1 Pertanika J. Sci. & Technol. 25 (S): (2017) SCIENCE & TECHNOLOGY Journal homepage: Productivity Improvement in Automotive Component Company using Line Balancing Muhammad Fikri Alif Dzulkarnain and Wan Emri Wan Abdul Rahaman* Faculty of Mechanical Engineering, Universiti Teknologi MARA (UiTM), Shah Alam, Selangor Darul Ehsan, Malaysia ABSTRACT One of the issues found in small and medium industry is the poor layout design affecting its productivity and line efficiency. In automotive industries, more attention should be given in improving assembly line to increase productivity. This paper presents application of line balancing at the accelerator and brake pedal assembly line at a small and medium automotive industry. Research methodology employed in this study includes time study, visualising cycle time based on Yamazumi Chart, distribution of workload on each workstation using line balancing based on the current takt time and re-layouting the assembly line. All the proposed layouts are assessed using commercially available software, DELMIA Quest to evaluate the robustness based on parameters such as fluctuation in demand, availability of the machine, and operator capacity. Finally, the outputs presented include reduction in manpower, maximum utilisation of manpower, as well as machine and minimum total production cost. This will lead to productivity improvement of the assembly line. Keywords: Automotive industry, line balancing, production efficiency INTRODUCTION Today, the automotive industry is facing new challenges as a result of globalisation, ARTICLE INFO Article history: Received: 25 October 2016 Accepted: 17 March addresses: fikrialiff@yahoo.com.my (Muhammad Fikri Alif Dzulkarnain), wanemri@salam.uitm.edu.my (Wan Emri Wan Abdul Rahaman) *Corresponding Author customisation and greater competition. Therefore, it is important for manufacturers to produce good quality products and meet customers demand. In order to achieve these, the industries have applied the Lean Manufacturing (LM) System, a philosophy of production that integrates a collection of principles, tools and techniques into the business processes to improve time, workers, resources and productivity, while refining the quality level of products and services to their customers (Holweg, 2007). Due to its ISSN: Universiti Putra Malaysia Press.

2 Muhammad Fikri Alif Dzulkarnain and Wan Emri Wan Abdul Rahaman worldwide advantage in cost, quality, flexibility and quick response, LM has become widely acceptable and adoptable best manufacturing practice across countries and industries (Womack, Jones, & Roos, 1990; Diego-Mas et al., 2009). The main objectives of LM are to reduce the cost of products and improve productivity by eliminating wastes or non-value added activities (Vaidya et al., 2013). Plant layout design has become important in today s industry as it can positively impact the work efficiency. A good layout will maximise the overall efficiency of operations. Research on facility layout of a production line has always been a crucial research area of the industrial engineering field (Tompkins, 1996). An effective plant layout requires the ability to position employees, materials, machines, equipment, and other manufacturing supports and facilities at the right place. Designing an efficient layout will help in reducing production cycles, workin-progress, idle times, number of bottlenecks, or material handling times, and increasing production output. A good placement of facilities contributes to the overall efficiency of operations and reduces it up to 50% the total operating expenses (Taj, & Berro, 2006). This paper focuses on productivity improvement at an automotive assembly line for accelerator and brake pedals. The objective of this work is to study the current assembly line system using time study and Yamazumi chart. Based on these, problems in the existing layout would then be listed. Several newly proposed layouts have been presented and analysed using DELMIA Quest. The optimum layout was proposed to the manufacturer. METHOD The general methodology of this study is presented in Figure 1. Initially, the time study was performed at the existing layout. Then, the Yamazumi chart analysis was constructed to evaluate the idle time of each workstation. Meanwhile, the takt time was calculated using Equation [1] (Heizer & Render, 2009), as follows: Takt time = Total available time in seconds/customer demand per day [1] 148 Pertanika J. Sci. & Technol. 25 (S): (2017)

3 Productivity Improvement in Automotive Component Company Figure 1. General method The value of takt time was then used for rebalance analysis. However, the number of minimum workstation was calculated before conducting the rebalance analysis. The minimum number of workstation was calculated using Equation [2], as presented by Heizer and Render (2009). Minimum number of workstations = Total cycle time / takt time [2] Total cycle time is the time required by each operator at each workstation to complete the task. After rebalance analysis was conducted, several proposed improved layouts were prepared and analysed using DELMIA Quest. The optimum layout in terms of productivity, efficiency and cost was then selected. Efficiency of the layout was calculated using Equation [3] based on the work of Heizer and Render (2009): Efficiency = Total task time/ (No of workstations)( Largest assigned cycle time) [3] Current Layout Analysis The study on assembly line assembling accelerator and brake pedals has been conducted to determine their efficiency. The operator motion and material movement path, from the raw Pertanika J. Sci. & Technol. 25 (S): (2017) 149

4 Muhammad Fikri Alif Dzulkarnain and Wan Emri Wan Abdul Rahaman material up to the finished goods, are shown in Figure 2. The process was categorised into 4 stations consisting of assembly and welding; assembly and inspection; assembly and inspection; and final assembly, where the only machine involved in this operation was the spot welding machine. Figure 2. Current assembly line layout Based on the current layout shown in Figure 2, Operator 1 assembled five components using a jig on the worktable and welded all the sections using the spot welding machine. Then, the base part was transferred to SIPS 1, which is also known as Standard in Process Stock, that was the hold area for the waiting parts before they went to the next process. In the simulation model, buffer acted as SIPS. Next, Operator 2 inspected and assembled the snap and fit for the mother part. Operator 3 inspected, assembled snap and fit, assembled the bushes, brake cover and parts for the accelerator and brake pedals. The finished assembled accelerator and brake pedals were put separately on SIPS 3 and SIPS 4. Operator 4 assembled the base part, tension spring, bolts and nuts, accelerator and brake pedal using jig and power tool. Finally, the finished good was put on the finished good rack. The takt time for the current layout is 60 second per piece. This is based on the total working duration of 31,500 seconds and the demand per day is 525 pieces. Meanwhile, the efficiency of the current layout is 59.08%. Based on the time study that had been conducted, all the data from the current assembly line were visualised in a stack bar chart. Based on Figure 3, the average cycle time for Operator 1 is 42.4 seconds, Operator 2 is 19.1 seconds, Operator 3 is 44.7 seconds and Operator 4 is 35.6 seconds. The main problem with the current layout is the unbalanced workload between each workstation that leads to bottleneck and high idle time. 150 Pertanika J. Sci. & Technol. 25 (S): (2017)

