Republic of Lithuania CONVENTION ON NUCLEAR SAFETY SEVENTH LITHUANIAN NATIONAL REPORT

Size: px
Start display at page:

Download "Republic of Lithuania CONVENTION ON NUCLEAR SAFETY SEVENTH LITHUANIAN NATIONAL REPORT"

Transcription

1 Republic of Lithuania CONVENTION ON NUCLEAR SAFETY SEVENTH LITHUANIAN NATIONAL REPORT Vilnius 2016

2 ISSN (ONLINE) of: State Nuclear Power Safety Inspectorate (VATESI) prepared this report with the contributions Ministry of Energy of the Republic of Lithuania Ministry of Environment of the Republic of Lithuania Ministry of Foreign Affairs of the Republic of Lithuania Lithuanian Geological Survey under the Ministry of Environment Environmental Protection Agency Radiation Protection Centre State Enterprise Ignalina Nuclear Power Plant Fire and Rescue Department under the Ministry of the Interior of the Republic of Lithuania UAB VAE SPB Lithuanian National Report is available in pdf format at the State Nuclear Power Safety Inspectorate website: All information and data used in the Lithuanian National Report are as of August 1st, 2016 unless explicitly specified otherwise. ISSN (ONLINE) Convention on Nuclear Safety Seventh Lithuanian National Report Publisher State Nuclear Power Safety Inspectorate (VATESI) A. Goštauto g. 12, LT Vilnius Lithuania VATESI 2016

3 Contents Introduction 6 Summary 8 A1. Implementation of the Vienna Declaration on Nuclear Safety 15 A2. Activities related to post-fukushima lessons learned 17 Article 6 Existing Nuclear Installations 23 Article 7 Legislative and Regulatory Framework 27 Article 7(1) The legislative and regulatory framework governing the safety of nuclear installations 27 Article 7(2)(i) National safety requirements and regulations 29 Article 7(2)(ii) System of licensing 33 Article 7(2)(iii) System of regulatory inspection and assessment 34 Article 7(2)(iv) Enforcement of applicable regulations and terms of licences 37 Article 8 Regulatory Body 38 Article 8(1) Establishment of the regulatory body 38 Article 8(2) Status of the regulatory body 44 Article 9 Responsibility of the Licence Holder 47 Article 10 Priority to Safety 50 Article 11 Financial and Human Resources 54 Article 11(1) Financial resources 54 Article 11(2) Human resources 57 Article 12 Human Factors 62 Article 13 Quality Assurance 65 Article 14 Assessment and Verification of Safety 69 Article 14(i) Assessment of safety 69 Article 14(ii) Verification of safety 74 Article 15 Radiation Protection 76 Article 16 Emergency Preparedness 85 Article 16(1) Emergency plans and programmes 85 Article 16(2) Information of the public and neighbouring states 96 Article 17 Siting 97 Article 17(i) Evaluation of site related factors 97 Article 17(ii) Impact of the installation on individuals, society and environment 103 Article 17(iii) Re-evaluation of site related factors 107 Article 17(iv) Consultation with other Contracting Parties likely to be affected by the installation 109 Article 18 Design and Construction 113 Article 18(i) Implementation of the "defence-in-depth" concept 113 Article 18(ii) Incorporation of proven technologies 115 Article 18(iii) Design for reliable, stable and easily manageable operation 116 Article 19 Operation 118 Article 19(i) Initial authorization 118 Article 19(ii) Operational limits and conditions 119 Article 19(iii) Procedures for operation, maintenance, inspection and testing 120 Article 19(iv) Procedures for responding to operational occurrences and accidents 122 Article 19(v) Engineering and technical support 124 Article 19(vi) Reporting of incidents significant to safety 126 Article 19(vii) Operational experience feedback 128 Article 19(viii) Management of spent fuel and radioactive waste on the site 131 3

4 Acronyms and abbreviations EPA Environment Protection Agency ABWR Advanced Boiling Water Reactor ALARA As Low As Reasonable Achievable AMC Accident Management Centre ASSET Assessment of Safety Significant Event Teams AS&QMD Audit, Safety and Quality Management Department (INPP) ATWS Anticipated Transient Without Scram BWR Boiling Water Reactor CPS Control and Protection System DSAR Decommissioning Safety Analysis Report DSS Diverse Shutdown System D&D Dismantling and Decontamination ECURIE European Community Urgent Radiological Information EIA Environmental Impact Assessment ENSREG European Nuclear Safety Regulators Group EML Environmental Monitoring Laboratory EPO Emergency Preparedness Organization EPP Emergency Preparedness Plan ERC Emergency Response Centre ESI Emergency Support Instruction EU European Union EURATOM European Atomic Energy Community FA Fuel Assemblies FC Fuel Channel FDP Final Decommissioning Plan FINAS Fuel Incident Notification and Analysis System HERCA Heads of the European Radiological Protection Competent Authorities IAEA International Atomic Energy Agency IMS Integrated Management System INES International Nuclear Event Scale INPP Ignalina Nuclear Power Plant IRS International Reporting System for Operating Experience ISFSF Interim Spent Fuel Storage Facility ISI In-Service Inspection I&C Instrumentation and Control LBB Leak Before Break LHMT Lithuanian Hydrometeorological Service LGT Lithuanian Geological Survey MCC Main Circulation Circuit MCP Main Circulating Pump MCR Main Control Room 4

5 MoH NI NIKIET OEF OIL OSART PAGD PSA PSAR QA QM RATA RAMP RBMK RCR RSC RSR RUZA SAR SFA SF SFSP SIP SOAI SPH SPI SSC SSRM SWMSF TG TLD TS TSC TSO USIE VAE VATESI Visaginas PGV VNIPIET VNPP WANO WENRA Ministry of Health Nuclear Installation Research and Development Institute of Power Engineering Operational Experience Feedback Operating Intervention Level Operational Safety Review Team Fire and Rescue Department Probabilistic Safety Assessment Preliminary Safety Analysis Report Quality Assurance Quality Management Lithuanian State Company Radioactive Waste Management Review of Accident Management Programs Channel-type Large Power Reactor Reserved Control Room Radiation Protection Centre Review of Safety Report Guidelines on the management of the beyond design accidents Safety Analysis Report Spent Fuel Assemblies Spent Fuel Spent Fuel Storage Pool Safety Improvement Program Symptom Based Oriented Accident Instructions Storage Pool Hall Safety Performance Indicators Structures, Systems and Components Site Safety Review Mission Solid Waste Management & Storage Facility Turbine generator Thermo-luminescent Dosimetry Training Subdivision Technical Support Centre Technical Support Organisation Unified System for Information Exchange in Incidents and Joint stock company Visagino atominė elektrinė Lithuanian State Nuclear Power Safety Inspectorate Visaginas Fire and Rescue Board All-Union Research and Development Institute for Energy Visaginas Nuclear Power Plant World Association of Nuclear Operators Western European Nuclear Regulators Association 5

6 Introduction Republic of Lithuania signed the Convention on Nuclear Safety (CNS) on 23 March The CNS was ratified on 17 October 1995 and entered into force on 24 October This report is issued according to Article 5 of the CNS. It is the seventh in it series and provides updated information as compared to the Lithuanian National Report issued in All reports on CNS are available on the State Nuclear Power Safety Inspectorate (VATESI) website: Information presented in this report demonstrates that Republic of Lithuania fulfils its obligation under the CNS. The structure and content of the Report was prepared taking into account recommendations provided in IAEA Guidelines regarding National Reports under the Convention on Nuclear Safety INFCIRC/572/Rev.5. Report contains two additional chapters regarding post Fukushima actions and implementation of Vienna Declaration. A summary of highlights and issues raised about Lithuania during the sixth review meeting are presented in Summary section. Overview of the national nuclear programme Currently nuclear installations in Republic of Lithuania are Ignalina Nuclear Power Plant (INPP), which is in permanent shutdown, Dry type interim spent nuclear fuel storage facility (SNFSF) and storage facilities for radioactive waste that are on the same site and are directly related to the operation of the INPP. All these nuclear installations and storage facilities for radioactive waste are operated by one licence holder State Enterprise Ignalina Nuclear Power Plant. Activities and facilities other than INPP, related to safety of spent nuclear fuel and radioactive waste management, are covered by the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. Ignalina Nuclear Power Plant The INPP contains two RBMK-1500 type reactors, which belongs to the category of boiling water channel-type reactors. The INPP is located in the north-eastern part of Lithuania, near the borders with the Republic of Latvia and the Republic of Belarus. The power plant was built as part of the Soviet Union's North-West Unified Power System. The INPP Unit 1 was connected to the power grid at the end of 1983, and Unit 2 - in August The design lifetime of the Units was projected to last till 2014 and 2017 respectively. The INPP Unit 1 was permanently shut down on 31 December 2004 and Unit 2 was permanently shut down on 31 December 2009 in compliance with the protocol of Lithuania s EU accession. Defueling of Unit 1 reactor started in 2006 and was completed in December Defueling of Unit 2 reactor started in 2010 and after unloading of about 1/3 of reactor inventory is now awaiting for free space in the unit s pool. Currently Unit 1 and Unit 2 are maintained in the post-operation state, in accordance with operation licence amended by VATESI. The spent nuclear fuel storage pools of both Units are filled up by fuel assemblies awaiting for start of spent fuel transport to new dry type interim spent fuel storage facility. Decommissioning of various Unit 1 and Unit 2 facilities is underway. These activities are performed in accordance with the INPP Final Decommissioning Plan and in line with Unit 1 and Unit 2 Decommissioning Projects. In response to the events at Japan s Fukushima Daiichi Nuclear Power Plant, the stress tests were conducted in at INPP according to ENSREG stress tests specification. Appropriate Plan of strengthening nuclear safety in Lithuania was prepared in 2013 and is in implementation stage. Dry type interim spent nuclear fuel storage facility (SNFSF) Spent nuclear fuel at INPP is stored in spent fuel storage pools and dry type interim spent nuclear fuel storage. Spent fuel storage pools are located near to the reactor hall of each Unit, and dry 6

7 storage facility (SNFSF) is located nearby INPP site. Wet storage option was provided in the initial design of INPP that was developed in the 70s of the last century in the former Soviet Union. It was intended to store the spent nuclear fuel unloaded from the reactors for several years in spent fuel storage pools and then to ship it for reprocessing. From the beginning of the 90s spent fuel reprocessing option was not considered anymore, so the decision was taken to build up a dry type interim storage for spent nuclear fuel at INPP and store it for 50 years. The storage is a passive storage system, which does not require any auxiliary equipment for decay heat removal. Visaginas Nuclear Power Plant UAB VAE SPB as a company responsible for the implementation of the preparatory works for the construction of the new NPP has performed a potential site evaluation against national and IAEA requirements. Site evaluation process has started in Evaluation included both deterministic and probabilistic assessments of various site related phenomenon. Also site evaluation report includes a peer review reports for all its parts. After considering the following aspects: the effects of external events occurring in the region of the Visaginas sites; the characteristics of the Visaginas sites and their environment that could influence the transfer to persons and the environment of radioactive material that has been released; the population density and population distribution and other characteristics of the external zone in so far as they may affect the possibility of implementing emergency measures and the need to evaluate the risks to individuals and the population, it was concluded that there are no exclusion criteria and no deficiencies that cannot be compensated for by means of design features, measures for site protection or administrative procedures. Therefore, both investigated sites are suitable for construction of the VNPP. Site Evaluation Report was reviewed by Independent IAEA Site Safety Review Mission (SSRM) which took place on 8 12th of November, IAEA experts stated that Sites evaluation is conducted in line with IAEA requirements and guides, the volume of investigation is sufficient, and sites are suitable for construction of VNPP. The experts of the mission have submitted several recommendations, which may be implemented only after selecting of nuclear technologies and layout of nuclear facilities providing opportunities for additional investigations related with design works. Site Evaluation Report was reviewed by Lithuanian authorities involved in coordination, including Lithuanian Hydro-meteorological Service (hereinafter the LHMT), Lithuanian Geological Survey (hereinafter the LGT), Radiation Protection Centre (hereinafter the RSC), Fire and Rescue Department under the Ministry of Interior (hereinafter PAGD), Civil Aviation Administration and approved by VATESI. Finally the VATESI approved the Site Evaluation Report on 30 October The results of the Site Evaluation Report shall be used in design process of the VNPP and shall constitute (updated where necessary) a part of the future PSAR. National policy towards nuclear activities Like many other countries in Europe, Lithuania is also facing challenges in the energy sector on three main dimensions: security of energy supply, competitiveness and sustainability of the energy sector. This situation was determined by historic and political circumstances as well as scarce internal energy resources. Most of energy resources used in Lithuania are imported. After the shutdown of INPP, the country is not able to satisfy its internal electricity demand at competitive prices. The Lithuanian electricity network is not connected to the European electricity system and therefore electricity can be imported only from a very limited number of countries. In order for Lithuania to become a fully-fledged Member State of the European Union, the Lithuanian energy sector should be entirely integrated into the European energy system. The country must have sufficient local capacity to satisfy the internal energy demand and, with regard to energy related questions, should be able to participate and compete in common EU energy markets and effectively cooperate with other countries. 7

8 The National Energy Independence Strategy, approved by Resolution No X-2133 of the Seimas of the Republic of Lithuania dated 26 June 2012 sets a number of tasks and major solutions in the fields of electricity, heating, gas, oil, renewable energy sources and improvement of energy efficiency, environment protection and reduction of greenhouse gas emissions. In current National Energy Independence Strategy (2012) as in previous National Energy Strategies (1994, 1999, 2002, 2007) nuclear energy is seen as a part of the Lithuanian energy supply mix. National Energy Independence Strategy (2012) sets the strategic target construction of a new regional nuclear power plant in Visaginas (VNPP). In 2009 the Ministry of Energy started tendering process, which resulted with selection of Hitachi Ltd. (as the Strategic Investor) together with Hitachi-GE Nuclear Energy (as ABWR technology provider) for the new NPP in Visaginas site. In 2012, the UAB Visagino atominė elektrinė (in August 2013 renamed to,,lietuvos energija, UAB) was appointed by the Lithuanian Government as a national investor of the VNPP, which together with other project participants will hold shares in the Project Company. National investor shall have no less than 34% of the VNPP's shares. After non-binding referendum on VNPP (in October 2012) a Special Working Group was established to evaluate VNPP project and the National Energy Independence Strategy. As a result, safe nuclear energy development has again been identified as necessary integral part of the Lithuanian energy supply mix. Taking into account these results and respecting the results of the referendum the Government stated that the project might be continued if it is being developed together with Regional Partners (Estonian and Latvian states and their utility companies) and in case it is economically viable. As an outcome of these discussions, Strategic Investor with the support of Japanese Government and participation of Japanese export credit agencies JBIC and NEXI submitted proposals on improvement of the financial conditions for the project. Additionally all of the project s potential investors (LT, LV, EE utility companies and Hitachi) carried out economic viability assessment of VNPP project that identified certain outstanding issues requiring attention of project hosting Government as well as the Governments of other Baltic States. These results were evaluated favourably and discussed among all three Baltic Prime Ministers during their meeting in November It was decided to pursue with the resolution of the outstanding issues named by potential investors. Baltic Prime Ministers decided to make use of the Committee of Senior Officials of the Baltic Council of Ministers composed of high level governmental representatives and competent institutions experts for the consideration and resolution of intergovernmental outstanding issues. Lithuanian Government has also established national Governmental commission dedicated to address remaining outstanding issues. Currently all interested parties are in the process of discussing possible ways for resolving the outstanding issues. Summary Safety improvement measures resulting from European Union (EU) stress tests that were foreseen to be implemented in INPP units and in existing SNFSF were completed by the end of The remaining measures are related with the future facilities and will be implemented in due time in accordance with the the Plan of Strengthening Nuclear Safety in Lithuania (National Action Plan). In 2014, VATESI agreed the Site Evaluation Report of new Visaginas NPP (VNPP). New sites are in the vicinity of existing INPP site. Sites for the construction of VNPP are selected in accordance with the IAEA safety standards and national Nuclear Safety Requirements BSR General requirements on site evaluation for nuclear power plants. During the VNPP site evaluation process all available geological, geophysical, seismological, meteorological, hydrological and other data collected by expert teams for the region extending more than 300 km from the sites. New site vicinity and site scale electrical resistivity tomography, seismic and engineering geological surveys were 8

9 conducted in The gathered available data and newly acquired results were collected and analysed by Lithuanian and foreign experts in Site Evaluation Report. All documents were independently reviewed and improved when necessary after the review taking into account the IAEA safety standards and national Nuclear Safety Requirements BSR General requirements on site evaluation for nuclear power plants. During the reporting period VNPP project was proceeding in its development. Currently a company called UAB VAE SPB (which stands for Joint Stock Company VNPP special purpose vehicle) analyses opportunities for the development of a new nuclear power plant project in Lithuania the company in 2015 took over the previously carried out preparatory works, projects and programmes. In presence of a favourable economic and political situation, the company would ensure the continuation of works and directly participate in the implementation of a new nuclear power plant project. UAB VAE SPB is a company which shares are 100% owned by Lietuvos energija, UAB (previously UAB VAE). The VNPP project preparatory works implementing company is developing and improving its own competence in safety and seeks external competences in the safety related aspects of activities of the organization. All the sites studies and assessments, including EIA and potential site evaluation are done in accordance with national requirements, international practice and in line with the relevant IAEA safety standards. Since 2009 Lithuania concerns about Ostrovets NPP project being developed in vicinity of capital city Vilnius (see Figure 1). It is important to stress that the selected site is not acceptable taking into account residual risk of sever accident and it is not properly investigated, compliance of design with some modern safety standards is not justified and stress tests are not performed, infrastructure and strategy for management of radioactive waste and spent nuclear fuel are not established and it is not evident that operating organization and regulatory authority are capable to perform their own responsibilities for safety (more details are provided in Article 16.6). Figure 1. Ostrovets NPP project being developed in vicinity of Vilnius Lithuania will keep focusing on these issues and will strive to receive all answers to its questions and requests and to make sure that these answers and requests make it clear that nuclear power plant in Belarus is sited, designed and built in full compliance with IAEA and other international environmental, nuclear and radiation safety requirements. Integrated Regulatory Review Service mission From 18 to 29 April 2016 full scope Integrated Regulatory Review Service (IRRS) mission took place at the VATESI and Radiation Protection Centre (RSC) Headquarters in Vilnius. The IRRS mission has covered all civilian nuclear and radiation source facilities and activities regulated in Lithuania. The review compared the Lithuanian regulatory framework for safety against IAEA safety standards as the international benchmark for safety. 9

10 The IRRS team carried out the review in the following areas: responsibilities and functions of the government; the global nuclear safety regime; responsibilities and functions of the regulatory body; the management system of the regulatory body; the activities of the regulatory body including the authorization, review and assessment, inspection and enforcement processes; development and content of regulations and guides; emergency preparedness and response; control of medical exposures, occupational radiation protection, control of radioactive discharges and materials for clearance, environmental monitoring, transport, waste management and decommissioning. The IRRS mission included one policy issue discussion on regulatory policy for authorization of dismantling activities during transitional period from operation to decommissioning. The most significant challenges for the regulatory authorities at the time of the mission were implementation of new international standards on radiation protection and nuclear safety, and securing resources and skills necessary to ensure the appropriate regulatory oversight of the ongoing decommissioning activities at INPP. The IRRS team identified a number of good practices and made recommendations and suggestions that indicate where improvements are necessary or desirable to continue enhancing the effectiveness of regulatory functions in line with IAEA safety standards. Action plan concerning recommendations and suggestions provided by IRRS mission team is under development and shall be endorsed in the near future. Challenges for Lithuania identified during the 6 th Review Meeting and their implementation To maintain safety of INPP while spent nuclear fuel is in the units Both Units of the INPP are now permanently shutdown and under decommissioning process. Though the number of operating normal operation systems important to safety and safety systems at Unit 1 is reduced from 53 to 11, at Unit 2 from 64 to 47, all systems important to safety of the spent fuel stored in storage pool hall (SPH) and Unit 2 reactor remains under the same safety requirements as during the INPP operation pursuant to the regulatory requirements. Systems and equipment important to safety and remaining in operation are operated and maintained in compliance with the safe operation conditions and limits set in the Technical Specifications for operation of the Units. Regardless of INPP Units 1 and 2 were permanently shut down and configuration of its systems and components has been significantly altered, INPP has been further performing non-destructive testing of fuel channels, piping metal condition and equipment of systems important to safety and other maintenance activities to maintain the acceptable conditions of systems and components important to safety. The INPP has established and developed ageing management system and prepared Ageing Management Programme according to Ageing Management Requirements of Systems and Elements important to safety of Nuclear Power Facilities, VD-E Fresh and spent nuclear fuel is stored in its dedicated places under conditions established in the internal normative technical documents in accordance to the regulatory requirements, including the procedure established for accounting of nuclear fuel. Modification of the existing cask handling system at Units, to upgrade of Unit 1 and Unit 2 Spent Fuel Pool Halls cranes to ensure safe and sufficient operational functionality and to fit B1 Project requirements were successfully performed in the frames of B1 Project implementation. Operation and maintenance of the systems remaining in operation is performed by qualified and appropriately trained staff undergoing training in accordance with annual training programs. Implementation of safety improvement measures under the Safety Improvement Program (SIP-3) is continued by implementing annually revised Programme including safety improvement measures linked to the post-fukushima lessons learned and stress test peer review recommendations and suggestions. 10

11 To implement projects related to the spent nuclear fuel and radioactive waste management The main development in the construction of the new facilities includes significant progress made towards completion of the Interim Spent Fuel Storage Facility (ISFSF Project B1) and Solid Waste Management & Storage Facility (SWMSF Project B2/3/4) construction projects. Construction of a new Dry Interim Spent Fuel Storage Facility With regard to necessity to handle and store the remaining approximately spent nuclear fuel assemblies from the shutdown INPP Units, in 2003 the Government of the Republic of Lithuania decided to construct a new dry type spent nuclear fuel storage facility (B1 Project) designed for handling and storage of the remaining spent nuclear fuel assemblies. The licence to construct the new dry type interim spent fuel storage facility was issued to INPP by VATESI in The construction of the new ISFSF was completed in ISFSF cold trials were completed in June Hot trials are scheduled in the period from September 2016 till August Construction of Solid Waste Management & Storage Facility (B2/3/4 Project) The objective of B2/3/4 Project is to build a new INPP Solid Waste Management and Storage Facilities. The Project includes two independent components to be implemented simultaneously: B2 (New Solid Waste Retrieval Facilities Design and Construction); B3/4 (New Solid Waste Management and Storage Facilities Design and Construction). It is scheduled to complete cold trials in August 2017 and to start hot trials in February 2018 followed by the start of the SWMSF commercial operation in late autumn Construction of Landfill Disposal Facility (B19 Project) Commercial operation of the Landfill Buffer Storage Facility started on 28 May 2013 and currently the Buffer Storage Facility is being filled with Class A radioactive waste packages waiting for the Landfill Disposal Facility to be built. On 30 July 2013 VATESI approved technical design of the Very Low Level Radioactive Waste Repository. Approximately m 3 of radioactive waste will be disposed in the repository. On 23 December, 2015 INPP got a License No (2015) for Construction and Operation of the Landfill Disposal Facility issued by the Order No of the Head of VATESI dated Tendering for construction of the Landfill Disposal Facility is now in progress. The permit for commercial operation of the 1st module of the Landfill Disposal Facility is expected to be obtained in the third quarter of Construction of Near Surface Repository (B25 Project) Low and intermediate level short-lived radioactive waste must be handled and placed in the repository for low and intermediate level short-lived radioactive waste. In December 2008 VATESI approved the technical specification of the repository for low and intermediate level short-lived radioactive waste (Project B25). The capacity of the repository will be approximately m 3 of radioactive waste. For the Near Surface Repository, the Basic Design and the Preliminary Safety Analysis Report were submitted to the state institutions for approval. A licence for construction and operation of the Near Surface Repository is expected to be obtained in mid of Completion of the Near Surface Repository construction of the 1 st group of vaults is scheduled to be completed by To implement projects for decontamination and dismantling of appropriate systems and components Projects related to dismantling and decontamination (D&D) of INPP systems and equipment not necessary for safety assurance are implemented in compliance with the technological solutions and the sequence developed and accepted in the technological design documents and within the very clearly defined equipment dismantling boundaries. The safety of implementation of such solutions is substantiated in the safety analysis documents approved by the VATESI. Prior to commencement of D&D activities preparatory works ensuring waste temporary storage, packaging sites, transportation 11

12 conditions and routes, sites for dismantled equipment preliminary decontamination, fragmentation, works related to preparation of building systems for performance of D&D works, etc. are performed. Safe operation of the SNF handling system during dismantling of equipment located in bld. A1, (see Fig. 2) will be substantiated in the Technological Design documentation and Safety Justification Report to be approved by the regulatory body leading to issue of the authorisation to start dismantling activities and proving that the works can be performed in accordance with the nuclear and radiation safety requirements, and the risks associated with their performance do not exceed the level of impact to safety as during the operational and maintenance period. The INPP systems and equipment dismantling sequence under the INPP Immediate Dismantling Strategy follows a building after building approach and is in detail established within Decommissioning Projects for Final Shutdown and Defueling Phase (DPs). DPs provide description of the INPP Unit 1 and Unit 2 systems that may be modified and isolated at each defueling stage as a consequence of losing their functions to ensure safe operation of other remaining in operation systems and normal operation functions. The safety of the work performance is substantiated in the corresponding Decommissioning Safety Analysis Reports in compliance with the requirements of the Nuclear Safety Requirements BSR Decommissioning of Nuclear Facilities. Dismantling of separate systems and components is performed within the scope of the changed operational Licences conditions issued by the regulatory authority having approved the technological design documents and documents substantiating safe performance of D&D works developed by the licence holder. The main achievements in the dismantling and decontamination (D&D) projects are as follows: completion of Unit 1 Bld. 117/1 equipment (Emergency Core Cooling System) dismantling in 2011, completion of Unit 1 Bld. 119 (Boiler House) equipment dismantling in 2013, completion of phase D1 D&D of Reactor Gas Circuit (Bld. V1) in 2013; completion of Unit 2 Building 117/2 equipment D&D activities in 2015; Unit 1 Turbine Hall (Bld. G1) equipment dismantling is in progress: 96% of all to be dismantled equipment have been dismantled by the end of 2015; Unit 2 Turbine Hall (Bld. G2) equipment is in progress: 21% of all to be dismantled equipment have been dismantled by the end of 2015; Performance of preparatory works for D&D of Unit 1 Bld. D1 (Control, Electrics & Deaerators) equipment; Preparation for Bld. A1 (Reactor Building) equipment D&D: development of the Environment Impact Assessment Report, Safety Analysis Report and Technological Design is in progress; Engineering on dismantling of Unit 1 structures and components from the reactor cavity (Project UP01), including the corresponding engineering analyses, research, documentation development, are in progress. 12 Figure 2. Current status of D&D progress

13 To be prepared for construction of new NPP Appropriate training of the staff of future operator, VATESI and other institutions and organizations The implementation of the IAEA national project, Strengthening the Nuclear Safety Regulatory Authority and Other Institutions for the Possible Licensing of a New Nuclear Power Plant, was approved by the IAEA Board for the period of and started in January Twenty four specialists have participated in workshops and training courses under this IAEA project, and have improved their knowledge. In order to continue preparation for construction of new NPP, the further IAEA national project, Enhancing the Regulatory Infrastructure in Line with International Safety Standards, for period would be implemented. IAEA support provided through the national projects helps Lithuanian specialists of nuclear safety to improve their technical knowledge, familiarise themselves with the most relevant international requirements in nuclear safety and the best practice in other countries. The VATESI cooperates with the United States Nuclear Regulatory Commission since Current Arrangement (hereinafter Arrangement) between the United States Nuclear Regulatory Commission (hereinafter the USNRC) and the VATESI for the Exchange of Technical Information and Cooperation in Nuclear Safety Matters was signed on 14 September 2015, as the extension of similar bilateral cooperation arrangements signed in 1994, 2000, 2005, and The Arrangement foresees different possibilities for enhancing VATESI specialists qualification such as to participate in USNRC staff training courses, to acquire on the job training experience by working on a certain period s assignments together with the USNRC staff or to participate in USNRC inspectors visits on reactor operation or reactor construction inspections, including extended briefings at USNRC regional inspection offices. On 31 December 2014 Memorandum for Information Exchange between the VATESI and the Nuclear Regulation Authority of Japan came in force. The participation of VATESI staff in international training courses and workshops is foreseen in the Memorandum as well. In Nuclear Engineering Intensive Courses were organized by Tokyo Institute of Technology and Hitachi, Ltd. in cooperation with Kaunas University of Technology for students and workers of state institutions. Continuation of development of Nuclear Safety Regulations in line with IAEA and EU requirements, WENRA reference levels and safety goals Pursuant to Paragraphs of the Nuclear Safety Requirements BSR Rules of Procedure for Drafting of Nuclear Safety Requirements and Nuclear Safety Rules, approved by the order No of the Head of VATESI, 15th of June, 2009, VATESI, while making proposals for new or amended legislation, shall make sure they comply with international treaties ratified by the Republic of Lithuania and they are drafted taking into consideration the best international and national practices of foreign countries, documents of the IAEA, documents of the WENRA and documents of other international organisations and agencies. The following regulatory requirements were adopted keeping in mind the development of the project of a new power plant: 1) Nuclear Safety Requirements BSR General requirements on site evaluation for nuclear power plants ; 2) Nuclear Safety Requirements BSR Preparation and Use of the Nuclear Power Plant s Safety Analysis Report ; 3) Nuclear Safety Requirements BSR Commissioning of Nuclear Power Plant. The new nuclear safety requirements for design and operation of NPP are in the advanced stage of preparation. Furthermore appropriate nuclear safety rules are under preparation as well. 13

14 Challenges identified by the Special Rapporteur of the 6 th RM Information was prepared in this chapter in order to reflect in a systematic way the challenges identified by the Special Rapporteur during the 6th Review Meeting of the Contracting Parties to the CNS. These challenges are: 1. How to minimize gaps between Contracting Parties safety improvements? 2. How to achieve harmonized emergency plans and response measures? 3. How to make better use of operating and regulatory experience, and international peer review services? 4. How to improve regulators independence, safety culture, transparency and openness? 5. How to engage all countries to commit and participate in international cooperation? In order to overcome these challenges Republic of Lithuania: 1. After implementing EU stress tests has developed and provided to the European Commission Plan of Strengthening Nuclear Safety in Lithuania (National Action Plan). Important to note, that all the measures for existing facilities are already implemented. In order to be in line with state of the art safety improvements Lithuania actively participates in ENSREG and WENRA activities. 2. Is implementing recommendations of HERCA-WENRA, negotiates with Belarus corresponding bilateral agreement. 3. Participates in IRS and European Clearinghouse activities, willingly provides experts for implementation of IAEA missions programme and in April 2016 successfully hosted IRRS mission. 4. Ensures independency of the regulatory body, further strengthening safety culture, transparency and openness. Currently regulatory body transposes amendments of EU Directive on Nuclear Safety into the national legal system. 5. Actively participates and encourages neighbours to join regional and worldwide networks of nuclear safety. Also Lithuania seeks to further maintain competence capacities ( know-how ) and safety culture on national level (operators, regulators and TSOs) in order to ensure proper understanding of the recent nuclear safety requirements and to maintain the appropriate safety level on nuclear installations taking into account operating experience, insights gained from safety analysis for operating nuclear installations, development of technology and results of safety research, when available and relevant. This goal could be reached with active participation in relevant international cooperation activities, including peer review services, and to transfer gained experience and knowledge during implementation of national nuclear power program. All these above mentioned challenges are particularly important for countries considering introduction of nuclear power and closely related with questions raised by Lithuania concerning Ostrovets NPP (Belarus) project being developed in vicinity of Lithuania s capital city Vilnius. In this relation Lithuania, as potentially impacted side, is seriously concerned about harmonization of emergency plans and response measures, use of international peer review services and regulatory experience, regulators independence, safety culture, transparency and openness of Belarus side, as Ostrovets NPP project developer (more details are provided in Article 16.6). 14

15 A1. Implementation of the Vienna Declaration on Nuclear Safety 1. New nuclear power plants are to be designed, sited, and constructed, consistent with the objective of preventing accidents in the commissioning and operation and, should an accident occur, mitigating possible releases of radionuclides causing long-term off site contamination and avoiding early radioactive releases or radioactive releases large enough to require long-term protective measures and actions. 2. Comprehensive and systematic safety assessments are to be carried out periodically and regularly for existing installations throughout their lifetime in order to identify safety improvements that are oriented to meet the above objective. Reasonably practicable or achievable safety improvements are to be implemented in a timely manner. 3. National requirements and regulations for addressing this objective throughout the lifetime of nuclear power plants are to take into account the relevant IAEA Safety Standards and, as appropriate, other good practices as identified inter alia in the Review Meetings of the CNS. 1. Safety Requirements for new Nuclear Installations The position of the Vienna Declaration regarding safety of new nuclear installations is going to be implemented in legal requirements implementing amendment of Nuclear Safety Directive (see Article 18). 2. Safety Assessments and Improvements of the Existing Nuclear Installations Pursuant to Part 7 of Article 32 of the Law on Nuclear Safety, a licensee shall perform a periodical safety analysis and justification and prepare a periodical safety review report at least every 10 years after the issuance of a permit for the commercial operation of a nuclear installation. If any nonconformities are identified, indispensable corrective measures ensuring the compliance of a nuclear installation with its design documentation shall be developed and implemented, as well as proper fulfilment of all requirements set in legal acts and normative technical documents shall be ensured. Pursuant to the conditions set in licence for operation of INPP Unit 1, periodical safety review of Unit 1 at the stage of fuel removal from the Unit shall be performed by the beginning of Therefore, the INPP is in the process of Unit 1 periodical safety review performance. The periodical safety review of INNP Unit 1 is going to be performed in accordance with regulatory requirements and recommendations set forth in the IAEA Specific Safety Guide No. SSG-25 Periodic Safety Review for Nuclear Power Plants. The scope of the periodical safety review of INNP Unit 1 was discussed with VATESI and covers at least the following areas: site characteristics, taken into account in the design that may impact the safety, and if necessary their reassessment based on new data and new methods used; actual status of SSCs important to safety taking into account implemented modifications, ageing effects and other effects which may impact the safety and the design lifetime; applicable safety requirements and their implementation, analysis of how the licence conditions are followed; analysis of events impacting the safety (review of results of earlier performed deterministic safety analysis for completeness of the set of postulated initiating events for design basis accidents and beyond design basis accidents); emergency preparedness issues; 15

