London Borough of Hillingdon Response to the Select Committee s 14 th and 15 th July statements on preliminary conclusions

Size: px
Start display at page:

Download "London Borough of Hillingdon Response to the Select Committee s 14 th and 15 th July statements on preliminary conclusions"

Transcription

1 London Borough of Hillingdon Response to the Select Committee s 14 th and 15 th July statements on preliminary conclusions 24 September 2015 Introduction 1. In its statements on 14 and 15 July, the Select Committee asked for reports or proposals to mitigate further the adverse effects of the proposed scheme in Hillingdon. On 14 July the Committee asked the Promoter to explore further how the impact of the Harvil Road construction on the community could be mitigated and to report back by mid-september, including: Working with TfL and Hillingdon on their proposals to relocate the HS2 railhead to the West Ruislip London Underground (LUL) depot. Giving consideration to alternative means of road access from adjacent and nearby sites, such as the haul road to Harvil Road. 2. On 15 July the Committee also requested: Reassurance on traffic modelling. A satisfactory compromise on the Hillingdon Outdoor Activities Centre (HOAC). Significant further interventions in Hillingdon to mitigate the effect of the railway and its construction on the community additional to those already envisaged. Proposals to reduce the impact on footpath amenity during construction. Proposals to reduce the impact on local traffic during construction. Consideration of a design competition for the Colne Valley viaduct. 3. Since July the Promoter has given further consideration to all these topics and has met with both LB Hillingdon and Transport for London (TfL) both separately and together to discuss the options for minimising the adverse effects of the proposed scheme in the area. Progress has been made on measures to address all these issues. 4. This response addresses the Committee s instructions under four main sections: SECTION 1: PROPOSED CONSTRUCTION TRAFFIC MITIGATION SECTION 2: POTENTIAL USE OF THE LUL DEPOT SECTION 3: HILLINGDON OUTDOOR ACTIVITIES CENTRE (HOAC) SECTION 4: FOOTPATHS DURING CONSTRUCTION SECTION 5: THE COLNE VALLEY VIADUCT DESIGN, DEVELOPMENT, ENGAGEMENT AND PROCUREMENT STRATEGY 1

2 SECTION 1: PROPOSED CONSTRUCTION TRAFFIC MITIGATION Summary 5. In addressing the Committee s concerns over environmental and construction impacts resulting from the proposed HS2 West Ruislip railhead and construction compound, the Promoter has focussed on three main issues: I. Reducing HGV construction traffic on the roads and improving traffic flows; II. III. Reducing the need for sustainable placement in the area; and Considering any potential role for the TfL LUL depot in delivering I and II above. 6. This work has concluded that the promotion of a construction haul road (included as part of Additional Provision 4 AP4) and partial signalisation of Swakeleys roundabout (at a combined cost of just over 25m) will provide the most appropriate further mitigation of the traffic impacts in Ickenham resulting from the Scheme. These two measures reduce the maximum number of HGVs on Swakeleys Road (two way combined) from 1460 per day in AP2 to 500per day and will reduce the number of vehicles per hour from 73 HGVs per hour in each direction to 25 at the peak. And reduce the number of HGVs on Harvil Road from 960per day to 100 per day. It should be noted that these are all worst case scenario rather than estimated numbers. Furthermore the average junction delay at Swakeleys roundabout is reduced from 3.38/0.23 min (am/pm peak) in AP2 to 0.94/0.21min. HS2 modelling shows that the proposed Partial Signalisation of Swakeleys roundabout reduces delay in the non-hs2 traffic situation from 1.32 minutes to 0.56 minutes in the AM peak, which demonstrates a potential benefit post HS2. The proposed haul road and partial signalisation also significantly reduces the need for sustainable placement in the area and assurances have been provided in this regard. 7. A number of additional technical options have been identified which may either further reduce the traffic impacts potentially to a level whereby in consultation with the relevant authorities it may be concluded that the haul road is not needed. These include, but are not limited to, the continued investigation of options around design and re-use of material at the Copthall Cutting and changes to the construction programme in relation to the Harvil Road railhead sidings. The Promoter is committed to exploring these options and assurances will be offered in this regard. 8. In relation to the potential use of the LUL depot, the Promoter, TfL and the LB of Hillingdon have broadly agreed that the TfL depot does not provide a feasible single alternative for the HS2 west Ruislip railhead and construction compound 1. Therefore the TfL depot could only be used in parallel to the proposed HS2 compound. This solution is not desirable for a number of technical, environmental and project reasons: it creates new and significant traffic impacts on West End Lane; it introduces new significant adverse effects (including noise and traffic) to Ruislip residents; it creates a bottleneck for trains removing spoil which may limit the Promoters capacity in this regard; it requires lengthy rail possessions and impacts existing services; it could add 1-2 years to the construction programme; and would cost between 60m to 90m more than the Bill Scheme to implement (excluding costs from programme delay). As such the Promoter does not propose to explore this option further. Further information on the points above is provided below and in appendix A to this report. 1 TfL and Hillingdon broadly agreed this position at a meeting on 28 August 2015 and as a result further discussions have focussed on use of the LUL depot in parallel to the HS2 railhead. 2

3 9. Since the Committee s announcements the Promoter has met with TfL and Hillingdon on 6 separate occasions to discuss proposals, share modelling and discuss technical feasibilities. Overview of traffic impacts under AP2 10. The Environmental Statement to AP2 assumes a peak of HS2 construction activity in LB Hillingdon of around 1460 HGVs per day (both directions combined) along Swakeleys Road in addition to baseline traffic. This is equivalent to a maximum number of HGVs per hour one way of 73. This is a pessimistic assessment assuming construction activities at compounds occur concurrently In reality, the estimate of construction traffic (rather than the most likely worst case predicted presented in the ES) is for a peak period of HS2 HGV construction traffic 0f 1060 HGVs gradually decreasing to a much lower rate of less than 200 vehicles per day for the majority of the construction programme. This trend is summarised in Figure 1 below. The geographical distribution of HS2 HGV construction traffic is shown diagrammatically in figure 2 below. Figure 1. AP2 HGV traffic along Swakeleys Road, LB Hillingdon, throughout the construction phase. This demonstrates the significant higher AP2 daily flows (of 1460 per day) compared with the expected flow shown by the histogram. Figure 2. Distribution of HS2 AP2 HGV construction traffic in LB Hillingdon 2. 2 Approximately 73 HGV per hour (compared to the Baseline) have been assumed to enter Swakeleys roundabout from the A40 eastbound and turn to the north on Swakeleys Road between 0800 and For the same time periods, it has 3

4 11. Under AP2 the average junction delay (mins) at Swakeleys roundabout is expected to be 3.38 and 0.74 for the AM and PM peak respectively, compared to a baseline (without HS2 scenario) of 1.32min and 0.23min. 12. All of the above modelling 1) assumes that existing (non HS2 traffic) does not divert due to the additional HS2 HGV traffic, 2) excludes the likely mitigating impacts of Local Traffic Management Plans which would be agreed with the highway authority and 3) ignores any reduction in HGV numbers as the design for the scheme is refined. As such, these represent a reasonable but worst case assessment in this location. Promoter s mitigation proposals 13. Following the Committee s statement the Promoter has explored a number of possible traffic improvements and proposes to bring forward two options in combination: a haul road enabling a direct route from the A40 to the West Ruislip site located between Harvil and Breakspear Roads and partial signalisation of Swakeleys roundabout. 14. In combination these two proposals will significantly mitigate the traffic impacts above. 15. The proposed haul road (which has been included in AP4) will connect at its southern end with the eastbound slip road adjacent to the A40 Western Avenue / B467 Swakeleys Road roundabout. The southern section of the haul road will pass to the west of - and parallel to - The Drive. The northern section will pass through Uxbridge Golf Course and land to the west of Harvil Road. The haul road will cross Harvil Road to enter the HS2 worksite. Figure 3. Location of the proposed haul road been assumed that 73 HGV will exit Swakeleys corridor via the A40 / Swakeleys Road roundabout and turn to the west on the A40 (westbound). 4

