SECTION II.2.4 PRODUCTION PART APPROVAL PROCESS (PPAP)

Size: px
Start display at page:

Download "SECTION II.2.4 PRODUCTION PART APPROVAL PROCESS (PPAP)"

Transcription

1 SUPPLIER SECTION II.2.4 PRODUCTION PART APPROVAL PROCESS (PPAP) PURPOSE: To define the methods by which the supplier is to submit Production Part Approval Process (PPAP) level parts. SCOPE: This applies to all suppliers of purchased production intent parts to HTNA. EXPLANATION: The purpose of the PPAP is to determine if the supplier completely understands all aspects of design and the specification requirements. The results of the PPAP should also help the supplier determine if the process has the potential to produce consistent product while meeting the demands of the specifications during an actual production run at the quoted production rate. Suppliers of HTNA specific parts, bulk, or off-the-shelf items are required to submit a PPAP to the level indicated by HTNA (see below). The supplier must follow the standard requirements for PPAP submission and not implement these changes until HTNA has issued formal written approval. A PPAP is to be submitted for anyone of the following situations: 1. New part or components (i.e. a specific part, material, or a color/appearance change) 2. Tooling change/update 3. Correction of a discrepancy on a previously submitted part 4. Product modified by an engineering change to design records, specifications, or materials 5. Any situations that are called out in Section I.3 of the AIAG Production Part Approval Process (PPAP) reference manual. SUPPLIER RESPONSIBILITIES: 1. Production Part Approval Process (PPAP): HTNA Supplier Quality System Requirements match TS Section Product Approval Process. HTNA Clarification The supplier shall have systems in place that meet or exceed the requirements that have been stated in the AIAG Production Part Approval Process (PPAP) reference manual. Unless HTNA waives the requirements for PPAP submission all suppliers shall follow the following submission requirements. A. All suppliers that manufacture custom materials specific to HTNA are to submit the PPAP to a Level 3 submission unless otherwise requested. In some cases HTNA may wish to perform a Level 5 (validation at supplier location) to expedite the process. B. Suppliers that produce items that are considered bulk items that are specific to HTNA will be required to submit to a level 3 PPAP unless otherwise negotiated with HTNA quality personnel (plant and supplier quality) C. Suppliers that produce off-the-shelf or non-htna specific materials are only required to submit to a Level 1 PPAP. Level 1 or Level 2 PPAP s may also be applicable to supplier-only changes (no change to material or purchased part). Page 1 of 5

2 SUPPLIER D. Products that HTNA feels are extremely critical to the overall performance of the final product may require the supplier to submit to Level 4 PPAP. HTNA identifies Level 4 as where the supplier submits all Level 3 documentation in addition to other documents that may be required. These other documents may contain but are not limited to: Operator Work Instruction Sheets Standardized Work Analysis/Sequence Sheets List of Poka-Yoke (error proofing) Devices and their Audit Schedule Preventative Maintenance Instructions and Schedule Employee Training Matrix E. Suppliers are to use the appropriate Automotive Industry Action Group (AIAG) forms or forms that are agreed upon between the supplier and HTNA QE/QC for all PPAP related documentation. F. The following documents are to be contained within the PPAP submission package and are as follows per the AIAG Production Part Approval Process (PPAP) reference manual: (HTNA will review, status, and provide feedback to these submitted documents using the PPAP Submission Results Sheet (page 5) against the appropriate PPAP submission level) Design Records Engineering Change Records Engineering Approval Design FMEA Process Flow Diagrams Process FMEA Dimensional Results Records of Material/Performance Test Results In Process Studies (minimum 25 per cavity) Measurement System Analysis Studies Qualified Laboratory Documentation Process Control Plan RMIS (raw material inspection standards approved) Part Submission Warrant IMDS reference SoC (Substances of Concern) Compliance Evidence Summary Sheet (Toyota applications, possibly others). Ref. Toyota form , with instructions, on page 5. Appearance Approval Report (if applicable) Bulk Material Requirements Checklist (if applicable) Rate Results (if not performed by HTNA) Sample Production Parts (minimum 3 per cavity) Master Samples Checking Aids Identified and their Gauge R&R Results Attached HTNA Specific Requirements (if applicable) G. Electronic submissions are preferred unless otherwise requested by HTNA purchasing or supplier quality. The award letter issued by HTNA Purchasing specifies proper contact information for PPAP submission. H. While the timing of trial events will vary between applications, initial PPAP submissions are typically due in their entirety at least 4 months before SOP. Page 2 of 5