16 measures related to radiation protection assurance, including radiological impact of the nuclear power plant on environment, personnel, population; fire protection measures and fire risk analysis; safety performance indicators and effectiveness of safety and quality management; operational experience and effectiveness of the feedback during the period under review; aging of SSCs important to safety, effectiveness of aging management; use of experience from other plants and research findings; operating organization, quality management systems and safety culture, staff training and qualification; physical protection issues. In response to the event at Japan s Fukushima Daiichi Nuclear Power Plant, the European stress tests were conducted in at INPP according to specification agreed by ENSREG. The stress tests were performed for two permanently shutdown INPP power units, existing Dry Spent Fuel Storage Facility and the New Interim Spent Fuel Storage Facility. Taking into account results and conclusions of INPP stress tests as well as suggestions and recommendations provided by peer-review experts, the internal INPP Action Plan was developed and approved by VATESI. Since the planned improvements measures were important to safety, they were also included into the annually reviewed INPP Safety Improvement Programme (SIP-3/2012) followed by their inclusion in subsequent SIP-3/2013, SIP-3/2014, SIP-3/2015 (for more details on SIP see Article 6). More details on INPP stress tests results and safety improvements measures associated with post- Fukushima lessons learned are presented in Section A2 of this report. Safety assessment of radiological consequences in case of beyond design basis earthquake during spent fuel transportation The evaluation of the spent fuel cask tip over in case of earthquake during transportation as well as assessment of radiological impact of such postulated scenario was carried out in The Report on Evaluation of Activity Release after a Cask Over-Tipping Accident was developed by the ISFSF construction (B1 Project) contractor and approved by license holder. It provides safety justification of this beyond design basis accident and assessment of its impact to personnel and the environment. At the request of VATESI the Report on Evaluation of Activity Release after a Cask Over- Tipping Accident was supplemented by additional calculations related to assessment of the capability of special bolts and sealings of the primary lid of the cask to withstand the cask over-tipping and falling down on the solid concrete base during its transportation from the INPP Units to the ISFSF site. The performed calculations, by applying highly conservative model, proved that those bolts of the primary lid keep their tightness, thus the primary lid remains in the dedicated place and prevent scattering of fuel bundles from the cask; the primary lid remains leaktight thus release of radioactive gases and solid particles to the environment is prevented. Regardless of the fact that such scenario of the cask over-tipping during transportation due to external events is unlikely, as a safety improvement measure this beyond design basis accident was included into the INPP Emergency Preparedness Plan documentation. 3. Improvement of the national legislation for nuclear safety The necessary provisions of the Vienna declaration will be implemented in the national legislation implementing amendment of Nuclear Safety Directive (Council Directive 2014/87/Euratom of 8 July 2014), which sets the similar safety principles as the Vienna Declaration. Provisions of this amendment are going to be implemented in the Law on Nuclear Energy, the Law of Nuclear Safety and in appropriate regulatory requirements. It should be noted, that requirement for periodical safety review already exists in the Law on Nuclear Safety and in the regulatory requirements. The periodical safety review shall be performed 16

17 for nuclear installations at least every ten years. The requirement is going to be updated in accordance with the amendment of Nuclear Safety Directive. Pursuant to Paragraphs of the Nuclear Safety Requirements BSR Rules of Procedure for Drafting of Nuclear Safety Requirements and Nuclear Safety Rules, approved by approved by the order No of the Head of VATESI, 15th of June, 2009, VATESI, while making proposals for new or amended legislation, shall make sure they comply with international treaties ratified by the Republic of Lithuania and they are drafted taking into consideration the best international and national practices of foreign countries, documents of the IAEA, documents of the WENRA and documents of other international organisations and agencies. One of the main regulations for possible new build, Nuclear Safety Requirements Design of Nuclear Power Plant, is going to be based on IAEA Specific Safety Requirements SSR 2/1 Safety of Nuclear Power Plants and WENRA positions concerning new nuclear power plants. The SSR 2/1 and the WENRA positions fully reflect principles set by the Vienna Declaration. A2. Activities related to post-fukushima lessons learned Implementation of stress tests peer review recommendations and suggestions In response to the event at Japan s Fukushima Daiichi Nuclear Power Plant, the European stress tests were conducted at INPP in according to the specification agreed by ENSREG. The stress tests were performed for two permanently shutdown INPP power units, existing Dry Spent Fuel Storage Facility and the New Interim Spent Fuel Storage Facility. Taking into account results and conclusions of INPP stress tests as well as suggestions and recommendations provided by peer-review experts, the internal INPP Action Plan was developed and approved by VATESI. Continuing the participation in follow-up activities of stress tests, the Plan of Strengthening Nuclear Safety in Lithuania (National Action Plan) associated with post-fukushima lessons learned and stress tests peer review recommendations and suggestions as well as results of the IAEA mission on Emergency Preparedness Review that was conducted in Lithuania in 2012 was developed by VATESI. The National Action Plan was prepared in accordance with ENSREG requirements and was presented during the National Action Plans Workshops, which were organized by ENSREG in 2013 and in More details participation of Lithuanian side in European stress tests and follow-up activity are provided in 6th National Report of Convention on Nuclear Safety as well as in ENSREG website ( Status and progress of all measures included in the National Action Plan is summarized in the Table 1. The measures provided in the Table 1. reflect the present status and progress on implementation of the National Action Plan. National Action Plan includes 14 measures, 10 of them are implemented and 4 are in progress. It should be noted that all safety improvement measures related to nuclear safety of INPP Units and operating spent nuclear fuel storage facilities were completed. Remaining safety improvement measures related to IAEA mission on Emergency Preparedness Review, and measure on updating of IAE emergency preparedness procedures taking into account results of evaluation of the spent fuel cask tip over in case of earthquake during transportation (measure No. 5) are under implementation. Minor changes of the National Action Plan were carried out since it was presented in 6th National Report of Convention on Nuclear Safety. The measures No. 1 and 2 of the National Action Plan were modified in order to reflect WENRA Safety Reference Levels for Existing Reactors, which were updated on 24th September 2014 in relation to lessons learned from TEPCO Fukushima Daiichi accident. The measures No. 3 of the National Action Plan was modified taking into account the results of the IAEA mission on Emergency Preparedness Review. The deadlines of measures No. 2, 4, 5 and 13 was changed (for clarification see the relevant comments in Table 1.). 17

18 Table 1. Summary of measures of the Plan of Strengthening Nuclear Safety in Lithuania (National Action Plan) No. Topic Measure/Comments Basis Status/ Responsibility Deadline 1. Natural Measure: To consider the necessity of revision of the national nuclear safety regulations In progress/ 1 VATESI hazards applied to the identification of natural hazards, their assessment and the corresponding assessment for cliff-edge (margins) effects in compliance with planed WENRA guidance when it will be issued. year issuing after of Comments: The measure is included in the National Action Plan in accordance with WENRA statement. VATESI is participating in the WENRA activities (working group T1 Natural hazards) related to preparation of the guidelines. 2. General Measure: To carry out review of WENRA Safety Reference Levels for Existing Reactors, which were updated on 24th September 2014 in relation to lessons learned from TEPCO Fukushima Dai-ichi accident, and if necessary: update of existing or develop of new ones national nuclear safety regulations applied to permanently shutdown INPP; as much as it is applicable update of existing or develop of new ones national nuclear safety regulations applied to new NPP. Comments: The updated WENRA Safety Reference Levels for Existing Reactors are going to be reviewed and, were appropriate, national nuclear safety regulations would be improved. 3. Emergency Measure: To implement the following actions of EPREV Action Plan: 3.1 preparedness/ - in connection with revised emergency classes of INPP, to carry out renew of the Severe State residents protection plan in case of nuclear accident ; 3.2 accident - to conduct a joint RSC, Environmental Protection Agency (EPA) under the management Ministry of the Environment, VATESI and INPP table top exercise to test collaboration abilities for predictions on radiological consequences, including dose projection and formulating recommendations for residents, in case of nuclear accident; to conduct a joint PAGD, VATESI, RSC and MoH table top exercise to test effectiveness of public information system in case of radiological accident. 18 Comments: The measures linked to the results of the IAEA mission on Emergency Preparedness Review and related to emergency preparedness for responding to a nuclear or radiological accident have been included in the National Action Plan after approval ENSREG Peer Review Report Planned WENRA guidance ENSREG Peer Review Report, WENRA Safety Reference Levels Existing Reactors EPREV review mission report for WENRA guidance In progress/ 2017 In progress/ 2016 Implemented/ 2015 In progress/ 2016 VATESI VATESI RSC, EPA, VATESI, INPP PAGD, VATESI, RSC, MoH

19 No. Topic Measure/Comments Basis Status/ Deadline of the measures of improvements among all Lithuanian institutions involved in this mission. 4. Natural Measure: To evaluate the spent fuel cask tip over in case of earthquake during National hazards transportation and to assess radiological impact on the environment, personnel and final report population. on stress tests Comments: Initially the action was planned to be finished in The date of implementation of the action is revised taking into account updated schedule of the INPP Interim Spent Fuel Storage Facility (ISFSF) construction project. 5. Natural hazards 6. Natural hazards 7. Natural hazards Measure: To consider the necessity of improvement of emergency preparedness procedures or updating those after confirmation of the calculation results of the spent fuel cask tip over during transportation. Comments: See comment No. 4. Measure: To assess the robustness and availability of accident management centre of organization of emergency preparedness against an earthquake. If needed, to develop measures to improve the robustness of accident management centre. Comments: INPP has performed the assessment of the robustness and availability of accident management centre (AMC) of organization of emergency preparedness in case of earthquake and has prepared the report of the assessment. The seismic analysis, including specific calculations were carried out for the assessment of the robustness and availability of AMC. The model of AMC was developed and computer code (SCAD) was used for calculation of seismic impact. The results of the calculations confirmed the robustness and availability of the AMC in case of earthquake with peak ground acceleration 0,13g. VATESI performed review and approved this report. Measure: To consider the possibility of the seismic warning and monitoring system application for formalization of the emergency preparedness announcement criterion and to include this criterion in the operational manual of the seismic warning and monitoring system. National final report on stress tests National final report on stress tests National final report on stress tests Implemented/ 2017 (initial deadline 2013) Implemented/ 2017 (initial deadline 2013) Implemented/ 2014 Implemented/ 2012 Responsibility INPP INPP INPP INPP 19 Comments: INPP has performed assessment of the data, which generates the seismic warning and monitoring system and determined the new criterion for formalization of the emergency preparedness announcement. The new criterion have been included in the operational manual of the seismic warning and monitoring system of INPP. VATESI

20 No. Topic Measure/Comments Basis Status/ Deadline carried out the review of documents submitted by the INPP, which are related with implementation of this action, and has approved them. 8. Natural hazards Measure: To provide data transfer of the seismic warning and monitoring system to the computer information system of organization of emergency preparedness, i.e. to the accident management centre, technical support organization and emergency control room and to update corresponding procedures of organization of emergency preparedness. National final report on stress tests Implemented/ 2013 Responsibility INPP 9. Natural hazards Comments: INPP has installed necessary hardware options, which ensure data transfer of the seismic warning and monitoring system to the computer information system of organization of emergency preparedness. Relevant emergency preparedness procedures have been updated by INPP and approved by VATESI. Measure: To assess the possibilities of the emergency removal and repair works by organization of emergency preparedness for beyond design-basis emergency scenarios related to the level of earthquake above maximal calculated earthquake and resulting in the cracks or collapse of the construction structures of the operating spent fuel interim storage facility and new spent fuel interim storage facility, including casks blockage by debris, as well as cracks or collapse of the construction structures of the hot cell of the new spent fuel interim storage facility during the works with spent nuclear fuel in the hot cell. National final report on stress tests Implemented/ 2013 INPP Comments: INPP has performed the assessment of the issues specified in this action and has prepared the report. In the light of this report's findings, relevant emergency preparedness procedures of INPP have been updated and approved by VATESI. 10. Design issues Measure: To provide the power supply of water temperature and level instrumentation in the storage pools of both units from diesel generator No. 7 of unit 2 or from the mobile diesel generator connected to Unit 2. Comments: INPP has implemented the modification of the emergency power supply system, including installation of special power sockets for mobile diesel generator in different places of Unit 2 building. The relevant operation documentation and emergency preparedness procedures of INPP have been updated and approved by VATESI. National final report on stress tests Implemented/ 2011 INPP 20

21 No. Topic Measure/Comments Basis Status/ Deadline 11. Design issues Measure: To provide the diesel fuel supply for assuring long-term operation of National emergency diesel generators. final report on stress Comments: INPP has assessed the time of operation of the emergency diesel generators. tests According to the results of the assessment, demand for extra fuel will occur after more than 5 days of nonstop emergency diesel generator operation. INPP signed a contract with a fuel supply company for supply of additional fuel in January Design issues Measure: To evaluate the capacity for work of water temperature and level instrumentation in the spent fuel storage pools as well as radiation detectors in the spent fuel storage pools halls of both units in conditions of beyond design-basis accident. If needed, to develop the appropriate improvement measures. National final report on stress tests Implemented/ 2012 Implemented/ 2013 Responsibility INPP INPP Comments: INPP has performed the evaluation of the equipment performance in conditions of beyond design-basis accident and prepared the corresponding report. Taking into account results of this evaluation, relevant severe accidents management guidelines of INPP have been updated and approved by VATESI. 13. Design issues Measure: The special sub-module of the plant computer information system will be developed to provide information about the water temperature and level measurements in spent fuel storage pools as well as radiation level in the spent fuel storage pools halls from both units during and after beyond design-basis accident. The data of water temperature and level measurements in the spent fuel storage pools, radiation level measurements in the spent fuel storage pools halls will be transferred to the computer information system of organization of emergency preparedness, i.e. to the accident management centre and technical support organization. The data of water temperature and level measurements in the spent fuel storage pools will be transferred to the VATESI. National final report on stress tests Implemented/ 2015 (initial deadline 2013) INPP Comments: INPP has implemented the modification of the plant main computer information system and developed special algorithm, which is dedicated to display data of water temperature and level in the spent fuel storage pools measurements as well as radiation level measurements in the spent fuel storage pools halls in case of beyond design-basis accident. The necessary hardware options have been installed as well, which allows the transmission of the data of water temperature and level in the spent fuel storage pools measurements as well as radiation level measurements in the spent fuel storage pools halls to the computer information system of organization of emergency 21

22 No. Topic Measure/Comments Basis Status/ Deadline preparedness. The implemented modification includes the transmission of data of water temperature in the accident management centre of VATESI as well. 14. General Measure: To examine existing documents concerning the spent fuel storage pools ENSREG Implemented/ safety. To review management procedures and manuals of beyond design-basis accidents Country 2013 in the spent fuel storage pools. To evaluate planned and implemented modifications Peer related with the spent fuel storage pools safety. To determine additional measures if Review needed. Report Responsibility INPP Comments: I NPP carried out the assessment of the existing documents, planned and implemented modifications, emergency preparedness exercises results and plans and other aspects related to the spent fuel storage pools safety. The results of performed assessment concluded that current and implemented technical and organizational measures of the INPP ensure the high nuclear safety level of the spent fuel storage pools in stage of final shutdown of INPP. VATESI carried out review and assessment of the documents submitted by INPP relating to the implementation of the action and approved them. 22

23 Compliance with Articles 6 to 19 Article 6 Existing Nuclear Installations Each Contracting Party shall take the appropriate steps to ensure that the safety of nuclear installations existing at the time the Convention enters into force for that Contracting Party is reviewed as soon as possible. When necessary in the context of this Convention, the Contracting Party shall ensure that all reasonably practicable improvements are made as a matter of urgency to upgrade the safety of the nuclear installation. If such upgrading cannot be achieved, plans should be implemented to shut down the nuclear installation as soon as practically possible. The timing of the shut-down may take into account the whole energy context and possible alternatives as well as the social, environmental and economic impact Existing Nuclear Installations as defined in Article 2 of the Convention The INPP is the only nuclear power plant in Lithuania. It contains two RBMK-1500 type reactors which are water-cooled, thermal neutron with graphite moderators, pressure-tube type boiling-water reactors. Both Units are now in permanent shutdown state. They are under decommissioning process, but still operated and maintained under separate operational licences in accordance with the safe operation conditions and limits set in the Technical Specifications for operation of systems and equipment important to safety and remaining in operation. Based on safety justification documents some of process equipment which are no more required for ensuring safety functions were taken out of operation, isolated and dismantled or are under dismantling process. Defueling of Unit 1 reactor started in 2006 and was completed in December Defueling of Unit 2 reactor started in Currently Unit 2 reactor is loaded with 1134 fuel assemblies as the spent fuel pools are completely filled up (7175 fuel assemblies stored in Unit 1 and 7246 fuel assemblies in Unit 2 spent fuel pools). Defueling of Unit 2 reactor was stopped until commissioning of the new Interim Spent Fuel Storage Facility, while transportation of spent fuel to the existing Spent Fuel Storage Facility of dry type was stopped in mid 2010 as it reached design capacities. There are a few nuclear facilities for management of radioactive waste and storage of spent nuclear fuel at the site of INPP. These facilities are described in detail in reports issued in accordance with Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Overview of significant safety related issues, including events that occurred in the nuclear installations over the last three years, and measures taken in response to these issues The INPP had reported on 9 events to VATESI, during the period of All the events were rated at level 0 / below the scale in accordance with INES scale. The events are analysed, reported and preventive and corrective measures directed towards elimination of event consequences and origination causes, as well as prevention of their recurrence are taken in accordance with the established procedures. In accordance with the tripartite agreement between the Government of the Republic of Lithuania, the IAEA and EURATOM, the INPP has a system to ensure international guarantees providing for periodic checks (inspections) of operating documents, actual number of fissile nuclear materials held by the IAEA and EURATOM inspectors. During the period of at the INPP 13 common inspections were held by the IAEA and the EURATOM. 23

24 6.3. Overview of planned programmes and measures for the continued safety upgrading of nuclear installations Regardless of the fact that INPP Unit 1 and Unit 2 are in permanent shutdown, INPP further implements the safety improvement measures in accordance with INPP s Safety Improvement Program (SIP-3) which is revised on an annual basis and is submitted it to VATESI for review and approval. Three SIP-3 measures are being implemented on a permanent basis: the measures for reducing the frequency of an individual exposure (the ALARA principle and radiation monitoring), managing the ageing of the safety-related structures, systems and components and maintaining the qualified condition of the safety-related structures, systems and components. The following safety improvement measures including ones linked to the post-fukushima lessons learned and stress test peer review recommendations and suggestions (see Table 1 of Section A2.) were implemented during the period of : Conservation of the fully loaded compartments of the Solid Radioactive Waste Storage Facility (building 157/1); Reconstruction of spent fuel storage pools sections by installing armour-plated sheets; Construction of Solid Waste Management and Storage Facility; Performance of Unit 2 safety related systems equipment and pipes metal inspection and control, including welding seams; Define methodology and measuring devices for activity determination of difficult-tomeasure nuclides; Evaluation of radiological consequences due to over-tipping of a cask filled with spent nuclear fuel during its transportation from the INPP Units to the ISFSF site in case of beyond design basis earthquake; Assessment of INPP Accident Control Centre structures robustness calculation and modelling, in case of a beyond design basis earthquake, and blocking INPP Accident Control Centre access in case of fallen structures of the nearby administrative buildings No. 185 and No. 140/2 in case of a beyond design basis earthquake; Performance of upgrade of INPP computerised data system enabling to receive data on water level and temperature in Unit 1 and 2 spent fuel storage pools as well as radiation level within the spent fuel storage pools halls in conditions exceeding the normal operation limits including in case of beyond design basis accidents; Installation of water level control systems at Unit 1 and 2 spent fuel storage pools was implemented. The installed systems ensure water level control during the normal operation conditions and in case of design and beyond design basis accidents; Installation of screen Beyond design basis accident management in the Automated Radiation Safety Monitoring System; Modification related to provision of additional possibility for Emergency Preparedness Organisation, Technical Support Organisation and Control Room staff to control the spent fuel pools water level and temperature by directly obtaining data from the Unit 2 data-computing system; Installation of water level control systems at Unit 1 and 2 spent fuel storage pools, which ensure water level control during the normal operation conditions and in case of design and beyond design basis accidents. Based on the assessment of the results of the implementation of the INPP Safety Improvement Programme, the planned and implemented measures were sufficient and effective in order to ensure safety functions performance and the safety level of INPP during the period of Safety Improvement Program (SIP-3) is continued in 2016 year. 24

25 6.4. Installations for which decisions on shutdown have been made In compliance with the protocol of Lithuania s accession to the EU, the INPP Unit 1 was shutdown on 31 December 2004 and Unit 2 was shutdown on 31 December In order to establish legal, organizational and technical measures related to INPP decommissioning, radioactive material and radioactive waste management and subsequent supervision and control, as well as foresee measures related to mitigation of the negative social and economic consequences within the Ignalina region as a result of the INPP decommissioning, on 9 February 2015 the Government of the Republic of Lithuania approved the INPP Decommissioning Interdepartmental Action Plan. The main objectives set in the Action Plan include: To ensure safe and fluent INPP decommissioning process by using allocated funds in transparent and efficient manner; To mitigate the negative social and economic consequences within the Ignalina region as a result of the INPP decommissioning. In order to reach the first objective several tasks must be fulfilled, among which: To ensure safe and efficient INPP decommissioning process and its supervision; Develop radioactive waste management infrastructure based on the state-of-the-art technologies, ensure safe and effective INPP operational and decommissioning radioactive waste management; The following tasks are set for reaching the second objective: Provide for the possibility for already dismissed or to be dismissed INPP employees to integrate into the labour market and mitigate dismissal consequences; To reduce energy consumption in public facilities and multi-storied buildings within the Ignalina region. As appendices, the Action Plan contains Measures for Implementation of the INPP Decommissioning Interdepartmental Action Plan objectives and tasks for the period of (amended), and the assessment criteria for reaching the above mentioned objectives. The Final Decommissioning Plan The Final INPP Decommissioning Plan (FDP) is the definitive and the only fully inclusive reference document describing how the INPP is being and will be decommissioned which is produced to meet regulatory and legal requirements of the Republic of Lithuania. In compliance with the Nuclear Safety Requirements BSR Decommissioning of Nuclear Facilities the FDP shall be reviewed at least once per 5 years considering the experience gained during the implementation of the decommissioning process, changes in the decommissioning strategy, decommissioning performance schedule, financing, etc. Therefore, on 25 August, 2014 the Minister of Energy of the Republic of Lithuania approved the updated FDP, Rev 07, by the order No The updated FDP includes all of the decommissioning process changes which have occurred in the period from 2004 to early On the basis of INPP decommissioning experience, international experience of NPP power units decommissioning, recommendations of the members of the INPP international technical support experts group, a new decommissioning projects structure was developed and implemented in 2013, and on the basis of it the INPP Decommissioning Megaproject Schedule, including the decommissioning costs, has been developed and presented in FDP Rev 07. Though the final date of termination of the overall decommissioning process has shifted, the adopted decommissioning strategy remains unchanged and is further implemented in compliance with the immediate dismantling strategy. The overall INPP decommissioning process is subdivided into several stages in order to facilitate coping with arising risks and to ensure reliable distribution of funds and consecutive 25

26 implementation of works. In respect to nuclear safety the activities such as handling of spent fuel, modification and isolation of systems, dismantling and decontamination of systems not important to safety is carried out after the final shutdown of the reactors. The preparatory works, actual dismantling and decontamination works are performed by the INPP qualified staff in compliance with the regulatory requirements within the scope of Units operational licences. The Plan encompasses the entire period of the INPP decommissioning (starting with the preparatory works for step by step dismantling of separate installations, systems and equipment not needed any more to ensure the safe operation and maintenance of the INPP, actual dismantling and decontamination of those installations, construction of new facilities dedicated for interim storage of spent fuel and radioactive waste, removal of spent fuel from the units to the constructed interim storage facility, demolishing of emptied buildings and to the final restoration of the site) Statement on the position concerning the continued operation of the nuclear installations Currently both INPP Units have the status of the permanently shutdown units. Based on paragraph 3 of Article 29 of the Law on Nuclear Safety the Licences for operation of the NPP Units are valid as long as all nuclear fuel is not completely removed from the Units. All requirements pertaining to the power unit in operation are applicable during this period. Two defueling stages are differentiated in the Decommissioning Safety Analysis Report (DSAR): Defueling phase 1 a stage starting after the final reactor shutdown, when the reactor is cooled down, fuel unloading from the reactor and the subsequent storage of spent fuel assemblies (SFA) in the SFSP or their transportation to Unit 2 for complete burn up (in case of Unit 1). The phase ends up when the reactor is completely defueled. Defueling phase 2 a stage starting after the stage 1 and ends up by SFA removal from the SFSP to the ISFSF, i.e. the complete defueling of the Unit. Both phases are associated with isolation, preparation for dismantling and subsequent dismantling of systems and equipment that are not needed any more to ensure safety and safe operation of the remaining in operation safety systems and equipment. Dismantling of separate systems and components is performed within the scope of the changed operational Licence conditions issued by the regulatory authority. The INPP systems and equipment dismantling sequence under the INPP Immediate Dismantling Strategy follows a building after building approach and is in detail established within Decommissioning Projects for Final Shutdown and Defueling Phase and is substantiated in corresponding Decommissioning Safety Analysis Reports in compliance with the requirements of the Nuclear Safety Requirements BSR Decommissioning of Nuclear Facilities. Implementation of the following principles ensures safe performance of the D&D process: provision of worker safety; provision of operational integrity of equipment remaining in operation; application of the ALARA principle; application of the specific dismantling sequence dismantling from radionuclide noncontaminated equipment towards radionuclide contaminated equipment; use of available equipment and devices, experience gained during implementation of previous D&D projects; application of such D&D techniques that lead to generation of minimum quantities of secondary waste and releases (radioactive and nonradioactive) into the environment; due to minimisation of dismantled equipment fragmentation at the dismantling sites, equipment is dismantled in as large as possible pieces depending on the load carrying capacity of 26

27 lifting devices, sizes of openings made for waste transportation and capacity of fragmentation facilities; use of mobile filtering devices for confinement of gases and aerosols; provision of separate transportation routes for different activity waste, i.e. free released waste and very low level waste routes are separated to prevent spread of contamination; decontamination of very low level waste to allow for subsequent categorisation as conditionally non-radioactive waste leading to minimisation of final disposal costs and environmental impact; subdivision of the entire scope of to be dismantled equipment into numerous working areas depending on the equipment location. At a time only the same type of equipment is dismantled. Construction and commissioning of new facilities for spent nuclear fuel storage and radioactive waste processing and storage will enable to further proceed with the decommissioning activities, thus enhancing the safety level at the Units as: Commissioning of the Interim Spent Nuclear Fuel Storage Facility will enable to unload and transport remaining fuel assemblies from the Units thus reducing the risk related to the fuel storage in the reactor core and spent fuel storage pools; Commissioning of the Solid Radioactive Waste Retrieval Facility, Solid Radioactive Waste Processing and Storage Facility, Landfill Facility, Near Surface Repository, Reactor Graphite Waste Interim Storage Facility will enable to handle produced operational radioactive waste and waste produced during dismantling and decontamination activity complying with new requirements of the Laws of the Republic of Lithuania, the European Union standards and the IAEA recommendations. Article 7 Legislative and Regulatory Framework 1. Each Contracting Party shall establish and maintain a legislative and regulatory framework to govern the safety of nuclear installations. 2. The legislative and regulatory framework shall provide for: (i) the establishment of applicable national safety requirements and regulations; (ii) a system of licensing with regard to nuclear installations and the prohibition of the operation of a nuclear installation without a licence; (iii) a system of regulatory inspection and assessment of nuclear installations to ascertain compliance with applicable regulations and the terms of licences; (iv) the enforcement of applicable regulations and of the terms of licences, including suspension, modification or revocation. Article 7(1) The legislative and regulatory framework governing the safety of nuclear installations 7.1. Overview of the primary legislative framework for nuclear safety, including interfacing national legislation The main laws, regulating nuclear energy, are: Law on Nuclear Energy; Law on Nuclear Safety; Law on Radiation Protection; Law on Radioactive Waste Management. The Law on Nuclear Energy was adopted in 1996 and was amended in 2011 (new edition). Law on Nuclear Energy establishes the general legal basis for activities involving nuclear materials, for other areas of nuclear energy involving sources of ionising radiation and for management of nuclear 27

28 fuel cycle materials, including radioactive waste, managed at a nuclear installation. Regulation and supervision of nuclear safety, radiation protection and safety of radioactive waste management in the area of nuclear energy is performed under this Law, the Law on Nuclear Safety, the Law on Radiation Protection and the Law on Management of Radioactive Waste. The amendments to the Law on Nuclear Energy of 2011 establish the basis for a stronger nuclear regulatory authority with functions clearly separated from the functions of other authorities, institutions or organizations engaged in development of the nuclear energy or use of nuclear energy, including production of electricity. Since October of 2011, VATESI is accountable to the President of Republic of Lithuania and the Government of Republic of Lithuania. The Law on Nuclear Safety, adopted in 2011, among other provisions, establishes a detailed procedure for issuing licenses, permits and other types of authorization, including the documents required and conditions to be fulfilled in order for an activity to receive authorization. This law also establishes the main principles for safety assessment and provides for different types of enforcement measures, including economic sanctions (penalties) for the most severe cases of noncompliance with safety requirements. The Law on Nuclear Energy and the Law on Nuclear Safety transpose the Council Directive 2009/71/Euratom of 25 June 2009 establishing a Community framework for safety of nuclear facilities. The Law on Radiation Protection establishes the legal basis for protection of people and the environment from the harmful effects of ionizing radiation. It also establishes a licensing system for the use of radioactive materials and radiation sources, and prescribes general rules for their use. The Law also provides powers and responsibilities to the authorities in this field. Since October 2011, VATESI is responsible for exercising state regulation of and supervision over the radiation protection of those engaged in the activities in the area of nuclear energy involving sources of ionising radiation. Other major amendments to this law were made in As a result to these amendments, since May 1 st, 2016, VATESI is empowered to: set requirements for physical protection of sources of ionising radiation used in the area of nuclear energy and supervise their implementation; set requirements in nuclear energy area for obligatory radiation safety training, instructing and evaluation of knowledge of persons, responsible for radiation safety, and supervise their implementation; set requirements for certification of persons, seeking to obtain the right to train persons, responsible for radiation safety, and perform the certification. The Law on Radioactive Waste Management establishes the rights, duties and functions of the state executive and supervisory authorities and of persons and legal entities involved in radioactive waste management. Since October 2011, VATESI is responsible for establishing the clearance levels of radionuclides for the materials and waste generated during the activities involving sources of ionising radiation in the area of nuclear energy (formerly functions of the Ministry of Environment). The Law on Radioactive Waste Management and the Law on Nuclear Energy transpose the provisions of council Directive 2011/70/Euratom of 19 July 2011 establishing a Community framework for the responsible and safe management of spent fuel and radioactive waste (the Laws were amended in 2014). The amendments to the Law on Radioactive Waste Management of 2014 are related to the introduction of the new and revision of the current definitions, introduction of additional principles of the radioactive waste management, defining of the content of the radioactive waste management program, specifying authority responsible for preparation and submission of the national reports to the European Commission, establishing deadlines of reporting and notification to the European Commission. 28

29 7.2. Ratification of international conventions and legal instruments related to nuclear safety Lithuania is a party to the main relevant international conventions. There was no new development in the area of ratification of international conventions and legal instruments related to nuclear safety during the reported period. There were several new agreements concluded between VATESI and other regulatory bodies: Memorandum for Information Exchange between the VATESI and the Nuclear Regulation Authority of Japan, came into force on 31st of December, 2014; Arrangement between the VATESI and the United States Nuclear Regulatory Commission for the Exchange of technical information and cooperation in nuclear safety matters, came into force September 22nd, 2015; Also Joint Action Plan between the Government of the United States of America and the Government of the Republic of Lithuania on Combating Illicit Trafficking of Nuclear and Radioactive Materials and Related Technology was signed in Article 7(2)(i) National safety requirements and regulations 7.3. Overview of the secondary legislation for nuclear safety and regulations and guides issued by the regulatory body The most significant regulations and rules issued or amended by the regulatory body during reported period: Regulatory system, inspection and enforcement: Order No , 15th of June, 2009, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Rules of Procedure for Drafting of Nuclear Safety Requirements and Nuclear Safety Rules, was amended in 2014 (new edition Nuclear Safety Requirements BSR Rules of Procedure for Drafting of Nuclear Safety Requirements and Nuclear Safety Rules ). The Rules of Procedure for Drafting of Nuclear Safety Requirements and Nuclear Safety Rules establishes rules of procedure for planning and implementing the process of drafting new and amended nuclear safety rules and requirements, adopted by VATESI. The new edition was adopted in order to formally introduce and elaborate on the use of the principle of graded approach in the process of establishing rules and requirements for licensees and to harmonize the Rules with recently amended general rules of legal technique. Order No , 25th of August, 2011, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Inspections Conducted by State Nuclear Power Safety Inspectorate, was amended in The most significant changes are: 1) The existing classification of inspections is replaced with a more streamlined, comprised of regular inspections (carried out according to the schedules or other aspects of ordinary activities carried out by an economic entity), technical inspections (witness inspections carried out during technical checks of nuclear facilities structures, systems and components or equipment, or during other inspections that are performed by an economic entity) and special inspections (other inspections, aimed at inspecting the specific aspects of safety or responding to the existing unexpected, unplanned, unusual situations, occurred unusual event or obtained specific information); 2) More streamlined procedures for inspecting suppliers of license and permit holders are introduced; 3) The right to declare the compliance of the activities in the area of nuclear energy with sources of ionising radiation carried out by licensees or temporary permit holders with the legal acts regulating radiation protection by submitting the Declaration of compliance with the established radiation protection requirements. The submittal of the Declaration results in possibility to decrease the number of inspections of the aforementioned activities; 29

30 4) The procedures and forms were revised and amended taking into account the existing practice in order for the requirements to be more comprehensible and transparent; 5) The application of the graded approach to inspection activities for the various facilities and activities was highlighted; 6) The principles for determining of periodicity of regular inspections were updated. Order No , 24th of October, 2011, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Rules of Procedure for Applying the Enforcement Measures Set by VATESI, was amended in 2016 (new edition Nuclear Safety Requirements BSR Rules of Procedure for Applying the Enforcement Measures Set by VATESI ). The main goal of the amendment was to harmonize the provisions of the Requirements with the new Code of Administrative Offences and describe actions to be taken if an incompliance is found not during a physical inspection (e.g. during the assessment of documents of the supervised legal entity). Order No , 15th of June, 2011, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Rules of Procedure for Confirmed Written and Published Public Consultations, was amended in 2016 (new edition Nuclear Safety Requirements BSR Rules of Procedure for Confirmed Written and Published Public Consultations ). The main goal of the amendment was to harmonize the provisions of the Requirements with recently amended general rules of providing services in state institutions. Radiation protection: Order No , 29th of April, 2016, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR On Procedure of Obligatory Radiation Protection Training, Examination, Briefing of Radiation Workers and Radiation Protection Officers Involved in Activities with Sources of Ionising Radiation in Nuclear Energy Area and of Certification of Natural Persons Seeking to Obtain Right to Teach Radiation Protection, was adopted due to amendments of the Law on Radiation Protection in 2016, mentioned in Article 7.1 of this report. Management system: Order No , 21st of June, 2010, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Management System Requirements, was amended in 2016 (new edition Nuclear Safety Requirements BSR Management System ). The regulation sets requirements for establishment, implementation, assessment and continuous improvement of the management system of the licensees acting in the field of nuclear energy and defines basic requirements for development of safety culture. The most significant changes are: 1) Broadened scope of application these requirements are now mandatory to persons with the licence for shipment of nuclear fuel cycle materials, nuclear materials and fissile materials and for acquisition, possession and usage of nuclear materials and fissile materials in quantities established in Annex 1 of the Law on Nuclear Safety; 2) Introducing requirements for security culture; 3) Transposition of the Safety reference levels for existing reactors, issued by the Western European Nuclear Regulators Association (WENRA) on 30th of May, Order No , 29th of January, 2014, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Management of Construction of Nuclear Facility, was adopted. It establishes requirements for license holder s quality management system for construction of safety related structures, systems and components of nuclear facilities during the phases of construction, operation, decommissioning of nuclear facilities and surveillance of closed radioactive waste repositories. Operation: Order No , 7th of October, 2011, approved by the Head of VATESI On the approval of Nuclear Safety Requirements BSR Categories of Modifications of Nuclear 30