5 16. The haul road will be constructed during the HS2 enabling works. It will take approximately one year to construct. It will be in operation for up to seven years and will take a further year to remove. The haul road will provide an alternative route to replace the use of the B467 Swakeleys Road and Harvil Road, reducing construction traffic along both roads (see below for more detail). The construction traffic route via the A40 Western Avenue, the B467 Swakeleys Road and Harvil Road will be retained, although subject to very substantially lower construction traffic flows than reported in Part 1 of the SES and AP2 ES. 17. New signal-controlled junctions will be provided temporarily at both ends of the haul road, with part signalisation of the NW and SE arms of Swakeleys roundabout between the A40 and Swakeleys Road. Two conceptual schemes have been considered for this. Figure 3 an option where the haul road would join the A40(W) eastbound off-slip via a give way sign and enter the right hand lane to navigate the roundabout. Figure 4: Conceptual design for proposed haul road and partial signalisation improvement at Swakeleys roundabout 18. The haul road and roundabout improvements are in addition to the assurances already offered to Hillingdon in relation to the following junctions Swakeleys Roundabout (A40 junction); B467 Swakeleys Road/ Harvil Road; B467 Swakeleys Road/ Breakspear Road South; B466 Ickenham Road/ B467 Swakeleys Road. 19. In these assurances the Promoter has committed to conducting further modelling on these junctions (using the LinSig model or alternative to be agreed) and consulting with the LB Hillingdon (or other appropriate highway authority) on appropriate temporary measures to be undertaken to mitigate the effect of HS2 construction traffic. Further detail of these assurances is provided in a letter to the LB Hillingdon dated 15 June appended to this report at annex B. 5

6 Transport impacts 20. In accordance with the TfL modelling guidelines 3, the WeLHAM strategic SATURN model has been used to forecast the traffic flows in LB Hillingdon in AP2 and AP4, arising from the HS2 construction scenario to identify the likely impacts on congestion. In order to develop a more detailed design of the Haul road access at Swakeleys roundabout, and in accordance with the assurance given to LB Hillingdon, LinSig has been used to model the operation of Swakeleys roundabout to better understand the local impacts and to develop more refined options of the geometric layout of the junction and signal staging design. The same methodology for HGV movements has been used as the ES to the Bill and AP4 which represents a reasonable worst case scenario. 21. Table 1 below provides a summary of the traffic impacts (based on the model above) under the baseline (no HS2), AP2 and with the proposed haul road and partial signalisation. It includes HGV movements 4 and junction delay data for Swakeleys roundabout In summary: The introduction of the haul road will remove 48 HGV vehicles per hour in each direction from Swakeleys Road, reducing the additional HS2 HGVs routing along Swakeleys Road between Swakeleys roundabout and Harvil Road from 73 to 25 vehicles per hour in each direction. The introduction of the haul road will reduce the maximum HS2 HGVs per day on Swakeleys roundabout (two-way combined) as assessed in the ES from 1460 to 500, for the predicted 6-9 month period of peak construction activity. The haul road and partial signalisation will reduce the average delay at Swakeleys roundabout, from 3.38 minutes to 0.94 minutes in the AM peak and from 0.74 minutes to 0.21 minutes in the PM peak compared with the hybrid bill AP2 scenario. The HS2 Ltd modelling shows that partial signalisation of Swakeleys roundabout reduces delay in the non-hs2 traffic situation from 1.32 minutes to 0.56 minutes in the AM peak, which demonstrates that signalisation could provide a traffic management benefit post HS2 construction if the relevant authorities agreed to make it permanent The table includes HGV movement data based on a worst case scenario using the same methodology used in the ES and SES to AP2 (WeLHAM strategic SATURN model). As described in paragraph 10 and shown in figure 1 these are significantly higher than the expected HGV movements. 5 The roundabout junction delay data is based on the LinSig model (as requested by the LB Hillingdon and in line with assurances offered in June 2015). 6

7 Swakeleys Road Harvil Road Average junction delay (mins) at Swakeleys roundabout Max HS2 Max HS2 HGVs Max HS2 Max HS2 HGVs per per day (two-way HGVs per HGVs per AM PM peak hour (one combined) hour (one day (twoway peak way) way) Scenario combined) Baseline 6 (no HS2 traffic) With HS construction traffic (AP2) With HS construction traffic (AP2) plus a haul road and partial signalisation Baseline plus partial signalisation (i.e. post HS2) Table 1: HGV movements on Swakeleys Road and Harvil Road using AP2 assumptions of demand. Junction delays at Swakeleys Roundabout using LinSig modelling as discussed with the LB Hillingdon and TfL and in line with assurances provided to LB Hillingdon on June 15 th LinSig modelling for delays is a refinement to the modelling assessment tool use both in the main ES and for the ES for AP Any additional improvements at the junctions described in paragraph 18 of this report which result from the assurances offered to Hillingdon on 15 th June are likely to reduce further the impacts described in table 1 above. Traffic modelling is currently underway which will determine any necessary additional works at these junctions. In accordance with TfL modelling guidelines, HS2 Ltd will develop a micro-simulation (VISSIM) model to stimulate the movement of individual vehicles travelling within the local road network and to represent the interaction of the operation of the junctions along Swakeleys Road. The VISSIM model will be able to model the impact of variability upon network behaviour, being capable of representing complex traffic problems. This work will be shared with LB Hillingdon and TfL before the end of the year and will inform any further road junction improvements or traffic management measures required in the area, in line with assurances offered. Sustainable placement impacts 24. The construction of the haul road provides the opportunity to significantly reduce (and potentially remove) the need for permanent and temporarysustainable placement at the southern sustainable placement site between Harvil and Breakspear Roads. This would be subject to further and ongoing discussions with the LB Hillingdon on potential impacts for HGV movements. The AP2 scheme is shown in figure 5 below and the area of sustainable placement which could be reduced is shown in figure 6. 6 The WeLHAM strategic SATURN model uses 2021 underlying demand to represent its non-hs2 baseline. LinSig uses 2014 counts to calculate the baseline. 7

8 Figure 5- Hybrid Bill scheme showing sustainable placement area to the south. Figure 6 Scheme with Haul road showing area of sustainable placement to the south to be significantly reduced or potentially removed. 25. An assurance will be included on the register in relation to the commitment of the Promoter in regards to delivering a reduction in sustainable placement in this area should the proposals outlined in this report be accepted. 8

9 Environmental impacts 26. The proposed haul road will have an increased impact on Uxbridge Golf Course temporarily. However, the Promoter has engaged with a golf course designer and is confident it is possible to maintain a playable competition 9 hole course for the duration of the works which will mitigate any potential losses. The Promoter continues to engage with the LB Hillingdon and the golf course on this. If reasonable mitigation is agreed and taken forward and notwithstanding this the golf course still suffers a demonstrable loss, this will be compensable under the Compensation Code. Once the construction is completed the haul road will be removed and in line with schedule 15 a restoration scheme will be agreed with the relevant parties. 27. The haul road will also pass through Frays Farm Meadows SSSI resulting in the direct loss of up to 0.3ha of wet grassland and 0.1ha of other mixed habitat, and temporary effects on 1.5ha of mixed habitat. Mitigation measure will include habitat reinstatement once the haul road is no longer in operation. In isolation, these measures are unlikely to be sufficient to reduce the adverse effect to a level that is not significant. Additional compensation proposals to address any residual effects will be developed in consultation with relevant landowners, the London Wildlife Trust and Natural England. Measures may include habitat enhancement within the unaffected areas of the SSSI and habitat creation. Mitigation measures will be required to address effects on Pinnocks Wood associated with changes in air quality. Measures may include habitat enhancement in the unaffected are of the woodland and habitat creation. This would be brought forward in conjunction with relevant landowners. Cost and programme impacts 28. The haul road and partial signalisation is estimated to cost 25m. Whilst the haul road will take one year to construct this will begin early enough in the programme to secure the maximum benefit from its use and so as not to delay the project overall. Other future mitigation options 29. The Promoter recognises that it may be possible to avoid the need for the haul road though detailed construction planning measures (and in consultation with the LB Hillingdon), which may achieving the same traffic mitigating effects whilst avoiding the adverse environmental impacts noted above. These are engineering details to be considered at detailed design and the contract preparation stage in accordance with the Environmental Minimum Requirements (EMRs). However, the Promoter is seeking to bring these investigations forward in so far as is reasonably practicable. 30. These include: I. Following Ground Investigations it may be possible to increase the gradient of the Copthall cutting, thereby reducing the amount of spoil to be removed and/or to re-use some of the locally excavated material. II. III. Working with Network Rail with a view to providing the Harvil Road railhead sidings earlier in the construction programme to reduce the import of material with a view to reducing the import of material via HGVs and potentially further reducing the requirement for sustainable placement. The Nominated Undertaker will engage with the relevant highway authority, transport providers and other relevant stakeholders, including the LB Hillingdon in the preparation of a construction workforce travel plan for HS2 workers in the LB Hillingdon area. This will 9

10 include engagement in relation to the use of sustainable modes of transport with a view to reducing the impacts of HS2 related workforce travel in Hillingdon on local residents and businesses, insofar as they are consistent with the Environmental Minimum requirements, and do not require the nominated undertaker to secure additional statutory powers to construct the facilities mentioned in or require anything to be done which may unacceptably interrupt the HS2 construction programme in any way. IV. Local Environment Management Plans (LEMPs) and Traffic Management Plans (TMPs). Prior to the commencement of the works in Hillingdon, the nominated undertaker will ensure that Traffic Management plans (TMPs) will be produced in consultation with the highway and traffic authorities and the emergency services. The nominated undertaker and/or its contractors will engage with the local community, Local Authorities and other stakeholders in Hillingdon in order to develop the Local Environment Management Plans which are applicable to Hillingdon during detailed design and during construction planning. 31. Assurances will be offered to the LB Hillingdon in relation to the points above. 10

