SAN FRANCISCO PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO AGREED-UPON PROCEDURES REPORT FOR SETTLEMENT QUALITY METER DATA PROCESSING

Size: px
Start display at page:

Download "SAN FRANCISCO PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO AGREED-UPON PROCEDURES REPORT FOR SETTLEMENT QUALITY METER DATA PROCESSING"

Transcription

1 AGREED-UPON PROCEDURES REPORT FOR SETTLEMENT QUALITY METER DATA PROCESSING TRADE YEAR

2 Contents Independent Accountant s Report on Applying Agreed-Upon Procedures 3 Section I Management s Executive Summary 4 5 Section II Summary of Findings 6 Section III Independent Accountant s Qualifications Summary 7 Section IV Description of Controls at SFPUC, Procedures Performed, and Results of Procedures 8 20 Page

3 INDEPENDENT ACCOUNTANT'S REPORT ON APPLYING AGREED-UPON PROCEDURES Barbara Hale Assistant General Manager for Power San Francisco Public Utilities Commission City and County of San Francisco APX, Inc. San Jose, California California Independent System Operator Folsom, California We have performed the procedures enumerated in Section IV of this report, which were agreed to by the management of San Francisco Public Utilities Commission ( SFPUC ), APX, Inc. ( APX ), and the California Independent System Operator ( CAISO or ISO ) (the specified parties), solely to assist you in evaluating SFPUC s compliance with Settlement Quality Meter Data Processing in accordance with the CAISO Scheduling Coordinator Self Audit Requirements. The procedures applicable to the Settlement Meter Data Processing level are the Monthly Meter Read Validating, Editing, and Estimating ( VEE ) Requirements and the profiled usage data files for the period August 1, 2014 through July 31, 2015 ( Trade Year ). Management is responsible for SFPUC s compliance with those requirements. This agreed-upon procedures engagement was conducted in accordance with attestation standards established by the American Institute of Certified Public Accountants. The sufficiency of these procedures is solely the responsibility of those parties specified in the report. Consequently, we make no representation regarding the sufficiency of the procedures described below either for the purpose for which this report has been requested or for any other purpose. We performed the procedures that SFPUC selected and deemed applicable in order to meet the requirement for audit and testing by Scheduling Coordinators per ISO Tariff Section , and which applied to SFPUC during the period of August 1, 2014 through July 31, 2015, as enumerated in Section IV. We were not engaged to and did not conduct an audit, the objective of which would be the expression of an opinion on compliance. Accordingly, we do not express such an opinion. Had we performed additional procedures, other matters might have come to our attention that would have been reported to you. This report is intended solely for the information and use of managements of SFPUC, APX, and CAISO in connection with regulatory oversight responsibilities of SFPUC, and is not intended to be and should not be used by anyone other than these specified parties. San Jose, California October 13, 2015

4 Section I - Management s Executive Summary Background The San Francisco Public Utilities Commission ( SFPUC ) has engaged APX, Inc. ( APX ) to provide Scheduling Coordinator services. APX is responsible for obtaining, processing, and submitting generation and load meter data to the California Independent System Operator ( CAISO ) for settlement purposes. This data is comprised of interval generation and station load data, interval load data, usage load data, and calculated data for streetlights, traffic signals, and other non-metered load collected from various sources. The SFPUC, as a certified Meter Data Management Agent ( MDMA ) self-provides this service by obtaining and processing the meter data and providing it to APX for submission to CAISO. SFPUC s electric load is metered by a combination of interval load meters and monthly usage, Customer Information System ( CIS ), meters. Approximately 87% of the total SFPUC load is recorded by approximately 240 interval load meters, which are currently read and reported by SFPUC. The remaining 13% is measured by the CIS meters, which are read by Pacific Gas and Electric Company ( PG&E ). SFPUC has approximately 1,745 service points that are metered based on elapsed usage. The meters are owned and read by PG&E on a monthly cycle as part of their normal meter reading process. Of these accounts, approximately 1,592 have simple kilowatt hour ( kwh ) meters, and the other 153 have time-of-use ( TOU ) meters that report reads by PG&E designated periods (on, partial, and off peak). In addition to the metered service points, SFPUC has 60 non-metered service points, for which PG&E has established an average monthly use value, which SFPUC uses in load calculations as if the service points were metered and read monthly. The total load for non-metered service points is less than 0.05% of the total CIS load. All of the usage meters are maintained and read by PG&E, and SFPUC receives a daily data feed containing the latest read information available from the PG&E systems. Load Data Processing CIS meter read data provided by PG&E is processed by SFPUC's Meter Data Management System ( MDMS ), subjecting it to an automated Validating, Editing, and Estimating ( VEE ) process, followed by manual staff review of any reads that failed validation. Interval load meters are read and undergo the VEE process by SFPUC using the Itron MV90xi ( MV90 ) meter reading application. The MV90 interval read data is loaded into the SFPUC MDMS. The MDMS profiles the CIS metered usage and calculates interval load for streetlights, traffic signals and other non-metered load, aggregates both based on load distribution factors, applies loss factors (as required under the PG&E Interconnection Agreement ("IA") through June 30, 2015 and as specified in the PG&E Wholesale Distribution Tariff, FERC Electric Tariff Volume No. 4 after June 30, 2015), consolidates the metered load by scheduling point and creates 60 minute interval Operational Meter Analysis and Reporting ( OMAR ) formatted files, which are submitted to APX for reporting to the CAISO. The SFPUC MV90 system also reads and performs the VEE process on all interval meters that record generation and station load for the Hetch Hetchy Water and Power ( HHWP ) hydro generation facilities. This data is aggregated by the MDMS at 5-minute intervals and submitted to APX for reporting to the CAISO. The SFPUC has an exclusive power purchase agreement for the Sunset photovoltaic generation plant located on SFPUC property; however this is a CAISO metered facility and SFPUC is not required to submit generation data. 4

5 Section I - Management s Executive Summary (continued) Load Data Processing (continued) File transfer of metered data to APX is via SFPUC FTP servers. The files are loaded to two different servers, one in San Francisco and the other in Moccasin, California, to ensure that APX will always be able to retrieve the files when required. In addition, the metered data files are prepared and exported over 3 consecutive days for each required submission; this ensures that metered data will be available for reporting to the CAISO even if SFPUC systems should be disabled for up to 48 hours. Scope of Procedures The objective of the engagement was to perform an agreed-upon procedures engagement of SFPUC s procedures to comply with the CAISO requirements. This report includes the results of procedures performed by the independent accountant on the process controls at the Settlement Meter Data Processing Level during the period of August 1, 2014 through July 31, Summary of Results Our review of the Settlement Meter Data Processing Level controls at SFPUC indicated that the process controls are adequate and functioning as documented. 5

