Assimilating Quality Function Deployment (QFD) with QUEST Analysis for Facility Layout Redesign of Handwork Section

Size: px
Start display at page:

Download "Assimilating Quality Function Deployment (QFD) with QUEST Analysis for Facility Layout Redesign of Handwork Section"

Transcription

1 2010 International Conference on Science and Social Research (CSSR 2010), December 5-7, 2010, Kuala Lumpur, Malaysia Assimilating Quality Function Deployment (QFD) with QUEST Analysis for Facility Layout Redesign of Handwork Section Mas Alina Mohd Ali a, Abdul Rahman Omar a, Alias Mohd Saman a, Ibrahim Othman b, Isa Halim a Abdul Hadi a a Faculty of Mechanical Engineering, Universiti Teknologi MARA, Shah Alam, Selangor, Malaysia. usu_ina@yahoo.com b Faculty of Art and Design, Universiti Teknologi MARA, Shah Alam, Selangor, Malaysia. ibkasut@yahoo.com. Abstract Quality function deployment (QFD) is a powerful customer-oriented tool to facilitate the customer needs. In this paper, an attempt has been made to examine the applicability of Quality Function Deployment (QFD) as a suitable design management tool for improving facility layout design of small and medium manufacturing industries. For this purpose, a simple case study using QFD has been conducted where survey has been done to collect and verify the expectations of the customer/worker profile for designing the facility layout. This paper presents the integration between QFD approaches with simulation modelling within a facility layout of a Handwork Section; Miyazu (M) Sdn Bhd, located in Shah Alam, Selangor. The department is struggling to locate the incoming parts from the depot since the pickup and drop off buffer is not properly placed, which results to untidy appearance. Quest simulation analysis is found to be very powerful tool that can be used in the design phase. Simulation modelling activity is used in this study since it allows verification of the floor design without having to rearrange the actual physical layout. The case study findings demonstrated that QFD approach is possible to prioritize and implement the new layout solutions at the onset of the design stage before the actual layout implementation. Keywords Quality Function Deployment; Facility Design Layout; Simulation Modeling I. INTRODUCTION Facility layout design is a well known key factor related to improvement of productivity. The efficient design of a facility layout has been recognized as one of the most important issues in contemporary manufacturing systems. It is generally accepted that effective facilities planning can reduce material handling cost by at least 10 to 30 percent. A good placement of facilities contributes to the overall efficiency of operations and can reduce about 50 percent of the total operating expenses [2]. Hence, if facilities are arranged optimally, manufacturers can reduce product cost and significantly enhance their competitive position [1]. Previous research [1, 2] indicate that limited attention paid to facilities design layout is a significant shortcoming since a wrong choice of machines /workers position can increase the expected travel distance. With rapid changes in market requirements, it is necessary to update the layout accordingly in order to operate efficiently. Hence, facility layout is not only affecting the production planning problem, but also an important part of manufacturing execution. The necessity for worker-friendly ambiance has initiated ever since facilities planning has taken a whole new meaning in the past 10 years [2, 8]. Thus, facility layout that able to accommodate accelerate productivity as well as providing comfort and safety to workers has become essential. The aim of satisfying the worker s requirement in the workplace environment can be achieved by integrating Quality Function Deployment (QFD) so that an efficient and establish design layout is able to be incorporated [3]. Quality Function Deployment (QFD) as a well-known customer-oriented methodology is widely used to assist decision making in product design and development in various types of production. Determining how and to what extent characteristics of products or services are to be met, with a view to gaining higher level of overall customer satisfaction is a key success factor in product design and development. The purpose of this research is to study the possible application of quality function deployment (QFD) methods and its suitability in determining the optimum layout parameters of manufacturing facilities based on the workers (customers ) satisfaction. In order to prove the relationship between the simulation analysis and performance matrices, an empirical facility layout model is developed first to illustrate its current performance. With this, a possible monitoring mechanism can be developed to quickly find out the adjustment solution once any configuration change is detected. II. METODOLOGY A case study was conducted in a metal stamping company situated in Shah Alam, Malaysia. One of the sections in the company s production is the handwork area. The main activity at the section is to perform restoration on the products of metal stamping process lines. The manufacturing operation at the production /10/$ IEEE 985

2 facility is run on two staged shifts including 80 minutes of tea breaks and lunch breaks per shift. This section was struggling to locate the incoming parts from the depot since the pickup and drop off buffer do not have its proper placed, which results to untidy appearance. The section is 30 meters in length and 11.5 meters wide were occupied with toilet, praying room, supervisor s office and eight working tables, differ in arrangements and shapes. All workers which are located at the respective table work simultaneously regardless of the difference in the amount and shapes of incoming parts that need to be restored. The incoming parts from the depot arrive at the area by two or more fork-lifts. The distance between the handwork area and the depot is 8 meters. Since the only space available to put the buffer at each working table is only 1.6 meter squared, the forklift has to locate the arrival parts at the space in between the depot and the handwork area which resulted congestion at the entry-exit points. The study was carried out in three stages. These approach was undertaken which began with identifying the type of facility layout used by gathering information from workers directly involved with the production operation. A. Questionnaire Surveys The first phase of the study was to gather and analyze all historical data. The production plant was visited for duration of one month with the assistance of the supervisor in charged. Data pertaining current production flow, process operations, processing times, resources and plant layout were gathered using proper time study methods. The questions were derived from several factors and design issues which strongly dependent on specific features of manufacturing system. The factors includes facility shapes, facility dimensions, pick-up and drop-off locations, product variety and product quantity, material handling systems and floor layout [4]. The questions are distributed among the industrial workers to acquire their requirements regarding the design of the facility layout. The questions are divided into five sections namely; 1) personal details of respondent, 2) facility shapes and dimensions, 3) material handling systems, 4) floor layout and 5) product quantity and product variety. Personal details of worker such as years of working experience were recorded in the first section. The information provided is vital to ensure that the workers understand and familiar with their layout surrounding. B. House of Quality Analysis The second phase commence with the process of developing the customer portion of the matrix by analyzing the information attained from the interview sessions. Figure 1 [5] illustrates the outline of the House of Quality design undertaken in this study. Once all the workers requirements have been obtained, the relative importance is calculated by multiplying each score by the number of worker who assigned it. The next step in HoQ analysis was to identify the technical importance of engineering characteristics. Figure 1: Simple flow diagram of QFD Process [5] By using the correlation between the customers / workers need and the engineering characteristic it was possible to determine the strength of relationship and impact on the need. It was possible to identify and prioritize the most important requirements and needs for the new design of layout. Using the lower part of the House of Quality matrix, the level of importance of the design requirements was determined using the results of the technical importance and relative importance of the engineering characteristic. Figure 2: HoQ step-by-step specifications determination 986