11 SECTION 2: POTENTIAL USE OF THE LUL DEPOT 32. The West Ruislip construction sites proposed in the Bill are necessary to implement three elements of the Proposed Scheme 1) to build the Northolt tunnel, 2) to build the trace between the tunnel and the Colne Valley viaduct, and 3) to implement the rail systems fit out (track, signalling, overhead electrification, lineside equipment etc.) between Euston and South Heath (approximately 25 km in each direction). 33. The Promoter met with both LB Hillingdon and TfL and commissioned Parsons Brinkerhoff (PB) to review the merits of a railhead and logistics centre at Ruislip Depot including the TfL proposal, and Mott McDonald & ETM to undertake a preliminary construction planning and environmental assessment. These documents were forwarded to both TfL in May 2015 and TfL responded on 23 June with comments on the PB report. 34. Following the Committee s statement, the Promoter has commissioned further work from Mott MacDonald to review the implications of the Ruislip Depot options and to consider TfL s comments on the earlier PB May report in the light of the revised proposals for Copthall cutting. The sift analysis from this review are attached at annex A to this report. Use of the LUL depot as a replacement for the railhead 35. In order to complete the rail fit out of HS2, a location is required with direct rail access to the HS2 trace in both directions, space for reception, loading and dispatch sidings and a space for materials delivery, storage and transfer. Whilst the location proposed by the Promoter meets these requirements, the TfL depot does not. As such it is now agreed by all parties that LUL depot cannot replace wholesale the proposed HS2 railhead and compound in delivering these elements of the works in this area As a result any use of the TfL depot would need to be in parallel with, not as an alternative to, the HS2 west Ruislip rail head. Uses for the LUL depot in conjunction with the HS2 site 37. Given the conclusions above, the Promoter conducted further analysis on the potential to use the LUL depot to alleviate construction impacts in the area based on it being used for the following potential functions: tunnel support (manufacture of tunnel segments and removing excavated material from tunnelling), the import of structural fill to build HS2 railway embankments, and the export of material from the Copthall cutting. 38. The fundamental challenge for the proposal is how to transport the tunnel and cutting excavations and the imported construction materials to and from the LUL depot and the HS2 worksites on the other side of the Chiltern Mainline. TfL proposed a conveyor for the excavated material (option b) along the west side of the Metropolitan and over the Chiltern and Central Lines at the intersection of the two lines. It would then continue on the north side of the Chiltern Line through West Ruislip station, under Ickenham Road to the West Ruislip portal and the trace. Tunnel segments and other building materials would be delivered to the trace by road and the rail systems fit out would be served by rail as in the Promoter s proposal. The Promoter also asked Mott MacDonald to explore options for a logistics tunnel (option a) between the depot and the portal under the residential area. 7 Meeting of 28 August

12 39. The two options (tunnel versus conveyor) for the transportation of both excavated material and imported fill are shown diagrammatically in figures 7 and 8 below. Figure 7. LUL depot use supported by a logistics tunnel (option a) Figure 8. LUL depot use supported by a conveyor belt (option b) 12

13 40. Both of the options outlined above have significant environmental and project impacts which are described in the sift report provided at annex A to this report: I. Potential temporary possession of a number of residential gardens and permanent acquisition of a strip of a school playing field would be required to widen the existing single lane access road to the LUL depot in order to make this suitable for HGV movements. This may also require the demolition of one residential property. This is shown in figure 9 below. Figure 9- Showing access road requirements including residential garden space and potential house demolition. (note: impact on school playing fields not shown] II. Additional Greenbelt land and nature reserve land would be taken from a semi-rural location to an urban environment to extend the LUL depot. Furthermore, land in the ownership of third parties would also need to be acquired. This is shown above and in figure 10 below 13

14 Figure 10- Red line shows the existing required extension of the LUL depot boundary to accommodate the HS2 works. Which includes taking land currently in the green belt and grade 1 nature conservation land. III. IV. The West Ruislip satellite construction site would need to be increased in size to accommodate the transfer of the main tunnelling worksite from Harvil Road to West Ruislip portal. This would result in closure of the South Ruislip golf course to facilitate this enlargement. The size of this compound in AP2/Bill Scheme and with the proposed haul road are shown in figures 5 and 6, compared to an increase in size for either LUL depot option (figures 7 and8). Northern sustainable placement areas can be removed but very large stockpile areas would be required at Harvil Road. V. The majority of the HGV traffic flows during the busy peak period of construction (up to 1060 HGVs per day) are due to the importation of fill for the railway embankments. In order to mitigate further delays to the programme (to allow for construction of the TfL depot expansion & logistics tunnel), this material must still be brought in to the construction sites by road. Based on the current programme, with the depot option the majority of the material for embankment construction would therefore be brought in via the A40 (and the Polish War Memorial junction), generating some 960 HGVS per day (two-way combined) on the north section of West End Road, Wood Lane and Ickenham Road. In addition, a further 180 vehicles per day would be generated on the south section of West End Road by the depot expansion plus construction of the West Ruislip portal. Because of the major movement restrictions at the TFL depot access off West End Road HGV movements between the depot and West Ruislip would need to travel southwards to u turn at the Polish War Memorial junction thus effectively nearly doubling HS2 HGV flows on this section of West End Road. However, the traffic flows on Swakeleys Road and Harvil road could be reduced to less than 100 HGVs per day. 14

15 Swakeleys Road Harvil Road West End Road (north), Wood Lane & Ickenham Road Max HS2 Max HS2 HGVs Max HS2 Max HS2 Max HS2 Max HS2 HGVs per per day (two-way HGVs per HGVs per HGVs per HGVs per hour (one combined) hour (one day (twoway hour (one day (two- way) way) way) way Scenario combined) combined) Baseline With HS construction traffic (AP2) AP2 plus a haul road and partial signalisation AP2 plus use of LUL depot 5 <100 5 < Table 2: HGV movements on Swakeleys Road, Harvil Road and West End Lane using AP2 assumptions of demand. VI. VII. The LUL depot has disadvantages in terms of the efficient use of rail capacity compared to the HS2 railhead. The HS2 railhead is located such that access is provided onto the Chiltern Mainline for trains travelling both eastbound and westbound and is planned to accommodate 400m long trains. In contrast, LUL depot can only be accessed off the Chiltern Line from the west and this access is not arranged to take 400m long trains (restricted to shorter length trains of 200m). For eastbound trains departing the LUL depot, the trains need to access the Chiltern Line westbound and then proceed eastwards. This operation requires two locomotives (one at either end) and two train paths. These restrictions could severely limit the capacity to remove spoil by rail in this area. An additional provision to the Bill would need to be promoted. 41. Additional impacts (above those described in para 40) of option a (logistics tunnel) include: I. 5m internal diameter logistics tunnel would pass through different ground conditions to the Northolt tunnel including an area of with poor/less competent ground which introduces a number of risks which cannot be overcome using pressure balance machines. These risks include the potential for settlement impacts on residential area. This would only be able to be confirmed through more detailed Ground Investigations work. II. III. IV. 24 hour operations for tunnelling will result in noise and light impacts for some residents. Would add 95m to the cost of the project (excluding delay costs and additional property costs). Would delay the project by up to 2 years. 15

16 42. Addition impacts (above those described in para 40) of option b (conveyor belt) include: I. Above ground conveyor requires a large raised conveyor bridge structures next to residential properties. This will be operational 24 hours per day which will have significant noise and light impacts. II. III. IV. Requires lengthy Chiltern Line and LUL railway possessions to construct conveyors (for extended weekends or longer) and closure of the West Ruislip Station Chiltern Line Southbound for the duration of the construction (6 years). Would add 60m to the cost of the project (excluding delay costs and additional property costs). Would delay the project by up to one year. 43. The Committee suggesting using RAF Northolt as a potential haul road between the LUL depot and the A40 which was considered and the Ministry of Defence (MOD) were consulted on this matter who in turn consulted subject matter experts. In summary, RAF Northolt is not considered a feasible option for this use based on a number of security, technical and environmental issues. Specifically: The route of the proposed haul road is across a designated Nature Conservation site of Metropolitan or Borough Grade 1 of importance. The proposed entry point to the west of the site is abutted by the Yeading Brook which would require the existing bridge to be upgraded. All vehicles accessing the site would have to be booked onto the base and the driver s security cleared it is thought that this could add 30 mins to the journey. There is currently no security provision at this location and therefore one would have to be created and manned for the duration which could be up to 10 years. If any driver does not have security clearance then that vehicle would have to be escorted whilst on site. The route would require vehicles transiting in areas where aircraft manoeuvre which would require the driver to hold an airfield driving permit for which a test has to be taken or again the vehicle will need to be escorted if the driver does not have a permit. FOD (Foreign Object Debris) All vehicles would have to transit the base with covered vehicles, with wheel wash areas provided at entry and exit points. Safeguarding Whatever route is chosen to get to the A40 vehicles will either have to cross the runway or access over aircraft taxi ways. Such access is controlled by traffic lights operated by air traffic control and all air related traffic would take primacy over vehicular traffic potentially adding to delays. There is a significant risk of traffic queuing to exit the base towards the west of the site which would infringe runway safety zones/surfaces counter to Military Aviation Authority regulations 16

