1 How to Improve Process Performance Using Lean Automation or Automating Waste Isn t Fun Frank Garcia ADVENT DESIGN CORPORATION

2 What We ll Cover? Building a Lean base for Automation including cellular manufacturing How much Automation is appropriate? p Should it be done in phases or all at once. Review examples of Levels of Lean Automation. Determine how to integrate Data Collection g into an Automation project.

3 AUTOMATE or NOT TO AUTOMATE Need to lower costs & reduce cycle times? Scrap too high? Can t deliver on time? Equipment too slow? Costs too high?

4 X Process Process Process Step1 I Step 2 I Step 3 C/T = 20 min C/0 = 30 min Reject = 5% C/T = 40 min C/0 = 2 hours Reject = 10% C/T = 25 min C/0 = 30 min Reject = 5% I New Machine Process Step 2 I C/T = 5 min C/0 = 10 min Reject = <1% Actual C/T = 20 min

5 What Do We Do? Analyze & Evaluate Using Lean Concepts & Techniques Implement Lean Six Sigma Solutions Design & implement LEAN AUTOMATION and Data Collection!

6 Why Lean Automation? After implementing lean improvements such as cellular manufacturing and setup reduction, selective automation can add value and reduce human variability. ab Richard Schonberger

7 Lean Manufacturing Fundamental Principle of Lean Manufacturing Any activity it or action which h does not add value to the product is a form of waste and must be eliminated or minimized. i i

8 Definition of Value -Added Value is added any time the product is physically changed towards what the customer is intending to purchase. Value is also added when a service is provided for which the customer is willing to pay (i.e. design, engineering, etc.). If we are not adding value, we are adding cost or waste. 90% of lead time is non-value added!

9 Lean Manufacturing Tools Value Stream Map * Flow: Setup Reduction *, Cellular Manufacturing *, Batch Size Reduction, Visual Workplace *,, Layout * Pull: Kanban Systems, Supply Chain Management, Point of Use * Others: Quality Improvement & Analysis *, Total Productive Maintenance, Cross Training * * Used * most frequently prior to Automation

10 Value Stream Map An Assessment Tool The value stream map follows the production path from beginning to end and shows a visual representation of every process in the material and information flows Shows how the shop floor currently operates Foundation for the future state

11 Value Stream Map Concept Suppliers Orders Production Control Orders Customers Schedules I Raw Materials Process Equipment Cycle Times Change Over Reliability Error Rate I Finished Goods Lead Time File: VSM-A1

12 Value Stream Map (Current State) Orders Every 2 Weeks Andrea Aromatics (Scented Oils) New Jersey Porcelain (Round Stones) Alanx (Shaped Stones) Order as Needed Production Control Randomly Placed Orders (Various Sizes) Various Customers 30 Cans of Oil 59,000 Stones 50,000+ Stones Every 2 Weeks Every 2 Weeks Every 2 Months (via stringer) Bi- Weekly Productio n Schedule Daily Shipping Orders Average of 6,000 Stones per Day in Various Size Orders (8 to 20 case & 200 to 400 case range mainly) Daily Shipments Existing Work Cell Soak & Dry Packaging Labeling Cartoning Case Packing Shipping 125 Cans of Oil 20,640 Round Stones 49,000 Shaped Stones Multiple Batch Tanks Ameripack Flow Packager APAI Automatic Stapler I I I I I I up to Operator Operator 1/2 Operator 1/2 Operator 90,504 1 Operator 250 Stones Stones stones in WIP Manual Manual C/T = min. C/T = 1 sec. C/T = 3 sec. C/T = 2 sec. C/T = 1 sec. C/O = 10 min. C/O = 5 min. C/O = 2 min. C/O = N/A C/O = N/A Rel. = 100% Rel. = 85% Rel. = 80% Rel. = 100% Rel. = 100% 11.6 Days 0.7 Days 15.1 days 27.4 Days Lead Time 65 min. 7 seconds 65 minutes, 7 seconds Value-Added Time

13 Value Stream Map (Future State) Orders Every Week Andrea Aromatics (Scented Oils) New Jersey Porcelain (Round Stones) Alanx (Shaped Stones) Monthly Order Production Control Randomly Placed Orders (Various Sizes) Various Customers 12 to 16 Cans 30,000 Stones 25,000 Stones of Oil Once a Once a Week Once a Month Week (via stringer) Bi-Weekly Production Schedule (large orders) Daily Shipping Orders Average of 6,000 Stones per Day in Various Size Orders (8 to 20 case & 200 to 400 case range mainly) Daily Shipments 4 Cases Existing Work Cell Soak & Dry Packaging Labeling Cartoning Case Packing Shipping 75 Cans of Oil 40,000 Round Stones 25,000 Shaped Stones Multiple Batch Tanks Ameripack Flow Packager APAI Automatic Stapler Manual I I I I I up to Operator Operator 1/2 Operator 1/2 Operator 30,000 1 Operator 250 Stones Stones stones in a supermarket in WIP type arrangement with stocking levels by shape and scent Manual C/T = min. C/T = 1 sec. C/T = 3 sec. C/T = 2 sec. C/T = 1 sec. C/O = 10 min. C/O = 5 min. C/O = 2 min. C/O = N/A C/O = N/A Rel. = 100% Rel. = 85% Rel. = 80% Rel. = 100% Rel. = 100% 10.8 Days 0.7 Days Increase Reliability 5.0 days 16.5 Days Lead Time 65 min. 7 seconds 65 minutes, 7 seconds Value-Added Time

14 VSM IMPLEMENTAION FUTURE STATE IMPLEMENTATION PLAN & SCHEDULE LOOP OBJECTIVES PROJECTS SEQUENCE (PRIORITY) COMPLETION DATE (Mon./Yr) Supplier Loop * Develop pull system with suppliers 1. Review Weekly/Monthly Requirements With Suppliers 1 Sep-01 * Increase number of deliveries per week 2. Revise current blanket orders 1 Sep-01 * Reduce raw material inventory to match 3. Send daily consumption data to suppliers 2 Nov Setup point of use raw material areas 1 Oct-01 Production Control Loop * Implement daily shipping schedule 1. Single point to schedule( shipping). See pacemaker loop. 1 Oct-01 * Work to schedule manufacturing based on shipping requirements 2. Daily production schedule by Operations Manager 1 Oct Implement kanban loops as shown on future state VSM 2 Nov Use MRP for materials forecasting 1 Oct-01 Element * Reduce lead time 1. Eliminate WIP between winding & annealing 1 Sep-01 Loop * Develop continuous flow 2. Implement supermarket for element prep and kanbans 1 Oct-01 * Develop pull system with element prep supermarket 3. Crosstrain element assembly operations 2 Dec-01 Module Assembly Loop * Reduce cycle time 1. Analyze process variance in environmental test 1 Oct-01 * Reduce variation in cycle time in testing 2. Analyze process variance in module drydown 1 Oct-01 * Reduce variation in cycle time in drydown 3. Implement supermarket and kanbans for cell installation 1 Oct-01 * Establish pull system with supermarket from cell installation 4. Crosstrain module assembly operations 2 Dec-01 * Reduce use of carriers 5. Analyze need for carriers vs. subassembly units 1 Sep Analyze material handling reductions and layout improvements for element prep operations 3 Jan Set up leak tested subassembly units in supermarket for final assembly 1 Oct-01 Pacemaker Loop * Reduce cycle time 1. Improve assembly methods in final mechancial assembly 2 Dec-01 (Unit Assembly/Shipping Loop) * Establish pull system with supermarket from shipping 2. Review design for manufacturing assembly improvements for tubing assembly 3 Feb Consolidate inspection with final mechanical assembly or shipping/packing 2 Nov Set up raw material suppermarket for final assembly 1 Oct Crosstrain unit assembly operations 2 Dec-01 NOTES: 1. Conduct kanban and point of use training for plant personnel in Priotities as follows: #1(Complete in 2 months), #2(Complete in 4 months), #3(Complete in 6 months) 3. Consider use of teams for implementation after training.

