OF REDUNDANCY POLICY This Policy should be read in conjunction with Appendices A and B (attached). 1 INTRODUCTION The University of Aberdeen is committed

More information

RECRUITMENT AND SELECTION POLICY AND PROCEDURE Contracted Staff (Permanent and Fixed Term Contract)

RECRUITMENT AND SELECTION POLICY AND PROCEDURE Contracted Staff (Permanent and Fixed Term Contract) RECRUITMENT AND SELECTION POLICY AND PROCEDURE Contracted Staff (Permanent and Fixed Term Contract) 1. POLICY STATEMENT The University s ability to attract and retain the highest calibre of staff is fundamental

More information

How Can Community Transport Systems be Improved?

How Can Community Transport Systems be Improved? How Can Community Transport Systems be Improved? HITRANS Response to the Scottish Parliament Community Transport Inquiry Introduction The Highlands and Islands Transport Partnership (HITRANS) welcome the

More information

JOB DESCRIPTION. European Regional Development Fund and Cornwall Council

JOB DESCRIPTION. European Regional Development Fund and Cornwall Council JOB DESCRIPTION SECTION: JOB TITLE: RESPONSIBLE TO: FUNDED BY: SUPERVISORY RESPONSIBILITY: Development Centre Manager - ESAM Head of Development European Regional Development Fund and Cornwall Council

More information

EST AQ Consultation Response Oct 2015

EST AQ Consultation Response Oct 2015 EST AQ Consultation Response Oct 2015 Question 1: Do you consider that the proposed plan set out in the overview document strikes the right balance between national and local roles? Due to the inherently

More information

This paper outlines the proposed community relations strategy to be used by the nominated undertaker during construction of Phase One of HS2.

This paper outlines the proposed community relations strategy to be used by the nominated undertaker during construction of Phase One of HS2. HIGH SPEED TWO INFORMATION PAPER G2: COMMUNITY RELATIONS This paper outlines the proposed community relations strategy to be used by the nominated undertaker during construction of Phase One of HS2. It

More information

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support for candidates 6 Links to National Standards / NOS

More information

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support for candidates 6 Links to National Standards / NOS

More information

Fishermans Bend Integrated Transport Plan Peer Review John Kiriakidis, GTA Consultants 28/03/2018

Fishermans Bend Integrated Transport Plan Peer Review John Kiriakidis, GTA Consultants 28/03/2018 Fishermans Bend Integrated Transport Plan Peer Review John Kiriakidis, GTA Consultants 28/03/2018 GTA creating transport that works 01 Preliminaries GTA creating transport that works Review scope : Review

More information

Flexible Working Policy & Procedure Schools

Flexible Working Policy & Procedure Schools Flexible Working Policy & Procedure Schools Risedale Sports and Community College This policy was last reviewed on July 2018 This policy is scheduled for review on September 2020 Section Contents Page

More information

Level 7 NVQ Diploma in Construction Site Management. Qualification Specification

Level 7 NVQ Diploma in Construction Site Management. Qualification Specification Level 7 NVQ Diploma in Construction Site Management Qualification Specification ProQual 2016 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support

More information

Innovative information systems for public transport

Innovative information systems for public transport O9 P o l i c y A d v i C E n ot e s Innovative information systems for public transport The CIVITAS Initiative is a European action that supports cities in the implementation of an integrated sustainable,

More information

A428 / Western Corridor brief. Background

A428 / Western Corridor brief. Background A428 / Western Corridor brief Background The Transport Strategy that has been developed to support the current Local Plan review outlines major investment in public transport as a pre-requisite to support

More information

METRO VANCOUVER MOBILITY PRICING INDEPENDENT COMMISSION FINAL TERMS OF REFERENCE. Revised - June 30, 2017

METRO VANCOUVER MOBILITY PRICING INDEPENDENT COMMISSION FINAL TERMS OF REFERENCE. Revised - June 30, 2017 METRO VANCOUVER MOBILITY PRICING INDEPENDENT COMMISSION FINAL TERMS OF REFERENCE Revised - June 30, 2017 Contents 1. POLICY CONTEXT... 3 2. PROBLEM... 3 3. MANDATE... 4 4. SUPPORTING REGIONAL OBJECTIVES

More information

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey Maintain transportation system in state of good repair 1. Increase focus on maintenance of existing infrastructure in poor

More information

Local Authority Borough: Caerphilly County Borough Council. Contact: Huw Morgan

Local Authority Borough: Caerphilly County Borough Council. Contact: Huw Morgan Case Study Theme: Our Environment Local Authority Borough: Caerphilly County Borough Council Good Practice: Blackwood Transport Interchange Contact: Huw Morgan - 01495 235089 - morganash@caerphilly.gov.uk

More information

The Association of Directors of Public Health Improving air quality: reducing nitrogen dioxide in our towns and cities

The Association of Directors of Public Health Improving air quality: reducing nitrogen dioxide in our towns and cities The Association of Directors of Public Health Improving air quality: reducing nitrogen dioxide in our towns and cities The Association of Directors of Public Health (ADPH) is the representative body for

More information

Land at Penny Pot Lane, Killinghall

Land at Penny Pot Lane, Killinghall NORTH YORKSHIRE COUNTY COUNCIL BUSINESS and ENVIRONMENTAL SERVICES LOCAL HIGHWAY AUTHORITY Proposed Development: Location: Applicant: Outline Application for erection of 600 dwellings, primary school,

More information

Bus Information Strategy

Bus Information Strategy Bus Information Strategy 2012-2017 www.wyltp.com INDEX Page 1 Vision 3 2 Background 3 3 Context 4 4 Meeting current and future expectations 5 5 Consultation feedback 6 6 Strategic approach to information

