Development of Cost Breakdown Structure for Defence Acquisition Projects

Size: px
Start display at page:

Download "Development of Cost Breakdown Structure for Defence Acquisition Projects"

Transcription

1 Development of Cost Breakdown Structure for Defence Acquisition Projects Abderrahmane Sokri DRDC Centre for Operational Research and Analysis Vrenti Ghergari Lily Wang D Cost S Defence Research and Development Canada Scientific Report DRDC-RDDC-2016-R086 May 2016

2 Template in use: (2010) SR Advanced Template_EN (051115).dotm Her Majesty the Queen in Right of Canada, as represented by the Minister of National Defence, 2016 Sa Majesté la Reine (en droit du Canada), telle que représentée par le ministre de la Défense nationale, 2016

3 Abstract Life cycle costing is a complex economic assessment that estimates the overall costs of an item over its entire life. A cost structure is a very useful tool whereby life cycle activities are grouped into cost elements. So far a formal cost structure with a good glossary and coherent relationships is missing for national defence acquisition projects. This report suggests an activity-oriented approach to developing a cost structure for defence acquisition projects. It defines its requirements and presents its theoretical foundation. It also provides a glossary of terms and many concrete examples to illustrate the key elements of the suggested structure. Significance to defence and security This work will enhance the understanding of the principles that govern cost structures in major acquisition projects. It will also provide an important tool that can guide cost estimators and project managers in implementing effective life cycle costing. At least two beneficiary communities were identified: ADM(Fin) and Allied Nations. DRDC-RDDC-2016-R086 i

4 Résumé Le calcul des coûts durant le cycle de vie est une évaluation économique complexe permettant d estimer l ensemble des coûts d un article tout au long de son cycle de vie. Une structure de coûts est un outil très utile pour les activités liées au cycle de vie ayant été regroupées sous des éléments de coût. Pour le moment, il manque une structure des coûts officielle ayant un bon glossaire et des liens cohérents pour les projets d acquisition en matière de défense nationale. Le présent rapport propose une approche axée sur les activités dans le but d élaborer une telle structure de coûts. Il présente son fondement théorique et les conditions de son application. Il fournit également un glossaire et de nombreux exemples concrets pour illustrer les principaux éléments de la structure proposée. Importance pour la défense et la sécurité Ces travaux permettront de mieux comprendre les principes qui régissent les structures de coûts dans les projets d acquisition majeurs. Ils fournissent également un important outil pouvant orienter les évaluateurs des coûts et les gestionnaires de projet dans l établissement des coûts du cycle de vie. Au moins deux collectivités bénéficiaires ont été déterminées : le SMA(Fin) et les pays alliés. ii DRDC-RDDC-2016-R086

5 Table of contents Abstract i Significance to defence and security i Résumé ii Importance pour la défense et la sécurité ii Table of contents iii List of figures v List of tables vi 1 Introduction Background Aim Document structure Definitions Phases of defence acquisition projects Development Acquisition Operations and sustainment Disposal Cost categorization Overall costs of military systems Cost structure development Cost decomposition Requirements Cost assignment Organisation of cost elements Conclusion References Annex A Annex B Activity list for defence acquisition projects A generic CBS for defence system acquisition Annex C Canadian generic CBS for defence acquisition projects C.1 Aircraft system CBS C.2 Sea system CBS C.3 Ground vehicle system CBS C.4 Missile system work breakdown structure List of symbols/abbreviations/acronyms/initialisms DRDC-RDDC-2016-R086 iii

6 List of figures Figure 1: Life cycle phases in defence acquisition projects Figure 2: Overall costs of military systems Figure C.1: CF-188 Hornet Figure C.2: HMCS Fredericton Figure C.3: Leopard 2A4 tank Figure C.4: Ballistic missile iv DRDC-RDDC-2016-R086

7 List of tables Table 1: Cost elements associated with the operation of the main system Table 2: The main steps in the suggested CBS Table A.1: Development phase Table A.2: Acquisition phase Table A.3: Operations and sustainment phase Table A.4: Disposal phase Table B.1: Combination of activities and products DRDC-RDDC-2016-R086 v

8 This page intentionally left blank. vi DRDC-RDDC-2016-R086

9 1 Introduction 1.1 Background Life cycle costing is an economic technique that assesses the overall costs of an item over its entire life. It can enhance decision making in choosing the best way to use economic resources. It has been used, for example, to identify the optimal replacement strategy for fleet equipment (Sokri 2011). If used from the very beginning of the analysis, it can assist in allocating budget and comparing different alternative courses of action. This technique has gained increasing importance in early planning and concept formulation of many military acquisition processes. It is being thought of as the cornerstone in many capital investment decisions (Sokri 2014; NATO 2007). New guidelines, procedures, and tools are being established by Treasury Board of Canada Secretariat (TBS) and the Department of National Defence (DND) to implement effective life cycle costing (TBS 2008; DND 2006). An important tool that can guide cost estimators and project managers in this operation is a consistent and commonly recognized cost structure. A cost structure systematically lists the tasks to be performed and groups them into cost elements. A well-developed cost structure will eliminate double counting and ensure that all appropriate costs have been considered. The Canadian Costing Handbook (DND 2006) suggests a generic cost element structure (CES) for military equipment procurement. While this document presents the basic concepts of a cost structure, it still suffers from two main pitfalls: (1) the lack of common definitions that describe the different cost elements, and (2) the absence of accurate relationships that connect the cost elements together. These two problems may cause inaccurate or misleading cost estimates. A good glossary of terms is indispensable in reducing or eliminating duplications, overlaps, and omissions (Stewart et al. 1995). It defines terms that may deviate from their original meanings in everyday use (e.g., maintenance cost, in-service cost). Moreover, each allied nation has developed and uses its own cost structure and terminology. Such a glossary is then crucial to effective communication between allied nations about equivalent cost elements. In a formal cost structure, the cost elements are tied together with relationships. These relationships provide a traceable analytical basis to each derived cost. The Canadian Costing Handbook (DND 2006) does not provide these relationships. Moreover, it specifies that they are not required for formal project approval. The absence of clear relationships of cost elements makes any life cycle cost (LCC) framework inoperative. 1.2 Aim Building on leading standards (NATO 2003), and recent research developments in this field (TBS 2013; DoD 2013), this study seeks to address the two mentioned pitfalls. It has two main interrelated objectives: develop a cost structure for defence acquisition projects, and suggest a cost breakdown glossary to be applied to defence system acquisition projects from a Canadian perspective. DRDC-RDDC-2016-R086 1

10 The resulting document will establish a common ground for preparing and presenting a cost structure for national defence acquisition projects. It can also provide guidance to LCC studies in multinational projects involving allied members. Beyond the proper accounting of all costs, the suggested cost structure offers clarity and order to cost elements and transparency and replicability to the cost attribution rule. It can help in conducting a more refined cost-benefit analysis at the margin. It can also provide insights about many financial issues, such as labour to capital ratio and the ratio of indirect (or overhead) to direct costs associated with military projects. 1.3 Document structure This document is organized into four sections. Following the introduction, Section 2 defines costs and shows how they can be classified. Section 3 describes an activity-oriented approach to develop a cost structure. In Section 4, some concluding remarks are made. 2 DRDC-RDDC-2016-R086

11

12 2.1.1 Development The main decisions about the system shape are taken in the development phase. This phase requires collaboration between the main stakeholders engaged in the project. It incorporates three different steps: (1) The identification, where military capability needs are determined and the feasibility of the project is analyzed; (2) The options analysis phase, where solutions to meet the required capability are explored; and (3) definition, where the design, concept characteristics, and/or implementation plans are refined (DND 2015). The development phase includes four main activities: (1) Project management, (2) Studies and Analysis, (3) Solicitation and contracts, and (4) Research and Design. Annex A provides the definition and lower sub-elements of the mentioned activities in a typical Canadian context Acquisition In the acquisition phase, the asset is being purchased and integrated as an operational capability. Nine main activities are typically performed in this phase to achieve overall project objectives: (1) Project management, (2) Studies and analyses, (3) Engineering, (4) Purchase, (5) Systems integration, (6) System test, trials and evaluation, (7) Deployment, (8) Infrastructure/Facilities, and (9) Other (e.g., contingency) (NATO 2003; NATO 2007). Annex A provides the definition and lower sub-elements of the mentioned activities. At the end of this phase, the output should fully meet the system requirements and satisfy mission needs Operations and sustainment The sustainment and operations phase (sometimes also referred to as in-service phase) corresponds to the operational utilisation of equipment (NATO 1989; Colabella et al. 2012). In this phase, the equipment under consideration is operated at the intended sites to deliver the required services (NATO 2007). Five main activities are typically performed in this phase: (1) Operation, (2) Maintenance, (3) Sustaining support, (4) Continuing system improvements, and (5) Indirect support. Annex A gives the definition and sub-elements of each mentioned activity. The collection of actual costs during this phase can be used to identify costs that are relevant for similar systems Disposal In the disposal phase, equipment is no longer needed and should be withdrawn from service at the end of its useful life. This phase includes planning and managing the demilitarization and removal of the equipment from service (DoD 2013; Colabella et al. 2012). When disposal through sale is not possible, many other options can be analyzed. They particularly include (but are not limited to): (1) Re-deployment when the equipment can be used for training, as a heritage asset, or for spare recovery, (2) Recycling when the material can be safely reused, (3) Long-term waste storage when a disposal site is available. In this phase, safety and environmental pressures are the most important considerations (DoD 2000). Many systems can cause safety hazards as well as environmental damage at this stage. These systems are generally demilitarized and de-armed to make them safe. Depending on the selected option, different activities may be undertaken: (1) Disposal planning, (2) Demilitarization, (3) Disposal of hazardous materials, (4) Dismantle or destruction, (5) Storage, (6) Transportation, (7) Resale. 4 DRDC-RDDC-2016-R086