6 Section II - Summary of Findings There were no exceptions noted for the period of August 1, 2014 through July 31, (See Section IV). 6

7 Section III - Independent Accountant s Qualifications Summary Stephen P. Carter, CPA - Principal Mr. Carter is a principal of Abbott, Stringham & Lynch in the Audit and Accounting Group. He has supervised this agreed-upon procedures engagement for SFPUC. He has over 40 years of experience in the field of public accounting. His areas of expertise are in auditing, review and evaluations of internal controls, and accounting systems design and reviews. He also consults with businesses on a variety of business, accounting, and tax issues. Abbott, Stringham & Lynch provides assurance, attest, tax, consulting and management advisory services to businesses located in and throughout California. Abbott, Stringham & Lynch has the qualifications and experience required to perform engagements of this nature. 7

8 Section IV - Description of Controls at SFPUC, Procedures Performed, and Results of Procedures We randomly selected the following sample days from which to perform tests: October 11, 2014 November 15, 2014 November 27, 2014 February 7, 2015 June 28, 2015 July 8, 2015 July 14, 2015 Process Controls 1 Verify documented procedures for meter data processing are up to date and are being followed. SFPUC has the following formally documented procedures which detail out the following: No exceptions were noted. Monitoring Customer Information System ( CIS ) Meter Reads 1. Daily Checklist 2. Monthly Checklist 3. Retrieving Pacific Gas & Electricity ( PG&E ) Daily Meter Read Files 4. Meter Data Management System ( MDMS ) Process 5. Verifying Usage Meter VEE Reads Usage Meter VEE Estimating Guidelines o Research Reads o Calculate Estimates We read the documented meter processing procedures found in the Monitoring CIS Meter Reads document, SFPUC CIS Meter Read Processing document, Monthly Meter Read VEE Requirements document, MV90 Daily Procedures document, MV90 30-Day High-Low Check Procedures document and MV90 kvar Check document, and ascertained that these procedures are being followed by interviewing the Utility Specialists and manager of EDS (Energy Data Systems) group. All procedures appear to be followed as documented. All applicable processes appear to be documented. 8

9 Process Controls 1 (cont.) Monitoring Customer Information System ( CIS ) Meter Reads (continued) Verify documented procedures for meter data processing are up to date and are being followed. 6. Appendix A: Screen Reference Use Meter VEE Review Electric Meter Read Adjustment Screen Adjustment Screen SFPUC - CIS Meter Read Processing 1. Overview Background---CIS Meters 2. CIS Meter Reads and VEE Identification of New Meter Reads System VEE Processing SFPUC Staff VEE Review Monthly Meter Read VEE Requirements 1. Background 2. Physical Meter Validation Checks 3. Data Cleansing 4. Meter Read Validation 5. Meter Read Estimation 6. Demand Estimations 7. Staff Review 8. Audit Trail We observed that the procedures are being performed as documented. All processes that are taking place as part of the meter data processing are listed in these procedural documents. 9

10 Process Controls 1 (cont.) Verify documented procedures for meter data processing are up to date and are being followed. MV90 Daily Procedures 1. MV90 Daily Checklist 2. Clearing the Task List Viewing the Task List Clearing Interrogation (Red) Tasks Clearing Failed Validation (Blue) Tasks Clearing Export (Purple) Tasks o Clearing Failed Export Tasks 3. Editing and Estimating Adding Missing Intervals Editing Using Fixed / Variable Data Estimating Data Forcing MV90 to Flag Estimated / Edited Data Validating Your Work 4. Referenced Procedures Communications (Remote Interrogation) Logs Delete / Post / All Read Manual Accept Manual Export (Upload) to MDMS 5. Verifying File Upload to MDMS Checking for Missing Reads in the Exported Data Files Checking for Failed Exports Ensuring That Estimated Data Is Flagged 6. Appendix A MV90 Failure Codes for Call On Demand Tasks 7. Appendix B Referenced Documents 8. Appendix C Glossary 10

11 Process Controls 1 (cont.) Verify documented procedures for meter data processing are up to date and are being followed. MV90 Daily Procedures (continued) 9. Appendix D Screen Access Instructions MV90 30-Day High-Low Check Procedures 1. High/Low Usage Tolerance (Average Daily Usage) 2. What to do if Meters Fail/Verifying 3. Changes in Usage 4. How to Mark Review Categories Comments 5. Completing the Temporary Irregular Recorder List 6. Reviewing the Temporary Irregular Recorder List 7. Developing Permanent Irregular Usage Lists MV90 kvar Check 1. Screen Content 2. Links 3. What to do if Meters Fail kvar Check 4. How to Mark Review Categories 11

12 Process Controls 2 Verify load profiles, if applicable, are applied properly. Also verify and SFPUC CIS Meter Read Processing 1. Reporting CIS Metered Load We identified and documented the procedures used to apply a No exceptions were noted. document the process for Profile Factors profile to each meter s It appears that SFPUC handling missing or Profiling Logic KWH Meter Read reported usage as is applying load profiles incomplete load profiles. Profiling Logic TOU KWH Meter described in SFPUC - CIS properly. Read Meter Read Processing Aggregation of Profiled Meter Data document. 3 Verify Distribution Loss Factors ( DLF ) are applied properly. Also verify and document the process for handling missing or incomplete DLFs. For reporting CIS metered load to the Meter Data Management Agent ( MDMA ), SFPUC applies a profile to each meter s reported usage, allocating the metered monthly usage to hour intervals based on the profile of the aggregate interval load data. All interval reads, calculated loads, and profiled usage are associated with a PG&E grid code as follows: P Primary S Secondary T Transmission A Airport Prior to July 1, 2015, the grid code corresponds to a DLF specified in the PG&E Interconnection Agreement ( IA ). We ascertained that these procedures are being followed by interviewing the Utility Specialists and manager of EDS group, and observing that the procedures are being performed as documented. We identified and documented the procedures used to apply the DLF value to the metered load. We ascertained that these procedures are being followed by interviewing the Utility Specialists and manager of EDS group and observing that the procedures occur as documented. No exceptions were noted. It appears that SFPUC is applying DLFs properly. 12

13 Process Controls 3 (cont.) Verify Distribution Loss Factors ( DLF ) are applied properly. Also verify and document the process for handling missing or incomplete DLFs. On and after July 1, 2015, the loss factors are specified in the Wholesale Distribution Tariffs. Transmission-level facilities (including the Airport) have no distribution loss factors. During the data preparation process for submitting metered data, the DLF value is applied to the metered load. In other words, metered load multiplied by DLF results in reportable load. 13