3 In this study, the competitive analysis was evaluated based on the standards design requirement using Malaysian Standards ISO :2007; Ergonomic Design of Control Centers Part 4: Layout and Dimensions of Workstations. To complement the information for the Target Values definition, the level of importance of the design requirements was determined using the results of the Technical Importance and the Relative Weight of the Technical Requirements was developed using the lower part of the House of Quality matrix. After obtaining the final results of the Relative Importance of the Technical Requirements, it was possible to implement the new layout solutions and design of the facility layout of the manufacturing company. The improvement performance of the design layout was evaluated by measuring the differences of the design index before and after application of QFD. C. QUEST Simulation Analysis The final stage of the study began with building a reference model using simulation modelling. For the purpose of this research study, QUEST simulation software has been chosen as a platform to simulate the current and new improved layout design. Simulation is used in this study since it allows verification of the floor design without having to rearrange the actual physical layout. In order to represent the actual operation condition, the reference model was simulated using several probability distributions such as uniform distribution and constant distribution that may simulate the model closely to the actual layout and production condition. Results from the as-is model are statically compared with outputs of the real-world system to validate the simulation model [6]. When doing this simulation study, certain constraints are considered such: 1. Each job will be processed at any particular machine only once. 2. One machine can only process one job at one time. No two activities requiring the same machine to execute at the same time. 3. Handling time is included in the machine process time. Transportation time is negligible because the distance from machines to machines are near. 4. Allocation of the job to machine is subject to the earliest availability of the job. The reference model was built according to the existing facility layout design, to simulate the actual production condition. The model layout was designed using QUEST simulation software (Figure 3). Each run of the simulation model starts with all the material handlings, (forklift) parked at different blocks of storage area (depot). Based on the shift patterns, the forklifts deliver the parts from the storage area to the handwork area by following the forklift path (yellow lines). The forklifts follow the path network back and forth between handwork area and depot whilst deal faithfully with the driving regulations. When the forklifts reach each work station, it will place the incoming parts at the space provided near to the working table. Once the process is finish, the parts will be placed on the respective buffer before being collect by the forklift. Figure 3a: Plant layout of the current Handwork Area s model Figure 3b: Layout measurement of the current Handwork Area s model Simulation always runs for some future anticipated situation, therefore, there will always going to be assumptions made regarding any unknown future condition [6]. The assumptions include those placed on the characteristics of the jobs, machines and processing times such as: i) All jobs are simultaneously available at the beginning of the planning period. ii) No job cancellation occurs. iii) iv) Due date is known in advance. Raw materials, tools, jigs, fixtures etc, are presented and released immediately when required. v) Figure of all parts are represented by the same display neglecting the types and measurements of the entity. Validations of the reference model were made based on the comparison between the actual production output obtained from the company and simulation output results. The simulation was thus replicated for one day production cycles. The output variations were tested by running the simulation model for several hours over a few 987

4 cycles. The actual process of designing the layout to achieve the expected output of the proposed new facility is a function of the size of the work area, the size of the products and the work-in-process inventory at various workstations. While the size of the handwork area is a constant parameter, the size of products and the work-inprocess inventory factors are variable parameters that are driven by the input process of the production system. For the purposed of this research study, an approval with an official consent letter indicating the necessity to adhere the companies regulations was obtained from the companies involved allowing the author to conduct the research study at their premises. Before conducting the study, the researchers have also obtained research approval regarding the procedures from the Research Ethics Committee of University Technology MARA. III. RESULTS AND DISCUSSIONS The construction and redesign of the layout was made based on the information gained using the QFD approach. Several factors have been determined in redesigning a new improved layout such as the working space area, horizontal distance between workspace, space between work area and material handling and the load/unload station located at each workstation. The location of fan was also included as one of the factors that need to be considered during the improvement implementation. In order to gain the actual operation condition, the current model was simulated using several probability distributions that may simulate the model closely to the actual layout and production output condition. The simulation runs for one day of production cycle which is 22.2 hours including 160 minutes break for 2 shifts. The output variations were tested by running the simulation model for several cycles. Figure 4 shows the reference model that was built to represent the actual production layout in the QUEST simulation environment. From here, the simulation model validity is tested. The model was built based on the present production operation condition. The circles labeled as A, B, C, D, E, F and G shown in Figure 4 indicate parts placed outside the handwork area, i.e. in between the handwork section and the storage area (depot). This is due to space limitation which results to an inappropriate arrangement of the incoming parts. This condition may interrupt the forklift path as well as the flow of production. The average waiting time per part at each pick up and drop off location is 11.5 minutes while the average cycle time at each refurbishing process is 14.5 minutes. The working table arrangement shown in circles labeled I and II provide discomfort to workers. Since the worker s position are facing the fan (attached on the side of the wall), hence every time they work on the surface grinding process, dust from the metals flies directly to the workers. In the long run, this will affect the worker s health. Furthermore, the location of the working table represented by circle labeled III is not suitable for forklift to move back and forth. This eventually lead to longer waiting time and longer cycle time for each part and process respectively. B A Figure 4: Current facility layout design of Handwork Area Figure 5 portrays the model in an improved layout arrangement that was created using QUEST simulation software. The redesign of the layout was made with reference from information recorded using QFD. The size of the praying room and the supervisor s office are reduced to the same width. However, this will not disturb the worker s doings since they only require little space to continue with their usual activities alternately. By resizing these rooms, more space is available to reposition each working table. This rearrangement was made based on the worker s comfort ability to move around the working table. With this new arrangement, the workers can avoid the metal dust from flying directly to the workers. This will lead to a healthier working environment. Additionally, the problems with the placement of incoming parts are also solved by having this extra space. Hence, there will be no disturbance along the forklift path as well as for the production flow. Despite the space of the praying room and the supervisor s office being reduced, the workers are provided with a new resting area. This area is made so that these workers can have a place to drink and have a snack during their short breaks and lunch hour. Figure 5a: New improved facility layout design of Handwork Area I C II D III E F G 988

5 Figure 5b: Comparison between the current and the improved work area arrangement Figure 6a: QUEST summary report for original layout design Figure 5c: The fan position before and after design improvement Figure 6a indicates the summary of QUEST simulation production output of the current facility layout design. The results of the analysis using simulation software show the amount of incoming parts at source that need to be send to handwork area and the amount of finished parts at each working table that has been sent to storage area in sink. By comparison, it is obvious that both of the amounts did not match. For instant, finished parts processed by work table 3 are only 100 units, which differ from the amount of 208 units of parts that has been send earlier for refurbish. This proves that bottleneck of 108 parts occur on buffer located at work table 1. Figure 6b shows the summary of QUEST simulation production output of the new redesign layout. The analysis of the results signifies an increase in the amount of finished parts processed by each working table. The result shows that by doing some modification towards the facility layout design can increased the number of productivity made by workers. This is demonstrated by the increased amount of finished parts at each work table. Figure 6b: QUEST summary report for new layout design Table 1 compares the production output between the facility layout design before and after QFD. The results of the analysis using simulation software show that by applying QFD approach will not only increase the company s overall volume of production, but also minimize the workers degree of uncomfortable as well as reduce the risk of injuries. 989