31 Installations and Procedure of Performing the Modifications, was amended in 2015 (new edition Nuclear Safety Requirements BSR Categories of Modifications of Nuclear Installations and Procedure of Performing the Modifications ). The Requirements establish categories of modifications of nuclear installations and assigns the licensee with the responsibility to document the modification process, carry out safety assessments and in the case of safety related modifications to submit documents for the approval of VATESI. The new edition endeavours to streamline the modification procedure during construction and commissioning of nuclear facilities and refines upon the description for categorization of modifications. Order No , 16th of July, 2015, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Commissioning of Nuclear Power Plant. The new nuclear safety requirements sets requirements for commissioning of nuclear power plants with pressurized or boiling light water reactors and pressurized heavy water reactors, including requirements for preparation, content and scope of commissioning programme, management of the commissioning process, implementation of the commissioning programme. Order No , 30th of July, 2010, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Notification on Abnormal Events in Nuclear Power Plants, was amended in The amendment introduces a more detailed procedure for analysis of licensees reports on abnormal events, carried out by VATESI. The amendment also establishes procedure for independent investigation of nuclear and radiological accidents, carried out by VATESI, including the scope of the investigation and rights and responsibilities of investigation commission. Order No , 10th of April, 2014, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Fire Safety of Safety related Structures, Systems and Components important to Safety of Nuclear Facility, was approved to establish requirements for fire safety of structures, systems and components important to safety of nuclear facility. It replaces requirements approved by the Head of VATESI, Order No. 42, October 11th, 2002, of a similar scope. The main goals of the new Requirements are to: 1) Adjust it to the recent general changes in nuclear energy safety legal acts; 2) Establish the applicable criteria and requirements for the protection against fires of safety related structures, systems and components important to safety of nuclear facility, including the commissioning and decommissioning stages, and aims to prevent or to limit the consequences of such fires; 3) Establish the requirements to apply defence in depth principle for the design fire safety assurance measures of safety related structures, systems and components important to safety of nuclear facility; 4) Establish the requirements for subdivision of the nuclear facility buildings into fire compartments and fire cells. Decommissioning: Order No , November 30th, 2015, approved by the Head of VATESI On the approval of Nuclear safety requirements BSR Decommissioning of Nuclear Facilities, was approved. The new requirements replace requirements of 2009 of a similar scope and include following main changes as compared to previous legislation: 1) List of definitions was significantly updated and specified (e.g., decommissioning project, surrogate radionuclides, background radiation, etc.); 2) The provisions for performing various radiological surveys during decommissioning of nuclear facility were clarified (e.g. characterization, scoping, final status, verification radiological surveys); 3) The requirements were harmonized with IAEA s General Safety Requirements Part 6 Decommissioning of Facilities and WENRA s Safety reference levels for the decommissioning of nuclear facilities; 31

32 4) The requirements for decommissioning projects, safety analysis and justification of decommissioning of nuclear facilities were laid out in more details; 5) Based on experience gained during the INPP s dismantling and decontamination activities, the requirements for dismantling and decontamination activities, removal of structures, systems and components and other preparatory actions for decommissioning during period of transition between permanent shutdown and the issuing license for decommissioning were streamlined. Radioactive waste and spent fuel management: Order No , May 27th 2015, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Radioactive Waste Acceptance Criteria For Near Surface Repository, was adopted. The requirements establish waste acceptance criteria for low and intermediate level short-lived radioactive waste to the near surface repository and requirements for radioactive waste packages specifications of low and intermediate level short-lived radioactive waste to be disposed to the near surface repository. The requirements replace the Order No , 27th of April, 2009, approved by the Head of VATESI of a similar scope. Nuclear Security: Order No , 4th of April, 2012, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Physical protection of nuclear facilities, nuclear material and nuclear fuel cycle material, was amended in The amendment establishes clear criteria for when the division to security areas of nuclear facility has to be reviewed. The amendment also strives to streamline the procedure of preparation, review, renewal and agreement of the security plan and provides for more detailed content of programme for evaluation of effectiveness of nuclear facility physical protection system. Nuclear Material Accounting and Control: Order No , May 30th, 2014, approved by the Head of VATESI On the Approval of Nuclear Safety Requirements BSR Rules of Procedure of Nuclear Material Accounting and Control, and Provision of Information about Research and Development Activities and repeal of some Orders approved by the Head of State Nuclear Power Safety Inspectorate, was adopted. It establishes requirements for nuclear material accounting and control and also rules of procedure for provision of information on nuclear fuel cycle related research and development activities to European Commission and VATESI. This document replaces General Requirements of Nuclear Material Accounting and Control and Provision of Information about Activities in the Field of Nuclear Energy or Another Fields Related to the Use of Nuclear Energy (approved by the Head of VATESI, Order No , January 28th, 2008,) and Recommendations for Implementation of the General Requirements (approved by the Head of VATESI, Order No , January 28th, 2008). Compared to the previous regulation, the new Rules of Procedure provide for more detailed and mandatory rules and as well as introduce a possibility of accounting for nuclear material in a nuclear material balance zone established by VATESI for natural persons using nuclear material for purposes other than commercial activities and legal persons handling nuclear material for short periods or those not required to obtain a license Overview of the process of establishing and revising regulatory requirements, including the involvement of interested parties Pursuant to the Article 5 of the Law on Nuclear Safety, the Head of VATESI approves the nuclear safety requirements and the nuclear safety rules, mandatory to all persons acting in the field of nuclear energy and approves the description of the procedure for drafting the nuclear safety requirements and the nuclear safety rules. The procedure of issuing these documents consists of these stages: 1. Planning. Pursuant to Nuclear Safety Requirements BSR Rules of Procedure for Drafting of Nuclear Safety Requirements and Nuclear Safety Rules, the five-year Program for Development of Normative-Technical Documents, describing priorities and needs of the 32

33 development of these documents in the different areas of nuclear safety (the Programme for is currently in force; it is revised every year) and The Plan for drafting and review of Normative- Technical Documents (for each year) are approved by the Head of VATESI. 2. Drafting. The draft of nuclear safety requirements or rules is developed by specialists of VATESI and discussed internally. 3. Agreement. The draft of nuclear safety requirements or rules is provided for agreement of other state institutions (if needed) and for comments or proposals of other interested parties (licensees, such as INPP, RATA or VAE) by publishing it in the Legislative Information System of Chancellery of Seimas (Parliament of Republic of Lithuania) (the addressees get notifications about a new draft), which is a mandatory procedure. As the database is public, all drafts are also available for the comments of the public. If there are a lot of relevant and complex comments or proposals, meetings can be organized in order to discuss and solve the issues. 4. Approval by the Head of VATESI and publishing in the Register of Legal Acts. Article 7(2)(ii) System of licensing 7.5. Overview of the licensing system and processes including types of licensed activity The Law on Nuclear Energy and the Law on Nuclear Safety together with the regulations made under the Laws establish the authorisation system for activities related to nuclear materials or nuclear fuel cycle materials, as well as for nuclear facilities during the following life-stages: site evaluation, design, construction, commissioning, operation and decommissioning as well as release from control. The supervision of closed radioactive waste repository, acquisition, keeping, use and transportation of nuclear or nuclear fuel cycle materials is also executed according to the laws mentioned above. Some of the steps of the licensing process are divided into several sub-steps. Licences, permits and approvals of the documents are used as authorisation steps and sub-steps. The Law on Nuclear Safety establishes types of licences and permits issued by VATESI. It also should be mentioned that some activities (hold points) during various stages in the lifetime of a nuclear facility require separate authorizations that have to be supported by safety review and assessment. The Law on Nuclear Safety together with the Regulations on the Issue of Licences and Permits Necessary to Engage in Nuclear Energy Activities and the Rules on Import, Export, Transit and Transport of Radioactive Material, Radioactive Waste and Spent Nuclear Fuel regulates issuance, amendment and suspension of licences and permits, listed in the Law on Nuclear Safety, supervision of keeping, list of documents which have to be submitted for issue of every type of licences and permits or amendments of a licence or permit, and instructions for providing documents, which must be provided in order to get a revocation of suspension of licences and permits. Detailed requirements for the safety document are determined in respective nuclear safety requirements and rules issued by VATESI. Some requirements for content of the documents that applicant is required to provide for the issue and amendment of an appropriate licence or permit are established by the aforementioned Regulation as well. Together with the application to issue a licence or permit a schedule of application documents has to be prepared and agreed with VATESI. The Law on Nuclear Safety sets requirements and conditions for acceptance of application, acceptance of a schedule of application document, as well as time limits of the acceptance of application and agreement on schedule. According to VATESI internal management system documents Procedure Document on Review and Assessment of Safety Justifying Documents and Procedure Document for Licensing, specialists of VATESI have to prepare review and assessment reports as well safety evaluation reports in support to VATESI decisions on the issue of authorization. According to recent practice, safety evaluation reports are usually available to applicant (licence holder) and its summary is available to 33

34 public on VATESI website. List of the documents, under which a licence or permit is issued is required to be added to a licence or permit. The Law on Nuclear Safety sets requirements and conditions and time limits for issuance of a licence and permit. Some additional conditions (e.g., necessary authorisations by other national regulatory bodies) are also established by the Law on Nuclear Safety as well as the Law on Nuclear Energy. Licence or permit has to be issued for an unlimited period of time until official decision of the regulatory body in this regard (with an exception for permits to transport radioactive materials or spent nuclear fuel). The permits to transport radioactive materials or spent nuclear fuel are issued for 3 years period. The Law on Nuclear Safety also determines conditions for making decision not to issue a licence or permit specifying the reasons based on provisions of the Law. Law on Nuclear safety determines the right of VATESI to set licence or permit conditions. Conditions can be amended in prescribed manner by VATESI. Following the provisions of the Law on Radiation Protection VATESI issues licences and temporary permits for the nuclear energy area activities involving the sources of ionising radiation, which mainly are either a licence or a temporary permit to carry out activities under ionising radiation at a nuclear facility and a licence or a temporary permit to use and store sources of ionising radiation at a nuclear facility Involvement of the public and interested parties VATESI applicants, licence holders, other regulatory bodies involved and public in authorization process are considered as VATESI stakeholders for external communication in the VATESI Manual of Integrated Management System and the Procedure Document on Monitoring of Interested Parties. The Documents define approaches for communication with every group of stakeholders, its expectations, and communication tools. According to legal acts regulating public information, VATESI has to provide information on VATESI decisions and on the bases for decisions which were made for granting or refusing an authorisation. Usually, the following information is provided to the public: short description on the licence, permit or temporally permit issued and licensed activity (or refusal of an authorisation) in VATESI News page on VATESI web site; title and requisites of a licence permit or temporally permit holder and number, date of issue, date of amendment or revocation of a single licence or permit in VATESI web page Services. VATESI informs public according to the management system document Procedure Document on Public Communication Legal provisions to prevent the operation of a nuclear installation without a valid licence The Law on Nuclear Safety Article 22, Part 4 prohibits every activity associated with nuclear facility, nuclear materials and nuclear cycle materials without an authorisation issued by VATESI (licence or permit prescribed in the Law). Article 7(2)(iii) System of regulatory inspection and assessment 7.8. Regulatory strategies VATESI carries out inspections of facilities and activities to verify that the authorized party (license holder) is in compliance with the regulatory requirements and within the conditions specified in the authorization (license). The regulatory inspections are conducted at all stages of the lifetime of a nuclear facility: during the evaluation of a construction site for a nuclear facility, construction, commissioning, operation or decommissioning stages. VATESI have right to inspect the applicants for obtaining licenses, permits and temporary permits, license, permit and temporary permit holders, 34

35 suppliers of goods or contractors performing works for the holders of VATESI issued licenses and permits, the entities carrying out the assessment of the construction site of the nuclear facility and other entities performing operations related to nuclear or nuclear fuel cycle materials. VATESI inspects activities of an organization that are related to nuclear safety, radiation protection, physical protection and to the fulfilment of obligations on non-proliferation of nuclear weapons Overview of the regulatory inspection and assessment process with regard to the safety of nuclear installations and basic features of inspection programmes The regulatory inspections of facilities and activities are planned (included in the annual plan) or unplanned. The unplanned inspections can be announced or unannounced. VATESI conducts four general types of inspections, namely Special inspections, Regular (routine) inspections, Technical checks and Regulation checks. Special inspections are carried out by VATESI inspectors to control the satisfaction of defined safety requirements, conditions of structures, systems and components, satisfaction of requirements defined in the normative technical documents of the licence holder. Regular or routine inspections are periodically recurring activities which necessary to control the satisfaction of defined safety requirements by state management and supervisory bodies and by inspected organization. Technical checks are verification of technical conditions of nuclear facility s separate systems, facilities and equipment, defined in the special (operation, test, repair and similar) technical normative documents. The objective of Technical checks is to ascertain that important to safety pressurized components at INPP (equipment and pipelines) have been manufactured, connected, installed, maintained and operated in accordance with the requirements of the regulations and operation manuals, as well as that they are in good condition and it is possible to use them in the course of the start-up commissioning works and to operate the facility at the specified operational parameters (e.g. pressure and temperature). Regulation checks are inspections of personnel particular actions (activities) given in nuclear facility s Technical Specification (the principal document that defines safety of INPP operation). Usually Regular (routine) inspections, Technical and Regulation checks are carried out by VATESI s resident inspectors from Surveillance Division. Inspections shall be planned and conducted in compliance with the principle of graded approach, in order to ensure a more efficient use of financial and human resources and to target inspections at activity areas which related to nuclear safety, radiation protection and physical protection and to the fulfilment of obligations on non-proliferation of nuclear weapons and pose a higher potential risk to employees of the economic entities being supervised, population and environment. While selecting the areas for inspections, priority shall be given to areas posing the highest risk to be assessed taking into account the following aspects: the quantity, composition and physical state of radionuclides in the nuclear facility or in an individual unit of its equipment, the probability of their spread and their potential impact on employees, population and environment; the risk of failure of physical safety barriers containing radionuclides; the availability of access to nuclear materials and/or nuclear fuel cycle materials; the number of employees and/or population who may be affected by licensed activities, failures of nuclear facility or its individual equipment, including nuclear and radiological unusual events and accidents, and potential damage such failures may do to the environment and property of people; data of nuclear facility safety indicators and their variation trends, if applicable; for respective SSC: safety class (if these are classified in terms of safety); seismic category (if these are categorised); potential risks of failure and consequences thereof; 35

36 importance to safety under the conditions of external danger (such as extreme meteorological and geological phenomena, etc.); passivity; the periodicity of implementing maintenance, surveillance and inspection measures to be undertaken by the holder of licence and/or permit, in order to ensure functionality of these SSCs; ageing; ongoing and/or implemented modifications; results of maintenance, surveillance and inspections; operational experience of the nuclear facility and SSCs and experience of other persons operating in the sector of nuclear energy; results of previous inspections. Periodicity of inspections is established considering results of previous inspections and essential events, which has influence on organization activities. The main regulation for conducting regulatory inspection is Nuclear Safety Requirements BSR Inspections Conducted by State Nuclear Power Safety Inspectorate. Based on the BSR , VATESI management document The Procedures for Special Inspections and for Routine Inspections by VATESI were drafted and approved. These procedures were superseded by VATESI management system document Procedure document for inspections PR-6, approved on November 6, In 2015, Nuclear Safety Requirements BSR Inspections Conducted by the State Nuclear Power Safety Inspectorate were revised, in order to make more clear provisions related to the procedure of organizing and conducting inspections of supervised economic entities. The revisited legal act came into force on 1 May 2016, and it is followed by the revision of the internal inspection procedures. The systematic performance of inspections is ensured by developing an annual plan of inspections in accordance with the established criteria and taking into account risk in the corresponding activity. The annual inspections plan involves all types of inspections. Backbone of this plan is Regular (routine) inspections with established periodicity in the procedure document PR- 6. Comprehensive analysis of particular area (for instance, management of beyond design basis accidents, quality management, safety culture, ageing management, assessment of operational experience, implementation of modification) are performed during Special inspections. Also description of safety related areas, which should be cover during construction, operation or decommissioning, are described in Procedure document for inspections PR-6. Regular inspections are based on inspection areas (initiating events, safety systems, integrity of physical barriers, emergency preparedness, radiation protection, radioactive waste management), safety indicators (readiness of safety systems, integrity of fuel and others) as well as list of safety related systems (Emergency core cooling system, system of protection against overpressure in the Main Circulation Circuit, Accident confinement system, Service water system, Intermediate circuits, Electric power supply system, Reactor power control systems and others) which are under supervision of VATESI. The results of an inspection are put down in report, and the organization that has been inspected is familiarized with it. If violations of regulatory requirements or incompliances with good practice are found during the inspection, the enforcement actions shall be applied in accordance with the procedure set forth by the laws. The inspection report together with the document formalizing the enforcement measures shall be sent to the organization. The latter, after having analysed the documents regarding application of the enforcement measures, has to draw up a plan aimed at eliminating detected violations. VATESI performs supervision of the plan of implementation of corrective measures. Each year the following safety-related areas are inspected: training of INPP personnel, safety systems and safety-related systems (emergency core cooling system, emergency power systems, fire protection systems, system of protection against overpressure in the Main Circulation Circuit and 36

37 others), management of beyond design basis accidents, quality management, management of radioactive waste, safety culture, ageing management, emergency preparedness, assessment of operational experience and others. The number of inspections performed by VATESI during period are presented in Figure 7.1. Inspections performed by VATESI in Number of inspections (43) 2014 (42) 2015 (43) Special inspections Regular inspections Technical checks Unplanned inspections Figure 7.1 Inspections performed by VATESI in Article 7(2)(iv) Enforcement of applicable regulations and terms of licences Power for legal actions In performing the state regulatory and supervision functions of nuclear safety, pursuant to Article 11 Paragraph 2 the Law on Nuclear Safety, VATESI applies enforcement measures in the manner set out by the Law on Nuclear Safety and other legal acts, requires relevant persons to implement corrective measures and (or) to eliminate the violations, and supervises the implementation of such requirements Overview of enforcement measures available to the regulatory body Enforcement measures are applied in accordance with legal principal of graded approach. All enforcement measures which are used by VATESI are arranged progressively considering the character of violation. VATESI is empowered to impose the following administrative enforcement measures: to issue an economic entity with a written order to eliminate insignificant violation of requirements of legal acts; to issue the licence or permit holder with a warning from the Head of VATESI before issuing them with the mandatory requirement; to provide mandatory requirements to all licence or permit holders, committing them to eliminate the detected violations in nuclear safety, to suspend the works within the time-limits set by the Head of VATESI and/or to shut-down the nuclear reactor, to decrease its capacity, to discontinue operation of other equipment or activities according to Law on Nuclear Safety; to warn the legal entity about suspending of the license, permit (temporary permit), to suspend the license, permit (temporary permit), to revoke the license, permit (temporary permit); to warn natural persons with an attestation certificate to train persons responsible for radiation protection about suspension of attestation certificate, to suspend attestation certificate, to 37

38 warn about termination of the validity of attestation certificate and to terminate the validity of attestation certificate; to impose administrative fines on natural persons according to Code of Administrative Offences of the Republic of Lithuania; to impose fines on legal entities according to the Law on Nuclear Safety (otherwise known as economic sanctions) Experience with legal actions and enforcement measures In the period of VATESI issued: mandatory requirements to eliminate detected violations of the nuclear safety requirements and rules (to take remedial actions); warnings to the licence holders about consequential suspension of the licence. Article 8 Regulatory Body 1. Each Contracting Party shall establish or designate a regulatory body entrusted with the implementation of the legislative and regulatory framework referred to in Article 7, and provided with adequate authority, competence and financial and human resources to fulfil its assigned responsibilities. 2. Each Contracting Party shall take the appropriate steps to ensure an effective separation between the functions of the regulatory body and those of any other body or organization concerned with the promotion or utilization of nuclear energy. Article 8(1) Establishment of the regulatory body 8.1. Legal foundations and statute of the regulatory body In accordance with national legislation, the Convention on Nuclear Safety, other international conventions and treaties, the Republic of Lithuania undertakes appropriate measures to ensure the safety of nuclear installations under its jurisdiction through the establishment of legal framework and infrastructure necessary to maintain the effective nuclear safety regulatory system. VATESI was established by the Decree of Government on 18 October 1991 to regulate and supervise the safety of nuclear power facilities within the territory of Lithuania. On 21 October 1992, the Government of the Republic of Lithuania approved the Statute of VATESI assigning its main duties, functions and rights. VATESI activities are financed by the Lithuanian state budget appropriations and other legitimate income. VATESI s statute was amended in 2016 due to new functions assigned to VATESI pursuant to the amendments of the Law on Radiation Protection (see Article 7.1 of this report). VATESI carries out its activities in accordance to strategic action plan and annual plan, approved by the Head of VATESI Mandate, mission and tasks of the regulatory body The legal framework establishes the VATESI as a single organization, responsible for state regulation and supervision of nuclear safety in Republic of Lithuania. VATESI sets safety requirements and rules, supervises compliance with them, applies enforcement measures in case of incompliance with safety requirements and rules, issues licenses, permits and temporary permits, assess safety of nuclear facilities and related activities. The mission of VATESI is to exercise the state regulation of, and supervise over the nuclear installations and the activities related to nuclear and nuclear fuel cycle materials, in order to protect the society and the environment against the harmful impact of exposure to ionising radiation. 38

39 The main tasks of VATESI in the area of nuclear safety is regulation and implementation of state regulation and supervision of nuclear safety, radiation safety of nuclear energy activities involving sources of ionizing radiation, physical protection of nuclear installations, nuclear materials and/or nuclear fuel cycle materials and accountancy and control of nuclear materials as well as supervision of requirements arising from international nuclear weapon non-proliferation obligations of Republic of Lithuania. Other tasks of VATESI: preparation and submission of national reports in accordance with international conventions and agreements; taking part in the activity of the IAEA, missions, commissions and committees of safety experts advisors; within VATESI s competence, cooperating with and participating in international organisations, associations and forums (ENSREG, WENRA, EURATOM, etc.); developing and maintaining multilateral and bilateral cooperation (with the IAEA, Sweden, the US, Japan, Ukraine, etc.). Decisions are taken independently by VATESI in carrying out its the statutory functions. VATESI responsibilities are kept apart from other institutions, agencies or organizations engaged in development of nuclear energy or nuclear energy utilization features Authorities and responsibilities of the regulatory body The Law on Nuclear Energy (last amendment in 2014) provides for main legal authority and responsibilities of Regulatory Body. Furthermore, the duties and responsibilities of VATESI are stated in the Statute of VATESI (Government resolution No of 21 of November, 2012, as amended in 2013 and 2016). According the Law on Nuclear Energy, VATESI exercises functions of the state regulation and supervision and performs the following main functions: creates and improves the state regulatory and supervision system for nuclear safety, radiation safety in the area of nuclear energy, physical protection of nuclear installations, nuclear and nuclear fuel cycle materials, as well as accounting and control of nuclear materials; prepares and submits to the Government drafts of laws and legal acts regarding regulating areas, and drafts and approves requirements and rules mandatory to all the state and municipal authorities, also to all persons engaged in such activities; supervises the compliance with requirements of the legal acts regulating nuclear safety, radiation safety in the area of nuclear energy, physical protection of nuclear installations, nuclear materials and nuclear fuel cycle materials, accounting for and control of the nuclear materials; supervises the implementation of requirements arising out of the international obligations for non-proliferation of nuclear weapons assumed by the Republic of Lithuania; analyses and assesses the documents submitted by applicants for obtaining a licence or a permit, also the documents submitted by licence holders or permit holders or other persons, adopt relevant decisions regarding such documents, review and evaluate the nuclear safety; supervises and inspects applicants, licence and permit holders or the persons rendering services, supplying goods or performing works for them or other persons engaged in activities pertaining to nuclear materials and nuclear fuel cycle materials; in the cases specified in the laws applies enforcement measures, suspends licences and permits, revokes suspension of licences and permits, or cancels licences and permits, establishes or changes their terms, supervises compliance with such terms, requires for implementation of corrective measures and elimination of infringements, and shall monitors the implementation of such requirements; in the event of a nuclear and/or radiological accident provides the interested state and municipal authorities with the time-critical information about the radiation situation in the nuclear 39

40 installation, estimated threats of the nuclear and/or radiological accident and other related information. Exercising the entrusted functions of state regulation and control of nuclear safety, VATESI has the right: to receive all information requisite for the review and evaluation of nuclear safety from persons, applicants and licence holders implementing the nuclear installation design, as well as from their service and goods providers, contractors or persons carrying out other activities related to nuclear and/or nuclear fuel cycle materials; in a manner prescribed by the laws and other legal acts receive all information and documents necessary for regulation and monitoring over the nuclear safety compliance with the requirements arising out of the obligations for non-proliferation of nuclear weapons and other international obligations assumed by the Republic of Lithuania from all the persons that possess such information; to coordinate actions with other state regulatory and/or municipal institutions, if it is required for the performance of the functions of the nuclear safety regulation; to obtain the services provided by experts and consultants, scientific-technical support organisations, other independent suppliers that are not related to the applicants, licence holders or persons involved in other activities related to nuclear and/or nuclear fuel cycle materials Organizational structure of the regulatory body The structure and competence of VATESI and its resources corresponds with the nature and scope of the activities in the field of nuclear energy, activities involving nuclear materials and other activities in the field of nuclear energy involving sources of ionising radiation undertaken and planned to be undertaken in the Republic of Lithuania. VATESI s staff comprises of state officials, public servants and employees, working under employment contracts. VATESI is headed by its Head, who has two Deputy Heads. The Head is appointed by the President on the proposal of the Prime Minister for a term of six years. The Deputy Heads are appointed by the Prime Minister on the proposal of the Head of VATESI for a term of six years. VATESI structure consists of 5 divisions and Administration department directly subordinate to the Head of VATESI, 3 divisions subordinate to Deputy head for Radiation Safety and 4 divisions subordinate to Deputy head for Nuclear Safety. Divisions are headed by heads of divisions. Work of a particular division is organized in accordance with the statue of the division and job descriptions of VATESI public servants and employees. Heads of divisions are personally responsible for the tasks and functions assigned to their units, and organization of labour discipline inside the division as well as they are responsible for implementing delegated tasks by the Head, Deputy Heads or Director of the Department, taking into account the subordination. Since January 1 st, 2014, VATESI has an Internal Audit Division, responsible for carrying out internal financial and activities audits. Current organizational structure is provided in Figure Development and maintenance of human resources of the regulatory body over the past three years From the middle of the year 2013 until the middle of 2016 there was a natural turnover of staff: of the permanent staff 2 civil servants retired and 4 civil servants left VATESI for different reasons and 5 new public servants were hired to take their place. In June 2016 the number of VATESI full-time staff positions was 75, and 68 of these 75 positions were filled (57 public servants, 8 employees under employment contracts and 3 state officials). 40

41 41 Figure 8.1 Current VATESI administrative structure Measures to develop and maintain competence One of the most important goals of VATESI in order to complete regulatory functions in a timely and appropriate manner is to maintain highly qualified and equipped with special knowledge personnel. Over reported period different methods of training formal training (courses, workshops), introductory training of public servants, initial internal training, lecturing by VATESI employees, independent study, work with more experienced specialists were used in order to maintain the qualification of more experienced employees and to train new employees. Dividing by topic, training included training of basic administrative skills and abilities, needed for public servants, and training of special professional knowledge (e.g. specific nuclear technologies). In III IV quarters of VATESI employees improved their skills at different training events in Lithuania, in , in and in I II quarters of Over reported period VATESI specialists also actively participated in the qualification improvement events arranged by the IAEA. In all, 47 VATESI specialists took part in 124 training events Developments with respect to financial resources of the regulatory body over the past three years VATESI is a state-financed institution financed from the national budget. VATESI budget is approved every year in the framework of the State Budget allocated to all state administrations. VATESI drafts its budget proposal and presents it to the Ministry of Finance and the Government for consideration. The final State Budget is approved by the Parliament of Republic of Lithuania.

42 8.8. Statement of adequacy of resources Over the reported period, during which VATESI was financed from State Budget, VATESI financial resources were adequate to its needs. Over reported period human resources were adequate to VATESI needs, taking into consideration the state of the nuclear energy programme in Lithuania Management system of the regulatory body VATESI has established and implemented integrated management system (IMS), aligned with the safety goals and corresponding to the requirements of standards ISO 9001:2008 and IAEA s Safety Requirements the Management System for Facilities and Activities No. GS-R-3. The scope of IMS includes all VATESI activities and functions. The VATESI management system is applied in the area of regulation and supervising of nuclear safety, physical protection of nuclear power facilities, physical protection of nuclear materials and nuclear fuel cycle materials, radiation safety of activities with ionising radiation sources in the nuclear power area, international obligations of the Republic of Lithuania with regard non-proliferation of nuclear weapons. IMS application relates to VATESI activities in the following areas: nuclear power safety, quality, environmental protection, information safety, and occupational safety and health. VATESI, with a help of external experts, has analysed existing management system, all regulatory responsibilities and functions, delegated to VATESI, all applicable national statutory and regulatory requirements, all requirements for the management system, determined in ISO 9001 and GS-R-3 standards, and using process approach identified 30 processes (see Figure 8.2). VATESI IMS processes are grouped into core, management and supporting processes for the implementation of delegated functions. Figure 8.2. Process interaction chart of VATESI IMS 42

43 8.10. Openness and transparency of regulatory activities, including actions taken to improve transparency and communication with the public VATESI and the licence holders must inform both the state and municipal institutions and the general public as well as other persons whose business activities are directly related to the licensed activities of a relevant licence holder about the conditions of nuclear safety in the manner required under the Law on Provision of Information to the Public and other legal acts. The organisations operating nuclear installations also must inform general public about the measures that are foreseen in the emergency preparedness plans which may have an impact on regular living conditions. VATESI has to deliver public announcements on the results of supervision the implementation of nuclear safety requirements. While implementing its regulatory functions VATESI provides confirmed written and/or public consultations to the legal entities that submitted written requests and/or questions or provides public consultations on its own initiative. The main means of ensuring the transparency of the decisions: draft legal documents are public in order to inform and get a response (suggestions, remarks, comments) from interested parties; consultations and meetings are organized on different issues with interested parties; regular public announcements on the information about the condition of nuclear safety in the Republic of Lithuania are announced; information on issues licences, permits, other authorizations is published on VATESI s website; all legal acts are public. Information on nuclear safety is prepared and disseminated using these methods: reports on implementation of conventions and EU law; VATESI annual reports (Nuclear Power Safety in Lithuania) and annual reports to The President and the Government in terms of activities and finances; VATESI website, press releases and other publications; possibility for students from universities to visit VATESI. To improve transparency and ensure feedback, VATESI organizes surveys of stakeholders, including public. The Annual Report of VATESI Nuclear Power Safety in Lithuania is also used as a measure of public communication. VATESI informs interested parties and public by publishing it online and sending it by mail to our interested parties, including local governments of Visaginas city and districts of Ignalina, Zarasai and Širvintos. It is also received by by subscribers of our website External technical support VATESI cooperates with the TSOs of Lithuania as well as of foreign countries, which provide VATESI with expertise and necessary technical-scientific support during safety reviews, verification of safety justifications, drafting of legal acts. Some TSOs are involved in international projects implemented through international and bilateral cooperation, coordinated by VATESI. Legal acts do not establish an advisory body for VATESI. Pursuant to Article 45 of the Law on Nuclear Safety, in selecting specific contractors, the principle of impartiality of the contractors shall be applied. The TSOs or experts and consultants which have already participated in preparing the documents on a nuclear installation design or the documents required for the evaluation of nuclear safety that were submitted when obtaining a licence or participated in the preparation of such documents under request of the licence holder, shall not participate in performing the review and assessment of the same documents. The TSOs and the 43

44 experts and consultants shall declare compliance with this requirement and their impartiality in the course of their selection carried out in the manner set out by the legal acts. During the reporting period the main VATESI cooperation directions with the Lithuanian TSOs are following: the evaluation work of decommissioning, equipment decontamination and dismantling of nuclear facilities at the INPP; expert services for VATESI in terms of the technical documents and the justifications of the INPP. Although services to support VATESI s regulatory functions and the corresponding budget for that are planned in advance, VATESI can purchase these services as soon as the need is determined. Expert support and advice is being secured in the frame of VATESI support projects in the area of decommissioning and waste management. Support to VATESI in the area of decommissioning has been an ongoing action since 2001 and is continued under the Ignalina Programme. Currently VATESI implements the sixth project. It is used for reviews of decommissioning-related submittals by technical support organisations. Technical support organisations are engaged to review decommissioning-related submittals, assisting VATESI in identification of requirements, documentation analysis, providing recommendations for improvements and conclusions, and performing test calculations, if needed. The consultants prepare a review of the relevant submittal (Dismantling and Decontamination Project, Technical Design Documentation, Safety Analysis Report, etc.) reports and as part of the review support work, representatives from the consultant also participate in meetings between the VATESI and INPP, the producers of the documents reviewed. The main technical support organizations of Western Europe and Lithuania that participate in the project and are engaged to review safety justifications of the interim storage facility for spent nuclear fuel assemblies and solid radioactive waste retrieval facility from the existing storage facilities and new treatment and storage facilities for INPP are following: Riskaudit (as managers of the project), IRSN (France), GRS (Germany), Kaunas University of Technology (Lithuania), former Institute of Physics (Lithuania). It is also worthwhile mentioning, that while implementing its duties to establish requirements and rules in the field of nuclear safety VATESI prepares drafts of legal acts and submits them for remarks and proposals to the state institutions, licence holders, TSOs and the public. Article 8(2) Status of the regulatory body Place of the regulatory body in the governmental structure VATESI is an independent state institution exercising the state regulation and supervision of nuclear safety, activities involving nuclear materials and other activities in the area of nuclear energy involving sources of ionising radiation which acts in accordance with the Law on Nuclear Safety, other laws and the Statute of VATESI. Supplementary to the Law on Nuclear Energy, other laws and legislative acts state the duties and competence of other state institutions and regulatory bodies, which provide VATESI with their respective statements before the regulatory authorization is granted by VATESI. Over reported period VATESI s position in Governmental structure remained as shown in Figure

45 45 Figure 8.3 VATESI position in Governmental structure Regulatory body reporting obligations The Head of VATESI is responsible for activities of VATESI and accountable to the President and the Government. VATESI informs other national and international bodies about its activities according to the national and international legal acts and treaties. In accordance with national legislation, VATESI coordinates its activities with other state bodies and institutions responsible for radiation safety and health care, emergency preparedness, civil protection, environmental protection, industrial safety and supervision of potentially dangerous industrial facilities. By 1st May each year VATESI has to submit an annual report on activities of VATESI and a set of financial statements to the President and to the Government of the Republic of Lithuania and have to make them public in the manner laid down in the legal acts. The President and the Government may invite the Head of VATESI to present the annual results of VATESI in terms of its activities and finances. In 2014 VATESI submitted the first report to the European Commission on the implementation of Council Directive 2009/71/EURATOM of 25 June 2009 Establishing a Community Framework for the Nuclear Safety of Nuclear Installations and will have to submit the second report no later than by 22nd of July, 2020 as required by Council Directive 2014/87/Euratom of 8 July 2014, amending Directive 2009/71/Euratom establishing a Community framework for the nuclear safety of nuclear installations Means by which effective separation of the regulatory body from the agencies responsible for promotion of nuclear energy is assured National legislation provides clear division between the responsibilities and functions of VATESI and those organizations or bodies engaged in development/promotion of the nuclear energy or use of nuclear energy, including production of electricity. The independence of VATESI as a regulatory body is deeply engraved in the national legislative system, as it is both established as a