13 2.2 Cost categorization Costs can be categorized into direct and indirect costs. A direct cost is directly attributable to a product without ambiguity. An indirect cost is shared between different products. Costs may also be classified into fixed and variable. A variable cost varies with the total level of activity or volume. A fixed cost remains unchanged within a range of activity, volume, or time. The cost associated with a testing facility for a specific system, for instance, is direct and variable. The cost associated with a storage facility common to many systems is indirect and fixed. Costs may also be divided into linked and non-linked costs. Linked costs include the costs associated with the project list of activities and set of resources. The costs associated with common facilities, munitions handling, and supervision are examples of indirect fixed linked costs. Non-linked costs are indirect and cannot be easily associated to the analyzed system. Examples of non-linked costs include medical services and family housing costs (NATO 2003; DND 2006). A cost element is associated with the consumption of a resource for a given activity to acquire, produce, operate, maintain, or dispose a product. In order to develop a meaningful cost structure, the following components must be defined: resource list, product tree, and activity list. The resource list defines all possible resources used by the system during its life cycle. It may include (but is not limited to): (1) Personnel, (2) Equipment (3) Consumables, (4) Infrastructure, and (5) Information. The product tree defines and describes all the product elements of the system. It may include the main system, such as a ship, aircraft or tank, and the corresponding support elements such as spares, facilities, and documentation. The activity list encompasses all the activities associated with the project under consideration. 2.3 Overall costs of military systems Many NATO nations have developed their own definitions, methods and tools to estimate the overall costs of military systems over their entire operational life (NATO 2003). Three different concepts are frequently used to define this cost: (1) Life cycle cost (LCC), (2) Total ownership cost (TOC), and Whole life cost (WLC). These three concepts are actually different and used for different purposes. There is, however, a relationship between them. As shown in Equation 1 and Figure 2, the set LCC is a subset of the set TOC and the set WLC is a superset of TOC. This means that all elements of LCC are also elements of TOC and all elements of TOC are contained inside WLC. LCC TOC WLC (1) LCC includes all direct and indirect costs associated with the project under consideration (e.g., sustainment and operation cost). It is used as an economic tool in comparing different alternatives. TOC covers the LCC elements and the indirect fixed linked costs (e.g., administration, common facilities, fuel and munitions handling). WLC covers the TOC elements and the indirect fixed non-linked costs (e.g., medical services, family housing). WLC is generally used in high level costing. DRDC-RDDC-2016-R086 5

14

15 3 Cost structure development In order to achieve the project objective and better facilitate planning and control of schedule, deliverables, and costs, the analyzed project should be divided into smaller and manageable pieces of work. This deliverable-oriented decomposition of the project constitutes the cornerstone of the project. This section suggests an activity-oriented approach to develop a cost structure. It describes the decomposition of cost elements and presents the key principles that should direct this operation. 3.1 Cost decomposition There are many ways of organizing a cost structure (NASA 2015). Examples of such decomposition include (but are not limited to): The product-oriented structure that focuses on the end product and organizes cost elements by subsystems. The activity-oriented structure that focuses on functions and organizes cost elements by activity. The organization-oriented structure that focuses on individual organizational units that perform the work. This study suggests an activity-based decomposition to develop a cost structure. It is an activity-oriented structure that overlaps with the product-oriented structure. This structure identifies the cost elements to be considered (ADO 2004). It becomes a formal Cost Breakdown Structure (CBS) whenever it is loaded with cost information. Annex C shows a generic cost structure for military equipment. 3.2 Requirements To analyze and evaluate a major acquisition project in a consistent manner, CBS should be rigorously prepared. It should particularly satisfy the following requirements (NATO 2003; ADO 2004): Comprehensive All the relevant activities and costs items should be identified over the system lifetime (Annex B). CBS should be logically guided by the principle of three constituents. According to this principle, a cost element is generated when a resource is used by an activity applied to a product. The cost element should be assigned to the activity that used the resource. This requirement ensures that the overall scope of work and cost is well-defined. Hierarchical While activities and costs can be broken down to any level of detail, they should be decomposed to the level necessary to enable effective management and reach the project objectives. To define the hierarchical relationships between elements, an identification system should be employed. In this system, each element is coded with a unique numeric or alphanumeric identifier. DRDC-RDDC-2016-R086 7

16 Flexible Life cycle costing is a complex process that involves multiple resources and activities. Flexible CBS is vital to its success. A flexible structure is easy to use and to update as the project evolves. It is dynamic enough to incorporate any change that reflects the current status of the project. A dynamic CBS has the flexibility to grow or contract in size by adding or removing activities. It can provide insights into the interactions between resources, activities and products over time. It can provide analysts with the flexibility to express, model, and simulate the cost behaviour over time. 3.3 Cost assignment To capture all relevant costs across the life cycle of a military system, the first step is to consider the list of all activities, sub-activities, and products involved in its different phases. The second step is to apply the list of activities and sub-activities to the product tree as shown in Annex B. Each activity (or sub-activity) can be further broken down by considering a combination of this activity (or sub-activity) and the corresponding products. For example, the combinations of Operation and Main system results in a new sub-activity called Operation of the main system. All possible resources used by each well-defined activity are defined in the third step. The list of cost elements is then obtained by assessing the costs associated with each set of resources used by a single activity applied to a product. As shown in Table 1, the activity of operating the main system, for example, may use four different resources: (1) Personnel, (2) Consumables, (3) Infrastructure, and (4) Information. The cost associated with this activity is the sum of the costs associated with the four resources used to operate the main system. In the final cost list, each cost element should correspond to four main originators that provide the rationale behind the CBS: (1) the phase of the project, (2) the resources applied, (2) the activity (or sub-activity) performed, and (4) the resulting product. A cost element as a combination of these four originators will be displayed in one of the last three columns of Table 1. Specific means in the last column include all elements indispensable for the system procurement process, but which are not delivered to the end user such as test and trial facilities (NATO 2003). Table 1: Cost elements associated with the operation of the main system. Phases Activity list (1) Main system Product tree (2) Support System (3) Specific Means (2) In-service (1) Operation (4) Information (3) Infrastructure (2) Consumables (1) Personnel Resources 8 DRDC-RDDC-2016-R086

17 3.4 Organisation of cost elements To organize cost elements into a logical and hierarchical coding schema, a CBS should be used. In this structure, level 1 costs can be defined by each life cycle phase. The numbers 1, 2, 3 and 4 would respectively correspond to the development, acquisition, in-service, and disposal phases. Consequently, the cost elements associated with activities under each phase will define level 2. When seeking elaboration, the following levels would correspond to sub-activities. The penultimate level elements would correspond to the resources applied. The resulting products define the last level. In this example structure, the cost of consumables to operate the main system, for instance, would be labeled Annex B shows how to develop a generic CBS for defence system acquisition. Examples of CBSs for defence system acquisition without the last two levels (i.e., resources and products) are provided in Annexes C.1, C.2, C.3, and C.4. Table 2 describes the main steps in the suggested methodology. Step 1 consists of identifying the different life cycle phases. Step 2 is to identify activities under each phase. Step 3 is to define the resulting products. Step 4 is to identify resources consumed by each activity. Step 5 is to assign resource costs to activities. Step 6 is to calculate the total cost of the project by summing the cost of each activity. Table 2: The main steps in the suggested CBS. Step Description 1 Identify phases 2 Identify activities 3 Identify products 4 Identify resources 5 Compute the cost each activity 6 Calculate the total cost The suggested CBS provides multiple benefits. In addition to the advantage of being comprehensive, hierarchical, and flexible, this structure is general to several types of fleets. It also has the significant advantage of using the principle of three constituents (activity, product and resource). It would be, therefore, a very useful tool whereby it becomes possible to analyze any of these three major cost factors. In general, the granularity of the CBS will vary with the maturity of the project. Its level of description should correspond to information management needs. Finer levels of details may be reached at or after the implementation phase for conducting any potential economic analysis. Last but not least, this structure is developed in collaboration with the final user and consequently adapted to Canadian nomenclature. DRDC-RDDC-2016-R086 9

18 4 Conclusion Life cycle costing is a complex process that involves estimating the overall costs of an item over its entire life. A CBS is a hierarchical structure whereby the project cost elements are organized to avoid missing or double counting errors. So far a formal cost structure with a good cost breakdown glossary and coherent relationships is missing for national defence acquisition projects. Using recent research and leading standards, this study suggested an activity-oriented approach to develop a generic CBS for national defence acquisition projects. It articulated the principles to be followed for preparing and presenting such a structure. It provided a cost breakdown glossary from a Canadian perspective. It also presented four concrete examples drawn from different systems to illustrate the key elements of the suggested structure. In order to better facilitate life cycle costing, each project is divided into four main phases: development, acquisition, in-service, and disposal phases. Each phase is also divided into smaller and manageable activities. The suggested approach is rationally guided by the principle of three constituents (activity, product and resource). This principle states that a cost appears when a resource is used by an activity applied to develop, produce, operate, sustain, or dispose a specific product. The first step in this approach is to identify the activities to be performed and their respective resources. The second is to assign resource costs to each activity. The third is to assign activity costs to cost objects. The suggested hierarchical structure is comprehensive ensuring all activities and costs are well-defined. It is also flexible and easy to use and to update as the project evolves. Using the principle of three constituents, this structure allows the analysis of anyone of these three constituents. The suggested CBS and the corresponding glossary of terms will establish a common ground for preparing and presenting a cost structure for national defence acquisition projects. They can also provide guidance to LCC studies in multinational projects involving allied members. Further efforts are ongoing to implement effective life cycle costing for military equipment (Sokri and Yazbeck 2015). Examples of such studies include (but are not limited to): the development of cost estimating relationships for heavy military equipment; and the development of a theoretical foundation for forecasting the life cycle cost of military equipment. 10 DRDC-RDDC-2016-R086

