Directive. Packaging. Valid for all divisions and sites of ThyssenKrupp System Engineering. Langenhagen,

Size: px
Start display at page:

Download "Directive. Packaging. Valid for all divisions and sites of ThyssenKrupp System Engineering. Langenhagen,"

Transcription

1 Directive Packaging Valid for all divisions and sites of ThyssenKrupp Langenhagen, Natalie Wollschläger Preparation Axel Girzig, Matthias Wendels, D. Hünnemeier Checker Olaf Schnur Release Quality Management

2 Change information: The following table lists the previous versions and the current of the document as well as other supplements and changes. Date Name/divisions Site Description N. Wollschläger Langenhagen First edition

3 Contents ThyssenKrupp 1 Purpose and field of application Contact persons in charge General information General conditions Confidentiality Safety Working Hours Qualification of the employees Packaging jobs general Platforms Preparation of container transportation Boxes Packaging machines When packed parts are placed on top of each other Packaging transport systems Box packaging Container shipment Carton packaging Packaging aviation security Packaging jobs general requirements Lockweiler site Packaging of tools and equipment VCI method General Packaging of body parts General Packaging of air cargo Lockweiler site Air cargo (secured) Air cargo (unsecured) Packaging jobs for transmission test stands for transports to Asia Preparatory measures General regulations for packaging/preservation Packaging of boxes for conventional loading Packaging of the noise protection cabin Packaging of control cabinets and operator panel

4 ThyssenKrupp Contents 9.6 Packaging of cabinets Revision:

5 Purpose and field of application ThyssenKrupp 1 Purpose and field of application The packaging and shipping activities are to protect our products along the entire transport route To avoid damage to our products, conservatory measures and if applicable additional packaging options are to be used. This applies to mechanical, chemical and physical stress. Our own and legal requirements as well as customer-specific guidelines require that the following fundamentals be kept for packaging and shipping activities: - The package size and the packaging effort are restricted to the protection of the product - Filling materials are to be reduced to a minimum - If possible take reusable or recyclable packaging materials - Use oiled and waxed paper only with the consent of the customer - Use only preservative agents complying with IPPC and EG directives. Instructions for handling the packaging must be attached visibly and weather-proof on all sides of the product. Example: The pretreatment, spraying the bare metal parts with appropriate preservative agents is carried out by the client unless stated otherwise in the individual order. 5

6 ThyssenKrupp Contact persons in charge 2 Contact persons in charge The commissioned packaging company is responsible for the proper realization according to this directive and other specifications. The respective named specialist departments are available for support. The following contact persons for shipping logistics will be glad to help you at the respective sites anytime: Site Contact Telephone Lockweiler Heilbronn Hohenstein-Ernstthal Langenhagen Bremen Matthias Wendels Abuzer Tas Manja Georgi Constanze Hübner Kirsten Baumgart +49 (0)6871/ matthias.wendels@thyssenkrupp.com +49 (0)7131/ abuzer.tas@thyssenkrupp.com +49 (0)3723/ manja.georgi@thyssenkrupp.com +49 (0)511/ constanze.hueber@thyssenkrupp.com +49 (0)421/ kirsten.baumgart@thyssenkrupp.com 6 Revision:

7 General information ThyssenKrupp 3 General information 3.1 General conditions With the acceptance of the order, the contractor confirms that the services to be provided by him are defined in full. There are no ambiguities about the scope of tasks to be carried out within the contract. All specifications given in the text or on site do not release the contractor from his obligation to exercise due care and from his sole responsibility concerning the interpretation and execution according to the generally accepted rules and state-of-the-art technology. It is the contractor's obligation to gather information. Procurement is as a matter of course the contractor's business. For this purpose the contractor must carry out all technical agreements and clarifications with ThyssenKrupp. The results of these talks and clarifications are to be documented by the contractor and may be handed over only to ThyssenKrupp. ThyssenKrupp pledges to deliver necessary provisions, data and information such as they evolve according to the process of the project. With the award of the assigned scope of delivery to a specialized company, the latter assumes complete responsibility for the technology as well as the compliance with deadlines and costs. 3.2 Confidentiality The contractor is obliged to observe silence concerning all procedures and matters of the client and the end customer no matter how they come to be known to him. The drawings, technical and other documents made available to the contractor by ThyssenKrupp System Engineering are the property of the client and must not be reproduced, distributed commercially, used for advertising purposes or made available to third parties or companies without approval by the client. The documents may be made available only to those employees that are familiar with the subject matter of the contract, and these employees must be instructed accordingly. The contractor may use the documents obtained from the client only for fulfilling the contract. On request from the client, the contractor must return all documents made available to him. 3.3 Safety When carrying out the contract, the contractor is obliged to ensure strict compliance with the regulations for safeguarding the respective construction job, the accident prevention regulations and the occupational safety instructions for external companies. To prevent occupational accidents, the facilities, instructions and appropriate measures corresponding to the valid accident prevention regulations must be applied; also the respective generally accepted occupational safety and medical health regulations and the in-house regulations of the end customer must be observed. In so far as there are requirements resulting from other legal provisions, these requirements are unaffected by these regulations. On request, the contractor can prove at all times that all safety requirements are kept. Only devices and machines complying with the accident prevention and VDE regulations may be used for carrying out work at the construction sites. When entering and leaving the facility of the client and the end customer, the contractor and his employees must undergo the controls resulting from the work rules of the contractor and the end customer. The contractor is obliged to return identification cards issued by the contractor or the end customer when the respective employment contract is terminated. The costs for lost ID cards are borne by the contractor. 7

8 ThyssenKrupp General information In so far as they apply to the execution of the contract, the laws and ordinances of the Federal Republic of Germany apply, and in addition also the supplementary laws and ordinances for the place of performance of the end customer. The contractor must take out a sufficient liability insurance as well as an erection insurance and on request presents them to the client. If employees from several companies (client and external company) jointly work at a workplace or in a common working area and mutual endangerment is possible, then in addition a so-called coordinator must be named according to 6 BGV A1 (accident prevention regulations) "Basics of prevention". A similar demand also results from the Baustellenverordnung (construction site ordinance) 3, which requests a safety and health coordinator if employees from several employers work together. The labor protection act 8 "Cooperation of several employers" obliges the client and the external company (the employers) to cooperate for ensuring safety and health protection and to inform each other about the dangers of their respective jobs. However, this presupposes that the possible hazards have beforehand been determined in the framework of a risk assessment. In general the contractor must instruct his workers accordingly before the start of the work and must ensure that the relevant regulations are complied with. The obligations of the contractor include, even without request by the client, active coordination, risk analysis and realization of safety measures concerning occupational and health protection. Before starting his work, everyone working for the contractor must confirm in writing to have taken notice of and understood the safety rules and must pledge to comply with them. Starting work without prior confirmation is strictly forbidden. Depending on the job definition, hazards may arise for employees of the client and those of the external company. It is therefore important that these possible hazards be determined jointly by the person(s) in charge or his coordinator at the client and the person(s) in charge at the external company. This risk assessment should be carried out during an on-site meeting. The determination of possible hazards as well as the specification of protective measures is documented with the form "Risk assessment external companies" (FB3620). 3.4 Working Hours The contractor must see to it that in case of extra, late, night, Sunday and holiday work all legal and in-plant notifications are carried out in due time. The periods for providing services at the construction site must be coordinated with the construction site manager from ThyssenKrupp. 8 Revision:

9 General information ThyssenKrupp 3.5 Qualification of the employees To ensure a quick packaging process, ThyssenKrupp has the right to reject personnel from the contractor for the following reasons: Insufficient qualification Insufficient performance Negative influence on the work ethic And for other important reasons The costs arising from this are borne by the contractor. On request, the contractor must be able to provide proof of the qualification of the individual employees. 9

10 ThyssenKrupp Packaging jobs general Platforms 4 Packaging jobs general 4.1 Platforms The most advisable and efficient way to ship machines and larger package units is via platforms. (Exceptions see chapter 9 Packaging jobs for transmission test stands for transports to Asia ) The dimensions depend on the type of shipment. The width of each platform is as a matter of principle 223 cm. We distinguish 3 lengths: cm: 2 Platforms fit into a 20 container or 4 into a 40 container cm: 3 Platforms fit into a 40 container cm: 2 Platforms fit into a 40 container or 1 into a 20 container Preparation of container transportation For the transport via container, one skid is implemented on each side Steel loops for dragging the platform out of the container 4.2 Boxes Small parts, single subassemblies and bulk goods are most conveniently shipped in boxes. 10 Revision:

11 Packaging jobs general Packaging machines ThyssenKrupp 6 box sizes are used: Size L W H A Weight cm 83 cm 60 cm 20 cm 50 kg cm 63 cm 60 cm 15 cm 30 kg cm 125 cm 122 cm 30 cm 120 kg cm 125 cm 123 cm 30 cm 105 kg cm 125 cm 60 cm 20 cm 77 kg cm 83 cm 123 cm 20 cm 87 kg For packed parts > 500 kg, reinforce the bottom with wooden bars 5 x 10 cm A frame made of boards 2 x 10 cm as nailing edge on the face 11

12 ThyssenKrupp Packaging jobs general Packaging machines 4.3 Packaging machines Requirements for the goods to be packed: Free from foreign residues Retention of proper oils/greases Dry (nor liquid residues/residual moisture, water, rain and the like) Free from sharp protruding parts and parts protruding into the packaging/encasement area Fix movable parts to the package goods by rigging, wedging or cushioning. Requirements for packaging: Ambient temperature and that of the package goods is similar No influence from atmospheric impurities and air with high relative humidity respectively No change in temperature > 5 C during packaging Requirements for packaging: The film is to form a closed space, no open packing! Make sure that water cannot enter The parts to be protected must not come into contact with wood or other acid-containing materials. Film sealing by folding, tacking, welding Requirements for the packaging material wood: Residual moisture % Free from mold fungi and impurities Wood must be treated according to ISPM 15 Stable nailing, stable connecting elements No nails or other parts freely protruding into the environment Fastening elements Use only wood approved for packaging. (No impregnated wood, no tropical wood or wood with bark residues) 12 Revision:

13 Packaging jobs general Packaging machines ThyssenKrupp Provision of the platform with support beams put on The machine is put on. The positions of the support beams are marked. The holes for the fastening bolts and the pin bores for the support beams are drilled. 13

14 ThyssenKrupp Packaging jobs general Packaging machines VCI method The VCI (volatile corrosion inhibitors) are anticorrosive agents that have a marked vapor pressure already at relatively low temperatures and envelope the part to be protected in a complete and long-lasting protective gas. The VCI agents can be applied to the surface to be protected in the form of powder, oil, paper, foam or film. The corrosive media are not removed but made harmless by chemical interaction. Prerequisite for this is barring the external air by a barrier envelope that maintains the saturation vapor pressure over a longer period of time. Corners and edges covered with padding film After putting it on, the film is welded. (Leave an opening for sucking off the air!) Part of the air is sucked off to increase the saturation vapor pressure of the VCI gases. Subsequently the opening is welded shut. 14 Revision:

15 Packaging jobs general Packaging machines ThyssenKrupp When packed parts are placed on top of each other Stable base (substructure) with wooden beams 10 cm x 10 cm 15

16 ThyssenKrupp Packaging jobs general Packaging transport systems 4.4 Packaging transport systems Requirements for the goods to be packed: Free from foreign residues Retention of proper oils/greases Dry (nor liquid residues/residual moisture, water, rain and the like) Free from sharp protruding parts and parts protruding into the packaging/encasement area Fix movable parts to the package goods by rigging, wedging or cushioning. Requirements for packaging: Ambient temperature and that of the package goods is similar No influence from atmospheric impurities and air with high relative humidity respectively No change in temperature > 5 C during packaging Requirements for packaging: The film is to form a closed space, no open packing! Make sure that water cannot enter The parts to be protected must not come into contact with wood or other acid-containing materials. Film sealing by folding, tacking, welding Requirements for the packaging material wood: Residual moisture % Free from mold fungi and impurities Wood must be treated according to ISPM 15 Stable nailing, stable connecting elements No nails or other parts freely protruding into the environment Fastening elements Use only wood approved for packaging. (No impregnated wood, no tropical wood or wood with bark residues) 16 Revision:

17 Packaging jobs general Packaging transport systems ThyssenKrupp Rests 8 cm x 10 cm Sides 5 cm x 10 cm The collos for packaging the friction conveyors, transport system posts, protective grille and other bulky goods are squared timber racks. Careful stacking with wood in between layers 17

18 ThyssenKrupp Packaging jobs general Packaging transport systems The package goods are secured with struts and steel bands. If applicable protect the face with planks Provide the platform with support beams put on and outer wooden lining Line the platform with protective padding film before applying the VCI film Lay the VCI film The resting points for the packed parts are once more lined with padding film 18 Revision:

19 Packaging jobs general Packaging transport systems ThyssenKrupp Put on packed parts The individual packed parts are connected with each other Nail on outer wooden lining Finally an outer wooden lining Two plastic plates for protecting the VCI film A tape is attached to prevent the VCI film from sagging 19

20 ThyssenKrupp Packaging jobs general Packaging transport systems The corners and edges are covered with padding film. The individual packed parts are secured. VCI-impregnated PU flexible foam strips The VCI film is welded. (Leave an opening for sucking off the air!) To increase the saturation vapor pressure of the VCI film, part of the air is sucked off; then weld the opening shut. 20 Revision:

21 Packaging jobs general Box packaging ThyssenKrupp 4.5 Box packaging Requirements for the goods to be packed: Free from foreign residues Retention of proper oils/greases Dry (nor liquid residues/residual moisture, water, rain and the like) Free from sharp protruding parts and parts protruding into the packaging/encasement area Fix movable parts to the package goods by rigging, wedging or cushioning. Requirements for packaging: Ambient temperature and that of the package goods is similar No influence from atmospheric impurities and air with high relative humidity respectively No change in temperature > 5 C during packaging Requirements for packaging: The film is to form a closed space, no open packing! Make sure that water cannot enter The parts to be protected must not come into contact with wood or other acid-containing materials. Film sealing by folding, tacking, welding Requirements for the packaging material wood: Residual moisture % Free from mold fungi and impurities Wood must be treated according to ISPM 15 Stable nailing, stable connecting elements No nails or other parts freely protruding into the environment Fastening elements Use only wood approved for packaging. (No impregnated wood, no tropical wood or wood with bark residues) 21