More information

City of London - Freight and Servicing Supplementary Planning Document - Consultation Draft

City of London - Freight and Servicing Supplementary Planning Document - Consultation Draft City of London - Freight and Servicing Supplementary Planning Document - A submission by: University of Southampton, University of Westminster, University of Lancaster and University College London The

More information

DEFRA consultation on the Implementation of Clean Air Zones in England ~ Response from Campaign for Better Transport

DEFRA consultation on the Implementation of Clean Air Zones in England ~ Response from Campaign for Better Transport DEFRA consultation on the Implementation of Clean Air Zones in England ~ Response from Campaign for Better Transport This paper records the response tabled online through the DEFRA consultation hub, in

More information

EXHIBIT LIST No Exhibit Name Page 1 P5 Traffic Presentation.pdf (P5) 2-20

EXHIBIT LIST No Exhibit Name Page 1 P5 Traffic Presentation.pdf (P5) 2-20 Reference No: HOC/10001 Petitioner: Phase 2a Teach-ins Published to Collaboration Area: Friday 23-Mar-2018 EXHIBIT LIST Page 1 of 20 No Exhibit Name Page 1 P5 Traffic Presentation.pdf (P5) 2-20 HOC/10001/0001

More information

Surrey Pay for Support Staff in Schools

Surrey Pay for Support Staff in Schools Surrey Pay for Support Staff in Schools GUIDANCE Contents Click a heading below to skip to specific section 1. Application of Surrey Pay to Support Staff in Schools... 2 2. Surrey Pay Grading Structure...

More information

JOB SHARE POLICY AND PROCEDURES JANUARY This policy supersedes all previous policies for Job Share Policy and Procedures

JOB SHARE POLICY AND PROCEDURES JANUARY This policy supersedes all previous policies for Job Share Policy and Procedures JOB SHARE POLICY AND PROCEDURES JANUARY 2016 This policy supersedes all previous policies for Job Share Policy and Procedures JOB SHARE POLICY_HR24_JANUARY 2016 Policy title Job Share Policy and Procedures

More information

Consultation on Integrated Transport Block Funding FINAL. March Consultation Response. pteg Support Unit

Consultation on Integrated Transport Block Funding FINAL. March Consultation Response. pteg Support Unit Consultation Response Consultation on Integrated Transport Block Funding FINAL Pedro Abrantes pteg Support Unit Wellington House 40-50 Wellington Street Leeds LS1 2DE 0113 251 7445 info@pteg.net 1. pteg

More information

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES The City Engineer, under the authority of the Public Works Director and recommendations from the Traffic Engineer, will make the final decision on the need for a traffic study. The purpose of the traffic

More information

Getting around in Essex A bus and passenger transport strategy summary

Getting around in Essex A bus and passenger transport strategy summary Getting around in Essex A bus and passenger transport strategy summary Working in partnership with 2 Contents Introduction 5 Section One Buses are important to Essex 6 Buses make life better for people

More information

Transportation Master Plan Introduction

Transportation Master Plan Introduction 1. Introduction Building a Liveable Ottawa 2031 has set out a process to guide the completion of a fiveyear update of the City s Official Plan, Transportation Master Plan, Infrastructure Master Plan, Cycling

More information

Project Appraisal Using PRISM Simon Hubbard 28 th September 2004

Project Appraisal Using PRISM Simon Hubbard 28 th September 2004 Project Appraisal Using PRISM Simon Hubbard 28 th September 2004 Introduction : Overview of Presentation - Option Appraisal Policy Context - Potential PRISM Applications - Use of the Model / Scale of the

More information

POLICY ON TRADE UNION RECOGNITION AND FACILITIES AND TIME OFF FOR TRADE UNION REPRESENTATIVES

POLICY ON TRADE UNION RECOGNITION AND FACILITIES AND TIME OFF FOR TRADE UNION REPRESENTATIVES POLICY ON TRADE UNION RECOGNITION AND FACILITIES AND TIME OFF FOR TRADE UNION REPRESENTATIVES Policy reference LWHR12 SUMMARY AUTHOR VERSION Formal agreement for the recognition of trade unions and arrangement

More information

PRINCIPAL ACCOUNTABILITIES

PRINCIPAL ACCOUNTABILITIES 1. JOB TITLE Job Title: Highway Maintenance Engineer Reports to: Principal Highway Maintenance Engineer Service: Local Highway Services Group Highways & Transport Date: March 2015 2. JOB PURPOSE To undertake

More information

Interim Operating Model

Interim Operating Model Interim Operating Model Table of Contents 1 What is Learn Sheffield?... 0 1.1 Vision... 1 1.2 Aims & Objectives... 2 2 Company Structure... 3 2.1 Interim Leadership & Workforce... 3 2.2 Organisational

More information

Community-led Housing Toolkit 4. How to deliver your project

Community-led Housing Toolkit 4. How to deliver your project Community-led Housing Toolkit 4 How to deliver your project Table Of Contents Table Of Contents... 2 Introduction: What and who is this guide for... 3 How should you use it?... 3 Step One: Professional

More information

Local Transport Powers

Local Transport Powers West of England Partnership Board 25 February 2010 Agenda item 6 Local Transport Powers Purpose 1. To consider the outcome of a review of the opportunities for increased transport powers and investment

More information

Local Transport Plan 4

Local Transport Plan 4 Central Bedfordshire Council Executive 5 April 2016 Local Transport Plan 4 Report of Cllr Nigel Young, Executive Member for Regeneration (nigel.young@centralbedfordshire.gov.uk) Advising Officers: Marcel

More information