1 AC7116/3 REV. A 161Thorn Hill Road Warrendale, PA AUDIT CRITERIA Issued Revised Superseding AC7116/3 Nadcap AUDIT CRITERIA FOR ELECTRICAL DISCHARGE MACHINING (EDM) 1. SCOPE This checklist is to be used as a supplement to PRI AC7116 for suppliers seeking accreditation for electrical discharge machining (EDM). Audits should not be performed in operations where EDM is used as a preliminary machining operation and subsequent methods are used to remove all traces of the EDM operation. Audits shall not be performed on process set-up instructions when they are part of the workstation instructions. 2. GENERAL INFORMATION Questions noted with (Info) are asked for information purposes only. For (Info) questions, answers do not require the issuance of an NCR or an explanation. N/A (Not Applicable) answers to questions will be permitted only to the extent defined in the Auditor Handbook. Auditor Scope The scope of this audit includes AC7116 and the following processes audited: Electrical Discharge Machining Wire EDM Sinker EDM Using Oil Dielectric Fluid Sinker EDM Using Water Based Dielectric Fluid Fast Hole EDM PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising therefrom, is the sole responsibility of the user." PRI invites your written comments and suggestions. Copyright 2009 Performance Review Institute. All rights reserved. t-frm-15 7-Jan-09
2 PRI AC7116/3 Revision A EQUIPMENT 3.1 Verification of EDM Power Supplies a) Does the supplier have a plan to annually verify the operation of each EDM power supply or calibrate meters and gages on the power supply? b) Does the calibration program cover conductivity measuring devices for water based dielectric systems? c) Does the supplier have a procedure for identifying and labeling all reference gages? d) Does the supplier s calibration plan cover external capacitors for manual or computer controlled supplies? N/A N/A N/A 3.2 Maintenance Does the supplier have an EDM machine preventative maintenance program that includes the following: a) EDM dielectric system? b) EDM machine? c) EDM power supply? Has the preventative maintenance program been completed as per schedule, and are records available to verify completion? 3.3 Do all EDM dielectric fluid and electrode material meet customer requirements? 4. WORK INSTRUCTION REQUIREMENTS 4.1 EDM Equipment a) Do the workstation instructions list the power supply model? 4.2 Fixtures and Support Material Fixtures a) Are the fixtures listed by identification number(s), code(s), or by a description when no tool number is available? Fixture Acceptance a) If fixture control is used for acceptance of parts, does the supplier have a program to periodically check the fixturing? N/A Electrodes a) For sinker EDM, are electrodes listed by a drawing and revision number, or unique configuration and material? b) For wire EDM, is the specific wire catalog number or type (base material and coating type if applicable), and size listed? N/A N/A
3 PRI AC7116/3 Revision A Electrode Dressing a) Is equipment and the process used for electrode dressing listed when electrode dressing is performed as part of the EDM operation? N/A 4.4 Machining Operations per Electrode a) Are the number or EDM machining operations per electrode or the allowable electrode wear specified in the workstation N/A 4.5 Work Instruction Approval a) Are work instructions approved in accordance with supplier requirements? b) Are work instructions approved in accordance with customer requirements? N/A 4.6 EDM Power Supply Parameter Requirements Manual EDM Machines a) Do the workstation instructions list a setting or range for every control or gage on the EDM machine power supply? b) On EDM power supplies where multiple leads can be used, do the workstation instructions list the number of power supply leads connected to the fixtures? c) Do the workstation instructions list the electrode polarity or describe how the EDM machine power supply should be connected? N/A N/A Computer Controlled EDM Machines a) Do the workstation instructions list the machine part program name or number with revision level? b) Do the workstation instructions list a setting or range for every control or gage on the EDM power supply not controlled by the machine part program? N/A N/A 4.7 EDM General Requirements Do the workstation instructions describe: a) Dielectric flushing method? b) Part loading and verification method? 3 Electrode loading and verification method? d) Dielectric fluid electrical conductivity limits? N/A e) Dielectric fluid used including any additives added to water or oil dielectric fluids N/A together with the amount or concentration used? f) Number or range of parts produced simultaneously, if greater than one part? N/A g) Settings for any external capacitors or capacitor boxes? N/A
4 PRI AC7116/3 Revision A QUALITY PLANS 5.1 Procedure Does the quality plan cover the following items: a) EDM generated dimensions to be checked? b) Method of control for each dimension or characteristic? (i.e., fixture, gages and/or inspection instruments, electrode, machine program) c) Frequency of inspection? d) Examination of part electrical points, and the EDM machined are for arcing? 5.2 Quality Approval Plan a) Has the quality plan, including sampling, been approved in accordance with customer requirements? 6. METALLOGRAPHIC EVALUATION 6.1 Does the supplier s quality plan require that initial metallographic testing is performed to verify compliance to applicable drawing notes and/or related specifications? 6.2 Does the supplier have a plan to perform periodic metallographic tests as per customer requirements? 6.3 Does the supplier s plan to perform initial and periodic metallographic tests require that the same parameters used in workstation instructions be used to produce metallographic samples? 6.4 Does the supplier s quality plan define acceptable samples used for the metallographic testing? 6.5 Does the supplier s quality plan require that customer approved laboratories are used to perform metallographic testing? N/A N/A N/A N/A N/A 6.6 Is metallographic testing on processed parts conducted by an approved source? N/A In-house check the one sub-question that applies Nadcap accredited to AC7101/4 or AC7109/5 Record: Certification # Issue Date Expiration Date Initially approved by Nadcap subscribing customer. Record: Customer Name Approval Date
5 PRI AC7116/3 Revision A Outside source check the one sub-question that applies Record: Subcontract metallographic facility (name and address) Nadcap accredited to AC7101/4 or AC7109/5 Record: Certification # Issue Date Expiration Date Initially approved by Nadcap subscribing customer. Record: Customer Name Approval Date 7. TRAINING 7.1 Does the supplier have an EDM operator training program?