17 List of annexes to this section of the report: Annex A: Stage 1 appraisal of options to relieve Harvil Road, Swakeleys road and Ickenham road traffic impacts Annex B: Assurance letter issued to LB Hillingon on 15 June SECTION 3: HILLINGDON OUTDOOR ACTIVITIES CENTRE (HOAC) 1. Since the Select Committee s announcement on the Colne Valley tunnel, HS2 Ltd has had meetings with the Denham Quarry operator (Summerleaze) and the planning authorities (Buckinghamshire County Council and South Bucks District Council). These meetings have covered, in particular, the size of lake which could be created on this site along with the anticipated timescale of any staged approach. 2. These meetings were constructive and productive, and there is a clear way forward. 3. Summerleaze has confirmed that the land needed for a relocation of HOAC to the site by April 2018 will be available in time for the necessary construction works, and it would be possible to create a 25 acre lake of a suitable shape in the same timescale. There are some practical issues that need to be worked through, for example in relation to the phasing of Summerleaze s works, but these were not considered to be unsolvable. 4. They believe that, subject to planning approval, a much larger lake could be delivered in stages between 2018 and In effect they would extract minerals moving south to north, continually releasing sections of the growing lake for recreational use as their works progress northwards. 5. They have also indicated that they have plans for further quarrying in this area beyond the enlarged site, which we have been exploring with them, and that there would be an opportunity for HOAC to influence the restoration proposals required as part of any future expansion. 6. This would be separate to the planning applications set out below, but it demonstrates the great potential of a wider site. 7. HS2 Ltd has also had productive discussions with the planning authorities to clarify the next steps which will have to be taken to submit applications for the necessary consents to re-provide HOAC s facilities at the existing Denham Quarry site. We have, in particular, discussed a twin tracked planning application, by which we would seek consent for the works necessary to relocate HOAC by 2018, against the background of that being a first stage of a wider scheme to ultimately provide for a larger lake on the site. 8. The planning authorities have considered the question of the final size of the lake further since we last reported on this. They are now of the view that it should be ultimately possible to approve an application for a lake of up to 45 acres, which is the size requested by HOAC. 9. So, in summary, subject to planning approval being granted, it should be possible to relocate HOAC to the Denham Quarry site with a 25 acre lake by 2018, with the possibility of gradually increasing the size of the lake thereafter, by potentially up to 45 acres by HS2 Ltd have appointed a dedicated team to deliver a successful relocation. The next step is to prepare the planning application setting out more details of the location and configuration of facilities as well as the lake itself for stage one. We have told HOAC that we would not wish to do this without their active participation as their input is clearly critical to ensuring that the 17

18 scheme prepared for submission to the planning authorities meets their operational needs. This was communicated to HOAC on 5 August HOAC confirmed that they were prepared to work with HS2 Ltd s dedicated team in this regard on 10 September 2015, and the first meeting was held at their site on 18 September. 12. Beyond the planning considerations, HOAC have indicated that they have some financial concerns around the relocation, mostly relating to the transition to the bigger lake. HS2 Ltd have previously requested further information regarding those concerns which would allow this to be considered further, and we await receipt of the same. We understand that HOAC are also concerned that the London Borough of Hillingdon may withdraw their funding (c 55k pa) if they were to relocate. Whilst this would seem surprising given the Council s statements about the importance in retaining this valuable community facility, we will continue to seek an assurance from the Council that the new location would not be a material consideration in their continued funding of HOAC. 13. We will keep Select Committee informed of future developments on both the funding issues and progress on the planning application. 18

19 SECTION 4: FOOTPATHS DURING CONSTRUCTION 1. The Secretary of State has provided the following assurance to LB Hillingdon with regards to Public Rights of Way (PROW): I. The Secretary of State will require the Nominated Undertaker to use reasonable endeavours to provide for diversions of the public rights of way shown on the attached drawings (U49 U50 Diversion), (U43 U45 U46 Diversion), (U36 U37 U38 Diversion) ( the Drawings ) and which are broadly in accordance with the arrangements described in the construction phasing summary attached at Appendix 1. II. The Promoter shall remain open to further discussions with LBH to consider alternative routes for any necessary diversions of the public rights of way to those shown on the Drawings so far as reasonably practicable and which are:- a. within the limits and powers set out in the HS2 Act; and b. do not create any new or different significant impacts that have not been assessed in the Environmental Statement for the Bill. 2. Amore detailed description of the diversions are listed below. There remains 2 PROWs that HS2 need to discuss in greater detail with LBH (U47 and U81) to agree the appropriate mitigation measures to provide a reasonable diversion.lbh and HS2 have agreed to hold further discussions in relation to highways including PROWS when all the necessary information is available by the end of September. Diversions in West Ruislip and Ickenham 3. There a number of Public Rights of Way (PROW) in the West Ruislip area, between the River Pinn and Breakspear Road South, which require temporary diversions to facilitate the HS2 construction activities and permanent diversion to facilitate the HS2 alignment. Temporary diversions that were proposed in the main Environmental Statement (ES) are in the process of being reviewed subject to the development of more detailed information on the phasing of works and consequent alternative diversionary routes. Revised temporary diversion of footpaths U36, U37 and U38 4. The Bill provides for the temporary closure of footpaths U36, U37 and U38 during deposition of sustainable placement materials north of Newyears Green Lane. The Bill assumed the concurrent closure of footpaths U36, U37 and U38 and a diversion utilising Breakspear Road North and the existing footpath west of Bayhurst Wood. The main ES stated that diversion of footpaths U36, U37 and U38 would be required for a period of approximately 7 years. Since submission of the Bill, revised temporary diversionary routes for footpaths U36, U37 and U38 are proposed based on the intended phasing of sustainable placement of excavated materials in this area. 5. The revised temporary diversion routes are as follows: footpaths U36 and U37 will remain in their current position with only one being closed at any one time, therefore maintaining a link between footpath U35 and 19

20 Newyears Green Lane with a diversion distance of less than 200m during each closure; and footpath U38: diverted approximately 700m, around the sustainable placement site, within the field boundaries along the northern edge of Newyears Green Lane and western edge of Breakspear Road North. The footpath is to be segregated from the deposition works by a temporary fence. 6. These diversion routes and closures will only be in place during the deposition of excavated materials at the sustainable placement areas, which will commence in Q and last for approximately 15 months. Where temporary haul routes intersect the alignment of footpaths U36 and U37, crossing points will be in place to ensure users of the public rights of way can cross the alignment of the haul routes in a safe manner. 7. This is shown in U36 U37 U38 Diversions.pdf attached to this report. Revised temporary diversion of footpath U49 8. The Bill provides for the temporary closure and diversion of footpath U49 to accommodate the Northolt Tunnel and Earthworks Main Compound and areas for sustainable placement. The diversion route proposed for footpath U49 in the main ES was approximately 2000m long, from the start of footpath U49, south on Breakspear Road South and Swakeleys Road and north along Harvil Road. The diversion would have been for a period of approximately seven years, with permanent reinstatement along its existing alignment. 9. Since submission of the Bill, a revised diversion route for footpath U49 has been developed and is now proposed. Footpath U49 will be diverted approximately 850m along the south-eastern edge of the Northolt Tunnel and Earthworks main construction compound and part way along the western boundary, adjacent to Harvil Road. The footpath is to be segregated from the works with a temporary fence and from Harvil Road by the existing hedgerow/fence. The diversion of footpath U49 will be in place for the full duration of construction works in this area ( ). 10. Where the alignment of the revised diversion is intersected by a temporary haul road associated with sustainable placement, crossing points will be in place to ensure users of the public right of way can cross the alignment of the haul route in a safe manner. The temporary haul route is anticipated to be in place for approximately 3 years. 11. This is shown in U49 U50 Diversions.pdf attached to this report. Revised temporary diversion of footpaths U43, U45 and U The Bill provides for the temporary closure of footpath U43 for a period of approximately 3 months and diversion via U45, U46 and Breakspear Road South whilst the proposed flood compensation area, across which the footpath passes, is excavated. Footpaths U45 and U47 would be temporarily closed following reinstatement of footpath U43, for approximately 7 years, for the construction of a new embankment and railway bridge over the River Pinn. The proposed diversionary route is via the Celandine Route, Breakspear Road South and footpath U43. 20