22 ThyssenKrupp Packaging jobs general Box packaging The box is lined with VCI film. Preservation of the metal parts with VCI oil or WD40 Secure steel cables separately. Avoid contact between wood and metal since the metal corrodes due of the residual moisture in the wood. 22 Revision:

23 Packaging jobs general Box packaging ThyssenKrupp Wrap all wooden parts inside the VCI film that come into contact with metal in wax paper. Once the protective film is closed, the packed parts are secured with wooden struts. Close the box with a lid and secure with steel bands. Label the box with the appropriate stencil 23

24 ThyssenKrupp Packaging jobs general Container shipment 4.6 Container shipment Use fork lift with the necessary lifting force and long forks for container shipment Use a wedge to secure Earmark one skid on each side for support in the container (soft soap increases the slippage of the platform) 24 Revision:

25 Packaging jobs general Container shipment ThyssenKrupp Attach a steel loop for dragging the platform out of the container. The last platform does not need a steel loop since the fork lift can grab under the platform. Finally place a cross beam to secure the load. 25

26 ThyssenKrupp Packaging jobs general Carton packaging 4.7 Carton packaging Requirements for the goods to be packed: Free from foreign residues Retention of proper oils/greases Preserve if applicable The label must match the specifications in the packing list Requirements for packaging: Ambient temperature and that of the package goods is similar No change in temperature > 5 C during packaging Secure sensitive parts that are not break-proof with bubble wrap or plastic foam chips Secure sensitive parts against contact Check (visual check and number of parts) Requirements for packaging: Stability Choose appropriate packaging material (protection against external influences) Proper carton size Remove old labels or designations Label unequivocally (address label, delivery note pouch) Folding carton - standard assortment Folding carton - blanks 26 Revision:

27 Packaging jobs general Carton packaging ThyssenKrupp Folding carton for folders Filling material: bubble wrap, plastic foam chips Clamp the base For greater weights also clamp the lid! Close the package with adhesive tape A finished package - closed, with delivery note / invoice 27

28 ThyssenKrupp Packaging jobs general Packaging aviation security 4.8 Packaging aviation security Protection of the outer wrap against tampering: The cartons are protected with adhesive tape against manipulation The wooden boxes are closed according to HPE standard/din / VDI directive 2700 The plastic boxes are closed and strapped Thus it is ensured that any manipulation will recognizable at once. The packaging materials must be protected against unauthorized access and must be locked away especially during breaks and at the end of work There is no finishing. 28 Revision:

29 Packaging jobs general requirements Lockweiler site ThyssenKrupp 5 Packaging jobs general requirements 5.1 Lockweiler site Requirements for the goods to be packed: Free from foreign residues Retention of proper oils/greases Dry (nor liquid residues/residual moisture, water, rain and the like) Free from sharp protruding parts and parts protruding into the packaging/encasement area Fix movable parts to the package goods by rigging, wedging or cushioning. Requirements for packaging: Ambient temperature and that of the package goods is similar No influence from atmospheric impurities and air with high relative humidity respectively No change in temperature > 5 C during packaging Requirements for packaging: The film is to form a closed space, no open packing! Make sure that water cannot enter The parts to be protected must not come into contact with wood or other acid-containing materials. Film sealing by folding, tacking, welding Requirements for the packaging material wood: Residual moisture % Free from mold fungi and impurities Wood must be treated according to ISPM 15 Stable nailing, stable connecting elements No nails or other parts freely protruding into the environment Fastening elements Use only wood approved for packaging. (No impregnated wood, no tropical wood or wood with bark residues) 29

30 ThyssenKrupp Packaging of tools and equipment VCI method 6 Packaging of tools and equipment 6.1 VCI method The VCI (volatile corrosion inhibitors) are anticorrosive agents that have a marked vapor pressure already at relatively low temperatures and envelope the part to be protected in a complete and long-lasting protective gas. The VCI agents can be applied to the surface to be protected in the form of powder, oil, paper, foam or film. The corrosive media are not removed but made harmless by chemical interaction. Prerequisite for this is barring the external air by a barrier envelope within which the saturation vapor pressure is maintained over a longer period of time. Corners and edges are covered with padding film. After placing it, the film is welded shut (leave an opening for sucking off the air!); part of the air sucked off to increase the saturation vapor pressure of the VCI gases. Subsequently the opening is welded shut. 30 Revision:

31 Packaging of tools and equipment General ThyssenKrupp 6.2 General Screw tools and equipment to the base of the box using threaded rods Reinforce the interior of the boxes sufficiently with cross beams to avoid compression of the boxes by suspension. Provide boxes heavier than 10 t with angled stops at least 8-10 mm thick (lid and base) to prevent box damage from chains and ropes. Cover box lids with PVC film (laterally overlapping) and fasten to prevent rain from entering the box. 31

32 ThyssenKrupp Packaging of tools and equipment General 32 Revision:

33 Packaging of body parts General ThyssenKrupp 7 Packaging of body parts 7.1 General Outer parts must not come into contact with each other and must not rub or move use spacers and cushioning accordingly the position of parts within the box depends on the properties of the part (individually). Inner parts may be nested depends on the properties of the part (individually). 33

34 ThyssenKrupp Packaging of air cargo Lockweiler site Air cargo (secured) 8 Packaging of air cargo Lockweiler site 8.1 Air cargo (secured) Protection of the outer wrap against tampering: The wooden boxes are closed according to HPE standard/din / VDI directive 2700 The cartons are protected with adhesive tape against manipulation Thus it is ensured that any manipulation will recognizable at once. The packaging materials must be protected against unauthorized access and must be locked away especially before breaks and at the end of work. 8.2 Air cargo (unsecured) Larger packed parts that do not fit into the scanner or cannot be scanned (dark alarm). Screw on one side or the lid to ensure a check at the airport without having to break open and damage the box. 34 Revision:

35 Packaging jobs for transmission test stands for transports to Asia Preparatory measures ThyssenKrupp 9 Packaging jobs for transmission test stands for transports to Asia 9.1 Preparatory measures The return connections for the cooling water (e.g. for test stands) must be equipped with plastic plugs, in addition plastic bags must be put around and fixed with cable fasteners. For electrical cabinets, the C profiles on which the frequency converters are placed must be shored up. 35

36 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia General regulations for packaging/preservation 9.2 General regulations for packaging/preservation The preservation is to be effected according to the desiccant method. Aluminum compound film is to be used as barrier envelope (has a fourfold lower water vapor permeability than PE film). Preservation period: 12 months The following handling symbols must stringently be attached: Top Fragile package goods Protect against moisture Center of gravity Fasten here Engage forklift here Permissible temperature range 36 Revision:

37 Packaging jobs for transmission test stands for transports to Asia Packaging of boxes for conventional loading ThyssenKrupp 9.3 Packaging of boxes for conventional loading Example end-of-line test stand Place the test stand on the floor to mark the bores for the fastening bolts Drill the holes 37

38 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of boxes for conventional loading Guide the bolts through the bottom of the box (4 screws M16) Put the rubber seal rings onto the bolts Line the bottom with PE film 38 Revision:

39 Packaging jobs for transmission test stands for transports to Asia Packaging of boxes for conventional loading ThyssenKrupp Line the bottom with prepared aluminum compound film Put the rubber seals on the bolts Line the bottom with PE film 39

40 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of boxes for conventional loading Put the machine onto the bolts Fasten with nuts fixed by locknuts Pad the corners and exposed parts 40 Revision:

41 Packaging jobs for transmission test stands for transports to Asia Packaging of boxes for conventional loading ThyssenKrupp Attach desiccant bags (at least 24 kg) Note: The bags should be attached in the upper area of the package goods and should not come into contact with blank metal surfaces. Cover completely with a PE film 41

42 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of boxes for conventional loading Put on the aluminum compound film hood and weld with the bottom film Suck off air for leak check, then seal the suction opening Cover completely with a textile tarpaulin Put on Akylux plates Cover completely with another textile tarpaulin Attach the box walls 42 Revision:

43 Packaging jobs for transmission test stands for transports to Asia Packaging of boxes for conventional loading ThyssenKrupp Insert the lid girders (squared timbers 12 cm x 14 cm) Put Akylux plates onto the lid girders Put a continuous PE film onto the Akylux plates Put on the lid (for manufacturing reasons tripartite) Seal the lid joints with silicone Attach a hood made of textile tarpaulin 43

44 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of boxes for conventional loading Attach skid and edge protection angles and label the box 44 Revision:

45 Packaging jobs for transmission test stands for transports to Asia Packaging of the noise protection cabin ThyssenKrupp 9.4 Packaging of the noise protection cabin Frame parts for the noise protection cabin Line the bottom with foam and aluminum compound film, stack the package goods In so far as required separate parts by cushioned wooden battens Fix with polyester clamping strap (Cordstrap 2000 dn) Pad edges and exposed parts with foam film Attach desiccant bags (at least 12 kg) Put on the aluminum compound film hood, weld, suck off air and seal suction opening 45

46 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of the noise protection cabin Cover with Akylux plates Cover with textile tarpaulin Mount box hood, attach marking and put on a textile tarpaulin hood 46 Revision:

47 Packaging jobs for transmission test stands for transports to Asia Packaging of the noise protection cabin ThyssenKrupp Wall elements for noise protection cabin Line the bottom with foam and aluminum compound film and stack the package goods In so far as required separate parts by cushioned wooden battens Fix with polyester clamping strap (Cordstrap 200 dn) Pad edges and exposed parts with foam film and attach desiccant bags (at least 12 kg) 47

48 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of the noise protection cabin Put on the aluminum compound film hood, weld, suck off air and seal suction opening Cover with Akylux plates Mount box hood, attach marking and put on a textile tarpaulin hood 48 Revision:

49 Packaging jobs for transmission test stands for transports to Asia Packaging of control cabinets and operator panel ThyssenKrupp 9.5 Packaging of control cabinets and operator panel Line the bottom with foam and aluminum compound film and place the package goods Fix with polyester clamping strap (Cordstrap 200 dn) and pad edges and exposed parts with foam film 49

50 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of control cabinets and operator panel Add desiccant bags (at least 12 kg) Put on the aluminum compound film hood, weld, suck off air and seal suction opening Cover with textile tarpaulin Mount box hood, attach marking and put on a textile tarpaulin hood 50 Revision:

51 Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets ThyssenKrupp 9.6 Packaging of cabinets Line the bottom with PE film Line the bottom with aluminum compound film Line the bottom with PE film Put on cabinets Laterally attach squared timbers outside of the barrier envelope to protect against skidding Fasten the cabinets to each other using polyester clamping strap (Cordstrap 2000 dn) 51

52 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets Fix the cabinets to the bottom of the box with polyester clamping strap (Cordstrap 2000 dn) Pad edges and exposed parts with foam film and attach desiccant bags (at least 20 kg) Put on the aluminum compound film hood, weld, suck off air and seal suction opening Cover with Akylux plates 52 Revision:

53 Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets ThyssenKrupp Cover with textile tarpaulin Mount box hood, attach marking (center of gravity not at the center!) and put on a textile tarpaulin hood and skid-/edge protection angles 53

54 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets 14.7 Packaging of the adaptation station Place the station on the bottom of the box and attach squared timbers to protect against skidding Line the bottom with foam film Line the bottom with aluminum compound film Line the bottom with foam film Mount the station on the bottom Fix with polyester clamping strap (Cordstrap 2000 dn) 54 Revision:

55 Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets ThyssenKrupp Pad edges and exposed parts with foam film Attach desiccant bags (at least 20 kg) Put on the aluminum compound film hood, weld, suck off air and seal suction opening Cover with Akylux plates Cover with textile tarpaulin Put Akylux plates onto the lid timbers 55

56 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets Mount box hood, attach marking and put on a textile tarpaulin hood 56 Revision:

57 Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets ThyssenKrupp 14.8 Packaging of the adaptation station accessories Line the bottom with foam film Line the bottom with aluminum compound film Line the bottom with foam film Placement and fixing of the package goods In so far as required separate parts by cushioned wooden battens 57

58 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets Pad edges and exposed parts with foam film Attach desiccant bags (at least 6 kg) Put on the aluminum compound film hood, weld, suck off air and seal suction opening Cover with textile tarpaulin 58 Revision:

59 Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets ThyssenKrupp Mount box hood, attach marking and put on a textile tarpaulin hood 59

60 ThyssenKrupp Packaging jobs for transmission test stands for transports to Asia Packaging of cabinets 14.9 Packaging parts of transport system Line bottom with foam film, aluminum compound film and foam film, place and fix package goods, pad edges and exposed parts with foam film Attach desiccant bags (at least 8 kg), put on the aluminum compound film hood, weld, suck off air and seal suction opening Put on Akylux plates, mount the side walls and add pressure timbers to fix the package goods Mount box hood, attach marking and put on a textile tarpaulin hood 60 Revision:

Spare Parts PACKING, MARKING AND SHIPPING REQUIREMENTS. Contents

Spare Parts PACKING, MARKING AND SHIPPING REQUIREMENTS. Contents Spare Parts PACKING, MARKING AND SHIPPING REQUIREMENTS Contents 1. General Requirements 2 Marking 3. Preparation Before Packing 4. Packaging and Crating of the Contract Equipment 5 Shipping Procedures

More information

1. General regulations

1. General regulations Page 1 von 1 1. General regulations 1.1 Parts shall be packaged by item. 1.2 The parts will be welded and powder-coated or galvanised at a later stage. The surfaces shall therefore be dry and free of paint,