46 principle in the laws and implemented through other legislative provisions and in practice. All of the following aspects of independence of regulatory body are present in Lithuanian legislation: All of the functions of VATESI and other state authorities that take part in regulating the activities in the area of nuclear energy are clearly defined in the laws and specified in secondary legislation, hence there are no duplications or omissions; The Head of VATESI, therefore VATESI itself, is accountable to the President of Republic of Lithuania and the Government of Republic of Lithuania. Moreover, the Law on Nuclear Energy sets a clear finite list of objective reasons for dismissal of the Head and Deputy Heads of VATESI, which allows to ensure that the state officials making the most important regulatory decisions shall not be dismissed on undue grounds; Pursuant to the Law on Nuclear Energy, VATESI is financed from state budget. Financial resources are allocated pursuant to VATESI s Strategic Action Plan, which is approved by the Head of VATESI. As a separate owner of allocations, VATESI shall have a right to dispose the allocated funds in a discretionary manner; VATESI is free to define and establish the structure of VATESI within the maximum allowable number of positions; Regarding decision-making, the Law on Nuclear Energy establishes the principle, that the Head and Deputy Heads of VATESI in their official capacity shall act independently from the persons engaged in activities in the field of the nuclear energy sector, also from other agencies, institutions or organisations engaged in development of nuclear energy sector, including generation of electricity. Independent activities imply a prohibition to be a member of a body of a legal entity, to accept other remunerated or public positions, to provide services or consultations, except the ones provided acting in the official capacity at VATESI, or to be engaged in other activities due to which a certain person, other agency, institution or organisation acting in the nuclear energy sector would or might gain unjustified competitive advantage over the persons engaged in relevant activities. A breach of this requirement shall be qualified as a serious misconduct. Moreover, the legal acts regulating civil and public service provide for legal means to require the employees of VATESI to be impartial, unselfish, objective and avoid the conflict of public and private interests, including the obligation to opt out from any actions that can cause a conflict of interests; Other institutions do not agree on, review or evaluate VATESI s regulatory decisions. In some cases, decisions have to be made or other activities have to be carried out by other institutions before VATESI makes a decision, for example, a permit shall be issued or conclusions received from another authority, but such decisions are made within their area of competence, therefore there is no duplication with VATESI s area of competence; Liability for the nuclear safety is clearly allocated. Pursuant to Article 16 of the Law on Nuclear Safety, full liability for the nuclear safety of a nuclear installation and for nuclear safety in carrying out other activities with nuclear and/or nuclear fuel cycle materials shall solely fall on persons that are engaged in such activities and hold relevant licences and/or permits. Several Nuclear Safety Requirements also have a provision, declaring, that supervision activities by the regulatory body do not relieve the licensee from responsibility for safety. 46

47 Article 9 Responsibility of the Licence Holder Each Contracting Party shall ensure that prime responsibility for the safety of a nuclear installation rests with the holder of the relevant licence and shall take the appropriate steps to ensure that each such licence holder meets its responsibility Formulation in the legislation assigning the prime responsibility for safety to the licence holder Article 3 of the Law on Nuclear Safety of the Republic of Lithuania establishes basic principles for ensuring nuclear safety where the first one is the principle of liability for ensuring nuclear safety. Article 3 of the Law on Nuclear Energy of the Republic of Lithuania identifies the legal principles of activities involving nuclear materials and other activities in the field of nuclear energy involving sources of ionising radiation. The first paragraph of the article states, that activities involving nuclear materials and other activities in the field of nuclear energy involving sources of ionising radiation in the Republic of Lithuania shall be permitted only subject to a licence or a permit issued by an authorised state institution. If such activities are conducted without a licence or a permit, they shall be held illegal and shall incur legal responsibility as provided by the laws of the Republic of Lithuania. The second paragraph states, that a licence holder or a permit holder shall be liable for compliance of the activities pursued thereby with the requirements of this Law, the Law on Nuclear Safety, the Law on Radiation Protection, the Law on Management of Radioactive Waste, other laws and legal acts. The final paragraph of the article defines, that an applicant having filed an application for a licence or a permit, and a licence or a permit holder shall notify state and/or municipal authorities, international organisations and the general public of the intended or pursued activities in the manner prescribed by the Government or its authorised institution. Article 16 of the Law on Nuclear Safety of the Republic of Lithuania determines that full liability for the nuclear safety of a nuclear installation and for nuclear safety in carrying out other activities with nuclear and/or nuclear fuel cycle materials shall solely fall on persons that are engaged in such activities and hold relevant licences and/or permits. The Law on Nuclear Energy of the Republic of Lithuania identifies the following responsibilities of a licence holder: The licence holder shall be responsible for the adequate and safe operation of the installation in accordance with the requirements stipulated in the laws and other legal acts, also in the articles of association, internal work rules of the licence holder and in the terms of the issued licence. The licence holder shall be responsible for safety of its activities and the nuclear installation. A nuclear installation shall be used only for the intended purpose as stipulated in its design. The purpose of nuclear installations may be changed in accordance with the procedure provided in the legal acts. The licence holder shall: include into accounting the nuclear materials belonging to the nuclear installation or used in the operation and exercise their control in such a manner as to ensure performance of the obligations of the Republic of Lithuania regarding the guarantees of the IAEA and the European Atomic Energy Community (the EURATOM); investigate nuclear and/or radiological accidents and nuclear incidents in the manner prescribed by the laws and other legal acts; notify VATESI and other interested institutions in the manner prescribed by the laws and other legal acts about all the violations of conditions and requirements for nuclear safety and all the malfunctions of the structures, systems and components ensuring safety of a nuclear installation, also shall notify promptly about a nuclear accident and/or radiological emergency, and shall inform of 47

48 level of the accident estimated according to the International Nuclear and Radiological Event Scale (INES) and recommended actions for protection of the population; analyse and evaluate the risk of nuclear and/or radiological accidents in the nuclear installation to the population, their property and environment and shall prepare an emergency management plan as well as ensure preparedness to mitigate the consequences of a nuclear accident and/or radiological emergency in the nuclear installation; perform other duties established on the grounds of Law on Nuclear Energy and other laws. In addition, Organisations operating nuclear installations and other holders of licences and/or permits, according to the national legal requirements shall: have the material, financial and human resources that are sufficient for involvement in the licensed activity or operations regulated by permits in compliance with the legal acts and technical standard documents of nuclear safety; ensure high level of safety culture and competence of the organisation and its workers; on a regular basis analyse the state of nuclear safety and improve it; consider human factors (human capabilities and their limits) at all stages of life of a nuclear installation; maintain an effective integrated management system with due priority on nuclear safety; develop an organisational structure which would ensure the fulfilment of nuclear safety policy formation, implementation and control functions; ensure radiation protection of staff and population during normal operation, and for design basis and beyond design basis accidents not to exceed the allowed levels of exposure for staff and population; implicitly follow the conditions of the licence; ensure quality of the licensed activity, proper management of documentation, its storage during all life-time of a nuclear installation, renewal in time and approval by licensing authority when it is necessary; be responsible for the safety of a nuclear installation even if the validity of the licence is suspended or it is revoked; monitor emissions of radionuclides into the environment in a systematic manner; monitor and investigate the contamination of a nuclear installation/site and environment in a systematic manner and present to the regulatory institutions with the data about emission of radionuclides, contamination of a nuclear installation/site and the environment; apply principles of defence-in-depth and the ALARA. A licence holder is liable for the nuclear damage resulting from the activity subject to the licence or related to that activity to the natural and legal persons, their property or to the natural environment. The organization shall insure a nuclear installation or procure in some other way the funds necessary to compensate for the damage after a nuclear accident as assumed by the Republic of Lithuania according to the Vienna Convention on Civil Liability for Nuclear Damage Description of the main means by which the licence holder discharges the prime responsibility for safety Since the final shutdown of both INPP units, the INPP mission changed from that of an electricity producer to that of a decommissioning organization while still a regulated nuclear facility. Therefore, the INPP goals are to safely and in an adequate manner carry out activities related to the INPP reactors final shutdown and implement the INPP decommissioning activities, nuclear and radioactive material and waste management by effectively and consistently implementing the required measures, as well as reasonably and efficiently using the funds allocated for implementation of the INPP decommissioning and related measures. 48

49 The integrated management system based on processes (see Article 13 of this report) implemented at the INPP encompasses all organizational components (including its structure, resources, processes and safety culture) in order to set the goals and tasks for the enterprise and to enable to reach these goals and tasks which among others include: safety, quality, environment protection, worker safety and health, fire, radiation, physical protection, economic aspects and social responsibility. The main objective of the INPP management system is to ensure and improve safety during the decommissioning process in such a manner as other requirements laid down for the enterprise and (or) its needs would not be evaluated separately from the requirements for safety, as well as in order to avoid potential negative impact to safety Description of the mechanism by which the regulatory body ensures that the licence holder discharges its prime responsibility for safety VATESI is obliged to ensure the state regulation and supervision of nuclear safety and radiation protection at nuclear installations and other related organizations. According to the Law on Nuclear Safety of the Republic of Lithuania the main target of VATESI in the area of nuclear safety is to exercise the state regulation of, and supervise over the nuclear installations and the activities related to nuclear and nuclear fuel cycle materials, in order to protect the society and the environment against the harmful impact of exposure to ionising radiation. The main tasks of VATESI in the area of nuclear safety is development and regular improvement of the nuclear safety regulatory system, evaluation of safety of nuclear installations and the activities related to nuclear and nuclear fuel cycle materials, issuance of licences and permits, monitoring of the compliance with legal acts by conducting inspections, and if required application of enforcement measures in the manner set forth by the legal acts of the Republic of Lithuania. Also see Chapter 8.3 of this report Description of the mechanisms whereby the licence holder maintains open and transparent communication with the public The INPP, according to legislations of the Republic of Lithuania, as well as to inner documents of the enterprise, maintains transparent communication with authorities, public, press and local society about the enterprise s financial status, provides information related to nuclear safety. The enterprise prepares and distributes information about unusual events to state institutions, local authorities, public, as well as by placing information on the INPP website Pursuant to the provisions of the Law on Environmental Impact Assessment of the Planned Economic Activity of the Republic of Lithuania and the Procedure for Notification and Participation of the General Public in the Environmental Impact Assessment Process of the Planned Economic Activity, the developed Environmental Impact Assessment Reports are placed on the INPP external website for the notification and familiarization of the general public. Hard copies of the reports are available at the INPP Communication Division and the local Municipality for those wishing to read the reports. The affirmative decisions regarding the possibility to carry out the planned economic activity under consideration issued by the responsible institution are published on the INPP external website. Based on the Nuclear safety requirements BSR Management system, INPP has developed the procedure for information concerning interested parties who raised reasonable claims or expressed their opinion about INPP activities, provision, administration and responsibility for usage of that information. Pursuant to the established procedure, INPP Communication Division informs the society periodically and maintains open communication with the public on the issues related to the enterprise; relevant decisions taken, implementation or completion of the decommissioning projects, structure of the enterprise, environmental safety, technical visits and other INPP activities related information. 49

50 The Management Procedure External and Internal information was reviewed and approved in July Activity on external and internal information is performed in order to timely inform the plant personnel, public, mass media and state institutions by means of preparation and transmission of information about INPP. Information about INPP condition, information about implementation of important projects, information about organizational changes at INPP including those related to the decommissioning process of INPP power units is presented by the Communications Department personnel placing the constantly updated information at INPP web-site Internal information includes regular editions of Information bulletins, broadcasting of weekly news by the plant radio and placing of relevant information to the internal web-site Description of the mechanism ensuring that the licence holder of the nuclear installation has appropriate resources (technical, human, financial) and powers for the effective on-site management of an accident and mitigation of its consequences Ministry of Energy of Republic of Lithuania executes control over financing of the INPP, assigns an independent auditor to review financial documentation of the INPP, and approves financial results of the INPP. During the process for confirming the adequacy of applicant s financial resources VATESI verifies the applicant's financial capacity in the Register of Legal Entities. According to the requirements of VATESI licensee shall prepare and approve list of safety related staff, specifying the job, competence requirements and the required minimum number of employees, also licensee shall have a long-term plan of obtaining employees. If the licensee intends to change the organizational structure or the number of employees, this change shall be implemented as a modification with the relevant safety justification and shall be approved by VATESI (also see Articles 11, 12 and 14 of this report). The Law on Nuclear Safety establish the general requirements for the prevention of nuclear and radiological accidents and nuclear incidents and emergency preparedness. Pursuant to Article 35 of the Law on Nuclear Safety in order to prevent nuclear and/or radiological accidents, nuclear incidents and other unusual events as well as to avoid their reoccurrence and to secure and further improve safety in the area of nuclear energy, at all stages of a lifecycle of a nuclear installation the licence holder shall be required to regularly analyse its own or other persons that are engaged in the nuclear energy sector experience as well as to exchange such experience and take necessary preventive and/or corrective measures that would ensure proper performance of nuclear safety requirements in the manner prescribed by the VATESI (also see Articles 15, 16 and 19 of this report). Article 10 Priority to Safety Each Contracting Party shall take the appropriate steps to ensure that all organizations engaged in activities directly related to nuclear installations shall establish policies that give due priority to nuclear safety Overview of arrangements and regulatory requirements regarding policies and programmes to be used by the licence holder to prioritize safety in activities for design, construction and operation of nuclear installations Safety as the highest priority is emphasised within the Law on Nuclear Energy of the Republic of Lithuania and within the national system of regulation of nuclear safety. The first article of the Law identifies the main goal of state regulation in the field of nuclear energy to ensure nuclear safety and preclude impermissible use and proliferation of nuclear materials and technologies. 50

51 According to the Law, the safety requirements and other legal documents the INPP established its policies, necessary structures, activities and integrated management system based upon the priority on safety. The VATESI performs the regulatory activities to ensure constant adherence of the licence holders to the safety requirements and proper prioritization of safety. Pursuant Lithuania s legislation, the licence holder bears full responsibility to ensure the safety. The Law on Nuclear Safety of the Republic of Lithuania determines the basic principles based on IAEA Safety Fundamentals for ensuring nuclear safety Measures taken by licence holders to implement arrangements for the priority of safety INPP Policy Statement The INPP, being the Operating Organization, is responsible for nuclear installation safety assurance in accordance with the international practice and pursuant to provisions of Article 3 of the Law of Nuclear Safety of the Republic of Lithuania undertakes full responsibility for the plant safety and establishes policy that gives the top priority to the plant safety. INPP Safety culture development Activities on Safety Culture development are performed in order to increase constantly nuclear safety by means of improvement of management and personnel attitude to safety, what provides safe and correct execution of works and creation of atmosphere of openness and mutual respect. During reporting period Safety culture management procedure and procedures for evaluation of safety culture were reviewed at INPP within the frame of integrated management system of organization. For safety culture evaluation INPP uses questionnaires (every three years), safety culture indicators (quarterly) and self-assessment of activities (once per year). Safety culture evaluation reports are submitted to the VATESI and managers of INPP departments. At INPP monthly meetings are held. The aim of these meetings is to exchange information about the status of the current affairs at the plant, to discuss the important safety and organizational issues. The Director General of the INPP annually approves Plan of activities on safety culture development at INPP, where the specific measures on implementation of the INPP safety culture development programme are determined. Mainly those measures are the results of self-assessment of activities and evaluation of safety culture indicators. The main objective of the programme is to orient behavior of the plant personnel and contractors, also plant management methods to the achievement of the highest priority SAFETY. The safety culture development programme, results of safety culture evaluation and principles of strong safety culture are presented on internal website of INPP. This information is constantly updated. Assessment of Safety Culture is based upon the plant personnel questioning and Safety Culture indicators. Assessments of Safety Culture at INPP were performed in 1998, 2000, 2004, 2008 and Assessment method is based on the interview sheets questionnaires which were developed considering the Safety Culture features which are applied in world nuclear power production industry. The results of Safety Culture assessment were developed on the basis of information presented in questionnaires which were filled by key personnel of INPP seven divisions. The next assessment of Safety Culture by using questionnaires is planned for the end of Training of the personnel The matters of Safety Culture concept, matters of the own and industrial experience and examples from practice of performance of works related to Safety Culture were included into the training process. Within the last three years the specific works were performed concerning the conduction of the Safety Culture training course for plant employees and contractor personnel. During this training course the personnel were familiarized with principles of strong safety culture also with 51

52 safety culture evaluation methods and with results of safety culture evaluation for the past period. Updated version of the safety culture training manual was issued in INPP also once per year organizes a Seminar for plant staff in order to maintain their qualification. One of the topics of seminar is the review of reports on events at INPP related to the disadvantages of safety culture. Independent reviews, inspections and audits At the INPP is established the Department of Audit, Safety and Quality Management. The main responsibilities of that Department are performance of independent reviews, safety inspections and internal audits of processes of organization integrated management system. Audit of the implementation process for management procedure MS Safety Culture Management Procedure was performed in June The purpose of the audit was to assess the implementation of management procedure MS-001-4, which was reviewed and issued on During the audit recommendations were presented for the Safety Culture training manual and for the INPP personnel training inspection. All recommendations are planned to be implement until October Self-assessment Each division of organizational structure of INPP performs self-assessment once per year. Scope of self-assessment consists of: evaluation of goals and plans implementation of past year; evaluation of corrective actions implementation related to results of internal and external independent assessments; evaluation of personnel preparation and qualification; evaluation of inspections results of workplaces, instrumentation, equipment and etc. which were performed during last year; evaluation of preparedness of procedures related to operation and technical maintenance of safety systems and components of the plant; evaluation of proposals of employees; preparing suggestions to safety culture development programme for the next year. Visaginas Nuclear Power Plant Regardless the VNPP project preparatory works implementing company is not a license holder and not even an applicant for obtaining a license for activities in the field of nuclear power yet, this organization recognizes the safety as a top priority for both on-going and planned future activities the company. For that purpose a safety policy in the company has been developed. The Management of the Visaginas NPP project preparatory works implementing company considers safety to be the most important part of the activities of the company and undertakes to ensure adequate execution of safety functions. The general goals of safety are as follows: understanding of the main aspects of the safety culture in the activities of the company, its contractors, and sub-contractors; timely provision of employees with resources and means necessary for safe and successful work; systematic and consistent development and assessment of the safety culture; environmental protection and preservation. The Management of the Visaginas NPP project preparatory works implementing company understands safety as a system of the specific features of the organisation and its employees, knowledge about possible consequences of the activities and provisions (including values) of importance for safety as well as relevant practice, which preconditions proper and comprehensive attention of all employees to safety including but not limited to the following: observance of the effective safety rules, work with certified tools and equipment, fostering of safe work culture, and 52

53 escalation of safety issues to the Management of the Visaginas NPP project preparatory works implementing company. The Management of the the Visaginas NPP project preparatory works implementing company undertakes the following obligations: to perform activities in a safe manner and to follow the established requirements; to give preference to safety over other priorities or goals; constantly improve safety and develop the safety culture; establish measures which allow proper execution of safety supervision Regulatory processes for monitoring and oversight of arrangements used by the licence holders to prioritize safety The requirement for operating organization to implement, maintain and develop management system giving due priority to nuclear safety is set in the Article 17 of the Law on Nuclear Safety and Nuclear Safety Requirements BSR Management System. The management systems of licence holder is the subject for regulatory review and assessment and regulatory inspections as well (also see Articles 7(2)(iii), 13 and 14 of this report) The VATESI continuously monitors safety culture of the INPP by the following activities: inspections and other activities to assess licensees compliance with requirements of the granted licence and other requirements; reviewing quarterly safety culture related reports on INPP safety culture indicators and organizational issues related to safety culture; review of results of the surveys for assessing safety culture at the INPP; performing review and assessment of the INPP submittals (e.g. on safety important changes to the INPP organizational structure); quarterly and other meetings with INPP management Means used by the regulatory body to prioritize safety in its own activities Safety as the highest priority is emphasised within VATESI Mission, MS documents, strategic and annual plans of the VATESI activities and nuclear safety requirements. The main goal of the VATESI strategy is to assure high level of nuclear safety. The VATESI has established and continuously improves system of nuclear safety requirements. Safety oversight is performed on the basis of specific and clearly defined requirements. Every VATESI employee must perform his duties with responsibility, using his professional knowledge and experience, enhancing his qualification and sharing the knowledge with the colleagues. The VATESI management system is integrated into the everyday work and ensures that the employees receive the necessary information, assistance and tools to perform their tasks properly. Heads of the divisions are responsible for the quality of work performed and services provided by their divisions. Each employee is responsible for the quality of work performed by him. Activities of the VATESI are based upon principals of honesty, openness and clarity. The VATESI provides reliable and correct information on nuclear safety in Lithuania to the public in timely and proactive manner. Corporative VATESI activities and those of individual employees are subject of continuous improvement which is based on the self-assessment. 53

54 Article 11 Financial and Human Resources 1. Each Contracting Party shall take the appropriate steps to ensure that adequate financial resources are available to support the safety of each nuclear installation throughout its life. 2. Each Contracting Party shall take the appropriate steps to ensure that sufficient numbers of qualified staff with appropriate education, training and retraining are available for all safetyrelated activities in or for each nuclear installation, throughout its life. Article 11(1) Financial resources 11.1 Mechanism for the provision of financial resources to the license holder or applicant in order to ensure the safety of the nuclear installation throughout its lifetime After the final shutdown of the INPP Unit 2 in December 2009 up to present, the following parties take part in financing the activities related to the INPP safe maintenance and performance of decommissioning activities: European Community under the Ignalina Programme (IP); INPP Decommissioning Fund (DF); INPP own means (INPP); Ignalina International Decommissioning Support Fund (IIDSF); Lithuanian Republic budget (LR). Breakdown of planned and actual INPP expenses by the source of financing are shown in Tables 11.1 and It was planned that about 85% of the total annual decommissioning expenses would be covered by the European funds, the rest by the national funds. Actual proportions are shown in Table Source Table 11.1 Breakdown of planned and actual INPP expenses by the source of financing (KEur) Plan Fact Plan Fact Plan Fact Plan IP NDF INPP * IIDSF SBF Total *sum of Eur is included as technical support from Sandia National Laboratory Table 11.2 Breakdown of planned and actual INPP expenses by the source of financing for different expense items (KEur) Expense item Plan Fact Plan Fact Plan Fact Plan Payments for personnel Utilities Works & Services, Equipment & Supplies Taxes Decommissioning projects Total

55 Table 11.3 Actual proportions of funds distribution Source Plan (%) Fact (%) Plan (%) Fact (%) Plan (%) Fact (%) Plan (%) European funds Lithuanian funds As of January 1st, 2016 there was EUR 4.95 million EUR accumulated in the INPP National Decommissioning Fund. The average amount to be allocated from the Fund to the INPP decommissioning activities is approx. EUR 4.5 million per year. The order of the Minister of Finance of the Republic of Lithuania No dated 30 January, 2014, states that proceeds from disposition of assets of the SE INPP shall be transferred to the account of the INPP National Decommissioning Fund. However, the risk of funding gap in the nearest future still remains and the issue related to the replenishment of the NDF itself is still ongoing. Financing of the activity by IP funds is performed in accordance with the annual activity programs developed on the basis of annual tasks under the INPP decommissioning schedule (Megaproject). Council Regulation (Euratom) No 1369/2013 of 13 December 2013 on Union support for the nuclear decommissioning assistance programme in Lithuania, and repealing Regulation (EC) No 1990/2006 establishing that the financial envelope for the implementation of the Ignalina Programme for the period from 2014 to 2020 shall be EUR In 2014, in order to optimize the activity of the State Enterprise INPP Decommissioning Fund by providing for a single administrator of the Fund as well as to include a provision establishing the proceeds obtained from the sale of the property of INPP during the closure as resources of the Fund, the Law on the State Enterprise INPP Decommissioning Fund was amended. New version of INPP Final Decommissioning Plan was finally agreed and adopted 25th August, 2014 by the order No of Minister of Energy. INPP decommissioning works are planned until year 2038, and calculated INPP decommissioning costs (excluding inflation and risks) amounts to 2,6 billion euros. To improve the legal regulation of the administration of the funds of the Programme for the Administration of the Ignalina Programme in Lithuania as well as to effectively implement the Ignalina Programme in Lithuania, the Ministry of Energy prepared the Rules for the Implementation of the Ignalina Programme in Lithuania which were agreed with the Ministry of Finance and Public Institution Central Project Management Agency and adopted on 3 September 2015 (Order No /1K-282 of the Minister of Energy of the Republic of Lithuania and the Minister of Finance of the Republic of Lithuania). New INPP decommissioning interinstitutional plan was adopted 9th of February, 2015 by Decree of Government. This plan was created in order to assure visibility and effectivity of planning and use of European Union and national financial resources in activities related to INPP decommissioning performed by different Lithuanian institutions. Demand of European Union and National financial resources, values of assigned measures are planned for 3 years period and updated every year. Financing Model for new Visaginas NPP The VAE SPB is not a licence holder but this organization is responsible for project preparatory works that are necessary in order to have proper arrangements, after the establishment of project implementing company, to develop new VNPP construction project. The VAE SPB is a special purpose vehicle company for the implementation of the VNPP project establishes and 100% owned by Lietuvos energija, UAB which is a state-owned company and the Ministry of Finance holds 100% shares of it. Project Company (PCO), once established, will coordinate, supervise and inspect the carrying out of the Project and construction of the VNPP. Once the VNPP will be commissioned the PCO will operate the installation. 55

56 The VNPP project participants are: Lithuania, regional partners Latvia and Estonia, and the Strategic Investor the Japanese company Hitachi together with Hitachi-GE Nuclear Energy as technology provider. According to the Lithuanian legal requirements, Lithuania will have no less than 34% of the VNPP shares. The VAE SPB will be national Lithuanian Investor to the new NPP construction project and will take presumably 38% of PCO shares. The remaining shares will be distributed among other participants of the project. The VNPP project is being developed based on the Mancala model. According to the model, the investors in the VNPP will get electricity at cost price in proportion to the amount of shares they have. It is envisaged that the investment costs would be funded by shareholder equity or through third party debt, secured by the shareholders. In the case of Lithuania a small proportion of the total investment cost is already identified as funded via the contribution in kind of the site and already completed development activities. The financing plan is based on conservative assumptions on scope of debt financing. Each of the shareholders would commit to fund the full investment requirement under their shareholding obligations even at a zero debt basis. The proportions of funding to be provided from different sources are yet to be finalized (i.e. whether funded at corporate level or using the shareholder secured financing). The VNPP construction project will be financed by export credit agencies: JBIC, US ExIm and NEXI backed commercial bank loans. It is also planned that the investors will formally apply to obtain debt funding both from the European Commission under EURATOM and from the EIB. Several debt financing options are being considered, including lending enabling prospective shareholders to receive ECA financing at the shareholder level then passed on further to PCO to finance the Project. Based on the letters of interest from the export credit agencies and other financing sources, a maximum leverage level of up to 70% of the overall required investment in the project would be possible. Securing Finances for VNPP Decommissioning Lithuanian Law on Nuclear Energy requires that operator of the nuclear installation shall ensure accumulation of the resources in the fund for decommissioning of the nuclear installation (the Decommissioning fund) required for safe decommissioning of the nuclear installation and management of radioactive waste. The operator of the nuclear installation shall be entitled to secure its obligations related to financing of the safe decommissioning and management of radioactive waste by furnishing to the Government or its authorised institution a guarantee in the prescribed amount. The procedure for establishing the guarantee and the terms for its delivery, the time limits of the guarantee, the amount of the guarantee and other mandatory requirements shall be regulated by the law on the decommissioning fund or the legal acts implementing the law on the decommissioning fund. The principal objective of the decommissioning fund shall be accumulation of resources required for safe decommissioning of a nuclear installation and safe management of radioactive waste, including spent nuclear fuel. The decommissioning fund (or funds) shall be established by a law. The law on the decommissioning fund shall inter alia set forth: sources for accumulation of the fund resources; tasks for which the resources are accumulated; principles of management and control applied to accumulation and use of the resources; principles for using the resources before beginning the decommissioning of the nuclear installation without prejudice to the principal objective of the decommissioning fund; measures for continuity of accumulation of resources in the event the nuclear installation is decommissioned due to unforeseen circumstances. The resources of the decommissioning fund may be used only for implementation of the measures and the tasks for which the resources were accumulated based on their intended purpose. The law on the decommissioning fund and corresponding legal acts are yet to be adopted; provisions of these draft acts shall be based on Comparison among Different Decommissioning Funds 56

57 Methodologies for Nuclear Installations, study made by Wuppertal Institute on behalf of the European Commission Directorate-General Energy and Transport, and is compliant with the Commission Recommendation on the management of financial resources for the decommissioning of nuclear installations, spent fuel and radioactive waste (2006/851/EURATOM). Lithuanian legislation requires Preliminary Decommissioning Plan together with application for nuclear facility construction license to be prepared and submitted to the VATESI. The purposes of the plan are accumulation of sufficient funds for safe decommissioning of the nuclear facility, early as possible planning of the measures facilitating the decommissioning and gather all information important for the decommissioning Statement with Regard to Adequacy of Financial Provisions Lithuania ensures the sufficient financial provisions to ensure safety and activities of the INPP and the VNPP Processes to Assess Financial Provisions The Ministry of Energy executes control over financing of the INPP, assigns an independent auditor to review financial documentation of the INPP and approves the financial results of the INPP. Director General of the INPP is responsible for INPP safety and undertaken activities and implements decisions regarding the INPP activities and its decommissioning taken by the Parliament (Seimas), the Government, Ministry of Energy and Management Board, formed by the Ministry of Energy Description of arrangements for ensuring that the necessary financial resources are available in the event of a radiological emergency Organisations operating nuclear installations or other persons engaged in the activities referred to in paragraphs 1 and 2 of Article 22 of the Law on Nuclear Safety must hold a licence and/or permit issued by the VATESI and must have material, financial and human resources that are sufficient for involvement in the licensed activity or operations regulated by permits in compliance with the legal acts and technical standard documents of nuclear safety. Nuclear safety requirements BSR Requirements for the Management System provides requirements on integrated management system, which ensures that health, environmental, security, quality and economic requirements are not considered separately from safety requirements, and gives due priority to nuclear safety in all stages in the lifetime of installation. The licence holder must ensure necessary financial, material, human and technical resources are in place as well as administration rules and technical requirements, scientific support and effective management system during all stages of lifetime of a nuclear installation. Article 11(2) Human resources Overview of the arrangements and regulatory requirements concerning staffing, qualification, training and retraining of staff for nuclear installations The enterprise employs a number of highly experienced staff members with unique expertise. The knowledge and experience of each employee is applied as much as possible in the activity of the enterprise. Since 1 January 2010 the main activity of INPP is decommissioning. Today many employees employed in the enterprise have a huge experience, unique knowledge that shall be maintained and 57

58 applied. While implementing the decommissioning projects the knowledge and experience of these employees are applied at most. The procedures, manuals and guidelines in the field of personnel management are developed in accordance with the IAEA standards. As of 1 January 2016 the INPP personnel is well educated and properly trained (total 2106): 43% of personnel have higher education (905 employees); 21% specialized secondary education (422 employee); 36% vocational schools (464 employees); general secondary education (300 employees) and unfinished general secondary education (15 employees). Due to the intention of the INPP management to implement as many projects as possible using internal manpower of the enterprise, and taking into account qualification of the INPP personnel and the performed works on equipment dismantling and decontamination, it was decided to refuse the services of external organizations and to perform as many works as possible by the INPP own resources. Due to this fact at the beginning of 2011 the amount of employees working at INPP started to rise. The need for INPP personnel is determined in accordance with the personnel needs calculation methodologies by types of activities, depending on the scope of work projected in the long-term INPP decommissioning Megaproject schedule and annual work plans. As of 1 January 2016 the amount of employees was In order to realize some short-term projects, employees are hired under the fixed-term employment contracts Methods used for the analysis of competence requirements and training needs for all safety related activities in nuclear installations Human Resources Management covers all the INPP internal processes by improving operational efficiency; making more transparent and optimized the key activity processes; optimizing servicing functions; creating new organizational structure; providing for staff training, developing necessary competence, upgrading employees qualification and preparing replacement of significant for the enterprise positions; creating a unified value-based organizational culture. By means of the enterprise structure optimization and improvement of relationship between structural divisions, on 1 November 2012 INPP passed on the new organisational structure. It was the first stage of large-scale reorganization of the INPP organisational structure. On 2 February, 2015 the second restructuring stage was implemented when activity planning and project management functions were centralized and activity planning and performance functions were separated. In 2015 the dismantling processes analysis was performed and dismantling process restructuring was initiated, the implementation thereof is planned for In addition, in 2016 next organizational restructuring is coming up by centralizing maintenance functions, as well as restructuring related to commissioning of the new Spent Nuclear Fuel Storage Facility and Solid Radioactive Waste Management and Storage Facilities. In 2013 the INPP realized public procurement of consulting services for the staff workplace/ position assessment and wage system creation. Based on the recommendations regarding the wage system, INPP began to develop and implement a new wage system since the autumn of Since 1 March, 2015 the new wage system is functioning based on workplace/position assessment. Also in 2013 the INPP realized public procurement of consulting services for general activity staff workload assessment. Based on the recommendations and general activity staff workload assessment methodology, the staff workload monitoring system is under development at the INPP since the autumn of Since 2014, the INPP applies employees annual performance assessment method that evaluates general and functional competencies, as well as mission performance/results. 58

59 11.7. Arrangements for initial training and retraining of operations staff The purpose of the initial training is to prepare employee for a position at INPP, including the training for promotion. After the initial training is completed the employee on the basis of the qualification committee conclusion is allowed to work under supervision of the experienced employee (for operation personnel) and/or independent work. Training of the personnel consists of the theoretical training and on-site training (probation). Number of the theoretical training items and their contents is specified in accordance with the specific activities performed at INPP. Theoretical training of the personnel can be performed in form of courses or individually by the TS instructors or the relevant experts of the INPP departments. Training using technical means (training computer programmes, equipment mock-ups, actual components and samples, etc.) is provided when required by a training programme and is conducted by the TS instructor. On-site training (probation) is to acquire practical skills and attitudes in situ and is conducted by the on-site training instructor. During probation period employees study and apply in their work areas the actual rules, required standards, job descriptions and operation manuals to the extent required in the job description to obtain experience for proper, safe and effective work. At the end of the on-site training (probation) and before the qualification by the appropriate qualification committee the employee s practical skills are checked Capabilities of plant simulators used for training with regard to fidelity to the plant and scope of simulation Pursuant to Decision No. Spr-222 (3.263) on Decommissioning of the Main Control Room (hereinafter the MCR) Full Scope Simulator of 4 October 2013, the simulator is no longer operated. This decision was adjusted by VATESI Arrangements for training of maintenance and technical support staff Maintenance and technical personnel at the INPP is trained by using initial training and continuous training. To provide proper qualification and competence of the personnel a systematic way of training is used on different stages of education. The activities related to the management of personnel at the INPP is regulated in accordance with the Personnel Management Procedure Description MS Improvements to training programmes as a result of new insights from safety analyses, operational experience, development of training methods and practices Continuous training of INPP personnel is performed according requirements for a particular position (e.g. periodic training to re-approve compliance to the qualification requirements of a safety important position), need to prepare for new activities or tasks of a division, other needs identified by a manager and discussed with an employee during annual individual appraisal meetings. TS are supporting managers of departments as an internal provider of training and, when needed, help to find and organise external training according the established needs. TS continuously is assessing effectiveness of training content and process, develops new programmes and training tools to support implementation of plans of INPP (e.g. to prepare new mock-ups for training on dismantling of contaminated equipment). TS work with line managers to establish training needs, assess training 59