21 13. Since submission of the Bill, a replacement diversion route for footpath U43 has been proposed, based on phasing of the construction of the replacement floodplain storage area. Initially, footpath U43 will be diverted along Footpath U45, along the east side of the River Pinn, to the adjacent footpath U46 (170m to south) during construction. At this stage of construction footpath U46 will still be in use. Footpath U43 will then be diverted along a route parallel to Breakspear Road South. This is a diversion of approximately 280m. Footpath U43 will be closed for approximately two months commencing in The verges on Breakspear Road South between footpaths U43 and U46 are narrow and comprise a small bund then a drainage channel. Therefore, to divert the path along a route parallel Breakspear Road South, the creation of a temporary footpath along the western side of the road is necessary. HS2 is further assessing measures to segregate the aforementioned footpath and will provide more detail once the assessment is complete. 14. Footpath U45 will be temporarily closed from late June It will be diverted along the reinstated footpath U43, along a route parallel to Breakspear Road South via a temporary footpath to a temporary footbridge over the River Pinn, to join up with footpath U47 and the Celandine Route to the south of the Chiltern Main Lines. FootpathU45 will remain closed during the construction of the embankment, River Pinn bridge, Breakspear Road South bridge and to allow for the removal of the haul road alongside these works. This is expected to last for approximately one year commencing in The proposed alternative diversion route for footpath U47 is the reverse of the situation proposed for footpath U45. The section of footpath U47 adjacent the River Pinn will remain closed during the construction of the River Pinn bridge and whilst the haul road crossing the footpath is in use. This is expected to last for approximately 14 months commencing in The temporary footpath and footbridge will be required to provide access across the River Pinn to allow the proposed diversion route of U45 to connect Breakspear Road South to footpath U47 and the Celandine Route. A temporary footpath will also be required alongside Breakspear Road South from Grays Cottages to Gatemead Farm. Temporary user controlled crossings may be required to allow safe crossing of Breakspear Road South. Temporary narrowing of Breakspear Road under the Chiltern Main Line is necessary to provide two-way traffic with a segregated walking route on the east side of the bridge. HS2 is currently in the process of further assessing traffic safety measures to segregating traffic and pedestrians and will be discussing these with LBH further. 17. This is shown in U Diversions.pdf attached to this report. Revised temporary diversion of footpaths U HS2 is continuing to undertake further works to better assess appropriate mitigation measures for this PROW and will be providing LBH with appropriate drawings and possible alternative routes by the end of September. 21

22 SECTION 5: The Colne Valley Viaduct - Design Development, Engagement and Procurement Strategy Summary 1. At the Select Committee s request the Promoter has given further consideration to the proposal to hold an international design competition for the Colne Valley viaduct. Having done so the Promoter remains of the view that the processes it will employ will ensure high quality design and, that an international design competition would not deliver any benefit over and above this. The reasons for this are set out below. The Design Vision and the Design Panel 2. The HS2 Design Vision published on 23 March 2015, will help to drive design excellence in every aspect of HS2 to achieve social, economic and environmental potential. The Design Vision will underpin all aspects of design. The objective is to provide direction and to form part of the requirements for any contract involving design and therefore ensure the HS2 s potential is realised in line with the Design Vision and principles. HS2 Ltd will apply this Design Vision to all aspects of the HS2 experience. 3. The HS2 Design Vision sets out nine principles grouped under the three themes of People, Place and Time. These principles, set the common context for all HS2 design decisions. The design vision is a platform for driving high quality design practice at HS2. 4. HS2 Ltd s Design Panel is set up in line with the mandate from the Secretary of State for Transport, as set out in 2012, To ensure high quality design along the HS2 route, and to give communities confidence that they will be as sensitive as possible to the character of their setting. In addition further site specific design panels have been set up in response to Assurances made in the hybrid bill. The Design Panel is chaired by Sadie Morgan. 5. The Design Panel will provide independent advice and critique of the development of HS2 to help achieve its Design Vision. It will work to ensure that design decisions deliver against the Design Vision, consider the needs of a range of audiences and people, and ensure the process is robust and transparent. A core design principle of HS2 s Design Vision is People: Design for everyone to benefit and enjoy which includes engaging with communities over the life of the project. Section 2 of the Design Vision states: HS2 is a project that will affect many communities. There are interests to serve at a national, regional and local level. Designing HS2 is all about meeting social and economic aspiration and opportunity. Where a particular impact is unwanted, design is there to find the best solution. In order to respond effectively to community concern and need, it is important to have strong design engagement. 22

23 6. Given its scale and setting, the design of the Colne Valley Viaduct is of notable interest to the Design Panel as a key structure. The Design Panel has confirmed that the Colne Valley Viaduct will be the subject of a dedicated panel review process. This process will ensure a high quality design for the Colne Valley Viaduct within the context of its setting. 7. In addition it is important to note that the Design Policy, the Design Vision and Design Panel will not sit in isolation from the other controls on the project, such as the Environmental Minimum Requirements (EMRs), the planning regime specified in Schedule 16 of the Bill and engagement with local communities on design outcomes. These will combine to influence design development and form a robust process for ensuring the high quality design outcomes. Competition in Procurement the Promoter s Approach 8. As a key design element, the Promoter will engage the public on the design development of the Colne Valley Viaduct. While the exact form and nature of such engagement will be developed closer to the time, it is likely to be an open engagement exercise, with public exhibitions, leaflet drops and on-line materials and related publicity. As stated in the Promoter's Design Policy (Information Paper D1), any engagement on key design elements, such as the Colne Valley viaduct, is likely to focus on engaging the public in the locality of that element. The Promoter intends to publish more detail on how it will engage with communities at the design development stage in due course. 9. HS2 Ltd will shortly be undertaking an international procurement exercise for the design and construction of the main civil elements of HS2 Phase One, including the Colne Valley Viaduct. Given the nature of these contracts they will attract significant interest from the leading design and engineering companies that specialise in national infrastructure projects throughout the world. This will ensure that all elements of HS2 have world-leading design. 10. With the appointment of the Chair of the Design Panel and the establishment of the Design Panel itself the Promoter has shown its commitment to embedding good design at the heart of all it does. The Terms of Reference of the Design Panel identify that the Design Panel will have a role in scrutinising how design requirements are incorporated into the key stages of the procurement of design contracts. To this end the Design Panel have been invited to review and consider the design specifications stated in the procurement documents for these civils contracts. An international design competition 11. The Promoter does not consider there to be compelling evidence to demonstrate that an international design competition would produce a better design than that which will be achieved by the processes it intends to employ. These processes will be highly competitive and will undoubtedly attract the best designers and design teams in the world. 12. Whilst it is recognised that design competitions can result in high quality design outcomes, they also have a series of potential drawbacks: 23

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION HIGH SPEED TWO INFORMATION PAPER E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION This paper outlines the framework for the control and management of traffic associated with the construction of the Proposed

More information

B1: THE MAIN PROVISIONS OF THE PLANNING REGIME

B1: THE MAIN PROVISIONS OF THE PLANNING REGIME HIGH SPEED TWO INFORMATION PAPER B1: THE MAIN PROVISIONS OF THE PLANNING REGIME This paper outlines the main provisions of the planning regime proposed for Phase One of the HS2 project. It will be of particular

More information

The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening;

The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening; 5 TRAFFIC AND TRANSPORT 5.1 SUMMARY OF RESIDUAL IMPACTS The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening; be outside of the

More information

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps Report To: Greater Cambridge City Deal Executive Board 3 rd March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A428/A1303 Better

More information

EXHIBIT LIST No Exhibit Name Page 1 P5 Traffic Presentation.pdf (P5) 2-20

EXHIBIT LIST No Exhibit Name Page 1 P5 Traffic Presentation.pdf (P5) 2-20 Reference No: HOC/10001 Petitioner: Phase 2a Teach-ins Published to Collaboration Area: Friday 23-Mar-2018 EXHIBIT LIST Page 1 of 20 No Exhibit Name Page 1 P5 Traffic Presentation.pdf (P5) 2-20 HOC/10001/0001

More information

High Speed Rail (London- West Midlands)

High Speed Rail (London- West Midlands) High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 4: Draft Environmental Memorandum November 2013 ESA 4.2 High Speed Rail (London- West Midlands) Draft Environmental

More information

D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS

D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS HIGH SPEED TWO INFORMATION PAPER D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS This paper outlines the range of construction compounds and the criteria used to select them for Phase One of HS2.