6 PRI AC7116/3 Revision A JOB AUDIT #1 Process Method: 8.1 Customer Requirements Complete the following and then check the supplier s information (i.e., technique sheets, travelers) against the purchasing requirements. a) Job Identity/Number: b) Operation Number: c) Drawing Number and Revision: d) Part Description: e) Does the supplier have a drawing that matches the drawing number and revision listed on the purchase order? f) Customer: g) Purchase Order/Revision Level: h) Specification (where applicable): i) Does the part serial number match the serial number on the shop traveler/router? N/A j) Were all job operations performed in the proper sequence, and signed off or stamped verifying completion? 8.2 Operator Qualification a) Has the EDM operator(s) received required training and has training been documented? 8.3 EDM Equipment a) Are all EDM power supply controls that the operator has access to operational/functional? b) Has the EDM machine, dielectric system, and power supply been maintained per the supplier s preventative maintenance plan? c) Have all meters and gages been calibrated, on EDM machines according to the N/A supplier s calibration plan? d) Are conductivity measuring devices for water based dielectric calibrated? N/A e) Are gages that are used for reference only labeled accordingly? N/A f) Has the EDM power supply operation been verified or all power supply meters and gages calibrated per supplier s plan? g) Is the EDM dielectric fluid listed in the workstation instructions, or general EDM instructions, the same fluid used in the EDM machine? h) Is the electrical conductivity of the EDM water dielectric fluid within limits in the N/A workstation instructions or in a supplier controlling document? i) Are any external capacitors or capacitor boxes calibrated and do they have a calibration sticker attached? N/A
7 PRI AC7116/3 Revision A Workstation Instructions a) Are workstation instructions available at the workstation? b) Is the EDM operation being performed on the same type of EDM power supply listed in the workstation c) Are the fixture identification number(s), code(s) or description listed in the workstation instructions the same as that used in the EDM machine? d) Are tools, gages and fixtures that the operator is using listed in the workstation e) For sinker EDM, is the electrode(s) listed in the workstation instructions the same N/A as those used at the EDM machine? f) For wire EDM, is the specific wire type and size listed in the workstation N/A instructions the same as that used at the EDM machine? g) If electrode dressing is done as part of the EDM operation, is the electrode dressing equipment listed in the workstation instructions the same as the equipment used at the EDM workstation? N/A h) Is the operator following the workstation instructions listing the number of cuts per electrode or allowable electrode wear before re-dress or electrode replacement? i) Are all of the controls on the EDM power supply set within limits listed in the workstation instructions or within the part program (including revision level) referenced in the workstation N/A j) Is the EDM machine set to the correct polarity as detailed in the workstation k) Are external capacitors or capacitor boxes set within limits listed in the workstation N/A l) When multiple leads are used are they connected per the workstation N/A m) Is the dielectric flushing method on the machine the same as it is described in the workstation n) Is the operator following the part loading and verification method described in the workstation o) Is the operator following the electrode loading and verification method described in the workstation p) Is the EDM operator machining the correct number or range of parts simultaneously as described in the workstation q) Does the part program name or number on the work instructions match the current program and revision level used? r) Have the EDM workstation instructions been approved according to the supplier s internal procedure? s) Have the EDM workstation instructions been approved by the customer? N/A t) Is the operator following the workstation u) If fixture control is used for part acceptance, has the fixture been calibrated? N/A 8.5 Part Cleaning Do pre and post cleaning methods used conform to the customer requirements? N/A
8 PRI AC7116/3 Revision A Part Inspection a) Are the gage(s) and/or measuring devices used within calibration time limits? b) Are all of the measurements described in the workstation instructions being performed at the required frequency? c) Is the supplier visually inspecting all parts for EDM arcing that includes examination of part electrical contact points, and the EDM machined area? d) Are the gages and/or inspection instruments used to inspect parts the same as those listed in the workstation
9 PRI AC7116/3 Revision A JOB AUDIT #2 N/A Process Method: 9.1 Customer Requirements Complete the following and then check the supplier s information (i.e., technique sheets, travelers) against the purchasing requirements. a) Job Identity/Number: b) Operation Number: c) Drawing Number and Revision: d) Part Description: e) Does the supplier have a drawing that matches the drawing number and revision listed on the purchase order? f) Customer: g) Purchase Order/Revision Level: h) Specification (where applicable): i) Does the part serial number match the serial number on the shop traveler/router? N/A j) Were all job operations performed in the proper sequence, and signed off or stamped verifying completion? 9.2 Operator Qualification a) Has the EDM operator(s) received required training and has training been documented? 9.3 EDM Equipment a) Are all EDM power supply controls that the operator has access to operational/functional? b) Has the EDM machine, dielectric system, and power supply been maintained per the supplier s preventative maintenance plan? c) Have all meters and gages been calibrated, on EDM machines according to the supplier s calibration plan? N/A d) Are conductivity measuring devices for water based dielectric calibrated? N/A e) Are gages that are used for reference only labeled accordingly? N/A f) Has the EDM power supply operation been verified or all power supply meters and gages calibrated per supplier s plan? g) Is the EDM dielectric fluid listed in the workstation instructions, or general EDM instructions, the same fluid used in the EDM machine? h) Is the electrical conductivity of the EDM water dielectric fluid within limits in the workstation instructions or in a supplier controlling document? i) Are any external capacitors or capacitor boxes calibrated and do they have a calibration sticker attached? N/A N/A