14 Process Controls 4 Verify that estimation performed is controlled and documented. MV90 Daily Procedures 1. Editing and Estimating No exceptions were noted. Adding Missing Intervals o Creating a Data File o Adding Intervals Using the Repetitive Add Function Editing Using Fixed / Variable Data Estimating Data o Estimating Data Linear Interpolation o Estimating Using Average Plug o Estimating Using the Copy Data Function Forcing MV90 to Flag Estimated / Edited Data Validating Your Work 2. Referenced Procedures Communications (Remote Interrogation) Logs We identified and documented the procedures used to estimate meter data, as described in the MV90 Daily Procedures document, Monitoring CIS Meter Reads document, and Monthly Meter Read VEE document, and ascertained that these procedures are being followed by interviewing the Utility Specialists and manager of EDS group, and observing that the procedures are being performed as documented. The sample data was tested to ascertain that estimation performed is controlled and documented. It appears that SFPUC is performing estimation for missing meters correctly and that the estimation process is functioning as required. No exceptions were noted. 14

15 Process Controls 4 (cont.) Monitoring CIS Meter Reads Verify that estimation performed is controlled and documented. 1. Verifying CIS Meter VEE Read Estimating Guidelines o Research Reads o Calculate Estimates Monthly Meter Read VEE 1. Meter Read Estimation 2. Demand Estimation 3. Staff Review 4. Audit Trail The MDMS prepares estimated interval reads for all interval load meters based on a 3-day average interval value for 12-month prior reads for comparable days. For work days, the average uses the work day 365 days prior (shifts if the day happens to be a holiday), the year-ago prior work day, and the year-ago next work day. For Saturday, it uses the yearago Saturday, the year-ago prior Saturday, and the year-ago next Saturday. For Sunday or a holiday, it uses the year-ago Sunday or holiday, the year-ago prior Sunday, and the year-ago next Sunday. SFPUC does not perform the function of submitting meter data by the final settlement deadline. APX performs the function of submitting accurate meter data to CAISO by the final settlement deadline. SFPUC does not perform the function of submitting meter data by the final settlement deadline, and therefore it is not within the scope of the SFPUC agreed-upon procedures herein. See APX Self Audit Report for

16 Process Controls 4 (cont.) Monthly Meter Read VEE (continued) Verify that estimation performed is controlled and documented. Estimated reads are developed prior to the beginning of each month for the full month. Thereafter, as MV90 reported read data are processed, any missing intervals for unreported meters are populated with the estimated interval values for the meter, and identified as missing (VEE code 'M'). If no estimated interval reads are available for a meter, the interval values are set to zero and identified as missing. The MDMS interval estimated values are interim values pending final VEE by MV90. When MV90 reports out actual reads, or at the point they determine that the read data are unrecoverable and report estimated reads, the MV90 reads replace the MDMS entries. 5 Verify that any SQMD submitted after T+48B days is documented and controlled to assure accurate and correct meter data is submitted to APX prior to resubmittal deadline. SFPUC has no automatic re-submission process. In any case where SFPUC determines that previously reported read data was incorrect (for example, PG&E determines that they programmed a meter incorrectly, and it should have been reporting 10 times the load), after the corrected reads are posted to the MDMS, SFPUC would (1) add SC export schedule entries for the dates that need to be resubmitted, which would trigger new exports for the dates, and (2) notify APX that new file(s) had been generated for re-submission. We ascertained that these procedures are documented. However, per our inquiry of the Utility Specialists and manager of EDS group, there was no SQMD submitted after T+48B days during the trade year. No submission after T+48B days was noted. 16

17 Process Controls 6 Verify that contingency plans are in place to ensure that if systems go down, data can still be submitted SFPUC MRTU Logical Meter Procedures 1. Data Exchange Interfaces 2. Meter Data No exceptions were noted. to APX in a timely manner. Overview MV90xi Software and Hardware Support 1. Information Technology Services Support Backup Server Updates IT Staff 2. Itron Support 3. Software ISO Meter Data Submission Overview 1. Process for Metered Data Submittal to the ISO We interviewed the Utility Specialists and manager of EDS group responsible for system contingency plans, and they explained the various procedures in place to properly and routinely back-up and safeguard all data. We identified and documented the contingency procedures used to determine that the meter data processing systems can function at all times. SFPUC appears to have adequate contingency plans and data recovery procedures in place to ensure that data can still be submitted to APX in a timely manner. 17

18 Verification and Testing 1 When reporting SQMD during Daylight Savings Time ( DST ), verify the data submitted to APX is in Pacific Standard Time ( PST ). The MDMS does not store any interval read data as local time. All interval read data sourced into the MDMS is assigned interval IDs during load processing; the interval IDs are unique keys to time dimension tables, which contain the corresponding times for UTC, PST, and PDT. We identified and documented procedures that are in place to see that all data is submitted to APX in PST. No exceptions were noted. All reads from MV90 are exported in CMEP interval data format, where the end time for the first interval of each row is in UTC; the MDMS attaches the corresponding interval ID for each imported UTC time. CIS meter reads are in local time, but when profiled to intervals, the interval time is identified by the interval ID. The only point an error could be introduced would be if a meter was read during the duplicate hour in the 2 a.m. fallback period in November, since there is no indication in the data source from PG&E whether the reported date/time is PST or PDT. However, this does not happen since the PG&E reads are taken during normal business hours. Even if it did occur, the maximum error would be 1 hour over an approximately 30 day period. Since most systems use only read dates and not times, SFPUC still has a greater degree of accuracy. The sample data was tested to conclude that data submitted to APX is in PST. No exceptions were noted. Sample testing results indicate that all data submitted to APX is in PST. The use of time dimension interval IDs facilitates all data preparation and reporting, since data can be selected by trade date (based on local time) or metered data submission date (based on PST time). 18

19 Verification and Testing 2 Verify system testing is completed prior to implementation of any meter data processing system change or modification. Validate appropriate documentation supporting the change has been created and that a comparative review was conducted prior to and after the system changes occurred. For any meter data processing system change or modification, SFPUC is required to test the system before and after implementation to verify that MDMS behaves in the new environment the same manner as it did in the current production environment. Proper proof of testing is required by CAISO for all software changes that affect SQM data processing. We interviewed the Utility Specialists and manager of EDS group and noted that the procedures are in place and being followed for all software changes. We identified and documented the procedures and results of comparative data testing before implementation. On July 1, 2015, SFPUC switched over its load reporting process. This was due in part to meet requirements from the expiration of the PG&E Interconnection Agreement. These changes improved load reporting accuracy and efficiency. Prior to implementation, SFPUC performed testing in the following area: It appears that SFPUC has adequately tested the system before and after implementation to verify that MDMS behaves in the new environment the same as it did in the current production environment. Testing historic data that went into the aggregations Testing aggregation of historic data into reporting aggregations Testing of streetlights inventory Testing of SC-Export process 19