6 TABLE 1 Design characteristics of the facility layout before and after QFD. Technical index Average waiting time per part Average cycle time per machine Overall production output per day Current Layout Design 11.5 minutes 14.5 minutes After Redesigning Layout Improvement 7.7 minutes 33 % 10 minutes 31 % 2330 parts 2580 parts 10.7% IV. CONCLUSIONS With the emergence of new generation of facilities design at the beginning of the century, there is a need to configure different approach to Facility Layout Problems. The new improved layout created smooth production flow and showed a good example of how facility design can be improved. Quality Function Deployment opens a new direction in terms of method to use to solve facility layout problems. The interrelationship is the most important mechanism of QFD process to stores valuable evidence needed for design improvements [7]. The use of simulation within layout can be an iteration process. The outcomes of the simulation model can be used as benchmarks for evaluating the efficiency of the new layout. ACKNOWLEDGMENT The author would like to acknowledge Miyazu (M) Sdn Bhd for the permission and ample opportunity to facilitate a fruitful case study. A special thank to Mr. Norazli Mohd, Supervisor of Handwork Area in Miyazu (M) Sdn Bhd for the assistance rendered during the related analytical work. Similar gratitude also goes to Faculty of Mechanical Engineering of University Technology MARA for providing facilities in carrying out this study. REFERENCES [1] S.S. Heragu, Facilities Design, PWS Publishing, Boston, 1997 [2] J.A. Tompkins, J.A. White, Y.A. Bozer, E.H. Frazelle, J.M. Tanchoco, and J. Trevino, Facilities Planning, 3 rd Edition, Wiley, New York, 2003 [3] M.M. Ali, A.R. Omar, A. Saman, I. Halim,, Improving facility layout using quality function deployment (QFD) approach Paper presented at the International Conference for Technical Postgraduates, Kuala Lumpur, Malaysia, ISBN: , December [4] A. Drira, H. Pierreval, and S.H. Gabouj, Facility Layout Problems: A survey Annual Reviews in Control, 2007, Vol. 31, pp [5] A.R. Omar, J.A Harding, and K. Popplewell, Design for Customer Satisfaction: An Information Modelling Approach The International Journal of Manufacturing Technology Management, 1999, Vol. 10, no 4, pp [6] C. Harrell, B.K Ghosh, and R. Bowden, Simulation Using ProModel, McGraw-Hill International Edition, United States of America, 2000 [7] M.M. Ali, and A.R. Omar, Integrating QFD and Simulation Analysis in Facility Layout Design Paper submitted to International Journal of Production Research for review. [8] F.E. Meyer & M.P. Stephens, Manufacturing facilities design and material handling, 3 rd Edition, Englewood Cliffs, NJ: Prentice Hall,

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process Journal of Mechanical Engineering Vol SI 4 (1), 47-60, 2017 Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process Seha Saffar * Centre

More information

AN INTEGRATED MODEL OF STORAGE AND ORDER-PICKING AREA LAYOUT DESIGN

AN INTEGRATED MODEL OF STORAGE AND ORDER-PICKING AREA LAYOUT DESIGN AN INTEGRATED MODEL OF STORAGE AND ORDER-PICKING AREA LAYOUT DESIGN Goran DUKIC 1, Tihomir OPETUK 1, Tone LERHER 2 1 University of Zagreb, Faculty of Mechanical Engineering and Naval Architecture Ivana

More information

Optimize Assembly Production Line using Line Balancing

Optimize Assembly Production Line using Line Balancing Optimize Assembly Production Line using Line Balancing Abdul Talib Bon 1, Asyran Abdul Rahman 2 Department of Production and Operation Management Faculty of Technology Management And Business Universiti

More information

Design and Operational Analysis of Tandem AGV Systems

Design and Operational Analysis of Tandem AGV Systems Proceedings of the 2008 Industrial Engineering Research Conference J. Fowler and S. Mason. eds. Design and Operational Analysis of Tandem AGV Systems Sijie Liu, Tarek Y. ELMekkawy, Sherif A. Fahmy Department

More information

ERGONOMICS ASSESSMENT OF WORKSTATION DESIGN IN AUTOMOTIVE INDUSTRY

ERGONOMICS ASSESSMENT OF WORKSTATION DESIGN IN AUTOMOTIVE INDUSTRY National Conference in Mechanical Engineering Research and Postgraduate Studies (2 nd NCMER 2010) 3-4 December 2010, Faculty of Mechanical Engineering, UMP Pekan, Kuantan, Pahang, Malaysia; pp. 195-201

More information

Design and simulation of integration system between automated material handling system and manufacturing layout in the automotive assembly line

Design and simulation of integration system between automated material handling system and manufacturing layout in the automotive assembly line IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS and simulation of integration system between automated material handling system and manufacturing layout in the automotive assembly

More information

Integrating Big Island Layout with Pull System for Production Optimization

Integrating Big Island Layout with Pull System for Production Optimization Integrating Big Island Layout with Pull System for Production Optimization M. H. M. Rusli, A. Jaffar, M. T. Ali, and S. Muhamud @ Kayat Abstract Lean manufacturing is a production philosophy made popular

More information

COMPARING ALTERNATIVE PLANT LAYOUTS BASED ON CRAFT AND BLOCPLAN ALGORITHMS

COMPARING ALTERNATIVE PLANT LAYOUTS BASED ON CRAFT AND BLOCPLAN ALGORITHMS COMPARING ALTERNATIVE PLANT LAYOUTS BASED ON CRAFT AND BLOCPLAN ALGORITHMS Leonardo 1, Hotma Antoni Hutahaean 2, Hui-Ming Wee 3 1,2 Department of Industrial Engineering, Atma Jaya Catholic University of

More information

ARCHITECTURE OF FMS. Typical Elements of FMS. Two Kind of Integration. Typical Sequence of Operation

ARCHITECTURE OF FMS. Typical Elements of FMS. Two Kind of Integration. Typical Sequence of Operation Typical Elements of FMS ARCHITECTURE OF FMS Versatile NC machines equipped with automatic tool changing and inprocess gauging, with capability to carry out a variety of operations An automated Material

More information

IMPROVEMENT OF OVERALL EFFICIENCY OF PRODUCTION LINE BY USING LINE BALANCING

IMPROVEMENT OF OVERALL EFFICIENCY OF PRODUCTION LINE BY USING LINE BALANCING IMPROVEMENT OF OVERALL EFFICIENCY OF PRODUCTION LINE BY USING LINE BALANCING Ahmad Naufal Adnan 1, Nurul Ain Arbaai 2 and Azianti Ismail 1 1 Faculty of Mechanical Engineering, Universiti Tekninology Mara

More information

USING THE MIN/MAX METHOD FOR REPLENISHMENT OF PICKING LOCATIONS

USING THE MIN/MAX METHOD FOR REPLENISHMENT OF PICKING LOCATIONS Transport and Telecommunication, 2, volume 8, no., 9 8 Transport and Telecommunication Institute, Lomonosova, Riga, LV-9, Latvia DOI./ttj-2-8 USING THE / METHOD FOR REPLENISHMENT OF PICKING LOCATIONS Raitis

More information

Systematic Planning Layout and Line Balancing for Improvement in an Armoured Vehicle Manufacturing Plant

Systematic Planning Layout and Line Balancing for Improvement in an Armoured Vehicle Manufacturing Plant Proceedings of the International Conference on Industrial Engineering and Operations Management Rabat, Morocco, April 11-13, 2017 Systematic Planning Layout and Line Balancing for Improvement in an Armoured