5 conducted, all the data from the current assembly line were visualised in a stack bar chart. Based on Figure 3, the average cycle time for Operator 1 is 42.4 seconds, Operator 2 is 19.1 seconds, Operator 3 is 44.7 seconds and Operator 4 is 35.6 seconds. The main problem with the current layout is the unbalanced workload between each workstation that Productivity Improvement in Automotive Component Company leads to bottleneck and high idle time. Figure 3. The Yamazumi chart for the current assembly line layout Figure 3. The Yamazumi chart for the current assembly line layout ProposedProposed LayoutLayout to reduce time,manpower, manpower, and total production cost. Three RebalanceRebalance is doneistodone reduce the the idleidle time, and total production cost.new Three new layouts were proposed and analysed to evaluate their effectiveness in improving the productivity layouts were proposed and analysed to evaluate their effectiveness in improving the of the assembly line. The minimum number of workstation needed to be calculated. Based productivity of the assembly line. The minimum number of workstation needed to be on the total cycle time of s and takt time of 60 s, the minimum number of workstation calculated. Based on the total cycle time of s and takt time of 60 s, the minimum required is 3. number of workstation required is 3. Figure 4. Propose assembly line (layout 1) Figure 4. Propose assembly line (layout 1) For the proposed layout 1 as shown in Figure 4, the number of workers can be reduced from Forthree the proposed layout as shown in Figure 4, the number of eliminated workers can and be reduced four to only operators. The1 operator 2 workstation could be the task is then delegatedfrom between and operator 4. Operator 1 would takebethe assembly four tooperator only three1operators. The operator 2 workstation could eliminated and of thesnap and fit for the mother part task from the previous operator 2 before the mother part is put on SIPS task is then delegated between operator 1 and operator 4. Operator 1 would take the 1. After that, additional parts for the snap and fit are put on the worktable besides Operator 1. of snap and for the mother part task the fromprevious the previous operator 2, 2 before the Operator assembly 4 will conduct thefitremaining tasks from Operator i.e. checking the quality on the mother part by marking on the required sections. By giving the previous tasks mother part is put on SIPS 1. After that, additional parts for the snap and fit are put on the worktable besides Operator 1. Operator 4 will conduct the remaining tasks from the Pertanika J. Sci. & Technol. 25 (S): (2017) previous Operator 2, i.e. checking the quality on the mother part by marking on the 151

6 Muhammad Fikri Alif Dzulkarnain and Wan Emri Wan Abdul Rahaman from Operator 2 to operator 1 and operator 4, some tasks from Operator 4 could be eliminated, i.e. taking mother part from SIPS 2. This will reduce 3.5 seconds from the overall task times. Instead of doing that, after quality check based on marking, the mother part could be put straight on the jig, which may take around 0.9 seconds. There was no proper rack for SIPS 2 as previously the completed mother part by operator 2 was either put on the worktable or put back on SIPS 1. The worktable of the previous Operator 2 was moved nearer to the worktable of Operator 4 in order to minimise the time wasted for walking and thus, ease the movement of the operator to do the tasks. As for Operator 3, all the tasks that were required to be done would remain. This could reduce a total of 3.5 seconds from the overall task time. Figure 5 shows the Yamazumi chart that summarises the time taken to complete the task at each workstation. Figure 5. Yamazumi chart for the proposed assembly line (Layout 1) Figure 5. Yamazumi chart for the proposed assembly line (Layout 1) For the proposed layout 2 shown in Figure 6, the number of workers can be reduced from four to three operators. This layout shows one piece flow of material, where the material flow from left to right in one direction as compared to the original layout, where the finished goods end at the centre of the layout. Based on this proposed layout, the operator who was involved in the final assembly was moved to the end position. Some of the tasks by Operator 3 previously (e.g., acquiring the accelerator pedal, checking the hole for the snap and fit, and quality checking using the marker) could be transferred to Operator 4. Additional work is given to Operator 1, where he/ she would take the assembly of snap and fit for the mother part from Operator 2 before the mother part was put on SIPS 1. Additional parts for the snap and fit are put on the working table next to Operator 1. Operator 3 would take the tasks from Operator 2 which includes checking the quality of the mother part based on marking the required sections. The worktable was moved nearer to Operator 3 in order to minimize the time waste due to walking. It was proposed that Operator 4 takes the task done by Operator 2 previously, which includes 152 Pertanika J. Sci. & Technol. 25 (S): (2017)

7 Operator 1. Operator 3 would take the tasks from Operator 2 which includes checking the quality of the mother part based on marking the required sections. The worktable was moved nearer to Operator 3 in order to minimize the time waste due to walking. It was Productivity in Automotive Component Companywhich includes proposed that Operator 4 takesimprovement the task done by Operator 2 previously, quality checking based on marking mother part, other thanproducing producingthe thefinal finalassembly quality checking based on marking on on thethe mother part, other than of allassembly parts. The rack was moved to the endtoofthe theend assembly line. Figure of finished all parts. goods The finished goods rack was moved of the assembly line. 7 shows the Yamazumi chart that summarises the time taken to complete the task at each workstation Figure 7 shows the Yamazumi chart that summarises the time taken to complete the task at for the proposed Layout 2. each workstation for the proposed Layout 2. FigureFigure 6. The6.proposed assembly line (Layout 2) The proposed assembly line (Layout 2) SIPS 3 Figure 7. The Yamazumi chart for the proposed assembly line (Layout 2) Figure 7. The Yamazumi chart for the proposed assembly line (Layout 2) For the proposed Layout 3 (Figure 8), the number of workers can be reduced from four to three operators.for Based the original Operator who was with final assembly the on proposed Layoutlayout, 3 (Figure 8), the4number of involved workers can bethe reduced from is moved to the end position. All the tasks for operator 1 remain the same. Operator 3 will four to three operators. Based on the original layout, Operator 4 who was involved with take all the previous tasks from Operator 2, except for checking the quality of the mother part by marking requiredis sections operator 4. operator The finished goods the finalthe assembly moved tothat the are end transferred position. Alltothe tasks for 1 remain the rack is moved to the end of the assembly line. A total of 1.1 second could be reduced from the same. 3 will take allcomes the previous tasks from Operator except for4.checking overall taskoperator time, which mainly from the previous tasks by2,operator Figure 9the shows the Yamazumi that summarises the the timerequired taken to complete the transferred task at each quality of chart the mother part by marking sections that are to workstation. operator 4. The finished goods rack is moved to the end of the assembly line. A total of 1.1 second could be reduced from the overall task time, which mainly comes from the previous tasks Pertanika J. Sci. &the Technol. 25 (S): that (2017) by Operator 4. Figure 9 shows Yamazumi chart summarises the time taken to 153 complete the task at each workstation.

8 Muhammad Fikri Alif Dzulkarnain and Wan Emri Wan Abdul Rahaman Figure 8. Proposed assembly line (Layout 3) Figure 8. Proposed assembly line (Layout 3) Figure 8. Proposed assembly line (Layout 3) SIPS 1 SIPS 1 Figure 9. The Yamazumi chart for the proposed assembly line (Layout 3) Figure 9. The Yamazumi chart for the proposed assembly line (Layout 3) Figure 9. The Yamazumi chart for the proposed assembly line (Layout 3) RESULTS AND DISCUSSION All the proposed layouts have been analysed using DELMIA Quest in order to check the RESULTS AND DISCUSSION effectiveness of eachand layout in terms of their productivity and line efficiency. The outcome was RESULTS DISCUSSION All the proposed layouts have been analysed using DELMIA Quest in order to check the further analysed to determine the optimum layout in improving productivity. The simulation All the proposed layouts have been analysed using DELMIA Quest in order to check the effectiveness of each in terms of their which productivity and available line efficiency. The outcome was run at 100% efficiency, or layout 31,500 seconds, is the time for the production of each indetermine terms ofthe their productivity and line efficiency. The outcome line to run effectiveness daily. itlayout is toimpossible tooptimum run thelayout production lineproductivity. at 100% efficiency due washowever, further analysed in improving The to the machine and limitation of the operator to run constantly and efficiently throughout the was further analysed the optimum inwhich improving productivity. The simulation was runtoat determine 100% efficiency, or 31,500layout seconds, is the available time for shift. Therefore, some allowances need to be applied to the machine availability and operator simulation was run at 100% efficiency, or 31,500 seconds, which is the available time for capacity. There are three types of allowance identified such as setup, breakdown and fatigue of the operators, as shown in Table 1. Table 1 Total machine availability and operator capacity per shift in the assembly line Type of allowance Setup allowance Breakdown allowance Operator fatigue allowance 154 Percentage of allowance (%) Pertanika J. Sci. & Technol. 25 (S): (2017)