3 SUPPLIER 2. Interim Approval / Final Approval: The approval process may be split into two separate and distinct methods, Interim and final approval. HTNA understands that many suppliers have a great deal of capital expenditure invested but the suppliers must also understand that HTNA must meet the final tuning requirements of its customers. HTNA will work with each supplier on a case by case basis to determine the payment schedule. A. Interim Approval is awarded to the supplier after all the PPAP and quality requirements of the SQM have been reviewed and approved by HTNA QE/QC. If HTNA rejects the request for Interim approval, HTNA will provide the reason and the information required to obtain the approval. In many cases, Interim approval is given for a specified time period, usually SOP plus 90 days, to ensure the process can consistently meet requirements. B. Final Approval may be held until after the supplier has been given Interim approval and the supplier can prove that the process can consistently provide acceptable quality parts at production volumes. In order for HTNA to confirm that the supplier s process is under control the supplier must submit the results of long term capability studies for confirmation. The requirements are as follows below: The supplier is to submit the request for approval using the standard Part Submission Warrant (PSW) and to check the Initial Submission (see page 4 for an example of the (PSW)). The supplier must submit this request along with the long term capability results no sooner than 30 manufacturing days after Start of Production (SOP). HTNA will provide either Interim or Final Approval no later than 45 manufacturing days after the supplier PPAP submittal. If after 45 days HTNA has not provided Final Approval the supplier can automatically assume final approval. HTNA will sign, copy, and return the original Part Submission Warrant for confirmation of final approval. Supplier may be charged a late fee of a pre determined amount for each day after due date unless an extension is accorded by an authorized HTNA associate. Supplier must request the extension in writing if they can not meet due date for legitimate reasons. HTNA retains the right to waive late fee partially or fully. If HTNA rejects the request for final approval, HTNA will provide the reason and the information required to obtain the approval. Any supplier changes requested after SOP and initial full approval by HTNA, must be initiated by out Process Change Request, detailed in Section II-9.9. Page 3 of 5

4 SUPPLIER Part Submission Warrant Part Name Part Number Safety and/or Government Regulation Engineering Drawing Change Level Dated Additional Engineering Changes Dated Shown on Drawing Number Purchase Order. Weight (kg) Checking Aid Number Engineering Change Level Dated SUPPLIER MANUFACTURING INFORMATION Supplier Name Street Address SUBMISSION INFORMATION Dimensional Materials/Function Appearance Customer Name/Division Buyer/Buyer Code City State Zip Application te: Has Substances of Concern information been reported? IMDS or other customer format? REASON FOR SUBMISSION Initial submission Engineering Change(s) Tooling: Transfer, Replacement, Refurbishment, or additional Correction of Discrepancy Tooling Inactive > than 1 year Change to Optional Construction or Material Sub-Supplier or Material Source Change Change in Part Processing Parts produced at Additional Location Other - please specify REQUESTED SUBMISSION LEVEL (Check one) Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer. Level 2 - Warrant with product samples and limited supporting data submitted to customer. Level 3 - Warrant with product samples and complete supporting data submitted to customer. Level 4 - Warrant and other requirements as defined by customer. Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location. SUBMISSION RESULTS The results for dimensional measurements material and functional tests appearance criteria statistical process package These results meet all drawing and specification requirements: YES NO (If "NO" - Explanation Required) Mold / Cavity / Production Process DECLARATION I affirm that the samples represented by this warrant are representative of our parts, have been made to the applicable Production Part Approval Process Manual 3rd Edition Requirements. I further warrant these samples were produced at the production rate of / 8 hours. I have noted any deviations from this declaration below. EXPLANATION/COMMENTS: Print Name Title Phone. Fax. Supplier Authorized Signature Date Part Warrant Disposition: FOR CUSTOMER USE ONLY (IF APPLICABLE) Approved Rejected Part Functional Approval: Other Approved Waived Customer Name Customer Signature Date Page 4 of 5

5 SUPPLIER SoC COMPLIANCE EVIDENCE SUMMARY SHEET (ESS) Delivery Part Information 1 Vehicle Delivery Part Delivery Part. Delivery Part Name Supplier Code Code Supplier Name Sign / Date SUPPLIER APPROVAL SIGNATURES APPROVER APPROVER ORIGNATOR Sub-Component Part Name Sub-Component Part. Supplier Name Name / A. Tyler Title Manager 5 A. Smitth J. Mills *Please reference TSZ0001G to obtain allowable limits. Asst Manager Engineer Basis for SoC Judgment Pb Cd Hg Cr+6 Asbestos PBB PBDE Deca-BDE HBCD Method Result Method Result Method Result Method Result Method Result Method Result Method Result Method Result Method Result Method Result PFOS Judgment Judgment Meets requirements X Does not meet requirements Form : Issue 5, Rev. G Page 5 of 5

PPAP 3rd Edition Check List (Steel Suppliers)

PPAP 3rd Edition Check List (Steel Suppliers) PPAP 3rd Edition Check List (Steel Suppliers) Supplier: Date: Submission Level: Part #: Eng. Chg. Level (PS#): Reviewed By: Yes No N/A Comments 1. Design Records / Drawings Correct Eng. Chg. Level 2. Eng.

More information

Applied PPAP within a Process Approach, Including Fourth Edition Updates. Jim Collins

Applied PPAP within a Process Approach, Including Fourth Edition Updates. Jim Collins Applied PPAP within a Approach, Including Fourth Edition Updates Jim Collins Outline Applied PPAP within a Approach, Including Fourth Edition Updates Approach Review Model Example Measuring Performance

More information

TOOLING AND GAGING REQUIREMENTS/IDENTIFICATION Section 20

TOOLING AND GAGING REQUIREMENTS/IDENTIFICATION Section 20 TOOLING AND GAGING REQUIREMENTS/IDENTIFICATION Section 20 The following summarizes Powers and Sons LLC processes with respect to any tooling or gaging and Powers and Sons LLC authorized engineering changes

More information

HTNA SUPPLIER QUALITY MANUAL

HTNA SUPPLIER QUALITY MANUAL SECTION II.9.3 PROCESS CONTROL PLAN PURPOSE: To establish the development and submission requirements of a process control plan for HTNA that defines and controls the method of consistent production processes.