15 Implementing Lean Changes My conclusion is that all of us making a lean leap will need to deal with capability issues (TQM/Six Sigma) and with availability issues (TPM) while removing wasted steps and introducing flow and pull in every value stream (TPS). My further conclusion is that there is no right sequence to follow in tackling these problems. Rather it depends on the nature of the product, the nature of the process technology, and the nature of the business. Jim Womack, October 2002

16 How Do We Use Lean Techniques for Automation? Assess the operation using a Value Stream Map and/or PFDs (Product families & Production data) Evaluate the layout Identify lean improvements & kaizens without automation at o Implement lean improvements using VSM plan Identify lean automation opportunities Design and implement lean automation Start the cycle again!

17 Sigma Level for Sustaining Control 5-6σ: Six Sigma product and/or process design eliminates an error condition OR an automated system monitors the process and automatically adjust critical X s to correct settings without human intervention 4-5σ: Automated mechanism shuts down the process and prevents further operation until a required action is performed 3-5σ: Mistake proofing prevents a product/service from passing onto the next step 3-4σ: SPC on X s with the special causes are identified and acted upon by fully trained operators and staff who adhere to the rules 2-4σ: SPC on Y s BEST 1-3σ: Development of SOPs and process audits 0-1σ: Training and awareness WORST

18 The Lean Automation Cycle Assessment (VSM) Continuous Improvement DO IT! Recommended Solutions Implementation Plan Set Up Layout Cells Visual Automation Information Systems

19 Levels of Automation Load Machine Unload Transfer Levels Machine Cycle Machine Part 1 Operator Operator Operator Operator 2 Operator AUTO Operator Operator 3 Operator AUTO AUTO Operator The Great Divide 4 AUTO AUTO AUTO Operator 5 AUTO AUTO AUTO AUTO As defined by the Lean Enterprise Institute in Creating Continuous Flow

20 Level 1 Lean Automation Electrical ca Device Assembly Client wanted wave soldering and robotic pick and place Functional operational layout Ergonomic problems Extensive material staging No space Initially, 13 people in Aurora cell Low output: 300 units/day Reject rate 5 to 8%

21 Lean Six Sigma Techniques Used Process mapping Cellular Manufacturing & Layout Balance Cycle Times Between Work Stations Reduce Batch Size & parts staging Quality Reject Data Collection & Analysis

22 Cellular Assembly Layout Later changed to U Shaped Cells

23 1 WORKSTATION CYCLE TIME: 25sec., 1.25 min. PER 3 UNITS REJECT DATA Cell Changes 2 5to8% TEST SAMPLES Root Cause Analysis LED SOLDER & CUT LED PLACEMENT ASSEMBLY #1 COLD STAKE TEST PCBs CONTACTS ASSEMBLY & SOLDER BUTTON & BATTERY ASSEMBLY LABEL 7 ATTACH BACK COVER, STAKE STRAP & ATTACH STRAP 8 9 GLUE SWITCH/ ATTACH STRAP PACK Pareto Analysis TEST PCBs LED SOLDER & CUT REJECT DATA INSERT SWITCH ACTIVATOR 1 3 ASSIST AFTER CHANGES WORKSTATION CYCLE TIME: 25sec., 1.25 min. PER 3 UNITS REJECT DATA <0.1% PCBs from supplier ASSEMBLY CONTACTS BUTTON & #1 ASSEMBLY BATTERY COLD STAKE & ASSEMBLY TEST PCBs SOLDER LABEL 4 ATTACH BACK COVER, STAKE STRAP & ATTACH STRAP TEST SAMPLES 5 6 GLUE SWITCH/ ATTACH STRAP PACK REJECT DATA INSERT SWITCH ACTIVATOR

24 Lean Six Sigma Changes Cold staking fixtures (Poka Yoke) Powered screw drivers Light test & soldering fixtures Quality data tracking via % defect control chart (p chart)

25 With Lean Six Sigma Balanced cell at 24 sec per work station Two U-shaped cells 3 piece flow The Results 1000 units/day per cell vs people per cell vs 13 Better teamwork Faster identification of quality problems Operating at 3 to 4 sigma

26 Level 2 Lean Automation Steel Panel Fabrication Wanted to reduce lead time to less than one week Automated equipment had been installed but had problems Long setup times Panel rejects & rework (5%) Few process controls or data collection

27 Lean Six Sigma Techniques Used Process Flow Diagrams Value Stream Mapping Setup time Analysis & Reductions Quality Data Collection & Analysis (Reduce Reject Rate & Variability) Root Cause Analysis