20 Root Cause Analysis No. Audit finding Identification of the finding Corrective actions 1 Document the audit finding, how it was identified, the cause for the finding, what effects the finding had on meter data submitted to APX, and the corrective actions taken to prevent recurrence. There were no findings noted for the period of August 1, 2014 through July 31, As there were no findings noted for the period of August 1, 2014 through July 31, 2015, no corrective actions are necessary. 20

21 i 525 Golden Gate Avenue, 7th Floor b3n I T9 PIC I SCO San Francisco, CA Water Power Sewer I Operator of the Hetch Hetchy Regional Water System October 13, 2015 Katherine Graham, Chief Operating Officer APX, Inc. 224 Airport Parkway, Suite 600 San Jose, CA Dear Ms. Graham: At the request of APX Power Market, Inc. ("APX"), San Francisco Public Utilities Commission ("SFPUC") engaged Abbott, Stringham & Lynch LLP to review the procedures used to prepare data at the Settlement Meter Data Processing Level, for the California Independent System Operator ("CAISO") trade year. The primary objective was to comply with the CASIO Scheduling Coordinator "Self Audit" requirements for the trade year. We have reviewed the Agreed-Upon Procedures Report for Settlement Quality Meter Data Processing for the prepared by Abbott, Stringham & Lynch LLP, and the report is satisfactory and in compliance with CAISO standards. If you have any questions, please do not hesitate to contact me. Sincerely, David Robinett Manager Retail Services Edwin M. Lee Mayor Ann Moller Caen President Francesca Vietor Vice President Vince Courtney Commissioner Anson Morau Commissioner Ike Kwon Commissioner Harlan L. Kelly. Jr. General Manager Services of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Frandsco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Frandsco Public Utilities Commission San Francisco Water Power Sewer Services of the San Frandsco Public Utilities Commission OFFICE OFTHE GENERAL MANAGER 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161

More information

Payment Acceleration Implementation Workshop #2

Payment Acceleration Implementation Workshop #2 Payment Acceleration Implementation Workshop #2 Steve Meinhofer Project Manager - Payment Acceleration Payment Acceleration Implementation Workshop #2 February 24, 2009 Payment Acceleration Implementation

More information

%&&2^ Harlan L. Kelly, Jr., General Manager

%&&2^ Harlan L. Kelly, Jr., General Manager San Francisco Water Powe Sewer Services of the San Francisco Public Utiiities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 MEMORANDUM

More information

Community Choice Aggregation (CCA) Reference Guide

Community Choice Aggregation (CCA) Reference Guide Community Choice Aggregation (CCA) Reference Guide Community Choice Aggregation (CCA) programs are governmental entities formed by cities and counties to serve the energy requirements of their local residents

More information

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 m 415.554.3488 February

More information

San Francisco Water Power Sewer Service* of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Service* of the San Francisco Public Utilities Commission San Francisco Water Power Sewer Service* of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 MEMORANDUM

More information

Procedure: Station Power Portfolio Application

Procedure: Station Power Portfolio Application Overview Introduction FERC has established a policy that allows a single corporate entity that owns one or more Generating Units to self-supply Station Power over a monthly netting period using Energy

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64531-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 64317-E APPLICABILITY Schedule TOU-GS-3-RTP Sheet 1 Applicable to Bundled

More information

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53145-E APPLICABILITY Schedule PA-RTP Sheet 1 Applicable to Bundled Service Customers where SCE determines that 70 percent or more of

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 65402-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 64974-E Schedule TOU-GS-3-SOP Sheet 1 APPLICABILITY Applicable to single-

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 No. 1210 Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 2 2.1. Background... 2 2.2. Scope/ Applicability... 3 3. PROCEDURE DETAIL... 3 3.1. Prior to DAM Close... 3 3.1.1.

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Energy Storage and Distributed Energy Resources Phase -2 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business Requirements

More information

Business Practice Manual for Metering. Version 56

Business Practice Manual for Metering. Version 56 Business Practice Manual for Metering Version 56 Last Revised: September 09, 2011 May 7, 2012 Approval History Approval Date: March 13, 2009 Effective Date: March 31, 2009 BPM Owner: Nancy TraweekBenik

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62910-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62282-E APPLICABILITY Schedule TOU-GS-2-RTP Sheet 1 Applicable to Bundled

More information

RECOMMENDATION TO NAESB EXECUTIVE COMMITTEE For Quadrant: WEQ 1. RECOMMENDED ACTION: EFFECT OF EC VOTE TO ACCEPT RECOMMENDED ACTION:

RECOMMENDATION TO NAESB EXECUTIVE COMMITTEE For Quadrant: WEQ 1. RECOMMENDED ACTION: EFFECT OF EC VOTE TO ACCEPT RECOMMENDED ACTION: 1. RECOMMENDED ACTION: EFFECT OF EC VOTE TO ACCEPT RECOMMENDED ACTION: X Accept as requested X Change to Existing Practice Accept as modified below Status Quo Decline 2. TYPE OF DEVELOPMENT/MAINTENANCE

More information

Bridging the Gap between AMI and the Enterprise with MDM

Bridging the Gap between AMI and the Enterprise with MDM Bridging the Gap between AMI and the Enterprise with MDM Wendy Lohkamp Director, Product Marketing, Itron Kevin Walsh Industry Principal, SAP for Utilities Itron s History More than,00 customers in over

More information

Payment Acceleration Meter Data Estimation

Payment Acceleration Meter Data Estimation Payment Acceleration Meter Data Estimation Jill Powers Manager, Operations Data and Compliance Stakeholder Conference Call September 18, 2008 Purpose of Today s Meeting Clarify where we are at in the process

More information

Relevant changes will be made to corresponding sections of OA and RAA.

Relevant changes will be made to corresponding sections of OA and RAA. PJM Interconnection - Intra-PJM Tariffs - OPEN ACCESS TRANSMISSION TARIFF PJM OPEN ACCESS TRANSMISSION TARIFF Relevant changes will be made to corresponding sections of OA and RAA. Effective Date: 9/17/2010

More information

X Accept as requested X Change to Existing Practice Accept as modified below Decline

X Accept as requested X Change to Existing Practice Accept as modified below Decline 1. RECOMMENDED ACTION: EFFECT OF EC VOTE TO ACCEPT RECOMMENDED ACTION: X Accept as requested X Change to Existing Practice Accept as modified below Status Quo Decline 2. TYPE OF DEVELOPMENT/MAINTENANCE

More information

The definition of a deficiency is also set forth in the attached Appendix I.