9 Productivity Improvement in Automotive Component Company Based on the information in Table 1, the new line efficiency is expected to be 85%. In order to check the overall efficiency and productivity of all the proposed layouts, simulation was performed for 26,775 seconds, which is the available time for the production line to run daily when the line is running at 85% efficiency. Table 2 and Table 3 show the comparison between the current layout and the proposed layouts when the line was running at 100% and 85% efficiency, respectively. Table 2 A comparison between the current layout and three proposed layouts when labours and machines worked at 100% efficiency Key Performance Index (KPI) Existing layout Proposed layout No. of workers Productivity (pieces/ day) Labour productivity (pieces/ hour/ man) Line efficiency (%) Table 3 A comparison between the current layout and three proposed layouts when labours and machines worked at 85% efficiency Key Performance Index (KPI) Existing layout Proposed layout No. of workers Productivity (pieces/ day) Labour productivity (pieces/ hour/ man) Line efficiency (%) Based on the existing layout, the simulated results showed that it was capable to produce 702 pieces and 594 pieces per day when the line was running at 100% and 85% efficiency, respectively. The existing layout has no problem to achieve the current demand of 525 pieces per day even when the line is running at 85% efficiency. However, it requires 4 workers to assemble the component. The proposed layout requires three workers and this could result in a saving of about RM12,000 annually for eliminating one manpower. Based on the three proposed layouts, layout 3 was eliminated because the productivity had a short of 3 pieces when the assembly line was at 85% efficiency. In reality, the production line would be expected to run at an efficiency of as low as 85% as no production line could operate at 100% efficiency when taking into account the time consumed for setup, breakdown and operator fatigue. Meanwhile, the proposed layout 1 is preferred because it performs better in terms of production capacity, labour productivity and able to meet the daily demands of 525 pieces. Based on the data presented in Table 2 and Table 3, the results for the proposed layout 1 show that the daily production output was 661 and 561 pieces, respectively, when the line ran at Pertanika J. Sci. & Technol. 25 (S): (2017) 155

10 Muhammad Fikri Alif Dzulkarnain and Wan Emri Wan Abdul Rahaman 100% and 85% efficiency, where it could produce more than required. The proposed layout 1 is much better than layout 2 in terms of productivity, whereby it exceeds as much as 36 pieces based on the current demand compared 22 pieces achieved by layout 2. The one with the higher productivity is better as the efficiency might drop below 85%. The proposed layout 1 is much better in coping with the fluctuation in customers demand and when the efficiency drops below 85%. In addition, the proposed layout 1 incurs lower cost as compared to layout 2. The proposed layout 1 would only require the operator to move closer to the worktable compared to the original layout. Other than that, additional cost is required to produce a proper rack for SIPS 2, in which the original layout required operator 2 to just put the complete assembled part either on the worktable or on SIPS 1 again. The proposed layout 2 is costly to be implemented because it uses hydraulic system power tools for operator 4 to tighten bolts and nuts. As the worktable is to be moved to the end, a lot of adjustment is required to attach the hydraulic system to the worktable of Operator 4. Additional cost is also required to make an additional proper rack for SIPS 2. CONCLUSION The objective of this study is to improve productivity in the automotive industry using line balancing technique. Performance of the existing layout is unsatisfactory due to low efficiency and high idle time. Three proposed layouts have been presented and compared in terms of their manpower requirement, line efficiency, labour productivity, production capacity and manpower utilisation. All the three proposed layouts have also been tested in terms of robustness so as to determine the optimum layout when the production line works at 100% and 85% efficiency, respectively, and when there is fluctuation in customers demand. The effectiveness of each layout has been simulated and evaluated using DELMIA Quest. The results show that all the proposed layout presented the same results in terms of reduction in manpower. Overall, the proposed layout 1 was found to be the optimum layout in terms of line efficiency, labour productivity, production capacity and robustness when the line works at 100% and 85% efficiency, although layouts 2 and 3 were shown to be better in terms of line efficiency. Based on the calculation, the proposed layout 1 could save up to RM12,000 per year, which is a significant cost saving in the overall revenue for the company. Therefore, the proposed layout 1 is recommended for the management of a company as it will reduce one operator in the assembly line, and increase the utilisation of operators, line efficiency, and labour productivity. Thus, this could increase the company s overall productivity. This study has proven that in line balancing issue, efficiency may not be the only criterion or measurement that may be used to decide the best layout, especially in cases where options are almost equivalent to each other. In this study, the robustness of all the three proposed layouts against various important parameters, such as fluctuation in demand and production output when the workers and machine runs at 100% and 85% efficiency, had been considered. A robust layout will have the capacity to perform better in an actual live environment where change and uncertainty are common. 156 Pertanika J. Sci. & Technol. 25 (S): (2017)

11 ACKNOWLEDGEMENT Productivity Improvement in Automotive Component Company The authors would like to thank Suria Component Manufacturing (M) Sdn Bhd, for providing all necessary facilities and information for this research. REFERENCES Diego-Mas, J. A., Santamarina-Siurana, M. C., Alcaide-Marzal J., & Cloquell-Ballester, V. A. (2009). Solving facility layout problems with strict geometric constraints using a two-phase genetic algorithm. International Journal of Production Research, 47(6), Heizer, J., & Render, B. (2009). Flexible Edition Operations Management (9 th Ed.). Pearson International Edition, Holweg, M. (2007). The genealogy of lean production. Journal of Operations Management, 25(2), Taj, S., & Berro, L. (2006). Application of constrained management and lean manufacturing in developing best practices for productivity improvement in an auto-assembly plant. International Journal of Productivity and Performance Management, 55(3), Tompkins, J. A. (1996). Facilities planning (2 nd ed.). New York: Wiley. Vaidya, R. D., Shende, P. N., Ansari N. A., & Sorte S. M. (2013). Analysis plant layout for effective production. International Journal of Engineering and Advanced Technology (IJEAT), 2(3), Womack, J. P., Jones, D. T., & Roos, D. (1990). The Machine That Change the World. New York: Rawson Associates Scribner. Pertanika J. Sci. & Technol. 25 (S): (2017) 157