28 Value Stream Map (Current State) Blanket Annual Purchase Order with Daily Releases Takt time = 5 min. Sheet Galvanized Steel (4 by 8 or cut) Sheet Galvanized Steel (4 by 8 or cut) Sheet Galvanized Steel (4 by 8 or cut) Sheet Galvanized Steel (4 by 8 or cut) Production Control (normally working 24 to 48 hours ahead of promised shipment) Randomly Placed Orders (normally single unit orders) Various Distributors (~ 24 for Smith Corp. & ~ 6 for Jones Systems Average volume of 1000 systems per month in peak season. Customers are mainly distributors. There are a few dealers. Up to an average of 130,000 lbs daily in peak season Daily Production Reports Daily Production Reports Daily Shipping Schedule Daily Shipments In Straight Panel Dept. I 2 to 5 days depending on pre-cut size 2 to 5 days Shear Notch Specialty Punch Corner Punch Bend Stake & Label Add Z Brace Radius & Band 1 Accurshear Automated Shear (P-3) 1 Manual Notcher (S-23) & 1 Automated 4 Semi-Auto Punches 3 Semi-Auto Punches (S-1, S-2, & S-3) 1 Manual Brake (R-7) & 1 Automated 1 Automated Machine (R-8) 1 Automated Machine (ACR) 1 Manual Table, 1 Jig-less Machine (R12), Notcher (R-3) Brake (R-13) & 1 Jig Machine 1 Operator 1/2 Operator 0 Operators 1 Operator 1/2 Operator 1/2 Operator 1/2 Operator (R1) 1 Material 2 Operators Handler 2 Operators C/T = 4 min. C/O = N/A Rel. = 99% C/T = 2 min. C/O = 4 min Rel. = 95% C/T = 2 min. C/O = N/A Rel. = 99% C/T = 2 min. C/O = up to 30 min. Rel. = 99% 4 min. C/T = 5 min. C/O = 30 to 60 sec. Rel. = 90% C/T = 2 min. C/O = N/A Rel. = 99% C/T = 7 min. C/O = N/A Rel. = 98% to 99% 2 min. 2 min. 2 min. 5 min. 2 min. 7 min. C/T = 8 min. (average) C/O = 2to30 min. Rej = 5% Uptime = 80% 8 min. Rack C/T = N/A C/O = N/A Rel. = 100% Shipping 2 to 5 Working Days, Lead Time 32 minutes, Value-Added Time

29 INITIAL IMPROVEMENT CONCEPTS Improve reliability and changeover capability of R1 and R12 machines. Reduce panel reject rate. Work to 1 to 2 days lead time Takt time = 5 min. What s Causing Evil Variation? I Radius & Band 1 Manual Table, 1 Jig-less Machine (R12), & 1 Jig Machine (R1) 2 Operators C/T = 8 min. (average) C/O = 2 to 30 min. Reject rate = 5% Uptime = 80% 8 min. Rack 1 Material Handler C/T = N/A C/O = N/A Rel. = 100% 2 to 5 Working Days, Lead Time

30 UNDERSTANDING ROOT CAUSES of R12 PROBLEMS CAUSE AND EFFECT DIAGRAM Red = Most Important Causes SET UP VALUES CHANGE MAINTENANCE CHANGES SETTINGS NO TRUST MOUNTING WRONG DIGITAL READOUT USELESS INDEXES VARY POOR TRANSDUCER SELECTION CRUDE INDEX SYSTEM DESIGN NOTCH O.D.SPACING VARIES.09 IN AIR CYLINDER OPPOSING HYDRAULIC IN HEAD ASSEMBLY EQUIPMENT OPEATOR PREFERENCE USE OF AIR vs. HYDRAULICS INDEXES VARY AIR PRESSURE LOW MAINTENANCE DIFFERENT SETUP PROCEDURES RADIUS VARIES SIDE TO SIDE OPERATORS POOR MAINT PANELS CATCH AT LAST 2 BENDS CONVEYOR NOT ADJUSTED PANEL NOT SQUARE. width TOO LARGE PANEL SQUARENESS OPERATOR JUDGEMENT STRAIGHT PANEL NO SPECS SPECIALTY PUNCH BAD BEARINGS ON LOWER FORMING TOOL RADIUS BACKING SHOE ADJ.USTMENT. PUNCH LOCATION VARIES ANGLES MEASUREMENT NO DIMENSIONAL SPECS OR TOLERANCES SEGMENT LENGTH PANEL WIDTH VARIES BANDS HAVE CAMBER LOCATION PANEL OF SPECIALTY PUNCHES ON PANEL RADIUS TEMPLATE ACCURACY NO SPECS DIFFERENT MEASURES USED ON R1 & R12 3 SUPPLIERS INACCURATE CUTTING PANEL NOTCH POSITION VARIES WIDTH OF STEEL BETWEEN NOTCHES VARIES 3.75 to 4.0 in. ACROSS RADIUS DIFFERENT EQUIPMENT USED NO SPECS MATERIAL (PANELS, STEEL) DIFFERENT STEEL PROPERTIES DON'T MEET CURVATURE TEMPLATE REQUIREMENTS AT SETUP (4' & 6' RADIUS PANELS) SHEET DIMENSIONS VARY GALVINIZED COATING DIFFERENT ON PANELS YIELD STRENGTH VARIES PLATE THICKNESS VARIES NO SPECS SURFACE FINISH VARIES NO SPECS 3 SUPPLIERS HOT VS COLD ROLL 3 SUPPLIERS COATING VARIES 3 SUPPLIERS

31 Process Improvements Lean Based Common setup procedure Replace measurement gages Completed identified R12 maintenance actions Implemented TPM program

32 6 Sigma Based Process Improvements Established radius process capability (3 sigma) DOE for radius variations Implemented process controls for panel dimensions in upstream process Vendor consolidation for dimensional compliance

33 New Radius Bending Machine R13 Automated band cutting Servo driven adjustments from panel bar codes Hydraulic cylinders vs air Online radius measurement and tracking

34 R13 Capabilities After Lean Automation Operates as a cell Runs two product families Changeover in less than 5 sec. within and between product families Cycle time reduced from 5 min. to 1.8 min. Realtime auto check of each panel with data collection Process capability at 4 to 5 sigma

35 Levels of Automation Load Machine Unload Transfer Levels Machine Cycle Machine Part 1 Operator Operator Operator Operator R13 2 Operator AUTO Operator Operator 3 Operator AUTO AUTO Operator The Great Divide 4 AUTO AUTO AUTO Operator 5 AUTO AUTO AUTO AUTO As defined by the Lean Enterprise Institute in Creating Continuous Flow

36 Level 3 Lean Automation Bearing Assembly Functional layout Average batch size of 900 bearings Long set ups of 9 hrs Large amount of WIP Long lead times of 4 to 9 weeks 3 shift operation

37 BEFORE Lean Automation

38 Lean Techniques Used Before Automation Product Family Value Stream Map Set Up Time Reduction (quick changeover chuck) Cellular Manufacturing & Layout Balance Flow & Cycle Time Reduction to Produce Small Batches

39 AFTER Cellular Layout

40 Next Step - Lean Automation Level 3 AUTOMATIC LOADER/UNLOADER Automated parts feeding & reduced handling Decouple machine cycle from operator Cell cycle time at 1 min. per bearing Setup time reduced to 2 to 4 hrs One shift operation Average batch size of 100 down to 10

41 AUTOMATIC LOADER/UNLOADER

42 Across the Great Divide Level 4 Automation

43 Level 4 Automation Smoke Detectors Cellular layout with 7 operators Manual packing Ergonomic problems New product being released Customer wanted to automate the cell

44 AFTER Automation Level 4 Focused product family automation Detectors conveyed between machine operations using special pallets 2 Operators running the line

45 Lean Automation and Data Collection Data, Data, everywhere and nothing do we know. Useful Data becomes Information Useful Information becomes the knowledge base for intelligent decisions and dfuture planning. If knowledge is money then useful data is the currency of the manufacturing floor. As lead time decreases, need for realtime data increases!