The definition of a deficiency is also set forth in the attached Appendix I. Deloitte & Touche LLP 361 South Marine Corps Drive Tamuning, GU 96913-3973 USA Tel: (671)646-3884 Fax: (671)649-4932 www.deloitte.com May 26, 2014 Mr. David Paul General Manager Marshalls Energy Company,

More information

Market Rules Procedure on

Market Rules Procedure on ver. 1.0 Page 1 from 27 Transmission System and Market Operator of Kosovo (KOSTT) February 2015 ver. 1.0 Page 2 from 27 Department: Market Operator This Market Rules procedure (including as subsequently

More information

Business Practice Manual for Reliability Requirements. Version 34

Business Practice Manual for Reliability Requirements. Version 34 Business Practice Manual for Reliability Requirements Version 34 Last Revised: January 1, 2009July 28, 2010 Approval History Approval Date: 3/27/09 Effective Date: 3/31/09 BPM Owner: Chetty Mamandur BPM

More information

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 September

More information

Independent Auditor s Report on Controls Placed in Operation and Tests of Operating Effectiveness of. For the Period of June 1, 2010 to May 31, 2011

Independent Auditor s Report on Controls Placed in Operation and Tests of Operating Effectiveness of. For the Period of June 1, 2010 to May 31, 2011 Independent Auditor s Report on Controls Placed in Operation and Tests of Operating Effectiveness of Central s Orbit Customer Management and Billing (Orbit CMB), Work Management System (WMS), and Dynamic

More information

SC Self Audit Attestation & SQMD Plan Affirmation

SC Self Audit Attestation & SQMD Plan Affirmation SC Self Audit Attestation & SQMD Plan Affirmation Elaine Siegel Market Services Policy Lead Stakeholder Web Conference August 23, 2018 1:00 PM 2:00 PM (PDT) SC Self Audit Attestation & SQMD Plan Affirmation

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Date Created: 3/19/2013 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer Business s Specification Date Created: 3/19/2013 All information contained in this draft Business s Specification

More information

SAN FRANCISCO PUBLIC UTILITIES COMMISSION STRATEGIC PLAN

SAN FRANCISCO PUBLIC UTILITIES COMMISSION STRATEGIC PLAN 2020 SAN FRANCISCO PUBLIC UTILITIES COMMISSION STRATEGIC PLAN Mayor Edwin M. Lee Commissioners Francesca Vietor, President Anson Moran, Vice President Ann Moller Caen Vince Courtney Ike Kwon Executive

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 25, Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 25, Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 25, 2018 Electric Grid Operations Associate Contracting Agent Construction Services: Supports completion

More information

ISO RESPONSE TO COMMENTS ON DRAFT RELIABILITY DEMAND RESPONSE PRODUCT TARIFF LANGUAGE

ISO RESPONSE TO COMMENTS ON DRAFT RELIABILITY DEMAND RESPONSE PRODUCT TARIFF LANGUAGE Proposed Tariff Language Related Tariff Section CAISO Response Included with Third Revised Draft RDRR Tariff Language Delete PDRs and in the title of section 4.13.5.3 Conforming Change Delete section 4.13.5.3.1

More information

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3.

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3. ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3. PSEI EIM Participating Resource Application and Processing 3.1 Application

More information

Schedule TOU-PA-2-SOP Sheet 1 TIME-OF-USE - AGRICULTURAL AND PUMPING SUPER OFF-PEAK - SMALL TO MEDIUM

Schedule TOU-PA-2-SOP Sheet 1 TIME-OF-USE - AGRICULTURAL AND PUMPING SUPER OFF-PEAK - SMALL TO MEDIUM Southern California Edison Revised Cal. PUC Sheet No. 54265-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 52345-E Schedule TOU-PA-2-SOP Sheet 1 APPLICABILITY Applicable where

More information

AGENDA CALL TO ORDER: DECLARATION OF QUORUM: Clerk of the Board

AGENDA CALL TO ORDER: DECLARATION OF QUORUM: Clerk of the Board Orange County Sanitation District Special Meeting of the AUDIT AD HOC COMMITTEE Friday, September 22, 2017 8:00 A.M. Administration Building Conference Room A 10844 Ellis Avenue Fountain Valley, CA 92708

More information

PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, Prepared by PJM Forward Market Operations

PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, Prepared by PJM Forward Market Operations PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, 2016 Prepared by PJM Forward Market Operations PJM 2016 Table of Contents Table of Contents Approval...5

More information

San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System

San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System Bureau of Environmental Management 1145 Market Street, Suite 500 San Francisco, CA 94103 T 415.934.5700 F 415.934.5750

More information

Electricity Market Code

Electricity Market Code Electricity Market Code Chapter 10 Information exchange between system operators and other market players; 1st and 2nd clearing Version 3.0 This document contains a non-binding English version of a text.

More information

Hong Kong Deposit Protection Board

Hong Kong Deposit Protection Board Hong Kong Deposit Protection Board Independent Assessment Program and Self-Declaration for Compliance with the Guideline on Information Required for Determining and Paying Compensation ( Program Guide

More information

CHAPTER 5 INFORMATION TECHNOLOGY SERVICES CONTROLS

CHAPTER 5 INFORMATION TECHNOLOGY SERVICES CONTROLS 5-1 CHAPTER 5 INFORMATION TECHNOLOGY SERVICES CONTROLS INTRODUCTION In accordance with Statements on Auditing Standards Numbers 78 and 94, issued by the American Institute of Certified Public Accountants

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 63091-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62171-E APPLICABILITY Schedule TOU-PA-3-SOP Sheet 1 Applicable where SCE

More information

Corporate Background and Experience: Financial Soundness: Project Staffing and Organization

Corporate Background and Experience: Financial Soundness: Project Staffing and Organization A motion by Kentucky, on behalf of the Certification Committee, to adopt changes to the Governing Board Rules, Appendix C, Criteria and Minimum Standards for CSP Certification: Appendix C (04/07/2015)

More information

CITY OF EDMONTON BYLAW 12367, AS AMENDED DISTRIBUTION TARIFF BYLAW

CITY OF EDMONTON BYLAW 12367, AS AMENDED DISTRIBUTION TARIFF BYLAW CITY OF EDMONTON BYLAW 12367, AS AMENDED DISTRIBUTION TARIFF BYLAW Whereas, pursuant to Section 3 of the Municipal Government Act, S.A. 1994 c. M26.1, the purposes of a municipality are to provide services,

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 66434-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 64377-E Schedule TOU-PA-2-RTP Sheet 1 APPLICABILITY Applicable to Bundled

More information

PAYMENT OF UTILITY CHARGES

PAYMENT OF UTILITY CHARGES APPENDIX 1 PAYMENT OF UTILITY CHARGES August 31, 2009 Auditor General s Office Jeffrey Griffiths, C.A., C.F.E. Auditor General City of Toronto TABLE OF CONTENTS EXECUTIVE SUMMARY...1 BACKGROUND...3 AUDIT

More information

Demand as an Active Actor Day 2, Item 1. Presented by: Flora Flygt XM Medellin, Columbia December 12-13, 2012