More information

ISO 9001:2008 PRODUCT CATALOGUE. (Packaging Division)

ISO 9001:2008 PRODUCT CATALOGUE. (Packaging Division) ISO 9001:2008 PRODUCT CATALOGUE (Packaging Division) INTRODUCTION SAS International Shipchandling LLC aims to provide efficient, organized and professional sales & support services for the burgeoning marine

More information

DHAHRAN MATERIALS & LOGISTICS DEPARTMENT TRAFFIC DIVISION GENERAL PACKING SPECIFICATION FOR SPARE PARTS

DHAHRAN MATERIALS & LOGISTICS DEPARTMENT TRAFFIC DIVISION GENERAL PACKING SPECIFICATION FOR SPARE PARTS ISSUED BY: DHAHRAN MATERIALS & LOGISTICS DEPARTMENT TRAFFIC DIVISION MS 8314-10 ISSUE DATE REPLACES 05-2005 02-05 SUBJECT: SAUDI ARAMCO PACKING SPECIFICATIONS APPROVAL PAGE NUMBER 1 OF 6 GENERAL PACKING

More information

Delivery specifications of Telegärtner Karl Gärtner GmbH

Delivery specifications of Telegärtner Karl Gärtner GmbH Delivery specifications of Telegärtner Karl Gärtner GmbH Table of contents 1 Purpose & Scope... 2 2 General provisions... 2 2.1 Cargo securing... 2 2.2 Delivery notes... 2 2.3 Delivery of large quantities...

More information

General Packaging and Shipping Standards

General Packaging and Shipping Standards General Packaging and Shipping Standards Valid from: 12/2017 Version: 1.2 KRACHT GmbH Gewerbestr. 20 58791 Werdohl, Germany Table of Contents Page 1. Revision status.. 04 2. Scope... 05 3. Updates... 05

More information

Customer Packaging Guidelines

Customer Packaging Guidelines Customer Packaging Guidelines Customer Packaging Guidelines 05.02.16 v1 CONTENTS Introduction Packaging Tips: Parcels Envelopes Packaging Tips: Pallets Crates Drums Pipes Spools & Reels Packaging Tips:

More information

Pointers On Shipping Mechanical/ Automotive Parts

Pointers On Shipping Mechanical/ Automotive Parts Pointers On Shipping Mechanical/ Automotive Parts FedEx Express Minimum Shipping Standards For Acceptance Note: Not intended to be used as a guide to meet FedEx Express preshipment test procedures. Objectives

More information

Packaging Computer Shipments

Packaging Computer Shipments Packaging Computer Shipments To help protect your computers and peripherals from shock and vibration during transit, follow these instructions for shipping via FedEx services. Recommended Packaging Options

More information

Packaging and Shipping Guidelines for Suppliers and Customers Status:

Packaging and Shipping Guidelines for Suppliers and Customers Status: Packaging and Shipping Guidelines for Suppliers and Customers Status: 25.08.2015 Target This guideline aims the properly packaging as well as the avoidance of corrosion of the goods and also to reduce

More information

Packaging. Well packaged, perfectly delivered

Packaging. Well packaged, perfectly delivered Packaging Well packaged, perfectly delivered The TNT Express packaging solutions TNT Express endeavours to deliver your parcels in perfect condition and on time. But you yourself can also contribute to

More information

Fred Simmons CHANGE CONTROL SHEET

Fred Simmons CHANGE CONTROL SHEET PerkinElmer, Inc. 68 Elm Street Hopkinton, MA 01748 Quality System Procedure Title: Originator: Procedure Fred Simmons 65256 PerkinElmer Generic Packaging Specification for Supplier Use CHANGE CONTROL

More information

This topic describes: 1. Packing an EX 8200 series Switch on page 1 2. Packing EX 8200 Switch Components for Shipping on page 4

This topic describes: 1. Packing an EX 8200 series Switch on page 1 2. Packing EX 8200 Switch Components for Shipping on page 4 Packing an EX 8200 series Switch or Component If you are returning an EX 8200 series switch or component to Juniper Networks for repair or replacement, pack the item as described in this topic. Before

More information

PACKING TYPES & COMPONENTS FOR PACKING AND SECURE SOLUTIONS

PACKING TYPES & COMPONENTS FOR PACKING AND SECURE SOLUTIONS PACKING TYPES & COMPONENTS FOR PACKING AND SECURE SOLUTIONS PALLETS AND SKID: CREST, assure of design develop to custom fabricate pallets and skids to ensure secured transportation. Pallets and skids are

More information

GAMA Headquarters 355 Lexington Avenue, 15th Floor New York, NY USA INTRODUCTION

GAMA Headquarters 355 Lexington Avenue, 15th Floor New York, NY USA INTRODUCTION INTRODUCTION The Global Acetate Manufacturer s Association is pleased to provide information on the handling of Cellulose Acetate Filter Tow Bales. For more information on GAMA and its members please visit

More information

MTS Criterion Series 40

MTS Criterion Series 40 MTS Criterion Series 40 Manual Title Lifting and Moving Additional Instructions Information be certain. 100-231-444 C Copyright information Trademark information Proprietary information Software validation

More information

Conergy SolarFamulus II

Conergy SolarFamulus II Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use

More information

Beach Energy - SPECIFICATION FOR PACKING, MARKING, LABELLING

Beach Energy - SPECIFICATION FOR PACKING, MARKING, LABELLING Beach Energy - SPECIFICATION FOR PACKING, MARKING, LABELLING Introduction: This specification (the "Specification") details the minimum requirements for the preservation, packing, marking and documentation

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

FREIGHT & PACKAGING GUIDELINES

FREIGHT & PACKAGING GUIDELINES PAINT AND FINAL ASSEMBLY SYSTEMS FREIGHT & PACKAGING GUIDELINES Truck transports Air freight Sea freight Bernd Panholzer PFS Logistics Bietigheim-Bissingen, 2015 www.durr.com TABLE OF CONTENTS 1 General

More information

Pointers on Packaging for Computer Shipments

Pointers on Packaging for Computer Shipments Pointers on Packaging for Computer Shipments At FedEx Express, we understand the importance of your computer shipment and strive to make sure that it will arrive on time and in good condition. Computers

More information

" RISKS ASSOCIATED WITH THE INSTALLATION OF THE SYSTEM

 RISKS ASSOCIATED WITH THE INSTALLATION OF THE SYSTEM PALLET RACK 85-110 installation, use and maintenance instructions Shelving made entirely of first grade certified steel sheet and cold-profiled steel with galvanized steel according to SENDZIMIR process

More information

Subject: Guidance on Corrosion Assessment of Ex Equipment

Subject: Guidance on Corrosion Assessment of Ex Equipment 1. Introduction Maintaining the integrity of Ex certified electrical equipment is a key barrier against Major Accident Hazards in the oil and gas industry. The integrity must be maintained to ensure that

More information

Automotive and Mechanical Parts Packaging Guidelines and Designs

Automotive and Mechanical Parts Packaging Guidelines and Designs Automotive and Mechanical Parts Packaging Guidelines and Designs Responsible packaging can save you money and improve the safety and handling of your shipments. Follow these tips and design recommendations.