46 Lean Automation Can Help Collect the Right Real-time Data What is the purpose of collecting the data? Will the data tell us what we need to know? Will we be able to take action on the collected data?

47 Levels of Control & Information IS DEPT HARDWARE SOFTWARE INFO & CONTROL REPORTING Bus. System MES SCADA PLC Server Farm Large Computers Client/Server PCs Industrial PC Bar Coding PLC & Terminal Large Database ERP/MRP II Large Database Web-based Small Database, SCADA SW PLC Program Fully Integrated Supply Chain Networked to Business System Small Control Network Programmable Control Internet Portal Or Extranet Intranet Portal Ad Hoc Printed Graphs I/O Office PC Spreadsheet Electrical Control By Hand or Printout ENGINEERING

48 Lean Automation Real-time Data to Control Variation for Six Sigma Supports Critical To Quality (CTQ) objectives (3.4ppm defects) Enhances Define-Measure- Analyze-Improve-Control methodology (DMAIC) Process Control Online measurement of process parameters Provide real-time controls as Provide real time controls as limits are understood

49 R13 Process Controls & System Status Real-time Data Collection for Six Sigma Analysis Diagnostics for Rapid Diagnostics for Rapid Identification of Problems

50 How Do Implement Lean Automation? Assess the operation using a Value Stream Map or PFDs (Product families & Production data) Evaluate the layout and flow Identify lean improvements & kaizens without automation Quality improvement TPM Point of Use

51 How Do Implement Lean Automation? Implement lean improvements using VSM plan Identify lean automation opportunities Reduce repetitive motion & stuck at machine Reduce material handling Improve quality Design and implement lean automation & data collection Start the cycle again!

52 Benefits of Lean Automation Lower cost automation Summary Simpler implementation & faster acceptance Greater flexibility for setup & material flow Maximizes operator utilization Better use of floor space Useful data providing a knowledge base for more profitable solutions in the future, and supporting a cycle of Continuous Improvement.

53 Lean Automation Makes Us All Reduced lead times Winners! Reduced costs Shorter cycle times Smaller batch sizes Reduced inventory Improved quality Greater flexibility

54 Contact Information Advent Design Corporation Canal Street and Jefferson Ave. Bristol, PA Frank kg Garcia, Director Planning &P Productivity it

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success  Presented by Larry Akre May 17, 2007 "Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007 LAKRE 2007 1 Lean Manufacturing What is Lean Manufacturing? A philosophy

More information

PLUS VALUE STREAM MAPPING

PLUS VALUE STREAM MAPPING LEAN PRINCIPLES PLUS VALUE STREAM MAPPING Lean Principles for the Job Shop (v. Aug 06) 1 Lean Principles for the Job Shop (v. Aug 06) 2 Lean Principles for the Job Shop (v. Aug 06) 3 Lean Principles for

More information

Finished goods available to meet Takt time when variations in customer demand exist.

Finished goods available to meet Takt time when variations in customer demand exist. Delaware Valley Industrial Resource Center 2905 Southampton Road Philadelphia, PA 19154 Tel: (215) 464-8550 Fax: (215) 464-8570 www.dvirc.org Term Batch-and-Queue Processing Buffer Stock Catchball Cell

More information

LEAN MANUFACTURING & TPM.

LEAN MANUFACTURING & TPM. LEAN MANUFACTURING & TPM www.fourprinciples.com BACKGROUND The core area of any manufacturing facility is the shop floor. Manufacturing is most often also the largest function within an organisation. In

More information

Value Stream Mapping Train the Trainer

Value Stream Mapping Train the Trainer Value Stream Mapping Train the Trainer Information For A Process Data Box (to be collected on the shop floor) Cycle time Changeover time Process reliability (uptime) Scrap/Rework/Defect rate Number of

More information

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing. Ch 26 Just-In-Time and Lean Production Sections: 1. Lean Production and Waste in Manufacturing 2. Just-in-time Production Systems 3. Autonomation 4. Worker Involvement What is Lean Production? Lean production

More information

Historical Phases of Production

Historical Phases of Production Lean 101 Overview Lean Background Taiichi Ohno and Shigeo Shingo developed Lean Manufacturing at Toyota over a period of 20-30 years. Their intention was not to develop some sort of unified field theory

More information

Lean Distribution. Mark Kushner, COO Lloyed Lobo, Director Business Development

Lean Distribution. Mark Kushner, COO Lloyed Lobo, Director Business Development Lean Distribution Mark Kushner, COO Lloyed Lobo, Director Business Development Agenda Brief Company Overview What is Lean? Lean in the Extended Supply Chain Benefits of Lean Distribution Can Lean Help

More information

Lean Flow Enterprise Elements

Lean Flow Enterprise Elements "Lean Flow" describes the performance of organizations that are effective enough to win consistently in the competitive global marketplace. To understand how to get there, it s useful to focus on Lean

More information

Managing for Daily Improvement

Managing for Daily Improvement Managing for Daily Improvement Standard Work and Tools For Management to Drive Continuous Improvement Front Line Leadership Development System Module Part 1 of 12 MDI Workshop Agenda 2 Day Monday Tuesday

More information

Five Tips to Achieve a Lean Manufacturing Business

Five Tips to Achieve a Lean Manufacturing Business Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining

More information

Chapter 11. In-Time and Lean Production

Chapter 11. In-Time and Lean Production Chapter 11 Just-In In-Time and Lean Production What is JIT? Producing only what is needed, when it is needed A philosophy An integrated management system JIT s mandate: Eliminate all waste Basic Elements

More information

LEAN PRODUCTION FACILITY LAYOUT.

LEAN PRODUCTION FACILITY LAYOUT. LEAN PRODUCTION FACILITY LAYOUT www.fourprinciples.com BACKGROUND The production facility layout is as important as the technology it houses and has a significant impact on business performance. The layout

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 MANUFACTURING SYSTEM Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing

More information

Lean Gold Certification Blueprint

Lean Gold Certification Blueprint The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types

More information

Just-In-Time (JIT) Manufacturing. Overview

Just-In-Time (JIT) Manufacturing. Overview Just-In-Time (JIT) Manufacturing Overview The Just-in-Time (JIT) Manufacturing Philosophy Prerequisites for JIT Manufacturing Elements of JIT Manufacturing Benefits of JIT Manufacturing Success and JIT

More information

PRODUCTION PLANNING ANDCONTROL AND COMPUTER AIDED PRODUCTION PLANNING Production is a process whereby raw material is converted into semi-finished products and thereby adds to the value of utility of products,

More information

Toyota Kaizen Patterns & Basic Stability:

Toyota Kaizen Patterns & Basic Stability: Toyota Kaizen Patterns & Basic Stability: Some observations and reflections on TPS Art Smalley President Art of Lean, Inc. Art of Lean, Inc. Presentation Outline Introduction The Need for Basic Stability

More information

Proficy * Plant Applications. GE Intelligent Platforms. Plant Performance Analysis and Execution Software

Proficy * Plant Applications. GE Intelligent Platforms. Plant Performance Analysis and Execution Software GE Intelligent Platforms Proficy * Plant Applications Plant Performance Analysis and Execution Software As a production manager, the key to unlocking the full performance potential of your manufacturing

More information

Value Stream Mapping

Value Stream Mapping Value Stream Mapping Dr. Bob Gee Dean Scott Bonney Professor William G. Journigan American Meridian University 1 Learning Objectives Upon successful completion of this module, the student should be able

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ABP SERIES OF AUTOMATIC BLISTER PACKAGING MACHINERY Ridat ABP series of machines are some of the most advanced models in the comprehensive range of Ridat blister packaging equipment.