Demand as an Active Actor Day 2, Item 1. Presented by: Flora Flygt XM Medellin, Columbia December 12-13, 2012 Demand as an Active Actor Day 2, Item 1 Presented by: Flora Flygt XM Medellin, Columbia December 12-13, 2012 1 Outline Introduction Demand Response Continuum Passive Demand Response Active Demand Response

More information

June 7, 2002 VIA OVERNIGHT COURIER

June 7, 2002 VIA OVERNIGHT COURIER June 7, 2002 VIA OVERNIGHT COURIER Hon. Janet H. Deixler, Secretary State of New York Department of Public Service Three Empire State Plaza Albany, NY 12223-1350 RE: Case 99-E-1470 Proceeding on Motion

More information

Electronic Business Transactions Marketer Billing and Settlements Termination of Electric Choice and Return to Full Service

Electronic Business Transactions Marketer Billing and Settlements Termination of Electric Choice and Return to Full Service ELECTRIC CHOICE SUPPLIER HANDBOOK Table of Contents Introduction Chapter 1: Chapter 2: Chapter 3: Chapter 4: Chapter 5: Chapter 6: Chapter 7: Chapter 8: Chapter 9: Chapter 10: Overview of Roles of Electric

More information

Meter Data Management Systems. Position. Vice President, Product Management. November 29 December 1, 2010 Santo Domingo Dominican Republic

Meter Data Management Systems. Position. Vice President, Product Management. November 29 December 1, 2010 Santo Domingo Dominican Republic Meter Data Management Systems Speakers Andy Zetlan name Position Company Aclara Country USA Vice President, Product Management November 29 December 1, 2010 Santo Domingo Dominican Republic Welcome Thank

More information

Business Practice Manual for Metering

Business Practice Manual for Metering Business Practice Manual for Metering Version 187 Revised: October 27, 2017May 24 th, 2018 Formatted: Superscript Approval History Approval Date : March 13, 2009 Effective Date : March 13, 2009 BPM Owner

More information

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7 METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7 PREPARED BY: DOCUMENT NO: Market Development MT_MA80 VERSION NO: 5.30 EFFECTIVE DATE:

More information

CUSTOMER AND SUPPLIER ROLES AND RESPONSIBILITIES FOR 21 CFR 11 COMPLIANCE ASSESSMENT. 21 CFR Part 11 FAQ. (Frequently Asked Questions)

CUSTOMER AND SUPPLIER ROLES AND RESPONSIBILITIES FOR 21 CFR 11 COMPLIANCE ASSESSMENT. 21 CFR Part 11 FAQ. (Frequently Asked Questions) 21 CFR Part 11 FAQ (Frequently Asked Questions) Customer and Supplier Roles and Responsibilities for Assessment of METTLER TOLEDO STARe Software Version 16.00, including: - 21 CFR 11 Compliance software

More information

Impact of AMI on Load Research and Forecasting

Impact of AMI on Load Research and Forecasting Itron White Paper Energy Forecasting and Load Research Impact of AMI on Load Research and Forecasting J. Stuart McMenamin, Ph.D Managing Director, Itron Forecasting 2008, Itron Inc. All rights reserved.

More information

Instructions for Buildings with Missing Benchmarking Information

Instructions for Buildings with Missing Benchmarking Information Instructions for Buildings with Missing Benchmarking Information The City of Chicago received your 2015 energy benchmarking report, but your submission is missing required information and is not yet complete.

More information

Electric Rate Schedule GS-TOU General Service Commercial, Time-of-Use

Electric Rate Schedule GS-TOU General Service Commercial, Time-of-Use Page 1 of 5 Applicability This Schedule is offered as an option to commercial customers having demands from 500 kilowatts up to 1,000 kilowatts in any month during the previous twelve (12) months. Character

More information

PG&E s General Comments on Demand Response Vision Update. January 11, 2008

PG&E s General Comments on Demand Response Vision Update. January 11, 2008 PG&E s General Comments on Demand Response Vision Update January 11, 2008 This document provides PG&E s comments on the draft California Demand Response: A Vision of the Future. The comments are divided

More information

GREEN MOUNTAIN ENERGY COMPANY

GREEN MOUNTAIN ENERGY COMPANY GREEN MOUNTAIN ENERGY COMPANY INDEPENDENT ACCOUNTANT S REPORT ON APPLYING AGREED-UPON PROCEDURES DECEMBER 31, 2013 INDEPENDENT ACCOUNTANT S REPORT ON APPLYING AGREED-UPON PROCEDURES To Management of Green

More information

PREPARED DIRECT TESTIMONY OF DAVID MERCER ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY SAN DIEGO GAS & ELECTRIC COMPANY

PREPARED DIRECT TESTIMONY OF DAVID MERCER ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY SAN DIEGO GAS & ELECTRIC COMPANY Application No: A.1-- Exhibit No.: Witness: David Mercer Application of Southern California Gas Company (U 0 G) and San Diego Gas & Electric Company (U 0 G) Regarding Feasibility of Incorporating of Advanced

More information

Smart Metering and the Need for Advanced Data Management

Smart Metering and the Need for Advanced Data Management Smart Metering and the Need for Advanced Data Management Brian Owenson Sr Director, Technology Strategy, Oracle Utilities Global Business Unit 1 Agenda A Little History Some Definitions Current State of

More information

California Independent System Operator Corporation Fifth Replacement Tariff

California Independent System Operator Corporation Fifth Replacement Tariff Table of Contents Station Power Protocol... 2 1 General Conditions... 2 1.1 Procurement... 2 1.2 Eligibility... 2 1.3 Limitations... 2 2 Station Power Requirements and Review... 3 2.1 Applications to Self-Supply

More information

Measurement and Verification Standards Wholesale Electric Demand Response Recommendation Summary

Measurement and Verification Standards Wholesale Electric Demand Response Recommendation Summary Measurement and Verification Standards Wholesale Electric Demand Response Recommendation Summary 2008-10-03 Austin, Texas Eric Winkler Ph.D., ISO-NE Paul Wattles, ERCOT Donna Pratt, NYISO 1 Agenda Standards

More information

Business Practice Manual for Metering. Version 1415

Business Practice Manual for Metering. Version 1415 Business Practice Manual for Metering Version 1415 Revised: May 25August 1October 1, 2016 Approval History Approval Date : March 13, 2009 Effective Date : March 13, 2009 BPM Owner BPM Owner s Title : Benik

More information

NERC Transmission Operator (TOP) Hetch Hetchy Water and Power (HHWP) (NCR05182)

NERC Transmission Operator (TOP) Hetch Hetchy Water and Power (HHWP) (NCR05182) NERC Transmission Operator (TOP) Hetch Hetchy Water and Power (HHWP) (NCR05182) September 27-28, 2011 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of

More information

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b) Company Name: Written Description of QMS Title and Rev. Status: Person who is responsible for preparing the owner s QMS written description: Name: Title: Telephone No.: ( ) Fax No.: ( ) Cell No.: ( ) E-Mail:

More information

Itron Enterprise Edition Meter Data Management SMART METER / AMI ROADMAP

Itron Enterprise Edition Meter Data Management SMART METER / AMI ROADMAP Itron Enterprise Edition Meter Data Management SMART METER / AMI ROADMAP IEE AMI MDM Roadmap: 2007-2011 5.3 Q3 2007 6.0 Q2 2008 Q2 2009 8.0 2011 > AMI System Integration for Readings and Events > AMI Readings

More information

This rule was approved by the Alberta Utilities Commission on January 2, 2008.