19 References Australian Defence Organisation (ADO) (2004). Work Breakdown Structures for Defence Materiel Projects. DEF(AUST)5664 Issue A. Bras, B. and Emblemsvåg, J. (1996). Designing for the Life Cycle: Activity-Based Costing and Uncertainty. Design for X, Colabella, L.P., Bower, A., Eden, R., Peltz, E., Lewis, M.W., and O Neill, K. (2012). Equipment Sustainment Data in Standard Army Management Information Systems. RAND Corporation Documented Briefing, Contract No. W74V8H-06-C-0001, CA, USA. Department of National Defence (DND) (2002). Engineering and Maintenance Management. Internal report, Ottawa, Canada. Department of National Defence (DND) (2006). Costing Handbook. Manual A-FN /AF-001. Ottawa, Canada. Department of National Defence (DND) (2012). DND Project Approval Directive (PAD) Ottawa, Canada. Department of National Defence (DND) (2015). Procurement Administration Manual (PAM). A-PP /AG-002, Revision 67, April NASA (2015). NASA Cost Estimating Handbook Version 4.0. Washington, D.C. NATO (1989). Handbook on the Phased Armaments Planning System (PAPS). Allied Administrative Publication (AAP-20) PAPS. NATO (2003). Cost Structure and Life Cycle Cost (LCC) for Military Systems. NATO RTO Technical Report TR-SAS-036, Paris, France. NATO (2003). Cost Structure and Life Cycle Costs for Military Systems. RTO Technical Report TR-028, Paris, France. NATO (2007). Methods and Models for Life Cycle Costing. NATO RTO Technical Report TR-SAS-054, Paris, France. Sokri, A. (2011). Optimal replacement of military aircraft: an economic approach. Defence and peace economics, 22(6), Sokri, A. (2014). Life Cycle Costing of Military Equipment. Proceedings of the International Conference of Control, Dynamic Systems, and Robotics, May 2014, Ottawa, Canada. Sokri, A. and Yazbeck, T. (2015). A Predictive Methodology for In-Service Costs. Defence Research and Development Canada, Scientific Letter DRDC-RDDC-2015-L273, Ottawa. DRDC-RDDC-2016-R086 11

20 Stewart, R.D., Wyskida, R.M., and Johannes, J.D. (1995). Cost Estimator s Reference Manual, 2nd Edition. New York, NY: Wiley. Treasury Board of Canada Secretariat (TBS) (2008). Guide to Costing. Catalogue No. BT66-12/2008E-PDF. Ottawa, Canada. Treasury Board of Canada Secretariat (TBS) (2013). Large Military Acquisition: Life Cycle Cost Framework Preliminary Draft, Ottawa, Canada. US Department of Defense (DoD) (2000). The Air Force System Safety Handbook, MIL-STD-882D, NM, USA. US Department of Defense (DoD) (2013). Defense Acquisition Guidebook. Defense Acquisition University, VA, USA. 12 DRDC-RDDC-2016-R086

21 Annex A Activity list for defence acquisition projects This Annex lists the generic cost elements in each of the life cycle phases, their sub-elements and definition in a typical Canadian context. The list is intended to be representative rather than exhaustive. Table A.1: Development phase. Activity (1) Project management Sub-elements: Salaries Contracted Support Operating Expenses Professional Service PWGSC Revenue Dependency Definition Project management is the systematic planning, organizing and controlling of allocated resources to accomplish project objectives (cost, time, performance, and risk). It is reserved for non-repetitive and time-limited activities that are different from the habitual activities of the organization. It encompasses personnel salaries and benefits (civilian and military); operating expenses (e.g., office equipment, travel, training); and professional services (e.g., contract management), contracted support, and Public Works and Government Services Canada (PWGSC) Revenue Dependency, etc. (2) Studies and analyses Activities undertaken in support of requirements determination, options analysis, cost estimating, and the development of project documents. These activities may be undertaken by internal or external stakeholders (DND, 2015). However, if details permit, the main deliverables could be highlighted as sub-elements (i.e., studies in support of concept of operation, functional requirement and performance specifications of the mission system, statement of operational requirements, or specific project approval documentation), etc. (3) Solicitation and Contracts This element covers the final delivery of the contracting documents such as Request for Proposal (RFP) and Statement of Work (SOW). Il also includes the preparation and execution of the bidding process. (4) Research and Design Sub-elements: Design & Development System Engineering Engineering Development Model Operational Test and Evaluations Other Studies Technical activities undertaken to design and develop a new complex capability and define its requirements and specifications. It may include design and development, engineering and testing in order to define the requirements, specifications, system and its operation, operational test and evaluation, support and disposal, etc. DRDC-RDDC-2016-R086 13

22 Activity (1) Project management Sub-elements: Salaries Contracted support Operating expenses Professional service Table A.2: Acquisition phase. Definition Project Management is similar to the development phase with increased scope of activities. It may also include the management of the project cost, schedule and performance measurements, risk management, configuration control, contract management, Reliability Availability Maintainability (RAM), Integrated Logistic Support (ILS), Quality Assurance (QA) including reviews and quality audits and documentation tasks, etc. (2) Studies and analyses Studies and analyses are similar to the development phase with increased scope of activities. Additional studies and analysis may include technology review, survivability and reliability, Integrated Logistics Support (ILS), Logistics Support Analysis (LSA) for spare and maintenance requirements, risk analysis, etc. (3) Engineering Sub-elements: System engineering Design and development Engineering Design and engineering changes (4) Purchase Sub-elements: Main mission system Support system/equipment Initial spare and parts Technical activities required to develop a new operational capability. This element usually includes system engineering, design and development engineering, design changes, etc. This includes the purchase of the main system and major subsystems not requiring significant additional development. It also includes procuring the initial spares and repair parts acquired as part of the deliverables of the acquisition project. The main mission system captures the cost of procuring a usable end item of equipment or software (DoD, 1992). The support system/equipment includes both peculiar support equipment and common support equipment that are required to support and maintain the system or portion of the system. The support system and equipment do not directly engage in the performance of the mission. Peculiar support equipment is the one that needs to be procured as new for the main mission system. Common support equipment also supports other systems and may (usually) already exist (DoD, 2011). Initial spare and parts are delivered to the end user together with the systems and support equipment for its maintenance in the initial year(s) of system in-service. Additional spares and repair parts for ongoing in-service sustainment are included under the Operation & Sustainment phase. (5) Systems integration This includes the integration of subsystems into a capability (6) System Test, Trials and Evaluation Sub-elements: ensuring that the final system meets the mission objectives. The test, evaluation, trials and demonstration activities to collect and validate engineering data on the system performance. It doesn t include the final acceptance test after the deployment 14 DRDC-RDDC-2016-R086

23 Activity Developmental test and evaluation Operational test and evaluation Mock-ups/system integration Test and evaluation support Test facilities (7) Deployment Sub-elements: Delivery Initial training Installations and set-towork Final acceptance test (8) Infrastructure/Facilities Sub-elements: Industrial investment Government investment Definition and activation of the system. This element contains items that are used or consumed in the conduct of such tests and specially fabricated hardware to obtain or validate engineering data on the performance of the system. This activity may further breakdown into sub-elements such as: developmental test and evaluation and test facilities. This encompasses delivery and installation and activation of the system (Set-To-Work), acceptance testing, and initial training to operate the system. Delivery includes moving materiel from the manufacturer to the first point of acceptance. It also includes conditioning, packaging, handling, storage and transportation activities to government operational sites. Set-To-Work includes installing all equipment at an end user or contractor locations. Through initial training personnel will learn how to operate and maintain the system. Acceptance testing includes demonstrating that the system configuration works in an operational environment. Facilities include the permanent, semi-permanent, or temporary real property assets required to operate and support the materiel system. This element can typically include: vehicle hangers, workshops, munitions storage, etc. (9) Other This element typically includes contingency. Activity (1) Operation Sub-elements: System manpower System operation materials Operation support and services (2) Maintenance Sub-elements: Level 1 maintenance Level 2 maintenance Level 3 maintenance Level 4 Maintenance Table A.3: Operations and sustainment phase. Definition The system manpower element includes the labour of all operators and other support labour directly related to the unit operation. It may include military, government civilian and sometimes contractor manpower. The system operation materials element includes operating energy (fuel, petroleum, oil and lubricates, electricity, etc.) and training munitions. This element also includes the activities that support the analyzed system (administration, engineering, logistics, safety and security, etc.). Planned and unplanned activities intended to keep the system in (or to return it to) a given state. Maintenance can be broken down into four levels: Level 1 maintenance includes preventive maintenance and corrective maintenance tasks of a minor nature. Level 2 maintenance includes corrective maintenance by repair or replacement of parts and assemblies limited only by time (usually 24 hours). DRDC-RDDC-2016-R086 15

24 Activity (3) Sustaining support Sub-elements: System specific training Support equipment Maintenance and repair Sustaining/system engineering Program management Software maintenance support Maintaining and updating of data and technical publications Replenishment and PHST (4) Continuing System Improvements Sub-elements: Software upgrade Modification and Engineering change Major system capability upgrade (5) Indirect Support Sub-elements: Installation/Operation support Personnel support general training and education Other indirect support Definition Level 3 maintenance includes corrective maintenance of longer duration than level 2, reconditioning of assemblies, rebuild of minor components, and limited calibration. Level 4 Maintenance includes the complete overhaul of equipment normally performed at a military Depot or civilian manufacturer (DND, 2002). Support activities provided by centrally managed organizations external to the units that own the operating systems. This includes (1) all the costs directly associated with systemspecific specialty training activities in the Operations & Sustainment phase. (2) The costs incurred to replace or repair support equipment associated with the primary system or its major subsystems at all levels of maintenance. (3) The government and contractor sustaining engineering to ensure the operational reliability and conformance with established specifications. (4) Management activities associated with the program. This element may be combined with Sustaining Engineering if costs cannot be identified separately. (5) Software Maintenance Support. (6) Maintaining and Updating of Data and Technical Publications. (7) Re-provisioning for the routine replenishment and PHST (Packaging, Handling, Storage and Transportation) (DoD, 2014). Upgrade and additional operational capabilities that occur after deployment of a system. This activity is intended to improve the system's safety and reliability. It can also be intended to enable the system to meet its basic original operational requirements. This activity may further breakdown into sub-elements such as Software upgrade, Modification and engineering change, and Major system upgrade. It could be considered as separate new procurement during the system mid-life and therefore could be accounted separately if applicable. Indirect support costs are those support costs from centrallyorganized resources that cannot be identified directly to the units but can be logically attributed to the system s operation, maintenance and sustainment. The indirect support can include a variety of services such as operation support, personnel administration, general training and education, security, and legal. 16 DRDC-RDDC-2016-R086