60 results after a trainee has worked for some time after the training. TS also performs analysis of OEF lessons, organises training for TS specialists and makes practical observations of the related tasks to improve training content and methods. In line with the commitment under the laws of the Republic of Lithuania to comply with nuclear and radiation safety requirements, the enterprise dedicates special focus to the qualification and psychological preparation of its employees prerequisites for ensuring that the safety of the INPP is a top priority and an underlying objective that fosters one s sense of responsibility and self-control in the performance of all safety-related tasks. The enterprise employs a number of highly experienced staff members with unique expertise; therefore retaining them is vital. The organization encourages employee responsibility, initiative and innovation, develops and implements employee training programmes, creates conditions for employees to constantly improve their qualifications and keeps them up-to-date on the enterprise s goals, current projects, changes and achievements. In the case of application to the vacant position within the structure of the INPP the redundant personnel of INPP has the priority to be selected for employment that other applicants. On 30 of August 2013 contracts on supply of training services entered into force according to the INPP Personnel Continuing Training and Retraining Programme. According to the mentioned programme INPP organizes: Management skills improvement trainings ( for example Strategic Management and Planning, Conflict Management, Projects Management, Effective teamwork, Change Management, Negotiation skills and etc.), IT training courses, Business English language courses, Lithuanian language courses Methods used to assess the sufficiency of staff at nuclear installations VATESI document BSR requires from a licensee to assess, plan and ensure sufficiency of staff performing safety important activities and affecting safety related professes of a licensed organization. It s necessary to assess and establish the number of staff needed for safe operation, and their competence in a systematic and documented way. The document will also require establishing and annually updating a long-term staffing plan for activities that are important to safety. Additionally, it s licensee is required to monitor sufficiency of staff for safe operation, their competence, and suitability and to document results of such assessments and always to have in house sufficient number of competent staff understanding the safety basis of a plant (e.g. Safety Analysis Report or Safety Case and other documents), as well as to understand the actual design and operation of the plant in all plant states. For instance, assessment of the staffing level at INPP was annually indicated within the annual INPP safety report. Since 2014, INPP has been making a comparative market analysis of its controlled operating costs, using "Make or buy" approach. In 2015 the INPP, in attempt to manage fluctuations of sudden work scope increase/decrease, also to estimate and use labour resources accurately to perform shortterm works or works of necessity, started procurement of temporary employment services. VATESI during regulatory inspections and other activities verifies suitability of personnel qualifications, quality of safety important training and sufficiency of competent INPP personnel to ensure safety of INPP Policy or principles governing the use of contracted personnel to support or supplement the licensee's own staff Personnel of contracting organizations prior to commencement of works in the controlled area of the INPP is trained in the INPP TS under the Training program for contracting organizations personnel, performing works within the controlled area of INPP (MC ), whereupon personnel 60

61 acquires respective knowledge and competencies in the area of radiation safety, fire safety, physical protection, emergency preparedness, safety culture and in other areas important to safety. Operations managers of contracting organizations are certified in the certifying commission No. 2 of the INPP. Moreover, all the personnel of contracting organizations undergoes induction and initial briefings at the working place on fire safety, health and safety of workers and, if necessary, on radiation safety Methods used to assess the qualification and training of contractor's personnel BSR requires from a licensee to establish personnel qualification requirements for safety important contractors within procurement documents, to monitor adherence to those and to this end to have enough specialists competent to perform this oversight and assess performance of a contractor. INPP has established management system procedure Procurement QA that requires careful assessment of qualification of a potential INPP contractor. The assessment includes checking of competence of the key personnel of contractor and applied management system before a contract is approved. After a contract for safety important activities is approved, INPP assigns the competent personnel to perform monitoring and inspections of implementation of a contract. INPP requires from contractors for safety important tasks to be performed at INPP to undergo a special training programme on INPP requirements for safety, application of quality requirements and principles of safety culture Description of the national supply of, and demand for, experts in nuclear science and technology Ministry of Education and Science of Lithuanian Republic is responsible for implementation of The National Plan of Preparation of Highly Qualified Specialists in Nuclear Energy for The Plan is intended to provide the Lithuanian nuclear energy infrastructure with highly skilled nuclear professionals. The aims of the Plan are to ensure the effective preparation of highly qualified nuclear energy specialists for VNPP and the entire nuclear industry and further develop nuclear knowledge, experience and practical, educational and scientific excellence. In order to achieve this objectives two study programs were started: The Studies of Nuclear Energy Physics at Vilnius University (since 2011 these studies were renamed to Energy Physics); Graduate and Postgraduate Studies of Nuclear Energy at Kaunas University of Technology. The goal of Energy Physics study program to prepare highly qualified specialists with expert knowledge in nuclear physics, neutron physics, nuclear reactors physics, radiation chemistry, nuclear material physics, nuclear fuel cycle, radiation ecology and safety, materials science, and to provide necessary university education in social and the human sciences. The main purpose of Graduate and Postgraduate Studies of Nuclear Energy to provide students of general technical and special nuclear energy education, to enable absorption of the essential knowledge of fundamental physics, theories and principles, to help develop nuclear power engineering design and manufacturing bases, introduce with operational technologies and to enable acquire the initial application skills, to provide the necessary social and human sciences knowledge. The dynamics of number of graduated students at Vilnius University and Kaunas University of Technology from 2006 until 2015 is presented in Table

62 Table Number of graduated students at Vilnius University (VU) and Kaunas University of Technology (KTU) from 2010 to 2015 Enrolment year Graduation year Number of graduated students (VU, BSc) Number of graduated students (KTU, BSc +MSc) Total After selection of strategic investor (Hitachi and Hitachi GE Nuclear Energy) to the new nuclear power plant and planning to further develop the human resource capabilities and deepen the knowledge in nuclear energy field, several initiatives have been taken in this regard with the Government of Japan (through the Ministry of Economy, Trade and Industry, METI and in cooperation with Japan Atomic Industry Forum International Cooperation Centre) and intensive cooperation in nuclear energy and human resource development launched since The cooperation includes organization of training programmes in Japan and seminars/workshops and intensive nuclear engineering courses, students exchange visits, scholarships in Lithuanian and Japanese universities and other activities. For example, during more than 1000 participants attended the intensive nuclear engineering courses at Kaunas University of Technology, held in cooperation with Tokyo Institute of Technology and Hitachi. Above mentioned events significantly contribute to strengthening and enhancement knowledge in nuclear energy sector and its development, nuclear safety, information exchange, sharing the experience and lessons learned in development and management of nuclear power projects Regulatory review and control activities Specialists of VATESI are continuously concentrating their efforts on the supervision of qualification of the employees of the nuclear energy sector. In supervising the training and qualification improvement system at the INPP, the VATESI follows the Requirements VD-E , the IAEA safety standards, recommendations and the best practice of other countries. Even after the final shut-down of both Units of the INPP, VATESI has not altered the commonly recognized approach that a nuclear facility has to be operated by a sufficient number of highly qualified employees. VATESI specialists coordinate the training programs, exam questionnaires, take part in the exams to evaluate the competencies of the INPP specialists responsible for safety. Article 12 Human Factors Each Contracting Party shall take the appropriate steps to ensure that the capabilities and limitations of human performance are taken into account throughout the life of a nuclear installation Overview of arrangements and regulatory requirements to take human factors and organizational issues into account for the safety of nuclear installations Human factors and organizational issues have significant importance for safety of nuclear installations. Lithuanian legislation covers human factors and organizational issues in several regulations: VD-E General Requirements for Personnel Management in the Organizations Operating Nuclear Facilities and Enterprises Rendering Services to Them, BSR Management Systems Requirements, VD-T Nuclear Safety Regulations for the Reactor s of Nuclear Power Plants. The extensive regulatory requirements on human factor are set in BSR Basic Safety Requirements for Nuclear Power Plants with RBMK

63 Reactors. VD-E defines more specific requirements for organizational structure and distribution of functions, staff recruitment, training and qualification and staff certification. Human factors and organizational issues during modification process are addressed in BSR Categories of Modifications of Nuclear Installations and Procedure of Performing the Modifications. INPP adheres to the requirements and VATESI performs the regulatory oversight of INPP compliance to them Consideration of human factors in the design of nuclear installations and subsequent modifications Human factor management at INPP is based on the consideration of organizational, labour (professional), environmental factors, as well as individual abilities and other characteristics of human behaviour at work to preclude safety problems. Human factors are taken into account in the design of new nuclear facilities for INPP decommissioning and modifications. Work spaces for operational, maintenance and dismantling personnel are arranged on the base of ergonomic principles and norms. Design solutions of the main control room provide operability and habitability for the staff under nuclear and radiation accident conditions, including a case of blackout. Working places of all personnel meet current ergonomics requirements. INPP personnel management process includes recruitment, primary and continuous training, certification and permission of personnel to work on their own at INPP, is regulated by the documents indicated in Article 11 of this report Methods and programmes of the licence holder for analysing, preventing, detecting and correcting human errors in the operation and maintenance of nuclear installations Human factor affects many aspects of safe decommissioning of a nuclear facility and first of all in such activity fields as nuclear, radiation and fire safety assurance, physical protection, safety and health of employees. The man-machine interface provides sufficient data about the on-going operating processes, status of process systems as well as systems of control and personnel attention in case of deviations from normal operation. Prior to the beginning of work the medical control of operating personnel is mandatory. The activities related to the Human Factor management at INPP is carried out with consideration for the following: The personnel has everything necessary to carry out its duties (documentation, materials and equipment) and is duly trained and certified; The operating conditions at the enterprise meet current standards and do not allow that hazardous influence of physical, chemical, biological and other harmful factors exceed the specified limits; INPP personnel safety and health system is aimed at ensuring the safety and health of the personnel, reduction of occurrence of accidents and rate of personnel occupational diseases. The personnel activities are being monitored. There is a system that ensures recording of incidents caused by human error at the INPP, investigation of the causes and development of corrective measures; performs probabilistic safety assessment considering human factor and monitor psychophysical capabilities of personnel providing safe operation of the nuclear facility. Considering the Human Factor Management Programme existing at INPP, activities on human factors management at the enterprise is performed in the following areas: Personnel recruitment, training and motivation; Personnel reliability and qualification; Provision of information and use of operational experience; Workplace organization; 63

64 Documentation control; Modifications and decommissioning organization. Personnel actions, not defined in the instructions, and errors are subjected to reviewing to identify direct and root causes of the event, to eliminate causes and prevent further recurrence, the corrective measures are developed and taken. In order to ensure the safety of INPP activities the system of medical alcohol tests is integrated in enterprise. Different aspects of motivating in respect of incentives for the personnel are highlighted in Policy of the plant. In addition, the motivation issues are considered during training and workshops on safety culture, which are conducted for the plant personnel on a regular basis. Human factors related unusual events at INPP are carefully investigated by commissions appointed in accordance with the norms and technical requirements in force. INPP is responsible for ensuring that the investigations are performed satisfactorily and in full, for reporting the results to VATESI and other interested organizations. Also the licensee is responsible for measures to perform needed corrections and to eliminate the root causes of an unusual event to preclude repetitions of similar events. Human factor Management Methods and Programmes at the VNPP Taking into account the nature of the activities of VNPP and that their results will form a basis for the future NPP construction, human factor related risks are managed by implementation of effective procedures, quality management system and by providing the adequate training. The activities of the company are project based. In line with the company s procedures the experience gained during the implementation of the preparatory works projects is being taken into account throughout all the stages of the implementation of other projects of VNPP. Experience is being reported by the projects managers to the Project Management Committee which ensures the distribution of the received information to all VNPP project managers thus providing the input to apply the lessons learned across VNPP projects Self-assessment of managerial and organizational issues by the operator The procedure for self-checking and self-assessment is regularly revised; the self-assessment of activity at the level of INPP divisions is carried out on a yearly basis. While preparing and performing the works that have an impact on safety, the personnel uses the self-control methodology STARK. Self-assessment activities of INPP are described within Article 10 of this report Arrangements for feedback of experience in relation to human factors and organizational issues The blame free work culture, when errors are seen as an opportunity for improvement, is supported by managers of INPP. The importance of the human factor as a significant matter in safety is taken into account in the methodology of the evaluation of operational events. Event analysis methodology applied at INPP is based on ASSET method and is directed towards identification of direct and root causes of the event. Direct and root causes of the individual events are classified as equipment failures, documentation deficiency or humane error. In case human factor impact is identified during the determination of causes, detailed investigation of human factor impact analysis for the respective event is performed. The analysis results are the integral part of the overall analysis of the respective operational event. To ensure the analysis is performed systematically, INPP applies the special Procedure for additional analysis of events caused by the incorrect personnel actions during unusual events. Such analysis identifies measures for prevention of events and their recurrence in the future as well as sharing the experience gained. 64

65 Audit, Safety and Quality Management Division carries out analysis of human factor impact on INPP safety. The division is responsible for carrying out special investigation of unusual events due to personnel error and (or) organizational factors. To perform the analysis INPP applies a special procedure Method for Detail Analysis of Unusual Events Related to Incorrect Actions of Personnel. According the procedure, the division forms a team of competent specialists. The methodology combines Man-Technology-Organization and ASSET methodology. The analysis is performed by using a relevant method (or their combination) from the following list of methods: Task analysis; Changes analysis; Barrier analysis (for physical and administrative barriers that ensure safety); Event cause-effect analysis diagram; Fault tree analysis. The team reviews the relevant documents, perform needed interviews, model and analyse causes of the event, its sequence and the related barriers, and develops the analysis report. Operating experience and feedback related information is presented within Article 19 (7) of this report Regulatory review and control activities Through the regulatory review and assessment of safety documentation submitted by a licence holder, as well as inspection activities, VATESI ensures that the licence holder adequately addresses human factor issues through all lifetime of nuclear facilities. VATESI has established the permanent commission for analysis of unusual events. This commission monthly meetings cover reviews of recent and other IAEA IRS reports as well as reports from INPP on unusual events, including those on the events due to human factors and (or) organizational issues. Commission provides recommendations to INPP to apply lessons learned, to review relevant IRS reports and (or) to present additional information on the events at INPP. The commission also provides recommendations to INPP for application of the lessons and performs follow-up of its recommendations to INPP. Article 13 Quality Assurance Each Contracting Party shall take the appropriate steps to ensure that quality assurance programmes are established and implemented with a view to providing confidence that specified requirements for all activities important to nuclear safety are satisfied throughout the life of a nuclear installation Overview of arrangements and regulatory requirements for management systems of the licence holders According to the Law on Nuclear Safety the one of the main areas of nuclear safety regulation is the management systems of the persons engaged in the licensed activities and in other operations related to nuclear and/or nuclear fuel cycles materials, as well as in the evaluation of construction site of a nuclear installation. The highest priority in the management system of such persons shall be the assurance of nuclear safety. Organisations operating nuclear installations and other holders of licences and/or permits must ensure high level of safety culture and competence of the organisation and its workers, on a regular basis analyse the state of nuclear safety and improve it, consider human factors (human capabilities and their limits) at all stages of life of a nuclear installation and maintain an effective integrated management system with due priority to nuclear safety. BSR Basic Safety Requirements for Nuclear Power Plants with RBMK-1500 Reactors requires that safety of the NPP shall be ensured by implementing a system of technical and organizational measures, including a management system at the NPP. Those technical and 65

66 organizational measures shall be experience based and comply with the legal acts, norms and regulations. Such approach shall be applied during all life cycle of the NPP. BSR Management System specify regulatory requirements for development, implementation and maintenance of an effective management system for the organizations operating nuclear facilities and require covering all activities related to the use of safety important systems and components by management system s documentation and periodically assess effectiveness of the management system. To this end an operating organization must establish an independent department to oversee application of management system requirements and coordinate its improvement. The licensee and its safety-important contractors shall comply with all national legal requirements and regulations, including those in the area of nuclear safety. According to the BSR licensee by developing management system shall consider application of the IAEA recommendations published in the IAEA guides on management systems. The BSR establishes requirements for implementation and continuous improvement of the integrated management system based upon GS-R-3 process approach Status with regard to the implementation of integrated management systems at nuclear installations The INPP integrated management system (hereinafter, IMS) integrates all organizational components (including its structure, resources, quality assurance, processes and safety culture) so as to establish the goals and objectives of the organization and enable the organization to achieve all of these goals and objectives. The INPP IMS provides a single framework for the arrangements and processes necessary to address all the goals and objectives of the organization. These goals and objectives include safety, quality, environmental, health, security and economic elements and other considerations such as social protection. The application of the IMS requirements is graded so as to deploy appropriate resources, on the basis of the consideration of the significance and complexity of each product or process, the hazards and the magnitude of the potential impact associated with the safety, health, environmental, security, quality and economic elements of each product or process and the possible consequences if a product fails or a process is carried out incorrectly. The INPP Senior Management is ultimately responsible for the IMS and shall ensure that it is developed, implemented, assessed and continually improved in accordance with the established requirements and objectives. Within the INPP organization this function is assigned to Audit, Safety and Quality Management Department (AS&QMD). This is an organizational unit, which is independent from other functions and reports directly to Director General of the INPP. The AS&QMD Manager in the capacity of the Senior Management Representative has the specific authority and responsibility for coordinating the IMS development, implementation, assessment and continual improvement. The personnel of this department are appropriately trained and qualified to conduct the tasks Main elements of a management system covering all aspects of safety throughout the lifetime of the nuclear installation, including delivery of safety related work by contractors The INPP Senior Management establishes goals, strategies, plans and objectives that are consistent with the policies of the organization and appropriate to the activities and facilities of the organization. Currently, there are 10 documented policies in the IMS, including the Quality Management Policy. The INPP IMS is a process-based management system. It is described by a set of documents specifying the overall controls and measures to be developed and implemented by the organization to meet the established requirements and objectives. These controls and measures apply to every unit and individual within the organization. 66

67 IMS Manual, Policies, Strategies and Final Decommissioning Plan are Level 1 documents applicable to development, implementation, assessment and continual improvement of the IMS. Currently, 41 upper-tier processes are grouped in the IMS Manual. All these processes are described in Level 2 documents (hereinafter, IMS procedures). The IMS procedures are documented process descriptions; they provide specific detail on which activities shall be performed and which organizational units shall carry them out so as to meet the general requirements specified in the IMS Manual. Detailed working documents, such as procedures, instructions, plans and schedules are Level 3 documents. Developed in accordance with the requirements specified in the IMS procedures, they prescribe the specific details for the performance of sub-processes, projects and tasks by organizational units or individuals. Records stating objective evidence of activities performed or results achieved are Level 4 documents. The relationship between the measurement, assessment and improvement processes in the IMS is shown in Fig below. These processes are described and detailed in Level 2 and Level 3 documents respectively. Fig Relationship between measurement, assessment and improvement processes Monitoring and measurement The effectiveness of the IMS is monitored and measured to confirm the ability of the processes to meet the established requirements and objectives, and identify opportunities for improvement. Self-assessment The Senior Management and management at all other levels in the organization carry out selfassessment to evaluate the performance of work and the improvement of the safety culture. Independent assessment The independent assessment process includes internal IMS audits, audits of management systems of suppliers of safety-related products, surveillance inspections, engineering surveys, review of safety-related operating documents, modifications, decommissioning projects, event reporting, corrective actions developed in response to VATESI inspections, and licensing-related documents. Requirements for the planning, conduct, reporting and follow-up of independent assessments are documented in respective IMS procedures. The owner of the independent assessment process is AS&QMD Manager. Management system reviews are conducted by the Senior Management annually to ensure the suitability and effectiveness of the IMS, and its ability to enable the objectives set for the organization to be accomplished. Quality management issues are discussed at monthly meetings chaired by General Director. The procurement process is managed within the IMS. General requirements for procurement are specified in the IMS Manual. Detailed requirements for procurement process (including those for selection, evaluation and control of suppliers) are set forth in the Procurement Procedure and respective working documents. The graded approach is applied, so special attention is paid to control of the suppliers of safety-related products. Procurement documents contain requirements for the 67

68 supplier organization, products to be supplied, supplier s capabilities, personnel qualifications and management system. The supplier s management system shall be equivalent at the least to the requirements of the standards LST EN ISO In some cases, such as procurement of construction works, other management system standards may apply too. After signing the contract, the selected safety-related product supplier is included into the List of Approved Safety-related Product Suppliers, which is reviewed and updated regularly. This list is communicated to VATESI annually. Control of suppliers and their sub-suppliers is in accordance with the Procedure for Assessment of Safety-related Product Suppliers and Sub-suppliers and Control of Their Activities at the INPP. Suppliers are allowed to start their on-site activities at the INPP after they develop a Quality Assurance Plan subject to approval and control by the interested INPP department(s) and AS&QMD. The Supplier s personnel shall pass special training and certification by the INPP Personnel Division, covering aspects of radiation safety, fire safety, security, health & safety, safety culture and emergency preparedness as appropriate. In case of serial production quality assurance plans are not required Audit programmes of the licence holders The internal and supplier audits are conducted by the INPP personnel, who are in the list of qualified lead auditors/auditors. This list is updated annually. There is a procedure specifying requirements for lead auditor/auditor qualifications. The AS&QMD personnel are adequately trained and qualified to fulfil these tasks. Audit reports are distributed to the INPP Senior Management, managers of audited departments, senior managers of audited suppliers and to VATESI as appropriate. Audits are conducted regularly on behalf of the Senior Management: to evaluate the effectiveness of the IMS processes and adherence to the established requirements and objectives; to determine the adequacy of work performance and leadership; to evaluate the organization s safety culture; to monitor product quality; to identify opportunities for improvement. The processes and products that do not conform to the specified requirements are identified, segregated, controlled, recorded and reported to an appropriate level of the management within the organization. Corrective actions for eliminating non-conformances are determined and implemented. Preventive actions to eliminate the causes of potential non-conformances are determined and taken. Opportunities for the improvements of the IMS are identified, and actions to improve the IMS processes are selected, planned, implemented and recorded. Annual reports on improvement of the INPP IMS are submitted to VATESI. Audits of suppliers of safety-related products belong to the independent assessment process. They are planned, conducted, reported and followed-up in compliance with the Procedure for Supplier Audits Regulatory review and control activities The Law on Nuclear Safety states, that the licences and permits shall be issued to persons with sufficient capacities in terms of technological and financial resources, management system, human resources, emergency preparedness, physical protection, safe storage and shipment of nuclear materials, their accounting and control that comply with the provisions on implementation of the IAEA and the EURATOM guarantees, and allowing to properly fulfil the conditions required by the licence or permit and to secure nuclear safety. 68

69 The regulations for issuing licenses and permits for nuclear power facilities and activities require applicants to submit to the VATESI to review and assess such documents as: procedures for selection, training and certification of the employees and improvement of their qualifications; description of means for safety culture development; documentation of 1 st and 2 nd level of management system; description of organizational structure; procedures related to selection, approval and control of suppliers and quality assurance of safety-important products, services and works; description of measures for employment of operational experience. The VATESI periodically performs review of the INPP s management system s documents, reports of audits, including those performed at contracted organizations, reports on safety issues, reports on safety culture monitoring, assessment and carried out surveys, the documentation of modifications to the nuclear installations including organisational changes whether they comply with legal acts and potential risks on safety are evaluated and properly managed. During other regulatory oversight activities, e.g. inspections, VATESI specialists analyse and inspect management system s documents related to the particular activity or safety issue. When needed, inspectors of the VATESI require to improve activities or to make necessary corrections in the INPP management system s documents and (or) practice. The VATESI performs the inspections of the activities of the INPP related to conducting the audits at the contractors organizations involved into the INPP s decommissioning projects. The goal of such inspection is to ascertain how the INPP is performing the assessments (audits) of the management systems of the suppliers that are relevant to safety and of the capability of these suppliers to meet the requirements of the procurement documents. Article 14 Assessment and Verification of Safety Each Contracting Party shall take the appropriate steps to ensure that: (i) comprehensive and systematic safety assessments are carried out before the construction and commissioning of a nuclear installation and throughout its life. Such assessments shall be well documented, subsequently updated in the light of operating experience and significant new safety information, and reviewed under the authority of the regulatory body; (ii) verification by analysis, surveillance, testing and inspection is carried out to ensure that the physical state and the operation of a nuclear installation continue to be in accordance with its design, applicable national safety requirements, and operational limits and conditions. Article 14(i) Assessment of safety Overview of arrangements and regulatory requirements to perform comprehensive and systematic safety assessments The Law on Nuclear Safety, among other provisions, establishes the main principles for safety assessment. Pursuant to Article 30 of the Law on Nuclear Safety the assessment of nuclear safety shall be a systematic process intended for verifying whether the siting, design, construction, operation and decommissioning of a nuclear installation are safe i.e. meet safety requirements established by the legal acts, technical codes and standards documents and other documents. The assessment of nuclear safety shall be conducted in the prescribed manner at all the stages of a lifecycle of a nuclear installation. The assessment of nuclear safety shall get sufficient attention and shall be assigned sufficient resources. The amount of resources shall be adequate to a possible issue s impact on nuclear safety. 69

70 The applicant or the licence holder carries out the analysis and justification of nuclear safety in the area of nuclear energy activities as well as other activities involving nuclear and nuclear fuel cycle materials. The persons implementing a nuclear installation project carry out the analysis and justification of nuclear safety during the evaluation of the construction site of a nuclear power plant. The results of the analysis and justification of nuclear safety are executed in the documents evidencing nuclear safety, which are established in the manner prescribed in the Law on Nuclear Safety and other legal acts. The results of the analysis and justification of nuclear safety are independently verified in the manner set out by VATESI. The applicant or the licence holder is responsible for the performance of such independent verification, whereas in case of the construction site of a nuclear power plant evaluation the responsibility for performance of an independent verification falls on persons implementing the nuclear installation project design. In addition to the main safety document evidencing nuclear safety, i.e. safety analysis report, the applicant or the licence holder shall provide to VATESI design documentation of a nuclear installation, which are necessary for the assessment of the safety analysis report. The nuclear installation design documentation shall establish and classify all the structures, systems and components of a nuclear installation according to their functions and importance to safety, and shall contain a comprehensive description of all the structures, systems, components, and operation processes that are important to safety. The review and assessment of nuclear safety shall be conducted by VATESI and results of such review and assessment shall be documented. The main goal of regulatory review and assessment process is to verify if the safety justification document complies with normative technical documents of nuclear safety and complies with factual circumstances. The decision on the safety justification document shall be made taking into account results of the review and assessment. The review and assessment of safety justification documents are performed in accordance with PR-5 Procedure document for review and assessment of safety justification documents, which is procedure document of VATESI management system. This procedure document defines formal procedure for regulatory review and assessment of safety justification documents. The outcomes, e.g. safety evaluation report of the VATESI review and assessment are documented in accordance with the provisions foreseen in procedure document PR-5. In additional, VATESI could require additional documents or conduct inspections, if it finds out that after review and assessment of the submitted documents the information is not sufficient to assess the documents according to the legal acts and valid criteria. It also assess the safety culture in the applicant organization and assess its technical and organizational measures, verify the effectiveness of the quality assurance system of the applicant and check if the requirements of the quality assurance system at the nuclear facility for purchased services or goods are kept Safety assessments within the licensing process and safety analysis reports for different stages in the lifetime of nuclear installations Siting According to the Paragraph 1 of Article 32 of the Law on Nuclear Safety, the safety analysis and justification of a construction site of a NPP shall be performed prior to starting preparing the design of a NPP. The persons implementing a NPP project shall carry out the analysis and justification of nuclear safety during the evaluation of the construction site of NPP. The results of such analysis and justification shall be reflected in a report on evaluation of the construction site, which shall be approved by VATESI. VATESI can approve the report on evaluation of the construction site only after verifying that the results of the analysis and justification of the construction site are in line with requirements of the legal acts and after having received positive decisions form other institutions, which are involved in the process of reviewing a report. The detailed procedures for reviewing the 70

71 site evaluation report are defined in the Governmental Resolution of the Republic of Lithuania No. 83 the Description of procedure on review of the construction site evaluation report of nuclear power plant and Nuclear Safety Requirements BSR General requirements on site evaluation for nuclear power plants. VNPP site evaluation process had started in Evaluation included both deterministic and probabilistic assessments of various site related phenomena. The main conclusions of this activity were determined after considering the following aspects: The effects of external events occurring in the region of the Visaginas sites; The characteristics of the Visaginas sites and their environment that could influence the transfer to persons and the environment of radioactive material that has been released; The population density and population distribution and other characteristics of the external zone in so far as they may affect the possibility of implementing emergency measures and the need to evaluate the risks to individuals and the population. It was concluded that there are no exclusion criteria and no deficiencies that cannot be compensated for by means of design features, measures for site protection or administrative procedures. Therefore, both investigated sites are suitable for construction of the VNPP. Site Evaluation Report was reviewed by Independent IAEA Site Safety Review Mission (SSRM) which took place on 8 12 th of November, IAEA experts stated that Sites evaluation is conducted in line with IAEA requirements and guides, the volume of investigation is sufficient, and sites are suitable for construction of Visaginas NPP. The experts of the mission have submitted several recommendations, which may be implemented only after selecting of nuclear technologies and layout of nuclear facilities providing opportunities for additional investigations related with design works. Design According to the Article 25 Paragraphs 1 and 2 of the Law on Nuclear Energy, construction of a NPP or an individual NPP energy unit shall be carried out in accordance with the Law on Construction of a new nuclear power plant or an individual nuclear power plant energy unit. NPP or an individual NPP energy unit may be designed only subject to a decision on the start of construction of a new NPP or an individual NPP energy unit adopted by the Government and only after the builder (customer) drafts and approves with VATESI a technical specification of NPP (the technical specification shall be understood as specification for procurement of a nuclear facility document which sets requirements for design). The technical specification shall include a site characteristics, a set of safety requirements (as well as established by utility, for example the technical codes and standards) and other safety criteria for design of NPP. According to the Article 26 Paragraph 1 of the Law on Nuclear Energy, the design of a building structure of a nuclear installation shall be prepared in accordance with the procedure and terms of the Law on Construction and the secondary legislation. The design documentation shall be approved with VATESI and other authorities involved in the manner established by the Government Resolution of the Republic of Lithuania No Rules of Procedure of Authorization of Nuclear Facility building Plan. Construction and operation The stages of authorization process are linked to licenses and permits which utility shall acquire for construction and operation of NPP. The necessary licenses and permits are listed in the Article 22 of the Nuclear Safety Law, and the main safety assessment issues, linked to the stages, are stated in the Article 32 of the Nuclear Safety Law. The necessary safety documents to be submitted when applying for each license or permit for regulatory review and assessment are listed in Regulations on the Issue of Licenses and Permits Necessary to Engage in Nuclear Energy Activities. 71

72 Commissioning The Article 32 Paragraphs 3 and 4 together with the Article 2 Paragraph 3 of the Law on Nuclear Safety set a requirement for preparation of Commissioning programme that have to be approved with VATESI. A person can start commissioning if he is a licence holder of a licence defined in the Article 22 Paragraph 1 or 3 of the Law on Nuclear Safety. All requirements for commissioning are established in Nuclear Safety Requirements BSR Commissioning of Nuclear Power Plants. The results of implementation of commissioning program are subject for further authorisations. Approval of safety analysis report (SAR) Pursuant to Paragraph 2 and 8 of Article 32 of the Law on Nuclear Safety the evaluation of nuclear safety shall be conducted in the prescribed manner at all the stages of a lifecycle of a NPP. Along with other documents, which shall be submitted for VATESI for the issue of an appropriate licence or permit, the applicant shall submit preliminary safety analysis report, safety analysis report and final safety analysis report. Regulatory requirements related to the preparation, content and format of safety analysis reports that have to be submitted at the different stages of the licensing process for a nuclear power plant are described in Requirements BSR Preparation and Use of Safety Analysis Report of Nuclear Power Plant. Re-evaluation of hazards assumptions The re-evaluation of hazards assumptions using deterministic and probabilistic methods of analysis is performed according to requirement for periodic safety assessment of nuclear installations that is established in the Law on Nuclear Safety. In response to the event at Japan s Fukushima Daiichi Nuclear Power Plant, the European stress tests were conducted in at INPP according to specification agreed by ENSREG. In accordance with the scope of stress tests, the re-evaluation of extreme natural events (earthquake, flooding and extreme weather conditions) challenging the plant safety functions and leading to a severe accident was performed. More details on INPP stress tests results and safety improvements measures associated with post-fukushima lessons learned are presented in Section A2 of this report. Overview of periodic safety assessments of nuclear installation The requirement for periodic safety assessment of nuclear installations using deterministic and probabilistic methods of analysis is established in the Law on Nuclear Safety. Pursuant to Part 7 of Article 32 of the Law on Nuclear Safety, a licensee shall perform a periodical safety analysis and justification and prepare a periodical safety review report at least every 10 years after the issuance of a permit for the commercial operation of a nuclear installation. Periodical safety review report shall be submitted to the VATESI for review and assessment. Thereafter, the VATESI shall adopt a decision regarding the coordination of such report. Taking into account the analysis and justification of nuclear safety, performed in the frame of decommissioning of INPP, for Unit 1 in 2007 and for Unit 2 in 2010, the next periodic safety assessment shall be carried out for INPP units accordingly in 2017 and in This obligation is included into licence conditions for operation of corresponding units. Therefore, the INPP is in the process of Unit 1 periodic safety review performance. Pursuant to the recommendations of the IAEA Specific Safety Guide No. SSG-25 Periodic Safety Review for Nuclear Power Plants and the national regulatory requirements the scope of the periodic safety assessment is described in Section A1 of this report. Overview of safety assessments performed In response to the events at Japan s Fukushima Daiichi Nuclear Power Plant, the stress tests were performed at INPP according to ENSREG stress tests specification and assessment for 72

73 reasonable improvements, taking into account as well as results of assessment performed in 2012 inline WANO recommendations, was done by the INPP. The results of the stress tests revealed that the INPP has implemented the relevant technical and organizational measures which would be adequate to control the emerging situation to maximally protect the people and the environment from the hazardous effects of ionizing radiation even in the most adverse conditions, such as the earthquake, flood, long-lasting interruption of power supply, long-lasting failure of the spent nuclear fuel cooling systems. More details on the post-fukushima lessons learned related to implementation of the INPP safety improvement measures are presented in Section A2 of this report Regulatory review and control activities Regardless of the fact that INPP Unit 1 and Unit 2 were finally shut down, INPP has been further performing the safety improvement works in accordance with the INPP s Safety Improvement Programme SIP-3. The purpose of INPP Safety Improvement Programme is to improve and ensure the highest possible level of nuclear safety at the power plant, by improving maintenance and operating procedures of structures, systems and components important to safety, and by taking into account operational experience of INPP and operators of other countries. The INPP Safety Improvement Programme SIP-3 is annually reviewed, updated and approved by VATESI. To assure the adequate supervision of the safety improvement measures linked to the post-fukushima lessons learned and stress test (the Plan of Strengthening Nuclear Safety in Lithuania (National Action Plan), see Section A2), INPP included the measures of the National Action Plan into the INPP Safety Improvement Programme SIP-3. The INPP activity for safety improvement is based on priorities to meet the current requirements of national and international safety standards, on results of the analysis, carried out in SAR of Unit 1, SAR of Unit 2 (SAR-2) and Periodic Safety Review scope. In additional, INPP Safety Improvement Programme SIP-3 includes additional calculations and measures related to implementation of INPP modifications and recent VATESI requirements. Besides safety improvement measures linked to the post-fukushima lessons learned and stress test, INPP Safety Improvement Programme SIP-3 includes the following major measures dedicated for: reduction of the frequency of an individual exposure (the ALARA principle and radiation monitoring); managing the ageing of the safety related systems; maintaining the qualified condition of the safety-related structures, systems and components; conservation of the fully loaded compartments of the Solid Radioactive Waste Storage Facility (building 157/1); reconstruction of spent fuel storage pools sections by installing armour-plated sheets; construction of Solid Waste Management and Storage Facility; performance of Unit 2 safety related systems equipment and pipes metal inspection and control, including welding seams; defining of the methodology and measuring devices for activity determination of difficultto-measure nuclides. With respect to the implementation results of INPP s Safety Improvement Programme SIP-3, and the results of inspections and review and assessment of safety justifying documents, VATESI specialists noted that the safety level of INPP during the period of was acceptable. Irrespective of the fact that INPP Units 1 and 2 are permanently shutdown, safety improvement measures will further be planned and implemented. 73