12

IMPROVEMENT OF OVERALL EFFICIENCY OF PRODUCTION LINE BY USING LINE BALANCING

IMPROVEMENT OF OVERALL EFFICIENCY OF PRODUCTION LINE BY USING LINE BALANCING IMPROVEMENT OF OVERALL EFFICIENCY OF PRODUCTION LINE BY USING LINE BALANCING Ahmad Naufal Adnan 1, Nurul Ain Arbaai 2 and Azianti Ismail 1 1 Faculty of Mechanical Engineering, Universiti Tekninology Mara

More information

Integrating Big Island Layout with Pull System for Production Optimization

Integrating Big Island Layout with Pull System for Production Optimization Integrating Big Island Layout with Pull System for Production Optimization M. H. M. Rusli, A. Jaffar, M. T. Ali, and S. Muhamud @ Kayat Abstract Lean manufacturing is a production philosophy made popular

More information

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process Journal of Mechanical Engineering Vol SI 4 (1), 47-60, 2017 Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process Seha Saffar * Centre

More information

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

Lean manufacturing concept: the main factor in improving manufacturing performance a case study Int. J. Manufacturing Technology and Management, Vol. 17, No. 4, 2009 353 Lean manufacturing concept: the main factor in improving manufacturing performance a case study N. Zakuan* Lecturer, UTHM, Parit

More information

APPLICATION OF LEAN METHODS FOR IMPROVEMENT OF MANUFACTURING PROCESSES

APPLICATION OF LEAN METHODS FOR IMPROVEMENT OF MANUFACTURING PROCESSES APPLICATION OF LEAN METHODS FOR IMPROVEMENT OF MANUFACTURING PROCESSES György KOVÁCS 1,a ABSTRACT: Changing market environment, increasing global competition and fluctuating customer demands require efficient

More information

Systematic Planning Layout and Line Balancing for Improvement in an Armoured Vehicle Manufacturing Plant

Systematic Planning Layout and Line Balancing for Improvement in an Armoured Vehicle Manufacturing Plant Proceedings of the International Conference on Industrial Engineering and Operations Management Rabat, Morocco, April 11-13, 2017 Systematic Planning Layout and Line Balancing for Improvement in an Armoured

More information

International Journal of Technical Research (IJTR) Vol. 5, Issue 1, Mar-Apr 2016

International Journal of Technical Research (IJTR) Vol. 5, Issue 1, Mar-Apr 2016 Experimental Study For Assembly Line Balancing Using Largest Candidate Rule Algorithm In Automoblie Lighting Industries A Case Study Ankur Malik 1, Umed Khod 2 1 M.Tech, Scholar, 2 Assistant Prof. Department

More information

EDMM Cycle Time Definitions and Line Balancing (Yamazumi) Charting

EDMM Cycle Time Definitions and Line Balancing (Yamazumi) Charting EDMM 487 Cycle Time Definitions and Line Balancing (Yamazumi) Charting 1 EDMM 487 2 EDMM 487 Ideal Cycle Time: The maximum time (generally in seconds) to perform a process; in terms of Standardized Work,

More information

A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION

A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION Intan Bazliah Mohd Faculty of Engineering Technology, Universiti Malaysia Pahang, Lebuhraya Tun Razak, 26300 Kuantan, Pahang Email: intanbazliahmohd80@gmail.com

More information

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processes, the Value-Added and Non-Value Added. 2. The later

More information

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processes, the Value-Added and Non-Value Added. 2. The later

More information

TOPIC 2 : WORK METHODS 2.1 Elemental breakdowns 2.2 Performance rating 2.3 Personal, fatigue, unavoidable delay allowances 2.4 Workload and line balan

TOPIC 2 : WORK METHODS 2.1 Elemental breakdowns 2.2 Performance rating 2.3 Personal, fatigue, unavoidable delay allowances 2.4 Workload and line balan TOPIC 2 WORK METHODS TOPIC 2 : WORK METHODS 2.1 Elemental breakdowns 2.2 Performance rating 2.3 Personal, fatigue, unavoidable delay allowances 2.4 Workload and line balancing 2.5 Machine and process studies

More information

LEAN PRODUCTION FACILITY LAYOUT.

LEAN PRODUCTION FACILITY LAYOUT. LEAN PRODUCTION FACILITY LAYOUT www.fourprinciples.com BACKGROUND The production facility layout is as important as the technology it houses and has a significant impact on business performance. The layout

More information

Assembly Line Efficiency Improvement by Using WITNESS Simulation Software

Assembly Line Efficiency Improvement by Using WITNESS Simulation Software IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Assembly Line Efficiency Improvement by Using WITNESS Simulation Software To cite this article: A S H M Yasir and N M Z N Mohamed

More information

Lean Manufacturing Implementation in Small and Medium Industry

Lean Manufacturing Implementation in Small and Medium Industry Advances in Smart Systems Research ISSN 2050-8662 Vol. 5. No. 1 : pp.17-29 : isrp16-004 Lean Manufacturing Implementation in Small and Medium Industry N.H.Zakaria 1, N.M.Z.N.Mohamed 1,2 *, A.N.M.Rose 1,

More information

Thorough Elimination Of Muri, Mura And Muda To Achieve Customer Satisfaction

Thorough Elimination Of Muri, Mura And Muda To Achieve Customer Satisfaction ISSN: 2278 0211 (Online) Thorough Elimination Of Muri, Mura And Muda To Achieve Customer Satisfaction Mr. Hanamant Rabakavi M Tech (MEM) Student, Department Of Industrial Engineering and Management, DSCE,

More information

Design and simulation of integration system between automated material handling system and manufacturing layout in the automotive assembly line

Design and simulation of integration system between automated material handling system and manufacturing layout in the automotive assembly line IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS and simulation of integration system between automated material handling system and manufacturing layout in the automotive assembly

More information

Production Line Analysis via Value Stream Mapping: A Case Study in Pakistani Manufacturing Firm

Production Line Analysis via Value Stream Mapping: A Case Study in Pakistani Manufacturing Firm Production Line Analysis via Value Stream Mapping: A Case Study in Pakistani Manufacturing Firm Zanjbeel Tabassum 1, Alyaan Khan 2 Graduate Student, Department of Industrial Engineering, Istanbul Technical

More information

Optimize Assembly Production Line using Line Balancing

Optimize Assembly Production Line using Line Balancing Optimize Assembly Production Line using Line Balancing Abdul Talib Bon 1, Asyran Abdul Rahman 2 Department of Production and Operation Management Faculty of Technology Management And Business Universiti

More information

Assimilating Quality Function Deployment (QFD) with QUEST Analysis for Facility Layout Redesign of Handwork Section

Assimilating Quality Function Deployment (QFD) with QUEST Analysis for Facility Layout Redesign of Handwork Section 2010 International Conference on Science and Social Research (CSSR 2010), December 5-7, 2010, Kuala Lumpur, Malaysia Assimilating Quality Function Deployment (QFD) with QUEST Analysis for Facility Layout

More information

Using Lean Manufacturing Techniques to Improve Production Efficiency in the Ready Wear Industry and a Case Study