More information

Lean Manufacturing Implementation in Small and Medium Industry

Lean Manufacturing Implementation in Small and Medium Industry Advances in Smart Systems Research ISSN 2050-8662 Vol. 5. No. 1 : pp.17-29 : isrp16-004 Lean Manufacturing Implementation in Small and Medium Industry N.H.Zakaria 1, N.M.Z.N.Mohamed 1,2 *, A.N.M.Rose 1,

More information

Introduction to the Toyota Production System (TPS)

Introduction to the Toyota Production System (TPS) COST VS DEFECTS Introduction to the Toyota Production System (TPS) 2.810 T. Gutowski 1 Three Major Mfg Systems from 1800 to 2000 Machine tools, specialized machine tools, Taylorism, SPC, CNC, CAD/CAM 1800

More information

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 MODULE 1 LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 1. Cultural Enablers 15% 20% 25% 1.1. Principles of Cultural Enablers 3% 4% 5% 1.1.1. Respect for the individual 1.1.2. Humility 1.2. Processes

More information

Lean Manufacturing. Overview and Perspectives on Lean Methods and Tools. WIW at WERC

Lean Manufacturing. Overview and Perspectives on Lean Methods and Tools. WIW at WERC Lean Manufacturing Overview and Perspectives on Lean Methods and Tools Lean Building Blocks Teams Pull/Kanban Changeover Reduction Visual Control Continuous Improvement Cellular/Flow Batch Reduction Supermarkets

More information

LEARNING TO SEE an introduction to lean thinking

LEARNING TO SEE an introduction to lean thinking LEARNING TO SEE an introduction to lean thinking 2 Why Lean? Customer satisfaction Market share Costs 3 Where did Lean come from? Henry Ford First flow production line 1960s The term Lean originated International

More information

Understanding Manufacturing Execution Systems (MES)

Understanding Manufacturing Execution Systems (MES) Understanding Manufacturing Execution Systems (MES) What is a Manufacturing Execution System (MES)? AMR Research, a Boston-based industry and market analysis firm, defines a Manufacturing Executing System

More information

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar L9: Lean synchronization 1 Lean operations Operations strategy Design Improvement Lean operations Planning and control The market requires

More information

Innovative Solutions for

Innovative Solutions for Supporting The Needs Of- ISO9000 QS9000 Six Sigma Innovative for Quality Control Measurement Flaw Detection Data Reporting Manufacturing Turnkey Systems Process Control Gauges & Fixtures Engineering Product

More information

How Lean Saves Money. Joe Margarucci January Copyright Bureau Veritas

How Lean Saves Money. Joe Margarucci January Copyright Bureau Veritas How Lean Saves Money Joe Margarucci January 2016 Lean Initiative Objectives To Learn the 8 Wastes for Lean To understand several tools of Lean l 5S l Standardized Work l Quality @ the Source l Total Productive

More information

Pull Systems: Overview, Challenges and Success Factors

Pull Systems: Overview, Challenges and Success Factors Pull Systems: Overview, Challenges and Success Factors Mike Osterling 619-572-3632 mike@mosterling.com 1 Session Objectives Cover the most common types of pull systems See some examples of application

More information

LeanView. User s Guide. For use with versions of LeanView.

LeanView. User s Guide. For use with versions of LeanView. LeanView User s Guide For use with versions 4.0.39 6.0.0 of LeanView LeanView The Next Generation of Lean Copyright 2012 bluespring SOFTWARE Page 1 Section I Introduction to Lean and Value Stream Mapping

More information

Implementing VMI to Reduce Direct and Indirect Cost

Implementing VMI to Reduce Direct and Indirect Cost Implementing VMI to Reduce Direct and Indirect Cost James M. Truog, Manager Strategic Purchasing Wacker Corp. 262-250-3518; james.truog@am.wackergroup.com 89 th Annual International Supply Management Conference,

More information

AMI AutoAGENT Shop Floor Manager

AMI AutoAGENT Shop Floor Manager AMI AutoAGENT Shop Floor Manager Contents Introduction... 2 Introduction... 3 What's In This Manual... 4 Symbols and Conventions... 5 Shop Floor Manager Navigation Tips... 6 Part 1: Shop Floor Manager

More information

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations JIT and Lean Operations Outline Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations Eliminate Waste Remove Variability Improve

More information

What is MRP (I, II, III) 1. MRP-I

What is MRP (I, II, III) 1. MRP-I What is MRP (I, II, III) 1. MRP-I Introduction: Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes. Although

More information

Continuous Improvement Toolkit. Flow Process Chart. Continuous Improvement Toolkit.

Continuous Improvement Toolkit. Flow Process Chart. Continuous Improvement Toolkit. Continuous Improvement Toolkit Flow Process Chart The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis

More information

MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY

MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY Quynh-Lam Ngoc LE 1, Ngoc-Hien DO 2, Ki-Chan NAM 3 1 Ho Chi Minh City University of Technology, 268 Ly Thuong

More information

10 Steps to become a Lean Enterprise. Level 2 Lean Practitioner In Manufacturing Training Course. Step 1 - Part 2

10 Steps to become a Lean Enterprise. Level 2 Lean Practitioner In Manufacturing Training Course. Step 1 - Part 2 10 Steps to become a Lean Enterprise Level 2 Lean Practitioner In Manufacturing Training Course Step 1 - Part 2 Table of Contents Welcome to Lean Certification Online... 3 Course Objectives... 4 Elements

More information

TABLE OF CONTENTS 1. SCOPE: REFERENCES: PARTS/PROCESS INFORMATION: EQUIPMENT SPECIFICATIONS: SPECIAL INSTRUCTIONS:...