74 Article 14(ii) Verification of safety Overview of arrangements and regulatory requirements for the verification of safety VATESI performs the supervision of maintenance, in-service inspections of SSC important to safety and ageing management processes at INPP in accordance with Nuclear Safety Requirements BSR Basic Safety Requirements for Nuclear Power Plants with RBMK-1500 Reactors, Basic maintenance requirements for Nuclear power plants, VD-E and Ageing Management Requirements of Systems and Elements important to safety of Nuclear Power Facilities, VD-E Main elements of programmes for continued verification of safety (in-service inspection, surveillance, functional testing of systems, etc.) At present the INPP is not operating, but prior to its decommissioning the operational maintenance and in-service inspection have to be carried out. In compliance with the Quality Management Programme and Documentation control system acting at the INPP all works related to maintenance, in-service inspection of SSC important to safety and ageing management are performed only on the basis and in accordance with documents, which are agreed with VATESI. Regardless of facts that INPP Units 1 and 2 were finally shut down and configuration of its systems and components has been significantly altered, INPP has been further performing nondestructive testing of fuel channels, piping metal condition and equipment of systems important to safety in accordance with the INPP Regulations ( Regulation Control of the Piping Metal Condition and Equipment of Systems Important to Safety in Unit-2 of the INPP with the RBMK-1500 Reactor and Regulation Control of Fuel Channels in Unit-2 of the INPP with the RBMK-1500 Reactor in Pursuance Decommissioning Project ), agreed with VATESI. These regulations have been developed in accordance with the requirements for in-service inspection (PNAE G and PNAE G ), experience of in-service inspection in other nuclear power plants, and IAEA Safety Guide Maintenance, Surveillance and In-Service Inspection of Nuclear Power Plants, NS-G-2.6. Regulations determine requirements of in-service inspection (methods, frequency, volume and regions (places)) and assessment of results of performed in-service inspection for systems important to safety. Every year the INPP prepares in-service inspection Programme of piping metal condition, equipment of systems important to safety and every two years the INPP prepares in-service inspection Programme of fuel channels on the basis of above mentioned Regulations. These Programmes have to be agreed with VATESI. During operation phase of the INPP in-service inspections were performed by the INPP staff (Metal and Technical Control division), but due to final shutdown both of the INPP Units was performed modification of the INPP organization structure and this division was liquidated. Now inservice inspections at the INPP are carried out by accredited Contractor organisation. Staff of the INPP together with representatives of the Contractor performs technical verification of pressurized components (equipment and piping) important to safety. VATESI s Surveillance Division performs appropriate regulatory oversight (technical inspections) of these activities. The technical verification comprises external and/or internal inspection of equipment and piping, checking of parameters that prove the compliance of pressurized components with safety requirements, testing of the components and other actions aimed at assessing their adequacy in terms of safety. 74

75 Operational staff of INPP performs maintenance during walk down with control condition of equipment and rooms. Also INPP staff carries out the diagnostic activities of system and components, vibration and failures analysis of equipment, which are important to safety. The results of maintenance are the basis to prepare the plans for repair or replace the components, to carry out modifications Elements of ageing management programme(s) The INPP has established and developed ageing management system and prepared ageing management programme according to Ageing Management Requirements of Systems and Elements important to safety of Nuclear Power Facilities, VD-E In accordance with VD-E-05-99, the INPP has prepared: procedure and programme for the SSC ageing management; methodology for evaluation of the technical conditions and remaining life time of the SSC; procedure for screening of SSC for the purpose of ageing management; list of the INPP safety related SSC; schedule of evaluation of the technical conditions and remaining life time of SSC, which are included in ageing management programme. The main task of the ageing management programme is to ensure reliable operation of systems and elements important to safety of nuclear power facilities. The INPP prepared ageing management programme ensures performance of following functions: general assessment of ageing process according design documentation requirements; timely assessment of systems and elements condition to ensure reliable operation of nuclear power facilities during design lifetime; timely detection of systems and elements degradation phenomena, including determination of unanticipated causes, their elimination and mitigation of consequences; performance of necessary modifications and change of operation conditions in order to mitigate degradation phenomena; assessment of residual service life of system and elements and planning of necessary measures. This programme will be implemented as long as particular systems, structures and components of the INPP are required to remain operating and the decommissioning process has not been completed, also for the existing and new constructed spent fuel and radioactive waste storages Arrangements for internal review by the licence holder of safety cases to be submitted to the regulatory body Law on Nuclear Safety of the Republic of Lithuania states that the analysis and substantiation of nuclear safety in the area of nuclear energy activities as well as other activities involving nuclear and/or nuclear fuel cycle materials shall be carried out by the applicant or the licence holder; whereas the analysis and substantiation of nuclear safety during the evaluation of the construction site of a nuclear power plant shall be carried out by the persons implementing a nuclear installation project. The results of the analysis and substantiation of nuclear safety shall be independently verified in the manner set out by the Head of the VATESI. The applicant or the licence holder shall be responsible for the performance of such independent verification, whereas in case of the construction site of a nuclear power plant evaluation the responsibility for performance of an independent verification falls on persons implementing the nuclear installation project design. Nuclear Safety Requirements BSR Management System states that licence holder shall establish requirements for implementation of the independent verifications, including audits. License holder is responsible for the performance of independent verification of the documentation of substantiation of modification safety according Nuclear Safety Requirements BSR- 75

76 Categories of Modifications at Nuclear Facilities and Procedure for Implementation of these Modifications Regulatory review and control activities Law on Nuclear Energy of the Republic of Lithuania states that VATESI shall analyse and assess the documents submitted by applicants for obtaining a licence or a permit, also the documents submitted by licence holders or permit holders or other persons, shall adopt relevant decisions regarding such documents, shall review and evaluate the nuclear safety. Regulatory review and control activities of the performance of licensed or permitted activities and evaluation of nuclear installations safety as well as safety of operations with nuclear and/or nuclear fuel cycle materials are comprised of: review, evaluation and agreement of nuclear safety documents submitted by the licence or permit holders and inspection activities. The Head of VATESI has appointed permanent authorised employees who in the manner set out by the Head of VATESI, shall regularly supervise all stages of a nuclear installation lifecycle at its construction site. VATESI inspections are conducted at all stages of the lifetime of a nuclear facility: during the evaluation of a construction site for nuclear facility, its design, construction, commissioning, operation or decommissioning stages, as well as in supervising the closed radioactive waste repository, procuring, storing or transporting nuclear and / or nuclear fuel cycle materials and / or dual use nuclear commodities. VATESI inspects applicants for obtaining licensees and permits, licenses and permits holders, suppliers of goods or nuclear fuel cycle materials. Every year VATESI develops a plan of inspections in accordance with the established criteria and with regard to the available human and financial resources. VATESI annual inspection plan involves four general types of inspections, namely Special Inspections, Regular Inspections, Technical Inspections and Control Room operation inspections. In addition to planned inspections as well as unplanned inspections which may be announced or unannounced are performed. Each year the following safety related areas are inspected: training of the INPP personnel, safety systems and safety-related systems (emergency core cooling system, emergency power systems, fire protection systems, spent fuel pools and their cooling system, service water system and others), management of beyond-design-basis accidents, quality management, management of radioactive waste, safety culture, ageing management, emergency preparedness, assessment of operational experience and others. Surveillance Division of VATESI Nuclear Safety Department performs periodical checks on technical condition of systems important to safety. The objective of technical checks is to ascertain that the technical condition of individual systems, installations and equipment of nuclear facilities complies with the requirements set in special operation, testing and repair regulations. Article 15 Radiation Protection Each Contracting Party shall take the appropriate steps to ensure that in all operational states the radiation exposure to the workers and the public caused by a nuclear installation shall be kept as low as reasonably achievable and that no individual shall be exposed to radiation doses which exceed prescribed national dose limits Overview of arrangements and regulatory requirements concerning radiation protection at nuclear installations The basic standards and safety requirements for occupational and public exposure (including dose limits) are established in Hygiene Standard HN 73:2001 Basic Safety Standards of Radiation Protection (national BSS). The basic regulation, which sets out requirements for radiation protection of workers working at the nuclear facilities, is BSR

77 Radiation protection requirements for outside workers are set in the Hygiene Standard HN 83:2004. The principal requirement is that the radiation protection of outside workers shall be at the same scale as of permanent workers of the NPP. The employers, whose workers are performing their activities within the controlled area of the nuclear power plant, shall establish the co-operation agreements with license holders, where the order and procedure of registration and estimation of workers exposure, measures of exposure reduction and other significant means from the radiation protection point of view shall be described. The limits for discharges from INPP, the order of permitting of discharges, requirements for radiological monitoring are set in the BSR Requirements for radiological environmental monitoring are laid down in the Order of the Minister of Environment On approval of regulation of environmental monitoring of economic entities Regulatory expectations for the licence holder s processes to optimize radiation doses and to implement the ALARA principle Lithuanian regulation (the Law on Radiation Protection, Lithuanian Hygiene Standards HN 73:2001 and nuclear safety requirements BSR ) clearly refer to the ALARA principle. There is a regulatory requirement that the optimisation of radiation protection is to be applied, together with the principle of justification of practices and the principle of limitation of individual exposures. According to the requirements of BSR , one of the items of the radiation protection programme must be the application of optimisation principle (ALARA) and measures on exposure reduction. For this purpose the optimization programme shall be carried out at nuclear facility. In order to optimize radiation protection of nuclear facilities workers, when they are performing routine, planned, maintenance, revision and other works at nuclear facility, the measures and procedures for exposure reduction of workers and reduction of amount of generated radioactive materials (reduction of exposure level in workplaces, decrease of surface and airborne radioactive contamination, determination of optimum number of workers, taking into account type of work, use of protective shielding, decontamination, iodine prophylaxis etc.) shall be included in the ALARA programme. An ALARA programme dedicated to the dismantling of a nuclear power plant shall comprise the traditional phases of prediction, performance follow-up and feedback analysis and also it must allow defining at least: Objectives and dose targets for the short, medium and long terms. The rationality behind the choice of such objectives and targets must be clearly stated; A radiation dose plan and a dose reduction plan (sources, dose rates and exposure times to be considered), for the different stages of the decommissioning, demonstrating that the doses have been optimised; Ways to monitor, follow up and analyse the experience; Plans and strategies for extended education and training of the work force as well as organisational aspects of the ALARA programme requirements Implementation of radiation protection programmes by the license holders To ensure adequate radiation protection of workers during decommissioning of the INPP the radiation protection program is established in accordance with the requirements of BSR Following items are included in the programme: classification of working areas and access control; local rules, measures of supervision of safety at work and work organisation order; 77

78 procedures of monitoring of workplaces and individual monitoring of workers; individual protective equipment and rules for their application; main premises, control systems for assurance of radiation protection; application of optimisation principle (ALARA) and measures on exposure reduction; programs of health surveillance; mandatory training of workers and their instructions. Observation of dose limits, main results for doses to exposed workers According to the Hygiene Standard HN 73:2001, the dose limit for the exposure of a worker is 50 msv a year. In addition it is stated, that the radiation exposure of a person engaged in radiation work is limited so that the added dose does not exceed 100 msv for the period of 5 years. Limits of exposure of critical organs determined by Hygiene Standard HN 73:2001 are presented in Table Table Limits of exposure of critical organs determined by HN 73:2001 Equivalent dose per year Dose limit Workers Public for the lens of the eye 20 msv 15 msv for the skin 500 msv 50 msv for the extremities (hands and feet) 500 msv - Individual monitoring of personnel exposure at the INPP aims at assessing and ensuring radiation protection of workers in the INPP controlled area, obtaining the information about internal and external exposure doses, timely identification of cases of increased radionuclide content level in organism, and as a proof of the fact that the dose limits are not exceeding both in normal plant operation and in possible emergency conditions. Individual monitoring of internal and external exposure of the INPP personnel is carried out with the help of the individual dosimetry control computer-based system, which includes: Thermo luminescence dosimetry system RADOS; Direct-reading electronic dosimetry system RAD-51, RAD-52, RAD-62 and others (for operative control); Gamma spectrometric system WBC ACCUSCAN 2260-G2KG (Whole Body Counter); Local net; Software support for collecting, storing, processing and displaying the information of individual personnel radiation monitoring from individual dosimetry control system RADOS and WBC ACCUSCAN 2260-G2KG. Individual monitoring of external exposure of INPP personnel and outside workers is set for a period of one month. If according to the results of operative control total individual dose of worker exceeds 2.0 msv reading of the TLD dosimeter is performed without delay. The results of individual monitoring of INPP personnel and outside workers for are given in the table In the Figure 15.1 the collective doses of INPP and outside workers from 2005 to 2015 are presented in graphic form. Table Exposure and collective dose dynamics of the INPP personnel and outside workers Year Collective dose, Man Sv Highest individual exposure dose, msv Average dose, msv INPP Outside workers INPP Outside workers INPP Outside workers

79 Collective dose (man Sv) 3,5 2,5 1,5 0,5-0, Ignalina NPP and Outside workers Ignalina NPP Outside workers Figure 15.1 Collective doses of the INPP and outside workers from 2005 to The annual individual exposure doses at the INPP did not exceed established dose limits. Individual monitoring of internal exposure of INPP personnel and outside workers is conducted by gamma spectrometric measuring system WBC ACCUSCAN with the aim of obtaining the information about internal exposure doses, timely identification of cases of increased radionuclide content level in body and prevention of fixed annual exposure dose exceeding. Personnel internal exposure control is realized in accordance with the Time Schedule for Radiation Safety Monitoring at INPP. The values of an effective dose of the personnel internal exposure from 2013 till 2015 are given in Table15.3. Table15.3. Monitoring results for nuclide content of workers Year The internal exposure effective dose of INPP personnel and outside workers, man Number of Less than minimal RLWBC people registration level of WBC -0.1 msv measured (RLWBC=0.001 msv) msv msv msv msv msv msv with WBC, man The highest internal exposure value of the INPP worker was registered in 2014, which amounted to 0.26 msv. The highest measured activity of Co-60 radionuclide equals 544 Bq, Cs-137 equals 578 Bq. The highest internal exposure value of outside workers was registered in 2015, which amounted to 0.64 msv. The highest measured activity of Co-60 radionuclide equals 1894 Bq, Cs-137 radionuclide equals 1232 Bq. According to the Program of Monitoring of the Workers and Workplaces Exposure, carrying out of the following kinds of the personnel internal exposure monitoring is foreseen: confirmative, target, regular monitoring prior to the beginning of works, monitoring after the completion of works. The confirmative monitoring of personnel internal exposure is carried out once a year for all personnel in order to prove that the radiation protection of personnel is ensured and is sufficient. The target monitoring of internal exposure is carried out during and after radiation hazardous works for the INPP personnel and outside workers depending on radiation conditions at working places and results of external exposure individual dose measurement. Regular monitoring of the personnel internal exposure is carried out at least once every 3 months for the workers, whose expected effective annual dose of internal exposure is higher than 0,1 msv/year according to the results of confirmative monitoring. Monitoring prior to the beginning of works is carried out with the purpose of internal irradiation individual background levels establishment for the personnel who have got a job in the controlled area. Monitoring after the completion of works is carried out with the purpose of estimation of internal exposure dose for the workers upon completion of work in the INPP controlled area at dismissal or transfer of the worker from the controlled area. 79

80 Conditions for the release of radioactive material to the environment, operational control measures and main results In optimization of radiation protection the source related individual dose is bounded by a dose constraint. The dose constraint for each source is intended to ensure that the sum of doses to critical group members from all controlled sources remains within the dose limit. According to requirements of the Nuclear Safety Requirements BSR the exposure of population shall be limited by application of dose constraint during design, operation (both normal operation conditions and anticipated operational occurrences) and decommissioning of nuclear facilities but it is not applicable for accidents. If more than one nuclear facility contributes to the exposure of the population, the total sum of annual effective doses to members of the public from all contributing nuclear facilities shall not exceed the dose constraint. The established dose constraint for members of the public is 0.2 msv per year. According to Nuclear Safety Requirements BSR , if radionuclides are dispersed into the environment by several pathways (e.g. by atmospheric and water paths) and the members of the same or different critical groups of population are impacted, the particular pathway resulting dose shall be limited in such a way that the total sum of doses from all pathways shall not exceed the dose constraint. The impact due to direct external ionizing irradiation shall be taken into account and the total dose (due to radioactive emissions and due to direct irradiation) to the critical group member of population shall not exceed the dose constraint. Operational control of radioactive releases into the atmosphere at the INPP is ensured in accordance with the Schedule of Monitoring for Ensuring Radiation Safety at the INPP. The control of radioactive substance releases into the environment is implemented by the following technical means: Automated Radiation Safety Monitoring System SAMRB; Laboratory equipment for taking, preparation and specific activity measurement of samples. Automated Radiation Safety Monitoring System SAMRB measurements are made by means of determination of the activity of each controlled environment component in the samples constantly taken into the facility detection units. Limits of authorized discharges from INPP to atmosphere are presented in Table Table15.4. Authorized discharges limits from the INPP to atmosphere Airborne discharges Bq/year Noble radioactive gases 2, Particulate Pollutant 1, Laboratory control is based on the stationary and portable sampling equipment, as well as on the stationary radiometric and spectrometric equipment. Discharge rates of noble radioactive gases and radioactive aerosols from the INPP during period are presented in Table No exceeding of limits in discharges was recorded. Table Discharges of noble radioactive gases, radioactive aerosols and I-131 from INPP Year Noble radioactive gases, Bq Radioactive aerosols, 10 7 Bq Sum % from DL* Sum % from DL , , , *DL Discharge limit. Radiological monitoring of the environmental contaminants, removed by the waterway, at the INPP is carried out in accordance with the Environmental Monitoring Programme. The periodicity 80

81 of taking samples from the intake and discharge channels everyday, from the industrial and storm water sewage system 3 times a month. Before August 2015 the permissible maximum water discharges constitute Bq/year and after August 2015 the permissible maximum water discharges constitute Bq/year. No exceeding of limits in discharges was fixed. Discharge rates of gamma nuclides into environmental water from the INPP during period are presented in Table Table 15.6 Discharges of radionuclides into environmental water from the INPP Year Discharges, 10 7 Bq , , ,45 Considering the Sr-90 and Н-3 radionuclides are widely spread in the ecosystem and in the lake Drūkšiai, it is impossible to identify their ingress with the process water, as their concentration in the water of both the intake and discharge channels is practically the same and is equal to the detection limit of the measurement equipment (0.007 Bq/l for Sr-90 and 3 Bq/l for Н-3). Using the INPP monitoring data regarding airborne discharges and discharges into the lake Drūkšiai doses for critical group of public during normal operation of the INPP were evaluated. Annual dose for critical group of public during normal operation of INPP did not exceed dose constraint value (0,2 msv): in , msv and 3, msv due to the airborne and liquid discharges respectively, in total 4, msv per year; in , msv and 4, msv due to the airborne and liquid discharges respectively, in total 13, msv per year; in , msv and 5, msv due to the airborne and liquid discharges respectively, in total 8, msv per year. Processes implemented and steps taken to ensure that radiation exposures are kept as low as reasonably achievable for all operational and maintenance activities Implementation of the ALARA Programme at the INPP was started in The aim of the ALARA Programme at INPP for is to make the personnel exposure dose as low as reasonable achievable and to provide maintaining of individual exposure limit within 20 msv/year for 5 years, as well as to reduce the personnel collective annual dose. The ALARA Programme has the following basic directions at the INPP: Proper organization of the activities; Improvement of working conditions and Personnel learning and training; Perfection of engineering process; Quality maintenance and Safety culture; Human factor impact. Responsibility for radiation protection is sharply defined at the INPP in accordance with a Control Procedure of the second level Radiation Safety MS Director General is responsible for policy making in the field of radiation protection at INPP, distribution of authority and allocation of responsibility, implementation ALARA foundations at INPP as well as financing of radiation protection activity. Heads of Departments and Services are responsible for organisation of activities on INPP radiation protection according to ALARA rules, standards and principles. Heads of divisions are responsible for organisation of activities on radiation protection in their divisions in accordance with rules and standards, for training and professional skills of their stuff, for making 81

82 such working conditions when personnel exposure doses will be maintained as low as reasonable achievable. Head of the Radiation Protection Service is responsible for work of the Service workers, their qualification, supply of resources, control of implementation of radiation protection standards and instructions, control of implementation of correction measures in case of inconsistencies. Head of the Radiation Protection Division is responsible for preparation and review of procedures for establishment of types and levels of impact on radiation protection, implementation of radiation monitoring, control of implementation of radiation protection standards. Head of the Maintenance and Quality Management Division is responsible for organisation and conducting of audits on radiation protection activity as well as coordination and corrective actions in this document. Every worker is responsible for fulfilment of radiation protection requirements. The staff that works in radiation exposure conditions is trained according to the programs on radiation protection preparation. According to the Nuclear safety regulations BSR the INPP territory and its premises are divided into the controlled area and the supervised area. The premises in the INPP controlled area are subdivided into three categories according to their radiation conditions, see Table Room category Colour of the area Frequency of service Dose rate µsv/h Table Classification of INPP controlled areas Surface alpha contamination Bq cm -2 Surface beta contamination Bq cm -2 Total aerosol activity Bq cm -3 I Red No service >56 >20 >266 >1110 II Yellow Periodic III Green Permanent <12 <4 <40 <185 The first category premises are unmanned ones. The access to the room is authorised under the orders, written orders or special programmes approved in accordance with the established procedure with the permission of the Shift Supervisor or Radiation Safety Control dosimetrist. The second category premises are those, the entrance into which is only permitted for periodic maintenance of the equipment located in them (Central Hall, a Spent Fuel Storage Pools Hall, a sample cutting room). The access to the specified rooms is authorised according to INPP valid procedures. The third category premises are those of personnel permanent residence (for example, operator rooms, control panels, workshops, laboratories, corridors, etc.). The access to the premises, which under any radiation factor are related to categories I or II, is strictly regulated. The works in these premises are carried out in the following order: people responsible for radiation protection shall assess the radiation condition of working places and develop the principles of requirements to safety; operators shall prepare the working place; workers get appropriate instructions; workers shall be followed by a person responsible for dose monitoring, who assess the radiation conditions. In order to reduce the personnel expose dose the working area or object is decontaminated before the activities can be started. The activities with increased exposure are usually carried out with the following radiation protection means: lead screens, distance safety equipment, video-monitoring systems. All activities threatened by ionising exposure are carried out in accordance with Direction on Radiation Accident Prevention during Work Performance in Controlled Area requirements. Environmental monitoring and main results In accordance with requirements for radiological environmental monitoring that are laid down in the Order of the Minister of Environment On approval of regulation of environmental monitoring of economic entities, the operator of nuclear energy object has to work out the monitoring programme and implement it. Measurements shall be made by the laboratory owned by the subject 82

83 or any other hired laboratory (or laboratories) possessing the required equipment and qualified personnel to ensure data quality. The laboratory that performs these analysis and measurements should be accredited by accreditation body, which belongs to European co-operation for Accreditation, or possess special permission to perform analysis and measurements of radionuclides in discharges and environmental samples. The monitoring programme shall cover all important routes of radionuclide dispersion and population exposure to enable the proper evaluation of annual airborne and water discharges, likewise their short term and consequently doses for critical group members, changes. To evaluate INPP impact to environment and population permanent radiation monitoring is carried out on the INPP site and within a radius of 30 km. Activities of radionuclides in foodstuffs, drinking water and soil have been measured since the INPP had been put into operation. The investigation data show that the activities of Cs-137 and Sr-90 in foodstuffs and drinking water do not considerably differ from the activity level in other regions of Lithuania and do not exceed levels laid out in the Lithuanian normative documents, see Table Table Concentration of Cs-137 in the fish and soil in INPP Region in Name of sample Average values in INPP region (Bq/kg) Fish 1,12 2,43 0,71 Soil 4,84 2,98 3,03 All release pathways are monitored at the INPP. Activities of noble gases, particles, iodine and aerosol are measured in the ventilation stacks of NPP continuously. The discharge water is checked every time before s discharging into the lake and the water from intake and outlet channel is measured in laboratory every day. On the site and in the vicinity TL dosimeters are set out for measurements of accumulated dose, which is evaluated at least twice per year. Also, on-line monitors for in-situ dose rate measurement are set around the INPP. The monitor readings permanently are available to the authority. In order to control the impact of the INPP to environment sampling of aerosols and atmospheric precipitation (continuously), water, bottom sediments, grass and other environmental samples is performed. The results of measurements are reported to the authority. The automatized system AKRB-06 for control of assurance of radiation protection of workers and environment is in operation at the INPP. System operates in the territory of the INPP and in the monitoring area of potential radioactive contamination Regulatory review and control activities There are two radiation protection regulatory authorities in Lithuania: VATESI and RSC. VATESI is responsible for supervision of occupational radiation protection in nuclear energy area. For the regulatory purposes, VATESI drafts and approves legal acts related to occupational radiation protection in nuclear energy area, which shall be coordinated with the Ministry of Health. VATESI also sets the requirements for different life stages of nuclear facilities taking into account radiation protection aspects, sets the requirements for clearance of radioactive materials and establishes the procedure and limits for the release of radionuclides from nuclear facilities. To evaluate how the radiation protection requirements are fulfilled by the license holder VATESI conducts inspections. During the inspections at nuclear facilities VATESI checks how the license holder performs the individual and workplace monitoring, manages the controlled area, implements the principle of optimization, applies personal protective equipment, ensures the radiation protection training of workers and implement other radiation protection measures during the decommissioning of INPP. During the annual inspections on implementation of environmental 83

84 monitoring programme, procedures of operational control of liquid and gaseous discharges from INPP are inspected as well. Also VATESI performs review of safety related documents, including reports on occupational exposure and release of radionuclides, which shall be submitted to VATESI on regular basis. By the end of the year VATESI is provided with the report on the impact of nuclear facilities on the environment. The radiation protection issues during decontamination and dismantling of the INPP buildings and equipment and the radioactive waste management, control of occupational and public exposure during the decommissioning of the INPP will remain one of the underlying areas of regulatory activities. The regulatory body coordinating the activities of executive and other bodies of public administration and local government in the field of radiation protection, monitoring and expert examination of public exposure is the RSC. The RSC exercises the state regulation and supervision of the practices involving sources of ionizing radiation, except of state regulation and supervision of the practices in the area of nuclear energy involving sources of ionizing radiation. Among other responsibilities the RSC is responsible for the radiation protection of the general public from negative impact which may cause the ionizing radiation, including ionizing radiation, arising from nuclear facilities in operation and decommissioning. RSC as regulatory body takes part in evaluation of Environment Impact Assessment Reports of INPP decommissioning projects and also is regularly assessing exposure for public due to discharges to the atmosphere and water from the INPP. Within State Environmental Radiological Monitoring the measurements of radioactivity in the foodstuffs (milk, meat, vegetables, grains, and fish), raw food, drinking water, and mushrooms are performed at schedule approved by Minister of Health Care. Milk and drinking water is analyzed on quarterly basis, fish, meat twice per year, vegetables, grains, mushrooms during summer time. Approximately 100 samples of food, 160 samples of drinking water and 150 samples of mushrooms were measured in every year from 2013 up to Results showed that the levels of man made radioactivity in the samples analyzed are very low, and radioactivity in the samples in INPP area is the same as in the other territory of Lithuania. External gamma dose equivalent measurements by thermo luminescent dosimetry in the surroundings of the NPP proved that. Dose due to man made radionuclides (Sr-90 and Cs-137) for the public estimated on the results of measurements was lower 2 µsv/year. During the last 5 years dose estimation for the public was performed analyzing results of monthly and annual reports of radioactivity discharged to the environment delivered by the INPP. The Ministry of Environment approves requirements on measurements of environmental radiation while EPA controls the implementation of these requirements. EPA provides environmental radiological control within the sanitary protection zone of the nuclear facility. There are six automatic gamma dose rate measurement stations in vicinity of INPP. There is a non-automatic station of aerosol sampling in 60 km distance from INPP and automatic aerosol station in Vilnius. Additionally monitoring of radionuclides in aerosols is done close to INPP (in the distance of 3.5 km) by the Center for Physical Sciences and Technologies, which reports the annual data to EPA. Environment samples are periodically taken within the zone of INPP: water, biota and bottom sediments of the Lake Drūkšiai. Control of INPP laboratory is provided for ensuring of reliability of results. 84

85 Article 16 Emergency Preparedness Each Contracting Party shall take the appropriate steps to ensure that there are on-site and off-site emergency plans that are routinely tested for nuclear installations and cover the activities to be carried out in the event of an emergency. For any new nuclear installation, such plans shall be prepared and tested before it commences operation above a low power level agreed by the regulatory body. 2. Each Contracting Party shall take the appropriate steps to ensure that, insofar as they are likely to be affected by a radiological emergency, its own population and the competent authorities of the States in the vicinity of the nuclear installation arc provided with appropriate information for emergency planning and response. 3. Contracting Parties which do not have a nuclear installation on their territory, insofar as they are likely to be affected in the event of a radiological emergency at a nuclear installation in the vicinity, shall take the appropriate steps for the preparation and testing of emergency plans for their territory that cover the activities to be carried out in the event of such an emergency. Article 16(1) Emergency plans and programmes Overview of arrangements and regulatory requirements for on-site and off-site emergency preparedness The main laws that set and describe the general criteria for ensuring on-site and off-site emergency preparedness and response in case of nuclear and radiological emergencies are: The Civil Protection Law establishes the legal and organisational framework for the organisation and functioning of the civil protection system, the competence of state and municipal institutions and agencies, the rights and duties of other agencies, economic entities and residents in the sphere of civil protection. The Law on Nuclear Energy sets the general obligations and assigns responsibilities for licence holders and state institutions for preparedness and response to nuclear and radiological emergencies at nuclear facilities. This law sets the order of preparation and approval of the state plan for protection of population in case of a nuclear accident. The Law on Nuclear Safety sets responsibilities for license holders to ensure the preparedness for possible nuclear and radiological accidents, their prevention at nuclear installations. This law sets the obligation for license holders to prepare and test an on-site emergency preparedness plan. The arrangements for ensuring the off-site preparedness and response to nuclear and radiological emergencies are: National Plan for Protection of Population in Case of Nuclear Emergency (hereinafter - Plan) at the State level defines civil protection actions in case of a nuclear emergency in Lithuania and (or) outside of its borders. The general objectives of emergency planning are to prevent serious deterministic health effects and to reduce the likely stochastic health effects of ionizing radiation. The Plan assigns the responsibilities of state institutions taking part in emergency preparedness, provides means of protecting the population. The Plan sets arrangements for co-ordination of actions taken over by ministries, other state administration institutions, municipal authorities, describes the early notification of neighbouring countries, EC, IAEA, etc. The Plan is prepared in accordance with IAEA Requirements No. GS-R-2 Preparedness and Response for a Nuclear or Radiological emergency and IAEA Safety Guide GS-G-2.1 Arrangements for Preparedness for a Nuclear or Radiological Emergency. Hygiene Standard HN 99:2011 Protective Actions of Public in Case of Radiological or Nuclear Emergency approved by the Order of the Minister of Health on December 7, 2011, implements IAEA General Safety Guide No. GSG-2 Criteria for Use in Preparedness and Response for a Nuclear 85

86 or Radiological Emergency. Hygiene Standard HN 99:2011 establishes generic criteria for acute doses to avoid or to minimize severe deterministic effects, generic criteria for protective actions to reduce the risk of stochastic effects, operation intervention levels (OIL) for environmental measurements, skin contamination, food, milk, drinking water, procedures on administration of stable iodine, clean-up procedures and dosimetric control of contaminated population, etc. This Hygiene Standard is a basis for application of public protective actions. The main arrangements for ensuring the on-site preparedness and response to nuclear and radiological emergencies at nuclear facilities are: Nuclear Safety Requirements BSR General requirements on assurance of safety of nuclear power plants with RBMK-1500 type reactors set the objectives, guidelines, principles and the main safety criteria for nuclear facilities operating RBMK-1500 type reactors. This document puts the obligation for operator of nuclear facility to make analysis and prepare the list of possible beyond design accidents, which may lead to severe reactor core damage or melting. The BSR sets the requirement for operator to prepare the emergency preparedness plan taking in account the analysis of possible severe beyond design accidents. Emergency Preparedness and Response Requirements for the Operators of Nuclear Facilities set the main requirements for emergency preparedness at the nuclear facilities. The Requirements oblige the operator of nuclear facility to assure prevention of accidents and incidents and, in the event of an accident, to perform the emergency preparedness tasks immediately. This document requires the operator of nuclear facility to develop the Emergency Preparedness Plan complying with these Requirements. This document is based on IAEA requirements GS-R-2, GS-R-2.1 and Method for Developing Arrangements for Response to a Nuclear or Radiological Emergency (TECDOC-953 update) Overview and implementation of main elements of national plan for emergency preparedness The civil protection and rescue system is comprised off the Government of Lithuania, the Government Emergency Commission, the Ministry of Interior, the PAGD, the State Emergency Operation Centre, other state and municipal civil protection offices, fire protection offices, searching and rescue groups, other territorial offices involved in warning, rescue, support to and evacuation of the population. National management of emergencies is carried out on two levels: state (governmental) and municipal. The state level comprises the Government of the Republic of Lithuania, the Government Emergency Commission, the State Emergency Operation Centre, the Emergency Operation Centres of the Ministry of Interior and other ministries, Emergency Operation Centres of the PAGD and other governmental institutions, including VATESI. The municipality level comprises the Municipal Administration, the Municipal Emergency Commissions, the Municipal Emergency Operations Centre, the Fire Protection Services, as well as other institutions, economic entities and theirs Emergency Operation Centres. Preparations for likely emergencies are carried out by means of planning related activities on each level of the civil protection system. The PAGD is competent authority that regulates and coordinates the state civil protection system in the country, controls the way the civil protection system is functioning, organizes operation of State Emergency Operations Centre during emergency situations, organizes and conducts civil protection exercises at national level, organizes fire fighting operations, rescue of people and property, organizes notification and provides information to public. Administrations of municipalities of Ignalina, Zarasai and Visaginas regions are responsible for development of plans for evacuation and temporary inhabitation for affected population. Ministry of Energy and VATESI are responsible for management of emergency situation caused by nuclear accident in domestic or abroad NPP. Also VATESI is collecting information about situation at the nuclear facilities, analyzing and forecasting the development of the situation and 86

87 predicting possible emissions and pathways of radioactive materials, providing information and advice to the Government, PAGD, Ministry of Environment and RSC, providing information and consulting the Government Emergency Commission, providing information to the mass-media and public about the situation in the nuclear facilities, notifying European Commission, IAEA, neighbouring countries in accordance with the Convention on Early Notification and bilateral agreements. In accordance with the Plan the RSC presents recommendations to the State or Municipal Emergency Commission, to the State or Municipal Operation Centre for the reduction of exposure doses and prevention of deterministic and stochastic effects of radiation on the public and emergency workers. RSC performs analysis of foodstuffs, drinking-water and other samples, contaminated by radionuclides, and presents suggest to the Ministry of Health to approve foodstuffs and their raw materials, drinking-water, feeding stuffs temporary maximum permissible levels of radioactive contamination for the emergency consequences liquidation period, organizes supervision and control of their compliance. RSC also presents proposals to the Ministry of Health about the necessity of applying iodine prophylaxis and provides information to the public, within the limits of its competence, about protection actions. In the event of a nuclear accident at the INPP, PAGD is responsible for organization of warning, fire protection and rescue and public information and a real surveillance of contaminated territory. In the case of emergency actions of ministries and government authorities shall be coordinated by the Government Emergency Commission, which is comprised of ministerial and governmental officers entitled to decisions making. Operation body of the Government Emergency Commission is the State Emergency Operations Centre comprised of ministerial officers and the headquarters of the PAGD. In the event of an emergency the State Emergency Operations Centre shall: Manage rescue operations and liquidation of consequences of the general emergency, aggregate the existing national forces and material resources, if the accident covered territories of more than three Municipalities; organize aggregation and co-ordination of assistance required for rescue operations and liquidation of the consequences of the emergency; if necessary, prepare and submit the Government proposals and drafts of decisions related to liquidation of the consequences of the emergency, organization of related operations and provision of assistance; prepare and submit the Government a report on material resources required for liquidation of the consequences of the emergency and proposals concerning compensations to victims; inform the general public on the accident and related actions according to issues delegated under authority of the Government Emergency Commission. In the event of an emergency the personnel of the INPP shall inform about emergency at the NPP and the existing situation in compliance with approved scheme for preliminary information on a radiation emergency at the INPP. Such kind of notices shall be given to municipalities situated in the zones of preventive and urgent protection measures and administration of territorial units in neighbouring countries: Daugavpils Region in Latvia and Braslav Region in Belarus. PAGD shall pass information on the emergency to the ministries, municipalities of cities/towns. For this purpose it shall use automatic system for the national managing bodies and warning of the population, public means of communication (subscribers telephone, fax for general purposes) and direct telephone and radio communication channels additionally arranged by PAGD. In addition, the PAGD also transmits information on the emergency to state civil protection management bodies in the neighbouring countries. International notification and information issues lay on VATESI. Radiation surveillance in the contaminated area is arranged and actively implemented during early phase of a nuclear accident. As for the late phase, radioactive contamination is constantly observed, while radiation surveillance is carried out only if this is required. Radiation surveillance is 87