Using Lean Manufacturing Techniques to Improve Production Efficiency in the Ready Wear Industry and a Case Study Vedat Dal, *Engin Akçagün, *Abdurrahim Yilmaz Marmara University, Faculty of Technology, Department of Textile Engineering Göztepe Kampusu Kadıköy İstanbul, Turkey E-mail: vedat@marmara.edu.tr *Mimar Sinan

More information

Effective Data Collection and Analysis for Efficient Implementation of Standardized Work (SW)

Effective Data Collection and Analysis for Efficient Implementation of Standardized Work (SW) Vol. 9, No. 1, 45-78, 2012 Effective Data Collection and Analysis for Efficient Implementation of Standardized Work (SW) Ahmed Jaffar Nurul Hayati Abdul Halim Noriah Yusoff Faculty of Mechanical Engineering

More information

Methods Engineering. Methods Engineering

Methods Engineering. Methods Engineering Methods Engineering 1 Methods Engineering Part II Chapters: 8. Introduction to Methods Engineering and Operations Analysis 9. Charting Techniques 10.Motion Study and Work Design 2 1 Chapter 8 Introduction

More information

Optimization of Cycle Time for Wire Harness Assembly Line Balancing and Kaizen Approach

Optimization of Cycle Time for Wire Harness Assembly Line Balancing and Kaizen Approach Optimization of Cycle Time for Wire Harness Assembly Line Balancing and Kaizen Approach Aasheet Kumar 1, Gaurav Chaudhary 2, Manish Kalra 3, Binit Kumar Jha 4 U. G. Student, Dept of Manufacturing Technology,

More information

APPLICATION OF LEAN MANUFACTURING USING SIMULATION

APPLICATION OF LEAN MANUFACTURING USING SIMULATION Jurnal Mekanikal June 2015, Vol 38, 46-62 APPLICATION OF LEAN MANUFACTURING USING SIMULATION Jafri Mohd Rohani*, Rozlina Md Sirat, Nur Amanina Mohamad Sharif Faculty of Mechanical Engineering, Universiti

More information

COMPUTERIZED VALUE STREAM SYSTEM (CVSS) TO REDUCE WASTE IN LEAN MANUFACTURING OPERATION

COMPUTERIZED VALUE STREAM SYSTEM (CVSS) TO REDUCE WASTE IN LEAN MANUFACTURING OPERATION COMPUTERIZED VALUE STREAM SYSTEM (CVSS) TO REDUCE WASTE IN LEAN MANUFACTURING OPERATION S. Hj. Hasan *, A. N. A. Ahmad, and D. Feriyanto Faculty of Mechanical and Manufacturing Engineering, Universiti

More information

IMPROVEMENT OF PLANT FACILITY LAYOUT FOR BETTER LABOUR UTILISATION: CASE STUDY OF A CONFECTIONERY COMPANY IN THE WESTERN CAPE

IMPROVEMENT OF PLANT FACILITY LAYOUT FOR BETTER LABOUR UTILISATION: CASE STUDY OF A CONFECTIONERY COMPANY IN THE WESTERN CAPE IMPROVEMENT OF PLANT FACILITY LAYOUT FOR BETTER LABOUR UTILISATION: CASE STUDY OF A CONFECTIONERY COMPANY IN THE WESTERN CAPE E.J. Jordaan 1* and S. Matope 2 1 Department of Industrial Engineering University

More information

Line Balancing through Cycle Time Reduction

Line Balancing through Cycle Time Reduction International Journal of Advance Industrial Engineering E-ISSN 2320 5539 2016 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijaie/ Research Article Kanagaraj A #, Vivek C #,

More information

Historical Phases of Production

Historical Phases of Production Lean 101 Overview Lean Background Taiichi Ohno and Shigeo Shingo developed Lean Manufacturing at Toyota over a period of 20-30 years. Their intention was not to develop some sort of unified field theory

More information

IARJSET. International Advanced Research Journal in Science, Engineering and Technology AGNI-PANKH 16

IARJSET. International Advanced Research Journal in Science, Engineering and Technology AGNI-PANKH 16 Concept of Heijunka Akshay M. Ramekar 1, Vivek D. Muneshwar 2, Ajinkya S. Kute 3, Ashish M. Choube 4 1, 2, 3 Student, Mechanical Engineering, JDIET, Yavatmal, India Assistant Professor, Mechanical Engineering

More information

Research Article Special Issue

Research Article Special Issue Journal of Fundamental and Applied Sciences ISSN 1112-9867 Research Article Special Issue Available online at http://www.jfas.info KNOWLEDGE MANAGEMENT TOBOOST PRODUCTIVITY IN MANUFACTURING M. A. Mansor

More information

LEAN REVERSE LOGISTICS.

LEAN REVERSE LOGISTICS. LEAN REVERSE LOGISTICS www.fourprinciples.com BACKGROUND In the early days, the reverse logistics focus was on the front-end of the retailer s return process. It was meant to provide the customers with

More information

Lean Manufacturing Implementation in Malaysian Automotive Components Manufacturer: a Case Study

Lean Manufacturing Implementation in Malaysian Automotive Components Manufacturer: a Case Study , July 6-8, 2011, London, U.K. Lean Manufacturing Implementation in Malaysian Automotive Components Manufacturer: a Case Study Rasli Muslimen, Sha ri Mohd Yusof, Ana Sakura Zainal Abidin Abstract This

More information

LEAN MANUFACTURING & TPM.

LEAN MANUFACTURING & TPM. LEAN MANUFACTURING & TPM www.fourprinciples.com BACKGROUND The core area of any manufacturing facility is the shop floor. Manufacturing is most often also the largest function within an organisation. In

More information

OUR TRAINING YOUR SUCCESS.

OUR TRAINING YOUR SUCCESS. Close to our customers OUR TRAINING YOUR SUCCESS. WELCOME TO OUR CENTER FOR TRAINING AND TECHNOLOGY Introduction Wirtgen Group has invested in a new state-of-the-art subsidiary in Malaysia to accommodate

More information

Manufacturing inventory performance enhancement using lean management

Manufacturing inventory performance enhancement using lean management 8, Issue 2 (2017) 1-6 Journal of Advanced Research in Business and Management Studies Journal homepage: www.akademiabaru.com/arbms.html ISSN: 2462-1935 Manufacturing inventory performance enhancement using

More information

SCIENCE & TECHNOLOGY

SCIENCE & TECHNOLOGY Pertanika J. Sci. & Technol. 25 (S): 233-240 (2017) SCIENCE & TECHNOLOGY Journal homepage: http://www.pertanika.upm.edu.my/ Analysis of Fill Time and Injection Pressure of Multiple 20 gram Parisons during

More information

SCIENCE & TECHNOLOGY

SCIENCE & TECHNOLOGY Pertanika J. Sci. & Technol. 26 (1): 379-390 (2018) SCIENCE & TECHNOLOGY Journal homepage: http://www.pertanika.upm.edu.my/ Application of System Dynamic Approach for Family Takaful Product Analysis Mohamad,

More information

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM Tan Hauw Sen Rimo 1, Engr. Mohd Soufhwee bin Abd Rahman 2, 1 tanhauwsr@utem.edu.my, 2 soufhwee@utem.edu.my LESSON OUTCOMES At the end

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 MANUFACTURING SYSTEM Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing

More information

Lean manufacturing implementation in reducing waste for electronic assembly line

Lean manufacturing implementation in reducing waste for electronic assembly line Lean manufacturing implementation in reducing waste for electronic assembly line Nurul Husna Zakaria 1, *, Nik Mohd Zuki Nik Mohamed 1,2, Mohd Fadzil Faisae Ab Rahid 1, and Ahmad Nasser Mohd Rose 1 1 Faculty

More information

A PM on Lean Production Randel Ltd.