This rule was approved by the Alberta Utilities Commission on January 2, 2008. Rule 004 Alberta Tariff Billing Code Rules This rule was approved by the Alberta Utilities Commission on January 2, 2008. Contents 1 General and administrative provisions... 6 1.1 Application... 6 1.2

More information

Electric Rate Schedule GS-3 General Service - Industrial

Electric Rate Schedule GS-3 General Service - Industrial Page 1 of 5 Applicability This Schedule is applicable to industrial customers having demands of 1,000 kilowatts or greater in any month during the previous twelve (12) months. Character of Service Alternating

More information

Electric Rate Schedule GS-3 General Service - Industrial

Electric Rate Schedule GS-3 General Service - Industrial Page 1 of 5 Applicability This Schedule is applicable to industrial customers having demands of 1,000 kilowatts or greater in any month during the previous twelve (12) months. Character of Service Alternating

More information

PJM InSchedule User Guide

PJM InSchedule User Guide PJM InSchedule User Guide Revision: 01 Effective Date: June 1, 2015 Prepared by Markets Applications PJM 2015 PJM 2015 Revision 7, Effective Date: 6/1/2015 i PJM eschedules User Guide Approval and Revision

More information

Cancer Prevention & Research Institute of Texas. IA # Internal Audit Report over Communication Report Date: April 30, 2018 Issued: May 25, 2018

Cancer Prevention & Research Institute of Texas. IA # Internal Audit Report over Communication Report Date: April 30, 2018 Issued: May 25, 2018 IA # 04-18 Internal Audit Report over Communication Report Date: Issued: May 25, 2018 C O N T E N T S Page Internal Audit Report Transmittal Letter To The Oversight Committee.... 1 Background... 2 Audit

More information

What You Need to Know Before Requesting Interconnection

What You Need to Know Before Requesting Interconnection Connecting to the Utility Grid What You Need to Know Before Requesting Interconnection Peter Giannotti Southern California Edison August 16, 2017 Tampa Convention Center Tampa, Florida Why is Grid Interconnection

More information

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

14620 Henry Road Houston, Texas PH: FX: WEB:  QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

How Do We Manage the Data Generated by AMI? Wendy Lohkamp Director, Product Marketing, Itron

How Do We Manage the Data Generated by AMI? Wendy Lohkamp Director, Product Marketing, Itron How Do We Manage the Data Generated by AMI? Wendy Lohkamp Director, Product Marketing, Itron Why Data Management with AMI? you are here With AMI: collecting shells in the surf while the tide is coming

More information

consider using the 2007 NRR- DR program software.

consider using the 2007 NRR- DR program software. NRR-DR Section 4: Forms and Instructions 4.1 Overview of Submittal Process... 4-2 4.2 Overview of Forms... 4-3 4.3 PG&E Incentive Application... 4-4 4.4 NRR-DR Form... 4-4 4.5 NRR-DR Installation Report...

More information

ACTION Agenda Item I ANNUAL AUDIT REPORT December 6, 2002

ACTION Agenda Item I ANNUAL AUDIT REPORT December 6, 2002 ACTION Agenda Item I-2 2001-02 ANNUAL AUDIT REPORT December 6, 2002 Recommendation That the KCTCS Board of Regents receive the financial audit results for the 2001-02 fiscal year. Rationale The resolution

More information

Revision: 67. Prepared by

Revision: 67. Prepared by PJM Manual 11: Energy & Ancillary Services Market Revision: 67 Effective Date: June 1, 2014 Prepared by Forward Market PJM 2014 i Section 9: Hourly Scheduling Section 4: Overview of the PJM Synchronized

More information

REPORT 2015/171 INTERNAL AUDIT DIVISION. Audit of the implementation of the interface between Umoja and Galileo

REPORT 2015/171 INTERNAL AUDIT DIVISION. Audit of the implementation of the interface between Umoja and Galileo INTERNAL AUDIT DIVISION REPORT 2015/171 Audit of the implementation of the interface between Umoja and Galileo Overall results relating to the audit of the implementation of the interface between Galileo

More information

Audit Follow-Up. Water Infrastructure (Report #0919 issued September 30, 2009) As of March 31, Summary

Audit Follow-Up. Water Infrastructure (Report #0919 issued September 30, 2009) As of March 31, Summary Audit Follow-Up As of March 31, 2010 Sam M. McCall, Ph.D., CPA, CGFM, CIA, CGAP City Auditor Water Infrastructure (Report #0919 issued September 30, 2009) Report #1018 June 7, 2010 Summary Thirteen of

More information

The definition of a deficiency is also set forth in the attached Appendix I.

The definition of a deficiency is also set forth in the attached Appendix I. Deloitte & Touche LLP 361 South Marine Corps Drive Tamuning, GU 96913-3911 USA September 22, 2015 Tel: (671)646-3884 Fax: (671)649-4932 www.deloitte.com Mr. David Paul General Manager Marshalls Energy

More information

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS Program Guide TABLE OF CONTENTS Introduction... 2 Purpose... 2 About CHP... 2 Program Description... 2 Call for CHP Projects... 3 Participant Webinar...

More information

ASSESSMENT AND EVALUATION OF THE CITY OF PHILADELPHIA S INFORMATION TECHNOLOGY GENERAL CONTROLS FISCAL 2016

ASSESSMENT AND EVALUATION OF THE CITY OF PHILADELPHIA S INFORMATION TECHNOLOGY GENERAL CONTROLS FISCAL 2016 ASSESSMENT AND EVALUATION OF THE CITY OF PHILADELPHIA S INFORMATION TECHNOLOGY GENERAL CONTROLS FISCAL 2016 Charles J. Brennan Chief Information Officer Office of Innovation and Technology 1234 Market

More information

Audit Follow Up. Electric Revenues (Report #0602, Issued November 15, 2005) As of March 31, Summary. Report #0714 May 17, 2007

Audit Follow Up. Electric Revenues (Report #0602, Issued November 15, 2005) As of March 31, Summary. Report #0714 May 17, 2007 Audit Follow Up As of March 31, 2007 Electric Revenues (Report #0602, Issued November 15, 2005) Report #0714 May 17, 2007 Summary The Electric Utility and Utility Business and Customer Services have completed

More information

Portland General Electric Company Eleventh Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Portland General Electric Company Eleventh Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. Portland General Electric Company Eleventh Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. 76R-1 PURPOSE SCHEDULE 76R PARTIAL REQUIREMENTS ECONOMIC REPLACEMENT

More information

August 18, Energy Imbalance Market (EIM) Entity Readiness Criteria

August 18, Energy Imbalance Market (EIM) Entity Readiness Criteria Energy Imbalance Market (EIM) Entity Criteria August 18, 2015 Energy Imbalance Market (EIM) Entity Criteria Table of Contents 1 Introduction... 3 2 Criteria Categories... 4 2.1 Metrics, Criteria, and Thresholds...