More information

Chesham Society: 15 Feb 2017

Chesham Society: 15 Feb 2017 Chesham Society: 15 Feb 2017 Introductions Luke Nipen C1 2 Community Relations Structure Julie King (Director) Head of Engagement (John Parrott) Senior Engagement Manager Greater London ( Patricia Thompson)

More information

ARCHITECTUS FEBRUARY 2010

ARCHITECTUS FEBRUARY 2010 ARCHITECTUS PEDESTRIAN AND TRAFFIC MANAGEMENT PLAN FOR DEMOLITION, EXCAVATION AND CONSTRUCTION OF COLLEGE OF FINE ARTS CAMPUS, PADDINGTON FEBRUARY 2010 COLSTON BUDD HUNT & KAFES PTY LTD ACN 002 334 296

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary i. Introduction and background Introduction The Environment Agency (generally referred to in this non-technical summary as we or us ) has prepared an Environmental Statement (ES)

More information

Crossrail Environmental Statement Volume 1

Crossrail Environmental Statement Volume 1 Crossrail Environmental Statement Volume 1 Project description The environmental impact assessment process The need for Crossrail Planning policy context Route development and alternatives 1 If you would

More information

In Title Your Area 4: Denham to Amersham

In Title Your Area 4: Denham to Amersham LOCAL AREA In Title Your Area 4: Denham to Amersham Find out here about: what is proposed between Denham and Amersham; what this means for people living in the area between Denham and Amersham; and what

More information

Hastings District Council. Whakatu Arterial Link Traffic Management Plan

Hastings District Council. Whakatu Arterial Link Traffic Management Plan Hastings District Council Whakatu Arterial Link Traffic Management Plan June 2014 Table of contents 1. Introduction... 2 1.1 Purpose of this report... 2 1.2 The Whakatu Arterial Link... 2 2. Traffic Management...

More information

Draft Code of Construction Practice

Draft Code of Construction Practice Draft Code of Construction Practice This factsheet outlines how it is expected the nominated undertaker will manage the effects of the construction of the Proposed Scheme on communities and the environment

More information

13. Traffic and Transport

13. Traffic and Transport 13. Traffic and Transport 13.1 Executive Summary The traffic impact of the Facility has been examined for both transport of materials and staff, and with regard to the latter, accessibility of the site

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

HS1 Link The View from London

HS1 Link The View from London HS1 Link The View from London For HS2 Growth and Connectivity Conference 12 September 2014 Contents 1. TfL Position on HS2 & Hybrid Bill Petition 2. HS1 Link Issues & Possible Options 2 HS2 Progress To

More information

In Your Area 2: North Acton to Northolt

In Your Area 2: North Acton to Northolt LOCAL AREA High Speed Rail Consultation In Your Area 2: North Acton to Northolt Find out here about: what is proposed between North Acton and Northolt; what this means for people living in and around North

More information

Stage One Reference Design Enhancements. Date: 2 October Cabinet-in-Confidence

Stage One Reference Design Enhancements. Date: 2 October Cabinet-in-Confidence Stage One Reference Design Enhancements Date: 2 October 2013 Introduction This paper provides further information regarding the proposed enhancements to the Reference Design that have been identified since

More information

EXHIBIT LIST No Exhibit Name Page 1 P3 Control of Environment Impacts Presentation.pdf (P3) 2-34

EXHIBIT LIST No Exhibit Name Page 1 P3 Control of Environment Impacts Presentation.pdf (P3) 2-34 Reference No: HOC/10001 Petitioner: Phase 2a Teach-ins Published to Collaboration Area: Friday 23-Mar-2018 EXHIBIT LIST Page 1 of 34 No Exhibit Name Page 1 P3 Control of Environment Impacts Presentation.pdf

More information

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee MEMORANDUM Date: July 14, 2006 Project #: 6389 To: US 97 & US 20 Refinement Plan Steering Committee From: Sonia Hennum, P.E., Andrew Cibor, E.I.T., & Julia Kuhn, P.E. Project: US 97 & US 20 Refinement

More information

Chapter 24 Route window W3 Old Oak Common Depot. Transport for London

Chapter 24 Route window W3 Old Oak Common Depot. Transport for London Chapter 24 Route window W3 Old Oak Common Depot OLD OAK COMMON DEPOT 24 Route window W3 Old Oak Common depot 24.7 24.8 24.9 The permanent works The permanent works will consist of 14 new Crossrail stabling

More information

Auckland Transport Code of Practice 2013

Auckland Transport Code of Practice 2013 26 Corridor Access Management 26.1 Background Auckland Transport is the Road Controlling Authority and Corridor Manager for all public roads within the Auckland Region (except motorways and state highways

More information

DraFt EnvironmEntal StatEmEnt

DraFt EnvironmEntal StatEmEnt PHASE ONE DraFt EnvironmEntal StatEmEnt Community Forum Area Report 7 Colne Valley HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 7 I Colne

More information

This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One.

This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One. HIGH SPEED TWO INFORMATION PAPER E10: CARBON This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One. It will be of particular interest to those potentially affected by

More information

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary Final WNGLDC Environment Agency Title We are The Environment Agency. It's our job to look after your environment and make it

More information

Passenger service for the Dudding Hill line: brief for feasibility study

Passenger service for the Dudding Hill line: brief for feasibility study Appendix 1: Specification for a Study Passenger service for the Dudding Hill line: brief for feasibility study Introduction The West London Alliance is currently investigating ways of accommodating the

More information

Main Works Civils Contract C2

Main Works Civils Contract C2 Main Works Civils Contract C2 Simon Matthews Interface Manager Eiffage Kier JV Main Works Civils Contract 1MC07-CEK-SE-PRE-CS07_CL24-000001 Outline Introductions MWCC Delivery Stages and Outcomes Design

More information

Radstone Fields, Brackley Construction Traffic Management Plan Taylor Wimpey & Barratt Strategic

Radstone Fields, Brackley Construction Traffic Management Plan Taylor Wimpey & Barratt Strategic Radstone Fields, Brackley Construction Traffic Management Plan Taylor Wimpey & Barratt Strategic April 2011 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft for Client Draft following

More information

SUBJECT: LONDON SOUTHEND AIRPORT & ENVIRONS JOINT AREA ACTION PLAN (JAAP) PRE-SUBMISSION PLAN

SUBJECT: LONDON SOUTHEND AIRPORT & ENVIRONS JOINT AREA ACTION PLAN (JAAP) PRE-SUBMISSION PLAN REPORT TO THE MEETING OF THE EXECUTIVE 5 DECEMBER 2012 PORTFOLIO: PORTFOLIO HOLDER FOR PLANNING AND TRANSPORTATION REPORT FROM HEAD OF PLANNING AND TRANSPORTATION SUBJECT: LONDON SOUTHEND AIRPORT & ENVIRONS

More information

The Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015

The Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015 The Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015 1. The Plans 1.1 What are you doing and why? Demand for rail travel between Sheffield and Manchester is increasing,

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018

Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall Greater Cambridge Partnership Recommendations from the Ely to Cambridge A10 Transport Study and proposed

More information

Chapter 7 Route Window NE6 Goodmayes station. Transport for London

Chapter 7 Route Window NE6 Goodmayes station. Transport for London Chapter 7 Route Window NE6 Goodmayes station GOODMAYES STATION 7 Route Window NE6 Goodmayes station Baseline conditions 7.7 This route window is in the London Borough of Redbridge. Goodmayes station is

More information

F2: INFRASTRUCTURE MAINTENANCE DEPOT STRATEGY

F2: INFRASTRUCTURE MAINTENANCE DEPOT STRATEGY HIGH SPEED TWO INFORMATION PAPER F2: INFRASTRUCTURE MAINTENANCE DEPOT STRATEGY This paper outlines the reasons for the proposed infrastructure maintenance depot strategy for HS2. It will be of particular

More information

Primary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane.