25 Table A.4: Disposal phase. Activity Definition (1) Disposal planning Activity intended to manage the end-of-life tasks and actions. It includes Sub-elements: the system disposal planning, costing and control. Disposal project management plan Disposal environmental management plan Tenders and tender evaluation (2) Demilitarization Activity intended to remove or neutralize the military potential of a system. It includes removal of explosives, weapons, etc. (3) Disposal of Activity intended to ease the pressure of the system disposal on the hazardous materials environment and public health. It includes destroying the hazardous wastes and remediating the site once contaminated. Activity intended to disassemble or destroy the demilitarized system. It includes disassembling or destroying the system. (4) Dismantle or destruction (5) Storage Activities intended to purchase and operate storage locations. It includes purchasing and operating storage locations. (6) Transportation Activity intended to transport the system to the demilitarization site. It includes transporting the system to the demilitarization site. (7) Resale Activity intended to sale the demilitarized system and the support elements. This activity not only incurs costs but may also realize revenue. DRDC-RDDC-2016-R086 17

26 This page intentionally left blank. 18 DRDC-RDDC-2016-R086

27

28 (4 Disposal (1) Disposal planning (2) Demilitarization (3) Disposal of hazardous materials (4) Dismantle or destruction (5) Storage (6) Transportation (7) Resale. 20 DRDC-RDDC-2016-R086

29 Annex C Canadian generic CBS for defence acquisition projects This Annex presents a generic CBS for military equipment in a typical Canadian context. 1.0 Development 1.1 Project management - Salaries (Civilian and military) - Contracted Support - Operating Expenses (Travel, Office Space/Supplies, Training, Legal, Security etc) - Professional Service - PWGSC Revenue Dependency 1.2 Studies and analyses 1.3 Solicitation and Contracts 1.4 Research and Design (Optional) - Design & Development - System Engineering/Program Management - Engineering Development Model - Operational Test and Evaluations - Other Studies 1.5 Other 2.0 Acquisition 2.1 Management - Salaries - Contracted Support - Operating Expenses - Professional Service 2.2 Studies, Analysis and Simulation 2.3 Engineering - System Engineering - Design and Development Engineering - Design and Engineering Changes 2.4 Purchase - Main Mission System - Major Sub-systems - Support System: Peculiar Equipment Common Equipment - Initial Spares and Repair Parts 2.5 System Integration 2.6 System Test, Trials and Evaluation - Developmental Test and Evaluation - Operational Test and Evaluation - Mock-ups/System Integration Labs - Test and Evaluation Support DRDC-RDDC-2016-R086 21

30 - Test Facilities 2.7 Deployment - Delivery (PHST Packaging, Handling, Storage and Transportation) - Initial Training - Installations and Set-To-Work - Final Acceptance Test 2.8 Infrastructure, Facilities and Investment on Specific Means - Industrial Investment - Government Investment 2.9 Other 3.0 Operations & Sustainment 3.1 Operations - System Manpower - Energy (Fuel, Petroleum, Oil and Lubricates, Electricity, etc.) - Training Munitions and Expendable Stores - Other Operating Materials - Operation Support and Services 3.2 Maintenance - Level 1 Maintenance - Level 2 Maintenance - Level 3 Maintenance - Level 4 Maintenance 3.3 Sustaining Support - System Specific Training - Support Equipment Maintenance and Repair - Sustaining/System Engineering - Program Management - Software Maintenance Support - Maintaining and Updating of Data and Technical Publications - Replenishment and PHST 3.4 Continuing System Improvements - Software Upgrade - Modification and Engineering Change - Major System/Capability Upgrade 3.5 Indirect Support - Installation/Operation Support - Personnel Support - General Training and Education - Other Indirect Support (Legal, Security, Housing, etc.) 4.0 Disposal 4.1 Disposal Planning - Disposal Project Management plan - Disposal Environmental Management Plan - Tenders and Tender evaluation 4.2 Demilitarization 4.3 Disposal of hazardous materials 22 DRDC-RDDC-2016-R086

31 4.4 Dismantle or Destruction of System 4.5 Storage 4.6 Transportation 4.7 Resale of Demilitarized System (revenue) C.1 Aircraft system CBS The aircraft system CBS is similar to the generic CBS in Annex C with only one exception in the acquisition phase. In this phase, the purchase activity can be decomposed as follows: 2.4 Purchase - Aircraft Airframe Propulsion Aircraft vehicle Subsystems Avionics Auxiliary Equipment Armament/Weapons Furnishings - Support System Peculiar Equipment Common Equipment - Initial Spares and Repair Parts Figure C.1: CF-188 Hornet. DRDC-RDDC-2016-R086 23

32 C.2 Sea system CBS The sea system CBS is similar to the generic CBS in Annex C with only one exception in the acquisition phase. In this phase, the purchase activity can be decomposed as follows: 2.4 Purchase - Ship Hull Structure Propulsion Electrical Command, Control, Communication and Surveillance Auxiliary System Outfit and Furnishings Armament - Major Sub-systems - Support System Peculiar Equipment Common Equipment - Initial Spares and Repair Parts Figure C.2: HMCS Fredericton. 24 DRDC-RDDC-2016-R086

33 C.3 Ground vehicle system CBS The ground (surface) vehicle system CBS is similar to the generic CBS in Annex C with only one exception in the acquisition phase. In this phase, the purchase activity can be decomposed as follows: 2.4 Purchase - Surface Vehicle System - Primary Vehicle Hull/frame/Body/Cab Turret Assembly Suspension/Steering Vehicle Electronics Power Package/Drive Train Auxiliary Automotive Fire Control Armament Automatic Ammunition handling Navigation and Remote Piloting Special Equipment Communications Primary Vehicle Software release Other vehicle Subsystems - Remote Control System Ground control Systems Communication and Control Subsystem Remote Control System Software Release Other remote Control Subsystem - Secondary Vehicle - Support System Peculiar Equipment Common Equipment - Initial Spares and Repair Parts Figure C.3: Leopard 2A4 tank. DRDC-RDDC-2016-R086 25

34 C.4 Missile system work breakdown structure The missile system CBS is similar to the generic CBS in Annex C with only one exception in the acquisition phase. In this phase, the purchase activity can be decomposed as follows: 2.4 Purchase - Missile System - Air Vehicle Airframe Propulsion Subsystems Power and Distribution Guidance Navigation Controls Communications Payload Reentry System Post Boost System Ordnance Initiation Set Onboard Test Equipment Onboard Training Equipment Auxiliary Equipment Air Vehicle Software Release - Encasement Device - Command and Launch Sensors Launch and Guidance Control Communications Launcher Equipment Auxiliary Equipment Booster Adapter Command and Launch Software Release Other Command and Launch System - Missile System Software Release - Support System - Peculiar Equipment - Common Equipment - Initial Spares and Repair Parts (parl.gc.ca) Figure C.4: Ballistic missile. 26 DRDC-RDDC-2016-R086

35 List of symbols/abbreviations/acronyms/initialisms ADM (Fin CS) CBS CES DND DoD DRDC LCC NASA NATO PAD PHST TOC US WLC Assistant Deputy Minister (Finance & Corporate Services) Cost Breakdown Structure Cost Element Structure Department of National Defence The US Department of Defense Defence Research and Development Canada Life Cycle Cost National Aeronautics and Space Administration North Atlantic Treaty Organisation Project Approval Directive Packaging, Handling, Storing, and Transporting Total Ownership Cost United States Whole Life Cost DRDC-RDDC-2016-R086 27

36 This page intentionally left blank. 28 DRDC-RDDC-2016-R086

37 DOCUMENT CONTROL DATA (Security markings for the title, abstract and indexing annotation must be entered when the document is Classified or Designated) 1. ORIGINATOR (The name and address of the organization preparing the document. Organizations for whom the document was prepared, e.g., Centre sponsoring a contractor's report, or tasking agency, are entered in Section 8.) 2a. SECURITY MARKING (Overall security marking of the document including special supplemental markings if applicable.) DRDC Centre for Operational Research and Analysis Defence Research and Development Canada 101 Colonel By Drive Ottawa, Ontario K1A 0K2 Canada UNCLASSIFIED 2b. CONTROLLED GOODS (NON-CONTROLLED GOODS) DMC A REVIEW: GCEC DECEMBER TITLE (The complete document title as indicated on the title page. Its classification should be indicated by the appropriate abbreviation (S, C or U) in parentheses after the title.) Development of Cost Breakdown Structure for Defence Acquisition Projects 4. AUTHORS (last name, followed by initials ranks, titles, etc., not to be used) Sokri, A.; Ghergari, V.; Wang, L. 5. DATE OF PUBLICATION (Month and year of publication of document.) May a. NO. OF PAGES (Total containing information, including Annexes, Appendices, etc.) 38 6b. NO. OF REFS (Total cited in document.) DESCRIPTIVE NOTES (The category of the document, e.g., technical report, technical note or memorandum. If appropriate, enter the type of report, e.g., interim, progress, summary, annual or final. Give the inclusive dates when a specific reporting period is covered.) Scientific Report 8. SPONSORING ACTIVITY (The name of the department project office or laboratory sponsoring the research and development include address.) DRDC Centre for Operational Research and Analysis Defence Research and Development Canada 101 Colonel By Drive Ottawa, Ontario K1A 0K2 Canada 9a. PROJECT OR GRANT NO. (If appropriate, the applicable research and development project or grant number under which the document was written. Please specify whether project or grant.) 9b. CONTRACT NO. (If appropriate, the applicable number under which the document was written.) 10a. ORIGINATOR S DOCUMENT NUMBER (The official document number by which the document is identified by the originating activity. This number must be unique to this document.) 10b. OTHER DOCUMENT NO(s). (Any other numbers which may be assigned this document either by the originator or by the sponsor.) DRDC-RDDC-2016-R DOCUMENT AVAILABILITY (Any limitations on further dissemination of the document, other than those imposed by security classification.) Unlimited 12. DOCUMENT ANNOUNCEMENT (Any limitation to the bibliographic announcement of this document. This will normally correspond to the Document Availability (11). However, where further distribution (beyond the audience specified in (11) is possible, a wider announcement audience may be selected.)) Unlimited

ballistic Defence April 20122

ballistic Defence April 20122 RHA steel variations and ballistic protection their effects on Grant W.J. McIntosh DRDC Valcartier Defence e R&D Canada Valcartier Technical Memorandum DRDC Valcartier TM 2011-533 April 20122 RHA steel