A PM on Lean Production Randel Ltd. A PM on Lean Production Randel Ltd. RANDEL LTD. INDUSTRY STREET 8 38267 WOMANCHESTER ENGLAND Written by: Tobias Reith, BSc Course: Lean Production (2016) Linköping University, Sweden A PM ON LEAN PRODUCTION

More information

Ch 16 Automated Production Lines

Ch 16 Automated Production Lines Ch 16 Automated Production Lines Sections: 1. Fundamentals of Automated Production Lines 2. Applications of Automated Production Lines 3. Analysis of Transfer Lines Automation, Production Systems, and

More information

Production Planning & Control BMM4823. Scheduling. by Dr. Ahmad Nasser Mohd Rose

Production Planning & Control BMM4823. Scheduling. by Dr. Ahmad Nasser Mohd Rose Production Planning & Control BMM4823 Scheduling by Dr. Ahmad Nasser Mohd Rose nasser@ump.edu.my Chapter Description Aims To understand the importance of short term scheduling in planning To determine

More information

INDUSTRIAL MANAGEMENT

INDUSTRIAL MANAGEMENT INDUSTRIAL MANAGEMENT 14-03-2014 00:43:54 BY: MAYANK PANDEY ASSISTANT PROFESSOR NIET BUSINESS SHOOL UNIT-2 Management Function: Principles of Management. Management Tools: time and motion study, work simplification-

More information

Impact of Lean Strategies on Different Industrial Lean Wastes

Impact of Lean Strategies on Different Industrial Lean Wastes International Journal of Theoretical and Applied Mechanics. ISSN 0973-6085 Volume 12, Number 2 (2017) pp. 275-286 Research India Publications http://www.ripublication.com Impact of Lean Strategies on Different

More information

Lean Operations. PowerPoint slides by Jeff Heyl. Copyright 2017 Pearson Education, Inc.

Lean Operations. PowerPoint slides by Jeff Heyl. Copyright 2017 Pearson Education, Inc. Lean Operations 16 PowerPoint presentation to accompany Heizer, Render, Munson Operations Management, Twelfth Edition Principles of Operations Management, Tenth Edition PowerPoint slides by Jeff Heyl 16-1

More information

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1 The Thinking Approach LEAN CONCEPTS All rights reserved 1 Tools to Drive Kaizen Activity CREATING A LEAN TRANSFORMATION All rights reserved 2 IMPLEMENTATION PLANNING MILESTONES: 1. Setting targets quantify

More information

CYCLE TIME REDUCTION THROUGH TOYOTA PRODUCTION SYSTEM

CYCLE TIME REDUCTION THROUGH TOYOTA PRODUCTION SYSTEM Int. J. Mech. Eng. & Rob. Res. 0 A P Kedar et al., 0 Research Paper ISSN 78 09 www.ijmerr.com Vol.,, April, 0 0 IJMERR. All Rights Reserved CYCLE TIME REDUCTION THROUGH TOYOTA PRODUCTION SYSTEM A P Kedar

More information

Value stream mapping in glide manufacturing: A case study of Insti-Tools in Zimbabwe

Value stream mapping in glide manufacturing: A case study of Insti-Tools in Zimbabwe International Journal of Science, Technology and Society 2015; 3(2-2): 6-10 Published online February 26, 2015 (http://www.sciencepublishinggroup.com/j/ijsts) doi: 10.11648/j.ijsts.s.2015030202.12 ISSN:

More information

Time and Cost Optimization of Parallel Services on Line Balancing Problem using Integer Programming

Time and Cost Optimization of Parallel Services on Line Balancing Problem using Integer Programming Time and Cost Optimization of Parallel Services on Line Balancing Problem using Integer Programming Tiar Anindya Putri Department of Management Technology tiaranindyap@gmail.com Riyanarto Sarno Department

More information

Simulation of Lean Principles Impact in a Multi-Product Supply Chain

Simulation of Lean Principles Impact in a Multi-Product Supply Chain Simulation of Lean Principles Impact in a Multi-Product Supply Chain M. Rossini, A. Portioli Studacher Abstract The market competition is moving from the single firm to the whole supply chain because of

More information

Productivity enhancement in excavator manufacturing plant by eliminating non value added activities

Productivity enhancement in excavator manufacturing plant by eliminating non value added activities ; (): 98- E-ISSN: 78- P-ISSN: 9-8 JPP ; (): 98- Received: -- Accepted: 8-- Dr. Chethan Kumar CS Associate Professor, I.E.M Dept, M.S.R.I.T, Bangalore-. Dr. NVR Naidu Professor, I.E.M Dept, M.S.R.I.T, Bangalore-.

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 FACILITY LAYOUT DESIGN Layout design is nothing but the systematic arrangement of physical facilities such as production machines, equipments, tools, furniture etc. A plant

More information

Key Knowledge Generation Publication details, including instructions for author and subscription information:

Key Knowledge Generation Publication details, including instructions for author and subscription information: This article was downloaded by: Publisher: KKG Publications Registered office: 18, Jalan Kenanga SD 9/7 Bandar Sri Damansara, 52200 Malaysia Key Knowledge Generation Publication details, including instructions

More information

The Application of Process Automation and Optimisation in the Rapid Development of New Passenger Vehicles at SAIC Motor

The Application of Process Automation and Optimisation in the Rapid Development of New Passenger Vehicles at SAIC Motor The Application of Process Automation and Optimisation in the Rapid Development of New Passenger Vehicles at SAIC Motor Dave Husson Vehicle CAE Manager, SAIC Motor UK Technical Centre Lowhill Lane, Longbridge,

More information

Business Improvement Lean Manufacturing Toolkit

Business Improvement Lean Manufacturing Toolkit Business Improvement Lean Manufacturing Toolkit Lean Introduction. Lean is an influential and established set of principles and methods which can be used in any environment and setting. Lean is essentially

More information

Unit WorkBook 1 Level 5 ENG U48 Manufacturing Systems Engineering UniCourse Ltd. All Rights Reserved. Sample

Unit WorkBook 1 Level 5 ENG U48 Manufacturing Systems Engineering UniCourse Ltd. All Rights Reserved. Sample Pearson BTEC Levels 5 Higher Nationals in Engineering (RQF) Unit 48: Manufacturing Systems Engineering Unit Workbook 1 in a series of 1 for this unit Learning Outcome LO1 to LO4 Manufacturing Systems Engineering

More information

INTRODUCTION TO FMS. Type of Automation. 1. Fixed automation 2. Programmable automation 3. Flexible automation Fixed Automation