More information

Planning of a production facility for a component manufacturer

Planning of a production facility for a component manufacturer Planning of a production facility for a component manufacturer - In view of logistics and risk management Cindy Yinglin Wang & Malin Karlsson May 202 Department of Industrial Management and Logistics,

More information

Case on Manufacturing Cell Formation Using Production Flow Analysis

Case on Manufacturing Cell Formation Using Production Flow Analysis Case on Manufacturing Cell Formation Using Production Flow Analysis Vladimír Modrák Abstract This paper offers a case study, in which methodological aspects of cell design for transformation the production

More information

A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION

A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION Intan Bazliah Mohd Faculty of Engineering Technology, Universiti Malaysia Pahang, Lebuhraya Tun Razak, 26300 Kuantan, Pahang Email: intanbazliahmohd80@gmail.com

More information

Awareness of Green Purchasing Amongst Construction Organisations

Awareness of Green Purchasing Amongst Construction Organisations 325 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 63, 2018 Guest Editors: Jeng Shiun Lim, Wai Shin Ho, Jiří J. Klemeš Copyright 2018, AIDIC Servizi S.r.l. ISBN 978-88-95608-61-7; ISSN 2283-9216

More information

The Use of Benchmarking to Improve the Finished Goods Inventory Management for Food and Agricultural Product Manufacturer in Thailand

The Use of Benchmarking to Improve the Finished Goods Inventory Management for Food and Agricultural Product Manufacturer in Thailand Mem. Muroran Inst. Tech., 65(2015) 15-22 特 集 The Use of Benchmarking to Improve the Finished Goods Inventory Management for Food and Agricultural Product Manufacturer in Thailand Panitnan SITTIMOON * and

More information

A STUDY ON THE POTENTIAL OF COST AND ENERGY - A SURVEY AT PLAYFORD BUILDING, UNIVERSITY OF SOUTH AUSTRALIA

A STUDY ON THE POTENTIAL OF COST AND ENERGY - A SURVEY AT PLAYFORD BUILDING, UNIVERSITY OF SOUTH AUSTRALIA Journal of Mechanical Engineering and Sciences (JMES) ISSN (Print): 2289-4659; e-issn: 2231-8380; Volume 1, pp. 25-36, December 2011 Universiti Malaysia Pahang, Pekan, Pahang, Malaysia DOI: http://dx.doi.org/10.15282/jmes.1.2011.3.0003

More information

RECENT REVIEW ON STANDARDS RELATED TO RISK ASSESSMENT FOR CONFINED SPACES

RECENT REVIEW ON STANDARDS RELATED TO RISK ASSESSMENT FOR CONFINED SPACES International Journal of Mechanical Engineering and Technology (IJMET) Volume 9, Issue 1, January 2018, pp. 950 969 Article ID: IJMET_09_01_103 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=9&itype=1

More information

ORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS October 19, 2017

ORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS October 19, 2017 ORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS October 19, 2017 TABLE OF CONTENTS Service Offerings CONSULTING SERVICE OFFERINGS Part Number ORACLE HOSPITALITY FOOD AND BEVERAGE POINT OF SALE

More information

ANALYSIS & EVALUATION OF PLANT PRODUCTION LAYOUT PT ARKHA JAYANTI PERSADA USING GROUP OF TECHNOLOGY CONCEPT WITH GENETIC ALGORITHM APPROACH

ANALYSIS & EVALUATION OF PLANT PRODUCTION LAYOUT PT ARKHA JAYANTI PERSADA USING GROUP OF TECHNOLOGY CONCEPT WITH GENETIC ALGORITHM APPROACH ISSN : 1978-774X Proceeding of 9 th International Seminar on Industrial Engineering and Management ANALYSIS & EVALUATION OF PLANT PRODUCTION LAYOUT PT ARKHA JAYANTI PERSADA USING GROUP OF TECHNOLOGY CONCEPT

More information

26 STOCKYARD LAYOUT MANAGEMENT FOR PRECAST CONCRETE PRODUCTS USING SIMULATION

26 STOCKYARD LAYOUT MANAGEMENT FOR PRECAST CONCRETE PRODUCTS USING SIMULATION 26 STOCKYARD LAYOUT MANAGEMENT FOR PRECAST CONCRETE PRODUCTS USING SIMULATION Ramesh Marasini 1 and Nashwan Dawood 2 The Environment Section School of Science and Technology University of Teesside Middlesbrough

More information

Process and Facility Layout Improvements to Meet Projected Growth at M.S. Walker s Norwood, MA Distribution Center

Process and Facility Layout Improvements to Meet Projected Growth at M.S. Walker s Norwood, MA Distribution Center Process and Facility Layout Improvements to Meet Projected Growth at M.S. Walker s Norwood, MA Distribution Center Design Team Christina Kach, Zachary Mahoney, Ryan McVey, Joseph Schneider, Christina Skursky

More information

INTEGRATION OF ECQFD IN CONCEPTUAL DESIGN ACTIVITIES FOR ENABLING ENVIRONMENTALLY CONSCIOUS DESIGN

INTEGRATION OF ECQFD IN CONCEPTUAL DESIGN ACTIVITIES FOR ENABLING ENVIRONMENTALLY CONSCIOUS DESIGN INTEGRATION OF ECQFD IN CONCEPTUAL DESIGN ACTIVITIES FOR ENABLING ENVIRONMENTALLY CONSCIOUS DESIGN Mohd Fahrul Hassan 1, Mohamad Hafiz Mat Shah 1, Muhamad Zaini Yunos 1, Sharifah Adzila 1, Ahmad Mubarak

More information

Improving Material Handling Efficiency in a Ginning Machine Manufacturing Company

Improving Material Handling Efficiency in a Ginning Machine Manufacturing Company Improving Material Handling Efficiency in a Ginning Machine Manufacturing Company A. P. Bahale 1, Dr.S.S.Deshmukh 2 P.G. Student, Department of Mechanical engineering, PRMIT&R, Badnera, India 1 Associate

More information

Discovered Inefficiencies in Material Handling and Alternatives for Their Improvement in a Ginning Machine Manufacturing Company

Discovered Inefficiencies in Material Handling and Alternatives for Their Improvement in a Ginning Machine Manufacturing Company ISSN 2278 0211 (Online) Discovered Inefficiencies in Material Handling and Alternatives for Their Improvement in a Ginning Machine Manufacturing Company Dr. S. S. Deshmukh Associate Professor, Mechanical

More information

Risk Assessments, Method Statements & Quality Plans

Risk Assessments, Method Statements & Quality Plans Risk Assessments, Method Statements & Quality Plans Street, 55100 Kuala Lumpur, Malaysia. Tel: +60327326992 Mobile: +601 8909 0379 Fax: +60327326992 Risk Assessments, Method Statements & Quality Plans

More information

SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY

SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY Ramesh Marasini, Nashwan Dawood School of Science and Technology, Univerisity of Teesside, Middlesbrough

More information

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations Why use simulation? Accurate Depiction of Reality Anyone can perform a simple analysis manually. However, as the complexity of the analysis increases, so does the need to employ computer-based tools. While