10 PRI AC7116/3 Revision A Workstation Instructions a) Are workstation instructions available at the workstation? b) Is the EDM operation being performed on the same type of EDM power supply listed in the workstation c) Are the fixture identification number(s), code(s) or description listed in the workstation instructions the same as that used in the EDM machine? d) Are tools, gages and fixtures that the operator is using listed in the workstation e) For sinker EDM, is the electrode(s) listed in the workstation instructions the same N/A as those used at the EDM machine? f) For wire EDM, is the specific wire type and size listed in the workstation N/A instructions the same as that used at the EDM machine? g) If electrode dressing is done as part of the EDM operation, is the electrode dressing equipment listed in the workstation instructions the same as the equipment used at the EDM workstation? N/A h) Is the operator following the workstation instructions listing the number of cuts per electrode or allowable electrode wear before re-dress or electrode replacement? i) Are all of the controls on the EDM power supply set within limits listed in the workstation instructions or within the part program (including revision level) referenced in the workstation N/A j) Is the EDM machine set to the correct polarity as detailed in the workstation k) Are external capacitors or capacitor boxes set within limits listed in the workstation N/A l) When multiple leads are used are they connected per the workstation N/A m) Is the dielectric flushing method on the machine the same as it is described in the workstation n) Is the operator following the part loading and verification method described in the workstation o) Is the operator following the electrode loading and verification method described in the workstation p) Is the EDM operator machining the correct number or range of parts simultaneously as described in the workstation q) Does the part program name or number on the work instructions match the current program and revision level used? r) Have the EDM workstation instructions been approved according to the supplier s internal procedure? s) Have the EDM workstation instructions been approved by the customer? N/A t) Is the operator following the workstation u) If fixture control is used for part acceptance, has the fixture been calibrated? N/A 9.5 Part Cleaning Do pre and post cleaning methods used conform to the customer requirements? N/A
11 PRI AC7116/3 Revision A Part Inspection a) Are the gage(s) and/or measuring devices used within calibration time limits? b) Are all of the measurements described in the workstation instructions being performed at the required frequency? c) Is the supplier visually inspecting all parts for EDM arcing that includes examination of part electrical contact points, and the EDM machined area? d) Are the gages and/or inspection instruments used to inspect parts the same as those listed in the workstation
12 PRI AC7116/3 Revision A JOB AUDIT #3 N/A Process Method: 10.1 Customer Requirements Complete the following and then check the supplier s information (i.e., technique sheets, travelers) against the purchasing requirements. a) Job Identity/Number: b) Operation Number: c) Drawing Number and Revision: d) Part Description: e) Does the supplier have a drawing that matches the drawing number and revision listed on the purchase order? f) Customer: g) Purchase Order/Revision Level: h) Specification (where applicable): i) Does the part serial number match the serial number on the shop traveler/router? N/A j) Were all job operations performed in the proper sequence, and signed off or stamped verifying completion? 10.2 Operator Qualification a) Has the EDM operator(s) received required training and has training been documented? 10.3 EDM Equipment a) Are all EDM power supply controls that the operator has access to operational/functional? b) Has the EDM machine, dielectric system, and power supply been maintained per the supplier s preventative maintenance plan? c) Have all meters and gages been calibrated, on EDM machines according to the N/A supplier s calibration plan? d) Are conductivity measuring devices for water based dielectric calibrated? N/A e) Are gages that are used for reference only labeled accordingly? N/A f) Has the EDM power supply operation been verified or all power supply meters and gages calibrated per supplier s plan? g) Is the EDM dielectric fluid listed in the workstation instructions, or general EDM instructions, the same fluid used in the EDM machine? h) Is the electrical conductivity of the EDM water dielectric fluid within limits in the N/A workstation instructions or in a supplier controlling document? i) Are any external capacitors or capacitor boxes calibrated and do they have a calibration sticker attached? N/A