Primary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane. 17. SERVICES 17.1 Introduction 17.1.1 WSP Development Limited has been appointed by CALA Homes to investigate and appraise the availability of services to serve a proposed mix-use development of approximately

More information

TOWN AND COUNTRY PLANNING ACT

TOWN AND COUNTRY PLANNING ACT Environment Directorate Lancaster City Council Regeneration and Policy Team Planning Advice Team PO Box 4 Town Hall Lancaster LA1 1QR County Council Phone: (01772) 534057 Fax: Email: Neil.Stevens@lancashire.gov.uk

More information

Chapter 12. Interaction with other major projects

Chapter 12. Interaction with other major projects Chapter 12 Interaction with other major projects 494 12.1 Introduction 12.1.1 This chapter describes the cumulative impacts arising from the interaction between the construction of Crossrail and other

More information

North Northamptonshire Joint Core Strategy Examination

North Northamptonshire Joint Core Strategy Examination North Northamptonshire Joint Core Strategy Examination Joint Position and Delivery Statement By North Northamptonshire Joint Planning Unit, Kettering Borough Council And Persimmon Homes Midlands Policy

More information

PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F)

PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F) PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F) 1 Introduction This briefing note summarises some of the

More information

G4: APPROACH TO TRAINING AND EMPLOYMENT

G4: APPROACH TO TRAINING AND EMPLOYMENT HIGH SPEED TWO INFORMATION PAPER G4: APPROACH TO TRAINING AND EMPLOYMENT This paper outlines the arrangements proposed for training and employment in the relation to the construction and operation of HS2

More information

SEARs project justification and conclusion

SEARs project justification and conclusion 31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need

More information

Frequently Asked Questions Connecting Palo Alto

Frequently Asked Questions Connecting Palo Alto Frequently Asked Questions Connecting Palo Alto www.cityofpaloalto.org/connectingpaloalto General Project Questions Q1: What is Connecting Palo Alto? A1: Connecting Palo Alto (formerly the Palo Alto Rail

More information

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress IPSWICH NORTHERN ROUTES STUDY Stage 1 Progress 17 th January 2017 STUDY CONTEXT 2 The study is being funded in partnership with the Suffolk district and borough councils. Work forms part of the Suffolk

More information

Excavated Material and Waste Management

Excavated Material and Waste Management Excavated Material and Waste Management The purpose of this factsheet is to set out the objectives which are expected to be adopted and the measures that are expected to be put in place for managing excavated

More information

Chapter 17 Cumulative Impacts

Chapter 17 Cumulative Impacts Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Proposed Petone to Grenada Link Road Options

Proposed Petone to Grenada Link Road Options Report 15.41 Date 2 March 2015 File TP/03/29/02 Committee Author Regional Transport Committee Chris Upton, Chair Chief Executives Forum Proposed Petone to Grenada Link Road Options 1. Purpose This report

More information

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement Non Technical Summary Business and Environmental Services A responsive County Council providing excellent and efficient local services

More information

The Nine Elms Vauxhall Partnership. London Borough of Lambeth London Borough of Wandsworth. Construction Charter. Summary SB15-22 APPENDIX 1

The Nine Elms Vauxhall Partnership. London Borough of Lambeth London Borough of Wandsworth. Construction Charter. Summary SB15-22 APPENDIX 1 The Nine Elms Vauxhall Partnership London Borough of Lambeth London Borough of Wandsworth Construction Charter Summary Draft 5.0 30 Jan 15 1 1. Introduction 1.1 The Nine Elms Vauxhall Partnership comprises

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 24, 2017

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 24, 2017 TO: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 24, 2017 FROM: SUBJECT: KELLY SCHERR, P. ENG, MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER CONTRACT AWARD:

More information

Nicola Detheridge Joint Northern Studies - Stakeholder Reference Group Partner Engagement Manager, Transport for the North

Nicola Detheridge Joint Northern Studies - Stakeholder Reference Group Partner Engagement Manager, Transport for the North Nicola Detheridge Joint Northern Studies - Stakeholder Reference Group Partner Engagement Manager, Transport for the North Housekeeping Have we all signed in? Fire alarms and exits Phones Toilets Agenda

More information

Fishermans Bend Integrated Transport Plan Peer Review John Kiriakidis, GTA Consultants 28/03/2018

Fishermans Bend Integrated Transport Plan Peer Review John Kiriakidis, GTA Consultants 28/03/2018 Fishermans Bend Integrated Transport Plan Peer Review John Kiriakidis, GTA Consultants 28/03/2018 GTA creating transport that works 01 Preliminaries GTA creating transport that works Review scope : Review

More information

RE THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER OPENING SUBMISSIONS ON BEHALF OF SUFFOLK COUNTY COUNCIL

RE THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER OPENING SUBMISSIONS ON BEHALF OF SUFFOLK COUNTY COUNCIL RE THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER OPENING SUBMISSIONS ON BEHALF OF SUFFOLK COUNTY COUNCIL Introduction 1. This purpose of this public inquiry is to assess Network Rail s application

More information

Chapter 10 Route Window NE9 Romford station and depot (east) Transport for London

Chapter 10 Route Window NE9 Romford station and depot (east) Transport for London Chapter 10 Route Window NE9 Romford station and depot (east) ROMFORD STATION AND DEPOT (EAST) 10 Route Window NE9 Romford station and depot (east) Introduction 10.1 The Romford Maintenance Depot will

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Western Rail Link To Heathrow

Western Rail Link To Heathrow Non-T echnical Summar y - Initi al Envir onmental Infor mati on R eport Networ k R ail Western Rail Link To Heathrow Network Rail Non-Technical Summary - Initial Environmental 129088-JAC-REP-HEN-000014

More information

Rail Freight Terminal

Rail Freight Terminal Rail Freight Terminal One of a series of background topic papers prepared by db symmetry in support of a public consultation on proposals for a strategic rail freight interchange in Blaby district, to

More information

Chichester District Council. THE CABINET (SPECIAL) 8 June 2018 THE COUNCIL (SPECIAL) 8 June 2018

Chichester District Council. THE CABINET (SPECIAL) 8 June 2018 THE COUNCIL (SPECIAL) 8 June 2018 Chichester District Council THE CABINET (SPECIAL) 8 June 2018 THE COUNCIL (SPECIAL) 8 June 2018 1. Contacts A27 Chichester Bypass Improvements: Submission to the Government s Roads Investment Strategy

More information

B6: RAILWAY POWERS IN THE HYBRID BILL

B6: RAILWAY POWERS IN THE HYBRID BILL HIGH SPEED TWO INFORMATION PAPER B6: RAILWAY POWERS IN THE HYBRID BILL This paper provides an overview of the purposes and practical implications of the Railway Matters clauses (clauses 37 to 42 and Schedules

More information

D9: MAINTENANCE OF PUBLIC UTILITIES

D9: MAINTENANCE OF PUBLIC UTILITIES HIGH SPEED TWO INFORMATION PAPER D9: MAINTENANCE OF PUBLIC UTILITIES This paper outlines what will be done to mitigate any risks of disruption to public utilities during construction of Phase One of HS2.

More information

Comments on the ecological content of the HS2 Draft Environmental Statement and associated documents

Comments on the ecological content of the HS2 Draft Environmental Statement and associated documents HS2 Ecology Technical Group HS2 Ltd FREEPOST RTEC-AJUT-GGHH Draft Environmental Statement Consultation PO Box 70178 London WC1A 9HS Chair: Mr D. A. Lowe c/o Warwickshire County Council PO Box 43 Warwick

More information

Sustainability Statement

Sustainability Statement Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Sustainability Statement Doc Ref: 7.07 Appendix B.21 Greenwich Pumping Station

More information

E9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE

E9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE HIGH SPEED TWO INFORMATION PAPER E9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE This paper outlines how the combined impact of Phase One of the HS2 project and potential climate change, on the receiving

More information

Llywodraeth Cymru / Welsh Government A487 New Dyfi Bridge Environmental Statement Volume 1: Chapter 3 Alternatives Considered

Llywodraeth Cymru / Welsh Government A487 New Dyfi Bridge Environmental Statement Volume 1: Chapter 3 Alternatives Considered Llywodraeth Cymru / Welsh Government Environmental Statement Volume 1: Chapter 3 Alternatives Considered 900237-ARP-ZZ-ZZ-RP-YE-00026 Final issue September 2017 This report takes into account the particular

More information

E3: EXCAVATED MATERIAL AND WASTE MANAGEMENT

E3: EXCAVATED MATERIAL AND WASTE MANAGEMENT HIGH SPEED TWO INFORMATION PAPER E3: EXCAVATED MATERIAL AND WASTE MANAGEMENT This paper outlines the approach for managing excavated material and waste that will arise from the construction of Phase One

More information

Regional Investment Programme A2 Bean and Ebbsfleet Junction Improvements Preliminary Environmental Information Report Volume 1 Main Text 19/02/18

Regional Investment Programme A2 Bean and Ebbsfleet Junction Improvements Preliminary Environmental Information Report Volume 1 Main Text 19/02/18 Et12 Regional Investment Programme A2 Bean and Ebbsfleet Junction Improvements Preliminary Environmental Information Report 19/02/18 Status: A1 Signed off - Publication Document Ref: HE543917-ATK-EAC-RP-LM-000001.docx

More information

REPORT Condition D19 Permanent Noise Barriers

REPORT Condition D19 Permanent Noise Barriers REPORT Condition D19 Permanent Noise Barriers Project Name: WestConnex New M5 Project number: 15.7020.2597 Revision date: 19/08/2016 Revision: 1 Document Approval Rev. Prepared by Reviewed by Recommended

More information

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

D7: TUNNEL CONSTRUCTION AND METHODOLOGY HIGH SPEED TWO INFORMATION PAPER D7: TUNNEL CONSTRUCTION AND METHODOLOGY This paper outlines the proposed tunnelling methodology. It will be of particular interest to those potentially affected by the

More information

Crossrail Act Schedule 7 Guide

Crossrail Act Schedule 7 Guide Crossrail Act Schedule 7 Guide Document Number: CR-PN-PRW-PL-GN-00005 Document History: Version Date Drafted by Authorised by Reason for Revision 18 Aug 2008 JD This document contains proprietary information.