TABLE OF CONTENTS 1. SCOPE: REFERENCES: PARTS/PROCESS INFORMATION: EQUIPMENT SPECIFICATIONS: SPECIAL INSTRUCTIONS:... REVISION: 1.0 REV. DATE: 2017-01-31 SHEET: 1 OF 9 TABLE OF CONTENTS 1. SCOPE:...2 2. REFERENCES:...3 3. PARTS/PROCESS INFORMATION:...3 4. EQUIPMENT SPECIFICATIONS:...4 5. SPECIAL INSTRUCTIONS:...8 6. QUOTATION:...8

More information

Eliminate Waste and. Increase Value

Eliminate Waste and. Increase Value Eliminate Waste and Increase Value By Six Sigma Qualtec You don t need a dance partner to Poka-yoke, but it does help to have a supportive management team. No, Poka-yoke isn t a new dance; it s Japanese

More information

Engaging All Employees to Eliminate the Eight Wastes

Engaging All Employees to Eliminate the Eight Wastes Engaging All Employees to Eliminate the Eight Wastes Abstract Charles Aubrey Vice President, Anderson Pharmaceutical Packaging, USA Kaizen means continuous improvement in Japanese. It has become closely

More information

It s Not Easy Being Lean. C G Clark Consulting Group

It s Not Easy Being Lean. C G Clark Consulting Group It s Not Easy Being Lean 1 It s Not Easy Being Lean or Lean - - it s not just for manufacturing anymore or Do I have to be Mean to be Lean? Abq INCOSE July 7, 2010 Sheri Clark Clark Consulting Group 2

More information

Materials Management. Implementation Process. Marek Piatkowski. December Marek Piatkowski FSP Consulting

Materials Management. Implementation Process. Marek Piatkowski. December Marek Piatkowski FSP Consulting Materials Management Implementation Process Marek Piatkowski December 2010 1 Materials Management Strategy the Big Picture 1 Major Steps Create a Materials Management Organization Key Points Responsible

More information

2004 Sales: ~$600 Million

2004 Sales: ~$600 Million Measuring Environmental Performance: A Genie Industries Case Study Sustainability Indicators Workshop February 26, 2004 Michael Johnson, PE Genie Industries Christa Colouzis, PE WasteMinCo Genie Industries

More information

Key Steps in Implementing a Kaizen Event

Key Steps in Implementing a Kaizen Event Northeast Supply Chain Conference Key Steps in Implementing a Kaizen Event Tom McBride Partners for Creative Solutions, Inc. (508) 845-1546 What We Will Cover What are kaizen events? Choosing the best

More information

CASE STUDY. adidas Group. The right team with the right experience wins big. automation that delivers

CASE STUDY. adidas Group. The right team with the right experience wins big.  automation that delivers adidas Group The right team with the right experience wins big automation that delivers The right team with the right experience wins big adidas Group Spartanburg, SC distribution centers Two DCs receive

More information

Lean Project Delivery Operating System

Lean Project Delivery Operating System Lean Project Delivery Operating System David MacNeel & Dan Passick, On Point Lean OCTOBER 16, 2017 LCI Education & Training Lean Construction Institute Provider Number H561 LCI Learning Module: Introduction

More information

PESMEL FULLY AUTOMATED STRIP PACKING LINES

PESMEL FULLY AUTOMATED STRIP PACKING LINES PESMEL FULLY AUTOMATED STRIP PACKING LINES New Sensitive Way of Packing with High Capacity Pesmel Strip Packing Line, is designed to protect strips against damages, moisture and dirt. The new way of packing

More information

SUPPLIER QUALITY ASSESSMENT

SUPPLIER QUALITY ASSESSMENT Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal

More information

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016 Improving Scrum with Lean Thinking Nuno Rafael Gomes @ SGMUN 2016 https://twitter.com/nrgomes https://www.linkedin.com/in/nrgomes A Product Owner in contact with Industry since 2003 1 Once upon a time

More information

WMS Best Practices Top Ten List

WMS Best Practices Top Ten List WMS Best Practices Top Ten List David Letterman Top Ten List Top 10 reasons to adopt WMS best practices Reason 10 Your receiving backlog is so bad you haven t seen the dock floor since 1974 Advanced shipping

More information

Continuous Improvement Toolkit

Continuous Improvement Toolkit Continuous Improvement Toolkit Lean Measures Managing Risk PDPC Pros and Cons Importance-Urgency Mapping RACI Matrix Stakeholders Analysis FMEA RAID Logs Break-even Analysis Cost -Benefit Analysis PEST

More information

Using Simulation in the Process Industries. Bennett Foster Sr. Consultant, DuPont Co.

Using Simulation in the Process Industries. Bennett Foster Sr. Consultant, DuPont Co. Using Simulation in the Process Industries Bennett Foster Sr. Consultant, DuPont Co. What s different about the Process Industries? Processes are often difficult (and/or expensive) to start and stop Relatively

More information

Process Mapping. You cannot improve a process until everyone agrees on what the process is.

Process Mapping. You cannot improve a process until everyone agrees on what the process is. Process Mapping You cannot improve a process until everyone agrees on what the process is. 1 Topics I. What is a Process Map? II. III. IV. Types of Process Maps A. Process Flow Chart B. SIPOC Diagram C.

More information

True North at Zimmer. Made as if intended for my family

True North at Zimmer. Made as if intended for my family True North at Zimmer History of Zimmer US Orthopaedic Multinational founded in 1927: Justin O. Zimmer 1972: Acquired by Bristol-Myers Squibb 2001:Spin-off Zimmer from BMS and NYSE (ZMH) Justin O. Zimmer

More information

Lean Thinking. Continuous improvement is about removing stuff that get in the way of your things working well.

Lean Thinking. Continuous improvement is about removing stuff that get in the way of your things working well. Lean Thinking Continuous improvement is about removing stuff that get in the way of your things working well. What is LEAN Maximize customer value Minimizing waste. More value fewer resources. Understands

More information

Advanced Revenue Management For Acumatica. A Complete Solution For Managing Recurring Revenue and Payments

Advanced Revenue Management For Acumatica. A Complete Solution For Managing Recurring Revenue and Payments Advanced Revenue Management For Acumatica A Complete Solution For Managing Recurring Revenue and Payments Advanced Revenue Management Advanced Revenue Management for Acumatica streamlines the operations

More information

YOUR BEST WAREHOUSE MANAGEMENT SYSTEM: GETTING MAXIMUM VALUE FROM YOUR WAREHOUSE AND YOUR FUNCTIONAL AREAS

YOUR BEST WAREHOUSE MANAGEMENT SYSTEM: GETTING MAXIMUM VALUE FROM YOUR WAREHOUSE AND YOUR FUNCTIONAL AREAS YOUR BEST WAREHOUSE MANAGEMENT SYSTEM: GETTING MAXIMUM VALUE FROM YOUR WAREHOUSE AND YOUR FUNCTIONAL AREAS Ultra Consultants 847.692.6485 www.ultraconsultants.com 1 CONTENTS Executive Summary The Case

More information

BCe Smart 2220 A leap in innovation, technology and intelligence. The Bend The Combi The Laser The Punch The System The Software

BCe Smart 2220 A leap in innovation, technology and intelligence. The Bend The Combi The Laser The Punch The System The Software BCe Smart 2220 A leap in innovation, technology and intelligence The Bend The Combi The Laser The Punch The System The Software Intelligent but affordable bending cell for semiautomatic, efficient, and

More information

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

Lean manufacturing concept: the main factor in improving manufacturing performance a case study Int. J. Manufacturing Technology and Management, Vol. 17, No. 4, 2009 353 Lean manufacturing concept: the main factor in improving manufacturing performance a case study N. Zakuan* Lecturer, UTHM, Parit

More information

The Digital Enterprise EWA Electronic Works Amberg. Unrestricted Siemens AG All rights reserved.