More information

Z5033 E3 Ball joint adapter Mounting instructions

Z5033 E3 Ball joint adapter Mounting instructions Z5033 E3 Ball joint adapter Mounting instructions Z5033 E3 Ball joint adapter References in the manual This refers to a potentially dangerous situation which may lead to personal injury. This refers to

More information

General packaging instructions_en

General packaging instructions_en Seite 1 / 9 1. Objective of the general packaging provisions The objective is to provide our suppliers with simple and practical guidelines that outline our requirements and supplier responsibilities and

More information

Change information: The following table lists the previous versions and the current of the document as well as other supplements and changes.

Change information: The following table lists the previous versions and the current of the document as well as other supplements and changes. Change information: The following table lists the previous versions and the current of the document as well as other supplements and changes. Date Name/divisions Location Description 2014-04-28 N. Wollschläger

More information

Chapter 11 Use and handling of packaging Section 11.0 General information

Chapter 11 Use and handling of packaging Section 11.0 General information Section 11.0 General information 11.0.0 Contents 11.0 General information 11.0.0 Contents 11.0.1 Introduction 11.1 Packaging material for areas with explosive atmospheres 11.1.1 Antistatic, dissipative

More information

Packing, handling and storage information for Saft products

Packing, handling and storage information for Saft products PHSI 1.1 May 2015 Packing, handling and storage information for Saft products Saft AB, Box 709, SE-572 28 Oskarshamn, Sweden Visiting adress: Jugnergatan, Oskarshamn Phone: +46 (0)491 680 00 Fax: +46 (0)491

More information

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS OSU PROJECT NO. 30-04-15 PAGE 1 PART 1 GENERAL 1.1 WORK INCLUDED A. Supports and anchors for piping systems and equipment. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. The provisions of Section 15050, Basic

More information

Modular Scaffold MEKA 48

Modular Scaffold MEKA 48 Modular Scaffold MEKA 48 Imperial units NA MODULAR SCAFFOLD MEKA 48 MODULAR SCAFFOLD The Modular Scaffold MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a

More information

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

OWNER S MANUAL SERIES MDS-96-BK, SM, DR SERIES MDS-96-BK, SM, DR OWNER S MANUAL Introduction... 1 Bill of Materials... 2 Assembly Instructions. 3 Warranty....12 IMPORTANT NOTES, WARNINGS AND SAFETY INSTRUCTIONS Ensure that all employees understand

More information

Logistics instructions

Logistics instructions Framo Morat GmbH & Co. KG "Effective in competition" Our customers expect flexible and cost-effective logistics, which can meet the demands of the market from Framo Morat GmbH & Co. KG. Framo Morat GmbH

More information

Protective Capony RTC-16

Protective Capony RTC-16 Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY

More information

5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE

5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE 5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE NUDURA Inc. has one of the most complete lineups of products and accessories available today in the construction industry. NUDURA s Integrated

More information

Z5054 Ci60/Ci90 Flying adapter Mounting instructions

Z5054 Ci60/Ci90 Flying adapter Mounting instructions Z5054 Ci60/Ci90 Flying adapter Mounting instructions Z5054 Ci60/Ci90 Flying adapter References in the manual CAUTION! IMPORTANT! Symbols on the equipment This refers to a potentially dangerous situation

More information

Hoesch isorock vario Installation recommendations

Hoesch isorock vario Installation recommendations A company of ThyssenKrupp Steel 1/12 D tk Info 2.4.2 5.2005 1 Table of contents Page 1. Regulations / Directives 2 2. Delivery / Unloading 3 3. Storage on the site 4 4. Preparation for installation 4 5.

More information

Suppliers' Manual for Standardized Deliveries to Aspöck Systems GmbH

Suppliers' Manual for Standardized Deliveries to Aspöck Systems GmbH Suppliers' Manual for Standardized Deliveries to Aspöck Systems GmbH Erstellt/Geändert: JAR Geprüft: REW Freigegeben: SEB QW 092.00 Datum: 02.10.2018 Datum: 02.10.2018 Datum: 08.10.2018 Ausgabe: 04 1.

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

Product Guide Specification DIVISION SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS

Product Guide Specification DIVISION SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS Product Guide Specification DIVISION 107300 SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS PART 1 - GENERAL [reference CSI 2004 MasterFormat Division 10 (Specialties Manufacturers) category 7300 (Protective

More information

Z5043 MAX Horizontal bracket Mounting instructions

Z5043 MAX Horizontal bracket Mounting instructions Z5043 MAX Horizontal bracket Mounting instructions Z5043 MAX Horizontal bracket References in the manual This refers to a potentially dangerous situation which may lead to personal injury. This refers

More information

Modular Scaffolding MEKA 48

Modular Scaffolding MEKA 48 Modular Scaffolding MEKA 48 MODULAR SCAFFOLDING MEKA 48 MODULAR SCAFFOLDING The Modular Scaffolding MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a wide range

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION TIMBER FLOATS

SECTION TIMBER FLOATS SECTION 06210 PART 1 - GENERAL 1.01 SUMMARY A. This section covers furnishing and installing the timber float framing for the pile guide area, and all other components not specifically mentioned, necessary

More information

Z5028 E3/Ci80 Horizontal bracket Mounting instructions

Z5028 E3/Ci80 Horizontal bracket Mounting instructions Z5028 E3/Ci80 Horizontal bracket Mounting instructions Z5028 E3/Ci80 Horizontal bracket References in the manual CAUTION! IMPORTANT! Symbols on the equipment This refers to a potentially dangerous situation

More information

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

OWNER S MANUAL SERIES MDS-96-BK, SM, DR VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angola, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.com Website: www.vestil.com SERIES MDS-96-BK, SM, DR OWNER S MANUAL Introduction...

More information

Installation Guide. PAROC panel solutions

Installation Guide. PAROC panel solutions Installation Guide PAROC panel solutions Panel System 4.00 INT January 2008 THESE INSTRUCTIONS ARE FOR NORMAL APPLICATIONS Work safety Preparation Wear protective gloves and clothing when handling the

More information

Strengthened Soil Wall Construction Manual

Strengthened Soil Wall Construction Manual Strengthened Soil Wall Construction Manual This information has been prepared by Shaw Technologies, Inc. as an aid in constructing their Strengthened Soil Wall system. Final determination of the suitability

More information

Repackaging the Router

Repackaging the Router APPENDIXA Revised: March 16, 29, Introduction This appendix describes two separate but related router repackaging tasks: How to remove the router from the equipment rack and repackage the router for shipment

More information

Meter Cup Board (MCB) for Single Phase Energy Meters

Meter Cup Board (MCB) for Single Phase Energy Meters DAKSHIN HARYANA BIJLI VITRAN NIGAM LIMITED SPECIFICATION NO.S-61/DD-161 Meter Cup Board (MCB) for Single Phase Energy Meters Issue of month:april,2006 TECHNICAL SPECIFICATION IN RESPECT OF METER CUPBOARD