More information

Supplier Quality Requirements FSQ01

Supplier Quality Requirements FSQ01 Supplier Quality Requirements FSQ01 1 Change Revision Level Date Introduced 0 25/06/2013 2 1. Scope 2. Code of Conduct 3. Acronyms and Definitions 4. Prohibited and Restricted Materials Policy 5. Quality

More information

PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2

PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2 PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2 PRODUCTION SUBMISSION REQUIREMENTS (PPAP) Refer to the AIAG s Production Part Approval Process (PPAP) manual, (latest edition). The default submission

More information

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260 Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260 Firestone Industrial Products Quality Policy We will

More information

SP-Q-SG 002 Supplier Guidelines for the APCB. Production Part Approval Process (PPAP)

SP-Q-SG 002 Supplier Guidelines for the APCB. Production Part Approval Process (PPAP) Supplier Guidelines for the APCB Production Part Approval Process (PPAP) These supplier guidelines complement and clarify the requirements defined in the AIAG PPAP manual and the APCB Customer Specific

More information

SUPPLIER PRODUCT / PROCESS CHANGE NOTIFICATION

SUPPLIER PRODUCT / PROCESS CHANGE NOTIFICATION SUPPLIER PRODUCT / PROCESS CHANGE NOTIFICATION Complete this form and e-mail to your customer organization whenever customer notification is required by the PPAP Manual in Table 3.1. Your customer will

More information

Supplier Quality Manual

Supplier Quality Manual Classification: QMS Created By: Jeff Teel 06/07/2016 Document No.: Mark "X" where applies Firestone Controlled Document New First Issue Published: Revision X Supersedes Issue Published: 01/12/2007 Three-Year

More information

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5 How to perform PPAP The process of completing a PPAP submission is complex. This detailed process is a collection of key elements that must be completed to verify that the production process will produce

More information

Production Part Approval Process Supplier Information. - Version 1.0

Production Part Approval Process Supplier Information. - Version 1.0 Supplier Information Quality@Suppliers - Version 1.0 Navigation What s PPAP? meaning Benefits & Targets What does it mean for you as the supplier? origin past today PPAP PPAP Content PPAP Timeline Additional

More information

PPAP Process Checklist \ Sign Off Sheet instructions

PPAP Process Checklist \ Sign Off Sheet instructions PPAP Process Checklist \ Sign Off Sheet instructions In addition to these requirements you must meet all Nexteer Automotive Supplier Requirements noted in the Nexteer Automotive Supplier Website. Nexteer

More information

GLOBAL PURCHASING. Supplier Technical Assistance. Phased PPAP

GLOBAL PURCHASING. Supplier Technical Assistance. Phased PPAP GLOBAL PURCHASING Supplier Technical Assistance Phased PPAP Edition 1, October 2002 Phased Production Part Approval Process Phased PPAP Ford Motor Company Supplier Technical Assistance October, 2002 Table

More information

10/24/18. Printed document is uncontrolled after 10/24/2018, unless in a controlled book

10/24/18. Printed document is uncontrolled after 10/24/2018, unless in a controlled book 10/24/18 Table of Contents Description Page CTA Acoustics Expectations 1 How to submit samples 2 How to process Corrective Action 3-7 How to request a temporary or permanent change 8-9 How your performance

More information

Supplier Quality Manual

Supplier Quality Manual including subsidiaries of Mexico and Canada Supplier Quality Manual Issue date: March 1, 2010 Revised: April 7, 2011 Page 1 of 14 Corporate Quality Statement Quality plays a vital role in SCHOTT Gemtron

More information

Guideline for Suppliers: Initial Sampling

Guideline for Suppliers: Initial Sampling 1. Purpose Regulation of the procedure for production process and product approval (initial sampling) with the goal to provide a documented proof that the requirements outlined and agreed upon in drawings,

More information

Overview of Production Part Approval Process PPAP. Factor Quality, Inc.

Overview of Production Part Approval Process PPAP. Factor Quality, Inc. Overview of Production Part Approval Process PPAP Factor Quality, Inc. Purpose of the PPAP To determine if the supplier understands all customer requirements and if the production process has the potential

More information

Supplier Requirement Manual. Preface

Supplier Requirement Manual. Preface 1 Preface This manual has been created to assist our suppliers in understanding the purchasing expectations and quality requirements for products supplied to RCO Engineering. The manual is also a tool

More information

Western Diversified Plastics, LLC. Supplier Requirements Manual

Western Diversified Plastics, LLC. Supplier Requirements Manual Western Diversified Plastics, LLC. Supplier Requirements Manual Revision Date: 12/10/2019 TABLE OF CONTENTS 1.0 Introduction.. 3 2.0 WDP Supplier Policy.. 4 3.0 Scope... 4 4.0 Launch Readiness Measures...