More information

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June DHL SUPPLY CHAIN: Design and Access Statement June 25 CONTENTS SECTION - The Design and Access Statement SECTION 1.1 The Design and Access Statement 6 1.2 The Planning Application 6 1.3 DHL Supply Chain

More information

150Intr Transport and Strategic Regeneration Welsh Assembly Government New M4 Project Magor to Castleton WelTAG Appraisal Report Stage 1 DRAFT 3 WORKI

150Intr Transport and Strategic Regeneration Welsh Assembly Government New M4 Project Magor to Castleton WelTAG Appraisal Report Stage 1 DRAFT 3 WORKI 150Intr Transport and Strategic Regeneration Welsh Assembly Government WelTAG Appraisal Report Stage 1 DRAFT 3 WORKING DOCUMENT 1 Transport and Strategic Regeneration Welsh Assembly Government WelTAG Appraisal

More information

Welsh Government M4 Corridor Enhancement Measures (CEM) Participation Report Executive Summary

Welsh Government M4 Corridor Enhancement Measures (CEM) Participation Report Executive Summary M4 Corridor Enhancement Measures (CEM) Participation Report Executive Summary Issue 5 August 2013 This report takes into account the particular instructions and requirements of our client. It is not intended

More information

Option Assessment Report for Cambourne to Cambridge Better Bus Journeys

Option Assessment Report for Cambourne to Cambridge Better Bus Journeys Option Assessment Report for Cambourne to Cambridge Better Bus Journeys Table of Contents EXECUTIVE SUMMARY... 2 PART 1 BACKGROUND SETTING THE SCENE... 6 Introduction... 6 Objectives of the Scheme... 7

More information

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) for a proposed development at the

More information

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS FINAL REPORT SEPTEMBER 2010 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 EXISTING TRAFFIC CONDITIONS 2 3.0 FUTURE TRAFFIC CONDITIONS 3 4.0 POTENTIAL IMPACTS

More information

M6 Junction 19 Improvements Scheme Assessment Report PCF Stage 2 B /OD/080

M6 Junction 19 Improvements Scheme Assessment Report PCF Stage 2 B /OD/080 PCF Stage 2 B2111100/OD/080 Revision 2 March 2017 Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363

More information

Relocation of Hillingdon Outdoor Activities Centre to New Denham Quarry including an extension to the mineral working area

Relocation of Hillingdon Outdoor Activities Centre to New Denham Quarry including an extension to the mineral working area Relocation of Hillingdon Outdoor Activities Centre to New Denham Quarry including an extension to the mineral working area Volume 2 Non-technical summary May 2016 CS525B Relocation of Hillingdon Outdoor

More information

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10 22 NETWORK UTILITIES 22.1 ISSUES 3 22.2 OBJECTIVES 4 22.3 POLICIES 4 22.4 RULES 6 22.5 PERFORMANCE STANDARDS 10 Whanganui District Plan (15 January 2018) Chapter 22 Network Utilities 22-1 22 NETWORK UTILITIES

More information

Consultation response. February 2014

Consultation response. February 2014 Department for Transport National road and rail networks: draft national policy statement Consultation response pteg Support Unit Wellington House 40-50 Wellington Street Leeds LS1 2DE 0113 251 7445 info@pteg.net

More information

Our approach to Options Appraisal

Our approach to Options Appraisal Our approach to Options Appraisal 2012 National Grid / 1 Options Appraisal / 2 Appraisal Topics / 8 Technical Considerations / 10 Environmental Considerations / 12 Socio-economic Considerations / 14 Cost

More information

It will be of particular interest to those potentially affected by the Government s proposals for high speed rail.

It will be of particular interest to those potentially affected by the Government s proposals for high speed rail. HIGH SPEED TWO INFORMATION PAPER E8: ARCHAEOLOGY This paper outlines HS2 Ltd's approach to assess and reduce as far as reasonably practicable the impact on archaeological remains that could result from

More information

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail

More information

Coleorton Parish Council Response to HS2 Draft Environmental Statement

Coleorton Parish Council Response to HS2 Draft Environmental Statement Coleorton Parish Council Response to HS2 Draft Environmental Statement 1. Introduction Coleorton Parish Council wish to put forward this response to the Draft Environmental Statement to be considered by

More information

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone Chapter 4 Mixed Activity Zone 4. MIXED ACTIVITY ZONE 4.1 RESOURCE MANAGEMENT ISSUES 1. Activities adjoining main arterial roads can adversely affect the safety, sustainability and efficiency of the network.

More information

Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies

Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies . Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka.1 Issues, Objectives and.1.1 Resources, Activities and Values Business activities occur throughout the commercial, service and

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

Managing Site Compounds & Containers

Managing Site Compounds & Containers BEST PRACTICE GUIDANCE No. W2013/0913 Managing Site Compounds & Containers It should be recognised that this best practice guidance does not replace any existing legal requirement placed upon organisations

More information

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project 06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval

More information

MINUTES OF ORAL EVIDENCE. taken before HIGH SPEED RAIL COMMITTEE. On the HIGH SPEED RAIL (LONDON WEST MIDLANDS) BILL

MINUTES OF ORAL EVIDENCE. taken before HIGH SPEED RAIL COMMITTEE. On the HIGH SPEED RAIL (LONDON WEST MIDLANDS) BILL PUBLIC SESSION MINUTES OF ORAL EVIDENCE taken before HIGH SPEED RAIL COMMITTEE On the HIGH SPEED RAIL (LONDON WEST MIDLANDS) BILL Tuesday 24 February 2015 (Afternoon) In Committee Room 5 PRESENT: Mr Robert

More information

Land at Penny Pot Lane, Killinghall

Land at Penny Pot Lane, Killinghall NORTH YORKSHIRE COUNTY COUNCIL BUSINESS and ENVIRONMENTAL SERVICES LOCAL HIGHWAY AUTHORITY Proposed Development: Location: Applicant: Outline Application for erection of 600 dwellings, primary school,

More information

H28. Special Purpose Quarry Zone

H28. Special Purpose Quarry Zone H28. Special Purpose Quarry Zone H28.1. Zone description Mineral resources are important to Auckland s economy and development. The Special Purpose Quarry Zone provides for significant mineral extraction

More information

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary Sizewell B Dry Fuel Store Environmental Statement Non-Technical Summary NON TECHNICAL SUMMARY 1 INTRODUCTION This Non Technical Summary (NTS) is submitted as part of the application to extend the existing

More information

NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY

NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY October 2012 1 NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY October 2012 Position Statement Status The purpose behind this Position

More information

Traffic Impact Study Requirements

Traffic Impact Study Requirements [TYPE THE COMPANY NAME] Traffic Impact Study Requirements County of San Mateo Department of Public Works Roadway Services 9/1/2013 I. Introduction The County of San Mateo (County), Department of Public

More information

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards 06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards THE APPLICATION Planning permission is sought for the construction of a noise attenuation

More information

REPORT /TA WORKING DRAFT NTS EDEN WESTWOOD TRANSPORT ASSESSMENT WORKING DRAFT NON TECHNICAL SUMMARY

REPORT /TA WORKING DRAFT NTS EDEN WESTWOOD TRANSPORT ASSESSMENT WORKING DRAFT NON TECHNICAL SUMMARY REPORT 62102063-200/TA WORKING DRAFT NTS EDEN WESTWOOD TRANSPORT ASSESSMENT WORKING DRAFT NON TECHNICAL SUMMARY CONSULTATION DRAFT AUGUST 2016 EDEN WESTWOOD TRANSPORT ASSESSMENT WORKING DRAFT NON TECHNICAL

More information

Industry Briefing Surface and Viaduct Civil Works Contract

Industry Briefing Surface and Viaduct Civil Works Contract Industry Briefing Surface and Viaduct Civil Works Contract 2 North West rail link Introduction The North West Rail Link is one of Australia s largest ever transport infrastructure projects. It is a priority

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Non-technical summary March 2016

More information

Welcome. A19 Downhill Lane junction improvement scheme. Tell us what you think today

Welcome. A19 Downhill Lane junction improvement scheme. Tell us what you think today Welcome Thank you for coming. We want to hear your views on our proposed improvements to the. We have developed a scheme for that would increase the s capacity, ease the flow of traffic and improve road

More information

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices Crossrail Environmental Statement Volume 9c Appendices Westbourne Park Bus Garage Extension Environmental Statement Volume 2 Appendices 9c If you would like information about Crossrail in your language,

More information