More information

General Packing and Shipping Instructions

General Packing and Shipping Instructions General Packing and Shipping Instructions Table of Contents 1. SCOPE... 2 2. RECEIVING HOURS AND DIRECTIONS... 2 3. SHIPPING PAPERS... 3 4. LABELING... 3 5. PACKAGING... 4 5.2 HANDLING SYMBOLS... 5 5.3

More information

Logistics Handbook for Suppliers. Specifications for Packaging and Delivering Purchased Parts

Logistics Handbook for Suppliers. Specifications for Packaging and Delivering Purchased Parts Logistics Handbook for Suppliers Specifications for Packaging and Delivering Purchased Parts Version: June 2011 Contents 1 Purpose and Area of Application...3 2 Packaging Requirements...4 2.1 General Packaging

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

Packaging Handbook for Suppliers. Guidelines for Packaging of Outsourced Items

Packaging Handbook for Suppliers. Guidelines for Packaging of Outsourced Items Packaging Handbook for Suppliers Guidelines for Packaging of Outsourced Items Status: June 2016 Table of Contents 1 Purpose and Area of Application... 3 2 Packaging Requirements... 4 2.1 General Packaging

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

Niagara / DLG-85 Shower Cabin Installation and User s guide

Niagara / DLG-85 Shower Cabin Installation and User s guide Niagara / DLG-85 Shower Cabin Installation and User s guide I. Mounting Preparation 1. After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet for

More information

Packaging Guideline. Mahle Industrial Thermal Systems GmbH & Co. KG

Packaging Guideline. Mahle Industrial Thermal Systems GmbH & Co. KG Packaging Guideline of Mahle Industrial Thermal Systems GmbH & Co. KG Preface The basis for a successful cooperation in partnership between you, as the supplier, and Mahle Industrial Thermal Systems Group

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Z5010 (Version 2) TV spigot with fixing plate Mounting instructions

Z5010 (Version 2) TV spigot with fixing plate Mounting instructions Z5010 (Version 2) TV spigot with fixing plate Mounting instructions Z5010 (Version 2) TV spigot with fixing plate References in the manual CAUTION! IMPORTANT! Symbols on the equipment This refers to a

More information

USER MANUAL FOR MOLDS MOLDS FOR THE PRODUCTION OF CONCRETE ELEMENTS

USER MANUAL FOR MOLDS MOLDS FOR THE PRODUCTION OF CONCRETE ELEMENTS USER MANUAL FOR MOLDS MOLDS FOR THE PRODUCTION OF CONCRETE ELEMENTS [incl. Installation Instructions for EG Machinery Directive 2006 42 EG Annex VI for partly completed machinery] MADE IN GERMANY Product

More information

TRITEC light Steel Panel Formwork

TRITEC light Steel Panel Formwork TRITEC light Steel Panel Formwork Perfection made in Germany Various practical illustrations of TRITEC Panel Combinations Guaranteed the largest possible range of sizes with the least possible amount of

More information

D Side lap. Side lap screw spacing < 500mm factory-installed seals on side lap. Decoupling tape > 60mm

D Side lap. Side lap screw spacing < 500mm factory-installed seals on side lap. Decoupling tape > 60mm 25 Side lap screw spacing < 500mm 333.3 15 42 Decoupling tape > 60mm 3 factory-installed seals on side lap Side lap D 201.1 SECTION VIEWS Type L Ridge profile Type R Ridge flashing FLOOR PLAN > 200 overlap

More information

GDLS-C PACKAGING GUIDELINES

GDLS-C PACKAGING GUIDELINES GDLS-C PACKAGING GUIDELINES GENERAL DYNAMICS Land Systems-Canada GENERAL DYNAMICS LAND SYSTEMS CANADA PACKAGING GUIDELINES ISSUED: May 8, 2009 This document has been prepared by General Dynamics Land Systems

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Delivery Instructions - Finished goods Leaflet for suppliers

Delivery Instructions - Finished goods Leaflet for suppliers Delivery Instructions - Finished goods Leaflet for suppliers This delivery instruction applies generally to all deliveries to the SITECO lighting systems in Traunreut (hereinafter referred to as Siteco)

More information

EDGE PROTECTION SPECIALIST WE SAVE LIVES

EDGE PROTECTION SPECIALIST WE SAVE LIVES EDGE PROTECTION SPECIALIST WE SAVE LIVES 2016 SAFETYRESPECT BOX 69 SE-83121 ÖSTERSUND SWEDEN TEL +46 (0)63 130400 INFO@SAFETYRESPECT.COM 2 EDGE PROTECTION SPECIALIST CONTENTS 2. INTRODUCTION 4. COMPANY

More information

a 3 CERAMICSTEEL SANS TECHNICAL GUIDE

a 3 CERAMICSTEEL SANS TECHNICAL GUIDE a 3 CERAMICSTEEL SANS TECHNICAL GUIDE Featuring a smooth inert surface, precision cut edges sealed for durability, and concealed mounting, a 3 CeramicSteel Sans offers a clean aesthetic for any working

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT Page 220529-1 SECTION 220529 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air BENCH FUME HOOD with Combination Sash H07 H09 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH07-SA 07/06 Part Number: IMAN-H07 FUME HOOD END PANEL

More information

HYG Supplier Packaging Guidelines. Hyster-Yale Group

HYG Supplier Packaging Guidelines. Hyster-Yale Group Page 1 of 26 Supplier Packaging Guidelines For Locations in North America Hyster-Yale Group Revision 2 October 21, 2016 This is a controlled document with the electronic read-only domain, accessed from

More information

SYSTEMS STORAGE STORAGE SYSTEMS. Shelving 200. Pallet Racking. Storage Containers 203. Part Bins & Accessories. Hospitality & Medical Storage 204

SYSTEMS STORAGE STORAGE SYSTEMS. Shelving 200. Pallet Racking. Storage Containers 203. Part Bins & Accessories. Hospitality & Medical Storage 204 STORAGE SYSTEMS Shelving 200 Storage Containers 203 Hospitality & Medical Storage 204 Pallet Racking Pallet Racking Accessories Pallet Racking Part Bins & Accessories Lamson Range Economy Range 206 207

More information

IOGP's disclaimer. applies:

IOGP's disclaimer. applies: NOTE: This document was provided by an IOGP Member and is made available on the 14 February 2018 a s an example of what a dropped objects scenario guide might look like. Contents have not been verified

More information

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels Assembly instructions Handling Receiving of goods Check that the material has not been damaged in transit

More information

Standards of Performance. Mariane Ewbank Chairperson Standards and Customs WG

Standards of Performance. Mariane Ewbank Chairperson Standards and Customs WG Standards of Performance Mariane Ewbank Chairperson Standards and Customs WG Please hold for instructions to open packs 1 and 2 Can we consider this an official doc???? Second version And this invoice?