More information

The 7 th International Scientific Conference DEFENSE RESOURCES MANAGEMENT IN THE 21st CENTURY Braşov, November 15 th 2012

The 7 th International Scientific Conference DEFENSE RESOURCES MANAGEMENT IN THE 21st CENTURY Braşov, November 15 th 2012 The 7 th International Scientific Conference DEFENSE RESOURCES MANAGEMENT IN THE 21st CENTURY Braşov, November 15 th 2012 Tudorel SLAVULETE Logistics Directorate/Romanian General STAFF Abstract Top managers

More information

LOGISTIC SUPPORT ANALYSIS DEFENCE STANDARD

LOGISTIC SUPPORT ANALYSIS DEFENCE STANDARD COMMONWEALTH OF AUSTRALIA AUSTRALIAN DEFENCE STANDARD Issue 1 Dated 02 December 2002 LOGISTIC SUPPORT ANALYSIS DEFENCE STANDARD * PUBLISHED UNDER AUTHORITY DEPARTMENT OF DEFENCE DOCUMENT MANAGEMENT INFORMATION

More information

A Simulation Study of Operational Availability of Canadian Armed Forces Equipment under Different Maintenance Regimes

A Simulation Study of Operational Availability of Canadian Armed Forces Equipment under Different Maintenance Regimes Her Majesty the Queen in Right of Canada, as represented by the Minister of National Defence, 2015 DRDC-RDDC-2015-P154 Sa Majesté la Reine (en droit du Canada), telle que représentée par le ministre de

More information

The Benefits and Costs of Land Vehicle Health & Usage Monitoring Systems: A multidisciplinary approach for Inservice

The Benefits and Costs of Land Vehicle Health & Usage Monitoring Systems: A multidisciplinary approach for Inservice The Benefits and Costs of Land Vehicle Health & Usage Monitoring Systems: A multidisciplinary approach for Inservice fleets Mr Bryan McGrath, MEng-ILM. Business Development Manager, Tectonica Australia

More information

Guidance on project management

Guidance on project management BSI Standards Publication NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW raising standards worldwide Guidance on project management BRITISH STANDARD National foreword This British

More information

Military Equipment Procurement Supplier Quality Assurance. ASQ Presentation 06 November 2015

Military Equipment Procurement Supplier Quality Assurance. ASQ Presentation 06 November 2015 Military Equipment Procurement Supplier Quality Assurance ASQ Presentation 06 November 2015 Breakout Speaker Vernon Purcell Quality Assurance Manager Calgary Department of National Defence Directorate

More information

TOPIC DESCRIPTION SUPPLEMENT for the SYSTEMS ENGINEERING SURVEY DESCRIPTION

TOPIC DESCRIPTION SUPPLEMENT for the SYSTEMS ENGINEERING SURVEY DESCRIPTION 1 2 Objectives of Systems Engineering 3 4 5 6 7 8 DoD Policies, Regulations, & Guidance on Systems Engineering Roles of Systems Engineering in an Acquisition Program Who performs on an Acquisition Program

More information

Evolution of Aircraft Maintenance and Support Concepts French Armed Forces Perspectives

Evolution of Aircraft Maintenance and Support Concepts French Armed Forces Perspectives ABSTRACT Evolution of Aircraft Maintenance and Support Concepts French Armed Forces Perspectives Colonel Patrick Joubert French Air Force, SIMMAD BA 217 F-91224 Brétigny-sur-Orge Cedex FRANCE patrick.joubert.simmad@wanadoo.fr

More information

DATA ITEM DESCRIPTION

DATA ITEM DESCRIPTION DATA ITEM DESCRIPTION TITLE: The 50/50 Requirements Report NUMBER: APPROVAL DATE: 20070912 AMSC NUMBER: F9002 LIMITATION: N/A DTIC APPLICABLE: N/A GIDEP APPLICABLE: N/A PREPARING ACTIVITY: 10 (ASC/YFPC)

More information

STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING DEVELOPMENT & INTEGRATION (SSPEDI) Space Solutions (SpS)

STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING DEVELOPMENT & INTEGRATION (SSPEDI) Space Solutions (SpS) SSPEDI SpS J.1(a), Attachment 1 80ARC018R0007 National Aeronautics and Space Administration Ames Research Center Moffett Field, CA 94035-0001 STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING

More information

NATO REQUIREMENTS FOR RELIABILITY AND MAINTAINABILITY. ARMP-1 (Edition 3)

NATO REQUIREMENTS FOR RELIABILITY AND MAINTAINABILITY. ARMP-1 (Edition 3) NATO REQUIREMENTS FOR RELIABILITY AND MAINTAINABILITY ARMP-1 June 2002 I ORIGINAL (Reverse blank) NORTH ATLANTIC TREATY ORGANIZATION NATO STANDARDISATION AGENCY (NSA) NATO LETTER OF PROMULGATION June

More information

Department of Defense MANUAL

Department of Defense MANUAL Department of Defense MANUAL NUMBER 4140.01, Volume 1 February 10, 2014 Incorporating Change 1, November 27, 2017 USD(AT&L) SUBJECT: DoD Supply Chain Materiel Management Procedures: Operational Requirements

More information

00-40 (PART 6) / Issue 1 (ARMP-6) RELIABILITY AND MAINTAINABILITY PART 6: IN-SERVICE R & M

00-40 (PART 6) / Issue 1 (ARMP-6) RELIABILITY AND MAINTAINABILITY PART 6: IN-SERVICE R & M Ministry of Defence Defence Standard 00-40 (PART 6) / Issue 1 () RELIABILITY AND MAINTAINABILITY 9 December 1988 PART 6: IN-SERVICE R & M DEF STAN 00-40 (PART 6)/1 ( ) AMENDMENTS ISSUED SINCE PUBLICATION

More information

DOD MANUAL , VOLUME 1 DOD SUPPLY CHAIN MATERIEL MANAGEMENT PROCEDURES: OPERATIONAL REQUIREMENTS

DOD MANUAL , VOLUME 1 DOD SUPPLY CHAIN MATERIEL MANAGEMENT PROCEDURES: OPERATIONAL REQUIREMENTS DOD MANUAL 4140.01, VOLUME 1 DOD SUPPLY CHAIN MATERIEL MANAGEMENT PROCEDURES: OPERATIONAL REQUIREMENTS Originating Component: Office of the Under Secretary of Defense for Acquisition and Sustainment Effective:

More information

Whole Life Costing (WLC) Principles, Problems and Solutions

Whole Life Costing (WLC) Principles, Problems and Solutions Whole Life Costing (WLC) Principles, Problems and Solutions Professor David Kirkpatrick Defence Engineering Group University College London Structure of presentation Introduction what are WLC? Forecasting

More information

DEPARTMENT OF DEFENSE HANDBOOK ACQUISITION OF SOFTWARE ENVIRONMENTS AND SUPPORT SOFTWARE

DEPARTMENT OF DEFENSE HANDBOOK ACQUISITION OF SOFTWARE ENVIRONMENTS AND SUPPORT SOFTWARE NOT MEASUREMENT SENSITIVE MIL-HDBK-1467 10 DECEMBER 1997 SUPERSEDING SEE 6.2 DEPARTMENT OF DEFENSE HANDBOOK ACQUISITION OF SOFTWARE ENVIRONMENTS AND SUPPORT SOFTWARE This handbook is for guidance only.