More information

Department of Management Studies, Indian Institute of Science

Department of Management Studies, Indian Institute of Science Modeling Urban Traffic Planning through Strategic Decisions A case from Bangalore, India S Srinidhi ------------------------------ srinidhi@mgmt.iisc.ernet.in N R Srinivasa Raghavan ---------- raghavan@mgmt.iisc.ernet.in

More information

MANUFACTURING RE-ENGINEERING DESIGN IN AUTOMOTIVE ASSEMBLY OPERATION USING COMPUTER SIMULATION MODEL

MANUFACTURING RE-ENGINEERING DESIGN IN AUTOMOTIVE ASSEMBLY OPERATION USING COMPUTER SIMULATION MODEL MANUFACTURING RE-ENGINEERING DESIGN IN AUTOMOTIVE ASSEMBLY OPERATION USING COMPUTER SIMULATION MODEL Arya Wirabhuana Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Islam Negeri

More information

Nobilia: PC-based control increases efficiency in production logistics up to 15 percent

Nobilia: PC-based control increases efficiency in production logistics up to 15 percent worldwide germany PC Control 03 2018 Traverse conveyor vehicles and roller conveyors from Horstkemper automate part transport operations in kitchen production Nobilia: PC-based control increases efficiency

More information

Sujin Woottichaiwat. Received September 9, 2014; Accepted February 9, 2015

Sujin Woottichaiwat. Received September 9, 2014; Accepted February 9, 2015 Research Article Efficiency Improvement of Truck Queuing System in the Freight Unloading Process Case Study of a Private Port in Songkhla Province Sujin Woottichaiwat Department of Industrial Engineering

More information

Determining the Effectiveness of Specialized Bank Tellers

Determining the Effectiveness of Specialized Bank Tellers Proceedings of the 2009 Industrial Engineering Research Conference I. Dhillon, D. Hamilton, and B. Rumao, eds. Determining the Effectiveness of Specialized Bank Tellers Inder S. Dhillon, David C. Hamilton,

More information

THE PMP EXAM PREP COURSE

THE PMP EXAM PREP COURSE THE PMP EXAM PREP COURSE Session 2 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falconppm.com Agenda 9:00 10:15 Practice the PMP Questions 10:15 10:30 Break 10:30

More information

Thomas R. Kurfess, Ph.D., P.E.

Thomas R. Kurfess, Ph.D., P.E. Management and Planning Tools ME 2110 Creative Decisions and Design Thomas R. Kurfess, Ph.D., P.E. HUSCO/Ramirez Distinguished Chair in Fluid Power and Motion Control Woodruff School of Mechanical Engineering

More information

Correlation Relationships between Green Office Attributes and the Expected Returns of Investors from Green Office Buildings

Correlation Relationships between Green Office Attributes and the Expected Returns of Investors from Green Office Buildings Correlation Relationships between Green Office Attributes and the Expected Returns of Investors from Green Office Buildings Mona Isa 1,2, Megat Mohamed Ghazali Megat Abd. Rahman 2, Ting Kien Hwa 1 and

More information

MANAGEMENT INFORMATION SYSTEMS: DEFINITION AND ATTRIBUTION

MANAGEMENT INFORMATION SYSTEMS: DEFINITION AND ATTRIBUTION 1 MANAGEMENT INFORMATION SYSTEMS: DEFINITION AND ATTRIBUTION Amarin Tawata Faculty of Management Science Silpakorn University, Petchburi IT Campus 1 Moo 3 Tambon Sampraya Ampur Cha-Am Petchburi 76120,

More information

IMPROVEMENT OF PLANT FACILITY LAYOUT FOR BETTER LABOUR UTILISATION: CASE STUDY OF A CONFECTIONERY COMPANY IN THE WESTERN CAPE

IMPROVEMENT OF PLANT FACILITY LAYOUT FOR BETTER LABOUR UTILISATION: CASE STUDY OF A CONFECTIONERY COMPANY IN THE WESTERN CAPE IMPROVEMENT OF PLANT FACILITY LAYOUT FOR BETTER LABOUR UTILISATION: CASE STUDY OF A CONFECTIONERY COMPANY IN THE WESTERN CAPE E.J. Jordaan 1* and S. Matope 2 1 Department of Industrial Engineering University

More information

Customer Relationship Management Model in Higher Education: A Case of Malaysia

Customer Relationship Management Model in Higher Education: A Case of Malaysia Journal of Social Economics Vol. 1, No. 1, 2014, 1-10 Customer Relationship Management Model in Higher Education: A Case of Malaysia Hossein Ahmadi 1, Maryam Salahshour, Rad 2, Mehrbakhsh Nilashi 3, Othman

More information

IIE/RA Contest Problems

IIE/RA Contest Problems 1 CONTEST PROBLEM 7 IIE/RA Contest Problems Seventh Annual Contest: SM Testing SM Testing is the parent company for a series of small medical laboratory testing facilities. These facilities are often located

More information

Quality Improvement in Steel Rolling Industry through Quality Function Deployment (QFD): A Case Study in Ajmera Steel Rolling, Ratlam

Quality Improvement in Steel Rolling Industry through Quality Function Deployment (QFD): A Case Study in Ajmera Steel Rolling, Ratlam INSTITUTE OF TECHNOLOGY, NIRMA UNIVERSITY, AHMEDABAD 8 481, 08-10 DECEMBER, 011 1 Quality Improvement in Steel Rolling Industry through Quality Function Deployment (QFD): A Case Study in Ajmera Steel Rolling,

More information

Evaluation of Diverse Inventory Policies Using Simulation and Design of Experiment

Evaluation of Diverse Inventory Policies Using Simulation and Design of Experiment Evaluation of Diverse Inventory Policies Using Simulation and Design of Experiment Siri-on Setamanit Faculty of Commerce and Accountancy, Chulalongkorn University, Bangkok, Thailand Abstract--The importance

More information

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM Tan Hauw Sen Rimo 1, Engr. Mohd Soufhwee bin Abd Rahman 2, 1 tanhauwsr@utem.edu.my, 2 soufhwee@utem.edu.my LESSON OUTCOMES At the end

More information

Development of Production Layout Model to Improve Production Efficiency

Development of Production Layout Model to Improve Production Efficiency Development of Production Layout Model to Improve Production Efficiency A. R. AB Kadir, W.M.K.Sajidah, C.A. Mohd Norzaimi, K. Shahril, and M. Sabri, Universiti Kuala Lumpur Malaysian Spanish Institute,

More information

Simulation Modeling for End-of-Aisle Automated Storage and Retrieval System

Simulation Modeling for End-of-Aisle Automated Storage and Retrieval System Simulation Modeling for End-of-Aisle Automated Storage and Retrieval System Behnam Bahrami 1, a) El-Houssaine Aghezzaf 3, c) and Veronique Limere 1,2 Department of Industrial Systems Engineering and product

More information

Simulation of fruit pallet movement in the port of Durban: A case study

Simulation of fruit pallet movement in the port of Durban: A case study Volume 21 (1), pp. 63 75 http://www.orssa.org.za ORiON ISSN 0529-191-X c 2005 Simulation of fruit pallet movement in the port of Durban: A case study J Bekker M Mostert FE van Dyk Received: 1 February