88 planned and coordinated by the RSC on the basis of information provided by administration of the INPP on characteristics of the accident, dose metric data, forecasts of LHMT, needs and recommendations of the Ministry of Environment, Ministry of Health Care and other authorities. First of all radiation surveillance is to be carried out in the zone of 30 km in four different routes. If there is a need PAGD also has a capability to make additional reconnaissance of contaminated area. Decisions concerning regular prophylactic application of iodine preparations in the event of an emergency in the INPP shall be made by municipal Emergency Operation Centres. Population in the zones of long-term protection measures (in radius of 50 km from the INPP) shall be supplied with stabile iodine preparations in advance by local municipalities of cities and regions. The latter shall acquire such preparations on their own account, consequently distributing iodine preparations for the population and replacing them prior to the date of expiration. The remaining population of the Republic of Lithuania shall by themselves acquire regular iodine preparations and ensure their stocks in advance. Iodine preparations should be supplied to drugstores enabling the population to acquire them for regular usage. In the event of the general emergency at the INPP a decision to evacuate the population exposed to radioactive contamination as well as the process of evacuation itself shall be managed on the municipal level by director of Municipal Administration or at highest level by a head official for civil protection operations assigned by the Prime Minister. Proposals concerning evacuation shall be given by municipal Emergency Operation Centres on the basis of the situation analysis and likely future forecasts. Evacuation might be implemented in the urgent procedure, if a territory has already been contaminated, or in the planned procedure through population collecting posts, taking into consideration a particular situation and specific features of the area. In the event of urgent evacuation from the territory contaminated with radioactive materials, the population is evacuated right from their places of residence or/and work. The population collecting points serve for evacuation of people from the territory, which, according to forecasts, might be contaminated with radioactive materials and therefore might be dangerous for work or living. Taking into consideration meteorological conditions (direction of the wind), evacuation might be carried out in three directions. Taking into account lessons learned from Fukushima Daichi accident, Republic of Lithuania is ongoing the legitimation process of HERCA-WENRA approach to ensure arrangements for urgent protective actions and other recommendations in case of nuclear and radiological emergencies in neighbouring countries. The importance of Lithuanian s preparedness to cross-border nuclear emergency is associated with Ostrovets NPP construction, which is just 50 km from Lithuania s capital Vilnius. According to HERCA-WENRA recommendations and latest IAEA methodology, Lithuania has ensure arrangements for urgent protective actions in 100 km from Ostrovets NPP. RSC in 2016 drew attention of the state institutions on the necessity to review the State Residents Protection Plan in Case of Nuclear Accident in line with HERCA-WENRA Approach for a Better Cross-border Coordination of Protective Actions during the Early Phase of a Nuclear Accident. The workshop was organized on 24th March The importance of Lithuanian s preparedness to cross-border nuclear emergency is associated with Ostrovets NPP construction which is just 20 km from the Lithuania and Belarus state border. The review and updating of the State Residents Protection Plan in Case of Nuclear Accident and of the Lithuanian Hygiene Standard HN 99:2011 are planned in the near future, in accordance with requirements of GSR Part 7 and HERCA- WENRA recommendations Implementation of emergency preparedness measures by license holders In order to protect the personnel of INPP and population of the Republic of Lithuania against potential consequences of nuclear and radiological emergencies, the INPP carries out emergency planning and emergency preparedness activities. Emergency planning process at the INPP includes: 88

89 analysing of potential emergencies and assessing of their consequences to the personnel, people and environment taking into account the worst-case consequences; establishing of the Emergency Preparedness Organization (hereinafter - EPO) capable of eliminating potential emergencies and their consequences; permanent monitoring of the operability of the technical means ensuring accident prevention, their localization and elimination; accumulating of the material and technical resources required for the EPO functioning; maintaining of continuous preparedness of the Accident Management Centre (hereinafter - AMC) and training of the personnel of EPO headquarters, services and teams, and the personnel not involved in the EPO services; developing of the documents prescribed by VATESI and recommended by IAEA; timely updating of the INPP Emergency Preparedness Plan (hereinafter - EPP) with due consideration of the full-scale exercises results, changes in requirements as well as results of inspections conducted by VATESI, Visaginas PGV, and other state management and control institutions. Director General of INPP is in charge of emergency preparedness and planning at the enterprise through the Manager of Fire Surveillance and Civil Protection Group of Audit, Safety and Quality Management Division (hereinafter - AS&QMD). Classification of emergencies The following emergencies classes are defined at INPP: Alert is a violation of a nuclear facility state capable to develop into nuclear or radiation accident, at which: the acceptable concentrations of radionuclides in nuclear facility premises can be exceeded; the established limits of irradiation doses of the personnel can be exceeded; the failure of safety related systems (hereinafter - SRS) equipment occurred, which can lead to decrease in a level of protection of the core or the spent nuclear fuel. Note: In case of such violations the appropriate nuclear facility EPP instructions come into force, members of the nuclear facility EPO headquarters are gathered in EPO AMC. EPO headquarters carry out an estimation and, if necessary, management of elimination of the arisen emergency. Investigation of radiation conditions within the limits of the nuclear facility site is conducted on a regular basis. Local accident is a violation of a nuclear facility state, at which: the acceptable concentrations of radionuclides in nuclear facility premises are exceeded or the maximum permissible activity of radionuclides released into environment is exceeded; the established limits of irradiation doses of the personnel are exceeded; the failure of SRS equipment occurred, which led to decrease in a level of protection of the core or a safety level of the spent nuclear fuel. Note: Consequences of the local accident do not go outside the limits of the controlled area. In case of such accidents EPP, the appropriate instructions on emergency preparedness and, if necessary, beyond design accident management manuals (hereinafter - RUZA) are put into action. Members of the EPO headquarters are gathered in AMC, the required EPO services and teams are gathered and brought to readiness. EPO headquarters carry out an estimation and management of elimination of the arisen emergency. Investigation of radiation conditions within the limits of the controlled area is conducted on a regular basis. In case of such accidents the protective actions for the population outside the controlled area, and for limitation of nuclear facility personnel irradiation doses, which should be specified taking into consideration the created circumstances, should be prepared in the EPO headquarters in advance. 89

90 Site area accident is a violation of a nuclear facility state, at which: a distribution of radioactive products within the limits of the controlled area occurred in the quantities exceeding the regulated values, which demand urgent performance of measures on protection of the personnel of the whole enterprise; the excess of the established limits of irradiation doses of the population is possible; the failure of SRS equipment occurred, which can lead to the core or the spent nuclear fuel damage. Note: In case of such accidents EPP, the instructions on emergency preparedness and appropriate RUZA are put into action. Members of the EPO headquarters are gathered in AMC. All EPO services and teams are gathered and brought to readiness. EPO headquarters carry out an estimation and management of localization and elimination of the arisen emergency. Investigation of radiation conditions within the limits of the controlled area and outside it is conducted on a regular basis. In case of such accidents the protective actions for the population outside the controlled area, as well as the protective actions for limitation of nuclear facility personnel irradiation doses, which should be specified taking into consideration the created circumstances, should be prepared by the EPO headquarters in advance. General emergency is a violation of a nuclear facility state, at which: emission of radionuclides into environment occurred that can cause environmental contamination and the population irradiation, wherefrom the protective actions should be applied established by the Hygienic Standard of Republic of Lithuania HN 99: 2011 Protection of the Population in Case of Radiation or Nuclear Accident Occurrence. damage of the core or the spent nuclear fuel; failure of SRS equipment occurred, which can lead to the core or the spent nuclear fuel melting. Note: In case of such accidents EPP, the instructions on emergency preparedness and appropriate RUZA are put into action. Members of the EPO headquarters are gathered in AMC. All EPO services and teams are gathered and brought to readiness. EPO headquarters carry out an estimation and management of elimination of the arisen emergency. Investigation of radiation conditions within the limits of the controlled area and outside it is conducted on a regular basis. Urgent actions on protection of the nuclear facility personnel are carried out. In case of the accidents of such class the municipalities of the nearby cities should execute the urgent actions on protection of the population suggested by the EPO headquarters. Accidents at INPP are classified in accordance with the Instruction for Classification of Accidents at INPP. At the beginning the decision to apply protective actions is based on the class of emergency, and then the necessity of performance of protective actions is reviewed on the basis of environmental monitoring results. The decision to apply protective actions is based on the operation intervention levels (OIL). There are six OIL in the Republic of Lithuania that are regulated by the Lithuanian Hygiene Standard HN 99:2011 Protective actions of general public in case of radiological or nuclear accident and that correspond with the IAEA Requirements No. GS-R-2 Preparedness and Response for a Nuclear or Radiological emergency and IAEA Safety Guide GS-G-2.1 Arrangements for Preparedness for a Nuclear or Radiological Emergency. Main elements of the on-site and off-site emergency plans The INPP EPP is the main procedure to follow during organizational, technical, medical, evacuation and other activities in order to protect the personnel and the environment from the consequences of accidents, natural disasters and man-made impacts. The EPP requirements apply to the EPO managers and personnel, as well as to the personnel not involved in the EPO services and to the contractors personnel working at INPP. The EPP is developed in accordance with national legal acts and IAEA requirements. 90

91 The EPP consists of two parts: general part of the plan (descriptive) with appendices; operational part of the plan (instructive) containing 13 instructions on emergency preparedness and civil protection. The EPP shall be agreed with VATESI and other institutions of state management and surveillance and shall be updated every three years or after important alterations in the NPP operation and activities. The Manager of Fire Surveillance and Civil Protection Group of AS&QMD of the INPP are responsible for updating EPP. The INPP prepared a Final Stress Tests Report on the basis of which VATESI prepared National Report of Stress Tests and submitted it to the European Nuclear Safety Regulators Group (ENSREG). In the ENSREG report the INPP strategy for severe nuclear accidents management was accepted as adequate for the existing hazards. On the basis of the aforementioned reports the Plan of Corrective Actions on improvement of emergency preparedness and development of accident management was prepared and implemented, and its actions were included into EPP. Facilities provided by the licence holder for emergency preparedness INPP EPO AMC is created at the enterprise for beyond design basis accidents management (in Bld. 185 basement), which is maintained in constant (round-the-clock) preparedness, has special premises for EPO headquarters and EPO services working groups operation, equipped with necessary furniture, computers, communication equipment, personal protection equipment (hereinafter PPE), and other life-support systems. For organization of EPO TSC experts work the following is foreseen: main TSC premises located at Unit D-1 in Room 300/56; spare TSC premises located at EPO AMC in Room 48. The description of TSC premises, their equipment and communication means are presented in the TSC Instruction on Emergency Preparedness. The following premises are foreseen for accidents management by the operation personnel: MCR-2 power unit 2 Main Control Room; RCR-2 power unit 2 Reserved Control Room; CCR Central Control Room for the enterprise electrical part; RPMCB the enterprise Radiation Protection Main Control Board. Working premises of EPO Services are indicated in the instructions on emergency preparedness of the specified EPO services. The INPP EPO applies monitoring systems, which includes automated radiation safety monitoring system (control of emissions, control of drains, control of radiation conditions on the site via stationary posts, as well as gamma background control in 30 km zone) and seismic warning and control system, which consists of an independent subsystem performing the function of the seismic alert system (SAS). SAS system is intended for informing on the earthquake prior to arrival of its waves at the INPP. When a seismic wave arrives at one or several external seismic stations, the system sends alarms power unit 2 MCR, the information from SAS is also transmitted to the main TSC and reserved TSC. Time from the alarm start up to arrival of seismic waves at the INPP is defined approximately as 10 sec. The information received from the seismic sensors is kept in SAS archive. The resources, equipment, tools, accessories and technical means required for EPO services for elimination of accidents are defined and specified in instructions on emergency preparedness of EPO services Training and exercises, evaluation activities and main results of performed exercises and lessons learned INPP Director General (if he has not appointed the authorized person regarding the enterprise EP and CP) shall undergo initial training under the programme on EP and CP for the Senior Managers 91

92 of the state importance facilities in the PAGD Civil Protection Training Branch of the Fire Fighters Training School. DD Director, as the authorized person appointed by the order of the INPP Director General regarding the enterprise EP and CP activities organization, is obliged to undergo initial training under the programme on EP and CP for the Senior Managers (or the authorized by them persons) of the state importance facilities in the PAGD Training Centre on Civil Protection. The Head of TS, as the person who can act as the DD Director, is obliged to undergo initial training under the programme on EP and CP for the Senior Managers (or the authorized by them persons) of the state importance facilities in the PAGD Civil Protection Training Branch of the Fire Fighters Training School. The Head of AS&QMD FI and CP Group, as the head of EPO headquarters, and the AS&QMD FI and CP Group civil protection engineer, as the assistant of the Head of EPO headquarters, should undergo initial training under the programme for the permanent EP and CP staff, in the PAGD Civil Protection Training Branch of the Fire Fighters Training School. Managers of EPO services and teams with their subordinates (that are involved and those not involved in the EPO) in compliance with the approved training schedule conduct annual theoretical practice on emergency preparedness and civil protection in the class of Accident Management Centre for the members of all 15 training groups. As all the EPO services and teams personnel shall be trained to respond in the event of an emergency training of the EPO headquarters administrative board is also carried out according to the Schedule of studies, trainings and exercises on emergency preparedness and civil protection at the INPP. The duration of training is not less than 2 hours theoretical training and not less than 2 hours practical training in group exercises or full-scale exercises. The INPP Director General not less than once per 3 years organizes emergency preparedness full-scale exercises, where all EPO personnel participate in the full-scale exercises, where the emergency preparedness level of all EPO services and teams headquarters personnel is checked, as well as their ability to work in complicated conditions at performance of the assigned tasks. During the full-scale exercises the actions of managers and personnel of EPO services are observed and assessed by appointed exercise controller and supervisors. When analysing the full-scale exercises, the supervisors report on merits and flaws in the actions of managers and personnel of EPO services as well as on the disadvantages and misjudgements made during the exercises. After completion of full-scale exercises the controller of the exercises together with the Head of EPO headquarters (or its assistant) prepare a report on performance of full-scale exercises. The report is to be approved by the INPP Director General, registered and stored in Audit, Safety and Quality Management Division. Two copies of the report are to be sent to the Ministry of Energy of the Republic of Lithuania and VATESI. On the basis of the reports of the supervisors, participated in the exercises, the workers of the Fire Surveillance and Civil Protection Group of Audit, Safety and Quality Management Division prepare the Plan of Corrective Actions for Emergency Preparedness in order to eliminate the detected disadvantages, and send the report to VATESI for control. Training and exercises of Regulatory Authorities staff Training for first responders and other competent authorities at the national level is organized every year. The purpose of this training is to strengthen the abilities of the competent authorities to respond and act in case of nuclear or radiological accident. VATESI and RSC has established its own emergency staff training and exercising programs. According to paragraph 33 of VATESI procedure for Preparedness for Management of Emergency Situations in Case of Nuclear and Radiological Emergencies, administrator of ERC shall prepare a 3 year period training and exercise programme. This programme shall include a list of training courses and exercises for VATESI ERC staff. Training and exercise programme is prepared 92

93 according to Section VII of VATESI Emergency Management Plan in Case of Nuclear Emergency, which sets the requirements for training and exercising. Besides VATESI training and exercise programme, the staff of VATESI ERC takes part in various IAEA s ConvEx and European Commission drills and exercises. Additionally VATESI ERC staff is trained on civil protection topics in the Branch of the Fire Fighters Training School of the PAGD. Key authorities also participate in various international exercises, such as Convex, ECURIE, CBSS, etc., organized by the IAEA, EC, NATO and other international organizations. On 30th of October 2013 RSC has organised state level exercise on Action Coordination of Subjects of Civil Protection System in Case of Dirty Bomb Explosion in Vilnius International Airport. 11 institutions together with RSC, Vilnius International Airport, PAGD, Police department, Lithuanian Police Antiterrorist Operations Team ARAS, Vilnius Municipality, VATESI and other institutions were involved in this exercise. During the exercise preparedness to evacuate, decontaminate, provide temporary shelter for large number of residents, predict radionuclide transfer in the air, inform and warn the public about the situation, organize medical assistance to victims, manage radioactive waste and other matters were evaluated, the knowledges of participants on how to respond to such type of radiological accident were updated and consolidated. In 2014 RSC, VATESI and other national institutions took part in the emergency preparedness exercise ConvEx-2d organised by the IAEA. According to the exercise scenario, a supposed nuclear accident occurred in Bulgarian Kozloduy NPP. VATESI and RSC specialists exchanged information with other Lithuanian institutions involved in the exercise and analysed the progress of the Kozloduy NPP accident. In 2014 RSC participated in the table exercise Interaction between Lithuanian Authorities in Response to Nuclear or Radiological Incidents organised by Nuclear Security Center of Excellence established within State Border Guard Service under the Ministry of Interior Border Guard School. The purpose of this table exercise was to promote and improve performance effectiveness and interaction between Lithuanian institutions involved in ensuring nuclear and radiological security. In 2015 institutions of Republic of Lithuania took part in ECUREX-2015 exercise organized by European Commission. The main objective of this exercise in Lithuania was to test information exchange and coordination of actions among national institutions in case of nuclear accident outside of Lithuanian territory. According to scenario nuclear emergency occurred in Cernavoda NPP, Romania. In 2016 Visaginas municipality and INPP organized table top exercise to test information exchange and provision to public and coordination of actions in case of nuclear accident at INPP. The representatives of VATESI, RSC, PAGD and other local and neighbouring institutions and municipalities administrations took part in this exercise Regulatory review and control activities VATESI is performing regular inspections at INPP to check that the emergency preparedness arrangements are implemented properly. This includes control of training and exercising of Emergency Response Organization staff and facility workers, review of emergency planning and response procedures and documents, inspection of equipment and functionality of Emergency Operation Centre, inspection of self-protection equipment and tools for emergency response organization workers. Additionally inspectors of VATESI participate in training and exercising activities as observers and give recommendations. In RSC focused on preparedness of its own staff and specialists of other institutions, which are involved in liquidation of the consequences of radiological or nuclear accidents, for safe performance of their functions without breaching radiation protection requirements. In total 617 radiological and nuclear accident responders from different institutions were trained on a number of radiation protection issues. 93

94 Every year health care hospitals are checked by RSC for its preparedness to take and render medical aid for injured people during radiological and nuclear accidents. Also workshops and training courses are organized for the specialists of public and personal health care. The training is provided on how in case of an accident to provide help to injured persons. The IAEA on October 1 11th 2012 conducted Emergency Preparedness Review (EPREV) mission in Lithuania and evaluated Lithuania s radiation emergency preparedness and response arrangements. One of the mission recommendations was to RSC to prepare National Plan in Case of Radiological Emergency, also to clarify in Lithuania s regulations and its organization, which agency is the lead (INPP, VATESI, Environmental Protection Agency under the Ministry of the Environment (EPA), RSC) in the predictions of radiological consequences. It was recommended to test and examine the roles of these organizations in dose projection and formulating suggestions of public protective actions in a specially designed exercise. In responding to the IAEA s above mentioned recommendation and lessons learned from Daiichi Fukushima accident, RSC on October 8th 2015 has organized table top exercise,,cooperation of institutions in dose projection and formulating recommendations on protective actions of the public in case of nuclear emergency. In the exercise participated professionals from INPP, VATESI, EPA, RSC. In the conclusions of the exercise it was stressed the need to review the State Residents Protection Plan in Case of Nuclear Accident and some other legal acts which are regulated emergency preparedness and response to nuclear or radiological emergency International arrangements Government of Republic of Lithuania has signed a number of international agreements with neighbouring countries and other States in the field of cooperation assistance in case of emergency situations: Agreement between Germany and Lithuania On Assistance in case of Natural Disasters and Severe Emergencies (signed in 1994); Agreement between Poland and Lithuania On Cooperation and Assistance in Case of Disasters, Elemental Events, and Other Emergencies (signed in 2000); Agreement between Hungary and Lithuania On Cooperation and Assistance in Case of Disasters and Severe Emergencies (signed in 2001); Agreement between Latvia and Lithuania On Assistance in Case of Natural Disasters and other Severe Emergencies (signed in 2001); Agreement between Ukraine and Lithuania On Cooperation and Assistance on Emergency Prevention and Liquidation of Emergency Consequences (signed in 2003); Agreement between Sweden and Lithuania On Cooperation in the Field of Emergency Prevention, Preparedness and Liquidation (signed in 2003); agreement between Belarus and Lithuania On Cooperation in the Field of Prevention and Liquidation of Natural Disasters and Severe Emergencies (signed in 2003); agreement between Pennsylvania Emergency Management Agency (US) and Lithuania On Cooperation and Assistance in the Field of Prevention and Liquidation of Emergencies (signed in 2009); Project of Agreement between Russia and Lithuania on Cooperation and assistance in the Field of Prevention and Liquidation of Emergencies is under development. The final document of the Sixth Review Meeting of the Contracting Parties on 24 March-4 April 2014 highlighted the importance of siting and emergency preparedness, and consultation and provision of necessary information to Contracting Parties in the vicinity of a proposed nuclear installation. In response to the possible nuclear event at Ostrovets NPP, Lithuanian competent authorities shall come to an agreement with Belarus competent authorities for early notification in 94

95 accordance with Convention on Early Notification of a Nuclear Accident. Emergency preparedness zones and measures to be applied in case of an accident at the Ostrovets NPP shall be in line with the international recommendations set by the IAEA and recommendations of HERCA-WENRA (Goatomnadzor of Belarus has an observer status in WENRA). Due to the short distance from the Ostrovets NPP to the Lithuanian capital Vilnius, Lithuania shall be prepared to implement some protective actions defined in these recommendations. The exchange of information to be prepared for development of appropriate harmonized emergency preparedness and response measures is one of the issues, which currently remains unsolved, in regard to the site in close vicinity to the Lithuanian border selected for construction of nuclear power plant in Belarus. To ensure complete and transparent exchange of information the draft of the Agreement between Lithuanian and Belarus nuclear safety regulatory authorities on the Cooperation and Exchange of Information in the Field of Nuclear Safety and Radiation Protection and Early Notification of Nuclear Emergency, was prepared and is under negotiation process. Lithuania is seriously concerned about Ostrovets NPP project and these key questions on nuclear safety raised by Lithuania are still unanswered: The selected site is not acceptable taking into account residual risk of severe accident Belarusian side has not provided evidence that during the process of site selection a proper evaluation of population density (especially on Lithuanian territory) as well as other aspects, important for implementation of measures for emergency preparedness and response, were evaluated. Also evidences were not provided that impact of ionizing radiation to population in the case of beyond design basis accident at Belarusian nuclear power plant is on acceptable low level. Hence, taking into account short distance to boarder of Lithuania and, especially, to capital Vilnius, in case of beyond design basis accident almost 1/3 of population of Lithuania will be impacted by ionizing radiation, such an extreme situation would be very difficult to manage, because state institutions would be pushed to work in the same impact conditions. The selected site is not properly investigated Belarusian side has not provided evidences that during investigation of site a liquefaction of soil, hydrological and seismic properties of site were properly evaluated. Additionally, it should be noted that Lithuania does not have evidence that site was evaluated against IAEA Safety Requirements NS-R-3 Site evaluation for Nuclear Power Plants. Therefore, Lithuania seeks that Belarus would conduct a full scope Site and External Event Design (SEED) Mission of IAEA and that results of the mission would be presented to the international comunity. Compliance of design with some modern safety standards is not justified Evidences that during design of nuclear power plant impact of heavy plane crash was evaluated and technical and administrative measures are foreseen for resistance to such an event were not provided. Similar deficiency was observed by Finish regulatory authority STUK during their review of AES-2006 design for their decision in principal. STUK also raised questions regarding physical separation of safety systems and independent reduction of pressure in primary circuit during beyond design basis accidents. Stress tests are not performed Belarussian side have declared that they would perform stress tests in , nevertheless it is doubtful if Belarussian side would perform requested tests, including implementation of needed safety improvement measures, until commissioning of nuclear power plant s first unit. It should be noted that results of stress tests should be reviewed and approved by the national regulatory authority as well as pass per-review process organized by European Commission. Lack of information on capabilities of operating organization and regulatory authority In view of several incidents during the construction of Ostrovets NPP there is a lack of information on capabilities of operating organization to perform their own responsibilities for safety 95

96 to control process of construction and ensure that Belarussian nuclear power plant is constructed in accordance with approved design documentation and standards. In addition, there is a lack of information on real activities of nuclear safety regulatory authority ensuring effective management system and leadership, safety management and high level of safety culture in all organizations participated in construction of nuclear power plant. Radioactive waste and spent nuclear fuel management strategy IAEA Safety Standards require that state embarking on nuclear power plant shall establish infrastructure and strategy for management of radioactive waste and spent nuclear fuel. The strategy shall include all necessary steps to be implemented, including disposal stage. Belarus is a Contracting Party to the Joint Convention. During the last Review Meeting Belarussian s team confessed that Republic of Belarus has no any document, talking on strategy of management of radioactive waste and spent nuclear fuel. Article 16(2) Information of the public and neighbouring states Overview of arrangements for informing the public in the vicinity of the nuclear installations about emergency planning and emergency situations The State Emergency Management Operational Centre is responsible for providing information to public in case of emergency. The State Emergency Management Operational Centre shall activate the Press Centre in the Press Service of Government of Republic of Lithuania or in PAGD. In case of an emergency Sate and municipality s institutions, public offices and citizens is notified using existing notification public warning and informing system, which consists of 421 central and 406 local electric sirens and cell-broadcast facilities. After notifying signal, the information about situation, possible consequences and process of liquidation of emergency is vocally spread through companies and institutions emergency sound systems and using national and local broadcasters. The citizens of municipalities are notified using technical and organizational means described in each municipality s emergency management plan. In places not covered by notification network system citizens are informed by using existing communication system, cell-broadcast facilities and specialized vehicles equipped with sound amplifying systems. Also courier or local police services could be used for spreading the information. According to the order approved by Director of the FRD, the heads of national importance objects and those registered in the registry of dangerous objects are responsible for notification of public, national and municipal institutions and public offices which could be affected by emergency. Ministries and other national institutions are responsible for notifying their own staff. The PAGD shall notify the population, using national television and radio channels, most of commercial broadcasting companies (which work in FM), as well as through the wire radio communication network Arrangements to inform competent authorities in neighbouring States In 1994 Lithuania has joined to Convention on Early Notification of a Nuclear Accident and in 2000 to Convention on Assistance in the Case of a Nuclear Accident or Radiological Emergency. VATESI is responsible for implementation of Convention on Early Notification and PAGD is responsible for implementation of Convention on Assistance. According to IAEA s EPR-IEComm requirements, VATESI is National Warning Point, National Competent Authority for events abroad and PAGD National Competent Authority for domestic events. VATESI is also a contact point and 96

97 competent authority in ECURIE arrangements. Mutual assistance policy between Lithuania and the neighbouring countries is based on bilateral agreements: The bilateral agreement between Lithuania and Denmark On Information Exchange and Cooperation in the Field of Nuclear Safety and Radiation Protection has been signed on 26 March The bilateral agreement between Lithuania and Norway On Early Notification of a Nuclear Accident and Information Exchange about Nuclear Objects has been signed on 13 February The Arrangement between Lithuania and Poland On Information Exchange and Cooperation in the Field of Nuclear Safety and Radiation Protection has been signed on 2 June The Agreement between Lithuania and Latvia On Early Notification of Nuclear Accidents, Exchange of Information and Cooperation in the Field of Nuclear Safety and Radiation Protection has been signed on 3 October The agreement on early notification of Nuclear and Radiological Emergencies between the VATESI and the Swedish Radiation Safety Authority of the Kingdom of Sweden has been signed on 1 January The Agreement between Lithuania and Belarus On Early Notification of Nuclear Accidents, Exchange of Information and Co-operation in the Field of Nuclear Safety and Radiation Protection is under negotiation process. Article 17 Siting Each Contracting Party shall take the appropriate steps to ensure that appropriate procedures are established and implemented: (i) for evaluating all relevant site-related factors likely to affect the safety of a nuclear installation for its projected lifetime; (ii) for evaluating the likely safety impact of a proposed nuclear installation on individuals, society and the environment; (iii) for re-evaluating as necessary all relevant factors referred to in sub-paragraphs (i) and (ii) so as to ensure the continued safety acceptability of the nuclear installation; (iv) for consulting Contracting Parties in the vicinity of a proposed nuclear installation, insofar as they are likely to be affected by that installation and, upon request providing the necessary information to such Contracting Parties, in order to enable them to evaluate and make their own assessment of the likely safety impact on their own territory of the nuclear installation. Article 17(i) Evaluation of site related factors Overview of arrangements and regulatory requirements relating to the siting and evaluation of sites of nuclear installations In making a decision on the construction of a specific nuclear facility, the Government of the Republic of Lithuania takes into consideration: economic and public needs; the principal characteristics of the use of natural resources and their impact on the environment; nuclear safety and radiation protection guarantees; the opinion of the local authority on whose territory the intended facility will be sited. Sites for the construction of the VNPP are selected in accordance with the IAEA recommendations and national requirements of nuclear safety. Compliance with the IAEA Safety Standards is mandatory in determining the appropriateness of construction sites as well as in evaluating the engineering geological conditions of the sites and in carrying out engineering geological (geotechnical) investigations. 97

98 In accordance with the Law on Nuclear Safety of the Republic of Lithuania, prior to starting the preparation of the NPP design adapted to a specific construction site, the safety analysis of the site and the justification of safety have to be performed. The results of such analysis and justification are presented in the Site Evaluation Report which has to be reviewed and approved by the VATESI. VATESI can approve the report on evaluation of the construction site only after verifying that the results of the analysis and justification of the construction site are in line with requirements of the legal acts and after having received positive decisions form other institutions, which are involved in the process of reviewing a report. The detailed procedures for reviewing the site evaluation report are defined in the Governmental Resolution of the Republic of Lithuania No. 83 the Description of procedure on review of the construction site evaluation report of nuclear power plant and Nuclear Safety Requirements BSR General requirements on site evaluation for nuclear power plants. Nuclear Safety Requirements BSR General requirements on site evaluation for nuclear power plants based on IAEA Safety Requirements No. NS-R-3 Site Evaluation for Nuclear Installations and best international practice. The regulation sets the main requirements for site evaluation, as well as proposals to use IAEA standards and guides for more detailed analysis: Site Evaluation for Nuclear Installations, NS-R-3; Seismic Hazards in Site Evaluation for Nuclear Installations, SSG-9; External Human Induced Events in Site Evaluation for Nuclear Power Plants, NS-G-3.1; Dispersion of Radioactive Material in Air and Water and Consideration of Population Distribution in Site Evaluation for Nuclear Power Plants, NS-G-3.2; Meteorological Events in Site Evaluation for Nuclear Power Plants, NS-G-3.4; Flood Hazard for Nuclear Power Plants on Coastal and River Sites, NS-G-3.5; Geotechnical Aspects of Site Evaluation and Foundations for Nuclear Power Plants, NS-G- 3.6; Nuclear Security Recommendations on Physical Protection of Nuclear Material and Nuclear Facilities (INFCIRC/225/Revision 5) In the course of the safety analysis and its justification, all factors related to the site or its environment that could impact the NPP s safety, including physical protection and planning of emergency preparedness, have to be identified, and corrective measures for the identified deficiencies of the site, if any, have to be proposed. According to Governmental Resolution, VATESI forward the site evaluation report for other institutions, which are involved in the process of reviewing the site evaluation, if site evaluation report are in line with execution requirements. The LHMT, the Ministry of Health, the Administration of Civil Aviation, the LGT and the PAGD are involved in the process of reviewing the site evaluation report, because the site evaluation, due to the abundance and the complexity of the possible impacts on the safety of the NPP, covers many areas metrology, hydrology, geology, aviation, emergency preparedness and others. Overview of assessments made and criteria applied for evaluating all site related factors affecting the safety of the nuclear installation The VAE has undertaken a number of preparatory works that are necessary in order to be properly prepared for construction of the new NPP in Lithuania. The detailed description of the process and activities related to preparatory works were provided in the 6 th National report. Sites evaluation report for VNPP was developed in line with the above mentioned requirements and IAEA standards and guides for more detailed analysis. Moreover provisions of at that time IAEA Draft Safety Guide No. DS417 Meteorological and Hydrological Hazards in Site Evaluation of Nuclear Installations (issued as Safety Guide SSG-18 Meteorological and hydrological hazards in site evaluation for nuclear installations in 2011) were taken into account. 98

99 In general it must be mentioned that the scope of Site Evaluation process in Lithuania is wider in comparison to the scope required by IAEA in its Safety Requirements NS-R-3 due to the fact that Lithuanian requirements also require to include considerations related to the impact of environment conditions on potential emergency planning and physical protection measures in to the scope of site evaluation report. Also it must be noted that provisions of IAEA Safety Guide NS-G-3.2 Dispersion of Radioactive Material in Air and Water and Consideration of Population Distribution in Site Evaluation for Nuclear Power Plants, according to Lithuanian legislation must already be covered at the earlier stage of NPP construction project development Environmental Impact Assessment. Therefore this evaluation was already completed for VNPP in 2009 (please refer to 6 th National Report). Nevertheless the information on dispersion of radioactive material in air and water and consideration of population distribution provided in EIA was reviewed once again and provided for regulatory consideration in the scope of Site Evaluation Report. The ground water monitoring programme on both potential construction sites of new NPP started in 2011 complying with the IAEA recommendations (description of programme is provided in the 6th National Report). Overview of design provisions used against human made external events and natural occurring external events and the impact of related sequential natural external events The VNPP sites evaluation process was implemented by dividing into two major parts: First part comprising of: Geotechnical evaluation; Seismic evaluation. Second part comprising of: Human induced events evaluation; Assessment of meteorological hazards; Evaluation of ultimate heat sink characteristics (including flooding hazards); Evaluation of potential dispersion of radioactive material and consideration of population distribution; Consideration of impact of environment on potential physical protection measures; Consideration of impact of environment on potential emergency planning measures; The scope of the first evaluation part for geotechnical evaluation comprised a soil investigations analysis including the liquefaction coefficient, slopes stability hazards and existing buried structures. The following tasks have been implemented: determining the limits and depth of occurrence of weak soils in the sites; assessing the liquefaction potential of soils; and identifying the remnants of buried structures and objects and determining the depth of occurrence of such objects. The scope of the first evaluation part for seismic hazards evaluates the risks of ground movements and surface deformation related to earthquakes and the other geological phenomena. The focus was on ascertaining the probability of tectonic faults in the NPP construction sites and on determining the degree of the seismic hazard for the sites on SL-1 and SL-2 levels and identifying the range of potential seismic impact. It is important to note that there have been a number of previous geotechnical and seismic surveying investigation done for the purpose of INPP that already covered the sites of VNPP and before starting the detailed investigations for VNPP an in-depth analysis of an existing geotechnical and seismic data for the sites was performed. In the scope of these evaluation the electrical tomography, geotechnical boring, satellite interferometry and 2D/3D seismic survey methods were used. 99

100 *Dots wells; Lines 2D seismic investigation lines; Striped polygons 3D seismic investigations; Yellow dash line 5 km radius. Figure.17.1 VNPP sites geotechnical and seismic investigation scope. More than 300 geotechnical investigation boreholes were drilled on the sites during previous investigations and 120 new geotechnical wells drilled in ecogeological audit wells drilled on the Sites in More than 800 hydrogeological boreholes provide extensive data on the hydrogeological conditions in Near Region and Site Vicinity area. 8 new hydrogeological wells drilled on the Sites in Sites, Site Vicinity and Near Region areas are completely covered by gravimetric and magnetic survey at a scale of 1: km of two dimensional (2D) seismic lines were shot in Near Region and Site Vicinity in All this data reprocessed and reinterpreted in km of high resolution 2D seismic lines carried out in Site Vicinity in km of the electrical resistivity tomography carried out on the Sites in There are 29 deep boreholes in the Near region, 18 of them penetrated crystalline basement. In total up till now 25 wells are drilled reaching the crystalline basement and/or Ordovician strata, and several shallower wells drilled within the study area. 2D seismic survey covers approximately 1000 square kilometers around the Ignalina Nuclear Power Plant (NPP). The survey comprises km of seismic lines acquired in year In year 2009 these seismic data were reprocessed and interpreted and to improve quality of seismic horizons at the Paleozoic levels and structural mapping for better understand faulting pattern of the site s near region. In year 2010, new 3D and 2D high resolution seismic data have been acquired and interpreted in the potential Visaginas NPP sites vicinity area: 3D survey 10.3 square kilometers, 2D survey, 24 km. Local seismic investigations were performed on the territory of the Eastern site in Sites are completely covered with high resolution three dimensional (3D) seismic survey in With regard to the second part of evaluation each safety analysis methodology is started from a formation of initiated event analysis methods. In accordance IAEA an initiating event is such event, which in power plant creates a sequence of events, conditioning core damage. During safety analysis frequencies of such events occurrence must be estimated as well as their impact on nuclear safety. 100

CONVENTION ON NUCLEAR SAFETY

CONVENTION ON NUCLEAR SAFETY Republic of Lithuania CONVENTION ON NUCLEAR SAFETY SIXTH NATIONAL REPORT Vilnius 2013 This page left blank intentionally 2 TABLE OF CONTENTS INTRODUCTION ------------------------------------------------------------------------------------------------

More information

IMPLEMENTATION OF PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA

IMPLEMENTATION OF PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA REPUBLIC OF LITHUANIA IMPLEMENTATION OF PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA (Follow-up of the stress tests performed in European Union) Final Report Vilnius 2018 This report prepared by the

More information

Nuclear Energy Development in Lithuania

Nuclear Energy Development in Lithuania MINISTRY OF ENERGY OF THE REPUBLIC OF LITHUANIA Nuclear Energy Development in Lithuania 10 February 2016 Gediminas Karalius Electricity Sector Division IAEA Technical Meeting TM-52851 Establishing a Strategic

More information

REPUBLIC OF LITHUANIA STATE NUCLEAR POWER SAFETY INSPECTORATE IMPLEMENTATION OF PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA

REPUBLIC OF LITHUANIA STATE NUCLEAR POWER SAFETY INSPECTORATE IMPLEMENTATION OF PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA REPUBLIC OF LITHUANIA STATE NUCLEAR POWER SAFETY INSPECTORATE IMPLEMENTATION OF PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA (Follow-up of the performed in European Union) Status report Vilnius 8

More information

NUCLEAR CONSULTING SERVICES

NUCLEAR CONSULTING SERVICES NUCLEAR CONSULTING SERVICES AN EXPERIENCED DEVELOPER OF NEW NUCLEAR POWER PLANTS ABOUT US Brief history Lithuania has more than 30 years of experience operating and decommissioning the Ignalina NPP and

More information

CONVENTION ON NUCLEAR SAFETY

CONVENTION ON NUCLEAR SAFETY Republic of Lithuania CONVENTION ON NUCLEAR SAFETY FIFTH NATIONAL REPORT Vilnius 2010 This page left blank intentionally 2 TABLE OF CONTENTS INTRODUCTION 1 Article 6 EXISTING NUCLEAR INSTALLATIONS 2 6.1.