More information

Materiel Life Cycle Guide

Materiel Life Cycle Guide A guide to life cycle processes for equipping and sustaining Australia s Defence Force Edition 1 May 2003 Materiel Acquisition and Sustainment Framework Foreword Our mission in the DMO is to equip and

More information

NATO POLICY ON AN INTEGRATED SYSTEMS APPROACH TO QUALITY THROUGH THE LIFE CYCLE

NATO POLICY ON AN INTEGRATED SYSTEMS APPROACH TO QUALITY THROUGH THE LIFE CYCLE AQAP 2000 NATO POLICY ON AN INTEGRATED SYSTEMS APPROACH TO QUALITY THROUGH THE LIFE CYCLE AQAP 2000 (June 2003) I ORIGINAL AQAP 2000 Page blank II ORIGINAL AQAP 2000 NORTH ATLANTIC TREATY ORGANIZATION

More information

The PORTFOLIO APPROACH developed to underpin the Capital Investment Program Plan Review (CIPPR)

The PORTFOLIO APPROACH developed to underpin the Capital Investment Program Plan Review (CIPPR) Defence Research and Development Canada Recherche et développement pour la défense Canada 6 November 2014 DRDC-RDDC-2014-L255 Produced for: Col. Basinger, Director, DCI, CFD Scientific Letter The PORTFOLIO

More information

NPS Total Ownership Cost Models

NPS Total Ownership Cost Models NPS Total Ownership Cost Models Raymond Madachy Naval Postgraduate School rjmadach@nps.edu Systems Engineering Research Center Annual Technical Research Review March 19, 2014 Objective Total Ownership

More information

in unmanned. Scientific Letter. Army [1]. The goal of. systems, employed. Tomorrow this study. focuses on

in unmanned. Scientific Letter. Army [1]. The goal of. systems, employed. Tomorrow this study. focuses on Scientific Letter Unmanned Systems Study for the Canadiann Army Introduction 2015-10-27 DRDC-RDDC-2015-L376 Produced for: Canadian Army Land Warfare Centre (CALWC) and Directorate of Land Requirements

More information

DEPARTMENT OF DEFENSE STANDARD PRACTICE

DEPARTMENT OF DEFENSE STANDARD PRACTICE NOT MEASUREMENT SENSITIVE MIL-STD-881C 3 October 2011 SUPERSEDING MIL-HDBK-881A 30 July 2005 MIL-STD-881B 25 March 1993 DEPARTMENT OF DEFENSE STANDARD PRACTICE WORK BREAKDOWN STRUCTURES FOR DEFENSE MATERIEL

More information

Ardmore Seaport-e Contract Team Capabilities

Ardmore Seaport-e Contract Team Capabilities Ardmore Seaport-e Contract Team Capabilities COMPANY NAME 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 ARDMORE CONSULTING GROUP SURVICE TWINTRON

More information

Standardization Template

Standardization Template Standardization Template I. PURPOSE: This template helps the user to make an informed standardization decision by assessing: (1) standardization opportunities, (2) standardization decision processes, and

More information

MORS Introduction to Cost Estimation (Part I)

MORS Introduction to Cost Estimation (Part I) MORS Introduction to Cost Estimation (Part I) Mr. Huu M. Hoang Slide 1 Disclosure Form Slide 2 Learning Objectives of Module Two 1. Understand how to define a program using the various documents and other

More information

Last Update: 25 June October 2014 Guide to Evaluating Total Cost of Ownership

Last Update: 25 June October 2014 Guide to Evaluating Total Cost of Ownership Innovation Procurement Guide No. 3 Guide to Evaluating Total Cost of Ownership Last Update: 25 June 201510 October 2014 Guide to Evaluating Total Cost of Ownership Table of contents Introduction... 2 Purpose

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY Template modified: 27 May 1997 14:30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 63-501 31 MAY 1994 Certified Current 4 November 2009 Acquisition AIR FORCE ACQUISITION QUALITY PROGRAM

More information

Instructions For Populating GFP Attachments

Instructions For Populating GFP Attachments Instructions For Populating GFP Attachments August 2014 The two attachments for GFP serve multiple purposes in the contract. They document the agreement between the Government and the contractor on what

More information

High-Level Costing Models within the Technical Cooperation Program Nations

High-Level Costing Models within the Technical Cooperation Program Nations High-Level Costing Models within the Technical Cooperation Program Nations Abderrahmane Sokri DRDC Centre for Operational Research and Analysis Prepared for: TTCP JSA TP 3, Focus Area 4 High-Level Costing

More information

PROTECTED A. Follow-up on Internal Audit: MWAV ISSC Pre-publication copy not for external distribution Proposed Final January 2014 PROTECTED A

PROTECTED A. Follow-up on Internal Audit: MWAV ISSC Pre-publication copy not for external distribution Proposed Final January 2014 PROTECTED A Follow-up on Internal Audit: MWAV ISSC Pre-publication copy not for external distribution Proposed Final January 2014 Follow-up on Internal Audit: Land Command Support System (LCSS) Contract March 2014

More information

NATO STANDARD AQAP-2210

NATO STANDARD AQAP-2210 NATO STANDARD AQAP-2210 NATO SUPPLEMENTARY SOFTWARE QUALITY ASSURANCE REQUIREMENTS TO AQAP-2110 OR AQAP-2310 Edition A Version 2 September 2015 NORTH ATLANTIC TREATY ORGANIZATION ALLIED QUALITY ASSURANCE

More information

DATA ITEM DESCRIPTION

DATA ITEM DESCRIPTION DATA ITEM DESCRIPTION Title: DISTRIBUTION OF DEPARTMENT OF DEFENSE (DoD) DEPOT MAINTENANCE WORKLOAD (50/50) REPORT Number: Approved Date: 20160322 AMSC Number: F9645 Limitation: N/A DTIC Applicable: No

More information

CRITERIA FOR A DIGITAL HUMAN MODELING AND ANALYSIS SOFTWARE TOOL

CRITERIA FOR A DIGITAL HUMAN MODELING AND ANALYSIS SOFTWARE TOOL CRITERIA FOR A DIGITAL HUMAN MODELING AND ANALYSIS SOFTWARE TOOL Kent W. McKee and David W. Tack Prepared By: Humansystems Incorporated 111 Farquhar Street Guelph, ON N1H 3N4 PWGSC Contract Number: W7711-088136/001/TOR;

More information

Systems Engineering Processes Applied To Ground Vehicle Integration at US Army Tank Automotive Research, Development, and Engineering Center (TARDEC)

Systems Engineering Processes Applied To Ground Vehicle Integration at US Army Tank Automotive Research, Development, and Engineering Center (TARDEC) 2010 NDIA GROUND VEHICLE SYSTEMS ENGINEERING AND TECHNOLOGY SYMPOSIUM SYSTEMS ENGINEERING MINI-SYMPOSIUM AUGUST 17-19 DEARBORN, MICHIGAN Systems Engineering Processes Applied To Ground Vehicle Integration

More information

National Aeronautics and Space Administration Washington, DC 20546

National Aeronautics and Space Administration Washington, DC 20546 Technical Standards Division Publication NASA-STD-2100-91 NASA Software Documentation Standard Software Engineering Program NASA-STD-2100-91 -91 Approved: July 29, 1991 National Aeronautics and Space Administration

More information

DEPARTMENT OF DEFENSE STANDARD PRACTICE

DEPARTMENT OF DEFENSE STANDARD PRACTICE NOT MEASUREMENT SENSITIVE MIL-STD-881D 9 April 2018 SUPERSEDING MIL-STD-881C 3 October 2011 DEPARTMENT OF DEFENSE STANDARD PRACTICE WORK BREAKDOWN STRUCTURES FOR DEFENSE MATERIEL ITEMS AMSC 9915 AREA MISC

More information

Supportability Modelling and Decision Making using the Baseline Comparison System. OmegaPS UGM June 2015 Jonathan Patterson

Supportability Modelling and Decision Making using the Baseline Comparison System. OmegaPS UGM June 2015 Jonathan Patterson Supportability Modelling and Decision Making using the Baseline Comparison System OmegaPS UGM June 2015 Jonathan Patterson Equipment Management Decisions We make decisions every day We consider alternatives,

More information

8Stockpile Management: Planning 1

8Stockpile Management: Planning 1 8Stockpile Management: Planning 1 Adrian Wilkinson Overview Stockpile management is a wide-ranging term that covers specific technical areas related to the safety and security of ammunition and explosives,

More information

FINABEL COORDINATING COMMITTEE Quartier Reine Elisabeth Rue d'evere B-1140 BRUSSELS. 06 May 2009 FIN/SEC/ C

FINABEL COORDINATING COMMITTEE Quartier Reine Elisabeth Rue d'evere B-1140 BRUSSELS. 06 May 2009 FIN/SEC/ C FINABEL COORDINATING COMMITTEE Quartier Reine Elisabeth Rue d'evere B-1140 BRUSSELS 06 May 2009 FIN/SEC/27.274-C Tél Col : 02/701.41.04 Tél Cdt : 02/701.41.03 Tél Srt : 02/701.68.24 FAX : 02/701.71.78

More information

Space Project Management

Space Project Management EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space Project Management Integrated Logistic Support Secretariat ESA ESTEC Requirements & Standards Division Noordwijk, The Netherlands Published by: Price:

More information

DEPARTMENT OF DEFENSE STANDARD PRACTICE FOR CALIBRATION AND MEASUREMENT REQUIREMENTS

DEPARTMENT OF DEFENSE STANDARD PRACTICE FOR CALIBRATION AND MEASUREMENT REQUIREMENTS NOT MEASUREMENT SENSITIVE MIL-STD-1839C 27 November 2000 SUPERSEDING MIL-STD-1839B 20 AUGUST 1995 DEPARTMENT OF DEFENSE STANDARD PRACTICE FOR CALIBRATION AND MEASUREMENT REQUIREMENTS AMSC F4562 AREA QCIC

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER EDWARDS AIR FORCE BASE EDWARDS AIR FORCE BASE INSTRUCTION 65-713 28 JANUARY 2016 Financial Management PRODUCT AND SERVICE RATES COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY:

More information

Downloaded from DEPARTMENT OF DEFENSE STANDARD PRACTICE FOR CALIBRATION AND MEASUREMENT REQUIREMENTS

Downloaded from   DEPARTMENT OF DEFENSE STANDARD PRACTICE FOR CALIBRATION AND MEASUREMENT REQUIREMENTS NOT MEASUREMENT SENSITIVE 27 November 2000 SUPERSEDING MIL-STD-1839B 20 AUGUST 1995 DEPARTMENT OF DEFENSE STANDARD PRACTICE FOR CALIBRATION AND MEASUREMENT REQUIREMENTS AMSC F4562 AREA QCIC DISTRIBUTION

More information

Department of Defense MANUAL

Department of Defense MANUAL Department of Defense MANUAL NUMBER 4140.01, Volume 7 February 10, 2014 USD(AT&L) SUBJECT: DoD Supply Chain Materiel Management Procedures: Supporting Technologies References: See Enclosure 1 1. PURPOSE