More information

Supplier Handbook Issue 12 September 2011

Supplier Handbook Issue 12 September 2011 Supplier Handbook Issue 12 September 2011 Foreword to Issue 12 The Lotus Supplier Handbook Issue 12 was issued with revisions to the following sections: Foreword, page 1 3.4.3 PPAP Requirements, page 13

More information

Supplier Quality Assurance Manual

Supplier Quality Assurance Manual Supplier Quality Assurance Manual Note: This manual is electronically controlled. The most current revision can be obtained on line through the TASUS website link www.tasus.com Click downloads Hardcopies

More information

Edition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by

Edition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by Working together as a team QUALITY AT THE SOURCE Page: 2 of 24 Supplier Quality Standard Edition: Revision 09, February 19, 2018 This document is controlled by: Mayco International, LLC Edited by Mayco

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual Second Edition Issued: August 25, 2015 Meeting Our Customers Needs Through Business Excellence First Edition All rights reserved under the copyright laws. 1 Marion Body Works Inc.

More information

Supplier Quality Manual (QQS )

Supplier Quality Manual (QQS ) Monticello Spring Corporation Quality Management System Supplier Quality Manual (QQS 100.00) 1.0 Introduction 1.1 Scope The details stipulated in this manual are the minimum mandatory requirements for

More information

PPAP Process Checklist \ Sign Off Sheet Instructions

PPAP Process Checklist \ Sign Off Sheet Instructions Global Supply Management PPAP Process Checklist \ Sign Off Sheet Instructions In addition to these requirements, you must meet all Nexteer Automotive Supplier Requirements noted in the Nexteer Automotive

More information

Supplier Quality Manual

Supplier Quality Manual QP #: 8.4.1.2 Rev. #:0 Date Issued: 12/19/17 Date Revised: Page 1 of 8 Supplier Quality Manual Approved by: Mike Cornwell ( VP of Materials) Date: 12/19/17 1.0 Purpose: To provide Suppliers of BRC Rubber

More information

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016 SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016 TABLE OF CONTENTS 1.0 Introduction 1.1 Purpose of Supplier Requirements 1.2 Scope 2.0 Quoting 3.0 Advance Product Quality Planning (APQP) 3.1 APQP

More information

SoC COMPLIANCE EVIDENCE SUMMARY SHEET (ESS)

SoC COMPLIANCE EVIDENCE SUMMARY SHEET (ESS) PROTECTED 関係者外秘 SoC COMPLIANCE EVIDENCE SUMMARY SHEET (ESS) SUPPLIER APPROVAL SIGNATURES Delivery Part Information Delivery Part Vehicle Code Delivery Part No. Delivery Part Name Supplier Code Supplier

More information

Its purpose is to define the approval process of new or revised parts, or parts resulting from new or significantly revised production methods.

Its purpose is to define the approval process of new or revised parts, or parts resulting from new or significantly revised production methods. SUPPLIER PPAP HANDBOOK NORTH AMERICA Revision D May 24, 2018 Table of Contents Table of Contents 1 Foreword.. 2 Production Part approval Process (PPAP) Purpose.. 3 When is a Submission Required?. 3 Significant

More information

SUPPLIER MANUAL Quality Policy

SUPPLIER MANUAL Quality Policy SUPPLIER MANUAL Quality Policy Prettl, Kurz Kasch is committed to providing our Customers with quality products. We will develop, maintain and continually improve our quality systems to ensure Customer

More information

SUPPLIERS MANUAL. Revision: Copyright Interconnect Product Assembly AS Printed NB! Paper copies are uncontrolled documents

SUPPLIERS MANUAL. Revision: Copyright Interconnect Product Assembly AS Printed NB! Paper copies are uncontrolled documents 1 (20) 1.0 Purpose and function of this manual 1.1. Vision It is IPA's goal to develop a working relationship with our suppliers that mirrors the Vision and Guiding Principles on which IPA s business philosophy

More information

LOTUS SUPPLIER HANDBOOK rev14 09/05/2018. Supplier Handbook

LOTUS SUPPLIER HANDBOOK rev14 09/05/2018. Supplier Handbook rev14 09/05/2018 Supplier Handbook Issue 14 May 2018 SECTION 0.0 Foreword to Issue 14 The LOTUS Supplier Handbook Issue 14 was issued with revisions to the following: Chapters re-organised Section 2.0

More information

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A Supplier Quality Specification 3DS Document 51000-P14 Rock Hill, South Carolina Revision A Revision History Change Description Revision Date All New Release 6/26/16 A Updated supplier classification section,

More information

Part Submission Warrant

Part Submission Warrant Safety and/or Government Regulation: Yes No Purchase Order No.: N/A Weight (kg): ORGANIZATION MANUFACTURING INFORMATION Rathsbergstr. 25 Street Address Nürnberg 90411 Deutschland City Region Postal Code

More information

BATES SUPPLIER MANUAL

BATES SUPPLIER MANUAL BATES SUPPLIER MANUAL 1 Bates, LLC 118 Rose Street Lobelville, TN 37097 The Supplier Requirements Manual Is a Controlled Document Any copies made of this document, in its entirety or in part, must be marked

More information

Supplier Production Part Approval Process (PPAP)

Supplier Production Part Approval Process (PPAP) 1.0 PURPOSE / SCOPE: 1.1 The process describes the minimum TI Automotive Corporate requirements for the Supplier Production Part which is executed in each TI Automotive Division. The process is a sub process

More information

Guideline Production Process and Product Approval (PPAP Requirements Vendor Parts)

Guideline Production Process and Product Approval (PPAP Requirements Vendor Parts) Guideline Production Process and Product Approval (PPAP Requirements Vendor Parts) Implementation of Requirements to IATF 16949 E-T-A Elektrotechnische Apparate GmbH Content: 1 Preface... 2 2 Purpose...