More information

NUCLEAR SAFETY REQUIREMENTS BSR

NUCLEAR SAFETY REQUIREMENTS BSR NUCLEAR SAFETY REQUIREMENTS BSR-1.8.2-2015 APPROVED BY Order No. 22.3-99 of The Head of State Nuclear Power Safety Inspectorate, of 7 October 2011 (as amended by Order No. 22.3-57 of the Head of State

More information

Implementation of the Visaginas Nuclear Power Plant Project

Implementation of the Visaginas Nuclear Power Plant Project IAEA-CN-164-1S03 Implementation of the Visaginas Nuclear Power Plant Project M. Grinevičius, Dr. G. Klevinskas, L. Koraliovas Visagino Atominė Elektrinė, UAB, Vilnius, Lithuania Abstract. On June 28, 2007,

More information

Republic of Lithuania

Republic of Lithuania Republic of Lithuania Lithuanian National Report on Implementation of Council Directive 2011/70/EURATOM of 19 July 2011 Establishing a Community Framework for the Responsible and Safe Management of Spent

More information

Nuclear reality and status of plans for new build in Lithuania - Visaginas Nuclear Power Plant

Nuclear reality and status of plans for new build in Lithuania - Visaginas Nuclear Power Plant Nuclear reality and status of plans for new build in Lithuania - Visaginas Nuclear Power Plant Rimantas Vaitkus Lietuvos energija, UAB Project Management Office Director, 2013-10-18 Vilnius LT2009 LT2010

More information

Ignalina NPP. Ignalina NPP decommissioning activities are co-financed by European Union

Ignalina NPP. Ignalina NPP decommissioning activities are co-financed by European Union Workshop on Decommissioning of Uranium Contaminated Facilities, Pretoria, SAF 22-26 August 2011 Ignalina Ignalina overview I Decommissioning Strategy What are we going to do? How are we going to do it?

More information

Visaginas NPP Project

Visaginas NPP Project Visaginas NPP Project Platts 8 th Annual European Nuclear Power Conference June 26-27, 2013 Warsaw Dr. Rimantas Vaitkus CEO, Visagino atominė elektrinė, UAB LT2009 LT2010 LT2011 LT2012 Lithuania is one

More information

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities DS447 Date: 20 February 2015 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 12 For submission to CSS Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle

More information

Convention on Nuclear Safety Answers to Questions Posted To Lithuania in 2014 Article General

Convention on Nuclear Safety Answers to Questions Posted To Lithuania in 2014 Article General Convention on Nuclear Safety s to Questions Posted To Lithuania in 2014 General 1. Question/ 2. Question/ General Are you going to make your CNS reports and the questions and answers to them publicly available?

More information

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management 5th as referred to in Article 32 of the Convention Sixth Review Meeting of Contracting Parties

More information

Decommissioning and Radioactive Waste Management in Lithuania

Decommissioning and Radioactive Waste Management in Lithuania Conference Nuclear Power Safety Regulation Challenges to commemorate the 20 th anniversary of Lithuanian State Nuclear Power Safety Inspectorate (VATESI) Decommissioning and Radioactive Waste Management

More information

REPUBLIC OF LITHUANIA

REPUBLIC OF LITHUANIA REPUBLIC OF LITHUANIA Law on The Management of Radioactive Waste* adopted on 20 May 1999 No. VIII-1190 Chapter I GENERAL PROVISIONS Article 1 Purpose of the Law This Law shall regulate relations of legal

More information

UAE NATIONAL REPORT. For the 7th Review Meeting of the CONVENTION ON NUCLEAR SAFETY March/April 2017

UAE NATIONAL REPORT. For the 7th Review Meeting of the CONVENTION ON NUCLEAR SAFETY March/April 2017 UAE NATIONAL REPORT For the 7th Review Meeting of the CONVENTION ON NUCLEAR SAFETY March/April 2017 This report has been prepared by the Government of the United Arab Emirates in fulfilment of Article

More information

Changes in the French Regulations in the light of the lessons learned from the Fukushima Daiichi accident

Changes in the French Regulations in the light of the lessons learned from the Fukushima Daiichi accident Changes in the French Regulations in the light of the lessons learned from the Fukushima Daiichi accident French approach in the European context Philippe JAMET ASN Commissioner International Conference

More information

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN N.MUGHAL Email: nasir.mughal@pnra.org F.MANSOOR J.AKHTAR Abstract In the aftermath

More information

Dr. G. Klevinskas, L. Koraliovas. Implementation of the Visaginas Nuclear Power Plant Project

Dr. G. Klevinskas, L. Koraliovas. Implementation of the Visaginas Nuclear Power Plant Project Dr. G. Klevinskas, L. Koraliovas Implementation of the Visaginas Nuclear Power Plant Project IAEA International Conference on Opportunities and Challenges for Water Cooled Reactors in the 21st Century,

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROGRAMME SUMMARY OF NEW NUCLEAR POWER PLANT CONSTRUCTION

ENVIRONMENTAL IMPACT ASSESSMENT PROGRAMME SUMMARY OF NEW NUCLEAR POWER PLANT CONSTRUCTION Lietuvos Energija AB ENVIRONMENTAL IMPACT ASSESSMENT PROGRAMME SUMMARY OF NEW NUCLEAR POWER PLANT CONSTRUCTION 1 PROJECT AND ITS JUSTIFICATION Lietuvos Energija AB has initiated an environmental impact

More information

Ignalina NPP. Presentation to Assembly of Contributors December Darius Janulevičius General Director. Decommissioning of Ignalina NPP is

Ignalina NPP. Presentation to Assembly of Contributors December Darius Janulevičius General Director. Decommissioning of Ignalina NPP is Presentation to Assembly of Contributors December 2017 Ignalina NPP Darius Janulevičius General Director Decommissioning of Ignalina NPP is cofinanced by the European Union activities are co-financed by

More information

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities DS447 Date: September 2014 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 11 MS comments incorporated Review Committee Member comments due 31 Oct Predisposal Management

More information

Ignalina NPP Decommissioning: Commitment to Achievement

Ignalina NPP Decommissioning: Commitment to Achievement Ignalina NPP Decommissioning: Commitment to Achievement 1 3 About the Ignalina Nuclear Power Plant Vision The enterprise aims to become known as leader and expert in the safe and effective decommissioning

More information

Current Status of Decommissioning in Lithuania

Current Status of Decommissioning in Lithuania Current Status of Decommissioning in Lithuania Dr. Gintautas Poškas Researcher Lithuanian Energy Institute Nuclear Engineering Laboratory Nuclear facilities in Lithuania Ignalina NPP (under decommissioning)

More information

REGULATORY CONTROL OF SAFETY AT NUCLEAR FACILITIES

REGULATORY CONTROL OF SAFETY AT NUCLEAR FACILITIES REGULATORY CONTROL OF SAFETY AT NUCLEAR FACILITIES 1 GENERAL 5 2 GOVERNMENT RESOLUTION 5 2.1 Application and its processing 5 2.2 Documents to be submitted to STUK 6 3 CONSTRUCTION LICENCE 6 3.1 Licence

More information

The IAEA Legal Framework for Nuclear Safety: At a Glance

The IAEA Legal Framework for Nuclear Safety: At a Glance The Legal Framework for Nuclear Safety: At a Glance International Atomic Energy Agency International Instruments International Instruments contd. 1. Convention on Nuclear Safety, 1994 (INFCIRC/449) 2.

More information

Implementation of SSR2/1 requirements for Nuclear Power Plant Design in Polish regulation.

Implementation of SSR2/1 requirements for Nuclear Power Plant Design in Polish regulation. Implementation of SSR2/1 requirements for Nuclear Power Plant Design in Polish regulation. Marek Jastrzębski Department of Nuclear Safety National Atomic Energy Agency (PAA) Technical Meeting on Safety

More information

Radioactive waste management strategy in Belarus

Radioactive waste management strategy in Belarus Technical Meeting Towards Nuclear Energy System Sustainability Waste Management and Environmental Stressors Radioactive waste management strategy in Belarus B. Popov Joint Institute for Power and Nuclear

More information

Safety Principles and Defence-in-Depth concept implemented in German Regulations

Safety Principles and Defence-in-Depth concept implemented in German Regulations Safety Principles and Defence-in-Depth concept implemented in German Regulations Shanna Eismar, GRS 04 October 2016 IAEA Technical Meeting on Novel Design and Safety Principles of Nuclear Power Plants

More information

Convention on Nuclear Safety 7 th Review Meeting 2017

Convention on Nuclear Safety 7 th Review Meeting 2017 Convention on Nuclear Safety 7 th Review Meeting 2017 International Atomic Energy Agency IAEA, Vienna Country Review Report for GHANA Drafted by Country Group 3 Bangladesh, Belarus, Canada, Japan, Latvia,

More information

Preparation of the Regulatory Infrastructure for the New Nuclear Build

Preparation of the Regulatory Infrastructure for the New Nuclear Build CNRA International Workshop on New Reactor Siting, Licensing and Construction Experience, 15 17 September 2010, Prague, Czech Republic Preparation of the Regulatory Infrastructure for the New Nuclear Build

More information

SIXTH NATIONAL REPORT UNDER THE CONVENTION ON NUCLEAR SAFETY

SIXTH NATIONAL REPORT UNDER THE CONVENTION ON NUCLEAR SAFETY REPUBLIC OF BULGARIA SIXTH NATIONAL REPORT UNDER THE CONVENTION ON NUCLEAR SAFETY Sofia, 2013 2 3 TABLE OF CONTENTS INTRODUCTION... 5 SUMMARY... 7 National nuclear programme... 7 Highlights from the previous

More information

NATIONAL PROGRESS REPORT INDONESIA

NATIONAL PROGRESS REPORT INDONESIA NATIONAL PROGRESS REPORT INDONESIA 2015-06-30 0. INTRODUCTION The Research Reactor Decommissioning Demonstration Project (R2D2P) was developed to provide a platform for training and exchange of information,

More information

DRAFT IMPLEMENTING DECREE. of 2016

DRAFT IMPLEMENTING DECREE. of 2016 1. ------IND- 2016 0202 CZ- EN- ------ 20160523 --- --- PROJET II. DRAFT IMPLEMENTING DECREE of 2016 on the requirements for the safe management of radioactive waste and on the decommissioning of nuclear

More information

NATIONAL REPORT OF TUNISIA

NATIONAL REPORT OF TUNISIA REPULIC OF TUNISIA Convention on Nuclear Safety NATIONAL REPORT OF TUNISIA August 2016 1 Contents List of Abbreviations Introduction 1- Article 6: Existing Nuclear Installations 2-Article 7: Legislative

More information

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set -

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set - Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set - 2013 Learning Objectives After going through this presentation the participants are expected to be familiar with:

More information

Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors

Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors Research Reactor Safety Section Division of Nuclear Installation Safety - EBP Workshop on the Transition Period

More information

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the Council of the European Union declared

More information

WENRA and its expectations on the safety of new NPP

WENRA and its expectations on the safety of new NPP WENRA and its expectations on the safety of new NPP INPRO Dialogue Forum on Global Nuclear Energy Sustainability Licensing and Safety Issues for Small- and Medium-sized Reactors (SMRs) Vienna, 29 July

More information

INTEGRATION OF SAFETY CULTURE INTO MANAGEMENT SYSTEM OF REGULATORY BODY

INTEGRATION OF SAFETY CULTURE INTO MANAGEMENT SYSTEM OF REGULATORY BODY TECHNICAL MEETING ON INTEGRATION OF SAFETY CULTURE INTO REGULATORY PRACTICES AND THE REGULATORY DECISION MAKING PROCESS INTEGRATION OF SAFETY CULTURE INTO MANAGEMENT SYSTEM OF REGULATORY BODY 06 Octobre

More information

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Fifth Review Meeting Radiation Safety Department, Environmental Board Estonia Tallinn October 2014

More information

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident Alexander Sapozhnikov Federal Environmental, Industrial and Nuclear Supervision Service of Russia, 109147 Moscow, Taganskaya,

More information

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA The EU Approach for Responsible and Safe Management of Spent Fuel and Radioactive Waste - 12118 Ute Blohm-Hieber and Christina Necheva European Commission, Directorate-General for Energy, Luxembourg L-2920,

More information

Regulatory framework on DPC licensing in the Czech Republic. Peter Lietava

Regulatory framework on DPC licensing in the Czech Republic. Peter Lietava Regulatory framework on DPC licensing in the Czech Republic Peter Lietava 1 Content Czech regulatory framework on DPC licensing Interfaces between DPC, AFR storage facilities and NPP licensing and transport

More information

Romanian Legislative Framework for Decommissioning

Romanian Legislative Framework for Decommissioning Romanian Legislative Framework for Decommissioning Presented by: Vilmos Zsombori, CNCAN IAEA Regional Workshop on Decommissioning of Research Reactors Manila, Philippines 26 30 June 2006 The Romanian main

More information

COUNCIL DIRECTIVE 2011/70/EURATOM

COUNCIL DIRECTIVE 2011/70/EURATOM L 199/48 Official Journal of the European Union 2.8.2011 DIRECTIVES COUNCIL DIRECTIVE 2011/70/EURATOM of 19 July 2011 establishing a Community framework for the responsible and safe management of spent

More information

Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants

Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants DS485 17 July 2017 IAEA SAFETY STANDARDS for protecting people and the environment STEP 13: Establishment by the Publications Committee Reviewed in NSOC (Asfaw) Ageing Management and Development of a Programme

More information

Let me start by congratulating Antigua and Barbuda, Barbados and Turkmenistan on their accession to the International Atomic Energy Agency.

Let me start by congratulating Antigua and Barbuda, Barbados and Turkmenistan on their accession to the International Atomic Energy Agency. Statement by Rokas Baliukovas, Vice-minister of Energy of the Republic of Lithuania, at the 59 th Session of the General Conference of the International Atomic Energy Agency Ladies and Gentlemen, Let me

More information

This is the third National Report of the Russian Federation on the fulfillment of commitments arising from the Convention on Nuclear Safety.

This is the third National Report of the Russian Federation on the fulfillment of commitments arising from the Convention on Nuclear Safety. This is the third National Report of the Russian Federation on the fulfillment of commitments arising. The Report covers nuclear power plant operation period after 2001 and takes into account the recommendations

More information

Experience in Safety and Environmental impact assessment to support irradiated graphite decommissioning

Experience in Safety and Environmental impact assessment to support irradiated graphite decommissioning Experience in Safety and Environmental impact assessment to support irradiated graphite decommissioning Prof. Povilas POŠKAS Head of Nuclear Engineering Laboratory Technical Meeting Experience of Reactors

More information

Arab Journal of Nuclear Science and Applications, 48(3), ( ) 2015

Arab Journal of Nuclear Science and Applications, 48(3), ( ) 2015 Specific Considerations in the Safety Assessment of Predisposal Radioactive Waste Management Facilities in Light of the Lessons Learned from the Accident at the Fukushima-Daiichi Nuclear Power Plant A.

More information

Establishing the Independent, Effective Regulatory Authority in the United Arab Emirates

Establishing the Independent, Effective Regulatory Authority in the United Arab Emirates Establishing the Independent, Effective Regulatory Authority in the United Arab Emirates Ian Grant Director of Nuclear Safety Federal Authority for Nuclear Regulation Presentation Outline The Nuclear Energy

More information

LEGAL AND REGULATORY FRAMEWORK FOR RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN SLOVAK REPUBLIC

LEGAL AND REGULATORY FRAMEWORK FOR RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN SLOVAK REPUBLIC LEGAL AND REGULATORY FRAMEWORK FOR RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN SLOVAK REPUBLIC ABSTRACT /DGLVODY.RQHþQê-DQD%XUFORYi Nuclear Regulatory Authority of the Slovak Republic Trnava Slovak

More information

SECOND NATIONAL REPORT

SECOND NATIONAL REPORT THE SOCIALIST REPUBLIC OF VIET NAM SECOND NATIONAL REPORT ON IMPLEMENTATION OF THE OBLIGATIONS UNDER THE JOINT CONVENTION ON THE SAFETY OF SPENT FUEL MANAGEMENTION AND ON THE SAFETY OF RADIOACTIVE WASTE

More information

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident FEDERAL ENVIRONMENTAL, INDUSTRIAL AND NUCLEAR SUPERVISION SERVICE (ROSTECHNADZOR) New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident Alexander Sapozhnikov Department for Safety

More information

International Conference on the Safety of Radioactive Waste Management

International Conference on the Safety of Radioactive Waste Management International Conference on the Safety of Radioactive Waste Management IAEA Headquarters Vienna, Austria 21 25 November 2016 Ref. No.: IAEA-CN-242 Announcement and Call for Papers A. Introduction The sustainable

More information

Overview of Nuclear Security Regime in Lithuania

Overview of Nuclear Security Regime in Lithuania Overview of Nuclear Security Regime in Lithuania Renaldas Sabas Discussion on Cooperation to Counter Illicit Trafficking of Nuclear or Other Radioactive Materials International Conference on Nuclear Security:

More information

Principles on Radiological Characterization of the Unit 1 at Ignalina NPP for Decommissioning Purposes 8096

Principles on Radiological Characterization of the Unit 1 at Ignalina NPP for Decommissioning Purposes 8096 Principles on Radiological Characterization of the Unit 1 at Ignalina NPP for Decommissioning Purposes 8096 P. Poskas, R. Zujus, G. Drumstas, R. Poskas, V. Simonis Lithuanian Energy Institute 3 Breslaujos

More information

Use of PSA to Support the Safety Management of Nuclear Power Plants

Use of PSA to Support the Safety Management of Nuclear Power Plants S ON IMPLEMENTATION OF THE LEGAL REQUIREMENTS Use of PSA to Support the Safety Management of Nuclear Power Plants РР - 6/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY TABLE OF CONTENTS

More information

7 th Review Meeting of the Convention on Nuclear Safety. SWEDEN Country Group 2 National Report Presentation Vienna, March 31, 2017

7 th Review Meeting of the Convention on Nuclear Safety. SWEDEN Country Group 2 National Report Presentation Vienna, March 31, 2017 7 th Review Meeting of the Convention on Nuclear Safety SWEDEN Country Group 2 National Report Presentation Vienna, March 31, 2017 1 Presentation Outline (1) Summary of Basic Information on the National

More information

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER Theinformationcontainedinthisdocumentcannotbechangedormodifiedinanywayand shouldserveonlythepurposeofpromotingexchangeofexperience,knowledgedissemination

More information

STATE NUCLEAR POWER SAFETY INSPECTORATE Of THE REPUBLIC OF LITHUANIA (VATESI) REGULATIONS

STATE NUCLEAR POWER SAFETY INSPECTORATE Of THE REPUBLIC OF LITHUANIA (VATESI) REGULATIONS 1 Translation from Russian STATE NUCLEAR POWER SAFETY INSPECTORATE Of THE REPUBLIC OF LITHUANIA (VATESI) REGULATIONS GENERAL REQUIREMENTS FOR THE EVENT REPORTING SYSTEM AT A NUCLEAR POWER PLANT VD-E-04-98

More information

Revised Mid-and-Long-Term Roadmap towards the Decommissioning of TEPCO s Fukushima Daiichi NPP Units 1-4

Revised Mid-and-Long-Term Roadmap towards the Decommissioning of TEPCO s Fukushima Daiichi NPP Units 1-4 Revised Mid-and-Long-Term Roadmap towards the Decommissioning of TEPCO s Fukushima Daiichi NPP Units 1-4 Tatsuya Shinkawa Director, Nuclear Accident Response Office, Agency for Natural Resources and Energy,

More information

Lietuvos Energija AB. Organizer (developer) of the proposed economic activity. EIA Procedure. Foreign countries

Lietuvos Energija AB. Organizer (developer) of the proposed economic activity. EIA Procedure. Foreign countries 27 August 2008 52 3 COMMUNICATION AND PARTICIPATION One of the objectives of the EIA procedure is to increase availability of information of the proposed economic activity and improve the opportunities

More information

M ertinssafety. The new German Safety Criteria for Nuclear Power Plants in the view of international standards. Prof. Dr. M.

M ertinssafety. The new German Safety Criteria for Nuclear Power Plants in the view of international standards. Prof. Dr. M. The new German Safety Criteria for Nuclear Power Plants in the view of international standards Prof. Dr. M. Mertins 1 Content Introductory remarks Major Information Sources for elaboration of the new Safety

More information

Document Preparation Profile (DPP) [Final] Version 5 dated 16 November, 2015

Document Preparation Profile (DPP) [Final] Version 5 dated 16 November, 2015 Document Preparation Profile (DPP) [Final] Version 5 dated 16 November, 2015 1. IDENTIFICATION Document Category: Specific Safety Guide Working ID: Proposed Title: Proposed Action: DS449 Format and Content

More information

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management 3rd Estonian National Report on Compliance with the Obligations of the Convention on Joint Convention

More information

CLASSIFICATION OF SYSTEMS, STRUCTURES AND COMPONENTS OF A NUCLEAR FACILITY

CLASSIFICATION OF SYSTEMS, STRUCTURES AND COMPONENTS OF A NUCLEAR FACILITY CLASSIFICATION OF SYSTEMS, STRUCTURES AND COMPONENTS OF A NUCLEAR FACILITY 1 Introduction 3 2 Scope of application 3 3 Classification requirements 3 3.1 Principles of safety classification 3 3.2 Classification

More information

WENRA APPROACH WITH RESPECT TO DESIGN EXTENSION OF EXISTING REACTORS

WENRA APPROACH WITH RESPECT TO DESIGN EXTENSION OF EXISTING REACTORS WENRA APPROACH WITH RESPECT TO DESIGN EXTENSION OF EXISTING REACTORS H. HIRSCH Austrian Nuclear Advisory Board Neustadt a. Rbge., Germany Email: cervus@onlinehome.de B. BECKER Gesellschaft für Anlagen-

More information

PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA

PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA REPUBLIC OF LITHUANIA STATE NUCLEAR POWER SAFETY INSPECTORATE PLAN OF STRENGTHENING NUCLEAR SAFETY IN LITHUANIA Follow-up of the stress tests performed in European Union Vilnius 2012 1 This page intentionally

More information

DRAFT MOTION FOR A RESOLUTION

DRAFT MOTION FOR A RESOLUTION EUROPEAN PARLIAMT 2009-2014 Plenary sitting 6.11.2012 B7-XXXX/2012 DRAFT MOTION FOR A RESOLUTION further to Question for Oral Answer B7-xxxx/2012 pursuant to Rule 115(5) of the Rules of Procedure on Risk

More information

Joint Convention on the Safety of Spent Fuel and on the Safety of Radioactive Waste Management

Joint Convention on the Safety of Spent Fuel and on the Safety of Radioactive Waste Management Joint Convention on the Safety of Spent Fuel and on the Safety of Radioactive Waste Management Second National Report of Lithuania in accordance with Article 32 of the Convention 2008 Table of contents:

More information

RECOMMENDED KEY GUIDELINES OF THE NATIONAL ENERGY STRATEGY OF LITHUANIA CHAPTER I GENERAL PROVISIONS

RECOMMENDED KEY GUIDELINES OF THE NATIONAL ENERGY STRATEGY OF LITHUANIA CHAPTER I GENERAL PROVISIONS APPROVED by the order of the Minister of Energy of the Republic of Lithuania of 24 November 2016 No. 1-314 RECOMMENDED KEY GUIDELINES OF THE NATIONAL ENERGY STRATEGY OF LITHUANIA CHAPTER I GENERAL PROVISIONS

More information

Discussion on nuclear energy- related projects

Discussion on nuclear energy- related projects Discussion on nuclear energy- related projects Dr. Stasys Motiejūnas Lithuania Meeting of the Parties to the Convention on Environmental Impact Assessment in a Transboundary Context Geneva, 22 June 2011

More information

Preparation of NPP Dukovany Periodic Safety Review

Preparation of NPP Dukovany Periodic Safety Review Preparation of NPP Dukovany Periodic Safety Review Dubský Ladislav Petr Vymazal Nuclear Research Institute Řež plc., Czech Republic ČEZ, a.s., Nuclear Division, Dukovany NPP, Czech Republic 1. ABSTRACT

More information

European Nuclear Stress Test

European Nuclear Stress Test European Nuclear Stress Test - Peer Review Process and Results - 9. St. Galler Energietagung Oskar Grözinger Symposium : The Fukushima accident and the future of nuclear energy in Europe Den Haag, 23.11.2012

More information

Joint ICTP-IAEA School on Nuclear Energy Management. 15 July - 3 August, Lecture Notes. I. Mele IAEA, Vienna, Austria

Joint ICTP-IAEA School on Nuclear Energy Management. 15 July - 3 August, Lecture Notes. I. Mele IAEA, Vienna, Austria 2473-9 Joint ICTP-IAEA School on Nuclear Energy Management 15 July - 3 August, 2013 Lecture Notes I. Mele IAEA, Vienna, Austria The IAEA Nuclear Energy Management School ICTP, Trieste, 15-2 August 2013

More information

Progress of Medium- and Long-term Efforts to Decommission Fukushima Dai-ichi NPP of TEPCO (Statement)

Progress of Medium- and Long-term Efforts to Decommission Fukushima Dai-ichi NPP of TEPCO (Statement) Progress of Medium- and Long-term Efforts to Decommission Fukushima Dai-ichi NPP of TEPCO (Statement) November 27, 2012 Japan Atomic Energy Commission Tokyo Electric Co., Ltd. (TEPCO) announced the Roadmap

More information

Australian National Report. Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management.

Australian National Report. Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. Commonwealth of Australia Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Australian National Report July 2003 AUSTRALIAN RADIATION PROTECTION

More information

National Report. Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. Republic of Latvia

National Report. Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. Republic of Latvia National Report On the implementation of the obligations under the Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management 3 rd Review meeting of the Contracting

More information

REGULATORY CHALLENGES IN PREPARING FOR THE REGULATION OF NEW REACTOR SITING: MALAYSIA EXPERIENCE

REGULATORY CHALLENGES IN PREPARING FOR THE REGULATION OF NEW REACTOR SITING: MALAYSIA EXPERIENCE REGULATORY CHALLENGES IN PREPARING FOR THE REGULATION OF NEW REACTOR SITING: MALAYSIA EXPERIENCE Regional Workshop on Volcanic, Seismic and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. National Report from Estonia

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. National Report from Estonia Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report from Estonia Estonian Radiation Protection Centre Second Review Meeting May 2006

More information

SAFETY CULTURE WITHIN THE NUCLEAR SAFETY REGULATORY ENVIRONMENT

SAFETY CULTURE WITHIN THE NUCLEAR SAFETY REGULATORY ENVIRONMENT SAFETY CULTURE WITHIN THE NUCLEAR SAFETY REGULATORY ENVIRONMENT O. ŠEŠTOKAS State Nuclear Power Safety Inspectorate (VATESI) Vilnius, Lithuania Abstract Safety culture cannot be easily regulated and controlled

More information

About 30 countries are currently

About 30 countries are currently By Dick Kovan About 30 countries are currently considering or planning to build their first nuclear power reactors or have already ordered a reactor or started plant construction. This new wave of interest,

More information

An International Peer Review of the Programme for Evaluating Sites for Near Surface Disposal of Radioactive Waste in Lithuania

An International Peer Review of the Programme for Evaluating Sites for Near Surface Disposal of Radioactive Waste in Lithuania An International Peer Review of the Programme for Evaluating Sites for Near Surface Disposal of Radioactive Waste in Lithuania Report of the IAEA International Review Team AN INTERNATIONAL PEER REVIEW

More information

Convention on Nuclear Safety. KSA NATIONAL REPORT For the 7th Review Meeting of the CONVENTION ON NUCLEAR SAFETY Aug/

Convention on Nuclear Safety. KSA NATIONAL REPORT For the 7th Review Meeting of the CONVENTION ON NUCLEAR SAFETY Aug/ Convention on Nuclear Safety KSA NATIONAL REPORT For the 7th Review Meeting of the CONVENTION ON NUCLEAR SAFETY Aug/2016-1- I. INTRODUCTION 1.1 Purpose and Scope of this Report On 20 September 1994 the

More information

Generic Aspects for Dismantling Preparation of INPP Reactor Facilities. Aleksej Merežnikov, Ignalina NPP, July 2014

Generic Aspects for Dismantling Preparation of INPP Reactor Facilities. Aleksej Merežnikov, Ignalina NPP, July 2014 Generic Aspects for Dismantling Preparation of INPP Reactor Facilities Aleksej Merežnikov, Ignalina NPP, July 2014 Agenda INTRODUCTION REGULATORY FRAMEWORK RBMK-1500 FEATURES GENERAL APROACH STATUS AND

More information

SNRIU Nuclear installation modifications

SNRIU Nuclear installation modifications State Nuclear Regulatory Inspectorate of Ukraine SNRIU Nuclear installation modifications Andrii Goroshanskyi Law of Ukraine «On Use of Nuclear Energy and Radiation Safety» of 08-Feb-1995 Article 22. The

More information

Seventh French Report under the CNS August

Seventh French Report under the CNS August Seventh French Report under the CNS August 2016-1 - Photo credits of cover page from left to right: EDF Marc Didier EDF Francis Chanteloup EDF Antoine Soubigou Seventh French Report under the CNS August

More information

SUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD

SUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD МИНИСТЕРСТВО ЭНЕРГЕТИКИ И УГОЛЬНОЙ ПРОМЫШЛЕННОСТИ УКРАИНЫ НАЦИОНАЛЬНАЯ АТОМНАЯ ЭНЕРГОГЕНЕРИРУЮЩАЯ КОМПАНИЯ SUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD D.V. Biley Inspector General

More information

LITHUANIA. Technical Meeting on the Country Nuclear Power Profiles (CNPP) IAEA, Vienna

LITHUANIA. Technical Meeting on the Country Nuclear Power Profiles (CNPP) IAEA, Vienna LITHUANIA Technical Meeting on the Country Nuclear Power Profiles (CNPP) IAEA, Vienna 2016 05 11 Lithuania: Facts & Figures 2 Nuclear installations: Ignalina NPP Light-water, graphite-moderated type reactors,

More information

Ignalina NPP. Human Resources points of attention for the nuclear decommissioning industry: Ignalina NPP experience

Ignalina NPP. Human Resources points of attention for the nuclear decommissioning industry: Ignalina NPP experience Human Resources points of attention for the nuclear decommissioning industry: Ignalina NPP experience Ignalina NPP Tomas Liukaitis Director of Corporate Affairs & Administration Decommissioning of Ignalina

More information

Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation Challenges for a New Regulatory Body

Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation Challenges for a New Regulatory Body International Conference on Effective Nuclear Regulatory Systems: Sustaining Improvements Globally 11-15 April 2016, Vienna Austria Regulating Nuclear Reactor Construction and Commissioning, and Preparation

More information

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER Theinformationcontainedinthisdocumentcannotbechangedormodifiedinanywayand shouldserveonlythepurposeofpromotingexchangeofexperience,knowledgedissemination

More information

Decommissioning of Nuclear Facilities - Regulatory Requirements -

Decommissioning of Nuclear Facilities - Regulatory Requirements - Decommissioning of Nuclear Facilities - Regulatory Requirements - Ernst Warnecke; NSRW R²D²Project: Basics of Decommissioning of Research Reactors / Manila; 16-20 October 2006 1 International Atomic Energy

More information

MINISTRY OF THE ENVIRONMENT OF THE REPUBLIC OF LITHUANIA

MINISTRY OF THE ENVIRONMENT OF THE REPUBLIC OF LITHUANIA MINISTRY OF THE ENVIRONMENT OF THE REPUBLIC OF LITHUANIA Institution financed from the state budget. Jakšto str. 4/9, LT-01105 Vilnius, Phone: + 370 5 266 3661, fax: + 370 5 266 3663, e-mail: p. info@am.lt,

More information

REPUBLIC OF CROATIA NATIONAL REPORT

REPUBLIC OF CROATIA NATIONAL REPORT REPUBLIC OF CROATIA NATIONAL REPORT ON IMPLEMENTATION OF THE OBLIGATIONS UNDER THE JOINT CONVENTION ON THE SAFETY OF SPENT FUEL MANAGEMENT AND ON THE SAFETY OF RADIOACTIVE WASTE MANAGEMENT 5 th report