More information

Methodology for Selecting the Preferred Networked Computer System Solution for Dynamic Continuous Defense Missions

Methodology for Selecting the Preferred Networked Computer System Solution for Dynamic Continuous Defense Missions Methodology for Selecting the Preferred Networked Computer Solution for Dynamic Continuous Defense Missions San Diego Dr. Glenn S. Tolentino Command & Control and Enterprise Engineering Department SPAWAR

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 4151.19 January 9, 2014 Incorporating Change 1, November 1, 2017 USD(AT&L) SUBJECT: Serialized Item Management (SIM) for Life-Cycle Management of Materiel References:

More information

Department of Defense DIRECTIVE. SUBJECT: DoD Replenishment Parts Purchase or Borrow Program

Department of Defense DIRECTIVE. SUBJECT: DoD Replenishment Parts Purchase or Borrow Program Department of Defense DIRECTIVE NUMBER 4140.57 April 13, 1987 Certified Current as of December 8, 2003 SUBJECT: DoD Replenishment Parts Purchase or Borrow Program USD(A) References: (a) Public Law 98-525,

More information

A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts

A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts Ahmed Ghanmi Defence Research and Development Canada Centre for Operational Research and Analysis Ottawa,

More information

Managing Systems Engineering Processes: a Multi- Standard Approach

Managing Systems Engineering Processes: a Multi- Standard Approach Managing Systems Engineering Processes: a Multi- Standard Approach Rui Xue, Claude Baron, Philippe Esteban, Hamid Demmou To cite this version: Rui Xue, Claude Baron, Philippe Esteban, Hamid Demmou. Managing

More information

NATO Initiatives to Improve Life Cycle Costing

NATO Initiatives to Improve Life Cycle Costing Marcel SMIT, M.Sc. TNO Defence, Security and Safety Oude Waalsdorperweg 63 P.O. Box 96864 2509 JG The Hague The Netherlands marcel.smit@tno.nl ABSTRACT There is a long and documented history of both cost

More information

ISO/IEC JTC1/SC7 N2683

ISO/IEC JTC1/SC7 N2683 ISO/IEC JTC1/SC7 Software & System Engineering Secretariat: CANADA (SCC) ISO/IEC JTC1/SC7 N2683 2002-07-25 Document Type PDTR Ballot Title PDTR 19760 Systems Engineering Guide for ISO/IEC 15288 (System

More information

SECTION C - DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK

SECTION C - DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK SECTION C - DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK C.1. OBJECTIVE The objective of OASIS is to provide Government agencies with total integrated solutions for a multitude of professional service

More information

Cost Estimating Documentation Guide

Cost Estimating Documentation Guide Cost Estimating Documentation Guide Prepared by Deputy Assistant Secretary of the Navy (Cost & Economics) Naval Center for Cost Analysis Purpose: Provide Naval Center for Cost Analysis (NCCA) policy on

More information

Number: DI-HFAC-81743A Approval Date: Office of Primary Responsibility: AS/AIR 4.6 Applicable Forms: N/A

Number: DI-HFAC-81743A Approval Date: Office of Primary Responsibility: AS/AIR 4.6 Applicable Forms: N/A DATA ITEM DESCRIPTION Title: HUMAN SYSTEMS INTEGRATION PROGRAM PLAN Number: Approval Date: 20110421 AMSC Number: N9190 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility:

More information

Space project management

Space project management -M-10B EUROPEAN COOPERATION FOR SPACE STANARIZATION Space project management Project breakdown structures Secretariat ESA-ESTEC Requirements & Standards ivision Noordwijk, The Netherlands Published by:

More information

How to Use the Government Furnished Property Attachments: A Step-by-Step Tutorial

How to Use the Government Furnished Property Attachments: A Step-by-Step Tutorial How to Use the Government Furnished Property Attachments: A Step-by-Step Tutorial Presented by: Defense Procurement and Acquisition Policy (DPAP) 1 This information:» Should not be construed as changing

More information

Operational Availability Modeling for Risk and Impact Analysis

Operational Availability Modeling for Risk and Impact Analysis David J. Hurst Manager Accreditation and Audits Aerospace Engineering and Project Management Division National Defence Headquarters Major General George R. Pearkes Building 400 Cumberland Street Ottawa,

More information

Spacefaring Logistics Infrastructure Planning (2018 update)

Spacefaring Logistics Infrastructure Planning (2018 update) The original paper, Space Infrastructure Planning, was presented at the ASCE Space 96 Conference on Engineering, Operations, and Construction in Space, Albuquerque, NM, June 1-6,1996. The original paper

More information

OmegaPS Suite. Aerospace & Defence Industry Leader In Logistic Support Analysis Software

OmegaPS Suite. Aerospace & Defence Industry Leader In Logistic Support Analysis Software OmegaPS Suite Aerospace & Defence Industry Leader In Logistic Support Analysis Software Aerospace & Defence Industry Leader In Logistic Support Analysis Software Supportability Engineering Application

More information

The Work Breakdown Structure in the Systems Engineering Process. Abstract. Introduction

The Work Breakdown Structure in the Systems Engineering Process. Abstract. Introduction The Work Breakdown Structure in the Systems Engineering Process Mark A. Wilson Strategy Bridge International, Inc. 9 North Loudoun Street, Suite 208 Winchester, VA 22601-4798 mwilson@strategybridgeintl.com

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO/IEC 15504-5 First edition 2006-03-01 Information technology Process Assessment Part 5: An exemplar Process Assessment Model Technologies de l'information Évaluation des processus

More information

USING ARCHITECTURAL MODELS TO IDENTIFY OPPORTUNITIES FOR IMPROVEMENT OF ACQUISITION MANAGEMENT

USING ARCHITECTURAL MODELS TO IDENTIFY OPPORTUNITIES FOR IMPROVEMENT OF ACQUISITION MANAGEMENT I&S USING ARCHITECTURAL MODELS TO IDENTIFY OPPORTUNITIES FOR IMPROVEMENT OF ACQUISITION MANAGEMENT Aleksandar DIMOV, Gueorgui STANKOV, and Todor TAGAREV Abstract: The article presents a model of the processes

More information

DoD H, January 1997

DoD H, January 1997 1 2 FOREWORD TABLE OF CONTENTS Page Foreword 2 Table Of Contents 3 References 5 Definitions 6 CHAPTER 1. APPLICABILITY AND SCOPE 10 Section C1.1. Purpose and Application 10 Section C1.2. Indexes and Computations

More information

Procedures for Transporting Special Access Program (SAP) Material Short

Procedures for Transporting Special Access Program (SAP) Material Short Procedures for Transporting Special Access Program (SAP) Material Short Procedures for Transporting Special Access Program (SAP) Material Short Information Objective Identify the steps to take in order

More information

OmegaPS Suite. Aerospace & Defence Industry Leader In Logistic Support Analysis Software

OmegaPS Suite. Aerospace & Defence Industry Leader In Logistic Support Analysis Software OmegaPS Suite Aerospace & Defence Industry Leader In Logistic Support Analysis Software Aerospace & Defence Industry Leader In Logistic Support Analysis Software Supportability Engineering Application

More information

CHAPTER 41 MAINTAINABILITY DEMONSTRATION CONTENTS

CHAPTER 41 MAINTAINABILITY DEMONSTRATION CONTENTS Applied R&M Manual for Defence Systems Part C - R&M Related Techniques CHAPTER 41 MAINTAINABILITY DEMONSTRATION CONTENTS 1 INTRODUCTION 2 2 PURPOSE OF MAINTAINABILITY DEMONSTRATION 2 3 PRINCIPLES OF DEMONSTRATION

More information

Final review report Review of corporate accommodation Public Works and Government Services Canada Office of Audit and Evaluation March 31, 2016

Final review report Review of corporate accommodation Public Works and Government Services Canada Office of Audit and Evaluation March 31, 2016 Number and Title of Audit Draft Preliminary Survey Report Review of corporate accommodation Public Works and Government Services Canada Office of Audit and Evaluation March 31, 2016 Table of contents

More information

Canada s First National Interoperability Baseline Assessment: CPRC Project Study

Canada s First National Interoperability Baseline Assessment: CPRC Project Study Canada s First National Interoperability Baseline Assessment: CPRC 91052 Project Study Alison Brooks, PhD, PMP IDC Canada Lawrence Surtees IDC Canada Rob Burbach IDC Canada Scientific Authority Steve Palmer

More information

CHARACTERIZATION OF BURIED LANDMINE BLAST DRDC-RDDC-2016-N028

CHARACTERIZATION OF BURIED LANDMINE BLAST DRDC-RDDC-2016-N028 CHARACTERIZATION OF BURIED LANDMINE BLAST DRDC-RDDC-2016-N028 W. Roberts, M. Ceh, T. Josey Defence Research and Development Canada, Suffield Research Centre, PO Box 4000, Stn Main, Medicine Hat, AB, T1A

More information

PRACTICE NO. PD-ED RELIABILITY February 1996 PRACTICES PAGE 1 OF 7 COMMON REVIEW METHODS FOR ENGINEERING PRODUCTS

PRACTICE NO. PD-ED RELIABILITY February 1996 PRACTICES PAGE 1 OF 7 COMMON REVIEW METHODS FOR ENGINEERING PRODUCTS PREFERRED PRACTICE NO. PD-ED-1215.4 RELIABILITY PRACTICES PAGE 1 OF 7 COMMON REVIEW METHODS FOR Practice: Conduct technical reviews to validate engineering designs using a common, consistent approach which

More information

Sensor Package Integration for the X-65B Experimental Unmanned Combat Air Vehicle -- Navy (UCAV-N) Statement of Work.