More information

Supplier. Quality. Manual

Supplier. Quality. Manual DEPARTMENT: Quality Assurance Title: Supplier - Quality Manual ISSUED ON: 29-Jul-09 PAGE 1 of 12 Supplier Quality Manual Distribution to: Electronically controlled. If this document is in hard copy it

More information

SUPPLIER MANUAL SUPPLIER MANUAL

SUPPLIER MANUAL SUPPLIER MANUAL SUPPLIER MANUAL Rev.: 4, 01.11.2013 Page: 1 of 9 IER-QSF 003 TABLE OF CONTENTS PAGE 1. INTRODUCTION 2 2. SCOPE 3 3. REFERENCE MATERIAL 3 4. SUPPLIER APPROVAL PROCESS 3 5. PRODUCT APPROVAL PROCESS 5 6.

More information

SUPPLIER GUIDELINES MANUAL

SUPPLIER GUIDELINES MANUAL 1.0 INTRODUCTION 1.1 This guidelines manual defines the minimum requirements for Supreme Machined Products Co.; Inc. LTD (to be referenced as Supreme throughout the document) Supplier s and does not supersede

More information

Supplier Change Management

Supplier Change Management 1.0 PURPOSE / SCOPE: 1.1 This procedure will be used by all TI Automotive Divisions globally for managing product, process and material changes requested by Suppliers. This procedure also defines the process

More information

Metal Powder Products Company

Metal Powder Products Company Metal Powder Products Company Supplier Quality Manual Revision 1 Page 1 of 10 Introduction 1. Purpose: This manual has been created for Metal Powder Product s (MPP) Production, Prototype and Service Suppliers.

More information

4. Delivery. 5. Manageme

4. Delivery. 5. Manageme Plastics Table Of Contents 1. Introduction 2. Quality Requirements 3. Product Packaging 4. Delivery 5. Manageme ent Responsibility 1 P age Plastics 1. Introductionn The purpose of this is to define the

More information

Supplier Quality Manual CHASSIX Inc.

Supplier Quality Manual CHASSIX Inc. Supplier Quality Manual CHASSIX Inc. SQM-001 rev 6/26/17 Page 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 CHASSIX QUALITY POLICY 1.2 CHASSIX SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.3 CHASSIX SUPPLIER

More information

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier ) Global Supplier Quality Manual Revision 1 Agreement Between Cooper Standard (Hereafter referred to as the CS ) And (Hereafter referred to as the Supplier ) This agreement is made between the above named

More information

JSP Supplier Quality Assurance Manual

JSP Supplier Quality Assurance Manual Changes to the Supplier Quality Assurance Manual: The 2011 has been reviewed for updates and revisions needed to keep our forms, policies and procedures current. The updates will be communicated to suppliers

More information

Supplier Quality Standard

Supplier Quality Standard Supplier Quality Standard Sherex Industries & Sherex Fastening Solutions "First Time Quality at the Source" Through Teamwork Supplier Quality Standard Edition: Rel. September 6, 2007 This document is controlled

More information

CUSTOMER SPECIFIC REQUIREMENTS FOR ISO/TS APPLICABLE TO FIASA/POWERTRAIN SUPPLIERS

CUSTOMER SPECIFIC REQUIREMENTS FOR ISO/TS APPLICABLE TO FIASA/POWERTRAIN SUPPLIERS Betim, July 27 th, 2012. CUSTOMER SPECIFIC REQUIREMENTS FOR ISO/TS 16949 APPLICABLE TO FIASA/POWERTRAIN SUPPLIERS Updates and replaces, from 08/06/2012, the "LETTER OF SPECIFIC REQUIREMENTS" from FIASA

More information

Supplier Quality Manual

Supplier Quality Manual Table of Contents 1.0 Introduction 2.0 Quality System Requirements 3.0 Quality Performance 4.0 Code of Ethics 5.0 APQP 6.0 SRG Global Access to Supplier Facility 7.0 Production Part Approval Process 8.0

More information

MANUAL SUPPLIER S QUALITY MANUAL

MANUAL SUPPLIER S QUALITY MANUAL MANUAL Raba Automotive Components Ltd Identification 50MR23003 1.8 Page 1/9 Coming into force 10.09.2015 SUPPLIER S QUALITY MANUAL Prepared/ Modified by Checked by Approved by Name Signature Date János

More information

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM) SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM) 11/3/2008 Page 1 of 12 PURPOSE The purpose of this manual is to provide Suppliers with the DeltaTech Control (DTC) requirements for various items related to the