More information

SELLING, DELIVERY AND TRADE MARKETING AN OPERATIONAL TRIDENT OF THE DISTRIBUTION SYSTEM

SELLING, DELIVERY AND TRADE MARKETING AN OPERATIONAL TRIDENT OF THE DISTRIBUTION SYSTEM Studies and Scientific Researches. Economics Edition, No 18, 2013 http://sceco.ub.ro SELLING, DELIVERY AND TRADE MARKETING AN OPERATIONAL TRIDENT OF THE DISTRIBUTION SYSTEM Ioana Olariu Vasile Alecsandri

More information

Staff Handbook Section G15. Work Experience at the V&A A guide for managers and students. Human Resources September 2013

Staff Handbook Section G15. Work Experience at the V&A A guide for managers and students. Human Resources September 2013 Staff Handbook Section G15 Work Experience at the V&A A guide for managers and students Human Resources September 2013 Contents: Introduction 3 Arranging a work experience placement 3 Types of placement

More information

Uncertain Supply Chain Management

Uncertain Supply Chain Management Uncertain Supply Chain Management 3 (2015) 283 288 Contents lists available at GrowingScience Uncertain Supply Chain Management homepage: www.growingscience.com/uscm Dynamic layout planning and its role

More information

Line Balancing through Cycle Time Reduction

Line Balancing through Cycle Time Reduction International Journal of Advance Industrial Engineering E-ISSN 2320 5539 2016 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijaie/ Research Article Kanagaraj A #, Vivek C #,

More information

MINOTAUR - A VICTIM OF ITS OWN SUCCESS? ACCOMMODATING EVOLVING AND CONFLICTING SOFTWARE REQUIREMENTS

MINOTAUR - A VICTIM OF ITS OWN SUCCESS? ACCOMMODATING EVOLVING AND CONFLICTING SOFTWARE REQUIREMENTS MINOTAUR - A VICTIM OF ITS OWN SUCCESS? ACCOMMODATING EVOLVING AND CONFLICTING SOFTWARE REQUIREMENTS Graeme Rainbird and Adam Pallant RM Consulting, The Post Office Technology Centre, Wheatstone Road,

More information

Material Flow Map and Layout Optimization: action plan and software validation

Material Flow Map and Layout Optimization: action plan and software validation Material Flow Map and Layout Optimization: action plan and software validation Domenico Falcone, Alessandro Silvestri, Vincenzo Duraccio, Gianpaolo Di Bona Department of Mechanics, Structures, Environment,

More information

Factors that influence layout

Factors that influence layout Facility Layout Design : Arrangement of machines, storage areas, and/or work areas usually within the confines of a physical structure, such as a retail store, an office, a warehouse, or a manufacturing

More information

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries Author Rahman, A., Chattopadhyay, G., Wah, Simon Published 2006 Conference Title Condition Monitoring and Diagnostic Engineering

More information

SCIENCE & TECHNOLOGY

SCIENCE & TECHNOLOGY Pertanika J. Sci. & Technol. 25 (S): 147-158 (2017) SCIENCE & TECHNOLOGY Journal homepage: http://www.pertanika.upm.edu.my/ Productivity Improvement in Automotive Component Company using Line Balancing

More information

RECTIFICATION IN PLANT LAYOUT BY IMPLEMENTATION OF 5S

RECTIFICATION IN PLANT LAYOUT BY IMPLEMENTATION OF 5S International Journal of Scientific Research in Engineering (IJSRE) Vol. (), March, 7 RECTIFICATION IN PLANT LAYOUT BY IMPLEMENTATION OF 5S Abhay Tiwari, Rishabh Dubey Student, Mechanical department, Laxmi

More information

THE IMPROVEMENT OF LINE EFFICIENCY ON DISASSEMBLY LINE BALANCING PROBLEM: AN HRRCD S HEURISTIC RULE

THE IMPROVEMENT OF LINE EFFICIENCY ON DISASSEMBLY LINE BALANCING PROBLEM: AN HRRCD S HEURISTIC RULE THE IMPROVEMENT OF LINE EFFICIENCY ON DISASSEMBLY LINE BALANCING PROBLEM: AN HRRCD S HEURISTIC RULE Yeoh Kim Hao and Sulaiman Hasan Department of Manufacturing and Industrial Engineering, Universiti Tun

More information

Learning Objectives. Identify the difference between job design, job analysis and job description. Understand how a job is design and developed

Learning Objectives. Identify the difference between job design, job analysis and job description. Understand how a job is design and developed Ibrahim Sameer Learning Objectives Identify the difference between job design, job analysis and job description. Understand how a job is design and developed Understand the factors affecting job design

More information

Journal of Industrial Engineering Research. The Study of Temperature Distribution for Fresh Fruit Bunch during Sterilization Process.

Journal of Industrial Engineering Research. The Study of Temperature Distribution for Fresh Fruit Bunch during Sterilization Process. IWNEST PUBLISHER Journal of Industrial Engineering Research (ISSN: 2077-4559) Journal home page: http://www.iwnest.com/aace/ The Study of Temperature Distribution for Fresh Fruit Bunch during Sterilization

More information

New Wayfinding Techniques in Pathfinder and Supporting Research

New Wayfinding Techniques in Pathfinder and Supporting Research New Wayfinding Techniques in Pathfinder and Supporting Research Charles Thornton, Richard O'Konski, Bryan Klein, Brian Hardeman, Daniel Swenson Thunderhead Engineering, 403 Poyntz Ave STE B, Manhattan,

More information

A Study on Natural Ventilation Performance in Selected Historical Building in Kuala Lumpur

A Study on Natural Ventilation Performance in Selected Historical Building in Kuala Lumpur A Study on Natural Ventilation Performance in Selected Historical Building in Kuala Lumpur Azlan-Shah Ali Building Performance and Diagnostic Research Group 2 nd Floor, Surveying Block Faculty of Built

More information

Boston Building Resources

Boston Building Resources Boston Building Resources Design Team Ramon E Faz, Isaac Lazoff Pedro Valenzuela Design Advisor Prof. Susan Freeman Sponsor Boston Building Resources Abstract Boston Building Resources (BBR) is a non-profit

More information

INTEGRATION OF STOCK KEEPING AREAS AND INVENTORY PLANNING

INTEGRATION OF STOCK KEEPING AREAS AND INVENTORY PLANNING INTEGRATION OF STOCK KEEPING AREAS AND INVENTORY PLANNING Murat Düzgün 1, Mehmet Tanyaş 2 Abstract Inventory are a company's merchandise, raw materials, semi-finished and finished products which have not

More information

An Adaptive Planning Tool for Ship Construction and Material Logistics

An Adaptive Planning Tool for Ship Construction and Material Logistics An Adaptive Planning Tool for Ship Construction and Material Logistics Kenyth Campbell Newport News Shipbuilding Newport News, VA Kenyth.W.Campbell@hii-nns.com ABSTRACT Newport News Shipbuilding (NNS)

More information

Module 1 Introduction. IIT, Bombay

Module 1 Introduction. IIT, Bombay Module 1 Introduction Lecture 1 Need Identification and Problem Definition Instructional objectives The primary objective of this lecture module is to outline how to identify the need and define the problem