Sensor Package Integration for the X-65B Experimental Unmanned Combat Air Vehicle -- Navy (UCAV-N) Statement of Work. Sensor Package Integration for the X-65B Experimental Unmanned Combat Air Vehicle -- Navy (UCAV-N) Statement of Work Frances Advincula Table of Contents 2.1 Department of Defense Specifications. [I am

More information

Marie Skłodowska-Curie Actions

Marie Skłodowska-Curie Actions Marie Skłodowska-Curie Actions Research and Innovation Staff Exchange Guide du candidat : Les changements Décembre 2018 1. How to use this Guide Box 2 Definitions of frequently used terms in this Guide

More information

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General 1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General The organization s management with executive The commitment and involvement of the responsibility shall define, document

More information

DATA ITEM DESCRIPTION

DATA ITEM DESCRIPTION DATA ITEM DESCRIPTION Title: HUMAN SYSTEMS INTEGRATION PROGRAM PLAN Number: Approval Date: 20070404 AMSC Number: N7716 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility:

More information

DESIGN PRINCIPLES, REQUIREMENTS, AND SAFETY ASSESSMENT FOR THE SAFE DISPOSITION OF MUNITIONS (An Overview of STANAG 4518)

DESIGN PRINCIPLES, REQUIREMENTS, AND SAFETY ASSESSMENT FOR THE SAFE DISPOSITION OF MUNITIONS (An Overview of STANAG 4518) DESIGN PRINCIPLES, REQUIREMENTS, AND SAFETY ASSESSMENT FOR THE SAFE DISPOSITION OF MUNITIONS (An Overview of STANAG 4518) Growing international awareness of ecological issues and the environmental impact

More information

A COMPREHENSIVE UXO CLEARANCE QUALITY ASSURANCE PLAN TRACADIE RANGE, NEW BRUNSWICK, CANADA

A COMPREHENSIVE UXO CLEARANCE QUALITY ASSURANCE PLAN TRACADIE RANGE, NEW BRUNSWICK, CANADA A COMPREHENSIVE UXO CLEARANCE QUALITY ASSURANCE PLAN TRACADIE RANGE, NEW BRUNSWICK, CANADA CAPTAIN FRANCOIS LEDUC, M. Eng., P. Eng. Director Construction and Property Services Delivery 7-8 National Defence

More information

D E F E N S E S T A N D A R D I Z A T I O N P R O G R A M O F F I C E

D E F E N S E S T A N D A R D I Z A T I O N P R O G R A M O F F I C E D E F E N S E S T A N D A R D I Z A T I O N P R O G R A M O F F I C E Public law requires the Secretary of Defense, to the highest degree practicable, to standardize items used throughout the Department

More information

Reliability, Availability, and Maintainability

Reliability, Availability, and Maintainability Army Regulation 702 19 Product Assurance Reliability, Availability, and Maintainability UNCLASSIFIED Headquarters Department of the Army Washington, DC 22 May 2018 SUMMARY of CHANGE AR 702 19 Reliability,

More information

LVC-IA EC WBS/Dictionary Dictionary

LVC-IA EC WBS/Dictionary Dictionary WBS 1.0 LVC-IA EC 1.1 LVC-IA Products 1.1.1 Live Integration Products 1.1.2 Virtual Integration Products 1.1.3 Constructive Integration Products 1.1.4 Gaming Integration Products 1.1.5 Integrated Architecture

More information

New Army and DoD Reliability Scorecard

New Army and DoD Reliability Scorecard Marguerite H. Shepler Mechanical Engineer USAMSAA 392 Hopkins Road Bldg. 237 (RDAM-LR) APG, MD 21005-5071 410-278-5124 e-mail: marguerite.shepler@us.army.mil SUMMARY & CONCLUSIONS New Army and DoD Reliability

More information

9 Maintainability. Management and Costing 9.1 INTRODUCTION 9.2 MAINTAINABILITY MANAGEMENT TASKS DURING THE PRODUCT LIFE CYCLE

9 Maintainability. Management and Costing 9.1 INTRODUCTION 9.2 MAINTAINABILITY MANAGEMENT TASKS DURING THE PRODUCT LIFE CYCLE 9 Maintainability Management and Costing 9.1 INTRODUCTION Just like in any other area of engineering, management plays an important role in the practice of maintainability engineering. Its tasks range

More information

TM TECHNICAL MANUAL DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

TM TECHNICAL MANUAL DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL TECHNICAL MANUAL DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL TURBINE ENGINE, FIELD SERVICE MODEL AGT1500 (M1/1PM1) (P/N 12287428), TURBINE ENGINE, FIELD SERVICE MODEL AGT1500 (M1A1) (P/N 12324029),

More information

Space Project Management

Space Project Management EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space Project Management Configuration Management Secretariat ESA ESTEC Requirements & Standards Division Noordwijk, The Netherlands Published by: Price:

More information

Canada Border Services Agency (CBSA) National Information Exchange Model (NIEM)-Based Information Exchange

Canada Border Services Agency (CBSA) National Information Exchange Model (NIEM)-Based Information Exchange CAN UNCLASSIFIED Canada Border Services Agency (CBSA) National Information Exchange Model (NIEM)-Based Information Exchange Daniel Charlebois DRDC Centre for Security Science Defence Research and Development

More information

LVC-IA EC WBS/Dictionary Dictionary

LVC-IA EC WBS/Dictionary Dictionary WBS 1.0 LVC-IA EC 1.1 LVC-IA Products 1.1.1 Live Integration Products 1.1.2 Virtual Integration Products 1.1.3 Constructive Integration Products 1.1.4 Gaming Integration Products 1.1.5 Integrated Architecture

More information

Space project management

Space project management ECSS-M-ST-10C Rev. 1 Space project management Project planning and implementation ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of

More information

MCMR-AAP-A 24 May 2013

MCMR-AAP-A 24 May 2013 DEPARTMENT OF THE ARMY US ARMY MEDICAL RESEARCH AND MATERIEL COMMAND 504 SCOTT STREET FORT DETRICK MD 21702-5014 MCMR-AAP-A 24 May 2013 MEMORANDUM FOR SEE DISTRIBUTION 1. PURPOSE. The purpose of this memorandum

More information

(Costing) A NATO Framework for Life Cycle Costing

(Costing) A NATO Framework for Life Cycle Costing (Costing) A NATO Framework for Life Cycle Costing Marcel C. Smit To cite this version: Marcel C. Smit. (Costing) A NATO Framework for Life Cycle Costing. International Journal of Computer Integrated Manufacturing,

More information

Reviewed by ADM(RS) in accordance with the Access to Information Act. Information UNCLASSIFIED.

Reviewed by ADM(RS) in accordance with the Access to Information Act. Information UNCLASSIFIED. Reviewed by ADM(RS) in accordance with the Access to Information Act. Information UNCLASSIFIED. Audit of the Financial Management Framework: Royal Canadian Air Force March 2015 7050-8-39 (CRS) Table of

More information

MEMORANDUM OF UNDERSTANDING. Between: The Department of National Defence. and. The Department of the Environment and Parks Canada Agency.

MEMORANDUM OF UNDERSTANDING. Between: The Department of National Defence. and. The Department of the Environment and Parks Canada Agency. MEMORANDUM OF UNDERSTANDING Between: The Department of National Defence and The Department of the Environment and Parks Canada Agency Concerning Cooperation on Terrestrial Species at Risk matters Under

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 4100.31 September 2, 1960 SUBJECT: Reports on Single Manager Operations Administrative Reissuance Incorporating Through Change 5, January 5, 1973 ASD(I&L) References:

More information

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:

More information

Audit of Departmental Fuel Management Final September Audit of Departmental Fuel Management. September (CRS) Chief Review Services

Audit of Departmental Fuel Management Final September Audit of Departmental Fuel Management. September (CRS) Chief Review Services Audit of Departmental Fuel Management September 2011 7053-72 (CRS) Table of Contents Acronyms and Abbreviations...i Results in Brief...ii Introduction...1 Background...1 Objectives...2 Scope...2 Methodology...2

More information

Product Support Publication Requirements

Product Support Publication Requirements Product Support Publication Requirements Robin Alexander 06 December 2012 Purpose To discuss requirements set forth by Department of Defense, Department of the Army and Logistics Support Activity (LOGSA)

More information

NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS Edition B Version 1 DECEMBER 2017 NORTH ATLANTIC TREATY ORGANIZATION ALLIED QUALITY ASSURANCE PUBLICATION

More information

Space engineering ECSS. Ground systems and operations Part 2: Document requirements definitions (DRDs) ECSS-E-70 Part 2A EUROPEAN COOPERATION

Space engineering ECSS. Ground systems and operations Part 2: Document requirements definitions (DRDs) ECSS-E-70 Part 2A EUROPEAN COOPERATION -E-70 Part 2A EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space engineering Ground systems and operations Part 2: Document requirements definitions (DRDs) Secretariat ESA-ESTEC Requirements & Standards

More information

DEPARTMENT OF DEFENSE HANDBOOK

DEPARTMENT OF DEFENSE HANDBOOK NOT MEASUREMENT SENSITIVE 29 January 2015 DEPARTMENT OF DEFENSE HANDBOOK LEVEL OF REPAIR ANALYSIS This handbook is for guidance only. Do not cite this document as a requirement. AMSC N/A AREA PSSS FOREWORD

More information

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION Edition D Version 1 JUNE 2016 NORTH ATLANTIC TREATY ORGANIZATION ALLIED QUALITY ASSURANCE PUBLICATION

More information

Image Cover Sheet CLASSIFICATION SYSTEM NUMBER UNCLASSIFIED TITLE. System Number: Patron Number: Requester: Notes: DSIS Use only: Deliver to:

Image Cover Sheet CLASSIFICATION SYSTEM NUMBER UNCLASSIFIED TITLE. System Number: Patron Number: Requester: Notes: DSIS Use only: Deliver to: Image Cover Sheet CLASSIFICATION SYSTEM NUMBER 507336 UNCLASSIFIED 1111111111111111111111111111111111111111 TITLE COMPARISON OF PERFORMANCE ON A SIMULATED TARGET TRACKING TASK WITH AND WITHOUT AN AUTOMATED

More information