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL QD-SUPPLIER-QUALITYMANUAL 1 of 13 02.20.15 TABLE OF CONTENTS Page A. Goal 3 B. Purpose 3 C. Approach 3 D. Applicability 3 E. Implementation 3 F. Zero Defects Policy 3 Section 1:

More information

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL LM-QU-PA-008 Revision Date:7/13/18 LM-QU-PA-008 Revision Date:7/13/18 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Approved Supplier List 5.0 Supplier

More information

supplier quality manual DTL-QA-001

supplier quality manual DTL-QA-001 1 2 supplier quality manual DTL-QA-001 INTRODUCTION The manual is meant as a Quality Management System (QMS) reference guide for the suppliers of Dynamatic Technologies Limited (DTL). DTL does appreciate

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL ASYST Technologies, LLC 5811 99TH AVENUE KENOSHA, WI 53144 PHONE (262) 857-2244 FAX (262) 857-3623 Approval Signatures APPROVAL SIGNATURES Name / Title Contact Information Approval

More information

Production Part Approval Process (PPAP)

Production Part Approval Process (PPAP) Document ID: QN-M04 Page 1 of 15 Aerojet Rocketdyne Quality Note M04 Date: 12/23/2016 Table of Contents 1. PURPOSE... 2 2. APPLICATION... 2 2.1. Resubmissions... 3 2.2. Applicable Documents... 3 3. CONVENTIONS...

More information

Supplier Quality Manual CHASSIX Inc.

Supplier Quality Manual CHASSIX Inc. Supplier Quality Manual CHASSIX Inc. SQM-001 rev 8/2/17 Page 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 CHASSIX QUALITY POLICY 1.2 CHASSIX SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.3 CHASSIX SUPPLIER

More information

SUPPLIER QUALITY REQUIREMENTS MANUAL

SUPPLIER QUALITY REQUIREMENTS MANUAL SUPPLIER QUALITY REQUIREMENTS MANUAL Manufacturing Locations: Nyloncraft Nyloncraft 616 W. McKinley Ave. 1640 East Chicago Road Mishawaka, IN 46545 Jonesville, MI 49250 (574) 256-1521 (517) 849-9911 Document

More information

Montaplast of North America, Inc.

Montaplast of North America, Inc. Montaplast of North America, Inc. Supplier Quality Manual Page 1 of 20 Table of Contents 1.0 Purpose pg. 3 2.0 Scope pg. 3 3.0 Quality System Requirements pg. 3 4.0 Approved Supplier List pg. 4 5.0 Supplier

More information

Supplier Requirements

Supplier Requirements Page 1 of 19 Supplier Requirements Quality, Purchasing and Material Control Systems Contents Section 1.0 Section 2.0 Section 3.0 Section 4.0 Section 5.0 Section 6.0 Section 7.0 Communication and Expectations

More information

MANUAL SUPPLIER S QUALITY MANUAL

MANUAL SUPPLIER S QUALITY MANUAL MANUAL Rába Automotive Component Manufacturing Ltd Identification 1.3 1/8 Coming into force 28. 01. 2009 SUPPLIER S QUALITY MANUAL Prepared by Checked by Approved by Name Signature Date János KENYERES

More information

Table of Contents. 1.0 Purpose. 2.0 Scope. 3.0 Quality System Requirements. 4.0 Approved Supplier List. 5.0 Supplier Assessments

Table of Contents. 1.0 Purpose. 2.0 Scope. 3.0 Quality System Requirements. 4.0 Approved Supplier List. 5.0 Supplier Assessments Issued 2/6/2009 Revision: 2/13/2017 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Approved Supplier List 5.0 Supplier Assessments 6.0 Advance Product Quality Planning (APQP)

More information

PRODUCT SPECIFICATION Sheet 1 of 13 NAME OF SPECIFICATION: Spec, Matl, Substances of Concern and Recycled Content

PRODUCT SPECIFICATION Sheet 1 of 13 NAME OF SPECIFICATION: Spec, Matl, Substances of Concern and Recycled Content PRODUCT SPECIFICATION Sheet 1 of 13 1. SCOPE The purpose of this specification is to define the global restrictions and reporting requirements pertaining to Substances of Concern and recycled content that

More information

ConMet Supplier Quality Manual

ConMet Supplier Quality Manual ConMet Supplier Quality Manual Revision: 11/2/17 Uncontrolled Copy Page 1 Table of Contents Title Page Introduction 3 Supplier Quality Systems Requirements 4 Supplier Social Responsibility 4 Confidentiality

More information

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities 1400 Lunar Drive Wapakoneta, OH 45895 Supplier Manual Table of Contents 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities 2.0 Supplier Quality Expectations 2.1 Quality System Requirements 2.2

More information

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page 3/2/18 Supplier Quality 1 of 19 3/2/18 Supplier Quality 2 of 19 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL 2 TABLE OF CONTENTS PAGE 1. INTRODUCTION 3 2. SCOPE 4 3. REFERENCE MATERIAL 4 4. SUPPLIER APPROVAL PROCESS 4-6 5. PRODUCT APPROVAL PROCESS 6 6. ON-GOING PRODUCTION 6-7 7. SUPPLIER

More information

CUSTOMER SPECIFIC REQUIREMENTS RELATED TO ISO/TS APPLIED TO FIASA/Powertrain SUPLLIERS

CUSTOMER SPECIFIC REQUIREMENTS RELATED TO ISO/TS APPLIED TO FIASA/Powertrain SUPLLIERS Betim, October 7 th 2013. CUSTOMER SPECIFIC REQUIREMENTS RELATED TO ISO/TS 16949 APPLIED TO FIASA/Powertrain SUPLLIERS This letter updates and replaces, from 12/02/2013 on, the previous Customer Specific

More information

Works Standard. PPAP - Production Part Approval Process

Works Standard. PPAP - Production Part Approval Process Works Standard PPAP - Production Part Approval Process WN 50 020 1 AREA OF APPLICATION AND PURPOSE This works standard contains the general, basic requirements for the approval of vendor parts for production.