13 PRI AC7116/3 Revision A Workstation Instructions a) Are workstation instructions available at the workstation? b) Is the EDM operation being performed on the same type of EDM power supply listed in the workstation c) Are the fixture identification number(s), code(s) or description listed in the workstation instructions the same as that used in the EDM machine? d) Are tools, gages and fixtures that the operator is using listed in the workstation e) For sinker EDM, is the electrode(s) listed in the workstation instructions the same N/A as those used at the EDM machine? f) For wire EDM, is the specific wire type and size listed in the workstation N/A instructions the same as that used at the EDM machine? g) If electrode dressing is done as part of the EDM operation, is the electrode dressing equipment listed in the workstation instructions the same as the equipment used at the EDM workstation? N/A h) Is the operator following the workstation instructions listing the number of cuts per electrode or allowable electrode wear before re-dress or electrode replacement? i) Are all of the controls on the EDM power supply set within limits listed in the workstation instructions or within the part program (including revision level) referenced in the workstation N/A j) Is the EDM machine set to the correct polarity as detailed in the workstation k) Are external capacitors or capacitor boxes set within limits listed in the workstation N/A l) When multiple leads are used are they connected per the workstation N/A m) Is the dielectric flushing method on the machine the same as it is described in the workstation n) Is the operator following the part loading and verification method described in the workstation o) Is the operator following the electrode loading and verification method described in the workstation p) Is the EDM operator machining the correct number or range of parts simultaneously as described in the workstation q) Does the part program name or number on the work instructions match the current program and revision level used? r) Have the EDM workstation instructions been approved according to the supplier s internal procedure? s) Have the EDM workstation instructions been approved by the customer? N/A t) Is the operator following the workstation u) If fixture control is used for part acceptance, has the fixture been calibrated? N/A 10.5 Part Cleaning Do pre and post cleaning methods used conform to the customer requirements? N/A
14 PRI AC7116/3 Revision A Part Inspection a) Are the gage(s) and/or measuring devices used within calibration time limits? b) Are all of the measurements described in the workstation instructions being performed at the required frequency? c) Is the supplier visually inspecting all parts for EDM arcing that includes examination of part electrical contact points, and the EDM machined area? d) Are the gages and/or inspection instruments used to inspect parts the same as those listed in the workstation
SCOPE OF ACCREDITATION. NonDestructive Testing. Veridiam Inc Cuyamaca St El Cajon, CA 92020
SCOPE OF ACCREDITATION NonDestructive Testing Veridiam Inc. 1717 Cuyamaca St El Cajon, CA 92020 This certificate expiration is updated based on periodic audits. The current expiration date and scope of
More informationServicios De Control e Inspeccion S.A. NonDestructive Testing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: Servicios De Control e Inspeccion S.A. Ctra. Ajalvir-Torrejon Km.1.8 Ajalvir Madrid, 28864 Spain This certificate
More informationAllegheny Ludlum, LLC d/b/a ATI Flat Rolled Products. Heat Treating
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 100 River Road Brackenridge, PA 15014 United States This certificate demonstrates conformance and recognition
More informationSenior Aerospace SSP. Chemical Processing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 2980 N. San Fernando Blvd United States This certificate demonstrates conformance and recognition of accreditation
More informationAluminum Precision Products Inc. Heat Treating
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 3333 W Warner Ave Santa Ana, CA 92704-5316 United States This certificate demonstrates conformance and recognition
More informationAluminum Precision Products Inc. Heat Treating
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 2621 S Susan St Santa Ana, CA 92704-5898 United States This certificate demonstrates conformance and recognition
More informationSenior Aerospace SSP. Chemical Processing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 2980 N. San Fernando Blvd United States This certificate demonstrates conformance and recognition of accreditation
More informationATI Flat Rolled Products Holdings LLC. Heat Treating
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 100 River Road Brackenridge, PA 15014 United States This certificate demonstrates conformance and recognition
More informationAluminum Precision Products Inc. Heat Treating
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 528 E. Alton St Santa Ana, CA 92707 United States This certificate demonstrates conformance and recognition
More informationATI Flat Rolled Products Holdings LLC. Heat Treating
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 100 River Road Brackenridge, PA 15014 United States This certificate demonstrates conformance and recognition
More informationIBERIA LINEAS AEREAS DE ESPAÑA SOCIEDAD ANONIMA OPERADORA Dirección Técnica. NonDestructive Testing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: IBERIA LINEAS AEREAS DE ESPAÑA SOCIEDAD ANONIMA OPERADORA Dirección Técnica A/ Sede central, Aeropuerto de
More informationAlloyweld Inspection Co. Inc. Aerospace Quality System (AC7004)
This certificate is granted and awarded by the authority of the Nadcap Management Council to: Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates
More informationAEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE
AEROSPACE STANDARD AS9003 Issued 2001-10 Revised 2012-07 REV. A Superseding AS9003 (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE This standard