The Digital Enterprise EWA Electronic Works Amberg. Unrestricted Siemens AG All rights reserved. The Digital Enterprise EWA Electronic Works Amberg Unrestricted Siemens AG 2016. All rights reserved. Site Amberg Plants & Products SIMATIC PLC - Programmable Logic Controller DP - Decentral Periphery

More information

Continuous Improvement Toolkit. Value Analysis

Continuous Improvement Toolkit. Value Analysis Continuous Improvement Toolkit Value Analysis VA NVA The Continuous Improvement Map Managing Risk FMEA Understanding Performance** Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Benchmarking***

More information

Hybrid Manufacturing Methods

Hybrid Manufacturing Methods Hybrid Manufacturing Methods The following manufacturing execution and costing methods are supported in SyteLine. These methods can be combined in a single environment so that the optimal method is used

More information

Automotive Weighing Guide

Automotive Weighing Guide Automotive Weighing Guide Increase Your Productivity with Solutions from the Weighing Expert Automotive Weighing Guide Quality and Productivity are Key For the Automotive Industry Automotive parts suppliers

More information

Cornerstone Solutions, Inc.

Cornerstone Solutions, Inc. Blueprint for Success Cornerstone Solutions, Inc. An implementation guide based on 50+ WMS Implementation Projects White Paper Introduction You know that implementing a WMS can increase your operation

More information

Case Study. Cosma International improves systems through collaboration with Solarsoft. Customer Spotlight.

Case Study. Cosma International improves systems through collaboration with Solarsoft.  Customer Spotlight. Case Study Cosma International improves systems through collaboration with Solarsoft Customer Spotlight Victor Manufacturing (Cosma) Tier-1 supplier of automotive assemblies A division of Magna International

More information

Politecnico di Torino. Porto Institutional Repository

Politecnico di Torino. Porto Institutional Repository Politecnico di Torino Porto Institutional Repository [Doctoral thesis] A Theoretical Model of Lean warehousing Original Citation: Mustafa, Muhammad Salman (2015). A Theoretical Model of Lean warehousing.

More information

Lean Checklist Self-Assessment

Lean Checklist Self-Assessment Lean Checklist Self-Assessment Marino Associates, LLC 110 Greenwoods Lane East Windsor, CT 06088 Tel: 860 623-2521 Fax: 860 623-0819 E-mail: Danam333@aol.com www.dmarinoassociates.com Copyright Marino

More information

AMERICAS Tel or Tel CHINA, SHENZHEN Tel

AMERICAS Tel or Tel CHINA, SHENZHEN Tel www.uic.com email: universal@uic.com AMERICAS Tel. 1-800-432-2607 or Tel. +1-607-779-7522 CHINA, SHENZHEN Tel. +86-755-2685-9108 CHINA, SHANGHAI Tel. +86-21-6495-2100 EUROPE Tel. +36-23-445-500 2010 Universal

More information

Lean Means Speed. Alessandro Anzalone, Ph.D Hillsborough Community College, Brandon Campus

Lean Means Speed. Alessandro Anzalone, Ph.D Hillsborough Community College, Brandon Campus Lean Means Speed Alessandro Anzalone, Ph.D Hillsborough Community College, Brandon Campus 1. Is This Lean? 2. The Essentials of Lean 3. The Lean Metric: Cycle Efficiency 4. Velocity of Any Process 5. Knowing

More information

MET-FAB FABRICATION & MACHINE, INC. P.O. Box 363, Batavia, Ohio Ph. (513) Fax (513)

MET-FAB FABRICATION & MACHINE, INC. P.O. Box 363, Batavia, Ohio Ph. (513) Fax (513) 1 2 MET-FAB FABRICATION & MACHINE, INC. P.O. Box 363, Batavia, Ohio 45103 Ph. (513) 724-3715 Fax (513) 724-1336 The people who can help you with your material handling needs Fact! A note about our references.

More information

JIT and Lean Operations. JIT/Lean Operations

JIT and Lean Operations. JIT/Lean Operations 5/7/2011 16 JIT and Lean Operations By : Sa Ed M. Salhieh, Salhieh, Ph.D. 16-1 JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental

More information

Set Up Change Time Optimization Using Single Minute Exchange of Die (SMED) Methodology

Set Up Change Time Optimization Using Single Minute Exchange of Die (SMED) Methodology International Journal of Research in Electronics ISSN : 2348-9065 (Online) Set Up Change Optimization Using Single Minute Exchange of Die (SMED) Methodology I Pankajkumar. J. Mistry, II Mukesh Desai I

More information

Lean Performance Measurements

Lean Performance Measurements Introduction to Lean Accounting Session 2 - TUESDAY Lean Performance Measurements Nick has over 20 years experience with lean accounting systems. He has been with BMA since 2002, and has worked with a

More information

CONVEYOR SYSTEM Frontier of Garment Conveyor Industry

CONVEYOR SYSTEM Frontier of Garment Conveyor Industry TUKU SINGAPORE PTE LTD TUKU GARMENT CONVEYOR SYSTEM Frontier of Garment Conveyor Industry ADDRESS 190 Woodlands Industrial Park E5 #04-12 Woodlands Bizhub Singapore757516 WEBSITE www.tuku-singapore.com

More information

Industrial IT cpmplus Collaborative Production Management. cpmplus for Pulp and Paper

Industrial IT cpmplus Collaborative Production Management. cpmplus for Pulp and Paper Industrial IT cpmplus Collaborative Production Management cpmplus for Pulp and Paper Maximizing the performance of your assets The best-in-class mill operations Today s economic environment requires paper

More information

An Introduction to Business Process Management

An Introduction to Business Process Management An Introduction to Business Process Management Alan Mendelssohn September 10, 2014 1 Business Process Management Identifying top-priority, priority, critical processes Validating customer requirements

More information

From KAIZEN to LEAN to GREEN. Kaizen Institute Masaaki Imai

From KAIZEN to LEAN to GREEN. Kaizen Institute Masaaki Imai From KAIZEN to LEAN to GREEN 2016 Kaizen Institute Masaaki Imai Kaleidoscope of Terms Toyota Production System Baldrige Six Sigma Gemba 5S Kanban Supermarket EFQM Efficiency KAIZEN (Original Definition)

More information

LEAN SIX SIGMA GLOSSARY OF TERMS

LEAN SIX SIGMA GLOSSARY OF TERMS LEAN SIX SIGMA GLOSSARY OF TERMS WWW.LBSPARTNERS.IE A A3 Analyse Andon Andon Board Autonomation B Balanced Production Line Batch-and-Queue Benchmarking Bottleneck Best-in-Class Blitz C Catch-Ball This

More information

LEAN WAREHOUSE OPERATIONS.