More information

Consolidated Metco, Inc. Supplier Quality Manual

Consolidated Metco, Inc. Supplier Quality Manual Consolidated Metco, Inc. Supplier Quality Manual Revision: 12/20/17 Uncontrolled Copy Page 1 Table of Contents Title Page Introduction 3 Supplier Quality Systems Requirements 4 Supplier Social Responsibility

More information

Supplier Quality Requirements Manual

Supplier Quality Requirements Manual Supplier Quality Requirements Manual Revision D 05/31/2017 Page 1 1.0 Purpose The purpose of this manual is to communicate the quality requirements pertaining to the systems, processes, tools and procedures

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL Work Instruction Standard Locknut, LLC Supplier Quality Manual Doc. No. SQM-01 Page 1 of 11 Initial Date 11/1/2009 Rev. 4 Prepared By Dwight Beaty Revised By Shannon Smith Rev. Date 9/12/12 Approvals Purchasing

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL Approval: A Pleavin Head of Quality I Snary Supplier Quality Assurance Manager Supplier Detail: Revision Level: 3 Supplier Name: Print: Sign: Position: Date: 0.1 Copyright Notice The contents of this manual

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL QMS Procedure PAGE: 1 OF 20 EFFECTIVE DATE: 11/5/2016 SUPPLIER QUALITY MANUAL November, 2016 If printed, this document is invalid after today 3/9/2018. Retain at risk of ISO:9001 violation. FQA001 Rev

More information

Supplier Resource Guide

Supplier Resource Guide Supplier Resource Guide The purpose of this Resource Guide is to strengthen our supplier s knowledge and understanding of General Fasteners Company (GFC) requirements. GFC aligns itself with supply chain

More information

Chrysler Group LLC Customer-Specific Requirements. for use with. August 2013

Chrysler Group LLC Customer-Specific Requirements. for use with. August 2013 Chrysler Group LLC Customer-Specific Requirements for use with PPAP, 4 th Edition August 2013 Chrysler Group LLC 2012 - All rights reserved New/changed text appears in BLUE 1. SCOPE This document defines

More information

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry. INTRODUCTION Welcome to, New Mather Metal Inc. (NMMI) New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry. You can view

More information

R.H. SHEPPARD CO., INC. HANOVER, PA QUALITY BY DESIGN SUPPLIER QUALITY MANUAL NINTH EDITION

R.H. SHEPPARD CO., INC. HANOVER, PA QUALITY BY DESIGN SUPPLIER QUALITY MANUAL NINTH EDITION R.H. SHEPPARD CO., INC. HANOVER, PA. 17331 QUALITY BY DESIGN NINTH EDITION TABLE OF CONTENTS TITLE PAGE 1. SUPPLIER QUALITY SYSTEM REQUIREMENTS 1 2. PURCHASE ORDERS, SPECIFICATIONS AND PRINTS 1 3. REQUESTS

More information

Global Supplier Quality Manual. Revision 4

Global Supplier Quality Manual. Revision 4 Global Supplier Quality Manual Revision 4 Introduction 1. Purpose: This manual has been created for Cooper Standard s (CS) Production, Prototype and Service Suppliers. The manual includes all CS locations

More information

Revcor Supplier Quality Manual

Revcor Supplier Quality Manual Revcor Supplier Quality Manual Documentation The Revcor is governed by comprehensive documentation as referenced herein. Procedures, work instructions, practices, forms, drawings, and similar documentation

More information

Supplier Quality Assurance Manual (SQAM)

Supplier Quality Assurance Manual (SQAM) Supplier Quality Assurance Manual (SQAM) March 2018 Edition Page 1 of 18 ***When printed this is copy only, Electronic version is Master*** FD 700392 Rev: 03/15/2018 Table of Contents 1. Introduction Pg.