More information

Simulation of Assembly Line Balancing in Automotive Component Manufacturing

Simulation of Assembly Line Balancing in Automotive Component Manufacturing IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Simulation of Assembly Line Balancing in Automotive Component Manufacturing To cite this article: Muthanna Jamil and Noraini Mohd

More information

CHAPTER 3 FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. In determining the requirement of a facility, three important consideration are: Flow

CHAPTER 3 FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. In determining the requirement of a facility, three important consideration are: Flow 1 CHAPTER 3 FLOW, SPACE, AND ACTIVITY RELATIONSHIPS Asst.Prof.Dr.BusabaPhruksaphanrat IE333 Industrial Plant Design Introduction 2 In determining the requirement of a facility, three important consideration

More information

Higher National Unit Specification. General information for centres. Facilities Layout and Analysis. Unit code: DT5N 35

Higher National Unit Specification. General information for centres. Facilities Layout and Analysis. Unit code: DT5N 35 Higher National Unit Specification General information for centres Unit title: Facilities Layout and Analysis Unit code: DT5N 35 Unit purpose: This Unit has been designed to allow candidates to develop

More information

Planning and Management Tools

Planning and Management Tools Planning and Management Tools Christopher Saldana, Ph.D. Woodruff School of Mechanical Engineering Georgia Institute of Technology Atlanta, Georgia USA Learning Objectives Understand the role of management

More information

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

Lean manufacturing concept: the main factor in improving manufacturing performance a case study Int. J. Manufacturing Technology and Management, Vol. 17, No. 4, 2009 353 Lean manufacturing concept: the main factor in improving manufacturing performance a case study N. Zakuan* Lecturer, UTHM, Parit

More information

Scheduling of Three FMS Layouts Using Four Scheduling Rules

Scheduling of Three FMS Layouts Using Four Scheduling Rules Scheduling of Three FMS Layouts Using Four Scheduling Rules Muhammad Arshad1 m.arshad8@bradford.ac.uk Milana Milana1 m.milana@student.bradford.ac.uk Mohammed Khurshid Khan1 M.K.Khan@bradford.ac.uk 1 School

More information

International Journal of Technical Research (IJTR) Vol. 5, Issue 1, Mar-Apr 2016

International Journal of Technical Research (IJTR) Vol. 5, Issue 1, Mar-Apr 2016 Experimental Study For Assembly Line Balancing Using Largest Candidate Rule Algorithm In Automoblie Lighting Industries A Case Study Ankur Malik 1, Umed Khod 2 1 M.Tech, Scholar, 2 Assistant Prof. Department

More information

IMPROVEMENT OF UNIVERSAL PARTS FOR PICK AND PLACE MACHINE IN SEMICONDUCTOR INDUSTRY USING QFD APPROACH

IMPROVEMENT OF UNIVERSAL PARTS FOR PICK AND PLACE MACHINE IN SEMICONDUCTOR INDUSTRY USING QFD APPROACH IMPROVEMENT OF UNIVERSAL PARTS FOR PICK AND PLACE MACHINE IN SEMICONDUCTOR INDUSTRY USING QFD APPROACH M. S. Abu Bakar, M. Z. Hassan, S. Bakhori, M. Y. M. Daud, S. Sarip and Z. Ismail 2 UTM Razak School

More information

APPLICATIONS OF THE GROUP TECHNOLOGY THEORY IN MANUFACTURING

APPLICATIONS OF THE GROUP TECHNOLOGY THEORY IN MANUFACTURING 7 th INTERNATIONAL MULTIDISCIPLINARY CONFERENCE Baia Mare, Romania, May 17-18, 2007 ISSN-1224-3264 APPLICATIONS OF THE GROUP TECHNOLOGY THEORY IN MANUFACTURING Jozef Novak-Marcincin Prof. Ing. PhD., Faculty

More information

A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP. Deidra L. Donald

A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP. Deidra L. Donald Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP Deidra L. Donald

More information

Oracle Technical Cloud Consulting Services Descriptions. January 25, 2018

Oracle Technical Cloud Consulting Services Descriptions. January 25, 2018 Oracle Technical Cloud Consulting Services Descriptions January 25, 2018 Services B83899 - Oracle Consulting Architecture Blueprint and Roadmap for Oracle Cloud... 2 B83896 - Oracle Consulting Rapid Start

More information

A Case Study of Lead Time Reduction by Transformation to Cellular Production

A Case Study of Lead Time Reduction by Transformation to Cellular Production IOSR Journal of Engineering (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 06, Issue 02 (February. 2016), V1 PP 53-58 www.iosrjen.org A Case Study of Lead Time Reduction by Transformation to Cellular

More information

NBR E-JOURNAL, Volume 1, Issue 1 (Jan-Dec 2015) ISSN EVALUATION OF TRAINING AND DEVELOPMENT FOR ORGANIZATIONAL COMPETITIVENESS

NBR E-JOURNAL, Volume 1, Issue 1 (Jan-Dec 2015) ISSN EVALUATION OF TRAINING AND DEVELOPMENT FOR ORGANIZATIONAL COMPETITIVENESS EVALUATION OF TRAINING AND DEVELOPMENT FOR ORGANIZATIONAL COMPETITIVENESS Ravindra Dey Professor and Head of Organizational Behaviors, Xavier Institute of Management and Research, Mumbai Human Resource

More information

SIMULATION MODEL DESIGN OF REFUELING SYSTEM AT PERTAMINA ALAM SUTERA GAS STATION

SIMULATION MODEL DESIGN OF REFUELING SYSTEM AT PERTAMINA ALAM SUTERA GAS STATION SIMULATION MODEL DESIGN OF REFUELING SYSTEM AT PERTAMINA ALAM SUTERA GAS STATION Abel Anthony, Eric Jobiliong, Enda D. Layuk Allo. Department of Industrial Engineering, University of Pelita Harapan, Karawaci,

More information

The Influence of Perceptions of Training towards Affective Commitment: A Conceptual Paper

The Influence of Perceptions of Training towards Affective Commitment: A Conceptual Paper The Influence of Perceptions of Training towards Affective Commitment: A Conceptual Paper Mikkay Wong Ei Leen, Rabeatul Husna Abdull Rahman, Halimah Mohd Yusof, Umar Haiyat Abdul Kohar To Link this Article:

More information

Agile Plus Comprehensive model for Software Development

Agile Plus Comprehensive model for Software Development Agile Plus Comprehensive model for Software Development Amit Juyal Umesh Kumar Tiwari Lata Nautiyal Shashidhar G. Koolagudi Assistant Professor Assistant Professor Assistant Professor Professor Graphic

More information

TPM IMPLEMENTATION CAN PROMOTE DEVELOPMENT OF TQM CULTURE: EXPERIENCE FROM A CASE STUDY IN A MALAYSIAN MANUFACTURING PLANT

TPM IMPLEMENTATION CAN PROMOTE DEVELOPMENT OF TQM CULTURE: EXPERIENCE FROM A CASE STUDY IN A MALAYSIAN MANUFACTURING PLANT Proceedings of the International Conference on Mechanical Engineering 2007 (ICME2007) 29-31 December 2007, Dhaka, Bangladesh ICME07- TPM IMPLEMENTATION CAN PROMOTE DEVELOPMENT OF TQM CULTURE: EXPERIENCE