More information

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017 For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For

More information

the ultimate guide to packaging your shipments

the ultimate guide to packaging your shipments introduction Properly packaging your shipment is a critical step in the shipping process. Just one mistake can expose your shipment to costly and time-consuming damages. Not only do you need to use quality

More information

ADJUSTABLE PIPING SUPPORT PRODUCT BROCHURE

ADJUSTABLE PIPING SUPPORT PRODUCT BROCHURE ADJUSTABLE PIPING SUPPORT PRODUCT BROCHURE OVERVIEW REVOLUTIONARY VERSATILE EFFICIENT The Roof Top Blox is a revolutionary roof top support block system that works with height extension rods, securing

More information

GLENWOOD PLACE 2 MAR 2015

GLENWOOD PLACE 2 MAR 2015 PART 1 - GENERAL 1.01 SUMMARY: SECTION 16110 RACEWAYS A. Description: 1. Provide continuous conduit systems - beginning at the service point, to all distribution equipment and to every outlet and piece

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

Packed with possibilities INNOVATIVE PACKAGING SOLUTIONS

Packed with possibilities INNOVATIVE PACKAGING SOLUTIONS Packed with possibilities INNOVATIVE PACKAGING SOLUTIONS PACKED WITH POSSIBILITIES At Northrich, we believe everything is possible. So we re always challenging ourselves to make it happen by working as

More information

External Reinforcement System

External Reinforcement System (Revised October 2013) Specifications of SMC Water Tank Product External Reinforcement System DOHA INDUSTRY CO., LTD. Table of Contents 1. General Matters A. Scope of Application B. Product Requirements

More information

KSS GLOBAL STANDARD. Global Supplier Packaging Guidelines

KSS GLOBAL STANDARD. Global Supplier Packaging Guidelines KSS GLOBAL STANDARD Document No: 1024318 Author: Thomas Shannon Valeriu Cristea Approved by: Paul Biegen Document History Revision: Release Date ECP No. Modification 1 02-2010 Created 2 11-2013 68903 Updated

More information

Puma-Folien by W.Bosch+Co.: High quality protection for moisture-sensitive goods.

Puma-Folien by W.Bosch+Co.: High quality protection for moisture-sensitive goods. by W.Bosch+Co.: High quality protection for moisture-sensitive goods. Powerful solutions to protect against corrosion and contamination - straight from the manufacturer. Original quality, made in Germany

More information

2. Pallets 2.1 Pallet size x 1000 mm (Preferred size), One Way Pallet, Heat treatment according to ISPM 15

2. Pallets 2.1 Pallet size x 1000 mm (Preferred size), One Way Pallet, Heat treatment according to ISPM 15 1. General Requirements 1.1 The below requirements on palletization, packaging and labelling apply to all shipments to UNICEF warehouse in Copenhagen. 1.2 Contractors who do not comply with the outlined

More information

Delivery type. Materials

Delivery type. Materials Operational standard 2010-12-10-en Delivery type Materials BtN 67-1 1. Scope This operational standard (in the following BtN) defines the delivery of all materials to the Busch-Jaeger Elektro GmbH (in

More information

Light-Metal Roof Edge, Raised

Light-Metal Roof Edge, Raised NAIL WOOD CANT TO BLOCKING 2 ROWS STAGGERED EACH ROW 24 O.C. 1/2 MIN. 10 0 MAX. FASTEN 18 O.C. WITH NEOPRENE GASKETED FASTENERS 3-1/2 MIN. 4 6 JOINT COVER PLATE SET IN TWO BEADS OF SEALANT 4 MIN. SPECIFIED

More information

CIRCULAR COLUMN SK 100

CIRCULAR COLUMN SK 100 CIRCULAR COLUMN SK 100 www.variant-factory.eu 1 2 VARIANT FACTORY LTD. CIRCULAR COLUMN SK 100 Contents GENERAL INSTRUCTIONS.....................................................................................

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

We store: high. wide. deep. safe. Cantilever racks. System K100 single-sided double-sided

We store: high. wide. deep. safe. Cantilever racks. System K100 single-sided double-sided We store: high. wide. deep. safe. Cantilever racks System K100 Economical Use of Space The K100 cantilever rack from Vogelsang meets all of the requirements when it comes to economically storing long and

More information

BRANZ FACTS RESILIENT NON-STRUCTURAL ELEMENTS SEISMICALLY RESILIENT NON-STRUCTURAL ELEMENTS # 3. Restraint systems

BRANZ FACTS RESILIENT NON-STRUCTURAL ELEMENTS SEISMICALLY RESILIENT NON-STRUCTURAL ELEMENTS # 3. Restraint systems SEISMICALLY BRANZ FACTS RESILIENT NON-STRUCTURAL ELEMENTS SEISMICALLY RESILIENT DESIGN CRITERIA # 2 NON-STRUCTURAL ELEMENTS # 3 Restraint systems The next step in the non-specific design pathway in NZS

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CLICK BAMBOO FLOORING INSTALLATION INSTRUCTIONS General The locking system is a revolutionary system for installing bamboo floors without using glue. The panels can be clicked together simply. Position

More information

International Packaging

International Packaging International Packaging All International Skids are constructed using Heat Treated Pine Wood and IPPC Stamped or otherwise 100% Export Compliant Plywood/OSB CINCINNATI EXPORT SEA SKID 1 (AEROSPACE,.125

More information

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air DYNAMIC BARRIER Bench Fume Hood H50 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH50-SA 06/01 Part Number: IMAN-H50 Kewaunee Scientific Corporation

More information

National Occupational Standards Developer s pack for Passive Fire Protection (Construction)

National Occupational Standards Developer s pack for Passive Fire Protection (Construction) National Occupational Standards Developer s pack for Passive Fire Protection (Construction) Project 2016 (COSVR350, COSVR351, COSVR352, COSVR353, COSVR354, COSVR355, COSVR356, COSVR357, COSVR358) To be

More information

STANDARD OPERATING PROCEDURES MANUAL Material Planning & Logistics Futuris Automotive Interiors

STANDARD OPERATING PROCEDURES MANUAL Material Planning & Logistics Futuris Automotive Interiors STANDARD OPERATING PROCEDURES MANUAL Material Planning & Logistics Futuris Automotive Interiors [ Packaging Specifications for International Suppliers ] Version 1.0 [1] Copyright Futuris Automotive Interiors

More information

General Shipping and Packaging Instructions for Suppliers of NETZSCH Pumpen & Systeme GmbH in Waldkraiburg

General Shipping and Packaging Instructions for Suppliers of NETZSCH Pumpen & Systeme GmbH in Waldkraiburg General Shipping and Packaging Instructions for Suppliers of NETZSCH Pumpen & Systeme GmbH in Waldkraiburg 1. Aim and Purpose of the General Shipping and Packaging Instructions... 2 2. Delivery Address...

More information

HOW TO BUILD AN EARTHQUAKE EMERGENCY SHELTER

HOW TO BUILD AN EARTHQUAKE EMERGENCY SHELTER HOW TO BUILD AN EARTHQUAKE EMERGENCY SHELTER 1. INTRODUCTION After a disaster such as an earthquake especially small children are weakened by lack of food, appropriate healthcare and save shelter. Therefore

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL http://www.walkincoolersandfreezers.com 786-286-2926 1 BEFORE INSTALLATION Please

More information