More informationATI Flat Rolled Products Holdings LLC. Heat Treating
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 100 River Road Brackenridge, PA 15014 United States This certificate demonstrates conformance and recognition
More informationServicios De Control e Inspeccion S.A. NonDestructive Testing
In accordance with SAE Aerospace Standard AS7003, to the revision in effect at the time of the audit,this certificate is granted and awarded by the authority of the Nadcap Management Council to: Servicios
More informationCertified Steel Treating Corp. Aerospace Quality System (AC7004)
In accordance with SAE Aerospace Standard AS7003, to the revision in effect at the time of the audit, this certificate is granted and awarded by the authority of the Nadcap Management Council to: United
More informationAlloyweld Inspection Co Inc. Aerospace Quality System (AC7004)
This certificate is granted and awarded by the authority of the Nadcap Management Council to: Alloyweld Inspection Co Inc 840 CHURCH ROAD Elgin, IL 60106 United States This certificate demonstrates conformance
More informationSupplier Self Survey
Supplier Self Survey This report is intended to gather data relative to the capabilities of the Supplier's Quality Management System. Please complete the report in its entirety. When supplemental documents
More informationATI Flat Rolled Products Holdings LLC. Heat Treating
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 100 River Road Brackenridge, PA 15014 United States This certificate demonstrates conformance and recognition
More informationQuality Control Manual Revision 5 1/21/2011
216 Colgate Avenue, Buffalo, NY 14220 PH: (716) 824-4359 Fax: (716) 824-0903 www.castironrepair.com www.portablemachining.com Quality Control Manual Revision 5 1/21/2011 Approved by: Matthew Gehman, President
More informationAlloyweld Inspection Co. Inc. Aerospace Quality System (AC7004)
This certificate is granted and awarded by the authority of the Nadcap Management Council to: Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates
More informationManufacturing Supplier Requirements Manual
Page: 1 of 15 TABLE OF CONTENTS SECTION TITLE PAGE... Table of Contents... 2... Log of Revisions... 3... List of Effective Pages... 3 1.0...Cost of Poor Quality... 4 2.0... Process Control... 4 3.0...
More informationThe purpose of this procedure is to define internal audit activities of PRI s administration of the Industry Managed Accreditation Programs.
INTERNAL AUDIT Page 1 of 5 1.0 PURPOSE 2.0 SCOPE The purpose of this procedure is to define internal audit activities of PRI s administration of the Industry Managed Accreditation Programs. This procedure
More informationProgram Document WLDBOK
161Thorn Hill Road Warrendale, PA 15086-7527 Program Document WLDBOK BODY OF KNOWLEDGE: PD 6103 WLDBoK-001/PL-2 REV. N/A Issued: 18 April 2016 Revised: NA Superseding: NA ROLE DESCRIPTION: RESISTANCE SPOT
More informationVac Aero International. Heat Treating
In accordance with SAE Aerospace Standard AS7003, to the revision in effect at the time of the audit,this certificate is granted and awarded by the authority of the Nadcap Management Council to: Vac Aero
More informationAERO GEAR, INC. SUPPLIER QUALITY MANUAL
AERO GEAR, INC. SUPPLIER QUALITY MANUAL REVISION HISTORY REVISION EFFECTIVE DATE SUMMARY OF CHANGES A 30-JAN-1998 Original Issue B 17-OCT-2002 Added note re: subcontractors may not subcontract to another
More informationReplaces: Not applicable.
Page 1/12 SCOPE - defines the quality requirements for purchasing materials, parts and services that may affect product quality of Airborne items. does not include requirements for design and development
More informationThis is to certify that All Metals Processing of Orange County, LLC 8401 Standustrial Street Stanton, CA USA
This is to certify that 8401 Standustrial Street Stanton, CA 90680 USA is registered as a Single Site quality management system in conformance with ISO 9001:2008 and AS9100C The audit was conducted in
More informationPlan QAQ Supplier Quality Requirements (Rev 15)
1.0 Purpose To define Insitu s Supplier Quality Requirements for items procured from suppliers by Insitu for use in the manufacture and repair of products. 2.0 Scope This document applies to suppliers
More informationAEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,
More informationHar-Conn Chrome Co. Chemical Processing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: Har-Conn Chrome Co 603 New Park Ave 06110 United States This certificate demonstrates conformance and recognition
More informationExternal Provider Quality Requirements QCS-001 Processing Sources
Page 1 of 11 The latest issue to this document is the version that is available on the Lockheed Martin Logistics Services Supplier Quality Management website: http://www.lockheedmartin.com/us/suppliers/bu-info/aeronautics/sustainment-services.html
More informationMagnetic Inspection Laboratory Inc. Chemical Processing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: Magnetic Inspection Laboratory Inc. 1401 Greenleaf Avenue Elk Grove Village, IL 60007-5522 United States This
More informationOrbel Corporation AS9100D Supplier Flow Down Requirements
The Supplier requirements below apply to all Suppliers and sub-tier Suppliers to Orbel Corporation providing raw materials, manufactured components and products as well as performing material processing
More informationSUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality
SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: Gear Technology 10671 Civic Center Drive Rancho Cucamonga, CA 91730 GENERAL INFORMATION Attn: Manager of Quality
More informationQuality Manual. Specification No.: Q Revision 07 Page 1 of 14
Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual
More informationTo establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.