More information

IBM Commerce Insights

IBM Commerce Insights IBM Terms of Use SaaS Specific Offering Terms IBM Commerce Insights The Terms of Use ( ToU ) is composed of this IBM Terms of Use - SaaS Specific Offering Terms ( SaaS Specific Offering Terms ) and a document

More information

The ESP Handbook. Chapter 9 Billing under CCA. Version 2.0 May 1, 2015

The ESP Handbook. Chapter 9 Billing under CCA. Version 2.0 May 1, 2015 The ESP Handbook Chapter 9 Billing under CCA Version 2.0 May 1, 2015 9.1 Introduction This chapter provides an overview of billing policies and procedures under Community Choice Aggregation (CCA). The

More information

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1 Issue Paper Direct Participation of Demand Response Resources in CAISO Electricity Markets December 22, 2008 CAISO JEP / BDC/ JDG 12/22/08, page 1 Direct Participation of DR Resources Table of Contents

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 No. 4120 Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 3 2.1 Background... 3 2.2 Scope/ Applicability... 4 3. PROCEDURE DETAIL... 4 3.1 General Information... 4 3.2

More information

Delivering high-integrity accounting with Xero

Delivering high-integrity accounting with Xero Delivering high-integrity accounting with Xero Contents Untouched data feeds directly into Xero 4 A multi-layered approach to data integrity 5 Access controls 6 Monitoring and alerts 7 Controls and reporting

More information

Business Practice Energy Imbalance Market (EIM BP) Revision Number: Revision Date: November 30July 29, 2015

Business Practice Energy Imbalance Market (EIM BP) Revision Number: Revision Date: November 30July 29, 2015 Revision Number: 3.02.1 Revision Date: November 30July 29, 2015 Revision Log 0.0 3/31/15 Pre-market initial draft 1.0 5/15/15 Email and phone contacts, Sections 3, 7, 8, 9, 11 and Appendix A for participating

More information

COMPUTERISED SYSTEMS

COMPUTERISED SYSTEMS ANNEX 11 COMPUTERISED SYSTEMS PRINCIPLE This annex applies to all forms of computerised systems used as part of a GMP regulated activities. A computerised system is a set of software and hardware components

More information

The Value of Enterprise Meter Data Management Phyllis Batchelder Itron, The Netherlands

The Value of Enterprise Meter Data Management Phyllis Batchelder Itron, The Netherlands The Value of Enterprise Meter Data Management Phyllis Batchelder Itron, The Netherlands Topics The Evolution of the Value of Meter Data Business drivers for an Enterprise Meter Data Management Solution

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid And Self-Schedule Submission For All CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

SCHEDULING COORDINATOR REQUEST FOR INFORMATION

SCHEDULING COORDINATOR REQUEST FOR INFORMATION SCHEDULING COORDINATOR REQUEST FOR INFORMATION For the Demand Response Auction Mechanism Pilot Participant Instructions Version 1.0 August 11, 2015 8.11.15 i TABLE OF CONTENTS ARTICLE ONE. GENERAL INFORMATION...1

More information

Code Subsidiary Document No. 0202: Meter Read Submission: Process

Code Subsidiary Document No. 0202: Meter Read Submission: Process Code Subsidiary Document No. 0202: Table of Contents 1. Purpose and scope... 4 1.1 Purpose... 4 1.2 Scope... 4 2. Meter Read Types and Meter Read Methods... 5 2.1 Overview... 5 2.2 Meter Read Types...

More information

NEW YORK INDEPENDENT SYSTEM OPERATOR

NEW YORK INDEPENDENT SYSTEM OPERATOR Rate Schedule 1 Study Status Update Review of Other ISO/RTO s March 2011 TABLE OF CONTENTS 1.0 RATE STRUCTURES AT OTHER ISO S/RTO S...1 1.1 PJM...1 1.2 ISO-New England...3 1.3 California ISO...6 1.4 Midwest

More information

Oracle Utilities Customer Care and Billing Release Utility Reference Model a Read Meter

Oracle Utilities Customer Care and Billing Release Utility Reference Model a Read Meter Oracle Utilities Customer Care and Billing Release 2.4.0 Utility Reference Model 4.2.1.1a Read Meter December 2015 Oracle Utilities Customer Care and Billing Utility Reference Model 4.2.1.1a, Release 2.4.0

More information

TECHNICAL REQUIREMENTS (CLAUSE 5)

TECHNICAL REQUIREMENTS (CLAUSE 5) LECTURE 4 THE ELEMENTS OF ISO/IEC 17025 - TECHNICAL REQUIREMENTS (CLAUSE 5) Slide 1 ISO 17025 - RELATIONSHIP OF EACH REQUIREMENTS Management System Organization Quality system Continual Improvement Management

More information

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Your Company Name QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Policies and Procedures Latest Revision Date Abstract:

More information

File. Audit. City Auditor

File. Audit. City Auditor Accounts Payab ble - Vendor Master File Audit Craig Hametner, CPA, CIA, CISA, CMA, CFE City Auditor Prepared By Marla Hamilton, Staff Auditor Reviewed By Jed Johnson, Sr. Auditor INTERNAL AUDIT DEPARTMENT

More information

RFI. Request for Information For Silicon Valley Power Data Warehouse and Reporting System

RFI. Request for Information For Silicon Valley Power Data Warehouse and Reporting System RFI Request for Information For Data Warehouse and Reporting System October 8, 2015 Table of Contents 1. Opportunity Overview... 1 2. Instructions for Vendors... 2 3. REQUEST FOR INFORMATION... 3 3.1.

More information

MV-90 xi. specifications. MV-90 xi Software System Interval Data Collection, Analysis and Application all in one system

MV-90 xi. specifications. MV-90 xi Software System Interval Data Collection, Analysis and Application all in one system MV-90 xi specifications MV-90 xi Software System Interval Data Collection, Analysis and Application all in one system Overview Itron s MV-90 xi software is the industry s leading system for collecting

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 No. 4120C Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 3 2.1. Background... 3 2.2. Scope/ Applicability... 3 3. PROCEDURE DETAIL... 4 3.1. Detail... 4 3.2. Notice of

More information