More information

Industrial Design and Simulation of a JIT Material Handling System

Industrial Design and Simulation of a JIT Material Handling System Industrial Design and Simulation of a JIT Material Handling System Chukwuedozie N. Ezema, Eric C. Okafor and Christiana C. Okezie Abstract A JIT Material Handling System attempts to manufacture products

More information

Container Transport Operator Access Terms & Conditions

Container Transport Operator Access Terms & Conditions Container Transport Operator Access Terms & Conditions (Last Updated 21 September 2017) These Terms & Conditions govern the entry into and use of ACFS Port Logistics, ACFS e-depot ( e-depot ) by Container

More information

Session 5 - MECHANICAL ENGINEERING PROFILE, ITS IMPORTANCE AND APPLICATION

Session 5 - MECHANICAL ENGINEERING PROFILE, ITS IMPORTANCE AND APPLICATION INTRO TO INDUSTRIAL ENGINEERING SESSION 5 1 Session 5 - MECHANICAL ENGINEERING PROFILE, ITS IMPORTANCE AND APPLICATION Definition of Industrial Engineering The formal definition of industrial engineering

More information

Continuous Improvement Toolkit. Questionnaires. Continuous Improvement Toolkit.

Continuous Improvement Toolkit. Questionnaires. Continuous Improvement Toolkit. Continuous Improvement Toolkit Questionnaires The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis

More information

REALIZING CONCURRENT ENGINEERING IN PRODUCT DEVELOPMENT: A SURVEY ON TWO WHEELER AUTO INDUSTRY

REALIZING CONCURRENT ENGINEERING IN PRODUCT DEVELOPMENT: A SURVEY ON TWO WHEELER AUTO INDUSTRY REALIZING CONCURRENT ENGINEERING IN PRODUCT DEVELOPMENT: A SURVEY ON TWO WHEELER AUTO INDUSTRY Dr. V.Venkata Ramana 1, H.M. Anil Kumar 2, B.Nagaraj 3 1 Professor, 2, 3 Asst. Professor, Department of Mechanical

More information

PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING

PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING Proceedings of the 2007 Winter Simulation Conference S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, eds. PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING Charles Harrell

More information

Shop-Trak SyteLine 9.00.XX Shop Floor Training Guide. Product Manual

Shop-Trak SyteLine 9.00.XX Shop Floor Training Guide. Product Manual Product Manual Shop-Trak 2015 SyteLine 9.00.XX Shop Floor Training Guide The Lake Companies, Inc. 2980 Walker Drive, Green Bay, WI 54311 920.406.3030 www.lakeco.com The Lake Companies, Inc. is an authorized

More information

Correlation Analysis of Building Performance and Occupant s Satisfaction via Post Occupancy Evaluation for Malaysia s Public Buildings

Correlation Analysis of Building Performance and Occupant s Satisfaction via Post Occupancy Evaluation for Malaysia s Public Buildings Fifth International Conference on Construction in the 21 st Century (CITC-V) Collaboration and Integration in Engineering, Management and Technology May 20-22, 2009, Istanbul, Turkey Correlation Analysis

More information

Loading Control of Complex Conveyor System

Loading Control of Complex Conveyor System Loading Control of Complex Conveyor System PEEP MIIDLA, JENS HAUG Institute of Mathematics, VKG AS University of Tartu Liivi 2, 50409 Tartu ESTONIA peep.miidla@ut.ee Abstract: - Problem of conveyor system

More information

MODELING OF A SHAFT PRODUCTION SYSTEM

MODELING OF A SHAFT PRODUCTION SYSTEM , TECHNOLOGIES IN MACHINE BUILDING, ISSN 11-5, 15 MODELING OF A SHAFT PRODUCTION SYSTEM Florin BURUIANA 1, Mihaela BANU, Alice BURUIANA 1 1 Department of Manufacturing Engineering, Faculty of Engineering,

More information

Performance Appraisal amongst Contractors in Construction Project in Malaysia Siti Hafiza Mat Yahya 1, a and Syuhaida Ismail 2,b

Performance Appraisal amongst Contractors in Construction Project in Malaysia Siti Hafiza Mat Yahya 1, a and Syuhaida Ismail 2,b Performance Appraisal amongst Contractors in Construction Project in Malaysia Siti Hafiza Mat Yahya 1, a and Syuhaida Ismail 2,b 1 UTM Razak School of Engineering and Advanced Technology, UTM Kuala Lumpur,

More information

ISO Certification Initiatives Prove the Commitment to Sustainability

ISO Certification Initiatives Prove the Commitment to Sustainability Communications in Applied Sciences ISSN 2201-7372 Volume 1, Number 2, 2013, 188-200 ISO Certification Initiatives Prove the Commitment to Sustainability Wai Onn Hong Processing Department, Genting Plantations

More information

9.7 Summary. 9.8 Training Cases. 394 Business Process Modeling, Simulation and Design

9.7 Summary. 9.8 Training Cases. 394 Business Process Modeling, Simulation and Design 394 Business Process Modeling, Simulation and Design experience more than 14 min of cycle time under the new design, which more than satisfies the goal of at most 30 min. Furthermore, no type 3 patient

More information

Journal of Multidisciplinary Engineering Science and Technology (JMEST) ISSN: Vol. 1 Issue 5, December

Journal of Multidisciplinary Engineering Science and Technology (JMEST) ISSN: Vol. 1 Issue 5, December INVENTORY CONTROL MODELS IN THE PRIVATE SECTOR OF NIGERIAN ECONOMY A CASE STUDY OF CUTIX PLC NNEWI, NIGERIA. Chikwendu, C. R. Department of Mathematics, Faculty of Physical Sciences, Nnamdi Azikiwe University,

More information

IBS Electronics, Inc.

IBS Electronics, Inc. ******************************* *** Quality Policy Manual ISO9001:2015 Uncontrolled When Printed 3506-D W. Lake Center Dr. Santa Ana, Ca 92704 U.S.A. 714.751.6633 800.527.2888 714.751.8159 FAX. E-mail:

More information

DESIGN FOR ERGONOMICS: CHAIR DESIGN FOR AGEING EMPLOYEES

DESIGN FOR ERGONOMICS: CHAIR DESIGN FOR AGEING EMPLOYEES DESIGN FOR ERGONOMICS: CHAIR DESIGN FOR AGEING EMPLOYEES Péter György Horváth Zsolt Kovács University of West-Hungary Faculty of Wood Science Institute of Product Design and Manufacturing Technologies

More information

Work System Design Dr. Inderdeep Singh Department of Mechanical and Industrial Engineering Indian Institute of Technology Roorkee

Work System Design Dr. Inderdeep Singh Department of Mechanical and Industrial Engineering Indian Institute of Technology Roorkee Work System Design Dr. Inderdeep Singh Department of Mechanical and Industrial Engineering Indian Institute of Technology Roorkee Lecture-53 Ergonomics: Anthropometry Namaskar friends. Welcome to session

More information