1.0 PURPOSE To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC. 2.0 APPLICATION When (QAM) Appendix 8.4 is specified on the purchase order,
More informationNadcap Supplier Symposium. The Bodycote Experience. UK Perspective Gareth Armstrong Quality Manager UK Bodycote Heat Treatments Limited
Nadcap Supplier Symposium The National Motorcycle Museum in Solihull on 25 th September 2013 The Bodycote Experience UK Perspective Gareth Armstrong Quality Manager UK Bodycote Heat Treatments Limited
More informationDocument Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements
Document 0000000000000045 Rev: State: RELEASED see Smarteam for approval authorities This document is applicable only to suppliers of Production Items as defined below and their sub-tier suppliers. Non-
More informationQP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE
Page 1 of 8 1.0 PURPOSE 1.1 The purpose of this manual is to have a single document which conveys the minimum quality requirements and manufacturing practices expected of suppliers for value added products
More informationSUPPLIER QUALITY SYSTEM SURVEY
SUPPLIER QUALITY SYSTEM SURVEY DATE (M/d/yy): 55 Dragon Court Woburn, MA 01801 Tel: (781) 933-7300 Fax: (781) 935-4529 GENERAL INFORMATION Supplier Name: Physical Address: City: State: Zip: Sr. Company
More informationQUALITY POLICIES HANDBOOK
QUALITY POLICIES HANDBOOK Origination Date: (mo/yr) Document Identifier: Date: Document Status: Document Link: Latest Revision Date Draft, Redline, Released, Obsolete Location on Server (if used) Abstract:
More informationCO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE
CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.018 Version 1 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group
More information1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert
1.0 Purpose This document defines PECO-Astronics (PECO) purchased material flow-down requirements. Additional specifications may also apply and will be documented on the purchase order; all requirements
More informationSupplier Quality Requirements
1 Surveillance and Auditing 1.1 The Supplier s Quality System is subject to initial and annual audits/surveys and acceptance by Texas Almet, its customers, and government regulatory agencies (e.g. The
More informationPlan QAQ Supplier Quality Requirements (Rev 17)
1.0 Purpose To define Insitu s Supplier Quality Requirements for items procured from suppliers by Insitu for use in the manufacture and repair of products. 2.0 Scope This document applies to all suppliers
More informationNadcap Asia Symposium October - November, 2011
Nadcap Asia Symposium 2011 October - November, 2011 1 Today s Presenter MARCEL CUPERMAN Senior Staff Engineer Heat Treating Agenda Nadcap Heat Treating (HT) Task Group Nadcap Audit Preparation The Nadcap
More informationTASK REQUIREMENTS. Supplier Quality Requirements
This document is applicable only to suppliers of Production Items as defined below and their subtier suppliers. Non-Production Item suppliers are not subject to this document. This document specifies the
More informationQuality System Standard Operating Procedure
Page: 1 of 10 Quality System Standard Operating Procedure 3-06-2977 TITLE Supplier Process Change Control Purchasing Product Family Leader Quality Assurance Stakeholder(s): Page: 2 of 10 TABLE OF CONTENTS
More informationSUPPLIER QUALITY SYSTEM SURVEY
SUPPLIER NAME DATE WEB ADDRESS ADDRESS CITY STATE ZIP PUBLICLY OR PRIVATELY HELD? TEL FAX CONTACT INFORMATION POSITION CONTACT NAME PHONE FAX E-MAIL PRESIDENT OPERATIONS MGR. QUALITY MGR. ENGINEERING MGR.
More informationI. Development, Submittal, and Acceptance of a Quality Management System
I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor
More informationDiamond Chrome Plating Inc. Chemical Processing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: Diamond Chrome Plating Inc 604 S. Michigan Ave Howell, MI 48844 United States This certificate demonstrates
More informationSUPPLIER QUALITY ASSURANCE REQUIREMENTS
FM-304 8/23/2018 RELEASED Page 1 of 4 1.0 SCOPE 1.1 When specified, this document defines the Quality System requirements to be met by suppliers in the performance of a purchase order issued by Computech
More informationSupplier Approval Questionnaire
1 Supplier Approval Questionnaire Quality Management Survey & DPD/MBD and CMS Assessment Reviewed by: Supplier Code: Assigned Commodity Code: Date: To be filled out by LMI SQE AS9100 Rev C YES NO Certified:
More informationPolicy on Measurement Traceability
Policy on Measurement Traceability Date of Issue: January 1, 2006 Voluntary EMC Laboratory Accreditation Center, Inc. (VLAC) This document is copyrighted under the Copyright Act. Unauthorized reproduction,
More informationTURBO MACH A DIVISION OF VT SAA
TERMS AND CONDITIONS PAGE: 1 OF 5 1. PURPOSE To define specific terms and conditions for the purchase of product, materials and services. 2. SCOPE All products, materials and services purchased for use
More informationVoluntary Industry Distributor Accreditation Program (AC 00-56)
U.S. Department of Transportation Federal Aviation Administration Voluntary Industry Distributor Accreditation Program (AC 00-56) FY 2004 Audit Report Prepared by Aircraft Certification Service & Flight
More informationQuality Honeycomb Supplier Quality Requirements
1 Surveillance and Auditing 1.1 The Supplier s Quality System is subject to initial and annual audits/surveys and acceptance by, its customers, and government regulatory agencies (e.g. The Department of
More informationWelding Performance Qualification Test Administrators GUIDE FOR APPLICANTS
TECHNICAL SAFETY BC Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS Date: October 12, 2017 Controlled Document: MAN-4018-02 MAN-4018-02 Page 1 of 27 Contents 1.0 Introduction...