LEAN WAREHOUSE OPERATIONS. LEAN WAREHOUSE OPERATIONS www.fourprinciples.com BACKGROUND Warehousing s historical core responsibility has been the storage of goods. However, the scope and core responsibilities of warehouse management

More information

Use Data-Driven Enterprise Planning in Your Meat, Poultry, or Fish Company

Use Data-Driven Enterprise Planning in Your Meat, Poultry, or Fish Company SAP Brief SAP Extensions SAP Meat Management by msg Use Data-Driven Enterprise Planning in Your Meat, Poultry, or Fish Company SAP Brief Manage data to deliver insight and increase efficiency As a large-scale

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry. INTRODUCTION Welcome to, New Mather Metal Inc. (NMMI) New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry. You can view

More information

MANUFACTURING TECHNOLOGY

MANUFACTURING TECHNOLOGY MANUFACTURING TECHNOLOGY UNIT II Hot & Cold Working - Drawing & Extrusion Drawing Drawing is an operation in which the cross-section of solid rod, wire or tubing is reduced or changed in shape by pulling

More information

Design Molded Plastics, Inc.

Design Molded Plastics, Inc. Design Molded Plastics, Inc. Part Design Assistance Design Molded Plastics offers the added resources to take their projects to the next level Key Points: Capturing the design intent Establish part tolerances

More information

Mitsubishi Electric and the Future of Monozukuri (Manufacturing) May, 2016 Mitsubishi Electric Europe B.V. Kazuaki Miyabe

Mitsubishi Electric and the Future of Monozukuri (Manufacturing) May, 2016 Mitsubishi Electric Europe B.V. Kazuaki Miyabe Mitsubishi Electric and the Future of Monozukuri (Manufacturing) May, 2016 Mitsubishi Electric Europe B.V. Kazuaki Miyabe Monozukuri Evolving Responding to Environmental Changes The following shows examples

More information

Application of Lean Methodologies in the Improvement of an Automotive Supplier s Operation

Application of Lean Methodologies in the Improvement of an Automotive Supplier s Operation Application of Lean Methodologies in the Improvement of an Automotive Supplier s Operation The SMP Portugal Case Study Amy Wulff e-mail: amy.wulff@tecnico.ulisboa.pt Abstract: The Portuguese automotive

More information

Smart Data Analytics: BMW Group relies on intelligent use of production data for efficient processes and premium quality

Smart Data Analytics: BMW Group relies on intelligent use of production data for efficient processes and premium quality Smart Data Analytics: BMW Group relies on intelligent use of production data for efficient processes and premium quality Data analysis creates growing added value for continuous improvement in the production

More information

Enabling Real-time Operational Intelligence

Enabling Real-time Operational Intelligence Proficy * Automation Software Enabling Real-time Operational Intelligence Close the loop on information and analytics to improve operations COLLECT OPTIMIZE ARCHIVE ANALYZE VISUALIZE CONTROL Put the right

More information

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95) SECTION 05 44 00 - PRE-ENGINEERED PRE-FABRICATED COLD-FORMED STEEL TRUSSES (Section 05425 in MasterFormat 1995) PART 1 GENERAL 1.1 SECTION INCLUDES A. Pre-engineered cold-formed steel trusses. B. Cold-formed

More information

High Yield Rip Systems

High Yield Rip Systems High Yield Rip Systems 130 Salt Point Turnpike Poughkeepsie, NY 12603 Tel: 800.952.1320 Fax: 845.452.0764 www.cameronautomation.com Skew: up to 7,000 board feet per shift Cameron Automation has pushed

More information

Leading Automotive Supplier Accelerates Lean Operations with EnterpriseIQ

Leading Automotive Supplier Accelerates Lean Operations with EnterpriseIQ Leading Automotive Supplier Accelerates Lean Operations with EnterpriseIQ Automotive Suppliers Advantage Competing in an industry where a large number of suppliers vie for comparatively fewer customers,

More information

Process Selection and Design Dr. Richard Jerz

Process Selection and Design Dr. Richard Jerz Process Selection and Design Dr. Richard Jerz 1 Learning Objectives Explain the strategic importance of process selection. Explain the influence that process selection has on an organization. Explore process

More information

Operations Management

Operations Management Operations Management Chapter 16 JIT and Lean Operations PowerPoint presentation to accompany Heizer/Render Operations Management, 11ed Some additions and deletions have been made by Ömer Yağız to this

More information

DENSO Supplier Labeling Policy

DENSO Supplier Labeling Policy NAPC Sr. Mgr NAPC Mgr NAPC Sec:on Leader Ace Sakakibara Paul Rush Jason Hoekstra Document # NAPSLPS001 Rev. 1 Revised Date 9/12/16 Issue Date 12/11/15 Purpose: DENSO Supplier Labeling Policy The objec:ve

More information

How to Increase Conveyor Line Efficiencies by Removing. Change-over

How to Increase Conveyor Line Efficiencies by Removing. Change-over Real-Time Change-over How to Increase Conveyor Line Efficiencies by Removing Change-over Discover real-time conveyor equipment that eliminates or reduces the need for change-over on multi-sku lines. Change-over

More information

EBITDA Optimization for High Tech Manufacturing

EBITDA Optimization for High Tech Manufacturing EBITDA Optimization for High Tech Manufacturing At a Glance This paper will help High Tech Manufacturers look at industry benchmarks to compare with their own EBITDA performance, along with industry trends

More information

INDUSTRIAL ENGINEERING

INDUSTRIAL ENGINEERING 1 P a g e AND OPERATION RESEARCH 1 BREAK EVEN ANALYSIS Introduction 5 Costs involved in production 5 Assumptions 5 Break- Even Point 6 Plotting Break even chart 7 Margin of safety 9 Effect of parameters

More information

Copyright Infor. All Rights Reserved.

Copyright Infor. All Rights Reserved. 1 SYSi 2983 XA Best Practices in Manufacturing Execution Mike Canik Sr. Manufacturing Consultant Paper-Less, LLC 2 An excellent source of information to help Cope with a changing landscape Demand Management

More information