More information

Springdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual

Springdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual Springdale Site Specific Requirements Addendum to DAYCO Global Supplier Policy Manual Uncontrolled if Printed 1 9/28/2017 TABLE OF CONTENTS 1. Purpose 3 2. Objectives 3 3. Scope 3 4. Supplier Sourcing

More information

Supplier Quality Systems Requirements Manual

Supplier Quality Systems Requirements Manual Supplier Quality Systems Requirements Manual Brink Towing Systems Version: 2.4 Date: 23-07-2018 Changed text in blue Page 1 / 9 Table of Contents 1. Introduction 3 1.1 Scope 3 1.2 Purpose 3 1.3 Background

More information

Supplier Quality Manual

Supplier Quality Manual Revised By: Supplier Quality Development Signature: Ramón Ibarra Date: Aug 30, 2017 Approved By: VP of Global Supply Chain Signature: Mark Bates Date: Aug 30, 2017 1. INTRODUCTION Hope Global Expectations:

More information

Metric Manufacturing Supplier Manual

Metric Manufacturing Supplier Manual Metric Manufacturing Supplier Manual This Manual applies to all suppliers of Metric Manufacturing Co. Compliance to all requirements within this manual, as well as the general terms and conditions, are

More information

Harvan Manufacturing ltd. Supplier Manual

Harvan Manufacturing ltd. Supplier Manual Harvan Manufacturing ltd. Supplier Manual Prepared by: Paul Vleuten President Harvan Manufacturing Limited TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 STATEMENT OF PURPOSE AND INTENT 1.2 APPLICATION 2.0 SUPPLY

More information

TRICO PRODUCTS PUR-C-P106-A

TRICO PRODUCTS PUR-C-P106-A TRICO PRODUCTS PUR-C-P106-A October 9, 2009 Supplier Guide Page 1 of 14 TRICO PRODUCTS PUR-C-P106-A October 9, 2009 Page 2 of 14 NAME: TRICO Supplier Guide PURPOSE: The purpose of this document is to communicate

More information

TSV Supplier Quality Manual TABLE OF CONTENTS

TSV Supplier Quality Manual TABLE OF CONTENTS TABLE OF CONTENTS 1.1. Preface... 2 1.2. Scope... 2 1.3. Confidentiality... 3 2.1. Supplier Approval Review... 4 2.2. Supplier Quality System Requirements... 4 2.3. Maintaining and Changing Quality System

More information

PRODUCTION PART APPROVAL PROCESS. Peter BÓLLO

PRODUCTION PART APPROVAL PROCESS. Peter BÓLLO PRODUCTION PART APPROVAL PROCESS Peter BÓLLO Author: Workplace: Address: E-mail: Peter Bóllo Johnson Controls spol. s r.o., Bratislava Business Centre Sturova 4, 81102 Bratislava, Slovak Republic Peter.Bollo@jci.com

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL IMT-SQM 1 OF 6 Rev: 11/10/10-01 INTRODUCTION In today s lean, just-in-time manufacturing environment, product found to be nonconforming can cause serious manufacturing disruptions. In our continuing efforts

More information

Supplier Quality Manual

Supplier Quality Manual Revised By: Global Supply Chain Analyst Signature: Akshay Poonia Date: May 18, 2016 Approved By: VP of Global Supply Chain Signature: Mark Bates Date: May 18, 2016 1. INTRODUCTION Hope Global Expectations:

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL Global Supplier of Automotive Tire Products & Refrigeration Components SUPPLIER QUALITY MANUAL Air Controls Products, LLC Oxford, NC Air Controls Products maintains sole control rights to the master copy

More information

KSS GLOBAL STANDARD. Supplier Request for Engineering Approval (SREA) Procedure KSS 701

KSS GLOBAL STANDARD. Supplier Request for Engineering Approval (SREA) Procedure KSS 701 KSS GLOBAL STANDARD Supplier Request for Engineering Approval Procedure KSS 701 Document No: 1005107 Author: Alexandru Iedu Christa Kerlin Joachim Verheugen Approved by: Kevin Gillis Todd Gross Rodolfo

More information

Carlex Supplier Quality Manual

Carlex Supplier Quality Manual Table of Contents 1.0 Introduction 2.0 Reference Documents 3.0 Quality System General Requirements 3.1 ISO-9001:2015/IATF-16949 3.2 Supplier Profile 3.3 Conflict Minerals 3.4 Heat Treat, Plating and Coating

More information

Any questions about this manual or the purchasing requirements should be directed to the Materials Manager at Design Molded Plastics.

Any questions about this manual or the purchasing requirements should be directed to the Materials Manager at Design Molded Plastics. Scope Design Molded Plastics is a thermoplastic injection molding company, with secondary finishing operations and the designing of molds used in production, at 8220 Bavaria Rd., Macedonia, Ohio; with

More information

Supplier Quality Manual. QF-SQR001 / Rev. Date: / Rev. Level: D

Supplier Quality Manual. QF-SQR001 / Rev. Date: / Rev. Level: D 1 Table of Contents COMMITMENT TO SUPPLIERS 4 SUPPPLIER CERTIFICATION REQUIREMENTS 5 SUBCONTRACTOR DEVELOPMENT 6 CERTIFICATE OF CONFORMANCE 6 ENGINEERING AND PROCESS CHANGES 7 MATERIAL LABELING 8 IMDS

More information

Sisler Manufacturing Group Supplier Quality Manual

Sisler Manufacturing Group Supplier Quality Manual Sisler Manufacturing Group Supplier Quality Manual Revision Date: 01/01/2018 INTRODUCTION Welcome to Sisler Manufacturing Group Sisler Manufacturing Group utilizes strong engineering support to specialize

More information

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210 SUPPLIER MANUAL Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210 TABLE OF CONTENTS Page Title 1... Introduction, Purpose, Scope Quality Policy, Certification & Exemptions

More information