INTRODUCTION TO FMS. Type of Automation. 1. Fixed automation 2. Programmable automation 3. Flexible automation Fixed Automation Type of Automation 1. Fixed automation 2. Programmable automation 3. Flexible automation Fixed Automation INTRODUCTION TO FMS Sequence of processing (or assembly) operations is fixed by the equipment configuration

More information

Application of Lean Methodologies in the Improvement of an Automotive Supplier s Operation

Application of Lean Methodologies in the Improvement of an Automotive Supplier s Operation Application of Lean Methodologies in the Improvement of an Automotive Supplier s Operation The SMP Portugal Case Study Amy Wulff e-mail: amy.wulff@tecnico.ulisboa.pt Abstract: The Portuguese automotive

More information

Development of Production Layout Model to Improve Production Efficiency

Development of Production Layout Model to Improve Production Efficiency Development of Production Layout Model to Improve Production Efficiency A. R. AB Kadir, W.M.K.Sajidah, C.A. Mohd Norzaimi, K. Shahril, and M. Sabri, Universiti Kuala Lumpur Malaysian Spanish Institute,

More information

Manufacturing & Production

Manufacturing & Production The OpsDog Manufacturing & Production Benchmarking Report Manufacturing & Production Benchmarks, KPI Definitions & Measurement Details ABRIDGED CONTENT Purchase to View Full Benchmarking Report! 2017 Edition

More information

Manufacturing Systems & Single Station Manufacturing. Lecture 2

Manufacturing Systems & Single Station Manufacturing. Lecture 2 Manufacturing Systems & Single Station Manufacturing Lecture 2 Manufacturing Systems in Production Sstem System Manufacturing System Defined A collection o of integrated equipment e and human resources,

More information

Assembly line balancing in textile industry

Assembly line balancing in textile industry 323 Assembly line balancing in textile industry Prabhuling Umarani 1, Keshav Valase 2 1 Department of Mechanical Engineering, Walchand institute of technology, Solapur 2 Department of Mechanical Engineering,

More information

Strategies to Achieve Labor Flexibility in the Garment Industry

Strategies to Achieve Labor Flexibility in the Garment Industry ISSN (Online): 1694-0784 ISSN (Print): 1694-0814 41 Strategies to Achieve Labor Flexibility in the Garment Industry Parisima Nassirnia 1, Masine Md. Tap 2 1 Department of Industrial Engineering, Faculty

More information

A Rational Approach of Lean Tool Implementation to SME - A Case Study

A Rational Approach of Lean Tool Implementation to SME - A Case Study Indian Journal of Science and Technology, Vol 10(1), DOI: 10.17485/ijst/2017/v10i1/108876, January 2017 ISSN (Print) : 0974-6846 ISSN (Online) : 0974-5645 A Rational Approach of Lean Tool Implementation

More information

FROM 5S METHODOLOGY TO LEAN LAYOUT: EVIDENCE FROM AUTOMOBILE INDUSTRY

FROM 5S METHODOLOGY TO LEAN LAYOUT: EVIDENCE FROM AUTOMOBILE INDUSTRY FROM 5S METHODOLOGY TO LEAN LAYOUT: EVIDENCE FROM AUTOMOBILE INDUSTRY Pavla Otenšlégrová Felipe Martinez Abstract This paper proposes a complementary approach to implementing 5S and Lean Layout methodologies

More information

Skateboard Assembly Line Balancing High School Student Worksheet

Skateboard Assembly Line Balancing High School Student Worksheet Name: Name: Date: Date: Part I: Vocabulary Words Match the following words with their definitions. G H F B E A D C 1. Assembly Line 2. Bottleneck 3. Manufacturing 4. Process Simulation 5. Throughput 6.

More information

Improvement of Facility Layout Using Systematic Layout Planning

Improvement of Facility Layout Using Systematic Layout Planning IOSR Journal of Engineering (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 08, Issue 5 (May. 2018), VI PP 33-43 www.iosrjen.org Improvement of Facility Layout Using Systematic Layout Planning

More information

TPS Basics. What defines worth? Value: The key focus. Delivery. Worth Value= Cost. Functionality: what the product will do Performance Features

TPS Basics. What defines worth? Value: The key focus. Delivery. Worth Value= Cost. Functionality: what the product will do Performance Features TPS Basics Value: The key focus. Worth Value= Cost Eyes of customer Incurred during production Toyota s strategy is achieve total quality and maximum cost reduction through variation and waste elimination

More information

International Journal of Recent Advances in Multidisciplinary Research Vol. 01, Issue 03, pp , September, 2014

International Journal of Recent Advances in Multidisciplinary Research Vol. 01, Issue 03, pp , September, 2014 sz International journal Journal of of Research Recent and Advances Review in in Health Multidisciplinary Sciences, July -14 Research, September -14 International Journal of Recent Advances in Multidisciplinary

More information

Flexible Manufacturing Systems

Flexible Manufacturing Systems Flexible Manufacturing Systems FMS is: Machine Cell used to implement the Group Technology Composed of Multiple automated stations Capable of Variable Routings (Type IIA) Integrate CNC, Computer Control,

More information

Productivity Improvement By Maynard Operation Sequence Technique

Productivity Improvement By Maynard Operation Sequence Technique Productivity Improvement By Maynard Operation Sequence Technique Prof. A. A. Karad 1, Mr. Nikhil K. Waychale 2, Mr. Nitesh G. Tidke 3, 1 Professor, Department of ME, K. V. N. Naik Institute of Engineering,

More information

FACTORY ORGANIZATION AND MANAGEMENT WORK STUDY

FACTORY ORGANIZATION AND MANAGEMENT WORK STUDY FACTORY ORGANIZATION AND MANAGEMENT WORK STUDY WORK STUDY A generic term for those techniques, particularly METHOD STUDY and WORK MEASUREMENT, which are used in the examination of human work in all its

More information

Heijunka Walkthrough. This article is written as a walkthrough for the understanding of what is Heijunka and its use in production.

Heijunka Walkthrough. This article is written as a walkthrough for the understanding of what is Heijunka and its use in production. By, Dr. Satnam Singh. MBizM Sdn Bhd satnam@mbizm.com Heijunka Walkthrough This article is written as a walkthrough for the understanding of what is Heijunka and its use in production. The slide above shows

More information

LEAN WAREHOUSE OPERATIONS.

LEAN WAREHOUSE OPERATIONS. LEAN WAREHOUSE OPERATIONS www.fourprinciples.com BACKGROUND Warehousing s historical core responsibility has been the storage of goods. However, the scope and core responsibilities of warehouse management

More information

Line Balancing on AUDI B8 Cable Assembly Line using MUDA: A Case Study

Line Balancing on AUDI B8 Cable Assembly Line using MUDA: A Case Study International Journal of Advance Industrial Engineering E-ISSN 2320 5539 2015 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijaie/ Research Article Line Balancing on AUDI B8

More information

Available online at ScienceDirect. Procedia CIRP 40 (2016 )

Available online at  ScienceDirect. Procedia CIRP 40 (2016 ) Available online at www.sciencedirect.com ScienceDirect Procedia CIRP 0 (06 ) 7 th Global Conference on Sustainable Manufacturing - Decoupling Growth from Use Lean line balancing for an electronics assembly

More information

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A.