More informationAUDIT CRITERIA. TO BE USED ON AUDITS AFTER OCTOBER 4, 2009 Nadcap AUDIT CRITERIA FOR CHEMICAL PROCESSING
161Thorn Hill Road Warrendale, PA 15086-7527 AUDIT CRITERIA AC 7108 REV. D Issued 1995-01 Revised 2009-6 Superseding AC7108 Rev C TO BE USED ON AUDITS AFTER OCTOBER 4, 2009 Nadcap AUDIT CRITERIA FOR CHEMICAL
More informationWelding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS
BRITISH COLUMBIA SAFETY AUTHORITY Welding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS Date: May 1, 2017 Controlled Document: MAN-4017-01 MAN-4017-01 (2017-05-01)
More informationBrinkman Precision, Inc. Supplier Quality Requirements. Document No. BPI 1000 Rev. C
Brinkman Precision, Inc. Supplier Quality Requirements Document No. BPI 1000 Rev. C This document establishes product assurance requirements for all products and services ordered under the Purchase Order
More information4-OF AS9102 FAIR Forms and Instructions (SC)
A FAIR package consists of the following required documents: a) Completed AS9102 Forms 1, 2, and 3; or equivalent, b) Material/process certs, c) Performance test results, and d) A design record or balloon
More informationWelding Performance Qualification Test Administrators GUIDE FOR APPLICANTS
BRITISH COLUMBIA SAFETY AUTHORITY Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS Date: April 25, 2017 Controlled Document: MAN-4018-01 MAN-4018-01 Page 1 of 27 Contents Contents...
More informationSupplier Quality System Survey
Supplier Division Address Date: Quality Contact: Reports to: Title: Title: Phone Fax e-mail Plant size (ft 2 ): Union: Contract expires: Total Employment: Direct Labor: Shifts: QA employees: This report
More informationI hope you continue to find the content valuable. Joseph G. Pinto Executive Vice President & Chief Operating Officer Performance Review Institute
NOVEMBER 2016 NADCAP NEWSLETTER WELCOME TO THE FIFTH ISSUE CONTENTS 1 Internal Auditing 5 Nadcap NMSE Audit Insight 11 Risk Mitigation Process Changes 12 eauditnet: Identifying your customer(s) 14 Nadcap
More informationCiDRA External Provider Quality Standards
Title: External Provider Quality Standards Page 1 of 5 CiDRA External Provider Quality Standards 1.0 Purpose: To outline minimum requirements for CiDRA External Provider Quality System. All external providers
More informationConformity Assessment. Section III Nuclear Requirements Buenos Aires, Argentina May 2017
Conformity Assessment Section III Nuclear Requirements Buenos Aires, Argentina May 2017 ASME Section III Requirements Workshop Scope ASME Certificates of Authorization Quality Assurance Requirements Discussion
More informationMedtronic XOMED. Top Level Procedure for General Inspection and Testing
Medtronic XOMED S.O.P. 360 Rev. AD Ref. 8.2.4 Page 1 of 7 1.0 PURPOSE: 1.1 The purpose of this procedure is to provide a system instructions, and responsibility assignments for performing and recording
More informationPressure Piping Construction Requirements QMS written description verification CHECKLIST AB-518b
QMS written description verification CHECKLIST AB-518b Company Name: Company Address: Title of the written description of the management system or manual(s): Person responsible for the overall management
More informationDesk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT
Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined
More informationLangham Creek Machine Works, Inc.
Langham Creek Machine Works, Inc. A Can Do Company Specializing in the Machining of Exotic Materials Quality Assurance Manual UNCONTROLLED COPY This manual is the property of Langham Creek Machine Works,
More informationSupplier Quality Requirements
Page 1 of 5 SQR-01 Quality Management Systems AS9100 Suppliers: The supplier will at a minimum maintain and implement a documented quality management system, available in the English language, which is
More informationTerms and Conditions Form OL-668 Rev l
1. The Purchase Order will specify all quantities and delivery date requirements and any other applicable documents necessary to fulfill the Purchase Order requirements 2. The current Manufacturing Sketch
More informationQUALITY SYSTEM MANUAL
TITLE: QUALITY SYSTEM MANUAL Page 1 of 15 QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 2 of 15 Index PARAGRAPH TITLE... PAGE 1.0 GENERAL INFORMATION... 3 2.0 DEFINITIONS... 5 3.0 RELATED DOCUMENTS...
More informationAEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS
AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS Page 1. GENERAL REQUIREMENTS 4 2. QUALITY SYSTEM 2.1 MIL-STD-45208A 5 2.2 MIL-Q-9858A 5 2.3 ISO 9001 5 2.4 ISO9002 5 2.5 NHB5300.4 (1B) 5 2.6
More informationEVANS CAPACITOR COMPANY
DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution
More information1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY
1050 Day Hill Road Windsor, Connecticut 06095-4728 Telephone (860) 688-0888 Fax (860) 285-8514 SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY POTENTIAL SUPPLIER INITIAL SURVEY ON-SITE EXISTING SUPPLIER
More informationUNCONTROLLED DOCUMENT
Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision
More informationContracts, Subcontracts, Purchasing and the Laboratory
Contracts, Subcontracts, Purchasing and the Laboratory ISO/IEC 17025 Standard www.aphl.org What does a laboratory need to do? Establish procedures for the review of: Requests Tenders Contracts ISO/IEC
More informationOverview of Draft API Standard 20M
Overview of Draft API Standard 20M Qualification of Suppliers of Machining Services for Use in the Petroleum and Natural Gas Industries API STANDARD 20M Slide 1 of 9 Overview Standard 20M provides methods
More informationCOMPLETED QUALITY SYSTEMS QUESTIONNAIRE
COMPLETED QUALITY SYSTEMS QUESTIONNAIRE Section I Introduction: SUPPLIER: Qualiseal Technology Phone (708) 887-6080 7319 West Wilson Ave. Fax (708) 887-8854 Harwood Heights, IL 60706 General Manager: Rob
More informationVendor Quality Control Audit Form Quality Assurance Survey
Vendor Quality Control Audit Form Quality Assurance Survey Vendor/Supplier Information Company Name: Street Address: Company Phone: Company Fax Number: City: State: Zip Code: Country: Contact Name (Quality
More informationRequirements for Suppliers
1.0 INTRODUCTION This document establishes requirements designed to ensure Park Engineering & Manufacturing Inc. (PEM) suppliers produce product that meets PEM s quality expectations and terms. Only suppliers
More informationDocument Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:
POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner A. SCOPE This document contains requirements for conducting business with Tri Star Metals, LLC and its customers. It is applicable to suppliers that provide
More informationRFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual
Skyworks RF Ceramics Supplier Quality Manual Page 1 of 8 RFC-SOP-0002 Rev. 1 1 Purpose and Scope 1.1 Purpose The purpose of this manual is to define the basic quality systems and business procedures required
More informationReference Paragraphs. Appendix B AQS Auditor Handbook
Introduction Auditing is a basic tool to assess effective implementation of and conformity to Quality Management System (QMS) requirements. In addition to the determination of conformity, this handbook
More informationPurchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015
Clause A - Quality System Requirements All references to the term Government in any of the documents referenced below shall be replaced with the term Curtiss-Wright and/or the Government. All references
More informationACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS
ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West
More informationCenterwide System Level Procedure
5.ARC.0004.1 1 of 17 REVISION HISTORY REV Description of Change Author Effective Date 0 Initial Release D. Tweten 7/17/98 1 Clarifications based on 7/98 DNV Audit and 6/98 Internal Audit (see DCR 98-028).
More informationBarry Avenue Plating Inc. Chemical Processing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: Barry Avenue Plating Inc 2210 Barry Ave 90064 United States This certificate demonstrates conformance and recognition
More informationSpecial Purchase Order Clauses
SC-1 Quality System: The Supplier shall have a quality management system that conforms to: a) SAE AS9100 Quality Management Systems Aerospace Requirements b) SAE AS9110 Quality Management Systems Aerospace
More informationNadcap A Regulator s View. Dr E H Blacklay 21 March 2017
Nadcap A Regulator s View Dr E H Blacklay 21 March 2017 1 Nadcap Define Nadcap Nadcap Function Nadcap Administration Programme / Process Regulatory Acceptance Regulator s Observations 2 Nadcap Is a worldwide
More informationWelding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS
TECHNICAL SAFETY BC Welding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS Date: October 12, 2017 Controlled Document: MAN-4017-02 MAN-4017-02 (2017-10-12) Page 1 of
More informationSupplier Quality Clauses
Page: 1 of 9 Supplier 425 Strempel St. Seguin, TX 78155 Page: 2 of 9 1.0 PURPOSE 1.1 The purpose of this this Quality Clause Document is to specify requirements by which Quality/Production activities shall
More informationAllegheny Ludlum, LLC d/b/a ATI Flat Rolled Products. Materials Testing
This certificate is granted and awarded by the authority of the Nadcap Management Council to: 100 River Road Brackenridge, PA 15014 United States This certificate demonstrates conformance and recognition
More informationTrident Precision Manufacturing
Trident Precision Manufacturing QASQC Rev. A 6/7/06 Title: Supplier Quality Clauses Author: April V. Lusk Director of Quality General Suppliers are responsible for compliance to all stated Quality Clauses
More informationACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS
ACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS [Not applicable to ASME Sec. IV, Cast Iron and Aluminum Boilers, ASME Sec. VIII Div 1, UG-90 (c) (2) and Graphite Vessels, ASME Sec. VIII, Div.
More informationQuality Assurance Procurement Clauses and Flow Down Requirements
Rev: U Page: 2 of 12 5.3 The Purchasing Department will insure all Purchase Orders include the following: 5.4 5.3.1 Vendor is on the Rogerson Kratos Approved Vendor List (AVL). Located on the server in
More information