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A. Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION Raid Al-Aomar Classic Advanced Development

More information

White Paper. Transforming Contact Centres using Simulation-based Scenario Modelling

White Paper. Transforming Contact Centres using Simulation-based Scenario Modelling White Paper Transforming Contact Centres using Simulation-based Scenario Modelling Meet Your KPI s, Deliver Consistently High Service and Reduce Customer Churn to Increase Your Bottom Line Results PM@SIMUL8.com

More information

SYSTEM ANALYSIS OF EFFICIENT PRODUCTION PROCESSES FOR PRODUCTIVITY ENHANCEMENT THROUGH PRODUCTIVITY BALANCE IN INJECTION MOULDING PROCESS

SYSTEM ANALYSIS OF EFFICIENT PRODUCTION PROCESSES FOR PRODUCTIVITY ENHANCEMENT THROUGH PRODUCTIVITY BALANCE IN INJECTION MOULDING PROCESS 010-014 system analysis 6/22/06 11:32 AM Page 10 SYSTEM ANALYSIS OF EFFICIENT PRODUCTION PROCESSES FOR PRODUCTIVITY ENHANCEMENT THROUGH PRODUCTIVITY BALANCE IN INJECTION MOULDING PROCESS R. Usubamatov,

More information

Finished goods available to meet Takt time when variations in customer demand exist.

Finished goods available to meet Takt time when variations in customer demand exist. Delaware Valley Industrial Resource Center 2905 Southampton Road Philadelphia, PA 19154 Tel: (215) 464-8550 Fax: (215) 464-8570 www.dvirc.org Term Batch-and-Queue Processing Buffer Stock Catchball Cell

More information

These tend to be sequential, and offer increasing levels of efficiency to an organisation.

These tend to be sequential, and offer increasing levels of efficiency to an organisation. 3 Forms of Waste There are 3 forms of waste in any organisation; muda (tasks with no value add), mura (where things are done inconsistently) and muri (where excessive effort is used). Benefit of thinking

More information

TYPICAL FACTORY LAYOUT vs THE TOYOTA APPROACH

TYPICAL FACTORY LAYOUT vs THE TOYOTA APPROACH TYPICAL FACTORY LAYOUT vs WHAT IS THE TYPICAL FACTORY LAYOUT IN MASS MANUFACTURING APPROACH? WHAT IS THE APPROACH TO FACTORY LAYOUT IN TOYOTA? RACHEL TATE @00441881 VALERIE CARDOZ @00442956 5/1/16 LEAN

More information

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries Author Rahman, A., Chattopadhyay, G., Wah, Simon Published 2006 Conference Title Condition Monitoring and Diagnostic Engineering

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

A Computer based novel approach of ergonomic study and analysis of a workstation in a manual process

A Computer based novel approach of ergonomic study and analysis of a workstation in a manual process A Computer based novel approach of ergonomic study and analysis of a workstation in a manual process Mr. Gurunath V. Shinde 1, Prof.V.S.Jadhav 2 1 PG student, Department of Mechanical Engineering, Government

More information

IMPLEMENTATION OF A LEAN MODEL FOR CARRYING OUT VALUE STREAM MAPPING IN A MANUFACTURING INDUSTRY

IMPLEMENTATION OF A LEAN MODEL FOR CARRYING OUT VALUE STREAM MAPPING IN A MANUFACTURING INDUSTRY Int. J. Mech. Eng. & Rob. Res. 2012 Trupti Nandikolmath et al., 2012 Research Paper ISSN 2278 0149 www.ijmerr.com Vol. 1, No. 2, July 2012 2012 IJMERR. All Rights Reserved IMPLEMENTATION OF A LEAN MODEL

More information

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING Kim Hindle Project

More information

PRINCIPLES OF LEAN MANUFACTURING. Purdue Manufacturing Extension Partnership (800)

PRINCIPLES OF LEAN MANUFACTURING. Purdue Manufacturing Extension Partnership (800) PRINCIPLES OF LEAN MANUFACTURING Purdue Manufacturing Extension Partnership (800) 877-5182 www.mep.purdue.edu What Is Lean? 2 Defining Lean Manufacturing Lean manufacturing is a systematic approach to

More information

JUST IN TIME APPROACH IN INVENTORY MANAGEMENT

JUST IN TIME APPROACH IN INVENTORY MANAGEMENT JUST IN TIME APPROACH IN INVENTORY MANAGEMENT Abdul Talib Bon (Corresponding author) Faculty of Technology Management, Business and Entrepreneurship Universiti Tun Hussein Onn Malaysia, 86400 Batu Pahat,

More information

Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints

Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints Home Search Collections Journals About Contact us My IOPscience Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints This content has been downloaded from IOPscience. Please

More information

AUTOMATED PROCESS MODELLING AND

AUTOMATED PROCESS MODELLING AND AUTOMATED PROCESS MODELLING AND CONTINUOUS IMPROVEMENT John Anthony Fresco A thesis submitted in the partial fulfilment of the requirements of De Montfort University for the degree of Doctor of Philosophy

More information

Process improvement in an Industry using Value Stream Mapping Approach

Process improvement in an Industry using Value Stream Mapping Approach Process improvement in an Industry using Value Stream Mapping Approach Rishi Govind T S 1, Dr. Pramod.M 2 l Asst. Professor, SNMIMT COLLEGE, Ernakulam, India l AssosiateProfessor, 2 Asst.professor,viswajothi

More information

Make Supplier as Just in Time Supplier. through a Case Study

Make Supplier as Just in Time Supplier. through a Case Study Applied Mathematical Sciences, Vol. 8, 2014, no. 43, 2131-2139 HIKARI Ltd, www.m-hikari.com http://dx.doi.org/10.12988/ams.2014.310589 Make Supplier as Just in Time Supplier through a Case Study K. Sivasakthi

More information

JIT and Lean Operations. JIT/Lean Operations

JIT and Lean Operations. JIT/Lean Operations 5/7/2011 16 JIT and Lean Operations By : Sa Ed M. Salhieh, Salhieh, Ph.D. 16-1 JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental

More information

Role of value stream mapping in process development: A Review

Role of value stream mapping in process development: A Review Role of value stream mapping in process development: A Review Rahul S Mor *, Sarbjit Singh, Rahul Bhoria, Arvind Bhardwaj Department of Industrial & Production Engineering, National Institute of Technology,

More information

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Advances in Production Engineering & Management 4 (2009) 3, 127-138 ISSN 1854-6250 Scientific paper LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Ahmad, I. * & Al-aney, K.I.M. ** *Department

More information

Motion and Time Study

Motion and Time Study IE 101-Industrial Engineering Orientation Fall 2009 Motion and Time Study Engin Topan Defining Work Systems Work consists of tasks Tasks consist of work elements Work elements consist of basic motion elements

More information

Chapter 11. In-Time and Lean Production

Chapter 11. In-Time and Lean Production Chapter 11 Just-In In-Time and Lean Production What is JIT? Producing only what is needed, when it is needed A philosophy An integrated management system JIT s mandate: Eliminate all waste Basic Elements

More information